Tourism development plan of the Spa-Francorchamps
Transcription
Tourism development plan of the Spa-Francorchamps
Tourism development plan of the Spa-Francorchamps destination Wallonia- Belgium Offering Memorandum www.spi.be/fr/destination-francorchamps March 2013 Preamble Preamble The project destination Spa / Francorchamps is aiming to build an "innovative tourist resort" based on the current and future activities of the Spa / Francorchamps circuit and the green region. The region is characterised by its nature, forests and lakes and has the Walloon region's richest concentration of tourism resources: spa and wellness, nature and outdoor activities, skiing and walking trails, mountain biking and cycling, gastronomy, heritage and historic towns in the nature reserve of Hautes Fagnes (the largest nature reserve in Belgium). This project will be implemented through a partnership between public authorities and private operators. It aims to structure and organise an overall tourism product focused on diverse leisure activities and day trips, as well as on stays in charming accommodation (boutique hotels, rural houses, bed and breakfasts, ...), ecoresorts and innovative accommodation options (glamping, a forest village, ...) and a golf course residential development. The role of the Public Authorities of Wallonia will be to: The role of Private Operators / Investors will be to: • Ensure the good land management of the project and guarantee its sustainability; • Invest in tourism projects which offer tourists / visitors a quality experience. • Develop the necessary basic infrastructure and appealing attractions (circuit, ...); • The different business projects may be divided or grouped into batches in order to offer attractive opportunities to operators (theme park based on automotive experience and transport history, bistros and restaurants, outdoor activities in natural settings, fitness activities, sports). • Ensure consistency in urban planning and development. 2 Table of Contents The opportunity Page 4 Background information on the destination Page 8 Concept Page 20 Conceptual Masterplan Page 23 Project Components Page 27 Development Programme Page 40 Financial and Economic feasibility Page 42 Appendice Page 69 3 A unique opportunity 4 The Opportunity The implementation of the project Implementation of the project The project can be entrusted to a single operator/investor or a developer associated with partners in each industry. It can thus be awarded in several homogeneous lots, namely • Theme park: Energy Motion focused on Automobile, transportation and technological innovation; • Experience in the Forest focused on outdoor activities in the nature, the Village in the trees, mountain bike, cycle touring and rambling; • Accommodation, namely ecological and unusual accommodation, the Spa/Wellness Hotel, Glamping, tourism Resorts in the region surrounding the circuit. These can be conceded in different lots (real estate golf, boutique hotel and wellness, unusual accommodation and glamping). The various projects around the Francorchamps circuit will be related to existing sites: Botrange Nature Centre, Berinzenne Forest House, the Libert Farm bike park , Ovifat and Mont des Brumes ski slopes, Stavelot Abbay and Malmedy Monastery, as well as the Spa thermal centre, in order to build a network of facilities which offers quality leisure experiences. 5 Preamble A unique opportunity to operate an innovative tourism destination in the Ardennes with great potential 1. The Destination Destination easily accessible by road and motorway; Destination close to the main markets for short stays and excursions : • Dutch market: 15 million inhabitants • German market of the Rhur Region: 30 million inhabitants • Belgian market: 10 million inhabitants This destination is a green oasis in the highly industrialised and urbanised north-west of Europe This destination welcomes large numbers of tourists all year round in every season (summer, autumn, winter, spring) 2. The project The project is an innovative and ecological tourism resort; It addresses many different customer segments on the basis of the new consumption trends; It is based on experiencing nature actively and on new transportation technologies; It offers educational fun (edutainment) in a unique environment 3. An initiative of the Walloon Region and the regional stakeholders The Walloon Region, main public funding contributor, backs the project and guarantees its sustainability along with that of the urban framework. The project is supported by local stakeholders 4. Key financial numbers of the project Investments Public €25,6 million Private € 36 millions IRR Components only 9,1% Net Present Value Total investment 1,7% Components only + €3,5 millions Total investment -€18,4 millions 6 Preamble This project is supported by the Public Authorities This project is supported by the Walloon region, main owner of the site and main public operator supported by the local stakeholders (provincial, intermunicipal, municipal and the whole of the tourism/catering industry). This project provides many guarantees for Operators / Investors and is a unique investment opportunity for the tourism/leisure business in the Wallonia territory: • Investment and employment incentives from the Walloon regional authority • It is located in the centre of the golden triangle of the Belgian Ardennes; • It is very accessible for the Dutch (15 million inhabitants), German-Ruhr (30 million inhabitants) and Belgian markets (10 million inhabitants); • Sound land management will be ensured by the public authorities; • The successful completion of the project is guaranteed by the strong presence of public investment and consistent planning (design, action and management unit) within the framework of the signing of long-term contracts between public authorities and private partners; • It will generate wealth, prosperity and employment Private operators will be able to work with a unique and powerful partner for the monitoring and development of the territory. The incentives, the quality of the resource, the guarantees of the government and the support from public organizations involved - make this project a unique business opportunity for the tourism business in Wallonia 7 Background information on the destination 8 The destination of Spa-Francorchamps The destination of Spa Francorchamps is located in southeastern Belgium in the province of Liège. Situated in the Ardennes, this region is particularly green making it a popular destination for sports and eco-tourism. It is perfect for a holiday centred around extreme sports, as well as being ideal for hiking and exploring nature. This region borders on Germany and Luxembourg making it an ideal venue for hosting international tourists. Moreover, it is particularly well served by several transport modes such as air, rail and road. For example, the E42 motorway goes through the centre of the region on its way to Germany; the station of Liège receives high speed trains and the airports of Liège and Maastricht are located at less than 100 km. 9 9 Potential clients in the project region The high population density means that within a radius of 50 to 300 km south of Belgium there are Volume of population, among the most affluent in Europe, within a 50 to 300 km radius in southern Belgian around the provinces of Namur-Luxembourg (in millions) more than 66 million people, representing an important customer potential for Wallonia 2 Million inhabitants This population represents potential clientele with easy access to Wallonia, particularly from the 9 Million provinces of Namur, Luxembourg and Liège inhabitants In addition, the GDP per capita of the countries around Wallonia, are among the most affluent in 20 Million Europe (figures in Euros in 2012): inhabitants • Luxembourg: €69,170 • Netherlands: €33,450 60 Million inhabitants • Belgium: € 30,290 • France: € 27,550 • Germany: € 31,320 • Great Britain: € 27,870 Site of Spa Francorchamps In the particular case of Francorchamps, estimated 50 million consumers are within a 250 km radius of the city Source: CITW and T&L research 10 Accommodation supply in the Walloon Region Distribution of tourist accommodation capacity (in beds) in 2008 The offering of tourist accommodation consisted of Regional tourism; 20.572; 21% 97,003 beds in 2008, including all types of accommodation, of which camping represents 31% Social tourism; 6.597; 7% Holiday towns; 17.275; 18% and hotels 23% of beds High density of tourist accommodation in the south-east of the region: provinces of Luxembourg, Namur and Hotels; Hotels 22.502; 23% Camp grounds; 30.057; 31% the south of the province of Liège Accommodation capacity in beds (2008): distribution by province Liege Province has 25% of the tourism beds registered Namur; 19% in the Walloon Region Luxembourg; 43% Brabant Wallon; 4% Hainaut; 9% Liège; 25% Sources: Strategic structural plan and evaluation of the tourist offer of the Wallonia region, KPMG, 2007 and CITW 11 Attractions in Wallonia There are many tourist attractions in Wallonia, generally of small size and intended for all segments Attractions classified by categories Castles and fortresses; 8% More than 8 out of 10 attractions register less than 50,000 visitors per year There are a large number of attractions, especially of traditional types, in scattered tt d locations l ti andd mostly tl with ith low l attendance tt d fi figures Historical homes and buildings; 6% Nautical attractions; 9% Recreational centres and parks; 10% Natural attractions; 12% Museums; 55% Museums are the most visited type of attractions followed by nature Tourist attraction attendance attractions and recreation parks Nature-related attractions represent 12% of the attractions classified and there is an opportunity for development. 