Audit Report
Transcription
Audit Report
QEF08 - RSPO.01 Public Summary Report App./Cert. Date RSPO20003 25/06/2010 Rev. 01 22/08/2011 CERTIFICATION AUDIT Client: Site Address: Standard(s): PT. SMART Tbk. Padang Halaban Mill and Its Supply Bases Padang Halaban Mill: Desa Padang Halaban Kec. Merbau Kab. Labuhan Batu Utara SUMATERA UTARA IDN Its Supply Bases: Kec. Aek Kuo Kab. Labuhan Batu Utara SUMATERA UTARA IDN Kec. Merbau Kab. Labuhan Batu Utara SUMATERA UTARA IDN Kec. Kualuh Hulu Kab. Labuhan Batu Utara SUMATERA UTARA IDN National Interpretation of RSPO Principles and Criteria for Sustainable Palm Oil Production, Republic of Indonesia, May 2008 Scope of Certification: COMMERCIAL- IN – CONFIDENCE The contents of this report must not be disclosed to a third party without the agreement of the SAI Global Client DISCLAIMER: This report has been prepared by SAI Global Indonesia (SAI Global) in respect of a Client's application for assessment by SAI Global. The purpose of the report is to comment upon evidence of the Client's compliance with the standards or other criteria specified. The content of this report applies only to matters, which were evident to SAI Global at the time of the audit within the audit scope. SAI Global does not warrant or otherwise comment upon the suitability of the contents of the report or the certificate for any particular purpose or use. SAI Global accepts no liability whatsoever for consequences to, or actions taken by, third parties as a result of or in reliance upon information contained in this report or certificate. ACTIVITY ID: 303335 QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 1 of 61 QEF08 - RSPO.01 Public Summary Report Padang Halaban Mill PT. SMART Tbk Location: Kec. Aek Kuo Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 50' 22'' E 2º 19' 09'' N Capacity (annual MT CPO): CPO/year : 83,759.46 ton PK/year: 19,378.04 ton Padang Halaban Estate PT. SMART Tbk Location: Kec. Aek Kuo Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 50' 20'' E 2º 18' 46'' N Annual FFB Production: 176.233,78 ton Total Area : 7,464.92 Ha Planted Area : 7,213.22 Ha Pernantian Estate PT. SMART Tbk Location: Kec. Merbau Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 46' 51'' E 2º 14' 11'' N Annual FFB Production: 54.354,22 ton Total Area : 2,344.92 Ha Planted Area : 2,226.22 Ha Adi Pati Estate PT. SMART Tbk Location: Kec. Merbau Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 57' 23'' E 2º 17' 59'' N Annual FFB Production: 41.732,36 ton Total Area : 2,490 Ha Planted Area : 2,403.22 Ha Kanopan Ulu Estate PT. MP Leidong West Indonesia (SMART’s subsiadiary company) Location: Kec. Kualuh Hulu Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 36' 58'' E 2º 34' 00'' N Annual FFB Production: 81.653,14 ton Total Area : 3,319.56 Ha Planted Area : 3,112.13 Ha COMMERCIAL- IN – CONFIDENCE The contents of this report must not be disclosed to a third party without the agreement of the SAI Global Client DISCLAIMER: This report has been prepared by SAI Global Indonesia (SAI Global) in respect of a Client's application for assessment by SAI Global. The purpose of the report is to comment upon evidence of the Client's compliance with the standards or other criteria specified. The content of this report applies only to matters, which were evident to SAI Global at the time of the audit within the audit scope. SAI Global does not warrant or otherwise comment upon the suitability of the contents of the report or the certificate for any particular purpose or use. SAI Global accepts no liability whatsoever for consequences to, or actions taken by, third parties as a result of or in reliance upon information contained in this report or certificate. ACTIVITY ID: 303335 QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 2 of 61 Public Summary Report Table of contents Executive Overview Abbreviations Used Page 5 5 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 SCOPE OF THE CERTIFICATION ASSESSMENT Introduction Audit Objective Scope of Certification Location of Mill and Estates Description of Supply Base Date of Plantings and Cycles Other Certification Held Organisational Information/Contact Person Time Bound Plan for Other Management Units Area of Plantation Approximate Tonnages Offered for Certification (CPO and PK) Date of Issue of Certificate and Scope of Certification 6 6 7 7 8 11 11 12 13 13 14 15 15 2.0 2.1 2.2 2.3 2.4 2.5 AUDIT PROCESS Certification Body Audit Methodology Qualification of the Lead Auditor and Audit Team Members Stakeholder Consultation Date of Next Surveillance Visit 15 15 16 16 17 18 3.0 3.1 3.2 AUDIT FINDINGS Summary of findings Recommendation 18 18 47 List of Tables 1 Mill and Estates GPS Locations 2 Organisation FFB Production 3 Age Profiles of Planted Palms 4 Other Certification Held by Mill and Estates 5 RSPO Certification Time Bound Plan of PT. SMART Tbk 6 Estates and Area Planted 7 Hectare Statement Page 8 11 11 12 13 14 14 List of Figures 1 Map of Mill and Estates Location 2 Boundaries Pegs with Estate name in PHLE 3 Land Applications in PHLE 4 Level meter in KULE PT. MP Leidong West Indonesia 5 Piezometer in ADPE 6 Watershed Protection 7 Barn owls and boxes in ADPE 8 Nepenthes in ADPE 9 Warning sign to control any illegal or inappropriate hunting and fishing in KULE PT. MP Leidong West Indonesia 10 POME pond completed with water level to monitor height of POME Page 9 21 25 26 27 27 29 36 37 QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia 41 Page 3 of 61 Public Summary Report List of Appendices A Audit Record B Nonconformities, Corrective Actions and Observations Summary C Stakeholder’s issues and comment D Definition of, and action required with respect to audit findings QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 48 52 59 61 Page 4 of 61 Public Summary Report Executive Overview SAI Global has audited PT. SMART Tbk. operations comprising one mill, four oil palm estates, support services and infrastructure. PT. SMART Tbk. operation complies with the requirements of the National Interpretation of RSPO Principles and Criteria for Sustainable Palm Oil Production, Republic of Indonesia, May 2008. The recommendation from this audit is that PT. SMART Tbk. be approved as a producer of RSPO Certified Sustainable Palm Oil and Palm Kernel. Abbreviations Used ADPE AMDAL BHL BKM BLH BOD BPN COD CPO CSR D&L DPPL EFB FFB HCV HGU HPH HR IPM ISO KULE LD MCAR MSDS NGO OHS PC PHLE PHLM PK PKB POME PPE PRNE PSM RABQSA RC RSPO SA SEL SKU SMARTRI Adipati Estate Analisis Mengenai Dampak Lingkungan (Environmental and Social Impact Assessment) Buruh Harian Lepas (Daily worker) Buku Kegiatan Mandor (Log book of group leader activity) Badan Lingkungan Hidup (Environmental Agency) Biological Oxygen Demand Badan Pertanahan Nasional (National Land Agency) Chemical Oxygen Demand Crude Palm Oil Corporate Social Responsibility Document and Legal Dokumen Pengelolaan dan Pemantauan Lingkungan (Document of Environmental Management and Monitoring) Empty Fruit Bunch Fresh Fruit Bunch High Conservation Value Hak Guna Usaha (Land Use Title) Hak Penguasaan Hutan Human Resources Integrated Pest Management International Standards Organisation Kanopan Ulu Estate Lethal Dose Management Committee Agronomy and Research Material Safety Data Sheet Non Government Organisation Occupational Health and Safety Production Controller Padang Halaban Estate Padang Halaban Mill Palm Kernel Perjanjian Kerja Bersama (Agreement of working) Palm Oil Mill Effluent Personal Protective Equipment Pernantian Estate Perkebunan Sinar Mas (Sinar Mas Estate) Quality Society of Australia Regional Controller Roundtable for Sustainable Palm Oil Social Accountability Studi Evaluasi Lingkungan (Environmental Evaluation Study) Syarat Kerja Umum (Permanent worker) SMART Research Institute QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 5 of 61 Public Summary Report SMD SMK3 SOP TPH VPA VPM Senior Managing Director Sistem Manajemen Kesehatan dan Keselamatan Kerja (Occupational Health and Safety Management System) Standard Operation Procedure Ton Per Hectare Vice President of Agronomy Vice President of Manufacturing 1.0 SCOPE OF THE CERTIFICATION ASSESSMENT 1.1 Introduction SAI Global conducted an audit of PT. SMART Tbk. Padang Halaban Mill and Its Supply Bases on 21/06/2010 to 25/06/2010. The purpose of this audit report is to summarise the degree of compliance with relevant criteria, as defined on the cover page of this report, based on the evidence obtained during the audit of the organisation. SAI Global audits are carried out within the requirements of SAI Global procedures that also reflect the requirements and guidance provided in the international standards relating to audit practice such as ISO/IEC 17021, ISO 19011, RSPO Certification System and other normative criteria. SAI Global Auditors are assigned to audits according to industry, standard or technical competencies appropriate to the organisation being audited. Details of such experience and competency are maintained in our records. The audit team is detailed in the attached audit record. In addition to the information contained in this audit report, SAI Global maintains files for each client. These files contain details of organisation size and personnel as well as evidence collected during preliminary and subsequent audit activities (Documentation Review and Scope) relevant to the application for initial and continuing certification of your organisation. Details of your primary contact persons and their contact details and site addresses are also maintained. Please take care to advise us of any change that may affect the application/ certification or may assist us to keep your contact information up to date, as required by SAI Global Terms and Conditions. Please note that this report is subject to independent review and approval. Should changes to the outcomes of this report be necessary as a result of the review, a revised report will be issued and will supersede this report. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 6 of 61 Public Summary Report 1.2 Audit Objective Certification Audit To determine the implementation of your organisation’s RSPO system; the capability and effectiveness of the RSPO system in ensuring continual compliance with RSPO principles and criteria and in meeting its specified objectives (indicators); and the conformity of the RSPO system to stated principles, criteria and indicators. 1.3 Scope of Certification The scope of certification is the CPO production from one (1) Palm Oil Mill and FFB supply bases comprising three (3) companies owned by PT. SMART Tbk. and one (1) Oil Palm Estate owned by subsidiary. Padang Halaban Mill PT. SMART Tbk Location: Kec. Aek Kuo Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 50' 22'' E 2º 19' 09'' N Capacity (annual MT CPO): CPO/year: 83,759.46 ton and PK/year: 19,378.04 ton Padang Halaban Estate PT. SMART Tbk Location: Kec. Aek Kuo Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 50' 20'' E 2º 18' 46'' N Annual FFB Production : 176,233.78 ton Total Area : 7,464.92 Ha Planted Area : 7,213.22 Ha Pernantian Estate PT. SMART Tbk Location: Kec. Merbau Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 46' 51'' E 2º 14' 11'' N Annual FFB Production : 54,354.22 ton Total Area : 2,344.92 Ha Planted Area : 2,226.22 Ha Adi Pati Estate PT. SMART Tbk Location: Kec. Merbau Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 57' 23'' E 2º 17' 59'' N Annual FFB Production : 41.732,36 ton Total Area : 2,490 Ha Planted Area : 2,403.22 Ha Kanopan Ulu Estate PT. MP Leidong West Indonesia (PT. SMART Subsidiary) Location: Kec. Kuala Hulu Kab. Labuan Batu, Sumatera Utara, Indonesia GPS Location: 99º 36' 58'' E 2º 34' 00'' N Annual FFB Production : 81.653,14 ton Total Area : 3,319.56 Ha Planted Area : 3,112.13 Ha QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 7 of 61 Public Summary Report 1.4 Location of Mill and Estates PT. SMART Tbk. mill and estates are located in North Sumatera Province. The geographical coordinate of the mill and estates are shown on Table 1. Table 1: Mill and Estates GPS Locations MILL AND ESTATE EASTING NORTHING Padang Halaban Mill 99o 50’ 22” E 2o 19’ 09” N Padang Halaban Estate 99o 50’ 20” E 2o 18’ 46” N Pernantian Estate 99o 46’ 51” E 2o 14’ 11” N Adipati Estate Kanopan Ulu Estate PT. MP Leidong West Indonesia 99o 57’ 23” E 2o 17’ 59” N 99o 36’ 58” E 2o 34’ 00” N QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 8 of 61 Public Summary Report Figure 1 Map of Mill and Estates Location QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 9 of 61 Public Summary Report QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 10 of 61 Public Summary Report 1.5 Description of Supply Base The FFB is sourced from three (3) companies owned by PT. SMART Tbk. and one (1) Oil Palm Estate owned by subsidiary. The areas and FFB production of the plantations are shown on Table 2. Table 2: FFB Production from each supply base ESTATE PLANTED AREA (HA) FFB (TON/YEAR) Padang Halaban 7,213.22 176,233.78 Pernantian 2,226.22 54,354.22 Adipati 2,403.22 41,732.36 Kanopan Ulu PT. MP Leidong West Indonesia 3,112.13 81,653.14 Source: QEF15RSPO.02 – 21 April 2010 1.6 Date of Plantings and Cycles Table 3: Age Profiles of Planted Palms YEAR 1971 *) 1978 **) 1981 1982 1983 1984 1985 1986 1987 1988 Total Old Mature >18 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 ADPE KULE PT. MP Leidong West Indonesia PHLE PRNE 61.34 1) 186.57 213.87 1) 343.73 1) 191.80 1) 496.83 1) 531.37 1) 1,777.60 338.41 1) 593.68 1) 376.76 1) 495.05 3) QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 2) 201.57 295.46 2) 1) 178.62 1) 609.02 1) 205.69 3) 371.99 3) 161.94 3) 362.28 3) 963.42 3) 236.28 3) 3,150.58 295.58 3) 276.38 3) 695.96 3) 237.47 3) 482.01 3) 624.78 3) 273.96 3) 183.96 3) 362.03 3) 384.03 3) 104.77 3) SAI Global Indonesia % OF PLANTED AREA SUM 186.57 61.34 186.57 178.62 822.89 549.42 371.99 353.74 859.11 1,494.79 236.28 5,114.75 295.58 276.38 695.96 575.88 1,349.65 808.74 376.76 857.08 690.37 295.46 0.41 1.25 1.19 5.50 3.67 2.49 2.37 5.74 10.00 1.58 34.20 1.98 1.85 4.65 3.85 9.02 5.41 2.52 5.73 4.62 1.98 Page 11 of 61 Public Summary Report YEAR ADPE 2002 2003 Total Prime Mature (718) 2004 2005 2006 Total Young Mature (36) TBM IDEV Total Immature Total Planted Area Note: *) **) 1) 2) 3) 1.7 1,803.90 KULE PT. MP Leidong PHLE West Indonesia 391.70 2) 356.60 2) 341.22 3) 1,245.33 3,699.46 89.20 2) 599.31 3) 599.31 2,403.21 89.20 163.18 3) 163.18 200.00 3) 200.00 7,213.22 3,112.13 PRNE % OF PLANTED AREA SUM 284.12 3) 846.81 391.70 981.94 7,595.50 2.62 6.57 50.79 508.38 3) 422.95 3) 261.51 3) 1,192.84 760.76 422.95 860.82 2,044.53 5.09 2.83 5.76 13.67 2,226.22 200.00 200.00 14,954.78 1.34 1.34 100 Replanting is planned in 2011. In 2009 production of plant still high 20.2 ton although the plant has not been fertilised since three years ago The plant was replanted in 2010. In 2009 production of plant still high 21.3 ton although the plant has not been fertilised since three years ago Take over from previous company New planting Replanting Other Certification Held The organisation is implementing quality, environmental, and occupational health and safety management system based on ISO 9001:2008, ISO 14001:2004, and SMK3 (health and safety management system based on Indonesia’s Regulation ‘PER. 05/MEN/1996’). The details of other certifications held are shown in the following table. Table 4: Other Certification Held by Mill and Estates ESTATE/MILL OTHER CERTIFICATION HELD Padang Halaban Mill SMK3 since 2000, ISO 9001:2008 since 2002 Padang Halaban Estate ISO 14001:2004 since 2003 Pernatian Estate ISO 14001:2004 since 2003 Adipati Estate Nil Kanopan Ulu Estate PT. MP Leidong West Indonesia Nil Source: QEF15RSPO.02 – 21 April 2010 QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 12 of 61 Public Summary Report 1.8 Organisational Information/Contact Person PT. SMART Tbk Plaza BII, Tower 2, 10th floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta 10350 Phone : (+62-21) 3181388 Fax : (62-21) 3181389 CP: Mr. Ismu Zulfikar Head of Environmental Department Email: [email protected] 1.9 Time Bound Plan for Other Management Units PT. SMART Tbk is committed to RSPO certification of all its Management Units located in North Sumatera, Jambi, Bangka, South Kalimantan, Central Kalimantan, and East Kalimantan. Time bound plan has been developed to achieve the RSPO certification for all its Management Units by 2012. The plan is detailed on Table 5. The time bound plan is realistic and challenging. It was evident that the organisation is committed to meet the target that had been set in the time bound plan. Table 5: RSPO Certification Time Bound Plan of PT. SMART Tbk., approved in June 2010 NO NAME OF MILL SUPPLY BASE COMPANY LOCATION YEAR 1 Padang Halaban Mill PT SMART Tbk North Sumatera 2010 2 Langga Payung Mill PT Tapian Nagenggan North Sumatera 2010 3 Batu Ampar Mill PT SMART Tbk South Kalimantan 2010 4 Tanah Laut Mill PT SMART Tbk South Kalimantan 2010 5 Hanau Mill PT Tapian Nadenggan Central Kalimantan 2010 6 Leidong West Mill PT Leidong West Indonesia Bangka 2011 7 Bukit Kapur Mill PT SMART Tbk South Kalimantan 2011 8 Gunung Kombeng Mill/ Muara Wahau Mill Padang Halaban Estate Pernantian Estate Adipati Estate Kanopan Ulu Estate PT. MP Leidong West Indonesia Langga Payung Estate Paya Baung Estate Normak Estate Batu Ampar Estate Batu Mulia Estate Sungai Panci Estate Sungai Panci Plasma Tanah Laut Estate Kintapura Estate Hanau Estate Tasik Mas Estate Tanjung Paring Estate Medang Sari Estate Lestari Unggul Jaya Estate Leidong West Utara Estate Leidong West Selatan Estate Bukit Intan Estate Bukit Mas Estate Sungai Cantung Estate Bukit Kapur Estate Sawita Estate Sawita Plasma Pamukan Estate Gunung Kombeng Estate Gunung Kombeng Plasma Muara Wahau Estate Rantau Panjang Estate Rantau Panjang Plasma PT Kresna Duta Agroindo East Kalimantan 2011 QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 13 of 61 Public Summary Report 9 Jak Luay Mill 10 Jelatang Mill 11 Langling Mill 12 Pelakar Mill 13 Sungai Bengkal Mill 14 Semilar Mill Pantun Mas Estate Pantun Mas Plasma Jak Luay Estate Jak Luay Plasma Long Buluh Estate Bukit Subur Estate Bukit Subur Plasma Batang Merangin Estate Kubang Ujo Plasma Pamenang Plasma Bangko Inti Estate Bangko Plasma Pelakar Estate Tiga Serumpun Estate Bukit Bungkul KKPA Sungai Bengkal Estate Batang Gading Estate Sungai Bengkal KKPA Semilar Estate Sei Rindu Estate PT Tapian Nadenggan East Kalimantan 2012 PT Kresna Duta Agroindo Jambi 2012 PT Kresna Duta Agroindo PT Kresna Duta Agroindo Jambi 2012 Jambi 2012 PT Satya Kisma Usaha Jambi 2012 PT Tapian Nadenggan Central Kalimantan 2012 Source: Data from PT. SMART Tbk. in June 2010 1.10 Area of Plantation The areas details for organisation owned estates are shown on Table 6. Table 6: Estates and Area Planted ESTATE MATURE (HA) IMMATURE (HA) Padang Halaban 7,013.22 200 Pernantian 2,226.22 0 Adipati 2,403.21 0 Kanopan Ulu PT. MP Leidong West Indonesia 3,112.13 0 14,754.78 200 Total Source: Data from PT. SMART Tbk. in 2009 Table 7: Hectare Statement AREA HECTARES Mature area 14,754.78 Immature area 200.00 Total area planted 14,954.78 Nursery 36.34 Emplacement, Mill, Road, etc. 548.50 River, Ditch, and Swamp QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 94.70 SAI Global Indonesia Page 14 of 61 Public Summary Report Other area 10.32 Total leased area 15,644.64 Source: Data from PT. SMART Tbk. in 2009 1.11 Approximate Tonnages Offered for Certification (CPO and PK) The approximate tonnages certified are: CPO/year: 83.759,46 ton and PK/year: 19.378,04 ton 1.12 Date of Issue of Certificate and Scope of Certification The scope of certification is the CPO production from one (1) palm oil mill and three (3) companies owned by PT. SMART Tbk. and one (1) Oil Palm Estate owned by subsidiary. Date of issue of certificate will be the date on approval of this Assessment Report by the RSPO Secretariat. 