TimberRock Case Study (3-15

Transcription

TimberRock Case Study (3-15

!
Case Study
!
!
Solar Microgrid Integrates Solar PV, Energy
Storage, Smart Grid Functionality and
Advanced Vehicle-to-Grid Capabilities
!
!
!
!
!
!
!
Project awarded Maryland Energy
Administration’s prestigious Game Changer
award
!
!
!
!
!
TIMBERROCK CASE STUDY
!
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
!
!
Overview!
3!
OnStar Integration!
4!
Project Elements!
5!
Performance!
5!
System Pictures!
6!
System Schematic!
7!
Web Based Dashboard!
8!
TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
!
Overview
!
General Motors, OnStar and TimberRock Energy Solutions have collaborated to deploy an
advanced, solar microgrid at GM’s E-Motor Plant in White Marsh, Maryland. The objective of the
project was to quantify how a microgrid comprised of distributed energy resources (DERs) that
include solar PV, EV charging infrastructure, stationary li-ion energy storage and a fleet of Chevy
Volts could deliver an economic “benefit stack” sufficient to enable scalable, microgrid business
models.
!
The project tightly integrates the performance of the various DERs within the microgrid via
TimberRock’s Distributed Energy Resources Management System (DERMS) called De-MAP. DeMAP serves as the integration platform for both the DERs and external market management
systems. The DERs are aggregated and managed as a single block of capacity allowing them to
“straddle the meter” and be dispatched to deliver value to both the host site – delivering costeffective energy and reducing demand charges – and the grid by providing services like frequency
regulation.
!
The project represents the first commercial deployment of OnStar’s Smart Grid solutions which
allows EVs to be integrated with a microgrid and directly managed as grid-interactive resources.
PJM, the grid operator, was heavily involved with the project since its inception and the Maryland
Energy Administration has awarded the project their prestigious Game Changer award.
TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
OnStar Integration
!
OnStar’s ubiquitous network and vehicle connectivity was leveraged to provide advanced vehicleto-grid integration with the solar-based microgrid. Whether physically on site or not, the EVs’ load
can be reduced in
response to a demand
response request or
pricing signal. Most
uniquely, the charging of
the Volt can be
modulated across its
charging range in direct
response to a frequency
regulation signal. In
aggregate, this allows the
fleet to support grid
balancing – tapping into
the revenue stream it
provides - while never
discharging energy from the
vehicle to the grid.
Infographic depicting the Microgrid currently deployed at GM’s E-Motor
Plant- OnStar and TimberRock connect to manage GM’s solar PV and
energy storage as well as a fleet of Chevy Volts.
“GM is positioning EVs as a means of helping balance grid capacity… GM’s
partner for pulling this off is TimberRock” - Forbes Oct ‘13
TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
Project Elements
!
• 600kW of combined solar PV (roof-mount and islanding-capable canopy mount)
• Sub-set of the solar PV integrated with multiple advanced bi-directional inverters with microgrid
(islanding) capability
• Custom parking lot canopy with integrated energy storage and inverter cabinets
• Transactive Energy Router - Embedded control hardware, telecommunications and software
required for optimization, aggregation, and dispatch
• DERMS provided by cloud-based De-MAP
• Stationary li-ion storage with integrated thermal management
• EV charging stations providing free charging for employees, guests and suppliers
!
Performance
!
• Generation of renewable electricity for EV charging and use by the E-Motor plant
• Solar firming & peak shifting
• Demand charge reduction
• Frequency regulation via stationary and mobile distributed energy resources
• Spinning reserve
• Dynamic load shedding during periods of high grid congestion as signaled by real-time LMP
data
• EV fleet management TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
System Pictures
!
Solar PV charges the stationary batteries, plugged
in EVs and back-feeds the E-Motor Plant
Li-ion energy storage
Bi-directional inverters full integrated into structural columns of
solar PV canopy
TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
Six EV chargers provide power to a fleet of Chevy Volts. De-MAP software communicates
directly with the EV via OnStar, eliminating the need for intelligent and costly plugs/chargers
System Schematic
Ancillary Services
Revenues
Solar Microgrid
Renewables - Storage - Smart Grid - Vehicle-to-Grid
Long-Term Energy
Supply Agreement
Energy & Capacity Payments
Roof Mount Solar
Customer
Meter
design review
Utility
Meter
Microgrid
Sustainable Microgrid
Electricity
IslandingCapable
Solar PV
5
6-Vehicle EV Fleet
Charging Infrastructure
GM White Marsh II
www.TimberRockES.com
Jan 12th, 2012
E-Motor
Plant
Li-ion Storage
Transactive Energy Router
Distribution Utility
Ancillary Services
Local Optimization
- Frequency Regulation
-Spinning Reserve
Local generation and/or
pass through; utility used
to balance
Utility Support
- Load Shedding
- Congestion Relief
Distributed Energy Management & Aggregation Platform (De-MAP)
Charging Modulated To Support Grid
Balancing
TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
WWW.TIMBERROCKES.COM
Web Based Dashboard
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
For more information, contact:
!
!Contact: [email protected]
Screen capture of De-MAP web-based system dashboard. Shows
complex data and energy flows that allow Transactive Energy
TIMBERROCK CASE STUDY
4539 METROPOLITAN CT.!
FREDERICK, MD 21704
Screen capture of De-MAP EV
fleet management application
WWW.TIMBERROCKES.COM