Development of Kalyan
Transcription
Development of Kalyan
Development of Kalyan Dombivli Solar City Final Master Plan Supported by Ministry of New and Renewable Energy Government of India, New Delhi ABBREVIATIONS AND ACRONYMS AC: BEE: BIPV: BMS: BOOT: BOT: CAGR: CDM: CDP: CERC: CFA: CFL: CHP: CNG: CO2: CPWD: CSP: DG Sets: DISCOM: DSM: DTS: ECBC: eCO2: EE: ESCo: FITM: FTL: GDP: GHG: GLS: GRIHA: HH: HPSV: Hrs/day: HVAC: Hz: ICLEI SA: Air-conditioner Bureau of Energy Efficiency Building Integrated Photovoltaics Building Management System Build, Operate, Own and Transfer Build, Operate and Transfer Compound Annual Growth Rate Clean Development Mechanism City Development Plan Central Electricity Regulatory Commission Central Financial Assistance Compact Fluorescent Light Combined Heat and Power Compressed Natural Gas Carbon Dioxide Central Public Works Department Concentrating Solar Power Diesel Generator Sets Distribution Company Demand Side Management Decentralized Waste Water Treatment System Energy Conservation Building Code Equivalent Carbon Dioxide Energy Efficiency Energy Service Company Feed in Tariff Mechanism Fluorescent Tube Light Gross Domestic Product Green House Gases Global Light Source Green Building Integrated Habitat Assessment House Hold High Pressure Sodium Vapour Hours per Day Heating, Ventilation and Air-conditioning Hertz International Council for Local Environmental Initiatives – South Asia IEA: International Energy Agency IEO: International Energy Outlook IREDA: Indian Renewable Energy Development Agency ISES: International Solar Energy Society JnNURM: Jawaharlal Nehru National Urban Renewal Mission KDMC: Kalyan Dombivli Municipal Corporation Kg: Kilogram kHz: Kilo Hertz kL: kilo litre kL: Kilo Litre kT/yr: Kilo Tonnes per Year kW: kilo Watt kWe: kWh: kWp: L: LED: LEED: LPD: LPG: m/s: M: MNES: Kilo Watt Equivalent kilo watt-hour Kilo Watt Peak Litre Light Emitting Diode Leadership in Energy and Environmental Design Litres per day Liquefied Petroleum Gas Metres per Second Metre Ministry of Non-conventional Energy Sources (now the MNRE) MNRE: Ministry of New and Renewable Energy MSEDCL: Maharashtra State Electricity Distribution Company MSW: Municipal Solid Waste MT: Metric Tonnes MU: million units MW: Mega Watt MWe: Mega Watt Equivalent MWh: Mega Watt-hour MWp: Mega Watt Peak NGO: Non-governmental Organization O&M: operations and Maintenance PDD: Project Design Document PNG: Piped Natural Gas PPP: Public-Private Partnership R&D: Research and Development RE: Renewable Energy REC: Renewable Energy Certificate RET: Renewable Energy Technology SCADA: Supervisory Control and Data Acquisition SCP: Solar Cities Project SERC: State Electricity Regulatory Commission Sft: Square Feet SNA: State Nodal Agency SPV: Solar Photo Voltaic Sqm: Square Metre STP: Sewage Treatment Plant SWH: Solar Water Heater SWM: Solid Waste Management T/yr: Tonnes per Year T: Tonne TeCO2: Tonnes of Equivalent Carbon Dioxide TERI: The Energy and Resources Institute ULB: Urban Local Body UNFCCC: United Nations Framework Convention on Climate Change W: Watt Wh: Watt-hour WTP: Water Treatment Plant ACKNOWLEDGEMENT This Master Plan is an outcome of the Ministry of New and Renewable Energy’s (MNRE’s) Solar City Programme as part of the 11th Five year plan. Their initiatives have led to the collaboration of the Kalyan Dombivli Municipal Corporation (KDMC) with ICLEI-South Asia for the preparation of the Solar City Master Plan for Kalyan Dombivli city, as part of this Programme. We gratefully acknowledge the support of Kalyan Dombivli Municipal Corporation and Maharashtra Energy Development Agency (MEDA) for providing assistance in primary and secondary data collection in the initial phase of master plan preparation. We would like to thank Secutech Automation (India) Pvt. Ltd Mumbai, for data collection and sample survey for Kalyan Dombivli city. The report benefited enormously from peer review process by a gamut of experts from ICLEI South Asia and most importantly the Kalyan Dombivli Municipal Corporation (KDMC), Maharashtra Energy Development Agency (MEDA) and the stakeholders of Kalyan Dombivli Solar City Programme. We acknowledge their contributions and suggestions which streamlined the structure and composition of the master plan. The report would have not been possible without the generous support of the Ministry of New & Renewable Energy, Government of India. We extend our gratitude to the honorable secretary of MNRE, Mr. G. B. Pradhan for his time and advice to make this report better. We specially thank Dr. Bibek Bandyopadyay, Advisor, MNRE and Dr. Arun Kumar Tripathi, Director, MNRE for their valuable advice and guidance during the preparation of this report. We also extend our thanks to the other officers and staff of the MNRE for their consistent support in preparing and finalizing the report. 2 CONSULTED ORGANISATIONS: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Kalyan Dombivli Municipal Corporation, Kalyan Dombivli Maharashtra Energy Development Agency (MEDA) Officials and Councilors of Kalyan Dombivli Municipal Council Maharashtra State Electricity Distribution Company Limited (MSEDCL) District Supply Officer (DSO), State Oil Coordinator for Maharashtra Hotels and restaurants Small Scale Industries Association Tourism Department Education Department Department of Health Members of the civil society Secutech Automation Pvt Ltd Local suppliers of RE and EE devices Local Media 3 MNRE TEAM: Dr. Bibek Bandyopadhyay, Advisor & Head, MNRE Dr. Arun Kumar Tripathi, Director, MNRE Mr. Hiren Borah, Scientist “B”, MNRE KALYAN DOMBIVLI MUNICIPAL CORPORATION AND NODAL AGENCY’S TEAM: Mr. R. K. Sonawane, Commissioner, Kalyan Dombivli Municipal Corporation Mr. Yashwant Sonawane, Executive Engineer, Kalyan Dombivli Municipal Corporation Mr. Prashant Bhagwat, Engineer, Kalyan Dombivli Municipal Corporation Shri Anand Limaye (IAS), Director General, MEDA Mr. H. M. Kulkarni, General Manager, Rural Energy, MEDA ICLEI SOUTH ASIA TEAM: Emani Kumar Dwipen Boruah Ravi Ranjan Guru Ashish Verma Laasya Bhagvatula 4 5 EXECUTIVE SUMMARY The “Development of Solar Cities” programme by the Ministry of New and Renewable Energy (MNRE), Government of India, is an immense opportunity for contributing towards a sustainable India in the coming years. This programme is a crucial step towards supporting Indian cities for the development of renewable energy and energy efficiency projects and curbing conventional energy demand by 10% in the next five years. This master plan is the outcome of the programme’s objective to develop a road map for the city to envision and implement renewable energy and energy conservation strategies. The master plan approach is in tandem with the requirements of the MNRE guidelines. The master plan begins with the introductory city profile which encapsulates the city’s current energy demands and also the municipal corporation services which are intrinsic to the city’s growing energy demand. The 2nd chapter provides the Current Energy Scenario of Kalyan Dombivli. Detailed analysis of the trend and pattern of electricity, petrol, diesel, kerosene and LPG consumption has been discussed and thoroughly analyzed to base the strategy development of the city. The main sources of energy in the city are electricity, petrol, diesel, LPG and kerosene. The 3rd Chapter Energy Demand Forecast of Kalyan Dombivli estimates the future conventional energy demand interpolating the past data of energy consumption as well as population growth data. However other key aspects detrimental to energy demand like population growth and city economic growth has also been considered for ascertaining the city’s future conventional energy Kerosene SWH 6.38% 0.35% demands. Electricity has the largest share in the makeup, accounting for 58% of the energy supply, with LPG at 12%, petrol at 7%, diesel at 16% and kerosene at 6%. The present penetration of SWH in Kalyan- Dombivli is approximately 1%. Sector wise, a majority of energy consumption is within the residential sector (81%), followed by the commercial sector. During the last five years, the residential and commercial sectors have shown higher growth in electricity consumption as compared to the municipal and industrial sectors. Diesel 15.51% Petrol 7.31% LPG 12.41% Electricity 58.04% Goal for Year 2013: Studying the historical growth in consumption levels and population growth projections until the year 2013, it has been assessed that the energy consumption in Kalyan-Dombivli in 2013 can be ascertained under the highest growth scenario as 1680 MU. This gives the city a 10% reduction goal of 168 MU. The success of renewable energy technology projects can only be assured with an accurate resource assessment and its potential in the city. Hence the 4th Chapter Renewable energy and Energy Efficiency 6 Strategies for KDMC begins with the resource availability and intensity of renewable energy resources like solar, wind, hydro- and geothermal in the city. This chapter is the most substantial part of the master plan as it delineates the specific strategies for the city. For ease of study the city has been divided into residential, commercial, municipal and industrial sectors and both renewable energy and energy efficiency initiatives are enlisted within it. Case studies have been highlighted in the city which are 4-5 specific sites within the city where RE and EE technologies can be showcased. A minimum of 5% of the energy reduction achieved is aimed to be met through renewable energy measures. The primary or the most feasible actions for which the techno-economics have been developed under renewable energy measures are solar water heater and solar home light systems. Considering the high upfront/ capital costs of solar equipments in India SWH has proved to be the least cost option compared to other solar equipments for KDMC. As KDMC is primarily an urban residential area, the potential for investment lies more in/from individual households. The table below summarizes the year wise energy savings goal with RE and EE strategies in different sectors: RE and EE Strategy for Kalyan Dombivli City Energy Savings target over 5 years period of implementation (MU per year) 2nd year 3rd year 4th year 5th year 1st Cumulati Cumulati Cumulati Cumulati Year ve ve ve ve % of savings target to achieve Emission reduction/ year RE for Residential Sector 8.30 20.75 37.36 58.11 83.02 49.41% 69231 RE for Commercial & Inst. Sector 0.50 1.25 2.25 3.50 5.00 2.98% 3187 RE for Industrial Sector 1.17 2.93 5.27 8.20 11.71 6.97% 9747 RE for Municipal Sector 0.10 4.70 6.50 13.16 13.46 8.01% 10903 Total for RE strategy 11.32 28.30 50.93 79.23 113.18 67.37% 93068 EE for Residential Sector 6.61 16.54 29.77 46.30 66.15 39.37% 53580 EE for Commercial Sector 2.51 6.27 11.28 17.55 25.08 14.93% 20312 EE for Industrial Sector 0.33 0.82 1.47 2.28 3.26 1.94% 2643 EE for Municipal Sector 1.46 3.65 6.58 10.23 14.61 8.70% 11838 Total for EE Strategy 10.91 27.28 49.10 76.37 109.10 64.94% 88372 RE and EE Combined Strategy 22.23 55.57 100.03 155.60 222.28 13% 33% 60% 93% 132% 181440 The table below summarizes the total budget and year wise expenses for implementation of solar city development programme shared among MNRE, state/ city and private users. Sharing of fund Year 1 (Crore) Year 2 (Crore) Year 3 (Crore) Year 4 (Crore) Year 5 (Crore) Total (Crore) State / City Share 3.10 4.65 6.20 7.75 9.30 30.99 MNRE Share 21.58 34.48 43.53 55.80 64.44 219.83 Private Share 40.98 64.37 83.00 106.63 122.93 417.90 Total Budget 65.66 103.49 132.72 170.17 196.67 668.71 7 Guidebook for development of Solar City: The “Guidebook for development of Solar City” is an integral part of the Master Plan. The guidebook provides generic information about general energy scenario, renewable energy scenario and energy efficiency initiatives in India, evolution of solar city concept, international solar city initiatives and local renewable network in its first two chapters. The third chapter describes the solar city programme in India and its objectives, targets and guidelines. Indicative renewable energy devices and energy efficiency measures are described in chapter 4 & 5. Financial models have been suggested in the 6th Chapter Financial Schemes and Business Models to enable the city to implement the strategies listed here. The implementation phase under this programme will be the key indicator to determine the level of success for this MNRE programme. The 6th Chapter cites numerous schemes available in India as well as various business models which can be emulated for successful implementation of RE & EE projects. Not only financing but capacity building and awareness generation go hand in hand to ensure sustainability of the MNRE programme. All activities from developing a “Solar City Cell” to workshops and training have been discussed in the 7th Chapter Implementation Strategy for Solar City Programme. 8th Chapter Risk Analysis describes the risks involved in developing renewable energy projects in the Indian context and suggests mitigation methods for the cities. A generic approach has been taken to provide the preventive measures however risks are city-specific and requires intrinsic detailing for individual projects. The master plan provides a framework to compare and analyze alternative strategies and policies, in order to facilitate Council’s review and the decision-making process. Achieving significant reduction in energy consumption requires collective effort by all City departments, other government departments, businesses, industries and citizens. The City needs to become a bolder leader in its policies, planning, programs, advocacy and its own operations – there is a tremendous opportunity and need to demonstrate Community Leadership. The investigation showed that the biggest energy saving potential is in the residential sector and most significant RES potential is for solar energy projects. It is the responsibility of leaders in all tiers of government, commerce, industry and civil society to promote action towards more efficient and renewable energy use. 8 Table of Contents ACKNOWLEDGEMENT ..................................................................................................................................... 2 CONSULTED ORGANISATIONS: ........................................................................................................................ 3 ICLEI SOUTH ASIA TEAM: ................................................................................... Error! Bookmark not defined. EXECUTIVE SUMMARY..................................................................................................................................... 4 1. INTRODUCTION ..................................................................................................................................... 15 1.1. Kalyan Dombivli City Profile .............................................................................................................. 15 1.2. City Urban Services ............................................................................................................................ 15 1.2.1. Administrative Setup ..................................................................................................................... 15 1.2.2. Water Supply ................................................................................................................................. 15 1.2.3. Municipal Solid Waste ................................................................................................................... 15 1.2.4. Sewage Treatment Plant ............................................................................................................... 16 1.2.5. Streetlights .................................................................................................................................... 16 1.2.6. Storm Water Drains ....................................................................................................................... 16 1.2.7. Roads, Traffic and Transportation ................................................................................................. 17 1.2.8. e- Governance ............................................................................................................................... 17 1.3. Developing Kalyan Dombivli as ‘Solar City’ ....................................................................................... 17 1.3.1. 2. Preparation of Master Plan for ‘Kalyan Dombivli Solar City’......................................................... 17 ENERGY BASELINE STATUS OF KALYAN DOMBIVLI CITY........................................................................ 19 2.1. Overall Energy Status ........................................................................................................................ 19 2.1.1. Energy Consumption ..................................................................................................................... 19 2.1.2. Supply Side Energy Balance ........................................................................................................... 21 2.2. Residential Sector .............................................................................................................................. 22 2.2.1. Energy consumption ...................................................................................................................... 22 2.2.2. Results of sample survey ............................................................................................................... 23 2.3. Commercial Sector ............................................................................................................................ 26 9 2.3.1. Energy consumption ...................................................................................................................... 26 2.3.2. Results of sample survey ............................................................................................................... 27 2.4. Industrial Sector ................................................................................................................................ 30 2.4.1. Energy consumption ...................................................................................................................... 30 2.4.2. Results of sample survey ............................................................................................................... 30 2.5. Municipal Sector ................................................................................................................................ 31 2.6. City Wide Green House Gas Inventory .............................................................................................. 32 2.6.1. City level Emissions........................................................................................................................ 32 2.6.2. Government Emissions .................................................................................................................. 32 3. ENERGY DEMAND FORECAST FOR KALYAN DOMBIVLI ......................................................................... 34 3.1. Forecasting Based on Population Growth ......................................................................................... 34 3.2. Goal for the year 2013....................................................................................................................... 36 4. RENEWABLE ENERGY STRATEGIES FOR KALYAN DOMBIVLI.................................................................. 37 4.1. Renewable Energy Resource Assessment ......................................................................................... 38 4.1.1. Solar Radiation............................................................................................................................... 38 4.1.2. Wind Energy .................................................................................................................................. 39 4.1.3. Biomass Resource .......................................................................................................................... 39 4.1.4. Waste generation .......................................................................................................................... 40 4.1.5. Liquid Waste from Sewage Treatment Plant................................................................................. 40 4.2. RE Strategy for Residential sector ..................................................................................................... 40 4.3. RE Strategy for Commercial and Institutional Sector ........................................................................ 46 4.3.1. RE Strategy for Hotels .................................................................................................................... 46 4.3.2. Renewable Energy Systems for Restaurants ................................................................................. 48 4.3.3. Renewable Energy Systems for Hospitals...................................................................................... 51 4.3.4. Renewable Energy Systems for Educational Institutes ................................................................. 55 4.3.5. RE Strategy for Industrial Sector.................................................................................................... 56 4.3.6. RE Strategy for Municipal Sector ................................................................................................... 57 10 4.3.7. Waste to Energy Potential in Kalyan Dombivli .............................................................................. 61 4.3.8. Application of biogas plants .......................................................................................................... 64 4.3.9. Solar Thermal for cooling .............................................................................................................. 66 5. ENERGY EFFICIENCY STRATEGIES FOR KALYAN DOMBIVLI.................................................................... 67 5.1. EE Strategy for Residential sector ..................................................................................................... 68 5.2. EE Strategy for Commercial Sector.................................................................................................... 71 5.3. EE Strategy for Industrial Sector ........................................................................................................ 75 5.4. EE Strategy for Municipal Sector ....................................................................................................... 77 5.4.1. 6. EE measures in Street Lighting ...................................................................................................... 77 ACTION PLAN AND BUDGET .................................................................................................................. 83 6.1. Year-wise Goals of Energy Savings .................................................................................................... 83 6.2. Physical Target and Action Plan......................................................................................................... 86 6.3. Implementation Strategy................................................................................................................... 88 6.3.1. Establishment of the Solar City Cell............................................................................................... 88 6.3.2. Awareness and Publicity ................................................................................................................ 88 6.3.3. Implementation of RE Strategy ..................................................................................................... 89 6.3.4. Renewable Energy Pilot Projects ................................................................................................... 91 6.4. Financial outlays and sharing of fund ................................................................................................ 93 6.5. Potential Carbon Market Benefit ...................................................................................................... 98 7. Annexure I – Pilot Project I .................................................................................................................... 99 8. Annexure II – Pilot Project II ................................................................................................................ 106 9. Annexure III – Pilot Project III .............................................................................................................. 113 10. Annexure IV – Pilot Project IV ......................................................................................................... 120 11. Annexure V - Pilot Project V ............................................................................................................ 128 12. Annexure VI - References & Bibliography ....................................................................................... 134 11 List of Figures Figure 1 : Figure 2 : Figure 3 : Figure 4 : Figure 5 : Figure 6 : Figure 7 : Figure 8 : Figure 9 : Figure 10 : Figure 11 : Figure 12 : Figure 13 : Figure 14 : Figure 15 : Figure 16 : Figure 17 : Figure 18 : Figure 19 : Figure 20 : Figure 21 : Growth in Electricity Consumption ........................................................................................................................................20 Sector Wise Break-Up of Electricity Consumption ...........................................................................................................20 Shares of Fuels in Supply Side Energy Balance ..................................................................................................................22 Supply Balance in residential sector ......................................................................................................................................23 Household Classification .............................................................................................................................................................23 Lighting Inventory and Usage ..................................................................................................................................................25 Awareness and Usage of RE & EE Technologies ................................................................................................................25 Share Of Fuels In Energy Balance ...........................................................................................................................................26 Consumer classification (kWh/month).................................................................................................................................27 Lighting Technology Used by Consumers.............................................................................................................................29 Awareness and Usage of Energy Efficient Lighting Technologies ..............................................................................29 Share of GHG Emissions by Sector...........................................................................................................................................32 Share of GHG emission in Government sector ....................................................................................................................33 Forecasting for Energy Consumption (MU) based on population growth ..............................................................35 Forecasting of Energy Consumption (MU) based on historical data ........................................................................35 Annual Solar Radiation profile in Kalyan Dombivli.........................................................................................................39 Year wise energy savings targets for Kalyan Dombivli Solar City .............................................................................84 Sharing of total budget for development of solar city Kalyan Dombivli .................................................................94 Sharing of RE Strategy Budget for Kalyan Dombivli Solar City .................................................................................94 Sharing of EE Strategy Budget for Kalyan Dombivli Solar City ..................................................................................94 Year wise sharing of budget for Kalyan Dombivli Solar City Programme ..............................................................95 12 List of Tables Table 1 : Table 2 : Table 3 : Table 4 : Table 5 : Table 6 : Table 7 : Table 8 : Table 9 : Table 10 : Table 11 : Table 12 : Table 13 : Table 14 : Table 15 : Table 16 : Table 17 : Table 18 : Table 19 : Table 20 : Table 21 : Table 22 : Table 23 : Table 24 : Table 25 : Table 26 : Table 27 : Table 28 : Table 29 : Table 30 : Table 31 : Table 32 : Table 33 : Table 34 : Table 35 : Table 36 : Table 37 : Table 38 : Table 39 : Table 40 : Table 41 : Table 42 : Table 43 : Table 44 : Table 45 : Table 46 : Table 47 : Table 48 : Table 49 : Table 50 : Electricity consumption in Kalyan Dombivli City .............................................................................................................19 LPG Consumption Data in KDMC ............................................................................................................................................20 Petrol Consumption Data in KDMC ........................................................................................................................................21 Diesel Consumption Data in KDMC ........................................................................................................................................21 Kerosene Consumption Data in KDMC..................................................................................................................................21 Supply Side Energy Balance in KDMC for 2007-2008.....................................................................................................22 Residential Sector Energy Consumption ..............................................................................................................................22 Energy Balance for Residential Sector .................................................................................................................................22 Summary of Sample Survey ......................................................................................................................................................24 Commercial Sector Energy Usage...........................................................................................................................................26 Energy Balance for the Sector for the Year 2007-08 ......................................................................................................26 Summary of Commercial establishments/institutes in the city ..................................................................................27 Household appliances inventory .............................................................................................................................................28 Interest Shown By Consumers for Solar Water Heater Installation .........................................................................30 Industrial Sector Energy Consumption ................................................................................................................................30 Energy Balance for Industrial Sector ....................................................................................................................................30 Overall Municipal Sector Energy Consumption (MU) .....................................................................................................31 Energy Consumption for Street lighting(kWh) .................................................................................................................31 Electricity Consumption in Water Pumping (MU) ...........................................................................................................31 Energy Consumption in waste water treatment plant (MU) .......................................................................................31 Population Projection till 2020 ...............................................................................................................................................34 Energy Consumption Projection (MU) ..................................................................................................................................34 Energy Consumption Projection for KDMC (MU) .............................................................................................................35 Energy consumption