100,000 to 200,000 visitors 5,0% 75,000 to 100,000 visitors 4,0% 200,000 to 500,000 4,0% More than 500,000 visitors 0,5% 50,000 to 75,000 visitors 5,4% Source: CITW 20,000 to 50,000 visitors 20,8% 0 to 20,000 visitors 60,4% 12 The tourist attractions offering in the Walloon Region and surroundings The current offer of tourist attractions in the province of Liège, and particularly near the Spa-Francorchamps Circuit is important Tourism Attractions in the Walloon Region Around the Spa-Francorchamps site, there are many sports, nature and culture tourist attractions • Nature: Botrange Centre, Bérinzenne Centre,.. • Sports: Ravel bike trail, Hautes Fagnes rail bike, RACB Karting Club… • Cu Culture: tu e Sta Stavelot e ot Abbey bbey Museum, useu , ... In Wallonia, tourist attractions are located mainly in the green zone of Wallonia, namely in the provinces of Liège and Namur The "nature" aspect is important for hikers and tourists in the SpaFrancorchamps area Attractions around the Walloon Region -Competitive Environment There are many urban destinations around Wallonia: they are well known, with quality cultural policy and/or events, listed in "city break" guides / websites for online or off-line travel agents and tour operators The number of visits to the main sites in neighbouring countries of Belgium ranges between 150,000 visitors per year and 2.3 million visitors (e.g. Phatasialand)... There are twenty recreational and leisure attractions in the surrounding areas (excluding the French and Belgian coast). From this point of view, the Walloon offering seems to be wider than in the surrounding areas In the outdoor activities niche, the main competitor is France However, the offer of tourist attractions is fragmented, and there are many small structures that offer individual experiences In the Netherlands and Germany, destinations of this type exist but on much smaller sites (Eifel, Heuvelland ...) The existence of numerous ski slopes near the site of SpaFrancorchamps is an opportunity for the development of new activities and leisure products. For activities related to automobiles and sports, the circuit of Nürburgring is a potential competitor There is a development opportunity for tourism activities related to nature and sports by further developing the existing supply Source: T&L research and Strategic Plan for the structuring and enhancement of the Walloon Region tourism offer, KPMG, 2007 13 Development opportunities in the Walloon Region Main conclusions of the market study • Belgium is strategically located in the heart of Europe and has a concentration of large populations (20 million inhabitants). • The Spa-Francorchamps site is easily accessible by high-speed train to Liège, by plane to Liège airport and by roads and highways. • The main source markets of Wallonia are Belgium (60%; Flemish market mainly) and the Netherlands (22%). • Apart from stays, day trips are popular with Walloons and Flemish. • Business tourism in Wallonia has potential, especially through “rural seminars" corresponding to business meetings organized in rural areas. • The leisure activities offering is varied but disparate; sites are often small, scattered across the Walloon region. • Recreational attractions, leisure and sports are essential for the Walloon tourism economy, both for day-trips in the most populated areas and also to meet the expectations of customers in rural areas which are heavily dependent on tourism. • Fitness is booming in Wallonia, mainly in the hotel services offer. • The accommodation and leisure supply in Wallonia is mainly formed by campgrounds and small hotels requiring general upgrading of the offer (except 5 stars boutique hotels) There is an opportunity to develop tourism and recreational products in nature which will mainly attract Belgian customers, and foreigners by developing short stays for the Dutch, German and French markets (leisure and team building) 14 The destination of Spa-Francorchamps The Spa-Francorchamps destination is divided into two major areas: • Les Hautes Fagnes with its natural park • The space around the circuit formed by the cities of Spa, Malmedy and Stavelot with Francorchamps at its centre Legend of the Destination Map Surrounding villages and towns Different activities in the destination Existing activities in the destination New activities in the destination Road network between Stavelot, Francorchamps, Spa and Malmedy Bike trails and hiking paths Highway (A-27) 15 The destination of Spa-Francorchamps Four cities provide the backdrop to the Spa-Francorchamps destination: Spa, Stavelot, Francorchamps and Malmédy. Each ones adds value to this tourist area; while all share common cultural traits. • The city of Spa is the thermal waters centre. Labelled as "Europe's café", Spa was recognized as a holiday resort thanks to its casino, one of the first in Europe, its thermal cures and its golf course • Stavelot is an historic town, cultural and heritage town. Especially notable are Place St Remacle and the Abbey, a protected site and monument, which hosts the Spa-Francorchamps museum, the Abbey museum and the Apollinaire museum. The town comes alive each year through its music festival and the Laetare, popular Carnival, famous for its “Blancs Moussis”. • The town of Francorchamps is located at the heart of the destination and is famous for its race track which hosts events such as the F1 Belgian Grand Prix and the 24 Hour Race. There are activities organised all year round in the best race track in the world, at the heart of an amazing natural setting. • Malmédy, the gateway to the Hautes Fagnes, is located in an exceptional environment near large natural reserves. The town is a lively commercial and tourist centre. Its carnival is famous because of the folk traditions that can be discovered throughout the year in the "Malmundarium", hosted in the monastery. The city of Spa Malmédy town Spa-Francorchamps circuit Stavelot Abbey 16 Spa-Francorchamps circuit The Spa-Francorchamps circuit is an automobile race track, well known both for its international Formula 1 race as for its long and illustrious history. It was developed in the 1920s in the Stavelot municipality, in an outstanding natural setting. Located in the midst of a lush forest, it is so well integrated that the views from the race track are breathtaking. Two sites around the circuit are classified as Natura 2000 protected areas. Formula 1 At present, present many races are organised in the circuit from March to September such as the Spa 1000km, the Spa 24 hours, the Formula 1 Belgian Grand Prix and many others. Automobile clubs can also rent the track to hold private events. The circuit is a renowned iconic asset for the region, but needs to be enhanced and developed by creating activities and attractions nearby. In addition, this new project would enhance economic activities in the circuit in all seasons and Spa-Francorchamps circuit create synergies with new activities developed in the region. 17 The automobile circuit, at the heart of the site revitalisation project Currently, the circuit has many buildings which are mostly under-used but could be integrated into the development of the new project to maximise the profitability of the A existing site. G P Some areas with charm and character could be used to host H B exclusive events, for example the Eau Rouge Hall. Other C areas could be transformed into office or technical E buildings for the new project, and the new paddocks could also be used to hold fairs, flea markets, festivals ... as well I as Formula 1. J D P E K Main buildings on the circuit A. Old Customs House B. L’Eau Rouge Hall C. Existing Paddocks D. Karting track E. University F. New paddocks G. Existing Buildings H. Existing Buildings I. Existing Buildings J. New Thermal Springs hotel: P. Parking areas 18 Strengthening of a well-established tourism destination This new project fits perfectly into the destination complementing the existing supply and serving as a lever for the entire region The Spa Francorchamps Circuit is situated in the heart of Eastern Belgium's Golden Triangle of green tourism. Today, the Hautes Fagnes destination is already a destination of choice for Belgians, Dutch and Germans for hiking and discovering nature. The town of Spa is a thermal destination par excellence. The hotel portfolio is being rapidly modernised (more than 4 new openings in 2 years). This region therefore has major potential for the development of green tourism in Wallonia. The new project of the destination Spa-Francorchamps is an important investment for the region to create a tourism cluster and take advantage of the fame of the Formula 1 racing circuit. This project leverags the two strengths that the destination offers: its natural environment and the circuit. Thanks to various experiences developed, these two opposites can become complementary and combined to form a rich and unique tourism proposition. As shown in the figures, the region greatly benefits from the implementation of the project, both economically and in terms of job creation. Direct revenue