www.businessaarhus.com

Transcription

www.businessaarhus.com
Business Aarhus
Construction Boom In Aarhus
An overview of the investments and projects in Aarhus
> Aarhus is currently experiencing a historical construction boom that will
continue in the years to come.
> Statistics from CRM Byggefakta (A highly recognised Danish construction
statistical company) highlights that there are planned projects in Aarhus in the
years 2010-2011 which equals to 28.2 billion DKK, while the region of Aarhus
have planned project equal to 45.1 billion DKK.
> During the same period Copenhagen has planned projects equal to 57.1 billion
DKK. When compared to the number of inhabitants in the two cities, this means
that Aarhus has nearly 3 times as many planned construction projects as
Copenhagen.
3
Business Aarhus
2
Overview Map 1
1
Projects outside the city center
6
1
In Lisbjerg a new city will be
constructed with room for
25,000 people
3
4
2
In Elev a new city area is built
with room for 4,000-7,000
citizens
5
8
3
6
In Risskov a new residential area
is constructed with more than
900 houses.
5
10
www.businessaarhus.com
The Marselis Tunnel: The project
supports the infrastructure in
the city by creating a direct
connection between the
highway system and the harbor.
The Danish Bank &
Moneyservice is building a top
modern contactcenter in
Brabrand
Projects in Aarhus N: The New
University Hospital and Agro
Food Park.
4
9
7
8
11
7
The residential area of Gellerup
will be reconstructed and
modernized to become a new
attractive city area.
At Viborgvej Zenit Company
House is building the 2nd stage
of their office complex
9
The residential areas of
Rosenhoej and Soendervang will
be modernized and
reconstructed
10
The Museum of Moesgaard will
be expanded with 15,000 sqm.
11
The Port of Aarhus is expanding
in several stages up until 2022
4
Business Aarhus
Overview map 2
1
1
1
Projects in the city center
7
Aarhus University is expanding
up until 2028 by 250,000 sqm.
2
Modernisation of the residential
neighbourhood of ”Ringgaarden”
6
2
3
3
12
4
5
7
10
11
The Ceres Area: The old brewery
site will be modernized. The
project includes a project that
covers 140,000 sqm.
4
8
5
The Freight Yard Project: The
former fright yard will be
transformed to a new cultural
production centre.
6
The Old Town is expanding with
a new neighborhood: The
Modern Town
www.businessaarhus.com
8
A new school will be built on
Frederiksbjerg
9
The former component
workshop will be transformed
into office and shopping
environment
10
The River Houses: The project
consist of 9 buildings.
9
The shopping mall Bruun’s
Gallery will be expanded and a
new bus terminal will be built
Business & conference project in
Vaerkmestergade.
11
Business project at
Aaboulevarden
12
High-rise building at Europaplads
16
13
The Aarhus Docklands
5
Business Aarhus
The Aarhus Docklands
›
Next to the city centre, an entire new city area is being built – with Urban Media Space
(new main library and citizens’ services), commercial leases, private housing, student
housing, cafés, restaurants etc.
› Read more at: www.debynaerehavnearealer.dk
The Z-House
(private housing and commercial leases)
SHiP
(commercial building,
incl. activities open to the
public)
Bestseller
(approx. 500 workplaces)
Light*house
The Iceberg
Student housing project
(approx. 350 housing units)
(private housing and
commercial leases)
(approx. 210 appartments)
Navitas
(innovation and
education centre)
www.businessaarhus.com
Urban Media Space
(new main library and citizens’ services)
6
Business Aarhus
Aarhus Docklands
Dokk1 2011-2015
Navitas 2011-2014
Havneholmen 2013-2015
The Iceberg 2010-2013
Warehouse 2013 2013-2015
Bestseller 2010-2014
Dormitories 2010-2012
The Harbour Houses 2013-2015
Lighthouse*
Stage 1: 2010-12
Stage 2: 2012-2014
Then follows stage 3
The Z-house 2013-2015
SHiP 2013-2014
www.businessaarhus.com
Side 6
7
Business Aarhus
The Aarhus Docklands
Lighthouse*
›
The Lighthouse* project consists of 3 phases:
› Phase 1:
› Construction of 8,600 sqm. has begun
(85 appartments and 4 terraced
houses).
