Adena Corporation - MKC Associates, Inc
Transcription
Adena Corporation - MKC Associates, Inc
TRANSMITTAL Adena Corporation No. 00251 1310 West Fourth Street Mansfield, OH 44906 Phone: 419-529-4456 Fax: 419-529-4288 PROJECT: Shelby High School TO: Barton Malow 8720 Orion Place Suite 110 Columbus, OH 43240 ATTN: Erich Hiedemann, AIA WE ARE SENDING: DATE: 6/5/2012 REF: SUBMITTED FOR: Shop Drawings ACTION TAKEN: Approval Approved as Submitted Letter Your Use Approved as Noted Prints As Requested Returned After Loan Change Order Review and Comment Resubmit Plans SENT VIA: Samples Other: Made from Distributions ITEM NO. COPIES DATE 1 6/5/2012 Submit Returned Attached Specifications alum window leed shelby hs shelby ohio Returned for Corrections Separate Cover Via: ITEM NUMBER SUB 085113-007 Due Date: email REV. NO. DESCRIPTION 001 STATUS Title: 1.4B LEED NEW SUBMITTAL REVIEW Remarks: REVIEWED FURNISH AS CORRECTED REVISE AND RESUBMIT REJECTED SUBMIT SPECIFIED ITEM x APPROVAL IS SUBJECT TO ALL CONTRACT DOCUMENTS AND DOES NOT AUTHORIZE ANY CHANGE IN COST UNLESS STATED IN SEPARATE LETTER OR CHANGE ORDER. This review is only for general conformance with (1) the design concept and (2) the information given in the construction documents. Corrections or comments made on a shop drawing during this review do not relieve the contractor from compliance with the requirements of the plans and specifications. Approval of a specific item does not include approval of an assembly of which the item is a component. The contractor remains responsible for: dimensions to be confirmed and correlated at the job site; information that pertains solely to the fabrication process or to the means, methods, techniques, sequences and procedures of construction; coordination of the Work with that of all other trades; and performing all Work in a safe and satisfactory manner. By: CC: file NO EXCEPTIONS TAKEN MAKE CORRECTIONS NOTED AMEND & RESUBMIT REJECTED - SEE REMARKS REVIEWED FOR COORDINATION Date: ADENA CORPORATION ENGINEERS & CONSTRUCTION 6/5/12 31205 DATE ______________ JOB NO. _______________ BY: 6/13/2012 Signed: J.J. Trumpower Expedition ® LEED MATERIAL BUY-OUT FORM DATE: Subcontractor Information 6/1/2012 Company Name: Peerless Products For each product or material included in this sheet, please: Complete ALL information fields (if an item does not apply, enter "N/A") AND Attach backup Source Information. This form is required for all materials used in spec sections 3-10, 31, 32 and all VOCs regardless of spec section. Address: 2403 S Main St, Fort Scott, KS 66701 Phone Number: 620-223-4610 Fax Number: 620-224-3105 Project Contact: Jim Pitts Cost2 Regional Materials3 Recycled Content4 Construction Cost (includes labor, equipment, materials) Materials Cost (excludes labor, equipment) Wood component cost Aluminum Extrusions $53,071 $17,883 NA 790 1080 0 Glass $31,169 $10,510 NA 790 890 0% Spec. Section Product or Material 85113 88000 Source Information1 (Attached) Distance Distance % of Material % Post between between meeting 500Consumer project & project & mile standard for manufacture extraction (in manufacture (in miles) miles) AND extraction FSC Certified Wood5 VOC6 % Pre Consumer (aka PostIndustrial) % Certified Wood Forest Stewardship Council Chain-ofCustody Certificate Number VOC Content (g/L) Material Quantity (in gallons or liters) 30% 60% NA NA 0 NA 53% 20.0% NA NA 0 NA 1 Attach Source Information for the materials / products listed verifying each category claiming credit. Acceptable sources include product literature, a letter from the manufacturer or product cut sheets. Letters from the installer or vendor are not acceptable unless they are also the manufacturer. 