Information on Solution selected – Spring 2016
Transcription
Information on Solution selected – Spring 2016
120-kV Langlois–Vaudreuil-Soulanges Line and Supply for Ericsson INFORMATION ON SOLUTION SELECTED • Spring 2016 The population of the regional county municipality (MRC) of VaudreuilSoulanges has grown significantly in the last decade. Between 2001 and 2014, the number of residents in the MRC increased by 43%. Combined with industrial and commercial development, this population growth has led to a significant increase in the region’s electricity consumption and has overloaded the power system. Hydro-Québec TransÉnergie needs to build a new 120-kilovolt (kV) transmission line on the territory of the Vaudreuil-Soulanges MRC. From this new line, Hydro-Québec TransÉnergie will also build a line segment to supply Ericsson, which recently moved into VaudreuilDorion’s industrial area. Commissioning of the planned equipment is scheduled for 2017. A MAJOR PROJECT FOR THE REGION • Meets the growing demand for electricity • Represents an investment of $45 million RESULTS OF THE PUBLIC PARTICIPATION PROCESS In 2015, Hydro-Québec presented the line routes and consulted community representatives, affected landowners and the general population. This consultation allowed Hydro-Québec to learn their various concerns and gather their comments. Hydro-Québec was able to improve its project and now proposes a slightly modified route that better meets community expectations. SELECTED LINE ROUTE Segment 1 36 m The 120-kV double-circuit transmission line will consist of six conductors and be supported by steel towers. The line will be approximately 20 km long and will connect Langlois and Vaudreuil-Soulanges substations. Work is also planned inside Dorion, Langlois, Vaudreuil-Soulanges and Rigaud substations to integrate the new line to the power system. No work is required from Langlois substation to Les Cèdres substation. The new line will be divided into two segments. Existing right-of-way New right-of-way: 21.5 m Total right-of-way width: 52 m From Les Cèdres substation to Dorion substation (segment 1) 2 Segment 2 Hydro-Québec favored using existing rights-of-way to avoid the impacts associated with opening a new line corridor. For this segment, to be about 8.5 km long, the selected solution is to dismantle the existing line supported by wooden H-frames, and rebuild it on double-circuit steel towers in the same 30 m right-of-way. This option allows Hydro-Québec to use existing servitude rights. From Dorion substation to Vaudreuil-Soulanges substation (segment 2) This new 7-km-long segment will run along the existing line between Les Cèdres and Dorion substations. This route has the advantage of grouping together Hydro-Québec’s lines in a single corridor. STUDY AREA 342 40 ? 45°25' in em Ch V e, ar az -L int Sa is Planned overheadunderground junction substation Segment 2 Cité de ard Boulev adie Ca n e ièr Riv VaudreuilSoulanges (MRC) ,M res V èd ac, sC u-L Le u-d tea Co 45°20' Ca Highway Provincial or secondary highway Local road Railway x, V ieu d a Substations and power transmission -C L'Île lines # Vaudreuil-surle-Lac, VL Ericsson Canada (planned) 120 kV 230 kV # 315 kV 735 kV 40 Boundaries Regional county municipality (MRC) Municipality Secteur de Vaudreuil Baie de Vaudreuil Secteur de Dorion la Pe L'Île Terrasser Vaudreuil, M P rot, inc V ou rt, V 20 Pincourt Dorion al on ti Na ie n d na Infrastructure 40 132 Montée Labossière -des-Jeunes Va ud reu il Le s C -Dor ion èd ,V res ,M ien nch Qui # Overhead-underground junction substation 20 # - 338 30 Pointe-desCascades, VL Segment 1 Sa R in ivi t-C èr ha e rle s # Monseigneur74°10' 201 Émard # Les Cèdres Fleuve Saint-Laurent Salaberry-deValleyfield Les Cèdres SaintTimothée 132 530 BeauharnoisSalaberry (MRC) 74°5' Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Équipement et services partagés. res, M Les Cèd y-deSalaberr , V ld e fi y Valle ! nges e Soula Canal d ot, V e-Perr -de-l'Îl Dame Notre- ue cifiq n Pa # Lac des Deux Montagnes Ericsson supply 342 u -Lo int Sa Saint-Lazare - Previously proposed route section ,V V on n, Dori o ilds Hu dreu u Va - VaudreuilSoulanges Planned 120-kV double-circuit line Deux-Montagnes (MRC) en di na Ca Riv ièr ed es Ou tao ua is P ac ifi q ue # Study area Oka Hudson To Rigaud substation 74°0' Project component 344 45°25' 74°5' Kanesatake, EI Ok Hu a, M ds on ,V 45°20' 74°10' Beauharnois, V 30 #Langlois CS 0 on a ti o rt sp ran T X 900 1 800 m MTM, Zone 8, NAD83 74°0' 7388_bu_hq_037_160317a.mxd 3 ERICSSON SUPPLY Hydro-Québec will also build a 3.5-km-long line segment to the Ericsson site at 3500A, Rue F.-X.-Tessier in Vaudreuil-Dorion, from the new Langlois–Vaudreuil-Soulanges line. This segment will begin near Montée Labossière and will be composed of a 3-km-long overhead line. It will cross Highway 40 before reaching an overheadunderground junction substation located near the Joseph-Carrier industrial park, just east of Montée Cadieux. From this point, it will run underground to the Ericsson connection point since there isn’t enough room in the industrial park for an overhead line. STAGES UNDERWAY AND TO COME Since December 2015, Hydro-Québec has held meetings with affected landowners and is carrying out field studies to determine the best location for each tower. During 2016, Hydro-Québec will complete engineering work and will obtain the necessary government approvals to carry out the project. Commissioning of the new line is planned for 2017. FOR MORE INFORMATION Info-project Line Jonathan Petit 1 877 653-1139 Advisor – Community Relations – Richelieu Direction – Affaires régionales et collectivités 705, boul. Clairevue Ouest, 1er étage Saint-Bruno-de-Montarville (Québec) J3V 6B6 E-mail: [email protected] www.hydroquebec.com/langlois-vaudreuil-soulanges Ce document est également publié en français. This is a translation of the original French text. 2016E0162-A 100 %