January 20, 2014 Aedis Architects 387 South First Street, Suite 300
Transcription
January 20, 2014 Aedis Architects 387 South First Street, Suite 300
January 20, 2014 Aedis Architects 387 South First Street, Suite 300 San Jose, CA 95113 Subject: New Classroom & Music Buildings at Jefferson High School Jefferson Union High School District Project No. 28042 DSA File No. 41-H2 DSA Application No. 01-111055 ADDENDUM NO. 1 ________________________________________________________________________ CHANGES AND/OR CLARIFICATION'S OF THE DRAWINGS AND SPECIFICATIONS AS FOLLOWS: ITEM NO. 1.1: STRUCTURAL ENGINEER CONTACT PHONE NUMBER: Clarify: ITEM NO. 1.2: ELECTRICAL ENGINEER COMPANY NAME: Clarify: ITEM NO. 1.3: Contractors shall review ALL construction documents (drawings, specifications, addenda, etc.), and not limited to respective contractors trade only, to determine scope of work and cost (labor and materials) prior to bid opening. BIDDING: Clarify: Clarify: Clarify: ITEM NO. 1.6: Contractor shall mount Architects signage on site fencing (on campus side) along Mission Street. Architect shall provide sign. SCOPE OF WORK: Clarify: ITEM NO. 1.5: Electrical Engineer: Integral Inc. CONSTRUCTION SIGN: Add: ITEM NO. 1.4: Structural Engineer: Thornton Tomasetti – (415) 365-6900. All bids over $100,000 require Bid Bonds. All List of Proposed Sub-Contractors is required to be submitted with the Bid Form Project Labor Agreement is not required on this project. LANDSCAPE SUBMITTALS: Clarify: Contractor shall submit all items shown per attached convenience checklist of submittals for review. All submittals shall be submitted per drawings, specifications and contract documents. ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 2 of 23 ITEM NO. 1.7: DSA File No. 41-H2 DSA Application No. 01-111055 LANDSCAPE FIELD QUALITY CONTROL CHECKLIST: Clarify: ITEM NO. 1.8: Contractor shall complete all items shown per attached convenience checklist of items for completion and final punch walk. All work shall completed per drawings, specifications and contract documents. TOPOGRAPHICAL SURVEY: Add: For reference only, additional topographical information from January 7, 2014. SPECIFICATIONS ITEM NO. 1.9: SECTION 00 02 00 – NOTICE TO BIDDERS: Replace: ITEM NO. 1.10: SECTION 00 10 00 – INSTRUCTION TO BIDDERS: Replace: ITEM NO. 1.11: Entire specification section per 00 43 00. SECTION 00 48 00 – NONCOLLUSION DECLARATION: Replace: ITEM NO. 1.17: Entire specification section per 00 42 00. SECTION 00 43 00 – LIST OF SUBCONTRACTORS: Replace: ITEM NO. 1.16: Entire specification section per 00 41 00. SECTION 00 42 00 – QUALIFICATION STATEMENT: Replace: ITEM NO. 1.15: Entire specification section per 00 31 00. SECTION 00 41 00 – BID BOND: Replace: ITEM NO. 1.14: Entire specification section per 00 30 00. SECTION 00 31 00 – DISABLED VETERENS FORMS: Replace: ITEM NO. 1.13: Entire specification section per 00 10 00. SECTION 00 30 00 – PROPOSAL FORMS: Replace: ITEM NO. 1.12: Entire specification section per 00 02 00. Entire specification section per 00 48 00. SECTION 00 60 00 – PAYMENT AND PERFORMANCE BONDS: 2 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 3 of 23 Replace: ITEM NO. 1.18: DSA File No. 41-H2 DSA Application No. 01-111055 Entire specification section per 00 60 00. SECTION 03 30 00 – CAST IN PLACE CONCRETE: Revise: Section 3.03 (N) to read: Contraction (Control) Joints in Slabs-on-Grade: Clarify: ITEM NO. 1.19: 3) Contraction joints in unexposed floor slabs may be formed by hand tooling (or approved saw cutting option) as soon as possible after slab finishing as may be safely done without dislodging aggregate. All exposed concrete corners shall receive ½” x ½” bevel. All exposed concrete corners shall receive ½” x ½” bevel. Entire specification per 06 20 00. Entire specification per 07 18 13 for all second floor walkways. SECTION 08 41 13 – ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS: Add: ITEM NO. 1.23: Time hand tooling (or approved saw cutting option), to allow sufficient curing of concrete to prevent raveled or broken edges. SECTION 07 18 13 – PEDESTRIAN TRAFFIC COATINGS: Add: ITEM NO. 1.22: 2) SECTION 06 20 00 – FINISH CARPENTRY: Add: ITEM NO. 1.21: Construct contraction joints in slabs-on-ground to form panels of patterns indicated on Shop Drawings. Use hand tooled control joints 1/8” x 1/4 slab depth, unless otherwise noted. Optional saw cutting is an optional installation method will have to be confirmed with Owner or Architect prior to Bid, otherwise contractor shall bid on hand tooled joints. SECTION 03 37 13 – SHOTCRETE: Clarify: ITEM NO. 1.20: 1) Sub-contractor shall provide deferred approval calculations and design as part of the bid. SECTION 08 63 00 – METAL- FRAMED SKYLIGHTS: Clarify: Section 2.3(A) shall be prismatic polycarbonate glazing. 3 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 4 of 23 ITEM NO. 1.24: SECTION 08 90 50 – TRANSLUCENT SKYLIGHT PANELS: Remove: ITEM NO. 1.25: Add: Revise: Section 3.3(J)(2) Surface Mounted Hand Dryer. SECTION 12 35 50 –EDUCATIONAL/ LIBRARY CASEWORK: Remove: ITEM NO. 1.30: All toilet compartment panels shall be solid color High Density Polyethylene(HDPE) and not composite material. SECTION 10 28 00 –TOILET ACCESSORIES: Remove: ITEM NO. 1.29: Part 2, Section 2.2 (B) (3) “Backing Material” to read “Osnaburg over Cement Fiber Backer Board” to mitigate uneven wall surface. SECTION 10 21 00 –TOILET COMPARTMENTS: Clarify: ITEM NO. 1.28: Section 2.4(A)(6) to read “Finish: Kynar Coated to match adjacent wall color.” Section 2.4(B)(9) to read “Finish – Clear Anodized. Confirm reflectivity of metal finish with District and Architect prior to fabrication. Section 2.8(B)(1) to read “Fluoropolymer Two-Coat Coating System: Manufacturer's Custom two-coat, thermo cured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight; complying with AAMA 2605.” SECTION 09 72 16 – VINYL-COATED FABRIC WALL COVERING: Revise: ITEM NO. 1.27: Entire specification section. SECTION 08 91 00 – LOUVERS AND VENTS: Add: ITEM NO. 1.26: DSA File No. 41-H2 DSA Application No. 01-111055 Section 2.9(A) Plastic Laminate. All countertops shall be solid surface countertops per section 3.9(B). SECTION 22 10 00 – PLUMBING PIPING SYSTEMS: Add: Section 2.15 to read: “WALL HYDRANTS 1. Hot and Cold Water Recessed Wall Hydrants: Combination hot and cold water 18 gauge Type 304 stainless steel box hydrant, 16 gauge stainless steel, lock shield loose key tee handles, flange and hinged locking cover, two 3/4 inch inlets, hose outlet with non-removable vacuum breaker. Acorn Model 8156.” 