District Strategic Plan - Streetsboro City Schools

Transcription

District Strategic Plan - Streetsboro City Schools
Streetsboro City School District
Strategic Plan
2012-2017
1
Streetsboro City School District
Strategic Planning 2012-2017
Board Members
Kevin
Denise
Grimm
Baba
John
Andrew
Kelly
Lesak
Cindy
Pennock-Hanish
Jon
Stacy
Cindy
Natko
Beth
Nichols
Lisa
Pennock-Hanish Sue
Scisciani
Shannon
Stockard
Nick
Marie
Lesley
Michelle
Andrea
Christy
Richard
Jeffrey
Karey
Edward
John
Lisa
Marlene
Ryan
Todd
Marcini
Maynard
Mitchell
Mrakovich
Murray
Nickerson
Nickerson III
Pritchard
Ralph
Rogowski
Saucier
Shannon
Speck
Spence
Teitel
Torrence
Torrence
Tuck
Valenti
Verdell
Violi
Zarlino
Lead Team
Tracy
Donna
Matthew
Campbell
BethAnn
Dascenzo
Lisa
Featherstun Robert
Hepburn
Howitt
Hunt
Stephen Laird
Dr. Sam Lewis
Michelle Mrakovich
Management Team
Gina
John
Denise
Jim
Regina
Mayor Glenn
Donya
Rick
James
Kelly
Jennifer
Tracy
Tim
Donna
Cynthia
Arlesic
Arlesic
Baba
Boardwine
Boardwine
Broska
Buchanan
Buckley
Butler
Butler
Cales
Campbell
Claypoole
Dascenzo
Deevers
Laura
Michael
Reginald
Selina
Darren
Natalie
Matthew
Rene
Heather
Jean
Steve
Ken
Nancy
Linda
Kevin
DeLambo
DiMaio
Dublin
Dublin
Ekron
Ekron
Featherstun
Fifik
Gawne
Giunto
Giunto
Granville
Granville
Gray
Grimm
Karyn
Aaron
BethAnn
Amy
Lisa
Joseph
Ted
Chuck
William
Michelle
Gayle
Stephen
Carmen
Bob
Joanne
Hall
Hatzo
Hepburn
Howard
Howitt
Huber
Hurd
Kocisko
Koleszar
Kravetz
Krutilla
Laird
Laudato
Long
Marcini
James
Karen
Nekiya
Linda
Fredericka
Brian
Jeanine
2
Streetsboro City School District
Strategic Planning 2012-2017
Focus Groups
Board Office
Campus
Central Service
Defer
High School
Middle School
Wait
Abbey
Stacey
Jeff
Rick
Terzah
George
Gina
John
Leah
Zac
Pam
Allison
Karen
Tim
Janis
Stephanie
Kathy
Jennifer
John
Lisa
Leesa
Tony
Jim
Staff
Staff
Staff
Staff
Staff
Staff
Staff
Abramowicz
Alexander
Allen
Alleshouse
Allred
Anderson
Arlesic
Arlesic
Babb
Balaguer
Beech
Benci
Benci
Berecek
Berlin
Berry
Betley
Bodevetz
Bodevetz
Bontempo
Boyer
Boyer
Braessler
Mayor Glenn
Matt
Marcus
Donya
Joslin
Heather
Rick
Haley
Kelly
Jennifer
Sara
Sue
Tracy
Cindy
Beth
Tony
Angela
Kristen
Jennifer
Cathy
Donna
Mike
Cheryl
Scott
Laura
Rick
Jon
David
Laura
Melanie
Broska
Bross
Brown
Buchanan
Buchanan
Buckley
Buckley
Bussey
Butler
Cales
Campbell
Campbell
Campbell
Carlson
Carone
Carone
Clay
Cottrell
Csorba
Danner
Dascenzo
Daulbaugh
DeCavitch
Deevers
Delambo
Delambo
Dilts
Duke
Duke
Dundon
Adrienne
Darren
Natalie
Jennie
Matthew
Annie
Denise
Rene
Laurie
Chris
Lisa
Mike
Carol
Heather
Justin
Bob
Bridget
Cory
Renee
Amy
Ryan
Ricki
Mary
Ken
Nancy
Megan
Kevin
Kim
Lexi
Chris
Edwards
Ekron
Ekron
Elliott
Featherstun
Fernandez
Ferrari
Fifik
Fischer
Fredmonsky
Freeman
Freeman
Fruscella
Gawne
Gawne
Gency
Gency
Gigax
Gigax
Golson
Golson
Graeser
Grant
Granville
Granville
Grim
Grimm
Guerrero
Gutierrez
Hall
Karyn
Marion
John
Steve
Courtney
BethAnn
Archie
Heather
Jim
Tim
Debra
Gary
Monica
Joseph
Robert
Heidi
Judi
Debbie
Marjorie
Stephanie
Devon
Kim
Marge
Allison
Holly
Jen
John
Michelle
Sarah
Stephen
Hall
Harn Jr.