2.0 AUDIT PROCESS 2.1 Certification Body PT. SAI Global Indonesia Graha Iskandarsyah, 4th floor Jl. Iskandarsyah Raya No. 66 C Kebayoran Baru, Jakarta 12160, Indonesia Phone : +62 21 720 6186, 720 6460 Fax : +62 21 720 6207 Contact person : Mr. Joko Prayitno Certification Manager Email : [email protected] SAI Global is one of the world’s leading business providers of independent assurance. SAI Global provides organisations around the world with information services and solutions for managing risk, achieving compliance and driving business improvement. We provide aggregated access services to Standards, Handbooks, Legislative and Property publications; we audit, certify and register your product, system or supply chain; we facilitate good governance and awareness of compliance, ethics and policy issues and provide training and improvement solutions to help individuals and organisations succeed. The SAI Global business is driven by two equally important client needs - the mandated need for organisations to conform to regulations, standards and legislation in all their locations, and the operational need for organisations to improve business processes and procedures as well as corporate culture. As we are a global company, we can meet these needs for any client - those operating within one country's borders and in one language or those operating across borders and in many languages. There are three business units/divisions within SAI Global namely the Information Services Division, the Compliance Division, and the Assurance Division. The Assurance Division helps QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 15 of 61 Public Summary Report organisations manage risk, achieve process or product certification and drive improvement by providing training, registration audits and supplier management programs that can improve business performance. We provide independent audits, assessments and certification of your products or business processes to ensure they comply with industry standards or customer specific requirements. We understand how compliance with those standards can improve the efficiency, economy and profitability of your operation. With auditing and assessment staff located around the world, our clients include large global corporations as well as single site organisations. 2.2 Audit Methodology SAI Global performed a pre-audit to RSPO Principles and Criteria on 28 to 29 April 2010 to review PT. SMART Tbk.’s RSPO system, confirm the scope for certification, determine organisation’s preparedness for Stage 2 (Certification) Audit; review the adequacy of the SAI Global audit program and resources for Stage 2 (Certification) Audit including confirming and preparing the draft audit plan. Before that, SAI Global sent ‘Self Evaluation Checklist’ to be completed to ensure that the organisation comply with the requirements of RSPO Principles and Criteria. Reference to documents and records were filled in the ‘Self Evaluation Checklist’ and it was used by the auditor as guidance during pre-audit and certification audit. The Certification Audit was performed on 21 to 25 June 2010. The audit programme was included in the body of report. The audit methodology for collection of objective evidences is site inspection, documentation and record review and interview with staffs, workers, and other stakeholders. 2.3 Qualification of the Lead Auditor and Audit Team Members Ria Gloria – Lead Auditor Ria Gloria graduated with Bachelor of Chemical Engineering degree from Bandung Institute of Technology in 1994. She has working experience as Environmental Consultant for many years. She has completed ISO 14001 (1995), ISO 9001 (2004) and RSPO (2009) lead auditor training courses. For the last 7 years she has been involved in quality (ISO 9001) and environmental (ISO 14001) management system audits for very broad industrial and in the palm oil sector since 2003 for several plantations and mills. She has received training for good agricultural practices including integrated pest management and high conservation value (2008-2009). Inge Triwulandari – Audit Team Member Inge Triwulandari graduated with Bachelor of Chemical Engineering degree from Bandung Institute of Technology in 1996. She has completed ISO 9001 (2000), ISO 14001 (1997) lead auditor training courses and RSPO auditor (2008). For the last 11 years she has been involved in quality (ISO 9001) and environmental (ISO 14001) management system audits including in the palm oil sector since 2006 for several plantations and mills. She has received training for good agricultural practices including integrated pest management and high conservation value (2008-2009). Sigit Yulianto – Audit Team Member Sigit Yulianto graduated with Bachelor of Metallurgical Engineering degree from University of Indonesia in 1993 and Master of Occupational Health and Safety from the same university in 2006. He has working experience in the manufacturing industry for many years. He also certified OHS Expert in Indonesia. For the last 13 years he has been involved in quality (ISO 9001) and occupational health and safety management system audits for very broad industrial and service sectors including in the palm oil sector since 2008 for several plantations and mills. He has QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 16 of 61 Public Summary Report received training for good agricultural practices including integrated pest management and high conservation value (2008-2009). Fadjar Deniswara – Audit Team Member He graduated with Bachelor of Industrial Engineering degree from National Institute of Technology in Malang. He is a Lead Quality Auditor for ISO 9001:2008 with SAI Global and registered in RABQSA. He has an experience for more than 10 years in auditing. He has an experience in audit with company with labour intensive type (e.g. textile, garments, shoes, etc). He has also registered as SA 8000 certified auditor. He has received training for good agricultural practices including integrated pest management and high conservation value (2008-2009). Resit Sözer – Technical Specialist for HCV Issues Dutch nationality Biologist, since 1994 active in Indonesia in the field of Endangered Species research (Bornean Peacock Pheasant, Javan Hawk-eagle), Endangered Species surveys (Sumatran Rhino, Orang Utan, Javan Tiger), habitats surveys (conservation areas, HPH, oil palm plantations), wildlife trade surveys, wild animal rescue, reintroduction and restocking of wildlife, endangered species breeding programs (Bornean Peacock Pheasant, Javan Warty Pig, Blackwinged Starling), scientific publications and community involvement. Andri Novi – Technical Specialist for Social Issue He graduated with Bachelor Degree of Linguistics, Literature and Cultural Studies from Padjadjaran University Bandung. He is an accredited RSPO HCV Assessor. He has working experience in Participatory Action Research and Community Development since 1990. He was involved in assessing several HCV Assessment and Social Impact Assessment as well as in several facilitation trainings as a trainer and facilitator for several Participatory Projects in Indonesia. 2.4 Stakeholder Consultation Stakeholder consultation was performed to internal and external stakeholders. Internal stakeholders included staffs and workers. External stakeholders were notified by placing an invitation to comment on the RSPO, PT. SMART Tbk and SAI Global websites. Letters were sent to individual stakeholders and telephone calls were performed to arrange meeting. Meetings and interviews with stakeholders as part of the audit were held. External stakeholders included governments, NGO and civil societies who have an interest in the organisation area and resident communities. List of stakeholders contacted Workers and Staffs Sinus, Lewi, Iwan – Sprayer Iwan S – SKU Harian Agung (Estate Manager), Wawan Susanto, Lukman (HR Operation) Rianto Alfadilllah, Hartati (RSPO Officer from PT. SMART Tbk.) Jon S (Union Labour) Local community Hutabarat – Community Leader Desa Sialang Taji, Nasim – Religion Leader Desa SikopiQEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 17 of 61 Public Summary Report kopi, Budi – Youth Leader Aek Kanopan H. Redoyaman – Religion Leader, Daud – Community Leader, Rollip Hasibuan – Community Leader M. Erwin Wijaya – Youth Leader, Samsul Tanjung – Religion Leader Government: Sukisman – Camat (Subdistrict Head) Aek Kuo Non Government Organisation: Amin Siahaan – Local NGO 2.5 Date of Next Surveillance Visit The next surveillance visit will be one year from approval of this report by the RSPO. 3.0 AUDIT FINDINGS 3.1 Summary of findings As mentioned in above, objective evidences were obtained during the certification assessment for the entire RSPO indicator for 1 Mill and 4 Estates. The evidences for each major and minor indicator from each of these operational areas were aggregated to provide overall findings. Statements were provided for each of the Indicators to support the finding of the assessment team. During audit, 24 minor nonconformities against minor compliance indicators and 11 opportunities for improvement were issued. Detail of minor nonconformities and opportunities for improvement was provided in the body of report. PRINCIPLES 1: COMMITMENT TO TRANSPARENCY Criterion 1.1 Oil palm growers and millers provide adequate information to other stakeholders on environmental, social and legal issues relevant to RSPO Criteria, in appropriate languages & forms to allow effective participation in decision making. Communication procedure was established and implemented by PT SMART Tbk. Communication procedure described follow up of information request from interested parties. All information requests from stakeholder were listed and recorded by the mill and estates. Most of the requests are relating to donation requests from village head and village institution. It was used for social activities of the communities. Follow up of request and information was recorded and maintained. Retention time for communication records was determined. Procedure for keeping records was described in ’SOP Pengendalian dan Masa Simpan Dokumen’ which made by each estate and mill. Criterion 1.2 Management documents are publicly available, except where this is prevented by commercial confidentiality or where disclosure of information would result in negative environmental or social outcomes. List of management documents which are publicly available has been made by the mill and all estates. The list included types of management documents and its relevant stakeholders: HGU (Land Use Title), AMDAL (Environmental and Social Impact Assessment), Occupational Health and Safety Management Plan and CSR Program. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 18 of 61 Public Summary Report All the estates and mill have established SOP for communication and consultation with stakeholder. All received correspondence from stakeholder was recorded in the incoming letter log. Some of correspondences were sighted: PHLE: Request of copies of HGUs from Labuhan Batu Police in March 2009 and its response. KULE PT. MP Leidong West Indonesia: Request of labor information and copies of health and safety permit from Disnakertrans (letter #560/116/STKT/2010) and its response (letter from Estate Manager #29/EM-KULE-RSPO/V/2010). PHLM: Request of DPPL document from BLH Labuhan Batu Utara in April 2010 and its response. No request of documents/information sighted at incoming letter log for ADPE and PRNE since 2009. Procedures for document and record maintenance have been established by regional mill and all estates office. The procedure requires that all records necessary for RSPO implementation to be kept at least 5 years at RSPO secretary office at mill and each estate. Opportunity for Improvement for ADPE It could be considered to provide clear reference within ADPE SOP for stakeholder communication and consultation, SOP/ADPE/KOM, for the list management documents and its relevant stakeholders. PRINCIPLES 2: COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS Criterion 2.1 There is compliance with all applicable local, national and ratified international laws and regulations. The mill and estates have developed SOP and appointed personnel for identifying, reviewing, applying and evaluating compliance with applicable laws and regulations including those related to land status, occupational health and safety, environmental, labour, agricultural practice, and mill operation. It is the responsibility of RSPO Officer at mill and each estate in consultation with other departments to identify review and ensure application of those law and regulations. The procedure requires regular access to regulatory bodies to update information of laws and regulations. The list of regulatory bodies was covered in the list of stakeholder and its contact person. Valid applicable laws and regulations were registered including detail requirement applied to which mill and or estates. The mill and estates have evaluated their compliance with applicable laws and regulations. Status of compliance with laws and regulations were evaluated, and evaluation of compliance result indicated that compliance status was justified with reference to the objective evidence of compliance. It was evident that the applicable laws and regulations were implemented by the organisation. Interview was conducted with the ENVD, D&L, HR Ops and RSPO Officer at mill and each estate to review the implementation of regulations. Minor nonconformity against Criterion 2.1 for mill and all estates Mechanism for conducting evaluation of compliance with law and regulation has not been clearly described in the SOP for legal and other requirements for PHLE, KULE PT. MP Leidong West Indonesia, ADPE, and PHLM. Some items as mentioned in the status of compliance for PHLE, KULE PT. MP Leidong West Indonesia, ADPE, PRNE and PHLM were not complete nor accurate, e.g.: o Not all relevant/related laws and regulations were listed in the evaluation of QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 19 of 61 Public Summary Report o o compliance although in practice they were already implemented, e.g. PP7/99, Kepres 32/90, and UU32/2009 and Local Regulation for Labuhan Batu Utara – KULE PT. MP Leidong West Indonesia. Some of the compliance status was not accurately mentioned / stated in relevant documents of the evaluation of compliance, e.g. legal demarcation of KULE PT. MP Leidong West Indonesia Division 4 & 5, DPPL documents which were still in approval process – KULE PT. MP Leidong West Indonesia, Permentan 14/2004 ADPE. Evaluation of compliance against regulation UU No 3 tahun 1992 tentang JAMSOSTEK and PP No. 28/2002 tentang JAMSOSTEK were performed but not specific to all requirements in the regulation. Criterion 2.2 The right to use land can be demonstrated, and is not legitimately contested by local communities with demonstrable rights. D & L Department of the PT. SMART, Tbk. held the original HGU documents. Copies of HGU were kept by each estate. All HGU sighted for all estates were current and showed the area and the length of tenure. PHLE & PHLM PT. SMART, Tbk. held 3 (three) HGUs: 1. HGU#1 (October 21, 2005 – April 22, 2024) Kelurahan Padang Halaban, Kecamatan Aek Natas, Kabupaten Labuhan Batu. Held by PT. SMART, Tbk. Expire date on April 22, 2024. Total area: 5,509.39 Ha. Already extended according to Decree from BPN #148/HGU/BPN/2004 for another 35 years since 2024. 2. HGU#2 (October, 21 2005 – April 22, 2024) Kelurahan Panigoran, Kecamatan Aek Natas, Kabupaten Labuhan Batu. Held by PT. Perkebunan Panigoran. Expire date on April 22, 2024. Total area: 1,583.53 Ha. Already extended according to Decree from BPN #110/HGU/BPN/2004 for another 25 and 35 years since 2024. 