› Construction of bldg. G (5,050 sqm.).
› Both buildings are expected to be
completed in 2012.
›
›
www.businessaarhus.com
www.businessaarhus.com
›
Phase 2: Construction of building L.
›
Phase 3: Construction of buildings H and T.
Total floorage of 63,000 sqm.
To include both housing and commercial leases –
including a hotel project.
Business Aarhus
The Aarhus Docklands
The Harbour Houses
›
Brabrand Boligforening is construction
83 family apartments and 155
student apartments
›
The nearest neighbours is going to be
The Z-house and Warehouse 2013
›
The architects on the project are
Luplau & Poulsen og ADEPT
›
Construction is expected to start in
2012
www.businessaarhus.com
8
9
Business Aarhus
The Aarhus Docklands
The Iceberg
›
›
›
30,000 sqm.
210 appartments
Ready for occupancy in March 2013
www.businessaarhus.com
www.businessaarhus.com
The Z-house
›
›
›
11,000 sqm. housing
14,000 sqm. commercial leases
Expected construction start in 2012
Business Aarhus
The Aarhus Docklands
Warehouse 2013
›
Warehouse 2013 is a business project
with a total of 35,000 sqm.
›
The tenants are engineering firm Moe
& Brødsgaard, business property
broker Nybolig Erhverv Aarhus and
Aart Architects
›
The owners are local and partly the
same behind Lighthouse*
www.businessaarhus.com
10
11
Business Aarhus
The Aarhus Docklands
SHiP
›
›
›
Commercial leases, including activities
open to the public
Total floorage of 21,700 sqm.
To be completed by 2013 at the earliest.
www.businessaarhus.com
www.businessaarhus.com
Student housing
4 separate buildings with approx. 350 student flats
The construction of the following buildings has begun:
› Grundfos College with 159 student apartments
› Marina House with 45 apartments
› Ringgaarden (housing association), Zero-Energy House
I and II, with approx. 150 apartments
12
Business Aarhus
The Aarhus Docklands
Urban Media Space
›
›
›
Gross floorage: 30,000 sqm.
› An area of 10,000 sqm. will be rented out
to other tenants in the cultural field
The project also includes the exposure of the
last section of the Aarhus River and the design
of the central harbor squares
Completion is expected in 2014
www.businessaarhus.com
www.businessaarhus.com
Navitas
›
›
New centre for innovation and energy:
› 2,000 students and 300 teachers,
researchers, staff and entrepreneurs
Floorage: 35,000 sqm.
›
Completion is expected in 2014
Business Aarhus
Bestseller´s new Aarhus branch
›
20,000 sqm.
›
New branch office with 500
employees
›
Ready for occupancy in 2013
›
The architect is
C. F. Møller
www.businessaarhus.com
www.businessaarhus.com
13
Business Aarhus
New HQ for Krifa in Lisbjerg
›
12,000 sqm
›
Krifas new headquarter in
Lisbjerg Business Park will house
300 employees. The building has
a value of 147 mio. Danish Kroner
›
Ready in March 2012
›
Drawn by GPP Arkitekter with
Gråkjær as constructor on the
project
www.businessaarhus.com
14
Business Aarhus
The Danish banks’ Moneyservice (Bankernes Kontantservice) is building
a top modern money handling center in Brabrand
›
The site area covers nearly 34,000
sqm
›
The building will be located on
Rosbjergvej in Brabrand and will
accommodate 250 employees
›
The construction will start in the
beginning of 2012 and is expected to
be ready for occupancy in 2014.