Harris
Hatch
Hatzo
Hepburn
Hess
Hillyer
Hillyer
Hinkk
Holbert
Holcomb
Holzapfel
Huber
Hunt
Inzerillo
Israelson
Johnson
Johnson
Judd
Klein
Klein
Klein
Kocis
Kocis
Koroly
Koroly
Kravetz
Lago
Laird
Alex
Robert
Pam
Mary
Carmen
Carlton
Andrew
Angela
Bob
Nikko
Lynn
Ginny
Mike
Dayna
Markos
Becky
Danielle
Joanne
Nick
Sarah
Shonda
Eric
Rob
Stacey
Bill
Lisa
Paula
Bret
Joey
Dave
Landgraf
Lankey
Lanning
Lanterman
Laudato
Lawrence
Lesak
Levert
Long
Lucas
MacMillan
Maglionico
Maglionico
Mallas
Mallas
Malone
Marcini
Marcini
Marcini
Marcini
Martin
Mass
Matusik
Matusik
Maxwell
Maxwell
McCabe
McClafferty
McCormack
McMillan
3
Streetsboro City School District
Strategic Planning 2012-2017
Focus Groups Continued
Karen
Emma
James
Jim
Monique
Lesley
Allana
Becky
Jay
Gina
Eric
Gary
Michelle
Bob
Caroline
Andrea
Cindy
Jon
Curt
Elizabeth
Stacey
Beverly
Angela
Brian
Rick
Sabrina
Linda
Bryan
Jeffrey
Melody
McMillan
Mesojedec
Minyard
Minyard
Minyard
Mitchell
Miura
Monahan
Moore
Mordue
Moss
Motz
Mrakovich
Mullaley
Mullaley
Murray
Mustafa
Natko
Newill
Nichols
Nichols
Nissel
Novotny
Novotny
Owens
Paul
Pelkey
Pengal
Pritchard
Puleo
Pearl
Judy
Eric
Melanie
Tina
Deb
Cheryl
Brian
Cathy
Kristal
Ellie
Melissa
Jeff
Johnny
Lori
Amy
Steve
Catherine
Tyler
John
Pam
Bob
Jamie
Linda
Tracy
Hannah
Laura
Mark
Lisa
Betty
Pullman
Puster
Rauschkolb
Reger
Reoch-Fitzgerald
Rhodes
Richards
Richesson
Richesson
Robinson
Robitaille
Rogowski
Rondo
Rondo
Rondo
Ross
Ross
Rouse
Sanders
Saucier
Saucier
Scheal
Scheal
Schettler
Schneeman
Schuller
Shaffer
Shaffer
Shannon
Simons
Carol
Len
Julie
Susan
Marlene
Ryan
Shelly
Von
Ron
Debbie
Jerry
Sue
Tom
Richard
Tamika
Debbie
JR
Lori
Barb
Gabriela
James
Karen
Tawnya
Traig
Joseph
Nekiya
Stacey
Linda
Eve
Matt
Skovensky
Skovensky
Solly
Sopko
Speck
Spence
Spence
Starkey
Stenglein
Stockard
Stockard
Stockard
Stockard
Taiclet
Taylor-Ivory
Teitel
Thompson
Thomson
Tibbs
Toro
Torrence
Torrence
Traylor
Traylor
Tripak
Tuck
Vadaj
Valenti
VanReeth
Vazzana
Brian
Tyler
Betty
James
Sandy
Taylor
Mary
Darlene
Heather
Arleigh
Beth
Daryl
Gloria
Josh
Leslie
Joe
Kathy
Bill
Kathy
Jeanine
Lindsay
Melissa
Violi
Violi
Ward
Washinski
Webb
Wells
Werner
Wheeler
Whitney
Wiler-Martin
Williams
Williams
Wilson
Wilson
Wiseman
Wolfe
Wood
Young
Zampounis
Zarlino
Zenker
Zenz
4
Streetsboro City School District
Strategic Planning 2012-2017
Retreat Team
Gina
Arlesic
Kelly
Butler
BethAnn Hepburn
Gary
Denise
Baba
Rene
Fifik
Robert
Beth
Scisciani
Michelle Mrakovich
Marlene
Speck
Jim
Boardwine
Heather
Gawne
Michelle Kravetz
Jon
Natko
Linda
Valenti
Donya
Buchanan
Aaron
Hatzo
Joanne
Marcini
Jeffrey
Pritchard
Brian
Violi
Rick
Buckley
Courtney
Hatzo
Nakia
Miller
Tracy
Schneeman
Kelly
Ashley
Miller
Nuber
Hunt
Motz
Action Teams
Extra and Co-curricular
Jennifer
Basich
Donna
Dascenzo
BethAnn Hepburn
John
Jim
Boardwine
Marisa
DeLambo
Joseph
Christine Koporc
Kaitlyn
Lisa
Bontempo
Rene
Fifik
Marjorie Johnson
Bob
Long
Samantha Palania
Donya
Buchanan
Courtney
Hatzo
Stephanie Judd
Joanne
Marcini
Kayla
Huber
Tuma
Community Engagement
Rick
Buckley
Carmen
Laudato
Heather
Gawne
Jon
Natko
Lisa
Howitt
Eric
Rauschkolb
Chuck
Kocisko
Lindsay
Zenker
Communications Internal and External
Denise
Baba
Kristen
Cottrell
Pam
Beech
Matthew
Featherstun
Jen
Cales
Kelly
Hall
Tracy
Campbell
Beth
Scisciani
Marlene
Speck
5
Streetsboro City School District
Strategic Planning 2012-2017
Action Teams Continued
Academic Growth
Gina
Arlesic
Michelle
Mrakovich
Tracy
Schneeman
Laura
Delambo
Andrea
Murray
Lisa
Shannon
Steve
Hatch
Elizabeth
Nichols
Linda
Valenti
Michelle
Kravetz
Cindy
Pennock-Hanish
Instructional Technology
Steve
Cain
Andrew
Lesak
Mike
Daulbaugh
Lesley
Mitchell
Maureen
Haska
Ryan
Spence
Matthew
Kolke
Karen
Torrence
Jeff
Allen
Kevin
Grimm
Jordan
Matusik
Jessica
Reker
Dorian
Williams
John
Arlesic
Robert
Hunt
Jillian
Meisinger
Brian
Violi
Joe
Wolfe
Jacob
Armbrecht
Stephen
Laird
Nakia
Miller
Jim
Washinski
November
Dolovacky
Nick
Marcini
Jeffrey
Pritchard
Darlene
Wheeler
Facilities
6
Streetsboro City School District
Strategic Planning 2012-2017
Beliefs
We believe student growth and achievement are the top priorities of our school district.
