S. LI. CITRA BINA SDN. BHD.
Transcription
S. LI. CITRA BINA SDN. BHD.
S. LI. CITRA BINA SDN. BHD. r.r o s-o llao#TiJ J3 2828 JALAN BARU, BANDAR nnP'i^'i,'o3'r' *o* PULAU ", PTNANG- i:m].r#"fdJ53600 ,ffi SU CB/J KSB/2 nd Date: 1.6 CERTIFICATE NO 335* Bridge3 D/382 )uly 2OL2 Jambatan Kedua Sdn. Bhd. 3C, GL & 2, Persiaran Bayan lndah, Bayan Bay, 11900 Sg. Nibong, Pulau Pinang. Attn Fax.:04-640 1133 En.HamizolNgah Construction Director Adept Engineering Consultant No. 23-2, LorongPJ/r, Taman Pauh Jaya, 13700 Perai, Pulau Pinang. Fax:04-3987004 Attn : lr. Mohamed Reza Bin Murusal lbrahim Resident Engineer Dear Sir, THE SECOND PENANG BRIDGE - PACKAGE 3D: TOLI PLAZA, ADMINISTRATION BUILDING AND REIATED WORKS Re: Method Statement for Soil lnvestigation (Rev. 02) The above matter is referred. Attached herewith the Method Statement Soil lnvestigation (Rev. 02) for your approval Your cooperation to the above is appreciated. I 1 Thank you. A Yours sincerely S.U. Citra Bina Sdn. Bhd r(ECE\VED 19 JuL ?$u ,ltlll'l'i"li"$l'Mohd Project n in Abd Rahman C.c. 1. H.Q Tel.:04-732 2940 lh4^144//1a49:"r^rn-bg4^r4.;+4,ttAaEt4//4//rt \/ U KAS cERTtFtED TO tSO 9001 200E Your Ref.: Our Ref.: u&r, Fax; 04-732 2941 ffi S.U CITRA BINA PageNo.:1OF - SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA, Doc. Ref.: ADMINISTRATION BUITDINGS & RETATED WORKS SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th MaY 2012 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. SECOND PENANG BRIDGE . PACKAGE 3D TOLL PLAZA, ADMINISTRATION BUILDING AND RELATED WORKS SOIL INVESTIGATION METHOD STATEMENT Revision 00 01 02 Description of Amendments Original First Issue Date ICE (Adept Engineering Consultant) and JKSB's comments incorporated. lnclusion of SI Machine Data and Calibration Certificates. ICE (Adept Engineering Consultant) and JKSB's comments incorporated. Inclusion of SI Machine Data and Calibration Certificates. Mar t5s zol2 oec zh zott ]ll/ray $tn 2ol2 Originator Syarikat Uiitanah Review Syahnaz Abdullah Abdullah Abdul Jabbar Ismail Siti Syafiqah Mohd Muzni Mohd Azuan Abd Rahman Syahnaz L ffi SECOND PENANG BRIDGE PACKAGE - 3D. TOLI PLAZA, ADMINISTRATION BUITDINGS & RELIITED WORKS S.U CITRA BINA SOIL INVESTIGATION PageNo.:2OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. 1.0 Objective 1.1 Scope of Work 1.2 Machinery and Equipment 1.3 Manpower 1.4 Governing Code and Standards 2.0 Soil Boring 3.0 Standard Penetration Test (SPT) 3.1 Undisturbed Soil Samples 3.2 Ground Water Sample 4.0 Vane Shear Test 5.0 Piezocone Test 6.0 Laboratory Testing Requirement Appendix Appendix Appendix Appendix Appendix Appendix Appendix Appendix Appendix Appendix A - Quatity Forms and Checklists B - Catalog for Soil Investigation Machines and Equipment C - Calibration Certificates D - lnspection and Test Plan E - Soil lnvestigation Contractor's Organization Chart F - Work Program for Soil Investigation G - Laboratory for Soil Testing H - Borehole Locations I - Bill of Quantity for Soil Investigation Works J - ICE (Adept Engineering Consultant's) and JKSB's Comments and Contractors Response Appendix K - HIRARC for Soil Investigation Works Appendix L- Malaysian Standards Extract MS - 2038 :2006: "Site Investigations - Code of Practice" MS 1056 :Part9:2005: "Soils for Civil Engineering Purposes In-Situ Tests" - Test Method - Part 9: 2 ffi SECOND PENANG BRIDGE PACKAGE - 3D. TOLL PLAZA, ADMINISTRATION BUILDINGS & RETATED WORKS S.U CITRA BINA PageNo.:3OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th Ma-12012 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD, 1.0 Objective This method statement of soil investigation works provides information on the scope of works, standards, specifications and requirements, qualrty assurance and work pro gram/resource planning. I .1 Scope of Work This method statement covers the soil investigation works performed for Package 3D of the Second Penang Bridge. This document list outs the equipment for the work, description of the work to be done, inspection and testing to ensure quality of work, as well as other aspects such as risk and safety. 1.2 Machinery and EquiPment The following table lists out the machinery and equipment used: Soil Borins Top Drive Machine - 80 m -Drilling Capacity (BW Rod) - Oil Hydraulic Cylinder Chain Feed -Type olswivel i{ead - 3'0m -Feed Stroke - \-Zmlmin (up) l\-2m/min (down) -Feed Speed - 3500kg -Maximum Thrust Capacity - 2600kg -Maximum Balancing Capacrty - 1200kg -Maximum Hoisting Capacity - 16 HP -Diesel Engine -Weight - 1300kg And associated rodsicasing Soil Samoline Piston Sampler Thin Walled Sampler Standard Penetration Test Split Spoon Sampler SPT Hammer (65kg with 0.76m fall and trip mechanism) AW rods 3 ffi SECOND PENANG BRIDGE - PACKAGE 3D . TOIL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS S,U CITRA BINA SOIL INVESTIGATION Page No. :4 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD, Vane Shear Test Geonor Field Shear Vane Borer Cone Penetration Test CPT Crawler machine Piezocone, datalogger, computer Extension rods 1.3 Manpower The following table lists out the manpower for theSoil Investigationsfield works Teams 2 I I Description Soil Borins Team/SPT Supervisor Assistant enetration Supervisor Assistant Cone P Te am Surveytus feam 6.U. Surveyor Chainman (U-i itanah/Keller Workers (Uiitanahl I 4 I 1 J Ciffd 1 2 1.4 Governing Code and Standards The Soil Investigations Works performed and the reports that are produced shall be governed by the following codes and standards listed below: I 2 J 4 Code/Standards MS 2038:2006 "Soil Investigations - Code of Practice", Department of Standards Malaysia MS 1056:Part 9 :2005 "Soil for Civil Engineering Purposes - Test Method Part9: In-Sifu Tests", Department of Standards Malaysia BS 5930: Code of Practice for Site investigation, British Standard Institute. BS 1377: Methods of Test for Soils for Civil Engineering Purposes, British Standard lnstitute. 4 il S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE - 3D. TOIL PLAZA, ADMINISTRATION BUILDINGS & RETATED WORKS PageNo.:5OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th MalzOLz SOIL INVESTIGATION METHOD STATEMENT S, U. CITRA BINA SDN. BHD. 2.0 Soil Boring Boreholes are advanced by drill bit with compatible casing. Soil cuttings are removed from the casing by flushing the bore hole with clean water. The drill bit is advanced until target depth foisoit testing/sampling is reached. When target depth is reached, the rotation of the drilt bit is stopped. The drill -dr u." pulled to the surface and retrieved until the last piece. The last piece th" th" drill bit shall be replaced by the split spoon sampler (for SPT) or the undisturbed thin wall (for undisturbed sampling). The rods shall be lowered back into the hole, rod by rod until the bottom of the hole is reached. The depth to the bottom of the hole shatl be recorded. This depth shall be within 5cm of the sampling depth. (Suppose sampling depth is l5m, the bottom of Ur" hole shall be within 5cm of this depth when the split spoon sampler or thin wall sampler is lowered into the hole.) Thus the hole shall neither be over*u.h o, under-wash (due to remnants falling back into the hole.) If cave-in is too much, the hole shall be washed again until the hole is clean. (The process of retrieving the rods from the hole and lowering the rods with drilt bit shall be repeated.) When the sampling depth is withinrange, the sampling shall be carried out. This process is to be repeated until the termination depth,or termination criteria are reached. Ground water level shall be recorded at the beginning and end of each day's work- 3.0Standard Penetration Test (SPT) The standard penetration test is used to obtain rapid empirical results which can be used to estimate shear strength and bearing capacity of the soil. The SPT is carried out in boreholes at approximately 1.5m intervals or as indicated by the Engineer. The SpT consist of driving a split spoon sampler a pre-determined depth to obtain a disturbed sample of the soil. A hammer of OS kg is dropped a distance of 0.76m using a trip mechanism to drive the split spoon sampler into the soil- 5 ffi SECOND PENANG BRIDGE PACKAGE PageNo.:6OF - Doc. Ref.: 3D. TOLI PLAZA, ADMINISTRATION BUITDINGS & RELATED WORKS S.U CITRA BINA SOIL INVESTIGATION SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. 32 in 1-- 7n 22in Flat, lor Vwench tt t ltr V\trsh PFe +--- 2n Dlam Dam + T---TlTead 8n. w*ereorts,f in-oim. Center Secbon, LerEthwise Tool Steel Drive Shoe Total Werght 15 lb f ,n' Diaeramfor Split Spoon Sampler "W Picture o-f Split Sooon Sampler The penetration test itself is calried out in two stages as follows: 1. Seating drive: number of blows for the first 150mm penetration. If 50 blows are required before 150mm penetration is reached, then record penetration and terminate seating drive. 6 [E S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE Page No. - :7 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 02 Revision : 02 Issued : 15th ME 2O12 3D. TOLI PLAZA, ADMINISTRATION BUILDINGS & RELI\TED WORKS SOIL INVESTIGATION METHOD STATEMENT S. U, CITRA BINA SDN. BHD. 2. Test drive: number of blows for 300mm penetration after seating drive. If 50 blows are required before 300mm penetration is reached, then record penetration for 50 blows and terminated test drive. After the test drive is completed, the split-spoon sampler is raised from the borehole to obtain a disturbed sample of the soil. The disturbed sample is placed immediately in a wide mouth, air-tight screw-top plastic jar or air tight plastic bag. The project title, borehole number, sample depth, N-value and date of test shall be recorded on the sample label. 3.1 Undisturbed Soil Samples Undisturbed soil samples are taken in order to further determine the soil classification, strength and properties. The undisturbed soil samples are carefully packed for laboratory analysis. Two types of equipment are used for undisturbed soil samples. They are listed below: sampler. This walled sampler is ca:ried out in soft to medium still soils. It consist of a thin-walled steel tube which has its lower end shaped to from a cutting edge with a small inside clearance. The main dimensions of the sampling tube are as follows: 1. Thin-walled Length External diameter Wall thickness Area ratio Inside clearance 1000mm 75 mm 1.5 mm t0% 0.5 + O.l%o The procedure to take soil samples using the thin-walled sampler is as follows: The borehole is cleaned out to the required depth and water maintained close to ground level. The thin-walled sampler is lowered to the required depth The outer part of the sampler with the sampling tube attached is then pushed using the outer drilling rods with as single steady movement in the soil being sampled. The thin-walled sampler is then pulled up to the ground level 7 - SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA, ADMINISTRATION BUITDINGS & RELATED WORKS S.U CITRA BINA SOIL INVESTIGATION PageNo.:BOF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May 2OL2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. Itl, {lr i The sampler is stripped down I \ and cleaned and the ends sealed micro crystalline wax and rubber end -' with non-shrinking caps. -f nLnr:-\t,i.e The maximum length that can be sampled is 0.9m due to the space occupied by the sampler. Empty spaces inside the tube are packed with sawdust. .t .i rh,l,iaf r!r'f,,1 'J- n'1 '11r" t1.7 - 'i l I ,-:1q'. EEFC I+t :)p.ruE ...- AFi F,F. IlF.1,';'- Fig J - l hin - nnlls{l Srnrpliog I ffi S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE PageNo.:9OF - Doc. Ref.: 3D. TOLL PLAZA, SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 ADMINISTRATION BUITDINGS & REUTTED WORKS Issued : 15th Ma72O12 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. 2. Piston sampler. Piston sampling is carried out in soft ahuvial deposits to provide a high quality undisturbed sample. The main dimensions of the piston sampler are as follows: Length Extemal diameter Wall thickness Area ratio Inside clearance Cutting edge taper 100Omm 73.2 mm 1.5 mm r0% 0.6% 12 degs The sampling head incorporates a locking device which allows the piston to move upwards in relation to the sampling tube, but prevents it moving downwards. The method of sampling is as follows: The borehole is cleaned out to the required depth and water maintained close to ground level. The piston sampler is lowered to the required depth and the inner rod with the piston attached is connected to the mast of the drilling machine. The outer part of the sampler with the sampling tube attached is then pushed using the outer drilling rods with as single steady movement in the soil being sampled, while the piston remains stationary. 9 ffi BRIDGE. PACKAGE 3D. TOLL PLAZA, ADMINISTRATION BUITDINGS & SECOND PENANG S.U CITRA RELATED WORKS BINA SOIL INVESTIGATION Page No. : 10 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. The complete assembly is then pulled up to the ground level, the piston remaining locked in the position. ti:t,rr. t.!l ,il- Ll- '-lJj r t, : ,: !-_ J t. Wlr-, The sampler is i{ F{'- stripped down and cleaned and the ends sealed with non- shrinking micro crystalline Ljlr wax and rubber end caps. The maximum length that can be sampled is 0.8m due to the space occupied by the piston. Empty spaces inside the tube are packed with *t .'nllf;.tJ-r - ii.aF-tcrr l4ad sawdust. !: r,[ '! 1,- fa!!f4 :ul'. Immediately after sampling, about 40mm of the soil is removed from the top and bottom of the sampling tube with a spatula. The ends of the tube are sealed with nonshrinking wax in layers to a thickness of about 40mm to preserve their undisturbed tDi[ i'r!1fi nature. EEFtrRfi flFrI!'fr The samples are placed in AFTNF FIN'E Fh4-Plstor-TrmptiilE transit boxes lined with foam rubber at all sides of the boxes for protection against vibration during transportation of the samples within the site and from the site to the laboratory. L0 SECOND PENANG BRIDGE i S.U CITRA BINA Page No. - PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUILDINGS & REIIITED WORKS : 11 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 02 Revision : 02 Issued : 15th MaY 2012 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN, BHD. 3.2 Ground Water Sample Ground water samples are taken from the boreholes only when all mud or water added to assist boring has been removed. The samples are sealed in a screw-top plastic bottle and consist of approximately 1.0 liter of water. 4.OVane Shear Test t, .r, The field Vane Shear test is a test in which a vane is pushed into the soil from the ground level. The test is usually carried out in soft cohesive soils to measure the Peak and residual vane shear strength of the cohesive soils. The test can also be carried out inside a borehole. The equipment used for the field vane shear is manufactured bY Geonor A/S Oslo, Norway. Geonor Vanes Shear Unit of two sizes are used depending on the shear strength the clay. cu:0 Cu:0 ro 60 kPa to 100 kPa of H: l30mm D:65mm H: 110mm D:55mm The vane is housed inside a protective shoe, atlachedto the base of the vane borer assembly and extended to the ground level by 16mm diameter extension rods. These rods pass through 36mm outer tubes which are connected to the vane borer assembly outer housing. The inner rods and outer tubes are 1.0m in length. The vane borer assembly allows the vane to be pushed 0.5m in the soil below the protective shoe. TL m S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE 3D - TOIL PLAZA, ADMINISTRATION BUITDINGS & RELATED WORKS SOIL INVESTIGATION Page No. : L2 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. The torque required to furn the vane is measured using an instrument which incorporates a worn and pinion mechanism. Two anchors are anchored into the ground by turning an auger attached to the ends of a G.I. pipe. The two anchors are about 1.5m in length. A horizontal frame is clamped to the anchors. A ratchet jack is attached to the horizontal frame clamped to the anchors. A spirit Ievel is used to check the verticality of the ratchet frame before proceeding with the iest. (Check by ensuring that the base frame is horizontal) The method of testing is described below: 1. The vane borer is advanced to the required depth by using the ratchet jack. The hexagonal adaptor and extension piece is attached to the top of the inner rod. By pushing the hexagonal piece at the top, the vane at the bottom is pushed to the test depth. 2. The outer rods are clamped against rotation. The torque measuring device is zeroed before being clamped in place. 3. A rest period about 2 minutes to 5 minutes is taken before the test starts. 4. The vane is rotated at a rate of 0.2 degrees per second by turning the crank handle at a speed of 1 revolution per second. Readings are taken every 2 degrees of rotation (10 revs) until a well dehned failure or constant readings are observed (undisturbed peak strength). 5. The soil is remolded by turning the vane rapidly 25 times followed by a rest period of 5 minutes. 6. The vane test (step 4) is repeated until failure is observed again(remolded strength). 7. The torque measuring device is taken down and kept in a protective box. 8. The vane is pulled back into the protective show by pulling out the hexagonal adaptor and extension piece. The inner rod is extended by lm by joining another rod to it. The outer tube is also extended by lm by joining another tube to it. The vane borer is advanced to the next test depth by repeating the procedure in Step l, Step 2 and Step 3. T2 tt S,U CITRA BINA SECOND PENANG BRIDGE. PACKAGE 3D - TOLL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS Page No. : 13 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th Mal2OLZ SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. Presentation of result. The results of the field vane shear test are given on there results sheet: V: Field Vane Test This sheet presents the results of all vane tests at a single location. The main results of each test are tabulated giving depth, date, vane, vane size, rate of rotation, then sfrength and time of failure for both peak and remolded tests. Sensitivity is defined as Cuu/Cr.. Abbreviations: The following abbreviations are used: - Peak vane shear strength Cr, - Remolded vane shear strength Cu" Note: The above procedure refers to the test to be conducted on natural ground level ie., before the earthworks. However, after the earthworks and compaction of the embankment the jacking device may not be able to penetrate through the compacted layer. Thus, pre-boring of holes through the depth of the embankment will be required before the post treatment vane shear test can be carried out. 5.0 Piezocone Test The piezocone test shall be carried out at locations indicated by the Engineer using an electric friction cone. The cone shall incorporate a filter and a transducer for instantaneous measurement of pore water pressure and the test shall comprise the measurements of cone resistance, local friction and porewater pressure. The cone used is the compression type. The capacity range from 0 kN to 30 kN for cone resistance measurement. The filter used to measure pore water pressure shall be located between the cone and the friction sleeve. The filter shall be saturated in a desired silicone oil or similar. A new filter shall be used for each test. t3 ffi S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE Page No. - : L4 OF Doc. Ref.: 3D. TOIL PLAZA, SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th Ma1 2012 ADMINISTRATION BUITDINGS & RELATED WORKS SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. An inclinometer and temperature sensor incorporate in the piezocone equipment shall be capable of measuring the inclination of the cone from the vertical and the temperature respectively. The capacity of the penetration tesdacking equipment is available reaction of 4 tonnes. l0 ton hydraulic capacity with an The following are the procedure of the Cone Penetration test: jacking equipment shall be set up on firm and level platform at the locations indicated by the Engineer. The cone apparatus shall be temperature conditioned to approximately the grotrnd temperature (+l-) 2 degrees Celcius and held for at least 30 minutes to stabilize the system electrically and zeroing of the various load cell readings before advancing the The piezocone. The piezocone shall be advanced into the ground at a rate of 20mm +/- 5mm/sec and ensuring that the sounding rods are vertical at all times, in accordance to MS 1056 : Part 9: 2006 requirements. Data shall be recorded using the specified recording equipment. Penetration shall be continued until the safe working limits of the equipment are reached. The output was recorded at 50mm intervals, producing a continuous record of Qr, Fr, P,, and inclination dwing penetration. The signals from the strain gauges were transmitted by way of built-in amplifiers through an umbilical cable along the insides of the hollow rods to data receivers and processors on the surface. The results ofthe piezocone test shall be generally presented in the forms of a series of graphs showing various measured and derived cone parameters plotted versus depth. The parameters, notation and definition adopted for the cone penetration test shall be follows: as 74 Page No. SECOND PENANG BRIDGE PACKAGE 3D - TOtt PLAZA, ru ADMINISTRATION BUILDINGS & RELATED WORKS S.U CITRA BINA : 15 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th Ma1 2012 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN, BHD. Cross Sectional Diaqram o.f Cone Penetration Tool. - tip resistance Q" Geophone (Mpa). The presented cone resistance is relative reference datum. to a start test zero local friction (kPa). The presented sleeve is relative to a start test zero reference datum. It is not corrected for unequal end area effects as no pore pressure measurements at the top of the friction sleeve were made. F, - friction Ffldron Steeve\ P* - Pore pressure (kPa). The presented pore pressure is relative to a start test zero Strain Ganges reference datum. Rr - Friction ration (%). The ratio of the sleeve friction to cone resistance. The ratio is Pr€ssure Transtfucer calculated relative to the position of the cone tip. Procedure for Dissipation Test Forous Frlter u? locdon Porous Fdlg u1 locaton At locations and depths to bedecided for the dissipation test, penetration of the piezocone shall be stopped and the excess pore water pressure shall be allowed to dissipate. During these periods loading on the sounding rods shall be removed. Dissipation of excess pore pressure shalt be recorded on a time scale by the data logger. The test shall be terminated when the excess pore pressure has been reduced by 50%. A period of 60 minutes of dissipation is generally sufficient for the dissipation test. 15 ffi S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS SOIL INVESTIGATION Page No. : 16 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 02 Revision : 02 Issued : 15th May2Ot2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. In addition to any graphical plots" numerical values of pore water pressure shall be recorded at least at the following times after cessation of penetratioqO, 0.5, 1, | .5, 2, 3 , 4, 6, 8, 10, I 5, 20, 25, 30, 35, 40, 50, 60 minutes. 6.0 Laboratory Testing Requirement The laboratory testing requirements shall be as follows: Clnssification Test Moisture Content Liquid Limit Plastic Limit Specific Gravity Particle Size/Distribution/Sieve Analysis Soil Streneth Test Unconsolidated UndrainedTriaxial Compression Test One Dimensional Consolidation Test Chemical Test Organic Matter Content Total Sulphate Content Sulphate Content of Ground Water Chloride Content of Ground Water Ph Level For total number of tests to be conducted, refer to Appendix I Investigations Works. - Bill of Quantity for Soil L6 a ffi S.U CITRA BINA SECOND PENANG BRIDGE - PACKAGE 3D - TOIL PLAZA, ADMINISTRATION BUILDINGS & REUTTED WORKS SOIL INVESTIGATION Page No. : t7 Doc. Ref.: OF SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th Mal 2ot2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDIXA QUALITY FORMS AND CHECKLISTS 1.7 ,ru S.U CTTRA BINA SECOND PENANG BRIDGE. PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUILDINGS & REUITED WORKS SOIL INVESTIGATION Page No. : 18 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th May 2O12 METHOD STATEMENT S. U. CTTRA BINA SDN. BHD. APPENDIX B CATALOG FOR SOIL II\IVESTIGATION MACHINESAND EQUIPMENT 18 SUCB/P3D/RFI/OO1 /Rev.01 il rq@ - JAMBATAN KEDUASDN.BHD SECOND PENANG BRIDGE LAND EXPRESSWAY S.U. Citra Bina Sdn. Bhd. Contract Name : Package 3D - Toll Plaza, Administration & Related Works RFI's No. REQUEST FOR INSPECTION ADEPT ENGINEERING CONSULTANT c: En. Hussin En. CheAzmi llme Date to : lr. Reza / En. Haslee En. Humaizi En. Hazrul A following works are ready for inspection at is intended to commence at Date llme Date Time Zone: of Work 10:00am Part: Route: Gridline/chainage Doc.Ref.No Attachment:YES II NO of Work by (SUCB) by Clients Representative Syahnaz Abdullah RESIDENT PART B ENGINEER Date: lnspection Response Works acceptable. Allowed to proceed. Remedial work as stated below to be completed but no further inspection required. Works unacceptable.Remedial work as stated below to be completed & no further inspection is required Works rejected.A new INSPECTION FORM to be issued. nspected by Clients Representative nspected by SUCB's Representative C Further Inspection Follow-up RemediatworkshavebeencarriedoUtat-am/pm,onJ-l-(dale) PART _I Remedial work acceptable Comments lf yes Report raised during inspection / reinspection Approved by Clients Representative lnsoected bv SUGB's Representative Signature: Name: lves l*" Date Signature Name: Date NCR No. Approved By: Prepared By: Doc Type: METHOD STATEMENT Doc No: Package - SI - DEEP BORING, UD SAMPLING & FIELD VANE SHEAR TEST (Rev 1) Revision No 1 Date: 3'd December 2010 BOREHOLE JOB NO SHEET of DATE OATE Today Stadad FIELD BOREHOLE REGORD PRq'ECT ltACHIt\E c stfil SEE LOCATION TO }9T.gA'A @orrD srriFlcE cot{o{$cils ArrHEsr Rf,orrEarNa s lFtE DEPTH sL. sEE{m} il AT PM OL SASPLE & TEST DE,sCRIPTION (rn.td) t{oTE ATI CoRE TVATER T!0. Fo m 0AT GROrr{O : GE S.O SIIEAGENT fyc. Nq orrah Io lobn RBI3 REIARKS & RECOVERY Tb : strARr WfiH FRE8H s}EEr EAcH DAY. ALNEOUTED INFOFIIAION rrt.|SI !