3. HGU#2 2005 (October 21, 2005 – December 31, 2012) Kelurahan Panigoran, Kecamatan Aek Natas, Kabupaten Labuhan Batu. Held by PT. SMART, Tbk. Expire date on December 12, 2012. Total area: 372 Ha. Already extended according to Decree from BPN #114/HGU/BPN/2004 for another 25 and 35 years since 2012. KULE PT. MP Leidong West Indonesia held 4 (four) HGUs: 1. HGU#1 (March 18, 1996 – December 31, 2030) Tanjung Pasir/Sialang Taji, Teluk Binjai, Kecamatan Kualuh Hulu – Kualuh Hilir, Kabupaten Labuhan Batu. Held by PT. MP Leidong West Indonesia. Expire date on December 31, 2030. Total area 2,980.14 Ha. 2. HGU#18 (July, 25 2008 – July 22, 2043) Kelurahan Damuli Pekan, Kecamatan Kualuh Selatan, Kabupaten Labuhan Batu. Held by PT. MP Leidong West Indonesia. Expire date on July 22, 2043. Total area 103.4 Ha. 3. HGU#1 (October 21, 2005 – April 01, 2023) Kelurahan Damuli, Kecamatan Kualuh Hulu, Kabupaten Labuhan Batu. Held by PT. MP Leidong West Indonesia. Expire date on April 01, 2023. Total area 354.10 Ha. Already extended according to Decree from BPN #138/HGU/BPN/2004 for another 25 and 35 years since 2023. 4. HGU#1 (October 21, 2005 – April 22, 2024). Kelurahan Kanopan Hulu, Kecamatan Kualuh Hulu, Kabupaten Labuhan Batu. Held by PT. MP Leidong West Indonesia. Expire date on April 22, 2024. Total area 1,408.21 Ha. Already extended according to Decree from BPN #137/HGU/BPN/2004 for another 25 and 35 years since 2024. ADPE PT. SMART Tbk held 2 (two) HGUs: 1. HGU#5 (December 22, 1994 – December 31, 2020) Kelurahan Negeri Lama Seberang, Kecamatan Bilah Hilir, Kabupaten Labuhan Batu. Held by PT. SMART Tbk. Expire date on December 31, 2020. Total area 1,594 Ha. Already extended according to Decree from BPN #109/HGU/BPN/2004 for another 25 and 35 years since 2020. 2. HGU#1 (October, 22 1991 – December 31, 2080) Kelurahan Aek Hite Toras, Kecamatan QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 20 of 61 Public Summary Report Gaya Baru Merbau, Kabupaten Labuhan Batu. Held by PT. SMART Tbk. Expire date on December 31, 2080. Total area 896 Ha. Already extended according to Decree from BPN #115/HGU/BPN/2004 for another 25 and 35 years since 2020. PRNE PT. SMART Tbk. held 2 (two) HGUs: 1. HGU#1 (April 24, 1998 – April 22, 2030) Kelurahan Pernantian, Kecamatan Merbau, Kabupaten Labuhan Batu. Held by PT. SMART Tbk. Expire date on April 22, 2030. Total area 1,462.07 Ha. Already extended according to Decree from BPN #117/HGU/BPN/2004 for additional 35 years since 2030. 2. HGU#1 (October 21, 2005 – December 31, 2031) Kelurahan Aek Hite Toras, Kecamatan Gaya Baru Merbau, Kabupaten Labuhan Batu. Held by PT. SMART Tbk. Expire date on December 31, 2031. Total area 916 Ha. Already extended according to Decree from BPN #135/HGU/BPN/2004 for additional 25 and 35 years since 2031. Plantation Operation Permit for PT. SMART Tbk.: 1. HK.350/253/Dj.Bun.5/III/2001 issued for PT. SMART Tbk. on March 30, 2001 for 10.749,46 Ha Kecamatan NA IX-X, Aek Natas Merbau, Kabupaten Labuhan Batu, Sumatera Utara. Mill capacity 60 TPH. 2. Decree #761/Menhutbun-VII/2000 issued for PT. PP Panigoran on June 29, 2000 for 1,583.53 Ha. Plantation Operation Permit for PT. MP Leidong West Indonesia: 3. Decree #762/Menhutbun-VII/2000 issued for PT. MP Leidong West Indonesia on June 29, 2000 for 1,408.21 Ha Kualuh Hulu, Labuhan Batu, Sumatera Utara. 4. Decree #503/683/F issued for PT. MP Leidong West Indonesia on April 17, 2002 for 103.4 Ha. In each estate, signboard was placed, indicated HGU, operation area and land title. Legal boundaries were clearly demarcated. In majority there is good evidence that the legal boundaries were maintained by each estate. Site survey and inspection of boundary pegs for each estate have been planned and conducted, accompanied by BPN officers, based on request from Regional Controller PT. SMART Tbk. (letter #266/RC-EXT/XII/2009, December 15, 2009). Based on the survey and inspection each estate at that time had updated its GPS location of their boundary pegs. Reconstruction of boundary pegs was evident. Regular inspection of the boundary pegs had been established to be conducted every 6 months and result was noted, however minor nonconformities were issued for KULE PT. MP Leidong West Indonesia and PRNE in this area. It was also sighted that estate supervisors monitored the boundary pegs condition and reported in their log book (Buku Kegiatan Mandor – BKM). Figure 2 Boundaries Pegs with Estate name in PHLE QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 21 of 61 Public Summary Report There were neither disputes nor outstanding disputes over the land for all estates except for PHLE. There was land conflict at PHLE a group of people named Kelompok Tani Padang Halaban dan Sekitarnya (KTPHS). The conflict has been brought to court by the claimant, KTPHS, since May 2009. The management of PT. SMART, Tbk has agreed that the land conflict to be settled by court. Court decision has been final as indicated on Putusan Perkara Gugatan Reg. No. 08/Pdt.6/2009/PN-RAP issued on May 07, 2010 stating that the claim was rejected. Based on HGU documents it was noted that all land were acquired from other companies. Both PT. SMART Tbk. and PT. MP Leidong West Indonesia have not acquired any new land for more than 10 years. Therefore the indicator regarding evidence of land acquisition resolution with free prior and informed consent was not applicable. A mechanism to resolve conflict has been established and documented by each estate: SOP for conflict resolution and land acquisition. The procedures have been disseminated and approved by some Kepala Desa, Camat, dan Kepala Seksi Sengketa BPN Labuhan Batu. However community/community representatives (e.g. community leader, religion leader, youth leader) have not been involved. PHLE and PHLM the procedures were disseminated and approved by Camat Aek Kuo. KULE PT. MP Leidong West Indonesia the procedures were disseminated and approved by Camat Kanopan Ulu. ADPE the procedures were disseminated and approved by Kepala Desa Sipare-pare Tengah and Belongkut PRNE the procedures were disseminated and approved by Camat Kanopan Baru and Camat NA IX-X. Minor nonconformity against Criterion 2.2 for KULE PT. MP Leidong West Indonesia Evidence of maintenance of several boundary pegs required by HGU KULE PT. MP Leidong West Indonesia Division 4&5 were not available. Evidence was available only for boundary pegs VI, VII, and XXXIV. Minor nonconformity against Criterion 2.2 for PRNE Boundary pegs for PRNE Division 3 were sighted and maintained, however several pegs position were not clear against the position required by HGU map, e.g. boundary pegs #23 and #24. Minor nonconformity against Criterion 2.2 for all estates Conflict resolution mechanism documented as SOP (SOP for conflict resolution and land acquisition) have been disseminated and approved by Camat/Kades and BPN Labuhan Batu Section Head of Conflict and Dispute, however community/community representatives (e.g. community leader, religion leader, youth leader) have not been involved. Criterion 2.3 Use of land for oil palm does not diminish the legal rights, or customary rights, of the other users, without their free, prior and informed consent. This criterion was not applicable. Planted areas of the estates are wholly on Government land, leased under HGU as indicated above. No land settlement for the estates area mentioned above. Maps have been developed for each estate indicating Legal demarcation and planted areas. 7 PRINCIPLES 3: COMMITMENT TO LONG-TERM ECONOMIC AND FINANCIAL VIABILITY Criterion 3.1 There is an implemented management plan that aims to achieve long-term economic and financial viability. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 22 of 61 Public Summary Report A ten years management plan was established in order to achieve long-term economic and financial viability. The management plan 2010 – 2020 was established based on the inputs from Agronomy Division regarding replanting plan which were described in area to be replanted (Ha) per year. Annual replanting plan and its ten years forecast (2010-2020) for each estate was sighted. Feasibility study (net income, net income after tax, payback period) was made for each estate considering replanting – maintenance of immature plant cost, estimate tonnage of FFB production, CPO/PK production, estate operation cost (harvest, transport FFB to mill, maintenance, fertilizer and estate overhead). Other consideration included was CPO/PK transport cost and management fee. Profitability study 2010 – 2020 was made for PHLM, based on summary of FFB production from all supply bases: PHLE, PRNE, ADPE and KULE PT. MP Leidong West Indonesia. The actual oil and kernel rates were used for one of regular review (OER and KER), also considering estate cost and mill cost. Estimated mill cost includes processing, repair and maintenance, overhead, depreciation and management fee. Profit and loss were evaluated. The management plan is reviewed annually based on actual sales/revenue, actual expenditure for each estate and inflation. PRINCIPLES 4: USE OF APPROPRIATE BEST PRACTICES BY GROWERS AND MILLERS Criterion 4.1 Operating procedures are appropriately documented and consistently implemented and monitored. The organisation has developed Standard Operating Procedures for Estates: Buku Pedoman Budi Daya Perkebunan Kelapa Sawit Sinarmas (MCAR) SMA/MCAR/06/05-07 dated 1 May 2007. The SOPs consist of procedures for several processes including land clearing, preparation before planting, fertilising, road maintenance, peat land management, drainage system, and integrated pest management. Other than those documents there were also other procedures, e.g. SOP/SMART/PJL for road maintenance, SOP/KULE/KWM for water management in KULE PT. MP Leidong West Indonesia, SOP/ADPE/WMAG for water management in ADPE. Estates activities are programmed in Division Work Program annually. Activities program are such as pest and diseases detection and census, weed controlling, maintenance of beneficial plant, fertilising, spraying and road maintenance. Site observation was performed during audit to some activities: spraying, road maintenance, replanting, land application, barn owls and boxes monitoring, weed controlling and harvesting. Activities have been performed at defined interval and records of activities were sighted. Standard Operating Procedures established for mill: Standar Operasional Prosedur Pengolahan Pabrik Kelapa Sawit PT. SMART Tbk., rev. 04, 2010. The SOP consist of procedures for several processes including receiving, sterilization, threshing, pressing, clarifying, oil recovery tank, oil recycling, nut & kernel, boiler and generator, water treatment, waste water treatment and tank cleaning. Other than those documents there were also Quality Manual PHLM/PM/01 and Quality Procedure PSM/01 to PSM/25, including PSM/11 for CPO and Kernel Dispatch and PSM/07 for CPO and Kernel Production. Site observation was made during audit to some work station: receiving and grading, sterilizing, threshing, pressing, clarifying, nut and kernel and dispatch. Interview with employees working in those work stations showed that procedures were implemented. Processes were monitored at defined interval and records of processes log sheet was sighted including: FFB receiving, grading, sterilizer, threshing, press and digester, clarifier, nut and kernel, boiler, quality control (in process, CPO and Kernel). Preventive maintenance of production machine and supporting machines were sighted: daily, QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 23 of 61 Public Summary Report weekly and monthly. Some preventive maintenance was planned based on machine working hours: generators. Preventive maintenance realization was documented including its check items: boilers. Operation reports were made for review from receiving to dispatch. Other than regular Mill Advisory Audit (MAA), twice a year, inspection was also performed by PC and VPM. The findings including its follow up were well documented. The mill is ISO 9001:2008 certified, a regular quality management system audit have been taken. Last internal audit was performed on October 15-16, 2009. Findings were followed up, verified, and closed. Criterion 4.2 Practices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield. SMARTRI analyses soil and leaf sampling regularly as input for fertiliser recommendation. Soil is analysed every three years and leaf is analysed annually. Soil and leaf sampling were taken from each division. PHLE: The soil analysis was in January 2007. The leaf analysis was in September 2009. PRNE: The soil analysis was in October 2008. The leaf analysis was in August 2009. ADPE: The soil analysis was in January 2009. The leaf analysis was in August 2009. KULE PT. MP Leidong West Indonesia: The soil analysis was in 2007 and 2008. The leaf analysis was in September 2009. The soil analysis in PHLE and KULE PT. MP Leidong West Indonesia is scheduled in 2010 which was documented in ‘Budget SMARTRI operational 2010 – Program Leaf Sampling Unit and Soil Sampling Unit’. Fertilising programme was developed by SMARTRI for all Division of Estates based on result of soil and leaf sampling analysis. Fertilising programme covers time of application and type and dosage of fertiliser. Fertilising is performed manually and mechanically using tractor or airplane. Fertilising using airplane is only performed in some area of PRNE and ADPE due to condition of area applied and only for Urea and MOP. Application of PRNE is on slope area and ADPE is peat land. The memo in regards to aerial application mentions that fertilising is prohibited over a 5-palm wide buffer strip along the river and the main drain. Procedure regarding fertilising using airplane was established in ITDV System Standard, Policy, and Procedure edition March 2007. There was permit to operate airplane from Transportation Department #AOC/137-001 dated 20 January 2009 and valid for two years. Minor nonconformity against Criterion 4.2 for PRNE and ADPE According to the internal memo, fertilising is prohibited over a 5-palm wide buffer strip along the river and the main drain. However, the memo does not mention the requirements in regards to fertilising of the area around collection drain. There was no evidence that 5-palm wide buffer strip along the river and the main drain were not sprayed by fertiliser during aerial application (i.e. no aerial application map could be demonstrated during the audit). Legume cover crops (LCC) are grown to protect soil from erosion, improve soil fertility and control weed. The LCC grown is Mucuna brachteata. The LCC is grown in PHLE and PRNE. LCC growth is monitored regularly. LCC is maintained through dangir (cleaning from weed) and fertilising. Rock phosphate (RP) and NPK is used as fertiliser to grow LCC. Empty fruit bunches (EFB) are applied as nutrients. EFB was applied based on the recommendation from SMARTRI in terms of quantity and location. EFB are applied only in PHLE. Good evidence of EFB application. Palm Oil Mill Effluent (POME) is applied only in PHLE where the mill is located. POME was only QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 24 of 61 Public Summary Report applied in several blocks in Division 2 and 3 based on permit obtained by the organization from government which then being distributed to several ponds with depth 12.5 cm by pipeline. Flow rate of land application is 375 m3/ha/year with three times rotation to each block. Flow rate and quantity of POME and area applied are recorded daily. Permit of land application to PHLE #503.3.660/365/BPDL-LB/AP/2007 has been obtained by the organisation from Bupati Labuhanbatu. Figure 3 Land Applications in PHLE Criterion 4.3 Practices minimise and control erosion and degradation of soils. MCAR chapter 3 ‘Preparation before Planting’ describes procedure for minimising and controlling erosion, peat land management. The organisation does not recommend plantings on slopes >40% and >22o. System for planting on slopes area is provided through terracing, determining of base line, leveling of terrace, and determining of planting space. To minimise and control erosion in slope area, several practices have been implemented such as terracing and growing of legume cover crops. Maps of soils survey from Plantation Monitoring and Planning Division were available for all estates. It was noted that there was no planting on slopes >40%. PHLE: No fragile soils. Planted area has slopes 0-8%. PRNE: 15.56% planted area has slopes 30% in Division 3 Block 23 and 28. ADPE: 100% planted area is a deep mature peat land (more than 3 m deep) KULE PT. MP Leidong West Indonesia: 15.26% planted area has slopes 15% and 65.79% of planted area is wetland and potential acid sulphate soils. Procedure for road maintenance is described in MCAR chapter 4.5. Estates have established road maintenance programme for main road, collection road, and access road by manual and mechanical maintenance. Road maintenance includes road watering. Manual road maintenance programme was provided in Division Work Programme. Manual road maintenance was implemented based on Division Work Programme or road condition. Mechanical road maintenance uses heavy equipment – grader and the mechanical road maintenance programme was provided in Planning of Road Grade Allocation which covered mechanical road maintenance for all division. Manual and mechanical road maintenance realisation was recorded including distance of road maintained and diesel fuel used for heavy equipment. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 25 of 61 Public Summary Report Opportunity for improvement Realisation of road maintenance has been recorded in ‘Kartu kerja kendaraan’ including distance of heavy equipment use and total of diesel fuel use. It can be considered to record distance of road maintained. Some area of KULE PT. MP Leidong West Indonesia is wetland. Water management procedure is established to control water table within range of 50-70 cm below ground surface. Water gates and pump machines are provided in KULE PT. MP Leidong West Indonesia to control water level. Level meter is monitored daily including monitoring of rainfall, operation of pump machine, condition of water gate (open or close), and diesel fuel consumption. Figure 4 Level meter in KULE PT. MP Leidong West Indonesia ADPE is on a deep mature peat land (more than 3 m deep), where the plantation existed long before 2004. Water management procedure is established to control water table within range of 50-70 cm below ground surface. Water gates and dike which were made from sand sacks are constructed to maintain water level in main drain and collection drain. Water level is monitored by checking the level meter which was provided in main and secondary drain and piezometer which was provided in each block. Piezometer and level meter are checked weekly including status of water level (below or above the range). Condition of piezometer and level meter are checked regularly including cleanliness of piezometer, condition of sand sacks, and identification of piezometer and level meter. During site visit it was observed that condition of piezometer and level meter was good. Condition of water gate and dike (open or close) was according to water level result. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 26 of 61 Public Summary Report Figure 5 Piezometer in ADPE Criterion 4.4 Practices maintain the quality and availability of surface and ground water. MCAR section 3.2 describe drainage system in Estates including requirement for making ditches of main drain, collection drain, and field drain, and its dimension. The MCAR also describe ditch maintenance. The organisation has policy ‘Memo #002/SMD Ops/I/2009’ with regard to ‘Watershed Protection’ from SMD Operation on 6 January 2009. The policy prohibits Estates for planting in 50 m on the left and right side of riparian buffer zones. At the time of audit there was no replanting activity nearby river. Warning board also placed regarding prohibition to apply agrochemicals and fertiliser in the buffer zone. Procedure and work instruction regarding maintaining quality of water availability and ditch cleaning are provided. Ditch is cleaned based on programme or ditch condition which is monitored regularly. Programme of ditch cleaning using heavy equipment was established for KULE PT. MP Leidong West Indonesia and ADPE includes for main drain, collection drain and outlet. Result of ditch cleaning using heavy equipment was recorded including ditch length cleaned and diesel fuel consumption. Figure 6 Watershed Protection QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 27 of 61 Public Summary Report The mill has monitored its water consumption including for process (dilution), boiler water, maintenance, repair and housekeeping. Water consumption data since 2008 until May 2010 was sighted. There was significant reduction (around 45% reduction) of process water consumption from 2008 – 2009, since innovation has been put in place: non use of purifier in the processing without compromising the CPO quality and also replace 60-66% of dilution water with condensate. For year 2010-2011 there is plan for improving FFB reception area using conveyor system and replacing 4 fire tube boilers with 1 water tube boiler. These innovation programs were estimated to give further reduction of mill water consumption for housekeeping and boiler water. Surface and ground water are monitored regularly. River water quality was analysed for both upstream and downstream. There are also three ‘monitoring wells’ which were monitored regularly to ensure that POME used in land application did not affect the quality of ground water. Result of analysis of river water from independent laboratory for parameters pH, NO 3, NO2, Cu, Zn, Mn, Fe, Cl, BOD and COD showed that surface and ground water were not affected. Report of analysis was sighted and kept as record. Opportunity for improvement Quality of river water has been analysed. It can be considered to analyse river water covering parameters which were included in fertiliser content which were applied by airplane, e.g. ammonia and phosphate. POME is collected in ponds prior to be used for land application. Flow rate of POME used for land application is recorded daily. BOD of POME is analysed monthly. Result indicated that BOD was inline with permissible limit for land application. Record of BOD of land application was evident. Criterion 4.5 Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate Integrated Pest Management (IPM) techniques. Procedure for IPM to control pests, diseases, weeds and invasive introduced species has been established in MCAR chapter 6. This includes setting out of technique to be implemented, chemical to be used, locations to be applied, and time frame for implementation. Estates established Division Work Program for IPM in each division. IPM programme includes pest and diseases detection, census and controlling, weeds controlling, planting of beneficial plant, use of pesticide and herbicide. The implementation of IPM is monitored. The barn owls and boxes were monitored to check availability of owl for rodent control. The growth and length of beneficial plants were recorded. Beneficial plants were replanted if damaged beneficial plants were found. Stages of UPDKS (Oil palm leaf eating caterpillar) growth are monitored. Census of UPDKS and rodent is performed regularly to determine its controlling. Controlling is performed if the UPDKS and rodent attack are higher than the critical point. Application of rodenticide during rodent attack was monitored. Census and controlling of termite is performed monthly. Oryctes is managed through IPM using pheromones. This applied in immature upkeep. All IPM programmes are well recorded and documented monthly in all divisions of estates. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 28 of 61 Public Summary Report Figure 7 Barn owls and boxes in ADPE Chemical is used if attack is uncontrolled. Routine use of chemicals is programmed including area applied, their dosage, and rotation. Training of IPM has been performed to PHLE, PRNE, ADPE, and KULE PT. MP Leidong West Indonesia staffs. List of participant attendance was sighted. Pesticide toxicity units (a.i. / LD 50 / FFB tonnage) are monitored to Glyphosate, metilsulfuron, paraquat. The records are provided since 2007 to present. Criterion 4.6 Agrochemicals are used in a way that does not endanger health or the environment. There is no prophylactic use of pesticides, except in specific situations identified in National Best Practice guidelines. Where agrochemicals are used that are categorised as World Health Organisation Type 1A or 1B, or are listed by the Stockholm or Rotterdam Conventions, growers are actively seeking to identify alternatives, and this is documented. Justification of all agrochemicals used by the organisation is documented. Agrochemicals use has been registered by each Division of Estates including trademark and register number from authorised institution (Agriculture Department), e.g. Decis – permit RI.387/11-2007/T, Rolixone – permit RI.2467/5-2006/T, Starane 200 EC– permit RI.854/5-2004/T. It was noted that there were no agrochemicals being used which are not on this register during this audit. Agrochemicals use and their register number refer to Pesticide Commission Book ‘Buku Komisi Pestisida’. Pesticides use is well recorded in ‘Recapitulation of pesticides use for spraying’ including active ingredients used, area treated, amount applied per ha and number of applications. The records were sighted in each Division of all Estates. During audit, spraying of weed was observed in PHLE and ADPE. It was noted that pesticides (rolixone, ally) use was registered agrochemical. Dosage of pesticides use, target weed was inline with MCAR section 6.3. Amount of pesticide use was recorded in BKM and ‘Warehouse card’. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 29 of 61 Public Summary Report Records of spraying of pest, weed, and disease were assessed in PRNE and KULE PT. MP Leidong West Indonesia, e.g. Division Work Program, ‘Buku kerja mandor’, and ‘Warehouse card’. It was noted that agrochemical use was inline with target pest, weed or disease, determined dosage, and applied by qualified person. PPE used during spraying of pesticides are boots, apron, safety glass, respiratory mask and hand gloves. Agrochemicals have been applied by qualified persons who have received formal training. Training was conducted by Agricultural Department qualified trainer. Training was performed in February 2009, April 2010. Training record was sighted for sprayers in all estates. Training covered handling of concentrate chemical and spraying method. Minor nonconformity against Criterion 4.6 for PHLE and KULE PT. MP Leidong West Indonesia There was no evidence that training of agrochemical spraying for some newest employees i.e. Supendi (PHLE) and J. Mare-mare (KULE PT. MP Leidong West Indonesia) although PPE using and MSDS understanding have been communicated. Daily briefing is also performed by supervisor called ‘mandor’ to his/her members. The mandor provides briefing on the issues of spraying activities such as spraying procedure, area applied, use of PPE, cleaning of PPE. The organisation policy is to perform medical check up annually to all employees. Medical check up 2010 was sighted for all pesticide operators in all estates. Results of medical check up in general were good. The organisation has policy regarding no work with pesticides for pregnant and breastfeeding women. Women were still involved in spraying of pesticides in PRNE and KULE PT. MP Leidong West Indonesia. PHLE and ADPE did not involve women in spraying of pesticides any longer. To ensure that there were no pregnant and breastfeeding women during spraying of pesticides, there are lists of women worker including data of leave during the first and second day of menstruation. Agrochemicals are stored in the determined area separated from fertiliser and other chemicals. Agrochemicals storage is provided in each Division of all Estates. Agrochemicals storage is locked areas with limited access. The storage is ventilated through cross flow ventilation. MSDS and hazard symbol label are provided nearby of agrochemicals. Emergency shower and eyewash are also provided to anticipate in case of an emergency of chemical handling. PPE for handling of chemicals are provided including boots, apron, safety glass, respiratory mask and hand gloves. Spill kit for agrochemical spill handling is provided. Prior to be used in the field, agrochemical was diluted in Division Office. There is a designated area of mixing which was completed with roof, secondary containment and information of agrochemical hazard. The area is also used for cleaning the agrochemical containers and fertiliser sacks. All chemical containers were triple rinsed prior to be disposed in the designated area and separated with domestic waste landfill. Records of chemical containers quantity disposed were evident. Paraquat is still used in the estates. Data of paraquat used is provided since 2007. It was observed that paraquat use was reduced year to year. Ammonium glusofinate has being used and to be used to change paraquat permanently. Criterion 4.7 An occupational health and safety plan is documented, effectively communicated and implemented. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 30 of 61 Public Summary Report It was noted that PHLM has been certified to occupational health and safety management system based on Indonesia’s Regulation ‘PER. 05/MEN/1996’. Occupational health and safety policy has been established and has signed by the management for the mill and estates. The policy statement includes the commitment to prevent injury and ill health, to comply with regulation and for continual improvement. The policy was made available for access by employees and other stakeholders and displayed on strategic locations of Estate Office and Mill Office. Occupational health and safety target and programme were also established for the mill and estates. The main targets and programme were in regard to zero accident and zero ill health. A safety committee has been established for the mill and estates and already approved by local authority (Dinas Tenaga Kerja (Disnaker)). The chairman of the committee is the respective Mill Manager and Estate Managers and the secretary of the committee is the OHS expert (AK3U) and the member consists of representative of each section. OHS expert is also a safety officer and acts as a representative on health and safety. The Safety Committee is responsible for the OHS programme and its implementation. Monthly meeting was held by Safety Committee to review the progress and implementation of OHS programme. Results of the meeting including the recommendation and action plan were recorded in the minutes of meeting - these were sighted during the audit. In the employees’ level, a daily briefing is performed by supervisor to his/her members which is called a morning circle (lingkaran pagi). In this event, the supervisor provides briefing on the issues of production including health and safety issues such as the use of PPE and accident prevention. Health and safety inspection was performed by the Safety Officer to identify any unsafe acts and conditions. Records of health and safety inspections were sighted. The hazard exists in the operations and activities of the mill and estates were identified and the risks were assessed using documented risk assessment methodology. Hierarchy of control principle was applied to determine risk control. It was noted that most risks were controlled by combination of establishment of procedure or work instruction, safety signage and the use of PPE. Sighted procedures or work instructions were included for estate activities such as planting/replanting, fertilizing, insecticide, herbicide and pesticide spraying, road maintenance and harvesting, clinic and warehouse. Division warehouse were observed during the audit. MSDS and hazard symbol label were provided nearby of chemicals. Emergency shower and eyewash was also provided to anticipate in case of an emergency of chemical handling. PPE for handling of chemicals were provided including boots, apron, safety glass, respiratory mask and hand gloves. Fertilizer warehouse has a good air circulation. Several activities of estate were observed during the audit e.g. spraying, harvesting, land clearing and other minor maintenance. The workers for spraying were provided with PPE including boots, apron, respiratory mask, safety glass and hand gloves. Minor non-conformance and opportunity for improvement were raised for harvesting hazard risk control. Hazard symbol label was provided at the container of pesticide/herbicide/insecticide. Interview with workers indicated that they have a good understanding on hazard and risk of their work. Interview with workers also indicated that they were provided by the organisation with the medical facilities (clinic or referred hospital). The supervisors were provided with first aid kit. Employees housing facilities were also observed during the audit. There was a programme of Clean Friday (Jumat bersih) for promoting health programme which mainly covered housekeeping and gardening - although in some estates still need to be improved. The fresh water was generally provided by the organisation, however in some estates the quality of fresh water still need to be improved. Minor non-conformance was also raised for this issue. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 31 of 61 Public Summary Report Each estate was provided with the clinic supported with the paramedics. The organisation doctor stands by on Padang Halaban Medical Centre and regularly visits the clinics. The housekeeping of clinics was generally in good conditions. The medicines were stored appropriately in closed cabinet and freezer. The expired date of medicines was controlled. Medical records were kept in the clinic. Transportation and heavy vehicles for estates activities such as tractor, trailer and grader were regularly maintained. The operators (drivers) were found having license from local authority (SIO). Workshops were available at each estate. Small compressor tanks were certified by local authority. Gas cylinders were placed and chained to prevent unintended fall and also provided with flash back arrester (non-returnable valve). PPE for welder was appropriately provided. Welders were also certified by local authority. The fuel tank was also available at each estate. Hazard symbol label was provided at the tank. Fire extinguishers were also provided appropriately. Ear muffs were required to enter generator set room. As for PHLM, the risk assessment has been conducted; sighted records including for receiving and handling of FFB, sterilizer, boiler, crane operation, conveyor, cleaning of CPO tank, maintenance and workshop, laboratory, etc. Procedure and work instructions were also established to control the operation including controlling the risk. Evident of risk control were sighted e.g.: Boilers were tested and certified in accordance to local regulations. Regular maintenance was also performed. Process parameters of boiler operation was established, controlled, and recorded. Emergency shut down procedure was established and tested regularly. Boiler operators were certified. Forklift and crane were also tested and certified in accordance to local regulations. Regular maintenance was also performed and the operators were also certified and trained in accordance with local regulations. Pressurized vessels (sterilizer, compressor tanks) were tested and certified in accordance to local regulations and completed with safety valve and pressure gauge. Fuel tanks were completed with secondary containment and fire extinguishers. Lock Out Tag Out procedure was in place and implemented especially for maintenance activities. Permit to Work procedure was also established and implemented such as for cleaning of CPO tank and contractor activities. Workers were wearing appropriate PPE. Pedestrian was determined appropriately inside the mill. Safety signages were properly provided at locations of mill. Most stair/ladders were provided with the hand rail. Acid cabinet was provided in the laboratory. Minor nonconformity against Criterion 4.7 for the mill and all estates Several unsafe acts and conditions were observed during the audit, e.g.: The compressor tanks (with the pressure 10 Bar) were not provided with the name plate giving indication of maximum pressure and working pressure. Furthermore, safety valve testing was not performed regularly. Transportation workshop was not provided with torsion wrench. The drainage system in several housing area was neither good nor working effectively. Minor nonconformity against Criterion 4.7 for all Estates Several unsafe acts and unsafe conditions were observed during the audit, e.g.: Most supervisors were using motor cycle for transportation inside the estate and not wearing helmet and the motorcycles were not provided with the back mirror. The harvesting workers were not provided with helmets to prevent hazard and risk of fall object (FFB). QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 32 of 61 Public Summary Report Minor nonconformity against Criterion 4.7 for PHLM Several unsafe acts and conditions were observed during the audit, e.g.: In the receiving of FFB, the license of truck driver has already expired. In the area of boiler, the platform was not provided with border/cover. The cover machine of WTR4-No 05 was not properly installed after repair. Minor nonconformity against Criterion 4.7 for PHLE Several unsafe acts and conditions were observed during the audit, e.g.: The result of laboratory test of fresh water for employee housing still did not meet the requirements. Minor nonconformity against Criterion 4.7 for PRNE Several unsafe acts and conditions were observed during the audit, e.g.: The vertical stair and platform of water tower was not provided with a fall protection cover. Minor nonconformity against Criterion 4.7 for ADPE Several unsafe acts and conditions were observed during the audit, e.g.: The design of bridge for harvester (titian panen) did not adequately provide fall protection hazard and risk (too narrow and without cover on both sides). Minor nonconformity against Criterion 4.7 for KULE PT. MP Leidong West Indonesia Several unsafe acts and conditions were observed during the audit, e.g.: Under repair (un-proper) devices were not tagged and locked e.g. NEW HOLLAND WTR 4.02 and Scissor lifter. The laboratory test of fresh water for employee housing still did not meet the requirements. The vertical stair and platform of water tower was not provided with a fall protection cover. Opportunity for improvement It is suggested to review and consider the use of boots for harvester and other small maintenance activities workers instead to provide them with non-boot shoes. Consider to develop the checklist for inspection of contractor activities including health and safety point of view. The organisation provides accident insurance to employees. Clinic was also available to provide medicine and medical treatment to employees and family. The organisation policy is to perform medical check up annually to all employees. Medical check up 2010 was sighted for all the estates and mill. Results of medical check up in general were good and a few employees have been referred to specialist doctors for further checking. Minor nonconformity against Criterion 4.7 The parameters for annual medical check up consist only of physical check. Laboratory check was performed only to the employees with specific exposure hazard, e.g. sprayer, chemical warehouse and fertilizer warehouse workers and employees exposed to noise hazard. Minor nonconformity against Criterion 4.7 In general the risk assessment has been conducted by the mill and all estates, however several hazard and risk were missing during risk assessment, e.g.: compressor operation in estate workshop and manual handling of fertilizer warehouse workers. One of the risk controls for welding process is by establishing work instruction however the content of work instruction did not mention the risk control of welding processes appropriately. The training in regard to occupational health and safety has been provided and sighted during the audit including for OHS expert for each mill and estates, first aid, spraying, emergency response QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 33 of 61 Public Summary Report and preparedness, heavy vehicle operators, OHS communication, chemical handling, manual handling, boiler operators, crane operators, etc. Training records were maintained. The procedure for emergency preparedness and response has been established for the mill and all estates. The procedures include fire, toxic emergency, chemical spillage, and earthquake. The organisational structures emergency response and preparedness were established at the mill and all estates. The organisation structure mainly consists of commander, medical team, external relation team, evacuation team, fire fighting. The responsibilities and authorities of team were defined and documented. The important telephone numbers for external parties were also identified for emergency purpose e.g. hospital, police and local fire brigade. The emergency response and preparedness equipment was provided and regularly inspected e.g. fire extinguisher, water tank truck, water pump, and hydrant. Ambulance was also available at the estates. The schedule for exercising the emergency response and preparedness was established and sighted for 2010. Fire emergency response and preparedness procedures have been exercised for the mill and all estates. Minor nonconformity against Criterion 4.7 The fire extinguisher for fuel tank was put inside the room and the door was locked (for PRNE). The fire hose reel of hydrant was locked (PHLM) and the key was kept by security personnel far from the location. The emergency shower and eyewash of central warehouse (KULE PT. MP Leidong West Indonesia) was placed outside where the chemical handling performed. In case of an emergency, this equipment will be difficult to be accessed and utilized. The first aider training was given by the organisation doctor to supervisors, assistant in the estates and supervisors in the mill. They were also provided with first aid kits. Records of such training were sighted. They were daily in charge in operation of the estates and mill and in case an emergency, they will be immediately able to provide first aids treatment. The system to record accident was established in the form of procedure. The procedure was dealing with accident reporting, investigation as well as corrective and preventive action to prevent action. Opportunity for improvement Currently, reporting and investigation of accident was limited to accident referred as loss time accident. Consider to extend the accident investigation also to cover minor accidents (e.g. first aid case). Note : The occupational health and safety policy and the management system exist. However, The number of nonconformities is large that indicated ‘health and safety culture’ has not been well developed. This 4.7 criterion will be one of the main focus for next surveillance assessment. Criterion 4.8 All staff, workers, small holders and contractors are appropriately trained. The competency requirements including training requirements for each function within the mill and estates were defined and documented. The training requirements including training/license required by regulations and training needed for operation in the mill and estates such as leadership training, production training, occupational health, safety and environmental training, etc. Training programme was identified based on these competency requirements. Training history of each employee was recorded and well maintained. There were several contractors working on behalf of the organisation such as PT. Universal Transindo for transporter of FFB and CV. Bintang Meriah Medan for land clearing (PHLE and PRNE). Briefing has been given to employees of PT. Universal Transindo. All drivers from this QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 34 of 61 Public Summary Report company have been completed with the license. Welder training for this contractor has been put in an action plan which will be completed soon. The operators of CV. Bintang Meriah Medan have been completed with certificate as heavy vehicle operators. First aids training have also been given to this contractor. PRINCIPLES 5: ENVIRONMENTAL RESOURCES AND BIODIVERSITY RESPONSIBILITY AND CONSERVATION OF NATURAL Criterion 5.1 Aspect of plantation and mill management, including replanting, that have environmental impacts are identified, and plant to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate continuous improvement. Environmental impact assessment documents called Environmental Evaluation Study (SEL) #RC.220/1262/B/VII/1993 dated 28 July 1993 approved by Agriculture Department on behalf of PT. SMART Tbk which covers PHLM and PHLE activities were provided. There were changes made to operations and changed impacts such as POME for land application, EFB application, and includes PRNE and ADPE. Environmental impact assessment document on behalf of PT. SMART Tbk was revised due to changes made. Revised environmental impact assessment document called Environmental Management and Monitoring Document (DPPL) of PT. SMART Tbk covers PHLM, PHLE, PRNE and ADPE activities. KULE PT. MP Leidong West Indonesia activities are covered in DPPL of PT. MP Leidong West Indonesia. DPPL is in the process for approval from the Governor of North Sumatera. The organisation sent DPPL to the Governor of North Sumatera through Environmental Agencies of North Sumatera on 8 March 2010. Environmental Agencies of North Sumatera has checked and assessed DPPL and based on letter #836/BLH–SU/BTL-A/2010 and #838/BLH– SU/BTL-A/2010 from Environmental Agencies of North Sumatera, they approved DPPL and has recommended the Governor of North Sumatera to sign off the DPPL. Revised DPPL of PT. SMART Tbk. and PT. MP Leidong West Indonesia have included all environmental components: Building new roads, processing mills or other infrastructure. Putting in drainage or irrigation systems. Replanting or expansion of planting area. Disposal of mill effluents. Environmental monitoring is programmed and covers all environmental monitoring required by DPPL. Environmental monitoring covers air quality in boiler area, ambient air in staff and employees housing, noise in Estate, quality of POME, surface water quality (well water in PHLM, Merbau River, Aek Korsik River, Parit Busuk River and Sungai Merah River), ground water quality (monitoring and community well), stack emission of boiler and electricity generator, air emission of heavy equipments and vehicles, soil quality, erosion rate. Environmental management is reported every six month as required by regulatory authorities to Environmental Office of Labuhan Batu Utara. The report includes DPPL implementation. Criterion 5.2 The status of rare, threatened or endangered species and high conservation value habitats, if any, that exist in the plantation or that could be affected by plantation or mill management, shall be identified and their conservation taken into account in management plans and operations Identification of any protected, rare, threatened or endangered species and HCV habitat has been performed by PT. SMART Tbk. Environment Department for PT. SMART Tbk. PHLE/PHLM, QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 35 of 61 Public Summary Report ADPE, and PRNE and for PT. MP Leidong West Indonesia KULE. The HCV assessment performed on January 5-15, 2009. Two reports have been issued, one for PT. SMART Tbk. and the other for PT. MP Leidong West Indonesia. Both reports have been independently reviewed by Mr. Dwi Muhtaman, one of the RSPO approved HCV assessor. In the report it was noted that for PT. MP Leidong West Indonesia, KULE, assessment performed partially from total area under HGU for Sialang Taji Division 4 & 5 area. The scope of HCV assessment was performed under area which was already acquired / planted by the Estate. The surrounding planted areas were currently used by local communities for housing and traditional plantation and there were major resistance where the communities did not allow the HCV assessment to be conducted. Appropriate measures to preserve rare, threatened or endangered species or high conservation value habitats have been taken by all the estates. The HCV management and monitoring plan was prepared, for PT. SMART Tbk. (PHLE/PHLM, ADPE, and PRNE) and for PT. MP Leidong West Indonesia, KULE. It was sighted that the management and monitoring plan were consistent with the identified HCV in the assessment report. PHLE/PHLM: HCV1.2 and HCV 4.1 were identified and none for other HCV: two species of birds (Bubulus ibis, Halcyon smyrnensis), one species of mammals (Felis temmincki), Titi Panjang and Wajiran rivers about 96.15 Ha. ADPE: HCV 1.2 and HCV 3.1 were identified and none for other HCV: one species of plant (Nephentes sp), one species of bird (Halcyon smyrnensis), one species of mammals (Felis temmincki), and HCV 3.1 area about 177.86 Ha. PRNE: HCV 1.2 and HCV 4.1 were identified and none for other HCV: two species of birds (Bubulus ibis, Halcyon smyrnensis), one species of mammals (Felis temmincki), Parit Busuk and Merah rivers about 83.22 Ha. KULE PT. MP Leidong West Indonesia: HCV 1.2 and HCV 4.1 were identified and none for other HCV: one species of birds (Halcyon smyrnensis), one species of mammals (Felis temmincki), and Kanopan Ulu river about 3.75 Ha. Figure 8 Nepenthes in ADPE Although at some area, e.g. PHLE (Division 8) and KULE PT. MP Leidong West Indonesia (Division 3) cemetery were identified, the report noted that there no indication the cemetery was considered sacred, no such religious rituals performed. Therefore the area was not considered as HCV. The Estates (PHLE and KULE PT. MP Leidong West Indonesia) have put some effort not to QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 36 of 61 Public Summary Report disturb the cemetery area and regular maintenance of the cemetery was performed. The HCV management and monitoring plan described measures taken for each HCV and its monitoring. Relevant laws were taken into account for determining appropriate measure including PP7/1999, Kepres.32/1990, and PP26/2008. HCV management areas maps were established. Buffer zone on the left and right side of the river were marked. Action to control any illegal or inappropriate hunting and fishing was sighted. There were warning signs which were made visible for workers and community. Warning board was also placed regarding prohibition to apply agrochemicals and fertiliser in the buffer zone. Vetiver grass was planted in for erosion prevention. Figure 9 Warning sign to control any illegal or inappropriate hunting and fishing in KULE PT. MP Leidong West Indonesia ADPE area is on a deep mature peat land (more than 3 m deep), where the plantation existed long before 2004. An established water management at ADPE was sighted to ensure that water table is maintained at a range of 50-70 cm below ground surface – these were described more detail for Criterion 4.3. The estate has constructed and maintained their drainage system which consisted primary, secondary and tertiary ditch, water gate, level meter, and piezometer. The water levels were monitored regularly. Dissemination of HCV and its management and monitoring plan was sighted both for employees and surrounding community representatives. Interviews with estate supervisors met during site observation showed their understanding of HCV and its management and monitoring plan. Each estate has appointed HCV officers to ensure the implementation of management and monitoring plan. Other than HCV officers, other level of employees also has their part of responsibility for managing and monitoring HCV as indicated in the HCV management and monitoring plan including its SOP. The overall management and monitoring plan involving Supervisors, Assistants, Estate Managers, Regional Controller and Environmental Department of PT. SMART Tbk. Monitoring records were sighted to ensure that management plan is implemented, e.g. warning sign and board monitoring, erosion prevention crop planting, river water quality monitoring. HCV monitoring book was given to each supervisor to record any flora and fauna classified as HCV. Minor nonconformity against Criterion 5.2 for PRNE Scope of area for PRNE Division 3 HCV identification did not include all areas within legal QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 37 of 61 Public Summary Report boundary, and this was not described in the report. Opportunity for improvement – KULE PT. MP Leidong West Indonesia and PRNE Based on interview with two supervisors from KULE PT. MP Leidong West Indonesia and PRNE, it was informed that one protected fauna usually sighted at night, however the monitoring activities has not involved employee who work in the night time (security and patrol). Criterion 5.3 Waste is reduced, recycled, re-used and disposed of in an environmentally and socially responsible manner. The mill and all estates have identified all wastes and sources of pollution from their activities. Result of identification was recorded in environmental aspect list. Waste management plan is described in waste controlling procedure. Wastes are