4 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 5 of 23 ITEM NO. 1.31: SECTION 28 31 00 – FIRE DETECTION AND ALARM: Add: ITEM NO. 1.32: DSA File No. 41-H2 DSA Application No. 01-111055 Sub-contractor must be pre-qualified and approved by the District prior to award of bid. SECTION 32 31 13 – CHAIN LINK FENCE GATES: Revise: Section 2.3 to read: A. Posts and Rails: Comply with ASTM F 1043 for framing, ASTM F 1083 for Group IC round pipe, and the following: 1. End, Corner and Pull Posts - Up to 6 foot fabric height: 2.375” OD steel pipe, 3.65 lbs. per lin. Ft., or 3.5” x 3.5” roll formed sections, 4.85 lbs. per lin. ft. End, Corner and Pull Posts –6 foot to 8 foot fabric height: 2.875” OD steel pipe, 5.79 lbs. per lin. Ft., or 3.5” x 3.5” roll formed sections, 4.85 lbs. per lin. ft. End, Corner and Pull Posts – 8 foot to 12 foot fabric height: 3.5” OD steel pipe, 7.58 lbs. per lin. ft. Line Posts – Up to 6 foot fabric height: 1.90: OD steel pipe, 2.70 lbs. per lin. ft., or 1.875” x 1.625” C- sections, 2.28 lbs. per lin. ft. Line Posts – 6 foot to 8 foot fabric height: 2.375” OD steel pipe, 3.65 lbs. per lin. ft., or 2.25” x 1.875”, 2.64 lbs. per lin. ft. Line Posts – 8 foot to 12 foot fabric height: 3.5” OD steel pipe, 7.58 lbs. per lin. Ft Top, mid and Bottom Rails: 1.66” OD steel pipe, 2.27 lbs. per lin. ft., or 1.625” x 1/25” roll-formed sections, 1.35 lbs. per lin. ft. 2. 3. 4. 5. 6. 7. Revise: Section 3.4 (D) to read: “Space line posts uniformly at 10 feet on center maximum unless indicated otherwise on Drawings.” DRAWINGS GENERAL ITEM NO. 1.33: TITLE BLOCK – AEDIS LOGO AND CONTACT INFORMATION: Revise: Aedis logo and contact information to be revised to match AD1- T1a on all drawing title blocks. 5 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 6 of 23 ITEM NO. 1.34: ITEM NO. 1.35: DSA File No. 41-H2 DSA Application No. 01-111055 PHASING: Clarify: All trades shall refer to phasing plan on sheet A1.04 for all phases of demolition and new work. Omit: Phase 3 scope of work and (E) portable removal on all drawings as shown on A1.04. Work shall commence after users have fully occupied new building and (E) portables are no longer in use (estimated end of Summer 2016). TRACER WIRE: Clarify: All non-metallic underground piping shall include tracer wires. CIVIL DRAWINGS ITEM NO. 1.36: DRAWING C1 – DEMOLITION PLAN: Revise: Revise: ITEM NO. 1.37: DRAWING C2 – GRADING AND DRAINAGE PLAN: Add: Add: Revise: Revise: Revise: Revise: ITEM NO. 1.38: Culvert detail referenced in drawing AD1-C2a per AD1-C2c. All existing electrical/ communications vault lids shall be new and raised or lowered to align with new paving. Myrtle Street reference to Miriam Street. Culvert layout, concrete walkway, and sidewalk grades per enlarged site plan AD1-C2a. Paving and grades around entrance to Building ‘E’ courtyard per AD1-C2b. Culvert step notation and culvert layout per AD1-C2d. DRAWING C3 – UNDERGROUND UTILITY PLAN: Add: Revise: Remove: ITEM NO. 1.39: Myrtle Street reference to Miriam Street. Scope of site demolition per AD1-C1a. Note for existing culvert under the side walk step to remain per AD1-C3a. Myrtle Street reference to Miriam Street. Perforated pipe for previous site retaining wall per AD1-C3a. DRAWING C4 – HORIZONTAL CONTROL PLAN: Revise: Myrtle Street reference to Miriam Street. 6 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 7 of 23 ITEM NO. 1.40: DRAWING C6 – HORIZONTAL CONTROL PLAN: Revise: ITEM NO. 1.41: DSA File No. 41-H2 DSA Application No. 01-111055 Myrtle Street reference to Miriam Street. DRAWING C7 – DEMOLITION PLAN, GRADING AND DRAINAGE PLAN: Add: Demolition of existing steps west of elevator tower as noted on 1/A2.02. ARCHITECTURAL DRAWINGS ITEM NO. 1.42: DRAWING A1.04 – TEMPORARY CONSTRUCTION FENCING AND STAGING AREA LAYOUT: Omit: ITEM NO. 1.43: DRAWING A3.01 – FIRST FLOOR PLAN: Add: Add: ITEM NO. 1.44: Keynote 25 to read: “COVERED WALKWAY WITH PEDESTRIAN TRAFFIC COATING O/ TOPPIING SLAB O/ WATERPROOFING MEMBRANE O/ STRUCTURAL SLAB O/ METAL DECK. SEE DETAIL 17/A8.23.” DRAWING A3.02a – WALL TYPE PLAN – 2ND FLOOR: Clarify: ITEM NO. 1.47: See all elevations and sections for additional wall types not show on plan. DRAWING A3.02 – SECOND FLOOR PLAN: Revise: ITEM NO. 1.46: General Note H to read “PROVIDE 3” CONCRETE OVER FOAM AT ALL GUSSET PLATES WHERE OCCURS PER DETAIL 1/A9.03.” Section cut per AD1-A3.01a. DRAWING A3.01a – WALL TYPE PLAN – 1ST FLOOR: Clarify: ITEM NO. 1.45: Phase 3 scope of work and (E) portable removal. Work shall commence after users have fully occupied new building and (E) portables are no longer in use (estimated end of Summer 2016). See all elevations and sections for additional wall types not show on plan. DRAWING A6.02 – EXTERIOR ELEVATIONS- CLASSROOMS MUSIC BLDGS: Clarify: Provide and install overflow penetration through louver system on detail 1 per detail l8/A8.24. 7 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 8 of 23 ITEM NO. 1.48: DRAWING A6.03 – BRIDGE & GATEWAY EXTERIOR ELEVATIONS: Add: ITEM NO. 1.49: “RESINOUS FLOORING…” to “PEDESTRIAN TRAFFIC COATING…” on detail 17. DRAWING A8.26 – EXTERIOR DETAILS – BRIDGE AND GATEWAY: Clarify: ITEM NO. 1.53: Prefinished metal deck on covered walkway shall be 18GA prefinished aluminum metal deck per structural drawings on details 4, 7, 8, 10, 18. Provide and install barrier between the dissimilar metals of the metal deck and structural steel. DRAWING A8.23 – EXTERIOR DETAILS: Revise: ITEM NO. 1.52: Section through Gridline M, N, and culvert adjacent to neighboring house on Miriam Street per detail 1/ AD1-A8.10a. DRAWING A8.22 – EXTERIOR DETAILS: Clarify: ITEM NO. 1.51: 3” min. clearance between gateway gutter to face of elevator tower and Building ‘F’ soffit fascia. DRAWING A8.10 – WALL SECTIONS: Add: ITEM NO. 1.50: DSA File No. 41-H2 DSA Application No. 01-111055 Detail 9 is cut through open area of canopy. Stud framing at cement plaster walls go all the way up to the underside of 12GA plate shown on 14/S2.04. DRAWING A9.03 – INTERIOR DETAILS: Clarify: Foam shall be a compressible foam joint filler to allow movement as noted on detail 1. STRUCTURAL DRAWINGS ITEM NO. 1.54: DRAWING S2.01 – FOUNDATION PLAN AND FIRST FLOOR PLAN: Add: Temporary shoring wall per AD1-S2.01a. Revise: Retaining wall extent, clarify detail call outs per AD1-S2.01a. ITEM NO. 1.55: DRAWING S2.02 – SECOND FLOOR FRAMING PLAN: Revise: Retaining wall extent, clarify detail call outs. Delete W16 beam at concrete landing per AD1-S2.02a. ITEM NO. 1.56: DRAWING S2.06 – BLDG D D.A. RAMP PLAN AND SECTIONS: Add: Temporary shoring wall detail per AD1-S2.06a. Add: Concrete culvert detail per AD1-S2.06b. Revise: Sheet title to include “Shoring Wall Details” per AD1-S2.06c. 8 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 9 of 23 ITEM NO. 1.57: DSA File No. 41-H2 DSA Application No. 01-111055 DRAWING S5.03 – CONCRETE AND RETAINING WALL DETAILS: Revise: Detail 9: clarify exterior flat work adjacent to retaining wall per AD1S5.03a. Revise: Detail 10: revised slab dowel location in concrete wall, clarify bottom of thickened slab at top of footing per AD1-S5.03b. Revise: Detail 12: show wall drainage and clarify top of footing locations per AD1-S5.03c. Revise: Detail 14: clarify exterior flat work adjacent to retaining wall per AD1S5.03d. Revise: Detail 20: location of key revised. Revise retaining wall schedule to include walls shorter than 4’-6” per AD1-S5.03e. MECHANICAL DRAWINGS ITEM NO. 1.58: DRAWING M0.02 – MISC. EQUIPMENT SCHEDULE: Revise: FH-1 THRU 4 “>>>Air Alert 600 Alarm, and fan switch” to read “…Air Alert 600 Alarm, light switch, and fan switch.” PLUMBING DRAWINGS ITEM NO. 1.59: DRAWING P0.01 – PLUMBING LEGENDS, NOTES, AND SCHEDULES: Add: Revise: ITEM NO. 1.60: . DRAWING P0. 