We believe our district will provide the highest level of personalized service.
We believe embracing diversity enriches our community.
We believe in a safe and inspiring learning environment.
We believe all decisions will be based on students' best interests.
We believe a strong partnership between staff, students, parents and community fosters student learning.
Vision Statement
By 2017 Streetsboro City School District will be rated in the top 100 school districts in Ohio.
Mission Statement
We partner with families and communities to provide a personalized education that inspires and empowers students
to be lifelong learners and productive members of our global society.
7
Streetsboro City School District
Strategic Planning 2012-2017
Goals
1. Every student in Streetsboro City School District will demonstrate at least one years worth of academic growth
2.
3.
4.
5.
6.
7.
annually by 2017.
We will improve extra and co-curricular options.
We will develop and implement a comprehensive instructional technology plan.
We will improve facilities.
We will develop and implement a comprehensive community engagement plan.
We will improve communications with internal and external stakeholders.
We will develop a plan that will financially support the beliefs, vision and mission of Streetsboro City Schools.
8
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 1: Every student in SCS District will demonstrate at least one years worth of academic growth annually by 2017.
Action 1: Professional Development
Person(s) Most Responsible
Timeline to Complete/Date
Steps to Accomplish this Action
The SEA, SSSPA, Exempt Staff and
Director of Student & Academic
Administrators create a long term short term
Services
professional development plan
At the start of each school year, the PD plan
will be reviewed and modified by the
Director of Student & Academic
admininstrators for relevancy to current data
Services
and educational initiatives and mandates based
on summer changes.
Evaluation
Jan-13
Final copy of Long & Short term
PD Plan for all Streetsboro staff
Annually beginning August 2013
Agenda from Administrators'
meeting when plans are reviewed
Current information from ODE, SST8, ESCs
and other educationally based support systems
will be used to guide decisions regarding
professional development opportunities.
Director of Student & Academic
Services
Quarterly beginning 12-13 SY
Agenda from administrators'
meeting
Student data (state tests, SRI, Summative
Assessment, etc.) will be reviewed quarterly
by administrators and staff to inform decision
regarding professional development
opportunities.
Administrators / Staff
Quarterly beginning 12-13 SY
Agendas from quarterly meetings
/ Summary of findings
Battelle For Kids value-added data will be
utilized to provide training
Director of Student & Academic
Services / Administrators
Ongoing beginning 12-13 SY
Summaries of work conducted
with agencies like Battelle for Kids
Create a professional development summer
academy
Administrators
May 2014
Summer Academy
Action 2: Intervention
Person(s) Most Responsible
Timeline to Complete/Date
Steps to Accomplish this Action
An RTI model will be defined for use Pre-K to
gr. 12 to ensure intervention and enrichment Director of Student & Academic
be available to students on an individualized
Services / Action Team
basis
Staff will undergo training in the use and
Director of Student & Academic
implementation of the chosen RTI model
Services / Principals
Evaluation
End of 12-13 SY
Defined and communicated
process for implementing RTI PreK-12 Staff meeting agendas
13-14 SY
Certificates of completion of
training / Agendas
9
An Intervention Assistance Team model will
be selected and followed Pre-K to grade 12 to
track and commun icate intervention results to
staff and parents.