€ GIVENW}IEE RE T.MGD I,'FOFUATION rrsE oNLY U P L O V ITt ibTAPPLTAEIE Followlr{s rffiI,trdsrrFb Pt fers.nCr t ch SrtTx. C{OI T'E THla ADDITIoNAL REIIAR(S: U,.IH'TI'A' LEGEIoS Omrbdssnfl. gEULo w $rs. V,s C RC tJvLdt srrnpL srfa? Cda [email protected], n* ats THE ENGINEERS: t{R lbRw . ClrE5ofR.hh$nf.t Page 64 of 67 S. U. CITRA BINA PROJECT PACKAGE NO BOREHOLE SAIVIPLE NO BOREHOLE DATE DEPTH '150mm 225mm 300mm 375mm 450mm BOREHOLE DATE DEPTH SECOND PENANG BRIDGE DEPTH 150mm 225mm 300mm 375mm 450mm SAMPLE NO BOREHOLE DATE DEPTH PACKAGE 3D. TOLL PLAZA LOCATION SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO 150mm 225mm 300mm 450mm 375mm 225mm 300mm 375mm 450mm S. U. CITRA BINA BATU KAWAN NO 150mm SECOND PENANG BRIOGE. PACKAGE 3D. IOLL PLAZA RECOVERY RATIO SPT BLOWS 75mm SPT BLOWS 75mm PROJECT SECOND PENANG BRIDGE, LOCATION BATU KAWAN SAMPLE NO DATE, S. U, CITRA BINA PROJECT - PACKAGE 3D - TOLL PLAZA NO NO RECOVERY RATIO SPT BLOWS 75mm s. u, crTRA BINA BOREHOLE SAMPLE NO RECOVERY RATIO SPT BLOWS 75mm LOCATION LOCATION BATU KAWAN BATU KAWAN NO SECOND PENANG BRIOGE PACKAGE 3D - TOLL PLAZA PACKAGE 3D - TOLL PLAZA LOCATION RECOVERY RATIO PROJECT PROJECT SECOND PENANG BRIDGE - 3D. TOLL PLAZA LOCATION BATU KAWAN DEPTH S. U. CITRA BINA S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE. BATU KAWAN NO SAMPLE NO DATE RECOVERY RATIO SPT BLOWS 75mm 150mm 225mm 300mm 375mm 450mm SPT BLOWS 75mm 150mm 225mm 300mm 375mm 450mm N= S. U. CITRA BINA PROJECT S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE, PACKAGE 3D - TOLL PLAZA PACKAGE 3D - TOLL PTAZA LOCATION BATU KAWAN NO BOREHOLE DEPTH LOCATION SAI\,IPLE NO BOREHOLE OATE DEPTH RECOVERY RATIO T S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE - PACKAGE 3D - TOLL PLAZA LOCATION BATU KAWAN BATU KAWAN NO SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO 't50mm 75mm 225mm 300mm 450mm 375mm SPT BLOWS 75mm SECOND PENANG BRIDGE - NO SAMPLE NO DATE RECOVERY RATIO 150mm 225mm 300mm 375mm 450mm SPT BLOWS 75mm 'l50mm 225mm 300mm 375mm 450mm N= S. U. CITRA B]NA PROJECT S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE. PACKAGE 3D - TOLL PLAZA LOCATION NO BOREHOLE PACKAGE 3D - TOLL PLAZA LOCATION EATU KAWAN OEPTH S, U. CITRA BINA PROJECT SECOND PENANG BRIDGE - SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO PACKAGE 3D - TOLL PLAZA LOCATION BATU KAWAN BATU KAWAN NO SAIVIPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO SPT BLOWS 75mm 150mm 225mm 300mm 450mm 375mm SPT BLOWS 75mm SAI\,{PLE NO DATE 1 50mm 225mm 300mm 375mm 450mm SPT BLOWS 75mm 1 50mm 225mm 300mm 375mm 450mm N= s. u. CITRA B|NA S. U, CITRA BINA PROJECT PROJECT SECOND PENANG BRIDGE - PACKAGE 3D. TOLL PLAZA LOCAIION BATU KAWAN NO BOREHOLE DEPTH SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO SPT S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE - PACKAGE 3D - TOLL PLAZA LOCATION NO PACKAGE 3D - TOLL PT.AZA SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATiO 'l50mm 225mm 300mm 375mm 450mm 75mm SPT BLOWS 75mm SECOND PENANG BRIDGE. LOCATION BATU KAWAN BATU KAWAN NO SAMPLE NO DATE RECOVERY RATIO 1 50mm 225mm 300mm 375mm 450mm N= SPT BLOWS 75mm 150mm 225mm 300mm 375mm 450mm N= S. U. CITRA B]NA PROJECT S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE - DEPTH SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO SPT BLOWS 75mm 150mm 225mm 300mm 450mm 375mm SPT BLOWS 75mm PACKAGE 3D - TOLL PLAZA NO DEPTH SAMPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO '150mm 225mm 300mm 375mm l45omm NO DEPTH SPT BLOWS 75mm 50mm 225mm 300mm 375mm 450mm 50mm 225mm 300mm 375mm 450mm S. U. CITRA BINA PACKAGE 3D - TOLL PLAZA PACKAGE 3D. TOLL PLAZA LOCATION BATU KAWAN SAMPLE NO BOREHOLE OATE DEPTH SECOND PENANG BRIDGE - NO SAMPLE NO DATE RECOVERY RATIO 1 50mm 225mm 300mm 375mm 450mm SPT BLOWS 75mm '150mm 225mm 300mm 375mm 450mm s. u. ctTRA F|NA PROJECT SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA BOREHOLE DATE DEPIH 22snm 300mm 375mm 450mm 150mm PROJECT NO SPT BLOWS 75mm SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA LOCATION BATU KAWAN BATU KAWAN SAI\,'IPLE NO BOREHOLE DATE DEPTH RECOVERY RATIO 1 SPT BLOWS 75mm S. U. CITRA BINA PROJECT SAMPLE NO RECOVERY RATIO DATE N= LOCATION BATU KAWAN SAMPLE NO SECOND PENANG BRIDGE. SPT BLOWS 75mm PACKAGE 3D - TOLL PLAZA LOCATION 1 NO S, U, CITRA BINA SECOND PENANG BRIDGE - NO RECOVERY RATIO RECOVERY RATIO I PROJECT DEPTH LOCATION BATU KAWAN BATU KAWAN SPT BLOWS 75mm BOREHOLE DATE s. u. crTRA BINA PROJECT SECOND PENANG BRIDGE. LOCATION SAMPLE NO RECOVERY RATIO S. U. CITRA BINA PROJECT LOCATION BATU KAWAN BATU KAWAN NO SECOND PENANG BRIDGE PACKAGE 3D. TOLL PLAZA PACKAGE 3D - TOLL PLAZA LOCATION BATU KAWAN NO BOREHOLE S. U. CITRA BINA PROJECT SECOND PENANG BRIDGE. PACKAGE 3D - TOLL PLAZA LOCATION BOREHOLE NO RECOVERY RATIO N= BOREHOLE SECOND PENANG BRIDGE - NO SAMPLE NO DATE RECOVERY RATIO 1 50mm 225mm 300mm 3 75mm 450mm SPT BLOWS 75mm 1 50mm 22snm 300mm 375mm 450mm SYARIKAT UJITANAH SDN. BHD. FIELD WORKSHEET TEST DEPTH TEST INFORMATION (m) Ground level Vane diameter (mm) (des) Vane rotation per one turn of handle 1.00 (deg/s) 0.20 Rate of rotating vane (No) Tums Reading Tums Reading Tums Reading Turns Reading (No) (Div) (No) (Oiv) (No) (Div) (No) (Div) 0 0 10 10 20 20 30 30 40 40 50 50 60 60 7A 70 80 80 90 90 '100 't00 110 110 120 120 130 130 140 1& 150 150 160 160 170 170 180 180 190 190 200 200 210 210 220 220 230 234 zfi 2& 2fi 250 RESULTS PEAK UNDRAINED SHEAR STRENGTH (kPa) 260 260 Maximum reading ( Div) Maximum torque ( Nm) Prc{ed GEONOR VANE TEST name Test reading Max- torque Mar Time to failure (min) ( Div) ( Nm) Test Second P€nang Brirge: Land E&ressway 38 - Batu Kawan Depth Chainage Tesl date no. Supervisor (no) (no) REMOULDED PEAK Reading (Div) (no) 0.20 (e) Time for one turn of handle site use Tubes in use Tubes not in 19t8n010 Calibration date 1634 Torque head no Tums Total tubes on Ground surface condition (mm) Vane heiqht Check by Table 2 - Vane Shear Test Record REM 5.3 WEEKLY SUMMARY OF SAFEWAND HEALTH ACTIVITIES EVENTS ITEM NO. LOCATIONS EVENT UNDERTAKEN REMARKS DATE BY 5.4 WEEKLY SUMMARY OF MANHOURS TOTAL WORK EXPOSURE ITEM NO. woRK 5.5 FoRcE I rnrs wEEK HouRs PROJECT MANHOURS (cUMULATIVE) LAST WEEK REMARKS TO DATE WEEKLY SUMI\4ARY OF RECORDABLE WORK INJURIES CUMULATIVE ITEM NO. DESCRIPTION OF INJURIES LAST WEEK TOTAL TO DATE REMARKS Corce,ssr'cn DCrcczil - kr.," JAHBATAN KEDUA SDN BHD {824s73-U) Soil )nvesfugatbn S.U.CITRA BINA SDN BHD SOIL INVESTIGATION - Vane Shear Sl-f Test Ref. l{o. TEST DEPTH TEST INFORT/IATIOIi Vane diameter Total tubes on Ground surface oondition (m) Ground Ievel (mrn) Vane hei-oht (mm) Calibration date Torque head no site (ro) use in use Tubes not in (no) Tuoes {no) (des) Vane rotation per onE tum of handle (s) Trme for one fum of handla 0,30m (des/s) Rate of rotatlng vane REI"'IOULDED PEAK Tums Reading Tums Readrng (No) (Div) (No) (Div) Tums Reading Tums Reading Tums Readrng iHo) (Divl (No) (Div) (No) (Div) 0 0 10 10 20 20 30 30 44 4u 50 50 60 60 70 70 -.-----.---;n 1.00m 80 90 on 100 100 110 110 120 120 130 130 140 MA 150 150 160 160 170 170 180 180 190 190 200 200 210 2'10 220 220 230 230 240 250 240 0.45m RESULTS PEAK REM UNDRAINEO SHEAR STRENGTH (kPa) 250 260 260 l,4aximum reading ( Maximum torque ( Nm) DrYL Ma)c reading ( Mac torque ( Nm) Time to failure (min) Div) Test Pmject The Second Penang Bridge Land Expressway VANE name SFIEAR TEST Test 38 - Bau Kawan Test Chainage Depth date no. The above mentioned works have been checked and are readytcr inspection. by: re & Date: Submitted BY: Name (full): Designation Signature & Date: Name (full) Approved by: Designation Gcmpany l.l,/A Signature & Date: ..... Name (full): Designatrcn as ncn-applicable Delete as applicable Fei JKSS - Sl-1 REl.r :0!' Dp-TE : 5 AUC 20it ,.. ,': Coticesstott conlpany + .-.,4:.-!:-...T. JA]\{BATAN KEDUA SDN BHD (8245?3-L) 10F SHEET S.U.CITRA BINA SDN BHD Soil lnveslgahon sl-4 SOIL INVESTIGATION - Field Bore PROJECT SECCI.ID PEI.IANG BRIDGE LAND EXPRESSWAY PACKACE 3E REDUCED LEVEL D\A/G & SPEC REF FINAL \(ATER LEVEL t20 t2a DATE START DATE CO[4PLETE BORING MN PO DEPTH OF h4O / TUE / \\'E /THU / FR / SAT i SUN I!4O /TUE / WE /THU / FR / SAT / SUN ROTARY WASH BORING S, P T 150 150 150 mm mm mm L SAJ,IPLE I BOREHOLE NO SUBCON TYPE OF REF NO . BH/ EATU KA.\\'A.I"] EXPRESSV\IAY LOCATION CASING D T G OF E LAYERS N P T D E H E DESCRIPTION REMARK E DEPTI-i P TlI,IE DATE nl metre 0.0 l I i I -{ i t i ts F t OPERATOI sorl l-l-l---l---l---l--- very hard strff stlf{ soft 30 50 10 4 (N) O sorl. cohesrve Non l---l---l----l--i--loose loose medtum dense dense very soft medrum stff Tne above mentoned woTks have been checked and are ready for rnspecttcn SUPERVISOR CHECKED BY dense Checked by. & Date Submitted By (full) Srgnature & Date by Name (full) Designation Company nature & Date Name lfull) gnalcn * N/A as non-applcable cin 2any t Deiete as applcable Rel JKS'-S-4 REv 00 DATE "AAL|G2010 ci U' t IJJ U) t uJ -I m Fo a z o o I z o F t ts t0o -, LL o t. f F = f = o Y tU' o Y t o E o IJJ F J tIU 06 zo 6 J J o z o tr t F q z o = < N J (L J J o F o (f) t! o Y o L lU o o tr o zo z U o- o z o o IU a F o uJ -) o tr o- ( s HO a\ Um '= 6r t'a ao o- F t) uJ F z o o o trJ Ef ^ O-r == o J x d. F F o IU F o F o o = o o o t' F (9 o tul BJ z oF Ntr zL o2 x o U) zC) o o- uJ f, E o = o > AV-13 'ujru 9o'o 'J_"lls '-l3AVUC 'uJruz.90'o 'oNvs < 'rcruvrsrs:u 'urur Z 0 9NrUVf HS JO 3'r9NV ztll/NI 'x30Nt 'NOrS3HO3 IN3UVddV 'ca NOtSS3Udl/\tO3 zu/Nr 'ovo] NOtSS3UdWO3'3Ud 'HICN3UlS o 'otlvu oro^ zt!/N\ o) (o o C,) o Io (o (.o t $ o o FT 1r) (o t+ o lo $ o o (v) o o (9 N o q o (, .D @ (Y) (+) o) <t hl (O (t g? C{ (.) o (Y' $ o o \ o N t- N c.i $ \f -f u? a9 (\I @ (9 o) (t @ Ol N NOISS3UdNO3 O3NIJNOSNN q l{) (o 6) o) N () o \ ecvyr'truHs uv3Ntl (v) ro c.i c\l il'l ornotl llHt't Strsv'ld J.[ ,u/6w ',tltsN=o,l,uo (o o !t o rr) + o r- u'l F- (v) (Y) r+ c{ o tto u? N a @ o o crj o (o t o Gi N y-lnE \t 9rrsvld rO o \t \ o 1 x30Nr \t e.i rt N ,.l.r^vu0 clJt3lds ( y" ) s o o 1 O) o o u? (L L a o u? o (o tO F ol rr) (o N N ro o rO ,u/6tti',tttSt,t3O ui ts J= a.i Fo 1 o) o F = o v. L o- o f o =o s o- II zo (L o z f, F o o o \ ro \o o o, E % ) rN3rNoo Junlstorll -lvunJ.vN I F o- I,IJ o .ON f,"IdWVS 'oN 3'roH3UO8 SYARIKAT UJITANAH SDN. BHD. LIQUID LIM|T ( CONE PENETROMETER ) AND PLASTIC LtMtT (BS 1377:Part 2:1990 )Clause4.3,5.3 and 5.4 Project SECOND PENANG BRIDGE - PACKAGE 3D TOLL PLAZA Sample No BH t1- DS1 (19.50 DETERMINATION NO. LIQUID LIMIT Can No Wt. of dry soil moisture Water content, w Wt t88 t90 1162 t161 t200 ) 32.07 44.92 10.88 22.75 40.85 26.68 10.45 ) 29.75 23.88 9.88 10.24 (qm) 9.16 8.72 8.31 8.44 ( Sm ) 13.59 (Sm of (% ) ) Cone Penetratron 1 mm ) 932 15.80 8.08 5.87 686 16I 29.44 9.04 20.40 17.96 1.57 1.80 15 48 14.17 057 /to 75.9 78.9 36.31 0.64 35 56 to t 20.4 21.4 BH T1-UD- Sample No. DETERMINATION NO t11 Wt. of wet soil + can ( gm 30.37 Wt. of dry soil + 6sn 1 o, , 23.19 Wt. of can (sm) 9.27 soil Wt. of morsture Water content, w UG ) ( Sm ) ( om (To ) ) Cone Penetratron ( mm ) 13.92 t153 34.98 25.95 8.97 16.98 t75 32.48 23.50 8.47 15.03 c Prc PLASTIC LIMIT t125 32.86 t128 t93 12.38 10.04 23.41 11.65 9.58 8.02 8.45 9.16 2.49 14.96 1.56 898 9.45 0.73 0.46 59.75 63.1 7 29.32 29.49 17 .1 182 19.6 20.6 E25 .o 920 o c o) o_ I 1I I B,u 10 50 t'115 125 174 r16 t105 31.19 36.22 34.73 1 1.00 10.72 23.80 8.73 26.65 8.97 25.07 10.76 10.30 E Wt. of can 22.05 (qm) 7.14 8.43 9.77 8.56 .o Wt. of dry sorl (qm) 15.07 lr/ 16.64 099 1.74 Ezo 0) g, I Wt. of dry soil + ca6 Wt of morsture w ( qm Penetralron ( mm Water content, Cone 1 (oh 14 91 ) ) ) OO 691 739 957 966 0.24 042 46 34 49 04 to J 54 13 58 05 24 24 24 14 200 219 15I Ltqurd lrmrt 54 Plastrc lrmrt 24 30 Plasticrty rndex 5a wr?& co,itBnt, 62 ,9Q2" 64 PLASTIC LIMIT t168 ) 52 Date Tested : 16 I 02 I 2011 28.96 Wt. of wet soil + can ( qm 80 *,/o75 E 60% 29% 31 % LIQUID LIMIT c39tent, 30 T1-UD- U8 (2a.00m) DETERMINATION NO wrt", Date Tested : 11 I 02 I 2011 9.03 Plasticrty index 65 60 53.18 Plastrc limit Can No. 0) Io) 10 7.18 BH i -920 O 51.58 Liqurd limit Sample No e25 E (21.00 m) LIQUID LIMIT Can No 30 76% 36% 40% Liquid limit Plastic limrt Plasticity Index Wt. of dry PLASTIC LIMIT t128 Wt. of wet soil + can ( gm Wt. of dry soil + can ( gm Wt. of can Date Tested : 12 I 02 I 2011 m) ",6 ot'o o/o e25 c - _ l-I c 0) 0_ a .c lJ o O 10 40 45 50 Water Content, w % 55 bU SYARIKAT UJITANAH SDN. BHD. PROJECT SECOND PENANG BRIDGE. PACKAGE 3 D: BOREHOLE NO BH. T1 UDPl BOREHOLE NO BH- T SAMPLE NO SAMPLE NO UDP2 DEPTH ( m 1,50 DEPTH ( m DATE 3.00 ) 11t02t2011 DATE Menlscus Corectlon, Cm Temperature, T Viscosrty of Water, il 05 28 'C 0 835 mPa s D = @ V (Gs-1)t TOLL PLAZA ) 16r02t2011 Calibratron Equaton. Hr = -4.1083 Rh oooss3l SIEVE -aF PERCENTAGE RETAINEO TOTAL PASSING {oms) lo/,) (v"l 39 67 gms Gs 10 00 mm 630 mm 500 mm MASS PERCENTAGE SIEVE RETAINED RETAINEO TOTAL PASSING (pms) (%l l'/o l 250 Gs 10 00 mm GRAVET O 500 mm VO JJ5 SAND srLT 0.300 mm CTAY 30 0.600 mm % 69 0.300 mm % 0.212 mm 0 150 mm 30 60 120 240 1440 100 00 0.38 096 Rh'+ Cm EFFECTIVE DEPTH Rh, =Rh Hr(mm) 21.5 21 0 220 170.3 172.3 176.4 '19 0 18 0 170 160 140 O/O SAND 1 % SILT 43 o/o CLAY 56 % Total lOO % 100 00 0 150 mm 0.063 mm 99 04 0.22 21.5 20,5 20.0 19 5 18 5 175 to ) 145 PARTICLE DIAMETER 0.55 0.75 030 HYDROMETER ANALYSIS 20.0 19,5 O 0 425 mm 0.212 mm a GRAVEL 118 mm 0 600 mm 0 425 mm 4 99.45 98 70 Total . D (mm) rRd 0.0539 0 0383 o,0274 0 0195 0 0101 0 0072 IJJ PERCENTAGEI o^i",TTol 98.73 ub.b5 92.43 90 33 88 23 84 03 79 83 75 62 67 22 23.0 22.0 lt.J 180 6 184 7 188 8 192 I o 0052 0 0037 19 0 18 0 201 1 0 0015 160 21 0 200 I I EupsEo I l, H:", HYDROMETER READING Rh' + Cm PARTICLE OIAMETER EFFECTIVE OEPTH Hr (hh) Rh Rh, D (mm) Rh' - Ro' Rd 22.0 170.3 0.0537 235 97.66 2 21.0 21.5 172.3 0.0382 23.0 95.58 4 20.0 20.5 176 4 o.0273 ?2.O I 91.42 19 0 19 5 180 6 0 0195 21.O 87.27 30 18 0 18 5 184 7 0,0102 20.0 83,1 60 16 0 16 5 192 9 0 0074 180 74.8O 120 140 145 201 1 0 0053 16.0 66.49 240 1440 13 0 13 5 115 0 0038 0 00't 6 15 0 110 205 2 213 4 13 0 s -80 huo Fso r -r' -J a-' zUJ I I 3+o tU 30 I L 20 i I 10 0 0 001 001 CLAY O 1 PARTICLE SIZE SILT FINE N/EDIUI\i] (mm) 10 1 SAND COARSE FINE (t?F ntcTDt K (%) 21.5 o o PERCENTAGE FINER THAN O 1 ^90 670 1OO % HYDROMETER ANALYSIS Rh'- Ro' 100 z 2.51 mm 200 mm 1O/O 1 18 mm 2 Dry Mass of Soil 40 00 gms 630 mm 200 mm 1 m( Gs-1 -2 20 00 mm 14 00 mm mm t (min) Ro' TEST + Dry Mass of Sotl 14 00 mm ELAPSED ar uxvtvlE I Et TIME READING .. n=-HO 100Gs -. 260.67 SIEVE ANALYSIS MASS RETAINED 20 00 mm 0.063 mm + Readrng rn Drspersant, SIEVE ANALYSIS TEST 1 N4EDIUN4 [i:?-ihi-7!it TO BRITISH STANDARD BS 1377 GRAVEL COARSE \ { Trn Nr r'l Dr : Part 2: FINE 1990 MEDIUM COARSE 1 54 02 SYARIKAT UJITANAH SDN. BHD. : Type of Test UNCONFINED COMPRESSION TEST ( BS Project SECOND PENANG BRIDGE - PACKAGE 38 TOLL PLAZA Sample No. BH T1 Date Tested 09t02-2011 i UD - P3 (4.5m - 5 35m 1377: Part 7: 1990 ) ) INITIAL CONDITIONS Specimen No. Specimen Dimension, S,1 Dia (mm) Ht. (mm wt. (s) Moisture Content (Yo Density, 38 76 ) 124.5 95.00 ) Bulk (Mg/m3 ) 1.444 Dry ( Ir4g/m3 ) 0.740 LOADING STAGE Max. Deviator Stress Axial Strain at Failure (kPa) Rate at Strain Mode of Failure (mm/min (o/o 7.8 6.58 ) 1.524 ) 1 STRENGTH ltlaximum Compression Strength (kPa I ) 10 (U oj 8 o o o a b o o o= 0) 4 2 0 0 2 4 6 8 '10 Percent Strain Note 1 Bulge 2 Srngle Shear Plane 3 14 12 (To ) Shear 16 18 20 SYARIKAT UJITANAH SDN. BHD. UNGONFINED GOMPRESSION TEST : PROJECT Date Tested BH No. Weight of sample Strain Cauge Strarn SECOND PENANG BRIDGE - PACKAGE 38 TOLL PLAZA BS 1377: Part 7 : 1990 ) : 09t02-2011 BH T1 / UD - P3 ( 4.5m - 5.35m Proving Ring Factor Strain Rate lnitial Diameter lnitial Hei ht ) 124.5 Axial Load Proving Ring Reading Area (%) Readrng ( S2 38 76 = n1mm2) S1 1.524 bJ S1 0 000 00 10 013 o 0.00 35 0 003 3.0 20 0.26 o 0.001 137 0.004 3.4 30 0.39 10 0.001 138 0.004 3.8 40 0.53 11 0.001140 0.005 4.1 50 0.66 12 0.001141 0.005 4.5 100 1,32 13 0.001149 0.006 4.9 150 1.97 15 0.001 156 0.006 5.6 200 2.63 17 0.001164 0.007 6.3 250 3.29 18 0.001 171 0.008 o.b 300 3.95 19 0.001 179 0.008 6.9 350 4.61 20 0.001 186 0.009 7.3 400 5.26 21 0 001194 0 009 7.6 450 5.92 21 0 001201 0.009 7.5 500 b56 724 22 0 001209 0.009 7.8 22 0.001216 0 009 7.8 600 7.89 22 0.001224 0.009 7.7 6s0 8.55 21 0 001231 0,009 7.2 700 9.21 20 0.001238 0.009 6.9 750 9.87 0.001246 800 10.53 0.001253 850 11.18 0.001261 900 11.84 0.001268 12.50 0.001276 3.16 0.00'128s 14.47 0.001298 15.79 0 001313 17 11 0.001328 EEA 950 1 000 I 100 1200 '1 0 001 134 11 1 300 1 400 18 42 0 001343 1 500 19 74 0 001358 1 600 21 05 0 001 373 0 001388 1700 22 37 1 800 23 68 0 001403 1 900 25 00 0 00141 8 2000 zo.5t 0.001432 0 000 mm/mins mm mm Deviator Stress p/A ( kN/m2 P(kN) S1 0.00043 kN / div 0.00 S2 ) Q2 SYARIKAT UJITANAH SDN. BHD. UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION TEST ( BS 1377:PATt 7:1990) SECOND PENANG BRIDGE PROJECT PACKAGE3D :TOLLPLAZA Sample No BHTl IUD-P2 Date Tested 12102t2011 Descriptlon. Grey silty clay Sam le 38 mm Diameter Depth (m): 76mm H 3.0-3.85m WET APPARENT COHESION 11 kNim2 DENSITY ANGLE OF SHEARING RESISTANCE 0 deg MOISTURE CONTENT DRY 1.407 Mgtm1 0.7'10 Mg/m3 98.04 IMMEDIATE TESTS RATE OF STRAIN '1.524 mm/mins Normal Load at Failure kN 0 014 0.015 0.018 Normal Stress kN/m2 12 12 IJ Lateral Pressure kN/m2 10 20 40 kN/m2 22 JZ 53 5.92 11.18 17.11 Bulge Bulge Bulge Total Normal Stress Strain at Failure % Specimen After Failure Type of Failure 80 z€ :60 t.u O z S40 a a tu t o)o .2. tr IIJ =0 a .].Y\ 0204060 80 100 120 140 160 180 200 NORMAL STRESS ( kN/m2 ) 220 % SYARIKAT UJITANAH SDN. BHD. UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION TEST PROJECT SECOND PENANG BRIDGE PACKAGE 3D: TOLL PLAZA Date Tested 02t12t2011 BH No. Tl 121.1 122.5 120.4 Proving Ring Factor / UD - P2 ( 3.0 - 3.85m BH Weight of sample (BS 1377:Part 7:1990) O.OOO43 kN 1.524 Strain Rate Initial Diameter ) gms. 38 76 lnitial He ht Strain Cauge Reading 0 Strain (Yo Proving Rrng Reading P(kN) A(mm2) ) 000 00 00 0.0 0001134 IJ 11 2 5 0.001 135 0.26 4a o 8 0001137 10 U. 20 0.00 0.00 0.005 0 001 0 006 0 003 0.00 0.00 0.00 m3 mm/mins mm mm Deviator Stress P/A ( kN/m2 Axial Load Area / ) 0.00 0 002 4.2 0.8 1.9 0 003 49 L.O a.) 3.0 30 0.39 16 I 10 0.001 138 0.007 0.004 0.004 6.0 3.4 3.8 40 0.53 19 11 12 0.001140 0.008 0.005 0.005 7.2 4.1 4.5 50 u.ob 21 13 13 0.001141 0.009 0.006 0.006 7.9 4.9 4.9 100 1.32 27 tc 18 0.001149 0.012 0 006 0 008 10 '1 5.6 6.7 150 1.97 29 18 22 0.001 156 0.012 0.008 0.009 10.8 6.7 8.2 200 2.63 30 20 24 0.001 164 0.013 0 009 0.010 11.1 7.4 8.9 250 3.29 31 22 ZO 0.001171 0.013 0.009 0 011 11 4 8.'1 9.5 300 3.95 3'l 23 28 0.001 179 0.013 0 010 0 012 11.3 8.4 10.2 350 461 31 25 29 0.001186 0 013 0 0'11 0.012 11.2 9.1 10.5 400 1a 26 30 0.001 194 0 014 0011 0 013 94 10.8 aa J1 27 JI c1 0 001201 0 014 0 012 0 013 tlc 115 9.7 11.1 10 0 11 .4 600 526 592 658 724 789 650 450 500 550 32 .,. 28 29 32 .),) 0 001209 0 014 0 012 0 014 '11 38 0.001216 0 014 0 012 0 014 11 14 10 3 11 .7 0.013 0 013 0 015 '10.89 10.5 11 .9 10,8 I 30 34 0.001224 8.55 31 34 0.001231 0 013 0.015 700 9.21 32 35 0.001238 0.014 0 015 11.1 12.2 750 9.87 32 36 0.001246 0.014 0.015 '11.0 12.4 12.7 31 '1.9 800 10.53 33 37 0.00'1253 0.014 0.016 11.3 850 '11.'18 34 37 0.001 261 0.015 0.016 11.6 126 900 11 84 34 37 0.001268 0.015 0.016 11 .5 12.5 950 12.s0 34 38 0.001276 0.015 0.016 11 .5 12.8 000 13,16 34 38 0.001283 0.014 0.0'16 11.2 12.7 1100 39 0.001298 0.014 0.017 10.9 12.9 1200 14.47 lA 70 40 0.001313 0 017 13.1 '1300 17 11 41 0 001328 0 018 13.3 0 001343 0 018 tJ I 1 400 18 42 41 1 500 19 74 42 0 001 358 0 018 1) IJ.JA 1 600 21 05 42 0 001 373 0 018 132 0 001 388 0 018 13.0 I 1700 22 37 42 1 800 23 68 43 0 001403 0 0'18 tJ I 1 900 25 00 A.' 0 001 4'1 8 0 018 13 0 2000 to Jt A' 0.001432 0 018 129 SYARIKAT UJITANAH SDN. BHD. UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION TEST '. 1 377 Parl 7 : 1990 ) Type of Test ( BS SECOND PENANG BRIDGE Project PACKAGE 3D TOLL PLAZA Sample No BHTl tUD-P2(30-385m) Date Tested 02t12t2011 Descripton Grey silty clay INITIAL CONDTTIONS Specimen No. Specimen Dimension, S1 S2 S3 Dia. (mm) 38 3B 38 Ht. (mm 76 76 76 wt. Moisture Content Density, ) (g) 121.1 122.5 120.4 (Y,) 98.12 98.00 1.420 1.397 0.717 0.705 Bulk ( lVlg/m3 ) 98.00 1 404 Dry 1 tt4g/m3 ) 0 709 LOADING STAGE (kPa) (kPa) Apphed Pewssure Max, Devrator Stress Axial Strain at Failure (Y" ) (mm/min Rate at Strain ) Mode of Failure 10 20 40 11.50 11.60 13.30 s.92 11.18 17.11 15 1.5 1.5 1 1 1 STRENGTH Maximum Compression Strength (kPa 13.3 ) 14 S3 N L 12 S2 iz a a 1 0 S1 c) U) o o .o 0) o b 4 2 0 02468 10 12 14 '16 Percent Strain Note '1 Bulge 2 Srngle Shear Plane 3 18 20 22 24 26 28 (%) Shear 30 SYARIKAT UJITANAH SDN. BHD. ONE DI]\NENSIONAL CONSOLIDATION TEST SECOND PENANG BRIDGE. PACKAGE 3 D : TOLL PLAZA BH T1lUD -P1 1.50 - 2.35 m 2.60 ; I I i i i I 2.40 \kI t 1 I I t 2.20 I I I I t ti 2 00 23 o ,F G tr 1 80 1 OU ii ii I I il tt I i l I I i i t i I i I I I I I G) I I I t kPa p o ^-*^*'"i*ry 1.40 I' i, i, 1.20 l I I I I 1 I 100 10 1 li I I I 1.00 i i I 1i t I I I : 1 Applied Pressure ( kPa 000 0000 1 ) coEFFtcIENT OF M, AND C, -_^-i_- l ltirl 7 I $ q) t i N E o 5 I t I I I t 4 I 3 E I 2 ii Ii tl "i^r--*i: I 1 ii il i i t I I \ + I 5 i I I ii1 li t I t I i i I t il I t iiii t I 1 I illi ti l, tl i N tl I i \ t I z I I : { I 1 i I I I I t I , 0 1 10 100 Applred Pressure ( kPa <-Mu *Cu 1 ) 000 1 0000 SYARIKAT UJITANAH SDN. BHD. ONE DIMENSIONAL CONSOLIDATION TEST MS1056-Part5:2005 Project SECOND PENANG BRIDGE - PACKAGE 3 D : TOLL PLAZA Borehole No BHTl UD /P1 Sample No Depth (m 1.50 - 2.35 m ) Tested : 081 02 I 2011 FINAL INITIAL Diameter of sample (mm) 50.00 Specific Gravity Wt. of ring + wet soil (gm) 112.06 Ht. of solid. Wt. of ring (gm) Wt. of wet soil (gm) h. (mm) 2.500 Diameter of 5.362 Wt of rinq (mm) 19.000 59.03 Ht. of soil 53 03 Vord Ratro, e Wt. of sample (mm) 50.00 + wet soil nng (qm) 105.20 (Sm) 2 544 Wt of wet soil (qm) 2.500 Speciflc Gravity Ht. of solid, h. (mm) 5.362 soil (mm) 15.469 ao n2 Ht. of 46.17 Vord Ratro, e 1.885 soil (qm) 26.32 Bulk Densrty (Mo/m3) 1 421 Wt, o{ dry soil (qm) 26.32 Bulk Density (Mg/m3 1.520 water (qm) 26 71 DRY Densrty (lvlg/m3) water (sm) 19.85 DRY Densiry ltvtg/m3) 75 42 Deq of Saturalion (%) '100.02 Wt of dry Wt of Water Content (%) 101 48 (%) Deg of Saturatron O 705 99 74 Wt of Water Content (o/o) Comp. lndex, Cc Precons Pressure Applied Pressure (kPa) Pressure Settlement dp (kPa) dh (mm ) [4ean ) =( h-h, )/h5 de (mm) hu (mm ) (mm e'p Change Ratio Herght h 867 0.717 Void Ratio e Height O hm (kPa) 23 Frtting I (min Coefficient of Coefficient of lvlu t90 ) lm2lwtN 1 ( m2iyear ) 0.00 0.00 0.000 19.000 13.638 2.544 0.000 0.00 0.00 0.000 0.000 6.25 6.25 0.202 18.798 13.436 2.506 0.038 18.90 6.25 1.7A1 6.343 12.50 6.25 0.452 18.346 12.984 2.422 0.084 18.57 10.89 3.847 3.516 18.75 625 0.690 17 656 12 294 2293 0.129 18 00 11.56 6 018 3.111 25 00 625 0 820 16 836 11 474 2.140 0 153 17.25 14 44 7 431 2.286 37 50 12 50 0 970 15 866 10 504 1 959 0 18'1 ro 5c 20 25 4.609 1 466 50 00 12 50 1 020 14 846 1 769 0 190 15,36 23 04 5.143 t. tJo 75 00 25 00 1 158 13 688 1 553 0 216 14 27 20,25 3 120 1.1 16 37 50 0 305 13 993 I 484 I 326 I 631 1 610 18.75 0.456 14 449 9.087 1.695 6.25 1.020 15.469 10.107 1.885 Approved by L I I I I I I I I I I I +1 ? (f u2 in s) rn MPa iPa o.o2 o.o4 0,06 o.o&0.2 0 234024680 0 0 E Sleeve friction Frictjon ratio (Rf ) in % Cone resistance (qc) in lvPa /- 0 2 0.4 0 { -2 .El o o tr -3 OJ q o o o -4 E .E c o o, o 5 T { =- 7 I 1_ '-;.- L -7 \ = € -8 \ -9 -10 I t f \ -j- I f, { , \ \ =sI -{ -11 12 7 > \ a ) -13 \ 1 I -14 I -15 1 -16 A A'74 .a->- -17 -18 u. /u [.-*-----. -> 14.57 . -19 = \ -20 ! -21 o IGl.l.ER ) Test according NEN 5140 class Project: Location: Position: 0.7'12 - 0.7117 a --E- { { I 50 ch' I 0 cm' 0.6326 0.6606 ) ) -22 r G.L. 0.89 NAP 1 W.L.: 0 2NO PENANG D(PRESSWAY:PAC€B cH 19,000 54/u/r/f OATPhT l=Ko/L'1 IPT Predrill 0 Date 10126t2010 Cone no.: ClOCH|P.@7 no.: PzX PAC.3B Project CPT no.: PZ'AB 112 Cone resistance (qc) in MI% -22 0 'I Friction ratio (Rf ) in % (f u2 in MPa s) in Mtu 0.2 0'4 o.o2 0.04 0.06 0.0&0.2 0 o 3402468 2 Sleeve friction > 8.31 > > € -24 6 <. -- =- Ic -26 o -27 0.8 =\ E { .E E o. (, > -25 .sl o) 0) o, E= -28 F o -29 1 =--; = "L_ < 0, -30 -31 -32 -33 -34 -35 .36 -37 F----r -38 -40 -..-.. -41 ,-1 -42 l-43 --+ -4 -45 o IGtlER o Test according NEN 5140 class cmr G.L, Project: Location Position: f A tu/ 0.89 NAP 1 W.L.: 0 2NO P ENANG E(P RESSWAY:PAC8B cH 19,000 Predrill 0 Oate 10t2d2010 Cone Project no. CPT P/ f /u7,oL/7 f-Krtut ( 1:7 no.: no.: C1 OCE|P.@7 P2X PAC.3B PZ'AB 212 0 I I I I I I I t I I I ll I i i i il il (E(E g,g clF )o @O) cq'Q ojo '6) o -o f, t- I o o N edr'J ul (cb) ecuelstsal euoc o ro N o o) o lO N tl o lO F lr) t'' tzt' i OUI tzuT f r<ltfut ( p f ed1 ur (n) a:nsseld alod c1u-reuA6 I I i I I i I I I i -!- i i o o o o o o o o o o o o o o o o r.r) (o c! $l o6 c o o o) o ; E o tr E o .c o o 0) o Ec e o o) o o E o, =o- E .8 = att Fg (.) il o o co Zt 2o N o lo f t il : 5 tr tr i *{* r.j o o N @ N t, (Y) CD (J *+ c, o E 1 -.1 o (, E O) o o; -c. o. E o) -9 ! o 0) C o o F E o o O o F 'd L co ? R L E t o a tu.t k IU o ro zo ul o- o- c NN o o-L o) (U o o o (o o o sl F r.() o) z zIU .E E o o o o o o F LO, OF K6 08 E3 oiE LJ / lll J I + Test number 1 Ubegin 0.133 MPa Uo 0.041 MPa 10 250 I I .5 200 I \ : \ ,\ (! (L I f E \ :\! \ \ \ \ \ \ ) (E (L .E 5 150 = f o o) o o o o ti o. c(E o, o o 6 o o co I o- () .E (E c o .5 100 () s€c 0 50 1000 100 10 Time in seconds Testaccording NEN 5140 class o IElIER $ I 1 ( 0000 1 Absolute sampling time in seconds:7770 ) : Date 1 Location I I I 2 ND PENAT.IG EXPR ESSWAYPAC-3B cH I 19,000 I I T II I'I 1026/2010 P2XPAC-38 lt9r"9lt9 Project 00000 CPT no. PZ-AB Test depth -4.109 [m] - G.L Water lerel 0 [m]- G.L I I I II I I l t t t I t Prolsct number ProlGct Nams Client Namo Test numb€r Conus number Locatlon Operalor 812 SECOND PENANG BRIDGE LAND EXPRESSWAY'PAC.3B IJM Corporation Berhad PZ-A8 cl0cF[P G27 cH.19,000 AffEndi Oats 26.10.2010 Rrferunco 16v6l (m) Penetratlon lsngth (m) 0.89 30.05 lnclinatlon Fr ctlon Ratlo,Rf Sleeve Frlctlon,fs lkPal Dynamlc Po16 PrBssure, u2 0.0 0.0 -1 0,00 0 000 0.0 0.0 0 0.00 0 000 0.0 0 0,00 1.14 0.0 0 0,00 1.21 0.0 0 1.24 0.0 0 0.00 0.00 1.32 0.0 .,1 1.36 0.0 0 Dspth Con6 RsslEtance,qc Iml lMPal IkPaI t1 l'/"1 i t 0,00 0.54 0.01 0.83 0,02 0.03 0.04 0,05 0.06 0,07 0.08 0.09 0.10 0.90 1 .0'l 1.09 1,41 0,0 .1 0,11 1.47 0.0 -l 0.01 o.12 0,13 o.14 0.15 0.16 0.17 0.18 0.19 0.20 1.51 0.0 0 0.01 1,54 1.57 1.59 0,0 -t 0,01 00 -1 0.01 00 -1 0,01 1.61 0.0 0 0,0'1 1.65 0,0 -l 0.01 1.66 1.72 0.0 -l 0,01 0.0 0 000 1.75 1.77 0.0 -l -0 01 00 -1 1.78 -1 0.00 0.00 rl 0.00 1.85 1.73 0.0 0.0 0,0 0.0 0.0 r.79 0.0 1.82 1.84 1.85 1.88 0.0 0.0 0 0.00 0,00 0.21 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 1.61 1,81 0.31 o.32 0,33 0.34 0,35 0.36 0,37 0.38 0.39 0,40 001 001 001 -l 000 -1 0 0.00 0,00 0 000 0 0 0.0 0.0 0.01 0 001 1.90 1.92 0.0 0 0,01 0.0 0.0 0 0 0.01 1.89 '1.87 0.0 0,0 1.87 1.85 1.82 0.01 0 0.01 0 0.01 0.0 0 001 0 0 0.01 0 0.01 0.4't 1.78 1.75 1,72 0.0 0.0 0,0 0.0 0.42 1.65 0.0 _0_.1q 1.9Q 0.44 0.45 0.46 0.47 0.48 0,49 0.50 1.56 1.51 0.52 0,53 0.54 0.55 0.56 0.57 0.58 0.59 0.60 0.61 0.62 0.63 0.64 0.65 0.66 0.01 0 0.01 001 0,0 0 0 0.0 0 0.0 0.0 0 0.00 0 0.00 1.42 0,0 0 0.00 1.38 0 1.16 0.0 0.0 0.0 0,0 0.0 0,0 1.16 00 .10 1.03 0.0 0.0 0.0 0,0 1.01 0.0 096 0.0 0 .0.01 0.97 0.94 0,0 0 0 -0.01 4.01 1 401 1.47 t.J6 1.30 1.26 1.24 1 '1.08 1.05 0.0 0,0 0.E9 0.E5 0.00 0.00 0 0.00 -0,01 -0,01 0 0 {,01 0 4.01 0 0 -0,01 0 -0,01 .0.01 0 o.01 0 {,0'1 0 .0 0 o.01 01 00 2 .0.01 0.78 0,76 0.0 3 .0,01 067 0.70 0,0 4 000 000 0.08 068 0.0 4 0,03 5l 00 ,4'/ i7 / tr 3 // 7 /t// r F,? d'lt,t OP7 ,+i:: 'i t i# -Yry. *,,-=.. ' -+** r ti,\ '..t ." -a:! ,:"fi: -'r . \;, U+rs:rt$,-,.ffi-, :rr 7- Top-Drive Machine hffie, if, I ,;, il :,E i v:-l', -(- .I*---u-- ,f - +i:.. ,. .\ "+ L ..\, Top-Drive Machine in progress at BH-P2 /t/l r-F DA 7 4 rl',F 7/P 0R//tr /vlA(/1 /\/tr /, t/trtrD 5F( Tl/A/ /'2 ill ;I ;r L .,L tp f ,4 :ra+i.;i*Er ' " .ru:-*4d# 1r -..-:L-- t t *"ff -l-p*ri -Y-t\> ! Geonor Vane Test at GV-A51 I a a *.t, t- '* kr. s,, ru #/P te-.-- {, ,'xnji;: *. .i *t1] 4 *l t u, As"+il I ,.} r* :ii,w Geonor Vane Test at GV-A57 r, -: t Geonor H-IO Field Sheqr Vone Borer \, FEATUREST Detailed lield investigation of undrained shear strength and sensitivity of soft and medium stiff clays From 0 to 30 meters by hand jack, even through hard layers ofclay. sand or silt Two vane sizes. Measurement range from 0 to 60 kPa and 0 to lfi) kPa Top-level accuracy results, can be used for the design of earth fill foundations and embankments goil Trrtine cEot{oR T I I hc ficld vanc shear tesl (FVST) is the most widcly used rnethod for measuring thc uroruined shear strength and scnsitivity ol' soli clays in-situ. FVST is a more economic method than for examplc CPT. as its operation does not require a drilling rig or highly qualilied personnel. Some critcria have nevertheless to be respected if the choscn FVST equipment is to be used as a prol'essional. detailed in vesti gation instru ment : - The inslrumcnt should allow direct penetration boring, in order to avoid inaccuracy due to - The vane itself must be protected against any bending due to slones or harder layers of soil. The Geonor H- l0 is a tully protected. pressure push-in. field vanc instrument. No rod-soil friction is possible duc to its tubc-protected rods. No need cithcr to chcck thc vanc, nor to clean il bctween each shearing (clay adhering to the vane nray increase its area ratio considerably): The protection shoe of the Geonor H-I0 not only protects the vane hut also cleans it automatically before each nreasurement. The shoe is particularly useful for testing in stratilied, sandy, stony and marine sediment clays. rod-clay friction. IECHHICAI. CHARACTEHSf,IGS: GEONOR. H.IO fIELD SHTAR VANT BORTR Installation: Pressure push-in, no hammering. By hand with the Geonor ground-anchored jacking system or with a hydraulic drilling rig. Instnrment: Crear driven, accuracy of torque reading: + - 0.57o of range. Measurement range: From 0-60 kPa (O{ T/m'1) and O-l 00 kPa (0-10 T/m'?). Lower part: Total lengXh with the vane extended: 1430 mm Max 77 mm 15 kg Tlvo different sizes of vanes: 55 mm x ll0 mm and 65 mm x 130 mm outerdiameter: Weight: Instrument: Max outer Weight including instrument diameter box 320 mm I6 kg Vane Borer H-10 complete for 30m depth, consists mainly of: - Readout instrument complete - Vane borer lower part with vanes - Set of spare vanes and protection tube - 30 extension tubes and rod.s - Preboring equipment complete Complete insenion/extraction with rack jack, ball cone clamp, anchoring scrcws etc. - Steel transport - c.a.ses. GEONOR A,/S P.B.99 Rrc NOZ0I Oslo, Nomoy SECOND PENANG BRIDGE PACKAGE S.U CTTRA BINA - 3D. TOLL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS SOIL INVESTIGATION Page No. : 44 OF Doc. Ref.: SUCB-PB2P3D- SiMS-Rev 01 Revision : 01 Issued : 15th Ma1 2012 METHOD STATEMENT S, U. CITRA BINA SDN- BHD. -,. l.