LIPA Front-End Transition Cost Estimate
Transcription
LIPA Front-End Transition Cost Estimate
Summer Preparation 2015 1 Long Island Control Area 2014 vs. 2015 DEMAND (MW) CAPABILITY (MW) SYSTEM OPERATION LICA Peak Load Extreme Weather Load Addition Total LI Extreme Weather Load 2014 2015 Forecast Forecast 5,506 5,567 650 592 6,156 6,159 Load Reduction Programs Net LI Extreme Weather Load -35 6,121 Total Long Island Generation NYISO Import ISO-NE Import -30 6,129 PJM Import (Neptune) Total LI 2014 2015 * Forecast Forecast 4632 4632 943 943 530 530 660 6,765 660 6,765 Power Capability Margin (MW) Normal Weather Extreme Weather 2014 Forecast 1,259 644 2015 * Forecast 1,198 636 * Based on 2014 Capacity Data. Expected update May 2015 All capability ratings are estimated ratings at extreme summer weather conditions. 2 15 Highest Long Island Control Area Loads 6200 Extreme Weather Forecast – 6129 Mw 6100 6000 5915 5900 5825 5792 5800 5761 5730 5700 5669 5613 5600 2015 Peak Forecast – 5567 Mw 5552 5506 5500 5505 5474 5452 5447 5427 5381 5400 8/8/07 7/18/06 7/16/13 7/18/12 7/17/13 6/21/12 7/7/10 7/15/13 8/1/06 7/19/13 8/2/06 7/18/13 8/3/06 7/6/10 5200 7/22/11 5300 3 Margins on Contingencies • Sufficient margins exist for all major contingencies under 2015 forecast • Operating procedures may be implemented, after certain contingencies, to maintain margin under extreme weather condition 4 T&D System • No equipment is expected to be at or above normal operating load ratings during projected peak conditions • The following major installations were completed since last summer – Terryville – installation of new 69/13 kV 33mva bank – Great Neck – installation of new 13 kV feeder – Conversion Reinforcement Projects • The following installations are expected to be completed for Summer 2015 service – – – – – – Ellison Avenue Bridge - 13.8kV bypass for New Cassel circuit 4UH-333 Terryville – installation of 13 kV feeder 13 Capacitors Elwood – 80 MVAR shunt reactor Floral Park – new 33/13 kV bank and switchgear Holbrook 69 kV double bus tie 5 T & D System – Contingency Arrangements • Amagansett – East Hampton – New 23kV Line • 69-465 failed under ground cable • 13kV Shelter Island cable 6 Summer Preparation Maintenance • Critical equipment is inspected and tested to ensure reliable operation • Distribution Capacitor Banks – To be complete by July 1 • Vegetation management in progress and on track • Thermography for Critical Stations • Battery Testing • Transformer Fans • Pumping Plants • Inspect Under Frequency Relay Trip Settings 7 PSEG Long Island Storm Restoration Plan • Continuously evolving Plan with emphasis on enhancing overall storm restoration processes and enhancing communications during storm events • Revised format filed with NYS Department of Public Service (DPS) December 2014 – Comprehensive document delineating storm response across Operations, Logistics and Customer/Communications functions – Designed to be simple, flexible, scalable and easily adaptable to specific emergency events – Delineates Incident Command Structure (ICS) – Continue to maintain Emergency Response Implementation Procedures (ERIPs) that include detailed procedures and checklists • All PSEG Long Island employees assigned a storm role in addition to their day job and provided training to ensure readiness • Plan reviewed and drilled regularly to ensure accuracy, completeness and understanding among those involved – Annual Hurricane Tabletop Exercise to be conducted May 14th 8
Similar documents
Wind Energy Market
According to a recently published report, the Global Wind Energy Market is expected to grow at the CAGR of 7.5% during 2015-2022.
More informationMental Health Software Market Analysis By P&S Market Research
The global mental health software market is growing significantly, due to high potential of subscription model. During the forecast period, the providers segment is expected to hold the largest share, among all the end user segments of the global mental health software market, due to its extensive use for maintaining patient records and management revenue cycle.
More information