projection for KDMC (MU) ..............................................................................................................36 Forecasting of Energy Consumption for KDMC .................................................................................................................36 Monthly Averaged Insolation Incident on a Horizontal Surface (kWh/M2/Day)................................................38 Monthly averaged wind speed above earth surface for terrain similar to airports (m/s) ..............................39 Biomass Resource .........................................................................................................................................................................39 Solid Waste Generation Data ...................................................................................................................................................40 Target for SWHs installation in Kalyan Dombivli City ...................................................................................................41 Target for introducing solar cooker in Kalyan Dombivli City .....................................................................................41 Target for introducing solar lanterns in Kalyan Dombivli City ..................................................................................42 Target for introducing solar home system in Kalyan Dombivli City .........................................................................43 Target for introducing Solar PV for Home Inverters in Kalyan Dombivli City .....................................................44 Target for replacement of diesel generator sets with PV Power Pack in Kalyan Dombivli City ....................44 RE system for residential apartments ...................................................................................................................................45 Summary of RE Strategy for Residential sector in Kalyan Dombivli City ...............................................................46 Case Study of Budget Hotel cum Bar & Restaurant .........................................................................................................47 Case Study of Restaurant ...........................................................................................................................................................49 Summary of RE strategy for Restaurants ............................................................................................................................51 Case Study of 50 bedded hospital............................................................................................................................................51 Case Study for 20 bed hospital .................................................................................................................................................53 Summary of RE systems for Hospitals ...................................................................................................................................54 Target for Introducing Solar Cookers in Primary Schools............................................................................................55 Summary of RE strategy for educational institutes ........................................................................................................56 RE Strategy for Commercial and Institutional Sector ....................................................................................................56 RE Strategy for industrial sector in KDMC..........................................................................................................................57 RE Strategy for KDMC municipal sector ..............................................................................................................................58 RE Systems for Shopping Complexes .....................................................................................................................................59 RE Systems for Outdoor lights, Road safety ........................................................................................................................59 13 Table 51 : Table 52 : Table 53 : Table 54 : Table 55 : Table 56 : Table 57 : Table 58 : Table 59 : Table 60 : Table 61 : Table 62 : Table 63 : Table 64 : Table 65 : Table 66 : Table 67 : Table 68 : Table 69 : Table 70 : Table 71 : Table 72 : Table 73 : Table 74 : Table 75 : Table 76 : Table 77 : Table 78 : Table 79 : Table 80 : Table 81 : Table 82 : Table 83 : Table 84 : Table 85 : Table 86 : Table 87 : Table 88 : Table 89 : Table 90 : Table 91 : Table 92 : Table 93 : Table 94 : Table 95 : Table 96 : Table 97 : Table 98 : Table 99 : Table 100 : Summary of RE Strategy for outdoor light and road safety ........................................................................................60 Renewable Energy Systems for Parks ...................................................................................................................................60 Summary of RE Strategy for Kalyan Dombivli Corporation Parks ............................................................................60 Summary of RE Strategy for Municipal Sector in Kalyan Dombivli ..........................................................................61 Municipal Solid Waste Characterization (2006) ..............................................................................................................61 Waste to Energy through thermo-chemical conversion ................................................................................................62 Waste to Energy through bio-methanation .......................................................................................................................62 Waste to Energy from Sewage Treatment Plant ..............................................................................................................63 Summary of waste to energy potential in Kalyan Dombivli City ................................................................................64 Replacement of incandescent lamps with fluorescent....................................................................................................68 T5 tube light + Electronic Ballast to replace T12/T8 tube light+ Magnetic Ballast ..........................................69 Efficient Ceiling Fans to Replace Conventional Ceiling Fans .......................................................................................69 Replacement of conventional air-conditioners with EE star rated ACs ..................................................................70 Replacement of Conventional Refrigerators with EE Star Rated Refrigerators ..................................................70 Replacement of conventional water pumps with EE star rated water pumps .....................................................71 Summary of EE Strategy in Residential Sector .................................................................................................................71 Replacement of incandescent lamps with fluorescent....................................................................................................72 Replace T12/T8 tube light by T5 tube light .......................................................................................................................72 Replacement of Conventional Fans ........................................................................................................................................73 Replacement of Conventional Air-Conditioners with EE Star Rated ACs ................................................................73 Replacement of Conventional Refrigerators with EE Star Rated Refrigerators ..................................................74 Replacements of Conventional pumps with EE Star Rated pumps ............................................................................74 Summary of EE Strategy in Commercial & Industrial Sector ......................................................................................75 Replacement of incandescent with CFLs in Industrial sector ......................................................................................75 Replacement of T8/T12 tube lights .......................................................................................................................................76 Replacement of conventional fans by EE star rated fans ..............................................................................................76 Replacement of Conventional ACs with EE Star Rated ACs ..........................................................................................77 Summary of EE Strategy for Industrial Sector ..................................................................................................................77 Replacement of 150 watt HPSV with LED ...........................................................................................................................78 Replacement of 40 watt T8/T12 tube lights with T5 tube lights ...............................................................................78 Proper pump-system design (efficient Pump, pumps heads with system heads) .................................................79 Variable Speed Drivers................................................................................................................................................................80 Power saver installation in pump house ..............................................................................................................................80 Proper pump-system design (efficient pump, pumps heads with system heads) .................................................80 Variable Speed Drivers................................................................................................................................................................81 Power saver installation in pump house ..............................................................................................................................81 Summary of EE Strategy for municipal sector ..................................................................................................................82 Energy savings goal over 5 years solar city implementation period ........................................................................83 Year wise Goal of Energy Savings ...........................................................................................................................................85 Physical target of RE systems and EE devices....................................................................................................................86 Physical Target and Action Plan .............................................................................................................................................87 Pilot Projects in Residential Sector ........................................................................................................................................91 Pilot Projects in Commercial and Institutional Sector ...................................................................................................92 Pilot Projects in Industrial Sector ...........................................................................................................................................92 Pilot Projects in Municipal Sector ..........................................................................................................................................92 Summary of Pilot Projects and indicative project cost implication ..........................................................................93 Sharing of budget for development of Kalyan Dombivli Solar City ...........................................................................93 Sector wise total budget and annual expenses ..................................................................................................................96 Budget and Sharing of fund ......................................................................................................................................................97 Potential Carbon Market Benefit ..........................................................................................................................................98 14 CHAPTER 1 1. INTRODUCTION 1.1. Kalyan Dombivli City Profile Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. Kalyan Dombivli, being close to Mumbai, the demographic profile of the city reveals that the population has increased continuously. As per census reports the population in the year 1961 was 1, 49,894 which is increased to 10, 47,297 in the year 2001. KDMC has projected population up to year 2020 which is assessed to be 20, 52,060. On the basis of proposed land use as provided in development plan and area available for future development to absorb additional population of approximately 16,55,550 souls in the year 2016 which can called as “Carrying Capacity of the City” up to year 2016. The demographic profile shows continuous increase in population of the city. The deletion of Ambarnath & Badlapur area including surrounding villages affected the economy of the city adversely. 1.2. City Urban Services 1.2.1. Administrative Setup Kalyan Dombivli Municipal Corporation (KDMC) is the main organization which is responsible for urban governance and civic management in the city of Kalyan Dombivli. The corporation has a democratically elected leadership from the constituencies within the geographic jurisdiction of the corporation boundaries. 1.2.2. Water Supply The total potable water supply in Kalyan Dombivli is sourced from Ulhas and Kalu River. The water supply was 238 MLD for a population 12.63 lakhs in the year 2006. Surface water is available to a significant extent as Ulhas and Kalu Rivers are perennial sources. As both the rivers flow within KDMC limits, the cost of transmission is comparatively less. The KDMC purifies water at its treatment plants located at Barave, Kalyan Dombivli and along the bank of Kalu River, Titwala. Additional requirement is being purchased from agencies like MIDC, NRC & ZP. The purification capacity of Barave Treatment Plant is 144 MLD and that of Titwala Treatment Plant is 7.5 MLD. The present installed distribution system covers all of the 107 wards in the cities of Kalyan and Dombivli. 1.2.3. Municipal Solid Waste The KDMC carry out the collection and transportation of the solid waste within the Kalyan Dombivli Municipal City Limits through its vehicle fleet, machinery and laborers. Out of 7 Administrative Municipal 15 Wards, 2 wards are selected for secondary collection and transportation of the solid waste through privatization. The department is headed by Deputy Municipal Commissioner who is assisted by 7 ward officers, 2 Assistant Public Health Officers, 36 sanitary inspectors, 90 Mukadams and 1468 sanitation staff. The city generates approximately 600 M.T. of municipal solid waste every day which comprises biodegradable and non bio- degradable solid waste components. The solid waste is generated by households, hotels and restaurants, markets, fruit vendors, construction activities. Waste segregation at all collection points and at storage is primarily done by rag pickers. The sweepers of the department collect the waste at the dustbin sites. KDMC endeavors to increase the private sector participation in solid waste management. KDMC has taken initiatives to direct house owners and establishments to store waste in 2 different containers at source and not to throw it on the streets. The waste is collected and transported from each corner of the Corporation by the man & machinery of KDMC 61 wards and by a private partner in rest of the 46 wards.. The solid waste so collected is presently transported to the solid waste disposal site located at Adharwadi, Kalyan Dombivli which is in close proximity to habitation. 1.2.4. Sewage Treatment Plant Sewage collected from individual house sewer connection is conveyed through sewer lines to the relevant pumping stations and sent to the sewage pumping plants at different locations for the treatment. The treated water is discharged finally to the creek. The performance standard benchmarked against standard requirements in terms of sewage collection system coverage is found to be very low, inadequate in terms of sewage treatment plants & function characteristics and adequate in terms of Revenue/ O & M ratio. 1.2.5. Streetlights KDMC is responsible for provision and maintenance of streetlights within the Corporation limits. The corporation handles material procurement; installation and maintenance through qualified technical staff of KDMC and approved/ registered Electrical Contractors. Private sector participation in maintenance of street lighting is being introduced in the year 2000 in the corporation. As per 2006 data, 13310 nos. of street lights on KDMC owned poles are maintained by Electrical Contractor appointed by KDMC and 2356 nos. of street lights on MSEDC poles are maintained by Electrical Departmental Staff of the corporation. Other general lighting service fitments includes 29 nos. of 20 mtr / 16 mtr, high mast at major intersections and roundabouts of the city. 1.2.6. Storm Water Drains The general elevation of Kalyan Dombivli city is 6.0 m above Mean Sea Level. Overall topography of the area slopes towards The North and West. The river Kalu, Ulhas and Kalyan Dombivli creek runs along the North and West side boundaries and cover 60% of the periphery of the corporation. There exists a network of major and minor nallas in the significant parts of the paved areas of the old municipal council limits of these towns. Major part of KDMC is divided into different storm water drainage zones. There are 8 major drains flowing from South- East to North – West. Out of these 8 drains, 7 are primary and major parts of the drains are 16 constructed. These drains also receive and convey sullage water from residential/ habituated areas besides storm water drainage up to different disposal locations in the creek. These drains are constructed and maintained by KDMC. 1.2.7. Roads, Traffic and Transportation The surface transport of the city is mainly divided into railways & roads. Kalyan Dombivli Municipal Corporation is an important satellite township of Mumbai city. It has an extensive road network. As per the development plan, the total length is 576 km. within the municipal limit. The figure includes state highways & Major District Roads, major arterial and internal roads. Kalyan Dombivli is an important railway junction and entry point of Mumbai city. Trains run between Dombivli, Thakurli, Kalyan Dombivli, Shahad, Ambivali, Titwala & Kopar railway stations. Besides this, on the periphery of corporation limits there is 1600 hectare and belongs to civil aviation Department and Airport is likely to be developed in near future. 1.2.8. e- Governance Kalyan Dombivli Municipal Corporation has initiated its journey in e Governance in 1999 with an aim of creating a solid, system driven corporation with highest levels of Transparency, Accountability and Citizen Servicing Standards. It creates hassle free interactions for citizens. Payment of taxes, application for newer water connection, application for birth/ death certificate, and application for any other service or simply the registration of a civic complaint can be done with ease. The project has received accolades/ awards at State, National & International level. 1.3. Developing Kalyan Dombivli as ‘Solar City’ The Ministry of New and Renewable Energy (MNRE), Govt. of India has launched a Scheme on “Development of Solar Cities” under which a total of 60 cities/towns are proposed to be supported for development as “Solar/ Green Cities” during the 11th Plan period. The program aims at minimum 10% reduction in projected demand of conventional energy at the end of five years, which can be achieved through a combination of energy efficiency measures and enhancing supply from renewable energy sources. Out of this 5% will be from renewable energy source. MNRE has been providing financial support to Kalyan Dombivli Municipal Corporation for preparing a Master Plan for developing Kalyan Dombivli as a Solar City. 1.3.1. Preparation of Master Plan for ‘Kalyan Dombivli Solar City’ The master plan preparation process is divided into six steps: (i) Preparing energy base-line for year 2008 Energy base-line for the city is a detailed documentation of the existing energy demand and supply scenario for the city. Among other things, it consists of sector-wise energy consumption matrix and energy supplymix for the base year. The city is divided into four sectors vis. Residential, commercial/ Institutional, Industrial and Municipal sector. (ii) Demand Forecasting for 2013/2018 This step involves predicting the energy demand for 5 year and 10 year periods. To estimate the demand, 17 growth in energy use in different sectors has been established. These growth rates are established based on immediate past trends and future growth plans. Based on the past time-series data and information on growth plans, growth rate in energy demand for different sectors has been estimated. These growth rates are used for making future projection of energy demand in each sector for year 2013 (five year) and 2018 (10 year). (iii) Sector wise strategies This step involves carrying out techno-economic feasibility of different renewable energy and energy efficiency options for each sector based on techno-economic feasibility for such application to the concerned sectors. A renewable energy resources assessment has been done to identify the potential renewable energy sources for the city. This includes assessment of solar radiation, wind power density and availability, biomass resources and municipal/industrial wastes. A strategy has been prepared for use of techno economically feasible renewable energy technology options in each sector. (iv) Year-wise goals of savings Year wise goals have been set to achieve targeted energy savings through demand side management by energy conservation and energy efficiency measures in different sectors & supply side measures based on renewable energy applications. (v) Action Plan A five-year action plan has been prepared to achieve the set goals & expected GHG abatements. This includes establishment of solar city cell, capacity building and awareness generation. (vi) Financial Outlay and sharing of fund An indicative financial outlay has been prepared for implementation of the proposed five-year action plan and potential sources of funding from respective sources (both public and private) has been indicated. 18 CHAPTER 2 This chapter gives details of energy consumption for the Kalyan Dombivli city for past 3-5 years. The consumption has been shown based on the energy sources such as electricity, LPG, petrol, diesel and kerosene. Further, sectoral break up (i.e. residential, commercial, industrial and municipal) of consumption for each fuel is also presented. The chapter also provides the findings of the primary sample survey, including monthly fuel consumptions, ownership of appliances and their usage, present usage of renewable energy, awareness and usage of energy efficient technologies etc. 2. ENERGY BASELINE STATUS OF KALYAN DOMBIVLI CITY 2.1. Overall Energy Status 2.1.1. Energy Consumption Based on the information gathered from survey, the energy consumption scenario is presented here. The main sources of energy are electricity, petrol, diesel, LPG and kerosene. Electricity: Electricity distribution in the city is done through five main stations viz. Kalyan E Section 1, Kalyan Rural (Titwala), Kalyan E Section 2, Dombivli division and Kalyan Urban/West. Based on the information available, sector wise electricity consumption data is compiled for last 4 years (Please refer to Annexure- I for details). Table 1 : Electricity consumption in Kalyan Dombivli City Electricity Consumption (MU) 2005-06 2006-07 2007-08 No. of Consumers (2007-08) Residential 635 694 780 305289 Commercial 106 116 124 62976 Industrial 26 26 33 1985 Municipal Total 26.7 29.0 30.7 - 794 865 968 370250 Year Growth trend for the electricity can be seen in the figure given below. The compound annual growth rate (CAGR) based on 2005-06 & 2007-08 data comes as 10%, which is much higher than the population growth rate (3.82%) in the city. 19 Figure 1 : Growth in Electricity Consumption Figure 2 : below gives the break up of electricity consumption for different sectors. Residential sector dominates (81%) in electricity consumption and hence should be targeted for Demand Side Measures (DSM). During last five years, the residential and commercial sectors have shown higher growth in electricty consumption as compared to the the municipal and industrial sectors. Industrial 3% Municipal 3% Commercial 13% Residential 81% Figure 2 : Sector Wise Break-Up of Electricity Consumption LPG: Based on the available data, LPG consumption is summarized in Table given below. Table 2 : Sectors LPG Consumption Data in KDMC Residential 2005-06 (MT) 12149 2006-07 (MT) 12951 2007-08 (MT) 13849 Commercial 349 324 378.9 7 6 7 12505 13281 14234.9 Industrial TOTAL 20 Petrol: Based on the available data, petrol consumption is summarized in Table given below. Most of the consumption would be in transportation sector; however, sectoral break up of petrol consumption is not available. Table 3 : Petrol Consumption Data in KDMC Petrol Consumption (kL) 2005-06 2006-07 2007-08 11086 11558.79 13199.5 Diesel: Based on the available data, diesel consumption is summarized in Table given below. Most of the consumption would be in transportation & industrial sector. There would also be some diesel consumption in residential sector for DG sets. However, sector-wise break up of diesel consumption is not available. Also, diesel consumption data might include the supply to industries which are not falling under KDMC area. Table 4 : Diesel Consumption Data in KDMC Diesel Consumption (kL) 2005-06 2006-07 2007-08 16508 18660 22727.5 Kerosene: Based on the available data, kerosene consumption is summarized in Table given below. Most of the consumption would be in industrial sector; however, it might include the supply to industries which are not falling under KDMC area. Sectoral break up of kerosene consumption is not available. Table 5 : Kerosene Consumption Data in KDMC Kerosene consumption (kL) 2005-06 2006-07 2007-08 10373 10474 10574 2.1.2. Supply Side Energy Balance Based on the available data for these 5 energy sources, the supply energy scenario for year 2007-08 is developed. It is assumed that the SWH penetration in the city is 1%, i.e. 1% of the households use SWH in the city. Other renewable sources have very low penetration and are too small a percentage to be reflected here. The table below gives contribution of these energy sources in the overall energy supply. 21 Table 6 : Supply Side Energy Balance in KDMC for 2007-2008 Source Electricity LPG Petrol Diesel Kerosene SWH Consumption Unit 968 14234.9 13199.5 22727.5 10574 3053 MU MT kL kL kL No. Total Consumption (MU) 968 207 122 259 106 5.8 1667 The pie-chart below gives the break up in percentage for supply side energy balance for the 2007-08. Kerosene 6.38% SWH 0.35% Diesel 15.51% Petrol 7.31% Electricity 58.04% LPG 12.41% Figure 3 : Shares of Fuels in Supply Side Energy Balance Residential Sector 2.2.1. Energy consumption 2.2. Residential sector dominates the overall energy consumption. Energy usage pattern for this sector is shown in Table below. Table 7 : Sources Electricity (MU) LPG (MT) Residential Sector Energy Consumption 2005-06 2006-07 2007-08 635 694 780 12149 12951 13849 Energy balance for the sector for the year 2007-08 Table 8 : Source Electricity Energy Balance for Residential Sector Consumption 780 MU Consumption (MU) 780 MU LPG 13849 MT 201 MU Total Total 981 MU 22 Electricity is the main source of energy in residential sector as it contributes 79% of the total whereas LPG contributes 21%. LPG 21% Electricity 79% Figure 4 : Supply Balance in residential sector 2.2.2. Results of sample survey It should be noted that numbers given in the summary are specific to the surveyed households only. In order to understand the end uses of energy, and consumer behavior patterns consumer survey has been conducted. The survey questionnaire has been developed to gather information such as monthly fuel consumption, ownership of appliances and their usage, present usage of renewable energy, awareness and usage of energy efficient technologies, etc. The survey data has been analyzed and the summary has been shown below. Household classification and general details Household class: Based on the monthly electricity consumption households have been classified under 4 categories. Figure 5 : Household Classification 23 Building type: − Bungalow / independent house-18% − Housing Scheme -8% − Apartment building / Flat - 44% − Slum pocket -7% − Other -23% − Family size: Less than 5 – 61%, 5-10 – 38% − House area varies from 100 to 3600 ft2 and the average size is 560 ft2 per household. Energy Consumption Pattern: As the data show that the primary sources of energy consumption in the residential sector are: Electricity, LPG and Kerosene, we will try to find out the consumption behavior of these energy sources in the residential sector. Table 9 : End Use Type of Appliances Lighting Incandescent CFLs Fluorescent –long Fluorescent – short Others Air Conditioner Room heater Fans –Ceiling, Table Pedestal Desert cooler Electric Water Pump Geyser Refrigerator Television Others Space Conditioning Water Pumping Water Heating Refrigeration Others Summary of Sample Survey % of surveyed HHs owning the appliance Average Usage/day Average Wattage 41% 65% 83% 8% 4% 18% 0% 99% Average number of appliances per surveyed HHs 0.9 2.5 2.1 0.2 0.5 0.24 0 3 3 3 3 3 5 5 0 8 60 15 36 20 10 1500 0 70 3% 5% 32% 84% 95 82 0.03 0.05 0.35 1.1 1.01 1.34 6 1 2 24 6 5 200 1000 1500 200 100 15 24 Figure 6 : Lighting Inventory and Usage Fuel usage: • Primary fuel used for cooking: − LPG/PNG - 95% − Kerosene - 15% − Fuel wood - 4% − Electricity - 12% (total is more than 100 due to multiple fuel usage) • Primary fuel used for water heating − LPG/PNG - 61% − Kerosene -11% − Fuel wood -6% − Electricity -24% − Other -3% (total is more than 100 due to multiple fuel usage) Figure 7 : Awareness and Usage of RE & EE Technologies 25 2.3. Commercial Sector 2.3.1. Energy consumption Commercial sector energy usage pattern is shown in Table below. The main sources are electricity and LPG. Table 10 : Commercial Sector Energy Usage Source 2005-06 2006-07 2007-08 Electricity (MU) 106 116 124 LPG (MT) 349 324 379 Table 11 : Energy Balance for the Sector for the Year 2007-08 Source Electricity LPG Consumption 124 379 Unit MU MT Consumption 124025208 5508259 Unit kWh kWh Total 129533467 kWh LPG 4% Electricity 96% Figure 8 : Share Of Fuels In Energy Balance 26 Electricity is the main source of energy in commercial sector. Table 12 : Summary of Commercial establishments/institutes in the city Educational Institutes Primary Schools/ Nursery 306 Intermediate & High schools 41 Universities/ colleges/ Technical Institutes 7 Hospitals Small hospitals and nursing homes with less than 50 beds Hospitals with 50-100 beds 190 30 Hotels Budget hotels 5 Restaurants Large Restaurants 50 Medium Restaurants 100 Small Restaurants 350 Food Cart 225 2.3.2. Results of sample survey Similar to the residential sector, a survey questionnaire has been prepared for commercial sector to understand the energy usage. The summary of the survey is given below. The data shown below are specific to the surveyed consumers only. Commercial consumers are classified in three categories based on the energy consumption. Figure 9 : Consumer classification (kWh/month) 27 Table 13 : Household appliances inventory End Use Type of Appliances Lighting Incandescent CFLs Fluorescent Tube Fluorescent Tube Others Space Air Conditioner Conditioning Fans –Ceiling, Table, Pedestal Refrigeration Refrigerator Cooking Cooking Equipment Laundry Laundry Equipment Office Equipments Office Equipment Computers % of surveyed establishment owning the appliance 41.38% 66.01% 83.25% 7.9% 4.92% 47.00% 100.00% 63.00% 13.85% 6.98% 10.77% 34.88% Average number of appliances per surveyed HHs 1 2 2 2 3 5 2.9 Average Usage/day 1 NA NA NA NA Average Wattage 6 3 3 6 5 6.02 7.08 60 16 40 30 20 1800 100 24 NA NA NA NA 400 NA NA NA NA Fuel usage: − − − − Electricity LPG Diesel Other - 98.8% - 21.3% - 20.0% - 3.8% (total is more than 100 due to multiple fuel usage) Average monthly fuel consumption: − Electricity consumption varies from 69 to 22462 kWh and the average consumption is 2147 per consumer. − Electricity bill varies from Rs.200 to 223670 and the average bill is Rs.17400 per consumer. − LPG consumption is 3.7 cylinders per consumer (considering 80 consumers). − Diesel consumption 45 liters per consumer (considering 80 consumers). 