Ministry of Public Works
Transcription
Ministry of Public Works
REPUBLIC OF INDONESIA List of Medium-Term Planned External Loans (DRPLN-JM) 2011-2014 ~2012 Revision~ 2nd Book (Project Digest) Ministry of National Development Planning/ National Development Planning Agency List of Projects Usulan Kegiatan Baru/ New Proposals Kementerian Kelautan dan Perikanan/ Ministry of Marine Affairs and Fisheries 1. Coral Reef Rehabilitation and Management Program - Coral Triangle Initiative (COREMAP - CTI) ........................................................................................................................... 5 Kementerian Pekerjaan Umum/ Ministry of Public Works Direktorat Jenderal Bina Marga/ Directorate General of Highways 2. Metropolitan Arterial Road Network Improvement in Jabodetabek, Surabaya, and Medan ............................................................................................................................................. 11 3. Regional Roads Development Project (Phase II) ....................................................................... 12 4. Development of Cileunyi - Sumedang - Dawuan Toll Road Phase II .................................. 13 5. Toll Road Development of Balikpapan - Samarinda ................................................................ 14 6. Toll Road Development of Manado - Bitung ............................................................................. 16 Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements 7. Rural Infrastructure Support National Community Empowerment Program IV (RIS PNPM IV)/Urban Sanitation and Rural Infrastructure (USRI) ........................................ 19 8. Metropolitan Sanitation Management Investment Program (MSMIP) .................................. 21 9. Construction of the West Java Regional Solid Waste Treatment and Final Disposal (Solid Waste Final Disposal and Treatment Facility) ................................................................ 22 10. Community Based Water Supply Project (PAMSIMAS II) ...................................................... 24 Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources 11. Bali Beach Conservation Program Phase II ................................................................................ 29 12. Additional Loan for Jatigede Dam .............................................................................................. 32 13. Construction of Mujur Dam ......................................................................................................... 34 14. Construction of Pamukulu Dam Irrigation Project ................................................................... 36 15. Implementation of Tanju and Mila Dam Construction for Rababaka Complex ................... 38 16. Lausimeme Multipurpose Dam Development Project ............................................................. 40 17. Passeloreng Dam and Gilirang Irrigation Project ...................................................................... 41 18. Countermeasure for Sediment in Wonogiri Multipurpose Dam Reservoir (Slice II) ........... 43 19. Comprehensive Countermeasure for Sediment & Flood Problems in South Sulawesi Province .......................................................................................................................... 45 20. Lower Solo River Improvement Project Phase II ....................................................................... 47 21. Urban Flood Control System Improvement in Selected Cities Phase II ................................ 48 22. Integrated Participatory Development and Management of Lhok Guci Irrigation ............. 50 23. Modernization Strategic Irrigation Project for Eastern Region of Indonesia ......................... 52 24. Modernization Strategic Irrigation Project for Western Region of Indonesia ....................... 54 25. Integrated Citarum Water Resources Management Project II ................................................. 56 i Kementerian Perhubungan/ Ministry of Transportation Direktorat Jenderal Perhubungan Laut/ Directorate General of Sea Transportation 26. Cilamaya New Port Development Project ..................................................................................63 Direktorat Jenderal Perhubungan Udara/ Directorate General of Civil Aviation 27. Procurement and Delivery Airport Rescue and Fire Fighting Vehicles (ARFF) ....................69 Direktorat Jenderal Perkeretaapian/ Directorate General of Railways 28. Jabodetabek Railway Capacity Enhancement Project Phase I .................................................73 29. Procurement of Track Material and Turn Out Phase II ............................................................75 30. Railway Double Tracking and Signaling Improvement Solo - Surabaya ..............................77 Kementerian Perumahan Rakyat/ Ministry of Public Housing 31. New Town Development in Maja ................................................................................................81 Kementerian Perencanaan Pembangunan Nasional/Badan PembangunanNasional (Bappenas)/ Ministry of National Planning/National Development Planning Agency Perencanaan Development 32. Professionalism Human Resource Development Program (PHRDP) Phase IV ....................85 Kementerian Riset dan Teknologi/ Ministry of Research and Technology 33. Research and Innovation in Science and Technology ...............................................................91 PT. PLN/ State Electricity Company 34. Indramayu Coal Fired Power Plant Project (1x1000 MW) Phase I ..........................................95 35. Suralaya Coal Fired Power Plant Rehabilitation for Unit 3 and 4 ...........................................97 36. Kamojang Geothermal Power Plant Rehabilitation for Unit 1, 2, and 3 ................................98 37. Warsamson Hydro Electric Power Plant (49 MW) ....................................................................99 38. Construction of Java - Sumatera Interconnection 500 KV (HVDC) - Phase II ......................100 ii Usulan Kegiatan Perubahan/ Revised Proposals Kementerian Pekerjaan Umum/ Ministry of Public Works Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements 39. National Community Empowerment Program - In Urban Areas......................................... 109 40. Rural Settlement Infrastructure and Kabupaten Strategic Areas Development ................. 111 41. Community Based Sanitation Program (SANIMAS) .............................................................. 113 42. Neighborhood Upgrading and Shelter Sector Project Phase II (NUSSP 2) .......................... 115 43. Emission Reduction in Cities - Solid Waste Management ..................................................... 117 44. Mamminasata Water Supply Development Project ................................................................ 118 45. Water Supply Project to The JABODETABEK (Jatiluhur - Jakarta Pipeline and Water Treatment Plant) .............................................................................................................. 119 Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources 46. Construction of Dams in East Nusa Tenggara : Including Raknamo Dam, Kolhua Dam, and Mbay Dam .................................................................................................................. 123 47. Urgent Disaster Reduction Project for Mount Merapi and Lower Progo River Area - Phase II .............................................................................................................................. 125 Kementerian Perhubungan/ Ministy of Transportation Direktorat Jenderal Perkeretaapian/ Directorate General of Railways 48. Engineering Services Jakarta Mass Rapid Transit (MRT) East - West Line Phase I Project ............................................................................................................................................ 131 49. Railway Double Tracking of Kroya - Kutoarjo on Java South Line - Phase II ..................... 134 Pemerintah Propinsi DKI Jakarta/ Local Government of DKI Jakarta Province 50. Construction of Jakarta Mass Rapid Transit Project ............................................................... 139 PT. PLN/ State Electricity Company 51. Hululais 1&2 Geothermal Power Plant Project (2x55 MW) .................................................. 143 52. Tulehu 1&2 Geothermal Power Plant (2x10 MW) ................................................................... 144 iii Usulan Kegiatan Baru/ New Proposals Kementerian Kelautan dan Perikanan/ Ministry of Marine Affairs and Fisheries BB-ID: BB-1114-R1-001-0 1. Project Title 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency : Coral Reef Rehabilitation and Management Program - Coral Triangle Initiative (COREMAP - CTI) : 60 months : Nationwide : Ministry of Marine Affairs and Fisheries : a. Ministry of Marine Affairs and Fisheries; b. Ministry of Forestry; c. Indonesian Institute of Sciences. 6. Background and Justification Indonesia is located in coral triangle areas which has a significant prospect to support the development of the marine economy in the future. Coral reefs are under threat because of expanding national and global markets, destructive fishing, various community activities such as rock mining, anchor, pollution and global warming those directly damage the coral reef . At the same time, Indonesia has very large prospects for marine tourism development, because it’s known to the world that Indonesia has the most beautiful coral reef in coral triangle areas. The Coral Reef Rehabilitation and Management Program (COREMAP) is a long term program of Indonesia for coral reef rehabilitation and management. COREMAP I (Initiation, 1998-2004) was successfully conducted through various public awareness activities, investment in the changing patterns of mind, human resource development, research and information system of coral reefs. COREMAP II (Acceleration, 2004-2011) was expanded to accelerate the management of coral reefs by more broadly involving the community, the development of conservation areas, education, sea partnership, and policies/legislation. Those achievements are a very important investment and need strong institutions to ensure that those achievements can really be developed, implemented, and provide optimal and sustainable benefits. It is to be noted that, the Coral Triangle Initiative (CTI) program was initiated by the President of the Republic of Indonesia and led by Indonesia, and geographically, Indonesia is the largest part of the coral triangle region, so that Indonesia should be at the forefront in implementing CTI programs both at national and regional levels. In the process of elaboration of national programs and regional CTI, COREMAP program is acclaimed as one of the program that could potentially be a center of excellence of coral reef management. The next step development of the COREMAP is expected to be a national CTI implementation and support regional CTI achievement. 7. Scope of Work This program consists of 5 (five) components, namely: a. Component 1: Institutional strengthening, consists of 5 (five) sub-components: 1) Data management and information; 2) Development of policies and regulations; 3) Research; 4) Monitoring, Control and Surveillance (MCS) of coral reef resources; 5) Human resource and extension development. 5 BB-ID: BB-1114-R1-001-0 b. Component 2: Ecosystem-based Management, consists of 4 (four) sub-components: 1) District and national marine conservation area management and community based marine protected area; 2) Integrated coastal management support; 3) Marine biodiversity protection; 4) Adaptation to climate change. c. Component 3: Conservation-Based Economic Activities and Livelihood Development, consists of 4 (four) sub-components: 1) Ecotourism development; 2) Sustainable fisheries; 3) Entrepreneur innovation and business incubation; 4) Community empowerment. d. Component 4: Public Awareness and Education, consists of 3 (three) sub-components: 1) Public awareness; 2) Education; 3) Sea partnership program. e. Component 5: Coordination and project management. 8. Priority Natural Resources and Environment 9. Output and Outcome a. Output 1) Availability of 6 million Square Ha of marine conservation areas which sustainable managed; 2) Strengthening of Conservation Institution in 16 districts/cities, 9 Provinces, 8 Technical Implementation Unit (UPT), and 10 National Marine Conservation Areas (KKPN); 3) Establishment of 100 units of conservation-based economic development institutions. b. Outcome 1) Protecting and conserve coral reef ecosystem and its associated; 2) Increasing coastal and small islands community welfare. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 6 100,000,000 20,000,000 : US$ 120,000,000 TOTAL : US$ 132,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 12,000,000 0 0 0 Sub Total : US$ 12,000,000 Kementerian Pekerjaan Umum/ Ministry of Public Works Direktorat Jenderal Bina Marga/ Directorate General of Highways BB-ID: BB-1114-R1-002-0 1. Project Title : Metropolitan Arterial Road Network Improvement Jabodetabek, Surabaya, and Medan : 60 months : Jabodetabek , Surabaya and Medan City : Ministry of Public Works : Directorate General of Highways, Ministry of Public Works in 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Due to the rapid motorization and urbanization, traffic congestion in major metropolitan cities is the most crucial issue not only for road users and residents, but also for regional economic activities. Furthermore, such traffic will increase Greenhouse Gas (GHG) emission, worsening global environment and increasing air pollution in urban areas. 7. Scope of Work a. Encouraging lesser usage of private cars by improving the public transportation system; b. Developing urban toll and non toll road networks to increase road traffic capacity; c. Constructing fly over/underpass at the congested intersection to clear bottleneck. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of fly over/underpass at congestion points around metropolitan cities. b. Outcome Solving the problem of traffic congestion in urban areas, such as traffic congestion at the intersection, railway junction and complexity of traffic corridors. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 310,000,000 0 310,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 31,000,000 0 0 0 Sub Total : US$ 31,000,000 341,000,000 11 BB-ID: BB-1114-R1-003-0 1. 2. 3. Project Title Duration Location : Regional Roads Development Project (Phase II) : 48 months : The northern corridor of Kalimantan Island and south corridor of Java Island : Ministry of Public Works : Directorate General of Highways, Ministry of Public Works 4. 5. Executing Agency Implementing Agency 6. Background and Justification Regional development needs sufficient road infrastructures network, especially in underdeveloped regions and border areas. The Directorate General of Highways (DGH) has prioritized the northern corridor of Kalimantan island as a strategic option of developing. In addition, the south corridor of Java Island also needs equal attention. Therefore, it needs a comprehensive measure in those areas in the form of the Regional Road Development Project (RRDP). 7. Scope of Work Development and improvement of road in the northern corridor of Kalimantan Island and southern corridor of Java. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased of road conditions in the northern corridor of the Kalimantan island and the southern corridor of Java; 2) Availability of road in the northern corridor of the Kalimantan island and the southern corridor of Java. b. Outcome Constructing North Kalimantan Island highway and south trans road in Java. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 12 250,000,000 0 250,000,000 300,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 50,000,000 0 0 0 Sub Total : US$ 50,000,000 BB-ID: BB-1114-R1-004-0 1. Project Title : Development of Cileunyi - Sumedang - Dawuan Toll Road Phase II : 36 Months : Cileunyi – Sumedang – Dawuan, West Java Province : Ministry of Public Works : Directorate General of Highways, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Bandung city, the Capital of West Java is one of the biggest emerging metropolitan cities that have attracted and generated socioeconomic activities. The Government intends to build a new international airport in Majalengka and a new port in Cirebon as the main inlet/outlet for West Java and as secondary inlet/outlet of Jakarta which need high standard road access. Therefore, The Government of Indonesia will develop the Cileunyi – Sumedang – Dawuan toll road along ± 58.5 km connecting the Trans Java Toll Road, new airport and other cities such as Bandung and Cirebon. 7. Scope of Work a. Civil works of toll road construction for 58.5 km; b. Consulting services for Detailed Engineering Design and Construction supervision. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of the toll road of Cileunyi – Sumedang – Dawuan with length of 58.5 km. b. Outcome 1) Improving accessibility and capacity of road networks connecting Bandung and Cirebon and the proposed new airport and seaport; 2) Promoting National and Regional development in the Corridor-impacted areas and cities along the road in the eastern part of West Java; 3) Increasing productivity and improve access for regional and international market. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 330,000,000 0 330,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 33,000,000 0 0 0 Sub Total : US$ 33,000,000 363,000,000 13 BB-ID: BB-1114-R1-005-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Toll Road Development of Balikpapan - Samarinda 60 Months Balikpapan and Samarinda City, East Kalimantan Province Ministry of Public Works Directorate General of Highways, Ministry of Public Works 6. Background and Justification Due to their rapid economic growth, Samarinda and Balikpapan have become important inlets/outlets for socioeconomic activities of the Kalimantan Island. The growth of heavy industries in the Eastern Kalimantan requires road of high standard for distributing and delivering the products to the market. The lack of efficiency and effectiveness of existing transportation facilities, for example the sea/river transportation, as well as the minimum road capacity has hindered industries to conduct market expansion. The Government of Indonesia, supported by the local government, intends to develop Samarinda – Balikpapan - Penajam of 117 km in order to improve the accessibility to support the heavy industry expansion, as well as to enhance economic and regional development. Based on a 2002 feasibility study, the project was financially marginal with a Financial Internal Rate of Return (FIRR) of 7%. Therefore, in order to realize this project, Government support is required. 