02 – PLUMBING FIXTURE SCHEDULE: Add: . ITEM NO. 1.61: RD/OF, see AD1-P0.02a DRAWING P1.02 – PLUMBING SITE PLAN: Revise: ITEM NO. 1.62: Plumbing sheet index; P4.01 Plumbing First Floor Enlarged Plans; P4.02 Plumbing Second Floor Enlarged Plans Instantaneous Water Heater Schedule: IWH-1 & 2 Temperature Rise at Flow Rate to read “75F @ 0.5 GPM”; IWH-3 Temperature Rise at Flow Rate to read “65F @ 0.5 GPM” Moved the plumbing utilities stubbed out for Building E to be located within the landscape planter areas. DRAWING P4.01 – PLUMBING FIRST FLOOR ENLARGED PLANS: Add: Prep Rm. J105 – DW connection to HW, see AD1-P4.01a. 9 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 10 of 23 ITEM NO. 1.63: DRAWING P4.02 – PLUMBING SECOND FLOOR ENLARGED PLANS: Add: Add: ITEM NO. 1.64: DSA File No. 41-H2 DSA Application No. 01-111055 Prep Rm. J202 – DW connection to HW, see AD1-P4.02a. Prep Rm. J205 – DW connection to HW, see AD1-P4.02b DRAWING FP0.02 – FIRE PROTECTION LEGENDS, NOTES, SCHEDULES, AND DETAILS: Clarify: Detail 1/FP0.02 shall remain for reference on dimensional clearance requirements around fire sprinkler riser only. ELECTRICAL DRAWINGS ITEM NO. 1.65: DRAWING E1.02 – ELECTRICAL SITE PLAN: Add: Add: Add: Add: Add: Revise: Revise: Relocate: ITEM NO. 1.66: DRAWING E3.10 – POWER PLAN – FIRST FLOOR: Add: Add: Add: Clarify: Revise: Revise: Revise: Remove: ITEM NO. 1.67: A receptacle in IDF rm. & circuited to JP2-7 per AD1 – E3.10a. Note # 29 and 30 per AD1 – E3.10a and AD1 – E3.10b. A receptacle in IDF rm. & circuited to JP2-25 per AD1 – E3.10c. See A3.01a for locations of all floor boxes. SAC-1 circuit number per AD1 – E3.10c. SAC-2 circuit number per AD1 – E3.10b. SAC-3 circuit number per AD1 – E3.10b and AD1 – E3.10a. Incoming circuit indicators inside IDF room per AD1 – E3.10a. DRAWING E3.20 – POWER PLAN – SECOND FLOOR: Clarify: ITEM NO. 1.68: (3) ‘Z1’ fixtures to archway per AD1 – E1.02a. Conduit between S3 fixtures per AD1 – E1.02b and AD1 – E1.02d. Lighting conduit and wiring per AD1 – E1.02b, AD1 – E1.02c, and AD1 – E1.02d. Sheet note 21 and 22 per AD1 – E1.02e. All existing electrical/ communications vault lids shall be new and raised or lowered to align with new paving. Circuits for landscape lighting and parking lot lighting per AD1 – E1.02b and AD1 – E1.02c. Note #11 changed J109 to J107 per AD1 – E1.02e. Fixture ‘M1’ on bldg. ‘E’ per AD1 – E1.02d. See A3.02a for locations of all floor boxes. DRAWING E3.30 – ELECTRICAL PLAN – ROOF: Revise: Revise: SCU-1 circuit number to KP1-15, 17 per AD1 – E3.3. SCU-2 circuit number to JP1-47, 49 per AD1 – E3.30b. 10 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 11 of 23 Revise: Remove: ITEM NO. 1.69: Add: Add: Revise: Revise: Remove: Revise: Revise: Remove: Remove: Fixture type tag from ‘X’ to ‘X1’ for (2) fixtures, and added ‘WP’ per AD1 – E4.20a and AD1 – E4.20b. Circuit from 11 and 13 to 19 and 21 for exterior fixtures type L1 and L1EM per AD1 – E4.20a and AD1 – E4.20b. (2) fixture labels from A to A1 in Prep Rm J202 and Prep Rm J205 per AD1 – E4.20a and AD1 – E4.20b. (3) fixtures near gridline J.2 and gridline 1 per AD1 – E4.20b. (1) fixture near gridline 6 and gridline k per AD1 – E4.20b. DRAWING E5.01– SINGLE LINE DIAGRAM: Add: Add: Revise: Revise: Revise: Revise: Revise: Revise: ITEM NO. 1.72: M1 and M1EM tags per AD1 – E4.10a, AD1 – E4.10b, and AD1 – E4.10c. “b, c” switchlegs linear fixtures in room K101 per AD1 – E4.10a. (5) D fixtures and (1) D1 fixtures and (2) switches in the IDF Room (J107) per AD1 – E4.10b. Circuit from 11 and 13 to 15 and 17 for exterior fixtures to the right of gridline D per AD1-E4.10b and AD1 – E4.10c. (2) fixture labels from A to A1 in Prep Rm J102 and Prep Rm J105 per AD1 – E4.10b and AD1 – E4.10c. (2) fixtures near gridline J.2 and gridline 1 per AD1 – E4.10c. DRAWING E4.20 – LIGHTING PLAN – SECOND FLOOR: Revise: ITEM NO. 1.71: SCU-3 circuit number JP2-38, 40 per AD1 – E3.30b. Irrelevant circuit number on drawing per AD1 – E3.30b. DRAWING E4.10 – LIGHTING PLAN – FIRST FLOOR: Add: ITEM NO. 1.70: DSA File No. 41-H2 DSA Application No. 01-111055 Shunt trip to elevator circuit breaker per AD1 – E5.01a. Sheet notes 8 and 9 per AD1 – E5.01a. KVA values of panel JP1, 2, 3, 4, 5 per AD1 – E5.01b. Main breaker size of DPJ to 500A per AD1 – E5.01b. KVA value of panel DPJ & JL2 per AD1 – E5.01a and AD1 – E5.01b. Incoming cable size of dist. pnl. DSBJ & DPJ per AD1 – E5.01a and AD1 – E5.01b. Incoming cable size of pnl. JL1 & JL2 per AD1 – E5.01a. Outgoing breaker size of pnl. JL2 and transformer TJ1 per AD1 – E5.01a. DRAWING E6.01 – LIGHTING FIXTRUE SCHEDULE: Revise: Revise: Remove: Remove: Fixture D to Moralite. “X” to edgelit and add “X1” of same type “X” but weather proof type per AD1 – E6.01b. Light fixture A2, A3, B and marked “Not used” per AD1 – E6.01a. Fixture F, G1, K and H and marked “Not used” per AD1 – E6.01a. 11 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 12 of 23 ITEM NO. 1.73: DRAWING E6.02 – LIGHTING FIXTRUE SCHEDULE: Revise: ITEM NO. 1.74: Height of concrete base of light pole shall be minim 2’-6” above finish grade on detail 1. DRAWING E6.03 – PANEL SCHEDULES: Revise: ITEM NO. 1.75: DSA File No. 41-H2 DSA Application No. 01-111055 Panel JP1, JP2, JL1 and KP1 per AD1 – E6.03a, AD1 – E6.03b, AD1 – E6.03c, and AD1 – E6.03d. DRAWING E6.05 – EQUIPMENT SCHEDULE: Delete: Reference and requirements for SCU-4 at Building ‘A’. COMMUNICATION DRAWINGS ITEM NO. 1.76: DRAWING T0.02 – SYMBOL SCHEDULE: Revise: Revise: ITEM NO. 1.77: DRAWING T3.01 - FIRST FLOOR SECURITY DEVICE PLAN: Revise: ITEM NO. 1.78: Detail sheet “T8.04” to read as “T9.07”. DRAWING T3.02 - SECOND FLOOR SECURITY DEVICE PLAN: Revise: ITEM NO. 1.79: FP2 Rough-in as shown on Addendum Drawing AD1-T0.02a. Swap the symbol between the wall telephone jack and WAP data device as shown on Addendum Drawing AD1-T0.02a. Detail sheet “T8.04” to read as “T9.07”. DRAWING T4.01 - IDF ENLARGED PLANS AND ELEVATIONS: Add: Add: Power receptacles as shown on Addendum Drawing AD1-T4.01a and AD1-T4.01b. Keynotes TN12 and TN13 as shown on Addendum Drawing AD1-T4.01c. LANDSCAPE DRAWINGS ITEM NO. 1.80: DRAWING L1.1 – LAYOUT PLAN: Add: (1) Removable bollard. See attached drawing AD1-L1.1a. 12 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 13 of 23 Change: Change: Change: ITEM NO. 1.81: Paint to bollards. See attached drawing AD1-L1.5A. DRAWING 1.6 – IRRIGATION PLAN: Revise: Change: Change: Add: ITEM NO. 1.85: Head layout and valve flow of valve B36. See attached drawing AD1-L1.4A. DRAWING L1.5 – CONSTRUCTION DETAILS, DETAIL A, L1.5, BOLLARD REMOVABLE: Add: ITEM NO. 1.84: Concrete curb at planting area. See attached drawing AD1-L1.2a. Painting of existing bollards. See