TRANSMITTAL
Adena Corporation
No. 00251
1310 West Fourth Street
Mansfield, OH 44906
Phone: 419-529-4456
Fax: 419-529-4288
PROJECT: Shelby High School
TO:
Barton Malow
8720 Orion Place
Suite 110
Columbus, OH 43240
ATTN:
Erich Hiedemann, AIA
WE ARE SENDING:

DATE: 6/5/2012
REF:
SUBMITTED FOR:

Shop Drawings
ACTION TAKEN:
Approval
Approved as Submitted
Letter
Your Use
Approved as Noted
Prints
As Requested
Returned After Loan
Change Order
Review and Comment
Resubmit

Plans
SENT VIA:
Samples
Other: Made from Distributions
ITEM NO. COPIES DATE
1
6/5/2012
Submit
Returned
 Attached
Specifications

alum window leed
shelby hs
shelby ohio
Returned for Corrections
Separate Cover Via:
ITEM
NUMBER
SUB
085113-007
Due Date:
email
REV. NO. DESCRIPTION
001
STATUS
Title: 1.4B LEED
NEW
SUBMITTAL REVIEW
Remarks:
REVIEWED
FURNISH AS CORRECTED
REVISE AND RESUBMIT
REJECTED
SUBMIT SPECIFIED ITEM
x
APPROVAL IS SUBJECT TO ALL CONTRACT DOCUMENTS AND DOES NOT AUTHORIZE ANY CHANGE
IN COST UNLESS STATED IN SEPARATE LETTER
OR CHANGE ORDER.
This review is only for general conformance with (1) the design concept and (2) the information
given in the construction documents. Corrections or comments made on a shop drawing during
this review do not relieve the contractor from compliance with the requirements of the plans and
specifications. Approval of a specific item does not include approval of an assembly of which
the item is a component. The contractor remains responsible for: dimensions to be confirmed and
correlated at the job site; information that pertains solely to the fabrication process or to the
means, methods, techniques, sequences and procedures of construction; coordination of the
Work with that of all other trades; and performing all Work in a safe and satisfactory manner.
By:
CC: file
NO EXCEPTIONS TAKEN
MAKE CORRECTIONS NOTED
AMEND & RESUBMIT
REJECTED - SEE REMARKS
REVIEWED FOR COORDINATION
Date:
ADENA CORPORATION
ENGINEERS & CONSTRUCTION
6/5/12
31205
DATE ______________ JOB NO. _______________
BY:
6/13/2012
Signed:
J.J. Trumpower
Expedition ®
LEED MATERIAL BUY-OUT FORM
DATE:
Subcontractor Information
6/1/2012
Company Name: Peerless Products
For each product or material included in this sheet, please:
Complete ALL information fields (if an item does not apply, enter "N/A") AND
Attach backup Source Information.
This form is required for all materials used in spec sections 3-10, 31, 32 and all VOCs
regardless of spec section.
Address: 2403 S Main St, Fort Scott, KS 66701
Phone Number: 620-223-4610
Fax Number: 620-224-3105
Project Contact: Jim Pitts
Cost2
Regional Materials3
Recycled Content4
Construction
Cost (includes
labor,
equipment,
materials)
Materials Cost
(excludes labor,
equipment)
Wood
component
cost
Aluminum Extrusions
$53,071
$17,883
NA
790
1080
0
Glass
$31,169
$10,510
NA
790
890
0%
Spec.
Section
Product or Material
85113
88000
Source Information1
(Attached)
Distance
Distance
% of Material
% Post
between
between
meeting 500Consumer
project &
project &
mile standard for
manufacture extraction (in
manufacture
(in miles)
miles)
AND extraction
FSC Certified Wood5
VOC6
% Pre
Consumer
(aka PostIndustrial)
% Certified
Wood
Forest Stewardship
Council Chain-ofCustody Certificate
Number
VOC
Content
(g/L)
Material
Quantity (in
gallons or
liters)
30%
60%
NA
NA
0
NA
53%
20.0%
NA
NA
0
NA
1 Attach Source Information for the materials / products listed verifying each category claiming credit. Acceptable sources include product literature, a letter from the manufacturer or product cut sheets. Letters from the installer or vendor are not acceptable unless they are also the
manufacturer.