28 Figure 10 : Figure 11 : Lighting Technology Used by Consumers Awareness and Usage of Energy Efficient Lighting Technologies Cooking and other appliances: • Consumers having cooking appliances in their premises: 44.7% • Appliances used for cooking (%age of consumer using): − LPG/PNG stove 39.6% − Microwave 6.4% − Steam cooking 4.3% − Any other 4.3% (total is more than 44.7% due to multiple appliances) • Average LPG consumption is 3.7 cylinders per month. • Consumer having water heating equipment in their premises – 19% • Hot water is mainly used for kitchen and bathroom. The fuel used for water heating is electricity and LPG. Central boiler and storage heaters are used for getting hot water. 29 Interest shown for SWH installation: Table 14 : Interest Shown By Consumers for Solar Water Heater Installation Yes No, it would be too expensive No, it would be impractical for this facility No, it is too risky and unproven 39% 37% 21% 3% 2.4. Industrial Sector Type of Industry Electrical Equipment Chemical Manufacturing Rayon Dyes Textile based cottage industry Others Total number of industries registered with MSEDL Number NA NA NA NA NA NA 1985 2.4.1. Energy consumption Table 15 : Industrial Sector Energy Consumption 2005-06 2006-07 2007-08 Electricity (MU) 26 26 33 LPG (MT) 7 6 7 Table 16 : Energy Balance for Industrial Sector Source Electricity LPG Consumption 33 7 Unit MU MT Consumption 33 0.1 Unit MU MU Total 33.1 MU 2.4.2. Results of sample survey There were only three industries operating during the time of survey and the data is collected only from them. 30 2.5. Municipal Sector The major energy end-uses under the Municipal sector include streetlights, water supply and sewage treatment plant. Energy consumption data for these three segments is shown in the Table below. Energy consumption for the Govt. buildings and facilities is considered to be falling under commercial sector. Overall Municipal Sector Energy Consumption: Table 17 : Overall Municipal Sector Energy Consumption (MU) 2005-06 2006-07 2007-08 2008-09 Street light 7.59 6.78 7.60 6.97 Water Supply 18.63 21.61 21.50 23.19 Sewage Treatment Plant 0.49 0.58 1.63 1.42 TOTAL 26.71 28.97 30.73 31.57 Table 18 : Energy Consumption for Street lighting(kWh) 2003-2004 560154 1375286 1694312 1264605 1280000 829000 1042000 8045357 A - Ward B - Ward C - Ward D - Ward F - Ward G - Ward H -Ward Total 2004-2005 595325 1484190 1861769 1268401 1033000 771000 982000 7995685 2005-2006 632981 1317136 2419524 1141844 655000 553000 869000 7588485 2006-2007 663030 1277391 1460280 1272099 682000 599000 830000 6783800 2007-2008 784220 1377950 1617534 1430598 896000 588000 904000 7598302 Water Pumping: Table 19 : Electricity Consumption in Water Pumping (MU) 2003-2004 2004-2005 2005-2006 2006-2007 2007-2008 Barave Water Treatment Plant Dombivali (E) Kalyan (E) Kalyan (Rural) Dombivali (W) 14741558 1385298 152000 566333 15660710 1559426 319300 560556 15914849 1480239 226100 512559 498385 17623560 1523660 209000 525652 1726848 17350336 1430916 312660 628941 1781914 Total 16845189 18099992 18632132 21608720 21504767 Waste Water Treatment Plant: Table 20 : Energy Consumption in waste water treatment plant (MU) 2003-04 G.K. Pumping Kolsewadi Pumping Sewage Treatment plant Ganesh Ghat Pumping 119738 54638 32299 18000 2004-05 251136 65384 23328 44147 2005-06 122073 66340 16405 30473 2006-07 177691 57940 13650 49459 2007-08 1302859 43422 17721 27625 31 Retibunder Pumping LalChowki Pumping P.S-I Pumping PS-II Pumping P.S-III Pumping STP 17628 82800 21520 127844 21520 16594 15043 86609 23420 133525 23420 13512 24417 67378 20081 97200 20081 25010 34628 70632 23516 110180 23516 20311 26695 63248 16385 96098 16385 17223 Total 512581 679524 489458 581523 1627661 2.6. City Wide Green House Gas Inventory 2.6.1. City level Emissions The city‘s inventory was conducted by compiling the best available data on energy consumption. The ICLEI SA study reveals that all activities in Kalyan Dombivli city contribute to 954923.8 T e CO2 in 2007-08. The Per capita emission for Kalyan Dombivli city is 0.70 T/ Year in 2007-08. The corporation level emission is about 2.65 % to the total city level emissions. The GHG emission has gone up by 21.57% in last three years, which is raising serious environmental sustainability concern and also energy security in near future. As per the study, the total electricity consumption has gone up by 21.92% in last three years. 7% 3% 3% 5% 82% Electricity Figure 12 : LPG Petrol Diesel Kerosene Share of GHG Emissions by Sector Above fig summarizes the city GHG emission by source. The electricity consumption accounts for 82% of the City’s total carbon emissions. The diesel consumption produces 7% of the City’s total carbon emissions. The LPG consumption in the city accounts for 5% of total emission and the Petrol & kerosene has another 3% each. 2.6.2. Government Emissions Greenhouse gas emissions from City of Kalyan-Dombivli government operations totaled 28107 metric tons of CO2e in the year 2008-09, which is approximately 3.28% of the City’s total emissions. Figure presents the distribution of greenhouse gas emissions from City government by sector. Buildings account for 8% of the City 32 government’s CO2e emissions. The City’s water supply system represents 68 % of the City government’s CO2e emissions. Electricity used to power streetlights represented 20% of the emissions. Figure 13 : Share of GHG emission in Government sector 33 CHAPTER 3 This chapter forecasts the future consumption of Kalyan Dombivli based on baseline energy consumption, past data and population growth. The forecasts figures gives us a clear view of the future conventional energy demands in the city based on which the strategies have been developed and substantiated. 3. ENERGY DEMAND FORECAST FOR KALYAN DOMBIVLI There are two scenarios for which the projections have been done. First is based on the population growth and the second is based on the time-series data on energy use during last five years. 3.1. Forecasting Based on Population Growth Population projection for Kalyan Dombivli Municipal Area has been done in city development plan (CDP) under JNNURM scheme. The table gives the data population data as per the CDP. Based on this data, population for year 2008, 2013 & 2018 has been interpolated considering linear growth between relevant years e.g. for calculating the population in year 2008, linear growth is considered between year 2006 & 2011 and then interpolation is done. Table 21 : Population Projection till 2020 Base year population (2001) 10,47,297 Projection @3.82% for year 2005 12,16,729 For year 2010 14,67,570 For year 2015 17,70,125 Projection @3% for year 2020 20,52,060 Forecasting for the year 2013/2018 The projections for fuel consumption have been done assuming that they fuel consumption will grow at the same rate as population. The table given below summarizes projections for year 2013 and 2018. Table 22 : Energy Consumption Projection (MU) Population Electricity LPG 2008 1367234 968 207 2013 1649103 1167 250 2018 1939286 1373 294 34 Figure 14 : Forecasting for Energy Consumption (MU) based on population growth Forecasting Based on Past Data The table given below gives the projected values for the year 2013 and 2018. Based on the past data, a linear growth has been considered and the projection has been done. Table 23 : Energy Consumption Projection for KDMC (MU) Year Electricity consumption LPG Figure 15 : 2008 2013 2018 968 207 1410 269 1856 332 Forecasting of Energy Consumption (MU) based on historical data 35 Forecasting based on national average of 25 cities data The Table 24 : given below gives the projected values for the year 2013 and 2018. Based on the 25 cities’ past data from ‘ICLEI South Asia’s Carbon and Emissions Profiles of 54 South Asian Cities’ report, a linear growth has been considered and the projection has been done. Table 24 : Energy consumption projection for KDMC (MU) Energy Sources Electricity consumption LPG 3.2. 2008 2013 2018 968 207 1265 1562 Goal for the year 2013 Since, transportation sector is not included in this study and petrol, diesel and kerosene consumption data is not available for different sectors, the energy usage for electricity and LPG is considered for defining the energy target. Based on this data, the targeted reduction in energy consumption (10% of the total based on past data projection) for the year 2013 would be 168 MUs. Table 25 : Forecasting of Energy Consumption for KDMC Energy Sources Electricity (MU) LPG (MU) Total (MU) Based on population growth (MU) 1167 250 1417 Based on past data (MU) 1410 269 1680 Based on 25 cities’ data (MU) 1265 36 CHAPTER 4 This chapter delves into renewable energy resource assessment and strategy for introducing different Renewable Energy Technologies in residential, commercial, industrial and municipal sector of Kalyan Dombivli city. Renewable energy resource availability and potential is a key criterion for suitable renewable energy technology installations and success. The chapter later develops the strategies for Kalyan Dombivli city based on the renewable energy available in the city and the baseline energy consumption and future energy demands of the city. 4. RENEWABLE ENERGY STRATEGIES FOR KALYAN DOMBIVLI The main objective of this chapter is to identify available renewable energy resources in Kalyan Dombivli city and carry out techno-economic feasibility of different renewable energy options for residential, commercial, industrial and municipal sector and making a priority listing of the options. A renewable energy resources assessment has been done to identify the potential renewable energy sources for the Kalyan Dombivli city. This includes assessment of solar radiation, wind power density and availability, biomass resources and municipal/industrial wastes etc. The strategy has been prepared for each sector identifying most techno economically viable renewable energy options considering wide range of potential consumers in the particular sector. An implementation target for development of solar city project in 5 years period has been set with an objective to meet at least 5% energy consumption from renewable energy on completion of the solar city project in Kalyan Dombivli. For the residential sector, potential for introducing the following renewable energy devices has been worked out based on present energy use pattern of the residents, economic level, availability of such products and economic feasibility. (i) (ii) (iii) (iv) (v) (vi) (vii) Solar Water Heaters Solar Cookers Solar Lanterns Solar Home System Solar PV system for Home Inverters PV for replacement of DG/ Kerosene Generator sets Renewable Energy Systems for Residential Housing Complexes Commercial and Institutional Sector has been divided in to four broad categories as below and these categories again sub divided into further categories based on their capacity and functional differences. (i) (ii) (iii) RE Strategy for Hotels – budget hotels RE Strategy for Restaurants – Large, medium, small, food cart RE Strategy for Hospitals – 250-1000 bedded, 100-250 bedded, 50-100 bedded, Dispensaries/ 37 dental clinic/ microsurgery (iv) RE Strategy for Educational Institutes – Primary, intermediate, colleges, engineering colleges, medical colleges, Computer Institute, Polytechnics, ITI On the spot assessment have been carried out visiting each of these sub categories to identify present energy demand, energy and fuel used, load shedding occurs, standby power supply provision, space available for installation of solar arrays and collectors etc. Based on the site visit and energy demand assessment, preliminary design/sizing of appropriate renewable energy devices have been worked out for each category establishment. An indicative budgetary financial implication, energy savings, payback period and GHG emission reduction has been estimated for each renewable energy option that has been suggested. Industrial sector is broadly divided into five categories. Suitable renewable energy technologies have been prepared for each of the category. (i) Electrical Equipment (ii) Chemical Manufacturing (iii) Rayon (iv) Dyes (v) Textile based cottage industry Municipal Sector is divided into seven categories and options for appropriate renewable energy options have been recommended based on the assessment made on each category of the sector. (i) (ii) (iii) (iv) (v) (vi) Buildings - Municipality building and other Office Buildings Markets – General markets, vegetable markets Parks – Municipality Parks Outdoor lighting Road safety- Street light, monuments, road blinkers, Municipal Solid Waste Sewage Treatment Plant 4.1. Renewable Energy Resource Assessment A preliminary assessment has been done for solar, wind and biomass resources and energy recovery potential from municipal solid waste and sewage treatment plant. While biomass data is for entire Kalyan Dombivli district, there is no hydro potential in the city. 4.1.1. Solar Radiation Kalyan Dombivli (Latitude 27.18 N, Longitude 78.02 E) receives good amount of solar radiation as the average annual solar radiation for Kalyan Dombivli is presented in the below table. Table 26 : Monthly Averaged Insolation Incident on a Horizontal Surface (kWh/M2/Day) Source NASA SSE Satellite Jan 4.97 Feb 5.66 Mar 6.4 Apr 6.72 May 6.56 Jun 4.62 Jul 3.54 Aug 3.49 Sep 4.3 Oct 5.18 Nov 4.94 Dec 4.58 Annual 5.08 MNRE Solar 4.60 5.41 6.18 6.62 6.49 4.86 3.74 4.03 4.54 5.00 4.61 4.29 5.07 38 Figure 16 : Annual Solar Radiation profile in Kalyan Dombivli 4.1.2. Wind Energy Wind data18 for Kalyan-Dombivli is presented in the table below. Generally, average annual wind speeds of at least 4.0-4.5 m/s are needed for a wind turbine to produce enough electricity to be cost-effective. From the wind data, there seems to be less potential for wind energy in Kalyan- Dombivli. Detailed Study is required for assessment of energy generation potential from wind resource Table 27 : Monthly averaged wind speed above earth surface for terrain similar to airports (m/s) Height 10 m 50 m Jan 2.39 3.02 Feb 2.84 3.6 Mar 3.14 3.97 Apr 3.48 4.41 May 3.8 4.8 Jun 3.93 4.98 Jul 4.26 5.39 Aug 3.86 4.88 Sep 2.64 3.34 Oct 2.19 2.77 Nov 2.13 2.7 Dec 2.17 2.75 4.1.3. Biomass Resource Biomass resource for Kalyan Dombivli is not available separately. However, the data is available at district level and presented below in the Table. Major agricultural products of the district are Paddy, Nagli, Pulses, Oilseeds, Spices and Flowers. Though the potential of power generation for biomass is estimated to be 93MWe for the entire district, apparently there is no potential of power generation from biomass within the Kalyan Dombivli city. Table 28 : Biomass Resource District Thane Thane Area (kHa) 149.7 593 Crop Production (kT/Yr) 356.5 NA Biomass Generation (kT/Yr) 591 854 Biomass Surplus (kT/Yr) 105.4 577.2 Power Potential (MWe) 12.5 80.8 Biomass Class Agro Forest & wasteland 39 4.1.4. Waste generation Waste generation data for Kalyan Dombivli Municipal area for the last 5 year is presented in the table given below. Table 29 : Year Solid waste Generation (MT/day) 2002-2003 2003-2004 2004-2005 2005-2006 2006-2007 2007-2008 500 520 540 560 580 600 Solid Waste Generation Data Paper Products 39.5 41.08 42.66 44.24 45.82 47.4 Food 300 312 324 336 348 360 Waste Composition Wood / Plant debris Textiles 35 10 36.4 10.4 37.8 10.8 39.2 11.2 40.6 11.6 42 12 % Other Waste (inorganic) 115.5 120.12 124.74 129.36 133.98 138.6 4.1.5. Liquid Waste from Sewage Treatment Plant Kalyan Dombivli has two Sewage Treatment Plants. The first sewage treatment plant has a capacity of treating 14 MLD and the second one has the capacity of 16 MLD. RE Strategy for Residential sector 4.2. With projected population of 14.67 lakh (2010) and 3.05 lakh households, the residential sector is the major energy consumer in the Kalyan Dombivli city. The residential sector consumes 81% of total electricity consumption of 968MU in Kalyan Dombivli city. The sector consumed 981MU of energy, which includes primarily electricity and LPG. Electricity is the major fraction (79%) of energy consumed by the residential sector. Use of renewable system to cater a part of energy demand in residential sector can substantially reduce fossil fuel consumption and green house gas emission. Different renewable energy options have been proposed based on technology available and economic feasibility. Only those renewable energy devices are recommended which are technically proven, commercially available and attractive in terms of financial benefit from energy savings. (i) Installation of Solar Water Heating System In 2006, Kalyan Dombivli Municipal Corporation (KDMC) made it compulsory for all the newly constructed buildings to install solar energy system for heating water as geysers and water heaters consume lots of electricity. Since then, no building in the suburb has been issued No Objection Certificate (NOC) and Occupancy Certificate on completion unless the solar system is installed. The target in 5 years for introduction of SWHs is set at 10% of residential consumers who are already using electric geysers for their daily hot water requirement. Introduction of solar water heating system could save up to 15.4 MU energy per year. Cost implication and energy savings potential is presented in the table below. 40 Table 30 : Target for SWHs installation in Kalyan Dombivli City Single Household Unit Average size of domestic SWH (2 sqm collector area) 100/125 LPD Total energy saved per year 1575 kWh Indicative cost of installation 20000 INR MNRE Subsidy @Rs.1100.00 per sqm 2200 Cost of energy savings Payback period 5512.5 INR 3 Years 305289 Nos. Target for entire city Total Residential household Residential household using geysers Target to replace electric geyser by SWH in 5 years Average size of domestic SWH (2 sqm collector area) 32% 10% 100/125 LPD Number of SWH to be installed in 5 years plan 9769 Nos. Total collector area in sqm 19538 Sqm Total energy saved per year 15.4 MU Indicative cost of installation 1953.85 Lakh MNRE Subsidy @Rs.1100.00 per sqm 214.92 Lakh Cost of energy savings 538.53 Lakh 3 Years 12463 Tonnes Payback period Emission reduction per year (ii) Use of Solar cookers (Box and dish type) Both box type solar cooker and dish type solar cooker can be promoted in the urban areas. Box type solar cooker is an ideal device for domestic cooking during most of the year, except for the monsoon season and cloudy days. It however cannot be used for frying or chapatti making. It is durable and simple to operate. On the other hand, dish type solar cooker can be used for indoor cooking. The stagnation temperature at the bottom of the cooking pot could be over 300oC depending upon the weather conditions. The temperatures attained with this cooker are sufficient for roasting, frying and boiling. Regular use of a box type solar cooker may save 3-4 LPG cylinders per year. The use of solar cooker to its full capacity may result in savings up to 10 LPG cylinders per year at small establishments. Setting a target of 5% residential consumer to adopt solar cooker (75% box type and 25% dish type) in the 5 years period, a total of 0.43 million kg of LPG could be saved by reducing 1491 tonnes of GHG from Kalyan Dombivli City (considering specific emission from LPG as 0.24 kg CO2 per kWh). Table 31 : Target for introducing solar cooker in Kalyan Dombivli City Solar Cooker for residential use Total Residential household Household having facility to install a solar cooker Target for introducing of solar cooker in 5 years Number of Solar Cooker to be installed in 5 years plan Average savings of LPG domestic cylinder per year (14kg) 305289 40% 5% 6106 5 Unit Nos. Nos. Nos. 41 Total LPG saved per year Total energy saved per year Indicative cost of installation (75% box type & 25% SK-14) MNRE subsidy for solar cooker @30% Cost of energy savings Payback period Emission reduction per year 427405 6.21 160.28 48.08 106.85 1.05 1491 kg MU Lakh Lakh Lakh Years Tonnes (iii) Solar lanterns to replace kerosene lamps Solar lantern has the average capacity of providing three hours of continuous light from a single charge per day, and can work as source of light for poor families without electricity. Kerosene is the main source of burning light in poor families in Kalyan Dombivli particularly during load shedding hours and survey results reveal that 14% of population use kerosene lanterns during load shedding to illuminate their houses. Average consumption of kerosene per household is 9 litres per month. Assuming a household uses 3-4 lanterns, consumption of one lantern will be about 3 litres per month. Targeting 10% of population to replace at least one kerosene lantern with solar lantern out of 14% of total population who uses kerosene lamps a 0.46 million litres of kerosene could be saved reducing 1172 tonnes of GHG per year. Detailed techno commercial is provided in the table below. Table 32 : Target for introducing solar lanterns in Kalyan Dombivli City Capacity of residential Solar Home System Number lights per Solar Lantern Number of Kerosene lamp replaced by SL Consumption of kerosene per lanterns/month Cost of kerosene per litre in the market Cost of kerosene per year per household Indicative cost of installing a SL MNRE subsidy @50% Payback period when replacing the kerosene lamps Total Residential household Residential household use kerosene lamps Target to replace kerosene lamp in 5 years Number of SL to be installed in 5 years plan Total kerosene lamp replaced Indicative cost of installation Kerosene saved Savings in terms of Electricity Cost of kerosene savings MNRE subsidy @50% Payback period Emission reduction per year 10 1 1 3 20 720 3000 1500 2.1 305289.00 14% 10% 12822 12822.1 384.66 461597 4.64 92.32 192.33 2.1 1172 Unit Wp Nos. Nos. Litres INR INR INR INR years Unit Nos. Nos. Nos. Lakh Litres MU Lakh Lakh years Tonnes 42 (iv) Use Solar Home Systems (SHS) A Solar Home System is a fixed indoor lighting system and consists of solar PV module, battery and balance of systems. Capacity of such system could be of 18Wp, 37Wp and 74Wp for different configuration. The luminaries used in the above systems comprise compact fluorescent lamp (CFL) of 7 W / 9 W / 11 W capacity respectively. The fan is of DC type with less than 20 W rating. One Battery of 12 V, 40 / 75 Ah capacity is also provided with SPV modules of 37Wp / 74Wp as required. The system will work for about 4 hours daily, if charged regularly. The Solar Home Lighting systems have been proposed to replace kerosene lamps used by 14% population in Kalyan Dombivli Municipality area during load shedding hours. A 74Wp Solar Home System can replace 3-4 kerosene lamps with 4-5 hours backup hence replacing entire need of kerosene, which is estimated at an average of 9 litres per month per household. Assuming 10% replacement in the planned 5 years period an estimated amount of 0.67 million litres of kerosene could be saved reducing 1707 tonnes of GHG emission from the city. The potential of kerosene replacement with Solar Home Systems and financial implication thereon is indicated in the table below. Table 33 : Target for introducing solar home system in Kalyan Dombivli City Single residential household Unit Capacity of residential Solar Home System 74 Wp Number lights per Solar Home System 4 Nos. Number of Kerosene lamp replaced by SHS 4 Nos. Consumption of kerosene per household/month (survey result) 13 Litres Cost of kerosene per litre in the market 20 INR Cost of kerosene saved per year per household 3144 INR Indicative cost of installing a SHS 16000 INR MNRE subsidy @50% 8000 INR 2.5 Years Payback period when replacing the kerosene lamps Target for the Entire City Total Residential household Residential household use kerosene lamps Unit 305289 Nos. 14% Target to replace kerosene lamp in 5 years 10% Number of SHS to be installed in 5 years plan 4274 Nos. Total kerosene lamp replaced 17096.2 Nos. Indicative cost of installation 683.85 Lakh 672 KL 7 MU Cost of kerosene savings 134 Lakh MNRE Subsidy @50% 342 Lakh 2.5 Years 1707 Tonnes Kerosene saved Savings in terms of Electricity Payback period Emission reduction per year (v) Using Solar PV for Home Inverters Use of solar panels to charge Home Inverter system could be an attractive option as standby power supply system during load shedding hours. The power supply situation in Kalyan Dombivli is very poor. About 5-6 43 hours load shedding occurs per day in most of the places of Kalyan Dombivli city. About 58% of residential consumer use inverters during load shedding hours. Assuming that 15% of HH who are already using inverters will adopt the 250 Wp solar PV systems to charge their inverter battery, an aggregate of 6.64MWp solar PV systems could be installed in the residential buildings, which will generate 9.96 MU green energy per year and reduce the load demand and emission by 8067.64 tonnes per year. It is assumed that MNRE will provide 50% subsidy for these system. The potential of energy savings, green house gas emission reduction and budgetary financial implication is indicated in the table below. Table 34 : Target for introducing Solar PV for Home Inverters in Kalyan Dombivli City Solar PV for Home Inverters Unit Capacity of solar PV system for Home Inverter 250 Wp Indicative cost of incorporating Solar PV to Home Inverter 30000 INR Total Residential household 305289 Nos. Residential household use Inverter during load shedding 58% Target to introduce solar charger for inverter in 5 years 15% Number of solar inverter to be installed in 5 years plan 26560 Nos. Total PV capacity installed 6640 kWp Energy generated by PV arrays per year 9.96 MU Cost of energy saved 349 Lakh Indicative cost of installation 7968 Lakh MNRE subsidy @50% 3984 Lakh 11 Years 8067.64 Tonnes Payback period Emission reduction per year (vi) Using Solar PV for replacement of DG/ Kerosene Generator sets Due to poor power supply situation, about 20% of resident of Kalyan Dombivli use typically 5-10kW DG/ kerosene generator sets during the load shedding hours. Solar PV power packs can be used to replace those polluting generator sets with high operating cost. A 1000 Wp solar PV power pack has been considered for an average household in Kalyan Dombivli. For 5-year framework 10 % households have been taken into consideration for replacement of DG /kerosene sets with solar PV systems with a target to save 7.33 million litres of diesel per year reduce GHG in the tune of 18610 tonnes per year. Table 35 : Target for replacement of diesel generator sets with PV Power Pack in Kalyan Dombivli City Solar PV for replacement of DG/ Kerosene Generator sets Capacity of solar PV system Indicative cost of Solar power pack Total Residential household Unit 1 kWp 2.00 Lakh 305289 Nos. Residential household use generators during load shedding 20% Target to introduce solar power pack in 5 years 10% Number of solar power pack to be installed in 5 years plan 6106 Nos. Total PV capacity installed 6106 kWp Energy generated by PV arrays per year 9.16 MU 44 Typical generator set used Average fuel consumption per day for 4-6 hours load shedding Amount of diesel saved per year for entire city Cost of Diesel saved Indicative cost of installation MNRE subsidy @50%, subject to maximum of Rs.1.00 Lakh per kWp Payback period 5-10 6 7327 litres KL 2930.77 Lakh 12211.56 Lakh 6105.78 Lakh 2.08 Emission reduction per year for replacement of diesel kW 18610 Years Tonnes (vii) RE systems for residential Apartments/ housing complexes Kalyan Dombivli has more than 8000 registered residential apartment building societies in the city with average number of 25 families in each society. Solar water heaters and solar PV power plants are considered to be most viable renewable energy devices for the existing and well as new residential complexes. Table 36 : RE system for residential apartments Number of residential apartment complex society 8000 Number of residential apartment per society 10% Number of Residential Apartments Blocks to Introduce RE system 800 Average number of Residence in each apartment Block 25 Solar Water Heater System Average size of Solar water heaters Total capacity of SWH to be installed in 5 years plan 2000 LPD 1600000 LPD Total collector area in sqm 32000 Sqm Total energy saved per year 18.9 MU Indicative cost of installation 1600.00 Lakh MNRE subsidy @Rs.1900.00 per sqm 608.00 Lakh Beneficiary/ State/ KDMC share 992.00 Lakh Cost of energy savings 661.50 Lakh 1.50 years 16000 Tonnes 12.5 kWp 15 Lakh Total capacity of PV systems for targeted apartments for 5 years 10000 kWp Energy generated by PV arrays per year 15.00 MU Payback period Emission reduction per year Solar PV Power Plant for Back up power Capacity of solar PV system for single apartment of 50 Residence Indicative cost of incorporating Solar PV to Home Inverter Cost of energy saved 525 Lakh Indicative cost of installation 12000 Lakh MNRE subsidy @50% 6000 Lakh Beneficiary/ State/ KDMC share 6000 Lakh 11 years 12150 Tonnes Payback period Emission reduction per year 45 (viii) Summary of RE strategy for Residential Sector Implementation of renewable energy projects as proposed above will save 83.02MU energy per year, which will reduce GHG of 69231 tonnes per year. When achieved the target, residential sector strategy will meet 49.41% of total target for energy savings for the city as per mandate of development of solar city. The entire target could be achieved with a total investment of about Rs.345.62 in the 5 years period where contribution from MNRE will be about Rs.163.00cr with existing schemes and balance fund could be met from users, state or other funding agencies. It is recommended that promotion of solar water heaters in residential sector should be given higher priority, as energy savings from solar water heaters is the highest. Table 37 : Summary of RE Strategy for Residential sector in Kalyan Dombivli City RE Strategy for residential sector Units of Target Target Capacity Investment (Lakh) Installation of Solar water Heaters Nos. 9769 1953.85 Use of solar cookers Nos. 6106 Use of Solar Lantern Nos. Use of Solar Home Lighting System Nos. Use of Solar Home inverter Nos. Use of PV for replacing DG sets Nos. Solar Water Heaters for Residential LPD Solar PV Power Pack for Residential kWp MNRE subsidy (Lakh) User’s contribu tion (Lakh) Energ y Saved per 214.92 1738.93 15.39 Emission s Reductio ns (T ) 12463 160.28 48.08 112.19 6.21 1491 12822 384.66 192.33 192.33 4.64 1172 4274 683.85 341.92 341.92 6.76 1707 26560 7968.04 3984.02 3984.02 6106 6105.78 6105.78 9.16 8068 18610 1600000 608.00 992.00 18.90 9.96 1861 16000 8000 4800.00 34562.24 4800.00 16295.0 6 12.00 18267.1 8 0 9720 83.02 16000 12150 69231 4.3. RE Strategy for Commercial and Institutional Sector The commercial and institutional sector is the second highest consumer of energy in Kalyan Dombivli city. The sector consumes about 13% of total electricity consumed in the city with its 354 educational institutes, 220 medical service facilities, 5 hotels and 725 odd restaurants. Different strategies are prepared for different categories of consumers based on type and quantum of energy consumed and availability of resource and space to generate renewable energy in their premises. While preparing the strategy, only techno economically viable and commercially available renewable energy options are considered. 