A6-3-1 - Apele Romane

Transcription

A6-3-1 - Apele Romane
Contributii pentru Dezvoltarea Strategiei de
Management al Riscului la Inundatii
EuropeAid 123064/D/SER/RO
Implementing Authority: Ministry of
Environment
Contracting Authority: Central Finance and
Contract Unit, Ministry of Economy and
Finance
Final Beneficiary: National Administration
‘Apele Romane’
Recipients:
Flood Study, Master Plan
and Investment Plan for the
Lower Siret River
ANNEXES
Ministry of Environment (ME)
Central Finance and Contract Unit (CFCU),
Ministry of Economy and Finance
Final Version
Date submitted:
Draft Version: March 06, 2009
Final Version: July 28, 2009
CONTRIBUTIONS TO THE
DEVELOPMENT OF THE FLOOD
RISK MANAGEMENT STRATEGY
Consortium SCE / CEMAGREF / HYDRATEC / PHARE 2005 / 017 – 690.01.01
GINGER S.A. / MEMORIS / ODISEA Consulting
EuropAid / 123064 / D / SER / RO
Project performance period:
February 2008 – May 2009
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y –
E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
DOCUMENT LEAD SHEET
Client Project Number:
PHARE 2005 / 017 – 690.01.01
Publication Reference:
EuropeAid / 123064 / D / SER / RO
SCE Project Number:
07536
Document Number:
A6-3-1-1 – Annexes - Final version
Ministry of Environment
Contributions to the development of the Flood Risk Management
Strategy
Report: “Flood study, Master Plan and Investment Plan for the Lower
Siret River - Annexes”
Final version
Issue
Date
A
22/12/2008
B
06/03/2009
C
Client
Approver
Reasons for
issue
Collaborator
Reviewer
O. Sonnet
H. Bousquet
“
“
“
Complements
25/05/2009
“
“
“
Complements
D
28/07/2009
“
“
“
E
30/09/2009
F
06/11/2009
“
“
“
07536/A6-3-1-1 Final
Author
L. Vives
A. Thomas
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 2 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
DATE GENERALE
Titlul şi scopul proiectului de investiŃii:
Studiu privind inundaŃiile, schemă directoare şi plan de investiŃii pentru Siretul inferior
Număr proiect:
PHARE 2005/017-690.01.01
EUROPAID/123064/D/SER/RO
Amplasarea studiilor şi a lucrărilor
JudeŃul Vrancea: localităŃile Bilieşti, Suraia, Vadu Roşca, Călienii Vechi, Călienii Noi, Năneşti
JudeŃul GalaŃi: localităŃile Cosmeşti Vale, Condrea Salcia, Fundeni, Nămoloasa, Tudor Vladimirescu, Piscu
Autoritate responsabilă cu soluŃionarea cererii (şi anume, autoritatea de management sau organismul
intermediar)
Nume:
OI BACĂU – REGIUNEA 1 – NORD-EST
Adresă:
B-dul IoniŃă Sandu Sturza, nr. 78 – BACĂU 600269
Telefon: 0234-206116
Telex/Fax:
0234-515501
[email protected]
E-mail:
Organism responsabil cu punerea în aplicare a proiectului (beneficiar)
Nume:
AdministraŃia NaŃională „Apele Române”
Adresă: Strada Edgar QUINET, nr. 6, Sector 1, CP 010018, Bucureşti, România
Contact:
TEXT
Telefon: +40.21.311.03.96
Telex/Fax:
+40.21.312.21.74
E-mail:
[email protected]
Consultantul care a realizat studiul:
ConsorŃiul SCE, Cemagref, Ginger, Hydratec, Memoris, Odisea Consulting
Liderul consorŃiului: SCE
Adresa liderului: 5 avenue Augustin-Louis Cauchy, BP 10703, 44307 Nantes Cedex 3, FRANłA
Tel.: +33 2 40 68 51 55
Fax: +33 2 40 68 79 43
http://www.sce.fr
Semnături:
Ing. Cyrille VALLET
Administrator proiect
Ing. Louis VIVES
Responsabil sarcină
Ing. Suzanne PEYRAUD
Expert în hidraulică
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 3 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
DATE GENERALE
3
APPENDICES
APPENDIX 1 : DAMAGES
2005 FLOOD EVENT
5
ALONG THE
LOWER SIRET FOR THE JULY
6
APPENDIX 2: TABLES GAUGING STATIONS ON SIRET BASIN
8
APPENDIX 3: SUB-BASIN MAPS
12
APPENDIX 4: CHARACTERISTICS OF EACH SUB-BASIN
18
APPENDIX 5: SUB-BASIN LAND COVER
23
APPENDIX 6: TABLES OF DAILY RAINFALL ON THE SIRET BASIN
27
APPENDIX 7: PICTURES
THE SIRET
32
OF THE HYDRAULIC STRUCTURES ALONG
APPENDIX 8: DIKE CROSS-SECTIONS
35
APPENDIX 10: UNIT COSTS OF WORKS
60
APPENDIX 11: AGGREGATED COST ESTIMATES
62
APPENDIX 12: GABION WALL CROSS-SECTIONS
68
APPENDIX 13 – LONG TERM INVESTMENT PLAN
74
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 4 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDICES
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 5 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 1 : DAMAGES ALONG THE LOWER
SIRET FOR THE JULY 2005 FLOOD EVENT
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 6 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 7 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 2: TABLES GAUGING STATIONS ON
SIRET BASIN
River
AGAPIA (DALIA)
ASAU
BANCU
BARLAD
BARLAD
BARLAD
BARLAD
BARLAD
BARLAD-BR.RATES
BASCA CHIOJDULUI
BASCA MARE
BASCA MARE
BASCA MARE
BASCA MICA
BERHECI
BERHECI
BICAZ
BICAZ
BISTRICIOARA
BISTRICIOARA
BISTRICIOARA
BISTRITA
BISTRITA
BISTRITA
BISTRITA
BISTRITA
BISTRITA
BOLATAU
BRODINA
BUZAU
BUZAU
BUZAU
BUZAU
BUZAU
BUZAU
CALNAU
CALNAU
CARLIBABA
Gauging Station
FILIOARA
ASAU
COSNA
BACESTI
BARLAD
NEGRESTI
TECUCI
VASLUI
TECUCI
CHIOJDU
BASCA ROZILIEI
COMANDAU
VARLAAM
VARLAAM
BOSIA
FELDIOARA
BICAZ CHEI
TASCA
BILBOR
BISTRICIOARA
TULGHES
CARLIBABA
DORNA ARINI
DORNA GIUMALAU
FRUMOSU
FRUNZENI
STRAJA (VIISOARA)
POIANA LARGULUI
BRODINA
BANITA
MAGURA
NEHOIU
RACOVITA
SITA BUZAULUI
VAMA BUZAULUI
COSTOMIRU
POTIRNICHESTI
CARLIBABA
07536/A6-3-1-1 Final
X coordinate
(stereo70)
Y coordinate
(stereo70)
600028.068
607654.609
513805.510
671894.843
707504.322
687540.176
689440.692
707499.295
689661.240
595038.952
605300.777
599012.565
612531.215
612869.746
675368.708
681267.830
566430.000
575379.267
538470.711
568927.706
557644.437
509659.685
530951.658
526567.719
565546.110
623952.563
589608.676
574130.480
532263.077
665387.827
622603.291
602165.319
692995.812
587173.102
576757.731
644921.743
645653.233
509660.908
630592.917
550973.033
652321.208
594359.839
527889.881
594986.355
485635.409
573663.525
485057.427
428653.402
440437.758
473367.726
447117.983
447259.372
546029.822
514201.109
591983.250
598447.340
617436.378
617649.911
607577.134
674826.569
649513.523
651286.813
627397.866
583853.875
600408.781
622200.082
709595.681
401690.541
420606.398
436705.094
424329.056
458979.693
453653.596
441547.567
414573.652
675409.988
Available
recording
period
1964-2005
1951-2005
1976-2005
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
1953-2005
1980-2005
1977-2005
1953-2005
1963-2005
1968-2005
1954-2005
1955-2005
1960-2005
1977-2005
1977-2005
1977-2005
1966-2005
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
1963-2005
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
Missing
period
Year of
record
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
1953-1960
1959-1973
1963-1967
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
-
42
55
30
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
47
26
29
40
43
38
52
51
43
29
29
29
40
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
43
page 8 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
River
Gauging Station
X coordinate
(stereo70)
Y coordinate
(stereo70)
CASIN
CIOBANUS
COTATCU
CRACAU
CRACAU
CRASNA
CRASNA
CUEJDIU
DAMUC
DOBROVAT
DOFTEANA
DORNA
DORNA
DORNISOARA
DURDUC (STAVNIC)
DURDUC (STAVNIC)
GERU
HAITA
HUMOR
IAPA
IZV.GIUMALAU
LEPSA
LOHAN
MILCOV
MILCOV
MOLDOVA
MOLDOVA
MOLDOVA
MOLDOVA
MOLDOVA
MOLDOVITA
MOLDOVITA
NANESTI
NARUJA
NEAGRA
NEAGRA
NEAGRA
NEAGRA
NEAMT (OZANA)
NEAMT (OZANA)
NECHIT
OITUZ
HALOS
CIOBANUS (CARALITA)
MARTINESTI
MAGAZIA
SLOBOZIA
MANJESTI
VINETESTI
CUEJDIU
DAMUC DE SUS
CODAESTI
DOFTEANA
DORNA CINDRENI
POIANA STAMPEI
POIANA STAMPEI
CAZANESTI
FRENCIUGI
CUDALBI
GURA HAITII
GURA HUMORULUI
LUMINIS
POJORITA
LEPSA
CURTENI
GOLESTI
REGHIU
FUNDU MOLDOVEI
GURA HUMORULUI
PRISACA DORNEI
ROMAN
TUPILATI
DRAGOSA
LUNGULET
SOHODOR
HERASTRAU
BROSTENI
DRAGOIASA
GURA NEGRII
SURA
DUMBRAVA (TG. NEAMT)
LEGHIN
BORLESTI
FERASTRAU
633441.889
603003.621
680149.358
596412.759
616838.476
717797.938
721557.895
599665.660
569307.093
712217.787
618505.076
520954.955
510465.742
509882.872
689552.735
689017.063
709150.834
518722.280
564645.540
609901.765
535351.874
622138.227
724444.795
668618.669
645363.738
529481.138
567261.465
552029.639
646424.194
625437.116
545874.962
539864.546
659173.310
627532.423
552078.233
534307.230
530438.974
519182.254
611304.442
589605.155
613221.063
622344.512
518831.122
548778.385
446348.792
623213.009
594308.669
568717.483
574156.482
610052.376
585638.140
599839.205
537625.224
650868.853
645045.451
645174.957
598671.728
602729.688
478329.203
632466.551
678019.279
591468.416
668788.674
495956.289
571231.318
465333.971
478734.347
670900.652
672093.261
673326.926
603589.900
622040.786
679575.980
691510.980
546547.989
479686.485
633692.191
628403.461
648734.834
631053.633
635618.500
636500.313
586917.875
523878.502
07536/A6-3-1-1 Final
Available
recording
period
1951-2005
1964-2005
1975-2005
1974-2005
1954-2005
Unknown
Unknown
1978-2005
1981-2005
Unknown
1977-2005
1954-2005
1967-2005
1986-2005
Unknown
Unknown
Unknown
1982-2005
1989-2005
1965-2005
1977-2005
1976-2005
Unknown
1957-2005
1977-2005
1953-2005
1977-2005
1953-2005
1951-2005
1959-2005
Unknown
Unknown
1995-2005
1967-2005
1954-2005
1990-2005
1954-2005
1982-2005
1977-2005
1976-2005
1977-2005
1951-2005
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
Missing
period
Year of
record
1953-1963
Unknown
Unknown
Unknown
1956-1959
Unknown
Unknown
Unknown
Unknown
1955-1967
1954-1956
1958-1982
Unknown
Unknown
-
46
42
31
32
52
Unknown
Unknown
28
25
Unknown
29
50
39
20
Unknown
Unknown
Unknown
24
17
41
29
30
Unknown
49
29
43
29
52
32
47
Unknown
Unknown
11
39
52
16
52
24
29
30
29
55
page 9 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
River
Gauging Station
X coordinate
(stereo70)
Y coordinate
(stereo70)
PERESCHIVUL M.
