MMT reports_2012_Carmen Copper - PH
Transcription
MMT reports_2012_Carmen Copper - PH
tulilPfiRilft mnffmilHrmffi CARMEN COPPER CORPORATION Barangay Don Andres Soriano, Toledo City 2nd Quarler l. ll. Date of Monitoring: 2012 Monitoring Report May 9 to 11 ,2012 Attendance Members / Representatives Present: 2. Christopher John Salcedo 3. Fedencio Carreon 4. Dominador S. Tan 5. Ariel A Gillera 6. Marlon L. Sayson 1. Armando L. Malicse Acting MMT Head, MGB-7 Company Representative DENR-7 Representative NGO Representative EMB-7 Representative LGU Representative Others Present: - Suarin Ouano Ares Hernando 1. Evelyno M. 2. Arnold 3. Aaron A. 4. Luther lll. MGB-7 EMB-7 CCC DENR-7 Meeting / Conference / Other Activities Engr. Armando Malicse, MGB-7 representative and MMT Acting head presided the meeting. The body reviewed and discussed the 1st quarter 2012 MMT report and the minutes of the 1st quarter 2O12 regular MRFC meeting. The team collected water samples and conducted 1-hour ambient team also inspected/validated air the commitments as contained in the 2012 samplings at established sampling stations. The accomplishments approved AEPEP. and/or cornpliances of the lV. Sampling Activities A. Surface Water 'for Tl "ature. Total S ms/L Solids Geographical Coordinates Date and Time SW-l (Brgy. Cambang-og) N 10"20.80 E 123041.A3 05-09-12 10:40 AM SW- 2 (Brgy. Cambang-og) N 10020.86 E 123041 .36 05-09-12 10:41 AM Along Hinulawan River (Upstream of NIA Dam) N 10"24.70 05-09-12 10:43 AM Along llag River 10"20 12304 05-10-12 10:36 AM Water is very turbid 10'18.90 05-09-12 04:03 PM Water is very turbid Sampling Station No./Location SW- 3 (Brgy. Cambang-og) E 123041 .30 SW- 4 (Abaca) SW- 5 (outfall of llag diversion) SW- 6-A-1 (llag settling pond chamber-1overflow) SW- 6-A-2 (llag settling pond chamber-l,undeqround water) SW- 6-A-3 (llag settling pond chamber-1, Lutopan pit discharge) SW-6-B(outnow of Settling Pond) SW-8A (lnlet of llag diversion @ Masaba) SW-88 (Crushing plant N. E: N: E: N: E: Remarks Colleded Downstream of llag & Hinulawan confluence 123042.69 10"18.89 No water sample collecied. There is ongoing road transfer 123042.79 N: 10''18.89 E: 123042^79 N 10019.99 No water sample collected. There is ongoing road transfer No water sample collected. There is ongoing road transfer E 123042.79 N 10"18.90 No overflow. This station is already backfilled. E 123042.72 N 10'18.530 E 123"43.406 05-10-12 09:45 AM Water is very turbid 05-10-12 09:40 AM Water is clear @ Masaba) SW-8C (Crushing plant @ Masaba) Upstream SW-9 (overflow of Sigpit Dam) SW-1 0 (Hinulawan Creek) SW-11-A (Overllo,vof Gabion Dam) N: 10'20.565 E: 123"42.54 05-09-12 02:50 PM N 10"20.579 05-09-12 02:51 PM E 123042.54 N: 1 0"20 .54 overflow) SW-12 (SBDT discharge) SW-1 3 (Sigpit spillway) No overflow E:123042.519 SW-11-B (Sigpit Settling Pond N E N: E: 10"20.436 Water is dear 05-09-12 02:53 PM Water is clear 05-09-12 02.41PM Water is slightly rusty 123042.550 10"20.366 123'42.423 05-09-12 03:00 PM Sampling station is no bngerpassable, Water Samde was offained dorvnstream of srillwav N: 10"21.71 E:123042.882 N: 10"21.990 E: 