Supercalender process and condition test, flyer
Transcription
Supercalender process and condition test, flyer
Supercalender Process and Condition Test A well-functioning supercalender is necessary for good paper quality and excellent runnability. e supercalender process and condition test analyzes the condition of the supercalender in terms of end product quality, machine runnability and maintenance. Benefits Minimizes waste Improves runnability Improves roll quality Improves profile Improves daily maintenance and operation Objective Grounds for service e objective of the supercalender process and condition test is to de ne the current condition of the supercalender and to determine the service operations needed for the next scheduled shutdown or the scope of the reconditioning needs. e test also provides the mill maintenance department with useful information for their daily maintenance actions. A defective supercalender can cause considerable economic loss due to broke, web breaks, poor pro les and unplanned shutdowns. Adjustments/servicing will be done during the test where possible within the time and with the crew speci ed in the contract. Mill personnel cooperation will be required in this respect. Recommended service Supercalenders operate under high mechanical and chemical stress. erefore they should be tested at least once a year to ensure trouble-free and reliable operation. It is recommended that a supercalender process and condition test be conducted every year. Scope of service e analyses made by service professionals will inform the mill of all necessary adjustment and maintenance needs. An oral report on the major de ciencies observed and the recommended solutions will be given at the end of the test. e supercalender test provides information on: Supercalender functions Nip loading Supercalendering parameters Paper roll structure e test includes: Loading pressure measurements Mechanical condition inspections ermal measurements DC-roll pressure measurements Spindle operation checks Reel hardness measurements CD pro le analyses Downtime needed © Valmet Corporation, SER41028 V5 EN 10/2014 A total shutdown of 6 to 8 hours per supercalender will be required. Shutdowns can be split into 2-hour sessions/supercalender, which will allow normal production to continue during the testing period. For more information, contact your local Valmet office. www.valmet.com e-mail: [email protected] Speci cations in this document are subject to change without notice. Product names in this publication are all trademarks of Valmet Corporation.