7. Scope of Work a. Project pre development (Detailed Engineering Design, Tender Assistance); b. Construction of Balikpapan – Samarinda – Panajam toll road with the length of 117 km; c. Construction supervision. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of toll road of Balikpapan – Samarinda – Panajam with length of 117 km. b. Outcome 1) Improving accessibility and capacity of road networks for the movement of people/goods/freight to and from Samarinda and Balikpapan and other cities; 2) Promoting national and regional development in the corridor-impacted areas and cities along the road; 3) Increasing productivity of the area by means of reducing distribution cost and improve access to regional and international market. 14 BB-ID: BB-1114-R1-005-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 380,000,000 0 380,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 38,000,000 0 0 0 : US$ 38,000,000 418,000,000 15 BB-ID: BB-1114-R1-006-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Toll Road Development of Manado - Bitung 36 months Manado and Bitung City, North Sulawesi Province Ministry of Public Works Directorate General of Highways, Ministry of Public Works 6. Background and Justification The North Sulawesi Province located in the Eastern Indonesia Region which has high economic potential, that will be supported by the presence of the Bitung Seaport on the eastern coast. Geographically, this port is very appropriate for Transshipment Port and is potentially competing with the Transshipment port of Singapore. At this moment the provincial government is preparing the KAPET (Integrated Economic Development Area) of Manado – Bitung with programs such as the development of Bitung Transshipment port, industrial area of Bitung – Airmadidi, agro industrial area and tourism area. The provision of efficient transport system is crucial for supporting the KAPET. The Manado – Bitung toll road that will connect Manado airport and Bitung City, is an alternative for providing highway access with high level service for supporting the KAPET of Manado – Bitung. Toll road is chosen because of low fiscal capacity of the government, which requires support of non-governmental sources both private investors and users of the highway. 7. Scope of Work Civil works of toll road construction for 57,021 km. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of toll road of Manado – Bitung with length of 57,021 km. b. Outcome Supporting development of the North Sulawesi Province, particularly the Manado – Bitung Integrated Economic Development Area (KAPET). 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 80,000,000 0 80,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 16 88,000,000 : US$ : US$ : US$ : US$ 8,000,000 0 0 0 : US$ 8,000,000 Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements (Direktorat Jenderal Cipta Karya) BB-ID: BB-1114-R1-007-0 1. Project Title : Rural Infrastructure Support National Community Empowerment Program IV (RIS PNPM IV)/Urban Sanitation and Rural Infrastructure (USRI) : 48 months : Nationwide : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification One of the Indonesia’s Millenium Development Goals (MDGs) target by 2015 is to nationally increase access of the population to proper sanitation to 62.7% to serve 154 million people, that has only reached 51.02% in 2009. To achieve these targets, the Government of Indonesia has developed a National Community Empowerment Program Sanitation (PNPM Sanitasi) as a means to create and improve the quality of people's lives, both individually and collectively to participate in solving various problems associated with efforts to increase the quality of life, self-reliance and public well-being. PNPM programs have been implemented since 2007 with various types of activities to reach all areas of Indonesia. The PNPM Sanitation Program is a program with the concept of community development and funding schemes such as PNPM Mandiri. This program will be implemented by capacity building of communities through mentoring facilitators and implementers of training, which will be needed to increase community understanding of planning and development. 7. Scope of Work a. Strengthen capacity for community planning and development; b. Improve rural basic infrastructure through community development; c. Improve sanitation service through community development. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of infrastructure facilities and environmental sanitation of settlements in accordance with community needs and capabilities, quality, sustainable, and environmentally friendly principles; 2) Increased capacity of rural communities in the implementation of rural infrastructure; 3) Increased ability of local government as facilitator of development, particularly the environmental health sector; 4) Implementation of participatory, transparent, and sustainable rural infrastructure development. 19 BB-ID: BB-1114-R1-007-0 b. Outcome 1) Improving under-developed rural community welfare; 2) Creating employment opportunities; 3) Improving community participation for more sustainable local community welfare programs. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 200,000,000 0 200,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 20 200,000,000 : US$ : US$ : US$ : US$ 0 0 0 0 : US$ 0 BB-ID: BB-1114-R1-008-0 1. Project Title : Metropolitan Sanitation Management Investment Program (MSMIP) : 36 months : Banjarmasin, Surakarta, Tangerang, Medan, and Yogyakarta City : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The Metropolitan Sanitation Management Investment Project is a program to encourage investment in the sanitation sector, especially wastewater, in metropolitan and big cities in Indonesia. This program aims to improve sanitation facilities in metropolitan and big cities and to improve the quality of life and public health, especially for poor communities. The objectives are to (i) to reduce the number of communities that are contaminated by wastewater. (ii) to reduce contaminated water bodies directly caused by wastewater. (iii) to improve conditions of urban environments. (iv) to increase attention of Local Government to handle wastewater management. 7. Scope of Work a. Communal sanitation; b. Infrastructure development for sewerage and Wastewater Treatment Plant (WTP); c. Project implementation support. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Awareness of the benefits of sanitation service increased; 2) Constructed and operational wastewater collection, treatment, and disposal facilities; 3) Availability of operational sanitation strategy. b. Outcome Increasing access to sanitation service, improving environmental health, and decreasing pollution discharge. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 264,000,000 0 264,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 115,000,000 0 0 0 : US$ 115,000,000 379,000,000 21 BB-ID: BB-1114-R1-009-0 1. Project Title : Construction of the West Java Regional Solid Waste Treatment and Final Disposal (Solid Waste Final Disposal and Treatment Facility) : 36 Months : Regional Nambo, West Java Province : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Solid waste management in Bogor City, Bogor District. is facing the problem of final disposal site in their area. Currently, the final disposal site for Bogor City is located in Galuga and it has been used together with Bogor District. Each final disposal site lifetime ended in 2011, beside, according to Solid Waste Management Law Number 18 of 2008, open dumping final disposal site must be closed not later than in 2013. According to the Jabodetabek Waste Management Cooperation (JWMC) study results, regional solid waste management final disposal site gives more benefit to environmental and economic aspects. 7. Scope of Work a. Construction of final disposal site with sanitary landfill concept; b. Construction of Intermediate Treatment Facility (ITF) (facilities of sorting, treatment, and waste final processing); c. Supporting facilities; d. Construction supervises; e. Construction of buffer zone. 8. Priority Infrastructure 9. Output and Outcome a. Output Construction of West Java regional solid waste treatment and final disposal. b. Outcome 1) Improving solid waste management; 2) Decreasing the number of solid waste that disposed to the final disposal site; 3) Improving human health and environmental quality; 4) Improving of solid waste management performance; 5) Reducing of greenhouse gas emission. 22 BB-ID: BB-1114-R1-009-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 100,000,000 0 100,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 20,000,000 0 0 0 : US$ 20,000,000 120,000,000 23 BB-ID: BB-1114-R1-010-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Community Based Water Supply Project (PAMSIMAS II) 36 months Nationwide Ministry of Public Works Directorate General of Human Settlements, Ministry of Public Works 6. Background and Justification Over the last three decades Indonesia has had a notable record in poverty reduction, human development and improvements in service delivery. But, notwithstanding its past achievements, the challenges facing Indonesia today remain daunting and the Government is looking for ways to deal with them more effectively. Access to Water Supply and Sanitation (WWS) services continues to be low in Indonesia and achieving the WSS Millennium Development Goals (MDGs) targets will require more intensive and effective government support. Based on the National Socioeconomic Survey (SUSENAS) data 2009, the proportion of Indonesia households with sustainable access to safe drinking water supply in urban and rural area is about 47.71%, whereas the MDGs for Indonesia in 2015 is 68.87%. Coverage condition in rural areas is less developed than in urban areas, namely only about 45,72% in the rural and 49.82% in urban areas. To accelerate achievement of WSS MDGs, Government of Indonesia proposes to expand the coverage of services with 3,250 villages. 7. Scope of Work a. Component 1 : Finances community empowerment and local institutional development to mainstream and scale up community-driven approach to water improvement. b. Component 2 : Support activities to improve sanitation and hygiene behavior, encompassing propagation of Community Lead Total Sanitation (CLTS), school sanitation, school hygiene programs and community-wide sanitation and hygiene promotion. c. Component 3 : Provides grants for the preparation and implementation of the village water supply. d. Component 4: Supports effective and efficient technical support and management of the Project 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of water supply system through community-based in rural areas. b. Outcome Enhancing the quality of life of rural poor communities. 24 BB-ID: BB-1114-R1-010-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 99,900,000 0 99,900,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 100,000,000 0 0 0 : US$ 100,000,000 199,900,000 25 Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources (Direktorat Jenderal Sumber Daya Air) BB-ID: BB-1114-R1-011-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Bali Beach Conservation Program Phase II 60 Months Bali Province Ministry of Public Works Directorate General of Water Resources , Ministry of Public Works 6. Background and Justification Bali Island is the one of the world-famous resort areas and is the major contributor to tourism in Indonesia. More than 30% of the Gross Regional Domestic Product (GRDP) of Bali is contributed by tourism and is constantly increasing. Bali Island has received nomination many times by international institutions as world tourism area and tourism area is continuously developed. Bali beach as one of the main tourism resources, require the preservation of its natural condition as world tourism area. However, serious beach erosion problem has been taken place since the development of tourism in 1970's and deterioration of coastal environment and loss of beach has induced the adversely effect on the tourism. To recover the eroded beach in the tourism area, Bali Beach Conservation Project (BBCP) Phase-1 was undertaken at 4 sites in south resort area and significant contribution on tourism can be obtained. The tourism area is now actively expanding and under development from south area to other area and there are several beaches which urgently require rehabilitate urgently from beach erosion to maintain the tourism potency. This project is to rehabilitate the beach in the major tourism areas in Bali Island to maintain and enhance the contribution to the tourism sector. 7. Scope of Work Based on Feasibility study, three project sites have been selected taking into consideration contribution to tourism, which are Candidasa Beach (Karangasem), North Kuta - Legian Seminyak - Canggu Beach (Badung) and Lovina Beach (Buleleng). a. Beach conservation at Candidasan Beach Although beach conservation measures at Candidasa have been undertaken by combination of groins and offshore breakwaters, together with seawall, the condition of the beach has not yet improved. From the review of efficiency for existing coastal facilities the following measures were proposed: 1) 2) 3) 4) 5) 6) 7) 8) Sand nourishment with modification and re-arrangement of existing groinsand; Breakwaters; Construction of permeable revetment; Reef flat restorations; Construction of walkway; Capacity building on beach maintenance and management; Establishment of rule on beach utilization; Public education on coastal environment and management. 29 BB-ID: BB-1114-R1-011-0 b. Beach conservation at North Kuta-Legian-Seminyak-Canggu The development of the beach in this area is active. The most attractive point at this area is the existence of continuous natural sandy beaches without any coastal structures. Taking into account the attractive and advantage of this beach, the following measures were proposed: 1) 2) 3) 4) 5) 6) Sand nourishment; Construction of walkway at land side; Improvement of existing seawalls and revetments (as needed); Capacity building on beach maintenance and management; Establishment of rule on beach utilization; Public education on coastal environment and management. At north Kuta, further countermeasures are required to minimize the sand outflow. The countermeasures by supplementary groins with filling of sand were proposed. c. Beach conservation at Lovina The following measures were proposed at this area taking into account is present condition and characteristics of natural conditions: 1) 2) 3) 4) 5) 6) Sand nourishment with supplementary coastal structures such as groinsand; Headlands; Construction of walkway at land side; Capacity building on beach maintenance and management; Establishment of rule on beach utilization; Public education on coastal environment and management. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Recovered the sandy beach; 2) Construction of coastal measure structure (groin, headlands, revetment, breakwater); 3) Construction of walkway along the beach to provide easy access along the beach; 4) Reef flat restoration. b. Outcome 1) Maintaining and enhancing the tourism contribution; 2) Improving the coastal environment (natural condition, landscaping) and utility condition as the world tourism area; 3) Establishing integrated beach management involving all related parties. 30 BB-ID: BB-1114-R1-011-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 80,000,000 0 80,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 8,000,000 0 0 0 : US$ 8,000,000 88,000,000 31 BB-ID: BB-1114-R1-012-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Additional Loan for Jatigede Dam 65 months Jatigede, West Java Province Ministry of Public Works Directorate General of Water Resources , Ministry of Public Works 6. Background and Justification The Jatigede Dam is planned to be constructed on the Cimanuk river about 25 km upstream of Rentang Barrage, with the purpose of making better use of water resources of Cimanuk river, provide a reliable water supply for domestic use and irrigation area, mitigation of floods and for hydroelectric power generation. The Government of Indonesia through the Ministry of Public Works has decided to construct the Jatigede Dam. Implementation of the project was commenced on November 15, 2007 and scheduled to be physically completed by December 2013. The main objectives of the Jatigede Dam are to increase and improve the capacity of the agricultural sector, and restore the economic and social infrastructures. The main advantages and benefits of Jatigede Dam are as raw water for the north coast region of Java (Cirebon, Indramayu), flood control, expansion of Rentang irrigation system, tourism around the Jatigede Dam, electrical power plant and fishery activities. 7. Scope of Work Scope of work of the construction of the Jatigede Dam Project consist of the following: a. Main Dam; b. Spillway; c. Diversion Tunnel; d. Irrigation Outlet; e. Power Waterway; f. Road Relocation. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Provided irrigation supply of 59.63 m3 /second in Rentang irrigation area of 90,000 ha; 2) Provided water for power development (electricity power of 110 Mw); 3) Provided flood control, tourism and fishery. b. Outcome 1) Increasing and improving the capacity of the agricultural sector (increase agricultural product (270%); 2) Restoring the economic and social infrastructure,the raw water for the north coast region of Java (Cirebon,Indramayu), flood control, expansion of Rentang irrigation system, tourism around the Jatigede Dam, electricity power plant and fishery. 