-ri, .! Figure 1 : Keller's CPT Machine -.: SECOND PENANG BRIDGE PACKAGE 3D . S.U CTTRA BINA Page No. : 45 OF - TOLI PIAZA, ADMINTSTRATION BUILDINGS & RELATED WORKS SOTL INVESTIGATION Doc. Ref.: METHOD STATEMENT S. U. CITRA BINA SDN. BHD. CPT Cone I'E: '',: + lrt -ti a 2 i, iu S SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Ma12OL2 Junction box to Data Logger w S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA, ADMINISTRATTON BUILDINGS & RELATED WORKS SOIL INVESTIGATION Page No. S. U. CITRA BINA SDN. BHD. ,t - !..9: I :;.:-v !:"_s Computer Display OF SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th May 2012 METHOD STATEMENT Data Logger :46 Doc. R.ef.: SECOND PENANG BRIDGE S.U CTTRA BINA - PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUITDINGS & REIIITED WORKS SOIL INVESTIGATION Page No. : 19 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th May 2OL2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDIX C CALIBRATION CERTIFICATE S 19 GDS Instruments Sdn' Bhd. (r047.r5-rY) 124, JalanKapar 27l89,Taman Alam Megah, Sectron 27, 40400 Shah Alam, Selangor Darul Ehsan, ivlalaysia Instrument no :K.K.Y Calibration z 1634 ri i Recommended Due Date : 15 Calibration date : 15 August 20rt I 2012 .6) Torque, T: 35 x load Shear Stress, Tau : 6T 7nD3 Vane diameter, D = 55mm or 65mm H:2 Vane height, xD Load T Tau (kPa) (N) (Ncm) D= 55mm D= 65mm 0 0 0.00 2 70 4 Instrument readings load unload reload unload average 0.00 0.00 0.00 0.00 0.00 0.00 1.15 0.70 1.00 1.50 1.50 L50 r.25 140 2.30 r.39 2.50 3.00 2.50 3.00 2.50 6 210 3.44 2.09 4.00 4.00 4.00 4.00 4.00 8 280 4.59 2.78 5.50 6.00 5.s0 6.00 5.50 10 350 5.74 3.48 7.00 7.00 7.00 7.00 7.00 t2 420 6.89 4.17 8.00 8.00 8.00 8.50 8.00 t4 490 8.04 4.87 9.s0 9.s0 9.50 9.50 9.50 t6 560 9.18 s.56 10.50 10.50 10.s0 10.50 10,50 18 630 10.33 6.26 11.00 1 1.50 11.50 11.25 20 700 1 1.50 6.95 12.50 Remark 0. 1o 1.50 1 13.00 t2.75 /sec/rev for instruments with serial number below I 500 O.2o lsechev for instruments with serial number above 1500 Client: Syarikat Ujitanah Sdn. Bhd. 13 47,J a,la,n Kebun Siren, Bukit Tengah, Bukit Mertajam, 14000 Penang rel 03-5192 3228 Fax: 03-51 92 3230 Email: [email protected] www.gdsi.com.my ff ,i; GDS Instruments Sdn. Bhctr, (40474s_.!y) l24,JalanKapar2TlSg,TamanAIam N/egah, Sectron 27,40400 ShahAIam, SelangorDarul Ehsan, Malaysia. 12 11 10 I 1 8 7 o o- l< o o o o / 6 ( (E G' / o 5 ,/ / I 4 3 ,/ / 2 ,/ t + D= 55mm +- D= 65mm 1 / 0 / 012345 10 11 12 13 14 6789 15 lnstrument Reading Tel:03-5192 3228 Fax:03-5192 3230 Email: [email protected] www.gdsi.com.my GDS Instruments Sdn. Bhd. (+oaz+s.ry) 124, Jalan Kapar 27189, Taman Alam Megah, Sectron 27, 40400 Shah Alam, Selangor Darul Ehsan, Malaysta Instrument no Calibration date : 15 Torque, T: :K.K.Y Calibration :1634 Recommended Due Date : 15 2011 2012 35 x load Shear Stress , Tau : 6T 7nD3 Vane diameter, D = 55mm or 65mm Vaneheight,H=2xD Load T Tau (kPa) N) (Ncm) D:55mm D= 65mm 0 0 0.00 20 700 40 Instrument readings load unload reload unload averaqe 0.00 0.00 0.00 0.00 0.00 0.00 11,50 7.00 13.50 13.50 13.50 13.50 13.50 1400 23.00 13.90 26.00 26.50 26.00 26.50 26.00 60 2100 34.40 20.90 38.00 38.50 38.00 38.s0 38.00 80 2800 45.90 27.80 52.50 s2.50 52.50 52.50 52.50 100 3500 57.40 34.80 62.50 63.00 62.50 63.00 62.s0 t20 4200 68.90 4t.70 75.50 75.50 75.50 75.50 7s.50 140 4900 80.40 48.70 86.s0 87.00 86.50 87.00 86.50 160 5600 91.80 55.70 98.00 98.50 98.00 98.50 98.00 180 6300 103.30 62.60 110.00 Remark 0.1 o 110.00 110.00 /sec/rev for instruments with serial number below 1500 0.2' lseclrev for instruments with serial number above 1500 Client: Syarikat Ujitanah Sdn. Bhd. l347,hbn Kebun Siren, Bukit Tengah, Bukit Mertajam, 14000 Penang Tel: 03-51 92 3228 Fax: 03-5.192 3230 Emarl: [email protected] www.gdsi.com.my GDS Instruments Sdn. Bhd" (40474s-1y) 124, Jalan Kapar 27189, Taman AIam Megah, Section 27, 40400 Shah Alam, Selangor Darul Ehsan, Malaysra. 110 100 / 90 / 80 70 / I G g60 o o o / o G__ .t 5u @ / ,/ 40 30 ./ / 20 .a *D= 10 55mm +- D= 65mm './ / 0 0 10 20 30 40 50 60 70 80 90 100 110 lnstrument Reading Tel: 03-51 92 3228 Fax: 03-51 92 3230 Email: [email protected] www.gdsi.com.my 120 /(rFj 2r;r1l 1: ilEFtt F,'ili: frrf[!r['lttttl-'{ .11_:H trF IIJIL ENti @(rtrri l l-lXl,1 I r'!.+L.li\t.', 1 t s. Puret Pengnllrrt Kelurubrcatd AwEm School Of Qlvlt Engineering ffiflnilIffiil Kompur Krfurutrrecn Englneerlng CamPw Univertitl Sairrs MalaYsia Sori Ampangan, 14300 NibongTebal Sebsrsng Peral Selatan S U Cltra Blna Sdn. Bhd, No. 3-61, 3rd Floor, Megamall Plnang Flrm: ZAZS Mohd. Azuan Abd Rahman Tel: 04 397 30e5 From: M R Selamat Tel.:04'599 6214: .e4{0rJogs-l 5 c&?. l.Fc, + Date: W : www.clvll'sn9'usm.my E : dean-clv@€ng'u6m'my 13600 Pulau Plnang Jatan Baru, Bandar Perai Jaya' Attn: Fax Pulau Plnang Malaysia T :04.599 62Ol F : 04.694 1000 012 s018 310 Fax:04'594 1009 June 1st,2012 Dear Sir, THESECONDPENANGBRTDGE-PACqg.FBD:TOLLPLAZA'ADMINISTARTIoN woRKS iuirprnCnND RELATED woRKS - cPr HerebyWsareattachingthecalibrationcertlflcatesasrequested-l0pagesall' or'l.T;ffilT,itfii:tfl'1ffi0.^ 2. Kawan site in Batu rrom our base in Nibons Tebarto polnt ponetratlon works at10 positions and polnt to June 22nd, 23rd, and 24th,2012- mobilization' 3. 4, ln Nibong Tebal June 24rr, 2012'Return to base base wlthin 2 weeks of our return to Report wlfl be submitted our alternative dates are June 30th.july 8U., 2012 1!t, 2012 and July Tttr.July before starting work' We wlll need a letter of appolntment SincerelY Yours, lr'' Dr') (Mohamad Razip bln Selamat' c.c. Dean \ jrrf; lfrl2 12 3E;Pl'l F,',li :ltlH rtF 'j453411tt'B r-I\IL Et{rj Lliil't @()(.t0'J 250 Beanville Road RandolPlt, Vl' 05060 802-728-4588 800'639'631 5 Dlglta t Cone Cone $erlelNumber Cugtomer Reference Load Cell Roference Press. Gauge enelrom ete r Ca II bratl on DSA1129 GDS ]NSTR SDN BHD INTERFACE 1221ANE.sOK.B DRESSER D XD 1OOOPSIG S/N sN 3220894 3432 TIP 1 7928 0 03s58 100000 KPA KPA Full rongo V Btr$oltno P v Fuil sc9le Force Oulpul Untts uilll Conv Fdclot 1 TIp 1 20000 R?=0 100000 o 80000 IJ tto E6J I ts0000 rB := <( 40000 20000 I 0 l 0 0,5 I 1.5 1 Cone Tip OtttPUt (VDC) Gallb LLS stsneo R- E/,^A/* ate dbv R HLrll S ned: fo^: LLs ffil'#i$iffi[#"1#' uffi"liu sriuu"ttYtn 0/2011 1,(rF; !1r .12 12:liPll FLli tr 451-r4ltrrt I:r-:H r-tF i IIirIL @ lrr.rr.rJ EllE uxli Usn TE[ 250 Beatr ville Road RanctolPlt, Vt 05f60 802-728-4588 800'639"631 5 Digltal Cone Penetrometer Cellbratlan DSA1 1 2S Cone Serlal Number Gustomer Referencs Load Coll Referencs Pro88' Gaugo GDS INSTR . SDN BHD INTERFACE 1 221 ANE-sOK.B DRESSER D XD lOOOPSIG SiN sN 3220894 3432 PRESSURE U2 I Full tango V 8574 0,0255s 3447,5 KPA Etrsunno V fuil| Sr;ale Fotco Outpul Unlt.s PSI lJnit Cottv. F6oaor 0.1 45033 Pore Pressure U2 4000 R2=1 3500 3000 0, 5 2500 o o o E 2000 t .q aEI { 1 stx) 1000 500 0 I 1.5 05 0 Cone Pore Pressure OutPut (VDC) Callbrsted BY: LLS d'R, t l. t. .r, Approved R Hull bY: sisnua. /2.€ Date 6/10/2011 e& f,:#.il]il' 'Bf-Til:g;mfi ' ---' Kclutuuraan XarnPus uir'ciru stint HrleYdr 5i0B ln12 17 il TPU F,iii rr45Ll lrF l--:IUIL Efll-i lJl:i11 :it::H 4lrrrrr' @t7tstt4 UerlEK 260 Beanville Road RandolPlt, V A5060 802-728-4588 800-639-631 5 Dt gllal Gono Penet romoter Callbratlon DSA1129 Cone Serial Numbor GDS INS]'R SDN BHD Gustomer Reforence Load Cell Roforonce Proue. Gauge Full Scalo Force FRICTION ?.6757 0 31688 1OOO KPA Oulpul Unts KPA Lhfi Aonv '! Full range v Bosohtro V Ftt<:lol sN 322089A INTERFACE 1 221ANE-5OK-B DRESSER D XD lOOOPSIG S/N 3432 Frlctlon 1200 R?=0 1000 0, 800 l, o u- E 0, 600 =a q 400 200 0 0 05 15 1 25 2 NF, 3 Cono Frlctlon Output (VDC) Grllbratcd BYt LLS sisn"d' forl, 7. d*"A L,L.E Approvod R. Hull bY: sisnea /2_4 i Dat€ 6/10/2011 € lt. Df. ilohrnud Rrdp Schmrl Pucrt Pongrilan KaluMctmn Awam ?rolsw KarnflJs KeJuruteraan Unlvcrtiti $rEu MdrPlr ll:tH trF 5/0E 2012. 12 iTPl'l FA)' rr4594l0ttll tlIriIL Ellrj uiiil @0rt05 K 250 Boanvllle Roecl Randolph, vt.05000 802-728-4588 800-639'631 5 Dlg ltat Cona Penetrometar Callbratlon DSA12O7 , Cone Serial Number Customor Reference Load Gell GDS INSTT I NTERFACE 1 22 1 ANE-5OK-B DRESSER D XD lOOOPSIG S/N Reference Prese. Gaugo 0 sN 3220894 3432 TIP 1 7S23 Full tt lt?o V Full Scalo Force 0,01614 100000 KPA Outpu Unlls KPA Urill Cttov, 1 Busol,,to Y Tlp 120000 '100000 R'=0 I I I 80c00 o 0 o E I 60000 ,9 I oo- d i .l I I 40000 I I : 20000 I I I I : 0 I .i 05 2 1.6 1 Cone TIP OutPut (VDC) Callbr WJCulver 0/2011 Srgned. lt'' Rhutl ned Ptolaror lr. Dr, l,tonsnrd Rrdp $clrmd Pusel PongEJlan KeJurulerarn AwCm lGmpus (cjuMeraan Un lvcmiti Srfu ilrlryrlr 5/iE 2t12 12 ilTFl,l FLi; (tri53410ttir rjI]H t:rF t:iIliIL Efi|-j @'l ott tl r_raii,t WUmFI( 250 Beanville Road RandolPh, Vl. 05060 802-728-4588 800-639-631 5 Dlgital Gone Penetromstor Cellbratlon Cono Serlal Number Cu6tomgr Reference Load Cell Reference Prees. Gauge Fuil t$il1o DSAl2Oi GDS lnstr INTERFACE 1 221ANE-50K.B DRESSER D XD lOOOPSIG S/N 0 sN 322089A 3432 FRICTION 2.6849 -0,28904 lOOO KPA KPA V Eoielilto v Full Scale Forcc Qttltxn Urns Uiltl Cottv l:aolol I Frictlon --"- rl200 r I R,=0 1000 I I I 800 0) u o tt 800 tg CL CL 400 2@ -0" ,05 0 1 0.5 15 25 3 Cone Frlctlon OutPut (VDc) Calibrated BYI WJCulver ir-"..,'ll/.4- Approved by; Dete 8/10/201 Rhull Profegor lr. Dr. i,lohamad Rrap Sclamd Pusot Ptngaihn Kelurutetean Awrnt XamPut KcluMooan UnMdU Srlil Mrlsyd' 1 SirrEi :012 12 3ijFf,l F,q:vi r'r4594 1u(ril :i tlH IJ F -l L' I L E llE Lli:tl @l-tf.t(tl Wu-ruEK f .--- 250 Beanvillo Rood Rendo/Ph, Vt 05060 802-728-4588 800-639.631 5 Dlgltal Cone Ponstromoler Cdllbrdtlon , Cone Serial Nuntber Customsr Refsrence Load Cell Reference Prsss. Gauge Full Scale Forcg PRESSURE U2 2.4041 -0 10979 3447 5 KPA Outpul Urtrts PSI Unll Gorrv, 0,1 Full range V Bnsollno v DSAl 207 GDS lnstr 0 INTERFACE 1 221 ANE-sOK-B DRESSER D XD lOOOPSIG S/N sN 3220894 3432 45033 Poro Pressure U2 '---t 4000 RJ='1 3500 3000 o, E 5 o q o d G .c E 6. 2500 2000 r 500 1 000 500 0 0 1 05 4E 1.5 Cone Pore Pressure OutPut {VDC) Callb WJCulver Oato 8/10/201 Approv tsy Signod Rhull S 1 ned Profcsor lr. Purrt Dr.llotumrd Rrnp Selamlt PongoJlan KtiutrJtctsen Awam Kampus KejuMeraen Unlvrnllt $rlnr MateYle !CH C|F II,I,IL EHIi r5,i0E 1012 12 SgFH F,q.{ (r4594100[] @ooo'r USI,I W-m-mIEK 250 Beanville Road Rarrctolplt, Vl 05060 802-728-4588 800-639-6375 Dl g lla I Co n e Pe n o tro n oter Cal I brallo n Cone Serial Number Cugtomgr Reference Load Cell Refersnco Press. Gauge DTA0603 0 0 sN 32208SA INTERFACE 1221ANE-sOK.B DRESSER D XD lOOOPSIG S/N 3432 TIP Full rur$o V 1.8341 Bot0lino -0.0503 V 50000 KPA Fuu Sc?le Fotco O,,/llilrt Llnll Uiili KPA Clltrv Fbolot 1 Tlp 60000 Rt=0 50000 40000 o u o l! 30000 .{t a CL ?oo00 10000 I ol I 06 o 1.5 1 2 Cone Tlp Output (VDG) Galibra L Smith Srgned I pprove R Hull ot2011 ed, Pmfaeor_h. Ilr. Mohamed Rrip Scbmrl Purot PrngaJlan XeJurulorann Awam tfirao M.t.yrh Kampug KeJun UnlvorElU Sain6 ,,r't'r E !.r1: 12 ,?El Pl,t Fq)i r'r45t41ir !l:H llF tlIlrIL Elll:i l-li:t'l rrl-l @(ttQil WsmrEK r250 Beanville Road RandolPlt, Vt. 0506A 802-728-4588 800-639-63r5 Dtgital Cone Ponotromotor Callbration Cone Serial Number DTAOEOS 0 Customer Reference Load Cell Reference Pro39, Gaugo 0 sN 3220894 INTERFACE 1221ANE-sOK-B DRESSER D XD lOOOPSIG SiN 3432 PRESSURE U2 Fvll renes V 2 191s Eo,sorrttJ Y 0 80367 Full Scale Force 3447 5 KPA Outpul Un,ls Uttlt Conv Faclor PSI 145033 Pore Pressure U2 c000 R'. 350r.) 1 00000 3000 E f o 2500 a (, o, 2000 !t g EL T 1 500 1000 500 0 0 0.6 1 ls 2 2.5 e 35 Cone Pore Preesuro OutPut (VDC) Callbreted L Smith Dato Approvod byt yi Signed R Hull 8/10/20'11 ned ftolcror lr, th.llohemad Rrdp Srlamel Pusal Pengefian K{uMeraan Awent lGmpur Kofurulotran t nhtnlu 9r{nr Mdrydr ,.r(r E itrr 1:. 1l :JEPH FAil HO(5EATTOGLEFT & r,451-141llr:r sIH ! r:tF t-iIri]L ENI-i l-llti @0rt1t, 7.41O.38 7'2390 co., rrvc- Cone Penetroffreter Techn11logy (cPT) pcnctromctcrs l{ogentogler.& Co. offers a wide range of advanced digital and analog electronic conc cottes have inl'ernal with capacitici ranging fi.orn 2.5 tons to l5 tons (tip load), All Hogcntogler electroni(: eliminuting the the bchind transduoer, clcctronic powcr amptificarion and regulation mountecl dircclly oones sre effect of cable resistance on the measrrelnents, )n adrlition, alt Flogentogler digital electronic channcls includc: (l )'l'ip tcmporatrrrc corxpcnsated to rcducc crrors duc to tempcraturu shifl. Availtrble (4) X and Y Inclination; (5) X, Y and Z axis Resistance; (2) Skin Friction; (3) UI/UZiU3 Porc Prcisurc: Imaging can and (6)'lbrryerature. Additional moasurements, such as Resistivity and oplical Soil Soismic; hcaohicvcclrvithacld-onrnoclulcs. lnactditiont<lourstnn<larcllincof l0cm2ancl l5cttr2cottcs,wehavc plohos and water level indicators' consl.ructcd many custonr probes, such as miniature penetronteters, pl,[ Please contact trs with We also manufhottrrc mcchanical corrc pcnclro*et"rs with automated readortts. your oommercial or rescarch requiremcnts' -r- Standard Gone Channels The fotlowing channels oorne standard on alloones: ' ' ' 'l'ip ltesistancc Local Frictiort Inclinatiorr Optional Cone Channels Thc fbllowing channcls nrc optionalon all of our standarcl cones: ' UIIUZ|U3 Pore Water Prcssurc ' Grottnd'lctrrllcrntttrc XIY lllieisnric VelocitY* Electrical ConductivitY#+ Vidco Conc ' ' ' + Cone Seisrnic OPtion .l5e downhole shear cone seismic option makcs it possible to use a cone penetrometer to tneasttre with an estimate or w've propagetion velocity, The shear wavc velouity can be used in conjunotion ol'thc soil at low strain valucs' mc*surcmunt of ttrc soil cicnsity to dotcunine tho clynurnic sheur tnodulus software. 'l'he data can be presented using the Hogentoglcr interPretation +* Resistivity (Electrical Conductivity) Module Ineasurem€nts of the The Hogentogler electrical conductivity modutc providcs clectrical conductivity of potontial ground.w-ater oontamination soit,,l'hesc m'usurctnents catl be uscclto dciermino thc locution top of a standard 5 ton or l0 ton andior salt watcr intrusion. The module is designed to attach to the electron ic conc Pcnctrometer. 4 VITWW. Ho,G E I^dT(,,G,LE- R.GOM j,ierE !'rr12. 12 3tFll FAli rr45:-l 41(r(r HOGE'VTOG.LE,FT & CO., 5 -llH uF II"/IL EflE Auol1 l-l:[1 7 -4 7 0.3ft7 -2390 ',vC. Cones:5 Ton Digital Tension Col.te Irull range of one through fivc channel capaclty nnd six chtnncls total 5 TON TE,MP ERATT,IRE COM PNNSATED The digital eleotronic tcnsion 5 ton cone tras trcen developcd to address the accuraoy, scnsitivity and durability problems inheront in other conc designs of the sarne or lower capacities. With a rcsolution ol'3 lbs., tltcrc no longcr cxists thc nccd for cones of lower capacities plus their assooiated spare parts' The unit consists of a dual element strain gaugc lransduoer, with conc support electronics packaged directly behind thc transclucr:rs,'l'ltc conc tip, local liiction clerttent and pore pressure element are field replaceahle by the operator in approximately five minutes. The conc is conIrgurcd with onc throtrglr fivc chtnnol capacity with six channels from which to choose' CONE CII.ANNELS: . TIP . LOCAL FRICTION PRESSURE TEMPERATTIRE . INCLINA ION . SEISMIC . RESISTIVITY MODULE CAN BE ADDEI) . PORTC . PorouB Fllter 6mm Thcrc $rc two possiblc locttions lbr porc prcssure; one olr thc tip or one directly bchind the tip, Porous Flltor 5mm The elcctronics havc prccision p0wer supplies the for sffain gauges, which eliminate the effects of cable rcsistanoe on the measure mcnts, Calibration drtu fbr tip, local friotion and pore Prss$ure channels is stored in CPLJ non-volatile memory' Digitul conc caliblation is capablc of oorrecting for non-lincarity and hystcrisis irr a way that analtlg circuitry cannot, Digital cones conforrn to all WWW.Ho,G.ENTo,G.LEf?..COM 7s j/0E ?r'12. 12 iSPtl F,qli iI]H t:r45841fi0::-r NF I-:I,,]IL EIIE UIt,t @0012 7.47 O.3f,1.2390, I Cones:5 Ton Digital Tension Gone f{,1 SLEEVE ectrica I Sneci fi ca tio ns - Sleeve area: 150 - I)ower; 't'12 Volt at 200 rnA (tnax). - Connector: l0 pin LF,MO waterproof conncctor. - Opcrating tctttpr:rature rengc: 0'C [o 60'C - Storage Lemperature: -40"C to 70"C1 - 4 channel, 24 bit AlD converter ftrr measurement ol'tip, friction, and pors prsssurc. Minilnum noise-free rcsolution of I part in 65000, - I0 channcl, l2 bit A/D convcrter For mcasuremcnt of inclination, sei$nric, tetnperature and spare ohannels. - 8 bit microcorrtroller with 8kb {la.sh lncmory for cone idoutifioation and calibration data storago, - 32kb non-volatile ram for data storagc. - RS-485 seriarI corrrnunicution. Cablc lcngths of 1000 ft possiblc. CRC error ohecking to prevent transnrission of incorrcct data, - Cones are interchangeable in thc ficld. Conos can be calibrated in the field. All calibration data is con(aincd in the conc, - Compatible with vision cone and fucl fluorescense detector. Mechanical Specificatigrns (10 Ton i l5 Ton) crtt2 - Sleeve capacity: I MPa - Sleeve mecharrical overload capacity: 700 %. - hcouraoy: .2o/o. - Tbmperature compensated. - Equal cncl area eliminate.s pore pressure elTeots, PORE PRESSURE TRANSDUCER - Porc pressurc r$nge: 3500 kPa (500 psi), - Porc pressure nrechanical overload prcssurc: grcater than 200 %. - Acc.uracy: .5 ol,. - Temperature cotn pensated. - Special cones svailable with threc pressure transduoers for simultancous mcilstlretnenI of U2, U3. LJ l, INCLINOMETER inclinometer. Pitoh and roll rrleflsuremcnt provitlcs information on cone - Two channcl migration. - ljses accelerotnctcrs ttl lneasutE inclilretion. No moving parts. - Range: 0 - I5 degrecs - Rcsolution: .l degree. Til' - Tip angle: 60 degree, - 'fip urr:u; l0 cmr - Net arca ratio: ,8 SEISMIC - Unior [Siaxial goophonc, - Capacity: +l- 28. -'l'ip range: 50 Mpa (522 TSF) - Tip rnechanical ovcrload capacily: 300 % - Accvracy: .2Yo. - TrLre DC response, - Elcotronic off'set eliminatcs elfe,ot of gravity. - Digitized in cone and transmittcd over serial port. - Ternpcraturc compr;n sated. 76 No cxtra wircs or analog mcasure[rent rcquired. WWW. H O G E N T OGLE R.C O TV' 5!0F-,21J12. i 12 ,!gPt'l F,t'ii tr {5i] 41r'rug H0GENTO(iLEFI &. I-II]H ilF L:I"/IL @rtnl'J E11E.U:it,I 7.4 '' O847.2390 C0,, rNG. Cones: 1O &1 5 Ton Digital Sutltraction Cone Full rangc ofonc through five channel capacity and six chnnnels totnl -r--- * TEMPERATTIRE COMPTIN SATET) The digital electronic subtraction l0 and 1 5 ton ooncs havc bccn dcvclopc<l to addrcss thc accuracy, scnsitivity and durability problems inherent in otlrer cone designs, with a resolution of 6.5 nnd l0 lbs. rospcctively, Thc unit consists of'u singlc clcment slrain gauge transducer, eliminating ntechanicalcoupling cffbcts, ancl with oonc sllpporl elcctronics packagccl dircctly behind the transducer. Both thc cone tip, local friotion element und pore pressurc cternent arc ticld rcplaocablc by the operator in approxinrately tive minutes, The cones are configured with one through five channel onpacity with six channcls ftorn whioh to <;lttrcse. CONIl CI.IANNELS: . TIP . LOCAL FRICTION '. PORE PRIISSURIC TEMI'IIRATURE . . . Poroug F llter 5mm INCLINATION SEISMIC RESISTIVITY MODULE CAN BE AI}DED There are twe possible locations for pore prcssurc; one on the tip or ono dircotly bchind thc 1O TON tip. I Porous Fllter ---+ 5mm 15 TON The electronios have prccision power supplies Ibr thc strairr guugcs, which clirninate the sll'Bcts of' cablc rcsistance on the rneasurernents. Subtraotion is performed digitally hy thc CPU and calibratitln data for tip, looal frictiorr and porc prcssure ohannels is stored in CPI) non-volatile rnemory. I)igitulcone calibration is capable of corrcuting for non-linearity and hystcrisis in a way that analog circuitry oannot. Digital cones confonn to all W W W. H O G E N T O G L E R, G O TV' 77 Q5/08 20'12 12 40PI F,qi 5[H trF r,'I\rIL EilG Uut,t 1/45t4]arr.rll @0(i14 a a },OGENTOGLER & Co., INc, 7 -4 7 O.3B 7.239C,, Cones: 1O &1 5 Ton Digital Sutltraction Cone Dlcctrical Specifi cations - Powcr: +12 Volt at 200 rnA (max). - Connector: I0 pin LEMO wate4rroof connector. - Operating tcnrperaturc rangc: OnC to 60"C - Storage tompereturc: -40qC tr-r 70"C - 4 channel, 24 bit AID convcrter for measurcrrcnt o[tip, friction, and porc prcssurr:. Minimum noise ticc resolution of I pafi in 65000. - l0 clrannel, I2 bit AiT) convcrter for - Acouraay: .2Yo. - Temperature cornpensatcd. - Equal end area eliminates porc pressure effects. PORE PRESSTIRE TRANSDUCER lrreasurement ot' incl ination, scisrn ic, tetnpereturc and spare channels. - Porc pressure runge: 3500 kPa (500 psi). - Pore prcs$ute rnechanical overload pressurer groater than 200 %. I - Acouracy: .5 70. bit rnicrocontroller with SkLr llash memory for conc identification and calibration data r;torage. - 32kb non-volatile ram for data storage. - RS-4ft-5 serial <;ulnrrrunication. Cable lerrgths of 1000 ft possible. Cl(C error c.hecking to prevent - SLEEVE - Slecvc arca: 225 cttt2 - Sleove oapacity: I Ml'a - Sleeve rnechanioal overload capacity :200 %. transmission of incorccl - Tcmperature oompensated. - Special cones available with three pressure transduccrs lbr sirrtultaneous tncasurcnrenl of [.J I , LJz, LJ3. clata. - Concs ure interchangeablc in ths field, Cones can be calibrated in the field. All calibration data is conlaincd in tlrc conc. - Compatiblc with vision cone and fucl fluorescencc dctector. INCLINOMICT'IIR - Two channel inclinomoter. Pitch and roll rnc&sul'c,nent providcs information on conc migration. - LIsos aocclcrotneters to rneasurc inclinal"ion. No moving par[5. Mcchanical Specilicetions (10 Ton / 15 Ton) 'r'IP - Tip anglc: 60 degree, - Tip arerr I0 crnT / 15 omt' - Net area ratio: .8 - Tip range: I 00 Mpa ( 1044 TSF) / I 50 Mpa ( 1566 TSI), - Tip rnechanical overload capacity: 300 - Acaurucy: .2Yo, o/o. - Range:0 - l5 degrees - Resolution: .l dcgree, SEISI\flC - Uni or Iliaxial gct>phonc. - Capacity: +l-ZE. - True I)C response. - Ulectronic <rlI'set elirninates ellcct ol'grtrvity. - I)igitized in cone aud transmitted over selial port. No extra wircs or antlog measrlrcmcnt rcquired, -'l-etnperaturc compensated. 7A WWW.H()GENToGLER.GOM . '\-r\, \'j,t$r Fl,ii '.#,t 1\ .:l \r .'\\, t\;;1 5i(rB 2n1i 12 4rrFll .'r (r45lJ4l(rr'rlr #s ,\q '\.1.J u t -,1 !, :jt::H \ .. ' i. .i. i 't'!'I r.t [rIliIL Elll.i \ /,.. ':, I' l,\ t t: rl )t ,.. , |,t ,{ u:--:ll , l '.lr \ ,. 1,, . ,( :. ,',1, I ll .t t. tl i '--- -1..@tP: , @r'rrr'l! 'ii:' \ )' .i, ( -.ri I ffi S.U CITRA BINA SECOND PENANG BRIDGE PACKAGE 3D . TOtt PLAZA, ADMINISTRATION BUILDINGS & REIITTED WORKS SOIL INVESTIGATION Page No. : 20 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDD(D INSPECTION AND TEST PLAN 20 ilrl S.U CITRA BINA SDN, BHD. JAMBATAN KEDUA SDN. BHD. ITP FOR SOIL INYESTIGATIONS (FIELD WORKS) ITEM DESCRIPTIONS NO Scfting Out I TEST & INSPECTION Bmcholc Locatron a) 2 Equrpment (Boring) Drill tug b) Dnll Rods/ ] & TP TITLE . PILE DRIVING ACCEPTANCE FREQUENCY CRITERIA Confim m per location shown ir drawings a) Condrtion Equrpmcnt (SPT) ACTION PROCEDURE REF. RESPONSIBILITY RESPONSIBILITY TYPE OF RECORD Sweyor R,E. Swey record Rework CHECKING FORMS REFERENCE NO ACTION WHEN NON-CONFORMANCE Each point Swey Bofore Vrsual inspcction Site Supwsor R,E Insprctron fonn Rework Visual inspection Site Supwrsor R.E. Inspcotron fom Rework inspeotion Srte SupeMsor R.E, Inspechon fom Rcwork Visual inspoction Site Superuisor R,E Inspechon fonn Rework Visml inspcction Srte Superisor R.E. Inspection fom Rework Vrsual Inspoction Srte Supenisor R.E. Inspfftlon fom Rework Check that drill ring is in good condition Check that there are no bent drill rod./casings casings 2 METHOD OF TESTING/ drilling Chcck that the split spom sampler rs in good condihon, no dings or dents oD thc Bcfore casing. b) Rods Cheok that the rods used for SPT re not conduotion test bent a) Condrtion 3 Equrpmflt (Undistubed Smple) Cheok that thin wallcd smplcr/piston samplcr uc in good condition, No dents, Before dings and damge on the casing. b) Rods Chcck that thc rods used for SPT re not Vr sua.l conduction test bent. a) Cahbmtron 4 Equipmcnt (Vme Shcar'Icst) 5 6 Check that thc torque measwing device has bcen calibratcd af,d thc cahbration certs me available Bcfore b) Vane Asscmbly Chcck that the vane asscmbly is m good conduction tcst c) Rods a) Calibration Chcck for bent rods Check that the CPT deuce has been calibrated md th€ oelibrenon certs are availablo. Before b) Frlter Ensue that the filter is new for erch tcst md has be€n satutcd properly cotrduchon tcst c) Rods Chcck for bcnt rods Sample a) Container Ensure that propcr oontainer aro ayailable Before taking Collectron b) Labcls Ensrrc that smples arc labeled properly shomg. dalc, location. time, md project Ensue smplc re prompdy send to lab, smple Equrpmcnt (CPT) o) Scnt to Lab condition. no vancs me bent or dcfomed. REMARKS ru S.U CITRA BINA SECOND PENANG BRIDGE - PACKAGE 3D - TOLL PLAZA, ADMINISTRATION BUILDINGS & REUTTED WORKS SOIL INVESTIGATION Page No. : 21 Doc. Ref.: OF SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th Ma12oL2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDIX E SOIL TNVESTIGATION CONTRACTOR' ORGANIZATION CHART S 2L 0rgani zation Chart Tan Kim Boon RIG RIC Loh Siew Wah 2 Low Kim Teck LABORATORY TEST Balakr i shnan A/L Ayalu Name: Tan Kim Boon Date of Birth 18-01-'1959 Citizenship Malaysian : B.Sc (Hons Qualification Experience : ) Project Manager, and Director with Syarikat Ujitanah Sdn. Bhd. 1) Soil lnvestigation works For Proposed Penang Waterfront Project, Jelutong, Penang. Engineer: Arup Jururunding Sdn. Bhd., Client: IJM properties Sdn. Bhd. Date : 14-3-2005 to 27-6-2005 Contract Sum : Rm 323,700.00 2) Cadangan Siasatan Tanah Bagi Cadangan Pembangunan Di Bandar Cassia, Batu Kawan, Seberang Perai, Pulau Pinang. Client: PDC Properties Sdn. Bhd. Engineer: PDC Consultancy Sdn. Bhd., Contract Sum : Rm 195,000.00 Date : 15-6-2006 to 16-10-2006 3) Soil lnvestigation works For Projek Baikpulih Muara Sg. Perai Secara Menyeluruh Serta Kawasan Sekitar Yang Berkaitan, Pulau Pinang. Client: IJM properties Sdn. Bhd. Engineer: Arup Jururunding Sdn. Bhd., Date : 15-12-2008 to 15-5-2009 Contract Sum . Rm 610,000.00 2000 to date Project Manager, and Director with Syarikat Ujitanah Sdn Bhd' Site supervision of drilling crew, Soil lnvestigation works, lnstrumentation works - experience in drilling work, field testing, vane shear test. - experience in soil sampling, rock drilling, packer Test, seismic survey works. - experience in instalation of inclinometers, pneumatic piezometers, - deep levelling datum, Rod Settlement gauge & settlement markers. - magnetic extensometers. 1988 to 2000 Site Manager, Project Engineerwith Syarikat Ujitanah Sdn. Bhd., Projects involved North South Expressway: Gurun to Sg. Petani, Kedah. North South Expressway: Butterworth to Sg. Dua, Pulau Pinang. North South Expressway : Ayer Hitam to Yong Peng, Johor. North South Expressway. Tapah to Bidor, Perak. Detailed Soil lnvestigation at Beris Dam, Kedah. Detailed Soil lnvesttgation at Timah Tasoh Dam, Kedah. Soil lnvestigation for Jelutong Expressway, Pulau Pinang. 1985 to 1988 Site Engineerwith Hock Guan Construction Sdn. Bhd., - experience in Earthworks and Road Constructton. Name: Loh Siew Wah Date of Birth 08-1 2-1 963 Citizenship Malaysian : S.P.M. Qualification Experience : Site management of drilling crew and piezocone equipment for : 1) Soil lnvestigation works For Proposed Penang Waterfront Project, Jelutong, Penang. Client : IJM properties Sdn. Bhd. Engineer : Arup Jururunding Sdn. Bhd., Contract Sum : Rm 323,700.00 Date : 14-3-2005 to 27-6-2005 2) Cadangan Siasatan Tanah Bagi Cadangan Pembangunan Di Bandar Cassia, Batu Kawan, Seberang Perai, Pulau Pinang. Client: PDC Properties Sdn. Bhd. Engineer: PDC Consultancy Sdn. Bhd., Contract Sum : Rm 195,000.00 Date: 15-6-2006 to 16-10-2006 3) Soil lnvestigation works For Projek Baikpulih Muara Sg. Perai Secara Menyeluruh Serta Kawasan Sekitar Yang Berkaitan, Pulau Pinang. Client: IJM properties Sdn. Bhd. Engineer: Arup Jururunding Sdn. Bhd., Contract Sum : Rm 610,000.00 Date .15-12-2008 to 15-5-2009 4) Soil lnvestigation for Second Penang Bridge Land Expressway Package 38 : Batu Kawan ExPresswaY Date : Oct 2010 to date From : 2000 to-date Senior Supervisor with Syarikat Ujitanah Sdn. Bhd. Site supervision of drilling crew & Field Testing. - experience in drilling work, field testing, vane shear test. - experience in soil sampling, rock drilling, packer Test. From : 1988 to 2000 Site Supervisor with Syarikat Ujitanah Sdn. Bhd., Projects involved : North South Expressway : Gurun to Sg. Petani, Kedah. North South Expressway: Buttenruorth to Sg. Dua, Pulau Pinang North South Expressway: Ayer Hitam to Yong Peng, Johor. Detailed Soil lnvestigation at Beris Dam, Kedah. Detailed Soil lnvestigation at Timah Tasoh Dam, Kedah. Name: Low Kim Teck Date of Birth 1 Citizenship Malaysian : S.P.M. Qualification Experience 6-09-1 966 Site management of drilling crew and piezocone equipment for : 1) Soil lnvestigation works For Proposed Penang waterfront Project, : Jelutong, Penang. Client: IJM ProPerties Sdn. Bhd. Engineer: Arup Jururunding Sdn. Bhd., Contract Sum : Rm 323,700.00 Date : 14-3-2005 to 27-6-2005 2) Cadangan Siasatan Tanah Bagi cadangan Pembangunan Di Bandar Cassia, Batu Kawan, Seberang Perai, Pulau Pinang' Client: PDC ProPerties Sdn. Bhd. Engineer: PDC Consultancy Sdn. Bhd., Contract Sum : Rm 195,000.00 Date : 15-6-2006 to 16-10-2006 3) Soil lnvestigation works For Projek Baikpulih Muara S9. Perai secara Menyelurulr serta Kawasan sekitar Yang Berkaitan, Pulau Pinang. Client: IJM ProPerties Sdn. Bhd. Engineer: Arup Jururunding Sdn. Bhd.' Contract Sum : Rm 610,000'00 Date : 15-12-2008 to 15-5-2009 4) Soil lnvestigation for second Penang Bridge Land Expressway Package From : 2000 38' Batu Kawan Expressway. supervisor with syarikat Ujitanah sdn. Bhd. Site managerment of drilling crew and piezocone crew to-date senior From : 1990 to 2000 site supervisor with syarikat Ujitanah sdn. Bhd., SECOND PENANG BRIDGE PACKAGE 3D . TOIL PLAZA, S.U CITRA BINA ADMINISTRATION BUILDINGS & REUITED WORKS SOIL INVESTIGATION Page No. :22OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th MatzOL2 METHOD STATEMENT S. U. CITRA BTNA SDN. BHD. APPEI\DIX F WORK PROGRAM FOR SOIL INVESTIGATION 22 z o * CJ a o Y o- ts a u) UJ x L! o J UJ D E ol It z ul E II N U E L o E o -J- z o ,_6 o e e -8. t ..5 "E ; t = a aS **Be**A * t**SSS ooooooooooooo00Noooo 6 a I E al E I o: @i ,!r-,- 9, o @ o. Sf t D .,E, ts o U ]J U e u- k: >* E 6Pi = oi d.