Full implementation of an IATprocess will be
used district-wide to track student need and
growth as part of the RTI model
The use of current universal screening tools
and the exploration of other universal
screening tools will be assessed and evaluated
for effectiveness
Full implementation of an IAT process
utilizing an RTI model will be implemented
Steps to Accomplish this Action
Ongoing professional development in the area
of high-yield instructional practices
Data from formal observations & informal
walkthroughs will be collected and used to
have collaborative conversations between staff
and administration regarding high-yield
teaching strategies
Development of teacher leadership in
providing peer-to-peer feedback on
instructional practices in the classroom
Analyze the benefits and financial implications
of creating teacher leader positions to support
best instructional practices, data review and
overall teaching and learning feedback
Differentiation across all classrooms to
address individual student needs
Develop a district wide assessment continuum
and train staff on the continuum
Formative and summative assessment data to
inform instruction
Director of Student & Academic
Services / Action Team
Director of Student & Academic
Services / Principals
Principals with Teacher & Tutor
input
End of 12-13 SY
Defined and communicated
process for implmeneting IAT
Pre-K-12 / Staff meeting agendas
13-14 SY
Certificates of completion of
training / District aligned forms
and defined process
Ongoing beginning 12-13 SY
Universal screening tools will be
purchased on a district level
requisitions and purchase orders
Director of Student & Academic
Services / Principals / Teachers /
Beginning 14-15 SY
Parents & Students
Action 3: Instructional Practices
Person(s) Most Responsible
Timeline to Complete/Date
Director of Student & Academic
12-13 SY
Services / Principals
B file evidence that process is in
place in all buildings / Staff
meeting agendas
Evaluation
PD Agendas and Exit Surveys
evaluating the PD and Presenters
Principals / Teachers
13-14 SY and ongoing each year
based on negotiations in 2013
Meeting agendas and notes
Administration
Teacher leaders identified
12-13 SY Supplemental added
Spring 2013 to begin 13-14 SY
Roster of teacher leaders at all
grade levels and departments
Administration
14-15 SY
Position is considered and
discussed at administrative
meetings - use of agenda
Principals / Teachers
13-14 SY
Rubrics for student placement
Principals / Teachers
13-14 SY
PD Agendas / Assessment Plan
Principals / Teachers
14-15 SY
Quarterly data meeting agendas
10
Implementation of specialized instructional
and intervention strategies such as Ortin
Gillingham & Wilson, reading and writing in
the content areas
Steps to Accomplish this Action
All content areas taught and reported for each
student daily, or the equivalent, K-12.
Research possibility of increased common
planning time for content specific, grade level,
interdisciplinary, and intervention specialists
scheduled four times per month with agenda
driven by data, principal, and lead teachers
Collaboration between grade band teachers
quarterly with administrative support (grade
bands are K-2, 3-5, 6-8 and 9-12)
A study of course rigor and alignment to the
CCSS will be conducted to evaluate necessary
changes to course offerings
Define a shared scheduling philosophy that
prioritizes the Common Core classes
(Reading/Math) and the Ohio Revised Core
classes (Science & Soc. St.) that considers all
populations of students
Steps to Accomplish this Action
Each building will identify and arrange for
speakers to present on the importance of
personal growth, goal setting and success
Each school will form a committee to establish
building initiatives on goal setting and growth
opportunities to include ways to recognize
growth and achievement
Create a mentoring program among buildings
to have students mentor other students in
meetings held quarterly to encourage each
other academically, socially, and behaviorally
Director of Student & Academic
Services / Administrators /
Teachers
2012 - Ongoing
Action 4: Scheduling
Person(s) Most Responsible
Timeline to Complete/Date
Prioritized on the long-term and
short-term PD plan
Evaluation
Principal / Teachers
12-13 SY
Lesson Plans / Report Cards
Principals / Guidance
Common Planning 13-14 SY
Meeting agendas / Notes from
meetings
Director of Student & Academic
Services / Principals
13-14 SY
PD Plan agendas
Administration
January 2013 If changes are
supported, they will be proposed
for 13-14 SY
Building Schedules
13-14 SY
Scheduling statement identifying
the priorities of the district /
Master schedules
Administration / Teachers
Action 5: Student Engagement
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Principals
Ongoing beginning 12-13 SY
Student assemblies 2x per year per
building
Principals / Teachers
Jan-13
Defined initiatives for each
building
Principals / Teachers
Research 13-14 SY / Fully
Implement 14-15 SY
Roster of
mentors/mentees/schedule for
visits
11
Involve students each year in analyzing their
state assesment scores to determine one year's
academic growth for goal setting and
benchmarking
Steps to Accomplish this Action
The administrators will identify a lead person
to be trained as the district value added
specialist
Teachers
12-13 SY
Action 6: Data
Person(s) Most Responsible
Timeline to Complete/Date
Schedules showing quarterly
meetings with students
Evaluation
Administration
September 2012
A name will be submitted to the
superintendent
Staff will be trained on value added and other
points of measure focusing on their current
population of students using EVAAS,the
Success website, and any other sites
DIVA / Principals
May 2013 and quarterly
thereafter
Quarterly data analysis maintained
in each building
The teaching staff will use the data to inform
decisions about instructional needs,
curriculum, and pacing
Teachers / Principals
Each quarter beginning with
13-14 SY
Quarterly data analysis maintained
in each building
Action 7: Curriculum
Person(s) Most Responsible
Timeline to Complete/Date
Steps to Accomplish this Action
Create curriculum maps on the Common Core
and allow time for quality conversations about
Director of Student & Academic
the maps with grades K-2 and grades 11 & 12
Services
implemented 12-13 SY and grades 3-10
implemented 13-14 SY
Curriculum alignment among grade levels and Director of Student & Academic
buildings at least two times per school year
Services
Report card revisions made K-6 to align report
cards to the CCSS and Ohio Revised
Administration / Teachers
Standards
Data analysis and review of students' OAA,
OGT, OTELA, SRI, ITBS, ACT, & COGat
scores and classroom summative assessments,
Principals / Teachers
as well as other identified assessments, and
student growth quarterly
Write summative assessments that identify the
quality of students' efforts and mastery of
Director of Student & Academic
skills based on the CCSS and Ohio Revised
Services
Standards
Evaluation
K-2 & 11-12-12-13 SY
/ 3-10-13-14 SY
Curriculum Maps
12-13 SY
Meeting Agendas
K-2-12-13 SY
/ 3-6-13-14 SY
Newly written report cards K-6
12-13 SY
Summary of each quarterly
meeting
K-2 & 11-12-12-13 SY
/ 3-10-13-14 SY
Summative Assessments aligned
with the defined assessment
framework
12
The district will create an inventory database
of the resources currently available in the
14-15 SY to create / 15-16 SY to
Director of Student & Academic
Database of current materials
district and evaluate their effectiveness making
maintain / Review of resources one
Services / Principals
district-wide
decision about keeping or eliminating
time each SY
resources
Create and implement an administrative policy Director of Student & Academic
Newly written policy and
14-15 SY
for adopting textbooks and programs
Services
administrative guidelines
Create a rubric or schedule for adopting new
Newly written rubric or schedule
Director of Student & Academic
textbooks and programs based on mandates
15-16 SY
for adopting new textbooks and
Services
from ODE
programs
12-13 SY Recommended changes
Assess all secondary electives to ensure they
Middle School / High School
Completed assesments with
implemented annually beginning
are best prepared students for the 21st century
Principals
recommendations
13-14 SY
Implement STEM program in the Middle
Middle School Principal
12-13 SY
Implemented
School
Assess STEM Instruction at SHS
High School
13-14 SY
Completed
Provide parent education through curriculum
Director of Student & Academic
nights to equip parents with educational
15-16 SY
Scheduled events
Services
support
13
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 2: We will improve extra and co-curricular options.