123043.569 05-09-12 11:27 AM Water is clear 05-09-12 11:38 AM Water is clear N: 10021.527 E:123"44.97 05-99-12 12:02 NN Water is clear N 10'21 .50 05-09-12 12:00 NN Water SW-18-A (Weir Outlet @ llaq) 05-10-12 01:30 PM Water is very iurbid SW-18-B (Weir Inlet @ ltas) 05-10-12 01:25 PM Water is very turbid SW-14 (Malubog Dam) SW-1 5 (Guingiotan River) SW-16 (Yogyogan River) SW-17 (Cumba River) E 123044.956 B. Ground Water Sampling Station No. / Location GW-1 (Cantabaco deepwell) GW-2 (Haul Road Near CarCon) E:123044.064 Date and Time Collecled 05-1G12 09:25 AM N: 10"19.914 E: 123'42.624 Remarks Source of potable water for Toledo City Water District. From spring box.. No overflow 05-09-1 2 This station is already covered with waste GW-3 (Brgy. Biga) GW-4 (Brgy. Biga) clear So/ids So/rds (ISS Tr Geographical Coordinates N: 10"18.507 is materials & considered condemn. 05-10-12 01:45 PM For washing purposes only. C. Seawater at Pier-2 'Sampling Station No. / Port Area Geographical Coordinates Location oit & Date and Time Colleded Remarks SWSP.1 05-09-12 09.40 AM North side of the oier SWSP.2 05-09-12 09-42 AM South side of the pier SWSP.3 05-09-12 09.50 AM Mid portion of the pier D. Special Sample (for pH, Temperature, TSS and Oil & Grease) Sampling Station No. / Location Geographical Coordinates Date & Time of Collected Remarks SS-1 (Wash Bay-Carmen H.E.) 05-09-12 02:05 PM For Oil & Grease SS.1A 05-09-'12 02.10 PM For TSS, pH & Temperature SS-2 (Drainage canal (below 05-14-12 01.08 AM DAS machine shoo) SS-3 (Lutopan open pit (south drainaqe) For TSS, pH & Temperature No Effluent Pls. refer to SW-8-C SS-4 (Crushing plant at Masaba) SS-5 (Washing from wash bay) No sample collected 55-6 (Lutopan Pit discharqe No Effluent SS-7 Carmen H.E. Main Oilwater seoarator SS-8 (Oil-Water Separator @ 05-09-12 05-09-12 01:05 PM Machine shoo LEGEND: SW GW SWSP SS E. SpecialSample school 2. Cantabco 3. DLS college V' Biga Elem For Oil & Grease Surface Water Ground Water Sea Water (@ Sangi port) Ambient Air Sampting Samplinq Station 1 No effluent Time Wind Direction 01:45 - 02.45 AM Not favorable 09:15 - 10:15 AM Notfavorable 01:50 - 02:50 pM No wind detected Second (2nd) Quarter 2012 ValidationlMonitoring of 2012AEpEp Accomplishments and other Findings / observations & Recommendations. (Please refer to attached 2012 AEPEP matrix duly signed by the MMT members) 2M Quarter 2012 Monltoring of 2Ol2 AEPEP ACCOMPLISHMENTS Name of Company: CARMEN COPPER CORPORATION Diaturbod Area: 819 h€c'tares PROJECTS / VERIFIABLE INDICATORS / PERIOD OF IMPLEMENTATION / BUDGET A. - May I to l l, 2012 ANNEX-A STATUS OF PROJECTS / FINDINGS AND OBSERVATIONS REMARKS / RECOMMENDATIONS CLIMATE CHANGE MITIGATION / ADAPTATION RCF 1. ESTABLISHMENT OF NEW Not yet implemented. PLANTATION (Regular Targets) r Tree Farm Development r Enrichment Planting Target : 25 Has. or 41,675 Seedlings Timetable : May-Nov, 2012 ) Budget : F 34,423.QO (88% charge to 2012 ASDMP Budqet) 2. ESTABLISHMENT OF NEW Not yet implemented. Q2. The target for NGP plantation based on Memorandum Order 2011-03 is 1,639 hectares (819 has. x 2). For 2011 NGP