* -- * i'i ONONOOO--O??E?FFNTN ii t! .l.l eEs E bE _t I u* .'5 c5 cl al d .6 6 SgSEgSSSSSSSSSSSSSO +d + *+gg+ + EE! g S re oooooooo600 oO o J eded3 d N L dNNUNN U u d.d,d,Edd 399*t= 666L66 F =6E ooa...! oooEi EEE{ua E ooOOFFF * si .6 -=- .E rn * + * { .{ d d dr.t & !4, dr al .$ rl 6 .FEd-NNNNFNNNNNFNN .Ep eo c9 O.-dNNdNNNNNOOO '{iA fIEiIg++sEs3$sii$s5 SSSSESssSsS}SSTTESS E*ia"fEEEEi4EEEEEgsE s***fR8=69*jggg8**N !SeSPTSS3P99PP9PE99 E<<-E->=-E-a-r-5UErl + + .l * .{ d d d6 ts.{ I * * * +: EEFEEEEEfEff;$Pff$$f J oi d - F d J 4.4 dl .r,: + .r.l .i TEE. :E .3-€-.-EEg .,d. s**s*as8ss****ss*8* 6CooPooooocoooooS6o @ a as*tsssesst**S;eS*SA oooooooooooooooooo **S *8SSSS*SSS**S**SSSS* 8Ail3t8083$t8388ts3003 NdooGi@dddN E i + =:d d +'r = + i.i ?ooN d6dr * * * * *+ u5,A I p c NNdNoN6oooooooooooo 6ctcidd- 5ss==sS999NSg99o^oSc HHHfrH:fg$3rfrig$ri3A+ NNNNNNNON-.NOTO- +: i=:;: A rl d .A,A i +,r5 |tl e .l A d 6 --NFdN-Nd--NdNNN iiiiiiiisfEE$EEpf$E! ,A,4,,!,4,A,A F-OF $ SeoooFo!69oo6ooo!ooS € E--a-O---<-f---= t dr = dr.n = = d= d d= d .t 6.$'r.t ::T:T:;:iT:: E E E * * BBaa* eeBBaB* ZZzzZz<ZzzzzzzzzO5=E o rA,6 -_g5 ; g' td E-* ll 6,A $,A,A .B !5,A,6,5 oooooooo OOOOObi6OOOOO- EgBa !rxHlE B 6 e9 EfrEEgEEggtEE 8 JI 6d = od.t =uu <--t-----t. e*EE=EEEEE=E FErrEilirrBi ts ! € E,3 5 E E _3. Ees E E=; E P E*? E E E EEE t( E g* rE E E EEi F Etg FgE i.E E EeiYl EPE E +t.e5i bo= E"eE., *g EEEgt:g-- ei" ^EgEESrl EEE aEE$i;EigEEi;EF=EiE EEFFEfiHEEF*SEEEeBsg EEEgEEEEE=EsEEEEEEEE r4[r[[[rrrIrcrddIc[[ B 6 cr._ gl - tt-- s* ets =z NS i+ fJ =o NS E} ;= rtdl E .9 Br= E! EP to FF EE ,, oo ET I o . ^. q c F @ 5 s r _a s d -a al o t-' s.=i E EIr -? EES _td l ;1[ rrl tseSAS* **s** e !! a! i o gSESF *s*** ip$$+ oo!!tc NNN!! *i*J* e a I c = +EFi (t6+ld E = A:E dd+F!.6 a - N )c at c-6 d .9_ F 5 t d. 5a I ! 6 a a odod a a a go E E I o sl bP G' -oE =6 = :t qd =E 'Eg 'E tso EI s Bi IE L< I ffi S.U CTTRA BINA SECOND PENANG BRIDGE PACKAGE 3D . TOLI PLAZA, ADMINISTRATION BUILDINGS & REU\TED WORKS Page No. : 23 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th Va12OL2 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BTNA SDN. BHD. APPENDIX G LABORATORY FOR SOIL TESTING 23 wwwwwem b ffiffiffiffiroffiffiffiffiffiffi xo. l<xei+ *t Ut4lD / fi +TeoItirAttNI{AYAffi q s,'il0'+''l/-D*tlrt'.ts'l'RA jd{rr@-riAi?j{LEttsi#{ -lFr;df-' i ! I I t ] i I . ,.I .: , -.1. t F EX, t' *fr;:-,* r il, 1- ',t.' .t '1 F q -# LL: t:i_ 'd 6 z :. -1. "4 rj' .I . ,'ii- CBR ! t ( * * * * * ,-L '+" .F lr{ff E t& TABORA?fiORY & FIDLO SOrL TNIIE"STIGATTON ) pnFnlrcc*Rrrc # * * * REgcuti'-r HAHriEft TEsr * .r.escazfonF sort rgs? &..Rficr ?.8s1' wsmt r-rem DENSTTYr.r.ET nrsru c.E-RTEsr coscngre cotttfc ptrlE erat$tta TEST eoniria &, DR:LLIN: tt{{EsrtGRTIot: sr"ctltttosrFnogEs rgsr NA*A ALIGFR IEST TEL: OB - 611m6127 EAX:.61ttO6827 ( oortts : MR. [email protected] HVIAIL : S12 - 3043801' ) COIVTEIVT 1) COMPANYREGTSTRATTOI{ 2) MANGEMET{T& STAFF 3) I-ABORATORY &FIELD EQLiIPMEI{T 4) METHOD OFSTATEMENT OF IABORATORY &FItrLD TEST 5) CE,RTIFICATE OF CALIBRATION 6) LETTER& TNSTRUCTION TO CARRY OIJT LABORATORY TEST 7) OFFICE, LOCATION PL{,N CONTENT 1 COMPANY REGISTRATION ffi#, f,ff trb/ Fffiffi,ffEIffi -- r.-lr- r.---.-^--. -E---I'-, -,-- GEOSOIL ENGINEERIT{G (Company No : 001700963-K) t-l E -E- r*-EI -. - A-G-12, Jalan PJU 10 / 10 G, Saujana Damansara, 47830 Petaling Jaya, Selangor Darul Ehsan' Tel : 03 - 61406127, Fax : 03 - 614066827 e - mail : qs soil @ vahoo.com Geosoil Engineering was established on 26th July with the management by MR. BALAKRISHNAN A/L AYALU ( DIRECTOR ) EN. ABDULAZIZ BIN ABDULLAH ( Project Manager) 2007, REGISTERED UNDER ( SURUHANJAYA SYARIKAT MALAYSIA ) PRRAKUAN PENDAFTRAN, AKTA PENDAFTRAN PERNIAGAAN 1956. REGISTER UNDER ( PRRAKUAN PENDAFTRAN, CIDB MALAYSIA the comoanv Kerja - Kerja Penggalian dan Penyelidikan Tanah, Kerja Kerja dalam Makmal PenyelidikaN Tanah We have registered under CIDB for Green Card Nature works 1 We have qualified Engineer , supervisor & Technician to manage the field works and laboratory works. 2 We have Laboratory for Testing soil& 3 We do jobs for Soil lnvestigation works for the following company. a) rrcnerrlt b) xnnM Road Works BHD. ( Selatan Kulai, Johor ) (Wilaya Perskutuan Kuala Lumpur) ENG. sERVlcEs sDN. BHD. ENG. sERVtcEs sDN c) Bandaraya Wilaya Persekutuan Kuala Lumpur. d ) Majilis Perbandaran Selangor. ( Soil lnvestigation contractor ) e ) Syarikat Ujitanah sdn. Bhd. ( Soil lnvestigation contractor ) f ) Gagasan Tuguh Sdn Bhd. ( Soil lnvestigation contractor ) g ) Ujiteknik Geoeviro sdn. Bhd. ( Soil lnvestigation contractor ) h ) Pakatan Tenaga Sdn. Bhd. ( Soil lnvestigation contractor ) i Pantas Drilling j ) Garuda Geotechnical. Testing. ( Soil lnvestigation contractor ) k ) United Soil Engineering Sdn. Bhd. ( Soil lnvestigation contractor ) l) Technic Field services Sdn. BHd. ( Soil lnvestigation contractor ) ( Soil lnvestigation contractor ) j ) KGA Engineering sdn. Bhd. ( Soil lnvestigation contractor ) Bhd. m ) North soil Engineering sdn. rks in accordance wo Scooe of work for Labo 4 BS 1377:1990 5 n accordance Scope of work for in-situ test for earth wo BS 1377 : 1900 & JKR Specification a ) ln-situ filed density, compaction test and ( CBR ) California Bearing Ratio Test to find out whether the earth fill material is Suitable or Unsuitable for compaction at field earth works. b) Premix coring for road works, Bituminous Pavement courses GEOSOIL ENGII'.JEERING c ) Concrete coring for Building works for Asphalitic Concrete. No. A-G-12, Jalan PJU 10/'10G, Satrlana Danransara, 47800 Petalrng JaYa, Seiangcr D'E' Tel 03-6'140 6127i03-5151 3801 Fax: 03-6140 6827 A 25847$ C ?.,', It: i:', i. L ,A- i' [. I r1.- lFerxkufin lFenhnffurcfit Adalah dengan ini diperakui bahawa kontraktor yang dinyatakan di bawah ini telah berdaftar dengan Lembaga mengikut Bahagian VtAkta Lembaga Pembangunan Industri Pembinaan Malaysia 1994. Pendaftaran ini adalah tertakluk kepada syarat-syarat yang telah ditetapkan di belakang Perakuan ini NoPendaftaran: 0120101223-SL132096 NamaKontraktor Alamat : GEOSOIL ENGINEERING Berdaftar: A- G- 10-, A- G- 12, JAI-AN PJU 10/10G SAUJANA DAMANSARA 47830 PETALING JAYA SEI.ANGOR Gred, kategori dan pengkhususan berdaftar Gl Gl Tidak meletrihi RM200,000 Tidak melebihi RH200,000 Tari}& Mula Berknafkuasa : B 804 CE cE0r cEzl 16 FEB 2012 Tarikh Habis Tempoh Perakuan : 15 FEB 2015* *Penkuan ini lrcndaklah diwrhharui *lewatlewattYa N hai *belum taikh habistemwh. Ai! SfAfUS : AKTIF - Kontnktoryang diawardkan proiek semasa penkuan ini dikeluarkan. .l: i .-a l9 ( b.p. Ketua Eksekutif Bertarikh: 16 FEB 2012 BIN R/qZqLl :ti;it=-.L NO PENDAFTARAN 01 201 01223-5Ll 32096 GEOSOIL ENGINEERING A. G.10., A. G- 12, JALAN PJU 1O/1OG SAUJANA DAMANSARA 478J0 PETALING JAYA sEr.AwGOR Pendaftaran Dengan Lembaga Pendaftaran dengan lembaga adalah bagi Gred, Kategoi dan Pengkhususan sepefiidi bawah ini: Kategoi Gred Pengkhususan (JI Tidak melebihi RM200,000 B PEMBINAAN BANGUNAN BO4 KERJA AM BANGUNAN ot Tidak melebihi RM200,000 CE PEMBINAAN KEJURUTERAAN AWAM CEO| CE21 PEMBINAAN JALAN DAN PAVMEN KERJA-KERJAAM KEJURUTERAAN AWAM .I II Su nu nn N JAYA Svnnl r.nr Mittlvg n CoMPANIES COMf,,{ISSION OF MALAYSIA PERAKUAN PEMBAHARUAN PENDAFTARAN AKTA PENDAFTARAN PERNIAGAAI.{ 1956 BORANGE (KAEDAH 13) No. Pendaftaran 001700963-K GEOSOTL ENGINEERING A.G.I.z, JALAN PJU 1O/10G, SAUJANA DAMANSARA 47830 PETALING JAYA SELANGOR Dengan ini diperakui bahawa Perniagaan yang dijalankan dengan nama GEOSOIL ENGINEERING telah didaftarkan dari hari ini 30 OKTOBER ZOL6 menurut peruntukan-peruntukan Akta Pendaftaran Perniagaan 1956, dengan nombor yang ditunjukkan di sini dan tempat utama perniagaannya di A-G-10, L'G-L1, sehingga JALAN PJU 1O/10G, SAUJANA DAMANSARA, 47830 PETALING JAYA, SELANGOR. Jenis Perniagaan KER'A-KERJA PENGGALIAN DAN PENYELIDIKAN TANAH, KERJA-KERJA DALAM MAKMAL PE}'TYELIDIKAN TANAH Bertarikh di KUALA LUMPUR pada 31 OKTOBER 2011. DATO' LZMTBIN ARIFFIN Pendaftar Perniagaan Semenanjung Malaysia DOKUMEN INI ADAT AH CETAKAN KOMP{JTER DAN TANDATANGAN TIDAK DIPERLUKAN U*rtD: iyhe Darc; It4on Ocr 3l 10:30;14 MYT 201I 38, EG -' ar{ JA\.A Sva Rt rcet lvlelaysta Covrpaxtes CorvtrttsstoN on'fi4alavstA . .-. S u Ru u PERAKUAN PEMAF"TABAN AKTA PENDAFTANAN PBNMAGAAN 1956 BORANGD (I(AEDAH T3) No. Pendaftar:an . GEOSOIL ENGINEERING" 4L-G-12,JATAN PJU IO/IOG, SAUJANA DAMAI{SARA 47830 PETALING JAYA SELANGOR Dqngan ini diperakui bahawa Pemiagaan yang dijalankan delgan na.rna telah didaftarkan dar,i had ini sehingga 2S OKTOBER 20L1^ -menurut ,,peruntukan-peruntukan Akta Pen{1$1ran,Perniagaan 1956, dengan nombor yang dirunjukkan di sini dan teupat utama.perni4gaaa4ya di A-,G:I2-:JALAN'PJU ' 1 O/TOG, SAUJANA :OAPTANSNNE, 47830 PETALING.JAYA,. SELANGOR. Jeni$:?erniagaan , KEtsJT.KERIA PENCCALIANDAN PENYELIDT$AN TANAH,XERJAJKERIA DALAM'MAKMAL PEI.TYELIDIKAN T'ANAH Bertarikh di KUALA tUI\trUR pada .21 NOVEMBER 2008. SITI Perniagaan Malaysia UsrtD'srtinrriur Due: Fri Nur ?l l5:05:02 WST2008 CE E' SURUHANJAYA SYARIKAT MALAYSIA CoMFANIES COMMISSTON OF MALAYSIA PERHATIAN: SUNGGUHPUN SEGALA USAHA TELAH DIAMBIT UNTUK MEMASTIKAN MAKLUMAT YANG DIBERI ADALAH BETUL DAN KEMASKINI PENDAETAR PERNIAGAAN TIDAK BOLEH DIPERTANGGUNGKAN BAGI SEBARANG KERUGTAN KERANA M.P.KLUMAT YANG TERSITAP ATAU TERTTNGGAL ** I.(AKLI'MAT PERNIAGAA}I ** NAMA PERNTAGAAN ALAMAT UTAMA PERNTAGAAN : GEOSOIL ENGINEERING :A4-10, A-G-12, JALAN pJU r0/10G, SAUJANA DAMANSARA 47830 PETALING JAYA SELANGOR NO PENDAFIAITAN TARIKH PERNTAGAAN MULABERNIAGA TARIKHMULADIDAFIARKAN TARIKH PERUBAHAN : 00 t 70096i-K :2647-2007 :2647-2007 : 02-03-201I TEMPOH LUPLI PERAKUAN PENDAFTARAN SEKARANG:28-t0-20t I BENTUK PERNIAGAAN : PERKONCSI,AN ** iTENIS PERNIAGAAII ** KERJA-KERJA PENGGALTAN DAN PENYELIDIKAN TANAH, KERJA.KERJA DALAM MAKMAL PENYELIDIKAN TANAH ** MAKLITI,IAT CAJ{ANGAI{ ** ++* TL{DACAWANGAN *+* UscrlD. lecyngfer Date Wcd Mar 02 08.43'23 MYT 201I MENARA SSI,{@SENTRAL NO. 7. JALAN STESEN SENTRAL 5, KUALALUMPUR SENTRAI.50470 KUALA LUMPL'R TEL:03-2299 4400 FAKS : 03-2299 4411 EMEL : enquilv@ssm'com.my t/3 Nanta Pemraggan GEOSOIL ENGINEEzuNC Nombor Pendaftamn 001700963-K u/ CE EG SURU HANJAYA SYARI KAT MALAYS IA CoMPANIES CoMMISSION OF MALAYSIA ** NAMA MAKLUI'IAT PEMTLIK MASA KINI ** BALAKRISHNAN A/L AYAIU ALAMAT KEDIAMAN A-I-I2. JLN. PJU IO/IOG, SAUJANA DAMANSARA . 47830 PETALING JAYA, SELANCOR U/ARNA/JENtS BIRU NO K/P (LAMA) 7622'740 NO K/P (BARU) 49033tA85729 TARIKH LAHIR 3 l -03-l 949 BANGSA INDIA JANTINA LELAKI JAWATAN PERKONGSIAN KEWARGANEGARAAN WARGANEGARA MALAYSIA TARIKH MASUK 26-01-2007 NAMA ABDUL AZIZBIN ABDULLAH ALAMATKEDIAMAN NO 3I, JLN INI'AN BAIDURI 48, TMN INTAN BAIDURI 52IOO KUALA LUMPUR. WILAYAH PERSEKU'IUAN WARNA/JENIS BIRU NO UP (LAMA) 566984 NO K/P (BARU) 5906t3035349 r TARIKFI I-AHIR r3-06- I 959 BANGSA MELAYU JANTINA LELAKI JAU/ATAN PERKONGSIAN KEWARGANECARAAN WARGANEGARA MALAYSIA TARIKH MASUK I tiserlD srtrnrerranr Datc Fn n{or 2 I 7-04-2008 lt) l5-04'49 WST 2008 TINGKAT 2.IO-19 PUTRAPLACE. lOO IALAN PI.]-TRA, 50622 KUALA LI'IVIPUR. MALAYSIA. TEL: 03-4047 6000 FAX:03-4041 6317 CONTENT 2) MAI{AGE,ME.NT AND STAF'F * GF*.7 -trEr ;i7 R ,tFr EEQSOTL ENGTNEERTNG ilrq tr.-.t;lr TTh. lFilnr r;l !EIIiF -n-#r (Company No. : 001700963-K) -- [E COMPANY ORGANISATION CHART EXPERIENCE Years MANAGING DIRECTOR BALAKRISHNAN A/L AYALU PROJECT MANAGER ABDUL AZIZ BIN ABDULLAH ln Field and Laboratory (M GGEOTECHNICAL ENGINEER TANABALAN A/L ANDY EXPERIENCE EXPERIENCE 26 Years ln Fleld and Laboratory Six Years with Bachelor of Engineering ( ( Diploma of Civil Eng. ( B. Eng.Hons.) GEOLOGIST ) GEOLOGIST NOOR IZATI BINTI ZAINAL HUSNA BINTI KAMARUDDIN UTM ) ACCOUNT CLERK JAYA A/P MUNUSAMY EXPERIENCE EXPERIENCE EXPERIENCE JUNIOR GEOLOGIST JUNIOR GEOLOGIST Bachelor of Science ( UMS ) B. Eng. Hons. Bachelor of Science ( UMS ) B. Eng. Hons. Nine Years( Soll Laboratory ) ( Diploma Teknologi MaKlumat with with LABORATORY AND FIELD TECHNICIAN LAB TECHNICIAN SAMYSINGAM/5yrs VICKNESWARAN / 5 yrs SRI RAMESWARY 4 yrs/ HEAMAWATHY /2yrs FIELD TECHNICIAN ANBAARASAN / 3 yrs / VINODH /2Yrs SOMORAMAN/2yrs SASITHARAN / 1 yr /SASIDHARAN/1 yr ) MRT SG. BULOH DEPOT SITE CLERK / SUPERVISOR MR. ANBARASAN AJL MAHAL]NGAM EXPERIENCE ( Diploma Teknologi MaKlumat Years ( Lab Technician ) ) CONTENT 3) IABORATORY ANI) EQIIIPMEI\tT GEOSOIL ENGINEERING o LAB Test Equipment Electronic Balance 2 0.001 Electronic Balance 300 kg ( 0.0!]9 m) 1 set with Air Japan GEOSOIL ENGINEERING 2008 Ainsworth England GEOSOIL ENGINEERING 2008 Bm series Japan Wykeham Farrance BS Equipment London, England GEOSOIL ENGINEERING Malaysla GEOSOIL ENGINEERING 2008 Trixial Equipment Speedy Moisture Content Hause 2 1 Company with details of 992 1 1 1 set 2011 1 set 2008 equipment BS Equipment 1 1 993 Wykeham Farrance Dimensional Consolidation 3 1 993 Wykeham One Dimensional Consolidation I 1 993 UCT Test EquiPment Mo isture 200 mm dia Mechanical Sieve 300 mm dia Mechanical Sieve Electrical sieve shaker H d ro mete meter Bulb Atterbe BS& Unit Test 1 GEOSOIL ENGINEERING Malaysia GEOSOIL ENGINEERING London, England GEOSOIL ENGINEERING London, England GEOSOIL ENGINEERING Malaysia GEOSOIL ENGINEERING Malaysia GEOSOIL ENGINEERING 993 Endecotts Ltd London, England GEOSOIL ENGINEERING London, England GEOSOIL ENGINEERING 1 set 1 9S8 Endecotts Ltd 1 set 1 998 Wykeham Farrance London, England GEOSOIL ENGINEERING 119 CN United Kingdom GEOSOIL ENGINEERING QY United Kinqdom GEOSOIL ENGINEERING 10 1 998 2 1 998 2 201 0 BS & GEOSOIL ENGINEERING ASTM Limits lndex Limit - Cone Penetrometer C 1 set 10 nder r Fqryqnge_ 300 content container toN Ownership Year 1 I Location No. Electronic Balance 30 kg ( 1'gm) PMENTS TES 2 nde Linear Shrin Equ nt 6 1 995 1512010 Wykeham Farrance Controls ut ment BS London, England GEOSOIL ENGINEERING Italy GEOSOIL ENGINEERING Malaysia GEOSOIL ENGINEERING GEOSOIL ENGINEERING FIELD TES Test Equipment Field DensitY , bY Sand ORMATION Company with details of equipment Location Ownership 995 Unit test malaysia GEOSOIL ENGINEERING 2 2002 BS EQUIPMENT Malaysia GEOSOIL ENGINEERING 1 210 BS EQUIPMENT Malaysia GEOSOIL ENGINEERING No. 1 SET Insitu CBR Machine with attached rovl UIPMENTS Year 1 Replacment Method ( 100 m4i!qr-) 150 mm dia Moisture content S Lab Pilcon Vane shear 1 set 1 995 Thomas Asworth England GEOSOIL ENGINEERING 1 set 1 995 Thomas Asworth England GEOSOIL ENGINEERING Concret co machine 1 set 2006 Hanken & Robin Malaysia GEOSOIL ENGINEERING Concret cori machine 1 set 201 0 Hanken & Robin Malaysia GEOSOIL ENGINEERING Premix cori machine 1 set 2006 Hanken & Robin Malaysia GEOSOIL ENGINEERING 1 201 0 BS EQUIPMEI.IT Malaysia GEOSOIL ENGINEERING 1 201 0 BS EQUIPMENT Malaysia GEOSOIL ENGINEERING 1 set 2008 BS IPMENT Malaysia GEOSOIL ENGINEERING Rock com ression mach 1 SET Point Load com ssion Mach, 1 SET rc sam Ie extruder horizontal ul ent CONTENT No 4 MtrTHOD OF'STATE,MEI{T ,.- -E -n :-----r .--E- -__-E - -lE_- GEOSOIL ENGINEERTNG (Company No. : 001700963-K) --r- Table 4 . Schedule of laboratory tests on soil Category of Name of test Where details Remarks Moisfure content can be found BS 1377 Frequently carried out as a part ofother soil tests. Read in test Liquid and plastic Limits (Atterberg BS 1377 glYes an indication Conjuclion' with ofthe shear Used to claasifo cohesive soil and as an aid to classifying the fine fraction of mixed soil. limits) limit Cone penetration BS 1377, Ii08] BS 1377 BS 1377 Linear sbrinkage Specific gavity Soil classificahion tests BS 1377 Particle size distribution (a) (b) Ar altemative method cohesive soil of determining the Iiquid limit of Used in conjunction with other tests, such as sedimentation and consolidation. Values commonly range between 2.55 aad2.75, and a more accurate value is required for air voids determination. Only occasional checks are needed for most British soil for r+tich a value of 2-65 15 455s6sd tmless experience of similar sofu shows otherwise. However, determination of specific Savity may be necessary where spoil heap material is concerned, and the test is uormaUy required where soils have come from sites overseasSieving methods give the grading of soil coarser than siltThe proportion passing the finest sieve represeuts the combined silUclay fraction. The relative proportions sieveing sedimeatation silt and clay can outy be deterrnined by of means of sedimentafion BS 1377 BS t924 Organic matter tests which should be carried out when there is a real need for rhis informafion Detecs the presence of organic matter able to interfere with the hydration of Portland cement in soil : cemeut pastes. Sulphate content of BS 1377 soil and ground water Soil chemical pH value BS 1377 Carbonate content t87) Chloride content BS tests The tests assess the aggressiveness of soil or ground water to Buried concrete. (See remarks on test for Ph value') To measwe the acidity or alkal.inity of the soil or water it is usually carried out in conjunction with sulphate content tests. This test and the one above should be pedormed as soon as possible after the sq4ples have been taken. Reference describes method using the Collins' calcimeter' Useful for estimatilg the chalk content ofsoils. 1881 Part 6 Dry densily of BS t377 Measwes the mass of soiids per tmit volfme of soil. Most of these tests are used to establish the dry density ofsoil, either naturaliy occurring or compacted f,rll, to which direct access may be obtained. Some, however can be applied to samples obtained from depth, and these tests are used when the density of the soil is required i-u conjunction with other tests BS 1377 This test indicates the degree of compaction that can be soil on site Soil compaction tests Dry densiry,' moisture content achieved at different moisture contents. Table 4 . Schedule of laboratory, tests on soil (continued) Categorl, of test Soil cornpaction Name of test Where details can be found Remarks Relative densiry of cohesionless soil [10e] Methods for determining the maximum dry density of the soil other than those given in the ASTM are currently in use in the UK. One such method is the use of the vibrating hammer method, specified in BS 1377. This and other altematives are valid the method used is clearl stated. tests BS r377, Pavement design tests California bearing Ratio (CBR) til Ij TRRL frost heave test BS 1377 [1 10,1 12] rneasuremetrt of pore water pressure (c) (d) consolidated undrailred consolidated This is aa empirical test used in conjunction with the design of flexible pavements. The test can be made either in situ, see 29.4 , or in the laboratory . A laboratory test used to deternrine the susceptibility to frost heave ofa of soil. Triaxial compression: (a) undrained (b) undrabed with [10] [110,112] By far the most commonly used of these tests is the standard urdiained test. There is a large amormt of experience in irs use and many partly empirical methods are available to utilize the parameters so obtained in the desip of foundations and other sub-structures. J[s lemaining tests also have their own uses which will be found fi.rily described in the references quoted. The test are nonnally carried out on nominal 100 mm or 40 mm diameter specimens, as appropriate. lr r0,1 121 mdrained with measurement ofpore water pressure (e) (t) cousolidated drained multi - fiaxial (g) stage test free and test Ir 10,1 12] [l 1 10,1 13 14,1 151 [1 16,1 17] Several techniques have been used for both drained and urdrained tests, detafu of which wiil will be found in the references. The test is useful where there is a shortage of specimens, and its mrin use is with 100 mm nominal diameter specfulens, onJy one of which can be prepared from each sampling tube. Soil strength tests Unconfiaed compressive strength Laboratory vane shear Direct shear box : (a) immediate (b) consolidated immediate (c) drained The me of lubricated end platens in the free and test lead to improved uniformily of skess and deformation in all fpes of tiaxial test. It also enables to be reduced to 1: l,thus enabling several 100 mm diameter specimens to be cut from each staudard sampling tube,which is useful ehen a limited number of mdisturbed les are available This simple is rapid substitude for the Lmdrained kiaxial test although it is suitable only for saturated non-fissured cohesive soil For soft clay , an alternarive to uadrained triaxial test where the prepafation of the specimen sometimes has aa adverse effect on the measured of the soil. In the measurement of the shearing resistance of soil, these tests are an alternative to t-iaxial tests,although the latter haye now largely superseded them.one of their man disadvautages is that drainage conditions cannot so easily be controlled. Another is that the plane of shear is predetermined by the nature of the test. One of their advantages is that specimens of non cohesive soil can be more readiiy prepared than in the triaxial test. The small 60 mm square shear box is sorted only to soil containing particies not larger than will pass a 3.35 mm sieve somplying r+'ith the requirements of BS 4l0.For coarser soils,the large 305 mm square box [105] should be used. This is suitabie for soil ali of whose particles will pass a 31 .5 mm sieve complying with the ofBS 410 Table 5 . Schedule of laborator;'tests on rock Categor-v of test Remarks Name of test Where details can be found Saturation moisture content (alteration index) BuIk density Moisture content BS 812 :PartZ, [128] 112e) These tests give some indication of propercies such as compressive strength,modulus of elasticiry,seismic wave velocity resistance to weathering and degree of weatheriag. 0301 [131] Porosiry' D^^1AULfr Thin section Useful to identify rock rype, degree of weathering and gives an Ir32] indication of stess history. Modai analysis by point counting claasification of thin sections may glye some tests Dyaamic tests Slake -durabiJity lr33l Carbonate contetrt BS 188I : Part Swelling test [134] Seismic velocity Dy'namic modulus Point Ioad test Ii38] Uniaxial u3el [135] 1136,1371 compression lndirect tensile tl40] guidance as to the machineability of rock 1126,127l Useful quality index for testi-ng clay-bearing rocks proposed for consfuction materials. 6 Reference descn-bes method using Collins' calcimeter. Useful for the identification of challg calcereous mudrocks. Gives some indication of moisture sensitivity of rock and possible ranges of induced pressures on h:urel linings Resulls may sometimes be useful in extrapolating laboratory and field tests to rock mass behaviour Quick and cheap laboratory and field indicator strength test. Useful aid to core logging. Generally yieid data on the test material on-ly. Its value is Iimited to giving and indication of the upper limit value. The lensth to diameter ratio of 2: I is a minimum fql ,y!*qg*. See remarks on unaxial compression tesl strenglh Rock skength tests tesfdiamet"al compression Ii41] Brazilian test Triaxiai compression (a) undrained u42,r43, (b) undrained with r44) measurement of [145,146] Specimeu size limited by stenglh. It may be possible to include one or more discontinuities in the specimen- Where intact test specimens axe tested , upper skength limits are obtaiued. pore water pressure Direct shear box I i .+7, I48] Rock strength tests Rock deformation tests Static elastic modulus [137,149] for study of friction on residual shear strength. also cover References discontinuities. \Vhere joints 'are fllled with gouge, the properties of the combined gouge joint should be derermined under conditions closely simulating those existing in situ. Absence of represeutative discountinuities in the specimen would load to faisely high values of modulus of elasticity. Specirnen disturbance 6a6 rrnsuitable testing techniques wouid Of considerable importance lead to falsely low values. Effects elsewhere [150]. of size are discussed CATEGORIES OF TEST Triaxial compression test for-the determination to the shear strength properties of soil can be divided into three main categories. 1) Quick - Undrained (QU) tests in wtiph no attempt is made to measure pore pressure and only total stresses are considered. 2) Undrained tests in which no drainage is permitted during the application of the deviator stress Thre e is no dissipation of excess pore pressure , which varies during the test and is measured. 3) Drained tests, in which drainage is'permitted and measured , and no excess pore pressure develops during the application of the deviator stess. Trioxial Test a) without pore pressure measurement. by allowing no drainage dwing the application of confining pressure either prior to or during axiai compression. This is refer as an Unconsolidated - undrained ( u u ) Test Tri^sxial b) Txt without pore pressure measurement By allowing drainage to consolidated the sample after the confining pressure and then preventing further drainage duri.::g compression- Which is applied slowly enough to enabie pre pressure tp equalize so that they can be measured vrith reasonable accuracy. This is the Consolidated - (Jndrained ( CW ) c) DRAIr\{AGE TEST are carried out by co-nsolidating the sample under the confining pressure and allowing further drainage during the compression stage- , Long time periods are need.ed with soilJ of low penneability to allow for consolidation and dissipation ofexcess pore pressure developed during compression, The drailage conditions relating to these Test are summarised In this volume the CU and CD Tests on Sturated soils are treated as Basis This is the " Consolid{tted-Drained (CD) Test " Effective Stress TEST 7371 : PART 8:1990 UI\CONLIDATED UNDRAINED TRIAXIAL TEST 8.i GENERAL B. Test specimens for unconsolidated uncirained triaxial test were 38mm, 5Omm and 75mm Diameter in height trimmed from thin-wailed undisturbed samples. After trimming, the weight and dimensions of the specimen were, measured. The specimen was then set up on the pedestal of a triaxial ceIl and enciosed in double rubbu membrances. A predetermined value of cell pressure, usuaily equal to the total overbudden pressure of the sample, was applied to the specimen tbrough a constant pressue coiurm system. The specimen was then shaered under undrained condition by increasing tfte ver'cical load under as constant rate of deformation of 0.005 run/min. A-fter the shearing process was completed process was completed, the inclination of the failure pla:re and the mode of failure were recorded. The entire specimen was then taken for etermi:ration of moisture content after testing. F,51371 ;PART7:1990 DIRECT SHEAR 1][ST Test specimens for direct shear tests were 60 mm in height trimmed form thin-walled tube samples. A sufficient amount of the sample was collected form the trimmings for moisture content determination of the test spe'cimen before testing. The trimmed specimen was then set up in the shear box. After the specimerr w'?s serup, are detennined, consolidation pressure was applied and '.he shear box was filled lvith water- Vertical disolacement was recorded during the stage of consolidation. During shearing, the horizontal displacement, vertical displacement and shearing resistance were recorded. The strain rate used for the shear test wzu 0.005 mm/min when the shearing process was completeC , the entire specimen was taken for moisture content determination- 7. LTIILLXL{L COIVIPRESSION TEST 7-1 GEh|ERAI, il Specimens of 38mm diameter atdT} mm in height were used for the deterrnination of unaxial compressive strength- The circumferences of every specimens were measured at the top center , arld bottcm to deterrnile the speciraen area Both the height ald the weight of the specimen rvere carefully measured- The strain rate used 0.05r*-rm . The applied load was measured from a load cell, anci axiai load was measured from a dial gage. The maximum axial load causing failure *,as ta-ken as the unaxial compressive strength of the qpecimen. Area correction was taken into account in the computation of compressive strength. ,.".,F GEOSOIL ENGIHEERING BS 1377: P AlRfs:E@. MET}]ODS (Company No. . 001 700963-K) -._ - - DETERMINATION - OF THE ONE-DIMENSIONAL CONSOLIDATiON PROPERTIES 3.1 GE].