4.3.1. RE Strategy for Hotels Kalyan Dombivli city does not have much of the big hotels. The city has 5 budget hotels and other commercial accommodations facilities. Some case studies are made to assess renewable energy and energy conservation measures in hotels. Major energy requirement such as hot water and electricity during load shedding hours could be met by solar energy. Solar thermal system can be used to generate hot water or steam for cooking. Solar PV power plant can be used to reduce or eliminate use of diesel generators which are being used during load shedding hours. Apart from that hotels also generate bio waste which can be 46 used to produce biogas through bio-methanation process. Solar pumps and solar garden lights can be used for sprinkling water and beautification. (i) Renewable Energy Systems for Budget Hotels cum Bar & Restaurant Hotel Raja has been chosen as the case study site for a budget hotels’ energy consumption portfolio. The tables below give us the energy appliances utilized by a typical budget hotel in Kalyan Dombivli. Based on the energy baseline scenario specific renewable energy systems have been proposed which can help in energy saving at the case study site. The occupancy of the hotel has been taken to be 50% for the calculations mentioned below. Table 38 : Case Study of Budget Hotel cum Bar & Restaurant Location of the Hotel Kalyan Dombivli No of rooms 16 Nos. Roof Area available 150 sqm Shadow free open space at ground 15 sqm Average Load Shedding 4 Hours/day 1620 kg 82.5 KVA 48 liters/ day Monthly LPG consumption for cooking Standby Power Supply System: Diesel Generator 1 (off peak load) Average consumption of diesel per day Electrical Energy Demand: Electrical Appliances No Ope ratin g Hou rs Wattage of the device (in watt) Load (kW) Energy consumpti on /day at 50% occupancy (kWh) Ceiling Fans (throughout the year) 16 12 60 0.96 5.76 Air Conditioner (throughout the year) 16 10 1800 28.8 144.00 Electric Geyser (throughout the year) 16 2 1750 28 28.00 Television 16 10 100 1.6 8.00 Incandescent (light Bulb) 16 10 60 0.96 4.80 Compact Fluorescent 32 6 15 0.48 1.44 Fluorescent (Long, 4 Feet Tube) 16 10 55 0.88 4.40 Ceiling fans 14 12 60 0.84 10.08 Air conditioner 16 10 1800 28.8 288.00 168 6 15 2.52 15.12 Fluorescent (Long, 4 Feet Tube) 4 10 55 0.22 2.20 Incandescent (Light Bulb) 4 10 60 0.24 2.40 Refrigerators/ Freezer 4 8 560 2.24 17.92 Television 1 8 100 0.1 0.80 Water pump 2 4 3750 7.5 30.00 Computers 1 24 100 0.1 2.40 Printer 1 10 100 0.1 1.00 104 566.00 Guest Rooms Common area and other facilities Compact Fluorescent Total energy consumption 47 The renewable energy systems proposed for the budget hotel in Kalyan Dombivli are enlisted in the tables below. The techno –economics of installing the RE systems has also been provided. Solar Water Heating system to replace geysers and preheating of water for Approximate area required for installation Indicative cost of the system MNRE subsidy @1400.00 per m2 Energy savings per day average Considering 4 months use of geyser (using 75% of water) & 12 months of hot water for cooking (using 25% of water) savings per year will be Savings of electricity per year Savings of LPG per year Annual cost savings from saving electricity Annual cost savings from saving LPG Total savings Payback period Emission reduction Rooftop PV system for diesel abetment Approximate area required Indicative cost of the system with 1 day battery backup MNRE Subsidy @Rs.1.00lakh per kWp Approximate annual energy generation Fraction of DG power replaced Amount of diesel saved per year Cost savings from diesel per year Annual O&M Cost of DG sets Payback period Emission reduction Biogas system Organic Waste from kitchen and other services per day Biogas plant recommended Investment MNRE subsidy @50% User’s share LPG saved per year Energy in terms of MU savings per year Cost savings per year Payback period Emission Reduction per year 2000 60 350000 84000 70 12688 LPD sqm INR INR kWh kWh 6300 6388 439.38 31500 17575 49075 5 10 30 30 7500000 3000000 45000 47% 8182 327273 75000 11 36 kWh kWh kg INR INR INR years tones kWp sqm INR INR kWh litres INR INR years tonne 30 3 0.5 0.25 0.25 438 0.00636 0.1752 1.43 0.267 kg CuM Lakh Lakh Lakh kg MU Lakh Years Tonn 4.3.2. Renewable Energy Systems for Restaurants Kalyan Dombivli has a number of restaurants and eateries. The city has more than 700 restaurants and which are categorised as large restaurant, medium restaurants/Dhabas and small restaurants. Solar water heaters can easily be introduced in these restaurants to meet their hot water demand for cooking and utensil 48 cleaning. Since all the restaurants are using DG sets as standby power supply source during load shedding, PV power plant will be an attractive and profitable option for the restaurants Cart food is very popular in Kalyan Dombivli. These carts serve piping hot traditional North Indian food and hence are preferred by all. There are hundreds of food cart which use kerosene or gas operated lights for illumination. Solar Lanterns will be a profitable and attractive option for these food cart operators. (i) RE strategy for Restaurants Restaurants have been separately taken up for case studies as innumerable such establishments are found across India which are huge energy guzzlers. Kalyan Dombivli city also has innumerable restaurants of which Gurudev restaurant has been chosen as a case study site. Table 39 : Case Study of Restaurant Location of the Restaurant Kalyan Dombivli Roof Area available 150 Connected load 50 kW Average Load Shedding 4 Hours/day 2700 kg 100-120 Kg/day 65 KVA 11.52 kL Monthly LPG consumption for cooking Organic waste generated sqm Standby Power Supply: Diesel Generator Average consumption of diesel per year Electrical Energy Demand: Electrical Appliances Ceiling Fans (12 months) Air Conditioner (12 months) Micro oven Milk Chiller Deep Freezer Compact Fluorescent Air conditioner for cold Television Water pump 1 Water pump 2 Computers Printer OTG Total Nos. Operati ng 5 4 5 1 1 123 2 3 2 1 12 1 1 12 10 6 8 8 12 10 8 4 4 24 3 4 Load (W) 60 2000 1000 740 560 20 1500 100 1500 1000 100 100 800 Total Load 0.30 8.00 5.00 0.74 0.56 2.46 3.00 0.30 3.00 1.00 1.20 0.10 0.80 26.46 Energy consump 3.60 80.00 30.00 5.92 4.48 29.52 30.00 2.40 12.00 4.00 28.80 0.30 3.20 Use per 365.00 365.00 365.00 365.00 365.00 365.00 365.00 365.00 365.00 365.00 365.00 365.00 365.00 Energy Consumpt 1314 29200 10950 2161 1635 10775 10950 876 4380 1460 10512 110 1168 85490 Based on the portfolio of energy consumption in the restaurant following renewable energy systems have been recommended to save energy. The techno economics of installing the PV system is provided below. 49 Solar Water Heating system to replace LPG for preheating of water for cooking: 1000 LPD 30 sqm 150000 INR MNRE subsidy @1400.00 per m 42000 INR Energy savings per day average Savings of LPG per year 35 12775 kWh kWh 878.76 kg Approximate area required for installation Indicative cost of the system 2 Annual cost savings from saving LPG 35150 INR 3.07 years Emission reduction 8 tonnes Rooftop PV system for diesel abetment 20 kWp Approximate area required 20 sqm Indicative cost of the system with 1 day battery backup 4500000 INR MNRE Subsidy @Rs.75.00 per Wp 1500000 INR 30000 kWh Payback period Approximate annual energy generation Fraction of DG power replaced 40% Amount of diesel saved per year 4552 litres Cost savings from diesel per year 182086 INR Annual O&M Cost of DG sets 50000 INR Payback period 13 years Emission reduction 24 tonnes 100-120 kg Biogas plant recommended 10 CuM Investment 0.5 Lakh MNRE subsidy @50% 0.25 Lakh User’s share 0.25 Lakh LPG saved per year 1460 kg Energy in terms of MU savings per year 0.02 MU Cost savings per year 0.58 Lakh Payback period 0.43 Years Emission Reduction per year 0.89 Tonnes Biogas system Organic Waste from kitchen and other services per day (ii) Summary of RE strategy for Restaurants Introduction of RE system in 25% of restaurants in Kalyan Dombivli city as described in the table below will save 1.85MU of energy per year and reduce GHG emission by 1518.81 tonnes. Introduction of solar water heater system should be given prime importance followed by biogas system and solar PV system for diesel abatement. 50 Table 40 : Summary of RE strategy for Restaurants Restaurants Numbers RE System Proposed SWH/SC PV system Biogas/ system kWp Biomass LPD/ system Nos. (cum) Energy Savings (MU) Total Emission reduction Tonnes/ year Large Restaurants Medium Restaurants/ Dhabas Small Restaurants Food Cart Aggregate 50 100 350 225 725 250000 100000 70000 0 420000 1250 50.00 87.50 0.02 1388 500 500 1050 0.00 2050 4.83 1.26 0.96 0.34 7.39 4069.50 1105.50 900.20 0.02 6075.22 Target 25% for 5 years Total investment (Lakh INR) MNRE subsidy (Lakh INR) Beneficiary’s contribution (Lakh INR) 181 105000 105 29 76 347 780 347 434 513 51.25 25.63 25.63 1.85 1518.81 * Replacing kerosene by using 2 lanterns in one cart 4.3.3. Renewable Energy Systems for Hospitals The Kalyan Dombivli city has 220 health care facilities, which includes two hospitals owned by Municipal Corporation with more than 100 beds each, a railway hospital with 50 beds, one maternity with 30 beds and some small hospitals with 15-20 beds capacity each. Apart from that the city has other health care facilities like dispensaries, dental clinic, microsurgery, day care centre and pathological laboratories. To portray the energy consumption scenario in these facilities a 50 and 20 bed Hospitals have been chosen in Kalyan Dombivli city. Detailed energy consumption data have been collected and specific recommendations for renewable energy systems have been made. An average occupancy of 75% has been considered for making all calculations. (i) Renewable Energy Systems for 50 bedded Hospital Wockhardt Hospital has been chosen as the case study site for a 50 bed hospital in Kalyan Dombivli. The general details and the energy consumption pattern of the hospital are mentioned in the tables below. Table 41 : Case Study of 50 bedded hospital Location of the Hospital No of beds Roof Area available Connected Load Average Load Shedding Average electricity bills per month Average occupancy Standby Power Supply: Diesel Generator 1 (off peak load) Diesel Generator 2 (peak load) Average consumption of diesel per day Kalyan Dombivli 50 Nos. 200 sqm 150 KVA 4 Hours/day 1.00 Lakh 75% 75 125 72 KVA KVA Liters/ day 51 Electrical Energy Demand: Electrical Nos. Appliances Opera ting Hours Watt/ unit Load (kW) Energy consumption /day at 100% occupancy (kWh) Energy consumption /day at 75% occupancy (kWh) Utilizatio n /year Energy Consump tion per year Ceiling Fans 70 12 60 4.2 50.40 37.80 270 10206 Air Conditioner 20 10 1800 36 360.00 270.00 150 40500 Electric Geyser 30 4 1750 52.5 210.00 157.50 120 18900 200 10 55 11 110.00 82.50 365 30113 Fluorescent tube Water pump 2 4 8820 17.64 70.56 70.56 365 25754 Computers 6 24 100 0.6 14.40 14.40 365 5256 Printer 2 3 100 0.2 0.60 0.60 365 219 Auto clave 2 2 5000 10 20.00 20.00 365 7300 132 836.00 653.00 138248 Based on the energy demand in this building the following renewable energy systems have been recommended for the 100 bedded hospitals. Solar Water Heating system to replace geysers and preheating of Approximate area required for installation Indicative cost of the system MNRE subsidy @1400.00 per m2 Energy savings per day average Electricity savings per year Annual cost savings from saving electricity Payback period Emission reduction Rooftop PV system for diesel abatement Approximate area required Indicative cost of the system with 1 day battery backup MNRE Subsidy @Rs.75 per Wp Approximate annual energy generation Fraction of DG power replaced Amount of diesel saved per year Cost savings from diesel per year Annual O&M Cost of DG sets Payback period Emission reduction (ii) 3000 90 750000 126000 157.5 57488 287437.5 2.17 47 30 30 67.50 22.50 45000 51% 13500 5.40 0.75 7 36 LPD sqm INR INR kWh kWh Lakh years tonnes kWp sqm Lakh Lakh kWh litres Lakh Lakh years tonnes Renewable Energy Systems for 20 bedded Hospital Shivam General Hospital has been chosen as the case study site for a 20 bedded hospital in Kalyan Dombivli. It is one of the primary medical facilities in Kalyan Dombivli. The energy baseline scenario of the Hospital reveals huge energy consumption on daily basis, supplemented by a high capacity diesel generator back-up of 150 KVA. An average occupancy of 75% has been taken to provide the calculations given below. 52 Table 42 : Case Study for 20 bed hospital Location of the Hospital No of beds Roof Area available Premise area Connected Load Average Load Shedding Average electricity bills per annum Average occupancy Standby Power Supply: Diesel Generator 1 Diesel Generator 2 Average consumption of diesel per day Kalyan Dombivli 20 200 450 80 5 10.00 75% Nos. sqm sqm kW Hours/day Lakh 50 100 52 KVA KVA Liters/ day Electrical Energy Demand: Electrical Appliances Nos. Operatin g Hours Watt/ unit Load (kW) Energy consumpti on /day at 100% occupancy (kWh) Energy consumpti on /day at 75% occupancy (kWh) Utilizat ion /year Energy Consump tion per year Table Fans 10 10 60 0.60 6.00 4.50 365 1643 Ceiling Fans 50 18 60 3.00 54.00 40.50 365 14783 Air Conditioner 15 10 1800 27.00 270.00 202.50 365 73913 Television 25 7 100 2.50 17.50 13.13 365 4791 Refrigerator 5 10 250 1.25 12.50 9.38 365 3422 Autoclaves 2 6 8820 17.64 105.84 79.38 365 28974 Water Pump 2 6 1000 2.00 12.00 9.00 365 3285 Incandescent 60 watt 20 20 60 1.20 24.00 18.00 365 6570 Incandescent 100 watt 20 20 100 2.00 40.00 30.00 365 10950 Compact Fluorescent 40 20 11 0.44 8.80 6.60 365 2409 Fluorescent Tube, Long 20 20 40 0.80 16.00 12.00 365 4380 Computers 15 20 150 2.25 45.00 33.75 365 12319 4 4 100 0.40 1.60 1.20 365 438 61.08 613.24 459.93 Printers Total 167874 Recommended Renewable Energy Systems The energy consumption baseline assessment of the 50 bedded hospital in Kalyan Dombivli, lead to the recommendation of Solar water heater to address the daily hot water requirement and PV systems for diesel abatement. 53 Solar Water Heating system to replace geysers and preheating of water for cooking: Approximate area required for installation Indicative cost of the system 2 MNRE subsidy @1400.00 per m Energy savings per day average Electricity savings per year Annual cost savings from saving electricity Payback period Emission reduction Rooftop PV system for diesel abatement Approximate area required Indicative cost of the system with 1 day battery backup MNRE Subsidy @Rs.75 per Wp Approximate annual energy generation Fraction of DG power replaced Amount of diesel saved per year Cost savings from diesel per year Annual O&M Cost of DG sets Payback period Emission reduction (iii) 2000 60 400000 84000 105 23625 118125 2.68 19 LPD sqm INR INR kWh kWh INR years tonnes 20 20 4500000 1500000 30000 67% 12653 506133 150000 5 24 kWp sqm INR INR kWh litres INR INR years tonnes Summary of RE strategy for Hospitals The analysis of the above two case studies of a 50 bedded hospital and a 20 bedded hospital in Kalyan Dombivli has revealed the huge energy consumption patterns in sector. Hospitals are a growing infrastructure need of any developing city. Hence the source to future energy consumptions lies in the proper streamlining of energy consumption patterns in these building sectors. Policy mandates and programmes for facilitating the adoption/installation of renewable energy technology in these building type will be a milestone for future energy savings. Adoption of Renewable energy systems in 25% of the hospitals will save 1.80MU energy per year reducing GHG emission by 1507 tonnes per year. The payback period for solar water heater system for hospitals is about one year only due maximum use of hot water in health care facility. Table 43 : Summary of RE systems for Hospitals Hospitals Small hospitals and nursing homes < 50 beds Hospitals with 50-100 beds Aggregate Targeting 25% implementation Investment (Lakh) MNRE subsidy @Rs.1400.00 per sqm Beneficiary/state/KDMC contribution Nos. 190 30 220 55 RE System SWH/SC PV 380000 90000 470000 117500 117.5 33 85 190 900 1090 273 613 273 341 Energy 4.77 2.41 7.19 1.80 Total 4031.80 1998.00 6029.80 1507.45 54 4.3.4. Renewable Energy Systems for Educational Institutes Educational institutes are major establishments in the commercial sector of a city. Although they are not major source of energy consumption in the city yet they account for a substantial degree of energy utilization. The official website of Kalyan Dombivli gives the following figures of educational institutes in Kalyan Dombivli. The city has 308 primary/ nursery schools, 41 intermediate and high schools, two engineering colleges, five degree colleges. The government primary schools provide free mid-day meal to its students. Community solar cookers can be used to cook mid-day meal in these schools. The institutes having hostels can use solar water heater to supply hot water to the bath rooms and the kitchen thereby providing bathing comfort to the students and hot water for cooking. (i) Use of Solar cookers for cooking mid-day meals in primary schools Solar Cookers can have an apt utilization for cooking mid-day meals in primary schools. Assuming 50% of the schools in Kalyan Dombivli have a mid-day meal programme a target of 50% for the framework of 5 years has been considered. Table 44 : Target for Introducing Solar Cookers in Primary Schools Total no of schools Schools providing mid day meal for students Target for introducing of solar cooker in 5 years Number of Solar Cooker to be installed in 5 years plan Average savings of LPG domestic cylinder per year (14kg) Total LPG saved per year Total energy saved per year Indicative cost of installation MNRE subsidy for solar cooker @30% Beneficiary/ State/ KDMC share Cost of energy savings Payback period Emission reduction per year 306 62% 50% 95 10 13280 0.19 18.97 5.69 13.28 3.32 4.00 46 Unit Nos. Nos. Nos. kg MU Lakh Lakh Lakh Lakh years Tonnes (ii) Summary of RE strategy for Educational Institutes The two renewable energy options can effectuate a considerable energy saving in educational institutes are the solar water heaters and solar PV systems. The potential for energy savings in different educational institutes in Kalyan Dombivli is tabulated below. The figures give a gross idea about the financial implications and emission reductions rendered by installation of the aforementioned renewable energy systems. 55 Table 45 : Summary of RE strategy for educational institutes RE System Proposed Educational Institutes Numbers Primary Schools/ Nursery Intermediate & High schools Engineering Colleges Degree Colleges Aggregate Target 25% in 5 years Investment (Lakh INR) MNRE subsidy @Rs.1750.00 per sqm Beneficiary/state/KDMC contribution 306 41 2 5 354 89 SWH/SC system PV system LPD/ Nos. 95 0 10000 2500 12500 3125 22 11 12 kWp Biogas/ Biomass Energy Savings 0 0 0 0 0 0 0 0 0 0.19 0.02 0.13 0.07 0.41 0.10 77 10 10 25 122 30 68 30 38 Total Emission Tonnes/ 46.34 12.51 112.20 55.50 226.54 56.64 (iv) Summary of RE strategy for Commercial and Institutional Sector The target of RE strategy for commercial and institutional sector is to achieve about 3% of total energy savings requirement. The strategy, once implemented fully will save 5MU of energy per year and reduce GH of 3187.33 tonnes per year. The primary focus should be given to introduction of solar water heaters for hotels, restaurants, hospitals and other residential institutes, which will save 1.80MU per year. Solar PV power plant should be introduced for diesel abatement in the establishment that are using diesel sets as standby power supply source. The restaurants and hotels that has considerable amount of food and organic waste, should introduce biogas system. Use of solar cooker for preparing mid-day meal in primary schools will be an attractive option to save LPG for cooking and creation of awareness and demonstration about use of renewable energy devices among school children. Table 46 : RE Strategy for Commercial and Institutional Sector RE Strategy for Commercial and Institutional sector Solar Cooker for mid-day meal in schools Solar Water Heaters for Hotels, Restaurants, Solar PV Power Plant for Hotels, Restaurants, Biogas for Hotels and Restaurants Pote ntial User s Target Users (Nos.) Units of Target Target Capaci ty Total Investm ent (Lakh) MNRE subsid y (Lakh) Sate/ KDMC/ Benefici ary's Amou nt of Energ y Emission s Reductio ns per 18.97 5.69 13.28 0.19 46.34 247.60 73.72 173.88 2.70 2286.25 153 95 Nos. 1304 326 LPD 95 24362 5 1304 326 kWp 662 1490.20 662.31 827.89 0.99 808.02 730 183 CuM 525 52.50 26.25 26.25 1.11 46.73 1809.27 767.97 1041.30 5.00 3187.33 4.3.5. RE Strategy for Industrial Sector The industry sector in Kalyan Dombivli consumes 3.40% of total electricity and considerable amount of coal, diesel and LPG for its different manufacturing and process industries. Kalyan Dombivli City has about 1985 odd small and medium scale industries. On the eastern side of the Kalyan city, there is a large industrial 56 complex where electrical equipment, rayon, and dyes and other chemicals are manufactured. There are also a large number of textile-based cottage industries. Dombivli is the home to many chemical manufacturing units. Target should be made to introduce solar water heaters and PV power plants in the industries in Kalyan Dombivli as shown in the table below. The system capacity assumed is average capacity and will vary based on the size of the industry and energy requirement. Introducing proposed systems in 25% of the industries will save 11.71MU of energy per year reducing 9747 tonnes of GHG emission. Table 47 : RE Strategy for industrial sector in KDMC RE System Proposed Small Scale Industries Nos. SWH system Energ y Savin gs Total Emissio n reductio 0.12 97 Electrical Equipment 159 0 PV system 159x0.5kWp Chemical Manufacturing 794 794x2000LPD 794x10kWp 30.67 25567 Rayon 496 496x1000 496x10kWp 13.30 11011 Dyes 397 198500 199 2.64 2227 Textile based cottage industry 139 0 139x0.5kWp 0.10 85 1985 2282500LPD 13248kWp 46.83 38987 496 570625 3312 11.71 9747 570.63 7451.72 94.15 3311.88 476.47 4139.84 Aggregate Targeting 25% implementation Investment (Lakh) MNRE subsidy @Rs.1400.00 Beneficiary/state/KDMC ib i 4.3.6. RE Strategy for Municipal Sector The municipal sector of Kalyan Dombivli city consumes 3.10% of total electrical energy in the city. The primary consumers in this sector are street lights, outdoor lights in parks and monuments, markets, office buildings of the Municipal Corporation, water supply, sewerage treatment plant etc. Renewable energy devices are suggested to all categories of consumers depending upon the energy demand. The sector has ample opportunity to save energy through introducing renewable energy and energy conservation measures and could show case these initiatives to encourage people to adopt further. (i) Renewable Energy System for Municipality building and other Office Buildings The main administrative building of the municipal corporation consumes about 0.55 MU of electricity per year. The loads consume most of the energy are air conditioners, fans and lighting loads. A 70kWp PV Power plant is recommended for the building to supply power during load shedding hours. 57 Table 48 : RE Strategy for KDMC municipal sector Main Administrative Building, Municipal Corporation, KDMC Name of the Building Total premise area 23400 sqm Built up area 3375 sqm 4 hours/day Average Load Shedding Electrical appliances in municipal building Total Nos. Table fans Ceiling Fans Exhaust fans Wall Fans Air Conditioner I Air Conditioner II Air Conditioner III Air Conditioner IV Air Conditioner V Television Refrigerator Electric Water Pump Water Cooler Incandescent CFLs Fluorescent Long 36 watt CFLs Computers TOTAL 34 241 44 10 42 2 4 6 2 2 2 2 5 38 30 766 80 250 Load (W) 60 60 300 100 1800 9000 6000 3600 2400 100 200 11250 300 60 11 55 36 100 Total Load (kW) 2.04 14.46 13.20 1.00 75.60 18.00 24.00 21.60 4.80 0.20 0.40 22.50 1.50 2.28 0.33 42.13 2.88 25.00 271.92 Hours of Operation Consumption / Day (kWh) 9 9 9 9 6 6 6 6 6 4 1 4 4 4 5 8 4 10 18 130 119 9 454 108 144 130 29 1 0 90 6 9 2 337 12 250 1597 Annual Utilization (days) 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 Annual Consumpti on (kWh) 5508 39042 35640 2700 136080 32400 43200 38880 8640 240 120 27000 1800 2736 495 101112 3456 75000 554049 Recommended Renewable Energy System: Rooftop PV system for diesel abatement Approximate area required Indicative cost of the system with 1 day battery backup MNRE subsidy for diesel abetment @75.00/Wp Approximate annual energy generation Fraction of DG power replaced 70 kWp 70 sqm 157.50 Lakh 52.50 Lakh 105000 kWh 27% Amount of diesel saved per year 18981 Ltrs. Cost savings from diesel per year 7.59 Lakh Annual O&M Cost of Generator sets 2.00 Lakh Payback period 11 years Emission reduction 53 tonnes 58 (ii) Renewable Energy System for Markets Kalyan Dombivli city does not has any particular market as such. The shops are scattered around. But there are some shopping complexes in the city like one is Jhojhwaala shopping complex in the main city. These kind of shopping complexes can be chosen in the city for installation of RE technologies like Solar PV and can be replicated in other establishments as well. Table 49 : RE Systems for Shopping Complexes Unit Capacity of solar PV system for Shops Indicative cost of incorporating Solar PV to Shop's inverter Total no of shops in eight markets Shops uses Inverter during load shedding 500 Wp 60000 INR 200 Nos. 100% Target to introduce solar charger for inverter in 5 years 50% Number of solar inverter to be installed in 5 years plan 100 Nos. Total PV capacity installed 50 kWp 0.08 MU 4 Lakh Indicative cost of installation 60 Lakh MNRE subsidy @50% 30 Lakh User's share 30 Lakh 8 years 61 Tonnes Energy generated by PV arrays per year Cost of energy saved Payback period Emission reduction per year (iii) RE System for Outdoors lighting (Streets, Traffic, Road safety etc.) The city has about 10322 outdoor lights, which have been fixed for illumination streets, wards, etc. The objective is to introduce one solar PV outdoor light in every three conventional lights so that minimum illumination level is maintained during load shedding hours. The tables below indicate targets, investment thereon and energy savings potential etc. Table 50 : RE Systems for Outdoor lights, Road safety Street Light Details Existing SL (Nos.) Solar SL (Nos.) 250/70 watt sodium points 40 watt tube light point Simple Bulb Point High Mast 400 watt flood light point 7011 454 2391 184 198 2337 151 797 61 66 Total 10238 3413 Targeting 50% in 5 years PV module capacity (Wp) Total PV Module capacity (kWp) Total Investment (Lakh INR) 1706 40 68 256 59 MNRE subsidy @50% (Lakh INR) KDMC/ State/ Beneficiary share (Lakh INR) Energy Generated (MU per year) Emission reduction (Tonnes per year) Payback period (Years) 128 128 0.10 83 25 Table 51 : Summary of RE Strategy for outdoor light and road safety RE Strategy for Kalyan Dombivli City Street and Road Safety LED based solar Street Light in every 3 alternative existing Total Road Stud @ 1 stud in 2m for 50% of 91km main road Investment 3413 1706 255.95 13 7 3.25 120 60 9.00 7500 1875 22.50 Solar PV Traffic Lights (2x74Wp) @ Solar Blinkers (37Wp) @ Target Total Investment required (Lakh INR) 290.70 MNRE subsidy @50% (Lakh INR) 145.35 KDMC/State’s share(Lakh INR) 145.35 Energy saved (MU per year) 0.12 Emission reduction (Tonnes per year) 93.63 (iv) Renewable Energy Systems for Parks Kalyan Dombivli City has 16 ‘Municipal Parks’ where electrical energy is consumed for outdoor lighting and water pumping for sprinkling irrigation. Solar PV outdoor lights and solar pumps are recommended for these parks. Table 52 : Renewable Energy Systems for Parks No. of Unit load (W) Total Hours of Energy Flood light 9 250 2.25 10 22.5 CFL outdoor light 50 20 1.00 10 10 Water Pump 1 1000 1.00 10 10 1270 4.25 30 42.5 Nos. Capacity Unit Investme 30 74 Wp 6.64 1 1 kWp 1.75 Total RE Options: Options Converting 50% of Providing solar pump for Table 53 : Summary of RE Strategy for Kalyan Dombivli Corporation Parks Total Number of Parks in Kalyan Dombivli Targeting 50% in 5 years Total PV system capacity per park Total investment MNRE Subsidy @50% KDMC/ state/ Park Operator 16 8 3.18 53.10 26.55 26.55 Nos. Nos. kWp Lakh Lakh Lakh 60 Energy saved per year Emission reduction per year Cost of electricity saved per year Payback period (v) 0.04 30.94 1.91 14 MU Tonnes Lakh Years Summary of RE Strategy for Municipal Sector The Municipal sector can contribute 0.98MU energy savings per year through introducing RE devices in the different municipal utilities and services reducing GHG emission by 795.44 tonnes per year. Table 54 : Summary of RE Strategy for Municipal Sector in Kalyan Dombivli RE Strategy for Municipal Sector Units of Target Target Capacit y Total Investme nt (Lakh) MNRE subsidy (Lakh) Sate/ KDMC/ User's Share (Lakh) Amount of Energy Saved (MU) Emissions Reductions per year (Tonnes) 70kWp PV Power Plant for Municipal and other Office Nos. 10 1575.00 788 787.50 0.75 610 LED based Solar Street Light Nos. 1706 255.95 127.98 127.98 0.10 83 Solar PV Traffic Lights Nos. 7 3.25 1.63 1.63 0.00 1 Solar Blinkers (37Wp) Road Stud @ 1 stud in 2m for 50% of 30 km main road Outdoor lights for Parks Nos. 60 9.00 4.50 4.50 0.00 3 Nos. 1875 22.50 11.25 11.25 0.01 7 Nos. 236 53.10 26.55 26.55 0.03 21 Solar Pumps for Parks PV system for Inverters in the k h Nos. 8 14.00 7.00 7.00 0.01 10 Nos. 100 60 30 30 0.08 61 1992.80 996.40 996.40 0.98 795.44 4.3.7. Waste to Energy Potential in Kalyan Dombivli Discussion with MSW department in the KDMC, reveals the waste characterization for Municipal Solid waste in Kalyan Dombivli to be as indicated in Table 55 :. Based on 2006 figures, the total waste quantity at dumpsites and at the dustbins aggregated to 600 MT/day. The total waste generated can be classified as biodegradable and non - biodegradable. Table 55 : Municipal Solid Waste Characterization (2006) Waste Composition Bio-degradable Non-biodegradable (Inert) Total Waste Per capita waste (Kg/capita/day) Percentage Waste 45.00% 55.00% 100% 300 gms/day/person Quantity (MT/Day) 270 330 600 A rough assessment of the potential of recovery of energy from MSW through different treatment methods can be made from knowledge of its calorific value and organic fraction, as under. Since relevant details are not available for Kalyan Dombivli, widely used estimates for municipal solid waste in India have been used. 61 (i) Waste to Energy Potential through thermo-chemical conversion In thermo-chemical conversion all of the organic matter, biodegradable as well as non-biodegradable, contributes to the energy output. Total electrical energy generation potential is estimated to be 0.73MWe and savings per year with 70% PLF is estimated as 4.46 MU. Table 56 : Waste to Energy through thermo-chemical conversion Unit Total waste generated Net Calorific Value (conservative estimate) Energy recovery potential ( NCV x W x 1000/860) Power generation potential (ii) 25 Tonnes 2400 kcal/kg 69767 kWh 2907 kW Conversion efficiency 25% Net Power generation potential 0.73 Plant Load Factor 70% MWe Net electrical energy savings potential @70% PLF 4.46 MU Emission reduction per year 3610 Tonnes Total Investment 509 Lakh MNRE subsidy @ 50% subject to maximum of Rs.300.00 per MW 218 Lakh State/City/Private Power Producer 291 Lakh Cost savings 201 Lakh Payback period 1.45 Years Waste to Energy Potential through bio-methanation In bio-chemical conversion, only the biodegradable fraction of the organic matter can contribute to the energy output. It is estimated that a 0.26MWe electrical energy generation is possible from this process which could save about 1.60 MU of energy every year assuming a 70% of PLF. Table 57 : Waste to Energy through bio-methanation Unit Total waste generated 25 Tonnes Total biodegradable volatile solid (VS) 30% Typical digester efficiency 60% Typical bio-gas yield (m3 / kg. of VS destroyed) 0.80 CuM/kg Biogas yield 3600 CuM calorific Value of bio-gas 5000.00 Energy recovery potential 20930.23 Power generation potential 872 Conversion efficiency 30% Net Power generation potential 0.26 kcal/CuM kWh kW MWe Plant Load Factor 70% Net electrical energy savings potential 1.60 MU Emission reduction per year 1299 Tonnes Total Investment MNRE subsidy @ R.200.00 lakh per MW 157 Lakh 52 Lakh 62 State/City/Private Power Producer Cost savings Payback period (iii) 105 Lakh 72 Lakh 1.45 Years Liquid Waste to Energy Potential from Sewage Treatment Plant (STP) Kalyan Dombivli City has two sewage treatment plants through which approximately 30 MLD of wastewater being treated every day. Energy consumption in these sewage treatment plants is about 1.63 MU per year (2007-08). The produce of waste water treatment can be used as a raw material for anaerobic distention and subsequent power generation. A very preliminary assessment shows that there is potential of generating 1.05MWe power which could deliver 6.42 MU of electrical energy per year with 70% PLF. Surat Municipal Corporation has established three such power plants with aggregate capacity of 3.50MWe with financial support from MNRE which have been running successfully since several years. A detailed study has to be made for Kalyan Dombivli to generate power from STPs. Table 58 : Waste to Energy from Sewage Treatment Plant Unit Total waste water generated 30 MLD Total biodegradable organic/ Volatile Solid available for Biomethanation 30 Tonnes/day Typical Digestion Efficiency Typical Biogas yield Biogas yield Electricity (kWh) 60% 0.8 cum / kg 14400 cum 83720.93 kWh Capacity of the plant 3488.37 KW Conversion Efficiency 30% Total Electricity Generated 1.05 MWe Plant Load Factor 70% Net electrical energy savings potential 6.42 MU Emission reduction per year 5198 Tonnes Total Investment 627.91 Lakh MNRE subsidy @40% subject to maximum of Rs.200.00 lakh/MW 209.30 Lakh State/City/Private Power Producer 418.60 Lakh Cost savings 288.77 Lakh 1.45 Years Payback period (iv) Summary of Waste to Energy Potential in Kalyan Dombivli City Total solid waste generated in Kalyan Dombivli is 600MT/day and capacity of two waste treatment plants is 30 MLD. A very preliminary assessment for energy recovery from MSW and STPs has been done based on the widely used assumptions and presented in the table below. 