Steps to Accomplish this Action
Establish a Extra/Co-Curricular activity
committee
Assess satisfaction with current offerings and
solicit feedback on past and future options
Create a list of offerings from other school
districts
Action 1: Data Collection
Person(s) Most Responsible
Timeline to Complete/Date
Superintendent
September 2012
Extra/Co-Curricular Committee
October 2012
Extra/Co-Curricular Committee
November 2012
Action 2: Committee Work
Person(s) Most Responsible
Timeline to Complete/Date
Steps to Accomplish this Action
Form action teams from stakeholder groups to
facilitate work on elementary and secondary
Extra/Co-Curricular Committee
March 2013
extra and co-curricular options
Conduct a comprehensive survey evaluating Extra/Co-Curricular Committee /
October 2012
current and potential offerings
Technology Director
Modify and/or revise offerings based on
survey results/and lists from other school
Extra/Co-Curricular Committee
March 2013
districts
Define possible new offerings
Extra/Co-Curricular Committee
March 2013
Provide program descriptions to SEA/Board of
Education for consideration during the
Extra/Co-Curricular Committee
June 2013
negotiation process
Action 3: Program Development
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Determine and find resources/partnerships to
Extra/Co-Curricular Committee
Ongoing
help support possible new offerings
Investigate the advantages of a performing arts
academy for Portage County within our school
Drama Club Advisor
January 2013
and present an implementation plan to the
Board of Education
Develop quality summer enrichment
Extra/Co-Curricular Committee
2013-2014 SY
programming
Evaluation
Completed Survey
Questionaire that produces
measurable results
Determine interests and
satisfaction with offerings
Evaluation
Interested participants from
community and staff
Completed Survey
Updated descriptions of offerings
Updated descriptions of offerings
Updated descriptions of offerings
Evaluation
Alternative sources of funding
and/or advisors
Performing arts school with staff
and students
Summer registrations
14
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 3: We will develop and implement a comprehensive instructional technology plan.
Steps to Accomplish this Action
Implement an interactive website for the
school district to serve students, parents, and
community stakeholders.
Action 1: Assess current technology practice.
Person(s) Most Responsible
Timeline to Complete/Date
Superintendent, Technology
Department, Building
September 2012
Administrators and Instructional
and Support Staff.
Evaluation
New Website
Perform a comprehensive technology audit of
Completed Report and
Superintendent/Third Party Vendor
October 2012
instructional technology.
Comparative Data
Assess the positive culture of accessible
technology to enhance student learning. (Lodi Superintendent/Third Party Vendor
January 2013
Survey Data
Survey)
Superintendent, Director of
Increase integration of technology in the
Curriculum, Technology
Increased Integration at Point of
classroom curriculum to improve student
January 2015
Department, Building
Instruction
learning. (Lodi Survey)
Administrators and Instructional
and Support Staff.
Superintendent, Director of
Create an ongoing professional development
Curriculum, Technology
Annual review of courses offered
program in the use of current technology to
January 2013
Department and Building
and participation
maximize the impact on student learning.
Administrators
Action 2: Implement an Interactive website for the school district to serve students, parents, and community stakeholders.
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Superintendent, Director of
Curriculum, Technology
Make online home school and/or blended
Department, Building
September 2012
Contract with online School
learning opportunties available for students.
Administrators and Instructional
Staff.
Director of Curriculum,
Expand online courses to students for Credit Technology Department, Building
September 2013
Integration in course selection
Flexibility.
Administrators and Instructional
Staff
15
Expand online course opportunities for staff
and community.
Director of Curriculum,
Technology Department, Building
Administrators and Instructional
Staff
September 2014
Public school works
Create a system for online student registration.
Technology Department
September 2013
Online RegistrationAvailable
Create an online fee payment system.
Technology Department,
Treasurer's Office
September 2012
System in place
Develop a single sign-on system for parents to
Technology Department, SPARCC
September 2013
System in place
access student information.
Utilize current bus mapping software to help
Technology Department, and
provide more accurate and timely information
September 2012
Printed Routes
Transportation Department
to stakeholders.
Action 3: Perform a comprehensive technology audit of instructional technology.