attached drawing AD1-L1.2b. (1) removable bollard. See attached drawing AD1-L1.2b. Edge of concrete paving. See attached drawing AD1-L1.2b. Fence and gate layout. See attached drawing AD1-L1.2b. Score and expansion joint layout. See attached drawing AD1-L1.2b. Location of Wall ‘A’ callout. See attached drawing AD1-L1.2c. DRAWING L1.4 – CONSTRUCTION DETAILS, DETAIL K, L1.4, CONCRETE CURB, 6” HIGH: Add: ITEM NO. 1.83: Edge of concrete paving. See attached drawing AD1-L1.1a. Fence and gate layout. See attached drawing AD1-L1.1a. Score and expansion joint layout. See attached drawing AD1-L1.1a. DRAWING L1.2 – MATERIAL AND DETAIL REFERENCE PLAN: Add: Add: Add: Change: Change: Change: Revise: ITEM NO. 1.82: DSA File No. 41-H2 DSA Application No. 01-111055 Head layout and valve flow of valve B36. See attached drawing AD1-L1.6A. Irrigation controller enclosure to stainless steel. See attached drawing AD1-L1.6b. Irrigation controller interface module. See attached drawing AD1-L1.6b. 1” electrical conduit between splice box and controller ‘C’. See attached drawing AD1-L1.6c. DRAWING 1.7 – PLANTING PLAN: Remove: Remove: Add: Add: (3) Hemerocallis species. See attached drawing AD1-L1.7a. (2) Euryops pectinatus ‘Viridis’. See attached drawing AD1-L1.7a. (4) Rosa officinalis ‘Collingwood Ingram’. See attached drawing AD1-L1.7b. (2) Phormium ‘Wings of Gold’. See attached drawing AD1-L1.7a. 13 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 14 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 SUBSTITUTION REQUESTS: Accepted substitution requests include: - Nelson Adams NACO (Sliding Marker Board), - Winco (1450L Series 4” Heavy Commercial Thermal Window), - American Warming and Vent (For Wall Louver Only. Manufacturer subcontractor shall supply louver screens and louver wall system per specifications at time of bid) - Balco (Expansion Joint Covers. Product must allow minimum required movement building without obstruction. Finishes shall be flush or meet with edges of the expansion cover) Rejected substitution requests include: - Spring Window Fashions (Roller Shades), - Tru Barrier (Concrete Vapor Barrier), - Excel Dryer (Hand Dryer) PRE-BID REQUEST FOR INFORMATION: ITEM NO. 1.86: FREMONT MILLWORK – DATED 1/17/14 Question 1: Bid Package 20 calls off Lab Sinks...so does Bid Package 23. Please clarify which bid package is required to pick up the Lab Sinks. Answer: The chemical sinks are incorporated into the lab tops and as such should be Bid as part of the Bid Package 20. ITEM NO. 1.87: FREMONT MILLWORK – DATED 1/15/14 Question 1: Looking at Bid Package 20 I would think that Section 12 35 53 Laboratory Casework would also be called off because the Lab Casework in is that Section not Section 12 35 50. Also note that the Music Casework is not in any Bid Package. Answer: Music casework will be included in the bid package 20. Question 2: The trim that is called off in Bid Package 20 is not called off in Spec Section 12 35 50 and there is no Finish Carpentry spec section in the spec book. Please clarify what type of material the window trim is. Answer: See addendum #1 for finish carpentry specifications for trim work. 14 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 15 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 Question 3: Is a Bid Bond required for this project for bids over 100k? If so please provide a bid bond form we can submit to our bonding company. Answer: Yes. Bid Bond forms are available through the AIA website per specification 00410. ITEM NO. 1.88: MIKE BROWN ELECTRIC CO. – DATED 1/15/14 Question 1: Note 20, sheet E1.02 at the South-East corner of Building ‘F’ calls for ‘Z1’ fixtures to be installed. There are two ‘Z2’ fixtures shown. Please, clarify how many ‘Z1’ fixtures supposed to be installed and provide detail. Also, provide point of power connection for fixtures ‘Z1’ and/or ‘Z2’. Answer: See Addendum #1 Question 2: It is unclear if 400A/3P circuit breaker designated to feed Distribution Switchboard ‘DSBJ’ is new or existing. Please, clarify. Answer: It is new. Anything without an “(E)” is new. Question 3: Panel ‘KP1’ schedule is missing. It’s not shown on panel schedule sheets E6.03 and/or E6.031. Please, add panel schedule. Answer: See Addendum #1 Question 4: Is ‘MC’ cable going to be acceptable? If yes, for what applications? Answer: No. ITEM NO. 1.89: MIKE BROWN ELECTRIC CO. – DATED 1/8/14 Question 1: Sheet note #1 on drawing E3.10 requires installation of (3) j-boxes and conduit risers per detail 1 on drawing E6.07 every 10’ O.C. Please, confirm that this is the intent of the design. It seems excessive and an unnecessary expenditure. In our opinion, one riser for 20’-30’long wiremold runs or two, at the most, risers for longer wiremold runs would be sufficient. Answer: Install per plan. The design intent is shown accurately. Question 2: Wiremold data/telephone outlets are not shown on power drawings E3.10, E3.20 and on communication drawings T2.01, T2.02 (except, partially, in classroom J204). Please, advise if intent is to use detail 1 on drawing E6.07 as a guidance (one telecom outlet per each power outlet) or it should be per communication drawings. 15 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 16 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 Answer: All telephone, data, clock/ PA and low voltage requirements shall be coordinated, provided and installed per the SFM’s ‘T’ drawings and specifications in the Construction Documents. Question 3: Lighting fixture identification on drawings E4.10 and E4.20 is controversial and needs to be clarified. Example, 2’x4’ fixtures identified as ‘A’ are not on lighting fixture schedule. Instead, there are A1, A2, A3 and A4 fixtures are listed. Per description, we can only guess, that not shaded symbols should be fixtures ‘A1’ and shaded symbols are ‘A2’ fixtures. Another example is fixture ‘M1’ and ‘M1EM’. Drawing E4.10: In one instance ‘M1’ identified as not shaded symbol (at columns D and 5.2), in second one it’s shaded (at columns M and 3) and in third one it’s shaded and identified as ‘M1EM’ (between columns J2 and K, right above column 1). Please, clarify. Answer: See Addendum #1. The Luminaire schedule and plans have been revised to clarify. ITEM NO. 1.90: T3 INC. – DATED 1/2/14 Question 1: Please clarify ceiling products to be used on this project. Section 095113 2.3 calls out Arm 746 and Armstrong 2776. Armstrong 746 is 12x12 ceiling tile and is not located on job. Armstrong 2776 is a 2x4 second look tegular edge ceiling board that is 3/4" thick. This product number also installs in 9/16" grid. 095113 2.5 calls out 15/16" grid. Please clarify which ceiling board and grid type is basis for bid. On sheet A9.02 detail 25 calls out a Donn VSA Post. These are over $40 per unit as opposed to a 1 5/8" 20g stud (DSA approved) for 1/10th the cost. Will this be accepted? Answer: There is no 746-12” X 12” on the project. The correct tile is Cortega Second Look (Lay-in), Size 2’ X 4’X 15/16” with a 2’ X 2’ Score. Color is white with a medium Texture. The grid system is Armstrong Prelude XL Fire guard 15/16 Exposed-Tee: A) 2’-Cross tee’s are # XL8320HRC B) Main Beams are # 6101HRC ITEM NO. 1.91: WESTMARK PRODUCTS. – DATED 1/2/14 Question 1: For the Teaching Walls at the Science Lab Rooms: are the casework subs to include or exclude the sliding markerboards, map rails, and chalk trays? Answer: Casework Subcontractor shall include sliding markerboards, map rail and chalk trays for all teaching walls in their bids. Question 2: Will Bid Package that includes Section 12 35 50 also include Sec 12 35 53? And, any parts of Section 06 20 00 like the wood window sills, wall paneling, etc.? And, any other items not in Section 12 35 50? 