Marrickville Station Determination Report Appendix 3 Part 2
Transcription
Marrickville Station Determination Report Appendix 3 Part 2
Marrickville Station Upgrade Marrickville, NSW Appendix 1 Proposed Design and Artists Impression PR119302; Final/September 2013 1 2 3 4 5 6 7 8 9 10 11 12 DEMOLISH EX BUS STOP DESCRIPTION MRF1 Metal Roof Sheeting LVR2 Frameless double louvres with bird mesh GLZ1 Clear safety glass to Railcorp standard GLZ2 Laminated safety glass with flush pocket aluminium framing system GLZ3 Laminated safety glass with Aluminium framing system GLZ4 Frameless laminated safety glass CLD1 Porcelain cladding tile CLD2 Aluminium composite panel CLD3 Aluminium composite panel CLD4 Aluminium composite panel GUT Steel gutter INFILL WALLS DEMOLISH EXISTING STAIR AND BUS STOP STRUCTURE A COMMERCIAL NEW BARRIER DEMOLISH STAIR MAX 1:40 BICYCLE RACKS BELOW 1 1304 Stainless steel handrail TLE3 Vitrified Ceramic tiles MSF1 Mesh screen and frame TCL1 Steel tactile indicators TCL2 Platform tactile indicator tiles PYT1 Platform tactile indicator tiles FNC1 Platform fencing 2 1302 2 FNC2 End of platform barrier fence PCT1 Platform edge coping tiles NEW BARRIER REET STATION ST BOUNDARY RL 14.27 DP EXISTING TREE 1303 RAISE KERB MAX 1:20 FALL MRF1 RL 14.67 STAIR 2 MRF1 BOL1 GUT D BOL1 BRIDGE TO LIFT RL 14.67 1301 DP RAISE KERB GUT DP MRF1 PLATFORM 2 CANOPY GUT GUT FALL 2 PLATFORM 2 RL 14.58 RL 14.67 FALL FALL RL 14.42 NEW BARRIER WAITING LIFT 2 BOX GUTTER REGRADE FOOTPATH AT MAX 1:20 MAX 1:20 TCL1 DP RELOCATED BUILDING C BOL1 3100 FALL GUT PID PID TO DULWICH HILL 2 1 TRACK UP - SYDNEY NEW KERB DEMOLISH EXISTING WALL RL 14.67 DP NEW PEDESTRIAN CROSSING (INCLUDING TRAFFIC LIGHTS) D MAX 1:40 NEW CONCOURSE 1301 1305 HAM TO SYDEN NEW KERB RAMP TO AS1428 MAX 1:40 TRACK KSTOWN DOWN - BAN 1 1303 E B RAISE KERB NEW BARRIER C:\Users\dbain\Documents\S120591_Marrickville_AUGUST_RA13_dbain.rvt SSH1 REGRADE FOOTPATH AT 1:15 1304 ILLAWARRA RD C 2 Aluminium stair nosing 4000 CIN1 6000 B RAISE KERB REGRADE PATHWAY AT 1:15 BOUNDARY A EX. RL 13.37 CODE DP BOL1 TCL1 LIFT 1 F EXISTING HERITAGE STATION BUILDING RL 14.64 DP FALL BUS STOP BUS STOP SEATING MRF1 MAX 1:40 GUT RL 14.61 EX. TRACK GLZ3 FALL PROPOSED NEW KERB LINE BOL1 STAIR 1 GLASS ROOF CANOPY BUS STOP RL 14.67 3000 DP 3300 GUT 1 1302 EXISTING OVERHEAD STRUCTURE TO BE REMOVED TEMPORARILY AND REINSTATED ON COMPLETION 3300 14500 GUT NEW KERB EX. TRACK G 15.08.13 07.08.2013 30.05.2013 C PK 03.05.2013 B A No PK PK BY 04.04.2013 19.03.2013 DATE REVISED DESIGN - STATION WORKING GROUP SUBMISSION REVISED FOR VALUE MANAGEMENT - PRELIMINARY ISSUE WINDOW TO BOOKING OFFICE. REVISED LEVELS, STRAIGHTEN STAIR 1, TEMP STAIR & BRIDGE SHOWN REVISED LIFTS, STAIR 1, PLATFORM LENGTH, CANOPY TO PLATFORM 2 & STATION STREET CANOPY REVISED FOOTPATH RL