63 Table 59 : Summary of waste to energy potential in Kalyan Dombivli City RE Strategy for Municipal Sector Units of Target Targ et Capa city Total Investm ent (Lakh) MNRE subsidy (Lakh) Amount of Energy Saved (MU) Emissions Reductions per year (Tonnes) 218 Sate/ KDMC/ User's Share (Lakh) 291 Waste to Energy Potential for thermo-chemical conversion Waste to Energy Potential for bio-methanation Liquid Waste to Energy Potential from Sewage Treatment Plant (STP) MWe 0.73 509 4.46 3610 MWe 0.26 157 52 105 1.60 1299 MWe 1.05 628 209 419 6.42 5198 1293.60 479.65 813.95 12.48 10107.10 4.3.8. Application of biogas plants Biogas from Kitchen Waste: Using bio-methanation technology all domestic bio waste including wastewater from the kitchen can be used to produce biogas. Use of domestic waste to produce biogas will help in reducing consumption of cooking fuel and better waste management in the cities. The municipal corporation will also save energy and expenses in collection and disposal of such waste. The biodegradable waste material and wastewater from the kitchen is fed into the plant through the inlet chamber of the plant. This waste is converted into biogas with the help of a special type of anaerobic bacteria. The main component of the gas produced is methane. The space required for a domestic plant is about one square meter. The portable plant developed by M/s Biotech can be installed in a day depending upon the model of the plant. The gas generated from the waste of a family of 3 -5 members is sufficient to operate for 2 hours per day in a single burner stove. Typical payback period of such plant is about 2 years. The slurry in liquid form can be used as fertilizer. Biogas from Institutional Waste: Conversion of bio waste generated in the iinstitutions like hostels, hospitals, hostels, old age-homes, could be a highly attractive way of reducing waste disposal hassle and save fuel for cooking and making hot water. In the same time the cooking fuel consumption of these Institutions is also very high. The solid Bio Manure / Organic fertilizer generated from the pre digesters can be utilized as a fertilizer. 64 Toilet attached Biogas Plant: Like any other bio waste, human excreta can be treated through biomethanation process to produce biogas. The night soil bas biogas plant can replace the conventional septic tank. Treated slurry coming out from the plant can be utilized as liquid fertilizer. All other easily biodegradable waste can also be treated together with human excreta in the same plant. Apart from residential apartments, the public institutions like hostels, hostels, hospitals etc the toilets can be attached with large sized plants for treating the human wastes for the production of biogas. The size of such plants is determined in accordance with the total number of inmates of those institutions. The treatment plant can be installed either as a single unit or more units in different locations. The installation of a night soil based biogas plant is more convenient during the building construction time. Sl. No. Plant Size (CuM) 1 2 3 4 5 1 2 3 4 6 Production of gas per day (CuM) 1 2-3 3-5 4-6 6-10 Suitable for Family Members 1-5 5-7 7-10 10-15 15-20 Max Treatable Waste (Kg) 2 3-5 5-8 8-12 10-20 Organic Waste Water (Litre) 20-25 25-40 40-50 50-60 60-70 Reference: http://www.biotech-india.org/ 65 4.3.9. Solar Thermal for cooling Introduction: Solar energy can be used for the cooling purposes in place of conventional air conditioners used in large commercial buildings now a day. The commercial establishments particularly hospitals, hotels and other institutional buildings use huge amount of conventional energy to power the air conditioners used for the cooling purposes in these commercial premises. Application of renewable energy for the cooling purposes can save a substantial amount of energy and the resultant emissions. As per an independent energy audit conducted by civic authorities, the compressor based central AC system had a specific energy consumption of 1.19 kilo watt per tonne, whereas a new AC system would have specific energy consumption of 0.89 kilo watt per tonne. Now a days air conditioners are used in almost all the commercial and industrial establishments. In a city like Kalyan Dombivli having more than 1,500 number of big commercial establishments, an estimation of total energy savings by use of solar cooling facilities can be made. How it works? The installation of solar cooling system is an unique combination of parabolic reflecting mirrors, heat receivers, insulated plumbing, boilers for storing the steam and vapour absorption machine (VAM). The mirrors with high reflectivity are focused on receivers containing water through a tracking system. The parabolic mirrors are capable of generating steam. The steam is routed through boilers for storage and getting the desired pressure to be fed in to the Vapour Absorption Machine. The VAM with lit hium bromide absorbers chills the water and steam which separates the absorbent from the water. The chilled water is circulated through the ducts cooling the air flowing in it. The circulation of steam, air and water can be ensured with a pump. As hot water is generated as a by-product it can be used for drinking, bathing and laundry. The steam which is generated can also be used for disinfecting the linen in the laundry and sterilise surgical equipments. A centralized solar AC system is being implemented in Chhatrapati Shivaji Maharaj Hospital at Kalwa in district Thane. The entire project cost of this 160 tonne solar air conditioning system is apprx INR 3.99. It is expected to save electricity worth INR 40 lakh per annum. Application and usage: The solar air conditioning systems introduced by Sharda Inventions are useful for large scale centralized applications with capacities of 10 TR and above. In near future the solar air conditioning system will be introduced for household applications as well. 66 CHAPTER 5 This chapter delves into Energy Efficiency strategy for residential, commercial, industrial and municipal sector of Kalyan Dombivli city. The chapter later develops the strategies for Kalyan Dombivli city based on the Energy conservation and Energy Efficiency measures in the city and the baseline energy consumption and future energy demands of the city. 5. ENERGY EFFICIENCY STRATEGIES FOR KALYAN DOMBIVLI While renewable energy technologies would provide clean energy, EE and DSM measures would help in reducing the energy demand. Energy Efficiency (EE) initiatives are the most financially feasible energy saving options in India today. In this report the EE measures have been thoroughly analyzed for all the four sectors, i.e. residential, commercial, industrial as well as municipal. The financial and technical analysis is provided for each strategy suggested in all the sectors. The list of EE and DSM measures suggested for different sectors is given below: Residential Sector: − − − − − − − − Replace Incandescent Lamps with Fluorescent T5 tube light + Electronic Ballast to replace T12/T8 tube light+ Magnetic Ballast Efficient ceiling fans to replace conventional ceiling fans Replacement of conventional air-conditioners with EE star rated ACs Replacement of conventional refrigerators with EE star rated refrigerators Replacement of conventional water pumps with EE water pumps Reduce energy consumption in existing private buildings Reduce energy consumption in all new construction Commercial and institutional building Sector: − Replace Incandescent Lamps with Fluorescent − T5 tube light + Electronic Ballast to replace T12/T8 tube light+ Magnetic Ballast − Efficient ceiling fans to replace conventional ceiling fans − Replacement of conventional air-conditioners with EE star rated ACs − Replacement of conventional refrigerators with EE star rated refrigerators − Replacement of conventional water pumps with EE water pumps Industrial Sector: − Replace Incandescent Lamps with Fluorescent − T5 tube light + Electronic Ballast to replace T12/T8 tube light+ Magnetic Ballast 67 − Efficient ceiling fans to replace conventional ceiling fans − Replacement of conventional air-conditioners with EE star rated ACs − Energy efficiency in motors, furnaces, boilers, etc. Municipal Sector: − − − − − − − − Replacement of 150 watt HPSV with LEDs Replacement of 40 watt T8/T12 tube lights with T5 tube lights Sensors for automatic on/off of street lights Proper pump-system design (efficient Pump, pumps heads with system heads Installation of variable speed drivers Power saver installation in pump house Plugging of leakages in the water supply system and use of efficient pumps and motors Energy Efficiency Measures in WTP A sector-wise techno-economic analysis of potential energy efficiency and DSM measures has been carried out. 5.1. EE Strategy for Residential sector Residential sector consumes largest amount of energy. Important proven and cost effective measures for the sector are described in this section. Based on the survey, it was found that incandescent lights are still used a lot in the residential sector. Utilizing the survey data the savings due to replacement of incandescent lamps with CFL are calculated and are presented in the table below. (i) Replace Incandescent Lamps with Fluorescent Incandescent bulbs are the major and the most common source of high energy consumption in the residential area. Replacement of incandescent lamps has acquired a substantial precedence in all the energy efficiency strategies as the most feasible option. The techno commercial for replacement of incandescent bulbs with CFL is given below. An assumption of 80% households utilizing CFLs has been considered as target group for replacements and an 80% replacement is assumed for the calculations below. Table 60 : Replacement of incandescent lamps with fluorescent Total Residential household Household using incandescent bulb Target to replace incandescent bulb with CFL Number of incandescent bulb to be replaced per household Total number of incandescent bulb to be replaced Indicative cost of installation Energy saved by replacing 60W bulb with 15W CFL Cost of electricity savings Payback period Emission reduction per year 305289 41% 80% 1 100135 150 9868284 345 0.43 7993 Unit Nos. Nos. Nos. Lakh kWh Lakh years Tonnes 68 (ii) T5 tube light + Electronic Ballast to replace T12/T8 tube light+ Magnetic Ballast A conventional tube light (with magnetic ballast consuming 15W) consumes around 55 watts. It can be replaced with T5 tube (28W) with electronic ballast (4W) which will require around 32W. The calculations have been done for a period of 5 years assuming 80 % replacement of T 12 /T8 tube lights can be possible in 83% of the households using T12/T8 tube lights. Table 61 : T5 tube light + Electronic Ballast to replace T12/T8 tube light+ Magnetic Ballast Total Residential household Household using T8/T12 tube lights Target to replace T8/T12 by T5 tube lights Number of incandescent bulb to be replaced per household Total number of T8/T12 tube lights to be replaced Indicative cost of installation Energy saved by replacing T8/T12(with magnetic ballast) with T5 (with electronic ballast) Cost of electricity savings Payback period Emission reduction per year (iii) 305289 83% 80% 2 405424 2027 13614131 476 4.25 11027 Unit Nos. Nos. Nos. Lakh kWh Lakh years Tonnes Efficient ceiling fans to replace conventional ceiling fans Replacing conventional fans with star rated fans can save substantial amount of electrical energy and money. The financial and technical analysis for replacement of conventional ceiling fans in residential sector of Kalyan Dombivli city assumes that 25% replacement should be possible in almost 100% of the households. Table 62 : Efficient Ceiling Fans to Replace Conventional Ceiling Fans Unit Total Residential household 305289 Household using Conventional Fans 99% Target to replace CF by EE Fans 25% Number of Conventional fan to be replaced per household Total number of Conventional Fans to be replaced Indicative cost of installation Energy saved by replacing Conventional Fans by EE Fans Cost of electricity savings Payback period Emission reduction per year Nos. 3 Nos. 226677 Nos. 3400 Lakh 7344337 kWh 257 Lakh 13 years 5949 Tonnes (iv) Replacement of conventional air-conditioners with EE star rated ACs Survey results in Kalyan Dombivli reveal that approximately 18% of residential households had 1.5 ton air conditioners on average. The energy consumption by a 1.5 ton unit is approximately 7.2 kWh per day. For calculating the energy savings by switching to more energy efficient air conditioners it is assumed that 66% 69 households in Kalyan Dombivli owns an air –conditioner and 25% air conditioners can be assumed as potential target for replacement with energy efficient ACs. Table 63 : Replacement of conventional air-conditioners with EE star rated ACs Total Residential household Household using Conventional AC Target to replace Conventional Acs by EE star rated AC Number of Conventional ACs to be replaced per household Total number of Conventional ACs to be replaced Indicative cost of installation Energy saved by replacing Conventional ACs by EE Star Rated ACs Cost of electricity savings Payback period Emission reduction per year (v) 305289 18% 25% 1 13738 2061 4.70 164 13 3806 Unit Nos. Nos. Nos. Lakh MU Lakh years Tonnes Replacement of conventional refrigerators with EE star rated refrigerators One of the most common appliance used in homes are the refrigerators. With increasing affordability refrigerators have become an indispensable item in most Indian households. They come in the capacity range of 200-400 litres. These days many BEE star rated energy efficient refrigerators are available in the Indian market. A conventional refrigerator of 200 watts has been taken to provide the calculations below. An assumption of 25 % households with conventional refrigerators is taken to show the energy savings. Table 64 : Replacement of Conventional Refrigerators with EE Star Rated Refrigerators Total Residential household Household using Conventional Refrigerators Target to replace Conventional Refrigerators by EE Star one Number of Conventional Refrigerators to be replaced per household Total number of Conventional Refrigerators to be replaced Indicative cost of installation Energy saved by replacing Conventional Refrigerators by Star Rated Cost of electricity savings Payback period Emission reduction per year (vi) 305289 84% 25% 1 64111 3847 30.39 1064 3.6 24615 Unit Nos. Nos. Nos. Lakh MU Lakh years Tonnes Replacement of conventional water pumps with EE star rated water pumps Survey in Kalyan Dombivli has shown that residential households use water pumps of 1.5 HP capacity which has an approximate electrical consumption of 2.2 kWh. Assuming 5% households in Kalyan Dombivli use water pumps, 10% replacement of conventional pumps by energy efficient pumps have been targeted for energy savings. 70 Table 65 : Replacement of conventional water pumps with EE star rated water pumps Unit Total Residential household 305289 Household using Water Pumps Nos. 5% Target to replace Conventional Water Pump by EE Pump Number of Conventional Pumps to be replaced per household 10% 1 Nos. 2137 Nos. 21.37023 Lakh 234004 kWh Cost of electricity savings 8.19 Lakh Payback period 2.61 years Emission reduction per year 190 Tonnes Total number of Conventional Pumps to be replaced Indicative cost of installation Energy saved by replacing Conventional Water Pumps by EE Water Pumps (vii) Summary of EE Strategy in Residential Sector The estimated potential of energy savings in the residential sector through energy efficiency measures is 66 MU per year which is alone can meet 39.37% of the target of 168MU energy savings per year in Kalyan Dombivli City. The reduction of emission through EE measures in residential sector is 70323 tonnes per year. Replacement of incandescent bulbs with CFL, conventional fans, refrigerators and air conditioners with star rated one is the most potential scope for energy savings. Table 66 : Summary of EE Strategy in Residential Sector EE Measures in residential sector Unit Target Capacity Investm ent (Lakh) Amount of Energy Saved (MU) Emissions Reduction s (Tonnes) Indicative cost of replacing 60 watt incandescent with 15 watt CFL Nos. 100135 150 10 7993 Indicative cost of replacing T12/T8 with T5 FTL Indicative cost of replacing conventional Fans with EE star rated fans Nos. 405424 2027 14 11027 Nos. 226677 3400 7 5949 Indicative cost of replacing conventional AC with EE star rated AC Nos. 13738 2061 5 3806 Indicative cost of replacing conventional refrigerator with EE star rated refrigerator Nos. 64111 3847 30 24615 Indicative cost of installing a EE water pump Nos. 2137 21 0 190 11506 66 53580 5.2. EE Strategy for Commercial Sector The commercial sector comprises primarily of offices, shopping malls, markets, hotels and restaurants and comprises of a mix of air conditioned and non air-conditioned buildings. The prime load centers in the sector are air-conditioning, lighting and pumps/equipment. The major share of electricity consumption is attributed to by air-conditioning in a full conditioned building followed by lighting, whereas the prime energy consumption in a non-air conditioned building is lighting followed by space conditioning (coolers, fans, etc.). The energy conservation and efficiency measures targeted for commercial sector thus should be aimed at enhancing efficiency levels and deploying conservation options for lighting and air conditioning. Thus 71 efficiency and conservation have to be addressed in existing and new buildings to affect overall demand and consumption reduction. While retrofit options in existing buildings are restricted to system upgrades (e.g. upgrade to efficient chillers, air handling units, pumps in HVAC system or upgrade to efficient lighting systems), new buildings offer ample opportunities for walls & roof, efficient glazing, energy efficient lighting & HVAC system and renewable energy integration for water heating or power generation) Energy efficiency in the commercial sector is also hugely dependent on replacement of conventional equipment with more energy efficient appliances. All kinds of building sectors are available in Kalyan Dombivli ranging from hotels, hospitals, shops, malls, hostels, educational institutes and restaurants. The strategies here target all these building types in Kalyan Dombivli. (i) Replace Incandescent Lamps with Fluorescent CFL usage has been widespread in the last few years and it is high time that all commercial establishments should voluntarily replace the high energy consuming incandescent lamps with CFLs. From survey results we have assumed that 11% of the commercial sector establishments use incandescent bulbs and 72% of establishment use T8/T12 tube lights. A target to replace 80% of the incandescent bulbs in this household is assumed to give the calculations below. Table 67 : Replacement of incandescent lamps with fluorescent Total Commercial Consumers Consumers using incandescent bulb Target to replace incandescent bulb with CFL Number of incandescent bulb to be replaced per consumer Total number of incandescent bulb to be replaced Indicative cost of installation Energy saved by replacing 60W bulb with 15W CFL Cost of electricity savings Payback period Emission reduction per year Unit Nos. 62976 11% 80% 10 55419 83 4488929 224 0.37 3636 Nos. Nos. Lakh kWh Lakh years Tonnes Table 68 : Replace T12/T8 tube light by T5 tube light Unit Total Commercial Consumers 62976 Consumers using T8/T12 tube lights 72% Target to replace T8/T12 by T5 tube lights 80% Number of incandescent bulb to be replaced per consumer Nos. 2 Nos. 72548 Nos. Indicative cost of installation 363 Lakh Energy saved by replacing T8/T12(magnetic ballast) with T5 (electronic ballast) 2.00 MU Cost of electricity savings 100 Lakh Total number of T8/T12 tube lights to be replaced Payback period 3.62 years Emission reduction per year 1622 Tonnes 72 (ii) Replacement of inefficient fans Analysis of the sample survey of Kalyan Dombivli city reveals that maximum commercial establishments in Kalyan Dombivli city have fans. Conventional fans have an average energy consumption of 1.03kWh per day. Assuming 25% of the conventional fans in the commercial sector of Kalyan Dombivli can be replaced with more energy efficient fans the following techno-commercials have been calculated. Table 69 : Replacement of Conventional Fans Total Commercial Consumers Consumers using Conventional Fans Target to replace CF by EE Fans Number of Conventional fan to be replaced per consumer Total number of Conventional Fans to be replaced Indicative cost of installation Energy saved by replacing Conventional Fans by EE Fans Cost of electricity savings Payback period Emission reduction per year (iii) 62976 100% 25% 3 42509 638 0.59 30 21.43 482 Unit Nos. Nos. Nos. Lakh MU Lakh years Tonnes Replacement of conventional air-conditioners with EE star rated ACs Commercial establishments are usually equipped with air conditioners. Survey in Kalyan Dombivli city reveals that 1.5 tons air conditioners are more popular in the commercial buildings. Assuming that 47% of the commercial establishments own an air conditioner, 10% target replacement of inefficient air-conditioners with more efficient conditioners are taken into consideration for the below mentioned calculations. Table 70 : Replacement of Conventional Air-Conditioners with EE Star Rated ACs Total Commercial Consumers Consumers using Conventional ACs Target to replace Conventional ACs by EE star rated ACs Number of Conventional ACs to be replaced per household Total number of Conventional ACs to be replaced Indicative cost of installation Energy saved by replacing Conventional ACs by EE Star Rated ACs Cost of electricity savings Payback period Emission reduction per year (iv) 62976 47% 25% 5 36998 5550 12.65 633 8.77 10249 Unit Nos. Nos. Nos. Lakh MU Lakh years Tonnes Replacement of conventional refrigerators with EE star rated refrigerators Refrigerators in commercial sector are restricted to the food outlets, restaurants, hotels, guest houses, and ice-cream parlors. General trend reveals that the refrigerators of the range of 200-400 W are found in the 73 commercial sector of Kalyan Dombivli City. Approximately 63% of the consumers own a refrigerator and a target of replacing 25% refrigerators has been taken to show the energy saving potential of replacing conventional refrigerators in commercial sector of Kalyan Dombivli city. Table 71 : Replacement of Conventional Refrigerators with EE Star Rated Refrigerators Unit Total Commercial Consumers 62976 Nos. 63% 25% 1 Nos. 9919 Nos. Indicative cost of installation 670 Lakh Energy saved by replacing Conventional Refrigerators by EE Star Rated one 4.70 MU Cost of electricity savings 235 Lakh 3 years 3808 Tonnes Consumers using Conventional Refrigerators Target to replace Conventional Refrigerators by EE Star Rated Refrigerators Number of Conventional Refrigerators to be replaced per consumer Total number of Conventional Refrigerators to be replaced Payback period Emission reduction per year (i) Replacement of conventional water pumps with EE star rated pumps Replacement of 10% conventional pumps by energy efficient pumps in the commercial and institutional sector will save 0.63 MU energy per year and reduce 514 tonnes of GHG emission per year. Table 72 : Replacements of Conventional pumps with EE Star Rated pumps Unit Total Residential household 62976 Consumers using Water Pumps 80% Target to replace Conventional Water Pump by EE Pump 10% Number of Conventional Pumps to be replaced per household Total number of Conventional Pumps to be replaced Indicative cost of installation Nos. 1 Nos. 7053 Nos. 71 Lakh 0.63 MU 22 Lakh Payback period 3.17 Years Emission reduction per year 514 Tonnes Energy saved by replacing Conventional Water Pumps by EE Water Pumps Cost of electricity savings (ii) Summary of EE Strategy in Commercial & Institutional Sector The estimated energy savings potential from commercial and industrial sector through energy efficiency measures is 3.26MU per year, which is 1.94% of total target to achieve. Potential for GHG reduction is 2643 tonnes per year. 74 Table 73 : Summary of EE Strategy in Commercial & Industrial Sector EE Measures Units Targets 12155 Investment (INR) 24 Electricity Saved 2.63 Emissions Saved 2127 Indicative cost of replacing 100 watt incandescent with 15 watt CFL Nos. Indicative cost of replacing T8/T12 tube lights with T5 FTL Nos. 10085 50 0.36 288 Indicative cost of replacing conventional fans with EE fans Nos. 7320 110 0.14 114 Indicative cost of replacing conventional AC with EE star rated AC Nos. 413 64 0.14 115 248 3.26 2643 5.3. EE Strategy for Industrial Sector Kalyan Dombivli has around 1985 industrial units a registered customer of MSEDCL. They are also contributing a lot towards the huge energy consumption in Kalyan Dombivli city. Energy efficiency measures are the most financially feasible option in this sector too. (i) Replacement of incandescent with CFLs Industrial sector survey in Kalyan Dombivli city reveals that almost all of them use incandescent bulbs as lighting appliances. A 50 % target of replacing incandescent bulbs with CFLs is taken to provide the energy savings calculations below. Table 74 : Replacement of incandescent with CFLs in Industrial sector Total Industrial Consumers Consumers using incandescent bulb Target to replace incandescent bulb with CFL Number of incandescent bulb to be replaced per consumer Total number of incandescent bulb to be replaced Indicative cost of installation Energy saved by replacing 100W bulb with 20W CFL Cost of electricity savings Payback period Emission reduction per year 1985 89% 50% 9 7597 15 1640865 82 0.19 1329 Unit Nos. Nos. Nos. Lakh kWh lakh years Tonnes (ii) Replacement of T8/T12 by T5 tube lights The T12 and Tt8 tube lights are also frequently used in the industrial sector in Kalyan Dombivli city. Survey results show that almost 87% consumers use these appliances. The energy saving potential by replacement of T12 and T8 with more efficient T5 tube lights is calculated below assuming a replacement of 50% appliances in target households. The financial and technical details of the replacement in Kalyan Dombivli city industrial units are given below. 75 Table 75 : Replacement of T8/T12 tube lights Unit Total Industrial Consumers Consumers using T8/T12 tube lights Target to replace T8/T12 by T5 tube lights Number of incandescent bulb to be replaced per consumer Total number of T8/T12 tube lights to be replaced Indicative cost of installation Energy saved by replacing T8/T12(with magnetic ballast) with T5 Cost of electricity savings Payback period Emission reduction per year 1985 87% 50% 7 6303 32 222250 11 2.84 180 Nos. Nos. Nos. Lakh kWh Lakh years Tonnes (iii) Replacement of Conventional Fans by EE Star Rated Fans Conventional fans are other energy guzzlers in industrial units of Kalyan Dombivli city. They are used for longer hours in this sector hence the replacement of conventional energy efficient fans with more efficient ones would bring about a lot of energy savings. 53% of industrial units have installed a conventional fan which can be targeted for replacement. Assuming a replacement of 25% of the conventional fans with energy efficient fans the economics and technical details of replacement are tabulated below. Table 76 : Replacement of conventional fans by EE star rated fans Total Commercial Consumers Consumers using Conventional Fans Target to replace CF by EE Fans Number of Conventional fan to be replaced per consumer Total number of Conventional Fans to be replaced Indicative cost of installation Energy saved by replacing Conventional Fans by EE Fans Cost of electricity savings Payback period Emission reduction per year 1985 100% 25% 15 7320 110 140538 7 16 114 Unit Nos. Nos. Nos. Lakh kWh Lakh Years Tonnes (iv) Replacement of Conventional ACs with EE Star Rated ACs Almost 50 % of the surveyed industrial units in Kalyan Dombivli City had the ownership of air conditioning units in their office premises. Assuming the replacement of 10% of the air-conditioning units with star rated air conditioning units the figures related to installments and energy savings are given below. 76 Table 77 : Replacement of Conventional ACs with EE Star Rated ACs Total Industrial Consumers Consumers using Conventional ACs Target to replace Conventional ACs by EE star rated ACs Number of Conventional ACs to be replaced per household Total number of Conventional ACs to be replaced Indicative cost of installation Energy saved by replacing Conventional ACs by EE Star Rated ACs Cost of electricity savings Payback period Emission reduction per year 1985 49% 10% 2 165 26 56550 3 9 46 Unit Nos. Nos. Nos. Lakh kWh Lakh years Tonnes (v) Summary of EE Strategy in Industrial Sector Energy Efficiency measures with mere replacement of incandescent bulbs, inefficient fans, ac and refrigerators in industrial sector of Kalyan Dombivli city can save at least 2.06MU energy per year reducing GHG emission by 1669 tonnes per year. Table 78 : Summary of EE Strategy for Industrial Sector EE Measures Unit s Indicative cost of replacing 100 watt incandescent with 15 watt CFL Indicative cost of replacing T12/T8 tube lights with T5 tube lights Indicative cost of replacing conventional fans with EE star rated Nos. Nos. Nos. Nos. Nos. Indicative cost of replacing conventional AC with EE star rated AC Target 7597 6303 7320 165 Invest ment (INR) Electrici ty Saved (MU) Emission s Saved (Tonnes) 15 32 110 26 182 1.64 0.22 0.14 0.06 2.06 1329 180 114 46 1669 5.4. EE Strategy for Municipal Sector Municipal services annually incur huge expenditures on electricity consumption to cater to the local public services. Hence energy efficiency has become the call of the day for municipal organizations in India, owing to growing city needs. The Bureau of Energy Efficiency in India has already come out with the Manual for development of Municipal Energy Efficiency Projects. Energy conservation drives in the municipal corporations and councils will become an exemplary initiative for similar activities in eth city. As a high visibility and administration center Municipal bodies across India should go ahead in implementing the strategies and replicating the success stories. 5.4.1. EE measures in Street Lighting Street lighting is one of the major sources of energy consumption in municipal area. The different lighting appliances used for municipal lighting are the 150W HPSV lamps, 250W HPSV lamps, and T12 and T8 tube lights. 77 (i) Replacement of 250 watt HPSV with LEDs 250 watts high pressure sodium vapor lamps are frequently used in street lighting fixture in municipal area. They can be replaced with more energy efficient LEDS available in the Indian market today. A 100% target to replace 250W HPSV lamps with LEDs is taken for Kalyan Dombivli city, to provide the techno-economics of implementing the replacement and bringing about energy savings. Table 79 : Replacement of 150 watt HPSV with LED Total number of 250 watt HPSV Target to replace HPSV lamp with LEDs Total number of 112 watt LEDs needed Indicative cost of installation Energy saved by replacing 250 watt HPSV with 112 watt LED Cost of electricity savings Payback period Emission reduction per year 5142 100% 5142 2828 3108030 155 18.20 2518 Unit Nos. Nos. Lakh kWh Lakh years Tonnes (ii) Replacement of 40 watt T8/T12 tube lights with T5 tube lights In Kalyan Dombivli city T12 and T8 tube lights are frequently used in street lighting and survey results have revealed approximately 454 tube lights in municipal street lighting. 