divided into two types: non hazardous and hazardous waste. It was observed that wastes bins are provided in determined areas including in housing. Domestic wastes from all estates, mill, and housing activities are collected regularly to be landfilled in determined area in the estates. Landfill area is located far from housing, not swamp area and flood-free area. The landfill is covered by soil regularly to prevent bad odour and rodent. PHLE, PRNE, and KULE PT. MP Leidong West Indonesia provide landfill in each area while ADPE do not provide landfill. Domestic wastes from ADPE are sent to landfill in PHLE. Human wastes are collected in septic tank. Condition of septic tank is monitored regularly however cleaning of septic tank has not been scheduled. Medical wastes from policlinic activities of all the estates were sent to Padang Halaban Medical Centre and collected in Padang Halaban Medical Centre prior to be burnt in the incinerator of Rantau Prapat Hospital. Delivery of medical wastes from all the estates to Padang Halaban Medical Centre and Padang Halaban Medical Centre to Rantau Prapat Hospitals was completed with receipt report. Hazardous chemical containers from all the estates activities were cleaned using a triple rinse method. Hazardous chemical cans and bottles were landfilled and separated from domestic waste landfill. PHLE, KULE PT. MP Leidong West Indonesia, and PRNE landfilled hazardous chemical cans and bottles in their areas. ADPE landfilled hazardous chemical cans and bottles in PHLE area. Quantity of hazardous chemical cans and bottles landfilled was recorded and picture of hazardous chemical cans and bottles landfilling was sighted. Hazardous chemical jerrycans were reused for chemical solution during spraying. Fertiliser sacks were cleaned prior to be reused for brondolan layer during harvesting. Quantity of fertiliser sacks cleaned was recorded. All Divisions in all the estates have been completed with area to clean hazardous chemical containers and fertiliser sacks. Liquid waste from cleaning was reused for chemical dilution during spraying. Chemical containers from PHLM activities were cleaned using a triple rinse method. There is a designated area for chemical containers cleaning. Liquid waste from cleaning was collected in the basin. pH of the liquid waste is monitored daily. The liquid waste is disposed to open drainage after pH was in range of threshold of Government regulation. Water quality of open drainage from the mill activities is regularly analysed. Chemical waste from PHLM laboratory contained phenol, ammonium vanadate, and selenium was sent to authorised institution to be processed. The other hazardous wastes such as used oil, used battery, used filter oil, and contaminated rags from workshop activities have been handled properly as hazardous wastes. Quantity of hazardous wastes was recorded. According to letter from Regional Controller #86/RC-SU/VI/2010 and QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 38 of 61 Public Summary Report contract agreement all the estates #129/PHLE/VI/2010, the hazardous wastes from KULE PT. MP Leidong West Indonesia, ADPE, and PRNE activities are sent to PHLE hazardous waste storage, to be collected in PHLE hazardous waste storage prior to be disposed to authorised institution. Hazardous wastes from PHLM activities are collected in PHLM hazardous waste storage. The hazardous wastes were disposed to the authorised institution. Hazardous waste manifests were evident. It was noted that PHLE and PHLM hazardous waste storage has owned a permit of hazardous waste storage from the Environmental Ministry. Fibre and shell are used for boiler fuel. EFB is applied in PHLE as nutrients. Boiler ash is spread in PHLE and given to communities for road maintenance. Quality of POME is analysed monthly. Stacks emission of boiler and electricity generator are analysed every six months. Air emission of heavy equipments, FFB transportation and operational vehicles are measured annually. The detail was addressed elsewhere in this report. Criterion 5.4 Efficiency of energy use and use of renewable energy is maximised. The mill used shell and fibre for boiler fuel. The use of this renewable fuel was recorded and efficiency analysis has been performed converted to kcal/ton CPO and kcal/ton PP. It was concluded that the use of renewable fuel reduced about two third of diesel fuel consumption. The mill and estates only use one type of fossil fuel: diesel fuel. Diesel fuel in the mill is used for operation vehicles and emergency electricity generator to supply electricity for office and housing. The consumption of diesel fuel is monitored monthly and evaluated for each CPO/PP tonnage. As described previously in this report, for 2010-2011 there is a plan to improve FFB receiving using conveyor system. This is estimated also to reduce diesel fuel consumption for bucket loader and lorry tractor operation and reduce electricity consumption. Diesel fuel in the estates is used for operation of heavy equipments, vehicles and electricity generator to supply electricity for nursery and office. The consumption of diesel fuel is recorded and monitored monthly and evaluated for each litre of diesel fuel/FFB tonnage. It was noted that consumption of diesel fuel/FFB tonnage in 2010 decreased compared to 2009. Minor nonconformity against Criterion 5.4 for all Estates Record of diesel fuel consumption / FFB tonnage and its analysis has not been provided in PHLE. Efficiency of diesel fuel consumption litre of diesel fuel / FFB tonnage has not been analysed in ADPE and PRNE. Criterion 5.5 Use of fire for waste disposal and for preparing land for replanting is avoided except in specific situations, as identified in the ASEAN guidelines or other regional best practice. The organisation has policy of zero burning documented in circular letter #071/SMD Ops/IX/2007 form SMD Operation. The requirement of zero burning was communicated to contractors who conducted replanting activities. This was documented in contractual agreement article #5 between the organisation and contractor. During audit, replanting is being carried out in PHLE (Division 3) and PRNE (Division 1). Realisation of replanting activities was well documented and reported including activities of chipping, ripping, cleaning ditch, making ditch and total area replanted. It was observed that there was no evidence of burning. Procedure of responding of land burning emergencies is provided in all the estates. Training of responding of land burning emergencies is divided into two types: basic training for all employees and advance training for emergency response team. The schedule for exercising the emergency response and preparedness was established and sighted for 2010. Fire emergency response and QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 39 of 61 Public Summary Report preparedness procedures have been exercised for all estates. Equipment to respond land burning have been provided such as fire extinguisher, shovel, mattock, communication equipment (Handy Talky HT), and water tank. Condition of the equipment is checked regularly for readiness of equipment. Opportunity for improvement It was noted referring to report of replanting that the land preparation for replanting was zero burning. It can be considered to monitor contractor activity regarding zero burning to ensure that land preparation for replanting was zero burning. Criterion 5.6 Plans to reduce pollution and emissions, including greenhouse gasses, are developed, implemented and monitored. Assessment of all polluting activities including gaseous emissions, particulate/soot emissions, effluent, and wastes has been conducted in the mill. All significant pollutants and emissions have been identified and result was documented in environmental aspect list. Plan to reduce significant pollutants and emission was described in procedures and monitoring schedule. Stacks of four boilers and three electricity generators are measured every six months as required by Government regulations. Measurement results indicated that emission of stacks were below thresholds of Government regulations. There are programmes to reduce pollution and emission including green house gasses such as use of fibre and shell as boiler fuel , participation in WWF program ‘60 earth hour’, replacement of four fire tubes with one water tube boiler in 2011 to reduce diesel fuel consumption, improvement of FFB receiving by using conveyor system. This new conveyor system is also estimated to reduce diesel fuel consumption for bucket loader and lorry tractor operation and reduce electricity consumption. Sources of POME are condensate from steriliser, tank drain, waste vibrating sludge, and mill floor cleaning. There are three ponds to collect POME prior to be used for land application in PHLE. Ponds are equipped with agitator to prevent sedimentation of POME and water level to monitor height of POME in ponds to prevent POME overflowing. Flow rate of inlet and outlet of POME and height of POME in ponds is recorded daily. The record also includes total POME applied and rest of POME in ponds. The organisation has owned a permit of land application for PHLE #503.3.660/365/BPDL-LB/AP/2007 dated 23 October 2007 and valid for three years. The permit requires that BOD and pH is measured monthly. Measurement results indicated that BOD and pH of POME were below thresholds of permit. Quality of POME is also analysed daily for parameter pH, alkalinity and VFA. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 40 of 61 Public Summary Report Figure 10 POME pond completed with water level to monitor height of POME PRINCIPLES 6: RESPONSIBLE CONSIDERATION OF EMPLOYEES AND INDIVIDUALS AND COMMUNITIES AFFECTED BY GROWERS AND MILLS Criterion 6.1 Aspects of plantation and mill management including replanting that have social impacts are identified in a participatory way, and plans to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate continuous improvement. Social impact assessment document was available, and it was made by the Social Impact Assessment Team of PT. SMART Tbk under research project No. 001/SIA_ENVD/II/2009 dated 2 February 2009. Social impact assessment was conducted for PHLM, PHLE, PRNE, ADPE and KULE PT. MP Leidong West Indonesia. Some aspects were considered during assessment such as residence, economy, social cultural and public health. Negative impacts and positive were identified during assessment. It was noted that negative and positive issues from social assessment results for all estates and mill were similar. Negative impacts were identified such as: Inequitable recruitment in villages around the plantation – economics sector Transport of dusting originating from full fruit bunches – public health Noise coming from transport – social cultural Inequitable donation for community estate – social cultural Positive impacts were identified such as: Regional development and increased population of the village economy Ease of road access Cattle population can be tended in the estate. Data was collected through questionnaire, observation, interview with community leaders and local government officials. Evidence that the social impact assessment was conducted together with affected parties can be shown. Minor nonconformity against Criterion 6.1 for PHLE Management plan for social impact assessment was determined and implemented, some negative aspects were identified e.g. dusting, noises and uneven pay. However public QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 41 of 61 Public Summary Report participation was not involved during follow up of negative aspects. Minor nonconformity against Criterion 6.1 for KULE PT. MP Leidong West Indonesia Public participation was not involved during follow up of social impact assessment in KULE PT. MP Leidong West Indonesia. Opportunity for improvement for KULE PT. MP Leidong West Indonesia Keeping records for social activities needs to be improved, e.g. there was no record pertinent to education program and scholarship for community estate. Minor nonconformity against Criterion 6.1 for ADPE Monitoring form for social impact was not implemented yet whereas their management plan was conducted. Minor nonconformity against Criterion 6.1 for PRNE Management plan for Social Impact Assessment for the area of sub district NA IX and X for PRNE was not determined and implemented. Criterion 6.2 There are open and transparent methods for communication and consultation between growers and/or millers, local communities and other affected or interested parties. Procedure for communication and consultation with public was determined in the SOP-LWI-KOM. Stage of communication and consultation with public was described in the procedure. RSPO Officer was responsible to coordinate communication and consultation. Result of communication and consultation was recorded in the ‘log book’. Stakeholder and interested party list was made. Member of stake holder consist of district head, forestry agency head, environmental agencies, social services, national land agencies, community leaders, and religious figures and youth leaders. Stake holder list was made detail, address and phone numbers were mentioned in the list. Community aspirations were kept and recorded by the RSPO Officer from PT. SMART Tbk., e.g. road work, donation, scholarship, etc., Records and interview result indicated that aspiration from community was followed up by the organisation. Criterion 6.3 There is a mutually agreed and documented system for dealing with complaints and grievances, which is implemented and accepted by all parties Procedure for complaints and grievances was determined and agreed by related parties (community leaders, and religious figures and youth leaders). Procedure for complaint and grievances was documented. All feedback can be informed to organisation and recorded in the ‘buku catatan keluh kesah’. There are no complaints from related parties. Criterion 6.4 Any negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that enables indigenous peoples, local communities and other stakeholders to express their view through their own representative institutions. The organisation did not acquire any new land for more than 25 years. The organisation did not acquire any new land for more than 25 years. Organisation has policy that there are not acquire for new land. However procedure for identification and compensation calculation was determined. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 42 of 61 Public Summary Report Criterion 6.5 Pay and condition for employees and for employees of contractors always meet at least legal or industry minimum standards and are sufficient to provide decent living wages Payment for employees and employees of contractor was regulated according Keputusan Gubernur Sumatera Utara Nomor 188.44/2555/KPTS/2010. Wage for employment also determined in the Perjanjian Kerja Bersama (PKB). PKB was agreed between workers represented by the labour union and organisation. PKB is in line with regulations by the Manpower District Agency. Some items were regulated in the PKB such as working hours, wage, over time, sickness, leave, maternity leave, work accident, etc. Validity of PKB is two years, and it was reviewed and approved periodically. Workers were classified as BHL (buruh harian lepas) and SKU (daily and monthly). Wage for all workers were paid according regulations. Payments for workers were determined according daily attendance. Daily attendance for workers was recorded and controlled by the Head of Assistant. It was evident that the wage was paid according to working hours and daily attendance. Public facilities were provided by the organisation i.e. residential facilities, day care, education, clean water. All workers were provided leaving house and agreement for approval to stay in the leaving house was made for workers. Residential facilities were periodically maintained; schedule for periodic maintenance was evident and implemented. Some of repair was conducted by the Engineering Division according to the request from the worker. In the work agreement with the contractor requirement to comply with workers regulations was mentioned. Opportunity for improvement for PHLE It could be considered to record name of the children in the day care unit. Minor nonconformity against Criterion 6.5 for ADPE Action plan to supply clean water for Pondok I & II has been determined (i.e. to make artesian well including their installation) but so far it has not been completed. Their realization will be rechecked during the next audit. Opportunity for improvement for ADPE Improve the way the organization explain its computation of daily wage for workers classified as daily SKU (permanent worker). Opportunity for improvement for PRNE It could be considered to improve format wage receipt to ensure that the receiver is correct person. Control of employee housing needs to be improved, the function of some of houses parts was changed. Criterion 6.6 The employer respects the right of all personnel to form and join trade unions of their choice and to bargain collectively. Where the right to freedom of association and collective bargaining are restricted under law, the employer facilitates parallel means of independent and free association and bargaining for all such personnel. A published statement in local languages recognizing freedom of association was stated in the Memorandum from VPA PSM. Memorandum stated that the organisation respect to comply with regulation pertinent to freedom of association. PKB (Perjanjian Kerja Bersama) also stated that QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 43 of 61 Public Summary Report freedom of association can be conducted by the workers through union labour. Union labour for each estate was available and chairman and his administrator of PUK was selected by the