PLUTON-DOLHESTI
POZEN
PUTNA
PUTNA
PUTNA
PUTNA
PUTNA
PUTNA
PUTNA
PUTNA
RACACIUNI (MOCAN)
RACATAU
RACOVA
RAMNA
RAMNA
RAMNICUL SARAT
RASCA
REBRICEA
RM.SARAT
RM.SARAT
ROMANI
SABASA
SACOVAT
SACOVAT
SARISORUL MARE
SCHEIA
SCHITU
SIMILA
SIMILA
SIRET
SIRET
SIRET
SIRET
SIRET
SIRET
SIRET
SIRET
SLANIC
SLANIC
SLANIC
SOLONET
FICHITESTI I
PLUTON
HORODNIC (RADAUTI)
BOTIRLAU
COLACU
LEPSA
MIRCESTI
POJORITA
PUTNA
TULGHES
TULNICI
RACACIUNI
RECEA
PUSCASI AV.
GROAPA-TUFEI
JILISTE (CIORASTI)
TULBUREA (CHIOJDENI)
BOGDANESTI (BOROAIA)
RATES CUZA
PUIESTI
TATARU
BUHUSI
SABASA
TIBANA
TUNGUJEI
PANACI
SCHEIA
CEAHLAU
BACANI
BARLAD (POD)
ADJUDUL VECHI
DRAGESTI
HUTANI (SERBANESTI)
LESPEZI
LUNGOCI
N.BALCESCU
SIRET
ZVORISTEA
CERNATESTI
CIRESOAIA
LOPATARI
PARHAUTI
691289.072
578722.515
565045.554
686152.983
642923.031
620197.631
676465.080
534211.101
545086.507
558139.078
629397.733
655150.728
659866.314
702764.285
655827.802
674209.662
644350.729
594847.609
695876.812
674051.244
694452.342
629040.454
562276.983
677103.552
678226.644
526719.365
592494.982
571407.755
706568.987
707110.580
669721.767
648744.586
609642.901
627753.341
696091.523
651033.414
580626.074
597856.277
637760.821
620631.396
623912.397
580827.275
525391.734
633534.911
707529.362
462070.869
489269.771
495635.610
473904.090
668742.774
707455.529
606647.592
491166.488
538408.389
549126.074
573229.735
457219.284
458389.082
453000.936
652202.302
595442.938
435730.600
447819.718
581555.106
634457.984
611799.248
607401.630
642881.754
683691.366
614900.394
537036.143
532782.565
517772.837
582522.318
689971.763
651827.034
454046.493
605070.055
718307.949
706780.939
420247.016
529231.559
443857.644
690770.398
07536/A6-3-1-1 Final
Available
recording
period
Unknown
1965-2005
1964-2005
1952-2005
1967-2005
1969-2005
1988-2005
1976-2005
1967-2005
1966-2005
1954-2005
1986-2005
1986-2005
Unknown
1961-2005
1952-2005
Unknown
1960-2005
Unknown
1988-2005
1955-2005
1999-2005
1967-2005
Unknown
Unknown
1986-2005
1968-2005
1977-2005
Unknown
Unknown
1986-2005
1962-2005
1969-2005
1952-2005
1951-2005
1986-2005
1963-2005
1978-2005
Unknown
1951-2005
Unknown
1956-2005
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
Missing
period
Year of
record
Unknown
1967-1969
1991-1993
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
1952-1967
Unknown
-
Unknown
41
41
54
39
37
18
30
39
40
51
20
20
Unknown
45
54
Unknown
46
Unknown
18
51
7
39
Unknown
Unknown
20
38
29
Unknown
Unknown
20
44
37
54
55
20
43
28
Unknown
41
Unknown
50
page 10 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
River
SOMUZUL MARE
SUCEAVA
SUCEAVA
SUCEAVA
SUHU-PECHEA
SULTA
SUSITA
TARCAU
TARCAU
TAZLAU
TAZLAU
TAZLAU
TAZLAU SARAT
TECUCEL
TESNA
TOMNATIC
TOPOLITA
TREBES
TROTUS
TROTUS
TROTUS
TROTUS
TROTUS
TUTOVA
TUTOVA
UZ
UZ
UZ
VASLUI (VASLUET)
VASLUI (VASLUET)
VIZAUTI
VL.NEAGRA
VL.RECE
ZABALA
ZABRAUTI
ZELETIN
Gauging Station
DOLHESTI
BRODINA
ITCANI
TIBENI
PECHEA
SULTA
CIURUC
ARDELUTA
MOARA IANOS(CAZACI)
HELEGIU
SCORTENI
TAZLAU
LUCACESTI
TECUCI
COSNA
DRAGOIASA
PASTRAVENI
BACAU
GHIMES FAGET
GOIOASA
ONESTI(GH.GH.-DEJ)
TG.OCNA
VRANCENI
CIOCANI
PUIESTI
CREMENEA
DARMANESTI
VL.UZULUI
CODAESTI
SATU NOU
VIDRA
SECUIENI
VL.RECE
NEREJU
FITIONESTI
GALBENI
07536/A6-3-1-1 Final
X coordinate
(stereo70)
Y coordinate
(stereo70)
613695.985
533606.145
592705.602
576099.504
718004.750
594728.113
640776.426
591594.932
587486.472
634111.618
628048.349
611567.605
615146.375
687313.602
516594.936
531610.948
617399.676
646637.730
585222.326
599683.060
636459.330
623817.338
646248.200
697164.883
692114.500
602593.525
614473.803
595041.912
713516.895
713499.640
648488.207
643942.864
573418.781
635342.515
659736.574
684274.549
661581.924
710804.235
686645.617
703891.362
461262.072
552507.076
501693.722
581741.903
595667.765
540504.018
560157.430
581268.321
555308.875
485643.091
650960.252
629913.683
631647.012
566818.355
562457.434
550431.495
530621.175
532047.099
525020.964
531918.621
550017.326
537594.318
545156.923
537780.263
600065.077
610515.629
492966.632
596264.780
570075.302
470032.530
501247.916
514328.267
Available
recording
period
1953-2005
1957-2005
1952-2005
1981-2005
Unknown
1964-2005
1961-2005
1976-2005
1990-2005
1951-2005
1979-2005
1968-2005
1966-2005
Unknown
1974-2005
1967-2005
1976-2005
Unknown
1961-2005
1952-2005
1951-2005
1955-2005
1963-2005
Unknown
Unknown
1977-2005
1977-2005
1968-2005
Unknown
Unknown
1975-2005
1974-2005
1976-2005
1967-2005
1990-2005
Unknown
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
Missing
period
Year of
record
Unknown
1954-1970
Unknown
Unknown
1952-1978
Unknown
Unknown
Unknown
Unknown
Unknown
53
49
54
25
Unknown
42
45
30
16
40
27
38
40
Unknown
32
39
30
Unknown
45
54
30
51
43
Unknown
Unknown
29
29
38
Unknown
Unknown
31
32
30
39
16
Unknown
page 11 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 3: SUB-BASIN MAPS
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 12 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Sa
co
(S
Ç
SATU NOU
ag
ƒ
TUNGUJEI
îa
)
1
CONTRIBUTIONS
TO THE
DEVELOPMENT
OF THE FLOOD
RISK
MANAGEMENT
STRATEGY
2008
FRENCIUGI
CAZANESTI CODAESTI CODAESTI
cÇ
l
en
i
2
NEGRESTI
RATES CUZA
BACESTI
)