{ERAL 3. The standard oedometer consolidation test for satured clay is the main feature of this chapter. Characteristics of both normally consolidated . and over consolidated clay are procedure, described. Analysis ofdata from tests on clays is presented as a standard conventional procedure test Special variations on which are described for applications to tests on silty soils. and for are described separately for soils liaving a swelling potential, for partially satured soiis included. are cell peat's. Tests for the direct measurementbf permeability in the consolidation 3.1 .1 . As with other load testing devices, calibration of the consolidation loading frame is important procedure. and this is covered together w.ith other practical aspects of the apparatus and testing 3.1.2. PURPOSE determination of the consolidation characteristics of soils of low permeability. The two parameters norrnally required are: ( 1 ) The compressibility of the soil expressed in terms of the coefficient of volume comprerribltity; aiso knoun as modulas 6f v6|rrme change (NIu), which is a measure of the amount by u'hich the soil will compress when loaded and allowed to consolidate. ( 2 ) The time related. parameter expressed in terms of the coefficii:nts of consolidation which indicates the rate of compression and hence the time-periosd over which The oedometer consolidation test is used for the consolidation settlement will take place- 3.1.3. COMPRESSIBILruY structural foundation, is placed on the ground, some Whenever a load, such as that due to a -the applied pressure is well within the safe bearing degreb of Settlement wiil occur even if capacity of the soil. The Iimitation of settlements to q'ithin toierable limits is sometime of greater signiflcance in for:ndation design than limitation imposed by bearing capacity requirement , ' derived form shear st'ength. 3.7.4 TIME EFFECTS Settlements in sands and gravel's take place in a short time , usuaily as construction proceeds, and these rarely cause major problems. But in clay soi1s, because of their low permeability, settlement can take place over much longer periods months, year, decades, even cenfuries, after completion of consiruction. Estimate of the rate of settlement and of the time within which settJement will be virtually complete, are therLfore,rmportant factors in foundation design- GEOSOIL ENGIilEERIHG _rE -_ -rlrr E --. -]-ET o D oF STATE --E-ilT-f -_ LABORATORY CALI M M H o (Company No. : 001 700963-K) r BEARING RATIO TEST The Laboratory CBR Test shall be carried out on Backfill Sample to find out the sample is Suitable or Unsuitable for Backfilling. 2 a) d !) 1 a) 4 b) Test in Accordance ( BS 1377: Part 4 : 1990,.Clause 3 ) Determination of the dry density/ Moisture content relationship. Moisture content and maximum dry density Determination of the dry density / moisture content relatioship This test covers the determination of the mass of dry soil per cubic metre when the soil is compacted in a speified manner over a range of moisture content including that giving the maximum mass of dry soil per cubic ,metre ln this test a 2.5 kg Rammer or 4.5 kg is used for compacting the sample ( BS 1377 : Part 4 : 1990, Clause 7 ) Determination of the California Bearinq Ration Test ( CBR ) Sample shall be compacted to the Optimum Moisture content and maximum dry density obtained from the compacted sample. This method covers the determination of the California Bearing Ratio( CBR of soil, which is obtained by measuring the relationship between force and penetration when a cylindrical plunger of cross - sectional area 1935 sqm is made to penetrate the soil at given rate. At any value of penetration the ratio of the force to a standard force is definc-:d as the Califirnia Bearing Ratio ( CBR ) CBR Top and Bottom shall be carried out for 4 Days ( 96 hrs. ) of Backfill Sample ( CBR Value shall not less then 5 % 5 Soaked a) The results 6 a) A load 7 a) b) I ) Seatinq Plunqer of 4.5 Kg,surcharge weights is used to seat the plunger on the surface of the soil,the load and the penetration gauges for measunng are set to zero. Aoplication of load Start the test so that the plunger penetrates the soil or crusher-run to a uniform rate of '1 . 2 mm per minute. Record the force measurement rn kN at the intervel of penetratton of 0.25 mm, to a total penetration not excedding 8.00 mm a) Test Result Load / penetration curve. The reading of load are plotted against the penetration rn mm The CBR Vaiue is given in Percentage at 2.5 mm and 5.00 mm penetration I Calulation of C.B.R. 9 Note Note : for Unsoaked CBR : for soaked CBR. x Proving Ring constant 0.033 kN / cjiv x Proving Ring constant 0.008 kN / div tlrL_=lr- .--( '- - - Ir-- -Ira- GEOSOIL ENGIHEERIHG (Company No' 001700963-K) r -II -. METHOD OF STATEMENT for LABORATORY CALIFORNIA BEARING RATION TEST 1 2 a) a b 3 a) 4 b) 5 a) The Laboratory CBR Test shall be carried out on Backfill Sample to find out the sample is Suitable or Unsuitable for Bacfiling. Test in A.ccordance ( BS L377 : Part 4 : 1990, Clause 3 ) Determination of the dry density/ Moisture content relationship. Moisture content and maximum dry density Determine of the dry density / moisture content relationship This test covers the determination of the mass of dry soil per cubic metre when the soil is compacted in a specified manner over a range of moisture content includlng that giving the maximum mass of dry soil per cubic , metre In this test a 2.5 kg Rammer or 4.5 kg is used for compacting the sample ( BS t377 : Part 4 : L99O, Clause 7 ) Determination of the California Bearing Ration Test ( CBR ) This method covers the determination of the Glifornia Bearing Ratio (cBR) of soil , which is obtained by measuring the relationship bewveen force and penetration when a rylindrical plunger of cross - sectlonal area 1935 sqm is made to penetrate the soil at given rate. At any value of penetration the ratio of lhe force to a standard force is defined as the California Bearing Ratio ( CBR ) Sokaed CBR Top and Bottom shall be carried outfor 4 Days ( 96 hrs. ) During Soaking the swelling measurement shall be recorded. 6) Seatinq Plunqer a) A load of 4'5 kg, surcharge weights is used to seat the plunger on the surface of the soil, the load and the penetration gauges for measuring are set to zero. 7) Application of load a) Start the test so that the plunger penetrates the soil or crusher-run to a uniform rate of 1 mm per minute. Record the force measurement in kN at the interval of penetration of 0.25 mm, to a total Penetration not excedding 8.00 mm 8) Test Result a) Load / penetration curve. The reading of load are plotted against the penetraLron in mm The CBR Value is given in Percentage at 2.5 mm and 5.00 mm penetration 9) Calculation of C.B.R a) Penetration reading at 2.50 mm = Penetration reading at 5.00 mm = b) Force Force 167 x proving Ring constant 0.008 kN / div 2BB x proving Ring constant 0.008 kN i div ( kN ) at 2.50 mm = 7.34 I t3.Z = 10.1 % ( kN ) at 5.00mm = 2.30 I 2O.O = 71.6 o/a Penetration (mm) 2.5 5.0 Force ( kN) Standard Force kN) (%) 7.34 2.30 13.2 10.1 11.6 ( 20.0 CBR Value 10) Reportinq of results. a) b) Where the results are within 10 Where the results are above 10 11) a) 4 Days ( Soaked CBRValue ) The results of Backfill sample ( cBR value shalt not less than s oh ) o/o o/o the mean ratio, the results shall be averaged the Maximurn value shall be recorded. GEOSOTI. EHGIHEERTHG r-- u-- -E-- (Company No. : 001700963-K) -- --E f!L-- -- METHOD OF STATEMENT ( ]NSITU CALFORNIA BEARING RATIO TEST The In - ) situ California Bearing Test were carried in accordance BS t377 : Part : 1990. Clausei 4.3.7 Scooe This method covers the determinations of the California Bearing Ratio (CBR) of a soil tested in situ. with a selected overburden pressure, by using a rylindrical plunger ( Cross - Sectional area sq cm ) to penetrate the Soil or crushed rock ( Crushed run ) compacted at the site. Test Procedures After the area has been well compacted and ready to test, the Lorry is reserved with the required Load. The CBR Jack is fitted to the brackeG at the back of lorry, the calibrated Proving ring Capacity ) is fitted to CBR Jack, with the plunger. The plunger is lower down so that is just about to touch the surface area to be tested. ( 40 kN ) ( 40 kN Seating Plunger A load of 4.5 kg, surcharge weights is used to seat the plunger on the surface of the soil, the load and The penetration gauges for measuring area set to zero. Application of load Start the test so that the plunger penetrates the soil or crusher-run to a uniform rate of 1 ; 2 mm per minute. Record the force measurement in KN at the interval of penetration of 0.25mm, to a total penetration not exceeding 8.00 mm. Test Result Load I penetration curve. The reading of load are plotted against the penetration in mm The CBR Value is given in Percentage at 2.5 mm and 5.00 mm penetration. Calculation of CBR Penetration reading at 2.50 mm = 180 x Proving Ring constant 0.0381 KN / div Penetration reading at 5.00 mm = 496 x Proving Ring constant 0.0381 KN Force Force / div ( KN) at 2,50 mm = !7.24 I 13.2 = 85.150/o ( KN) at 5.00 mm= 19.23 I 20.0 = 98.68% Maximum CBR Penetration value shall be Force (mm) (kN) 2.5 5.0 77.24 19.74 Passing Standard Force CBR Value (KN) ( o/o) t3,2 85.15 98.68 20.2 value for Roadbase not less then 80 o/o _m -- ---_IEI.EL 4 EE EE...---r--t --IL_ --- GEASOIL ENGIfif EERTNG E--' -.E' - (Company No. : 001 700963-K) Ir - METHOD OF STATEMENT PREMIX CORING 1 One unit of Hakken SPM 12 V Diamond Core Machine powered by a Yamaha 1.75 KW Ac Generator was used for the coring of bituminous surface and the hard - core material A 100 mm diameter Hakken core Bit was used to performe the coring. 2. Coring was carried out up to the subsoil and core samples extracted. Thickness of each Layer and the typed of material were logged. Core samples extracted were then reinstated back to its hole position- GEOSAIL ENGITiEERING -- (Company No. . 001700963-K) =r- \E7 -Er -..'lr - METH OD OF SIATEMENT STANDAD 1. a) ) : BS 1377 :Part 4 : Mould. Mould diameter : Mould helght : 1990 ( Clause 3'4) Compa 105.0 mm '1 '15.5 mm Contpacti' an Rammer ( 2.50 ko Ram : 50.00 mm 300.0 mm 1000 Cubic Metre / cm3 Volume or 4.50 kq rammer Rammer diameter : 50.00 mm Falling Height : 450 mm a) Rammer diameter b) Falling c) Compaction .| Determination of the drv densitv / Moisture content relatioship a) 4. a) b) c) d) Height : Effort: 27 Blows 3 Layers Compaction Effort : 27 Blows 5 Layers This test cover the determination of the mass of dry soil per cublc metre when the soil is compacted ina specified manner over a range of moisture content, including that giving the maximum mas of dry soil per cubic metre ln this test a 2.5 kg Rammer falling through a height of 300 mm is used. or In this test a 4.5 kg Rammer falling through a height of 450 mm is used' Procdure Soil not susceptible to crushing during compaction. a 3 kg or 5 kg sample air dried soil passing the 20 mm bs test sieve. ( reported nearest 1 %) The mould,with base plate atteched, shall be weighed to the nearest 1 g' The moist soil shall compacted onto the mould with the extension atteched. in three( 3 )or 5 layer of approxlmately equal mass, each layer being given 27 blows from the rammer dropped from a height of 300 or 450 mm above the soil' The blows shall be distributed uniformly over the surface of each layer, The amount of soil used shall be sufficient to fill the mould The compacted soil specimen shall be removed from the mould and placed on the large tray, w, a representive sample of the specimen shall be taken and its moisture shall be determine. same procdure as item c, the sample shall compacted at different five moisture optimum moisture content and maximum dry density content to obtained occures , is within that ranges 5. a) Repoftinq of results. The Expermintal points and the smooth curve drawn through them showing the relatlonship b) between moisture content and dry density shall be reported. The dry density in Mg/m3 , corresponding to the maximum point on the moisture content / dry densrty curve shall be reported as the maximum dry density to the nearest 0.01 c) .IIT E - m B-4.E GEOSOTI- EHGTNEERING - rrr}h..Ut.ilE[ TTL- (compan1, No. : Ofi 7a0963-K) --,EI -r METHOD OF STA TEIVTEN T ( Field ( Small Pouring cylinder ) Part DAD Test ) 9 the dry density of soil on the site. Sand reolacement method suitable method suitable forfine, and medium - arained soits ( smal! pourinq cvlinder method ) This method covers the determination in situ of the dry density ( mass of dry soil per cubic metre ) of natural or compacted fine - and medium grained soils for which a 1 15 mm diameter sand - pouring cyiinder is used. Determination of a) b) c) d) 2. a) b) c ) d) Determination of the mass of sand in the ccne of pouring cylinder Determination of the bulk density of ( ps Mgim Cu.metre The internal volume v in cm cu. of the calibrating container shall be determined from the mass of water required to fill the container. sand , Procedure Metre Measurment of ) soil densifu A flat area, approx. 450 mm square, of the soir tested shair be exposed and trimmed down to a level surface, preferably with the aid the scraper tool. The metal tray shall be laid on the prepared surface of the hole over the portion of the soil to be tested. 100 mm diameter hole and the depth of layer to be tested upto a maximum of 150 mm shall beexcavated inthe soil. No loose material shall be left in the hole and the immediate surround to the hole shall not be disturbed. The pouring cylinder, fllled to the constant mass, shall be placed so that bass of the cylinder covers the hole concentricall, The shutter on the pourrng shall be closed during this operation. The shutter shall the be opened and sand allowed to run out. The Pouring cylinder and the surrounding area shall not be vibrated during this period. when no further movement of the sand takes place the shutter shall be closed. The cylrnder shall be removed and weighed to the nearest 1 gm. e) f) s) h) soil, The bulk density of the p in Mg/m cu. Metre. shallbe claculated. The mositure content shall be determined from the exvated from the hole. Standard or Modified compaction shall be compacted to optained optimum moisture content and maximum dry densrty Degree of compaction at site shall calculated from the result from following ;Dry Density of the compaction at the over Dry Density of laboratory compaction i) The Value is given a Material The Replacment SAND The replacment sand shall be a clean SAND and oven dry which provide a bulk density that is reasonably consistent. The grading of the sand shall be such that 100 % passes a 600 micron test sieves and 100 % is retained on a 63 micron test sieve. a) ino/o _ --- EET- I I- GEASOIL ENGTNEERING -t-EL-r! t--ry - -E (Company No. : 001700963-K) E - -._+ METHA D OF STA TEMENT (Fi eld Densitv Test ( Pcore cutter method ) STANDAD : BS 1377 Part I : 1990 1. Determination of a) Core - b) This method covers the determination in situ of the dry density ( mass of dry soil per cubic metre ) of natural or compacted soil in- situ. c) A cyliderical steel core - cutter, '1 30 mm long and 100 mm internal diameter, with a wall thickness of 3 mm bevelled at one end, of the type illustrated in fig 30' V in cm Cu. Metre of the calibrating container shall be The internal volume determined from the mass of water required to fill the container, d) 2. a) ) the dry density of soil on the site lk soils freee arained and method for stones , Procedure Measurment of soil densitv b) A flat area, approx. 450 mm square, of the soil tested shall be exposed and trimmed down to a level surface, preferably with the aid the scraper toolThe metal tray shall be laid on the prepared surface of the hole over the portion of the sorl to be tested. 100 mm diameter hole and the depth of layer to be tested up to a maximum of 150 mm shall be excavated in the sotl. c) No loose material shall be left in the hole and the immediate surround to the hole d) e) f) s) h) i) J d) shall not be disturbed. The pouring cylinder, filled to the constant mass, shall be placed so that bass of the cylinder covers the hole concentricall, The shutter on the pourlng shall be closed cjuring this operation. The shutter shall the be opened and sand allowed to run out. The Pouring cylinder and the surrounding area shall not be vibrated during this period. When no further movement of the sand takes place the shutter shall be closed. The cylinder shall be removed and rveighed to the nearest 1 gm, soil, P in Mg/m cu. Metre. shall be claculated. The bulk clensity of the The mositure content shall be determined from the exvated from the hole. Standard or Modified compaction shall be compacted to optained optimum moisture content and maximum dry density. Degree of compaction at site shall calculated from the result from following :Dry Density of the compaction at the over Dry Density of laboratory compaction The Value is given inTo Material The Replacment SAND The replacment sand shall be a clean sAND and oven dry. which provide a bulk density that is reasonably consistent. The grading of the sand shall be such that 1 00 % passes a 600 micron test sieves and 100 % is retained on a 63 micron test sieve. COruTENT ( 5) CERTIFICATE OF CALIBRATION SUCE/Ct]18 s,1l cl't'RA I]il{a sDI{'IIFI'[-) LI T P IL.E CH EC PIlE C,ASI Pe-"a JNJ &i PFIOJECT LOCA TION tv\K 11)fr Tll\4E IrS BUILDI\IG / BLOCK L+[4 [ lo [2 DATE P INIG tE DATE REF L NG-IH OF PILE N] 0"n"4-+ ON OF LATE P END E? CO D el PILE MNI srRnto E ND P LATE SQ U ARE N E SS O F o.l(. N o.K NO OF PILE (-) o.K. C B.ACK TNES N o T a) l(. S NG R KS I{O I I J /n t ,J ryt 3C. ) a S-h r- 356 JOO tf C: *{f f (*) (-r ri* irt il-:' . SU Uh ':1 .j < rrl' q ,,) ( ',: - .)- CONFIRMED Ir. , 'clil hlAI\4t: !\/I rl MECHTECH BERVICES toolssosoe-D) r;#* 47, JAi-AN JEJARUM 48, SEKSYEN 9 BANDAR BUKIT BERUNTUNG NO. 48300 RAWANG SEI.ANGOR DARUL EHSAN TEL: 603-6021 123i FAX I 603-6021 1233 o CERTIFICATE OF CALTB ISSUED BY DATE OF ISSUE CERTIFICATE NUMBER A : MECHTECH SERVICES : 13 FEBRUARY 20i2 : SAM ROVED ISSUE TO GEOSOIL ENGINEERING N0. A-G-12, JAIAN PJU r0/10G SAUJANA DAMANSARA 47800 PE*IALING JAYA SEIANGOR DARUL EHSAN PERSON INCHARGE MR BALAKRISHNAN MANAGING DIREfTOR JOB NUMBER DATE OF CALIBRATION t MSl2010056 PAGElOF2PAGES DEPARIMENT ;/) ; CS0018 : 11 FEBRUARY 2012 BHA IGITATORY A 1985 11 FEBRUARY 2013 CALIBRATION STICKER NO REQUESTED CAL. DUE DATE EOUIPMETIT DETAILS MODEL : DIAL GAUGE :NL : NL 7021 SERIAL NUMBER r N/A DESCRIPTION MANUF''ACTURER CALIBRATIO}I DETAILS BASIS OF'TEST UPON RECEIVING UPON RETURNING RELATED NUMBER CAPACITY : BS 1610 : PART I t 1992 : GOOD PHYSICAL CONDITION I CALIBRATED : RESOLUTION READABILITY EITYIRONMEHTAL : C : ; J ?1339 12,7 mm mm 0,002 0,002 rnrF OND ITI OIq S BEGIN END TEMPERATURE : 24 REI-ATIVE HUMIDITY r 64 2+ 64 .C %R.H, R.EFEREI{CE EOUIPME}IT DETAILS WORKING PROCEDURE EQUiPMENT USED IDENTITY NUMBER TRACEABILITY ued with traceab rlity to recognised nation a1 standards and to the u nitg of meaau rem snt national Etan d a rds Iab oratory Copyrrght of this cert ificate I6 own ed by rh e !6 su tn s lab aralory other th an in fu t1 e,lc ept with th e p r10r written apP roval of th H ead of the IEB uing lab o ratory certificat e is C0rrebP o nd rng ro d uc ed ]N HOUSE PROCEDURE WI2OOF" DIAL GAUGE CALIBRATOR MS 0010 NML SiRiM BERFTAD at the may not be CERTTFNCATE GF C&ITERA?I+H ISSUEI) BY r I\,{E(]HTECH SEFIIiICE;q L,ATE DF ISSUE DESCRIPTIO},tr r 13 PEERUARY 201! I DIAL GAUGE CEFIT]F.ICATE SER]AL BER }.IUIVI },IUh{BER IVI S12U1O T] 5 6 N1A CALIBRATIOI{ RESULTS LII\IEARITY PAGE2OF2PAGES CALIBRATION RANGE, 25 UNIT IN mm TLrRI'lED DIVISOTJ mm TURN u I 0.Doo0 2 U.UIJUU -0.0002 -ur 0005 0,0005 -o ooo/ 3 -0,0006 4 -0 00118 -Ll,Li0O8 5 -0.0008 b -!J,UUU9 -U.UUIU -O.OOLI 7 -o.ooL1 I 0.00{_'}9 -o.riot3 -o.oot4 9 -0.0011 -0 0013 1U -o.uol4 11 -0.01r15 o.0016 -o.oo15 t2 13 -0.01i16 14 -o o018 -0 0017 -0.0018 15 16 I7 t8 19 20 2L 22 23 24 25 -L't,0019 -o.DDt+ -0,00r5 -0.rx)r+ o.0014 -0 0015 fi rtnl 6 -0.0017 0.0017 -0,0016 0,0017 -0,0r118 -t),0u1 -0.0019 -0.0020 -0.0019 -0.0019 -0.0020 -0.0020 -0,0021 -o.0019 -o.0020 -0.0021 -0.oo22 -0.0022 -0.0023 -0.o023 0.0023 0,0025 0.0026 7 -0,0021 0.o022 L.r,OLr25 0 0025 0.0025 ll flt^rtE 0,uLr2 r -f\ -0.0023 -o,0024 0,0025 -0,0025 itatr4 II{G AVE REPEAT Expernded U -L]LIU9 -0,0005 -o,ouu6 0.0006 -0.0007 O,UUU+ 0,0008 uncertaintl,r t 0,002 rnrn Esiimatecl at a conficience 1evel olappro:rimately 959t with a coverage factor ol k = 2,16 The suitab ility of tire instrurnent for its intentied use.shor-rld b e detennined b a-sed on the user's requrrement b fl,{# Cl II TTALIBRATED EY hl.ltr, r'71 li\/l\ a!,'_tfl T sta tt darl s ogfl I( ed natlon to IB IE ISBLI ed t rac rresp 0 rrdtrr g natlor al stan d ard s lab orat ary -,Dp yngh of his certificate 6! 'llt h th B p 11{ r ',,vr1tteri ap p ro, al of th rep r,l d u c e,l ot h er h 'aIt 1n iu 1l D ADDD Er arr: TORY e unit t; of IIleasu rerIr ent reahs eil al lng 1ab Drato ry and tri ay n ot by th g Iab orat 0 ry u 1rr h e la oI H ead e a 0'eRn ed b JL CERTIFICATE OF CALTERATION ISSUED BY MECHTECH SER\4CES DATE OF ISSUE : CERTIFICATE NUMBER 13 FEBRUARY 2012 COMPAM ADDRESS MECIITECE BER|IIICES : MS1201 57 (ootosssoe-Dl NO. 47 JAI.A,N JF^'AROM 4E} SEKSYEN 9 BANDAR BUIflT BERUNTUNG 48300 RAWANG SELA}IGOR DARUL EI{SA}{ TEL:603 6027 1237 FAX:6O3 602l L233 tEa PAGE 1 OF ISSUE TO GEOSOL ENGINEERING NO. A-G-12, JALAN Pru IO/IOG SAUJANADAMANSARA 47800 PETALINGJAYA ,n\ r-t-\ SELANGORD.ARUL EHSAN )$) e/ PERSON INCHARGE DEPARTMENT MR BALAKRISHNAN MANAGING DIRECTOR JOB NUMBER cs0018 CALIBR{TION STICIGR NO. DATE OF CALIBRATION 11 FEBRUARY 2012 REQUESTED CAI. DUE r : A 19E6 DAIE: 11 FEBRUARY to 13 EPIIIPMEilT DETAII.S DESCRIPTION MANUFACTURER MODEL SEzuAL NUMBER : DIAL GAUGE : BATY : CLl : N/A REMARKS N/A RANGE 25 0.01 0.01 RESOLUTION READABILITY BEING BS 907 : 1965 50 TURNED 24 TEMPERATURE i GOOD WORKING CONDITION 62 RELATM HUMiDITY : NO ADJUSTMENT MADE REFEREI| CE EOUIPMETIT DETAILS EQUIPMENT USED IDENTITY NUMBER TRACEABILITY E1III IIilIt EIII'IROISUEIrTAL COilDITIONS CALIBRATTOI{ DETAILS BASIS OF TEST CALIBRATION RANGE EQUIPMENT CONDITION REI,ATED NUMBER DiAL GAUGE CALIBRATOR MS OOIE SAMM ACCREDITED I.ABORATORY Thrs cerhficate rs rssued with traceabrlit5r to recognised natronal standards and to the urrits of realised at the correspondirrg nalional standards laboratory. Copynght of this certificate is owned by iaboratory and oot may be reproduced other than rn full except rith the prior written approval of the 24 62 o C YoR.H. CERTIFIC.E.TE OF CALTBRATION ISSUED BY MECHTECH SERVICES CATE OF ISSUE 13 FEBRUARY 2012 CERTIFICATE NUMBER DESCRITflON DIAL GAUGE SEzuAL NUMBER : : MS12010057 N/A PAGE2OT3PAGES CALIBRATIOII RESULTS CALIBRATION RANGE 50 UNIT IN Illm DrvIsolt o 10 TURNED 2A TI'RIT o 1 0.ooo0 2 3 -o.oo06 4 -o.ooo8 -0.0009 -0.ooo9 -o.oo10 5 6 7 8 9 10 I1 L2 13 t4 L6 16 t7 1A t9 20 2l 22 23 24 25 50 60 30 40 COLLECTIOII READING M UI{IT -m 70 80 9() 0.0000 -0.0002 -o.ooo5 -0.ooo5 -o.ooo7 -o.oo09 -0.0009 -0.0009 -0.0010 -0.0012 -0.o011 -0.oo13 -0.0014 -0.0011 -0.0013 -0.oot4 -o.oo14 -0.00i5 -0.0014 -0.0014 -0.0015 -0.0016 -0.0015 -0.0015 -0.0016 -0.0017 -0.0017 -0.o016 -0.oo16 -0.0017 -0.0018 -o-oor7 -0.0018 -0.o019 -0.0017 -0.0020 -0-0019 -0.0o18 -0.0019 -o.oo19 -0.0020 -o.oo19 -0.oo20 -o.oo20 -0.0021 -0.0o21 -o.oo22 -o.oo22 -0.0o21 -0.0023 -0.0025 -0.0023 -o.oo24 -0.0023 -0.0023 -o.oo2s -0.0025 -0.0025 -o-0025 -0.0025 -0.0025 -0.0025 -o.oo27 -o-oo26 -o.oo26 REPE,ATABILIIY: Expanded uncertaint5r AVERACE REAI'ITG ' t O.O02ma 0.002 mm Estimated at a confi.dence level of approximately 95Y" with a coverage factor of k = 2 Ttre suitabilitSr of tl.e instrument for its intended use,strould be determined based ##- CAIIBRATED BY NOR AZLI This certificate is issued wit-h traceability to recognised nationa.l standards and to tJle units of measuremerlt reahsed at the corresponding national standards laboratory. Copyright of this certjfrcate is owned by the issuing laboratory and may not be reproduced other than rn full exept p'ith the prior wntten approlal of the Head of the rssui4g CERTIFICATE OF CALTBRA?IO}I ISSUED BY MECHTECH SER\,']CES DATE OF ISSUE 13 FEBRUARY 2012 CERTIFICATE NUMBER MSl DESCRIPI]ON DIAI GAUGE SERiAL NUMBER NIA 10057 CALIBRATION RESULTS LtrTEARITY CALIBRATION RANGE 50 UNIT IN tllm DwISO$ o 10 T1'Rfi 2t; 27 2A 29 30 31 32 33 34 35 36 -o.oo27 TURNED 20 30 40 50 60 COLLECTIOII RtAIr[{G II{ UHIT -- 70 ao 90 -0.oo27 -0.0028 -0.o029 -0.0029 -0.0028 -0.oo29 -0.0030 -0.0031 -o.oo27 -o.o028 -0.0029 -0.0o30 -0.oo30 -0.0030 -o.oa29 -o.oo29 -0.003 -0.0030 -0.0031 -0.0031 -0.0032 -o.0033 i -0.o031 -0.0030 -0.0031 -0.001 -0.0033 37 -o-o032 -0.oo34 -0.oo34 -0.oo35 -0.0032 -o.0035 -0.0033 -0.0035 40 -0.0034 -o.oo36 41 -o.oo34 -o.o037 42 -0.o034 -o.oo37 43 -o.oo35 -0.o036 44 -o.0036 -0.0036 45 -o.oo36 -0.0032 46 -0.0o38 -0.0038 47 -0.0037 -0.0038 -0.0039 -0.0036 -0.0038 -o.oo37 4A -0.0037 -0.0039 -0.0037 -0.0038 -o.oo37 -0.00I 49 -0.0o38 -0.0037 -0.0039 -0.0038 50 -o.oo39 -0.o039 REPEATAEILITY: AVERAGE READII{G O.(}02mm 38 39 Expanded ulcertaint5r = + 0.002 mm Estimated at a con-fidence level of approximately 95oh with a coverage factor of k = 2. The suitabilif5r of tJle instrument for its intended use,should be determined bas,ed on BY NORAZLI ertifiete is iesued with traeabfity to recognised nab.onal stmduds and to the units of mnespondrng national stadrds labomtory. Copynght of this ertiEcate is omed by ttre labmatory not be reproduced othq thm m full except with ttre prior mtten approval of the Head of the rssuing at ray lb CERTIFICATE OT CALTBRATIOI{ : ISSUED BY MECHTECH SERVICES DATE OF ISSUE COMPANY ADDRESS : CEKIIFICATE NUMBER 13 FEBRUARY 2012 MECIITECH SERVICES MS12010058 (oo13-5ssoe-Dt NO. 47 JAIAN JE.'AROM 4B SEKSYEN 9 BAI{DAR BUIflT BERUNTUNG 48300 RAWANG SELA}IGOR DARUL EHSA}I TEL:603 6021 123I FAX:603 6021 1233 PAGElOTSPAGES ISSUE TO GEOSOILEI'IGINEERING JALANPru IO/IOG NO. A-G-12, SAUJANA DAMANSAXA 47800 PETALINGIAYA SELANGORDARULEHSAN PERSON INCHARGE DEPA-RTMEI{T MR BAI"AKRISHNAN MANAGING DIRECTOR JOB NUMBER csool8 DATE OF CALIBRATION 11 FEBRUARY 2012 A I9E7 CALIBRATION STICI(ER NO. REQUESTED CAI. DUE DATE 11 FEBRUA.RY 2013 EQUIPUET{T DEf,AILS DESCzuPTION DIAI GAUGE REI"{TED NUMBER MANUFACTURER MODEL SERIAI, NUMBER 10 JEWEI.S RANGE RESOLUTION N/A N/A REMARKS REFERET{CE EQ UIPMET{T EQUIPMENT USED IDENTITY NUMBER TRACEABILITY certifcafe u rsuad 0.002 0.002 READABILITY CALIBRATTOH DETAILS BASIS OF TEST CAIIBRATION RANGE EQUIPMENT CONDITION F 06607 L2.7 flrm II}In IIun EIII'IRO TDIEIYTA.L CO I{DITIO I{S BS 907: 1965 50 TURNED GOOD WORKING CONDITION NO AD.IUSTMENT MADE D BEING END TEMPERAIURE : 24 REI,ATM HUMIDIT; 64 24 "C 64 %R.H. ETAILS} DIAL GAUGE CALIBRATOR MS OO18 SAMM ACCREDITED LABORATOH vith frea^bility to recognied aatiorul rtsodrds rrd to tbE unitr of @Eur.'qt realied corespondirtg natronal stmdads laboratory. CopSright of ttris certGete is owned by the isuiog labmtor5r md may not be reproduced other thm m full except with the prior rritten approval oI the Head of the isuirlg tJ:e CERTIFICATE OF CALIERATIOI{I ISSUED BY MECHTECH SER\,1CES DATE OF ISSUE 13 FEBRUARY 2012 CERTIFICATE NUMBER DESCRIPTION DIAL GAUGE SEzuAI NUMBER MS 10058 :N/ PAGE 2 OF PAGES CALIBRATTOI$ RESULTS LIlIEARITY CA.LIBRAT]ON RANGE 50 UNIT IN rlm DwISOll o to 0.0000 0.0000 TI'RI{ o I 0.0005 0.0008 0.0008 2 3 4 TURNED tr 20 3() 4() 5() 70 COLLECIIOH READIIIG III UIIIT rm 0.ooo2 o.ooo4 0.o005 0.0005 o.0006 0.0007 0.0008 0.0008 0.0009 0.0009 0.ooo9 5 0.0009 0.00r0 6 7 0.0010 0.0012 o_0o12 o_oo12 0.0013 o.oo13 o.oo14 0.oo14 I 9 10 11 LZ o.oo14 0.o014 0.oo15 0.00r6 14 0.0017 0.0017 0.0018 0.0019 0.0019 o.0020 0.0020 16 L7 l8 19 20 2t 0.0016 o.ool7 13 I5 0.0015 o-oo15 0.0017 0.0016 o.oo17 0 0008 o.oo14 o.oo15 o oo16 0.o024 o.oo25 o 0025 o.oo18 o.oo19 0.0020 0.o019 0.0019 0.o020 0.oo20 o.oo22 o.oo24 0.oo25 o.oo25 o.oo25 0.0025 o.oo25 o.oo27 AVERAGE 95o/o 0.0023 REAIIIIG = O.(X)ilmm with a coverage factor of k = 2. The suitability of the instrument for its intended use,should be determined based on s o.0006 0.0007 0.oo21 Expanded uncertainty = f 0.O02 mm Estimated at a con-fi.dence levei of approximately CALIBRATED BY MOHAMAD GHAZALI 90 o.oo2l o.oo21 22 o.oo22 23 o.oo22 o.oo23 24 25 0.0026 REPEATABILITY: 0.oo14 ao 's SUL This cerlifrcate is rssued with traceabiiity to recogrrised national etandarde and to the units of at the c.orrespond:ng national standards laboratory. Copyright of this certiEcate is owned by the issuiqg may not be reproduced other than in full except rp'ith the prior wrLtten approval of tJ:e Head of the issuirrg and CERTTFICATE OF C^&LIBRAIrION ISSUED BY MECHTECH SER!'ICES DATE OF ISSUE 13 FEBRUAR\'2012 CER]I'IFICATE NUMBER MS12010058 DESCPJPTION DIAL GAUGE SEzuAL NUMBER N/A PAGESOFSPAGES CALIBRATIO$ RESULTS LIIIEABITY CAIIBARTION RANGE 50 UNIT ]N run DrvIsolr Tt Rtt A6 27 2A 29 3(} 31 32 33 34 35 36 lo o 0.0o30 38 39 0.0032 4() 0.oo33 41 0.0035 o.oo34 0.o035 N 50 60 70 EO 90 0.0028 0.0028 0.0029 o.oo29 0.0030 o.oo31 0.0031 0.0030 0.0031 0.0030 0.0031 0.0033 0.0031 0.0034 0.0034 0.0034 0.0030 0.oo36 o.0036 $ 0.0037 47 0.0037 0.0037 48 0.0038 49 0.0039 50 0.0040 REPEATABILITY: Expanded ffiTmm 0_0029 0.0032 43 44 45 30 20 o.oo27 o.oo27 0.o028 0.0029 0.0030 o.oo30 0.0028 0.0028 :tt 42 TURNED uncertainff = 0.0038 0.0038 0.00s9 0.0039 0.0039 0.0033 0.0033 0.0034 0.0035 0.oo36 0.0035 0.0035 0.0036 0.0037 0.0037 o.oo30 0.0031 0.0032 0.0032 0.0032 0.0037 0.0038 o.0039 0.0038 0.0039 0.0039 0.0040 AVERAGE RE,AI}IT{G 0.0038 O.