100% replacement of tube lights with in municipal street lighting should be targeted to bring about energy savings. Table 80 : Replacement of 40 watt T8/T12 tube lights with T5 tube lights Unit Total number of 40 watt Tube lights Target to replace incandescent bulb with CFL Total number of 112 watt LEDs needed Indicative cost of installation Energy saved by replacing 250 watt HPSV with 112 watt LED Cost of electricity savings Payback period Emission reduction per year (iii) 454 Nos. 100% 454 Nos. 2 Lakh 45736 kWh 2 Lakh 0.99 years 37 Tonnes Sensors for automatic on/off of street lights Automatic street lights ensure that energy is not wasted by lights turned on during day time. Many streetlights in India face this predicament due to faulty manually controlled street lights. Manual control involves labor costs, energy wastes and poor efficiency , hence Municipal street lights should hasten the process of installing automatic sensors. Solar sensors are the new and upcoming products in the market today and should be applied by municipalities for higher efficiency in the operation and maintenance of municipal street lights. Kalyan Dombivli city showed predominantly manual control of municipal street 78 lights and hence it is highly recommended for switch over to automatic sensors preferably solar automatic sensors. (iv) Energy Efficiency Measures in Water Pumping Water pumping is one of the major utility practices which consume high energy. The energy efficiency initiatives for water pumping in India have been going on for quite some time. BEE state in its Manual for Development of Municipal Energy Efficiency Projects states that 25% energy savings can be obtained from initiatives in water systems alone. In Karnataka Municipal energy efficiency Improvement initiatives, water pumping has been addressed. This has been further taken up as a Municipal Energy efficiency CDM project. The effort can be replicated throughput other municipalities sin India. This would bring about a lot of energy savings in water pumping utilities. The Table 19 : shows the electricity consumption in supplying water to different areas in the city. (v) Proper pump-system design (efficient Pump, pumps heads with system heads Proper water pumping design can bring about lots of energy savings in the running and maintenance cost of water pump systems. Careful designing is required to assess the volume of water to be pumped and the height it needs to be raised to. Fluid piping softwares can be utilized for designing water pumps in Municipal bodies. A 20% saving is assumed for design based energy efficiency of water pumping systems. The technoeconomics given below for this initiative is based on this assumption. Table 81 : Proper pump-system design (efficient Pump, pumps heads with system heads) Standard/Recommended Condition Annual Energy Consumption in MU Annual Energy Cost in Rs. (lacs) Saving % Total Annual Saving in MU Annual Saving in Rs. (lacs) eCO2 (Tonne) Reduction (vi) Value 21.5 752.5 20% 4.3 150.5 3483 Installation of variable speed drivers Dimension and adjustment losses are two of the major energy loss sources in pumping processes. Adjusting pump speed or using Variable Speed Driver to adjust speed is one way to decreasing both the aforementioned losses in pumping processes. An assumption of 5% savings is taken to provide the financial and technical details of installing variable speed drivers in municipal water pumping systems in Kalyan Dombivli City. 79 Table 82 : Variable Speed Drivers Standard/Recommended Condition Value Annual Energy Consumption in MU 21.5 Annual Energy Cost in Rs. (lacs) 752.5 Saving % (vii) 5% Total Annual Saving in MU 1.075 Annual Saving in Rs. (lacs) 37.625 eCO2 (Tonne) Reduction 870.75 Power saver installation in pump house An assumption of 15% savings is taken as the energy saving potential for installing power saver in municipal pump houses. The following techno-economics is based on this assumption. Table 83 : Power saver installation in pump house Standard/Recommended Condition Annual Energy Consumption in MU Annual Energy Cost in Rs. (lacs) Saving % Total Annual Saving in MU Annual Saving in Rs. (lacs) eCO2 (Tonne) Reduction (viii) Value 21.5 752.5 15% 3.225 112.875 2612.25 Energy Efficiency Measures in STP Pumping systems are utilized in water treatment plants of the municipal corporations whose energy efficiency can also be determined through efficient system design. A considerable amount of energy can be saved taking suitable measures in STP. KDMC should initiate energy audit in all its utility services and installations to take a stalk of the energy consumption and potential savings. (ix) Proper pump-system design (efficient pump, pumps heads with system heads) The same principle of speed adjustment to reduce adjustment and dimension energy losses in water pumping process applies in water treatment plants. An assumption of 5% saving is taken into consideration for giving the techno-economics of installing variable Table 84 : Proper pump-system design (efficient pump, pumps heads with system heads) Standard/Recommended Condition Value Annual Energy Consumption in MU 1.63 Annual Energy Cost in Rs. (lacs) 57.05 Saving % 20% Total Annual Saving in MU 0.326 Annual Saving in Rs. (lacs) 350 eCO2 (Tonne) Reduction 264 80 (x) Installation of variable speed drivers Installation of variable speed drivers for municipal pumps could save at least 5% energy resulting total savings of 0.8MU per year reducing 648 tonnes of GHG emission. Table 85 : Variable Speed Drivers Standard/Recommended Condition Value Annual Energy Consumption in MU 1.63 Annual Energy Cost in Rs. (lacs) 57.05 Saving % 5% Total Annual Saving in MU 0.08 Annual Saving in Rs. (lacs) 2.85 eCO2 (Tonne) Reduction (xi) 66 Power saver installation in pump house An assumption of 15% savings has been taken to calculate the energy saving potential and financial implications of installing power saver in pump houses. Table 86 : Power saver installation in pump house Standard/Recommended Condition (xii) Value Annual Energy Consumption in MU 1.63 Annual Energy Cost in Rs. (lacs) Saving % 57.05 15% Total Annual Saving in MU 0.2445 Annual Saving in Rs. (lacs) 8.56 eCO2 (Tonne) Reduction 198 Summary of EE Strategy for Municipal Sector The energy savings potential through energy efficiency measures in municipal sector is 22.60 MU per year which is about 9% of total target to achieve. 81 Table 87 : Summary of EE Strategy for municipal sector EE Measures Water Supply STP Invest ment (Lakh) Electricity Saved (MU) Emissions Saved (Tonnes) 454 2 0.05 37 5142 2828 3.11 2518 10316 84 2.38 1929 NA NA 4.30 3483 Installation of variable speed drivers NA NA 1.08 870.75 Standard/Recommended Condition Proper pump-system design (efficient Pump, pumps heads with system heads NA NA 3.23 2612.25 NA NA 0.33 264.06 Installation of variable speed drivers NA NA 0.08 66.015 NA NA 0.24 198.045 2914 14.79 11978 Indicative cost of replacing T8/T12 tube lights with T5 tube lights Indicative cost of replacing 250 watt HPSV with 112 watt LED 100% timer based operation and installation of power saver Proper pump-system design (efficient Pump, pumps heads with system heads Standard/Recommended Condition 82 CHAPTER 6 6. ACTION PLAN AND BUDGET 6.1. Year-wise Goals of Energy Savings The table below presents a summary of year wise goals for energy savings through introduction of renewable energy and taking energy efficiency measures. The goal is to minimum 10% reduction in projected total demand of 1680MU of conventional energy at the end of five years to be achieved through energy saving from energy efficiency measures and generation from renewable energy installations. The master plan sets a goal of total savings of 222.28MU with 113.18MU from renewable energy installation and 109.10MU from energy efficiency measures. Table 88 : Energy savings goal over 5 years solar city implementation period RE and EE Strategy for Kalyan Dombivli City Energy Savings target over 5 years period of implementation (MU per year) 2nd year 3rd year 4th year 5th year 1st Cumulati Cumulati Cumulati Cumulati Year ve ve ve ve % of savings target to achieve Emission reduction/ year RE for Residential Sector 8.30 20.75 37.36 58.11 83.02 49.41% 69231 RE for Commercial & Inst. Sector 0.50 1.25 2.25 3.50 5.00 2.98% 3187 RE for Industrial Sector 1.17 2.93 5.27 8.20 11.71 6.97% 9747 RE for Municipal Sector 0.10 4.70 6.50 13.16 13.46 8.01% 10903 Total for RE strategy 11.32 28.30 50.93 79.23 113.18 67.37% 93068 EE for Residential Sector 6.61 16.54 29.77 46.30 66.15 39.37% 53580 EE for Commercial Sector 2.51 6.27 11.28 17.55 25.08 14.93% 20312 EE for Industrial Sector 0.33 0.82 1.47 2.28 3.26 1.94% 2643 EE for Municipal Sector 1.46 3.65 6.58 10.23 14.61 8.70% 11838 Total for EE Strategy 10.91 27.28 49.10 76.37 109.10 64.94% 88372 RE and EE Combined Strategy 22.23 55.57 100.03 155.60 222.28 13% 33% 60% 93% 132% 181440 83 Figure 17 : Year wise energy savings targets for Kalyan Dombivli Solar City 84 Table 89 : Year wise Goal of Energy Savings 85 6.2. Physical Target and Action Plan The Master Plan for developing Kalyan Dombivli as Solar City sets a target of installing 3.38 MLPD capacity Solar water heater with a collector capacity of 67600 sqm, 25.80MWp cumulative solar PV systems, 525CuM Biogas systems, 2.03MWe waste to energy projects and 6201 nos. solar cookers. A list of renewable energy equipments and energy efficient devices has been presented in the table below. Table 90 : Physical target of RE systems and EE devices Renewable Energy Devices proposed Domestic Solar Water Heating System (100/125LPD system) x 1000LPD solar water heating system Solar cookers (Box and dish type) Community Solar Cooker Solar lanterns Use Solar Home Systems (SHS) 0.25 - 1.0kWp Solar PV system for inverters x 10kWp PV Power Plant for diesel abatement x 10CuM Biogas system from organic/food waste Solar Street Light Solar PV Traffic Lights Solar Blinkers (37Wp) Road Stud Solar PV Pumps Waste to Energy Power Plant Energy Efficient Devices proposed CFLs T5 tube light + Electronic Ballast to replace Efficient ceiling fans Star rated Acs Star rated refrigerators Star rated water pumps 112 watt LED Power saver 9769 2399 6106 95 12822 4274 36078 1198 53 1942 7 60 1875 8 3 Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. 167708 488512 276506 51150 74029 9190 5142 10316 Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. 86 Table 91 : Physical Target and Action Plan 87 6.3. Implementation Strategy 6.3.1. Establishment of the Solar City Cell The Solar City Cell is a very integral component of the MNRE’s Development of Solar Cities” Scheme. The basic purpose of establishing a Solar City cell is to ensure the parallel set up of a local site for exchange and collection of relevant data for sustenance, promotion and awareness generation of renewable energy and energy efficiency at the local level. The solar city cell will be the focal point and critical player for implementation of the solar city development programme. Solar City Cell will be established within the Kalyan Dombivli Municipal Corporation and will function under the full administration of the Kalyan Dombivli Municipal Corporation and the Council Chairman will be the highest level authorizing personnel. A senior technical officer at the level of executive engineer or above will be the overall in charge of the solar city cell. The officer in-charge will prepare all strategy and functioning modalities of the solar city cell. A full time technical expert will be associated to the Solar City Cell for day-to-day activities, documentation, communication and every other activity under Solar City Cell. The Solar City Cell will provide technical guidance, expertise and financial analyses of projects for potential investors- individual or companies. It will also help for customer outreach. It will act as a platform where all relevant stakeholders (citizens/manufacturers /banks/institutions etc.) can meet and exchange information on RE and EE. The Ministry of New and Renewable Energy, Government of India will provide Rs.10.00 Lakh (Rupees ten lakh only) for the establishment and operation the solar city cell for five years. The Kalyan Dombivli Municipal Corporation will provide space for the cell and depute one senior engineer/ technical person of the level of executive engineer or above as an overall in-charge of the solar city cell. The detailed functions and modus operandi of the solar city cell is elaborated in the guidebook for development of solar city, which is an integral part of this master plan. 6.3.2. Awareness and Publicity Awareness and Publicity Programme will be taken up to creating awareness among mass and target sectors in the city about benefits and financial incentive for targeted Renewable Energy systems & devices. Under these programmes, information on technological developments, financial benefits and cost savings from RE system and EE measures, government initiatives and incentives for such devices/ measures, availability, price etc will be disseminated through various media. The Solar City Cell will primarily take up these programmes. MNRE has earmarked Rs.20.00 lakh (Rupees twenty lakh) for each city for awareness and publicity activities under the solar city development programme. The following activities are proposed for creation of awareness and publicity. (i) Publicity through electronic media − − Production and telecast of documentary films, short duration films, TV spots/advertisements etc through local TV network Production and broadcast of Radio sponsored programmes, Radio Spots/jingles and Radio Talks etc. through local FM channels 88 − Creating an interactive E-Commerce website exclusively for “Kalyan Dombivli Solar City” for awareness campaigns, information sharing and support to the users for submission of online application for incentives etc. (ii) Print Media/Publication − − − Advertisements in colour and black & white in Newspapers/magazines/journals etc. Printing of booklets/folders/brochures/posters/calendars/Trade Guide/ Compendium/ Newsletters etc. on different promotional schemes under Kalyan Dombivli Solar City project. Develop educational programs on energy efficiency, distributed generation, and renewable energy systems in buildings for homeowners, businesses, government staff, and those in the building industries. (iii) Exhibitions, Outdoor Publicity, Campaign − − − − − − − Use of Exhibitions and Outdoor Publicity activities like hoardings, kiosks, bus panels, bus-stop shelters, wall paintings, computerized animation display systems, etc. in the city. Display and demonstration of RE and EE equipments in the Solar City Cell. Organizing runs, debates, seminars, quiz, drawing, model making, poster, essay and slogan writing competitions among others for school children and others; Promotion and publicity of RE and EE by displaying models and posters etc in different public places, institutions/organizations, hospitals, bus stand etc. Encourage maximum participation by residents and business owners in the City’s energy efficiency programs through marketing and education. Educate government purchasing agents in each City department regarding the benefits of Energy Star rated equipment, including the cost savings to the city. Encourage community input on strategies for improving energy efficiency in building. (iv) Workshops and Seminars It is proposed to organize workshops and seminars on specific technologies for targeted audiences from residential, commercial, Institutional, Industrial and Municipal Sectors. 6.3.3. Implementation of RE Strategy The solar city development programme will be implemented through joint participation of the residential citizens of the Kalyan Dombivli city, industries, commercial and institutional establishment, city municipal corporation, state government and Ministry of New and Renewable Energy. Financial assistance for installation of various renewable energy devices and systems will be availed as per the provisions of various schemes of the Ministry. Support for various other activities will also be availed as per the scheme provisions of MNRE. The ministry will give priority for support to the cities identified as potential Solar Cities. The Ministry, IREDA and other implementing institutions for promoting the use of renewable energy devices/systems, will consider these cities as priority cities. State Nodal Agency may also request the Ministry to allocate higher targets for installation of various renewable energy devices/systems in these cities under its different schemes through subsidies. Ministry of Urban Development would also be 89 approached for assistance under their schemes e.g., JNNURM, etc., as well as the Bureau of Energy Efficiency. The following activities are proposed to promote use of renewable energy and energy efficiency measures among different section of people, commercial establishment, institutions, municipality and industries. (I) Show casing and promotion of different MNRE programmes through different audiovisual publicity, workshop, exhibition, campaign etc. (II) Establishment of single window clearance mechanism to avail all government incentives. The Solar city cell can be used as a single point contact and clearance centre for all kinds of promotional activities and subsidies for RE and EE devices. (III) Creation of interactive web based tool for accepting application for availing incentives from MNRE/ State/ City (IV) Providing technical assistance to project developers in site assessment, feasibility and detailed project report preparation. (V) Providing assistance in conducting energy audit (VI) Involvement of financial institution/ IREDA for providing soft loan for large scale promotion of RE projects. (VII) Setting up of a high level committee including city administration, state nodal agency, developers, MNRE, RE/ EE experts, Finance institution stakeholders from different sectors to oversee and review implementation of the Master Plan (VIII) Provide additional subsidy/ incentives for those systems which have payback period more that 3 years (IX) Amend building bye-laws for making the use of solar water heating systems mandatory (X) Provide rebate in property tax through Municipal Corporations/ Municipalities & in electricity tariff though Utilities/ Electricity Boards to the users of solar water heaters especially in domestic sector. (XI) Comply MSW Rules 2000 notified by the MoEF and set up projects of suitable capacity for generating energy from the waste collected from the city/town. (XII) Conduct energy auditing of Govt./Public sector buildings, water pumping and street lightings in the city at regular interval and take necessary steps towards conservation of energy for the same. (XIII) Issue G.O as regards to construction of energy efficient solar buildings at least in Govt. /Public sectors in accordance with ECBC : 2006 and follow up its implementation rigorously. (XIV) Organize rigorous publicity, and also the training programmes/ business meets for various stake holders e.g. architects, engineers, builders & developers, financial institutions, NGOs, technical 90 institutions, manufactures/suppliers, RWAs etc. so as to involve them actively in meeting the objective of solar city. (XV) Generate necessary funds from State Govt. and other funding organizations for achieving the objective of making the city as “Solar City”. Benefits of the schemes of Govt. of India will also be taken in meeting the objectives. (XVI) Promote National Rating System for construction of energy efficient Green Buildings in particular to commercial and institutional buildings (XVII) Avail financial benefit from Carbon Market 6.3.4. Renewable Energy Pilot Projects MNRE will provide financial assistance for implementation of pilot projects in all the sectors. Five categories of projects in different RE technologies are proposed in each sector. It is proposed that MNRE will provide financial assistance to meet 75% of the project cost, KDMC/ State will support 15% and users will contribute 10% project cost. The total investment for implementation of all proposed pilot projects is estimated as Rs.311.59Lakh out of which MNRE will contribute Rs.233.69Lakh, City/ Sate will contribute Rs.46.74Lakh and the users will contribute Rs.31.16Lakh. All the pilot projects shall be executed in the first year of implementation. All the pilot projects shall be executed in the first year of implementation. The following tables show pilot projects proposed and financial implication thereon in different sectors in the city. Table 92 : Pilot Projects in Residential Sector Sl. No. 1 2 3 4 5 Proposed Pilot Projects Solar lanterns for roadside markets/ hawkers to replace kerosene lamps PV system for Home inverter PV system to replace Home Generator Solar Water Heating System for residential Apartment Complex PV Power Plant for residential apartment Complex Total Capacity Unit Nos. Cost per system (Lakh) Total cost (Lakh) MNRE Share (Lakh) Users share (Lakh) 2.25 City/ State Share (Lakh) 0.45 10 Wp 100 0.03 3.00 250 1 5000 Wp kWp LPD 10 5 2 0.30 2.00 5.00 3.00 10.00 10.00 2.25 7.50 7.50 0.45 1.50 1.50 0.30 1.00 1.00 25 kWp 2 30.00 60.00 45.00 9.00 6.00 86.00 64.50 12.90 8.60 0.30 91 Table 93 : Pilot Projects in Commercial and Institutional Sector Sl. No. Project Community Solar Cooker for mid day meal in schools Solar Water hearts for Hospitals Biogas system for Restaurants Solar Water Heater for Restaurants PV system for educational institutes Total 1 2 3 4 5 Capacity Unit Nos. 1 5000 10 5000 6 No. LPD CuM LPD kWp 10 2 2 2 2 Cost per system (Lakh) Total cost (Lakh) MNRE Share (Lakh) City/ State Share (Lakh ) Users share (Lakh ) 0.20 5.00 0.50 5.00 12.91 2.00 10.00 1.00 10.00 25.82 48.82 1.50 7.50 0.75 7.50 19.36 36.61 0.30 1.50 0.15 1.50 3.87 7.32 0.20 1.00 0.10 1.00 2.58 4.88 Total cost (Lakh) MNRE Share (Lakh) Users share (Lakh) 10.00 4.00 7.50 3.00 City/ State Share (Lakh) 1.50 0.60 Table 94 : Pilot Projects in Industrial Sector Sl. No. 1 2 3 4 5 Project Biogas system for restaurants PV System for Leather Industries Solar Water Heaters for Food processing Solar PV system for Garment Industry Solar steam generator process heating Total Capacity Unit Nos. 10 1 CuM kWp 5 2 Cost per system (Lakh) 2.00 2.00 2000 0.5 LPD kWp 2 2 2.00 1.00 4.00 2.00 3.00 1.50 0.60 0.30 0.40 0.20 1 Nos. 2 1.00 2.00 22.00 1.50 16.50 0.30 3.30 0.20 2.20 Cost per system (Lakh) Total cost (Lakh) MNRE Share (Lakh) City/ State Share (Lakh) Users share (Lakh) 1.00 0.40 Table 95 : Pilot Projects in Municipal Sector Sl. No. 1 2 3 4 5 Project Solar PV power plant for Municipal building/ bus stand Solar Streetlights/ traffic lights/ blinkers Solar PV system for markets Outdoor PV systems for Municipal Parks Solar Hoardings Total Capacity Unit Nos. 25 kWp 2 50.00 100.00 75.00 15.00 10.00 74 500 Wp Wp 100 5 0.20 0.60 20.00 3.00 15.00 2.25 3.00 0.45 2.00 0.30 1 1 No. No. 2 10 8.39 1.50 16.78 15.00 154.78 12.58 11.25 116.08 2.52 2.25 23.22 1.68 1.50 15.48 92 Table 96 : Summary of Pilot Projects and indicative project cost implication Sl. No. 1 2 3 4 6.4. Project Total cost (Lakh) Pilot Project in Residential Sector Pilot Projects in Commercial & Institutional Sector Pilot Projects in Industrial Sector Pilot Projects in municipal Sector Total 86.00 48.82 22.00 154.78 311.59 MNRE Share (Lakh) 64.50 36.61 16.50 116.08 233.69 City/ State Share (Lakh) 12.90 7.32 3.30 23.22 46.74 Users share (Lakh) 8.60 4.88 2.20 15.48 31.16 Financial outlays and sharing of fund The total indicative budget for development of Kalyan Dombivli as Solar City is estimated at Rs.668.71 crore which will be invested over the 5 years of implementation period of solar city development programme. The total budget will be shared by the state government/ City authority (5%), MNRE (33%) and the private users (62%). The budget for implementation of RE strategy and EE strategy is estimated at Rs.463.87 crore and is Rs.191.43 crore respectively. Budget for establishment of the Solar City Cell and awareness and publicity is estimated at Rs.48.30 Lakhs which could be enhanced depending upon the requirement. While budget for RE strategy will be shared among MNRE, state/city and private users, private investors will primarily drive EE activities. A substantial amount of investment could be recovered or the entire project could be partially financed through carbon finance mechanism. A suitable methodology will be adopted to avail benefit from carbon market selling the CER generated from the project. Table 97 : Sharing of budget for development of Kalyan Dombivli Solar City Sharing of fund Year 1 (Crore) Year 2 (Crore) Year 3 (Crore) Year 4 (Crore) Year 5 (Crore) Total (Crore) State / City Share 3.10 4.65 6.20 7.75 9.30 30.99 MNRE Share 21.58 34.48 43.53 55.80 64.44 219.83 Private Share 40.98 64.37 83.00 106.63 122.93 417.90 Total Budget 65.66 103.49 132.72 170.17 196.67 668.71 93 Figure 18 : Sharing of total budget for development of solar city Kalyan Dombivli Figure 19 : Sharing of RE Strategy Budget for Kalyan Dombivli Solar City Figure 20 : Sharing of EE Strategy Budget for Kalyan Dombivli Solar City 94 Figure 21 : Year wise sharing of budget for Kalyan Dombivli Solar City Programme 95 Table 98 : Sector wise total budget and annual expenses Unit Total Year 1 Year 2 Year 3 Year 4 Year 5 MNRE contribution for RE strategy Establishment of Solar city cell Lakh 10.00 3.52 1.62 1.62 1.62 1.62 Publicity and awareness Lakh 28.00 8.15 8.15 5.60 3.05 3.05 RE for residential sector Lakh 16295.06 1629.51 2444.26 3259.01 4073.77 4888.52 RE for Commercial & Inst. sector Lakh 767.97 76.80 115.20 153.59 191.99 230.39 RE for Industrial sector Lakh 3406.03 340.60 510.90 681.21 851.51 1021.81 RE for Municipal sector Lakh 996.40 99.64 149.46 199.28 249.10 298.92 W2E Project form MSW & STPs Lakh 479.65 0.00 218.02 52.33 209.30 0.00 21983.12 2158.22 3447.61 4352.64 5580.34 6444.31 10.30 0.70 2.40 2.40 2.40 2.40 MNRE State/city contribution Establishment of solar city cell RE for Institutional sector Lakh 263.72 26.37 39.56 52.74 65.93 79.12 RE for Municipal sector Lakh 966.40 96.64 144.96 193.28 241.60 289.92 1843.33 184.33 276.50 368.67 460.83 553.00 14.79 1.48 2.22 2.96 3.70 4.44 3098.54 309.85 464.78 619.71 774.63 929.56 EE measures for Inst. sector EE measures for Municipal sector State / City Private/ Users contribution RE for residential sector Lakh 18267.18 1826.72 2740.08 3653.44 4566.79 5480.15 RE for Commercial & Inst. sector Lakh 777.58 77.76 116.64 155.52 194.39 233.27 RE for Industrial sector Lakh 4616.32 461.63 692.45 923.26 1154.08 1384.89 RE for Municipal sector Lakh 30.00 3.00 4.50 6.00 7.50 9.00 EE for Residential sector Lakh 11506.19 1150.62 1725.93 2301.24 2876.55 3451.86 EE for Commercial & Inst. sector Lakh 5529.98 553.00 829.50 1106.00 1382.50 1658.99 EE measures for Industrial sector Lakh 248.40 24.84 37.26 49.68 62.10 74.52 Private Investor for W2E projects Lakh 813.95 0.00 290.70 104.65 418.60 0.00 41789.59 4097.56 6437.04 8299.78 10662.51 12292.69 66871.25 6687.12 10030.69 13374.25 16717.81 20061.37 Private/ Users Total Lakh 96 Table 99 : Budget and Sharing of fund 97 6.5. Potential Carbon Market Benefit The RE and EE activities under solar city programme will considerable amount of green house emission per year. The CER generated under this project can be sold to carbon market under suitable mechanism. It is estimated that a total of 181440 CER could be sold from the project which will give a revenue of Rs.13.06 crore per year. If project life is considered 10 years, the income from carbon market will recover about 20% of the project cost. Table 100 : Potential Carbon Market Benefit Assumption: Value of CER = 12 Euro; 1Euro= 60 INR Energy Saved (MU) CER (Tonnes) Value (Lakh/ year) CER from RE strategy 113.18 93068 670.09 CER fro EE strategy 109.10 88372 636.28 CER from entire solar city project 222.28 181440 1306.37 98 7. Annexure I – Pilot Project I Project Proposals for Solar Thermal Systems/ Devices Under Development of Solar City Programme of MNRE 1. Title of the Project : Solar Water Heating System for Hospitals in Kalyan Dombivli Municipal Area 2. Name of the Project Proponent : Kalyan Dombivli Municipal Corporation 3. Socio- Economic Justification of the Project: There are many benefits of from solar water heater, and number one is economics. Solar water heater economics compare quite favorably with those of electric water heaters, while the economics aren't quite so attractive when compared with those of gas water heaters. Heating water with the sun also means longterm benefits, such as being cushioned from future fuel shortages and price increases, and environmental benefits. Economic Benefits Solar water heaters offered the largest potential savings compared to electric heating, with solar waterheater owners saving as much as 50% to 85% annually on their utility bills over the cost of electric water heating. Typical simple payback period of a solar water heating system is 2 to 3 years. Tax Incentives and Rebates Ministry of New and Renewable Energy (MNRE) offers subsidies on domestic as well as commercial solar water heating systems installations. Government of India offers 80% depreciation claim in the first two years itself on installation of commercial solar water heating systems. Long-Term Benefits Solar water heaters offer long-term benefits that go beyond simple economics. In addition to having free hot water after the system has paid for itself in reduced utility bills, it contributes towards future fuel shortages and price increases and reduce country's dependence on foreign oil. Environmental Benefits Solar water heaters do not pollute and contribute in reduction of GHG emission. A 100 LPD solar water heater system when replaces an electric water heater, the electricity displaced over 20 years represents more than 30 tons of avoided carbon dioxide emissions alone. 4. Benefits of the proposed project: There are 220 hospitals Kalyan Dombivli Municipal area out of which 190 hospitals with intake capcity less then 50 beds and 30 hospitals with 50-100 beds. in It is proposed to install Solar Water Heating systems in all hospitals in KDMC area. Total potential for solar water heating systems in the hospital sector is estimated to be 470000 LPD. Complete installation of solar water heaters in the hospitals will save about 7.20MU electricity per year and reduce about 6000 tons of GHG per year. The target for the first phase is to install 130000LPD solar water heating systems in 60 hospitals. 99 Ministry of New and Renewbale Energy (MNRE) declared KDMC as a “Solar City” and a master plan has been prepared to reduce 10% energy consumption through renewable energy and energy efficiency measures. The master plan sets a goal to reduce 168MU electricity per year within 5 years period. Implementation of solar water heating projects in hospitals alone can contribute 4.3% towards the set goal. Most importantly, hospitals will save considerable amount of electricity and will enjoy free hotwater within 2-3 years of payback on the investment. They will avail subsidy from the MNRE and may avail 80% depreciation benefit in the first two years. PART-A: Details of the Project Proponent I II III IV Name of the Project Proponent: Kalyan Dombivli Municipal a) Renewable Energy Service Providing Corporation, Kalyan Dombivli, Company (RESCO) Maharashtra. b) Financial Institutions (Banks, NBFCs, MFIs) c) Financial Integrator Category: Program Administrator. d) System Integrator e) Program Administrator Name, Designation and Address of the Authorized Name: The Commissioner Representative for correspondence with telephone Address: Kalyan Dombivli no, fax & email Municipal Corporation KDMC, Shankarrao Chowk, Kalyan West - 421301 In case of Channel Partner other than Programme Administrator, the following information will be provided: Name and Category of Project Proponent a) Whether commercial or non-commercial. b) Copy of Articles of Association, Registration NA No. & Date c) Audited Balance Sheet for last three years d) Annual Report of previous year e) Whether MNRE has earlier sanctioned any Solar Thermal project (s) for implementation to the Project Proponent, if yes, please furnish information Autonomous Institution set by In case of 1 (e), Please indicate: State Government (Urban Local a) Government Department, Autonomous Body) Institution set up by Central/ State Government, State renewable Energy development agency, Public Sector Undertaking b) Others 100 PART-B: Details of the Project Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. It has not only made its presence felt in terms of overall development and commercialization but also in its many eco drives for a sustainable future. Kalyan Dombivli has been approved by the Ministry of New and Renewable Energy to be developed as a solar city. Kalyan Dombivli Municipal Corporation (KDMC) is the main organization which is responsible for urban governance and civic management in the city of Kalyan Dombivli. The corporation has a democratically elected leadership from the constituencies within the geographic jurisdiction of the corporation boundaries. Kalyan Dombivli Municipal Corporation is a very active organization for initiating good practices and it has also come with the added supportive policy framework from Maharasthra Government for the implementation of renewable energy initiatives. There are 220 hospitals in KDMC area out of which 190 hospitals with less then 50 beds and 30 hospitals have capacity of 50-100 beds. All the hospitals uses electric geysers to fulfill their hot water demand. It is proposed to install solar water heaters in all the hospitals in phased manner as a part of solar city activities. In the first phase, 10 hospitals of 50-100 bed capacity will be installed solar water heaters of capacity 3000LPD each. Similarly, 50 hospitals having less then 50 beds will be installed with 2000LPD solar water heaters. 1. Details of Project site: The Kalyan Dombivli city is located at geographical coordinates of 27.18 N and 78.02 E. The administrative building of Kalyan Dombivli Municipal Corporation is located in the heart of the city. Average annual solar radiation in Kalyan Dombivli is 5.08kWh/m2/day. 2. Details of Project Beneficiaries: Kalyan Dombivli Municipal Corporation (KDMC) will be the direct beneficiary of the project. KDMC is responsible for providing the basic services infrastructure to city dwellers. The services include water supply, sewage treatment and disposal, solid waste management, disaster management, buildings and roads, street lighting, maintenance of parks and open spaces, cemeteries and crematoriums, conservation of heritage sites, and registering of births and deaths. 