Ra
c
3
d
ov
a
Bƒ
rz
em e -ti
ni c
r la
Bƒ
Tu
t
ov
St
Cra s na
Gauging Stations
Pur c
#
ic a
Legend
ni
TIBANA
(D
lna
Ve
Bo
z ie
et
a
n ic
î
a
VASLUI
4 PUSCASI AV.
S im
Ch
iî
oc
i la
Gh
ila
h oi
Berh ec i
e -ti
P ƒr v
iala
Ho r o
PUIESTI
BOSIA
iv
P ere s c h
8
5
7
CURTENI
MANJESTI
Idrici
bo
v
S tav
Vas lu
i
Ga
r
vÇ
Te le jn a
t
Barlad Basin
re
Si
Water
Sub-Basins
VÇ le
ni
BACANI
CIOCANI
BARLAD
FICHITESTI I
ian a
Tr e s t
JÇ
ra
vÇ
an
a
i- )
e tr
ze l
s
Ho
b
Co
ra
a
ne
a
sa
P
a(
et
5
BlÇ
ot
c el
±
ne
a
Sir
0
6
9
u
Te c
sources, references :
-
lÇ
rz
Bƒ
Lu p ul
BÇ
î
FELDIOARA GALBENI
TECUCI
TECUCI
TECUCI
10
10
KM
PHARE 2005 / 017 - 690.01.01
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
EuropAid / 123064 / D / SER / RO
page 13 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Water
Sub-Basins
Suh u
Geru Basin
(P ec h
CONTRIBUTIONS
TO THE
DEVELOPMENT
OF THE FLOOD
RISK
MANAGEMENT
STRATEGY
2008
u h ur
e a, S
Gauging Stations
Ge
Gologan (Bujo re-ti)
r u-
iî a
#
lu i)
Legend
1
3
Je p
ea
CUDALBI
Sir
et
2
Ger u
PECHEA
sources, references :
-
0
±
4
8
KM
Sir et
Sir
et
PHARE 2005 / 017 - 690.01.01
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
EuropAid / 123064 / D / SER / RO
page 14 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Water
Sub-Basins
Putna Basin
CONTRIBUTIONS
TO THE
DEVELOPMENT
OF THE FLOOD
RISK
MANAGEMENT
STRATEGY
2008
2
p
Le
-a
Vi d
r
14
9
z
Co
Va
le a
SÇ
10
a
r ii
lim
Ti -iîa
Ti ch ir
VÇ s ui
uî
r ce
i-
i
i)
VIDRA
15
COLACU
Val
ea
Ch
i
5
Pu
et
ea
TULNICI
a(
et
ro g
Ast
Ca c iu
r
Pƒ
lM
ƒu
Vi
zÇ
4
LEPSA LEPSA
Sir
Gauging Stations
i
u
#
u lu
Çr
j
De
Legend
Re
a
HERASTRAU
REGHIU
ZÇ
7
1
tn
Pu
la
ba
13
a
11
NEREJU
ZÇ
6
Va
le
a
St
ƒn
e
la
ba
lc
Mi
ov
16
¸o im
ul
MIRCESTI
12
Rƒ
m
na
3
GOLESTI
i
BOTIRLAU
17
8
GROAPA-TUFEI
JILISTE
sources, references :
-
0
±
4
8
KM
PHARE 2005 / 017 - 690.01.01
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
EuropAid / 123064 / D / SER / RO
page 15 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Water
Sub-Basins
Ramnicu Sarat
Basin
Sir
CONTRIBUTIONS
TO THE
DEVELOPMENT
OF THE FLOOD
RISK
MANAGEMENT
STRATEGY
2008
et
Legend
#
Gauging Stations
nÇ
u
a
ot
î
rÇ
el
Ma
rtin
Tu lb u
re
SÇ
1
Rƒ mnice l
M
TULBUREA
BÇ
uî
lan
CÇ
tÇ
TATARU
î
Co
MARTINESTI
4
at
cu
2
3
nic
Rƒ m
Çn
ra
u l SÇ
ab
Gr e
PUIESTI
t
sources, references :
-
0
±
3
6
KM
PHARE 2005 / 017 - 690.01.01
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
EuropAid / 123064 / D / SER / RO
page 16 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Water
Sub-Basins
Susita Basin
CONTRIBUTIONS
TO THE
DEVELOPMENT
OF THE FLOOD
RISK
MANAGEMENT
STRATEGY
2008
Legend
Gauging Stations
em
Cr
eî
Du
m
ic u
-
1
a
a
un
CIURUC
oa
r
Al
ira
ej
ea
a
Dr
m
go
Re
p
d
Ve r
)
re )
h iu a M a
Ch iu a (C
en
p ejoa ra
Alba (Lim
#
a
-iî
¸u
2
Sir
et
sources, references :
-
0
±
2.5
5
KM
PHARE 2005 / 017 - 690.01.01
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
EuropAid / 123064 / D / SER / RO
page 17 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 4: CHARACTERISTICS OF EACH SUBBASIN
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 18 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Barlad
Barlad
Barlad
Barlad
Barlad
Barlad
Barlad
Barlad
Barlad
Barlad
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Bistrica
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
07536/A6-3-1-1 Final
Sub-basin ID
AREA (km²)
Longest
hydraulic
path (m)
Longest
hydraulic
path (km)
ZMAX
ZMIN
Mean slope
(m/m)
Mean slope
(%)
Tc: Time of
concentration
(hr)
Tlag: Lag
time (hr)
Tc / Area
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
11
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1536.9
703.4
523.4
408.6
816.2
457.9
950.2
1075.3
228.1
561.0
755.1
311.7
772.2
391.5
443.9
1164.0
560.9
540.5
556.2
322.8
623.5
185.8
320.3
108.0
238.5
104.3
332.5
189.7
188.8
106.9
233.7
231.6
114.3
477.5
262.9
250.8
251.8
606.0
504.4
98.1
65.5
78000
73000
58000
58000
39000
26000
90000
90000
20000
45000
69800.0
34600.0
63500.0
32600.0
66600.0
46000.0
38307.0
13400.0
49300.0
26800.0
54600.0
30300.0
26900.0
17400
46085
16614
40875
34426
34993
20337
33651
50310
15941
77382
33085
41177
59592
61148
34000
13962
18066
78
73
58
58
39
26
90
90
20
45
69.8
34.6
63.5
32.6
66.6
46.0
38.3
13.4
49.3
26.8
54.6
30.3
26.9
17
46
17
41
34
35
20
34
50
16
77
33
41
60
61
34
14
18
420
425
417
466
450
357
473
500
277
305
1679
1824
1288
1290
1192
1824
1297
1200
810
600
1524
438
400
1776
1770
1439
1770
1191
900
1496
1116
38
1954
1312
177
725
850
551
114
1079
1434
93
100
85
80
60
55
48
40
40
24
805
786
512
400
259
650
512
512
259
236
786
160
213
1005
535
370
525
175
150
470
240
8
785
123
55
97
90
39
22
685
755
0.00419
0.00445
0.00572
0.00666
0.01000
0.01162
0.00472
0.00511
0.01185
0.00624
0.01252
0.03000
0.01223
0.02730
0.01401
0.02552
0.02049
0.05134
0.01117
0.01358
0.01352
0.00917
0.00695
0.04431
0.02680
0.06434
0.03046
0.02951
0.02143
0.05045
0.02603
0.00060
0.07333
0.01537
0.00369
0.01525
0.01275
0.00837
0.00271
0.02822
0.03758
0.4
0.4
0.6
0.7
1.0
1.2
0.5
0.5
1.2
0.6
1.3
3.0
1.2
2.7
1.4
2.6
2.0
5.1
1.1
1.4
1.4
0.9
0.7
4.4
2.7
6.4
3.0
3.0
2.1
5.0
2.6
0.1
7.3
1.5
0.4
1.5
1.3
0.8
0.3
2.8
3.8
91
58
44
36
45
32
65
67
22
45
36
15
37
18
26
34
25
19
33
24
32
21
33
8
14
6
15
12
14
7
14
90
6
25
40
19
20
39
67
9
6
54
35
27
22
27
19
39
40
13
27
22
9
22
11
15
20
15
12
20
14
19
13
20
5
8
4
9
7
8
4
8
54
4
15
24
11
12
24
40
6
4
0.06
0.08
0.08
0.09
0.05
0.07
0.07
0.06
0.10
0.08
0.05
0.05
0.05
0.05
0.06
0.03
0.05
0.04
0.06
0.07
0.05
0.11
0.10
0.07
0.06
0.06
0.05
0.06
0.07
0.06
0.06
0.39
0.05
0.05
0.15
0.07
0.08
0.07
0.13
0.09
0.09
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 19 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Buzau
Geru
Geru
Geru
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Putna
Ramnicu Sarat
Ramnicu Sarat
Ramnicu Sarat
Ramnicu Sarat
Siret Diffuse Runoff
07536/A6-3-1-1 Final
Sub-basin ID
AREA (km²)
Longest
hydraulic
path (m)
Longest
hydraulic
path (km)
ZMAX
ZMIN
Mean slope
(m/m)
Mean slope
(%)
Tc: Time of
concentration
(hr)
Tlag: Lag
time (hr)
Tc / Area
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
1
2
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
2
3
4
1
41.7
46.3
60.6
66.2
78.7
121.9
100.6
46.4
50.9
50.0
63.7
40.5
72.7
50.4
30.8
66.1
113.8
269.8
371.9
116.6
71.6
80.7
85.8
143.1
266.7
123.8
348.4
152.4
37.2
122.8
295.1
157.7
138.0
131.6
114.0
101.8
190.7
312.7
321.0
239.2
108.8
10883
14169
12795
9233
9038
19270
16801
10839
12883
9667
12690
7000
6000
7477
7691
7563
21 000
57 000
67 000
8000
16000
10000
23000
21000
44000
15000
58000
18000
6000
26000
20000
13000
13000
10000
28000
30000
24 000
66 000
43 000
43 000
26 000
11
14
13
9
9
19
17
11
13
10
13
7
6
7
8
8
21
57
67
8
16
10
23
21
44
15
58
18
6
26
20
13
13
10
28
30
24
66
43
43
26
1166
1090
1288
1657
1558
1662
1442
1060
1114
908
1343
826
725
735
464
799
273
251
305
996
1390
88
924
1724
1778
1676
979
1514
825
1330
999
1375
1284
960
281
510
1378
979
571
167
430
715
675
670
660
570
510
470
330
300
275
365
265
255
222
140
142
80
2
8
32
590
16
210
650
520
520
30
440
270
280
55
310
310
175
33
30
331
55
30
10
88
0.04144
0.02929
0.04830
0.10798
0.10932
0.05978
0.05785
0.06735
0.06318
0.06548
0.07707
0.08014
0.07833
0.06861
0.04213
0.08687
0.00919
0.00437
0.00443
0.12050
0.05000
0.00720
0.03104
0.05114
0.02859
0.07707
0.01636
0.05967
0.09250
0.04038
0.04720
0.08192
0.07492
0.07850
0.00886
0.01600
0.04363
0.01400
0.01258
0.00365
0.01315
4.1
2.9
4.8
10.8
10.9
6.0
5.8
6.7
6.3
6.5
7.7
8.0
7.8
6.9
4.2
8.7
0.9
0.4
0.4
12.050
5.000
0.720
3.104
5.114
2.859
7.707
1.636
5.967
9.250
4.038
4.720
8.192
7.492
7.850
0.886
1.600
4.4
1.4
1.3
0.4
1.3
5
6
5
4
4
7
6
4
4
4
4
4
5
4
4
5
17
36
42
5
6
17
8