ISSUED FOR TENDER DESCRIPTION 4000 5000 mm 1:100 The information shown on this drawing is for the purposes of Contract No: PSC2168, Ingleburn Station Upgrade only. No warranty is given or implied as to its suitability for any other purpose. TfNSW and it's Consultants accept no liability arising from the use of this drawing and the information shown thereon for any purpose other than the Project. This drawing and the information contained thereon have been created solely for a particular purpose and client. This is protected by copyright. You may not reproduce any of it in any form without the written permission of Rail Corporation New South Wales. If you do, you may have to pay damages to RailCorp or you may be prosecuted. ARCHITECT Design accepted* for use by RailCorp APPD. As indicated @ A1 A1 Original Co-ordinate System: MGA Zone 56 Height Datum: A.H.D. 1 2 DRAWN DANAE BAIN 15.08.13 DESIGNED STEWART BRADLEY 15.08.13 DRG CHECK STEWART BRADLEY 15.08.13 DESIGN CHECK IAN ARMSTRONG 15.08.13 APPROVED 3 4 5 6 SIGNATURE ANTHONY QUAN 7 * RailCorp signatures on this document designate only that the content appears to be consistent with RailCorp's requirements. Responsibility for the design rests with the designers. NOT FOR CONSTRUCTION 15/08/2013 12:51:52 PM DB DB DB 3000 N F E D 2000 NOTE A detailed survey prepared by a registered surveyor will need to be undertaken prior to the development of this Reference Design during the Detailed Documentation phase of this project. MARRICKVILLE STATION BANKSTOWN LINE 6.45 - 6.700km ARCHITECTURE PART CONCOURSE PLAN DETAIL PLAN 1 FILE No. TITLE STATUS: DRG No. 15.08.13 DATE 8 9 10 OF 1 PRELIMINARY TAP-1826-AR-1202 11 A1 C F EDMS No. 12 PLOT DATE & TIME : CLIENT 1000 0 WORK IN PROGRESS FOR INFORMATION ONLY PLOT DATE 15.08.13 G THIS DRAWING CONTAINS STRUCTURAL, SERVICES AND RAILWAY INFORMATION THAT HAS NOT BEEN COORDINATED, CHECKED OR VERIFIED. THIS INFORMATION, SHOWN ON OUR DRAWINGS, SHOULD NOT BE RELIED ON FOR ANY PURPOSE OTHER THAN TO DEMONSTRATE THE ARCHITECTURAL INTENT. THE USER OF THIS DRAWING IS TO CARRY OUT THEIR OWN COORDINATION, CHECKING, CALCULATIONS AND VERIFICATION TO DETERMINE THE SUITABILITY OF THE DRAWING FOR THEIR USE. H F PLOTTED BY DANAE BAIN PLATFORM 1 3100 GLZ3 EXISTING KERB LINE BOL1 WAITING RL 14.67 1500 BRIDGE TO LIFT FALL E H DESCRIPTION MRF1 Metal Roof Sheeting LVR2 Frameless double louvres with bird mesh GLZ1 Clear safety glass to Railcorp standard GLZ2 Laminated safety glass with flush pocket aluminium framing system GLZ3 Laminated safety glass with Aluminium framing system GLZ4 Frameless laminated safety glass CLD1 Porcelain cladding tile CLD2 Aluminium composite panel CLD3 Aluminium composite panel CLD4 Aluminium composite panel GUT Steel gutter CIN1 Aluminium stair nosing Steel tactile indicators