315/25-kV Saint-Jean Substation and 315-kV - Hydro
Transcription
315/25-kV Saint-Jean Substation and 315-kV - Hydro
315/25-kV Saint-Jean Substation and 315-kV Supply Line ADVERTORIAL Hydro-Québec plans to refurbish Saint-Jean substation and convert the current voltage to 315/25 kV. Given that the facility is over 50 years old, most of the substation’s 120/12-kV equipment must be replaced. The project also calls for the construction of a new 315-kV line, about 3 km long. This line will be built in a right-of-way which already contains a 120-kV overhead line and is wide enough for the 315-kV overhead line. Proposed landscaping and recreational facilities in the existing right-of-way between Saint-Jean and des Sources boulevards The existing right-of-way could be improved thanks to a forward-looking and sustainable project to create landscaping and recreational facilities between Saint-Jean and des Sources boulevards. In collaboration with the city of Dollard-des-Ormeaux, Hydro-Québec intends to create a model right-of-way. Once commissioned, the substation and its supply line will meet the short- and long-term electricity needs of the area they serve. Commissioning is planned for spring 2019. Commissioned in 1957, Saint-Jean substation is located in Dollard-des-Ormeaux, at the intersection of Saint-Jean and De Salaberry boulevards. It currently supplies part of the cities of Dollard-des-Ormeaux, Pointe-Claire, Kirkland and Beaconsfield. For more information Existing Saint-Jean substation and right-of-way www.hydroquebec.com/transmission-construction-projects/ saint-jean-substation/ Graphisme : GB Design Studio Titre : Publireportage : Poste Saint-Jean et ligne d’alimentation o N d’annonce : 2015-089 Format : 10 po x 12.5 po Couleur : 4 couleurs Client : Hydro-Québec Publication : The Chronicle Date de parution : 27 mai 2015