ENERGY IN ITALY

Transcription

ENERGY IN ITALY
ENERGY IN ITALY:
CURRENT STATUS
Eng. Federico Tunzio
Sofitel So Hotel, Bangkok,
21st -22nd March 2012
The development of technologically advanced communities
implies a continuous growth in power demand
World power demand evolution by sector
(IEA – World Energy Outlook)
In European scenario, Italy is a strong and net importer of
power from other countries
Italian Challenges:
1. Reduce import of power
2. Reduce GHG emissions
3. Respect International agreements
4. Create new employment and promote R&D
RES
Renewable Energy Sources
HYDRAULICS
WIND
GEOTHERMAL
BIOGAS
BIOMASS
SOLAR
Policy background
Energy policy pursues the objective of a sustainable, competitive
and secure supply of energy.
Since 2007, the European Commission has been adopting an
energy policy for Europe. This was supported by several
documents on different aspects of energy and included an action
plan to meet the major energy challenges in Europe.
Renewable energies help to thwarth climate change while
increasing security of supply.
Italy targets imposed by the European
Directive 2009/28/CE are:
17% of gross energy consumption must be
supplied by RES
Reduction of CO2 emission of 14% respect
to 2005 values
10% of energy employed in tranport sector
must be provided by RES
These targets must be reached within 2020
Renewable energies in Italy
(GSE data march 2012)
Power
(MW)
2008
2009
2010
2011
Hydraulic
17.623
17.721
17.876
17.950
Wind
3.538
4.898
5.814
6.860
Solar
432
1.144
3.470
12.750
Geothermal
711
737
772
772
Bioenergies
1.555
2.019
2.352
3.020
Total
23.859
26.519
30.284
41.352
Production 2008
(GWh)
2009
2010
2011
Hydraulic
41.623
49.137
51.117
46.350
Wind
4.861
6.543
9.126
10.140
Solar
193
676
1.906
10.730
Geothermal
5.520
5.342
5.376
5.650
Bioenergies
5.966
7.557
9.440
11.320
Total
58.164
69.255
76.964
84.190
2020 target
Evolution of power systems from RES in Italy
GSE october 2011
Installed power
Power growth
At national and regional level is now available a wide range of
economic and regulatory incentives to promote use of RES.
Main national tools are:
1. Priority access to the grid system is granted to electricity
from RES and CHP plants.
2. An obligation for electricity generators to feed a given
proportion of RES-E into the power system.
3.Tradable Green Certificates are used to fulfill the RES-E
obligations.
4. A feed-in tariff for PV. This is a fixed tariff, guaranteed for
20 years and adjusted annually for inflation.
5. Net metering
6. Obligations for biofuels diffusion
Italian government has moreover provided a series of
actions to promote energy efficiency and and lower
consumptions
These actions involves directly Italian citizens:
1. Incentives for energy saving restructurings of
buildings
2. Emission of EPC certificates;
3. 55% of tax deduction for home installation of RES
systems
4. Incentives on energy saving products like saving
bulbs,
etc....
Energy Performance Certificate (EPC)
EPC includes data on their building energy efficiency, the current
values in accordance with the law and the reference values, which
allow citizens to evaluate and compare the energy performance.
Must be accompanied by suggestions on the most significant and
cost-effective to improve the performance of the building.
EPC must be attached to documents at the time of sale
Low consumption
High consumption
Energy classes
Overview on
RES
power plants in Italy
HYDROELECTRIC SYSTEMS
HYDROELECTRIC SYSTEMS
GRESSONEY GABIET’S SYSTEM
It is a system by
reservoir.
Forced behavior is
constitued by pipes with
a diameter of 1 m and a
length of 1.704 m.
Power = 11,0 MW;
Production = 14.290MWh
HYDROELECTRIC SYSTEMS
COTILIA’S SYSTEM
It is a system by reservoir.
Derivation canal is
lengthed 11.792 m, has
two forced behavior of
275m and 4m of diameter.
It has 2 turbine group of
30MW.
Power = 60 MW
Production = 64.529 MWh
HYDROELECTRIC SYSTEMS
GALLETTO’S SYSTEM
It is a system by river basin.
It has 4 turbine-generator
group of 40MW, 2 behavior
lengthed 265m each.
Power = 328,2MW
Production = 687.385MWh
HYDROELECTRIC SYSTEMS
VERRES’S SYSTEM
It is a fluent water system.
Derivation canal is lengthed
2,8km and the forced behavior
has a diemeter of 1,4m; leap is
of 248m.
System has 5 turbines.
Power = 12,8MW
Production = 50.000MWh
HYDROELECTRIC SYSTEMS
RONCON’S SYSTEM
It is a fluent water system.
Forced behavior is a pipes with
a diameter of 750mm and a
length of 130m; leap is of 48m.