workers. Some interviews were conducted with the Union Labour, e.g. Pak Jon. S – PUK Kanopan Ulu Estate. Meeting with worker representatives was conducted regularly, it was recorded as well. Criterion 6.7 Children are not employed or exploited. Work by children is acceptable on family farms, under adult supervision, and when not interfering with education programmes. Children are not exposed to hazardous working conditions. Organisation has policy for minimum age for worker and mentioned in the ‘Surat Edaran No. 02/SE HRDV/03/2009’ and the PKB (Perjanjian Kerja Bersama). List of worker and related document was verified and there is no worker under 18 years old. According to observation in the estates and mill, there is no worker under 18 years old. Criterion 6.8 Any form of discrimination based on race, caste, national origin, religion, disability, gender, sexual orientation, union membership, political affiliation, or age, is prohibited. Policy for discrimination was determined by the organisation, and all discrimination is prohibited for all area in the estates and mill. PKB (Perjanjian Kerja Bersama) also mentioned ban of discrimination for all worker in the organisation. Worker list for the estates and mill mentioned all workers from different back grounds (race, religion, gender, etc). Criterion 6.9 A policy to prevent sexual harassment and all other forms of violence against women and to protect their reproductive rights is developed and applied. Policy for sexual harassment and violence was determined in the 145/CEO1-SE/04/2010 and also in PKB. Communication to all workers pertinent to prevent sexual harassment and violence was conducted by the organisation, and it was complied with the UU No. 13Tahun 2003 about workers at North Sumatra. Communication was conducted on 17 May 2010 and attended by the gender committee team, employee’s wife and RSPO officer. Complaint handling procedure for sexual harassment was determined. All complaints can be issued verbal and or written and informed to all administrator and Estate/Mill Manager. Complaints were identified by Factory Manager and reported to RC – Region Controller, VPA – Vice President of Agronomy and HR Operations organisation. An interview with workers was conducted related to implementation policy of ‘no sexual harassment and violence’. It was concluded that there was no sexual harassment and violence within the organisation. Criterion 6.10 Growers and mills deal fairly and transparently with smallholders and other local business. There was no transaction with smallholders; therefore criterion 6.10 indicator major 1 & 2 was not applicable. Some local businesses were involved to growers and mills. Local business were selected and appointed by Head Office. Local businesses were supported for growers and mills, main supports were pertinent to procurement spare parts and vehicle maintenance. Criterion 6.11 Growers and millers contribute to local sustainable development wherever appropriate. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 44 of 61 Public Summary Report Records of organisation contribution to regional development were evident, among either levied in region, agreement contract, and social assistance list. Some activities were conducted by the local contractors such as building houses, road maintenance (road hardening), etc. Agreement contract with local supplier was evident. CSR program was provided by the organisation and deployed in to CSR program for each estate and mill. Activity of CSR was identified by the estate/mills. Budget yearly was provided and their realization was monitored. PRINCIPLES 7: RESPONSIBLE DEVELOPMENT OF NEW PLANTINGS Criterion 7.1 A comprehensive and participatory independent social and environmental impact assessment is undertaken prior to establishing new plantings or operations, or expanding existing ones, and the results incorporated into planning, management and operations. There was no new planting included in PT. SMART Tbk. plantation and supply bases area. Criterion 7.2 Soils surveys and topographic information are used for site planning in the establishment of new plantings, and the results are incorporated into plans and operations. There was no new planting included in PT. SMART Tbk. plantation and supply bases area. Criterion 7.3 New plantings since November 2005, have not replaced primary forest or any area required to maintain or enhance one or more High Conservation Values. There was no new planting included in PT. SMART Tbk. plantation and supply bases area. Criterion 7.4 Excessive planting on steep train and/or marginal and fragile soils, is avoided. There was no new planting included in PT. SMART Tbk. plantation and supply bases area. Criterion 7.5 No new planting are established on local peoples’ land without their free, prior and informed consent, dealt with through a documented system that enables indigenous peoples, local communities and other stakeholders to express their views through their own representative institutions. There was no new planting included in PT. SMART Tbk. plantation and supply bases area. Criterion 7.6 Local people are compensated for any agreed land acquisition and relinquishment of rights, subject to their free, prior and informed consent and negotiated agreement. There was no new planting included in PT. SMART Tbk. plantation and supply bases area. Criterion 7.7 Use of fire in the preparation of new plantings is avoided other than in specific situations, as identified in the ASEAN guidelines or other regional best practice. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 45 of 61 Public Summary Report There was no new planting included in PT. SMART Tbk. plantation and supply bases area. PRINCIPLES 8: COMMITMENT TO CONTINUOUS IMPROVEMENT IN KEY AREAS OF ACTIVITY Criterion 8.1 Growers and miller regularly monitor and review their activities and develop and implement action plans that allow demonstrable continuous improvement in key operations The commitment for continual improvement was shown through innovation system involving all levels within the organisation. There were several events for innovation system including Regional conference and PSM conferences. Innovation projects from Assistant Level were reviewed and evaluated to be nominated to the higher conference level. The innovation project then shared to other estates. Evidences of application of the innovation project were sighted for the mill and all estates: PHLE: clean housing project and stretcher for reducing damage of the cover crop seed. KULE PT. MP Leidong West Indonesia: use of tire covers for cart during rainy season and installation of safety blade for road grader unit. ADPE: tools making for cleaning up weeds and installation of safety blade for road grader unit. Noted also there was also new water gate design which was still under study for year 2010. PRNE: three in one bag for fertilizing dosing to ensure exact dosage and installation of safety blade for road grader unit. PHLM: automatic de-pericarper draft control to achieve consistent kernel loss in fibre cyclone and installation of resin trap to minimize resin loss. The estates which were certified to ISO 14001: 2004, continually set environmental management objective and target which were supported by environmental management program: PHLE and PRNE. Internal environmental management audit were performed for PHLE and PRNE and their findings were followed up. The mill which implemented and was certified to ISO 9001:2008 had set their quality objectives. Internal quality management audit was performed for the mill and its findings were followed up. Regular management review meeting was held to evaluate the adequacy and effectiveness of the management system. Several rounds of audit were performed covering all operation areas including operation (Operation Internal Audit – OIA), agronomy (AAA) and manufacturing (MAA) for all the estates and mill. Negative findings identified during audit appeared to be properly followed up directly monitored by RC/PC and VPA/VPM. RSPO internal audit has been conducted on April 13-15, 2010 for the mill and all estates, the auditors assigned from Environmental Department of PT. SMART Tbk. Internal audit report was generated, and internal audit findings were followed up by the mill and all estates. A list of negative findings and its corrective action plan was used for monitoring their status. Internal verification has been taken prior to this certification audit. Opportunity for improvement – for the mill and all estates It could be considered to establish standard methodology for innovation system where it comprehensively consider environmental aspect, occupational health and safety hazard, social aspect, operations as well as financial. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 46 of 61 Public Summary Report 3.2 Recommendation The recommendation from this audit is approval as a producer of RSPO Certified Sustainable Palm and Palm Kernel. Audit recommendations are always subject to ratification by RSPO. This report was prepared by: Ria Gloria, Inge Triwulandari, Sigit Yulianto and Fadjar Deniswara QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 47 of 61 Appendix ‘A’ – Audit Record Audit Team Leader : Ria Gloria Auditors : Inge Triwulandari, Sigit Yulianto, Fadjar Deniswara Observers/Technical Specialist : Resit Sözer, Andri Novi Applicable Statutory/Regulatory/Standards requirements (to be identified by the client) Day Auditor Audit meetings plus functions/ processes/ areas/ *shifts audited: 21.06.2010 Day 1 All Opening meeting PHLE Inge Sigit Ria Document review and site visit: Principle 1: Criterion 1.2 Principle 2: Criterion 2.1, 2.2, 2.3 Principle 3: Criterion 3.1 Principle 4: Criterion 4.4 Principle 6: Criterion 6.10 Principle 8: Criterion 8.1 Document review and site visit: Principle 2: Criterion 2.1 Principle 4: Criterion 4.7, 4.8 Principle 6: Criterion 6.5, 6.10 Document review and site visit: Principle 4: Criterion 4.1, 4.2, 4.3, 4.4, 4.5, 4.6 Principle 5: Criterion 5.1, 5.3, 5.4, 5.5 Resit Sözer Document review: Report of HCV assessment Overview to site Inge & Resit Sözer Document review and site visit: Principle 5: Criterion 5.2 PHLM & PHLE Denis & Andri Novi Document review and interview with employees: Principle 1: Criterion 1.1, 1.2 Principle 2: Criterion 2.1 Principle 6: Criterion 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.11 Interview with labour union Interview with employees Denis & Andri Novi Interview with local community All QEF08C.07 / Issue Date: 2008-Mar-11 Present audit findings for PHLE and PHLM © SAI Global Limited Copyright 2008 - ABN 67 050 611 642 Page 48 of 61 Public Summary Report 22.06.2010 Day 2 KULE PT. MP Leidong West Indonesia Inge Sigit Ria Document review and site visit: Principle 1: Criterion 1.2 Principle 2: Criterion 2.1, 2.2, 2.3 Principle 3: Criterion 3.1 Principle 4: Criterion 4.4 Principle 6: Criterion 6.10 Principle 8: Criterion 8.1 Document review and site visit: Principle 2: Criterion 2.1 Principle 4: Criterion 4.7, 4.8 Principle 6: Criterion 6.5, 6.10 Document review and site visit: Principle 4: Criterion 4.1, 4.2, 4.3, 4.4, 4.5, 4.6 Principle 5: Criterion 5.1, 5.3, 5.4, 5.5 Resit Sözer Document review: Report of HCV assessment Overview to site Inge & Resit Sözer Document review and site visit: Principle 5: Criterion 5.2 Denis & Andri Novi Document review and interview with employees: Principle 1: Criterion 1.1, 1.2 Principle 2: Criterion 2.1 Principle 6: Criterion 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.11 Interview with labour union Interview with employees Denis & Andri Novi Interview with local community All Present audit findings for KULE PT. MP Leidong West Indonesia All Interview with NGO: Lentera Rakyat 23.06.2010 Day 3 ADPE Inge Sigit Document review and site visit: Principle 1: Criterion 1.2 Principle 2: Criterion 2.1, 2.2, 2.3 Principle 3: Criterion 3.1 Principle 4: Criterion 4.4 Principle 6: Criterion 6.10 Principle 8: Criterion 8.1 Document review and site visit: Principle 2: Criterion 2.1 Principle 4: Criterion 4.7, 4.8 Principle 6: Criterion 6.5, 6.10 QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 49 of 61 Public Summary Report Ria Document review and site visit: Principle 4: Criterion 4.1, 4.2, 4.3, 4.4, 4.5, 4.6 Principle 5: Criterion 5.1, 5.3, 5.4, 5.5 Resit Sözer Document review: Report of HCV assessment Overview to site Inge & Resit Sözer Document review and site visit: Principle 5: Criterion 5.2 Denis & Andri Novi Document review and interview with employees: Principle 1: Criterion 1.1, 1.2 Principle 2: Criterion 2.1 Principle 6: Criterion 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.11 Interview with labour union Interview with employees Denis & Andri Novi Interview with local community All 24.06.2010 Present audit findings for ADPE Day 5 PRNE Inge Sigit Ria Document review and site visit: Principle 1: Criterion 1.2 Principle 2: Criterion 2.1, 2.2, 2.3 Principle 3: Criterion 3.1 Principle 4: Criterion 4.4 Principle 6: Criterion 6.10 Principle 8: Criterion 8.1 Document review and site visit: Principle 2: Criterion 2.1 Principle 4: Criterion 4.7, 4.8 Principle 6: Criterion 6.5, 6.10 Document review and site visit: Principle 4: Criterion 4.1, 4.2, 4.3, 4.4, 4.5, 4.6 Principle 5: Criterion 5.1, 5.3, 5.4, 5.5 Resit Sözer Document review: Report of HCV assessment Overview to site Inge & Resit Sözer Document review and site visit: Principle 5: Criterion 5.2 Denis & Andri Novi Document review and interview with employees: Principle 1: Criterion 1.1, 1.2 Principle 2: Criterion 2.1 Principle 6: Criterion 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.11 Interview with labour union Interview with employees QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 50 of 61 Public Summary Report All applicable requirements of relevant standards are covered during the audit of the ‘Functions/Processes/Areas. * Enter shift Denis & Andri Novi All 25.06.2010 Interview with local community Present audit findings for PRNE Day 6 PHLM Inge Sigit Ria Document review and site visit: Principle 1: Criterion 1.2 Principle 2: Criterion 2.1, 2.2 Principle 3: Criterion 3.1 Principle 4: Criterion 4.1, 4.4 Principle 5: Criterion 5.4 Principle 6: Criterion 6.10 Principle 8: Criterion 8.1 Document review and site visit: Principle 1: Criterion 1.2 Principle 2: Criterion 2.1 Principle 4: Criterion 4.7, 4.8 Principle 6: Criterion 6.5, 6.10 Document review and site visit: Principle 1: Criterion 1.2 Principle 5: Criterion 5.1, 5.3, 5.6 PHLM, PHLE, PRNE, ADPE, KULE Denis Confirmation of response to the interested parties Ria & Denis Verification of SMART response to report from NGO: Lentera Rakyat Inge, Sigit, Ria Present audit findings for PHLM Ria, Inge, Sigit, Denis Final closing meeting details only where applicable. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 51 of 61 Public Summary Report Appendix ‘B’ – Nonconformities, Corrective Actions and Observations Summary Minor Nonconformities RSPO Indicator Details Corrective action 2.1 Minor nonconformity against Criterion 2.1 for Revise SOP for identifying, Mill and all Estates reviewing, applying and evaluating compliance with Mechanism for conducting evaluation of applicable laws and regulations compliance with law and regulation has not including those related to land clearly described in the SOP for legal and status, occupational health and other requirements for PHLE, KULE PT. MP safety, environmental, labour, Leidong West Indonesia, ADPE, and PHLM. agricultural practice, and mill by including Some of the status of compliance stated for operation to evaluate PHLE, KULE PT. MP Leidong West mechanism Indonesia, ADPE, PRNE and PHLM were compliance with legal and other requirements. not complete and accurate, e.g.: o Not all relevant/related law and regulation were listed in the evaluation Re-evaluate status of compliance of compliance although in practice they with legal and other were already implemented, e.g. requirements. PP7/99, Kepres 32/90, and UU32/2009 and Local Regulation for Labuhan Batu Utara – KULE PT. MP Leidong West Indonesia. o Some of the status was not accurate, e.g. legal demarcation of KULE PT. MP Leidong West Indonesia Division 4 & 5, DPPL documents which still in approval process – KULE PT. MP Leidong West Indonesia, Permentan 14/2004 ADPE. o Evaluation of compliance against regulation UU No 3 tahun 1993 tentang JAMSOSTEK and PP No. 28/2002 tentang JAMSOSTEK were performed but not specific to all requirements in the regulation. 2.2 Minor nonconformity against Criterion 2.2 for KULE PT. MP Leidong West Indonesia Evidence of maintenance of several boundary pegs required by HGU KULE PT. MP Leidong West Indonesia Division 4&5 were not available. Evidence was available only for boundary pegs VI, VII, and XXXIV. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Establish communication with surrounding community in order to have access for maintaining boundary pegs and to provide evidence of maintenance of boundary pegs Page 52 of 61 Public Summary Report 2.2 Minor nonconformity against Criterion 2.2 for Map to ensure pegs position for PRNE PRNE Division 3 will be gotten Boundary pegs for PRNE Division 3 were form previous owner. sighted and maintained, however for several pegs position were not clear against the position required by HGU map, e.g. boundary pegs #23 and #24. 2.2 Minor nonconformity against Criterion 2.2 for Communicate to community: all Estates o All Estate Managers develop Conflict resolution mechanism documented program to visit the as SOP (SOP for conflict resolution and land community acquisition) have been disseminated and o All Estate Staffs implement approved by Camat/Kades and BPN the program Labuhan Batu Section Head of Conflict and Dispute, however community/community representatives (e.g. community leader, religion leader, youth leader) have not been involved. 