accomplishments creditable is 132.39 has., therefore the remaining target for PLANTATION (NGP Commitment) : Timetable 100 Has./166,700 seedlings Timetable : Jun-Oct. 2012 Budget : 3. Charge to SDMP NURSERY MANAGEMENT 2012 & 201 3 is 1 ,506.61 has. As of April 2012, there are 28, 447 available seedlings at the Central nursery. (Regu lar Reforestation Targets) Timetable : Jan-Dec, 2012 Budget : P 458,320 4. NURSERYMANAGEMENT (People's Organization (PO) Level Timetable : Feb-Aug, 2012 Budget : Charge to SDMP 5. PREVENTIVE MAINTENANCE SERVICES (PMS) OF COMPANY LIGHT VEHICLES Timetable: Every 5000 km or as needed Budget : There are 2 established nurseries located in Brgys.Loay & Biga. These are operated by ACFa-MPC and 4-Bs, respectively. Presently, they are doing nursery activities such as: soil preparation, bagging/potting, sowing of seeds etc. As of April 2012, there are 2,633 potted bags 18,082 newly grown seedlings of various tree species in Brgy Biga and 33,004 seedlings of which more than 9,000 are plantable and 6,897 potted baqs in Brqv. Loay. ) & I i This is done regularly. I I I I I P 2,500,000 (25% of total mst) I Well maintained. 6. OPERATION AND MAINTENANCE OF PERIPHERIRAL DRAI NAGE SYSTEMS AND ROADS WITH]N THE PIT Timetable : As needed Budget : F15,500,000 Well maintained. 7. OPERATION & REGULAR MANTENANCE OF EMERGENCYTAILINGS POND (ETP) Timetable: Quarterly Budget : P 11,700,000 The present water treatment facility in llag was affected by the road transfer, which is now on going. Eventually there will only be 2 chambers (out of 4 chambers) settling ponds that will be operational. 8.IMPROVE AND IMPLEMENT REGULAR MAINTENANCE OF WATER TREATM ENT FACILITIES AT SIGPIT & ILAG DIKE The three (3) dikes at llag River (upstream of Abaca) were already destroyed. Timetrable: Quartedy Budget : F9,700,000 9. MATNTENANCE OF THE DRAINAGE SYSTEM @ CARCON Timetable: Quarterly Q4 2011 . In lieu of the llag settling pond outfall sampling station, the final discharge of 3'o silt trao & the inlet of silt trap no. 2 is recommended as permanent sampling station. A2 2012. lt is recommended that ) total development plan for water treatment facilities should be submitted on or before June 30, 2012 to the MRFC and MMT Well maintained. Budget:8190,200 Well maintained. 10. MAINTENANCE OF EXISTING REFORESTATED AREAS (Reforestation/M ine Revegetation) r 50 Has. Old & new Plantation r 5 Has. Monocropped plantation r 1 Ha. Arboretum Timetable: Jan-Dec, 2012 Budqet : P1,680,633 ) Not yet implemented. 11. VEGETATIVE SLOPE STABILIZATION (Critical slope slanted with appropriate plant species) I Timetabfe : Sept - Oct, 2012 Budqet : P61,466 B. CAPITAL EXPENSE PR OJECTS I 1. PROCUREMENT OF ONE (1) UNlr I Already purchased DIGITAL CAMERA Timetable : Budqet : P25,000 2 - 2. PROCUREMENT OF ONE (1) UN|T MOTORIZED PUMP BOAT Not yet implemented. Timetable: Budget : P80,000 3. PROPOSED CONSTRUCTION OF Not yet implemented. ILAG DIKE (3 Chambers) l" Quarter Budget : P1,488,660 Timetable: 4. ESTABLISH OIL.WATER SEPARATOR r r r TransportShop Not yet implemented. ) PED Yard CarGon Timetable: June2Q12 Budget : P622,816 5. ESTABLISH