Indirect revenue TOTAL €127.5 million €63.5 million €191million Direct jobs Indirect jobs TOTAL 670 people 1,900 people 2,570 people Environmental value of the project • Preserving the environment and ensuring long-term sustainable development is at the core of the project • Moreover, this project aims to change the image of the Spa-Francorchamps circuit into a unique site which uses new green technologies as a springboard between nature and the adrenaline-motor side 19 Concept 20 The vision of the new project This new vision includes key new customer segments The vision Spa-Francorchamps destination is located in the Spa-MalmédyStavelot triangle; also including the green area located on the Hautes Fagnes plateau. This new destination takes you to an area of innovation which fuses sports and leisure, offering an authentic and complete experience to allow you to reconnect with nature at any time of year. It offers “Motion/Action”, relaxation and innovation experiences. Rejuvenate, amaze yourself, discover the rhythm of nature by choosing the "RELAXATION" option. Thrill yourself with recreational and sports activities designed to boosts the adrenaline, experience nature and activities anchored in new technologies, by choosing the option "MOTION / ACTION ». Thanks to INNOVATION and green technologies , the discoveries, relaxation and all the action take place in a setting that respects the environment. • Young people wanting to "Feel alive”, looking for sporting activities and adrenaline • Families who enjoy spending time and relaxing together • Seniors who seek to pamper themselves and find peace • Motor sports fans attracted by the big auto events and driving experiences • Sports cycling fans who seek competition, races and the numerous infrastructures tailored to their needs Mouvement Motion / / Action Action ► • Couples who are drawn by the chance to share new experiences Détente Relaxation ll • MICE groups because of the ideal infrastructure and unique offer provided by the region and the circuit 21 Vision Activities related to the new vision of the project Innovation & Green Technology MOTION / ACTION ► Activities Recreation • Ballooning • Flying fox • Treasure hunting • Full-scale role game • Adventure park Adrenaline Sport Automobile • Mountain • Test track bike • Rafting • Free flight • Canoeing • Karting • Circuit Innovation Technologies vertes RELAXATION ll Discovery Wellness • 'Energy-Motion' Centre • Sensory walking • Spa • Simulation centre • Hiking • Spa treatments • Discovery of the applications of • Barefoot trail • Relaxation new green technologies • Electric vehicles • Horse riding • Wildlife discovery • Gastronomy Edutainment 22 Conceptual Masterplan 23 The experiences of the Spa-Francorchamps circuit A Welcome centre/ Discovery Centre B Experience in the forest C ‘Energy-Motion’ experience • Main welcome area • Hanging village • Events • Satellite welcome area • Nature & Adventure Park • ' Energy-Motion' Innovation Centre • Virtual welcome area • Adventure Games • Museum of the History of Spa- Francorchamps • Travel planner • Welcome boards Regional Experience Cycling Experience Business zone - Technology Park Services 24 Concept map of possible cluster sites around the circuit and in the SpaFrancorchamps region Amphitheatre Events ‘Energy-Motion' Innovation Centre Experience in the forest MiniWelcome centre Hanging village ‘ Energy-Motion’ experience Highway rest area of Cronchamps Tourism experience SpaFrancorchamps Museum Spa-Francorchamps circuit Nature and Adventure Park Adventure Games Paths-TrailsTracks lr Business zone Business zone Regional Experience Activities in the region Cycling Experience Mountainbike / cycling Experiences to be developed in the entire SpaFrancorchamps destination 25 Conceptual Masterplan of the project Conceptual master plan Vers l’A-27 Pistes cyclables vers la Ferme Libert 12 1 21 20 19 23 12 11 10 12 2 24 18 15 12 12 23 24 16 5 22 17 Vers Malmedy 6 8 9 3 7 14 Vers Stavelot 14 4 Vers le Mont des Brumes 13 Vers Malmedy 1. 1 Mini welcome centre 2. 2 Starting point for the Experience in the Forest 3. 3 “Spa-Nature” Eco-hotel 4. 4 Other Accommodation 5. 5 Central space for the Experience in the Forest 6. 6 Bar-Restaurant, Hanging Village 7. 7 Enchanted Forest and Hanging village 8. 8 Adventure Playground 9. 9 Themed trails: "Emotions" trail and "Barefoot" trail 10.10 Administrative and Services area 11.11 Nature Park & Adventure area 1212 12. Parking area 13.13 Hiking trails / Barbecue and Picnic Area / Camping sites 14.14 Ravel trail for cycling 15.15 New paddocks and terrace lounge 16.16 L’Eau Rouge Hall - VIP event space 17.17 Gourmet Restaurant at Old Customs House 18.18 Village for "Energy Motion" Experience 19.19 Amphitheatre 20.20 Central space for the "Energy Motion" Experience 21.21 Underground parking 22.22 Schweeb and Indoor Karting 23.23 Gondola (from forest to "Energy-Motion" Experience village) 24.24 Bridges Zones on the master plan I Francorchamps Facilities and Circuit II Experience in the forest III ‘Energy-Motion’ Experience Chemin de vélo vers Stavelot IV "Spa-nature" Eco-Hotel and other accommodation V Cycling and Hiking Space 26 Project Components 27 The components of the Spa-Francorchamps destination 1 Welcome centre Discovery Centre 2 Main welcome area Experience in the forest 3 Experience on the circuit Hanging village Events Nature & AdventurePark ' Energy-Motion' Innovation Centre Adventure Games Museum of the History of Spa-Francorchamps 4 Satellite welcome area Virtual welcome area Travel planner Welcome boards 5 6 Regional Experience Cycling Experience 7 Business zone Technology Park Services Accommodation F&B Retail shops Circulation The main components of the concept are described in this section, the activities explained by components are in the following section 28 Spa-Francorchamps is a destination for everyone, whatever the different groups or segments proposed. The developed activities have been designed to create all seasons destination Segments Characteristics Experience in the forest The ‘ EnergyMotion’ experience Cycling Experience Regional Experience 99 999 999 9 Youth - "Feel alive" • Search for thrills and sports Family Fun • • • Share moments together Entertainment Activities in nature 999 99 9 999 Seniors • Take the time to live 999 9 9 99 Motorsports fans • • Important events Driving experience 9 999 9 9 Cycling sports fans • • • Competition Racing Amateur sport being professionalised 9 99 999 99 Couples • • New experiences together Nature-based activities 999 9 9 99 MICE • • Innovative experiences Research Activities and bid 99 999 9 9 29 The start of the experience: the welcome centres The physical or virtual welcome centres are intended to provide information about the destination, to facilitate the marketing of its products and to improve the visitor experience. Main welcome centre at the Cronchamps rest area The welcome centres are the first contact point for the visitor with the Spa-Francorchamps destination and the activities offered in the Spa-Francorchamps circuit. It is, therefore, important that the centre are especially adapted to the needs of every visitor. Legend of the Destination Map Surrounding villages and towns Different activities in the destination Existing activities in the destination New activities in the destination Road network between Stavelot, Francorchamps, Spa and Malmedy Bik ttrails Bike il andd hiki hiking paths th Welcome centre Highway (A-27) The main gateway to the destination is located on the Cronchamps motorway rest area. This is where the adventure in the SpaFrancorchamps destination starts for the majority of tourists. They can explore all the tourism activities and services available in the region through the information centre and interpretation centre. They will also have the option of leaving their cars at the parking area on the motorway and visiting the region using the different modes of transport available such as 'Vélo-Wallon' electric bikes, electric Virtual Welcome centre Before, during and after their trip, tourists can also use the "Travel Planner“ on their Smartphones through the destination's website. shuttle buses, electric motorbikes linking the circuit attractions to the motorway rest area and making sightseeing visits possible. In addition, as a complement to the Cronchamps motorway rest area, each city (Malmédy, Francorchamps, Spa and Stavelot) will offer tourists an information service on the destination and the possibility to The virtual reception area is an internet platform which allows visitors to plan their trip, book their own accommodation, transport and activities, view real-time weather and traffic conditions or comment on their experience in the destination. make their reservations on site, through their tourist offices. 