32 BB-ID: BB-1114-R1-012-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 172,060,000 0 172,060,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 17,200,000 0 0 0 : US$ 17,200,000 189,260,000 33 BB-ID: BB-1114-R1-013-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Construction of Mujur Dam 60 months Lombok Island, West Nusa Tenggara Province Ministry of Public Works Directorate General of Water Resources, Ministry of Public Works 6. Background and Justification Due to low annual rainfall precipitation as low as 800 mm/annum in the southern part of East Lombok, there is no enough viable water and has a tendency of having critical area. There are 1,065,379 people living in East Lombok, with per capita income in the 30th rank among 32 provinces. As critical area which lack till now, and in 1969 is the dry period with a long dry season to people and animal life. Less rainfall depth is one reason for the critical area, as 800 1000 mm/annum occur in 3 months. Topographical area of South Lombok as the lower reach of Rinjani mountain is a mountainous area, and the available spring water could not reach on surrounding populations. In order to solve the lack of viable water in southern part of Lombok, it is necessary to build High Level Diversion (HLD) suppletion system which has a 50.564 ha potential area with semi technical irigation system and rainfed area. There are still 20.750 ha potential rainfed area in Mujur area and Pandanduri Suwangi that need to be developed though dam contruction. 7. Scope of Work a. b. c. d. e. f. g. h. Review design of dam and appurtenant structure; Detailed design of irrigation system; Land acquisition and resettlement; Construction works consist of : Infrastructures relocation road; Construction of dam and appurtenant structure; Rehabilitation and improvement of irrigation system. Consulting services. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of dam with 25,9 million cubic storage. b. Outcome 1) Fulfilling the needs of clean water for rural community covering 3 sub district those are Praya Tengah, Praya Timur and Janapria; 2) Increasing the utilization of rained -based land use around 8,300 ha which will be converted to field rice technical irrigation; 3) Increasing the production intensity of rice, crop plants, and bero with productivity 3 ton ha changing to twice rice/twice the crop plants system with the assumption of production is 5 ton/ha; 34 BB-ID: BB-1114-R1-013-0 4) 5) 6) Increasing rural economic growth, shall can minimize social disparity and crime prevention; Pushing the creation of employments in agriculture and trading sector which can minimize unemployment; Maintaining the food subsistence and regional food stock in the Eastern part of Indonesia. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 92,550,000 0 92,550,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 13,000,000 0 0 0 : US$ 13,000,000 105,550,000 35 BB-ID: BB-1114-R1-014-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Construction of Pamukulu Dam Irrigation Project 84 months Makassar City, Gowa, Maros and Takalar District Ministry of Public Works Directorate General of Water Resources, Ministry of Public Works 6. Background and Justification The present Pamukulu Irrigation Project lies on the area with 4,500 ha of core paddy fields or 6,400 ha of potential areas, adjoining the south east of irrigation areas of the Kampili and Bissua areas of Bili-bili Irrigation Project. Technical irrigation systems have been constructed in the Pamukulu Irrigation area since 1960’s including Pamukulu, Cakura, and Jenemarrung irrigation systems. They, however, have not been well maintained and some of them are no longer operating. Besides, the maintenance of channel has been disregarded during the dry seasons when the systems are not useful. This is one of the factors behind the inadequate maintenance of the facilities. Another crucial constraint to the agricultural development of the southern Takalar Distric is insufficient water resources. water user associations in this area could not function efficiently because of the shortage of water resources and poor operation and maintenance of the existing facilities. In addition, it is anticipated that a marked socioeconomic disparity between the areas covered by the Bili-bili project and those not covered by it will occur in Takalar District. Considering the above, development of the water resources through the construction of the Pamukulu Dam is the most fundamental requirement in this area. Developing the water resources will definitely contribute to mitigating economic disparity between the Bili-Bili irrigation area and the remaining area in Takalar District, as well as improving living conditions. 7. Scope of Work a. Construction of Pamukulu Dam for the development of water resources; b. Rehabilitation and improvement of the existing irrigation facilities. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of Pamukulu Dam and Reservoir; 2) Availability of irrigation system, water improvement to supply about 6,430 of paddy fields. b. Outcome 1) Improving paddy production in existing paddy fields and surrounding areas; 2) Increasing farmer’s income; 3) Mitigating economic disparity between the Bili-Bili irrigation area and the remaining area in Takalar District as well as improving living conditions. 36 BB-ID: BB-1114-R1-014-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 87.360.000 0 87.360.000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 15,814,000 0 0 0 : US$ 15,814,000 103.174.000 37 BB-ID: BB-1114-R1-015-0 1. Project Title : Implementation of Tanju and Mila Dam Construction for Rababaka Complex : 60 months : Dompu Distrct, West Nusa Tenggara Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The local revenue of Dompu District, West Nusa Tenggara Province is mainly generated from the agriculture sector. It is therefore urgent to improve agricultural management in order to boost the income contribution and increase people welfare. In line with this idea, one of potential areas to be developed is Rababaka Complex. Currently, the utilization of existing water resources to fulfil the demand for water irrigation and household needs in Rababaka region is not optimal. On the other hand, the Rababaka river has abundant water potential, while the existing irrigation land is relatively limited (A=1,689 Ha). The current condition of inflow in the river is 79 m3/year, and it is only used around 40 m3/year while the rest of the water is flowing to the sea. In contrast, on the right position of the Rababakan River is sited the Tanju river. The Tanju river has quite wide potential land (A = 2,350 Ha) but the potential inflow is relative small and unequal to the land served. Based on the conditions above, it is proposed to develop of the Rababaka Complex, which has interconnection network among catchment areas. This development is expected to optimize the potential inflow and the existing land. 7. Scope of Work a. b. c. d. e. Construction of Rababaka Wier and Interbasin Canal, Tunel I and Tunel II; Construction of Tanju and appurtenant structure; Construction of Mila dam and appurtenant structure; Review design of irrigation system; Consulting service. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) For watering rice fields at approximately 2,350 Ha in irrigation area of Tanju; 2) For watering rice fields at approximately 1,689 Ha in irrigation area of Rababaka; 3) Availability of the providence of community water supply for 5,776 Households (Q50 lt/dt). b. Outcome 1) Optimalization the potentiality of water resources and land resources; 2) Supporting the development of the tourism sector; 3) Improving community life through the development of freshwater fisheries. 38 BB-ID: BB-1114-R1-015-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 74,108,000 0 74,108,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 8,234,000 0 0 0 : US$ 8,234,000 82,342,000 39 BB-ID: BB-1114-R1-016-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Lausimeme Multipurpose Dam Development Project 48 months Lausimeme and Deli Serdang District, North Sumatera Province Ministry of Public Works Directorate General of Water Resources, Ministry of Public Works 6. Background and Justification Medan City, the center of economic and industrial development of Sumatera, with a population of more than 2 million in 2005, has suffered frequent flood damages. Together with the city's vicinity, Deli Serdang District, the total population has reached to 3.5 million of which municipal water has been served by the Regional Water Company (PDAM) Tirtanadi Medan. The growth of the city population in recent years has resulted in the serious shortage of municipal water supply. 7. Scope of Work a. Construction of dam and reservoir; b. Construction of spillway and outlet facilities; c. Construction of hydropower generation. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of flood control; 2) Availability of municipal water supply; 3) Availability of electricity. b. Outcome Increasing economic and industrial development of Sumatera through the availability of flood control, municipal water supply, and electricity in Medan city and city's vicinity. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 103,500,000 0 103,500,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 40 115,000,000 : US$ : US$ : US$ : US$ 11,500,000 0 0 0 : US$ 11,500,000 BB-ID: BB-1114-R1-017-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Passeloreng Dam and Gilirang Irrigation Project 60 months Jeneberang District, South Sulawesi Province Ministry of Public Works Directorate General of Water Resources, Ministry of Public Works 6. Background and Justification The Pasalloreng Dam and Gilirang Irrigation System is one priority project identified in the “Master Plan for the Central South Sulawesi Water Resources Development”, consisting of Langkeme, Bila, Sanrego and Gilirang. The project area is located about 240 km northeast along the national road from Makassar, the capital of South Sulawesi Province. It extents northeast from Sengkang, the capital of Wajo District and is approximately bounded by coastal swamp belt of Bay of Bone on the east and Attapange-Doping road on the south. The northern and eastern boundaries skirt along the foot of hilly ranges. The central feature of the project is to supply irrigation water to the existing paddy field of about 8360 ha with a gravity irrigation system by utilizing water from the Paselloreng Dam which will be constructed on the middle reach of the Gilirang River. 7. Scope of Work a. b. c. d. e. f. Construction of Paselloreng Dam and reservoir (Zoned Type Fill Dam); Construction of Gilirang Head works; Construction of Gilirang irrigation System (8360 ha); Construction of Drainage System; Improvement of roads; On-farm development. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of Passeloreng Dam; 2) Availability of irrigation system water improvement to supply about 8.360 of paddy field. b. Outcome 3) Enhancing agricultural productivity through development of irrigation and drainage system; 4) Increasing rural economic growth in order to poverty alleviation. 41 BB-ID: BB-1114-R1-017-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 79,663,000 0 79,663,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 42 88,514,000 : US$ : US$ : US$ : US$ 8,851,000 0 0 0 : US$ 8,851,000 BB-ID: BB-1114-R1-018-0 1. Project Title : Countermeasure for Sediment in Wonogiri Multipurpose Dam Reservoir (Slice II) : 48 months : Wonogiri District, Central Java Province : Ministry of Public Works : Directorate of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The Wonogiri Multipurpose Dam that was completed in 1981 is the sole large dam on the mainstream of the Bengawan Solo River. The Wonogiri reservoir has been suffering from sediment deposits and garbage at the intake that provides water for power generation and irrigation water supply. The intake has to be shut down on a regular basis to allow for the removal of sediment and garbage. The Keduang River that enters the reservoir just upstream of the dam is the primary cause of the current sediment-related problems. The sediment and garbage from the Keduang River have deposited massive quantities of sediment in the forebay adjacent to the dam. The reservoir sedimentation survey in 2006 showed sediment deposition depth of approximately maximum 20 m in the forebay. It was predicted that the forebay area would be completely filled with sediment deposits due to continuing sediment inflow from the Keduang River. Establishment of sustainable sediment management system in the reservoir becomes crucial. The source of the sediment was identified as soil erosion from the cultivated upland fields and settlement areas in the Wonogiri dam watershed. The volume of annual soil erosion is estimated at around 93% of the annual sediment inflow into the reservoir (annual average 3.2 million m3 in 1993-2004). Such high soil erosion rate might be caused by poor land management and agricultural development that local farmers had to develop topographically critical areas on steep mountain slope due to poverty and large agricultural population. Out of sub-watersheds, the Keduang watershed produces the highest soil loss. Urgent countermeasures are proposed in this project. The project aims at securing the proper function of the intake with provision of combination of structural and non-structural measures to cope with the sediment inflow into the reservoir from the Keduang River. The Keduang River to the downstream goes through the new spillway, thereby the sedimentation at the intake would be drastically decreased. Almost all of the sediment and garbage inflow from the Keduang River will be completely retained in the sediment storage reservoir. The existing intake will become completely relieved from the current sedimentrelated issues. The retained sediment and garbage in the sediment storage reservoir will be easily released from the new spillway. The watershed conservation in the Keduang sub-watershed as the non-structural measure will mitigate sediment yield, thereby reducing the sediment inflow from its watershed. Implementing of the watershed conservation will be carried out by means of community-based management, encouraging the local farmers to increase farm income and thereby to improve the quality of life by improving their current land use practices. This comprehensive approach for the watershed conservation will contribute to poverty alleviation, providing stabilization of the farmers economic situation. 43 BB-ID: BB-1114-R1-018-0 7. Scope of Work Project component consists of : a. Completion of sediment storage reservoir with new gates, consists of the closure dike, and overflow dike; b. Watershed conservation of Keduang river. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of 1 piece of closure dike; 2) Availability of 1 piece of overflow dike; 3) Construction of 10 pieces of check dam (Watershed conservation II); 4) Implementation of 1 area of soil conservation measures. b. Outcome 1) Improving farming technology and agro-forestry development; 2) Promoting water conservation; 3) Increasing farmer's income. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 73,210,000 0 : US$ 73,210,000 TOTAL : US$ 84,840,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total 44 : US$ : US$ : US$ : US$ 11,630,000 0 0 0 : US$ 11,630,000 BB-ID: BB-1114-R1-019-0 1. Project Title : Comprehensive Countermeasure for Sediment & Flood Problems in South Sulawesi Province : 60 months : South Sulawesi Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification An urgent sediment disaster reduction project has been conducted since 2005 and the constructed series of sabo facilities have retained the 2004 collapsed debris materials in the upper river valley and control debris sediment transportation to the downstream. However besides sedimentation material retained in wide catchment area of caldera (90 million m3), there is possible extensional caldera collapse with 113 million m3, totally 203 million m3 in the upper caldera area. These sediments have still produced alarge number of debris flows with heavy local rainfall. The cumulative sedimentation volume in the reservoir for 7 years (2004-2011) has reached 80,000,000 m3 which is 2.8 times of designed sediment reservoir capacity. If that sedimentation continues in the range of 2 to 4 million m3/year, cumulative sedimentation volume in 2048 (lifetime of Bili-Bili Dam) is predicted at 190 million m3. This sedimentation condition creates difficulty for dam operation and result serious in water utilization capacity shortage. In addition an extensional potential collapse has been observed behind the 2004 collapsed caldera wall, in the amount of 113 million m3. It is a very serious situation where existing water intake facility of Bili-Bili main dam could be blocked by future cumulative sedimentation within a few years, and hydroelectric facility (18.7MW), drinking water for Makassar city and irrigation water will adopted operation. In order to recover and maintain the functions of Bili-Bili Dam for sustainable utilization, it is important to conduct urgent countermeasures on the sedimentation problems of Bili-Bili Dam. Moreover, other river basins in South Sulawesi have also been adversely affected by rapid floods and sediment disaster occurrences, affecting the operation of existing infrastructure such as Lekopancing Weir in Maws River, Benteng Weir in Saddang River and so on. 7. Scope of Work a. Construction works: 1) Rehabilitation of Bili-Bili dam intake as water level selectable; 2) Construction of sand trap facility at edge of Bili-Bili reservoir; 3) Construction of a series of sediment restrain facility at the exit of caldera for future extensional caldera collapse. b. Capacity building program though the following collaborative works are implemented: 1) Identification of issues related sediment problem within existing infrastructure; 2) Prioritization of basins and selection of pilot river basin; 3) River basin sediment management plan study; 4) Feasibility study, basic design and/or detailed design for priority rehabilitation project. 45 BB-ID: BB-1114-R1-019-0 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of water selectable intake at Bili-Bili dam; 2) Availability of giant sand trap; 3) Availability of several sediment control facilities; 4) Implemented feasibility study, basic design and/or detailed design for priority rehabilitation project. b. Outcome 1) Maintaining raw water supplies for Regional Water Company (PDAM); 2) Reducing sedimentation flow into Bili-Bili Dam; 3) Restraint of sedimentation deposited at the middle and upper reach of Jeneberang river and the Caldera of Mt. Bawakaraeng; 4) Readiness of starting implementation of Sediment Control Project at river basins of South Sulawesi. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 108,100,000 0 108,100,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 46 112,000,000 : US$ : US$ : US$ : US$ 3,900,000 0 0 0 : US$ 3,900,000 BB-ID: BB-1114-R1-020-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Lower Solo River Improvement Project Phase II 72 months East Java and Central Java Province Ministry of Public Works Directorate General of Water Resources, Ministry of Public Works 6. Background and Justification In the rainy season, the Lower Solo River Basin has frequently experienced large scale of floods of almost every five years since 1958 to 2007. The flood in December 2007 caused severe damages over the basin, and the inundated area extended to 79,000 ha especially in the Lower Solo River Basin (69,000 ha). The periodic flood prone area is estimated at 22,000 ha in which 12,000 ha is paddy field. Duration of the inundation usually lasts two to twenty days. In the December 2007 flood, the total flood damage was estimated to reach up to Rp 2,400 billion (US$ 255 million, ¥-31.2 billion). More than 80% of the damage occurred in the Lower Solo River area. 7. Scope of Work a. River improvement works in both the right and left waterside of the Lower Solo River from Cepu town to Babat barrage and their tributaries flowing into the objective stretches; b. Drainage improvement in Jero Swamps; c. Engineering services for tender assistance and construction supervision. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of flood control by river improvement works and drainage improvement. b. Outcome Preventing huge flood damage in social and economic life of the people in the Lower Solo River basin. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 155,836,000 0 155,836,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 22,500,000 0 0 0 : US$ 22,500,000 178,336,000 47 BB-ID: BB-1114-R1-021-0 1. Project Title : Urban Flood Control System Improvement in Selected Cities Phase II : 57 months : Sumatra, Sulawesi, Kalimantan, East Java and West Java Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Flood does not only occur in great rivers but also in rivers which pass cities. Currently, flood happen in many cities in Indonesia. The major factor in inundation area in the cities are as follows: a. The increasing elevation of water surface of the river due to rain on the upstream of the river, has lead to the inundation from the river itself or from creeks of the city. b. The relatively flat condition of the city area has caused difficulties in draining the rain water from the city area through the existing tributaries drainage canals. c. River degradation caused by sedimentation, contamination (trash) into the river, its tributaries and city drains has reduced capacity of the river to sufficiently drain the rain water from the city area. d. The urban development are not well planned in the cities which not follow regulation of river can cause increase in runoff ratio and insufficient discharge capacity of urban drains. e. The combination of urban drainage and urban flood control, has caused the river capacities to decrease. 7. Scope of Work a. Enhance capacity of the river and drainage system in the cities to drain the rain water from the city area through: b. Construction and rehabilitation of drainage system; c. River improvement works. 8. Priority Infrastructure 9. Output and Outcome a. Output Improvement of urban flood control system. b. Outcome Preventing damages in social and economic life of the people in the cities area. 48 BB-ID: BB-1114-R1-021-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 74,900,000 0 74,900,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 18,725,000 0 0 0 : US$ 18,725,000 93,625,000 49 BB-ID: BB-1114-R1-022-0 1. Project Title : Integrated Participatory Development and Management of Lhok Guci Irrigation : 60 months : West Aceh District, Nangroe Aceh Darussalam Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The Government of Indonesia (GoI) indicated that revitalization of agriculture is one of the national priorities to sustain national economic growth and to achieve food self-sufficiency in terms of food security. The expected target of agricultural revitalization during the period of 2010-2014 is to attain growth rate of 3,22% on average of the agriculture sector and to increase income and welfare of farmers. Thus, it is urgently required to increase rice production in Indonesia for sustainable food security. One of the targets to fulfill is the rounding up of existing irrigation facilities in the Nangroe Aceh Darussalam Province namely the Lhok Guci irrigation project with the total area of about 18,542 ha, which is one of the major rice producing regions and this would significantly contribute to increase a rice production. Lhok Guci irrigation project is located in Pante Ceureumen, Kaway XVI, Bubon, Samatiga, Johan Pahlawan Sub-district, West Aceh District. With the major irrigated area being on the right side of Krueng Meurubo river, Lhok Guci will irrigate about 18,542 ha, consisting of about 1,000 ha for left intake and about 17,542 ha for right intake. 7. Scope of Work a. Sustainable integrated development of irrigated facilities with participative Area Irrigation System (SID), construction and operational maintenance; b. Participative design and implementation of rehabilitation of irrigation system; c. Establishment and empowerment of Water User Associations (WUAs); d. Strengthening of operation and maintenance of irrigation system; e. Implementation of irrigation asset management; f. Improvement of on-farm irrigation; g. Catchment area improvement of water resources conservation through public consultation, socialization and dissemination. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of irrigation system through integrated participatory approach in Lhok Guci, Nangroe Aceh Darussalam Province. 50 BB-ID: BB-1114-R1-022-0 b. Outcome 1) Increasing of rice production through rounding up irrigation systems; 2) Accelerating poverty alleviation in agriculture based districts in rural areas. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 78,650,000 0 : US$ 78,650,000 TOTAL : US$ 84,387,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total : US$ : US$ : US$ : US$ 5,737,000 0 0 0 : US$ 5,737,000 51 BB-ID: BB-1114-R1-023-0 1. Project Title : Modernization Strategic Irrigation Project for Eastern Region of Indonesia : 72 months : South Sulawesi, Southeast Sulawesi, West Sulawesi, and West Nusa Tenggara Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. Duration Location 4. 5. Executing Agency Implementing Agency 6. Background and Justification Food security through improved crop production is among the highest priorities of Indonesia, which poses a challenge in meeting the country’s demand of water agriculture, in addition to the household water needs of the growing population. The need of improvement and modernization of Indonesia irrigated areas is easily understood when some of their technical characteristics are taken into account. Some of Indonesia strategic irrigated area is more than three decades. Moreover, competition for water and shortcomings in managing it to meet the needs of society and the environment call for enhanced societal responses through improved management, and more effective and transparent water allocation mechanisms. The challenge includes wise planning of water resources, evaluation of availability and needs in watershed, possible reallocation or storage expansion in existing reservoirs, more emphasis on water demand management, better balance between equity and efficiency in water use, inadequate legislative and institutional frameworks and the rising financial burden of ageing infrastructure. The improvement and modernization program attempt to correct this situation, which burdens the competitiveness of the irrigated agriculture and causes environmental concerns, in addition to extend to opportunities of the new economy to the rural countryside. 7. Scope of Work a. Preparation of Asset Management Plan (AMP), based on the asset inventory; b. Review and update the existing plan and design from views of modernization and rationalization taking into account the competition of water use; c. Execution of modernization and rationalization work; d. Empowerment of Water User Associations (WUAs) and introduction of asset management through water management activities; e. Irrigated farming improvement through improvement of water supply and distribution at farm level (Irrigation Level of Farmer Network (JITUT) and Irrigation Level of Villages Network (JIDES)), and tertiary development unit. f. Conservation improvement through socialization, introduction reforestation of catchment area. 8. 52 Priority Infrastructure BB-ID: BB-1114-R1-023-0 9. Output and Outcome a. Output 1) Optimized agricultural irrigation by increasing efficiency of the whole irrigation system; 2) Improved the water management by promoting new technologies, lowering production costs, increasing the value added and upgrading the manpower efficiency; 3) Achievement of a technological shift by using new technologies in irrigation. b. Outcome 1) Reinforcing national self-reliance and to enhance food security; 2) Realizing the sustainable irrigation water uses and operation and maintenance; 3) Upgrading farm management and increasing productivity. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 52,180,000 0 52,180,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 7,675,000 0 0 0 : US$ 7,675,000 59,855,000 53 BB-ID: BB-1114-R1-024-0 1. Project Title : Modernization Strategic Irrigation Project for Western Region of Indonesia : 72 months : West Java, East Java and Central Java Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Food security through improved crop production is among the highest priorities of Indonesia, which poses a challenge in meeting the country’s demand of water agriculture, in addition to the household water needs of the growing population. The need of improvement and modernization of Indonesia irrigated areas is easily understood when some of their technical characteristics are taken into account. Some of Indonesia strategic irrigated area is more than three decades. Moreover, competition for water and shortcomings in managing it to meet the needs of society and the environment call for enhanced societal responses through improved management, and more effective and transparent water allocation mechanisms. The challenge includes wise planning for water resources, evaluation of availability and needs in watershed, possible reallocation or storage expansion in existing reservoirs, more emphasis on water demand management, better balance between equity and efficiency in water use, inadequate legislative and institutional frameworks and the rising financial burden of ageing infrastructure. The improvement and modernization program attempt to correct this situation, which burdens the competitiveness of the irrigated agriculture and causes environmental concerns, in addition to extend to opportunities of the new economy to the rural countryside. 7. Scope of Work a. Preparation of Asset Management Plan (AMP), based on the asset inventory; b. Review and update the existing plan and design from views of modernization and rationalization taking into account the competition of water use; c. Execution of modernization and rationalization work; d. Empowerment of Water User Associations (WUAs) and introduction of asset management through water management activities; e. Irrigated farming improvement through improvement of water supply and distribution at farm level (Irrigation Level of Farmer Network (JITUT) and Irrigation Level of Villages Network (JIDES)), and tertiary development unit. f. Conservation improvement through socialization, introduction reforestation of catchment area 8. 54 Priority Infrastructure BB-ID: BB-1114-R1-024-0 9. Output and Outcome a. Output 1) Optimized agricultural irrigation by increasing efficiency of the whole irrigation system; 2) Improved the water management by promoting new technologies, lowering production costs, increasing the value added and upgrading the manpower efficiency; 3) Achievement of a technological shift by using new technologies in irrigation. b. Outcome 1) Reinforcing national self-reliance and to enhance food security; 2) Realizing the sustainable irrigation water uses and operation and maintenance; 3) Upgrading farm management and increasing productivity. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 150,610,000 0 150,610,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 20,481,000 0 0 0 : US$ 20,481,000 171,091,000 55 BB-ID: BB-1114-R1-025-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Integrated Citarum Water Resources Management Project II 60 months West Java Province Ministry of Public Works Directorate of Water Resources, Ministry of Public Works 6. Background and Justification The Citarum River Basin (CRB) is located in the West Java Province, It is the most strategic river basin in Indonesia. The basin provides around 80% of the surface water supply to the capital city of Jakarta and surrounding areas and supports a population of about 30 million people and 20% of the country's industrial outputs. The river supplies water to irrigation schemes that produce some 5% of the country's rice production. Sustainable management of the basin's surface and ground water is therefore critical to the social and economic development of the country. Environmental degradation has reached levels that compromise public health and livelihoods, particularly for the urban and rural poor, and incurs additional economic and financial costs related to the delivery of clean reliable raw water. 7. Scope of Work a. Developing further surface water resources and reducing the dependence of the greater Bandung area on ground water; b. Conservation in upper watershed areas targeting crucial catchments that will provide bulk water; c. Introducing community-demand development agriculture and forestry activities in order to reduce soil erosion and conserve water resources and improve the bulkwater supply in metro Bandung areas. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of a master plan and options for raw water supply in the metropolitan Bandung areas prepared; 2) Constructed new raw water supply systems; 3) Reduced groundwater stress and replenished ground aquifer; 4) Improved upper watershed management. b. Outcome 1) Improving raw water supply in Bandung and surrounding areas; 2) Reducing groundwater exploitation; 3) Improving upper watershed management. 56 BB-ID: BB-1114-R1-025-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 130,000,000 0 130,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 55,700,000 0 0 0 : US$ 55,700,000 185,700,000 57 Kementerian Perhubungan/ Ministry of Transportation (Kementerian Perhubungan) Direktorat Jenderal Perhubungan Laut/ Directorate General of Sea Transportation (Direktorat Jenderal Perhubungan Laut) BB-ID: BB-1114-R1-026-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Cilamaya New Port Development Project 48 months Jakarta Metropolitan Area and West Java Province Ministry of Transportation Directorate General of Sea Transportation, Ministry of Transportation 6. Background and Justification The West Java area consisting of Jakarta DKI, West Java province and Banten province, has an important role in national socioeconomic development. This region has large shares of total population and Gross Domestic Product (GDP) of Indonesia, at around 30% and 25% respectively. Huge investment has been made in this area, which is vital to the overall acceleration of the Indonesian economy. The port is a key infrastructure of the logistic system for cargo distribution and port services and has great influence on economic and industrial activities. Since demand of export/import containers is anticipated to grow by 5-6% per year in the next few years. The volume of export /import container will exceed the capacity of the present facilities in 2015-2016. On the other hand, the Tanjung Priok Port can not adequately accommodated the following needs: a. Adequate capacity of accessible roads surrounding the Tanjung Priok Port, and b. Appropriate facilities and space for handling export/import and domestic containers exceeding the capacity of the Tanjung Priok port. It is obvious that the port function as a basic national logistic infrastructure for export/import industrial and economic activity has been gradually paralyzed in the Tanjung Priok and by traffic congestion in the greater Jakarta metropolitan area. This logistic system will surely depress the investment climate especially for foreign investors. Indonesian products would lose competitiveness in the International market, especially in the Association of Southeast Asian Nation (ASEAN) market. In order to alleviate the severe logistic system conditions in the metropolitan area and to achieve sustainable national economic growth, the most important task is to establish an effective cargo distribution system for reliable transportation services. The proposed a Cilamaya New Port Development project including development of access road construction was formulated as parts of the master plan of the Tanjung Priok Port carried out by the JICA Study “the Projects of Master Plan Study on Port Development and Logistics in Greater Jakarta Metropolitan Area” in 2010/2011. This project is one of the Potential Fast-Track Projects which was endorsed by the Steering Committee of the Metropolitan Priority Areas for Investment and Industry (MPA) on March 17, 2011. Ministry of Transportation authorized Tanjung Priok port Master Plan in May 2011, where Cilamaya port is one of the components of middle term development (2011-2020) and long term development (2011-2030). 63 BB-ID: BB-1114-R1-026-0 7. Scope of Work Consulting services for : a. Port development : 1) Detail design (soil investigation, topograpic survey, hidrographic survey, magnetic hidrographic survey, etc); 2) Detail engineering design for port facilities; 3) Basic design of the facilities to be provided by private investors; 4) Prepare the constructions method and plan of the required facilities; 5) Prepare PQ document and tender document; 6) Review the previous cost estimate of the projects; 7) Review the environmental impacts; 8) Prepare the envirenmental management and monitoring program; 9) Tender assistance. b. Access road : 1) Formulation of implementation scheme of access road development; 2) Detail design; 3) Tender and contract assistance. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of Detailed Engineering Design (DED) Documents of the Cilamaya New Port including access road, PQ document, and tender document. b. Outcome 1) Making the Tanjung Priok Port together with the Cilamaya new port function as a “Logistic Center” for ASEAN countries in order to maintain and enhance the competitiveness of Indonesian industry among the countries by providing attractive business /investment environment; 2) Developing the Cilamaya new port for reinforcing the capacity of international container traffic to meet the demands of 2020 in the metropolitan area and encourage the export/import industry; 3) Reliefing the heavy traffic congestion of the toll roads in and around the metropolitan area by developing new port together with access roads outside the Tanjung Priok Port. 64 BB-ID: BB-1114-R1-026-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 50,000,000 0 50,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 0 0 0 0 Sub Total : US$ 0 50,000,000 65 Direktorat Jenderal Perhubungan Udara/ Directorate General of Civil Aviation (Direktorat Jenderal Perhubungan Udara) BB-ID: BB-1114-R1-027-0 1. Project Title : Procurement and Delivery Airport Rescue and Fire Fighting Vehicles (ARFF) : 36 months : 146 Airports Technical Units : Ministry of Transportation : Directorate General of Civil Aviation, Ministry of Transportation 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Law Number 1 of 2009 on Aviation, stipulates that one of the main facilities that must be provided in the form of Airport Rescue and Fire Fighting Vehicles (ARFF) in the airport must satisfy the largest category of aircraft that operate at the airport. ARFF must meet flight safety standards level of protection in the Airport in accordance with established international standards, the International Civil Aviation Organization (ICAO) as outlined in the document regarding Annex 14 Aerodrome, ICAO Document 9137.AN/898 part 1 and Law Number 1 of 2009 on Aviation, Minister of Transportation Regulation No.KM 24 of 2009 and Directorate General of Civil Aviation Regulation Number: KP420 of 2011 regarding the Technical Standards and Operational Requirements Civil Aviation Safety Regulations Part 139 (Manual of Standards CASR Part 139) Volume IV Aviation Rescue and Fire Fighting Services Department. ARFF Vehicles for the existing 205 airports, only 91 airports have ARFF Vehicles while the remaining 114 airports do not get have any. Total number of ARFF vehicles for the Directorate General of Civil Aviation airport is 235 units. However, 57% or about 135 units of such vehicles are aged 15 years old over. 7. Scope of Work a. b. c. d. e. f. g. h. Procurement; Delivery vehicles including ARFF equipment; Primary and complementary agent; Factory acceptance test; Site acceptance test: Factory and site training; Spare parts; Technical support. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Fulfillment standards and regulations of ARFF category; 2) Development of air transport network and system. b. Outcome Improving air transport safety standard in this case for Airport Rescue and Fire Fighting Services as category. 69 BB-ID: BB-1114-R1-027-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 70 66,870,000 0 66,870,000 72,870,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 6,000,000 0 0 0 Sub Total : US$ 6,000,000 Direktorat Jenderal Perkeretaapian/ Directorate General of Railways (Direktorat Jenderal Perkeretaapian) BB-ID: BB-1114-R1-028-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Jabodetabek Railway Capacity Enhancement Project Phase I 72 months Jabodetabek Ministry of Transportation Directorate General of Railways, Ministry of Transportation 6. Background and Justification Traffic demand has been increasing rapidly due to vital social and economic activities which have been brought about by the economic growth in the region. The increase of traffic demand has led to serious traffic congestion, in particular in the Central Business District (CBD) of Jakarta in the morning and afternoon peak periods. The traffic congestion causes significant amount of economic losses which includes extra vehicle operation costs and unnecessary travel time. The traffic congestion problem would get worse due to the expected increase of person trip demand and shifting to private modes due to the growth of real household income. The central and local governments could not catch up with the ever increasing traffic demand by merely providing sufficient transportation infrastructure since the governments has not sufficient funds and they have been facing difficulties for land acquisition too. Despite the efforts made by the governments such as development of busways, improvement of the Jabodetabek railway, the share of public transportation has been decreasing drastically. The number of motorcycles has been increasing 3.07 times in 8 years from 2002 to 2010 while that of the private passenger cars has been increasing 1.57 times. Reflecting the drastic increase of the number of motorcycles, the share of motorcycles has also been increasing from 27.8 % to 62.9 %. Accordingly, the share of the public transportation has been decreasing significantly from 59.0 % to 19.7 % in the same period. This drastic drop of public transportation share should be regarded as the crisis of public transportation. Improvement of public transportation system should be an urgent task to alleviate the traffic congestion problem. The Jabodetabek railway system should be the backbone of the public transportation system and it should be integrated with the planned Mass Rapid Transit (MRT), busways, and the other public transportation. Therefore the capacity expansion of the Jabodetabek railway, by addition of the rolling stock and the improvement of the existing Jabodetbek railway system, is urgently required. 7. Scope of Work Phase 1 includes the following activities: a. Engineering service; b. Construction of workshop at Depok; c. Installation of Automatic Train Protection (ATP) on the Central/Bogor Lines and between Manggarai and Bekasi stations on the Bekasi Line; d. Modification of substation at Manggarai, Duri and Jakarta Kota Station; e. Procurement of 80 units rolling stock (Electric Multiple Unit) Modification of Signalling System at Universitas Pancasila Station; f. Modification of telecommunications system at Universitas Pancasila Station; 73 BB-ID: BB-1114-R1-028-0 g. Interlinked breaking at Depok Baru, Citayam, Bojong Gede and Cilebut (Bogor Line), Limo, Pondok Betung, Jurang Mangu, Ciater, Serpong and Parung Panjang (Serpong Line), Karet (West Line) and Grogol (Tangerang Line); h. Improvement of track layout modification of station facility at Pancasila University Station; i. Improvement of stations facility at Tebet and Depok Lama Stations; j. Modification of feeder system at Jatinegara and Bekasi Timur (Bekasi Line), Tenjo and Tigaraksa (Serpong Line), Tanah Abang and Karet (West line), Jakarta Kota and Pasar Senen (East Line) Ancol and Tanjungpriok (Tj. Priok Line). 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of new electric trains; 2) Availability of Automatic Train Protection (ATP) system; 3) Availability of new and improved Jabodetabek railway system. b. Outcome 1) Increasing commuter railway transport capacity in Jabodetabek region; 2) Alleviating traffic congestion by shifting from automobiles and motorcycles to public transportation system. 10. Project Cost Foreign Funding Loan : US$ Grant : US$ Sub Total : US$ TOTAL : US$ 74 495,400,000 0 495,400,000 553,300,000 Counterpart Funding Central Government Regional Government State-Owned Enterprise Others : US$ : US$ : US$ : US$ 57,900,000 0 0 0 Sub Total : US$ 57,900,000 BB-ID: BB-1114-R1-029-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Procurement of Track Material and Turn Out Phase II 48 months DKI Jakarta Province Ministry of Transportation Directorate General of Railways, Ministry of Transportation 6. Background and Justification Indonesia has a railway network of approximately 8,159 Km of route length separated in Java, North Sumatera, West Sumatera and South Sumatera. The network on Java island has 4,816 Km and 3,464 Km route in operational condition by 1,067 mm gauge system. Major routes of the railway network are still single track type and Java Main Lines from Jakarta area are already double track type or are changing into double track type by double tracking construction projects. Axle load typically varies from 9 tons to 18 tons and track condition has been deficient due to insufficient routine maintenance. As a result, the number of train derailing accidents significantly increased from 40 in 2000 to 116 in 2007. To reduce the accident risks, the Directorate General of Railways has established a policy to introduce train speed limits. Maximum speed on heavily used lines is restricted to as low as 20 – 30 km/hour. This has caused a substantial decrease in transport capacity and affected railway performance targets both for passenger transportation and goods distribution, which will be solved by track rehabilitation and track modernization, by replacing track material and turnouts. 7. Scope of Work a. Procurement of 1.500 Km track materials of the International Union of Railways (UIC) – 54 type; b. Procurement of 300 units of turnouts; c. Consulting services for International Tender Process and procurement control. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of track materials of type UIC – 54; 2) Availability of turnouts. b. Outcome 1) Improving the existing tracks to original capacity to maintain the designed train speed; 2) Enhancing track service level for train operation of passenger and freight transport; 3) Reducing accident. 75 BB-ID: BB-1114-R1-029-0 10. Project Cost Foreign Funding Loan : US$ Grant : US$ Sub Total : US$ TOTAL : US$ 76 185,474,000 0 185,474,000 231,843,000 Counterpart Funding Central Government Regional Government State-Owned Enterprise Others : US$ : US$ : US$ : US$ 46,369,000 0 0 0 Sub Total : US$ 46,369,000 BB-ID: BB-1114-R1-030-0 1. Project Title : Railway Double Tracking and Signaling Improvement Solo - Surabaya : 60 months : East Java and Central Java Provinces : Ministry of Transportation : Directorate General of Railways, Ministry of Transportation 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification In order to accommodate the railways and transport needs in the future, the construction of double track is required with a high priority. With the construction of the double track on the Solo – Madiun – Surabaya line, the capacity of traffic that currently average 58 trains / day may be increased to 165 trains / day. 7. Scope of Work a. Engineering Services : 4) Survey and detail design for the construction; 5) Preparation of tender and contract document; 6) The cost estimation of construction works; 7) Assistance in bidding and evaluation; 8) Construction supervision services. b. Construction of roadbed, track, bridges, signaling system and associated facilities. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of 243,37 Km of double tracking railway ; 2) Availability of 240 units of bridges; 3) Availability of 3 sets of Centralized Traffic Control (CTC); 4) Availability of 35 units of station interlocking. b. Outcome 1) Increasing line capacity for Solo – Madiun – Surabaya; 2) Shortening railway travel time through Solo – Surabaya; 3) Increasing safety operation along Java South Line; 4) Connecting double track line continuous for Cikampek – Cirebon – Kroya – Yogyakarta – Solo – Madiun – Surabaya; 5) Supporting national economic development. 77 BB-ID: BB-1114-R1-030-0 10. Project Cost Foreign Funding Loan : US$ Grant : US$ Sub Total : US$ TOTAL : US$ 78 609,583,000 0 609,583,000 717,155,000 Counterpart Funding Central Government Regional Government State-Owned Enterprise Others : US$ : US$ : US$ : US$ 107,572,000 0 0 0 Sub Total : US$ 107,572,000 Kementerian Perumahan Rakyat/ Ministry of Public Housing (Kementerian Perumahan Rakyat) BB-ID: BB-1114-R1-031-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : New Town Development in Maja 60 Months Maja, Banten Province Ministry of Public Housing a. Deputy of Area Development, Ministry of Public Housing b. Deputy of Formal Housing, Ministry of Public Housing c. Deputy of Self-Help Housing, Ministry of Public Housing d. Deputy of Housing Finance, Ministry of Public Housing 6. Background and Justification Along with the economic growth, especially in big cities in Indonesia, the level of urbanization also increases,especially in Jakarta, causing some problems that are related to urban sprawl environment and the neighborhood conditions which are not suitable for the low-income communities. To overcome these problems, the city of Kinship Maja is planned to be developed as a new township, which will serve the settlement for the low-income society. Total area of the Maja area is 10,900 ha and about 3,565 ha has been released, located in West Jakarta corridor and considered a strategic area. This area is located in 2 major economic centers in Banten Province, particularly in Tanggerang District. In northern region, some industries are already developed (The Bojonegara International Airport and Tanggerang industrial area). Meanwhile, in the southern region, there has been some agro-industries (generally the palm oil plantations). To reach this region, we have to cross the Serpong and Tanggerang area (which is already developed as a settlement area for the middle and upper income people). This area is accessible through highways, regional roads as well as by railway. The capacity and quality of the railway is currently being upgraded through the construction of the double track railway. The development of this region is expected to be an alternative solution for the very high urban growth problem, which is currently being faced by the Jabodetabek area, especially to reduce the city growth burden in terms of housing and employment provision. In addition, the development of the city of Kinship Maja is expected to balance the development and distribution of population in Jabodetabek area, West Java and Banten Province and will reduce the housing backlog in Indonesia, which until now has reached 8,4 million units. 7. Scope of Work a. Developing an integrated, comprehensive and sustainable planning document of the city of the Kinship Maja Township; b. Improving the quality and completing the availability of the infrastructure, along with other supporting facilities both inside and outside of the new township area; c. Developing the house and settlement in the city of the Kinship Mega New Township, especially for low-income society; d. Improving and strengthening the institutional capacity and human resource who are related to the program implementation. 8. Priority Infrastructure 81 BB-ID: BB-1114-R1-031-0 9. Output and Outcome a. Output 1) Availability of master plan document of the City of Kinship Maja Township. 2) Availability of feasibility study, business plan, block plan, site plan and Detailed Engineering Design (DED) Documents of the city of the Kinship Maja Township; 3) Availability of infrastructure to support the accessibility and utility, both inside and outside the new township area; 4) Availability of the settlements infrastructure facilities in the city of Kinship Maja New Township, especially for the low-income population with good quality and reasonable price; 5) Improvement of capability human resources and institution in the development of residential areas. b. Outcome 1) The achievement of the city of Kinship Maja New Township development, synergistically, integrated and sustainable; 2) Pushing (as a trigger) economic growth of the city of the Kinship Mega New Township, along with the growth of external area; 3) Overcoming the problems of slum area settlements in Jabodetabek area and to push the development of other settlements around the new township; 4) The sustainability of the program and development of the city of the Kinship Mega New Township, based on the Master Plan and other regional planning documents, also supported with quality human resources and management institution. 10. Project Cost Foreign Funding - Counterpart Funding Loan Grant : US$ : US$ 161,970,000 10,000,000 Sub Total : US$ 171,970,000 - Central Government Regional Government State-Owned Enterprise Others Sub Total TOTAL : US$ 82 184,470,000 : US$ : US$ : US$ : US$ 12,500,000 0 0 0 : US$ 12,500,000 Kementerian Perencanaan Pembangunan Nasional/Badan Perencanaan Pembangunan Nasional (Bappenas)/ Ministry of National Development Planning/National Development Planning Agency (Kementerian Perencanaan Pembangunan Nasional/Badan Perencanaan Pembangunan Nasional - Bappenas) BB-ID: BB-1114-R1-032-0 1. Project Title : Professionalism Human Resource Development Program (PHRDP) Phase IV : 84 months : Nationwide : Ministry of National Development Planning/ National Development Planning Agency : Ministry of National Development Planning/ National Development Planning Agency 2. 3. 4. Duration Location Executing Agency 5. Implementing Agency 6. Background and Justification One of the National development targets in the National Medium Term Development Plan of Indonesia (RPJMN) 2010-2014 is the establishment of a democratic, prosperous and equitable society. To achieve this target, the Government remains committed to consistently implement Law Number 32/2004 on Regional Autonomy and Law Number 25/2004 on National Development Planning System. Decentralization, as mandated in the Law Number 32/2004, is a prerequisite of development and commitment to encourage community participation in the stages of planning, implementation and monitoring of policy development through the partial delegation of authority from the Central government to Local government institutions. Local governments are considered relatively close to and can better understand the aspirations of its people than the central government. The role of the development planning apparatus is very crucial because they will be the spearheads development of policies, programs and activities which are the elaboration of Law Number 32/2004 and Number 25/2004. Given the important role of planners in supporting the success of this decentralization process, the efforts to strengthen capacity and accountability of development planners in the central and regional/local government become a crucial priority in order to form competent, qualified, and professional planners. In terms of performance accountability, at the very least, efforts to strengthen the capacity of the apparatus as a whole in the preceding RPJMN (2004-2009) have shown results from year to year. This is demonstrated by improved government effectiveness indicators (government effectiveness), when in 2004 the index of government effectiveness of Indonesia -0.43 improved to -0.36 in 2006, and in 2008 to -0.29. The total number of central and local planners is currently 34,400 people consisting of 1,900 central planners and 32,500 regional planners. Meanwhile, in terms of quality, until 2010, the number of planners who have S2 (Masters) and S3 (PhD degrees) estimated around 5,500 people (16%). Ideally, to be a professional planner, planners hold S2 S2 (Masters) and S3 (PhD degrees) should approach 60% to 70% of the total number of personnel. As mandated by Law Number 17/2007 on the National Long-Term Plan Development Plan (RPJPN), development in the areas of the state apparatus is through bureaucratic reforms to realize good governance, to support the successful development in other fields, both at central and local levels. In addition, as mandated also in RPJMN 2010-2014, policy development in the field of apparatus directed at improving some of these strategies is the increased capacity and performance accountability of the bureaucracy and strengthening the implementation of bureaucratic reform. 