Power = 0,44MW
Production = 3.230 MWh
HYDROELECTRIC SYSTEMS
VALLE DI MOLBENO’S SYSTEM
It is a fluent water system.
Water flow is of 0,46m³/s
with a leap of 290m.
1 turbine.
Power = 0,43MW
Production = 2.400MWh
HYDROELECTRIC SYSTEMS
BERTINI’S SYSTEM
It is a fluent water system.
System is constitued by 4
turbines.
Leap is of 180m.
Power = 12,64MW
Production = 69.300MWh
HYDROELECTRIC SYSTEMS
BUSSOLENGO’S SYSTEM
It is a fluent water system.
System is constitued by 3
turbines.
Water arrive to the load
basin by load canal length
39km.
Power = 51,58MW
Production = 348.900MWh
HYDROELECTRIC SYSTEMS
ROVESCA’S SYSTEM
Typology of the system is by
reservoir.
Power = 23,75MW
Production = 67.300MWh
WIND SYSTEMS
Regional distribution in 2009
Installed power
From 2004 to 2009
WIND SYSTEMS
CASTIGLIONE
It is constitued by 24 aerogenerators with a unit
power of 660kW.
Power = 15,8 MW
Production = 32.000MWh
WIND SYSTEMS
RIPABOTTONI
It is constitued by 24 aerogenerators with a unit
power of 660kW.
Power = 15,8 MW
Production = 27.000MWh
WIND SYSTEMS
TOCCO DA CASAURIA NORD
It is constitued by 2 aero-generators with a unit power of 80Kw.
Power = 1,8 MW
Production = 3.200MWh
WIND SYSTEMS
MONTE PREZZA
It is constitued by 42 aero-generators with a unit power of 850Kw.
Power =35,7MW
Production = 35.000MWh
WIND SYSTEMS
CORLETO PERTICARA
It is constitued by 11 aero-generators with a unit power of 850kW.
Power = 9,3MW
Production = 12.000MWh
WIND SYSTEMS
SERRA MARROCCO
It is constitued by 55 aero-generators with a unit power of 850Kw.
Power = 46,7MW
Production = 86.100MWh
WIND SYSTEMS
COLLARMELE
It is constitued by 5 aero-generators with a unit power of 1.500Kw.
Power = 7,5MW
Production = 14.000MWh
WIND SYSTEMS
SANTA TURRINA MANNA
It is constitued by 28 aero-generators with a unit power of 850Kw.
Power = 23,8MW
Production = 42.300MWh
GEOTHERMAL SYSTEMS
Power installed by geothermal systems in
Italy from 1997 to 2008
Year
N.
Power
MW
Production
GW
Utilization
MWh/MW
GEOTHERMAL SYSTEMS
NUOVA GABBRO
Power = 20,0 MW
Production = 138.980 MWh
GEOTHERMAL SYSTEMS
NUOVA LAGO
Power = 10,0 MW
Production = 62.000 MWh
GEOTHERMAL SYSTEMS
NUOVA LAGO
Power = 20,0 MW
Production = 142.800MWh
GEOTHERMAL SYSTEMS
VALLE SECOLO
Power = 60,0 MW
Production = 441.000 MWh
BIOGAS AND BIOMASS SYSTEMS
Biogas plants in Italy
in 2011
521 Plants
350 MWe installed
(CRPA data)
BIOGAS SYSTEMS
BOLOGNA
Power = 2,8 MW
BIOGAS SYSTEMS
REGGIO EMILIA
Power = 330 kW CHP
Disposal of 35.000 tons of manure/year
Direct biomass combustion
Chimney
Boyler
Steam
Steam turbine
Biomass
generator
Grid
transformer
Oven
BIOMASS SYSTEMS IN ITALY
N.
MW
GWh
2009
122
2.018
4.443
2010
138
2.352
4.307
Plant
Province/site
Power (Mwe)
BIOMASS SYSTEMS
STRONGOLI
Feed: WOOD CHIPS
Power = 46 MW
Production = 260.000 MWh
BIOMASS SYSTEMS
FAENZA
Feeds: WOOD CHIPS, OLIVES WASTE, VEGETABLE AND ANIMAL fats
Power = 22,9 MW
Production = 152.000 MWh
PHOTOVOLTAIC SYSTEMS
Regional distribution
PHOTOVOLTAIC SYSTEMS
N. 6351
Power = 48,96 kW
Production = 80 MWh
PHOTOVOLTAIC SYSTEMS
N. 51880
Power = 1,92 kW
Production = 2,112 MWh
PHOTOVOLTAIC SYSTEMS
N. 1643
Power = 1,98 kW
Production = 2 MWh
PHOTOVOLTAIC SYSTEMS
N. 14300
Power = 44,46 kW
Production = 47,234 MWh
PHOTOVOLTAIC SYSTEMS
N. 2125
Power = 994,62 kW
Production = 1.600 MWh
ENERGY IN ITALY:
CURRENT STATUS
END