30 Experience in the forest The Experience in the forest is a place of relaxation and recreation for the whole family At the heart of the Francorchamps forest, there will be no shortage of adventures, walks and discoveries for visitors. The experience of the forest is a place of relaxation and recreation for the whole family. All elements combine to provide an unforgettable experience from the roots to the tops of the trees. The bravest will embark upon the different ropes courses in the trees and give themselves a scare on the "Death ride" flying fox, more than 500m long, as well as taking the plunge from the bungee jumping tower. The Nature and Adventure Park is more than just a ropes course in the trees! Each course in addition to its various physical tests also offers puzzles that will challenge the minds of visitors. Those who are not eager for thrills, but still want fun, will be drawn by the adventure playgrounds. These playgrounds offer fun and sporting activities for both adults and children. Giant wooden structures allow the little ones to play safely while older children can take part in archery, throw javelin or participate in the "Outgame" - a multi-sensory treasure hunt which tests the knowledge of participants like an "Indiana Jones" quest or a "Sherlock Holmes" mystery in a forest setting setting. Images of the types of activities planned 31 Experience in the forest Conceptual master plan of the experience in the forest 2 Starting point for the Experience in the Forest 5 Central space for the Experience in the forest 6 Bar-Restaurant, Hanging Village 7 Enchanted Forest & Hanging Village 8 Adventure Playground 9 Themed trails: Emotions trail and Barefoot trail 10 Administrative and Services area 11 Nature Park & Adventure area 12 Parking area 13 Hiking trails / Barbecue and Picnic Area / Camping sites 23 Gondola (from forest to "Energy-Motion" Experience village) 32 Experience in the forest The Hanging Village is a space in which to live the forest experience. This zone proposes discovery paths such as the Museum Under A Magnifying Glass or the Museum in the Trees, but also trails to delight your senses such as the "Land Art" Emotions trail and the Barefoot trail. Each trail is accessible for everyone (the Museum Under A Magnifying Glass is also adapted for those with disabilities) so anyone can discover the secrets of the forest and the beauty of nature, while moving at their own pace. Architectural imagery 33 33 The "Energy-Motion" experience The adrenalin thrill of motor racing linked to new green technologies This new area in the Spa-Francorchamps circuit proposes to use some of the emblematic buildings as a "mini-village" of attractions. In the "Energy-Motion" Experience village, the Spa-Francorchamps Museum presents the history of the race track and the region to visitors through historical objects, vintage cars, trophies and photos of past champions. Meanwhile, the exhibition at the innovation centre explains advances in eco-technologies relating to green vehicles through an edutainment concept suitable for everyone, in the form of an interactive tour. If some visitors may find these activities too passive, there are three areas that have been designed just for them: the simulation area, the electric karting and the shweeb. In the simulation space, the latest type of dynamic driving simulator allows visitors to drive Formula 1 and Rally vehicles, as well as trying many other sports simulations (mountain bike, bike skiing...). skiing ) In the electric karting, karting visitors can experience eco-friendly eco friendly competitive motor sport. sport The shweeb, shweeb an innovative and eco-friendly transport mode, allows visitors to discover the surroundings of the village for « Energy-Motion » experience. The Spa-Francorchamps destination currently organises many national and international events. To accommodate and improve this events offer, a semicovered amphitheatre for 5,000 people is proposed. This unique structure is constructed of canvas, covering the stage with an auditorium of 2,000 seats. It lets in the light and shadows of the forest into the amphitheatre through its unique design. This incredible site intensifies the beauty of the shows that will take place on the stage. Moreover, the buildings of the circuit and its environment will regularly host events such as markets, car shows, book fairs, a marathon and a variety of active and popular events. 34 The "Energy-Motion" experience Conceptual master plan 13.1 Mini welcome centre 14.12 Parking area 15.15 New paddocks and terrace lounge 16.16 L’Eau Rouge Hall - VIP event space 17.17 Gourmet Restaurant at Old Customs House 18.18 Village for "Energy Motion" Experience 19.19 Amphitheatre 20.20 Central space for the "Energy Motion" Experience 21.21 Underground parking 22.22 Schweeb and Indoor Karting 23.23 Gondola (between the two Experiences) 24.24 Bridges Architectural imagery 35 The "Energy-Motion" experience Some of the unforgettable experiences that make up the "Energy- Motion" Experience with other edutainment and fun Images of the types of activities planned 36 Services available To make the circuit visit a unique occasion, there are restaurants and shops in both experiences offering a range of products to appeal to all visitors Restaurants Retail shops In the Experience in the Forest, The Hanging Village offers "La Pause Détente" fast food restaurant where visitors can enjoy fresh and simple products such as salads and sandwiches. At ground level, the "Slow Food Restaurant" offers meals based on organic local produce. "Le Petit Encas" will delight all lovers of homemade cakes, waffles and crepes. A bike rental shop is available in the main square of the Experience in the Forest, allowing you to explore the forest or the region. There is also a store selling "nature" products for treehouse builders, star watchers and animal lovers, is also available. In the 'Energy-Motion' Experience village, three restaurants are available for visitors. The "Fast-Bio, Fast-Bon", a modern fast food restaurant with a fun u aandd innovative o a e deco decor. Meanwhile, ea e, thee ca cafeteria ete a in tthee Innovation o at o centre, has a range of simple and fast dishes with a "new technologies" theme. "la Brasserie Art déco" offers a menu of typical Belgian dishes. Beside the circuit, in the Old Customshouse building, a gourmet restaurant with around twenty tables, serves Belgian-style nouvelle cuisine in a setting that is historic yet modern, with a multimedia projection of the menu on diners' plates. The Energy-Motion Experience has two souvenir shops: one that is specific to the Spa-Francorchamps museum and aanother ot e ded dedicated cated to tthee innovation o at o space space. Thee Spa SpaFrancorchamps museum shop offers antique collectibles like books or postcards on the circuit and the destination. The Innovation Centre store offers souvenirs with the circuit brand, as well as many innovative technological gadgets. Accommodation After a day full of adventures why not extend your stay and enjoy the unusual accommodation offered in the forest? For those who want a taste of life in the trees, the nests and treehouses are ideal. And for those who prefer to stay down to earth, the 3-star nature eco-hotel or vintage caravans offer comfortable alternatives in the midst of nature. 37 Regional Experience Regional Experience The Spa-Francorchamps destination offers a wide variety of activities that enables all segments to find something to do in the Spa-Stavelot-Malmedy triangle and on the Hautes Fagnes plateau. Regional experience makes it possible to create a synergy between the new project and all existing activities in order to enhance them by involving them in the promotion of the destination and its circulation plans. The Spa thermal baths Plopsa Coo Domaine de Bérinzenne Horse riding centres Spa parachuting club Balloon trips In addition to forming existing operations into a network, new sites will also be set up such as the new golf resort of Hockai or the balloon launch site between, the circuit and the town of Malmedy. Visitors will be able to enjoy thematic experiences such as an "extreme sports" visit, participating in a BMX race on the Ferme Libert circuit or a parachute jump at Spa, a karting race as part of the Energy-Motion experience or canyoning ride in the Coo gorges. gorges They can also enjoy a "nature" nature "Energy-Motion"experience stay with a hiking in the Hautes Fagnes Park, spend a day exploring the new Ravel bike trails and a night in the "Tree houses" of the Experience in the Forest Cycling experience BMX trails Mountainbike trails North Shore trails Noticeboards showing mountainbike trails in the region The cycling experience activities are perfect for sporting holidays in the SpaFrancorchamps region. On the slopes of Mont de Brumes and Ferme Libert, fans of BMX, mountain bike downhill, four cross and downhill biking can practice before taking part in international competitions. Mountain bike trails with different levels are freely accessible for biking in family or for sport. For the most competitive there is the option involving new technologies, with a Smartphone-based timing system allowing the user to compete with every other visitor to the region. For less-sporty bike fans, new Ravel type trails will be created, including one surrounding the circuit, and an electric bike rental system will be created for the whole region: the "Vélo Wallon" scheme - a concept similar to that of "Villo" in Brussels. 