Michael Berning - 2011 GreenGov Symposium

Transcription

Michael Berning - 2011 GreenGov Symposium
2011 GreenGov Symposium
Oct. 31 ‐ Nov. 2, 2011
Washington Hilton Š Washington, DC
What About Performance After
Receiving Your (LEED) Plaque?
Michael J. Berning PE, CEM, LEED AP BD+C
Director of Sustainable Design, Sr. Principal
Heapy Engineering
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Copyright Materials
This presentation is protected by US and International
Copyright laws. Reproduction, distribution, display and
use of the presentation without written permission of the
speaker is prohibited.
© Heapy Engineering 2011
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Why Build High Performance?
Whole Building Design Guide
U.S. Naval Facilities Command:
“Many of the factors that influence environmental comfort, such as quality lighting and
adequate ventilation rates, also have a direct impact on building energy use. But the
relationship between productivity and building energy use should be put in
perspective.”
For private sector offices:
Salaries average
Building leases average
Energy costs average
$200 - $600 / SF / yr
$20 - $30 / SF / yr
$2 - $4 / SF / yr
Thus, a "productivity" increase of just 1%.….
…can completely offset a building's entire utility bill !
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Who’s Talking About Green?
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Who’s Talking About Green?
The Next Generation’s Perspective…..
….. will increase GREEN building:
89%
Choose
brands aligned with social cause
74%
Listen to
brands aligned with social cause
69%
Shop for
brands aligned with social cause
66%
Recommend
brands aligned with social cause
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Energy Code
Changes
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Impact of Energy Code Changes
Case Study:
43,000 SF Laboratory Facility (LEED GOLD)
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Impact of Energy Code Changes
Key Changes:
90.1–2007 Energy Code Updates from 90.1–2004:
ƒ Any project between 25,000 ft² and 75,000 ft² will now be System 5 (VAV w/
Reheat) instead of System 3 (CV Rooftop Unit)
ƒ Envelope - 20 to 25% increase in U-Factors
ƒ Glass - 20% Reduction in maximum glass allowance
ASHRAE 2010:
ƒ Standard to be nearly 30% more stringent than 90.1-2004
ƒ Lighting Controls will be significant factor
ƒ Extensive Building Envelope and Glass Orientation Revisions
ƒ Sub-Metering to be Required – Lighting, Plug Loads, HVAC Systems
ƒ Computer Rooms now Covered by Standard
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Case Studies
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Wright State University
Diggs Laboratory – LEED-NC GOLD
Key Project & Green Features:
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
Green Facilities – Session 6
Facility Initiatives
$11.7 Million Project Cost
4% Below Project budget
INTEGRATED DESIGN
$ ZERO Green Project Cost Premium
Energy Cost Savings +40% vs. Code
Return On Investment: Immediate!
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Wright State University
Diggs Laboratory – LEED-NC GOLD
Energy Profile After Occupancy:
Bio III Energy Usage Comparison
Original Model (Baseline)
10000
9000
Total Btu/yr (10^6)
8000
Original Model (Proposed)
Post Occupancy EM (Proposed)
Actual Utility Bills
7000
6000
5000
4000
3000
2000
1000
0
Energy Models
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Heapy Engineering
LEED-EB: O&M PLATINUM
Key Project & Green Features:
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
Green Facilities – Session 6
Facility Initiatives
45,000 SF, $4.4 Million
1.25% Green project premium
$17,000 Commissioning Savings
35% Annual energy savings ($1.38/SF)
Daylight Harvesting & Occupancy sensors
Highly efficient HVAC Systems
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Heapy Engineering
LEED-EB: O&M PLATINUM
Energy Profile After Occupancy:
Heapy Engineering
4000
Original Model (Baseline)
Original Model (Proposed)
3500
Actual Utility Usage
3000
2500
2000
1500
1000
500
0
Energy Consumption
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Heapy Engineering
LEED-EB: O&M PLATINUM
LEED-EB: O&M Lessons Learned:
ƒEstablish implementation plan prior to starting the
LEED-EB Performance Period
ƒEngage all affected departments from the beginning
ƒImplement tracking tools for “Purchasing” Credits
ƒProvide educational training (regarding specific LEED
Credits) for any affected staff
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
Heapy Engineering
LEED-EB: O&M PLATINUM
Key LEED-EB: O&M Successes:
ƒAnnual energy savings of $8,600
ƒAnnual water cost savings of $1500
ƒ$950 Annual Savings by purchasing sustainable
paper products
ƒ$1400 Annual paper use reduction savings
ƒ$1500 Annual Savings from less waste generated
ƒImproved Indoor Air Quality: use low-VOC products
ƒTotal Annual Cost Benefit: $13,950
ƒTotal Soft & Hard Costs: $50,000
ƒROI: +27%
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011
What About Performance After
Receiving Your (LEED) Plaque?
Thank You !
Michael J. Berning PE, CEM, LEED AP BD+C
Director of Sustainable Design, Sr. Principal
Green Facilities – Session 6
Facility Initiatives
What About Performance After Receiving Your (LEED) Plaque?
November 1, 2011