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Select a vendor to perform an educational
technology audit providing a comprehensive
Superintendent, and Technology
analysis of technology integration and
September 2012
Comprehensive Audit
Department
utilization with a comparative data from
similar districts.
Survey the staff and commuity for needs and
Technology Department
September 2012
Survey Results
expectations in the area of technology.
Report the findings of the Technology Audit to
Third Party Vendor
October 2012
Board Presentation
the Board of Education
Based on the data from the Technology Audit,
Superintendent, Director of
create a comprehensive instructional
Curriculum, Technology
technology plan including infrastructure,
Department, Building
January 2013
Technology Plan
hardware integration, software and
Administrators and Instructional
professional development.
Staff.
Identify opportunities for shared services in
Superintendent/Technology
the area of technology with the city of
September 2015
Technology Plan
Department/Mayor
Streetsboro.
Action 4: Create a positive culture of accessible technology to enhance student learning.
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Provide secure and stable wireless
Superintendent, and Technology
Based on Technology Plan
Wireless
infrastructure across the district.
Department
16
Superintendent, Director of
Curriculum, Technology
Based on Technology Plan
Completion
Department, Building
Administrators and Instructional
Staff.
Superintendent, Director of
Curriculum, Technology
Establish a common vision for technology
Department, Building
Based on Technology Plan
Completion of Technology Plan
across the district.
Administrators and Instructional
Staff.
Superintendent, Director of
Research the feasability of a community
Curriculum, Technology
technology lab to increase availability of
Feasability report to
Department, Building
September 2014
technology to students, staff and community
Superintendent
Administrators and Instructional
members after traditional school hours.
Staff.
Create a student technology assistance
Technology Department, and
September 2013
Annual Review
program.
Building Administrators.
Action 5: Increase integration of technology in the classroom curriculum to improve student learning.
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Superintendent/Director of
As curriculum revisions occur, transfer to the
Curriculum/Technology
Ongoing per Curriculum Revision Completion of each Curriculum
use of online resouces as appropriate.
Department/Building
Cycle
Revision
Administrators/Instructional Staff
Modify existing policies in order to permit
students and staff to utilize personal
technology in an educational environment.
September 2012 35% of all
Superintendent/Director of
classrooms September 2013 50%
Provide Interactive Whiteboard Technology in
Curriculum/Technology
of all classrooms September 2014
every classroom.
Department/Building
70% of all classrooms September
Administrators/Instructional Staff
2015 100% of all classrooms
Superintendent/Director of
Curriculum/Technology
Institute the District wide use of Google Apps.
Department/Building
Administrators/Instructional Staff
Implement a Thin Client Initiative across the
Superintendent/Director of
district to reduce maintenance costs and
Curriculum/Technology
increase the availability of classroom
Department/Building
technology.
Administrators/Instructional Staff
100 % Integration
September 2013
Utilized regularly by students and
staff
Based on Technology Audit
Increased student access
17
Superintendent/Director of
September, 2013 Hosting of
Curriculum/Technology
September 2015
Wireless Controler September,
Department/Building
2015 Hosting of Phone Systems
Administrators/Instructional Staff
Action 6: Create an ongoing professional development program in the use of current technology to maximize the impact on student learning.
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Superintendent/Director of
Develop a short and long term professional
Based on Technology Audit
Curriculum/Technology
development plan for both certified and
District Professional Development
Annual Review
Department/Building
classified staff.
plan 2013
Administrators/Instructional Staff
Superintendent/Director of
District Professional Development
Curriculum/Technology
Implement a teacher digital academy.
Plan 2013 Timeline to be
75% of staff by September 2015
Department/Building
completed 2015
Administrators/Instructional Staff
Increase the use of available SPARCC
resources.
18
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 4: We will improve facilities.
Steps to Accomplish this Action
Develop a facility advisory council made up of
staff, students, parents, city and community
Commit to the continued involvement of the
OSFC plan
Support, monitor and modify as needed the
OSFC Master Plan
Determine priorities of the Non OSFC funded
Develop a timeline for the implementation of
the Master Plan
Develop a timeline and implementation plan
for Non OSFC funded items
Steps to Accomplish this Action
In conjunction with the City, seek community
feedback & coordinate future site of the high
school
Action 1: Ohio School Facilities Planning
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Maintenance Director
Summer 2012/ongoing
Active Advisory Council
Advisory Council / BOE
ongoing
Meet all necessary OSFC timelines
Advisory Council / BOE
July 2012/ongoing
File Master Plan with OSFC
Maintenance Director
December 2012
List of Non OSFC Plan
Advisory Council / BOE
August 2012
Completed Timeline
Maintenance Director/Committee
2013-2014 SY
Completed Timeline
Action 2: School / City Planning
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Superintendent / Mayor
Fall 2012
Survey data and feedback shared
with BOE / City Council
Publicize, market and educate the community
regarding the current status of district facilities
Maintenance Director /
Superintedent
ongoing
Documents
In conjunction with the City create a list of
"adopt a spot" project areas
Advisory Council
2014-2015 SY
Completed List
Steps to Accomplish this Action
Implement a district wide energy conservation
plan
Develop a 5 year PI Plan
Action 3: Facility Action Items
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Maintenance Director
June 2013 / 2013-2014 SY
Completed Conservation Plan
Maintenance Director /
Technology Director /
Superintendent
December 2012
Completed PI Plan
19
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 5: We will develop and implement a comprehensive community engagement plan.