85 BB-ID: BB-1114-R1-032-0 In the field of public service, which is also related to the quality performance of the apparatus, the government should provide quality public services that better suit the needs of the more advanced societies. Various indicators of the quality of public services, such as survey results of integrity and index of ease of doing business, still show results that have not yet been satisfactory for various community groups. Taking into account the various problems associated with the performance of the apparatus as described above, then the goals of development in the field of apparatus need to be directed to realize the increased implementation of good governance which is supported by a credible government, that is professional, free of corruption, collusion, nepotism in a comprehensive, measurable, and systematic way. Furthermore, as described in the Bappenas (the National Development Planning Agency) Strategic Plan 2010-2014, the development of human resources, particularly planners, will be redirected to achieve process integration, synchronization and synergy of planning, with a better inter-regional, interspace, inter-time, and inter-function of government, and among the stages of planning, budgeting, implementation and supervision of development activities. Considering that the effectiveness of integration, synchronization, and synergy planning depends on the expertise of its planners both at central and regional levels, the Government of Indonesia is still in great need of capacity building programs in the form of professional development human resources program. In this regard, the Professionalism Human Resource Development Program (PHRDP) stage IV is still urgently needed. 7. Scope of Work PHRDP-IV is the human resources development program for apparatus of planner for seven (7) years which is designed to dispatch as many as 8,181 participants comprising : 12 participants of Overseas PhD program; 15 participants of Domestic PhD program, 540 people attend the MA program linkage, 75 people attend the regular MA program, 300 participants of Non Degree Linkage, 300 participants of Non Degree Overseas, 60 people On the Job Training (Overseas), 2,000 participants of the Domestic MA program, 3,625 participants of Domestic Non-Degree program, 627 participants of English Academic Program, and 627 participants for Basic Japanese Language (BJLT). Country of training for degree and non-degree programs are: a. Japan; b. ASEAN Countries (for Non Degree); c. Indonesia. Other related activities will be implemented in this program includes: preparation of program implementation activities, selection, evaluation and monitoring of activities / programs, procurement and financial management consultants, procurement of equipment selection, procurement of goods and equipment, procurement of pre-departure preparation, maintenance and handling, reporting , technical audits and alumni surveys. 8. 86 Priority Law and State Apparatus BB-ID: BB-1114-R1-032-0 9. Output and Outcome a. Output 5) The percentage of employees educated S2 and S3 work in accordance with their expertise and indispensable in the context of decentralization and reform of the bureaucracy; 6) The percentage of employees who have completed non-degree training and relevant to their expertise and indispensable in order to decentralize and reform the bureaucracy; 7) The percentage of respondents in the target institutions that said they were satisfied with the program's impact on the capacity of institutions based on the result. b. Outcome 8) Increasing institutional capacity of central and local planners in order to speed up the process of decentralization and reform of the bureaucracy; 9) Implementing policies of the decentralization and effective and efficient bureaucracy reform at the central and regional planning institutions; 10) Improving indicators of government effectiveness. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 96,525,000 0 96,525,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 26,422,000 0 0 0 Sub Total : US$ 26,422,000 122,947,000 87 Kementerian Riset dan Teknologi/ Ministry of Research and Technology BB-ID: BB-1114-R1-033-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Research and Innovation in Science and Technology 60 Months DKI Jakarta Ministry of Research and Technology Ministry of Research and Technology 6. Background and Justification Development of science and technology is highly correlated with improving innovation policy framework and performance of public research centers, strengthening public research funding, and developing Science and Technology (S&T) human resource capacity. In general, quality of human resources on science and technology is low. A significant decline in number has occurred since 1997 when the Indonesian government implemented the policy of zero growth recruitments. Meanwhile, many researchers are aging and there is a big gap between senior and junior researchers’ capacity. These conditions directly influence the productivity of the research institutions. From another perspective, this lack of productivity is not only caused by quality of researchers but also other factors, such as the availability of research facilities, management of research institutions, and the lack supply of expertise. From 1992 to 2005, the Ministry of Research and Technology has developed many tools to generate research activities which called Integrated Research Advancement (RUT) and Ministry of Research Advacement (RUK). There were 22 schemes of incentive research released by the Ministry of Research and Technology. Since 2006, those schemes were compressed to 5 programs, i.e.: basic research, applied research, research of S&T capacity enhancement on a production system, research on science and technology dissemination and national strategic research (Rusnas). However, by reviewing their history, the quality of research penetration of those programs has not yet significantly influenced the Indonesian people prosperity, particularly the economic growth of Indonesia. 7. Scope of Work a. b. c. d. Improving innovation policy framework and performance of public research centers; Strengthening public research funding; Developing S&T human resource capacity; Project management. 8. Priority Science and Technology 9. Output and Outcome a. Output 1) Increased percentage of Public Research and Development (R&D) Institutes reform milestones reached (100%); 2) Increased share of total Public Research and Development Institutes revenue generated from external partners (industry, local community, foreign grant); 3) Increased percentage of Masters or PhD degree holder in Public Research and Development Institutes and at the Ministry of Research and Technology. 91 BB-ID: BB-1114-R1-033-0 b. Outcome 1) Creating an enabling policy environment for R&D in science and technology; 2) Improving the public R&D institutes’ performance and Science, Technology, and Innovation (STI) human resource capacity. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 92 95,000,000 0 95,000,000 150,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 55,000,000 0 0 0 Sub Total : US$ 55,000,000 PT. PLN/ State Electricity Company BB-ID: BB-1114-R1-034-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Indramayu Coal Fired Power Plant Project (1x1000 MW) Phase I 52 months Indramayu District, West Java Province PT. PLN (Persero) PT. PLN (Persero) 6. Background and Justification Based on the Electricity Power Supply Business Plan (RUPTL) 2011-2020 draft, the peak demand in Java-Bali System is expected to grow from 18,694 MW in 2010 to 38,742 MW in 2020. With the demand growth of 7.8% per year, it requires 3,200 MW additional power generations per year. Fast Track coal fired power plant 7,490 MW in Java-Bali which planned to operate in 2009-2014 will be absorbed by the system, so the new power plants are still needed to meet the electricity demand. The Feasibility study conducted by Tokyo Electric Power Services Co ( Tepsco) in 2009 concluded that development of Indramayu coal fired power plant 1x1000 MW is feasible to meet the electricity demand and reduce oil consumption. Indramayu coal-fired power plant is planned to be environmentally friendly because uses ultra supercritical technology which produce less carbon emission than subcritical power plant. This project is one of the Second Fast Track Project as mentioned in Presidential Regulation Number 4 of 2010 and the Minister of Energy and Mineral resources Regulation Number 15 of 2010. 7. Scope of Work a. Procurement and installation of : 1) Boiler; 2) Steam turbine and generator; 3) Coal and ash handling equipment. b. Construction of : 1) Marine works; 2) Transmission line and substation; 3) Site preparation works; 4) Site finishing works. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased supply of electricity in Java – Bali system; 2) Reduced cost of production. b. Outcome 1) Fulfilling electricity demand in Java-Bali system with annual growth 7.8%; 2) Easing the stringency of power demand in the Java-Bali System; 95 BB-ID: BB-1114-R1-034-0 3) 4) Improving the reliability of power supply by introducing the 1,000 MW ultra super critical coal-fired power plant in Indramayu and the mitigation measures against climate change through the highly efficient energy utilization; Contributing to the economic development in the region by improvement of the investment climate. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise 833,870,000 - Others 833,870,000 0 Sub Total TOTAL : US$ 96 968,380,000 : US$ : US$ : US$ : US$ 0 0 134,510,000 0 : US$ 134,510,000 BB-ID: BB-1114-R1-035-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Suralaya Coal Fired Power Plant Rehabilitation for Unit 3 and 4 48 months West Java Province PT. PLN (Persero) PT. PLN (Persero) 6. Background and Justification Based on the Electricity Power Supply Business Plan (RUPTL) 2011-2020 draft, the peak demand in Java-Bali System is expected to grow from 18,694 MW in 2010 to 38,742 MW in 2020. With the demand growth of 7.8% per year, it requires 3,200 MW additional power generations per year. To increase market share and power plant reliability, there is need for power plant upgrade and modernization project, as well as for efficiency improvement. Most component part of Suralaya Power Plant is old and the performance and efficiency of the power plant has declined so that it needs rejuvenation to extend the lifetime of the power plant. 7. Scope of Work Construction works for the Suralaya Coal Fired Power Plant rehabilitation consist of : a. Generator portion; b. Turbine portion; c. Boiler portion. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased supply of electricity in Java – Bali system; 2) Reduced cost of production. b. Outcome 1) Increasing the supply capacity of the Suralaya Power Plant; 2) Extending the lifetime of power plants; 3) Improving performance, efficiency and reliability of the power plant; 4) Modernize and attaining coal fuel flexibility. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 137,100,000 0 137,100,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 0 0 24,200,000 0 : US$ 24,200,000 161,300,000 97 BB-ID: BB-1114-R1-036-0 1. Project Title : Kamojang Geothermal Power Plant Rehabilitation for Unit 1, 2, and 3 : 48 months : West Java Province : PT. PLN (Persero) : PT. PLN (Persero) 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Based on the Electricity Power Supply Business Plan (RUPTL) 2011-2020 draft, the peak demand in Java-Bali System is expected to grow from 18,694 MW in 2010 to 38,742 MW in 2020. With the demand growth of 7.8% per year, it requires 3,200 MW additional power generations per year. To increase market share and power plant reliability, there is need for a power plant upgrade and modernization project, as well as for efficiency improvement. Most component part of the Kamojang Power Plant is old and the performance and efficiency of power plant has declined so that it need rejuvenation to extend the lifetime of the power plant. 7. Scope of Work Construction works for the Kamojang Geothermal Power Plant rehabilitation consist of : a. Turbine portion; b. Auxiliary portion; c. Instrumental and Control Electrical portion; d. Electrical equipment portion. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased supply of electricity in Java – Bali system; 2) Reduced cost of production. b. Outcome 1) Extending the lifetime of the power plants; 2) Improving performance, efficiency and reliability of the power plant; 3) Modernize equipment of the power plant. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 55,300,000 0 55,300,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 98 65,100,000 : US$ : US$ : US$ : US$ 0 0 9,800,000 0 : US$ 9,800,000 BB-ID: BB-1114-R1-037-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Warsamson Hydro Electric Power Plant (49 MW) 36 months Sorong District, West Papua Province PT. PLN (Persero) PT. PLN (Persero) 6. Background and Justification The high growth of electricity energy demand in West Papua in 2010 of 10.04% per year with the sale of electricity energy of 239 GWh and peak demand of 45 MW, it is necessary to anticipate the growth of demand, which is projected reach 581 GWh and peak demand of 101 MW in 2019. This project attempts of renewable energy application, to lead to low consumption of fuel for electricity generation related to gas emission CO2 which cause global warming issue. Also attempts to reduce the production cost of electricity and reduce fuel consumption. 7. Scope of Work a. Preparatory, consist of access road, site office; b. Civil works, consist of main dam, intake, headrace channel, surge tank, powerhouse and tailrace; c. Metal works, consist of gates, valves, stoplogs, trashrack, penstock and embedded parts; d. Electromechanical, consist of a turbine-generator barrel, and transformator; e. Transmission line and substation. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased portion of renewable energy in the national energy mixed; 2) Reduced cost of production. b. Outcome Anticipating load growth and improve the reliability of the electrical system on the West Papua Province. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 164,590,000 0 164,590,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 0 0 29,040,000 0 : US$ 29,040,000 193,630,000 99 BB-ID: BB-1114-R1-038-0 1. Project Title 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification South Sumatera is considered as the main national energy resource, primarily it has abundant low rank coal which can be most efficiently utilized in mine mouth power plants. Demand growth of Java-Bali is very high, 9.3% per year, it requires 3.500 MW power generations every year. There is a limited location for building new power plants in Java. PLN has a plan to engage Independent Power Producer (IPP) developers to build mine mouth power plants with capacity of 4x600 MW in Muara Enim and 2x600 MW in Musi Rawas of South Sumatera. The operation date of the project is planned in 2016. Transferring the output from the mine mouth power plants to Java will require very long distance and large capacity transmission facilities, which only can be realised by 500 kV HVDC line. 7. Scope of Work Construction of: a. 500 kV AC Overhead line (OHL) b. 500 kV DC Overhead line (OHL) c. HVDC submarine cables d. HVDC inverter and converter stations e. 275 kV Overhead line (OHL) 8. Priority Infrastructure 9. Output and Outcome : Construction of Java - Sumatera Interconnection 500 KV (HVDC) Phase II : 42 months : Sumatra and Java Province : PT. PLN (Persero) : PT. PLN (Persero) = 272 km = 494 km = 40 km = 3000 MW = 167 km a. Output 1) Increased supply of electricity in Java – Sumatera; 2) Reduced production cost. b. Outcome 1) Utilizing untraceable low rank coal in South Sumatera; 2) Evacuating power from mine mouth power plants to load centers in Java; 3) Increasing the reliability of Java-Bali system and Sumatera system; 4) Sharing reserve capacity between Java-Bali and Sumatera; 5) Reducing production cost of Java-Bali and Sumatera system. 100 BB-ID: BB-1114-R1-038-0 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 757,680,000 0 757,680,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 0 0 113,650,000 0 : US$ 113,650,000 871,330,000 101 Usulan Kegiatan Perubahan/ Revised Proposals Kementerian Pekerjaan Umum/ Ministry of Public Works Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements BB-ID: BB-1114-R1-038-1 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : National Community Empowerment Program - In Urban Areas 36 months Nationwide Ministry of Public Works Directorate General of Human Settlements, Ministry of Public Works 6. Background and Justification The Government of Indonesia (GoI) is committed to achieve the Millenium Development Goals (MDGs). One such target within the MDGs is to reduce the poverty level by 50% in 2015. As a mean of achieving this, the GoI has established the National Community Empowerment Program in urban areas as an “umbrella policy” to create synergy amongst the various community empowerment programs. This program has been implemented by expanding the coverage area of various ongoing community empowerment programs, so that by the end of 2009, the National Community Empowerment Program (PNPM) covered a total of more than 6,000 sub districts of which about 1,144 will be urban. The expansion of coverage area is urgent and relevant, considering the financial assistance to the beneficiary communities from current programs is relatively small (at $2/person) compared to the minimum requirement ($5/person). In addition, the availability of assistance to the community can only cover 10-15% of the needs. Therefore the GoI plans to implement PNPM at least until 2015 in two phases. PNPM is now shifting into a more sustainable mode in the second phase, 2010-2014. Whereby the local government and sectoral programs will take on greater responsibility for financing. Over time, other Community Driven Development (CDD) – poverty reduction initiatives will be folded into the PNPM umbrella in order to make programming at community level more streamlined, coordinated and responsive to beneficiaries needs. Presidential Regulation Number 13 of 2009 was issued to underline the importance of PNPM to coordinate, consolidate and integrate the poverty reduction agenda on the government higher contribution. Subsequently in 2010, the GoI will establish a policy for implementation of PNPM in all sub districts through PNPM urban. In this context, PNPM urban covers 1,094 urban sub districts in 256 cities and the implementation mechanism will incorporate the improved concepts from evaluations of the ongoing PNPM. 7. Scope of Work a. Block grant to the existing PNPM – urban wards; b. Financing a channeling program by community self reliant organizations in 1,420 villages; c. Institutional enhancement to the more sustainable revolving funds component. 