pt eptco dian persada
Transcription
pt eptco dian persada
PT EPTCO PERSADA PT EPTCO DIANDIAN PERSADA Presentation 1973 1977 1981 1983 1986 It all Started at Fluor oil terminal construction project in Cilacap (1973-1977 & 1981-1986, when MrSolichin work, and gain a lot of experience from this project MrSolichin, former employee of Fluor, established PT EPTCO Purindo Tama (Engineering, Procurement, Trading and Operation) on Feb, 14 1986 2003 After 17 years of experience with EPTCO Purindo Tama, MrSolichin established PT EPTCO Dian Persada (EDP) – a professional Engineering, Procurement and Construction (EPC) company in Jakarta. Our history “with over 20 years of magnificent experience, EPTCO continuously reenergized its working prowess and commencing large scale for both domestic and overseas projects “Engineering, Procurement, Transportation and Operation are our prominent of services. Our expanding field in the operation and maintenance works by providing highly qualified and professional manpower services, have been proven to meet the most demanding budget, quality and deadline” “EPTCO is committed to satisfy its clients expectations by providing products and services under rigid and beyond benchmark quality requirements Solichin General Manager Our services Vision : To be recognized service provider in Engineering, Procurement, Transportation, Cons truction, Operation including maintenance and manpower Mission : Understanding the highest efficiency of human, natural, financial and time framing, is the key to achieve customers end. And we will carry this journey with integrity as accountable corporate citizens Vision & Mission Our clients Project New Oil Terminal Work Type •Civil works •Building works Client PT Shell Indonesia Location PulauLaut-KalimantanINdonesia Our Projects Oil Terminal – PulauLaut Project Karimun Shipyard Construction Work Type •Concrete Pits Production on site for compressed air & sewage •Building works Client PTSaipem Indonesia Location Karimun island – Riau Indonesia Our Current Projects Karimun Shipyard Construction Project Tangguh LNG Project Work Type •General Facilities & civil works •Composter Installation •Nursery &Revegetation •Organic Waste Pit •Camp Refurbishment •Waste Water Treatment Client BP,JGC, KBR Location Tangguh LNG Project West Papua- Indonesia Our Current Projects Tangguh LNG Project Project Pertamina Refinery Unit IV Cilacap Work Type •Civil works •Piping •Mechanical Erection •Tank Restoration •Interior works for GriyaPatra Building Client PTPertamina (persero) Location Cilacap oil Terminal -Central Java-Indonesia Our Current Projects KilangPertamina RU IV Cilacap “The requirement that every employee conducts its operations to the highest achievable standards of Health and Safety with ZERO ACCIDENT rates as the target.” PT. EPTCO Dian Persada has primary and continuing commitment to the protection from accidental loss to its employees and property. The Supervisor shall be accountable for all aspects of safety performance, including the application of company procedures, codes of practice and applicable regulations. Controlling hazards should not be only as a reaction to an accident or the result of workplace inspections. Line management and employees can be more proactive. It is necessary to ensure that the important things are done first. HSE Policy To achieve this commitment and to maintain a positive HSE environment in which safety comes first, PT. EPTCO Dian Persada will ensure: 1. 2. 3. 4. 5. The requirement that every employee conducts its operations to the highest achievable standards of Health and Safety with ZERO ACCIDENT rates as the target. Carry out regular inspections to identify and reduce potential hazards. Conduct internal audits to a schedule and “follow up” the results for accident prevention as early as possible. Develop training for all employees and encourage them to suggest ideas by sharing information and hold two way communication sessions. Develop emergency plans and procedures to respond promptly and efficiently to incidents, whether they be of an occupational health, safety and environmental or security nature, thus minimizing their impact on the company and others. Ensure that each field activity has an accident/incident reporting procedure and each event is fully investigated, documented and costed. HSE Policy Tool box meeting Sea survival training Safety award Equipment inspection HSE activity monthly