Steps to Accomplish this Action
Group 1: Residents without Students in Streetsboro Schools
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Establish a community engagement committee
Superintendent
October 2012
Completed
Develop PR packets about Streetsboro City
Schools for local businesses
Establish consistent communication between
the district and these residents
Survey families with school age children
attending non-Streetsboro schools as to why
the children are attending else where
Survey families with children between the
ages of 0 and school age what their intentions
are and the expectations of Streetsboro City
Schools
Community Engagement
Committee
January 2013
Completed packet
Building Principals
January 2013
Scheduled Communication
Community Engagement
Committee
January 2014
Compiled Data
Community Engagement
Committee
January 2015
Compiled Data
Group 2: Streetsboro Schools to reach out to community
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Each club, sport, and school group plan an
Athletic Director/Building
May 2013
event for community service
Principals
Establish a district "Achievement Hall of
Superintendent/Alumni
September 2012
Fame"
Association
Establish a list of annual events that will
Athletic Director/Building
December 2012 / Reviewed
engage the community
Principals
Annually
Information Sign in front of Stevenson House
Superintendent
June 2015
Honor Mayor, City Council Members, and
City Employees at a school event
Superintendent/Athletic Director
September 2012
(Football/Basketball game)
Distribute PR Packets to local businesses
Superintendent/Chamber
May 2014
Formulate an exit survey for withdrawing
Administrative Team
May 2015
families
Evaluation
Scheduled Events
Achievement HOF Induction
Completed List
Sign
Scheduled Events
Bi Annual Distribution
Completed Surveys
20
Steps to Accomplish this Action
Schedule school activities for living/senior
center/retirement
Develop a 12th grade internship program
Host a holiday luncheon at the school for the
community
Senior Citizen night at sporting events
Invite Senior Citizens to all dress rehearsals of
dramatic performances
Survey Senior Citizens to find out how we can
increase the engagement between the schools
and senior citizens
Steps to Accomplish this Action
In collaboration with the city, identify and
welcome new residents
Billboards/banners around town to promote
success
Identify and utilize potential shared
communication mechanisms between the
schools, the city government, and the
community
Create a program that brings city proffesionals
into the schools
Steps to Accomplish this Action
Develop a superintendent advisory committee
comprised of local businesses and community
organizations
Develop an annual calendar of events of all
support organizations
Compile lists of partnerships already built and
the contact information of the contact people
at the businesses/organizations
Group 3: Senior Citizens
Person(s) Most Responsible
Timeline to Complete/Date
Building Principals/Athletic
September 2014
Director
Director of Student and Academic
Services, High School
September 2015
Administrators
Evaluation
Scheduled Events
Internship Program
Building Principals
September 2013
Scheduled Events
Athletic Director
September 2014
Scheduled Events
Administrative Team
September 2013
Scheduled Events and luncheon
Community Engagement
Committee
May 2013
Survey Results
Group 4: City Government
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Superintendent/Mayor
May 2014
Welcome letter
Community Engagement
Committee
May 2015
Billboards/Banners
Superintendent/Mayor
May 2013
Coordinated messages
Superintendent/Mayor
May 2013
Completed Process
Group 5: Community Organizations
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Superintendent
October 2012
Completed List
Community Engagement
Committee
May 2013
List of Goals
Community Engagement
Committee
May 2014
Completed List
21
Develop a recognition program for business
partners
Establish at least 1 new business/organization
relationship per building each year with a goal
of five new relationships for the district
Superintendent
May 2014
Established Program
Administrative Team
Ongoing
Demonstration of Partnerships
22
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 6: We will improve communications with internal and external stakeholders.
Steps to Accomplish this Action
Establish a PR Committee
Evaluate annually the web design and platform
to improve ease of use for parents staff and
community
Collect parent email addresses to establish
database for email alerts and newsletters
Collect email addresses of interested
community members (no children in school) to
establish database for email alerts and
newsletters
Standardize frequency and type of school
communication (newsletters, upcoming
events, good news, etc.) to parents/community
from each building.