›
The engineering company Cowi are
consulting engineers on the project.
www.businessaarhus.com
15
Business Aarhus
High-rise building in the city centre
›
The high-rise building on Europlads 16 will have
16 storeys and a total area equal to 15,000
sqm.
›
The high-rise building will be located next to
the Urban Media Space building, and is
expected to be ready for occupancy in 2016.
›
The project is currently under evaluation for
the new district plan.
www.businessaarhus.com
www.businessaarhus.com
16
Business Aarhus
The former component workshop
›
The buildings of the former component workshop is positioned between Værkmestergade
and Jægergårdsgade and has been acquired by the real-estate company Bricks A/S. The
company is currently working together with the architectural company C. F. Møller and the
Municipality of Aarhus to produce a masterplan for the future usage of the property.
›
The property has a ground area of 13,575 sqm. and is expected to become a combined
office, shopping and housing complex.
www.businessaarhus.com
www.businessaarhus.com
17
Business Aarhus
New busterminal and expansion of the shopping center Bruun’s Gallery
›
The Municipality of Aarhus, The railway
company DSB and the owners of the
shoppingcenter ”Bruuns Gallery” Steen &
Stroem has made an agreement about the
reconstruction of the city area around ”Ny
Banegårdsgade”. Besides a new
busterminal, the project also includes an
expansion of the shoppingcenter ”Bruuns
Gallery”.
www.businessaarhus.com
www.businessaarhus.com
18
Business Aarhus
Business & Conference center in Vaerkmestergade
›
›
›
›
›
›
›
94 metres
22 stories
25,000 sqm.
The building is fully let, and the
construction is fully financed
Ready for occupancy in 2013
Commercial leases:
› Law firm Bech-Bruun
› Audit firm Deloitte
Comwell: Hotel and conference centre
› 240 hotel rooms and conference
facilities for up to 1,000 guests
www.businessaarhus.com
www.businessaarhus.com
19
20
Business Aarhus
The Freight Yard Project
›
The buildings of the former freight yard will be transformed into a new cultural production
centre that is expected to attract much attention to the City of Aarhus.
›
The production centre will become a powerful cultural hub, and create a social hub for the
surrounding neighbourhood – closely linked to the centre of Aarhus and the Ceres site
(former site of local brewery, now an urban development area).
› Read more on: www.godsbanen.dk
www.businessaarhus.com
www.businessaarhus.com
Business Aarhus
The River Houses
›
The project consists of 9 buildings
with a total of 432 appartments. The
total housing area is equal to 27,000
sqm.
›
The project is primarily targeted
towards students, younger families
and elder people, who seeks to move
closer to the city.
›
The project started in 2010 and the
first building is expected to be ready
for occupancy by september 2011,
while the rest of the 9 buildings will
be finished in 2014.
www.businessaarhus.com
www.businessaarhus.com
21
22
Business Aarhus
School Project in Aarhus City
›
Besides a new school for 850 children
the project also includes an after school
care as well as daycare institutions
›
The project has a total budget equal to
300 million Danish Kroner
›
The construction is expected to start in
2013
www.businessaarhus.com
www.businessaarhus.com
Business Aarhus
The University of Aarhus is expanding: New Arts and Business Building
›
The University of Aarhus is building a new
high-rise building opposite the Nobel
Park, with 20 stories and approx. 60.000
sqm.
›
The building will be the new base for
students and scientists from the Faculty
of Cultural Science and the new Faculty of
Business and Society
›
An architectural competition is to be
organized in May 2011, and the building is
expected to be completed by 2016
›
The high-rise building is to include shops,
cafés, libraries, sports facilities, as well as
two lecture halls and classrooms for
students and scientists
www.businessaarhus.com
www.businessaarhus.com
23
Business Aarhus
New IKEA in Aarhus
›
IKEA is constructing a new
department store in Skejby with a
total of 35.000 sqm. They will
demolish the existing building
after the inauguration
›
The local plan is currently being
planned and it is expected to be
adressed in the city council in the
first quarter of 2012.