inspection-heavy lifting equipment PERSONNEL EXPOSURE HOURS DEPARTMENT EPTCO - A EPTCO - B Total Manhour 2005 1,060 45,880 46,940 2006 677,770 51,840 729,610 2007 1,212,730 35,820 1,248,550 2008 1,691,270 45,100 1,736,370 2009 2,484,110 25,480 2,509,590 Project-to-Date 2,484,110 25,480 2,509,590 3,000,000 Total Manhour 2,500,000 2,000,000 1,500,000 Number of Recordable Work Injuries Fatality LWDC RWDC MT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T… 1,000,000 500,000 0 2005 2006 2007 2008 2009 Recordable Workdays Lost Workdays 0 0 0 0 0 0 Restricted Workdays 0 0 0 0 0 0 Frequencies LTIR = Total Lost Time Injury x 200,000 / Manhours RIR 140,000 TSTO 120,000 0 0 0 0 0 0 0 0 0 0 0 0 100,000 TSTI audit 80,000 60,000 Severity 0 SR 0 0 0 0 0 0 First Aid Property Damage Motor Vehicle Accident Fire / Explosion Near Miss Environment Accident 0 0 0 0 0 0 5 0 0 0 2 0 5 0 0 0 2 1 5 0 0 0 2 1 5 0 0 0 2 1 5 0 0 0 2 1 40,000 HSE Statistics Tangguh Project SAFETY INPUT TBM & StandDown Participants 146 51,884 47,099 41,199 33,518 173,846 TSTI Conducted 20 7,907 6,987 4,472 3,762 23,148 TSTI Participant s 20,000 0 2005 2006 2007 2008 2009 PT.EPTCO Dian Persada recognize the importance of safe guarding the environment wherever its conducts its activities. It undertakes to continually seek to improve its operating procedures and equipment in line with the following Environmental Policies: 1. 2. 3. 4. It will observe all applicable environmental, health, hazardous material transportation and similar laws and regulating. Every employee is expected to carry out the spirit as well as the intent of is policy. All new operations or changes to existing operations will address any possible adverse environmental impact prior to their implementation. Protection of employees, the public, customers and the environment is the prime consideration. The line management responsible for Operations will assess the environmental impact of all materials currently used or proposed for use in operations. Environmental Policy 5. 6. 7. 8. The use of materials which are of a hazardous nature to the individual employee, public at large or the environment will be minimized. Such materials should be replaced, wherever possible, with alternative materials of an environmentally friendly nature. The line management responsible for operations will control, wherever feasible, waste generation and onsite disposal together with toxic and criteria pollutant emissions. Work will be planned in such a way that spills and unintended releases will be avoided. Line managers will promote environmental concern among employees and generate an awareness of the impact to their activities on the environment. They should encourage employees to identify and promptly communicate environmental matters of concern to senior management or the safety and environmental group. Environmental Policy Quality Policy PT. Eptco Dian Persada (EDP) is fully committed to the adoption of a companywide quality management system in full compliance with ISO 9001:2008 as the basis for business excellence, performance improvement, and continuing growth. This commitment shall be achieved by: 1. 2. 3. 4. 5. 6. 7. Establishing a strategy, policy and strategic objectives. Provision of a structure and resources that are necessary to support our strategic plans. Fully understanding current and future customer needs, meeting customer requirements and striving to exceed customer expectations. Continually seeking to improve the effectiveness of all aspects of company business through greater awareness and superior performance monitoring techniques. Development of employee skills at all levels as a key to superior company performance. Identifying, where applicable, partnership arrangements with customers and suppliers based on joint strategy and knowledge sharing for mutual benefit. Effective management of change. Corporate Quality Management Policy, Objectives, Management Organization and Responsibilities Specification, Standard data sheets, User Manuals, Drawing etc Model Project Quality Management System Company Quality Manual Project Execution Plans Project Specification & Procedures Project Quality Plan Construction Procedures Work Instructions Project Control system Corporate Quality Management System Feedback System/ Process Control Documents We’ll make sure that construction workmanship and product quality are maintained to an acceptable throughout the