EDF - Confindustria Vicenza
Transcription
EDF - Confindustria Vicenza
EDF engineering experience for the nuclear renewal worldwide an opportunity for Italian industry Jean-Paul Chatry, Executive Vice-President, Sviluppo Nucleare Italia The french Nuclear Generation Fleet Single line of pressurized water reactors designed along the same technological principles •55•• 58 reactors in operation • • Spread across 19 sites • • Single technology: PWR (Pressurized Water Reactor) • 3 series : 900 MW : 34 units 1300 MW : 20 units 1500 MW (N4): 4 units • Average age : 23 years old • Mature: 1300 reactor years • Low CO2 emissions EDF France : 50g/kwh Europe : 400 g/ kwh Connection to the grid Site date Net Power Mwe EPR Flamanville 3 project : Flamanville 3 : General view (may2010) Flamanville 3 : General view Flamanville 3 : Reactor building Flamanville 3 : inlet aspiration / structural steels Flamanville 3 : discharge gallery under the sea Flamanville 3 : May 2010 energizing electric boards The FA3 Site in Numbers • 120 000 tons of armoured cables • 600 000 m³ of cement • 150 km of pipes • 80 000 tons of carpentry • 3 500 km of electrical cables • > 2 000 people working on site • 15 milions hours of work • 2 millions hours of engineering Our core competency : EDF as an Architect Engineer A profile very similar to Enel engineering ∎ Project Management (schedule, cost, quality, interface management, risk analysis …) ∎ Definition of general technical codes and specifications ∎ Technical specifications and surveillance of main contracts (NSSS, I&C, TG, BNI design, nuclear fuel) ∎ Definition of technical references and overall operation ∎ Definition of contract allotment and contract management ∎ Licensing process ∎ Construction on site and commissioning test Support to the existing fleet & new build : A continuing mobilization of engineering 58 units commissioned in France + Owner’s assistance for new nuclear build projects 1970 1980 1990 EDF’s ambition Develop, invest and operate 2000 2010 07 71 6 PWR 900 CPO 79 74 18 PWR 900 CP1 85 88 76 10 PWR 900 CP2 77 8 PWR 1300 P4 86 78 Koeberg 1&2 85 South Africa 79 12 PWR 1300 P’4 1 EPR Flamanville 3 13 C EPR 09 Taish. 1 Penly 3 Taish. 2 US EPR 13/14 CC3 93 84 4 PWR 1500 N4 2020 US EPR 2 US EPR 3 US EPR 4 98 87 Daya Bay 1&2 94 China 13/14/16/17 EPR HP 1 97 Ling Ao 1&2 02 China 05 Ling Ao 3&4 11 China PWR: Pressurised Water Reactor CP0, CP1, CP2, P4, P’4, N4 = technological series for French reactors EPR: European Pressurized water Reactor EPR projects : a series effect 15/16/18/19 EPR HP2 SZWL 1 SZWL 2 EPR Italy 1 Engineering for EPR’s Strategy : to duplicate Flamanville 3 model UNITED STATES 4 EPR FRANCE FLAMANVILLE 3 PENLY 3 2 EPR UNITED KINGDOM ITALY 4 EPR 4 EPR CHINA 2 EPR Balance of Nuclear Island BNI Conventional Island CI Nuclear Steam Supplying System NSSS The precise definition depends on actual contractual allotment Balance of plant BOP Flamanville 3 : an architecture on 3 levels Architect Engineer Level 1 EDF NSSS Detailed studies AREVA BNI* SOFINEL Level 2 55% EDF,45% AREVA BOP EDF CI Flamanville3 ALSTOM Engineering contracts ANP Suppliers Level 3 Supply and construction contracts: Bouygues, … *BNI: Nuclear Island excluding boiler STUDY CONTRACTS SUPPLY CONTRACTS Contract management for Fla 3 1. 