8
14
6
21
8
3
8
13
7
7
7
17
12
10
21
23
37
13
3
4
3
2
3
4
4
2
3
3
3
2
3
3
3
3
10
21
25
3
3
10
5
5
8
4
13
5
2
5
8
4
4
4
10
7
6
13
14
22
8
0.12
0.13
0.09
0.06
0.06
0.06
0.06
0.09
0.08
0.09
0.07
0.09
0.07
0.09
0.14
0.07
0.15
0.13
0.11
0.05
0.08
0.21
0.09
0.06
0.05
0.05
0.06
0.05
0.09
0.07
0.04
0.05
0.05
0.05
0.15
0.11
0.05
0.07
0.07
0.16
0.12
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 20 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Siret Diffuse Runoff
Susita
Susita
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
07536/A6-3-1-1 Final
Sub-basin ID
AREA (km²)
Longest
hydraulic
path (m)
Longest
hydraulic
path (km)
ZMAX
ZMIN
Mean slope
(m/m)
Mean slope
(%)
Tc: Time of
concentration
(hr)
Tlag: Lag
time (hr)
Tc / Area
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
41.2
271.1
335.6
602.2
154.2
203.1
82.0
146.2
107.8
175.2
379.0
145.6
140.5
178.4
209.5
469.7
208.6
119.7
27.1
76.4
47.2
38.8
11.4
117.6
135.3
109.0
123.1
331.6
130.1
276.6
106.3
128.0
15.8
27.4
21.5
16.4
24.7
23.8
26.7
17.0
100.6
15 000
40 000
43 000
45 000
18 000
36 000
29 000
39 000
7 000
26 000
36 000
14 000
6 000
22 000
50 000
18200.0
40000.0
28400.0
9500.0
22400.0
15000.0
13100.0
6900.0
24500.0
32900.0
22100.0
25900.0
65900.0
10100.0
17000.0
13600.0
24300.0
8800.0
5500.0
6000.0
4600.0
5040.0
7000.0
4900.0
3400.0
15100.0
15
40
43
45
18
36
29
39
7
26
36
14
6
22
50
18.2
40.0
28.4
9.5
22.4
15.0
13.1
6.9
24.5
32.9
22.1
25.9
65.9
10.1
17.0
13.6
24.3
8.8
5.5
6.0
4.6
5.0
7.0
4.9
3.4
15.1
517
120
198
60
62
80
295
699
217
495
171
295
45
1350
709
900.0
1400.0
1400.0
1300.0
1600.0
1340.0
900.0
1400.0
1300.0
1300.0
1500.0
1500.0
1400.0
1400.0
1000.0
800.0
1200.0
1400.0
1340.0
1400.0
1400.0
1400.0
1100.0
600.0
580.0
800.0
95
12
8
10
18
13
3
60
90
68
2
55
25
345
45
250.0
400.0
190.0
700.0
600.0
660.0
375.0
900.0
520.0
500.0
300.0
250.0
200.0
600.0
350.0
150.0
640.0
900.0
940.0
800.0
700.0
660.0
450.0
350.0
500.0
200.0
0.02813
0.00270
0.00442
0.00111
0.00244
0.00186
0.01007
0.01638
0.01814
0.01642
0.00469
0.01714
0.00333
0.04568
0.01328
0.036
0.025
0.043
0.063
0.045
0.045
0.040
0.072
0.032
0.024
0.054
0.048
0.018
0.079
0.038
0.048
0.023
0.057
0.073
0.100
0.152
0.147
0.093
0.051
0.024
0.040
2.8
0.3
0.4
0.1
0.2
0.2
1.0
1.6
1.8
1.6
0.5
1.7
0.3
4.6
1.3
3.6
2.5
4.3
6.3
4.5
4.5
4.0
7.2
3.2
2.4
5.4
4.8
1.8
7.9
3.8
4.8
2.3
5.7
7.3
10.0
15.2
14.7
9.3
5.1
2.4
4.0
6
47
41
111
39
48
13
14
14
15
43
15
40
10
18
20
13
8
3
6
5
5
2
9
11
7
7
19
7
14
7
11
2
3
2
2
2
2
4
5
8
3
28
24
67
23
29
8
8
8
9
26
9
24
6
11
12
8
5
2
4
3
3
1
5
6
4
4
12
4
8
4
7
1
2
1
1
1
1
2
3
5
0.14
0.17
0.12
0.18
0.25
0.24
0.16
0.09
0.13
0.09
0.11
0.10
0.28
0.05
0.09
0.04
0.06
0.06
0.12
0.08
0.10
0.12
0.16
0.08
0.08
0.06
0.06
0.06
0.05
0.05
0.07
0.09
0.16
0.12
0.11
0.10
0.09
0.10
0.14
0.27
0.08
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 21 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T S T R AT E G Y – E U R O P E AI D / 1 2 3 0 6 4 / D / S E R / R O
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
Trotus
07536/A6-3-1-1 Final
Sub-basin ID
AREA (km²)
Longest
hydraulic
path (m)
Longest
hydraulic
path (km)
ZMAX
ZMIN
Mean slope
(m/m)
Mean slope
(%)
Tc: Time of
concentration
(hr)
Tlag: Lag
time (hr)
Tc / Area
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
45.8
104.1
115.8
26.2
53.0
31.4
48.6
68.4
68.8
35.6
31.2
122.8
33.3
213.4
111.7
373.9
237.3
7300.0
13800.0
22400.0
5900.0
6500.0
7800.0
5100.0
8600.0
12500.0
9500.0
10100.0
22300.0
9600.0
28600.0
16100.0
55000.0
21300.0
7.3
13.8
22.4
5.9
6.5
7.8
5.1
8.6
12.5
9.5
10.1
22.3
9.6
28.6
16.1
55.0
21.3
860.0
600.0
700.0
900.0
800.0
1600.0
1400.0
1300.0
1500.0
1300.0
1200.0
1500.0
1400.0
1200.0
1500.0
1300.0
500.0
400.0
200.0
150.0
400.0
275.0
800.0
500.0
600.0
700.0
800.0
400.0
800.0
900.0
550.0
400.0
185.0
80.0
0.063
0.029
0.025
0.085
0.081
0.103
0.176
0.081
0.064
0.053
0.079
0.031
0.052
0.023
0.068
0.020
0.020
6.3
2.9
2.5
8.5
8.1
10.3
17.6
8.1
6.4
5.3
7.9
3.1
5.2
2.3
6.8
2.0
2.0
4
9
10
3
4
3
3
5
5
4
3
9
4
15
6
20
17
3
6
6
2
3
2
2
3
3
2
2
6
2
9
4
12
10
0.10
0.09
0.09
0.11
0.08
0.09
0.06
0.07
0.07
0.11
0.10
0.08
0.12
0.07
0.06
0.05
0.07
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 22 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 5: SUB-BASIN LAND COVER
Trotus river basin
Sub-basin ID
Urban areas (%)
Meadows (%)
Forests (%)
Agriculture (%)
CN
1
15
16
34
35
85.68
2
2
2
94
1
95.00
3
7
5
87
1
95.00
4
6
11
72
11
80.03
5
1
1
92
5
78.15
6
9
12
78
1
78.87
7
19
14
32
34
86.09
8
1
39
60
0
65,07
9
3
9
86
2
84.00
10
1
1
99
0
77.13
11
4
8
86
2
78.17
12
4
9
83
4
88.00
13
4
4
80
12
79.74
14
1
1
98
0
77.15
15
11
20
48
20
82.77
16
12
21
27
39
86.18
17
0
13
83
4
83.87
18
1
60
36
3
79.48
19
12
32
57
0
87.59
20
13
29
54
4
80.45
21
12
39
48
1
80.10
22
15
20
54
10
81.68
23
17
7
71
5
80.63
24
23
7
36
35
86.54
25
39
17
25
18
86.48
26
13
19
5
63
90.21
27
8
19
60
14
81.07
28
14
2
45
38
85.69
29
5
6
74
15
80.52
30
13
20
64
2
79.98
31
12
31
50
7
80.92
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 23 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Sub-basin ID
Urban areas (%)
Meadows (%)
Forests (%)
Agriculture (%)
CN
32
7
18
73
2
78.96
33
8
15
75
3
79.07
34
9
6
64
21
82.12
35
8
11
78
4
79.10
36
8
29
61
2
79.39
37
10
16
60
14
71.46
38
6
44
48
2
79.61
39
8
22
70
0
78.83
40
0
3
96
1
77.29
41
3
7
87
2
78.15
42
8
10
65
18
81.50
43
14
3
52
31
84.38
* The values reported in RED have been adapted for calibration purposes
Siret river basin
Basin
Sub-basin ID
Urban areas (%)
Meadows (%)
Forests (%)
Agriculture (%)
CN
Siret_Tribs
1
10
15
14
61
89.31
Siret_Tribs
2
8
14
9
69
90.23
Siret_Tribs
3
3
1
5
92
93.05
Siret_Tribs
4
5
2
3
91
93.24
Siret_Tribs
5
6
5
8
82
91.87
Siret_Tribs
6
11
2
24
62
89.36
Siret_Tribs
7
8
2
6
84
92.57
Siret_Tribs
8
12
5
2
81
92.73
Siret_Tribs
9
6
4
44
47
85.91
Siret_Tribs
10
12
2
35
51
87.52
Siret_Tribs
11
12
3
33
52
87.71
Siret_Tribs
12
12
4
11
73
63.70
Siret_Tribs
13
10
3
16
71
90.67
Siret_Tribs
14
14
5
35
45
86.97
Geru
1
5
3
6
86
92.53
Geru
2
5
5
4
87
92.57
Geru
3
8
4
7
81
92.04
Ramnicul
1
6
8
79
7
79.35
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 24 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Basin
Sub-basin ID
Urban areas (%)
Meadows (%)
Forests (%)
Agriculture (%)
CN
Ramnicul
2
16
6
39
39
86.20
Ramnicul
3
5
6
18
71
90.05
Ramnicul
4
7
7
0
86
92.83
Susita
1
4
18
69
9
79.66
Susita
2
12
8
48
32
84.41
Putna
1
18
6
27
49
88.16
Putna
2
1
1
98
0
77.23
Putna
3
9
2
8
81
92.21
Putna
4
5
20
54
22
82.02
Putna
5
1
5
94
0
77.33
Putna
6
2
3
94
0
77.51
Putna
7
0
1
98
0
77.15
Putna
8
11
6
46
38
85.22
Putna
9
1
7
92
1
77.45
Putna
10
9
30
54
7
80.52
Putna
11
5
15
72
8
79.55
Putna
12
11
5
52
31
76.18
Putna
13
11
27
55
7
80.66
Putna
14
7
42
30
21
82.96
Putna
15
8
13
56
23
82.54
Putna
16
20
7
0
73
92.59
Putna
17
13
2
3
82
92.93
Barlad
1
9
11
32
47
86.78
Barlad
2
9
10
26
55
88.01
Barlad
3
9
11
25
56
88.11
Barlad
4
12
6
28
53
88.04
Barlad
5
9
10
19
62
89.16
Barlad
6
8
12
15
64
89.54
Barlad
7
10
9
19
62
89.26
Barlad
8
11
8
22
59
88.84
Barlad
9
8
7
8
77
91.50
Barlad
10
10
6
10
74
91.25
* The values reported in RED have been adapted for calibration purposes
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 25 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Buzau river basin
Sub-basin ID
Urban areas (%)
Meadows (%)
Forests (%)
Agriculture (%)
CN
1
1
5
94
0
77.35
2
0
1
99
0
77.08
3
7
9
73
10
80.10
4
1
2
97
0
77.19
5
14
15
42
30
84.58
6
13
16
41
31
84.67
7
2
8
87
3
78.14
8
8
15
48
28
83.54
9
6
4
6
85
92.41
10
0
12
85
3
77.82
11
12
12
46
30
84.26
12
9
6
8
77
62.19
13
7
4
66
23
82.09
14
12
7
25
56
88.51
15
6
2
4
88
92.91
16
10
9
6
74
91.41
17
16
26
36
22
83.85
18
3
8
77
11
79.68
19
4
27
47
22
82.16