(X)2mrn 0.002 mm Estimated at a confidence level of approximat ely 95Yo with a coverage factor of k = 2 .76 The suita.bility of the instruaent for its intended use,should be determined orr BY MOHAMAD GH,qZAIi certi.Ecate is issued wittr traceabrlity to recognised natiorral standards and to the units of measurement realieed at conespondilg oational standards laboratory, Copyrieht of this certifcate rs ocmed by t}le issuiog laboratory and may be reproduced oftrer than in full except wjth the pnor written aDlrroval of the Head of the issuirrg laboratory, 1 CERTTE'ICATE OF CAI,IBRA?ION ISSUED BY MECHTECH SER!']CES DATE OF ISSUE 13 FEBRUARY 2012 COMPAI.IY ADDRESS CERTIFICATE NUMBER MECHTECII : MS12O1 59 SERIIICES (rx lssssoe-Dl NO. 47 JAIA},I JEJAROM 4E} SEKSYEN 9 BANDAR BUIflT BERUNTUNG 48300 RAWAIIG SELANGOR DARUL EHSAN TEL:603 602l l23l FAX:603 602l L233 PAGE I. OT 3 iSSUE TO GEOSOL ENGINEERING JALAN Pru IO/IOG SAUJANADAMANSARA 47800 PETALING JAYA SELANGORDARUL EHSAN NO. A-G-12, PERSON INCHARGE DEPARTMENT MR BA].AIGISHNAN MANAGING DIREC"TOR JOB NUMBER csoo18 DATE OF CALIBRATION 11 FEBRUARY 2012 CALIBRATION STICKER NO. REQUESTED CAL. DUE DATI A 1988 11 FEBRUART o13 EOUIP}IE'I{T DETAILS DESCRIPTION MAIYUFACTURDR DIAI GAUGE RELATED NUMBER N/A NL MODEL SERIAL NUMBER NL-7021 RANGE RESOLUTION L2.7 0.01 J2I3LL READABILIfi 0.0025 CALIBRATIOI{ DETAILS BASIS OF TEST CALIBRATION RANGE EQUIPMENT CONDITION REMARKS EIIVIRO TTHEI{TAI, CO HDTrIO f, S BS 907: 1965 TO L2.7 rnrn TEMPERATURE GOOD WORKING CONDITION NO AD.JUSTMENT MADE RELATIVE HUMIDITY O BEING : :, 24 24 64 64 REFEREIICE EOUIP}IE.r{T DETAILS EQUIPMENT USED IDENTITY NUMBER TRACEABILITY DIA.L GAUGE CALIBRATOR MS 0018 SAM M ACC REDITED LABORATOFY Ttris certificate is issued wrth traceabfity to recognised national standards aad to tlre uaits of reahsed at tJ:e corresponding nalional standards laboratory. Cop;a-rght of tlus certificate is owned by laboratory and not may be reproduced other thm in full ez.cept nrth t.lle prior written approval of the oc !,/oR.H. CERTIF'TCATE OF CALIERA?IG$I ISSUED BY MECHTE,CH SERVICES CATE OF ISSUE 13 FEBRUARY 2012 CEMIFICATE NUMBER DESCRlPIION DlAi GAUGE SERIA' NUMBER : : MS 12010O59 J2131 1 PAGE2OF3PAGES CATIERATIOFI R.ESULTS CAIIBRATION RANGE 50 UNIT IN IE-In TURNED o lo 20 0.0000 0.0002 0.0005 0.0007 Drvlsor TURfJ 70 ao 90 0.0007 0.0007 0.0011 0.0011 60 50 40 30 COLLPETION READING II{ UI{IT MfIx o I a 0.0011 0.0012 0.0015 0.0017 4 5 6 7 0.0008 0_G011 0.0018 11 0.0019 t2 0.o016 0.o019 o.aa22 0.0023 0.0023 0.0024 0.0025 n nnoo 0.0030 0.0032 1A ld l5 l6 o1 0.0035 0.oo3s o.oo37 0.0038 o.o037 o.0035 oo 0.0036 aa o.oa37 L7 18 t9 20 0.0013 0.0017 o.o0i7 IG 0.0012 0.0012 0.0015 0.0017 0.0017 0.0018 0.0018 I I 0.0028 0.0026 o.oo27 0.0028 o.oo22 0.0023 o.oo29 0.0029 0.o035 0.0036 0.o037 0.0028 0.0028 0.0029 o_0031 0.o034 0.o036 0.0036 I o.o037 0.0036 0.0023 24 0.0038 25 REPEATAEIi.ITY I Expanded 0.0005 0.0006 0.003s 0.0038 o.oa37 0.0038 0.0037 0.0038 AVERAGI READII{G O.(X)2mrlr uncertainty = + O.002 mm Es'imated at a con-fi.deoce ievel of approximately 957o with a coverage factor of k= 2.L6 The suite.bility of tl.e instrumellt for its intenrle<I use.shoufd be determined based on ttre user's I AD E;1' IIIOHA]\IAD GHAZALI Thr fi-,t--" ?': is irrasa on 11s ma_1' ,1r,: he rir)rofi1 at '5e D SIGNATORY d traceabr):f - to recogaised natrcnal standards and to the units of measurement realised owned by rJre lSSU1rig Iaboratory and a'ronal :randa'ri Iaboraton, Copl-n1ht of tlus cerblicate othef fh an 11 irr l1 e{cept imth the pfl or wntten approral of the Head of the lssurng CERTIFICATE OF CALIBRATiOII ISSUED tr\' MBCHTECH SERVICES DATE OF ISSUE 13 FEBRUARI'2012 CERT]F]CATE NUMBER MS DESCRIFrIION DIA-L GAUGE SERIAL NIJIUBER J273 10059 1 CALIEftATIOFT FESULTS LII{EARITY CALIBRA'I]ON RANGE sir UiJiT IN EIIT DrvI50tr 10 G 'i'URNED 20 30 60 so 40 TURI{ 70 90 ao TEET 2A 29 31 s2 -0.003 0.0039 0,0040 0.0041 0.0039 0.0039 0.0041 0.oo4i 0 0 0.oo43 0 0.0043 39 40 I o.oo42 0.oo43 a.oo44 o. 0 0.0043 0 0 .ao4 46 47 0.0047 0. 8 48 0.0048 o.oo47 49 o.0046 o 0.0049 0. REFEATABILITY I AVERAGE READiHG Expanded uncertainty = + 0.002 mm Es 'imated at a confidence 1eve1 of approxioately 95o/o with a coverage factor T?re suitability of the instru-ment for its intended use,should be determined ?{- O.OO2mm of k = 2.16 ba-sed on user'E A ouJ CALiBRATED BY MOHAMAD GHAZALI s certficate is rssued wth traceabrlity to recognrsed national standarris afld to the units of measurement i}le conespondrng nauonal stanrlaCs labcratcr_,' Copy-nght oI thrs cer-.ificate is owned by tJle rssumg laboratory oot be reprcducerl othel' rhan m full except q'rth the l\lfor wr'ltten appro'u-al of the Head of the rssuiig RY at mav CERTTFICAfE SF CALTBRATEOI{ ISSUED B1' MECHTECH SER'v'ICES DATE OF ISSUE 13 FEBRUAXf 2OI2 COMPAMADDRESS qfib CERfiFICATE NUMBER UtCEftCE AEXUICEA : Msl2OlOO63 l@rg535@D) NO. 47 JALAN JEIAEOM 48 SEKSYEN 9 BANDAR BUKIT BEzuNTUNG 48300 RAWANG SEI,ANGOR DARUL EHSAN TEL:6O3 602l L23l FAX:603 6021 1233 PAGE ISSUETO : 1OT3 PAGEA GEOSOIL ENGINEERI},IG No. A{-12, IALiN Pru l0/10G SAI'IANADAMANSARA 4?EOO PETALINGIAYA SELANGB.DARTJLEHSAN PERSON INCHARGE DEPARTMET{T : : SAIUSUL MR. BAIAKRISHNAI.I SIG[AT!ONIr MANAGING DIRECI1OR JOB NUMBER csooI8 DATE OF CALIBRATION 11 FEBRUARY 2012 CAIIBRAIIONSfiCKERNOREQUESTED cAL. DUE DAII : A 1989 : 11 FEBRUARY 2013 EOI'IPf,EiT DETAILA DESCRIPTION MAI{UFACTURER MODEL SERI,AL NUMBER 2050s DIAL GAUGE REIIITED NUMBER MITUTOYO RANGE 50 DCM 186 RESOLUfiON o.ol Ilrfi. N/A READABTUTY 0.0025 ElIl mm EITYIBOESI|'TAI, COTDNTO.trB CAI,IERATIOT DEIAIIA BS9O7: 1965 BASIS OFTEST CAUBRAflON RANGE 50 TURNED TEMPER#ruRE GOOD WORI(ING CONI}ITION REL#ITVE HUMIDITY NOAD'USTME}IT MADE EQUIPMEI{T CONDITION REMARILS BEING t : 24 64 END o 24 c 64 xn.u. REIDNSSCE EOUITreTT I'DTAEA EQUIPMEI\M USED IDENTITT NUMBER TRACEABILITY : : : DIAL GAUGE CALIBRATOR MS OOIS SAMM ACCREDITED LABORATOFIY llxis oertiicate ir ieeued Eith tmcrability to rcoogni!€-d nafioflsl rtrrdard! Ed to tlrc uaitr of Eernurcoeot rcaliacd at the correspoodiag nafiorral standarde labatory. Cofyrieht of ttril certific*o l3 omced by ilariDt of laboratory md not MEII be reproduced other tbstr rn fuII except vith tb€ $1or rrittco aPP'rovd of tbr Heed CERTIETCATE OE. CALISNATIOIS ISSUED HT MECHTEfH SEM/ICES CATE OF ISSUE 13 FEBRUAR{ 2012 CERflFICAIE NUMBER DESCRIPTION DIAL GAUGE SERIAL NUMBER 10063 N/A CALIBRAfIOIY RISULTS CALIBRATION RANGE 50 UNITIN EIII DIVIS'T o TURNED 80 10 TUro & t[} 60 IA 11 3 I o, EEPDATIBTIJ?I lVEntOf EEADIIG = O.(XlIlas :, EpmdcdunocrtEirrty = t O.OO2ras Estimsted at e comEdeocc level of ryroximately 95016 slth acovcrsgc ftctor of k The eritability of the in*rtrment fc its intcrldcd ure,tfr.ouldbe detcroined based BY UOHAMAD GHAZAU Thir certiEc*e ir icsued *ith at the corrcrpmdiag nrfimd Dqr Eot be rcproduccd othcd' trace-ubrfity to Ercognied Ddioalt rtmdads and to thc uait! of Eeaar€orot r=alircd rtudg:ds labordory, A-oWtiCi8 of this c.rtificdr ie mred by the iguiqg rod rhh in fi-rll exoapt rith the prir rrittco of 6c HGad of tha irariag CER?IFICATE OF CAI,IB P-ATION ISSUED BY IvIECHTECH SER\I'ICES DATE OF ISSUE 13 FEBRUARY 2012 CEKTIFICATE NUMBER : MS12010O63 DESCRIPTION DIAL GAUGE SERIAI NUMBER : N/A PAGESOT3PAGES CALIBRATIOT{ RESULTS LINIARITY CAIIBRATION RANGE 50 UNIT IN EIII]. DTYISOIIT o 10 TURNED 2A TURfl 26 27 zo 29 30 31 32 33 34 35 36 0.0026 o.oo27 o.oo27 0.0028 0.0028 0.oo29 38 39 40 0.0034 0.0030 o.oo32 0.0037 0.0036 0.oo3B 47 0.0038 0.0039 0.0040 0.0038 0.o039 o.oo40 0.0043 I uncertainty = t 0.0032 0.o033 0.0o34 0.0o34 0,0036 0.0036 0.0037 0.0038 0.0o38 0.oo39 0.0028 o.oo30 0.0030 9(} 0.o031 0.0039 0.0041 0.oo40 0.0041 o.o043 0.o040 0.0041 REPEATABILITY 80 0.oo31 0.0036 0.0036 0.0036 42 43 44 45 46 Expanded o.oo29 0.o030 0.0035 4t 5G o.oo29 0.o031 0.0034 70 0.0023 0.0023 o.oo24 0.0025 o.oo24 0.0025 0.0o26 0.oo26 0.oo29 0.0024 o.oo24 0.0025 0.0025 37 48 49 6(} 50 40 30 COLIrErgfi()N l(ltAlrlN(i lN UNrr mm 0.oo42 o.oo42 0.0043 AVERAGE READING = o.oo41 O.@2mm 0.OO2 mm Es ;mated at a confidence 1eve1 of approximately 95"/o wittr a coverage factor of k = 2.16 The suita.bility of the instrument for its intended use,shoul<i be determ:ined based R4iTED BY MOHAMAD GHAZN-I SIGNAI\ORY certiJrcate rs issued with traceability to recognised oational standards md to the units of measurement realised at the coresponding natiooal standards laboratory. Copyright of this cerb.Ecate rs owned by tJre issuiog laboratory md may be repioduce-c1 other thm in full except with the pnor e'ntten approual of the Head of the rssuing laboratory' _i.J L_l_ +b +L q:,#* If,ECHTECH EEItVICEB {o0lgsssoe-D} NO, 47, JALAN JEJARUM 48, SEKSYEM BANDAR EUK]T BEFUNTUNG 48300 RAWANG SELANGOR DARUL EHSAh] TEL: 603-6021 1231 FAX r 603-6021 1233 CERTIFICATE OF CALIBRAT, TOCI I6N LODVuD DVI D DATE OF ISSUE CERTIFICATE ]iUlvlBER IE Ii{ECHTECH SERVICES U 17 FEBRUARY 2012 MS1 20 1 0074 BHA IG}IATORY PAGElOT2PAGES rddr rn ti)irtJrr, d^(,, l GEOSOIL ENGiI{EEFING NO. A-G_12, JALA}I PJLI 1O/1DG S}\UJANA DAIVIANSARA 4?8OO PETAL]NG JAYA SELANGOR DARUL EHSAN PERSON iNCHARGE DEPARTh{ENT IdR A tsAL,A,KR]SHNAN [,{ANAGI}'IG DiRECTOR JOB NUMBER csO028 16 I,-EBRUARY 2012 DATE OF-CALIBRATJON CALIBRAT]ON STICKER NO REQUESTED CAL. DUE DATE A 15{ |8 16 FI }BRUARY 20I3 EQUIPIvIENT DETAILS DESCRIPTlON MANUFACTUFER DIAL GAUGE I\4ODEL NiA N/A SER]AL NUT,IBER V/YKEHAM FARRANCE r BS 1610 r PART 1:1992 r GOOD PHYSICAL CONDITION TEMPERATURE : CALIBRATED BELATIVE HUMIDITY REFEREHCE EOUIEUIEHT DETAIL WORKITiG PROCEDURE EQUIPL{ENT LISED IDENTITY I{UIVIBER TRACEABILiTY --l N/t mm mm mm 25 0.0 I 0,0 1.) ENVIR,ONMEHTAL COHD I'I IOHS CALIERATIOH DETAIL$ BASIS OF'' TEST UPON RECEIViNG UPON RETURN]NG REI,ATED NUMBER CAPACiTY RESOLUTION READABiLITY BEG II, END 64 65 q4 z"t \/ %R,H, S IN HOUSE PROCEDURE WI2OOF DIAL GALIGE CALIBRATOR MS 0010 NML S]RIM BERHAD This certificate is issrred with traceability to recognised national standards and to the units of measure ent realised at the corresponding national standar,'le laboratory, Copyright of this certificate is owned by the issuing I ,oratory and m not be reproduced other than in full except .with the prior written approval o[ the Head of the issuiog L oratory. CERTTFTCATE OF CALIB RATION ISSUED BY MECHTECH SERVICES DATE OF ISSUE i7 DESCRIPTION DIAL GAUGE FEBRUARY 2OI2 CERTIFICATE NUMBER MS12010074 SERIAL NUMBER N/A CALIBRATIGI{ RESULTS LIITEARITY PAGE2OF2PAGES 25 TURNED CALIBFATION RANGE mm UNIT iN 'lt) 7A ou 5U 30 40 COLLECTION BEAIJIIIG IIT UTYI-I' mm (, IU I 0,0000 0.0002 3 0.ml2 4 0.oo15 0,0013 o.0015 o,oo15 0.0010 0.0013 0.our6 u.uJtb t 0,0015 0,0013 0.0014 l(J 0.0014 0.0018 0.0019 0.0020 0.0016 11 0,0013 o.oo14 o.@15 0.0016 o.oor6 0.0017 13 0.0016 o.0016 14 o.ml7 15 L6 L7 0,0018 0.0020 o.0021 I9 o,@22 0.0024 DIVISOH TURN o 2 5 b 7 I L2 It n 2L 22 n M 'J5 o.oo13 0.000s 0 ,0011 0,o012 0.0016 o.oo17 0.0016 0.0017 0.0017 0.0015 o.0016 o.0017 o.0018 0.ml9 0.0020 0.0021 o.ffi22 0.0025 o.0024 0.m25 o 0025 0.0026 0.002s 0.0025 o.0026 o.ffi27 o.m28 0.0030 o.0030 0.0028 0.m29 0.0ffi0 o.oo29 o.0030 o.oo30 TABILITY o,ooo5 o.ooo5 o.0005 o.0008 o.oooa 0.001 0 90 EU I o.0033 o.0ffi2 A]/ERAGE Expanded tincertainty t 0.002 mm Esiimated at a confidence level of approximately 95% with a coverage factor of k = 2.16 The suitability of the instrument lor its intended use,should be determined based on the user's requira:rent. #ff CALIBRATED BY NOR AZLI A [\A M L SIG RY un its of measurement realised at Ean to t to recognised natlon 15 rSSU trac corresponding national standards iab oratory. Copyright of this certificate is owned bv the issuing laboratory and mav not b roduced other than ia ful1 scept with the prior -aritten approval of the Hesd of the issuiag laboratory trIECH?ECH $EEYICE8 {oolasasoe-D] ft*; NO, +7, JALAN JEJARUM 48, SEKSYEN 9 BAI{DAR BUKIT BERUbITUNG 48300 RAWANG iSELANGOR DARUL EHSAN TEL ; 603-6021 723t FAX; 603-6021 1233 CERTIFICA?E OF CALIB ISSUED BY DATE OF ISSUE CERT]FiCATE NUMBER H I MECHTECH SERVICES ; : 17 FEBRUARY 2012 it{S12010075 PAGElOF2PAGES ORY I ISSUE TO GEOSOIL ENGINEERING N0. A-G-i2, JALAN PJU 10/10G SAUJANA DA},{A]-{SARA 47800 PETALING JAYA SELANGOR DARUL EHSAN PERSO]{ TNCHAFGE DEPARTI\.[ENT MP A BALAKRISHNAI{ JOB I{UMBER cs0028 16 FEBRUARY 2012 h{AIIAGING DIRECTOR DATE OF CALIBRATION CALIBRATiON STICKER NO RDQUESTED CAL. DUE DATE A 156 ARY 16 20i3 EOUIPMENT DETAILS I DIAL GAUGE I $/YKEHAM FARRANCE : N/A ; N1A DESCRiPTION MANUF.ACTURER I\,TODEL SERIAL NUMBER RELATED NUMBER N/A CAPACITY 25 0,01 0.00 RESOLUTION READABILITY CALIERATION DETAILS REFERENCE COT{D r BS 1610 : PART BAS]S OF TEST UPON RECEiVING UPON RETURNING mm mm mm : ; l:1992 GoOD PHYSICAL CONDITION TEMPERATURE CALIBRATED RELATIVE HUMIDITY BEGiN 24 64 END 24 0c 6 o/oR. 5 H, MENT DETAITS WORKiNG PROCEDURE EQUIPMENT USED 1}I HOUSE PROCEDURE V/I2OOF' DIAL GAUGE CALIBRATOR IDENTITY NLThiIBER I\ilS 0010 TRACEABILITY NML SIRIII,I BERHAD Thtq terttiica.tt rs irysued ,"i!h tra.e ea.bilit' to recoelised na.tiooa,l nta-ncl-a-rel-r a.od tq the ,-lnits of mEa-El.lreln realiredat the eorresponding national standards laboratory, Copyrieht of this certificate is ovrned by the issuins ory and m r:ot be reproduced other than in full ence.pt with the prior written approval of the Head of the issuing lab rat ory. CERTIFICATE OF CATIE RATIOIS BY ISSUED DATE oF I MECHTECH SERVICES ISSUE: 17 FEBRUARY 2012 DESCRIPT]ON : DIAL GAUGE CEPTIF'ICATE NUMBER MS1201007 SERIAL NUMBER N/A 5 CALIERATIOI{ RESULTS LIIEARITY PAGE2OF2PAGES CALIBRATIOH RANGE 25 TURNED UNIT IN mm Dtclsoil o IO TURil 0 7A og 3g 4g 5g OOf,f,ECTfCHEEtrIIYG IH UIIIT mm z{) I o.oooo o.0003 0.0005 o.0@5 0.o@s o.ooo7' 3 o.oma o.ooto 2 4 oNr 0,mo7 0.0010 o.0013 o.ml+ o.w1'/ 7 0.mr7 0.0018 8 o.oo17 o,m19 o.m18 0.0020 0,0020 0.0020 0.0020 o.w22 o.0022 11 t2 I3 14 I5 I6 o.mE 0.m23 0.m23 o.m2+ 0.m23 0.0023 o,m24 o.oo23 o.m5 0.oo25 0.m29 o.offio o.oo17 0.m28 o.0018 0.m32 o.ool9 o.m20 L'l 1t 0.oo33 0,002r 0.00G5 offi22 19 0.0038 0.002s o,0026 0.0028 0.0029 n 2t 0.ffi7 0.offi xt 0.0037 n 0.0G136 '5 o.ffi o.oo29 0.0G2 0.0028 o,om9 0.ffi37 0.m38 o.0038 24. o.oo39 0.0008 o.00io o.0005 o.0012 lo 9g o,mos o.uj()s o,[xxJ 5 o q EO 0.0038 o.offi o.m39 o.oo38 o.m3a Expanded uncertainty t 0,002 mm Estimated at a confidence lerel oI appr.oximately 95% with a coyerage factor The suitel ility of the instrument for its intended use,should b e d of k = 2,16 on the user's requira'nent, A +htf RIN CALIBRATED BY NOR AZLI cate rs is rued to recogniEed natronal corr€sP ond rng n at ional st andards lab orat ory cop yright of th t5 certificate rod uced oth er han 1n full except with h e P rlor wfltten aP,p roval of APPR to eu oEn ed by th th e H ead of he IE SIGH TORY measur€ment at e EUrng Iab oratory and may n ot b e lAEU lng lab o rat ory Ir MECHTECH $ERIIICES {oolasosoe-Dl {ff* r{o, 47, JALAI\] JEJARUM 48, SEI(SYEN I BAI{DAR BUKIT BERUNTUNG 48300 RAVfANG SELANGOR DARUL EHSAN TEL: 603-6021 1231 FAX : 603-6021 1233 CER?IFICATE OF CALIB RATTOII T OOT r rrr Dl.r ,,JAALD D I nnEn -rn IDDUIf L,|fII D \JF A ]'{ECHTECH SERVICES 17 FEBRUARY 2012 CERTIFI]CATE I,IUI'{ EER : IvlSl2C 1 0076 PAGElOF2PAGES ROVED ISSUE TO RY GEOSOIL EhIG]NEERING N0. A-G-12, JAL.AN PJU 1o/i0G SAUJANA DAMANSARA +7800 PETALING JAT-A SELANGOR DARUL EHSAN PERSON INCHARGE DEPARTI',{ENT I MR A BALAKRISHNAN : h{ANAGING DIRECTOR JOB NUMBER DATE OF'' csO028 16 FEBRUARY 2012 CALIBRATION CALIBRATION STICKER NO REQUESTED CAL, DUE DATE A r567 Y 2013 16 EOUIPMETIT DETAILS DESCRIPTION MANUPACTURER DIAL GAUGE V/YKEHAM F'ARRANCE MODEI. NiA SERIAL NUMBER TT /B N/A 25 0,01 RESOLUTION READABILITY mm mm mm 0,002 EHVIRONMENTAL COND ITIO} CALIBRATIOH DETAILS BASIS OF TEST UPON RECE]VING UPON RETURNING REI.ATED NUMBER CAPACITY l BS 1610: PART 7:7992 r GOOD PHYSICAL CONDITION : CAL]BRATED S B EGiN TEMPERATURE RELATIVE HUMIDITY 24 64 OC 6 %R.H REFERE}ICE EOUIPMEI{T DETAILS WORKING PROCEDURE EQUIPMENT USED iDENTITY NUMBER TRACEABILITY --l IN HOUSE PROCEDURE WIzOOF DIAL GAUGE CALIBRATOR MS 0010 NML SIRIIVI BtrRHAD This certificate is issued 'dth traceability to recognised national standards and to the units of measurem, at the corresponding natronal standards laboratory. Copyright of this certficate is otrned by the issuing lab not be reproduced other than in full encept with the prior written approval of the Head of the issuing lab realised ry and may CERTIFICATE OF CALIE RATTOII ISSUED BY DATE OF ISSUE bIECHTECH SERVICES 17 F'EBRUARY 2012 CERTIFICATE NUMBER MS12010076 DESCRIPTION DIAL GAUGE SERIAL NUMBER N1A CALIBRATIOH RESULTS LIHEARITY PAGE2OT2PAGES CALIBRATION RANGE 25 TURNED UNIT IN mm (, DIVISOH IU 'Jl) 30 +o TURil '7{) 60 50 II{G IN UNIT mm EO 90 (} T 0.Gooo o,oool o.ooo2 o,ooo3 o.ooo2 o,ooo4 0,000+ 0.000s 0.0m4 0.0005 Z 3 4 5 o 7 I 0.ooos 0.ooo4 0,0004 u.txlu5 0.0006 o.ooo7 11 0.0009 u.w0/ 0.0007 0.0006 0.0007 0.0008 o.offi 0.0009 L2 o.ooo8 0.0010 0.ooo9 0.oo09 o.oo10 0.oo11 o.oo10 o.oo10 14 o.oo12 1S 0.oo12 t6 0.0013 L7 0^0014 IE 0.0014 0.0015 0.oo1s 0.00i4 0.00I7 22 0.0016 0.oo17 73 o.oo18 o.oo17 20 2L 25 o.0012 o.wlz 0.mls 0.ml5 0.0016 0.o019 ?/+, 0.0018 o.o019 I 0,0020 o.o019 o.0021 0,0020 o.oo22 0.0021 o.ffi22 o.oo23 0.0023 o.g)22 REPEATABILITY o.m10 o,001r o.oo10 0.oo1l o.0010 o.0012 13 19 0.0006 o.ooo5 o.0006 0.000s o.0006 0.mo7 9 10 0.ooo5 mG E.Eozmm Expanded uncertainty t 0,002 mm Eslimated at a confidence level of approximately 95% with a coverage factor of k = 2' 16 The suitab ility of the instrument for its intended use,should b e determined b ased on the user's requiranent, A w CALIBRATED BY NOR AZLI SI ORY measurement s and to the to recognised nat This lF lEEU wlt laborat ory and e issuing by th owned ificate 1S cert yright of his orat ory cop E lab he rresp o ndin n at ional stan d ard aot b e reF ro d pced oth er h an ln full exc e? t wrt th P r10r writt en anp rovel of rh e H ead of he tf, cu 1S s l3b arat o ry IkIECHTECH BERVICES {00135350e-D} NU 4?, JAL,AN JEJARUM 48, SEKSYEN 9 BANDAR BUKIT BERUNTUI{G 48300 RAWANG SELANGOR DARUL EHSAN TEL: 603-6021 1231 FAX: 603-6021 1233 CER,?IF'ICATE OF CALIB oH A [{ECHTECH SERVICES 17 FEBRUARY 2OL2 MS1 20 1 0077 ISSUED EY DATE OF lSSUtr CERTIFICATE NUMBER ATORY PAGElOF2PAGES GEOSOIL ENGINEERING N0, A-G-1?, JALAN PJU 10/i0G ISSUE TO SAUJATIA DAMANSARA ,T78OO PETALING JAYA SELANGOR DARUL EHSAN DEPARTIUENT I MR A BALAKRISHI{AN I MANAGING DIRECTOR JOB NUMBER r CS0028 PERSON INCHARGE CALIBRATION STICKER REQUESTED CAL' DUE NO I A i566 DATE I 16 FE : 16 FEBRUARY 2012 DESCRIPTION MANUFACTURER : : DIAL GAUGE REIATED NUMBER N/A BATY CAPACITY MODEL r N/A 25 0,0 r SERIAL NUMBER : N/A DATE OF'' CALIBRATION RY 2013 EOUIPMEHT DETAILS RESOLUTION READABILITY mm mm mm 0,00 GALIERATION DETAILS BASiS OF TEST UPON RECEIVING UPON RETURN]NG : BS 1610 : PART I I 1992 : GOOD PHYSICAL CONDITION : CALIBRATED BEGiN 24 64 TEMPERATURE | RELATIVE HUMIDITY : END 24 65 "C %R.H. REFERENCE EOUIPh{E.I{T DETAILS WORKING PROCEDURE EQUIPMENT USED IDENTITY NUI,,IBER TRACEABiLITY IN HOUSE PROCEDURE WI2OOF DIAL GAUGE CALIBRATOR MS 0010 NI\4L SIRIIv{ BERHAD This certificate is issued with traceability to realised to the units of measurem is owned by the issuing lab ratory and the Head o[ the issuing lab recognis ed national ttandards and at the corresponding national standards laboratory. Cop yright of this cetficate not be reproduced other than in full ecrceat with the prior writt en approval of maY CERTIFICATE GF CALIB RATIOTE ISSUED BY : MECHTECH SERVICES DATE OF ISSUE 17 FEBRUARY 201? CERTIF']CATE NUMBER MSl 20 1 0077 DESCRIPTION SER]AL NUMBER N/A DIAL GAUGE CALIBRATIOH RESULTS LIITEARITY PAGE2OF2PTGES CALIBRATIOI{ RAHGE 25 TURNED UNIT I}[ mm 0 DIVISON 1U TURT{ o I o,ooo0 o.ooo3 2 .JU cot 5 o 0.oot 9 10 0,0013 o.oo14 o.oo14 o.0015 13 0.m15 o.oo16 19 o.oo20 2L 0 0021 o.o021 72 oo02i 23 o-4022 o.ooo4 o,ooo4 o.oo05 0.0009 0.0010 0.0011 0.0012 l1 t2 20 o.ooo5 9A UO 0.00(_xJ 0,m13 1E l) o.0005 0,0008 1 o.oo16 o.0018 0.0018 o,0019 0.0019 -t 0.m05 0.0005 o.0006 0.()010 o.oo11 I 0.m12 0.0013 o.oo15 0.0015 0,0016 o.o016 o.o0Is o.o015 0.0016 0.0017 0.0017 0.o018 0.0019 0.0019 o.o014 0,o015 o.oo17 0,m20 o.o021 o.ao2l 0.0023 24 25 ou u.ooo3 o.@10 7 L7 50 o.ooo3 o.oo08 o,o00B G' I4 40 o.ooo4 0,0003 0.0o0+ 4 15 16 30 EcTrortE-AD ING IN UHIT mm 0.0021 o.w22 0.oo21 0.0023 o.oo23 REPEATABILITY: o.w)22 o.oc22 o.oo2i. o.@22 0.0023 0.oo23 O.ff)23 AIIERAGE READING O.OO2mm Expanded uncertainty * 0,002 mm Estimated at a confidence level of approximately 95Yo with a coyerage factor of k = 2,16 The suitability of the instrument for its intended use,should be determined based on the user's requiranent. ES A = $#4- 'tl + CALIB-RATED BY NOR AZLI MS APPR S HARIN ORY tc at e 1E 166 traceab to recogn ised 6an to eun s measurement realised at hecorreeponding national standards laboratory. Copyright o[ this certifrcate is orryned by the issuins lahsratory and may not te reproduced other than in futt ecept with the priot written approval of the Hrod of the isruiag laboratory CERTIFICATE OF CALIB RATIOTS ISSUED BY DATE OF"ISSUE DESCR]PTION MECHTECH SERVICES 17 FEBRUARY 2012 12010078 CERTIF'ICATE NUMBER N A SERIAL NUMBER DIAL GAUGE CALIBRATION RESULTS LIITEARITY CALIBRATION RANGE 25 TURNED UNJT iN mm DIYISOI{ l0 o ?U UU COLLECTION TURN o I 3 -0.0003 {.ooo4 -o.0m5 5 -o,ooo5 s.00G5 D -u.rxj(Jb 7 o.oo&5 -o.u_xjo -0.0007 -o.0006 -0.0006 9 10 4.m,47 11 4.OOOB 4.W7 -o.0008 -o.oo@ 13 4.OO1l- 14 -o.ml2 o,oor2 L7 tt s.0009 o.oo10 -0.0011 {.0009 o.oo09 t2 15 16 9U -o.ooo2 -o.ooo+ -0,0004 4 t EO -o.ooo3 -o.ooo5 -0.0006 -o.ooo5 -o.0006 -0.000s -0.mos s.0004 o.oom -o.ooo2 -o.ooo2 2 70 OU 50 N XFSItr6IHUI{IT mm -0.ooo8 o.0010 -0.0009 -0.o010 o.o011 -0.oo11 -0.0010 s.0010 o.0012 {,o011 o.0012 4.0012 o.oo13 {,oo14 -0.0013 -0.0014 -0.o013 19 4.0015 20 {.0o15 {.0016 22 -0.0017 -o.oo17 -0.0019 -0.oo20 {,oo19 -0,o018 -0.oo17 -0.0018 o.oo21 -o.@22 -0.oo19 -0.oo20 -0.0020 -o.oo22 -o.m23 -o,0023 4.C022 2t 2:3 24 o.001s o.0016 25 REPEAT^qBILITY Expanded AIIERAGE nPnOtuE O.OO2mm uncertainty t 0,002 mm Estimated at a confidence level of approxima tely 95% with a coYerage lactor of k = 2. 1 The suitability ol the instrument lor its intenr ded use,should be determined based on th user's requiranent, A r+6 9.l MS CALIBRATED BY NOR AZLI SI mea6urem and to e u national recogn lab orato ry the rssulng by ed own e ls yright c ifrcat of 15 ert rh c0 rresp 0n ding national stand ards lab orat ory cop rod u ed oth er han 1n fu 1l e)(c@ wit h h e D rlof written arlD roval of th e H ead of th e 15 su lng lab oratory This certificate is issued with t o to N RY at the may not be + -..t lt +h MECHTECH SERIIICES too13535oe-Dl NO, 47, JALAN JEJARUM 48, SEKSYEI{ 9 BANDAR BUKIT BERUNTUNG {:!5:P 48300 RAWANG SELANGOR DARUL EHSAN TEL: 603-6021 1231 FAX I 603-6021 i233 CERTIFICATE OF'CALIE tClcir lpvvbuTE,T1 Ev DI H r IsIECHTECH SERVICES DATE OF ]SSUE CERTIF'ICATE NUMBER : l7 : FEBRUARY 2012 MS12010078 ATORY PAGElOF2PAGES GEOSOIL ENGINEERING ISSUE TO N0, A-G-12, JALAN PJU 10/1oG SAUJANA DAMANSARA 47800 PETALING JAYA SELANGOR DARUL EHSAN PERSON INCHARGE DEPARTIT{ENT JOB NUMBER DATD OF'' CALIBRATiON MR A BALAKRISHNAN [4ANAGING DIRECTOR ; CS00?8 : 16 FEBRUARY 2012 : A 1565 r 16 FEBRUARY 2013 CALIBRATION STICKER NO REQUESTED CAL. DUE DATE EOUIPMET{T DEIAI-LS DESCRIPTION MANUFACTURER MODEL SERIAL NUMBER : DIAL GAUGE : BATY : N/A : N/A UPON RECEIVING UPON RETURNING N/A 2s RESOLUTION READABILITY 0.01 EHVIROI{ MENTAL GALTBRATION DETAILS BAS1S OF TEST REI-qTED NUMBER CAPACITY : BS i610 r PART L:1992 : GOOD PHYSICAL CONDITION ; CALIBRATED 0,002 C mm mm mm OHD ITION S BEGIN END TEMPERATURE RELATIVE HUM]DITY 24 24 64 65 0C o/oR, H. REFERENCE EOUIPMPHT DETAILS WORKING PROCEDURE EQUIPMENT USED IDENTITY NUMBER TRACEABILITY IN HOUSE PROCEDURE WI2OOP DIAL GAUGE CALIBRATOR MS 0010 NML SIRIM BERHAD istutd, ,rith tra.cra.bilrty tq r+cqgrired, ne.tiqre.l rtand.a.rrl-s a.nel, tq the ',lnlts qf lne?-Eure!1ier1t rea-liryed. at the corresponding national standards \ahoratory Copyright of this certificate is owned hy the issuing laboratorv anri may flot be re-oroduced oiher than in full excelt voith the prior voritten approval of the Head of the igsuing laboratory, Thir certrfrca.te ir T m S.U CTTRA BINA SECOND PENANG BRIDGE - PACKAGE 3D - TOLL PLAZA, ADMINISTRATION BUILDINGS & REUTTED WORKS SOIL INVESTIGATION Page No. : 24 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th May 2Ot2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDIXH BOREHOLE LOCATIONS Z4 3 I \ I \ \ )-' t' I I I I m!E4a I I I \ m6B @@l9t @mi I I \ v. E -j --.\ I fa 1" -i r-l 4 I 6 I I = ; :] t i F I I I b . ! s :\---::_ -.>€:-1::^:- I I E= 6s B Z I: e tl E;- T I 't /tL.- I l,i &H, I I ti.-r# G I I t i r rl I iE 5iE @wl I {l I er TT tr ,!ii IEEi E t E mmmm Ir ir .?, IE i E: i E F rt rE rt li F TT El 4 E t l 5 \ \ $ 9\ \ 1 l l 1 \ E \t \ @El \ l t t = = I s E 3 1 l trll ..8 ilt. eEEt grr!9 GDI @ML mwl F E ; ? E, I -t3 Hi? Eis r-il Iht !rt E mf nN '!-J vl al tul sl -o E (r IL TD o o U a o U E U J W j=41d4\ o-l --JI UI ? _l : <l ; tt r E 6 ;t I r e EI E I I ! i?: E l Ji E:g " t_ lar I :,[{,['fle 3d z 5 $ .l MNL '\tra i Ir iE Fq r\ b a I ; t ( a I i I ? o o d i E t ti t I , E g := iE I , 6t EI t I EE ; I t.: s E a i ,E I EA T [H E I li I= t E: !1ll ; EI i=gt r!!i I iiii I I 3 t e ii rii: IE IF h I,T lr r9i i KH t {, ti :Ir r Ii I E e I - I I I e A t lEElir; lE*Ei+l : leelt a ,I-EI tI t ts E e , i IC t I= E I J ,; E 7 i @ al: I I I 5l I I 1 \ 6 I I I {- MW I I I \\ ;f A { t i is I ls l,-i- \ t '-j.' j- tr ,l I IJ t-\ -1 ir iil l1 g -)t i; 1-r al :a ai 1; *+Y r 6 t I oE I d E' 'h t E I -HEarTIfr ar o c s ;T I P = ": ffiffi ! D_ t' jt, t tr I \ I I \' I \ I ,/ i 1. I E BeE iF l! rt I e Ea iE - IFEI EE t*riit* TI t t IL :E i ! EE EE E E E rlI ;; .1:: I lr; lEr! i:ir d I I ir i:' E:= I+c riffiki & TN lrl <t o_l F:l 1l =l rJt o-l 6 E 6 t t t r i L = c c \ d c 6 E I I E E f I tI t I 2 I l0 E P i a I o IE td tt H 8 o o i[ $t' fili Er t GTErI E I EIiiE: =l9.iF E' r{g I =r r Et: rt I { Kq[li ! lEEiir! E!5 T f : a t I e { E I is tl :t EE liiiiiE T E i I i it ! E t T E I, E E*E;ti ETIt :Ir , Ii; ti I g 1 t E I EtE I ilii d t -fu5 r!i i I a t: U {, IE I I tE t t E $ 7 f, 6E s ;-E i e ,@ i d te d 91-!t E E ET lJJ E Ei r E I Ar,l E EAJ o U J FEli=E#rIi ! o U Etriiffi$,1 E,EE IE (D IEl....*'.-'riE @ E 7 E s I til3l3=SESiE t;-----r-r .,: o U a a E L o oo E Ef iiE { -[ -['l " ir i EI ErrIl.rlI al ra I ummmHm i T ffi S.U CTTRA BINA SECOND PENANG BRIDGE Page No. - : 25 OF Doc. Ref.: PACKAGE 3D - TOLI PLAZA, ADMINISTRATION BUILDTNGS & REUTTED WORKS SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th M E 2ot2 SOIL INVESTIGATION METHOD STATEMENT S. U, CITRA BINA SDN. BHD. APPENDIX I BTLL OF QUANTITIES FOR SOIL II\WESTIGATION WORIG 25 SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 3D : TOLL PLAZA, ADMINISTRATION BUILDING AND RELATED WORKS B2 - BILLS OF QUANTITIES BILL NO. 4.ltt) - SOIL |NVEST|GATTON .\ tpBzx) Unit BILL N0.l: Rate SOIL INVESIIGAflON (ALL PROVISIONAL QUANTIflES) Note: All quantities are subiect to remeasurement ADDITIONAL SOIL INVESTIGATION WORKS [in accordance with MS203B.2OO6} DEEP BORING WITH BORING PLANT Boring Plant - Mobilisation and Denrobilisation A Mobilise at least five [5) deep boring plant to Site including erecting the plant at the first borehole locations which are on land. Maintain the plant in good working conditions and ren'rove the same upon completion of Works B ITEM of boring plant from one borehole position to the next including dismantling it at the old position and Movement erecting it at the new position which is on land I 4oveme rt 9 ROTARY DRILLING (as per Clause 4.2.73 of MS2038:2006) Grry out rotary drilling, whether C From existirrg ground level or cased or mudline uncased: to a depth not exceeding 10.00 metres D M 90 M 90 M ?0 M 30 exceeding 50.00 metres M 30 From a depth exceeding 50.00 ntetres M 30 M I M I From a depth exceeding 10.00 metres to a depth not exceeding 20.00 nretres E From a depth exceeding 2O.0O ntetres to a depth not exceeding 30.00 metres F From a depth exceeding 30.00 metres to a depth not exceeding 4O.0C metres C H From a depth exceeding 40.0O metres to a depth not \ DRILLING IN ROCK Grrv out diamond core lins of 54mm minimum diameter in all kinds of includins delivery cores in standard boxes to Ensineer's Office From a depth exceeding of rock 30.00 metres to a depth not exceeding 40.00 metres K From a depth exceeding 40.00 nletres to a depth not exceeding 50.0O metres EXTERNAL WORKS, PB2X Toll Plaza zND BRIDGE, PK3D To Colledion RM BQ/4.t/r/r Unit n Rate BILL NO. I : SOIL INVESTIGATION IALL PROVISTONAL QUANTITIES) [Cont'd) DRILLING lN ROCK (Cont'dJ Grry out diamond core drilline of 54mm minimum diameter in al I kinds of rocks includins very of rock cores in standard boxes to Eneineer's Office (Cont'd) A From a depth exceeding 50.00 M metres 9 F]ELD TESTS Grrv out Standard Penetration Test and collect disturbed samples:B At a depth from existing ground or level nrudline to a depth not exceeding 10.0O metres c NO. 54 NO 53 NO. 53 NO. IB exceeding 50.OO metres NO. 2t From a depth exceeding 50.