construction phase every the Project or Work. Quality Assurance and Quality Control Procedure shall comply with the requirements of the applicable provisions of the latest edition of all codes, standards and project specifications as required to meet the scope of supply. QA/QC Procedure Codes & Standards PIPING & MECHANICAL : ASME B31.8 Gas Transmission and Distribution Piping Systems ASME B31.3 Chemical Plant and Petroleum Refinery Piping ASME Sect. IX Qualification Standard for Welding ASME Sect. V Non Destructive Examination API 1104 Welding of Pipeline and Related Facilities ASTM A-code American Standard for Testing Materials for Steel MIGAS Regulation: 06P/0746/M-PE/1991 SKPI/SKPP Regulation 84K/38/DJM/1998 SKPI/SKPP Guidance 5D.54.0.1992/W Welding of Pipelines and Facilities 300.K/38/M.PE/1997 KeselamatanKerjaPipaPenyalur Gas Bumi QA/QC Procedure CIVIL STRUCTURAL : ACI – 214 Recommended Practices for Evaluation of Strength Test Result of Concrete ACI – 301 Specifications for Structural Concrete for Buildings ACI – 302.1R Guide for Concrete Floor and Slab Construction ACI – 304R Guide for Measuring, Mixing, Transporting, and Placing Concrete ACI – 305R Hot Weather Concreting ACI – 308 Standard Practice for Curing Concrete ACI – 309R Guide for Consolidation Concrete ACI – 318 & 318RBuilding Code requirements for Reinforced Concrete ACI – 347 Formwork for Concrete ACI – 534.74 Recommendation for Design, Manufacture, and Installation of Concrete Pile AISC American Institute of Steel Construction “Manual of Steel Construction” Allowable Stress Design ANSI A 40.8 Safety Requirement for Plumbing ANSI A 12.1 Safety Requirement for Floor and Wall Opening Railing and Toe Boards ANSI A 14.3 Safety Requirements for Fixed Ladders ASTM A - Code American Standard for Testing Materials for Steel Materials ASTM C - Code American Standard for Testing Materials for Civil Materials AWS D 1.1 American Welding Society, Structural Welding Code JIS A 5335 Pre-tensioned Spun Concrete Piles JIS A 7201 Piling Procedure for Concrete brought Piles UBC Uniform Building Code Human Resources Management Human Resources Department at Eptco Jakarta have a function and continuous coordination to support the existing department at each project of Eptco Dian Persada and ensuring the needs of manpower are fulfilled based on the site requirements. In its capacity as Human Resources to continuously develop high-quality resources thoroughly ensuring the work performance by each department at project locations in accordance with the implementation of ISO quality management system. Human Resources Department of Eptco Dian Persada have been performing manpower requirement in very selective way to ensure with supply of potential candidates before the user conducting interview and final selection. As fulfillment of our commitment in giving job opportunity equally, we are also hiring local people where Eptco Dian Persada project is being undertaken. This has been proved by Eptco Dian Persada both on its previous and current projects in Indonesia. Human Resources Policy Conduct preliminary on paper screening of qualified and experienced applicant Undertaken detail interviews with appropriate suitable applicant for further evaluation Conduct appropriate skills and ability assessment of selected candidate Verification of claimed academic and professional qualification Prepare interview report with shortlist candidates and send the report to Client for evaluation and selection Whenever required arrange an interview of prospective candidates with Client thru a long distance call Arrange signing employment agreement for selected candidate and mobilisation to the jobsite Recruitment Flowchart EDP Manpower as of April 2010 With Category breakdown Category Tanki Tangguh Local MP Pulau Jakarta Expatriat Cilacap Indrama 71T - 15 LNG Tangguh Laut Office e MP Branch yu (GTH) & 32T Project LNG Project H06000 Karimun Senoro CFPP BP Camp Yard WWT LNG TJ.TABA Refurbish Total MP Remarks Constructi Project Project LONG ment on C-08006 C-09010 C-09045 C-09034 Managerial 7 1 - - 7 1 3 - - 2 1 1 1 24 Supervisor 4 3 15 - - - 8 - - 18 5 3 1 57 Foreman - - - - - - - - - 10 5 - - 15 Staff 40 12 3 - - 6 19 - 1 26 2 12 2 123 Non- staff 6 16 - - - 3 12 - - 274 45 - - 356 Grand Total 57 32 18 - 7 10 42 - 1 330 58 16 4 575 3.1% 0.0% 1.2% 1.7% 7.3% 0.0% 0.2% 57.4% 10.1% 2.8% Percentage 9.9% 5.6% Manpower statistics 0.7% 100.0% Grow and share experiences