3. Details of Proposed Systems : I. II. Proposed capacity of the Solar Water Heating System is as below: Unit Capcity (LPD) Proposed Units Gross Capcity (LPD) 50-100 bedded hospitals 3000 10 30000 20- 50 bedded 2000 50 100000 Availability of shadow free roof area for the power plant : Sufficient area (90 sqm for 3000LPD and 70sqm for 2000LPD system) is available in each hospital. 101 PART C: Implementation Schedule • Major Monitorable Milestones Sl. No. 1 2 3 4 5 6 7 • Activities 1 2 3 Progress Months 4 5 6 7 8 Application/ clearance from MNRE Procurement Process Site survey & ystem integration layout Erection of collector mounting Structures Installation of Collectors & storage tank Distribution Pipings Testing and commissioning Project Commissioning Timeline Project can be completed within 6 months from the date of finalization of technology partner. PART D: Performance Monitoring Mechanism: Performance will be monitored with facilities for daily, monthly & annual (Daily, Monthly and Annual energy generation, power generation. Energy meters and logging, compilation and sharing with MNRE) data loggers will be installed accordingly. Performance Data Monitoring Monthly monitoring of reduction in diesel/electricity/ other fuel consumption, if any. Yes Own Mechanism In built monitoring system with energy meter and data logger will installed Third Party 5 years AMC will be signed with the supplier Yes PART E: Project Cost and Financing Details. i. Cost of Systems Hardware ii. Cost of transportation and insurance iii. Cost of civil works and electrical works iv. Cost of installation and commissioning v. Cost of Annual Maintenance for 5 years vi. Any other cost Total Cost of the Systems/Project Total Capacity & Collector Area 211.00Lakh 4.00Lakh 16.00Lakh 16.00Lakh 4.00Lakh 20.00Lakh 251.00Lakh 130000LPD (2600sqm) 102 Means of Finance a) Contribution of Project Proponent b) Contribution of Beneficiaries organization c) Envisaged CFA from MNRE d) Other Source (s) of Funding (capital grant) e) Envisaged Soft Loan assistance, if any f) Whether funds are in surplus or deficiency Details of Project Revenue recurring, if any NA Project Duration 6 months a) Contribution of Project Proponent b) Contribution from beneficiaries: c) CFA from MNRE 165.20Lakh 85.80Lakh PART F: Operation and Maintenance Arrangements The supplier will train engineers and technicians of KDMC / hospital authority for day to day operation, monitoring and scheduled maintenance work such as cleaning, topping up of batteries etc. - Detail of Operation and Maintenance Arrangements. The system will be procured with minimum 5 years comprehensive annual maintenance contract service. During this period engineers and technicians from KDMC/ hospital will be trained for O&M of the system. - Arrangement for Energy Savings Data Collection (i) Flow meter will be installed where in manual recording of the reading will be maintained in a log. The reading will be taken on a regular periodic basis. (ii) Data logging system for recording water temperature would be installed. This system will keep a log of the cold water and hot water at the inlet and outlet of the SWH system respectively. (iii) Energy delivered in kcal by the SWH system will be calculated based on the quantity of the water consumed and temperature rise of the water (Δt). (iv) The flow meter reading needs to be taken regularly and average from the temperature logging system needs to be noted regularly. (v) Collected data will be reported to MNRE/ designated agencies on regular basis - Method of monitoring of reduction in conventional fuel consumption, if any. - NA - Strategy for training of the O&M Personnel of the Beneficiary Organization. As stated above 103 PART G: Declarations It is certified that I/we have read the guidelines issued by the Ministry vide 5/23/2009/P&C dated 16th June, 2010 and the related provisions/terms and conditions for availing financial support from the Ministry of New and Renewable Energy and I agree to abide by these guidelines and related terms and conditions. I understand that failure to comply by these guidelines may result in denial of financial support by the Ministry. I confirm that the present proposal in full or part has not been submitted / has been submitted to any other agency for seeking support (In case proposal has been submitted to any other agency or under consideration all details and a copy of the proposal must be submitted along with the present proposal). I confirm that I will not submit the same proposal or a part thereof to any other funding agency, without prior knowledge of the Ministry of New and Renewable Energy. I confirm that the share of project proponent/beneficiaries shall not be lower than 20% in any circumstances. Projects owned by the Programme Administrators are exempt from this condition. I confirm that the proposed solar thermal system(s) have not been installed/supplied at the proposed sites or to the proposed beneficiaries, prior to the receipt of project sanction letter from the Ministry. There is no duplication in the proposal and the submitted proposal is the only proposal by the proponent and to the best of my / our knowledge no other organization has submitted any proposal for the systems at these site(s) to MNRE for financial support. A detailed site survey has been done/or will be undertaken to identify the beneficiaries before actual supply and installation takes place. In case of System Integrators, the beneficiaries will be charged net of MNRE subsidy towards cost of systems installed by them at their respective places. I confirm that in case of any dispute, the decision of Secretary, Ministry of New and Renewable Energy, Government of India will be final and binding on all. Signature _____________ Name & Designation of Authorized Signatory Seal Place: Date: 104 Annexure DETAILS OF SYSTEMS TO BE INSTALLED Sl. no Systems to be installed Type of systems/ collector to be used* 1 Solar water heating systems Flat plate type Place(s) of installation** No. of systems No. of collecto rs/ dishes Total collector area (sq. m) Applicatio n Total cost of systems/ units including AMC for 5 yrs (apprx) Subsidy sought from MNRE @ Rs.3300/s q. m 50 beded Hospitals 10 300 600 Hot water 58.00 Lakh 19.80 <50 bedded hospitals 50 1000 2000 Hot water 193.00 Lakh 66.00 60 1300 2600 251.00 85.80 State subsidy to be availed if any @ Rs. ---- Expected date of completion a) Domestic b) Others Sept 2011 ETC type a) Domestic b) Others Storage collector cum type * Only those systems will be eligible for subsidy which have BIS/MNRE standards/ specifications or have approval from test centers of MNRE ** For domestic systems, only area of operation/implementation will be mentioned This is to certify that the various components of the Solar Thermal System (s) conform to the Relevant Standards, as mentioned in the Guidelines for Off-grid and Decentralized Solar Applications for Solar Collectors and components under JNNSM. Copies of the Relevant BIS/MNRE Certificates/specifications should be enclosed. Note: It is mandatory to provide technical performance specifications of each component of the system(s) to be installed under the project and for which the performance will be warranted. All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry. (Signature & Seal of Channel partner) as Head of Organization 105 8. Annexure II – Pilot Project II Project Proposals for Solar Thermal Systems/ Devices Under Develppment of Solar City Programme of MNRE 1. Title of the Project : Solar Water Heating System for Hotels and Restaurants in Kalyan Dombivli Municipal Area 2. Name of the Project Proponent : Kalyan Dombivli Municipal Corporation 3. Socio- Economic Justification of the Project: There are many benefits of from solar water heater, and number one is economics. Solar water heater economics compare quite favorably with those of electric water heaters, while the economics aren't quite so attractive when compared with those of gas water heaters. Heating water with the sun also means longterm benefits, such as being cushioned from future fuel shortages and price increases, and environmental benefits. Economic Benefits Solar water heaters offered the largest potential savings compared to electric heating, with solar waterheater owners saving as much as 50% to 85% annually on their utility bills over the cost of electric water heating. Typical simple payback period of a solar water heating system is 2 to 3 years. Tax Incentives and Rebates Ministry of New and Renewable Energy (MNRE) offers subsidies on domestic as well as commercial solar water heating systems installations. Government of India offers 80% depreciation claim in the first two years itself on installation of commercial solar water heating systems. Long-Term Benefits Solar water heaters offer long-term benefits that go beyond simple economics. In addition to having free hot water after the system has paid for itself in reduced utility bills, it contributes towards future fuel shortages and price increases and reduce country's dependence on foreign oil. Environmental Benefits Solar water heaters do not pollute and contribute in reduction of GHG emission. A 100 LPD solar water heater system when replaces an electric water heater, the electricity displaced over 20 years represents more than 30 tons of avoided carbon dioxide emissions alone. 4. Benefits of the proposed project: There are about 720 restaurants and food carts in Kalyan Dombivli Municipal area out of which 100 restaurants are of medium size, 50 are large, 350 are small and 225 are foodcarts. There are 5 budget hotels in the municipalty area. It is proposed to install Solar Water Heating systems in hotels and restaurants in KDMC area based on the hot water demand and available area for installation of such systems. Total potential for solar water heating systems in the hotels and restaurants is estimated to be 432000 LPD. Complete installation of solar water heaters in the hospitals will save about 7.60MU electricity per year and reduce about 6460 tons of GHG per year. The target for the first phase is to install 140000LPD solar water heating systems in 5 hotels, 10 large restaurants, 25 medium restaurant and 50 small restaurant. 106 Ministry of New and Renewbale Energy (MNRE) declared KDMC as a “Solar City” and a master plan has been prepared to reduce 10% energy consumption through renewable energy and energy efficiency measures. The master plan sets a goal to reduce 168MU electricity per year within 5 years period. Implementation of solar water heating projects in hotels and restaurant can contribute 4.5% towards the set goal. Most importantly, hotels and restaurants will save considerable amount of electricity and will enjoy free hot water within 2-3 years of payback on the investment. They will avail subsidy from the MNRE and may avail 80% depreciation benefit in the first two years. PART-A: Details of the Project Proponent I II III IV Name and Category of Project Proponent a) Renewable Energy Service Providing Company (RESCO) b) Financial Institutions (Banks, NBFCs, MFIs) c) Financial Integrator d) System Integrator e) Program Administrator Name, Designation and Address of the Authorized Representative for correspondence with telephone no, fax & email Name of the Project Proponent: Kalyan Dombivli Municipal Corporation, Kalyan Dombivli, Maharashtra. Category: Program Administrator. Name: The Commissioner Address: Kalyan Dombivli Municipal Corporation KDMC, Shankarrao Chowk, Kalyan West - 421301 In case of Channel Partner other than Programme Administrator, the following information will be provided: a) Whether commercial or non-commercial. b) Copy of Articles of Association, Registration No. & Date NA c) Audited Balance Sheet for last three years d) Annual Report of previous year e) Whether MNRE has earlier sanctioned any Solar Thermal project (s) for implementation to the Project Proponent, if yes, please furnish information In case of 1 (e), Please indicate: Autonomous Institution set by a) Government Department, Autonomous State Government (Urban Local Institution set up by Central/ State Body) Government, State renewable Energy development agency, Public Sector Undertaking b) Others PART-B: Details of the Project Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. It has not only made its presence felt in terms of overall development and commercialization but also in its many eco drives for a sustainable future. Kalyan Dombivli has been approved by the Ministry of New and Renewable Energy to be developed as a solar city. Kalyan Dombivli Municipal Corporation (KDMC) is the main organization which is responsible 107 for urban governance and civic management in the city of Kalyan Dombivli. The corporation has a democratically elected leadership from the constituencies within the geographic jurisdiction of the corporation boundaries. Kalyan Dombivli Municipal Corporation is a very active organization for initiating good practices and it has also come with the added supportive policy framework from Maharasthra Government for the implementation of renewable energy initiatives. There are about 720 restaurants and food carts in Kalyan Dombivli Municipal area out of which 100 restaurants are of medium size, 50 are large, 350 are small and 225 are foodcarts. There are 5 budget hotels in the municipalty area. It is proposed to install Solar Water Heating systems in hotels and restaurants in KDMC area based on the hot water demand and available area for installation of such systems. The target for the first phase is to install 140000LPD solar water heating systems in 5hotels, 10 large restaurants, 25 medium restaurant and 50 small restaurant. 4. Details of Project site: The Kalyan Dombivli city is located at geographical coordinates of 27.18 N and 78.02 E. The administrative building of Kalyan Dombivli Municipal Corporation is located in the heart of the city. Average annual solar radiation in Kalyan Dombivli is 5.08kWh/m2/day. 5. Details of Project Beneficiaries: Kalyan Dombivli Municipal Corporation (KDMC) will be the direct beneficiary of the project. KDMC is responsible for providing the basic services infrastructure to city dwellers. The services include water supply, sewage treatment and disposal, solid waste management, disaster management, buildings and roads, street lighting, maintenance of parks and open spaces, cemeteries and crematoriums, conservation of heritage sites, and registering of births and deaths. 6. Details of Proposed Systems : Proposed capacity of the Solar Water Heating System: Beneficiaries Budget Hotels Large Restaurant Medium Restaurant Small Restaurant III. Capcity of SWH (LPD) 2000 3000 2000 1000 Target 5 10 25 50 Total Total Capacity (LPD) 10000 30000 50000 50000 140000 Availability of shadow free roof area for the power plant : Sufficient area (90 sqm for 3000LPD, 70sqm for 2000LPD system and 35sqm for 1000LPD) is available in the proposed hotels and restaurants. PART C: Implementation Schedule • Major Monitorable Milestones No. 1 2 3 4 5 6 7 S Activities 1 2 3 Progress Months 4 5 6 7 8 Application/ clearance from MNRE Procurement Process Site survey & ystem integration layout Erection of collector mounting Structures Installation of Collectors & storage tank Distribution Pipings Testing and commissioning 108 • Project Commissioning Timeline Project can be completed within 6 months from the date of finalization of technology partner. PART D: Performance Monitoring Mechanism: Performance Data Monitoring Performance will be monitored with (Daily, Monthly and Annual energy generation, facilities for daily, monthly & annual logging, compilation and sharing with MNRE) power generation. Energy meters and data loggers will be installed accordingly. Monthly monitoring of reduction in Yes diesel/electricity/ other fuel consumption, if any. Own Mechanism In built monitoring system with energy meter and data logger will installed Third Party 5 years AMC will be signed with the supplier Yes PART E: Project Cost and Financing Details. i. ii. iii. iv. v. vi. 213.00Lakh 4.00Lakh 16.00Lakh 16.00Lakh 20.00Lakh 4.00Lakh Cost of Systems Hardware Cost of transportation and insurance Cost of civil works and electrical works Cost of installation and commissioning Cost of Annual Maintenance for 5 years Any other cost Total Cost of the Systems/Project Total Capacity & Collector Area Means of Finance 140000LPD (2800sqm) 271.00Lakh a) Contribution of Project Proponent b) Contribution of Beneficiaries a) Contribution of Project Proponent organization c) Envisaged CFA from MNRE d) Other Source (s) of Funding (capital b) Contribution from beneficiaries: 178.60Lakh grant) c) CFA from MNRE 92.40Lakh e) Envisaged Soft Loan assistance, if any f) Whether funds are in surplus or deficiency Details of Project Revenue recurring, if any Project Duration NA 6 months PART F: Operation and Maintenance Arrangements The supplier will train engineers and technicians of KDMC / hotels/restaurant authority for day to day operation, monitoring and scheduled maintenance work such as cleaning, topping up of batteries etc. 109 - Detail of Operation and Maintenance Arrangements. The system will be procured with minimum 5 years comprehensive annual maintenance contract service. During this period engineers and technicians from KDMC/ hotels/restaurants will be trained for O&M of the system. - Arrangement for Energy Savings Data Collection a) Flow meter will be installed where in manual recording of the reading will be maintained in a log. The reading will be taken on a regular periodic basis. b) Data logging system for recording water temperature would be installed. This system will keep a log of the cold water and hot water at the inlet and outlet of the SWH system respectively. c) Energy delivered in kcal by the SWH system will be calculated based on the quantity of the water consumed and temperature rise of the water (Δt). d) The flow meter reading needs to be taken regularly and average from the temperature logging system needs to be noted regularly. e) Collected data will be reported to MNRE/ designated agencies on regular basis - Method of monitoring of reduction in conventional fuel consumption, if any. - NA - Strategy for training of the O&M Personnel of the Beneficiary Organization. As stated above 110 PART G: Declarations It is certified that I/we have read the guidelines issued by the Ministry vide 5/23/2009/P&C dated 16th June, 2010 and the related provisions/terms and conditions for availing financial support from the Ministry of New and Renewable Energy and I agree to abide by these guidelines and related terms and conditions. I understand that failure to comply by these guidelines may result in denial of financial support by the Ministry. I confirm that the present proposal in full or part has not been submitted / has been submitted to any other agency for seeking support (In case proposal has been submitted to any other agency or under consideration all details and a copy of the proposal must be submitted along with the present proposal). I confirm that I will not submit the same proposal or a part thereof to any other funding agency, without prior knowledge of the Ministry of New and Renewable Energy. I confirm that the share of project proponent/beneficiaries shall not be lower than 20% in any circumstances. Projects owned by the Programme Administrators are exempt from this condition. I confirm that the proposed solar thermal system(s) have not been installed/supplied at the proposed sites or to the proposed beneficiaries, prior to the receipt of project sanction letter from the Ministry. There is no duplication in the proposal and the submitted proposal is the only proposal by the proponent and to the best of my / our knowledge no other organization has submitted any proposal for the systems at these site(s) to MNRE for financial support. A detailed site survey has been done/or will be undertaken to identify the beneficiaries before actual supply and installation takes place. In case of System Integrators, the beneficiaries will be charged net of MNRE subsidy towards cost of systems installed by them at their respective places. I confirm that in case of any dispute, the decision of Secretary, Ministry of New and Renewable Energy, Government of India will be final and binding on all. Signature _____________ Name & Designation of Authorized Signatory Seal Place: Date: 111 Annexure DETAILS OF SYSTEMS TO BE INSTALLED Sl. no Systems to be installed Type of systems/ collector to be used* 1 Solar water heating systems Flat plate type a) Domestic b) Others Place(s) of installation** No. of system s No. of collecto rs/ dishes Total collector area (sq. m) Applicatio n Hotels Large Restaurants Med Restaurant Small Restaurant Total 5 10 25 50 90 100 300 500 500 1400 200 600 1000 1000 2800 Hot water Hot water Hot water Hot water Hot water Total cost of systems/ units including AMC for 5 yrs (apprx) Subsidy sought from MNRE @ Rs.3300/s q. M State subsidy to be availed if any @ Rs. ---- Expected date of completi on 271.00Lac 92.40Lac 178.60Lac Sept 2011 ETC type a) Domestic b) Others Storage cum collector type * Only those systems will be eligible for subsidy which have BIS/MNRE standards/ specifications or have approval from test centers of MNRE ** For domestic systems, only area of operation/implementation will be mentioned This is to certify that the various components of the Solar Thermal System (s) conform to the Relevant Standards, as mentioned in the Guidelines for Off-grid and Decentralized Solar Applications for Solar Collectors and components under JNNSM. Copies of the Relevant BIS/MNRE Certificates/specifications should be enclosed. Note: It is mandatory to provide technical performance specifications of each component of the system(s) to be installed under the project and for which the performance will be warranted. All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry. (Signature & Seal of Channel partner) as Head of Organization 112 9. Annexure III – Pilot Project III Project Proposals for Solar Thermal Systems/ Devices Under Develppment of Solar City Programme of MNRE 1. Title of the Project : Solar Water Heating System for Residential Apartment Building in Kalyan Dombivli Municipal Area 2. Name of the Project Proponent : Kalyan Dombivli Municipal Corporation 3. Socio- Economic Justification of the Project: There are many benefits of from solar water heater, and number one is economics. Solar water heater economics compare quite favorably with those of electric water heaters, while the economics aren't quite so attractive when compared with those of gas water heaters. Heating water with the sun also means longterm benefits, such as being cushioned from future fuel shortages and price increases, and environmental benefits. Economic Benefits Solar water heaters offered the largest potential savings compared to electric heating, with solar waterheater owners saving as much as 50% to 85% annually on their utility bills over the cost of electric water heating. Typical simple payback period of a solar water heating system is 2 to 3 years. Tax Incentives and Rebates Ministry of New and Renewable Energy (MNRE) offers subsidies on domestic as well as commercial solar water heating systems installations. Government of India offers 80% depreciation claim in the first two years itself on installation of commercial solar water heating systems. Long-Term Benefits Solar water heaters offer long-term benefits that go beyond simple economics. In addition to having free hot water after the system has paid for itself in reduced utility bills, it contributes towards future fuel shortages and price increases and reduce country's dependence on foreign oil. Environmental Benefits Solar water heaters do not pollute and contribute in reduction of GHG emission. A 100 LPD solar water heater system when replaces an electric water heater, the electricity displaced over 20 years represents more than 30 tons of avoided carbon dioxide emissions alone. 4. Benefits of the proposed project: There are about 8000 residential apartment building Society Kalyan Dombivli Municipal area which accommodate about 160000 famlies. Generally hot water demand of residents is met from electric geysers. These electric geysers can be replaced with solar water heating system based on the availability of space to install such system in the apartment buildings. If 10% of such apartment complex are installed with solar water heating system of capacity, total solar water heating systems will be 1600,000LPD which will save about 18.90MU electricity per year and reduce about 15120 tons of GHG per year. 113 Ministry of New and Renewbale Energy (MNRE) declared KDMC as a “Solar City” and a master plan has been prepared to reduce 10% energy consumption through renewable energy and energy efficiency measures. The master plan sets a goal to reduce 168MU electricity per year within 5 years period. Implementation of solar water heating projects in hotels and restaurant can contribute 11.25% towards the set goal. Most importantly, hotels and restaurants will save considerable amount of electricity and will enjoy free hotwater within 2-3 years of payback on the investment. They will avail subsidy from the MNRE and may avail 80% depreciation benefit in the first two years. PART-A: Details of the Project Proponent I II III IV Name and Category of Project Proponent a) Renewable Energy Service Providing Company (RESCO) b) Financial Institutions (Banks, NBFCs, MFIs) c) Financial Integrator d) System Integrator e) Program Administrator Name, Designation and Address of the Authorized Representative for correspondence with telephone no, fax & email In case of Channel Partner other than Programme Administrator, the following information will be provided: Name of the Project Proponent: Kalyan Dombivli Municipal Corporation, Kalyan Dombivli, Maharashtra. Category: Program Administrator. Name: The Commissioner Address: Kalyan Dombivli Municipal Corporation KDMC, Shankarrao Chowk, Kalyan West - 421301 a) Whether commercial or non-commercial. b) Copy of Articles of Association, Registration No. & Date NA c) Audited Balance Sheet for last three years d) Annual Report of previous year e) Whether MNRE has earlier sanctioned any Solar Thermal project (s) for implementation to the Project Proponent, if yes, please furnish information In case of 1 (e), Please indicate: Autonomous Institution set by State Government (Urban Local a) Government Department, Autonomous Body) Institution set up by Central/ State Government, State renewable Energy development agency, Public Sector Undertaking b) Others 114 PART-B: Details of the Project Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. It has not only made its presence felt in terms of overall development and commercialization but also in its many eco drives for a sustainable future. Kalyan Dombivli has been approved by the Ministry of New and Renewable Energy to be developed as a solar city. Kalyan Dombivli Municipal Corporation (KDMC) is the main organization which is responsible for urban governance and civic management in the city of Kalyan Dombivli. The corporation has a democratically elected leadership from the constituencies within the geographic jurisdiction of the corporation boundaries. Kalyan Dombivli Municipal Corporation is a very active organization for initiating good practices and it has also come with the added supportive policy framework from Maharasthra Government for the implementation of renewable energy initiatives. There are about 8000 residential apartment building Society Kalyan Dombivli Municipal area which accommodate about 160,000 famlies with an average of 20 families per apartment. It is proposed to install solar water heaters in 800 apartments (10% of total apartment) to provide hot water to about 16000 families using solar water heating systems of 160,000LPD capcity. 1. Details of Project site: The Kalyan Dombivli city is located at geographical coordinates of 27.18 N and 78.02 E. The administrative building of Kalyan Dombivli Municipal Corporation is located in the heart of the city. Average annual solar radiation in Kalyan Dombivli is 5.08kWh/m2/day. 2. 3. I. Details of Project Beneficiaries: Kalyan Dombivli Municipal Corporation (KDMC) will be the direct beneficiary of the project. KDMC is responsible for providing the basic services infrastructure to city dwellers. The services include water supply, sewage treatment and disposal, solid waste management, disaster management, buildings and roads, street lighting, maintenance of parks and open spaces, cemeteries and crematoriums, conservation of heritage sites, and registering of births and deaths. Details of Proposed Systems : Proposed capacity of the Solar Water Heating System: Beneficiaries Residential Apartment II. No. of families 20 Capcity of SWH (LPD) 2000 Target Total Capacity (LPD) 800 160,000 Availability of shadow free roof area for the power plant : Sufficient area (70sqm for 2000LPD system) is available in the proposed apartments. 115 PART C: Implementation Schedule • Major Monitorable Milestones S No. 1 2 3 4 5 6 7 • Activities 1 2 3 Progress Months 4 5 6 7 8 Application/ clearance from MNRE Procurement Process Site survey & ystem integration layout Erection of collector mounting Structures Installation of Collectors & storage tank Distribution Pipings Testing and commissioning Project Commissioning Timeline Project can be completed within 6 months from the date of finalization of technology partner. PART D: Performance Monitoring Mechanism: Performance will be monitored with Performance Data Monitoring (Daily, Monthly and Annual energy generation, facilities for daily, monthly & annual power generation. Energy meters and logging, compilation and sharing with MNRE) data loggers will be installed accordingly. Monthly monitoring of reduction in Yes diesel/electricity/ other fuel consumption, if any. Own Mechanism In built monitoring system with energy meter and data logger will installed Third Party 5 years AMC will be signed with the supplier Yes PART E: Project Cost and Financing Details. i. ii. iii. iv. v. vi. Cost of Systems Hardware Cost of transportation and insurance Cost of civil works and electrical works Cost of installation and commissioning Cost of Annual Maintenance for 5 years Any other cost Total Cost of the Systems/Project Total Capacity & Collector Area Means of Finance a) Contribution of Project Proponent b) Contribution of Beneficiaries organization c) Envisaged CFA from MNRE 244.00Lakh 5.00Lakh 19.00Lakh 19.00Lakh 23.00Lakh 5.00Lakh 160,000LPD (3200sqm) 314.00Lakh a) Contribution of Project Proponent b) Contribution from beneficiaries: 208.40Lakh c) CFA from MNRE 105.60Lakh 116 d) Other Source (s) of Funding (capital grant) e) Envisaged Soft Loan assistance, if any f) Whether funds are in surplus or deficiency Details of Project Revenue recurring, if any NA Project Duration 6 months PART F: Operation and Maintenance Arrangements The supplier will train engineers and technicians of KDMC / housing society for day to day operation, monitoring and scheduled maintenance work such as cleaning, topping up of batteries etc. - Detail of Operation and Maintenance Arrangements. The system will be procured with minimum 5 years comprehensive annual maintenance contract service. During this period engineers and technicians from KDMC/ housing society will be trained for O&M of the system. - Arrangement for Energy Savings Data Collection (I) Flow meter will be installed where in manual recording of the reading will be maintained in a log. The reading will be taken on a regular periodic basis. (II) Data logging system for recording water temperature would be installed. This system will keep a log of the cold water and hot water at the inlet and outlet of the SWH system respectively. (III) Energy delivered in kcal by the SWH system will be calculated based on the quantity of the water consumed and temperature rise of the water (Δt). (IV) The flow meter reading needs to be taken regularly and average from the temperature logging system needs to be noted regularly. (V) Collected data will be reported to MNRE/ designated agencies on regular basis - Method of monitoring of reduction in conventional fuel consumption, if any. - NA - Strategy for training of the O&M Personnel of the Beneficiary Organization. As stated above 117 PART G: Declarations It is certified that I/we have read the guidelines issued by the Ministry vide 5/23/2009/P&C dated 16th June, 2010 and the related provisions/terms and conditions for availing financial support from the Ministry of New and Renewable Energy and I agree to abide by these guidelines and related terms and conditions. I understand that failure to comply by these guidelines may result in denial of financial support by the Ministry. I confirm that the present proposal in full or part has not been submitted / has been submitted to any other agency for seeking support (In case proposal has been submitted to any other agency or under consideration all details and a copy of the proposal must be submitted along with the present proposal). I confirm that I will not submit the same proposal or a part thereof to any other funding agency, without prior knowledge of the Ministry of New and Renewable Energy. I confirm that the share of project proponent/beneficiaries shall not be lower than 20% in any circumstances. Projects owned by the Programme Administrators are exempt from this condition. I confirm that the proposed solar thermal system(s) have not been installed/supplied at the proposed sites or to the proposed beneficiaries, prior to the receipt of project sanction letter from the Ministry. There is no duplication in the proposal and the submitted proposal is the only proposal by the proponent and to the best of my / our knowledge no other organization has submitted any proposal for the systems at these site(s) to MNRE for financial support. A detailed site survey has been done/or will be undertaken to identify the beneficiaries before actual supply and installation takes place. In case of System Integrators, the beneficiaries will be charged net of MNRE subsidy towards cost of systems installed by them at their respective places. I confirm that in case of any dispute, the decision of Secretary, Ministry of New and Renewable Energy, Government of India will be final and binding on all. Signature _____________ Name & Designation of Authorized Signatory Seal Place: Date: 118 Annexure DETAILS OF SYSTEMS TO BE INSTALLED Sl. no Systems to be installed Type of systems/ collector to be used* 1 Solar water heating systems Flat plate type a) Domestic b) Others Place(s) of installation** No. of system s No. of collect ors/ dishes Total collector area (sq. m) Applica tion Total cost of systems/ units including AMC for 5 yrs (apprx) Subsidy sought from MNRE @ Rs.3300/sq. m State subsidy to be availed if any @ Rs. ---- Expected date of completion Apartment complex 800 16000 32000 Hot water 314.00Lac 105.60Lac 208.40Lac Sept.2011 ETC type a) Domestic b) Others Storage cum collector type * Only those systems will be eligible for subsidy which have BIS/MNRE standards/ specifications or have approval from test centers of MNRE ** For domestic systems, only area of operation/implementation will be mentioned This is to certify that the various components of the Solar Thermal System (s) conform to the Relevant Standards, as mentioned in the Guidelines for Off-grid and Decentralized Solar Applications for Solar Collectors and components under JNNSM. Copies of the Relevant BIS/MNRE Certificates/specifications should be enclosed. Note: It is mandatory to provide technical performance specifications of each component of the system(s) to be installed under the project and for which the performance will be warranted. All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry. (Signature & Seal of Channel partner) as Head of Organization 119 10. Annexure IV – Pilot Project IV Project Proposal for 70kWp Stand Alone SPV Power Plant under Development of Solar City Programme of MNRE 1. Title of the Project: 70kWp rooftop Solar PV system for Kalyan Dombivli Municipal Corporation Building. 