2 Construction cost is the total contract cost of materials, labor and equipment for the installation of a given product or material. Materials cost is the construction cost minus the labor and equipment cost. Cost information is not required for adhesives sealants or paints reporting only VOC content (unless that product also claims credit for another category. 3 Manufacture location is defined as the final assembly location of the product or material. Extraction location is where the source material was mined, harvested or collected. For recycled materials, the extraction point is the place where the recycling occurred. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value (referred to as "percent compliance" per LEED). Any material with a manufacture or extraction point further than 500 miles, please indicate >500 in the corresponding box. 4 Recycled content is calculated by cost and percentages are determined by weight, separated into pre-consumer and post-consumer content. Pre-Consumer (aka post-industrial) recycled content is output from a process that has not been used as part of a consumer product, that is sold, traded, or exchanged under commercial terms as feedstock for another industrial process, and that would otherwise be landfilled, incinerated or somehow disposed of as waste, as defined by the Federal Trade Commission. Post-Consumer recycled content is consumer waste that has become raw material (feedstock) for another product. It originates from projects that have served a useful purpose in the consumer market. 5 Forest Stewardship Council (FSC) is a third-party certification system adopted by timber management companies. A LEED point is earned if at least 50% of wood based products (by cost) used on the project carry this certification standard. The calculation includes the total cost of FSCcertified wood products divided by the total cost of wood-based products used on the project. 6 VOC content and total product quantity information must be provided for all adhesives, sealants, paints and coatings used within the building moisture barrier. 2403 S. Main Street P.O. Box 431 Fort Scott, KS 66701 620-223-4610 Toll Free 1-866-420-4000 Sales Fax: 620-224-3107 Main Fax: 620-224-3105 April 12, 2012 Re: Shelby HS Reference: 572513 To Whom It May Concern: Please see below for LEED information for Shelby HS. Aluminum: Percentage for Post-Consumer (PC) Content - 30.34% Percentage for Post-Industrial (PI) Content - 60% DIE NUMBER DESCRIPTION 091-206H SILL (T) 041-504H 3/4" TAPE ON TRIM (NT) DF 091-001H S.H. HEAD - FXD HEAD & SILL (T) 091-002H FIXED-JAMB (T) 091-006H ULTRA FEMALE SH JAMB (T) 091-014H TOP & BOTTOM RAIL (T) 091-015H KEEPER RAIL (T) 091-016H LOCK RAIL (T) 091-017H STILE-(T) 091-019H STILES VANDAL SASH -(T) 091-020H BOTTOM WIDTH VANDAL SASH-(T) 091-066H BOTTOM WIDTH VANDAL SASH -(T) 091-076H 1/4" DG TOP BEAD W/BULB 091-077H 1/4" DG BTM BEAD W/BULB 091-078H 1/4" DG STILES BEAD W/BULB WEIGHT PER DIE(LBS.) 750.18 481.04 306.07 265.57 1,983.33 425.32 463.12 396.40 362.63 394.55 229.22 247.80 212.97 228.95 316.41 TOTAL % PC = % PC 3.22 2.07 1.31 1.14 8.52 1.83 1.99 1.70 1.56 1.70 0.98 1.06 0.92 0.98 1.36 30.34 Aluminum billets are supplied within 290 miles of Peerless Products, Inc. manufacturing facility. Glass: Percentage for Post-Consumer (PC) Content - 52.85% Percentage for Post-Industrial (PI) Content - 20% GLASS DESCRIPTION CL4 1/4" CLEAR SNG500 1/4" SUNGATE 500 LOW E-PPG WEIGHT (LBS.) 6,589.73 5,710.91 TOTAL % PC = % PC 28.31 24.54 52.85 Glass is supplied/fabricated within 100 miles of Peerless Products, Inc. manufacturing facility. Thanks, Brian Weaver Project Manager Peerless Products, Inc. 1 of 1