TCL2 Platform tactile indicator tiles PYT1 Platform tactile indicator tiles FNC1 Platform fencing FNC2 End of platform barrier fence 2 1303 BR DEMOLISH EXISTING STAIR 1 1304 BR 2 BR 2 BICYCLE RACKS 1302 REET T S N IO T A T S DARY BOUN BOLLARDS @ 1.5m CENTERS EXISTING SEWER MAINS EXISTING SEWER MAINS CLD3 FNC2 Platform edge coping tiles BR BR EXISTING SEWER MANHOLE +RL9.60 LVR2 DP BR ENTRY Y BOUNDAR OHWS SSH1 BLK2 SW PIT COL COL 2 PLATFORM MAX 1:40 FALL MAX 1:40 FALL MAX 1:40 FALL MAX 1:40 FALL TCL1 COL EXISTING TREE MAX 1:40 FALL GARBAGE RM BR BR COL BR SERVICES COL CLD2 2 DP LVR2 SW PIT 1301 +RL9.67 TCL1 D EXISTING TRAIN STOP PCT1 & PYT1 TCL1 RELOCATE EXISTING TIMBER BUILDING EX. STORMWATER TO DULWICH HILL TRACK 2 1 1305 1301 HAM TO SYDEN TRACK UP - SYDNEY PLATFORM 1 MAX 1:40 FALL COMMS ROOM DB DB DB 15.08.2013 07.08.2013 30.05.2013 B PK 03.05.2013 A No PK BY 19.03.2013 DATE 2 SSH1 DP 1302 CLIENT 2000 3000 4000 5000 mm 1:100 APPD. THIS DRAWING CONTAINS STRUCTURAL, SERVICES AND RAILWAY INFORMATION THAT HAS NOT BEEN COORDINATED, CHECKED OR VERIFIED. THIS INFORMATION, SHOWN ON OUR DRAWINGS, SHOULD NOT BE RELIED ON FOR ANY PURPOSE OTHER THAN TO DEMONSTRATE THE ARCHITECTURAL INTENT. THE USER OF THIS DRAWING IS TO CARRY OUT THEIR OWN COORDINATION, CHECKING, CALCULATIONS AND VERIFICATION TO DETERMINE THE SUITABILITY OF THE DRAWING FOR THEIR USE. EX. TRACK 5 NOTE A detailed survey prepared by a registered surveyor will need to be undertaken prior to the development of this Reference Design during the Detailed Documentation phase of this project. This drawing and the information contained thereon have been created solely for a particular purpose and client. This is protected by copyright. You may not reproduce any of it in any form without the written permission of Rail Corporation New South Wales. If you do, you may have to pay damages to RailCorp or you may be prosecuted. ARCHITECT Design accepted* for use by RailCorp DRAWN DANAE BAIN 15.08.13 DESIGNED STEWART BRADLEY 15.08.13 DRG CHECK STEWART BRADLEY 15.08.13 DESIGN CHECK IAN ARMSTRONG 15.08.13 APPROVED 4 WORK IN PROGRESS FOR INFORMATION ONLY The information shown on this drawing is for the purposes of Contract No: PSC2168, Ingleburn Station Upgrade only. No warranty is given or implied as to its suitability for any other purpose. TfNSW and it's Consultants accept no liability arising from the use of this drawing and the information shown thereon for any purpose other than the Project. As indicated @ A1 3 F G EASEMENT OF EXISTING HIGH PRESSURED ETHALYNE GAS PIPELINE 1000 EXISTING OVERHEAD STRUCTURE TO BE REMOVED TEMPORARILY AND REINSTATED ON COMPLETION A1 Original Co-ordinate System: MGA Zone 56 Height Datum: A.H.D. 1 SSH1 FNC2 FNC2 0 INDICATIVE STORMWATER PIPE LOCATION EX. TRACK FALL MAX 1:40 1 N H E D C SSH1 