@ metres NO. 2t NO 40 Fronr a depth exceeding 10.00 merres to a depth nor exceeding 20.00 metres D Fronr a depth exceeding 20.00 metres to a depth not exceeding 30.00 metres E From a depth exceeding 30.00 metres to a depth not exceeding 40.00 nretres F G From a depth exceeding 40.00 ntetres to a depth not Carry out in-situ Vane Shear Test usins Geonor Vane Test Equipment H At a depth from existing ground level or mudline ro a depth not exceeding 10.00 metres From a depth exceeding 10.00 metres to a depth not exceeding 20.00 metres NO B) SAMPLING Obtain Undisturbed Samples with thin walled tube sampler:K At a depth from existing ground level or mudline to a depth not exceeding I0.0O metres L From a depth exceeding 10.00 ntetres 2+ NO. B to a depth not exceeding 20.00 metres EXTERNAL WORKS, PB2X Toll Plaza zND BRIDGE, PK3D NO. To Collection BQr+.UU2 RM Uqt BILL NO. Qty Rate I : SOIL INVESTIGATION IALL PROVISIONAL QUANTITIES) [C-ont'd) COLLECTING WATER SAMPLES A Collea one (l) Iitre of representative ground water sample in a water tight, clean container from a deep borehole. NO. 3 Set 3 PHOTOCRAPHS B Take and supply mounted 4R size photographs for all extracted rock cores, soil samples or such portion of the Works in progress as directed by the Engineer, The rate shall be for one set consisting of one (l) negative and twelve (12) prinr CONE PENETRATION TEST C Mobilisation of piezocone and ancillaries to the site ITEM D Setting up of piezocone at testiug location NO. 7 NO. 70 NO. 70 NO. 35 Moisture Content NO. 90 Liquid Limit NO. ?o K Plastic Lirnit NO. 90 L Specific Gravity NO. 27 NO. ?0 NO. 90 C-arrv out electrical cone nPnPfration fPstrE From existing ground level or mudline to a depth not exceeding 10.O0 metres F From a depth exceeding 10.0O metres to a depth not exceeding 20.0O metres G From a depth exceeding 20.@ metres to a depth not exceeding 30.OO metres '(Tests listed below shall be carried Parts I to ?, unless otherwise stated) out as per BS lTT7l9?0: CLASSIFICATION TESTS Grry out H classification testsi M Particle size distribution for coarse-grained soils N Particle size distribution for fine-grained soils inclucling sieve ana Iysis EXTERNAL WORKS, PB2X Toll Plaza zND BRIDGE, PK3D \ To Colleaion BQI+.UU3 RM SEN on BILL nir Rate NO. I : SOIL INVESTIGATToN (ALL PROVTSIONAL QUANTITIES) [Cont'd) SOIL STRENGTH TESTS A Unconsolidated Undrained Triaxial Compression Test without pore-lryater measurement involving at least three [3) specimens to obtain the cohesion value and friction angle B One-dimensionaI Consolidation Test Series 32 NO. 32 CHEMICAL TESTS Io che accordine to BS 1377:199O. Part 3 C Organic matter content NO. 27 D Total Sulphate content NO. I E Sulphate content of ground water NO. 3 F Chloride content of ground water NO. 3 G pH Value NO. I NO 3 ROCK TEST g OTHER TESTS er cco ASTM procedures or British Standards. Rate preparation of samples for testing H to include Unconfined Compression Strength Test for rock cores EXTERNAL WORKS, PB2X Toll Plaza 2ND BRIDGE, PK3D To Collection kM BQt+.Uu4 RM SEN Unit Description Qty Rate COLLECTION Page No. BQ/4.1/l/l Page No. BQl4.llll2 Page No. BQl4.llllS Page No. BQl4.llll+ sotl INVESTTCATTON (ALL PROVTSTONAL QU I Cqrried to Summary EXTERNAL WORKS, PB2X Toll Plaza 2ND BR|DGE, PK3D BQ/4.r/r/s RM SEN SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 3D : TOLL PLAZA, ADMINISTRATION BUILDING AND RELATED WORKS 82 - BILLS OF QUANTTTTES BILL NO. +.2(l) - SOIL INVESTTGATION 't (PLUS) Unit Description BILL Qty Rate NO. I : SOIL INVESTIGATION IALL PROVISIONAI QUANTITIES) Note: AII quantities are subject to remeasurement ADDITIONAL SOIL INVESTIGATION WORKS (in accordance with MS203B:,2OO6} DEEP BORING WITH BORING PLANT Boring Plant - Mobilisation and Demobilisation A B Mobilise at least five (5) deep boring plant to Site including erecting the plant at the first borehole locations which are on land. Maintain the plant in good working conditions and remove the same upon completion of Works ITEM Movement of boring plant from one borehole position to the next including dismantling it at the old position and erecting it at the new position which is on land 4oveme lt I ROTARY DRILLING (as per Clause42.73 of MS2038:2000 Grry out rotarv drilling, whether c From existing ground level or cased or mudline uncased: to a depth not M 90 M ?o M 90 M 30 exceeding 50.0O metres M 30 From a depth exceeding 50.0O metres M 30 M 9 M I exceeding 10.00 metres D From a depth exceeding 10.00 metres to a depth not exceeding 20.0O metres E From a depth exceeding 20.00 metres to a depth not exceeding 30.0O metres F From a depth exceeding 30.OO metres to a depth not exceeding 40.@ metres C From a depth exceeding 4O.0o metres to a depth not 'i H q DRILLINC IN ROCK Grry out diamond core drilling of 54mm minimum diameter in all kinds of rocks includine delivery cores in standard boxes to Ensineer's Office ) From of rock a depth exceeding 30.0O metr€s to a depth not exceeding 40.0O metres K From a depth exceeding 40.00 metres to a depth not exceeding 50.00 metres External Work, 2ND BRIDGE, PLUS P3D Toll To Colledion Plaza BQt4.2illl RM SEN Unit Rate BILL NO. I : SOIL INVESTIGATION IALL PROVISTONAL QUANTITIES) [Cont'd) DRILLING lN ROCK (Cont'd) Grrv out diamond core drilline of 54mm minimum a A From a depth exceeding 50.00 metres M I FIELD TESTS da At a depth from existing ground level or B to mudline a depth not exceeding 10.0O metres NO. 54 NO. 63 NO. 63 NO. IB exceeding 50.0O metres NO. 21 From a depth exceeding 50.0O merres NO. 2l NO. +o NO. B NO. 2+ NO. B From a depth exceeding 10.00 metres ro C a depth not exceeding 20.0O metres From D a depth exceeding 20.00 metres to a depth not exceeding 30.00 metres From E a depth erceeding 30.00 metres to a depth not exceeding 40.00 metres From F c a depth exceeding ,[0.O0 merres to a depth not o lEouioment l-I H At a depth from existing ground level or mudline to a depth not exceeding 10.0O metres From a depth exceeding 10.00 metres to a depth not exceeding 20.0O metres { SAMPLINC Obtain Undisturbed Samples K thin walled tube sampleri At a depth from existing ground level or mudline to a depth not exceeding I0.0O metres L From a depth exceeding 10.00 merres Io a -depth not exceeding 20.00 metres External Work, PLUS zND BRIDGE, P3D Toll To Collection Plaza BQI+.21u2 RM Unit SEN BILL NO. I : SOIL INVESTIGATIoN IALL PROVISIONAL QUANTITIES) tCont'd) COTLECTING WATER SAMPLES A lect one (l) titre of representative ground water sample in water tight, clean container from a deep borehole. NO. 3 Set 3 PHOTOGRAPHS B for all or such portion of the ake and supply mounted 4R size photographs extracted rock cores, soil samples in progres as directed by the Engineer, The rate I be for one set consisting of one (l) negative and twelve (12) prints CONE PENETRATION TEST c Mobilisation of piezocone and ancillaries to the site ITEM D Sening up of piezocone at testing location NO. 7 NO 70 NO. 70 NO. 35 NO. ?0 E From existing ground level or mudline to a depth not exceeding l0.OO metres F From a depth exceeding 10.00 metres to a depth not exceeding 20.0O metres c From a depth exceeding 20.0O metres to a depth not exceeding 30.O0 metres 'fTests listed below shall be carried out as per BS l3T7:l?9O: Parts I to 9, unless otherwise stated) CLASSIFICATION TESTS Carry out classification testsi H Moisture Content q ) Liquid Limit NO, 90 K Plastic Limit NO. 90 L Specific Gravity NO. n NO. 90 NO 90 M Particle N size distribution for coarse-grained Particle size distribution soils for fine-grainecl ,oil, including sieve nalysis To Collection External Works, PLUS Toll Plaza zND BRIDGE, P3D BQt+.Znt3 Unit Description Qty Rate NO. I : SOIL INVESTIGATION IALL PROVISIONAL QUANTITIE$ [C-ont'd) BILL SOIL STRENGTH TESTS A Unconsolidated Undrained Triaxial C-ompression Test without pore-water measurenrent involving at least three (fl specimens to obtain the cohesion value and friction angle B Onedimensional Consolidation Test Series 32 NO. 32 CHEMICAL TESTS Grry qut chemisa] test on soil or accordine to BS wate 137:1990, Part 3 c Organic matter content NO. n D Total Sulphate content NO. I E Sulphate content of ground water NO. 3 F Chloride content of ground water NO. 3 G pH Value NO. 9 NO 3 ROCK TEST & OTHER TESTS Rock and other laboratory Testing in accordance to relevant or British Standards. Rate preparation of samples for testing ASTM procedures H to include Unconfined Compression Strength Test for rock cores 't To Collection External Works, PLUS Toll Plaza 2ND BRIDGE, P3D BQt4.2lU+ RM SEN RM COLLECTION Pase No. BQI+.Zllll Page No. BQl4.ZlllZ Page No. BQI+.Zltl3 Page No. BQI+.21114 SOIL INVESTIGATION (ALL PROVISIONAL QUA Csried to Summary RM External Works, PLUS Toll Plaza zND BRIDGE, P3D ES) BQt+.Zfits SEN ru S.U CITRA BINA SECOND PENANG BRIDGE - PACKAGE 3D - TOLI PLAZA, ADMINISTRATION BUIIDINGS & RELATED WORKS SOIL INVESTIGATION Page No. :26 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th Ma7 2Ol2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDIX J ICE AND JKSB'S COMMENTS AND CONTRACTORS RESPONSE 26 JAMBATAN KEDUASDN BHD JKSB's CHECK COMMENT fr*-,4"-..-\. -z_ PACKAGE 3D : TOLL PLAZA, ADMINISTRATION BUILDING AND RELATED WORKS Document Title: Method of Statement for Soil lnvestigation Rev. No:0 Document Ref. No: - Item L Document Type: Method Statement Comment Documentation of Method Statement following item: Date - Contractor's response 2oltlt2 To include the a Table of Content page /A/TT A DFD b. Objective /N////280 c. Scope of Work - To provide the sampling - requirement (UD sample depth and numbers) To provide the type of testing require for the UD sample d. Man power team e Date: 20th January 20L2 - 47Tlc/JE) rHE 5r / A/ FQ. A /?FNI,I lX T , 581772117 6' o /=O K )rf/ ,"/L 7fr7. ,4 oatnarv4 L 0e7A/L5 //v 4//(MolX f ,40080 /A/ A//tN?/v E' A . Work Methodology/Procedure alF?uKE i,/t 7ir'2 il?6 y. F4 le 0 //v FIE/D WzP ( 2FfCr/ . 7277 i4 FTHDD {T/UT Item 1 Comment f. - Date 2OltlL2 Contracto/s Response DDE' /N A ?/TND/ X K, EN t// ( //V // rA 74 t / A4 P/+{ T DuF r2 5z w/l/ /JE Al//v/R 2/ ( fuR ES /Nc / qoE) 1/V - Safety, Health and Environment Measures Attached Hazard ldentification, Risk Assessment and Determ ining Controls (H IRADC) Attached EnvironmentalAspect lmpact (ElA) g. Attachment(picture)for machineries to be deployed h. lnspection and Testing Plan (lTP) i. Calibration certificates for machineries A i. Specialist subcontractors organization chart 4 k. Work Programme for Slwork l. - Related forms for construction work lnspection form for related work Request for inspection form m. To attach related Codes of Practise or Standard used as reference A .4 ?/F,V 0 /k I f rAc/+Pl ' /N 4t7/t/VD/Y C- , / ^/ / yz/!)/D /X E /+77/+(HE2 /N 4 //t tl/D t\ F' 77.4c Hf /+774c//ED /A/ 4r/t,yrtrX 4. ' ADEPT ENGINEERING CONSULTANT SDN BHD CHECK COMMENT Document Title Method of Statement for Soil lnvestigation Works Document Ref. No ADEPTflKSB/MS/Sl/No.1 Document Type Design Brief Item 2 Method Statement Design Study / Special Report Preliminary Detailed Materials/ Design Design Products Shop Drawing COMMENT Field Exploration and Tests - Equipment a. The machine proposed for boring is not as per specification, which should be rotary boring. n lssue Date: L9 January 2012 Technical Notes Others Level Date CONTRACTOR'S RESPONSE NC t6/02/2Ot2 Rotary boring machine shall be used. Rig data for rotary boring machine is attached in Appendix B. c Lelotl2ot2 Added data sheet/field worksheet in Appendix A. c tslou2072 Added section L.4 quoting the relevant Malaysian Standard. Test Reports and field work will comply with MS 1056. Field Tests - Data Sheet/Field Worksheet a. 3 Rev. No:0 Detailed Design Drawing 7 PACKAGE 3D: TOLL PlAzA, ADMINISTRATION BUtLDtNG AND RELATED WORKS Data Sheet/Field worksheet to be used shall be submitted. All critical data/information shall be included and to be properly recorded during the field work/tests. Field Tests - Test Report a. Level Q - Query C Format of Test Report shall fulfil the requirements of MS 1056, - Comment SC - Significant Comment NC - Non Compliance CHECK COMMENT ADEPT ENGINEERING CONSULTANT SDN BHD Level Item COMMENT 4 Field Exploration and Tests- Work Proeramme and Procedure Work programme indicating time frame required to carry out the a. b. PACKAGE 3D: TOLI PLAZA, ADMINISTRATION BUItDING AND RETATED WORKS c Date CONTRACTOR'S RESPONSE t9lo1.l2Ot2 Work program added and attached in Appendix f. All soil investigation works will comply with the relevant MS. LglollzOLz Specialist su b-contractor organization chart added (including personnel resume ) in Appendix E. field works and laboratory testing. Work procedures shall strictly follow MS1056:2005 and MS 2038:2006 5 Field Exploration and Tests- Personnel a. 6 Field Exploration and Tests - laboratorv and Testins a. lnformation of laboratory and its accreditation (SAMM) shall be furnished by contractor for record purposes. b. 7 Qualification of personnel to be assigned to carry out the works shall be provided. c c t9/01120!2 c oLlo2l2Ot2 Method of testing shall conform to MS 1056:2005 Laboratory accreditation attached in Appendix G. Method of testing will comply with the relevant MS. Laboratorv Tests Requirement for Undisturbed Samples a. Classification Test i) ii) iii) iv) v) Moisture Content Liquid Limit Plastic Limit Specific Gravity Particle Size Distribution / Sieve Analysis Level Q-Query C-Comment SC - Significant Comment NC - Non Compliance Added new section 6.0 to elaborate the lab testing requirements. For the quantities stipulated, a copy of the BQ is attached in Appendix l. Item 7 COMMENT Date c ot/0212012 Added new section 6.0 to elaborate the lab testing requirements. For the quantities stipulated, a copy of the BQ is attached in Appendix l. c ot/02/2012 A copy of the BQ is attached in Appendix CONTRACTOR'S RESPONSE Laboratorv Tests Requirements for Undisturbed Samples b. c. Soil Strength Test i) ii) Unconsolidated Undrained Triaxial Compression Test One Dimensional Consolidation Test Chemical Tests i) Organic Matter Content ii) iii) iv) v) 8 tevel Total sulphate content Sulphate Content of Ground Water Cloride Content of Ground Water pH Value Sampline Requirements for Undisturbed Samples a. Obtain Undisturbed Samples using thin walled tube sampler with SPT value < 10 blows/300mm and the primary soil is Cohesive Soil (Silt @ Clay). Remarks - to obtain UD only after SPT taken @ to I elaborating the quantity for undisturbed samples to be taken. maintain SPT value at 1.5m interval. At a depth from existing ground level to a depth not exceeding 10 metres - 3 samples for each borehole At a depth from existing ground level to a depth exceeding 10 metres - 1 sample for each borehole vi) vii) 9 Borehole Termination Criteria a. b. c. Location of bore holes as shown in attached layout plan. Borehole to be terminated if 3 consecutive SPT values of 50 blows before 300mm penetration are reached OR; 3.0m bedrock coring if RqD > 25% @ 6,0m bedrock coring if RQD c otl02/20t2 Location of boreholes added in Appendix H. Termination criteria noted. <25%OR; d. Borehole maximum depth shall be 60m. Level Q-Query C-Comment SC-SignificantComment NC-NonCompliance Maximum depth of boreholes noted. DOCUMENT CHECKING COMMENT Checked By ADEPT ENGINEERING Approved By ADEPT ENGINEERING Name Signature Level Q- Query C - Comment SC - Significant Comment NC - Non Compliance CLOSE OUT Confirmed and lssued ByJKSB ffi S.U CITRA BINA SECOND PENANG BRIDGE - PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS SOIL INVESTIGATION Page No. :27 Doc. Ref.: OF SUCB-PB2P3DSIMS-Rev 01 Revision : 01 Issued : 15th May 2012 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. APPENDIX K HIRARC FOR SOIL INVESTIGATION WORIG 27 F&I S.U --_ CITRA BINA SDN. BHD. JAMBATAN KEDUA SDN, BED. HIRARC FOR DRMNG PRECAST RC PILE as pcr Guidclines for Hazard ldcntilicatlon, Risk Assascmcnt and Risk Control (HIRARC)', lhc of ud Hcalth ofHumrn No. JKKP DP Contractor: Sub-Contractor. Process U. Citra Sdn. Bhd. itanah Sdn. Bhd. Soil Investigation 3D - Batu Kawan Penang Bridge Conducted by by. Construction Manager S,U. Citra Bina Sdn. Bhd. Ir. Mohd Reza Principal Engineer Consultant Feb'10 2012 0 FR}I S,U -- 1. Work No Rev :l as Activity I Feb l0 2012 pcr Guidclincs for Hazerd Idcntilication' Risk Asscssemcnt end Risk Control (HIRARC)i Hunrn No, JKKP DP 127178914-41 larcd HAZARI} IDENTIF'ICATION Which can cause/effect Hamrd Mobilization of Soil Drilling 0 Date JAMBATAN KEDUA SDN, BIID. CITRA BINA SDN. BHD. HIRARC FOR SOfL INVESTIGATION ";L Traffic accident Damage to Soil 2. Existing Risk Control Dtilling RISKANALYSIS Likelihood (1 -s) Setterity Risk (1-s) Control Measures 2 5 10 Machrne Machrne to Site 3. RISK CONTROL Person in Charge Recommended TraIfic control by lead vehicle with flag SI Supervrsor Iniury. death to oerson Unloadrng and assembly of Sorl Dnlling Machine 1 Rrg overtum Rrg slips from truck Injury, death to person Warning sign 1 5 5 tlnlikelv SI Supervisor Injury, death to person Waming sign I 5 5 Ensure no non essentral personnel nearby when Sl Supervisor Damage to Soil Drilling Rrg ng is unloaded Fall ofequrpment Injury 2 PPE a 4 Ensure all loose material SI Supewrsor removed from rig or secured before unloadtng Oil/tuel spillage 3 Storage of sotl boring oasings at site Personel hrt by lifted Fire, noxrous fumes nausea, tllness PPE, Sprll Kt 2 , 4 Ensure that all tanks are SI Supervisor capped, hydraulic 2 Injury 5 10 Ensure no non essential SI Supervisor personnel neaby when casing piles are unloaded. Personnel tripping over Injury PPE 3 1 6 Ensure soil boring SI Supervrsor casings are stored in sorl boring casing a tidy and orderly manner 4 Borrng ofhole for soil sample. Worker acctdenttly steps in borehole Injury PPE 2 J 6 Ensure that all holes bored are filled when boring site is completed SI Supervrsor Due Date Itlt S,U Rev Date '-__ CITRA BINA SDN, BHD. 0 Feb l0 2012 JAMBATAN KEDUA SDN. BIID. HIRARC l-OR SOIL INVESTIGATION es per Guidclines for Hrzlrd Idcntificetlon, Risk Asscssement rnd Risk Control (HIRARC)'' end Hcrlth 127178914-47 dated I. HAZARD IDENTIFICATION No Work Hazard Which can cause/effect Activity 5 Lrlirng ofcasing, connectrng casing, rnserting casing, removal ofcasing from borehole, 6 lr*,"* Sorl samples, soil 2. Existing Risk Control RISKANALYSN Likelihood (1 -s) Severity Risk (t -s) ,3. Recommended Person in Charge Control Measures Casing fall and hrt worker due to broken wrre rope Injury PPE 3 3 9 Wre ropes to be rnspected before lift ing SI Supervisor Pinced finger when screwing casing Injury PPE 3 2 6 Provrde gloves SI Supervrsor Dropped hamrner SPT Injury for workers. 2 7 4 Ensure operators are trained to use equlpment l"o'"* RISK CONTROL SI Supervisor Due Date APPENDIX 7.2 Etrvirwl.:H"#^ Aciivity ffii4f NPPLICABTLiTY .,' ' : L.te Pre i,1,-' ,-,'l-, on/Site Preparation /lovement of Machinery within work ls ,.J - OilSpillage - Black Smoke Emission Scheduled waste gener - Noise Emission - Silt Generation Biomass Waste Genere - Disturbance of Terrestri Dust Generation I ii i, ll Removal of Biomass/Vegetation Discovery of fully protec & birds Biomass Waste caught femporary Stockpile of Biomass rste SurveyOGL I '}egging within ROW ii' ltovement of Vehicle - Disturbance of Flora & F Disturbance of Animal F Oil Leak Dust Generation Smoke Emission Scheduled waste generi Norse Emission ll Sutting of Shrubs Disturbance of Animal F Bromass Waste Genera Note: I I EmergencY Abnormal Paoe 'l of 1 SECOND PENANG BRIDGE Page No. - PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUILDINGS & REII\TED WORKS S.U CITRA BINA : 38 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th M a1 2aD SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN' BHD- ItlS 1056: PART s:2005 Dlssipaticn ttsst during a souncilng test shall nct sho!1' any al b) c) oF the fDllov"ing: sensDt chamber not aCeguately salurated; fllter elernent not adequatel, saturated; and the transmission fluid not de-aired- be rePEaled afler otherwlse the $,ho}e sortnding test shall be deemed faultl, and the test shall measure has been tal€n. rcrectiw HCTES. a{ Eter has beeD fomd lo [oprognatlm $'ih silrFr oi,, gfrryin. or ilodfe of gt]'erine $'i!b nd' morr lhan PL?' redue relntry of ak pdo. t! PeoEtr;Ing bElew tlt Eter tabte 10 E upon z Adequ?trty salsalEd meaos lhe PoE rder pl€ssurc Eadings It not to 6rinE lo iis6siog afrer 1, ffihelrql of fhe dissipalbo ttsl 5,2.4.5 Verticality E ect (he thrust machine to Provide thrust on the 5.2.4.6 in as near a vertiGl direciion as from the vertical shall not exceec 2 %' PUSh rods po"ti""ur". in. -"rt;um d&iaii;; oi'r* tn*st aiL"tion P€netration place them in lhe machtoe so thaE thar After joining the penekome[er tlP to the leadiDg push rod ax1-s Eincids vrrth the tharst dliedicn. llArere a friction reduer is used ensr:re thal it ls Iocated as described ifi 522'V' hts vertlcality of the Check lfrat verticalty is maintained throughout th?..!esl .by obsruino -Disconrinue the test if it pusn rod. ,pru.1u"r,ie'pi,.h i#tmmeaiatetf'lie;;;i"9'"; addirional discarded tesl eiceeds ilre specifiec llmi." an6 ,e"o.m"nJr the tesr at least 1 m from the losahon th:.lglS- exceDd Use the push rod guides wiren lhe requrled Penetration.pressurc begils to in use to rhe eno or resisunce of tire u[shnding leng:h of the Push rods and lhereafrer keeD lhem flle tesL t.llt'j-IY^td Complele each penetration test in one continuous operaticn to lhe tuli t:Pll mnespono' the drrratlon of abnormal delays beyand 30 min al the dfPths lo which tr)ey at that depth and the detay *G"oi'e h shall',smean that the test is oompteted stipp"g* i siiaEie test snail be uieu ir a greaterdepth to b€ tested- in,Iri; 5-2,4,7 Rat€ of Peneration 20 The Ete ot penetra'.ion whetheror not reaCin-os are being Eken shall normally be 4A - 5 mrds' SECOND PENANG BRIDGE @ PACKAGE 3D . - TOLI PLAZA, ADMINISTRATION BUITDINGS & REIITTED WORKS S.U CTTRA BINA SOIL IHVESTIGATION Page No. :37 aF Doc. Ref.: METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 1056: PART 9:2005 5.2.3.5 Lirearrecordings where equlpment is incoqporaEd in the penekometer lor recordlng the penetrahcn ol the tip this apparatui shal be catibraied before and after every Z 000 of use, and after a repair or overhaul. The precision requrremenls shall be b€tter than 0.1 m. 5.?.4 Ptocedure The prlnclple [c be tolloryed shall be that of ogntinuous testing ln \rhich the.resistanoe measuremsnts are made while all elements of he Penekordeler tip ae moving downwards simultaneously aod at the standard ra[e Qf penetration. 5,2.4,1 E,2.4,? Fietertcheci(s Make lhe ldlowing rnspections bei'cre each test and rePlace defectfue items oi apparatus with otherc in sound conditlon. a) Push rods Stand the push rod verhcally, spin Pe and observe whether lt wobbles whiie it is there is sobble disGrd lhe rod or check lt for complEnce !,!i$l 5.2.2-6. b) ConE and fTiclicn rotating' lf sleq,e Cbeci( ihat the wear does not cxceed the pemitted tolemnces (see 5-22-2 and 5'?'2'31' c) Seals behreen differenielafieilts of G-trect< for *rhe Perlelrorneteriip wear and remove an.v Parliol"-s of slEl Presscl lhsl n''!3hi hlerfere msasuremgnts. d) 'ilfi ih= Electdc cable nlr signal llEnsrflissioR i''om the penetrometer bp ctEck for ssuhd oute[ cOver and ensure i! is ahaady thIeadecl lhrough sufficlent Push rods not to 2ffect contiauGus testing. e) ZerO toad reading af all meas[riog dannels shzll ba PnflreC at site it'ith tha cone o{rtside ground knmediately before pEnefaflofl stads. 5.2.4.3 ti'e Solection ot test location 4 ln order b owiate disturbance locate lhe t€st po$tion at leasl 1 m from previously W,1?r aone penefafion tests nof more than 10 m Oee! or A least 1.6 m YJhere the depth exceeded 10 m, or 25 botehole diameters from prwious boreholes- i2,4.4 PiezomEtrlcsensors Ensure th€l there iE fu|| saturation of th€ fillar and othei sp5ces of lhe measuring system Pnor to each tesl JY SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Ma1 2oL2 w S.U CTTRA BINA PACKAGE 3D - Page No. - SECOND PENANG BRIDGE : 36 OF Doc. Ref.: TOLI PLAZA' SIMS-Rev ADMINISTRATION BUILDINGS & RELATED WORKS SUCB-PB2P3D- O1 Revision : 01 Issued : 15th MaY 2012 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. ['lS 1056: PLRT 9:2005 5-2.?.9 Callbrated rDeasuringequipment Direc-t readings of the resislanee of the cone and locel iriclion sleeve (if fitf!L-1119f-lli a test ano snall Dlezomett'tr sinsor trf ritted) shali be available indlvldualiyior display throughout iupplement tape or other recording techniques where provided' 5,?.2,10 Thrustmachlne e) []e reaEEon providing tr]e tirust.does not ostance influence lhe resislance, by hzuing lfie screw anohcrs or ballast suPports at a suttElent lnBn u'c from lhe PUSh rods, b) thamachloe shall not move relative to trE soil suriaoe Dy lrore tIe rnashiiie shalt be i=PabiE o[ conlinuous oer iN of thrusr drrrinq the pushing "-c6cn, c) 1tp s.lal] thrusi stroke of al le'st 1 m-, d) the rate of penetralion dLrring driving of the penetrometer at a conslanl be capable of being controied at a rate of 20 5 nim/s and thsretlre maintaineo The thrust mecfrine shall be cons[rusled such that ^* t meduringtheentiiestmt eventfoadlngsarEtakenintermlnertly(seeN-ote?! eI1"]-1'^2-1i): necessary e) means"sha[ be provideci to thrust the push rods verticalll inlo lne ground and when provide support for the push rod guides. Splrit level to observe verucatity oi file thrust machine and the push rods and their 5,22.11 deviaticn. 5.2.3 calibEtion 5,?.3,1 ln the talfral eliUretcn befcre Lse aild iEElibta"ion r'econis shaii be EtalneC b-y."riu,t tiot'.s reglsbr for each'lrdiudual iiern of measuting eq']PmT! t:.Elt:l-9 #n"r-","f*i itsreferenceoumoa..AeooyoflhedJrenica}ibratDnceitrScates!.Ecoldingthe.aliDE[onor devlce dudng ]bs resuJt6, and oai'i v,tten rnade" sha]i acu$rpany each measufng user on slte, and bo avallable for krspeclion, ,arrfibr=tion 5.2,32 Galibration of each force-measuring instrument shall use, and after a repak o, overhaul- 6,23.3 I Measurlhg aqulpmeht for leslstances I be rnade heiore and afrfr every 2 000 m o[ t Grading of reslstaneefleasuring eqpiPrnent I Taking into accoltrlt alt pads of the sys,^Ems including lhe sen$o'.s,.5l90af mn:I:-tP-tlf!l:1,::l versb-n, re"ordrng and Sisplay figether h41h the maximum reqLiked comPensfl"* preclslon snall De for temierature v-ariatons'and eocentricilT ol sbess on he cona or sleeve the nDt mors han 5 % ofthe aofual apphed resistance' f^f-Tfl:::: specirled shall be vedned ifl ac@rdance with Bs 1610, but the grading limits Thh o/erEl srddins =b;;i;;";;"d. therein shall all limPs, 5.2,3,+ on i i 1 stte ver1frcation of the precision rirnits sha1l be R)ade evailable a[ ) -l I I 1 PiEzornetricsensors Calbrations shall be made before'and after every 2 000 rn of use, anC af,er a repair or overhaul The precision requlremenis are as speEified in 5.2.2.5. 38 '? J ill_- - ffi SECOND PENANG BRIDGE Page No. - PACKAGE 3D . TOLL PIAZA, BINA Issued : 15th SOIL INVESTIGATION METHOD STATEII{ENT S, U. CITRA BINA SDN. BHD. MS 1056i PART 9;2005 5.2.2,5 Piezometric sensor Pore pressures shall be roeasured lmrned'rately below the {riction sleeve and above the cone faoe (Eee FEure c), posi0on uz. The sensor shall be capable o{ rfleasuring wster PressulE to an acatracy of 3 5 % dovrn to a limit of + 02 m of water and shall be protected against lhe eohy oF I soi particles by a flltErof wEaHeEistanl malerial, ilOIE, be Other posalm aod typ€s o[ Feomelric silsor have ffisuEd sd 62.7.6 nof EeEn sFeciflrd, .s tl6e $ill Ery a@rding tg vfiat is la lhe sol type. Push rods Push rods shatl consist of steel cylindrical tubas, each 1 m aonrii'el ejfeCve lenglh, sae'+ed or attached together to bear egainsiact other, and wiih sufficient wall'thlchness, b form.a rlgidjointed se#s with a mntinr.Lus sfaight arrs isee Figure t0). The minimum quality of he sleel shal{conespondtothatspecifiedforuPsel drill rodsiilBS40,9-1. Theboreuftherodsmaybe Il}ad for corvaying hre measuilng slgnals from the sensing dwices io lhe measuring equipment a[ lhe surface. The exteroal diameter Of the pcsh rods Strall be such thatit does not rllllu€nce measurements at hepeiislrcmetertip- Normallyheexlemal diameterof thePushrodsis35mmil mm- smallar extemal diameters rnay be used continuously or at Intervals along the suing lo reduce soil trichon acting on ute push rods providlng that thi distance betwea Bmmencement of the smaller dlamirter push roCs and the cone base shall be at least 1 rrl The defleclion from a sB.aight tine thcougH the eitds at the ml&Poiol of a 1 m bng push Ipd shall pal's not exceed a) g.5 rnfi for tie f,ve bwesl prrsh rods and b) 1 mm for 'Jie rsqernder' For any of ioned push rcrds {tre deflEclion frpm a shaght line thrcnrgh the rnid-potnts of tha lods at the ground irlnt shau also not exceed these lirBits. The p$sh rods shall be chect(ed aiter every test lo 'conditons imowB to be coBduciv€ lo rod bending, e,g. Erge dephs oi very soft sofl over hard byers, or soits contalning cemenled zooes or aoarse lrraterlal. Rods udh excesstve delleclions shall not be reused untll strslghteoed- NOIE Cootl(6 4d ffidriq'ly @y a be sltPly obsetud{ bt @uPlng trB da8rswfae. 