38 Circulation within the destination An ecological transport system to discover the destination Destination Spa-Francorchamps has relatively good transport infrastructure with a network of road, motorways and bike trails of good quality. New roads and bike trails, including an extension of the “Ravel” bike rambling trails, should be created to complement the network. An environmentally friendly transport system can then be developed in the destination in order to move easily between the different attractions; it will make it possible to move around using environmentally friendly transport such as small electric buses, electric cars, electric bicycles, electric scooters, etc. These different transport modes are an eco-friendly way to discover the destination, combining motor-powered transport with the need to protect nature. The visitor will be able to enjoy a new experience in a quiet and pollution free environment (edutainment in green transport). In the area of the circuit, visitors will be encouraged to leave their vehicles on the motorway rest area or in the parking area located near the circuit and use the available green transport. Marked mountainbike trail Electric bus Marked hiking trail Electric bike station Main components 'Energy-Motion' Experience Amphitheatre Welcome Centre - Reception Main services of the circuit Nature Park & Adventure Hanging village Adventure Games “Spa-Nature” Eco-hotel Camping and Picnic Area Circulation network Roads Circuit Electric minibus Hiking trail Cycling lanes Cable car “Ravel” bike trail Parking area Buggy ride Horse and cart rides 39 Development programme 40 The project is situated in an area of approximately 50 hectares, of which 50,000m² have already been built upon Built area in m2 Components: Land allocated in m2 Welcome centre / motorway rest area Interpretation centre Total for Welcome Centre Components: 300 300 Built area in m2 Land allocated in m2 640 50 200 80 500 80 100 80 44,000 30,000 9,000 5,000 70,000 15,000 640 30,000 25,000 210,000 6,000 4,000 199,500 500 324,000 Welcome-Reception Interactive Space – Innovation Centre Simulation space Spa-Francorchamps Museum Administrative offices ‘Fast bio fast bon’ ‘Brasserie Art-Deco’ ‘Cafétéria de l’innovation’ Old Customshouse Restaurant Museum Shop Innovation Centre Shop Shweeb Indoor Karting Amphitheatre New Ravel bike trails Total for the "Energy Motion" Experience 200 6,000 3,000 2,350 300 150 250 300 200 100 200 1,500 2,000 10 km 17,800 50,000 25,000 20,000 100,000 Accommodation Tree houses “Spa-Nature” Eco-hotel "Glamping" tent Caravans Yurts Nests Green areas Total Accommodation 20 40 20 10 10 10 4 2 4 2 4 2 80 80 80 20 40 20 800 2,500 400 N/A 200 200 110 18 320 4,100 Parking areas Uncovered parking Covered parking Total Parking Gondola Land size in Total for project Land allocated in m2 Energy-Motion' Experience Experience in the Forest F&B and shops Welcome centre “Slow Food” Restaurant Restaurant "la Pause Détente" Bar B "Le "L Petit P tit Encas" E " Picnic Area Barbecue Area Natural products store Equipment hire store Nature Park & Adventure Adventure course "Death Ride" flying fox Bungee jumping tower Hanging village Barefoot trail "Museum Under A Magnifying Glass" Land Art- Emotions Trail Adventure Playground Kids' Playground Javelin throw / Archery / Climbing wall Outgame Stilts Total for Experience in the Forest Number of Number of Built area in Number of persons per beds units m2 Unit Components: m2 49,390 3,000 15,000 2,000 1,000 800 800 27,400 50,000 Units M2 per place 800 25 20 200 25 5,000 1,000 25 25,000 20,000 5,000 25,000 1,000 10,000 Land allocation in m2 510,020 41 Financial and Economic feasibility 42 Key questions on financial results The objective of the preliminary financial projections is to provide a financial basis for discussions between the operator, the investor and the seller. The results are subject to change. 1. How much investment is needed? • What is the overall investment for the project? • What is the detailed investment per components ? 2. What are the financial results for the project? • What is the return on investment? • What is the value for the project? • What is the investment payback period? 43 The phasing of the site development and construction will be spread over 3 years Phasing of the construction Phasing of the site development Year 1 Year 2 50% 50% Phasing of the construction for the Experience in the Forest 100% Phasing of the construction for the circuit experience 50% Phasing of the construction for the welcome centre Phasing of the accommodations (excepting hotels) 50% Year 3 50% 50% 100% 44 Construction Hypotheses (I) Welcome centre Construction cost for the different components of the welcome centre Unit Price € Sources €/m2 1,100 Gerens-Hill €/m2 1,100 1,100 500 500 1,100 Gerens-Hill Gerens-Hill Wooden structure Wooden structure Gerens-Hill Accommodation € € Sources 82,000 HVS Office, 2009Hotel development survey Experience in the forest Welcome centre F&B Picnic Area Barbecue Area Retail shops Nature and Adventure Park Adventure courses Flying fox- Death Ride Bungee jumping tower €/m2 €/m2 €/m2 €/m2 €/PU €/PU €/PU 250,000 120,000 250,000 Expert Expert Expert 130,000 130,000 500,000 Expert Expert Expert 300,000 500,000 40,000 250 Module.be Expert Cityroc Stelzen Shop 15,275 2,100 300 Ecomobility firm Ecomobility firm Décathlon " Spa-Nature" Eco-hotel * €/per room Tree houses €/PU 50,000 Treehouses Glamping tent €/PU 30,000 www.exclusivetents .fr Caravans €/PU 40,000 On-line caravan sales Yurts €/PU 7,000 Yourte.com Nests €/PU 2,000 Parcabout Hanging village Barefoot trail Emotions trail "Museum Under A Magnifying Glass" €/PU €/PU €/PU Adventure Playground Kids' Playground - javelin throwing space Outgame Climbing wall Stilts Electric bike and Mountainbike Vélo wallon station 10 bicycles + placement Vélo-wallon (similar to Villo in Brussels) Mountainbike €/PU €/PU €/PU €/PU €/PU €/PU €/PU 45 Construction Hypotheses (II) Construction costs 'Energy-Motion' Experience 46 Unit Price €/m2 Sources Parking Welcome- reception Interactive Space Scenography of the interactive space Spa-Francorchamps Museum Scenography of the museum €/m2 €/m2 €/m2 €/m2 €/m2 1,100 1,100 3,000 1,100 900 Gerens-Hill Construction CITW- T&L Construction CITW- T&L Uncovered parking Simulation space €/m2 2,500 IWAY-World Lyon Roads and paths Administrative offices €/m2 1,100 Gerens-Hill Gondola €/PU 7,000,000 MDP Consulting Shweeb €/PU 1,000,000 www.shweeb. com Amphitheatre F&B Retail shops €/m2 €/m2 €/m2 Indoor Electric Karting €/PU 1,100,000 1,100 1,100 1,100 Covered parking €/m2 €/m2 New Ravel bike trails €/km Connecting road Cronchamps- SF 90 T&L Research 680 Gerens -Hill Project Management company 40,000 Expert (4.5km) €/km 450,000 Gerens Hill/ JNC Belgium Gerens-Hill Gerens-Hill Gerens-Hill T&L Research 46 Land development cost hypotheses Land Development € Sources Trail development cost €/m2 20 Gerens -Hill - Project Management company Development cost for the Experience in the Forest €/m2 40 Gerens -Hill - Project Management company Circuit - Energy-Motion Experience development cost €/m2 80 Gerens -Hill - Project Management company Amphitheatre development cost €/m2 20 Gerens -Hill - Project Management company Welcome Centre development cost €/m2 40 Gerens -Hill - Project Management company Accommodation development cost €/m2 40 Gerens -Hill - Project Management company Gondola/ Footbridge development cost €/m2 40 Gerens -Hill - Project Management company Parking areas development cost €/m2 20 Gerens -Hill - Project Management company The price includes all urbanisation costs (road, network, various) 47 Attendance hypotheses For the project, a potential attendance of 600,000 visitors per model year in total, with 430,000 paying and 170,000 non-paying visitors has been assumed Details of the 600,000 visitors: Experience in the Forest: The ‘Energy-Motion’ Experience: Events: Non-paying visitors: 150,000 visitors 180,000 visitors 100,000 visitors 170,000 visitors (40% approx. of all paying visitors) 48 Pricing system Hypotheses (I) • The entry prices for the different activities at the Spa-Francorchamps site were determined based on benchmarks for Belgium and France • A 50% discount will apply for children aged 3-12 Spa-Francorchamps Project Products Ropes course "Death ride" flying fox Bungee jumping tower Experience in the forest 15 13-16 Odyssée verte- Vallon de Villaret- Barefoot trail on the Lac Blanc Kids' Playground- Climbing wall Archery Range 10 4.5-6 Kid Factory 15 10 15 40 15 15 10 15 7 - Other activities & workshops Innovation Centre Dynamic simulators Circuit experience 20 11 15 Price Benchmarking Sources € 15-25 Adventure Parc Wavre, Grimpobranche 11 Lacs de l’Eau d’Heure 29 Wavre Adventure Parc "Museum Under A Magnifying Glass"Barefoot trail - Emotions-Land Art path Outgame Activities €/ Adult Price assumption for the project Karting Shweeb Other activities & workshops Events Spa-Francorchamps Museum 15 Autostadt 75-90 IWAY world Lyon 13-28 Euperner Karting, Kart indoor chrono - www.agrodome.nz 5 7 Stavelot Abbey 49 Pricing system Hypotheses (II) • The prices of overnight accommodation at the Spa-Francorchamps site were determined based on benchmarking of related products, mostly in Europe Spa-Francorchamps Project €/ Adult Price Benchmarking € Tree houses 100 100-200 100 200 Yurts 70 60-87 Nature Hotel 120 130 Hôtel la Grée des Landes Nests 70 69 Parcabout Glamping 100 100-132 Vintage Caravans 100 163 Products Accommodation Sources Treehouse Breant wooden hut Treehouse, hut, Ecurie du Kerbalan Pencuke farm, Inside out camping Villatent, les Neufs Cerisiers, Domaine Douce France Grand Daddy Hotel 50 The total investment in the circuit project is approximately €61 million, with €36 million for the components and €25 million for infrastructure TOTAL INVESTMENT € 61 million (Attractions & Accommodations) Details of infrastructure investment Detail of the investment by component Total: €36,029,432 58% of the total investment Total: € 25,687,501 42% of the total investment 70% 25.100.802 18% 12% 6.497.333 4.431.297 A Experience in the Forest 25% 33% 41% 10.477.819 8.499.026 6.313.562 1% B 'Energy-Motion' experience' C Accommodation 397.095 Parking Gondola / footbridge Other infrastructures* Cronchamps Welcome Centre * Ravel trails and additional roads, including the Conchamps-Circuit junction; utilities development of the site The detail of the components is presented on the next pages, especially the Energy-Motion Experience, which requires the highest investment, due to its innovative concept and appeal to a vast public (70%) 51 Repartition of the investments per component for the public and the private sector TOTAL INVESTMENT € 61,716,933 (Attractions & Accommodations) Investment per component A. Experience in the forest € 4,431,297 100% Private investment B. EnergyMotion Experience € 25,100,802 100% Private investment Infrastructures C. Accommodations € 6,497,333 C. Infrastructures € 25,687,501 100% Private investment 100% Public investment The total investment of the private sector in the project is € 36 million 52 The Experience in the Forest represents an investment of €4.4 million, integrated into the environment and offering innovative latest generation attractions Detail of the investment for the Experience in the Forest Accommo dation 18% Exp. Forest 12% Total: € 4,431,297 * 21% EnergyMotion 70% 17% 23% 1.022.218 919.936 22% 953.712 789.376 746.056 Adventure Nature Park 18% Hanging village Adventure games Electric bikes & montain bikes Electric bikes & mountain bikes Reception-F&B-Shops The most important investment is for the Adventure Games (23% of the investment), including a Kids' Playground and the investment in electric bikes and mountain bikes (22%) *including professional fees and reserve margin 53 The "Energy-Motion" experience represents a € 25 million investment, due to its interactive space showcasing the use of latest technologies (research and development) for cars and other motor types Detail of the investment for the "Energy-Motion" experience 38%Exp. Accommo dation 18% Forest 12% Total: € 25,100,802 * 38% 9.470.343 EnergyMotion 70% 18% 4 553 050 4.553.050 14% 11% 3.609.950 5% 2.647.297 S-F Museum Shweeb 5% 2.270.454 1.335.561 1.214.147 Interactive Space Simulation space 9% Amphitheatre Indoor Karting Reception-F&B Administration *including professional fees and contingency reserve • The most important investment is for the interactive space (€9.4 million, 38%), which has a similar concept to that of the Cité des Sciences et de l'Industrie in Paris, the Futuroscope in Poitiers or the I-Way in Lyon, using latest technologies in scenography and interaction • The Simulation Space (€ 4.5 million) is also important, due to its attraction potential related to motor and other vehicles and to its latest generation equipment • It will be possible to have the Spa-Francorchamps Museum and the Amphiteatre built by public authorities 54 Accommodation that is original and environmentally friendly is proposed on the project site and represents a total investment of € 6.5 million Details of the investment for Accommodation Accommo dation 18% Exp. Forest 12% Total: €6,497,333 * 61.3% 3.982.401 EnergyMotion 70% 18.5% 1.203.317 "Spa-Nature" ecohotel Treehouses 11.1% 721.990 Glamping Tents 7.4% 481.327 Vintage Caravans 1.3% 84.232 0.4% 24.066 Yurts Nests in the trees *including professional fees and contingency reserve The Eco-hotel requires the most important investment, of € 3.4 million (61.3%) with 40 rooms, followed by the Treehouses (18.6%) 55 The results of the project are positive with a current project value of €3.5 million Net Present Value and an Internal Rate Of Return of 9.1%, excluding infrastructures The results of the project, without infrastructures, are positive assuming that the site receives 600,000 visitors per year after 6 years of operation Results only including project components In this assumption, the investor does not support the site infrastructures investment costs, but does pay the construction costs for the project components Results of the project including infrastructures In this assumption, the investor supports the construction costs for the components and for development of the site, such as utilities, parking areas,… Investment components only €36,029,432 Total investment with infrastructures €61,716,933 Value of the project today Net Present Value (NPV) + €3,593,443 Value of the project today Net Present Value (NPV) -€18,481,107 Profitability Internal Rate of Return (IRR) 9.1% Profitability Internal Rate of Return (IRR) 1.7% Payback period 15 years Payback period 22 years Positive cash flow Year 4 Positive cash flow Year 4 These results are obtained by using a capital cost of 7.5% and a debt-capital ratio of 50%/50% • The results for the components alone are as follows: the project value is positive at €3,593,443 with a return of 9.1% and a pay back period for the initial investment of 14 years • With the inclusion of the infrastructure investment of about € 25.6 million, the results are negative with a return of 1.7% (well below the capital cost of 7.5%) These investments will have to be made by public authorities in order to generate a new source of income and activities in the region • Furthermore, it is assumed that public authorities will invest in the museum and amphitheatre infrastructures 56 Summary of project cash flows (investment and operation) including only the main components without the infrastructure, the museum construction and the amphitheatre, to be financed by pubic authorities € Million Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 50,04 2,05 -17,18 Consolidated Cash Flow (MM Euros) Year 1 2,15 2,25 2,4 2,61 2,79 2,93 3,07 3,23 3,39 3,56 3,74 The last year includes the project’s terminal value -10,78 Year 2 3,93 Year 3 Cash Flow ‐ ‐ 17.18 ‐ 10.78 Cumulative cash flow ‐ ‐ 9.25 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 2.05 2.15 2.25 2.40 2.61 2.79 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 2.93 3.07 3.23 3.39 3.56 3.74 3.93 50.04 ‐ 14.71 ‐ 14.69 ‐ 14.54 ‐ 14.25 ‐ 13.77 ‐ 13.03 ‐ 12.07 ‐ 10.91 ‐ 9.55 ‐ 7.98 ‐ 6.18 ‐ 4.14 ‐ 1.85 2.08 52.12 The cash flow will be positive from Year 4 The return on investment will be positive after 14 years of operation 57 Project Results by components A- Experience in the Forest Results B - ‘Energy-Motion’ Experience Results C - Accommodation results Total Investment €4,431,297 Total Investment € 18,948,497 Total Investment €6,497,333 Value of the project today Net Present Value (NPV) + 3,831,153 Value of the project today Net Present Value (NPV) + 5,035,365 Value of the project today Net Present Value (NPV) + 356,207 Project Internal Rate of Return (IRR Project) 15.9% Internal Rate of Return (IRR Project) 10.6% Internal Rate of Return (IRR Project) 8.1% Internal Rate of Return on Equity (IRR) 18.9% Internal Rate of Return on Equity (IRR) 11.6% Internal Rate of Return on Equity (IRR) 8.3% Investment pay back period 10 years Investment pay back period 13 years Investment pay back period 5 years Positive cash flow Year 4 Positive cash flow Year 4 Positive cash flow Year 4 These results are obtained by using a capital cost of 7.5% and a debt-capital ratio of 50%-50% The results of the Experience in the Forest give a positive value with a return of 15.9% and a payback period on the initial investment of 10 years The value of the Energy Motion Experience results is negative with a profitability of 10.6% and a payback period on the initial investment of 13 years The value of the accommodation is positive with a return of 8.1% and a pay back period for the initial investment of 5 years These results have been obtained assuming 430,000 paying visitors to the project, 130,000 to the Experience in the Forest, and 300,000 to the Energy-Motion Experience It is assumed here that the Museum and Amphitheatre are funded by the public sector and operated by the private sector Note: The hypotheses used can be found in the appendices 58 Model sensitivity for the number of visitors and entrance fee Model sensitivity to the number of visitors and entrance fee NPV Number of visitors 344,000 365,500 387,000 408,500 430,000 451,000 473,000 494,500 -20% -15% -10% -5% 0% 5% 10% 15% -15% 15% -80.469 80 469 1 123 230 1,123,230 2 326 928 2,326,928 3 530 627 3,530,627 4 734 325 4,734,325 5 938 024 5,938,024 7 141 722 7,141,722 8 345 421 8,345,421 -10% 1,175,182 2,439,001 3,702,820 4,966,639 6,230,459 7,494,278 8,758,097 10,021,916 -5% 2,430,833 3,754,773 5,078,712 6,402,652 7,726,592 9,050,532 10,374,471 11,698,411 0% 3,686,484 5,070,544 6,454,604 7,838,665 9,222,725 10,606,786 11,990,846 13,374,906 5% 4,942,134 6,386,316 7,830,497 9,274,678 10,718,859 12,163,040 13,607,221 15,051,402 10% 6,197,785 7,702,087 9,206,389 10,710,690 12,214,992 13,719,294 15,223,595 16,727,897 15% 7,453,436 9,017,858 10,582,281 12,146,703 13,711,125 15,275,547 16,839,970 18,404,392 9,222,725 Entry fee The model can support a fall of 15% in the number of visitors and of 10% in the entrance fee 59 Sensitivity of the model for construction and capital costs Model sensitivity to construction and capital costs (WACC) NPV WACC 9,222,725 6% 6.5% 7% 7.5% 8% 8.5% 9% -15% 18,948,497 16,795,619 14,808,186 12,972,973 11,277,877 9,711,823 8,264,664 Costs -10% 10% 17,655,399 15,517,096 13,544,000 11,722,890 10,041,671 8,489,269 7,055,543 of -5% 16,362,301 14,238,573 12,279,814 10,472,808 