20
14
21
45
20
83.17
21
3
3
93
1
77.60
22
3
7
88
2
77.92
23
0
0
1
99
93.83
24
1
4
95
0
77.30
25
5
4
89
3
78.34
26
11
17
63
10
80.79
27
9
28
54
9
80.78
28
17
15
35
32
75.70
29
8
6
73
13
80.55
30
17
18
31
35
86.00
31
17
6
55
22
83.49
32
15
16
36
33
85.30
33
9
23
22
46
86.84
34
19
7
32
42
87.18
* The values reported in RED have been adapted for calibration purposes
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 26 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 6: TABLES OF DAILY RAINFALL ON THE
SIRET BASIN
1)
RAINFALL STATION USED – TROTUS BASIN
The 3h time-step rainfall station used for the Trotus basin is the Targu-Ocna station.
Rainfall (mm)
RIVER
STATION
X_COORD
Y_COORD
11th July
2005
12th July
2005
13th July
2005
SUM
FRUMOASA
FRUMOASA
565062.56
550916.19
6.5
29.3
1
36.8
SIRET
ADJUDUL VECHI
669721.77
517772.84
9
47
3
59
NECHIT
BORLESTI
613221.06
586917.88
28.6
127
8.4
164
TROTUS
LUNCA DE SUS
575097.54
563949.07
30
28
2
60
TROTUS
GHIMES FAGET
585222.33
562457.43
31.5
51
0
82.5
TROTUS
GOIOASA
599683.06
550431.49
29.8
0
0
29.8
TROTUS
TG.OCNA
623817.34
532047.1
25
89
4
118
TROTUS
ONESTI
636459.33
530621.18
39.6
112
0
151.6
TROTUS
VRANCENI
646248.2
525020.96
41.4
114
6.7
162.1
SULTA
SULTA
594728.11
552507.08
30.2
0
0
30.2
CIOBANUS
CIOBANUS
603003.62
548778.39
32.3
0
0
32.3
ASAU
ASAU
607654.61
550973.03
81.1
36.8
6.9
124.8
UZ
CREMENEA
602593.53
537594.32
44.8
0
0
44.8
UZ
DARMANESTI
616532.04
541901.33
61.7
93.2
0
154.9
DOFTEANA
DOFTEANA
618505.08
537625.22
54.5
130
0
184.5
SLANIC
CIRESOAIA
620631.4
529231.56
35
74.6
0
109.6
CASIN
HALOS
633441.89
518831.12
73.7
132
12.5
218.2
TAZLAU
TAZLAU
611567.61
581268.32
23.8
150
11.5
185.3
TAZLAU
SCORTENI
628048.35
560157.43
28.4
134
0
162.4
TAZLAU
HELEGIU
634111.62
540504.02
40.2
87.5
12.3
140
TAZLAU
SARAT
LUCACESTI
615146.38
555308.87
33.2
117
0
150.2
LEPSA
LEPSA
622138.23
495956.29
66
109
0
175
VL.RECE
VL.RECE
573418.78
570075.3
0
42
10
52
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 27 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
SUSITA
CIURUC
640776.43
501693.72
43
0
0
43
RACACIUNI
(MOCAN)
RACACIUNI
655150.73
538408.39
26
25.3
25.3
76.6
TREBES
BACAU
646637.73
566818.35
2
100
19
121
UZ
VL.UZULUI
595041.91
537780.26
0
88
13.8
101.8
2)
RAINFALL STATION USED – BISTRITA BASIN
The 3h time-step rainfall station used for the Bistrita basin is the Bacau station.
RIVER
STATION
X_COORD
Y_COORD
A11
A12
A13
SUM
SIRET
DRAGESTI
648744,6
582522,3
1,9
42,5
1,9
46,3
MOLDOVA
FUNDU
MOLDOVEI
529481,1
670900,7
5,1
13,6
2,5
21,2
MOLDOVA
TUPILATI
625437,1
622040,8
0,8
23,2
0,4
24,4
IZV.GIUMALAU(COLBUL)
POJORITA
535351,9
668788,7
6,1
16,1
3,4
25,6
NEAMT(OZANA)
LEGHIN
589605,2
636500,3
15,2
63,1
49,3
127,6
PLUTON-DOLHESTI
PLUTON
578722,5
633534,9
7,2
53,9
0,6
61,7
AGAPIA (DALIA)
FILIOARA
600028,1
630592,9
1,0
53,3
0,0
54,3
VL.NEAGRA
SECUIENI
643942,9
596264,8
1,5
53,6
4,3
59,4
BISTRITA
DORNA
GIUMALAU
526567,7
651286,8
1,0
8,0
0,0
9,0
BISTRITA
DORNA ARINI
530951,7
649513,5
0,6
18,6
0,0
19,2
BISTRITA
FRUMOSU
565546,1
627397,9
6,5
29,3
1,0
36,8
BISTRITA
STRAJA
589608,7
600408,8
65,0
92,2
3,0
160,2
BISTRITA
FRUNZENI
623952,6
583853,9
16,2
52,0
3,1
71,3
CARLIBABA
CARLIBABA
509660,9
675410,0
1,9
11,1
0,0
13,0
DORNA
POIANA STAMPEI
510465,7
645045,5
1,5
13,0
2,0
16,5
DORNA
DORNA CINDRENI
520955,0
650868,9
0,8
7,4
1,3
9,5
BANCU
COSNA
513805,5
652321,2
0,5
2,9
2,4
5,8
NEAGRA
GURA NEGRII
530439,0
648734,8
0,0
0,0
0,0
0,0
SARISORUL MARE
PANACI
526719,4
642881,8
0,0
0,0
0,0
0,0
SABASA
SABASA
562277,0
634458,0
5,2
37,0
1,2
43,4
BOLATAU
POIANA
LARGULUI
574130,5
622200,1
0,0
35,9
3,3
39,2
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 28 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
RIVER
STATION
X_COORD
Y_COORD
A11
A12
A13
SUM
BISTRICIOARA
TULGHES
557644,4
607577,1
39,2
22,3
2,5
64,0
BISTRICIOARA
BISTRICIOARA
568927,7
617649,9
19,6
104,0
0,0
123,6
SCHITU
CEAHLAU
571407,8
614900,4
17,2
83,5
10,2
110,9
BICAZ
BICAZ CHEI
566430,0
591983,3
42,0
35,5
3,8
81,3
BICAZ
TASCA
575379,3
598447,3
43,2
62,2
1,5
106,9
CUEJDIU
CUEJDIU
599665,7
610052,4
17,2
83,5
10,2
110,9
IAPA
LUMINIS
609901,8
591468,4
39,4
133,0
0,0
172,4
CRACAU
MAGAZIA
596412,8
623213,0
8,0
55,0
0,0
63,0
CRACAU
SLOBOZIA
616838,5
594308,7
14,0
62,7
14,0
90,7
NECHIT
BORLESTI
613221,1
586917,9
28,6
127,0
8,4
164,0
RACATAU
RECEA
659866,3
549126,1
13,2
86,5
2,1
101,8
TROTUS
GHIMES FAGET
585222,3
562457,4
31,5
51,0
0,0
82,5
TAZLAU
TAZLAU
611567,6
581268,3
23,8
150,0
11,5
185,3
TAZLAU
SCORTENI
628048,4
560157,4
28,4
134,0
0,0
162,4
MOLDOVA
CIMPULUNG
9,3
17,6
6,4
33,3
BISTRITA
BROSTENI
2,4
16,9
0,0
19,3
VL.RECE
VL.RECE
42,0
10,0
0,0
52,0
TREBES
BACAU
2,0
100,0
19,0
121,0
BISTRITA
PIATRA NEAMT
1,0
75,0
24,0
0,0
3)
573418.78
570075.3
RAINFALL STATION USED – DOWNSTREAM SIRET BASIN
The 3h time-step rainfall stations used for the Downstream Siret basin are resumed in the following table:
Water basin
3h time-step rainfall stations
Putna
TG Ocna
Ramnicul Sarat
Adjud
Susita
TG Ocna
Siret (tributaries)
07536/A6-3-1-1 Final
Adjud for the upstream (BV1, 2, 10, 11 et 9)
Tecuci for the downstream (BV13, 14, 6, 7, 5, 3, 4, 12)
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 29 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
For the Barlad and the Geru basin no daily rainfall stations were available. The following stations have been
used:
Daily station
Water basin
(cumulated rainfall)
3h timestep rainfall stations
Barlad 1, 2, 3 et 4
Secueni
Bacau
Barlad 5, 6, 7 et 8
Adjud
Adjud
Barlad 9 et 10
Tecuci
Tecuci
Geru
Tecuci
Tecuci
RIVER
STATION
X_COORD
Y_COORD
A11
A12
A13
SUM
SIRET
ADJ. VECHI
669721,76717
517772,83720
6.2
43,4
0.4
50,0
SIRET
COSMESTI
673815,47000
497709,62000
18.7
71,6
0
90,3
SIRET
LUNGOCI
696091,52313
454046,49293
17.4
80,4
2.6
100,4
VL.NEAGRA
SECUENI
643942,86386
596264,77962
1.5
53,6
4.3
59,4
RACATAU
RECEA
659866,31404
549126,07402
13.2
86,5
2.1
101,8
RACACIUNI
RACACIUNI
655150,72786
538408,38867
26
25,3
0
51,3
TROTUS
VR┬NCENI
646248,20048
525020,96417
41.4
114,0
6.7
162,1
CASIN
HALOS
633441,88886
518831,12207
73.7
132,0
12.5
218,2
SUSITA
CIURUC
640776,42612
501693,72156
43
0,0
0
43,0
PUTNA
LEPSA
620197,63108
495635,61040
66
109,0
0
175,0
PUTNA
TULNICI
629397,73349
491166,48807
40.6
93,0
0
133,6
PUTNA
COLACU
642923,03143
489269,77125
25
148,0
26.5
199,5
PUTNA
MIRCESTI
676465,08041
473904,08991
9.4
94,1
0
103,5
PUTNA
BOT┬RLAU
686152,98300
462070,86906
12.5
87,5
1.0
100,0
LEPSA
LEPSA
622138,22693
495956,28917
66
109,0
0
175,0
ZABALA
NEREJU
635342,51510
470032,53010
45
0,0
0
45,0
NARUJA
HERASTRAU
627532,42275
479686,48525
73.4
147,0
0
220,4
MILCOV
REGHIU
645363,73796
478734,34719
63.5
0,0
0
63,5
MILCOV
GOLESTI
668618,66921
465333,97137
8.7
0,0
0
8,7
RAMNA
GR. TUFEI
655827,80152
457219,28357
23.6
0,0
0
23,6
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 30 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
RIVER
STATION
X_COORD
Y_COORD
A11
A12
A13
SUM
RAMNA
JILISTE
674209,66214
458389,08167
9.2
100,0
0
109,2
RM. SARAT
TULBUREA
644350,72867
453000,93584
39.2
107,0
0
146,2
RM. SARAT
PUIESTI
674051,24413
435730,60000
21.1
70,1
0
91,2
RM. SARAT
TATARU
694452,34163
447819,71772
29.2
62,4
3.2
94,8
COTATCU
MARTINESTI
680149,35847
446348,79201
14
101,0
0
115,0
4)
RAINFALL STATION USED – BUZAU BASIN
For the Buzau water basin no precipitation data was available. The whole basin has been split in two rainfall
areas in order to consider a spatial repartition:
•
Upstream area : transposition of the observed precipitations at Targu-Ocna station
•
Downstream area : transposition of the observed precipitations at Tecuci
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 31 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 7: PICTURES OF THE HYDRAULIC