›
Constrcution is expected to start
in 2012
www.businessaarhus.com
24
Business Aarhus
The New University Hospital
www.businessaarhus.com
25
26
Business Aarhus
The New University Hospital
›
Upon its completion in 2019, the
New University Hospital will be the
largest hospital in Northern Europe
and the largest employer in Aarhus
•
344,000 sqm.
•
9,000 employees
•
100,000 admissions per year
•
40-50% of all hospital activity
in the Central Denmark region
•
Total investment of almost 7 billion
Danish kroner
› For more info: www.dnu.rm.dk
www.businessaarhus.com
www.businessaarhus.com
Business Aarhus
New Masterplan for the urban areas of Gellerup and Toveshoej
www.businessaarhus.com
27
28
Business Aarhus
New Masterplan for the urban areas of Gellerup and Toveshoej
›
Brabrand Boligforening (housing
association) and the City of Aarhus
are cooperating to carry out major
physical changes in the social housing
area of Gellerupparken and Toveshøj,
turning the area from a socially
marginalised neighbourhood into an
attractive city area – for all of Aarhus
to enjoy.
›
As the first of its kind in Denmark, the
overall vision of the masterplan is to
combine major physical changes of
an area, such as the introduction of
workplaces, businesses and cultural
life, with a social effort – for a safer
city area.
›
The total investment in the area will
be close to 1 billion Danish kroner.
www.businessaarhus.com
www.businessaarhus.com
› Read more on: www.helhedsplangellerup.dk
29
Business Aarhus
Development plans for the residential areas of Rosenhoej
www.businessaarhus.com
www.businessaarhus.com
›
The Municipality of Aarhus, The
Housing Association of Aarhus and
The Cooperative Housing Association
of Viby has created an overall plan for
the residential areas of Rosenhøj,
Kjærslund and Søndervang.
›
The Project includes renovation and
redevelopment of the residential
areas as well as new constructions.
The vision is to create one unified city
area.
›
The architects: Arkitema, C.F. Møller
and aarhus arkitekterne are among
the winners in the architecture
contest.
30
Business Aarhus
City development in Lisbjerg
City development in Lisbjerg
›
The vision for the development plan in
Lisbjerg is to create a new and sustainable
city with room for 20,000 citizens.
›
A central focal point in the project has
been to build a new international school –
which is now established.
Lisbjergs new school
›
The project will be reinforced within the
coming years by several infrastructural
investments – among others the light rail
transit.
www.businessaarhus.com
www.businessaarhus.com
31
Business Aarhus
City development in Elev
›
The City development project ”Nye” in the city of Elev is constructed by the Taekker
Group in coorporation with the architectural firm ”Cebra Architects” and the
consultancy firm ”Niras”.
›
The new neighborhood ”Nye” will be divided into 7 city areas and are expected to host
between 4.000-7.000 citizens.
www.businessaarhus.com
www.businessaarhus.com
Read more: www.nye.dk
Business Aarhus
32
Modernization of the residential area ”Ringgaarden”
›
The Housing association Ringgaarden is cooperating with the architectual company The Aarhus
Architects and the engineering company Viggo Madsen to make and extensive modernisation of
its oldest housing estate (division 1). The modernisation includes all of the buildings 140
apartments, approx. 17.600 sqm.
›
With a total budget equal to 180 million DKK, the old and worn down appartments will be
converted into modern and energy efficient appartments. The modernisation is expected to finish
in the fall of 2013.
www.businessaarhus.com
www.businessaarhus.com
Business Aarhus
33
Expansion of Moesgaard Museum
›
In January 2011 the construction of the new Moesgaard Museum building began. The building is
designed by Henning Larsen Architects and landscape architect Kristine Jensens drawing office.
The budget of the project is equal to 345 million DKK, and it is expected to be completed by 2013.