Develop Intranet to provide employees with a
centalized location for work related
information
Action 1: Enhancement of District / Building website
Person(s) Most Responsible
Timeline to Complete/Date
Superintendent
September 2012
Evaluation
Completed
PR Committee
Ongoing
Completed
Building Principals
December 2012/ongoing
Collection of at least 75% of
parent email addresses
PR Committee
December 2013
Collection of at least 250
community email addresses
PR Committee
June 2013
Communication vehicles utilized
on regular basis
Technology Department
June 2015
Launch of Intranet
Technology
Review/survey of webpages of all
December 2012
Department/Administration
staff
Action 2: Establish protocol, in writing, for all employees to follow when responding to e-mail/phone contacts from both internal and external
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Establish turn-around time for responding to
Administrative Team
October 2012
Expectation Sheet
messages for all staff
Establish webpage expectations for all staff
Develop text for automatic “bounce back” emails so individual who initiates contact will
know when to expect a personalized response
Administrative Team
October 2012
Standardized bounceback email
utilized
Develop a standardize phone greeting
Administrative Team
October 2012
Standardized phone greeting
utilized
December 2013
Flip Chart
Create FAQ information flip chart for building
Board Office/Building Secretaries
secretaries/initial contact people
23
Create ‘Who to Contact’ sheet for
information/question not covered by FAQ
Develop person who gets question/problem
owns question/problem policy
Steps to Accomplish this Action
Establish one master calendar for internal and
external use
Board Office/Building Secretaries
May 2014
Contact Sheet
Board Office/Building Secretaries
May 2014
Written Policy and Procedures
Action 3: Modify master calendar for all district activities
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Internal/External Calendar
Seperation
Director of Technology
September 2012
Establish protocol for timely updates of
calendars
Director of Technology/Building
Administrators/Building
Secretaries
December 2012
Calendar update protocol
Provide calendar or search function to show
availability of school facilities on specific
dates
Director of Technology/Building
Administrators
December 2012
Searchable availability
Provide “at-a-glance” calendar in addition to
more detailed calendar
Steps to Accomplish this Action
Conduct a survey to determine the various
types of forms used throughout the district
Standardize forms used by the entire district
Director of Technology/Building
Administrators/Building
December 2012
Secretaries
Action 4: Develop district-wide forms
Person(s) Most Responsible
Timeline to Complete/Date
Administrative Team/Building
January 2013
Secretaries/Board Office Staff
Administrative Team/Building
September 2013
Secretaries/Board Office Staff
at-a-glance calendar
Evaluation
Completed Survey
Standardized Forms
Investigate the options for completing,
Technology Department
January 2014
Online Forms Available
submitting and updating forms online
Create district wide information packet for
Administrative Team/Building
January 2014
Information Packet
incoming parents
Secretaries/Board Office Staff
Develop system for reviewing and updating
Building Secretaries and Board
January 2015
Yearly Review Meeting
forms as needed
Office Staff
Centralize Student Registration
Board Office Staff
January 2013
Centralized Registration
Action 5: Create a positive culture of “buy-in” to new communication practices
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Survey district
needs/wants/preferences/opinions about
Technology Department
January 2013
Completed Surveys
communication policies and practices
Establish date for full implementation of new
Administrative Team
May 2013
Completed implementation plan
practices
24
Create posters/information sheets outlining
Building Secretaries/Board Office
established protocols and post in areas where
May 2014
Posters and information sheets
Staff
staff will see regularly
Develop a system where current practices are
regularly reviewed and ideas for improved
Administrative Team
May 2015
Review Meeting Dates
practices can be shared in and between
buildings
Action 6: Maximize the use of existing resources to improve communications with parents, staff and community
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Create list of how the following resources are
being utilized for district communication:
PR Committee
December 2012
Completed Document
Radio station, Channel 16, Flip/Digital
cameras, Parent Internet Viewer
Create list of additional ways to use the
following resources: Radio station, Channel
PR Committee
February 2013
Completed Document
16, Flip/Digital cameras, Parent Internet
Viewer
Develop action plan to increase use of the
following resources: Radio station, Channel
PR Committee
June 2013
Completed Document
16, Flip cameras, Parent Internet Viewer
Implement action plan to increase use of the
following resources: Radio station, Channel
PR Committee
June 2014
Programming up and running
16, Flip cameras, Parent Internet Viewer
Action 7: Increase points of contact with general community
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Monthly informational meeting between
Building Principals
September 2012
Meetings held
principals and parents
Determine best outlets for disseminating
Document types of information &
PR Committee
May 2013
information (newsletter/phone blast/e-mail)
how it should be shared
Establish e-mail address to receive news/info
Technology Department
September 2012
Active e-mail account
tips ([email protected])
Establish a point of contact (person) to receive
Superintendent
September 2012
Appointed person in position
/review all news tips
Develop school spirit shop
High School Administration
September 2015
Shop open and operating
25
Streetsboro City School District
Strategic Planning 2012-2017
Goal # 7: We will develop a plan that will financially support the beliefs, vision and mission of Streetsboro City Schools.
Action 1: Educate the community regarding the district's budget and elements that impact the financial position of the district.
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Provide the BOE updated 5 year forecast 2
Treasurer
October / May
Completed
times per year
Post 5 year forecast and notes on the district
Treasurer / Treasurer Department
November / June
Completed
website
Share the 5 year forecast with the community
Treasurer
November / June
Completed
support organizations
Provide current information to the public
Treasurer
May 2013
Completed
regarding school finances consistently
Establish community meetings to discuss
Treasurer / Superintendent
May 2013
Completed
finances (State of the Schools)
Develop a clear timeline of district renewal
Treasurer
May 2013
Completed
and potential levy activities
Solicit community input regarding financial
Treasurer / Superintendent /
December 2012
Completed
issues and potential ballet items
Support Organizations
Base annual budget on priorities identified in
Treasurer / Superintendent
Annually
Completed Budget
the district strategic plan
Pursue collaborative initiatives with the City
of Streetsboro that consolidate services and Mayor / Treasurer / Superintendent
Ongoing
Multiple Shared Services
save tax dollars
Action 1: Explore alternative funding sources to enhance business partnerships
Steps to Accomplish this Action
Person(s) Most Responsible
Timeline to Complete/Date
Evaluation
Seek and pursue potential grant opportunities
Refine grant request process for all district
support organizations aligning requests with
district initiative(s)
Develop business advisory group
Establish Business partners through Business
Advisory Group
Administrative Team
Ongoing
1 grant per school year
Superintendent
May 2014
New Application Process
Treasurer / Superintendent
May 2013
Established Group
Treasurer / Superintendent
October 2015
Established Partners
26