16 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 17 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 Answer: All educational and laboratory casework and wood trim shall be incorporated into one bid package, see addendum #1 revised proposal. Educational and laboratory casework are not to be provided by the same manufacturer, as each require different certification and materials. Question 3: In the Science Rooms: which countertops are to be Epoxy Resin and which are to be Trespa? Sec Section 12 35 50 specifies “Trespa tops at wet areas, i.e. shops, science classrooms, etc.” Drawings show “Chemical Resistant” tops along casework at walls and “Epoxy Chemical Resistant” at teacher demonstration station. It will be helpful to have this clarified to ensure all the casework bids have the same scope. Answer: All casework identified with a “PS” on the drawings shall receive chemical resistant epoxy resin countertops per Laboratory Casework specification 12 35 53. All casework identified with a “PC” on the drawings shall receive Trespa countertops per Educational Casework specification 12 35 50. No P-Lam countertops will be accepted. Question 4: Will Durcon Epoxy Resin tops and sinks be an acceptable substitute for the Kewaunee brand spec’d in section 12 35 53 (assuming all the performance spec’s are equal) Answer: Yes, as long as all specifications are equal. Question 5: In the Science Rooms: are all the cabinets to comply with Section 12 35 53? If not, please provide clarification as to which cabinets need to comply with Section 12 35 53 and which can comply with Section 12 35 50 Answer: All casework identified with a “PS” (All Science Classrooms and Prep Rooms) on the floor plans shall follow Laboratory Casework specification 12 35 53. All casework identified with a “PC” on the floor plans shall follow Educational Casework specification 12 35 50. All casework identified with a “PM” on the floor plans shall follow Music Education Casework specification 12 35 51. Question 6: Will the submittals due date of Feb 25, 2014 be a hard date for all subs or flexible based on the construction schedule? That will be a very hard date to meet based on the requirements for this project. Answer: We do not need all of the submittals at once, but we need these items in an orderly manner to prevent scheduling issues and in many cases information is required to place certain items that you can only coordinate from the information provided in the submittals. Coordination will be required with Gonsalves and Stronck, and allow minimum 2 weeks time for architectural review. 17 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 18 of 23 ITEM NO. 1.92: DSA File No. 41-H2 DSA Application No. 01-111055 DASCO Construction and Drywall, Inc. – DATED 12/31/13 Question 1: Per mandatory job walk, it was noted that subs are expected to supply and install all items listed in spec section you are bidding. Spec section 092116 list hi impact corner guards, isolation strips, sound attenuation blankets, thermal insulation, and polyethylene vapor retarder. Typically these items are installed by specialty subcontractors who are licensed and experienced with that scope of work. Please confirm that these items are intended to be installed by other specialty contractors experienced in just mentioned scope of work and not drywall contractor. Answer: See revised proposal form on Addendum #1 for items to be included in your bid package. Question 2: Spec Section 092116/3.8 list all levels of drywall finish and 3.9 describes spray texture finish. What level of finish is required for project? Answer: All drywall should receive a level 5 finish, except for the following: a) Above the ceiling grid would only require a level two finish. b) Any surface receiving the sound board or tackable surfaces require a level three finish. ITEM NO. 1.93: DW ACOUSTICS – DATED 12/31/13 Question 1: Section 095123 – The 12 x 12 Armstrong #592 ceiling tile is discontinued. The Drawing A11.01 – Finish Schedule does not list this or any other 12 x12 ceiling tile. Please Advise. Answer: There are no 12x12 ceiling tiles in the project. Question 2: Specification 00410-1 calls for a bid bond. Specification 00600-1 calls for a payment and performance bond for work over $100,000.00. In section 00100 page 10 the bond requirements are struck out. Please Advise. Answer: A bid bond is required if the amount of your bid exceeds $100,000.00; Sections 00 20 00 thru 00 60 00 have been revised to reflect this change. Question 3: Specification section 095113, part 2, products – 2.3-A. Armstrong #746 ceiling tile – This 12x12 ceiling tile is not shown in any of the drawings. Armstrong #2776 second look 2x4 ceiling tile requires a 9/16” grid system, in products 2.5 the suspension system listed all 15/16” grid systems and will not work with ceiling tiles ACP-A and ACP-B. Please advise. 18 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 19 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 Answer: There is no 746-12” X 12” on the project. The correct tile is Cortega Second Look (Lay-in), Size 2’ X 4’X 15/16” with a 2’ X 2’ Score. Color shall be white with a medium Texture. As a result there is no problem with grid compatibility as the grid system is Armstrong Prelude XL Fire guard 15/16 Exposed-Tee A. 2’-Cross tee’s are # XL8320HRC B. Main Beams are # 6101HRC. Question 4: Bid form, section 00300B-1 through 00300B-11 – Are we to include all of the pages in our bid package? Answer: All pages of the Bid Form are to be included. Question 5: Section 098433 part 2, products 2.1, manufacturers, A, products 1.a.2. The panels are listed as 2” in thickness. Drawings A9.03 detail #2 shows the panels to be 3” thick. Please advise. Answer: 2” is sufficient. Question 6: At line 4.9, there is no detail for the connection of the acoustical ceiling at the ridge. At lines 3 and 7 there is no detail as to how the wall angle is to be attached in regard to the 3/12 slope. Please advise. Answer: At each of these locations the contractor will need to provide a finished ( painted to match the manufactured grid) special bent angle for this and other conditions similar. Question 7: Gonsalves and Stronck Construction schedule, page 3, line #34255 refers to the installation of 12”x12” glue up ceiling tile. I do