›
Besides being a new show room for the museum, the 15,000 sqm. building also functions as a
show room for archaeological and anthropological research projects from the University of
Aarhus.
www.businessaarhus.com
www.businessaarhus.com
34
Business Aarhus
The Ceres Site
www.businessaarhus.com
www.businessaarhus.com
›
The brewery company Royal
Unibrew and the contracting
company A. Enggaard have
signed an agreement about
the Ceres site
›
The proposal for the district
plan includes a project of
140,000 sqm. divided
between 65% business,
education and cultural
leases, and 35% on housing
Business Aarhus
VIA University College Campus Aarhus C
›
Campus Aarhus C is going to be the
new campus for the teacher,
pedagogue and social worker
educations in Aarhus.
›
The educational building will have
5,5000 students at the heart of
Aarhus.
›
They will build 39,500 sqm.
with construction start
ultimo 2011 and delivery in
2014
›
The architects are Arkitema
www.businessaarhus.com
35
36
Business Aarhus
New residential area in Risskov
www.businessaarhus.com
www.businessaarhus.com
›
The Municipality of Aarhus is
planing to build a new residential
area in Risskov with 900 houses.
›
The Area is located at Vejlby Ringvej
and Gustav Holms Vej and is about
129,000 sqm.
›
The Area is owned by The
Municipality of Aarhus, Domis
Ejendomme and three minor local
companies.
›
The project is soon to be processed
at the City Council.
Business Aarhus
Agro Food Park
›
Agro Food Park is a new cluster of
companies and institutions working
within the field of agriculture and
food.
›
Here companies, public
organizations, and science and
educational institutions are working
together to create innovation and
science.
›
The vision is for the Park to have
3,000 employees and 40-50
companies by 2020
www.businessaarhus.com
www.businessaarhus.com
37
Business Aarhus
Light rail transit
›
The introduction of a light rail transit will help to ensure that public transport in and around
Aarhus becomes quick, efficient and environmentally friendly.
›
According to the current plans, the first phase of the light railway system will be a 12
kilometer stretch from the City of Aarhus, along Nørrebrogade and Randersvej via The New
University Hospital in Skejby, to the new urban area of Lisbjerg. Here the light rail will be
connected to Grenaabanen via a new connection to Lystrup.
›
The investment in this first phase (1 billion DKK) is the largest public transport investment in
the city’s history.
›
The partners of the light rail consortium are currently prioritizing the next phases of the
system.
www.businessaarhus.com
38
39
Business Aarhus
Research Facilities for Institute for Biomedicine
www.businessaarhus.com
›
Aarhus University expands with new
research facilities
›
In the University Park a new research
building of 12,300 m2 will be built and
furthermore the Bartholin Building’s
14,300 m2 will be renovated.
›
Total price of 644 mio. DKK
›
Construction is expected to start in
April 2014 and be completed in
November 2015.
›
The architect is Cubo Arkitekter
Business Aarhus
The Port of Aarhus
›
The Port of Aarhus is expanding in
several stages up until 2022.
›
The first stages have been
completed, and a new container
terminal and Port expansion has
already been taken into use.
›
The Port of Aarhus will soon start the
final stage of the expansion and
when this stage is done, the harbors
total area will be twice the size it
used to be, which equals to 360
hectare. Furthermore, the
goodcapacity will increase to 20
million tonnes on a yearly basis.
www.businessaarhus.com
www.businessaarhus.com
40
41
Business Aarhus
The Marselis Tunnel
›
The project creates a direct link from the highway system to the harbor, which continues to
be a central part of Aarhus, with housing, businesses, cultural institutions and the Urban
Media Space (new central library and citizens’ centre).
›
The Marselis tunnel project is among the largest construction projects in Aarhus with a
budget of approx. 1.5 billion DKK.
› Read more on: www.marselisboulevard.dk
www.businessaarhus.com
www.businessaarhus.com
42
Business Aarhus
Find more information at: www.businessaarhus.com
Søren Boel Pedersen
Manager
T: +45 8940 2205
E: [email protected]
www.businessaarhus.com
www.businessaarhus.com