MAX 1:40 FALL MAX 1:40 FALL MALE AMBULANT TOILET MAX 1:40 FALL REVISED DESIGN - STATION WORKING GROUP SUBMISSION. DRAINAGE REVISED; TVM; GARBAGE ROOM, SWITCH ROOM, BICYCLE STORE REVISED REVISED DESIGN - STATION WORKING GROUP SUBMISSION REVISED FOR VALUE MANAGEMENT - PRELIMINARY ISSUE EX. STORMWATER SHOWN, REVISED LEVELS, TEMP STAIR & BRIDGE SHOWN REVISED LIFTS, STAIR 1, PLATFORM LENGTH & PLATFORM 1 LEVELS AMENDED ISSUED FOR TENDER DESCRIPTION +RL9.62 +RL9.62 +RL9.55 MAX 1:40 FALL 16.08.2013 STAFF ROOM STAIR 1 TCL1 FNC2 +RL9.56 DB TICKET OFFICE +RL9.58 CLEANER'S STORE F SSH1 SSH1 STAFF TOILET EX. +RL 9.58 EXISTING FEMALE TOILET (NOT IN USE) FALL MAX 1:40 RELOCATE EXISTING COMMS CABINET FALL MAX 1:40 EX. +RL 9.61 F.A.T. MAX 1:40 FALL DP GLZ2 TVM VIN2 TL2 BCT +RL9.56 COL CPT1 + RL9.61 +RL9.56 DP LIFT 1 +RL9.67 SINK1 EX. SEAT 1--1502 EX. SEAT COL COL EX. SEAT EX. SEAT DP E PLOTTED BY DANAE BAIN F SERVICES PLANT ROOM EX. PH TCL1 +RL9.72 +RL9.67 EX. SEAT FEMALE AMBULANT TOILET MAX 1:40 FALL OHWS MIN 2700 GRATING CLD2 2650 TCL1 MAX 1:40 FALL MAX 1:40 FALL MAX 1:40 FALL 1305 CLEAR PCT1 & PYT1 1 PLATFORM 1 HERITAGE BUILDING (REFER NOTE 1.) 3500 DEMOLISH EXISTING STAIR E C COL DP MAX 1:40 FALL KSTOWN DOWN - BAN 1 1303 LIFT 2 SW PIT COL SW PIT SWITCH ROOM 3500 ALL MAX 1:40 F BR 2650 MAX 1:40 FALL CLD2 CLEAR ALL MAX 1:40 F BLK2 BR FNC2 SW PIT ALL MAX 1:40 F BR SSH1 GLZ2 ALL MAX 1:40 F BR NEW BICYCLE STORE (MIN 20 BIKES) BR FNC2 MAX 1:40 FALL BR DP NEW LOCATION OF RELOCATED EXISTING TIMBER BUILDING PING LANDSCA EXISTING STAIR 2 +RL9.57 TVM REMOVE AND REINSTALL EXISTING FENCE G BR SSH1 C MAX 1:40 FALL B 1304 SHARED ZONE PAVED TCL1 D 12 A COMMERCIAL 1890 PCT1 11 ACCESS CARPARK 3550 TCL1 10 C:\Users\dbain\Documents\S120591_Marrickville_AUGUST_RA13_dbain.rvt Mesh screen and frame 9 6 SIGNATURE ANTHONY QUAN 7 * RailCorp signatures on this document designate only that the content appears to be consistent with RailCorp's requirements. Responsibility for the design rests with the designers. NOT FOR CONSTRUCTION MARRICKVILLE STATION BANKSTOWN LINE 6.45 - 6.700km ARCHITECTURE PART PLATFORM PLAN DETAIL PLAN 1 FILE No. TITLE STATUS: DRG No. 15.08.13 DATE 8 9 10 PLOT DATE 15.08.13 MSF1 8 16/08/2013 11:08:25 AM Vitrified Ceramic tiles 7 OF 1 PRELIMINARY TAP-1826-AR-1201 11 A1 C F EDMS No. 12 PLOT DATE & TIME : TLE3 6 1700 Stainless steel handrail 5 1500 SSH1 4 1800 B CODE 3 1700 A 2 BOUNDARY 1 H 1 2 3 4 5 6 7 8 9 10 11 12 SCHWE BEL ST REET A A E AVE N E R F LEO STATION STREET B BRICK BUILDING STATION STEET B C ILLAWARRA ROAD C REET STATION ST GUT RELOCATED EXISTING TIMBER BUILDING FALL MRF1 BOX GUTTER GUT OHWS FALL MRF1 GUT GUT GUT GUT FALL TRACK PLATFORM 2 HERITAGE BUILDING HILL TO DULWICH GUT GUT GUT TRACK FALL ORM 2 F T A L P FALL FALL PLATFORM 1 HERITAGE BUILDING RM 1 PLATFO NEW