2 Construction cost is the total contract cost of materials, labor and equipment for the installation of a given product or material. Materials cost is the construction cost minus the labor and equipment cost. Cost information is not required for adhesives sealants or paints reporting only VOC
content (unless that product also claims credit for another category.
3 Manufacture location is defined as the final assembly location of the product or material. Extraction location is where the source material was mined, harvested or collected. For recycled materials, the extraction point is the place where the recycling occurred. If only a fraction of a
product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value (referred to as "percent compliance" per LEED). Any material with a manufacture or extraction point further than 500 miles, please
indicate >500 in the corresponding box.
4 Recycled content is calculated by cost and percentages are determined by weight, separated into pre-consumer and post-consumer content. Pre-Consumer (aka post-industrial) recycled content is output from a process that has not been used as part of a consumer product, that is sold,
traded, or exchanged under commercial terms as feedstock for another industrial process, and that would otherwise be landfilled, incinerated or somehow disposed of as waste, as defined by the Federal Trade Commission. Post-Consumer recycled content is consumer waste that has
become raw material (feedstock) for another product. It originates from projects that have served a useful purpose in the consumer market.
5 Forest Stewardship Council (FSC) is a third-party certification system adopted by timber management companies. A LEED point is earned if at least 50% of wood based products (by cost) used on the project carry this certification standard. The calculation includes the total cost of FSCcertified wood products divided by the total cost of wood-based products used on the project.
6 VOC content and total product quantity information must be provided for all adhesives, sealants, paints and coatings used within the building moisture barrier.
2403 S. Main Street
P.O. Box 431
Fort Scott, KS 66701
620-223-4610
Toll Free 1-866-420-4000
Sales Fax: 620-224-3107
Main Fax: 620-224-3105
April 12, 2012
Re: Shelby HS
Reference: 572513
To Whom It May Concern:
Please see below for LEED information for Shelby HS.
Aluminum:
Percentage for Post-Consumer (PC) Content - 30.34%
Percentage for Post-Industrial (PI) Content - 60%
DIE NUMBER
DESCRIPTION
091-206H
SILL (T)
041-504H
3/4" TAPE ON TRIM (NT) DF
091-001H
S.H. HEAD - FXD HEAD & SILL (T)
091-002H
FIXED-JAMB (T)
091-006H
ULTRA FEMALE SH JAMB (T)
091-014H
TOP & BOTTOM RAIL (T)
091-015H
KEEPER RAIL (T)
091-016H
LOCK RAIL (T)
091-017H
STILE-(T)
091-019H
STILES VANDAL SASH -(T)
091-020H
BOTTOM WIDTH VANDAL SASH-(T)
091-066H
BOTTOM WIDTH VANDAL SASH -(T)
091-076H
1/4" DG TOP BEAD W/BULB
091-077H
1/4" DG BTM BEAD W/BULB
091-078H
1/4" DG STILES BEAD W/BULB
WEIGHT PER DIE(LBS.)
750.18
481.04
306.07
265.57
1,983.33
425.32
463.12
396.40
362.63
394.55
229.22
247.80
212.97
228.95
316.41
TOTAL % PC =
% PC
3.22
2.07
1.31
1.14
8.52
1.83
1.99
1.70
1.56
1.70
0.98
1.06
0.92
0.98
1.36
30.34
Aluminum billets are supplied within 290 miles of Peerless Products, Inc. manufacturing facility.
Glass:
Percentage for Post-Consumer (PC) Content - 52.85%
Percentage for Post-Industrial (PI) Content - 20%
GLASS
DESCRIPTION
CL4
1/4" CLEAR
SNG500
1/4" SUNGATE 500 LOW E-PPG
WEIGHT (LBS.)
6,589.73
5,710.91
TOTAL % PC =
% PC
28.31
24.54
52.85
Glass is supplied/fabricated within 100 miles of Peerless Products, Inc. manufacturing facility.
Thanks,
Brian Weaver
Project Manager
Peerless Products, Inc.
1 of 1