150 main contracts 2. The 20 biggest lots represent about 80 % of the construction budget 3. Contracts for both equipment supply and erection on site 4. Competition for all the lots except for NSSS Involvement of regional suppliers Facilitate contacts, information exchange with regional small suppliers 9 To elaborate the list of potential regional suppliers & transmit it to potential main contractors before tendering 9 To inform regional suppliers of the timetable of invitation to tenders & of the main chosen suppliers Ensure commitment of national suppliers to involve regional resources and companies 9 To ensure regional recruitment & training as needed 9 To ensure subcontracts for dedicated lots within regional suppliers whenever possible Flamanville 3 suppliers repartition Worldwide supply chain France : 250 Germany : 50 Spain / Portugal : 15 Other european : 45 Italie : 45 USA : 4 Mexico : 3 Brazil : 2 Japan : 1 Taiwan : 2 Indonesia : 1 Emirates : 1 Italian industry involvement in EPR Projects Skills welcome in engineering, civil work, manufacturing and erection Today 45 Italian companies are supplying safety or availability related components for Fla 3 Ex : forgings Ex : pumps Tomorrow Increase Italian companies involvement in number, scope and responsibility : Objective To be ready to tender for Italian EPR project Opportunity To participate now in EPR Penly and EPR UK procurement process Italian companies involvement in Flamanville 3 project Italia Lombardia Riganti Spa Forgings Forgiatura Monchieri Forgings Fomas Forgings Bassi Luigi Tubes Mega Spa Fittings Forgiatura Marcora Forgings Belleli Heaters HP Mangiarotti Nuclear Tanks RIS, RCV, … Italcementi Concrete Acciaieria de Valbruna Blades Forgital Spezzapria Forgings (generator) Emilia Romagna Tectubi Tubes Petrol Raccord Fittings Officine Meccaniche Righi Fittings BSA Bolts Carpenteria Manessi Tanks Metalforch Flanges C Blade Blades Acciai speciali forgiati (ASFO) Steel CMA Welding Aturia Pumps Microcast Casting Mangiarotti Tanks SAFAS Casting Primary pumps Ofar Forgings Forgiatura Moderna Forgings Galperti Forgings (tubes) Venezia Sesia Fucine Forgings Ansaldo Componenti DTM Motors CMF Fucine Rotor shaft DMV Tubes Forgiatura Morandini Forgings Forgiatura Mame Tambour TKJ Friuli-Venezia Giulia Dalmine Tubes FEAT Forgings Forgiatura Fedriga Forgings Faco Batteries Piemonte Liguria OME Bolts Franchini Acciai Tubes Casagrande elettro Diesels San Giorgio Segen Generators bearings Umbria SDF Terni Forgings, Rotors BP Fittinox Fittings For Italian companies : an opportunity to start, to extend or to strengthen activities in the nuclear field with EDF ¾ Currently New build : 900 M€ per year Investment for the existing fleet: 1 billion € per year Maintenance of the existing fleet : 1 billion € per year Decommissioning : 200 M€ per year ¾Main future projects EPR Penly 3 : 1 unit First orders in 2010 - First concrete in 2012 EPR UK : 4 units First orders in 2010 - First concrete in 2013 Life extension of existing fleet : > = 400 M€/unit – 58 units First orders : 2010 - First work in 2015 Common calls for bid for several lots With Enel, EPR Italy : First orders in 2012 – First concrete : 2015 An internet link: http://portail-achats.edf.com. New Nuclear Build Worldwide : GWs under Construction & Planned/Proposed for 2030 (June 2010) Finland 2,7 1,6 Nuclear capacities in GWs (no.of reactors) Existing 532 (496) 57 (57) 375 (439) Planned or proposed Under construction UK Netherland 11 France 1,5 Belgium. 101 3,4 Switz. Spain Belarus 1,6 Slovenia 13,2 29 0,7 1 Romania Hungary 1,4 Turkey 17 Armenia 1 1 1 4 Jordan Iran 0,9 China Pakistan 1,5 20 South Africa 1,9 7,6 8,6 2,2 0,4 0,3 2,6 UAE Argentina 47,3 1,2 1,2 1 South Korea 17,7 Japan Kazakhstan Egypt Israel Brazil India 4,2 2,6 6,7 25,3 158 Bangladesh 66 5 Vietnam Thailand 10 6 Malaysia 8,2 Taiwan 2 1,2 Sources: World Nuclear Association North Korea 1 10,4 2 1 0,7 1,9 2,2 1,9 1,9 1,3 2 1,3 2 Bulgaria Italy 1,6 Mexico 1,2 44,8 44 20,3 Poland 4 Czech Rep. Slovakia 1,8 0,8 6 Germany 3,7 3,6 1,2 63,2 Ukraine 7,5 46 9 Lithuania 6 3,2 4 8 9,4 0,5 1 Canada USA 23 Russia Sweden 15,2 12,7 1 2,6 8 Indonesia 6 2,8 18 Thank you for your attention