STRUCTURES ALONG THE SIRET
Road bridge at Cosmeti – Chainage 50 233
Railway at Suraja – chainage 71 775
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 32 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Road bridge at Nanesti – Chainage 102 310
Conduit at Cotu Mihalea - Chainage 161 591
No picture available
Road bridge at Sendreni – Chainage 173 283
Railway at Galati – Chainage 177 229
No picture available
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 33 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Conduit at Galati – Chainage 181 146
Road bridge at Galati – Chainage 181 391
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 34 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 8: DIKE CROSS-SECTIONS
Elevation (m)
Dike cross section n°1
80.5
80
79.5
79
78.5
78
77.5
77
76.5
76
75.5
0
5
10
15
20
25
30
Distance (m)
Elevation (m)
Dike cross section n°2
79
78.5
78
77.5
77
76.5
76
75.5
75
74.5
74
73.5
0
5
10
15
20
25
30
35
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 35 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°3
79
78
Elevation (m)
77
76
75
74
73
72
71
0
10
20
30
40
Distance (m)
Elevation (m)
Dike cross section n°4
79
78
77
76
75
74
73
72
71
70
69
68
0
10
20
30
40
50
Distance (m)
Dike cross section n°5
80
Elevation (m)
78
76
74
72
70
68
66
0
10
20
30
40
50
60
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 36 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°6
69.5
69
Elevation (m)
68.5
68
67.5
67
66.5
66
65.5
0
10
20
30
40
50
40
50
40
50
Distance (m)
Elevation (m)
Dike cross section n°7
68
67.5
67
66.5
66
65.5
65
64.5
64
63.5
63
62.5
0
10
20
30
Distance (m)
Dike cross section n°8
66
Elevation (m)
65
64
63
62
61
60
0
10
20
30
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 37 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°9
55
Elevation (m)
54.5
54
53.5
53
52.5
52
0
10
20
30
40
50
20
25
Distance (m)
Dike cross section n°10
57
Elevation (m)
56.5
56
55.5
55
54.5
54
0
5
10
15
Distance (m)
Dike cross section n°11
52.5
52
Elevation (m)
51.5
51
50.5
50
49.5
49
48.5
48
0
5
10
15
20
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 38 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Elevation (m)
Dike cross section n°12
54.6
54.4
54.2
54
53.8
53.6
53.4
53.2
53
52.8
52.6
0
5
10
15
20
25
Distance (m)
Dike cross section n°13
54
53.5
Elevation (m)
53
52.5
52
51.5
51
50.5
50
0
5
10
15
20
25
30
20
25
30
Distance (m)
Dike cross section n°14
52.5
52
Elevation (m)
51.5
51
50.5
50
49.5
49
48.5
0
5
10
15
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 39 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Elevation (m)
Dike cross section n°15
51.5
51
50.5
50
49.5
49
48.5
48
47.5
47
46.5
0
5
10
15
20
25
30
35
Distance (m)
Dike cross section n°16
52
51
Elevation (m)
50
49
48
47
46
45
44
43
0
10
20
30
40
50
20
25
Distance (m)
Dike cross section n°17
38
37.5
Elevation (m)
37
36.5
36
35.5
35
34.5
34
0
5
10
15
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 40 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°18
34
33.5
Elevation (m)
33
32.5
32
31.5
31
30.5
30
0
5
10
15
20
25
30
35
Distance (m)
Dike cross section n°19
34
Elevation (m)
33.5
33
32.5
32
31.5
31
0
5
10
15
20
25
Distance (m)
Dike cross section n°20
33
Elevation (m)
32.5
32
31.5
31
30.5
30
29.5
0
5
10
15
20
25
30
35
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 41 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°21
31
30.5
Elevation (m)
30
29.5
29
28.5
28
27.5
27
0
10
20
30
40
15
20
Distance (m)
Dike cross section n°22
31
30.5
Elevation (m)
30
29.5
29
28.5
28
27.5
27
26.5
0
5
10
Distance (m)
Dike cross section n°23
27
Elevation (m)
26.5
26
25.5
25
24.5
24
0
5
10
15
20
25
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 42 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°24
26
Elevation (m)
25.5
25
24.5
24
23.5
23
0
10
20
30
40
50
Distance (m)
Dike cross section n°25
24.5
Elevation (m)
24
23.5
23
22.5
22
21.5
0
10
20
30
40
30
40
Distance (m)
Dike cross section n°26
24
Elevation (m)
23.5
23
22.5
22
21.5
21
0
10
20
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 43 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°27
24
Elevation (m)
23.5
23
22.5
22
21.5
21
20.5
0
5
10
15
20
Distance (m)
Dike cross section n°28
23.5
23
Elevation (m)
22.5
22
21.5
21
20.5
20
19.5
19
0
5
10
15
20
25
30
Distance (m)
Dike cross section n°29
24
23.5
Elevation (m)
23
22.5
22
21.5
21
20.5
20
19.5
0
10
20
30
40
50
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 44 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°30
24
Elevation (m)
23.5
23
22.5
22
21.5
21
20.5
0
5
10
15
20
25
30
Distance (m)
Dike cross section n°31
23.5
23
Elevation (m)
22.5
22
21.5
21
20.5
20
19.5
19
0
5
10
15
20
25
30
35
Distance (m)
Dike cross section n°32
23
Elevation (m)
22
21
20
19
18
17
0
10
20
30
40
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 45 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°33
24
Elevation (m)
23
22
21
20
19
18
17
0
10
20
30
40
50
60
40
50
60
Distance (m)
Elevation (m)
Dike cross section n°34
21
20.5
20
19.5
19
18.5
18
17.5
17
16.5
16
0
10
20
30
Distance (m)
Dike cross section n°35
21.5
Elevation (m)
21
20.5
20
19.5
19
18.5
18
0
5
10
15
20
25
30
35
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 46 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°36
21
Elevation (m)
20.5
20
19.5
19
18.5
18
0
10
20
30
40
50
Distance (m)
Elevation (m)
Dike cross section n°37
22
21.5
21
20.5
20
19.5
19
18.5
18
17.5
17
0
10
20
30
40
Distance (m)
Dike cross section n°38
22
Elevation (m)
21
20
19
18
17
16
0
5
10
15
20
25
30
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 47 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°39
22
Elevation (m)
21
20
19
18
17
16
15
0
10
20
30
40
Distance (m)
Dike cross section n°40
22
Elevation (m)
21
20
19
18
17
16
15
0
10
20
30
40
50
Distance (m)
Elevation (m)
Dike cross section n°41
21
20.5
20
19.5
19
18.5
18
17.5
17
16.5
16
0
10
20
30
40
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 48 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°42
21
Elevation (m)
20
19
18
17
16
15
0
10
20
30
40
Distance (m)
Dike cross section n°43
21
Elevation (m)
20
19
18
17
16
15
0
5
10
15
20
25
30
Distance (m)
Dike cross section n°44
21
Elevation (m)
20
19
18
17
16
15
0
5
10
15
20
25
30
35
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 49 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°45
20
Elevation (m)
19
18
17
16
15
14
13
0
10
20
30
40
50
60
Distance (m)
Dike cross section n°46
20
Elevation (m)
19
18
17
16
15
14
13
0
5
10
15
20
25
30
35
Distance (m)
Dike cross section n°47
19
Elevation (m)
18
17
16
15
14
13
0
10
20
30
40
50
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 50 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°48
20
Elevation (m)
19
18
17
16
15
14
13
0
10
20
30
40
50
Distance (m)
Elevation (m)
Dike cross section n°49
18
17.5
17
16.5
16
15.5
15
14.5
14
13.5
13
0
5
10
15
20
25
30
35
Distance (m)
Dike cross section n°50
19
Elevation (m)
18
17
16
15
14
13
12
0
10
20
30
40
50
60
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 51 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°51
19
Elevation (m)
18
17
16
15
14
13
12
0
10
20
30
40
50
Distance (m)
Dike cross section n°52
18
Elevation (m)
17
16
15
14
13
12
0
10
20
30
40
Distance (m)
Dike cross section n°53
18
Elevation (m)
17
16
15
14
13
12
0
10
20
30
40
50
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 52 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°54
18
Elevation (m)
17
16
15
14
13
12
0
5
10
15
20
25
30
Distance (m)
Elevation (m)
Dike cross section n°55
17
16.5
16
15.5
15
