Folie 1 - GreenFlow

Transcription

Folie 1 - GreenFlow
ENERCON and the
Portuguese Wind Energy Cluster
The Portuguese energy challenge
ENVIRONMENT
Polluting Emissions
Kyoto Protocol
ECONOMY
Cost of Energy
Vulnerability
DEPENDENCY
INEFFICIENCY
2001: The “awakening”
Portugal launches energy policy centered on:
 Encouraging Energy Efficiency
 Large-scale use of Portugal’s vast Endogenous &
Renewable Energy potential
Wind
Sun
Biomass
Wind Energy leads the growth
 Mature & competitive technology
 65% average annual growth 1999-2006
2008:
2858 MW
2012:
>5000 MW
How to proceed to the next level and
transform wind energy into an essential
component of the Portuguese energy mix
- and of the Portuguese economy?
The 2005-2006 public tender
provides interconnection rights for new wind farms,
under the condition that:
A new industrial cluster be created, bringing
investment, employment and technology transfer to
Portugal
New solutions be developed to exploit the
wind resource more efficiently, namely
dispatch centres, prevision models and storage
solutions
The Cluster: Porter’s Concept
Firm’s
Products and
Services
• Based on Porter’s Diamond
• Group of closely-related
companies
• Maximises efficiency and
added value
Surrounding Factors:
Infrastructures, I&D
• Constitutes an efficient
strategy in high-tech sectors
Demand
Related
Companies
Creating Synergies
Enercon’s lasting contribution
As the world leader in wind energy technology
development, Enercon’s contribution to the success of
the Portuguese industrial cluster was considerable:
 Adhering fully to the concept and challenge of creating
an industrial cluster
 Federating companies, knowledge and skills around
this endeavor
 Performing an unprecedented process of technology
transfer
Technology Transfer / R&D
Integral production of the E-82 in Portugal
(blades, generator, e-module, tower)
New R&D and training centres
Portuguese personnel sent to Germany for
advanced training
Results (1): A new expansion
phase for wind energy
48 new wind farms, 1200 MW
2700 GWh/yr of electricity,
i.e. supply equivalent to more than
2,3m domestic consumers
25% of the portuguese wind
energy production in 2011
Results (2): A tremendous boost
for the Portuguese economy
Total Investment
€ 1700 m
Total Added Value
€ 286 m per year
Job Creations
1 800 direct, 5 500 indirect
Balance of
Payments
Local Development
Exports
> 60% of the production
(€200m per year from 2010)
Avoided gas imports
> € 100 m per year
Avoided purchase of
CO2 certificates
€ 24 m per year
(1 MtCO2 per year)
Local taxes
€ 5 m per year
Land rents
€ 3,4 m per year
Results (3): A true change of paradigm
 In addition to the environmental benefits, wind energy
provides jobs, economic growth and activity to dozens
of Portuguese companies
7 new & 12 upgraded factories
ENERCON Rotor Blades (1, 12, 13) – ENERCON Concrete Towers (5, 7, 9) – ENERCON Synchronous Generators (10) – SAERTEX Glass
Fiber (11) – A. SILVA MATOS Steel Towers (3, 6, 15) – SIEMENS Transformers and Electrical Panels (8, 14) – JAYME DA COSTA Electrical
Equipments (4)
Building the wind farms
1. Enercon Rotor Blades ready for export in the port of Viana do Castelo – 2 & 15. Special transport of Enercon E-82 blades (Transportes Laso) – 3.
Building a power substation (Painhas) – 4 & 7. Installing electric lines (Painhas) – 5 & 8. Erecting the wind turbines (Montalgrua) – 6. Building the
electric pylons (Painhas) – 9 & 12. Special transport of Enercon towers and nacelles ( Transportes Gonçalo)
Exceeding expectations & commitments
Company
ENEOP/Enercon
A. Silva Matos
Cabos para Eólicas
CME
EWG
Jayme da Costa
Metalogalva
Montalgrua
Painhas
Probilog/Laso
Saertex
Siemens
Siemens
Siemens
Tegael
Transportes Gonçalo
Factory
Rotor Blade Factory
Concrete Tower Factory
Generator Factory
Mechatronics Plant
Administrative & Training Centre
Logistics & Transport Centre
Second Blade factory
Steel Tower Factory
Electrical Equipment Unit
Electrical Installations Unit
WEC Service Centre
Electrical Equipment Unit
Electrical Supplies Unit
Cranes Service Unit
Electrical Installations Unit
Transport Services Unit
Glass Fiber Factory
Electrical Transformer Factory
Medium-Voltage Panels Factory
Other investments
Electrical Installations Unit
Transport Services Unit
Total Direct Investments and Jobs
Contractual Commitments
Location
Viana do Castelo
Viana do Castelo
Lanheses
Lanheses
Lanheses
Viana do Castelo
Lanheses
Sever do Vouga
Vila Nova de Gaia
Lousã
Viana do Castelo
Vila Nova de Gaia
Albergaria-a-Velha
Paredes
Viana do Castelo
Arcos de Valdevez
Viana do Castelo
Sabugo
Corroios
Lisbon & Porto
Coruche
Porto
Investment (€)
34.760.000
21.685.000
15.070.000
4.585.000
1.725.000
17.337.000
55.000.000
10.345.000
672.000
806.000
4.510.000
742.000
800.000
25.676.000
2.199.000
2.485.000
4.000.000
8.573.000
1.696.000
559.000
1.687.000
5.343.000
New Jobs
510
108
100
55
35
78
500
57
10
60
105
44
21
15
63
24
40
17
10
18
35
26
220.255.000
1.931
161.500.000
1.709
Thank you!