4.2 Minor nonconformity against Criterion 4.2 for Coordination with VPA Secretary PRNE and ADPE According to the internal memo, fertilising is prohibited over a 5-palm wide buffer strip along the river and the main drain. However, the memo does not mention the requirements in regards to fertilising of the area around collection drain. There was no evidence that 5-palm wide buffer strip along the river and the main drain were not sprayed by fertiliser during aerial application (i.e. no aerial application map could be demonstrated during the audit). 4.6 Minor nonconformity against Criterion 4.6 for PHLE and KULE PT. MP Leidong West Indonesia: There was no evidence that training of agrochemical spraying for some newest employees i.e. Supendi (PHLE) and J. Maremare (KULE PT. MP Leidong West Indonesia) although PPE using and MSDS understanding have been communicated. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Develop training program for spraying training for old or new sprayer in all Estates Implement the training program Page 53 of 61 Public Summary Report 4.7 Minor nonconformity against Criterion 4.7 for Unsafe acts and conditions have Mill and all Estates: been reported to Mill and Estates Several unsafe acts and conditions were and are being addressed observed during the audit, e.g.: The compressor tanks (with the pressure 10 Bar) were not provided with the name plate giving indication of maximum pressure and working pressure. Furthermore, safety valve testing was not performed regularly. Transportation workshop was not provided with torsion wrench. The drainage system in several housing area was not good nor working effectively. 4.7 Minor nonconformity against Criterion 4.7 for all Estates: Several unsafe acts and conditions were observed during the audit, e.g.: Most supervisors were using motor cycle for transportation inside the estate and not wearing helmet and the motorcycles were not provided with the back mirror. The harvesting workers were not provided with the helmet to prevent hazard and risk of fall object (FFB). Display signage to fulfil regulation of traffic Unsafe acts and conditions have been reported to Mill and Estates and are being addressed 4.7 Minor nonconformity against Criterion 4.7 for Unsafe acts and conditions have PHLM: been reported to Estate and are Several unsafe acts and conditions were being addressed observed during the audit, e.g.: In the receiving of FFB, the license of truck driver was already expired. In the area of boiler, the platform was not provided with border/cover. The cover machine of WTR4No 05 was not properly installed after repair. 4.7 Minor nonconformity against Criterion 4.7 for PHLE: Several unsafe acts and conditions were observed during the audit, e.g.: The laboratory test of fresh water for employee housing still did not meet the requirements. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Re-analysis of fresh water sample to external laboratory Install water treatment plant when result of re-analysis is still not meeting the requirements Page 54 of 61 Public Summary Report 4.7 Minor nonconformity against Criterion 4.7 for Unsafe acts and conditions have PRNE: been reported to Estate and are Several unsafe acts and unsafe conditions were being addressed observed during the audit, e.g.: The vertical stair and platform of water tower was not provided with the fall protection cover. 4.7 Minor nonconformity against Criterion 4.7 for Unsafe acts and conditions have ADPE: been reported to Estate and are Several unsafe acts and unsafe conditions were being addressed observed during the audit, e.g.: The design of bridge of for harvester (titian panen) did not adequately provide fall protection hazard and risk (too narrow and without cover on both sides). 4.7 Minor nonconformity against Criterion 4.7 for KULE PT. MP Leidong West Indonesia: Several unsafe acts and conditions were observed during the audit, e.g.: Under repair (un-proper) devices were not tagged and locked e.g. NEW HOLLAND WTR 4.02 and Scissor lifter. The laboratory test of fresh water for employee housing still did not meet the requirements. The vertical stair and platform of water tower was not provided with the fall protection cover. 4.7 Unsafe acts and conditions have been reported to Estate and are being addressed Re-analysis of fresh water sample to external laboratory Install water treatment plant when result of re-analysis is still not meeting the requirements Minor nonconformity against Criterion 4.7: Laboratory check will be nd The parameters for annual medical check up conducted in 2 semester 2010 consist only of physical check. Laboratory check was not performed only to the employees with specific exposure hazard, e.g. sprayer, chemical warehouse and fertilizer warehouse workers and employees exposed to noise hazard. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 55 of 61 Public Summary Report 4.7 Minor nonconformity against Criterion 4.7: Revise the risk assessment In general the risk assessment has been conducted by Mill and all Estates, however several hazard and risk were missing during risk assessment, e.g.: compressor operation in estate workshop and manual handling of fertilizer warehouse workers. One of risk control for welding process is by establishing work instruction however the content of work instruction did not mention the risk control of welding processes appropriately. 4.7 Minor nonconformity against Criterion 4.7: Check the readiness The fire extinguisher for fuel tank was put emergency equipment. inside and the door was locked (for PRNE). The fire hose reel of hydrant was locked (PHLM) and the key was kept by security where far from the location. The emergency shower and eyewash of central warehouse (KULE PT. MP Leidong West Indonesia) was placed outside where the chemical handling performed. In case of an emergency, this equipment will be difficult to be accessed and utilized. 5.2 Minor nonconformity against Criterion 5.2 for HCV identification is to be PRNE: conducted comprehensive and Scope of area for PRNE Division 3 HCV cover all areas. identification was not included all area within legal boundary, and this was not described in the report. 5.4 Minor nonconformity against Criterion 5.4 for Analyse diesel fuel consumption all Estates: / FFB tonnage Record of diesel fuel consumption / FFB tonnage and its analysis has not been provided in PHLE. Efficiency of diesel fuel consumption litre of diesel fuel / FFB tonnage has not been analysed in ADPE and PRNE. 6.1 Minor nonconformity against Criterion 6.1 for Communicate the management PHLE: plan for social impact to Management plan for social impact community assessment was determined and implemented, some negative aspects were identified e.g. dusting, noises and uneven paid. However public participation was not involved during follow up of negative aspects QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia of Page 56 of 61 Public Summary Report 6.1 Minor nonconformity against Criterion 6.1 for Communicate the management KULE PT. MP Leidong West Indonesia: plan for social impact to Public participation was not involved community during follow up of social impact assessment in KULE PT. MP Leidong West Indonesia. 6.1 Minor nonconformity against Criterion 6.1 for Social impact assessment form ADPE: is implemented Monitoring form for social impact was not implemented yet whereas their management plan was conducted. 6.1 Minor nonconformity against Criterion 6.1 for PRNE: Management plan for Social Impact Assessment for area sub district NAIX and X for PRNE was not determined and implemented. 6.5 Minor nonconformity against Criterion 6.5 for Provide evidence of water supply ADPE: installation to Pondok I & II Action plan to supply clean water for Pondok I & II was determined and will plan to make artesian well including their installation. Their realization will be checked during the next audit. Management plan for Social Impact Assessment for area sub district NAIX and X for PRNE is to be implemented Opportunities for improvement 1. 1.2 Opportunity for Improvement for ADPE: It could be considered to provide clear reference within ADPE SOP for stakeholder communication and consultation, SOP/ADPE/KOM, for the list management documents and its relevant stakeholders. 2. 4.3 Opportunity for improvement: Realisation of road maintenance has been recorded in ‘Kartu kerja kendaraan’ including distance of heavy equipments use and total of diesel fuel use. It can be considered to record distance of road maintained. 3. 4.4 Opportunity for improvement: Quality of river water has been analysed. It can be considered to analyse river water covering parameters which were included in fertiliser content which were applied by airplane, e.g. ammonia and phosphate. 4. 4.7 Opportunity for improvement: It is suggested to review and consider the use of boots for harvester and other small maintenance activities workers instead to provide them with non-boot shoes. Consider to develop the checklist for inspection of contractor activities including health and safety point of view. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 57 of 61 Public Summary Report Currently, reporting and investigation of accident was limited to accident referred as loss time accident. Consider to extent the accident investigation also to cover minor accidents (e.g. first aid case). 5. 5.2 Opportunity for improvement for KULE PT. MP Leidong West Indonesia and PRNE: Based on interview with two supervisors from KULE PT. MP Leidong West Indonesia and PRNE, it was informed that one protected fauna usually sighted at night, however the monitoring activities has not involved employee who work in the night time (security and patrol). 6. 5.4 Opportunity for improvement: It was noted referring to report of replanting that the land preparation for replanting was zero burning. It can be considered to monitor contractor activity regarding zero burning to ensure that land preparation for replanting was zero burning. 7. 6.1 Opportunity for improvement for KULE PT. MP Leidong West Indonesia: Keeping records for social activities needs to be improved, e.g. there was no record pertinent to education program and scholarship for community estate. 8. 6.5 Opportunity for improvement for PHLE: It could be considered to record name of the children in the day care unit. 9. 6.5 Opportunity for improvement for ADPE: Improve the way the organization explain its computation of daily wage for workers classified as daily SKU (permanent worker). 10. 6.5 Opportunity for improvement for PRNE: It could be considered to improve format wage receipt to ensure that the receiver is correct person. Control of employee housing needs to be improved, the function of some of houses parts was changed. 11. 8.1 Opportunity for improvement – for the mill and all estates: It could be considered to establish standard methodology for innovation system where it comprehensively consider environmental aspect, occupational health and safety hazard, social aspect, operations as well as financial. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 58 of 61 Public Summary Report Appendix ‘C’ – Stakeholder’s issues and comment Date and Time Location Interviewee Status of workers was determined in the employment contract, and mentioned wage and working hours. Calculation of wage and over time was understood. Above personnel have worked in the organisation more than 2 years. Started work at 6.30 am to 02.00 pm. Wage was paid according to employment contract and paid on time. Accept the rice for his family every month Organisation provided training for OSH, and communicated for sexual harassment policy. Above personnel said there are no complaints to organisation, in case any complaint it will be informed to ‘mandor’. Representative housing, and clean water and electricity provided by the organisation. Date and Time Location Interviewee : 21 June 2010 at 14.00 – 17.00 pm : Padang Halaban Estate and Mill : Parnagabe – religious leaders Padang Halaban Abu Rambe – society leaders Karang Anyar Jamaludin – youth leaders Pulau Jantan All gentlemen have lived around the estate is more than 10 years. Community gardens (75%) have their own oil palm plantation and the rest work in the Padang Halaban Estate. Cows belonging to the community are allowed in the garden area. Request for rental of heavy equipment for road repairs very quickly followed by estate. Estate is very concerned about the environment around garden, Employees wage are paid in accordance with applicable regulations. Between estate with community estate established a good relationship. Improvement of school building even without being asked by the community. There is no conflict with farmers and plantation land. For religious activities, social and general repairs facilities, estate parties must be involved. Religious activities such as mass circumcisions are conducted periodically. Good response from estate in the event of a fire in the station Padang Halaban. Date and Time Location Interviewee : 21 June 2010 at 10.00 – 11.00 am : Padang Halaban Estate and Mill : Sinus, Lewi, Iwan (spraying) : 22 June 2010 at 20.00 – 23.00 pm : Hotel Rantau Prapat : Amin Siahaan – LSM Lentera Personnel protective equipment and work equipments were not provided by the organisation, e.g. Helmet, glasses. In case any damage of equipment which the worker must be replaced. Intimidation to workers e.g. snapped. There are no communications about ‘premi’ and his manner of payment. Fines: worker error is determined subjectively by the ‘mandor’ and his assistant without any defence from worker. Laborers forced to work sick Salaries and reduced rice. Sloping palm trees, affecting the usefulness – safety work. Morning assembly workers (BHL) did not participate, directly lay offs. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 59 of 61 Public Summary Report There are no school facilities for Padang Halaban Estate There are no ambulances in the clinics. Reduction of 0.5 kg rice per family. Flood – pump, water discharged to community. Water wells unfit for bathing and washing Date and Time Location Interviewee Some of resident work in the PT. SMART Estate. No complaint from residents about wage. There is no land conflict, Dusun Sikopi-kopi all around the SMART estates, Good response from estate in case any request from community, e.g. road repair. Request for rental of heavy equipment for road repairs very quickly followed by estate. Date and Time Location Interviewee : 23 June 2010 at 14.00 – 17.00 pm : Adipati Ulu Estate : H. Redoyaman – Religion Leader Daud – Community Leader Rollip Hasibuan – Community Leader Some of resident work in the PT. SMART Estate. No complaint from residents about wage or other aspects Good response from estate in case any request from community, e.g. road repair. Request for rental of heavy equipment for road repairs very quickly followed by estate. Date and Time Location Interviewee : 22 June 2010 at 14.00 – 17.00 pm : Kanopan Ulu Estate PT. MP Leidong West Indonesia : Hutabarat – Community Leader Desa Sialang Taji Nasim – Religion Leader Desa Sikopi-kopi Budi – Youth Leader Aek Kanopan : 24 June 2010 at 14.00 – 17.00 pm : Pernantian Estate : M. Erwin Wijaya – Youth Leader Samsul Tanjung – Religion Leader Between estate with community estate established a good relationship. Improvement of school building even without being asked by the community. There is no conflict with farmers and plantation land. For religious activities, social and general repairs facilities, estate parties must be involved. Religious activities such as mass circumcisions are conducted periodically. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 60 of 61 Public Summary Report Appendix ‘D’ – Definition of, and action required with respect to audit findings Major Nonconformities occur when system is failing to meet a relevant compulsory indicator. Action required: This category of findings requires SAI Global to issue a formal NCR; to receive and approve client’s proposed correction and corrective action plans; and formally verify the effective implementation of planned corrections and corrective action. Correction and corrective action plan must be submitted to SAI Global for approval within 14 days of the audit. Follow-up action by SAI Global must ‘close out’ the NCR or reduce it to a lesser category within 90 days or less where specified. Certificate of conformance to the RSPO Criteria cannot be issued while any major nonconformity is outstanding. Major nonconformities raised during surveillance audit shall be addressed within 60 days, or the certificate will be suspended. Major nonconformities not addressed within a further 60 days will result in the certificate being withdrawn. Minor Nonconformities occur when system is failing to meet other indicators. Action required: This category of findings requires SAI Global to issue a formal NCR; to receive and approve client’s proposed correction and corrective action plans; and formally verify the effective implementation of planned corrections and corrective action. In this instance, a certificate may still be awarded providing the root cause of the problem is identified and an acceptable plan is put in place to achieve the outstanding requirements in an agreed time frame. Verification will be made at subsequent surveillance audits. Minor nonconformities will be raised to major if they are not addressed by the following surveillance audit. Opportunity for Improvement is a documented statement, which may identify areas for improvement, but shall not make specific recommendation(s). Client may develop and implement solutions in order to add value to operations and management systems. SAI Global is not required to follow-up on this category of audit finding. QEF08 - RSPO.01 / Issue Date: 2009-Mar-03 SAI Global Indonesia Page 61 of 61