2. Name of the Project Proponent: Kalyan Dombivli Municipal Corporation. 3. Socio- Economic Justification of the Project: Solar PV power plant generates clean electricity using sunlight thereby off set green house gases produced by fossil fuel based power generating system. The country’s majority generation capacity is largely coal based and produces high quantity of carbon dioxide and other harmful gases. If the untapped solar energy potential is realized carbon dioxide and other toxic gas emissions can be lowered by significant quantity and thereby saving our environment. Therefore, every kilowatt of solar energy produced has to be seen from this angle as a small but major step towards mitigation of carbon dioxide emission and subsequently combat climate change. The proposed 70kWp PV power plant will generate about 105000 kWh of clean electrical energy per year and will reduce 84 tons of GHG per year. Many Government and commercial buildings in Kalyan Dombivli use Diesel Generator sets as standby power supply system during load shedding hours. DG sets create pollution and generation cost of electricity from DG sets is high which is Rs.15-Rs.20 per kWh based on capacity of DG sets and utilization of capacity. Solar PV power plant generates electricity at much lower cost then DG sets and use of Solar PV power plant can replace diesel set completely or reduce fuel consumption. Use of Solar PV power plant also reduces peak load, air-conditioner load in particular. 4. Benefits of the proposed project: The proposed 70kWp PV power plant in the KDMC building will generate 105000kWh per year which will save equivalent amount of electricity consumed from the grid. The power plant will reduce peak load and will supply power during load shedding hours thereby replace the use of diesel generator sets for standby power supply. PV systems are becoming increasingly popular in India however; experience in O&M of such system in is very low. The first hand experience PV system O&M train engineers and technical staff in Kalyan Dombivli Municipal Corporation, which will help in developing similar projects in future. PART-A: Details of the Project Proponent 120 i ii Name and Category of Project Proponent a) Renewable Energy Service Providing Company (RESCO) b) Financial Institutions (Banks, NBFCs, MFIs) c) Financial Integrator d) System Integrator e) Program Administrator Name of the Project Proponent: Kalyan Dombivli Municipal Corporation, Kalyan Dombivli, Maharashtra. Name, Designation and Address of the Authorized Representative for Correspondence with telephone no., fax & email Name: The Commissioner Address: Kalyan Dombivli Municipal Corporation KDMC, Shankarrao Chowk, Kalyan West - 421301 iii In case of Channel Partner other than Programme Administrator, the following information will be provided: a) Whether commercial or non-commercial. b) Copy of Articles of Association, Registration No. & Date; PAN/TAN No. c) Audited Balance Sheet for last three years d) Annual Report of previous year e) Whether MNRE has earlier sanctioned any SPV projects for implementation to the Project Proponent, if yes, please furnish information. iv In case of 1 (e), please indicate: a) Government Department, Autonomous Institution set up by Central/ State Government, State Renewable Energy Development Agency, Public Sector Undertaking b) Others Category: Program Administrator. NA Autonomous Institution set by State Government (Urban Local Body) PART-B: Details of the Project 1. Summary of the Proposal: Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. It has not only made its presence felt in terms of overall development and commercialization but also in its many eco drives for a sustainable future. Kalyan Dombivli has been approved by the Ministry of New and Renewable Energy to be developed as a solar city. Kalyan Dombivli Municipal Corporation (KDMC) is the main organization which is responsible for urban governance and civic management in the city of Kalyan Dombivli. The corporation has a democratically elected leadership from the constituencies within the geographic jurisdiction of the corporation boundaries. Kalyan Dombivli Municipal Corporation is a very active organization for 121 initiating good practices and it has also come with the added supportive policy framework from Maharasthra Government for the implementation of renewable energy initiatives. It is proposed to install one 70kWp SPV power plant in Kalyan Dombivli Municipal Corporation as model Renewable Energy power generating systems to cater the electrical energy demand for the office and simultaneously to set example and encourage entrepreneurs to invest on such projects. The system will be installed in the administrative building of KDMC and will be opened to the interested public and entrepreneurs. Trained manpower will be deployed to explain about the system and benefits to the interested visitors. 2. Details of Project site: The Kalyan Dombivli city is located at geographical coordinates of 27.18 N and 78.02 E. The administrative building of Kalyan Dombivli Municipal Corporation is located in the heart of the city. The building has sufficient space on its roof for installation of 70kWp PV system. Average annual solar radiation in Kalyan Dombivli is 5.08kWh/m2/day. The Corporation uses three DG sets (2 nos. 250KVA and 1 no. 100KVA) alternatively to supply power during load shedding hours. Average load shedding per day reported be 4 hours. Based on the use of DG sets and occurrence of load shedding annual diesel consumption in the corporation building is about 46.50kL. 3. Details of Project Beneficiaries: Kalyan Dombivli Municipal Corporation (KDMC) will be the direct beneficiary of the project. KDMC is responsible for providing the basic services infrastructure to city dwellers. The services include water supply, sewage treatment and disposal, solid waste management, disaster management, buildings and roads, street lighting, maintenance of parks and open spaces, cemeteries and crematoriums, conservation of heritage sites, and registering of births and deaths. 4. Details of Proposed Systems : I. II. III. Proposed capacity of the SPV Power Plant: 70kWp Availability of shadow free roof area for the power plant : 1400 Sqm Details of loads to be energized by Power Plant, calculations and justification for the proposed capacity and expected annual energy generation Details of the loads to be energized by Power Plant:- Table fans Ceiling Fans Exhaust fans Wall Fans Air Conditioner I Air Conditioner II Air Conditioner III Air Conditioner IV Air Conditioner V Television Total Annual Annual Total Load Load Hours of Consumption Utilisation Consumption No.s (W) (kW) Operation / Day (kWh) (days) (kWh) 34 60 2.04 9 18 300 5508 241 60 14.46 9 130 300 39042 44 300 13.20 9 119 300 35640 10 100 1.00 9 9 300 2700 42 1800 75.60 6 454 300 136080 2 9000 18.00 6 108 300 32400 4 6000 24.00 6 144 300 43200 6 3600 21.60 6 130 300 38880 2 2400 4.80 6 29 300 8640 2 100 0.20 4 1 300 240 122 Refrigerator Electric Water Pump Water Cooler Incandescent CFLs Fluorescent Long 36 watt CFLs Computers TOTAL 2 200 2 11250 5 300 38 60 30 11 766 55 80 36 250 100 0.40 22.50 1.50 2.28 0.33 42.13 2.88 25.00 271.92 1 4 4 4 5 8 4 10 0 90 6 9 2 337 12 250 1597 Standby Power Supply: DG set I Diesel consumption @ 75% load DG Set II Diesel consumption @ 75% load DG set III Diesel Consumption @ 100% load Power supplied by DG set per year assuming 50% usage of DG I, 50% usage of DG II and 75% usage of DG III Diesel consumption per day assuming 50% use of DG I, 50% use of DG II and 75% use of DGIII Diesel consumption per year Rooftop PV system for diesel abetment Approximate solar array area Approximate annual energy generation Fraction of DG power replaced Amount of diesel saved per year Emission reduction 300 300 300 300 300 300 300 300 250 40 250 40 100 25 120 27000 1800 2736 495 101112 3456 75000 554049 KVA Ltrs./hr KVA Ltrs./hr KVA Ltrs./hr 240000 kWh 235 46500 70 70 105000 44% 20344 84 Ltrs. Ltrs. kWp sqm kWh Ltrs. tonnes IV. Output Voltage of the Power Plant: 440 V V. Storage battery capacity: 300 kWh (3 hours backup for entire load except ACs and water pump) VI. Building for housing the battery bank and plant control systems: Separate rooms within the building available VII. Distribution Network (if any): The existing distribution network will be used VIII. Expected reduction in diesel consumption, if any: 30% (21500 liters per year) System Components PV Module Charge Controller/ Inverter Make and Model Make: MNRE approved supplier Mono/ Multi crystalline MNRE approved supplier Capacity Numbers 200Wp at STC 350 nos. 70kW Integral part of Power Conditioning Unit Indigenous/ Imported Indigenous Indigenous 123 Power Conditioning Unit Storage Battery Bank Performance Data Acquisition System Other components MNRE approved supplier MNRE approved supplier BIS or equivalent 70kW 1 no. Indigenous 300kWh 1 set. Indigenous NA 1 No Indigenous BIS approved or equivalent As As required applicable Indigenous 124 PART C: Implementation Schedule o Major Monitorable Milestones Sl. No. o Activities 1 Application/ clearance from MNRE 2 Procurement Process 3 Site survey & Engineering design 4 Erection of array mounting Structures 5 Module mounting and cabling 6 Installation of Power Conditioning Unit 7 Testing and commissioning Progress Months 1 2 3 4 5 6 7 8 Project Commissioning Timeline • Project can be completed within 6 months from the date of finalization of vendor. PART D: Performance Monitoring Mechanism: Performance Data Monitoring (Daily, Monthly and Annual energy generation , logging, compilation and sharing with MNRE) Monthly monitoring of reduction in diesel consumption, if any Own Mechanism Third Party Remote Monitoring (for SPV power plants having capacity above 5 kWp) Performance will be monitored with facilities for daily, monthly & annual power generation. Energy meters and data loggers will be installed accordingly. Yes In built monitoring system with energy meter and data logger will installed 5 years AMC will be signed with the supplier Yes PART E: Project Cost and Financing Details. i. Cost of Systems Hardware ii. Cost of transportation, insurance iii. Cost of civil works and electrical works iv. Cost of installation and Commissioning v. Cost of Annual Maintenance for 5 years vi. Any other related costs Total Cost of Systems Rs. 168.00 Rs.3.00 Rs. 13.00 Rs.13.00 Rs. 13.00 Rs. 2.00 Rs. 212.00 125 Total kWp SPV Capacity 70kWp Means of Finance a) Contribution of Project Proponent b) Contribution of Beneficiaries organization c) Envisaged CFA from MNRE d) Other Source (s) of Funding (capital grant) e) Envisaged Soft Loan assistance, if any f) Whether funds are in surplus or deficiency Details of Project Revenue recurring, if any NA Project Duration 6 Months a) KDMC : Rs. 106.00 Lakh b) MNRE: Rs. 106.00 Lakh PART F: Operation and Maintenance Arrangements The supplier will train engineers and technicians of KDMC for day to day operation, monitoring and scheduled maintenance work such as cleaning, topping up of batteries etc. - Detail of Operation and Maintenance Arrangements. The system will be procured with minimum 5 years comprehensive annual maintenance contract service. During this period engineers and technicians from KDMC will be trained for O&M of the system. - Arrangement for Generation Data Collection (applicable for SPV Power Plants having more than 10 kWp capacity). Details of monitoring equipment proposed to be installed and method of supplying data to MNRE/ designated agency. As stated above - Method of monitoring of reduction in diesel consumption, if any. DG set logbook is being maintained in the KDMC. The same will be maintained to know in reduction of operating time of DG sets after installation of PV systems. The Solar system will - Strategy for training of the O&M Personnel of the Beneficiary Organization. As stated above 126 PART G: Declarations and Certificates A. It is certified that I/we have read the guidelines issued by the Ministry vide 5/23/2009/P&C dated 16th June, 2010 and the related provisions/terms and conditions for availing financial support from the Ministry of New and Renewable Energy and I agree to abide by these guidelines and related terms and conditions. B. I understand that failure to comply by these guidelines may result in denial of financial support by the Ministry. C. I confirm that the present proposal in full or part has not been submitted / has been submitted to any other agency for seeking support (In case proposal has been submitted to any other agency or under consideration all details and a copy of the proposal must be submitted along with the present proposal). D. I confirm that I will not submit the same proposal or a part thereof to any other funding agency, without prior knowledge of the Ministry of New and Renewable Energy. E. I confirm that the share of project proponent/beneficiaries shall not be lower than 20% in any circumstances. Projects owned by the Programme Administrators are exempt from this condition. F. I confirm that the proposed solar PV system has not been installed/ supplied at the proposed sites or to the proposed beneficiaries, prior to the receipt of project sanction letter from the Ministry. G. There is no duplication in the proposal and the submitted proposal is the only proposal by the proponent and to the best of our knowledge no other organization has submitted any proposal for the system at this site to MNRE for financial support. H. A detailed site survey has been done/or will be undertaken to identify the beneficiaries before actual supply and installation takes place. I. This is to certify that the various components of the SPV power plant will conform to the Relevant Standards, as mentioned in the Guidelines for Off-grid and Decentralized Solar Applications (Annexure-3) for SPV modules and components under JNNSM. Copies of the Relevant IEC/ BIS Certificates should be enclosed. J. It is mandatory to provide technical performance specifications of each component of the power plant proposed to be installed under the project. And for which the performance will be warranted. K. All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry. I confirm that in case of any dispute, the decision of Secretary, Ministry of New and Renewable Energy, Government of India will be final and binding on all. Place: Date: Signature _____________ Name & Designation of Authorized Signatory Seal 127 11. Annexure V - Pilot Project V Project Proposal for Stand Alone Solar PV Systems for Kalyan Dombivli Municipal Corporation under Development of Solar City Programme of MNRE 1. Title of the Project: Solar PV standalone system for Kalyan Dombivli Municipal Corporation 2. Name of the Project Proponent: Kalyan Dombivli Municipal Corporation. 3. Socio- Economic Justification of the Project: Solar PV power plant generates clean electricity using sunlight thereby off set green house gases produced by fossil fuel based power generating system. The country’s majority generation capacity is largely coal based and produces high quantity of carbon dioxide and other harmful gases. If the untapped solar energy potential is realized carbon dioxide and other toxic gas emissions can be lowered by significant quantity and thereby saving our environment. Therefore, every kilowatt of solar energy produced has to be seen from this angle as a small but major step towards mitigation of carbon dioxide emission and subsequently combat climate change. A cumulative capacity of 105kWp PV power plant will generate about 157500 kWh of clean electrical energy per year and will reduce 126 tons of GHG per year. Use of solar streetlights and outdoor lights in the municipal parks will ensure illumination of these areas during load shedding hours. Reliable traffic lights, blinkers and road studs will increase road safety. Water pumps in the municipal parks will help in maintaining the parks green. Municipal parks can avoid use of Diesel Generator sets as standby power supply system during load shedding hours thereby reduces pollution and generation cost of electricity from DG sets. Use of Solar PV power plant also reduces peak load, air-conditioner load in particular. 4. Benefits of the proposed project: The proposed standalone PV systems in the KDMC area will maintain a minimum illumination level in the roads and parks of the municipal area during load shedding and will save 157500kWh per year which will save an amount of 7.89 lakh from electricity bill per year. The systems will reduce peak load and will supply power during load shedding hours thereby replace the use of diesel generator sets for standby power supply. PV systems are becoming increasingly popular in India however; experience in O&M of such system in is very low. The first hand experience PV system O&M train engineers and technical staff in Kalyan Dombivli Municipal Corporation, which will help in developing similar projects in future. 128 PART-A: Details of the Project Proponent i ii Name and Category of Project Proponent f) Renewable Energy Service Providing Company (RESCO) g) Financial Institutions (Banks, NBFCs, MFIs) h) Financial Integrator i) System Integrator j) Program Administrator Name of the Project Proponent: Kalyan Dombivli Municipal Corporation, Kalyan Dombivli, Maharashtra. Name, Designation and Address of the Authorized Representative for Correspondence with telephone no., fax & email Name: The Commissioner Address: Kalyan Dombivli Municipal Corporation KDMC, Shankarrao Chowk, Kalyan West - 421301 iii In case of Channel Partner other than Programme Administrator, the following information will be provided: f) Whether commercial or non-commercial. g) Copy of Articles of Association, Registration No. & Date; PAN/TAN No. h) Audited Balance Sheet for last three years i) Annual Report of previous year j) Whether MNRE has earlier sanctioned any SPV projects for implementation to the Project Proponent, if yes, please furnish information. iv In case of 1 (e), please indicate: c) Government Department, Autonomous Institution set up by Central/ State Government, State Renewable Energy Development Agency, Public Sector Undertaking d) Others Category: Program Administrator. NA Autonomous Institution set by State Government (Urban Local Body) PART-B: Details of the Project 1. Summary of the Proposal: Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. It has not only made its presence felt in terms of overall development and commercialization but also in its many eco drives for a sustainable future. Kalyan Dombivli has been approved by the Ministry of New and Renewable Energy to be developed as a solar city. Kalyan Dombivli Municipal Corporation (KDMC) is the main organization which is responsible for urban governance and civic management in the city of Kalyan Dombivli. The corporation has a 129 democratically elected leadership from the constituencies within the geographic jurisdiction of the corporation boundaries. Kalyan Dombivli Municipal Corporation is a very active organization for initiating good practices and it has also come with the added supportive policy framework from Maharasthra Government for the implementation of renewable energy initiatives. It is proposed to install 1000 solar streetlights, 10 solar traffic lights, 50 solar blinkers, 2000 road studs, 200 outdoor lights for parks and 8 solar pumps in Kalyan Dombivli Municipal Corporation as model Renewable Energy systems. 2. Details of Project site: The Kalyan Dombivli city is located at geographical coordinates of 27.18 N and 78.02 E. Average load shedding in the city reported be 4 hours per day. The streetlights, traffic lights, solar blinkers and road studs will be distributed in prime areas of the city. Outdoor lights and solar pumps will be installed in all the municipal parks. 3. Details of Project Beneficiaries: Kalyan Dombivli Municipal Corporation (KDMC) will be the direct beneficiary of the project. KDMC is responsible for providing the basic services infrastructure to city dwellers. The services include water supply, sewage treatment and disposal, solid waste management, disaster management, buildings and roads, street lighting, maintenance of parks and open spaces, cemeteries and crematoriums, conservation of heritage sites, and registering of births and deaths. 4. Details of Proposed Systems: I. Proposed capacity of the SPV Systems: Solar System Proposed No. Proposed system Capacity/unit (Wp) Total capacity (kWp) Solar Street Light 1000 74 74.00 Solar PV Traffic Lights 10 74 0.74 Solar Blinkers (37Wp) 50 37 1.85 Road Stud 2000 3 6.00 Outdoor lights for Parks 200 74 14.80 Solar Pumps for Parks 8 1000 8.00 105.39 II. III. Availability of shadow free roof area for the power plant: Available Details of loads to be energized by Power Plant, calculations and justification for the proposed capacity and expected annual energy generation Details of the loads to be energized by Power Plant:- As stated above IV. V. VI. VII. VIII. Output Voltage of the Power Plant: 12V Storage battery capacity: 3 days autonomy for all systems except solar pumps Building for housing the battery bank and plant control systems: Not required Distribution Network (if any): Not required (Standalone) Expected reduction in diesel consumption, if any: NA 130 System Components PV Module Charge Controller/ Inverter Power Conditioning Unit Storage Battery Bank Performance Data Acquisition System Other components Make and Model Make: MNRE approved supplier Mono/ Multi crystalline MNRE approved supplier MNRE approved supplier MNRE approved supplier BIS or equivalent MNRE approved Capacity Numbers 100Wp/ 74Wp/ 37Wp/ 3Wp at STC 3340 nos. Indigenous/ Imported Indigenous As required As required Indigenous Not required Not required Indigenous As required As required Indigenous NA NA Indigenous MPPT required As required for solar pumps Indigenous PART C: Implementation Schedule o Major Monitorable Milestones Sl. No. 1 2 3 o Activities 1 2 Progress Months 3 4 5 Application/ clearance from MNRE Procurement Process Installation and commissioning Project Commissioning Timeline • Project can be completed within 6 months from the date of finalization of vendor. PART D: Performance Monitoring Mechanism: Performance Data Monitoring (Daily, Monthly and Annual energy generation , logging, compilation and sharing with MNRE) Monthly monitoring of reduction in diesel consumption, if any Own Mechanism Third Party Remote Monitoring (for SPV power plants having capacity above 5 kWp) Performance will be monitored through regular inspection. NA NA 5 years AMC will be signed with the supplier NA 131 PART E: Project Cost and Financing Details. Rs. 252.00 Rs.5.00 Rs. 20.00 Rs.20.00 Rs. 20.00 Rs. 3.00 Rs. 320.00 i. Cost of Systems Hardware ii. Cost of transportation, insurance iii. Cost of civil works and electrical works iv. Cost of installation and Commissioning v. Cost of Annual Maintenance for 5 years vi. Any other related costs Total Cost of Systems Total kWp SPV Capacity Means of Finance a) Contribution of Project Proponent b) Contribution of Beneficiaries organization c) Envisaged CFA from MNRE d) Other Source (s) of Funding (capital grant) e) Envisaged Soft Loan assistance, if any f) Whether funds are in surplus or deficiency Details of Project Revenue recurring, if any Project Duration 105kWp a) KDMC : Rs. 160.00 Lakh b) MNRE: Rs. 160.00 Lakh NA 6 Months PART F: Operation and Maintenance Arrangements The supplier will train engineers and technicians of KDMC for day to day operation, monitoring and scheduled maintenance work such as cleaning, topping up of batteries etc. - Detail of Operation and Maintenance Arrangements. The system will be procured with minimum 5 years comprehensive annual maintenance contract service. During this period engineers and technicians from KDMC will be trained for O&M of the system. - Arrangement for Generation Data Collection (applicable for SPV Power Plants having more than 10 kWp capacity). Details of monitoring equipment proposed to be installed and method of supplying data to MNRE/ designated agency. As stated above - Method of monitoring of reduction in diesel consumption, if any. NA - Strategy for training of the O&M Personnel of the Beneficiary Organization. As stated above 132 PART G: Declarations and Certificates A. It is certified that I/we have read the guidelines issued by the Ministry vide 5/23/2009/P&C dated 16th June, 2010 and the related provisions/terms and conditions for availing financial support from the Ministry of New and Renewable Energy and I agree to abide by these guidelines and related terms and conditions. B. I understand that failure to comply by these guidelines may result in denial of financial support by the Ministry. C. I confirm that the present proposal in full or part has not been submitted / has been submitted to any other agency for seeking support (In case proposal has been submitted to any other agency or under consideration all details and a copy of the proposal must be submitted along with the present proposal). D. I confirm that I will not submit the same proposal or a part thereof to any other funding agency, without prior knowledge of the Ministry of New and Renewable Energy. E. I confirm that the share of project proponent/beneficiaries shall not be lower than 20% in any circumstances. Projects owned by the Programme Administrators are exempt from this condition. F. I confirm that the proposed solar PV system has not been installed/ supplied at the proposed sites or to the proposed beneficiaries, prior to the receipt of project sanction letter from the Ministry. G. There is no duplication in the proposal and the submitted proposal is the only proposal by the proponent and to the best of our knowledge no other organization has submitted any proposal for the system at this site to MNRE for financial support. H. A detailed site survey has been done/or will be undertaken to identify the beneficiaries before actual supply and installation takes place. I. This is to certify that the various components of the SPV power plant will conform to the Relevant Standards, as mentioned in the Guidelines for Off-grid and Decentralized Solar Applications (Annexure-3) for SPV modules and components under JNNSM. Copies of the Relevant IEC/ BIS Certificates should be enclosed. J. It is mandatory to provide technical performance specifications of each component of the power plant proposed to be installed under the project. And for which the performance will be warranted. K. All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry. I confirm that in case of any dispute, the decision of Secretary, Ministry of New and Renewable Energy, Government of India will be final and binding on all. Place: Date: Signature _____________ Name & Designation of Authorized Signatory Seal 133 12. Annexure VI - References & Bibliography 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. “India Power Scenario”, Young India Inc http://maps.grida.no/go/graphic/natural-resource-solar-power-potential, 11.08.09, map credit: Hugo Althenius, UNEP/GRID – Arendal http://www.igreenspot.com/solar-powered-city-concept/, 12.08.09 “Solar and Sustainable Cities: Renewable Energy Information on Markets, Policy, Investment and Future Pathways”, Eric Martinot, http://www.martinot.info/solarcities.htm, 10.08.09 “India: Addressing Energy Security and Climate Change”, Ministry of Environment and Forests, Ministry of Power, Bureau of Energy Efficiency, Government of India http://www.indiasolar.com/ren-india.htm, 12.08.09 “Solar Radiation Handbook 2008”, Solar Energy Centre, Ministry of New and Renewable Energy, Indian Meteorological Institute http://www.mnre.gov.in/ Source: MSEDCL Source: State oil Coordinator (HPCL, BPCL, IOCL) Source: State oil Coordinator (HPCL, BPCL, IOCL) Source: State oil Coordinator (HPCL, BPCL, IOCL) http://www.energymanagertraining.com/DesignatedConsumers/main.htm, http://www.hindustanpetroleum.com/en/UI/AboutLPG.aspx Source: MSEDCL, state oil Coordinator (HPCL, BPCL, IOCL) Source: MSEDCL and State Oil Coordinator Kalyan Dombivli CDP Source: http://eosweb.larc.nasa.gov/ ; http://www.mnre.gov.in/ Source: http://eosweb.larc.nasa.gov/ Source: Biomass Resource Atlas of India (http://lab.cgpl.iisc.ernet.in/Atlas/Default.aspx) Source: http://mnes.nic.in/shp-state/maharashtra.htm (Source: Kalyan Dombivli Report) http://www.mnre.gov.in/ Case-study booklet on Renewable Energy. 2009 Source:GEDA Anil Dhussa: Presentation “ Biogas in India”, MeKalyan Dombivli to Markets Partnership – Meeting of Agr. SubCommittee April 22, 2004 CII. 2005. Development of small ESCOs to undertake biomass gasification projects for industrial applications. Report prepared for MNES. Confederation of Indian Industries. Basic Information Sourced from: Ministry of Urban Development and Poverty Alleviation 2000. (Biomethanation of Vegetable Market Waste – Untapped Carbon Trading Opportunities K. Sri Bala Kameswari, B. Velmurugan, K. Thirumaran and R.A. Ramanujam. Department of Environmental Technology, Central Leather Research Institute (CLRI), Adyar, Chennai, India Proceedings of the International Conference on Sustainable Solid Waste Management,5 - 7 September 2007, Chennai, India. Pp.415-420) (Energy Revolution, Green Peace International) Renewable Energy: Economic and Environmental Issues, Pimental et al) (A roadmap for renewable energy risks, Lloyd). Source: Green Peace 134 CONTACT Emani Kumar Dwipen Boruah ICLEI South Asia Ground Floor, NSIC - STP Complex, NSIC Bhawan, Okhla Industrial Estate New Delhi - 110020 Phone: 011-41067220 Fax: 011-41067221 www.iclei.org/sa 135