14.5
14
13.5
13
12.5
12
0
5
10
15
20
25
30
35
Distance (m)
Elevation (m)
Dike cross section n°56
17
16.5
16
15.5
15
14.5
14
13.5
13
12.5
12
0
5
10
15
20
25
30
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 53 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°57
17
Elevation (m)
16
15
14
13
12
11
0
10
20
30
40
Distance (m)
Dike cross section n°58
17
Elevation (m)
16
15
14
13
12
11
10
0
10
20
30
40
50
60
70
Distance (m)
Dike cross section n°59
16
Elevation (m)
15
14
13
12
11
10
0
10
20
30
40
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 54 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°60
16
Elevation (m)
15
14
13
12
11
10
0
5
10
15
20
25
30
35
Distance (m)
Dike cross section n°61
16
15
Elevation (m)
14
13
12
11
10
9
8
0
10
20
30
40
50
40
50
Distance (m)
Dike cross section n°62
16
Elevation (m)
15
14
13
12
11
10
9
0
10
20
30
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 55 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°63
15
Elevation (m)
14
13
12
11
10
9
0
10
20
30
40
50
Distance (m)
Dike cross section n°64
16
15
Elevation (m)
14
13
12
11
10
9
8
7
0
10
20
30
40
50
60
Distance (m)
Dike cross section n°65
14.5
14
Elevation (m)
13.5
13
12.5
12
11.5
11
10.5
10
0
5
10
15
20
25
30
35
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 56 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°66
15
Elevation (m)
14
13
12
11
10
9
0
10
20
30
40
30
40
Distance (m)
Dike cross section n°67
14
Elevation (m)
13
12
11
10
9
8
0
10
20
Distance (m)
Dike cross section n°68
14
Elevation (m)
13
12
11
10
9
8
0
10
20
30
40
50
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 57 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Elevation (m)
Dike cross section n°69
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
0
10
20
30
40
50
Distance (m)
Elevation (m)
Dike cross section n°70
13
12.5
12
11.5
11
10.5
10
9.5
9
8.5
8
0
10
20
30
40
50
60
20
25
30
Distance (m)
Dike cross section n°71
10
Elevation (m)
9.5
9
8.5
8
7.5
7
0
5
10
15
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 58 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Dike cross section n°72
12
Elevation (m)
11
10
9
8
7
6
5
0
10
20
30
40
50
60
Distance (m)
Dike cross section n°73
12
Elevation (m)
11
10
9
8
7
6
0
10
20
30
40
50
40
50
Distance (m)
Dike cross section n°74
11
10.5
Elevation (m)
10
9.5
9
8.5
8
7.5
7
0
10
20
30
Distance (m)
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 59 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 10: UNIT COSTS OF WORKS
UNIT COST ESTIMATES
Unit costs of civil works
The following unit costs estimates are based on June 2008 economic conditions. The euro/RON exchange
rate considered is 3,66 RON/€.
Designation of the work
Unit
Unit Cost (RON) Unit Cost (€)
EXCAVATION
Tree cutting
Tree uprooting
unit
unit
m2
110
10
1,6
30
2,7
0,44
ha
m3
5300
10
1448
2,7
Rehandling of materials and dumping on embankment
m3
2,4
0,66
Rehandling of materials and transportation to waste area
(distance < 10 km)
m3
14
3,8
Trench Excavation
m3
2,4
0,66
Trench Backfill
m3
3,3
0,9
Ditch excavation
m3
22
6,0
Preparation of foundations
m2
1,4
0
Removal of loose and unsuitable foundation material
m3
1,7
0
Earthfill placing on embankment
m3
7,9
2
Wire mesh screen
m2
15
4,1
Geogrid screen
m2
50
14
Top soil cover on the slopes
m2
3,5
1
Seeding of the top soil cover
m2
0,9
0
Construction of road crest (crushed aggregates)
m3
9,6
3
Supply of crushed aggregates
Engineering fabric (filter under the aggregates)
t
m2
78
15
21
4
Supply of cobbles for gabions
m3
89
24
Gabion boxes
m3
260
71
Gabion mattress 0,3m thick
m3
91
25
Bank slopes excavation prior to gabions placing
m2
1,3
0,4
Engineering fabric (filter under the gabions)
m3
15
4,1
Brush clearing
Stripping (top soil removal)
Open cut excavation
EMBANKMENT
BANK PROTECTION
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 60 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Designation of the work
Unit
Unit Cost (RON) Unit Cost (€)
CONCRETE WORKS
Blinding concrete
m3
Structural Concrete
m3
Steel Reinforcing bars
Formwork (straight)
kg
m2
380
4,0
35
Formwork (curved)
m2
59
16
ml
ml
ml
ml
ml
ml
160
220
300
440
690
3900
44
60
82
120
189
1066
m2
m2
45
130
12.3
35.5
330
90
104
1,1
9,6
PIPES
Concrete pipe, diameter 400 mm
Concrete pipe, diameter 600 mm
Concrete pipe, diameter 800 mm
Concrete pipe, diameter 1 000 mm
Concrete pipe, diameter 1 200 mm
Manhole, diameter 1000 mm
OTHERS
Road demolition
Road reconstruction
Some unit costs (for instance tree cutting) are given here for memory as the corresponding quantities can not
be assessed at this stage of the technical studies. These works will be included in the miscellaneous.
Unit costs of equipment
The following unit costs estimates are based on June 2008 economic conditions. The euro/RON exchange
rate considered is 3,66 RON/€.
Designation of the work
Unit
Unit Cost (RON) Unit Cost (€)
Balustrade
Gate 1,6 m ht x 2 m
Trash rack
ml
u
m2
915
100 000
1 300
250
27 322
355
Bulkhead (out of metal)
m2
4 000
1 093
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 61 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 11: AGGREGATED COST ESTIMATES
AGGREGATED COST ESTIMATE FOR POLDERS
On the basis of the detailed unit costs presented in annex 1, global costs have been computed. These
aggregated costs, which are of much easier use for the present study than detailed costs, are:
Embankment cost
Weir cost
Outlet cost
Polder embankment aggregated cost
The calculation of the embankment aggregated cost is based on the following assumptions, considering that
the height of the embankment may vary:
Crest width : 5 m
Slopes : 3 / 1
Top soil depth : 0,3 m
Wire mesh barrier against diging animals
Gravel track for inspection and maintenance on top of crest
Provision for some bad soil foundation removal and replacement
Provision for miscellaneous 15% : way crossings, drainage outlets, etc.
General costs 10%: installations, execution studies, etc.
The following table gives the aggregated cost per meter cube of earthfill, with regards to the height of the
embankment.
Aggregated cost of embankment
Embankment height above ground level (m)
H=3m
14,2 €/m
H = 3,5 m
3
13,4 €/m
3
H=4m
12,8 €/m
H = 4,5 m
3
12,4 €/m
3
H=5m
12,0 €/m
3
Weir aggregated cost
The calculation of the weir aggregated cost is based on the following assumptions, considering that the height
of the embankment may vary:
Crest width of embankment: 5 m
Slopes of embankment: 3 / 1
Spillway made of concrete slabs and concrete guiding walls
Concrete spillway basin and gabions mattresses for energy dissipation at the toe of the spillway
Upstream embankment protection made of gabions mattresses
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 62 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Provision for miscellaneous: 15%
General costs 10%: installations, execution studies, etc.
The following table gives the aggregated cost per linear meter of spilling weir length, with regards to the height
of the embankment.
Aggregated cost of weir
Embankment height above ground level (m)
H=3m
H = 3,5 m
5 900 €/ml
6 200 €/ml
H=4m
H = 4,5 m
H=5m
6 500 €/ml
6 800 €/ml
7 100 €/ml
Outlet aggregated cost
The calculation of the outlet aggregated cost is based on the following assumptions, considering that the
height of the embankment may vary, as well as the number of gated sluices according to the needs:
Crest width of embankment : 5 m
Slopes of embankment : 3 / 1
Outlet made of concrete culvert, with at least two sluices
Typical gate : 1,6m ht x 2 m i.e 3,2 m2, with at least two gates
Provision for miscellaneous 15%
General costs 10%: installations, execution studies, etc.