5-2.27 rod wilh a st aEht aDd ro6ng Uro latler m 'od Frictionreducer OI lhe posh rqds, Mth an external diamefer brger than the base of tttd cone, lo reduce soil fric*ion actlng on lhe push rDds- A .lng fi,(Ed o0 the oL.tside The position of his ring on the push rods shall be more than 400 mm above the base ot the cone and al least200 mm above the-lop oI the fiction sleeve. 5.2.2.8 Push rod guldes Guftjes shall be po.rided lor the part of tbe Ftsh rods protruding above the sofl, and for the rod len_oth Exposed in water, in order to prevenl buckling y/hen the requked penetration Pressure increases beyond the safe Iimitfor the exposed uPstanding lengfh of PUsh rods' JI SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 ADMINISTRATION BUITDINGS & RELATED WORKS S.U CITRA : 35 OF Doc. Ref.: May 2012 w S,U CITRA BINA Page No. SECOND PENANG BRIDGE _ t 34 OF Doc. Ref.: PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS SOIL INVESTIGATION SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th M a1 2otz METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 1056: PART 9:2005 5.?.2.1 PenetromelertiP mounled on th€ lc^}r'er The penelrcmeter tip shall compdse a cyllncrical {Pmlnal b}dy whlch is the basetip snaii conLin: ul E" -nt al'Jre.base' b) close above ptin iois. Ttre 6rct" -J o.r tnt"d. l"."*aly, the sensing davices [or *tir*rrrvl f,-e-rri"iirn .t""ve, *t "?.t?t:'"tJ Nole) and e) "i an inclnometer rshere fitLed (see sleeve resistanc,*s,""di inbm;lly tl* ""n,i ""a piezomelric senso.s where fltted' tip shall bE The iles of lhe cone fr'rctjon SleeVe, if ihcluded, and the bc,)y o{ the Penelrometer rpincidenL sinaller or '1 mm larger than the The dlameter of the PerEtrometer tiP shall rcwhere be 0'3 mrn with a ir;cttln gieeve' rs Fart diameter of tho base of !]e cone. in ti't= ota cf a peilefomet€i shall te fitted at lhe ends ":rP of m" penetrometer tip sball prolecf UeyonO the sleeve dlameler' Se3ls r,'r" ltm* and a! t# base of the mne to prelent ent)' of soil partictes "r not exs€ad 5 mm exept The gap wid*r between hase oF cone and base of frotion sleeve shali the sensor shall ooi when occupiad by another senJln ,"rri"f,-.r=" tire overali widn, hcludin' to the ;,;;-ia ,*. 'The externai <iiameter, exc€pt ?vhere +eais are fdted, shall corresPond diameter of the 6o'1e base' Examples ofsuitablE penetrometer tiPs are shorvn in Figure 6' ilOTL WhlE lh. gsund cooditiss aE t s.zZJ erpedeq b Busa lhe Pneb@ter ilD lo tloi"Hi"];;d;;;"]t; Den.kat'oE in qtess orro-r zo r* in: pcfleueadtr fp lo indirale ts lndiEtiol bffi i;'ieorrat'ocrooeet:r l' rhdfled' Dl N{Ec L€ e=+32r:J h 6+'coiiE shaped ;oni;ai P:tt'lilThe @ne of hard-weiaring naterial Fhall mnslsi sf 1 loHer'-YErelly and an aPex angle o{ 60e' non nal base dEmeter of 35.7 mm (nornlnbl base area'1 000-mm?1 the Permfttad tolerances wilh an upper cYlindncal extension lil;; i; t;rn' figure I shous iuowancres for wea( surface Enlsh and typical mafiufuctuf,ng dimensons nctuulnE 522,3 Friction sleeve lhe extemal diameEr of the An iodep,endent cylindrtcal unit, wfiictt shau nourhere' be smaller than gxteanal da'he-lei cf-Lhe one base- Tl-'e lenglh shaii .iE rjlan he or'0-35 n1ln brgsr cone base perrnitled p",ip}tulJ'o"is tso x td mm'' -Fpure '10 shows the dimensions' inciruing arfciwEnces for-vr,ear, surhoe flnish and typical manutacJuring suct lhat its e)damal GilG, 5.?i-4 Cone and friction sleevc sensors ThqmnsingdevicesforDeasuriogtheFneandlridionaifcsistanceshallb€coflsh.uctedinsuch readings- Th€ senslng vr.v GlfoGur" er"ent i"lty oi"ri,"i"-r"rtsin"Bs cannot tnfluenc, the i tdaxiallorce imposeo on ttre cone by trre soil belotr' not normal ntted to tne mction'Jee'! siratt measure onty shear shess€s and itresses."-c"i; Elactronlc sensors shatl be temperature-compensatad' devi- fitted to the cone 5ha,l it. ir,. #;r;",lly 36 ; I t ! I i 1 t a { SECOND PENANG BRIDGE Page No. - Doc. Ref.: PACKAGE 3D - TOLL PLAZA' SIMS-Rev 01 Revision : 01 ADMINISTRATION BUITDINGS & RELATED WORKS S.U CITRA BINA : 33 OF Issued : 15th MaY 2012 SOIL INVESTIGATION METHOD STATEMENT S. U, CITRA BINA SDN. BHD. MS 1056: PART9:20c5 d) mg/m3' where appiicabte, the dry dens,ty 6f lhe soil {in mg/m] to th€ f,earest 0'01 e) nature of measure,menI aPplicatron (4'6-5'2 and/or 4.6-6'2h D g) the mcdel and ser;al nurfiber of the gauge; and 5- the information required by Glause i 0 of MS 1058, Pad 1' In-situ penetration tests 5-1 .lnboduction desqibes methods fDr determlning three dir,erent tyPes of penetratDn resistance,of ,ql ,a empirical melirods of testing the strength of soil at various.depth" b"]Y l-llll"fl tocatron. The code penetration test and the dynamic probing tesf are Euallv .:-"f:i-:^ti Ine laRer This c.taLrse *ir. precEe v'htle indeoendenilv of the borehole qnd sther tests; the former being the more itie standard penetration lesl is rcr use in a bo,ehole ;;;;;'i"il. "ppiitu.. and frictlon Determination of the penetrallon resistance using the tixed 60o cone slEsve (static cone penetration test CPT) 5,2 E,L1 GaaaiEI Thi< method mvErs ,-he delbnninatlcn cf he resistance oi sorls ifl situ to it\e cDnlinuous havins a cone at rhe base, and .Ji,ililirt?Sli",j"ir|rrTijii,la;;"n* ot pusn rods inr"*"r"* oenerrarioriresistsnce or lhe cooeofand, #;i;;';;il;;r, "iiiI"fJiLi'o"pin o'a fid,ion sleeva and pore pressure in thevicinitl, ihg il;i.j";fi t1,ulgc; ti3tilr-E-A;i* @ne and sleeve, ThismethodrequlrestheusdoJ.penetromeErtipwithelectricalsensorsasdelinedinS2l,4, pohibit lnEnded to p"ntitting iefuinli'*; ";tnit'nt "'d-o't' Ths rc nst taken .t -;'6;i'de,cootlrirrqug hrough inoer where readings are t'pe * m*fiinii"i panarometer, th;"Lrv ft lt should be noled that ;;J;;G th;r-6;;"g'i*t l""a.;i*rL'mounred on ihe hrustmachlne. as wolldbe cbEfnsc b)i readlnos in"ir#r.iiii.ii-p!it;i;;-d;;;;;t give Predsel,v.thesame -suUmining repcrts, he typei Itp""ifi-"6;s spodard. ln the etectrical peneuo,,,"tu,. tir, ."iiri,;il be givenoi pE Eor"["i rrd penetrorieter tp wti'rh h'a been used should ilways The lequiremeDls- of MS -describ6d in this clduse. 5.?-Z SUCB-PB2P3D- ',056: Parl 1, where apProprlate, sbatl apply to fire t'est rnetlrods Apparatus the parts described ln The complele apparatos, K6owo as lhe penelrometer' shall conslst ot 5.z.z.t o's.zz.tt. SECOND PENANG BRIDGE _ PACKAGE 3D . TOIL PLAZA, ADMINISTRATION BUILDINGS & S.U CITRA : 32 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Mal 2012 REUI.TED WORKS BINA Page No. SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 2038:2006 MS ISO 3310: 200?, Test sbves of meta! cloth 1-4 - fechnica! tequirentenls anC testing - Pa,'i 7: Iesl sieves Definitions Forthe purposes of this stanciard, the terms and defrnitions given in BS 6100 aPply, with the following exceptions. 1.4.1 Soil and rock Have the meanings ascribed to them by common Usage in civil engineering and construction and, as yet, therJare rn universally accepted definitions. An indicatlon of lhe scope of these tem-s is found in Section 7. 1.42 Ground General term covering soils, rocks aM made ground. 1.4.3 Made ground Covers all depostts which have accumulated through human activlty and may consist of natural materials, e.g. Glayandior man+nade matedals, e.g. refuse. IA' Eill "Made ground,, in which the material has beea seiecterj, placed anci compacted in accordance with an engineering specification. i.1.5 Grounciwaierconuol Has been adopted in preference lo'dewatering', sinca $re former is considered to convey a better descriptron of the scope of lhe expedient 1.5 Safet! This slandard desdibes procedr.nes for site investigatiors and all involve some risk lo safety urless an appropriate safev plan has been prepafed and implemented. safety b cons'dered in 3_1.4. Elsanfrere, safety is only mentioned wfrere a specbl reminder has been consijered necessary' $sk in contffiinaied ground. Hmwer, is ernPhaslsed that sdety b of palamoljnt irnporlance for every activity in site investigahon- e.g. I SECOND PENANG BRIDGE PACKAGE 3D - TOLL PLAZA, ADMTNISTRATTON BUILD INGS ffi@* s.u clrRA Page No. : 31 OF - Doc, Ref.: SIMS-Rev 01 Revision : 01 & Issued : 15th Ma12OLZ RET-A.TED WORKS BINA SOIL TNVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 2038:2006 MS 1056: Pat,1, MethaCs of test {or soils for citil engineering purposes quireme nts and sample pre p aration - Paft 1: General re MS '1056: Pa,l2- Methods af tesl for soi/s for civil engineerng purposes - Parl 2: Aassification lesfs MS 1056: Pat,3, Methods of test for so/s /or civi) engineering purposes - Part 3: Chemical anC electro-chempal tesls MS J 056: Pad 4, Methods of fesf for sOi/s for civil enginaering purposes - Part 4: Compaction- relalad fesfs MS 1056: W, 5, of test for soils for cinl Methods Compresslbilily, porrneabilit!' and durability lests d MS 1056: Pan7, Methods enginea'ing {}ueosas - Pe!]. 5: testfor soils for eivil engineeing purposes - Pai 7: Shear strcngth tesls (tolal shess.) MS 1056: ParT A, Methods of lest for soils for civil engineerlng purposes sfrerglh tests (effective stress) MS 1o56: Pat g, Methods of test for soils for civil engineering purpcses - MS 1754:2004, Earthwo.*s - MS 17562001, Foundations - Pai 8: Shear Pai 9: /n-s,tu tesls Code of practice - CoCe of practice BS 812-2, Tesfing agyegates - Part 2: Mtthods for determination of density Bs 1s2+1, Sfabilised materials for civil engineeing purposes - Pad 1: Gernral reguirements, sampling, sample preparation and tesls on mats-rials befot'e stabilisailon - BS 4019-3:1993, Rotary core drillng equipment units BS 40'i94:1933, Rotary core dritling esuiDment BS 5493, Cde of practice for - Wtective @ating Paft 3: ST)cificatbn for system A - Metric Part a:.specificati,tr, for s1,s1s1r1 tr - lnch unts of iron and steel stuctures against corrosion &S 606s.0:J995, Water guality - Parl 0: lntrodud.ion -.BS 606&2, Water guality - Part 2: Physical, chembal and biochemical methods :.BS OtOO, Glossary of bui)ding and avll engineering terms 'ES 6316:19S2, Cde of practice for test pumping of waler wells 73A11, Cathodic Wtection . Pai 1: Code of Wctice for land and marine apphcations 0008:1996, Guide to safety prscautions and procedures for the @nslruction bcred shafts foi piling and othet purposes 2.012, Code of prac;t)e machines SUCB-PB2P3D- fa- foundalions for nachinery - aN descent Parl 1: Foundations for @ S,U CTTRA BINA SECOND PENANG BRTDGE Page No. - : 30 OF Doc. Ref.: PACKAGE 3D . TOLL PI,AZA, SUCB-PB2P3D- SIMS-Rev 01 ADMINTSTRATION BUILDINGS & REUI.TED WORKS Revision : 01 Issued : 15th M*12O72 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 2038r?00€ The division between sections 4 and 5 is somervhat arbitrary and has been based mainry on convenJence in arranging ltre subject maiter. - sec.ion 7 dea{s with the terminorogyand systems recomrnended for use in describirB aM classifyirig soil and rock materials - Section r"U, "-na g deals wiih the ir"o"r.-*"' .preparation oi. lield reports and interpretation of the data oOtaireO t o, ti," i^*rt!?tfr. and final borehole logs, the the preparation of lhe final reporL Users of thb slanda,.d, par[ci]lar,ytho_se of lmiled expe.isnce, are adyised not to refer to the methods of ground invstiqation in suctrcns z'e*J"a'i-"trl"rt str,,Jying rh"r[ ; ];.l;i"J tr"t ti" desaiption the of a method ;iH;r=Jn",s *,naa-y rn rr;s resperi rsit :H,F ff ,gi5yr"lil, 8,,1,,9:*,.J Dpment conbnues to take place involving changes i^ ccrsida-atiors in Sections 2 and,s. lr preriminarv ;;;i ;;;il; melhods. It may be noted u-at frere is an imbararrce of beatment bet$een tests; in some cases more comprehensire beatment has'been giv"n ro t".t" Lrr rr"qil^iiy *"0. Thrs is because manv of the common rests are described 1056), nhereas there b a paucity of reference to othe:. tests. #;;y;;;*Jf*J ,a The standard has been drawn up rn reiation lo conditrons exisung in Malaysia, l^Lt occas;onai rc-ference is male to concitibns overseas where mu l.,"" rpirr"O desirable. 12 Scope r-his Malaysian standard dears..*4th the inv-esiigaiion suitabiriry foi ffE consfuclion oo shes for the purpcsas sf assessing tfEir r""ila,"n'ilrr,* a,rd of acquiring knoiyredoe ".gi*"ii,tlri #iJttr"ilil work and the security of neigrhbouring ffi,Ta "#''.#!r.oion of such in the se,ection oi rypary. rf #i'#J"?*rmed const'uction sites due reoard has'been ;r[ ;-#;;; environrnentar ',"r and eoonom," consids.ations affeaing 6 community g"*,,,ty. il;;" thr; one site may require de*rled inyestigation before of the cf,aracteristics of a sit!"r "irl r"r the rinal droice b mad!. l-3 lriormative references The foilor'ving nolmarive references. ae indispensabre br the apflication of thb sbndard. For dated references,'nrv the ediflon dted il;-,rdat"i'LiLr,*., tl," btest edftion of tfE normative referen@ (lndut ing any amendmenfs) "pp#- '-- - "pp6, MS 26: Part 2:1991, Methods of testing concrole _ patl co n crele ( Firsl ro visi on) Z: Methods of testing hardened Ms 29:1s95, speciffcatbn for aggregates trom naturar sources ror concrete (First revision) MS 30: Pad 4:1995' Methods of.t?stils aggregates pad 4: Methods for determination of particle size distribution (Fhst revision) MS.30: Parl 5:1gg1, MethoCs partole shepe {Fi.si reviston) of testing aggregates _ parl S: Methods for determinatian of SECOND PENANG BRIDGE Page No. - PACKAGE 3D - TOLL PLAZA, ADMINISTRATION BUILD INGS & REIII.TED WORKS S.U CTTRA BINA :29 Doc. Ref.: OF SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Ma72Ot2 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 2038:2006 SITE INVESTIGATIONS. CODE OF PRACTIGE SEGTION 1: GENERAL 1.1 lntroduction It is important to note that the site investigation information plays an impodant role ln the construction industry. lnadequaie site investlgation has contributed towards cost ovenuns, projeot delays and numerous problems after completion. Factors influencing outcome of the site lnvestigition include initial pressures with respect to lime and money, lack of guidelines to'"vai'ds p'opei pianning and praciice of sire investigation. Before reliable and adequate site investigation infonnation can be obtained, there should be ,*r."n"r. botr in the englneering community and the owners as to inherenl risks associated with inadequate or unreliable site investigation, particularly with respect to cost overruns and saiety. Regardless of quality of the lnterpreters of tre site invesiigation information, interpretation remain as good as the base information. Basic being that good decision can never be made on bad information. Every decision made ultimately translates into costs and safety, extent of which will depend upon quatity oF the base information' paid Every civil engrneering structure is founded on ihe ground. Ground therefore has to be gr"r[., or atleast same sare and attention as given to other aspects of the engineering it r"trr". Site investigation therefore stpuld be enbusted only to professionals with special kdining and experienie in geotecfinical engineering and in rJre prectice of site in','estigation- Guidelines presented in this standard should help towards acquisition of reiiable sile Rel'ability, nevertheless, will depend upon commitment to quality and diligenoe of ,en(;ineers involved- :tiiii standard, the expression'site investigation" has been useC in its wider sense. lt is elsewheie in a nairow sente to describe the axptoration of the gnound, Y/hich in has been termed 'gmund lrivestigation'. lt.is to be noted that although the of ground investigntion is detailed, the treitment of other aspects of site is less detafled. r,of soil and rock as consfr.rction materials is treated only briefl5 further information is MS 1754:2004. stdndard consists of eight sections; 1 tleals with general matters. 2 deals with those matters of a technical, legal or environmental character which to be taken into acc'ounl in selecting the site (or in deternining whether a site is suitable) and in preparing the design of li€ works. describes general aspects and planning of ground investigations,-including the- of generai oonditions and ground conditions of the selection of methods of 4, 5 and 6 describes methods of ground investigation, SECOND PENANG BRIDGE PACKAGE 3D - TOLI PLAZA' ffiu ADMTNTSTRATION BUILDINGS & REIIITED WORKS S.U CITRA BINA Page No. : 28 OF Doc. Ref.: SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Ma7 2012 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN, BHD. ffi IWALAYSIAN STAE{#AHP MS 1055: PART 9:2O05 SOILS FOR GIVIL ENGINEERING PURPOSES - TEST METHOD PART 9: !;'J-SITU TESTS '\ :^.i .y:; l-,- ] - ( : ,.-, _l ICS:19.020 DescnptoE scri, detemrnalrofi @ c,vrr eDgrnerrns rn-s,lu lesE Copyright 2005 DEPARTF/IENT OF STA'F',DAFIDS MALAYSIA ffi S.U CTTRA BINA SECOND PENANG BRIDGE - PACKAGE 3D . TOLL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS SOIL INVESTIGATION Page No. : 28 Doc. Ref.: OF SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Mal2012 METHOD STATEMENT S. U. CTTRA BINA SDN. BHD. APPENDD( L MALAYSIAN STANDARDS EXTRACT 28 SECOND PENANG BRIDGE PACKAGE 3D - TOLL PI.AZA, ADMTNISTRATION BUILDINGS S.U CITRA Page No. - SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th & RELATED WORKS BINA :42OF Doc. Ref.: M ay20t2 SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 1056: PART 9:2005 i)thedepthatwhlchpushrodshavebeenpsrtlywithdrawninordertoreduceUreslderriclion resislance; J) kl' deiails ol any unusual event or abnormal lnteffuption to the test observat'ons on sounds from or unusual vibrations conespondlng towhen thgyoccuned; of the push rods and the deptlrs |)thedeplhtothBwatqleyelintheholeremainingefterWithdrar.ralofthepenetrornete'tiPor lhe depth at which he hole collapsedi .ml whether ornotlhe test hole was backfilledi and n) the infomation required by Claose 10 of MS 1056: Part 1' 5.& Determlnatlon probing DP) 5.3., of the dynamic problng resistEndE u6ing ths 90' cone tdynamlc General Thjsmethodcoversthedeterrninationoftheresistance.of.soilsinsitutotheintermittent record is penetration ol a 90" cone when Jiii"" aynrt"""ly ln a -standard manner. A continuous o a"ptn oi'ti,J re-sistaric. df the cone rn contrast [o the standard il&ffi-ffi;Jp""t penetration test (see 8.4), but are specified. $,e; probing can be used "i" ^ll"*pti"g faciiitres. Two ditferent sizes of apparatus to detect so't layars and to looate strong layers' e g' in Dynamic resrilts of dynamic probing .should normally be coheslonless soils for end-bearinq-piE.. *c iimetins, p*ic:rtartt *.ith raspect thc Enpaieilce cf a ;'" -"j-"i1"., ih. irif #;#;ft;r;.; bEaring stratum. in Goheslve soils a]1d ln soils at depth' cstjtion has to along the extension rods becones sEnllicanl \ Ihen interpreling tftE test results otrtained n" t t"n wtt.n tiitton The requirements oi MS 1056: Part l, where appropriate' shafi apFly to the test mefiods desDnled in lhis clause. 53.? Principle lvlth a tree-tall a harnmer a Tho basis of the test wi(h eithBr size of apparetus conslsts of droPolno the semi-continuous'peietration, normally from 'rhe standard distance on to an ,rrif io e 90' oointed @ne at the "iiLtt oround surfacs, of a series ot p.JfJ"iU"O extenslon rods caniino straieht and miniri" rod frrcrion aio io reep tire horeplot sh'winsi g measured-, results consist of a ffi;i"di';f;;;;rl;6"i;,i;';;ito ;;ar;'h" fu;are.hrrned fie -iirii-iJrqrJ the'iumberofbhwsornrenammertoo'r,veth"coneeachlo0mmlndepthandthevaluesofthe torque (in Nm) at speciFted intervals. t 44 ! i i I i { j :ii 9i1 SECOND PENANG BRIDGE PACKAGE Page No. : 40 OF - Doc. Ref.: 3D. TOIL PLAZA, ADMINISTRATION BUILDINGS & RELATED WORKS S.U CTTRA BINA SOIL INVESTIGATION ]yIETHOD STATEMENT S. U. CITRA BIHA SDN. BHD" MS J056: PART 9i2005 A, is thE external 5.2.5,3 surhce ar* of the slee',e (in mr,z). Frictlon ratlo and triction index he friction ratic {,Q1) and the fncuon inciex (/r) formeasuiemeirts of the cone resistance ti'rction r€sistafl.e (rr) at the same depth i,e. wher) ths cons was at thg level cbnesponding to the mid-pornt ot the slesye. Calculare (ft) and local unit side Fr;ctioo ratio Calculate the fn:ctucn ralo, ,q( {in %), from lhe equatron. P, ' 5.2.6 Test report /.. :ll- \r-t [s" 'l 1o 5) The repod shalt affirm that tle lest v/as caried out in amcrdance r,vith this part ol this standard and shallcontain lhe following information: a) b) the method of tes{ Lrsed; grapnicrepresentalions wil}l respecl.lo the oeptl Df the folloutng measuremonts: @ne resis€nce (qE) (in MPa); local unit srd€ fictlon .eestarce (i!) (ln kPa)i fricti$1 raUo (,<r: horizontal exisi and pore v/atpr pEssur€ (u): hortzontal axis, where appropriate c) d) e) fl S) h) readrngs oF the rnclinometer, if laken, beyond a limit b be speclfrEd; he capacityand type ol the peneuorneter used; flre type of r€sisranse-measuring s)Etem used; the type of the penefometer llp and cone ssed and the c?pacities of lhe different resistance-measuring devices used and thelr conditions wnh rEspect [o weac lf pezomeiric sensors are used, their posifion and the-type of he depth over which a friclron reducer or push rods iseeFom!DolAnner.a SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Mar12O72 fller vath reduced dameter has been used; SECOND PENANG BRIDGE PACKAGE 3D - TOLL PIITZA' ADMINISTRATION BUILDTNGS W S.U CITRA Page No. & Revision : 01 Issued : 15th l4a1 2OL2 SOIL INVESTIGATION METHOD STATEMENT S, U. CITRA BINA SDN. BHD. IJiS 1056: PAHT 912005 NOTE- ln had ol very cariipzpl g,oond. sDeddg al &?tl" fu may rcl b€ pcible to rch'tne thE slaDda(d rele Gl perekaliotr. 52-4.8 Data for site record and the lntervals of measurernents ioteN/als not,larger than 5 cm' the Measure, record and prini, oo rezi tlme basis at specrFied depti) following' eitheL' aJ the axial forue iCL) actifig on ',ha cone (in ki'i); aod b) the hictionat F3rce (A) acting on the sleeve (in kN)i or dircct measurements when machine lacilities permft of: c) the cone resistaoce (gc) 0n MPa) (see 5'2'5'1)i and d) 2'5-2li the local unilside friction resistance (i'J (in kPa) (see 5 and v,tren required, e) (ln kPa) the poie 'r';a'!=r p-'essure (u) ecling on tire piezomeUic senscr D dl vt the inclinometer valu? (i, ' degtBes or iaiians)' and/oi to lhs a!}ve of the cone base below the grDund srriiatre ci"r.sP44i'rg at least 100 lnm' -L="i#="".' i+=iiure the depth b an accuracry- of Ele deoth (representrng indicatjons of,,the Note sounds from' or unusuaL vibrations of, the Push.,rDds, mrre-spcndins !o wheF thev ;;;"r;';i;;J m"t"iia ,' ocpIrfed. oulH,,mn"i,'""J 'iot" in" depihd rtich the PUSh rods rlay ha'/e irle blele! reslstanre, aiid tiieil be€i' at Record alqy unusual event during the test hcludifig the deptls trem ex&acted over a llmited i#il'r'""t*-1":lraar pushed back iDto the soll 524^9 Post-test checks and records Check and recold lhe following at the end o[ each t€st at a) lmmediatety upon comPleHon of eegh ilb;;;;, iJ; tii. r". tesl lhe resistance measuring equiPment ts cianners. Zem kcad rEadins betu/een the Y/hen rii*rlii,rt"e ^iioiis ,t il'=t irrrri ,ii-Jrr"i u"y more oan o 05 stari of tesl and the end oieacr, rneasuring channel or 5 kPa whichever ls larger' 1/r ol he fuli scale cePacny bllnsoecltheeone,sleeve,seatsandpiezomelerswher€fitte|J'foldamageandwearsince the commencetent ol {he tesl 41 SUCB-PB2P3D- SIMS-Rev 01 REUTTED WORKS BINA : 39 OF Doc. Ref.: SECOND PENANG BRIDGE PACKAGE 3D . ffi*.- Page No. : 41 OF Doc. Ref.: SUCB-PB2P3DSIMS-Rev 01 - TOLI PLAZA, ADMINISTRATTON BUITDTNGS & RELATED WORKS S.U CITRA BINA Revision : 01 Issued : 15th Ma12OL2 SOIL INVESTIGATION METHOD STATEMENT S, U. CITRA BINA SDN. BHD. MS 1056r PA.RTSr2005 lnspect the push rods for alipoment and damag e. Where uear of lhe sleeve or coTre has laken plaffi durirE lhe test su6h thal eilher has reached a state where duing the test d should have been replaceC. the lest shall lemaln valid but shBll include rn the repcrs a slaiemant descnling the condition oi the sleeve and cone at the end ol' c) Record, where possible, lhe depth to fhe water tevel in the hole Bfrer rlithdra"(al penetrometer tp, o, the deplh at whlch, the hole collapsed. d) Record whether the lesf hole has been beckfilled, and e) Record the identiircalion number ofthE penebornaler tip used For the test. f) Record the dales and relerence numbers of the calibration csrflRcatBs for the measurang devies. S) h) Record t re ddrfls of ihs opemror in charge of ihe crew whrch performed the tesl iF oI th6 so bt sfiich method. I ; i { I AII tesl data shall be recrrded and furnished rn ASGI1 dlgital flEs 5.2.5 CalcUlatlons and expression of the results 5.2.5.1 Coneresistance i I ! I i I 1 t it I I Calculate lhe c'one reslstance, go (in MPa), F om the eqoabon: ro.\ n=:1=- ha'" \Ac ) I I 1 I Wfrere, I I Q" is the axial force artulrg cn the cone (rn kN); and l A. is the atea o{ the base oF the mne (rn mmz;. ) J 5.2.52 Local unit side friction reslEtance Calculate th€ loEal unlt side friction resislance, f, lin kPa), fam be equation: r= =l.9-}0" l.ts / where, a. is the lrictionai force actlng o0 the sleeve (in kN); Bnd 42 Page No. : 40 OF SECOND PENANG BRIDGE PACKAGE 3D . TOLL PLAZA, . ADTVIINISTRATION BUILDINGS 5.U CrrRA Doc. Ref.: & RELATED WORKS BINA SOIL INVESTIGATION METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS J056r PART 9:2005 A, Is the 5.2.5,3 :xternal surfrace area of the slee','e (in mm?). Friotlon ratlo and triction index Galculare L\e friction ratic (,41) and the fnctofl index (Ir) ior measurements of the cone resistance (+) and local unit sida frr;tio; resistance (fr) at the same dePth i.e. when the cone was at th3 leve) cbnespondrng io the mid-poinl of the sleeve. Fristion ratio Calculate the f|i6ticn ratjo, & (in o/,), from lhe equ?tion. ,- ) t r' =l!ls"' 10 a, 5-2.6 Test report 5) The repOrt shall affinn that tie lest v/as caried out in accoldance rNith this Part ot this standard and shallDontain lhe following informarion: a) b) tha meihoci of test used; graphicrepresentations wiih respect 10 the depttS tf the {.llot'/lng measuremeotsi cone resisEncs (qJ (in MPa)i lccal unil srd€ fistton resistance [fs) (ln kPa); fricticn raiio (Ar: hoilzontai axis: affi pore watei pressur€ (u): horizonral axis, where appropriate. c) d) e) he capactyand type ot 0 the type of the penetrcmetu tlp and cone used 6nd the Gapacities of the dfferent resjsiince-measuring devices used and their ccnditions wfth rEspect to weac S) h) lFprezomelric sensors are used, their Positon and the type readiogs of the inclinometer, if taken, beycnd a liiaii !3 5e sP$iied: he the penetro:-neterused; typE of reslshnee-measuring system used; offlie,: he depth over which a friclion reducer or push rods yrith reducad drameter has been used, ')Sce Fom ! D olAnnex A n3 SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th Mar12Ot2 SECOND PENANG BRIDGE PACKAGE S.U CITRA BINA Page No. - :42OF Doc" Ref.: 3D. TOLL PLAZA, SUCB-PB2P3D- SIMS-Rev 01 Revision : 01 Issued : 15th ADMINISTRATION BUILDINGS & REIITTED WORKS SOIL INVESTIGATION M ay 2ot2 METHOD STATEMENT S. U. CITRA BINA SDN. BHD. MS 1056: PART 9:2005 i) the depth at which push rods have been psrllywihdrawn iB order to reduce dre slde friction resislance; J) k) details oI any unusual event or abnormal intenuption lo the test obseryations on sounds from or unusual vibrations conespording to when thsy oocuned; of the ptish tods and the depths l) the depth to the water level in the hole remainlng afrer withdrav'ral of the penetrometer tip or lhe depth at which the hole collapsed'l m) whether or not the test hole was backfilledi and n) the inionnation required by Glause 10 of MS 1056; Part 15.3 DltGrmlnatlon of the ctynamic ptoblng resistandE uElng thE 90" cane tdynamic probing DP) 5,3,1 General This method coverg the detErmination of he resistance of soils in situ {o the intermittent record is oenetration of a 90o cofle when dtiJ"n aynu*ioffy ln a standard manner. A continuous to the standard [iJvtirJ-nnfr *"peot to d"po, of the resistanm oJ the cone rn conpstsizes of 6Pparatus l"*toition t""t (see E.a), budtfrere are no sarnpling fadlilies. Two ditferent are specified. Dvnamic orobinq can be used LjiLliJ"r#J.Jil" ioi lo detect sort leyers and to locate strong layels. e.g, .in piies. The .es,is of dynamic probing should normally be "no-693rins irlih sampling, Pai',iculatly r'ith tespect tc th6 coinpaieace ol a checkad by boing in co;-,juncilon beadng stratsm. to \ryhen interpreting rhe tesr results obtained in Goheslve 9o1s 8.ild ln soils at depth, cautj,on has be takert $dieo tri;tlon along the extension rods becones E'EnlficanL The requirErneRts of MS 1056: Part 1, wher6 appropn?te. shall apply descnled in lhis clause. 53..2 to the test methods Prihciple Thebasisofthetestwitheithersizeo{apparatusconststsofdropplnglvlth.afree.fallahammeta sEndard distance on to an anvil to effec[ he semi-conlinuous penetra-qqn, normElly Irom tne orcundeur(acg.ofaseriesofparallelsidedextenslonrodscarryinga90.po'ntedcone.aJme and to keep the hole straight and ilffi;rd Aft;;rarlntervats,'in ofder to minimbe lod frlclion consist of a pbt 6ho1/ing i.rti}.-tt" ioor""r" u.,m"a and lhe torque ls measurec,-, The results In depth and the valoes of lhe riurnUer of alows of thg hammer to drive thB cone each 100 mm brque (in Nm) 8t sPecirled intervals. tG 44 j 4) -A