8,805,464 7,266,714 5,846,422 Construction 0% 15,069,203 12,960,049 11,015,627 9,222,725 7,569,257 6,044,160 4,637,302 5% 13,776,104 11,681,526 9,751,441 7,972,643 6,333,050 4,821,605 3,428,181 10% 12,483,006 10,403,003 8,487,255 6,722,560 5,096,844 3,599,051 2,219,060 15% 11,189,908 9,124,480 7,223,068 5,472,478 3,860,637 2,376,497 1,009,939 • The model gives a positive result even if construction costs increase by 15% • Moreover, the model can offer higher profitability for the investor, up to 9% and more for similar construction costs • The construction of the museum and amphitheatre is funded by the public sector, the rest of components are funded by the private sector 60 Operating model The financial model is based on the development and construction over 3 years and on an operational model of 15 years Sources Year 1 Inflation Opening days for the Experience in the Forest Opening days for the circuit experience Opening days for the welcome centre Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 BFPB 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% T&L 0 0 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 T&L 0 0 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 T&L 0 0 250 365 365 365 365 365 365 365 365 365 365 365 365 365 365 Sit Site WACC - Capital cost 7.5% Beginning of operation Year 3 50%/50% Debt/ capital ratio financing Phasing Start End Development/ Investment Year 1 Year 3 Projections of operations Year 3 Year 17 61 Operating model accommodation The financial model is based on the development and construction over 2 years and on an operational model of 15 years Sources Year 1 Inflation Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 BFPB 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8% Opening days for the accommodations T&L 0 0 180 210 210 210 210 210 210 210 210 210 210 210 210 210 210 Rooms units T&L 0 0 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 Rooms available T&L 0 0 19.800 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 23.100 Sit Site WACC - Capital cost 7.5% Beginning of operation Year 3 50%/50% Debt/ capital ratio financing Phasing Start End Development/ Investment Year 2 Year 3 Projections of operations Year 3 Year 17 62 Operational results: Profit and loss account projections Nature experience Cash Flow Experience in the Forest Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 TOTAL - - 1,625,592 32,314 1,672,892 32,896 1,738,614 33,488 1,806,918 34,091 1,896,316 34,704 1,990,137 35,329 2,108,878 35,965 2,234,704 36,612 2,368,038 37,271 2,509,327 37,942 2,659,046 38,625 2,817,698 39,320 2,985,817 40,028 3,163,967 40,749 3,352,746 41,482 34,930,693 550,815 - - 22,810 23,220 23,638 24,064 24,497 24,938 25,387 25,844 26,309 26,783 27,265 27,755 28,255 28,764 29,281 388,811 - - - - - - - - - - - - - - - - - 0 - - 1,680,716 1,729,009 1,795,740 1,865,072 1,955,517 2,050,404 2,170,230 2,297,160 2,431,618 2,574,052 2,724,936 2,884,774 3,054,100 3,233,479 3,423,510 35,870,320 - - 588,251 84,036 117,650 605,153 86,450 121,031 628,509 89,787 125,702 652,775 93,254 130,555 684,431 97,776 136,886 717,642 102,520 143,528 759,581 108,512 151,916 804,006 114,858 160,801 851,066 121,581 170,213 900,918 128,703 180,184 953,728 136,247 190,746 1,009,671 144,239 201,934 1,068,935 152,705 213,787 1,131,718 161,674 226,344 1,198,228 171,175 239,646 12,554,612 1,793,516 2,510,922 Profit and loss account Revenue Tickets sale revenue F&B revenue - Rental Shops revenue – Rental Gondola revenue - non-paying visitors Total revenues 100% Operational expenses Personnel costs Maintenance Administration Costs of electricity, water,... Marketing Total expenses by department Gross operating revenues Fixed expenses Fixed costs Total fixed expenses EBITDA - - 84,036 86,450 89,787 93,254 97,776 102,520 108,512 114,858 121,581 128,703 136,247 144,239 152,705 161,674 171,175 1,793,516 - - 84,036 86,450 89,787 93,254 97,776 102,520 108,512 114,858 121,581 128,703 136,247 144,239 152,705 161,674 171,175 1,793,516 - - 958,008 985,535 1,023,572 1,063,091 1,114,645 1,168,730 1,237,031 1,309,381 1,386,022 1,467,209 1,553,213 1,644,321 1,740,837 1,843,083 1,951,401 20,446,082 57% - - 722,708 743,474 772,168 801,981 840,872 881,674 933,199 987,779 1,045,596 1,106,842 1,171,722 1,240,453 1,313,263 1,390,396 1,472,109 15,424,237 43% - - 151,264 151,264 155,611 155,611 161,617 161,617 167,857 167,857 175,997 175,997 184,536 184,536 195,321 195,321 206,744 206,744 218,846 218,846 231,665 231,665 245,244 245,244 259,630 259,630 274,869 274,869 291,013 291,013 308,116 308,116 3,228,329 3,228,329 - - 571,444 587,863 610,552 634,125 664,876 697,137 737,878 781,035 826,750 875,178 926,478 980,823 1,038,394 1,099,383 1,163,993 12,195,909 34% In Year 17 (last year of operation), the operational projections predict Gross Operating Revenues of € 1.4 million, providing a margin of 43% of total revenue and EBITDA of 34% 63 Cash Flow Nature experience Cash Flow Experience in the Forest EBITDA Investment Reinvestment (furniture and equipment reserve) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 TOTAL - - 571,444 587,863 610,552 634,125 664,876 697,137 737,878 781,035 826,750 875,178 926,478 980,823 1,038,394 1,099,383 1,163,993 12,195,909 - 3,337,700 1,093,598 - - - - - - - - - - - - - - 4,431,297 - - 117,650 121,031 125,702 130,555 136,886 143,528 151,916 160,801 170,213 180,184 190,746 201,934 213,787 226,344 239,646 2,510,922 10,270,530 10,270,530 15,524,219 Terminal value Cash Flow before debt - (3,337,700) (639,804) 466,832 484,850 503,570 Cumulative cash flow - (3,337,700) (3,977,504) (3,510,672) 1,668,850 546,799 - - - 100,131 100,131 25,033 132,939 132,939 8,202 169,896 132,939 302,835 - 172,444 125,059 297,503 187,347 527,990 553,609 585,962 620,233 656,537 694,994 735,733 778,889 824,607 873,039 11,194,877 (1,440,653) (854,691) (234,458) 422,079 1,117,073 1,852,806 2,631,695 3,456,302 4,329,341 15,524,219 - - - - - - - - - - - 2,215,649 175,031 116,706 291,737 - 177,656 107,851 285,508 - 180,321 98,466 278,787 - 183,026 88,517 271,544 - 185,772 77,972 263,743 - 188,558 66,794 255,352 - 191,387 54,945 246,331 - 194,257 42,385 236,642 - 197,171 29,071 226,242 - 200,129 14,959 215,088 - - - 1,188,733 3,404,382 33,235 211,833 242,482 274,822 314,419 356,490 401,185 448,663 499,091 552,647 609,519 873,039 11,194,877 14,302,251 (947,679) (633,261) (276,771) 124,415 573,077 1,072,168 1,624,815 2,234,334 3,107,373 14,302,251 (3,025,822) (2,522,252) (1,994,263) Debt Debt financing Debt payment Capital Interest Total Capital+Interest Debt opening cost Cash Flow after debt - (1,794,014) (234,146) 163,997 Cumulative cash flow - (1,794,014) (2,028,160) (1,864,162) WACC NPV Project IRR FP IRR (1,676,816) (1,464,983) (1,222,501) 7.5% 3,831,153 15.9% 18,9% • The consolidated cash flow for the operation of the accommodation represents, after 15 years of operation, €15.5 million before debt • With a capitalisation rate of 7.5%, the Net Present Value (NPV) is €3.8 million and the project IRR is 15.9% 64 Operational results: Profit and loss account projections "Energy-Motion" circuit experience’ Cash Flow "Energy-Motion" circuit experience Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 TOTAL - - 4,483,928 4,610,285 4,787,135 4,970,770 5,212,051 5,465,044 5,785,951 6,125,702 6,485,403 6,866,226 7,269,411 7,696,271 8,148,196 8,626,658 9,133,215 95,666,246 Operational results Cash Flow Exp. Circuit Revenue Tickets sale revenue Food and Beverage premises rental revenues Shops rental revenue Gondola revenue - non-paying visitors Total revenues Operational expenses Personnel costs Maintenance Administration Costs of electricity, water,... Marketing Total expenses by department Gross operating revenues Fixed expenses Fixed costs Total fixed expenses EBITDA - - 107,713 109,652 111,626 113,635 115,681 117,763 119,883 122,041 124,237 126,474 128,750 131,068 133,427 135,829 138,273 1,836,052 - - 38,017 38,701 39,397 40,107 40,828 41,563 42,312 43,073 43,848 44,638 45,441 46,259 47,092 47,939 48,802 648,018 - - - - - - - - - - - - - - - - - 0 - - 4,629,658 4,758,638 4,938,159 5,124,512 5,368,560 5,624,370 5,948,145 6,290,816 6,653,489 7,037,338 7,443,602 7,873,598 8,328,715 8,810,426 9,320,291 98,150,316 - - 1,620,380 231,483 324,076 231,483 231,483 1,665,523 237,932 333,105 237,932 237,932 1,728,356 246,908 345,671 246,908 246,908 1,793,579 256,226 358,716 256,226 256,226 1,878,996 268,428 375,799 268,428 268,428 1,968,530 281,219 393,706 281,219 281,219 2,081,851 297,407 416,370 297,407 297,407 2,201,786 314,541 440,357 314,541 314,541 2,328,721 332,674 465,744 332,674 332,674 2,463,068 351,867 492,614 351,867 351,867 2,605,261 372,180 521,052 372,180 372,180 2,755,759 393,680 551,152 393,680 393,680 2,915,050 416,436 583,010 416,436 416,436 3,083,649 440,521 616,730 440,521 440,521 3,262,102 466,015 652,420 466,015 466,015 34,352,611 4,907,516 6,870,522 4,907,516 4,907,516 - - 2,638,905 2,712,424 2,814,750 2,920,972 3,060,079 3,205,891 3,390,443 3,585,765 3,792,489 4,011,282 4,242,853 4,487,951 4,747,367 5,021,943 5,312,566 55,945,680 57% - - 1,990,753 2,046,214 2,123,408 2,203,540 2,308,481 2,418,479 2,557,703 2,705,051 2,861,000 3,026,055 3,200,749 3,385,647 3,581,347 3,788,483 4,007,725 42,204,636 43% - - 416,669 416,669 428,277 428,277 444,434 444,434 461,206 461,206 483,170 483,170 506,193 506,193 535,333 535,333 566,173 566,173 598,814 598,814 633,360 633,360 669,924 669,924 708,624 708,624 749,584 749,584 