8. Priority Infrastructure 109 BB-ID: BB-1114-R1-038-1 9. Output and Outcome a. Output 1) Achievement of an empowered and independent community that is capable of overcoming local poverty problems; 2) Increased capacity of local governments to incorporate the participative development model as basis of a partnership with the community empowerment programs; 3) Increased benefits towards the poverty affected community. b. Outcome 1) Strengthening the community leadership through community self reliant organization that is inspirational, representative and accountable; 2) Preparing and integrating a medium-term plan for comprehensive poverty alleviation by creating synergy between the various poverty alleviation initiatives in accordance with the aspirations as well as the needs of the community in the context of improving their living environment in a sustainable way; 3) Improving the access of the poor to basic services within the community as a part of the objective of increasing Human Development Index and achieving the MDGs throughout Indonesia. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 645,450,000 0 645,450,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 110 645,450,000 : US$ : US$ : US$ : US$ 0 0 0 0 : US$ 0 BB-ID: BB-1114-R1-042-1 1. Project Title : Rural Settlement Infrastructure and Kabupaten Strategic Areas Development : 24 months : Nationwide : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification To accelerate economic development in rural communities based on local resources, to reduce the development gap between regions, reduce poverty, improve governance at district, sub district and local governance level, and to strengthen local institutions at village level, it is necessary to develop synergy with other programs within a similar framework of National Community Empowerment Program (PNPM Mandiri). 7. Scope of Work a. Construction/improvement of transportation infrastructure : Access roads for transportation network development in kecamatan level or among villages are those connecting the villages with district/provincial roads, bridges and local ship mooring facility shall be the access infrastructure for water-access villages; b. Construction/improvement of production support facilities : Small scale irrigation system and fishing facilities for the increasing of agricultural and fishery products of villages; c. Construction/improvement of marketing support facilities : Public market, warehouse/ terminal; d. Construction/improvement of village water supply and sanitation facilities : Piped water system or non-piped water system according to local conditions to be combined with community sanitary unit; e. Construction/improvement of Primary health care facilities : (1) rehabilitation of building facilities for puskesmas (public health center) and pustu (public auxiliary health center); (2) new construction and rehabilitation of building facilities for polindes (village polyclinic); and (3) procurement of non-medical equipment; f. Construction/improvement of primary and junior high school buildings : (1) rehabilitation of building facilities for primary and junior high schools, and (2) procurement of class furniture. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of provision of basic social and economic infrastructure services and increasing economic opportunities in rural areas; 2) Adoption of appropriate technology for supporting the agribusiness sector of District Strategic Areas Development. 111 BB-ID: BB-1114-R1-042-1 b. Outcome 1) Poverty alleviation; 2) Highlighting institutional capacity building of both central and local governments, with special focus on district and sub-districts administrations in rural Indonesia; 3) Supporting social development, strengthened capacities and institutionalized community empowerment and self-reliance. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 120,000,000 0 120,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 112 138,000,000 : US$ : US$ : US$ : US$ 18,000,000 0 0 0 : US$ 18,000,000 BB-ID: BB-1114-R1-029-1 1. Project Title : Community Based Sanitation Program (SANIMAS) : 36 months : Nationwide : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification One of Indonesia’s Millenium Development Goals (MDGs) target by 2015 is to access of the population to proper sanitation nationally by 62.7% to serve 154 million people, that has only reached 51.02% in 2009. To achieve these targets, the Government of Indonesia has developed a National Community Empowerment Program Sanitation (PNPM Sanitasi) as a means to create and improve the quality of people's lives, both individually and collectively to participate in solving various problems associated with efforts to increase the quality of life, Self-reliance and public well-being. PNPM programs have been implemented since 2007 with various types of activities to reach all areas of Indonesia. The PNPM Sanitation Program is a program with the concept of community development and funding schemes such as PNPM Mandiri. The implementation of this program, is by a capacity building of communities through mentoring facilitators and implementers of training. This will be needed to increase a community understanding of development, especially in the field of sanitation. 7. Scope of Work a. Block Grant to the existing PNPM-Urban wards : Block Grant Community (BLM) is a Block Grant facility which will be channeled directly to communities in the target area. It is managed and used to finance the construction of of sanitation infrastructure by the communities. The total number of villages targeted for this program is approximately 2,690 Villages scattered in 14 provinces. b. Institutional enhancement through capacity building : 1) Training of facilitators : Facilitator training held regionally and aims to prepare the facilitator in assisting the community. 2) Training facilities to the community of potential users : Training at the community level by facilitators aimed to enhance the ability in development planning, operation and maintenance of sanitation facilities. c. Consultant services. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased the community awareness of sanitation through promotion of clean and healthy living practices and campaign activities of Clean and Healthy Behavior (PHBS); 113 BB-ID: BB-1114-R1-029-1 2) 3) 4) Availability of infrastructure facilities and environmental sanitation of settlements (Communal sanitation) in accordance with community needs and capabilities, quality, sustainable, and environmentally friendly; Increased capacity of communities in the implementation of infrastructure / neighborhood sanitation facilities through a participatory, transparent, and sustainable system; Increased ability of local government as a facilitator of development, particularly the environmental health sector. b. Outcome 1) Increasing the community awareness of sanitation through promotion of clean and healthy living practices; 2) Increasing capacity of communities and community agencies in planning and development of sustainable sanitation services; 3) Availability of communal sanitation system of quality, environmentally sustainable and in accordance with the needs and capacities of communities. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 100,000,000 0 : US$ 100,000,000 TOTAL : US$ 115,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total 114 : US$ : US$ : US$ : US$ 15,000,000 0 0 0 : US$ 15,000,000 BB-ID: BB-1114-R1-041-1 1. Project Title : Neighborhood Upgrading and Shelter Sector Project Phase II (NUSSP 2) : 36 months : Nationwide : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The growth of slum areas had been significant namely at 1.37% per year (Statistics Indonesia Agency/BPS) and it is estimated that the total area of slum settlement will reach 71,860 Ha in 2025. The total area of housing and slum settlement in the city is 59,000 Ha in 2009 from around 54,000 Ha in 2004. The spread of slum areas in the city has caused the floods and fire damage frequency increasing, increased social conflict and vulnerability, decreased people’s health and basic facilities and housing service. The handling of cities without slums refer to the target in Long Term Development Plan (RPJP) 2005-2025 that in 2025 Indonesia will free from slum areas. The Millenium Development Goals (MDGs) target stated that in 2020 poor people who live in slum area will be reduced by half. 7. Scope of Work a. Improve planning and management of slum settlements in urban areas through the preparation of an area development strategy; b. Improvement and development of cities scale slum area settlement facilities; c. The development new settlement areas in the cities for Low-Income Communities (MBR); d. The strengthening of institutional capacity of local government and community. 8. Priority Infrastructure 9. Output and Outcome a. Output The establishment of sustainable human settlements through a synergy of planning and handling between the central government, local government, community and other related stakeholders. b. Outcome Improving of living condition in slum settlement areas. 115 BB-ID: BB-1114-R1-041-1 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 74,400,000 0 74,400,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 116 81,840,000 : US$ : US$ : US$ : US$ 7,440,000 0 0 0 : US$ 7,440,000 BB-ID: BB-1114-R1-032-1 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Emission Reduction in Cities - Solid Waste Management 36 months Nationwide Ministry of Public Works Directorate General of Human Settlements, Ministry of Public Works 6. Background and Justification Final Disposal Sites (FDS) in Indonesia are still using the old system, namely open dumping. The consequence of the application of open dumping is that this type of solid waste management emits methane gas that creates environmental problems such as local air pollution and increases the risk of fires and explosions at the landfill site. Landfill gas contributes to global warming as it emits methane gas that is one of the greenhouse gases. It’s the global warming potential that is twenty one times larger than that of carbon dioxide leads to the importance of this gas to be mitigated in such a way that could give not only environmental benefits but also economic as well as social benefits. 7. Scope of Work a. Rehabilitation of existing FDS and development of new FDS according to feasibility study and detailed engineering design; b. Improvement of urban solid management. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of new FDS and improvement of the existing ones; 2) Improved solid waste management. b. Outcome Optimizing the management. performance of final disposal sites for achieving clean development 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 100,000,000 0 100,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 0 0 0 0 : US$ 0 100,000,000 117 BB-ID: BB-1114-R1-036-1 1. Project Title : Mamminasata Water Supply Development Project : 36 Months : Makassar City, Gowa, Maros and Takalar District South Sulawesi Province : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works 2. 3. Duration Location 4. 5. Executing Agency Implementing Agency 6. Background and Justification Mamminasata Water Supply Development Project is an advanced program of the Makassar water supply project whit a premilinary design of raw water derived from the Bili-Bili Dam with a capacity of 3,000 l / sec. Currently, the capacity used is about 1,000 l/sec. On the other hand, Makassar city will used about 1,000 l/sec for development water supply of Makassar City in cooperation with Public Private Partnership (PPP) scheme, and about 1,000 l/sec will be used in Regional Mamminasata water supply development project. Mamminasata Metropolitan city is a region that is being developed as Eastern National Center and to support that region it needs a regional water supply system. Regional Mamminasata Water Supply Development Project will cover Makassar City area, Gowa District, Maros District and Takalar District. 7. Scope of Work a. Development of transmission pipes; b. Development of water treatment plant with capacity of about 1,000 l/sec; c. Consulting services. 8. Priority Infrastructure 9. Output and Outcome a. Output Availability of water supply system that is able to serve the community in the Mamminasata Region with water that fulfills the water supply standard. b. Outcome Improving community prosperity in Mamminasata Region. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 100,000,000 0 : US$ 100,000,000 TOTAL : US$ 150,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total 118 : US$ : US$ : US$ : US$ 50,000,000 0 0 0 : US$ 50,000,000 BB-ID: BB-1114-R1-030-1 1. Project Title 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The increase of population and economic activities in DKI Jakarta, Bekasi and Karawang has also increased water demand. Meanwhile water supply infrastructure, especially in Jakarta, is incapable to provide and cover current and future demand. 7. Scope of Work a. b. c. d. : Water Supply Project to The JABODETABEK (Jatiluhur - Jakarta Pipeline and Water Treatment Plant) : 36 months : Jakarta, Bogor, Depok,Tanggerang and Bekasi City : Ministry of Public Works : Directorate General of Human Settlements, Ministry of Public Works To prepare Detailed Engineering Design (DED) and Feasibility Study ( FS); To build Water Treatment Plant (WTP) 5.000 lps; To build transmission pipe 57.85 km; To build booster pump and reservoir. 8. Priority Infrastructure 9. Output and Outcome a. Output Increased water supply service coverage for 400.000 house connection or 2 million people. b. Outcome 1) Increasing water supply service coverage in DKI Jakarta, Bekasi, Karawang; 2) Improving productivity and quality of community's life through the adoption of healthy behavior in DKI Jakarta, Bekasi, Karawang. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 347,000,000 0 : US$ 347,000,000 TOTAL : US$ 447,000,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total : US$ : US$ : US$ : US$ 100,000,000 0 0 0 : US$ 100,000,000 119 Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources BB-ID: BB-1114-R1-046-1 1. Project Title : Construction of Dams in East Nusa Tenggara : Including Raknamo Dam, Kolhua Dam, and Mbay Dam : 60 months : East Nusa Tenggara Province : Ministry of Public Works : Directorate General of Water Resources, Ministry of Public Works 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Indonesia is characterized as a volcanic country, having 129 volcanoes equivalent to 16% of the world total. East Nusa Tenggara province is one of the poorest provinces in Indonesia with approximately 28% of its population living below the poverty line, far above national average of 16.66 %. Moreover, Gross Regional Domestic Product per capita is Rp. 3,1 million which is one third of the national average. One of the causes of an underdeveloped economy in this area is the shortage of basic infrastructure such as irrigation system, flood control, and water conservation facilities to meet the needs for economic activities. The shortage of irrigation water in West Timor, especially in the long dry season, limits the agricultural production resulting in the poor nourished status and low income of residents. It is projected that irrigation water supply during the dry season will dramatically improve crop productivity of the area. Insufficient safe water supply is a cause of waterborne diseases. Recurrent flood damages constraints to sustainable development and discourage people’s motivation for steady progress. Main sources of water supply in Kupang district/city are spring water and ground water. However, they are not reliable water sources throughout the year. Especially, spring water supply in dry season is reduced by more than a half of the capacity in the rainy season. 7. Scope of Work a. Integrated water development plan for West Timor, consist of: 1) Review of the existing development project and project identification in West Timor; 2) Prioritization of the project; 3) Establishment of implementing a plan of water development plan in West Timor; b. Construction of Raknamo Dam, consist of: 1) Review of the detailed design; 2) Review and support of the Environmental Impact Analysis (EIA); 3) Support of Land Acquisition and Resettlement Action Plan (LARAP); 4) Construction of Raknamo Dam; 5) Development of irrigation system; 6) Development of water supply system. c. Construction of Kolhua Dam and Mbay Dam, consist of: 1) Review of feasibility studies; 2) Detailed design of Kolhua Dam and Mbay Dam; 3) Construction of Kolhua Dam and Mbay Dam; 4) Development of water supply system; 5) Water resources development and flood control of the east of West Timor; 6) Review of the existing studies and survey on current condition; 123 BB-ID: BB-1114-R1-046-1 7) 8) 9) Preparation of water resources development; Preparation of flood control plan; Selection of priority project. d. Community capacity development program, consist of: 1) Development/empowerment of water users’ association for effective Operation and Maintenance (O&M) of the facilities and water, which could lead to productivity improvement in the agricultural sector, and for creation of new employment such as freshwater fishery industries; 2) Capacity development of dam operators on O&M; 3) Capacity development of local authorities on dam operation, maintenance and management; 4) Capacity development of communities on effective use of water. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of irrigation water to irrigate East Nusa Tenggara; 2) Availability of raw water in East Nusa Tenggara . b. Outcome 1) Reducing the negative impacts of flash floods and draughts; 2) Enhancing the welfare in East Nusa Tenggara. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 210,730,000 0 210,730,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 124 236,910,000 : US$ : US$ : US$ : US$ 26,180,000 0 0 0 : US$ 26,180,000 BB-ID: BB-1114-R1-059-1 1. Project Title : Urgent Disaster Reduction Project for Mount Merapi and Lower Progo River Area - Phase II : 60 months : Central Java Province : Ministry of Public Work : Directorate General of Water Source, Ministry of Public Work 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification Indonesia is characterized as a volcanic country, having 129 volcanoes equivalent to 16% of the world total. Among them, Mount Merapi is one of the most active volcano. Frequent eruptions have induced pyroclastic flows resulting in tremendous amount of volcanic loose deposit on the slope, and concequently the debris flows occur with the intensive rainfall. The project is intended to protect assets and people living in the downstream region of Mount Merapi, with a population of approximately three million from the threat of natural disasters due to flood of lava eruption of Mount Merapi with Progo degradation of the downstream. In general, the project is aimed to increase security level of regional and national against natural disaster of debris flow due to Mt. Merapi eruptions and degradation in downstream of Kali Progo. Therefore, social activities and regional/national economic growth can be sustained. The Government of Indonesia (GoI) has made efforts to mitigate sediment disasters in Mount Merapi area since the 1980s. Considering the regional developments in Mount Merapi area and high frequency of recent eruption of Mount Merapi, the Urgent Disaster Reduction Project for Mount Merapi and Progo River Basin has been implemented since 2006 and projected to be finished in 2011. To achieve the overall targets, further implementation is necessary, so that the regional development through volcanic disaster mitigation can be achieved. 7. Scope of Work a. Consulting services include: (1) review of the current condition, (2) public consultation meeting, (3) detailed design studies, (4) procurement of goods/services, and (5) construction supervision; b. Civil works and equipment including: c. Implementation of construction and; d. Procurement of heavy equipment. e. Empowerment of the institution strengthening of Public Services Agency (BLU) of Central River of Serayu Opak Basin. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Availability of Sabo facilities on slope of Mount Merapi; 2) Availability of primary irrigation canal with inspection road on the slope area of Mount Merapi; 125 BB-ID: BB-1114-R1-059-1 3) 4) Availability of groundsill in Progo River at Kamijoro irrigation intake in downstream area of Mount Merapi; Strengthened capacity of BLU concerning sand mining management related to sediment control, avoiding debris flows disaster caused by Mount Merapi. b. Outcome Reducing the damage caused by disasters of Mount Merapi eruption. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ 64,040,000 0 64,040,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total TOTAL : US$ 126 90,762,000 : US$ : US$ : US$ : US$ 26,722,000 0 0 0 : US$ 26,722,000 Kementerian Perhubungan/ Ministy of Transportation Direktorat Jenderal Perkeretaapian/ Directorate General of Railways BB-ID: BB-1114-R1-083-1 1. Project Title : Engineering Services Jakarta Mass Rapid Transit (MRT) East - West Line Phase I Project : 14 months : DKI Jakarta Province : Ministry of Transportation : Directorate General of Railways, Ministry of Transportation 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The Jabodetabek area, a large scale metropolitan with a population of 28 million (2010), consist of DKI Jakarta Province and 7 municipalities. Its gross regional domestic product is estimated at about 30% (2008) of the national domestic product showing that Jabodetabek is the most important area in terms of economy and politics. The population of Jabodetabek increased 1,6 times from 17 million (1990) to 28 million (2010). Population in the suburb is especially significant. However, bussiness area is still concentrated in DKI Jakarta Province and daily commuters to DKI Jakarta Province amount to 700,000 per/day. According to Study on Integrated Transportation Master Plan (SISTRAMP 1&2) for Jabodetabek undertaken by JICA, it is predicted that the total number of trips made in Jabodetabek will increase by 40% in 2020 compared to that of 2002. Traffic modal split shared by road traffic in Jakarta Metropolitan Area, the center of the Indonesian economy and commerce, is more than 90%. It shows a high degree of reliance on road traffic, which causes chronic traffic congestion. Consequently,the average travelling speed has decreased to as low as 10 km/hr during peak hours. In the previous study, a transportation system in the east and west directions was proposed for the development of the Jakarta Metropolitan Area. In addition, Japanese loan has been continuously provided since 2006 for the Jakarta Mass Rapid Transit Project (Lebak Bulus to Bunderan HI), and an extention line up to Kampung Bandan is being planned. Jakarta MRT East-West Line Project is important not only in dealing with improvement of passengerfriendliness and the increasing number of passengers, but also in expanding railway networks. And the objective of Jakarta MRT East West Line Project is to enhance the transportation capacity of the Jakarta metropolitan area through construction of a mass rapid transit system, thus mitigating the escalating traffic congestion, so that it will ultimately contribute to enhanced investment climate in the Jakarta Metropolitan Area. For preparing the total implementation of the MRT system program, Engineering Services are initiated urgently after completion of the ongoing Feasibility Study for Jakarta MRT East-West Line Phase 1 section. Engineering Services are to prepare the construction and procurement programs for MRT System within the same standards and operation concepts for the entire system in North-South Line. Finance arrangement for execution of construction and procurement of MRT System is to be scheduled by the comprehensive result of engineering services for the North – South Line. 7. Scope of Work a. Route and network planning of Jakarta MRT East-West System for Kembangan-Ujung Menteng Section considering the further network integration with the existing and the future public transportation networks;. 131 BB-ID: BB-1114-R1-083-1 b. Demand forecast review and analysis, considering the operating Trans-Jakarta Busway System, Monorail system and future public transport and feeder system concept along the planned MRT System corridor; c. Transport capacity and operation planning, including executing staging analysis and program; d. Detailed route surveys including geological survey, topographic survey, utility survey and others, and land preparation planning and implementing procedures; e. Design and engineering analysis for infrastructure construction, system facilities installation and rolling stocks procurement, including the operation and maintenance management system plans; f. Environmental impact assessment, including natural and social aspects, land requirements and humanities and area resettlement along the planned corridor and right of way and so on; g. Implementation planning, including analysis on the demarcation of roles by Central Government and DKI Jakarta Regional Government, MRT System operation and maintenance organizational structures and their establishment and private sectors participation; h. Investment planning and analysis, including funds requirement and schedule, source of finances, and their application and private investors participation; i. Economic and financial impact analysis and evaluation, including MRT System tariff method and financial operating planning; j. Prequalification and Tender documents preparation based on a design build contract, including contract lots analysis and project execution plan. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Maximized services on the existing railways as well as the planned MRT system; 2) Contributed to the enhancement of public transport system and social economy in Jakarta city. b. Outcome 3) Establishment of MRT System on East – West Line; 4) Integrating MRT System networks for East – West Line and North – South Line. 10. Project Cost Foreign Funding Loan : US$ Grant : US$ Sub Total : US$ TOTAL : US$ 132 23,000,000 0 23,000,000 26,000,000 Counterpart Funding Central Government Regional Government State-Owned Enterprise Others : US$ : US$ : US$ : US$ 3,000,000 0 0 0 Sub Total : US$ 3,000,000 133 BB-ID: BB-1114-R1-078-1 1. Project Title : Railway Double Tracking of Kroya - Kutoarjo on Java South Line Phase II : 42 months : Central Java Province : Ministry of Transportation : Directorate General of Railways , Ministry of Transportation 2. 3. 4. 5. Duration Location Executing Agency Implementing Agency 6. Background and Justification The Government of Indonesia develops policy for securing sufficient line capacity and quality upgrade for significant railway lines, identifies railway double tracking on the Java South Line, as stated in the Mid-Term Development Plan (RPJM) 2010-2014. It also aims at improvement of safety and services of railway. The Railway Law Number 23 of 2007 enacted in April 2007 stipulates safety and quality upgrade for the railway. Perseroan Terbatas Kereta Api Indonesia (Persero)(PT. KAI) also indicates railway double tracking on Java South Line and safety and quality upgrade in the long-term plan (2007-2011). There is much to be improved for transportation capacity, delivery speed and safety by railway double tracking. According to the Transport Sector Strategy Study (Asian Development Bank, 2000), the share of railways among the transportation modes is only 7.3% in passenger transportation and 0.6% in freight transportation despite its huge network of 6,000km in Java and Sumatra islands. A Modal shift is needed, not only to bring efficient transportation, but also to mitigate traffic jam on roads, to minimize negative impacts on environment, etc. On the main line between Jakarta and Solo (576km), the Prupuk-Purwokerto line (56km) is the only section where railway double tracking has been realized. The traffic volume of the Kroya-Kutoarjo section in 2010 is 60 trains per day, including 56 regular trains (48 passengers and 8 freight trains and 4 irregular freight trains. The traffic volume will 69 trains per day in 2010, while traffic demand analysis shows that the traffic volume will reach the level of 88 trains per day in 2015 when railway double tracking for Kroya-Kutoarjo section is completed. The traffic volume of Kroya-Kutoarjo will exceed the line capacity in 2017 to 93 trains, and the line capacity will be increased to 186 trains per day if the construction of railway double tracking for the Kroya - Kutoarjo section will be finished until 2017. On single track, a train delay causes another train delay because of waiting for crossing at a station. The average train delay between Kroya and Kutoarjo in 2010 is 7.5-16.8 minutes per train. They have been listed in the Memorandum (MoD) on Railway Double Tracking on Java South Line Project (Stage: Kroya-Kutoarjo between JICA and Government of Indonesia represented by Bappenas (National Development Planning Agency) and Directorate General of Railways, Ministry of Transportation on May 25, 2011. 7. 134 Scope of Work Civil works including permanent works, track, bridge and signal and telecommunication works and also supervision for the Kroya - Kutoarjo section. BB-ID: BB-1114-R1-078-1 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Civil Works : (a) Permanent Works : (i) Availability of 2,5 million m3 land works; (ii) Availability of 1 unit tunnel construction ; (iii) Availability of 75.639 m drainage; (iv) Availability of 47.600 m2 protection; (v) Availability of 2 Units new building works. (b) Track Works : (i) Availability of main 76km+siding 49km track and turnout laying; (ii) Availability of 345.288m3 ballast and sleeper installation; (iii) Availability of 3,000 units FFU sleeper; (iv) Availability of 970 units elastic seal for concrete sleeper in tunnel. (c) Bridge Works : (i) Availability of 31 units new bridge; (ii) Availability of 23 units existing bridge renewal; (iii) Availability of 97 units new box culvert; (iv) Availability of 58 units box culvert renewal. (d) Signaling and Telecommunication Works : (i) Availability of 1 unit Centralized Traffic Control Center (CTC); (ii) Availability of 14 units station interlocking . 2) Consulting Services (Supervision services) Assistance in inspection of equipment and materials and Supervision of construction works b. Outcome 1) Railway double tracking works; 2) Contributing to the regional economic development. 10. Project Cost Foreign Funding Counterpart Funding Loan Grant : US$ : US$ 224,753,000 0 Sub Total : US$ 224,753,000 Central Government Regional Government State-Owned Enterprise Others Sub Total TOTAL : US$ : US$ : US$ : US$ : US$ 43,223,000 0 0 0 : US$ 43,223,000 267,976,000 135 Pemerintah Propinsi DKI Jakarta/ Local Government of DKI Jakarta Province BB-ID: BB-1114-R1-097-0 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Construction of Jakarta Mass Rapid Transit Project 60 months DKI Jakarta Province Local Government of DKI Jakarta Province a. Local Government of DKI Jakarta Province b. PT. Mass Rapid Transit Jakarta 6. Background and Justification The number of motor vehicles in Jakarta Province increased by 1,7 times from 2003 to 2008, while the length of the roads increased only 2%. Jabodetabek railways with a total length about 160 km to 120 km have been electrification, carrying about 124 million passengers each year (2008). Jakarta spatial plan of 1999 – 2010 includes planning and building the system on the network and transport capacity over the railway transportation by developing an elevated and underground railways. At the same time, The Governor’s Rule no 103/2007 regarding the macro transportation plan initiated the construction of Jakarta MRT. The alignment of North – South Line MRT started from Lebak Bulus – Bunderan HI and Bunderan HI to Kampung Bandan. 7. Scope of Work a. Construction and engineering services of North – South Jakarta Mass Rapid Transit Phase I (Lebak Bulus – Bunderan HI); b. Engineering services of North – South Jakarta Mass Rapid Transit Phase II (Bunderan HI – Kampung Bandan) consist of engineering design services and tender assistance services. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Establishment of MRT system on North – South Line and ready to be operated at the end of 2016; 2) Integrated MRT system networks for the North – South Line and other modes of transportation. b. Outcome 1) Maximizing services on the existing railway as well as the planned MRT system; 2) Contributing to the enhancement of public transport system and social economy in Jakarta City. 139 BB-ID: BB-1114-R1-097-0 10. Project Cost Foreign Funding Counterpart Funding - Loan : US$ 1,050,000,000 - Central Government - Grant : US$ 0 - Regional Government - State-Owned Enterprise Sub Total : US$ 1,050,000,000 - Others Sub Total TOTAL : US$ 1,200,000,000 140 : US$ : US$ : US$ : US$ 150,000,000 0 0 0 : US$ 150,000,000 PT. PLN/ State Electricity Company BB-ID: BB-1114-R1-114-1 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Hululais 1&2 Geothermal Power Plant Project (2x55 MW) 42 months South Sumatra Province PT. PLN (Persero) PT. PLN (Persero) 6. Background and Justification The peak demand of electricity in Southern Sumatera was 615 MW in 2011 and has grown by 9.3% per year. The demand is mostly supplied by oil fired diesel plant. To meet the demand increase PLN needs to increase the capacity. Geothermal prospect has a potential reserve of more than 125 MW in the Hululais district. The upstream field will be developed by PT Pertamina Geothermal Energy. 7. Scope of Work a. Engineering Services for facilities: 1) Detail design and preparation of tender document; 2) Construction supervision. b. Construction of power plant; c. Construction of transmission line. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased portion of renewable energy in the national energy mixture; 2) Increased electricity availability in Southern Sumatera region; 3) Anticipation of delayed operation of Independent Power Producer (IPP) in the area; 4) Reduced production cost. b. Outcome 1) Fulfilling the electricity power demand in Sumatera system with annual growth 9.3%; 2) Utilizing renewable energy resources; 3) Improving the Southern Sumatera system reliability. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total : US$ TOTAL : US$ 178,380,000 0 178, 380,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others : US$ : US$ : US$ : US$ 0 0 31,480,000 0 Sub Total : US$ 31,480,000 209,860,000 143 BB-ID: BB-1114-R1-129-1 1. 2. 3. 4. 5. Project Title Duration Location Executing Agency Implementing Agency : : : : : Tulehu 1&2 Geothermal Power Plant (2x10 MW) 42 months Central Maluku District, Maluku Province PT. PLN (Persero) PT. PLN (Persero) 6. Background and Justification The peak demand of electricity in Ambon was 44 MW in 2011 and have grown by 11% per year. The demand mostly supplied by oil fired diesel plant, but due to meet the demand increase, PLN needs to increase it's capacity. Geothermal prospect has a potential of probable reserve of 20 MW in Tulehu district to improve energy mix. 7. Scope of Work Construction works for Tulehu construction power plants : a. Engineering service; b. Production well drilling; c. Power plant construction. 8. Priority Infrastructure 9. Output and Outcome a. Output 1) Increased portion of renewable energy in the national energy mix; 2) Anticipation of delayed operation of Independent Power Producer (IPP) in the area; 3) Reduced production cost. b. Outcome 1) Fulfilling the electricity power demand in Ambon with annual growth of 11%; 2) Utilizing renewable energy resources; 3) Improving the Ambon system reliability. 10. Project Cost Foreign Funding - Loan : US$ - Grant : US$ Sub Total 103,690,000 0 : US$ 103,690,000 TOTAL : US$ 121,980,000 Counterpart Funding - Central Government - Regional Government - State-Owned Enterprise - Others Sub Total 144 : US$ : US$ : US$ : US$ 0 0 18,290,000 0 : US$ 18,290,000