not see these ceiling tiles in any of the drawings. Please advise. Answer: There are no 12x12 ceiling tiles in this project. Question 8: Section 01630, page 1, part 1, 1.02, product options, C, should be included in section 095113, part 2, per P.C.C. section 3400. Will the acoustic ceiling section 095113 be revised to allow substitutions by the January 10th, 2014 deadline? (P.C.C.) Public Contract Code – Section 3400 Please advise as to whether part (c) – lines (1)(2)(3) and (4) apply to this project. Thanks. Answer: For substitutions, see 01630-1, they were due January 10th. They apply (a) No agency of the state, nor any political subdivision, municipal corporation, or District, nor any public officer or person charged with the letting of contracts for the construction, alteration, or repair of public works, shall draft or cause to be drafted specifications for bids, in connection with the construction, alteration, or repair of brand or trade name unless the specification is followed by the words "or equal" so 19 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 20 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 that bidder may furnish any equal material, product, thing, or service. In applying this section, the specifying agency shall, if aware of an equal product manufactured in this state, name that product in the specification. Specifications shall provide a period of time prior to or after, or prior to and after, the award of the contract for submission of data substantiating a request for a substitution of "an equal" item. If no time period is specified, data may be submitted any time within 35 days after the award of the contract. (b)Subdivision (a) is not applicable if the awarding authority, or its designee, makes a finding that is described in the invitation for bids or request for proposals that a particular material, product, thing, or service is designated by specific brand or trade name for any of the following purposes: (1) In order that a field test or experiment may be made to determine the product's suitability for future use. (2) In order to match other products in use on a particular public improvement either completed or in the course of completion. (3)In order to obtain a necessary item that is only available from one source. (4)(A)In order to respond to an emergency declared by a local agency, but only if the declaration is approved by a four-fifths vote of the governing board of the local agency issuing the invitation for bid or request for proposals. (B)In order to respond to an emergency declared by the state, a state agency, or political subdivision of the state, but only if the facts setting forth the reasons for the finding of the emergency are contained in the public records of the authority issuing the invitation for bid or request for proposals. - See more at: http://codes.lp.findlaw.com/cacode/PCC/1/d2/1/3/5/s3400#sthash.uEdQH1eY.dpuf ITEM NO. 1.94: AIR SYSTEMS – DATED 12/20/13 Question 1: Please confirm that the attendance requirement for a Contract Signatory Officer (person authorized to sign contracts for the company) is waived; and that any Subcontractor’s Representative that attended the Pre-Bid Conference is sufficient to fulfill the mandatory attendance requirements in order to bid the project. Answer: The Requirement for a signatory to attend was waived is correct. Question 2: Conference. Please post on the next addendum the attendance sheet of the Pre-Bid Answer: See attached Pre-Bid Conference attendance sheet. Question 3: What is the spec section for the “Prefinished Metal Deck” (canopy metal roof)? Is the spec the same as spec section 07 42 13 Metal Soffit Panels? Please confirm. Answer: See Addendum #1. Pre-finished metal deck for covered walkway roof shall be pre-finished aluminum deck. 20 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 21 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 Question 4: Spec Section 07 42 13 paragraph 1.4B calls for “Delegated Design.” Please clarify what “Delegated Design” means? Or in terms of “Delegated Design,” what are the responsibilities or what role does the subcontractor (installer) play for this project? Answer: Subcontractor shall provide literature and/or calculations from manufacturer that the product used meets deflection requirements, loads, allowable movement, and ASTM requirements outlined in all of Section 1.4. If manufacturer selected by subcontractor does not provide noted literature and/or calculations, subcontractor (installer) shall provide documentation at their own expense. Documentation will be required at time of submittals. Question 5: Spec Section 07 42 13 paragraph 1.5F calls for “…metal wall panel assembly…” Please clarify where the metal wall panels are located at? Answer: Project does not have metal wall panels, only metal ceiling soffit panels. Question 6: Spec Section 07 31 13 paragraph 1.2 A3, paragraph 2.5 and 3.3 describes sheet metal flashings. Spec section 07 60 00 paragraph 1.2 A4 and paragraph 2.9 describes sheet metal flashings at steep slope roof (assumed steep slope roof to mean the Asphalt Shingle roofing). Please clarify whose scope of work are the Sheet Metal Flashings germane to the Asphalt Shingle Roofing. Answer: See revised proposal form in addendum #1 for items to be in included in each bid package. Question 7: Spec section 07 60 00 paragraph 2.4 J calls for “Bituminous Coating…SSPCPaint 12”. Please provide name of product or an example of a product that is acceptable for use for this specified “Bituminous Coating…” Answer: Karnak is an example of a product manufacturer. Question 8: Please provide a copy of “FMG Loss Prevention Data Sheet 1-49” per spec 07 60 00 paragraph 2.6G. Answer: You can find the sheets on FL Global Website (FL Global Website www.fmglobaldatasheets.com) or http://www.aadvanced.com/front/ EDGE%20METAL/Factory%20Mutual%20%20LPDS%201-49.pdf. 21 ADDENDUM NO. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 1/20/14 Page 22 of 23 DSA File No. 41-H2 DSA Application No. 01-111055 ____ Division of the State Architect June Yip, Architect Aedis Architects Carl Wilford, Structural Engineer Thornton Tomasetti, Inc. Bryce Carroll, Civil Engineer Carroll Engineering, Inc. Steve Myers, Mechanical Engineer Capital Engineering Consultants, Inc. David Kaneda, Electrical Engineer Integral, Inc. ____ Alissa Noguez, Landscape Architect ANLA Associates, Inc. 22 ATTACHMENTS: GENERAL: Job walk sign in sheet Landscape Convenience List Topographical Survey (FOR REFERENCE ONLY) SPECIFICATIONS: 00 10 00 – Instructions to Bidders 00 20 00 – Notice to Bidders 00 30 00 – Proposal Forms 00 31 00 – Disabled Veterans Forms 00 41 00 – Bid Bond 00 42 00 – Qualification Statement 00 43 00 – List of Subcontractors 00 48 00 – Non-collusion Declaration 00 60 00 – Payment and Performance Bond 06 20 00 – Finish Carpentry 07 18 13 – Pedestrian Traffic Coating DRAWINGS: AD1-T1a - AD1-C1a AD1-C2a AD1-C2b AD1-C2c AD1-C2d AD1-C3a - AD1-A3.01a AD1-A8.10a - Structural Calculations (FOR DSA REFERENCE ONLY) AD1-S2.01a AD1-S2.02a AD1-S2.06a AD1-S2.06b AD1-S2.06c AD1-S5.03a AD1-S5.03b AD1-S5.03c AD1-S5.03d AD1-S5.03e - AD1-P0.02a AD1-P1.02a AD1-P4.01a AD1-P4.02a AD1-P4.02b - AD1-E1.02a - AD1-E1.02b AD1-E1.02c AD1-E1.02d AD1-E1.02e AD1-E3.10a AD1-E3.10b AD1-E3.10c AD1-E3.30a AD1-E3.30b AD1-E4.10a AD1-E4.10b AD1-E4.10c AD1-E4.20a AD1-E4.20b AD1-E5.01a AD1-E5.01b AD1-E6.01a AD1-E6.01b AD1-E6.03a AD1-E6.03b AD1-E6.03c AD1-E6.03d AD1-T0.02a AD1-T4.01a AD1-T4.01b AD1-T4.01c AD1-L1.1a AD1-L1.2a AD1-L1.2b AD1-L1.2c AD1-L1.4a - AD1-L1.5a AD1-L1.6a AD1-L1.6b AD1-L1.6c AD1-L1.7a JEFFERSON NEW CLASSROOMS/MUSIC BUILDINGS JOB WALK PARTICIPANTS 12/19/13 Did not prequalify ABC School Equipment Ahlborn Structural Steel Air Systems Aire Sheet Metal Allen Specialties All American Tile & Terrazzo Anderson Carpet Atlas Pellizzari Electric Bay Cities Fire Protection Berkeley Cement Best Contracting Boeger, Robert Plastering Brady Air Brown, Mike Electric D&D Commercial Painting Dasco Construction DeHaro Ramirez Del Monte Electric Dinelli Plumbing Dowdle & Sons Mechanical DW Acoustics Environmental Systems Fremont Millwork Galeb Paving Gridline Masonry Harrison Drywall Intermountain Electric Interstate Grading/Paving ISEC J.C. Metals Jones, O.C. Linden Steel & Construction JEFFERSON NEW CLASSROOMS/MUSIC BUILDINGS JOB WALK PARTICIPANTS 12/19/13 Maher, R.E. Marquee Fire Protection Masker Meiswinkel, RFJ MGM Drywall MK Pipelines Nalevia Wall National Air Balance National Electric National Metal Fabricators Nichols Concrete Cutting Northern California Fence Pacific Bay Masonry Pioneer Contractors Poms Landscape Preston Pipelines Progress Glass Safway Services Scaffold Solutions Service Mechanical Service Unlimited Shepard Steel Shumaker, J.L. Systems Mechanical t3 Thompson, Jerry & Sons Trahan Mechanical United California Glass & Door United Comfort Solutions Valdez Painting Westmark Products Zolman Construction X X X ANLA Associates, Inc. 913 Willow Street, Suite 101 San Jose, CA 95125 T.408.292.2196 www.anla-associates.com LANDSCAPE SUBMITTALS The following is a list of submittals required by the contractor for all landscape related specifications. This is not an exhaustive list and the contractor must refer to the specifications for all instructions regarding submittals. This list is meant to aid to the contractor in ensuring that all submittals are addressed at the appropriate time. 12 93 00 SITE FURNISHINGS Prior to construction 1. Product data Prior to substantial completion 1. Product warranties 2. Spare or replacement parts 3. Care instruction shipped with components 32 12 16.1 ASPHALT PAVING - PLAYGROUND Prior to construction 1. Material certificates 32 12 33.1 TENNIS COURT SURFACING Prior to construction 1. Material certificates 2. Reference list of past projects 32 13 13.1 LANDSCAPE CONCRETE WORK Prior to construction 1. Shop drawings reinforcement 2. Design mixes submittal a. Concrete paving, pedestrian b. Concrete paving, vehicular c. Concrete steps, vertical walls and curbs d. Concrete footings 32 14 00 – Unit Pavers Prior to construction 1. Product data 2. Samples for initial selection 3. Samples for verification 4. Qualification data 32 31 13 CHAIN-LINK FENCING AND GATES Prior to construction 1. Product Data, construction details, material descriptions, dimensions of individual components and profiles, finishes of: a. Fence posts b. Gate posts c. Rails d. Fittings e. Chain-link fabric f. Chain-link fabric reinforcements g. Chain-link fabric attachments h. Gates i. Hardware j. Accessories: privacy slats 2. Samples for Initial Selection 3. Samples for Verification a. Polymer-coated steal wire (for fabric) in 6-inch lengths b. Polymer coating, in 6-inch lengths on shapes for posts, rails, wires, and gate framing and on full-sized units for accessories c. Vinyl slat material 4. Product Certificates 5. Strength test results for framing according to ASTM F 1043 6. Qualification Data for installer 7. Maintenance Data a. Polymer finishes b. Vinyl slats/privacy fencing 32 84 00 IRRIGATION SYSTEMS Prior to construction 1. Product data, including irrigation wire diagram of irrigation system 2. Operation and maintenance data During construction: 1. Coordination drawings 2. Field quality-control test reports 3. Manufacturer certification of irrigation controller At substantial completion: 1. Controller legend 2. Quick coupler keys and hose swivels 3. Record drawings 4. Irrigation guarantee 32 96 00 LANDSCAPE PLANTING Prior to construction 1. Product data 2. Samples for verification a. Soil conditioner (1/2 c.f. each) b. Bark mulch top dressing (1/2 c.f. each) c. Edging materials and accessories, of manufacturer's standard size, to verifiy color selected 3. Product certificates a. Manufacturer’s certified analysis for standard products b. Analysis of other materials by a recognized laboratory 4. Qualification data 5. Materials list 6. Material test reports for soils 7. Planting schedule Prior to end of maintenance period: 1. Maintenance instructions ANLA Associates, Inc. 913 Willow Street, Suite 101 San Jose, CA 95125 T.408.292.2196 www.anla-associates.com LANDSCAPE FIELD QUALITY CONTROLS The following is a list of field quality control measures required of the contractor for all landscape related specifications. This is not an exhaustive list and the contractor must refer to the specifications for all instructions regarding these measures. This list is meant to aid to the contractor in ensuring that all field quality control tests and measures are performed at the appropriate time. 32 12 16.1 ASPHALT PLAYGROUND After installation of asphalt 1. Test in-place asphalt concrete courses for compliance of: a. Thickness b. Base course c. Surface course d. Surface smoothness 1. Base course surface 2. Wearing course surface 32 14 00 UNIT PAVERS Before installation of pavers 1. Install 7’x7’ mockup 32 84 00 IRRIGATION SYSTEMS Prior to substantial completion 1. Irrigation system leak test 2. Irrigation controller and control valve operational test 3. Irrigation controls and safeties 4. Irrigation coverage test Prior to end of maintenance period 1. Inspection by factory-authorized service representative to inspect field-assembled components and equipment installation. 32 96 00 LANDSCAPE PLANTING Prior to planting 1. Soil preparation 2. Layout of plants and headerboard At substantial completion 1. Pre-maintenance review 2. Re-inspection as required At end of maintenance period 1. Final review 2. Re-inspection as required Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00020 NOTICE TO BIDDERS 1.01 THE PROJECT IS Jefferson High School New Classrooms & Music Buildings 6996 Mission Street Daly City, CA 94014 1.02 THE OWNER IS Jefferson Union High School District 699 Serramonte Boulevard Daly City (San Mateo County) California 94015-4132 1.03 THE ARCHITECT IS AEDIS Architecture & Planning 387 S. First Street, Suite 300 San Jose, CA 95113 1.04 DESCRIPTION OF THE PROJECT A. The work regarding this project will be performed under the supervision of a Construction Manager at Risk (Gonsalves & Stronck Construction Company, Inc.). Each prime contractor wishing to bid a specific work scope or scopes must first prequalify as a competent contractor capable of performing the scope they apply for under the criteria set forth by the district. Prequalification packages must be submitted and approved prior to the pre-bid job walk. Upon being accepted as a prequalified contractor and a low bidder, the prime contractor will be issued a contract with the Construction Manager at Risk. B. The work of this contract is comprised of new steel framed buildings with stucco and veneer siding. 