MATERIAL RECOVERY Not yet implemented. FAC|L|TY (MRF) r Transport Area r r r Machine Shop Carcon Area Carmen HE Area Timetable : April2012 Budget : P707,370 6. ADDITIONAL PROCUREMENT OF No purchased made yet. SPILL MANAGEMENT KIT ) Timetable: As needed Budget : P 250,000 7, ESTABLISH STORAGE FACILITY FOR EMPTY CHEMICAL BOTTLES r Main Assay Lab r CarCon Assay Lab Timetable: 2no Quarter Budget :P 779,842 Complied. Two (2) storage were already Constructed. Q2. lt is recommended that signage be installed. 8. CARMEN PIT DRAINAGE Not yet implemented. (Establishnnnt/lnstallation of Raise & Adit) Tinetable: BudgBt :P 2,500,000 9. PROCUREMENT OF HIGH VOLUME For delivery. AIR SAMPLER Timetable: 1sr Quarter Budget : P500,000 10. RENOVATION AND MOUNTING OF TWO (2) TONS MONORATL AT LIME Not yet implemented STORAGE FACILTIY ) Timetable: April -June 2012 Budget :83,784,000 15. PROCUREMENT OF TWO (2) UNTTS PORTABLE M ULTI.GAS AM BIENT AIR ANALYZER (For 02, CO, CO2, NO2, SO2 & NH3) Not yet implemented. Timetable : 2no Quarter Budget : P1,420,556.66 16. PROCUREMENT OF GAS Not implemented. CALIBRATION KIT Timetable : 2nd Quarter Budget : P682,354 17. PROCUREMENT OF ONE (1) UNIT Not yet implemented. PORTABLE REAL.TIME AUTOMATIC ) PM1 O/TSP MEASUREMENT METER (E-BAM) Timetable : 3'o Quarter Budget : P1,200,000 18. PROCUREMENT OF ACCESSORIES FOR REAL.TIME AUTOMATIC PM1 O/TSP MEASUREMENT METER TIMETABLE ; 3'd Quarter Budget :&3'12,530 Not yet implemented. 19. INSTALLATION OF AIR POLLUTION CONTROL DEVICE (Dust Collecting System), (Carcon STC) Not yet implemented. Timetable : 1"'Quarter Budset : F6,936,000 20.INSTALLATION OF AIR POLLUTION CONTROL DEVICE (Wet Scrubber) r CarCon Assay Lab r Main Assay Lab Timetable : 1" Quarter Budqet Not yet implemented. : *768,480.12 ) 21. PURCHASE/INSTALL NURSERY FACILITIES (Gentral & Biga) r Danawan Nursery Water System r Gentral Nursery Water System r Permanent Stock Shed r Greenhouse Mist Watering System r Greenhouse Concrete Seedbeds r Establishment of Orchidarium r Purchase of Cooler r Perimeter fencing (cyclone wire) r Repair of Ceiling & comfort room Timetable : l" Quarter Budget : F1,039,000 c. For Central Nusery: - Water system alreadY installed - Permanent Stock shed already installed - Repair of Ceiling & CR comPleted. - On going construction of Orchidarium For Biga Nursery: - Stock shed alreadY installed ENVIRONMENTAL PROTECTION AND MAINTENANCE ACTIVITIES 1. OPERATION AND MAINTENANCE OF Well maintained. TAILINGS DISPOSAL SYSTEM ) Timetable : As needed Budset 2. : F-41,000,000 WATER SPRINKLING AND MAINTENANCE OF ACCESS There was intermittent shower during the monitoring of the operations area. ROADS WITHIN CCC OPERATION AREA Timetable: As needed Budget : P5,000,000 3. PROCUREMENT OF COOKED LIME No purchase made. (To control/neutralize AM D) Timetable: As needed Budget :P1,440,000.00 5 4. MATNTENANCE OF ONE (1) SLAKE LIME SET.UP AT SBDT AREA The slake lime set up at SBDT is maintained. Timetable: Monthly Budqet :*142,824.0O 5. MAINTENANCE OF EXISTING USED OIL STORAGE FACILITY AT Carmen H.E. & Machine Shop Timetable: Monthly Well maintained. Budqet :P180,000.00 8. MAINTENANCE OF OIL.WATER SEPARATOR@ Garmen H.E (2 facilities) & DAS Machine Shop The outlet pipe was blocked by eroded materials from the side of the canal.. Q2. lt is recommended that the side of the canal be concreted/riprapped and immediate desiltation of the overflow pipe. ) Q2. This issue will be raised to the MRFC for deliberation for possible credit to 2012 AEPEP. ) Timetable: As needed Budqet :*722,760 D. RESEARCH AND DEVEL OPMENT 1. MINE REHABIUTATION &ENHANCED Not yet implemented. WATERSTIED RESEARCH & DEVELC'PMENT r Monitor/assess plant grondt performance r Establish plantation/pilot tested mine revegetation rEstablish veg€tali\re slope sEilization me:lsunes r Condud pedodc esessrrenUdocunentation Timetable: As needed Budqet :P761,630.00 2. ENVIRONMENTAL COMPLIANCE cERTr FTCATE (ECC) AP PLTCATTO N (prepare EIA documenUapplication, Validation/actual inspection) Timetable : June,2012 Budqet : F 3. The preparation of the EPRMP as a requirement for the amendment of the ECC of Atlas mines tailing disposal facility was conducted last December 2011. I 800,000 RE.VALIDATION OF BASELINE DATA (Document assessment, Conduct sampling & submission of There is on going negotiation betvveen the company and the consultant. Q2 2012.lt is recommended that the proposal should not be approved without the indorsemenVapproval of the MRFC Documents on baseline study) Timetable: Mar-Oct, 201 2 Budget : R 2,500,000 6 OTHER FINDINGS. OBSERVATIONS AND RECOMMENDATIONS: 1. lt is recommended that the inlet of llag diversion tunnel should be cleared of va.ious debris. 2. There is on going dialogue between the company and residents of Brgy. DAS re: proposed blasting of over hanging cliff near the vicinity of llag dumpsite. The blasting is intended to prevent possible rock slide that may affect the outlet of liag diversion twin tunnel. 3, There is an on going road maintenance at Biga near the nursery. 4, There was no ship loading during sea water sampling. crushing and screening plant at lvasaba is still existing and contributed to the turbidity of llag diveFion 5, The team observed that the aggregate e quarter 201 2 MMT monitodng is hereby quoted "lt is strongly recommended that CDO be issued by river. The recommendation during the 1 MGB-7, EM&7 & LGU-Toledo city to this operation". 6. The recommendation during the ls quarter 2012 MMT moniio.ing is hereby reiterated. '"The washing of hauling truck was done in an inappropriate position. Thus allo{ing lhe muddy \r/ash water to dircctly flot^, into the n€arby creek. lt is recommerded that this practice be stopped". lt is recommended that Carmen HE should submit washing procedure. 7. No grcund vrater sample was collecled at the Carcon access road sampling station. 8, lt is recommended hat all mine roads be provided with appropriate signages. 9. lt is recommended that the source of \aashing w"ter at sampling station GW4 be improved (deepening and concreting of well). '10. Access going to sampling station SW-g (overflow of Sigpitdam) should be repaired. ) Prepared a642rrntqtrz, Noted by: CHR]STOPFIER€OHN W. SALCEDO Head / MGB-7 @ ) Represent 't