The following table gives the aggregated cost per square meter of outlet gate, with regards to the height of the
embankment (the height of the embankment impacts longer sluices and guiding walls).
Aggregated cost of outlet
Embankment height above ground level (m)
H=3m
22 800 €/m
H = 3,5 m
2
24 700 €/m
H=4m
2
26 100 €/m
H = 4,5 m
2
28 600 €/m
H=5m
2
30 300 €/m
2
AGGREGATED COST ESTIMATE FOR PROTECTION EMBANKMENT
Protection embankments are more exposed to flow velocity than the polder embankments (except for the
polder embankments settled along the stream banks).
The calculation of the protection embankment aggregated cost is based on the following assumptions,
considering that the height of the embankment may vary:
Crest width : 4 m
Slopes : 2,5 / 1
Top soil depth : 0,3 m
Wire mesh barrier against digging animals
Gravel track for inspection and maintenance on top of crest
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 63 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Provision for some bad soil foundation removal and replacement
Provision for miscellaneous 15%: way crossings, drainage outlets, etc.
General costs 10%: installations, execution studies, etc.
The following table gives the aggregated cost per meter cube of earthfill, with regards to the height of the
embankment.
Aggregated cost of protection embankment
Embankment height above ground level (m)
H=2m
16,7 €/m
H = 2,5 m
3
15,3 €/m
07536/A6-3-1-1 Final
3
H=3m
14,2 €/m
H = 3,5 m
3
13,5 €/m
3
H=4m
12,9 €/m
3
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 64 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
AGGREGATED COST ESTIMATE FOR CULVERTS
On the basis of the detailed unit costs presented in annex 1, global costs have been computed. These
aggregated costs, which are of much easier use for the present study than detailed costs, are:
Culvert cost
Road embankment cost
Culvert aggregated cost
The calculation of the culvert aggregated cost is based on the following assumptions, considering that the
height of the embankment may vary:
Platform crest width : 10 m
Slopes : 3 / 1
Top soil depth : 0,3 m
Basic size of concrete culvert : 2 m x 2 m
u/s and d/s protection of floodplain with 0,3 m thick gabion mattresses
Destruction and rebuilding of road structure
Provision for miscellaneous: 15%
General costs 10%: installations, execution studies, etc.
The following table gives the aggregated cost per meter cube of earthfill, with regards to the height of the
embankment.
Aggregated cost of relief culvert
Embankment height above ground level (m)
number of culverts:
2mx2m
H=3m
H = 3,5 m
H=4m
H = 4,5 m
H=5m
2
11 900 €/m
2
14 100 €/m
2
15 900 €/m
2
18 800 €/m
2
21 000 €/m
2
3
10 300 €/m
2
12 000 €/m
2
13 400 €/m
2
15 600 €/m
2
17 300 €/m
2
4
9 500 €/m
2
10 900 €/m
2
12 200 €/m
2
14 000 €/m
2
15 400 €/m
2
5
9 000 €/m
2
10 400 €/m
2
11 500 €/m
2
13 100 €/m
2
14 400 €/m
2
Road embankment aggregated cost
The calculation of the embankment aggregated cost is based on the following assumptions, considering that
the height of the embankment may vary:
Embankment crest width : 10 m
Slopes : 3 / 1
Top soil depth : 0,3 m
Polyethylene mesh against erosion
Destruction and rebuilding of road structure
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 65 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Provision for some bad soil foundation removal and replacement
Provision for miscellaneous including way crossings
The following table gives the aggregated cost per square meter cube of hydraulic cross-section, with regards
to the number of culverts.
Aggregated cost of road embankment
Embankment height above ground level (m)
H=3m
19,6 €/m
H = 3,5 m
3
18,3 €/m
3
H=4m
17,2 €/m
H = 4,5 m
3
16,4 €/m
3
H=5m
15,7 €/m
3
AGGREGATED COST ESTIMATE FOR MAJOR STREAMBED CROSS SECTION ENLARGEMENT
On the basis of the detailed unit costs presented in Appendix 7, a global cost called enlargement cost have
been computed.
It includes stripping, excavation, re-handling and transportation to waste.
It amounts to 9 €/m3.
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 66 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
AGGREGATED COST ESTIMATE FOR BANK PROTECTION
The calculation of the bank protection aggregated cost is based on the following assumptions, considering
that the height of the bank may vary:
Protections made of a gabion wall
Gabion mattress on toe to prevent erosion for height > 3 m
Concrete cover on top
Provision for miscellaneous 15% (temporary embankment protection of work area and water control
during the works, etc.)
General costs 10%: installations, execution studies, etc.
The following table gives the aggregated cost per linear meter cube of bank protection, with regards to the
height of the bank.
Aggregated cost of bank protection
Bank protection height (m)
H=1m
160 €/ml
H = 1.5 m
230 €/ml
H=2
360 €/ml
H=3m
710 €/ml
H=4m
1070 €/ml
In case of protection placed directly in the minor streambed below water level, an extra cost of 20% will be
applied.
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 67 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 12: GABION WALL CROSS-SECTIONS
NB: on the figures, “Trotus” is indicated as to mention the river. The presented cross-section
are typic cross-sections elaborated for the Trotus but identically applicable for the Siret.
07536/A6-3-1-1 Final
SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA
page 68 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 69 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 70 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 71 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 72 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 73 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
APPENDIX 13 – LONG TERM INVESTMENT PLAN
LIST OF INVESTMENTS ON THE RIVER BASIN SIRET
The list of investments presented below has been aproved and provided to the Consultant by ANAR. The
Consultant does not take any responsibility regarding the relevance of these projects and their implementation.
LUCRARI IN DERULARE
Nr.
Nominalizarea pe obiective de investitii, dotari si
alte cheltuieli de investitii
Crt.
1
2
VALOAREA
TOTALA
(mii RON)
INV/C+M
Valoarea totala
actualizata (mii
RON)
INV/C+M
INV/C+M MII LEI
Capacitati
Termen
P.I.F
Canal magistral Siret Baragan,
769
708 968
44.3 km canal
jud. Vrancea
709
623 573
2015
Amenajare rau Putna pe zona comunei Vanatori
4 293
4 670
dig=2.55km
jud Vrancea
3 877
4 218
aparare de mal=0.524 km
calibrare albie=0.524km
3
Amenajare rau Trotus si afluenti,
42 466
49 027
jud. Harghita
37 581
43 387
2015
13.275 km recalibrare
albie
12.385 km aparare de mal
2015
(PHARE 2005-17)
4
Amenajare rau Tazlau si afluenti
60 111
69 399
11.075 km aparari de mal
jud bacau
52 644
60 778
9.375 km dig
13.09 km recalibrare albie
(PHARE 2005-17)
5
Amenajare rau Trotus si afluenti, pe tronson
614 420
651 654
Ghimes-Urechesti,
547 180
580 339
jud Bacau
2010
110.975 km recalibrare
albie
101.175 km aparari de
mal
309 buc praguri
2010
6
Amenajare parau Ramna in zona Taratu Dumbraveni
6 824
7 238
jud Vrancea (Siretul Inferior)
6 048
6 415
2.4 km consolidari mal
17 praguri de fund
2009
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 74 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
Valoare
investitie
Nr.
DENUMIREA OBIECTIVULUI DE
INVESTITIE
Crt.
INV/C+M
LEI/EURO CAPACITATI
ANUL 2008
Abandonare baraj si acumulare Belci, judetul
Bacau
10000
-Refacerea barajului initial de acumulare in lac,
V = 2,2 mil. mc.
-Refacerea lacului de acumulare Belci ca o acumulare
laterala in fostul lac,V = 2,2 mil.mc.
1 Faza: SPF
-Abandonarea barajului si acumularii Belci si
reconstructia ecologica a zonei
ANUL 2009
2 Amenajare rau Rm. Sarat la Topliceni, judetul
3 781,58
-Regularizare albie,
L = 1.080 m;
3 422,68
-Aparare de mal,
L = 1.150 m.
15 279,24
-lucrari de indiguire,
L = 12.000 m;
13 505,45
-amenajare albie,
L= 8.600 m.
Buzau
903,92
Faza:SF
818,15
S.C.Moldape S.R.L. Bacau
3 Amenajare rau Putna pe zona comunei Tifesti,
jud. Vrancea
Faza:SF
4 Amenajare rau Ramnicu Sarat la Buda, jud.
3 652,30
3 228,27
2 810,83
-consolidari maluri
L = 1.090 m;
2 460,73
-calibrare albie minora
L = 1.550 m.
Buzau
Faza : SF
671,885
Amenajare albie rau Trotus in zona municip.
Adjud, jud. Vrancea
14 586,04
-aparare mal,
L = 1.500m
Faza: SF
13 356,24
-dig geocontainer,
L = 2. 000 m
3 968,02
-regularizare albie,
L = 4.000m.
8 976,90
-aparare mal,
L = 2.000m
6 280,49
-recalibrare albie,
L = 2.000m.
588,198
5
3 633,46
6 Amenajare parau Zabrauti la Fitonesti, jud.
Vrancea
Faza: SF
1 898,01
1 708,56
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 75 / 76
MINISTRY OF ENVIRONMENT
C O N T R I B U T I O NS T O T H E D E V E L OP M E N T O F T H E F L OO D R I S K M AN AG E M E N T
STR ATE GY – EUROPE AI D/123064/D/SER/RO
7 Regularizare parau Slimnic la Tamboiesti, jud.
2 598,18
-aparare mal,
L = 500m
2 296,72
-recalibrare albie,
L = 1.000m.
Vrancea
Faza: SF
706,82
624,8
07536/A6-3-1-1 Final SCE / CEMAGREF / GINGER / HYDRATEC / MEMORIS / ODISEA page 76 / 76

Similar documents

lucrari hidrotehnice in administrarea a.b.a siret_2012

lucrari hidrotehnice in administrarea a.b.a siret_2012 Functiunea principala: atenuare viituri Clasa de importanţă: a III-a, conform STAS 4273/81 Categoria de importanţă: normalã C - indice de risc asociat RB = 0,19. Administrator: S.G.A. SUCEAVA

More information