792,938 792,938 838,826 838,826 8,833,528 8,833,528 9% - - 1,574,084 1,617,937 1,678,974 1,742,334 1,825,310 1,912,286 2,022,369 2,138,877 2,262,186 2,392,695 2,530,825 2,677,023 2,831,763 2,995,545 3,168,899 33,371,107 34% 100% In Year 17 (last year of operation), the operational projections predict Gross Operating Revenues of 4 million euros, providing a margin of 43% of total revenue and EBITDA of 34% of the total revenues 65 Cash Flow "Energy-Motion" circuit experience’ Operational results with investment supported by private and public sectors, with private sector participation of €18 million for the EnergyMotion Component Cash Flow "Energy-Motion" circuit experience EBITDA Investment Reinvestment (furniture and equipment reserve) Terminal value Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 TOTAL - - 1,574,084 1,617,937 1,678,974 1,742,334 1,825,310 1,912,286 2,022,369 2,138,877 2,262,186 2,392,695 2,530,825 2,677,023 2,831,763 2,995,545 3,168,899 33,371,107 - 9,337,738 9,505,817 - - - - - - - - - - - - - - 18,843,555 - - 324,076 333,105 345,671 358,716 375,799 393,706 416,370 440,357 465,744 492,614 521,052 551,152 583,010 616,730 652,420 6,870,522 27,960,874 27,960,874 35,617,904 Cash Flow before debt - (9,337,738) (8,255,809) 1,284,832 1,333,303 Cumulative cash flow - (9,337,738) (17,593,547) (16,308,715) (14,975,412) 1,518,580 1,605,999 1,698,520 1,796,442 1,900,081 2,009,773 2,125,871 2,248,753 2,378,815 30,477,352 (13,591,794) (12,142,283) (10,623,703) 1,383,618 1,449,511 (9,017,704) (7,319,183) (5,522,741) (3,622,660) (1,612,887) 512,984 2,761,737 5,140,552 35,617,904 Debt financing Debt payment - 4,668,869 4,752,909 - - - - - - - - - - - 9,421,777 Capital - - - 722,462 733,299 744,298 755,463 766,795 778,297 789,971 801,821 813,848 Interest - 280,132 565,307 565,307 531,797 496,277 458,625 418,715 376,409 331,566 284,032 233,645 826,056 838,446 851,023 - - 9,421,777 180,236 123,622 63,611 - - Total Capital+Interest - 280,132 565,307 1,287,768 1,265,096 1,240,575 1,214,088 1,185,509 1,154,706 1,121,537 1,085,852 1,047,493 4,909,281 1,006,292 962,069 914,635 - - 14,331,058 Debt opening cost - 70,033 71,294 - - - - - - - - - - - - - - 141,327 Cash Flow after debt - (5,019,034) (4,139,501) (2,936) 68,207 143,043 235,423 333,071 451,293 576,983 710,590 852,588 1,003,481 1,163,803 1,334,118 2,378,815 30,477,352 30,567,297 Cumulative cash flow - (5,019,034) (9,158,535) (9,161,472) (9,093,264) (8,950,221) (8,714,798) (8,381,727) (7,930,434) (7,353,450) (6,642,861) (5,790,273) 89,944 30,567,297 Debt WACC NPV Project IRR FP IRR - - - (4,786,792) (3,622,989) (2,288,871) 7.5% 5,035,365 10.6% 11.6% • The consolidated cash flow for the operation of the accommodation, after 15 years of operation, represents €35 million before debt • With a rate of 7.5%, the Net Present Value (NPV) is €5 million and the project IRR is 10.6% 66 Operational results: Profit and loss account projections Accommodation ACCOMMODATION Year 1 Profit and loss account Cash Flow Spa-Francorchamps Accommodation Revenue Rooms revenue Food and Beverage revenue Shops Spa Other revenue Total revenues Expenses by department Rooms Food and Beverage Shops Spa Other revenue Total expenses by department Undistributed expenses Management expenses General and Administration Marketing expenses Repair & Maintenance Total undistributed expenses Gross operating revenues Fixed expenses Taxes/ Land Tax Insurance Incentives cost Total fixed expenses EBITDA Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 TOTAL 0 0 397,273 707,741 792,528 855,690 995,535 1,266,818 1,418,583 1,444,117 1,470,111 1,496,573 1,523,512 1,550,935 1,578,852 1,607,271 1,636,202 18,741,741 0 0 59,591 106,161 118,879 128,354 149,330 190,023 212,787 216,618 220,517 224,486 228,527 232,640 236,828 241,091 245,430 2,811,261 0 0 0 0 0 0 3,973 3,973 3,973 7,077 7,077 7,077 7,925 7,925 7,925 8,557 8,557 8,557 9,955 9,955 9,955 12,668 12,668 12,668 14,186 14,186 14,186 14,441 14,441 14,441 14,701 14,701 14,701 14,966 14,966 14,966 15,235 15,235 15,235 15,509 15,509 15,509 15,789 15,789 15,789 16,073 16,073 16,073 16,362 16,362 16,362 187,417 187,417 187,417 468,782 835,134 935,183 1,009,715 1,174,731 1,494,845 1,673,928 1,704,058 1,734,731 1,765,957 1,797,744 1,830,103 1,863,045 1,896,580 1,930,718 22,115,255 100% 119,182 29,795 119 2,185 1,390 152,672 212,322 53,081 212 3,893 2,477 271,985 237,759 59,440 238 4,359 2,774 304,569 256,707 64,177 257 4,706 2,995 328,842 298,660 74,665 299 5,475 3,484 382,584 380,045 95,011 380 6,967 4,434 486,838 425,575 106,394 426 7,802 4,965 545,161 433,235 108,309 433 7,943 5,054 554,974 441,033 110,258 441 8,086 5,145 564,964 448,972 112,243 449 8,231 5,238 575,133 457,054 114,263 457 8,379 5,332 585,486 465,280 116,320 465 8,530 5,428 596,024 473,656 118,414 474 8,684 5,526 606,753 482,181 120,545 482 8,840 5,625 617,674 490,861 122,715 491 8,999 5,727 628,792 5,622,522 1,405,631 5,623 103,080 65,596 7,202,451 33% 0 0 0 0 0 0 0 0 0 0 0 0 15,891 28,310 31,701 34,228 39,821 50,673 56,743 57,765 58,804 59,863 60,940 62,037 63,154 64,291 65,448 619,931 0 0 0 0 0 0 27,809 23,836 23,836 91,373 49,542 42,464 42,464 162,780 55,477 47,552 47,552 182,282 59,898 51,341 51,341 196,809 69,687 59,732 59,732 228,973 88,677 76,009 76,009 291,368 99,301 85,115 85,115 326,274 101,088 86,647 86,647 332,147 102,908 88,207 88,207 338,126 104,760 89,794 89,794 344,212 106,646 91,411 91,411 350,408 108,565 93,056 93,056 356,715 110,520 94,731 94,731 363,136 112,509 96,436 96,436 369,672 114,534 98,172 98,172 376,326 1,084,879 929,896 929,896 4,310,601 19% - 224,737 400,369 448,333 484,064 563,174 716,639 802,492 816,937 831,642 846,612 861,851 877,364 893,156 909,233 925,599 10,602,203 48% 0 0 0 0 0 0 0 0 0 3,973 20,226 24,199 0 7,077 36,033 43,111 0 7,925 40,350 48,275 0 8,557 43,566 52,123 0 9,955 50,686 60,641 0 12,668 64,498 77,166 0 14,186 72,224 86,410 0 14,441 73,524 87,966 0 14,701 74,848 89,549 0 14,966 76,195 91,161 0 15,235 77,567 92,802 0 15,509 78,963 94,472 0 15,789 80,384 96,173 0 16,073 81,831 97,904 0 16,362 83,304 99,666 0 187,417 954,198 1,141,616 0 0 200,538 357,258 400,058 431,941 502,533 639,473 716,082 728,972 742,093 755,451 769,049 782,892 796,984 811,330 825,933 9,460,587 - 43% The operational projections predict Gross Operating Revenue of € 925,000, providing a margin of 48% of total revenue and EBITDA of 43% of total revenue in year 17 67 Cash flow Accommodation ACCOMMODATION EBITDA Pre-opening Working capital Investment Reinvestment (furniture and equipment reserve) Terminal value Cash Flow before debt Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 TOTAL 0 0 200,538 357,258 400,058 431,941 502,533 639,473 716,082 728,972 742,093 755,451 769,049 782,892 796,984 811,330 825,933 9,460,587 - 19,800 4,488,371 40,674 2,008,961 - - - - - - - - - - - - - - 19,800 40,674 6,497,333 - - 32,815 58,459 65,463 70,680 82,231 104,639 117,175 119,284 121,431 123,617 125,842 128,107 130,413 132,761 135,150 1,280,157 7,675,369 7,675,369 - (4,508,171) (1,881,912) 298,799 334,595 361,261 420,302 534,834 598,907 609,688 620,662 631,834 643,207 654,785 666,571 678,569 8,366,152 9,030,082 (4,508,171) (1,881,912) (4,209,372) (1,547,317) 660,060 754,897 896,095 1,019,209 1,144,522 1,219,569 1,241,521 1,263,869 1,286,618 1,309,778 1,333,354 9,032,723 2,244,186 1,004,481 - - - - - - - - - - - - - - Debt Debt financing Debt D bt paymentt - 3,248,666 Capital - - - 249,108 252,844 256,637 260,487 264,394 268,360 272,385 276,471 280,618 284,827 289,100 293,436 - - 3,248,666 Interest - 134,651 194,920 194,920 183,366 171,118 158,136 144,374 129,787 114,325 97,935 80,562 62,146 42,625 21,933 - - 1,730,800 Total Capital+Interest - 134,651 194,920 444,028 436,210 427,755 418,622 408,768 398,147 386,710 374,406 361,180 346,973 331,725 315,370 - - 4,979,466 Debt opening cost - 33,663 15,067 - - - - - - - - - - - - - - 48,730 Cash Flow after debt - (2,432,300) (1,087,419) (145,229) (101,615) (66,494) 1,680 126,066 200,760 222,977 246,256 270,654 296,233 323,059 351,201 678,569 8,366,152 7,250,552 Cumulative cash flow - (2,432,300) (3,519,718) (3,664,947) (3,766,562) (3,833,056) (3,831,376) (3,705,310) (3,504,550) (3,281,573) (3,035,317) (2,764,663) (2,468,430) (2,145,370) WACC NPV Project TRI FP IRR 1,794,169) (1,115,600) 7,250,552 7.5% 356,207 8.1% 8.3% • The consolidated cash flow for the operation of the accommodation, after 15 years of operation, represents €9 million before debt • With a capitalisation rate of 7.5%, the Net Present Value (NPV) is € 356,000 and the project IRR is 8.1% 68 Appendices 69 Cadastral plan of the Francorchamps circuit Cadastral plan of the Circuit Scale 1/2500 Land owners: Intercommunity association for the management of the circuit of Spa-Francorchamps City of Stavelot City of Malmedy Liege Province Private owners Property of SPI+ Walloon Region/ Assets managed by ISF Association/ Belgium Royal Automobile Club Association/ Spa Royal Automobile Club ISF + Liege Province Emphyteutic Lease 70 Your contact for the Société de Valorisation du circuit de Spa-Francorchamps (SVF) : Centre d’Ingénierie Touristique de Wallonie (CITW) Fabienne Vanthuyne José Clossen Avenue Sergent Vrithoff, 2 5000 Namur Belgium egu Phone: +(32) 81 435404 Fax: +(32) 81 434784 Email : [email protected] www.spi.be/fr/destination-francorchamps Projet financé par l’Union Européenne et par la Wallonie le Fonds Européen de Développement Régional et la Wallonie investissent dans votre avenir