CONCOURSE CANOPY GUT MRF1 FALL FALL FALL MRF1 EX. TRACK GUT DNEY UP - SY EXISTING AWNING REMOVED GUT NEW GLASS ROOF (GLZ3) OHWS EX. TRACK F ENHAM D Y S O T OHWS OHWS THIS DRAWING CONTAINS STRUCTURAL, SERVICES AND RAILWAY INFORMATION THAT HAS NOT BEEN COORDINATED, CHECKED OR VERIFIED. THIS INFORMATION, SHOWN ON OUR DRAWINGS, SHOULD NOT BE RELIED ON FOR ANY PURPOSE OTHER THAN TO DEMONSTRATE THE ARCHITECTURAL INTENT. THE USER OF THIS DRAWING IS TO CARRY OUT THEIR OWN COORDINATION, CHECKING, CALCULATIONS AND VERIFICATION TO DETERMINE THE SUITABILITY OF THE DRAWING FOR THEIR USE. G WORK IN PROGRESS FOR INFORMATION ONLY NOTE A detailed survey prepared by a registered surveyor will need to be undertaken prior to the development of this Reference Design during the Detailed Documentation phase of this project. CLIENT 2.5 0 5 7.5 10 12.5 m 1:250 DB DB PK 15.08.13 30.05.2013 03.05.2013 B A No PK PK BY 22.03.2012 19.03.2013 DATE REVISED DESIGN - STATION WORKING GROUP SUBMISSION NOTE REVISED LIFTS, STAIR 1, PLATFORM LENGTH, CANOPY TO PLATFORM 2 & STATION STREET CANOPY REVISED PLATFORM 1 EXTENSION ISSUED FOR TENDER DESCRIPTION This drawing and the information contained thereon have been created solely for a particular purpose and client. This is protected by copyright. You may not reproduce any of it in any form without the written permission of Rail Corporation New South Wales. If you do, you may have to pay damages to RailCorp or you may be prosecuted. ARCHITECT Design accepted* for use by RailCorp N H E D C The information shown on this drawing is for the purposes of Contract No: PSC2168, Ingleburn Station Upgrade only. No warranty is given or implied as to its suitability for any other purpose. TfNSW and it's Consultants accept no liability arising from the use of this drawing and the information shown thereon for any purpose other than the Project. APPD. 1 : 250 @ A1 A1 Original Co-ordinate System: MGA Zone 56 Height Datum: A.H.D. 1 2 DRAWN DANAE BAIN 15.08.13 DESIGNED STEWART BRADLEY 15.08.13 DRG CHECK STEWART BRADLEY 15.08.13 DESIGN CHECK IAN ARMSTRONG 15.08.13 APPROVED 3 4 5 6 SIGNATURE ANTHONY QUAN 7 * RailCorp signatures on this document designate only that the content appears to be consistent with RailCorp's requirements. Responsibility for the design rests with the designers. NOT FOR CONSTRUCTION 15/08/2013 12:14:16 PM G MARRICKVILLE STATION BANKSTOWN LINE 6.45 - 6.700km ARCHITECTURE ROOF PLAN PLAN 1 FILE No. TITLE STATUS: DRG No. 15.08.13 DATE 8 F PLOTTED BY DANAE BAIN OHWS E 9 10 PLOT DATE 15.08.13 OWN ANKST B N DOW FALL MRF1 E OHWS MRF1 OF 1 PRELIMINARY TAP-1826-AR-1104 11 A1 C E EDMS No. 12 PLOT DATE & TIME : FALL FALL GUT FALL MRF1 FALL C:\Users\nsrinivas.DESIGNINCSYDNEY\Documents\S120591_Marrickville_AUGUST_RA13_nsrinivas.rvt FALL FALL FALL D BOX GUTTER D H