1. Installing and removing temporary fencing for security and safety of the project. 2. Demolition of existing portable foundations, underground utilities and paving as required to install new work described in the drawings and contract documents. 3. Remove existing sidewalks to install a new site entry. Section 00020-1 Notice to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Jefferson High School New Classrooms & Music Buildings Install new underground, storm, sewage, gas, electrical, data, signal, fire alarm, telephone and security wiring and conduits for relocated buildings. Data will require a new fiber line. New sound and signal system systems including clocks and speakers. Earth work as required for new buildings, hardscape and landscape. Installation of building foundations, erection, finishes and utilities as required by documents. Installation of chain link enclosures and fencing. Procurement of hauling permits as required by the City of Daly City and the maintenance of the haul routes. Permits as required by the National Pollutant Discharge Elimination System (NPDES). Coordinate with other district contractors. All other work as described in the documents. Pavement, patching of new trenches to connect to existing utilities. Cleanup as required of debris created by construction and demolition. Coordination of activities with the school site calendar as it relates to special events (graduations, etc.). Security of the construction site during construction. Providing safe walkways for staff and students for any and all construction activities on the site. Site demolition and excavation to form and place new footings and retaining walls. Repairs to an existing bridge connecting buildings A, B and F including the elevator tower. Bridge repair and associated site work will take place June 5 through August 1 in both 2014 and 2015. Additional site work and modernization projects will be on-going on the site at the same time limiting the contractor’s access to the site. The work will be done between March 31, 2014 and November 30, 2015 (610 calendar days.) C. Additional items included: 1. Procurement of hauling permits as required by the City of Daly City and the maintenance of the haul routes. Permits as required by the National Pollutant Discharge Elimination System (NPDES). Cost of the permits will be reimbursed by the district for the cost of the permit including no mark-up or administration fees. Each subcontractor will be responsible for the procurement of this permit as it pertains to their scope of work. 2. Special protection required for preservation of existing finishes. 3. Coordinate with other district contractors. 4. All other work as described in the documents. Section 00020-2 Notice to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.05 Jefferson High School New Classrooms & Music Buildings DRAWINGS AND SPECIFICATIONS Drawings and specifications pertaining to this project will be available on December 9, 2013 at: ARC Document Solutions 835 West Julian Street San Jose, CA 95126 Main: 408.295.5770 | fax: 408.286.7122 e-mail: [email protected], PlanWell Department, contact Reg Berti www.e-arc.com Cost is approximately $210.00 per complete set. Documents are also available on line at the District website: www.JUHSD.net. Please note that you will need to obtain a voucher from Aedis Architecture and Planning in order for ARC to release plans. Please contact Aedis at (408) 300-5160 or www.aedisgroup.com. BID FORM A. Sealed bids will be received by the Jefferson Union High School District not later than 2:00 PM on Thursday, January 23, 2014 for the Jefferson New Classrooms & Music Buildings. All bids shall be either hand-delivered in person or delivered by mail not later than the above time and date. Each bid package must be delivered in separate envelopes to: Board of Trustees of the Jefferson Union High School District Reference: Jefferson High School New Classrooms & Music Buildings 699 Serramonte Boulevard, Suite 100 Daly City, California 94015-4132 B. All bids shall be made on Bid Forms provided by the District, without any alteration. Section 00020-3 Notice to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 C. Jefferson High School New Classrooms & Music Buildings All bidders must be prequalified to submit a bid form and have attended the pre-bid job walk. 1.06 PRE-BID CONFERENCE A mandatory pre-bid job walk for all subcontractors prequalified to bid the project will be held Thursday, December 19, 2013 at 10:00 AM, at the Jefferson High School Flag Pole, 6996 Mission Street, Daly City, CA 94014. Proof of attendance will be verified by the Signature on the pre-bid job walk sign-in sheet. All bidders must attend this mandatory job walk. 1.07 PROJECT TIME LINE • To Board for Approval 08/04/09 • • • • Plans to DSA for Back Check First Advertisement for Sub Prequals Second Advertisement for Sub Prequals Sub Prequals Due 09/10/13 10/11/13 10/18/13 10/25/13 (10 AM) • • • • Prequals Notified Plans to District from DSA Plans to Subs and Posted on Web Mandatory Job Walk 11/12/13 12/06/13 12/09/13 12/19/13 (10 AM) • • • • • • Background Check RFI's Due to Architect/District Addendums Emailed Bid Opening Gonsalves & Stronck/District Review Bids Bid Notice to Superintendent's Office completed in prequal 01/02/14 01/20/14 (noon) 1/23/14 (2 PM) 01/24/14 1/30/14 (spcl del to Brd) • • • Bids to Board for Award Notice of Award to Subcontractors Schedule of Values Due 02/04/14 02/05/14 02/11/14 • • • • Copy of Subcontracts Due to District Bonds/Insurance/Agreement Due Notice to Proceed Pre-Construction Meeting 02/18/14 02/18/14 02/19/14 02/19/14 • Submittals Due to Architect 02/25/14 Section 00020-4 Notice to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings • Submittals Back to Contractor 03/25/14 • • • • Start/End of Construction Punch List/Bldg Commissioning Closeout Documents to Dist/Arch Partial Occupancy 3/31/14 - 11/30/15 (610 days) 11/30 thru 12/30/15 11/30/15 11/30/15 • December 2015 (based on actual completion) • Notice of Completion to Board Notice of Completion to County Final Payment to Contractor • • IOR Inspector Architect Keith Gilbert Glenn Ly • December 2015 (based on actual completion) Based on completion. END OF SECTION Section 00020-5 Notice to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00100 INSTRUCTIONS TO BIDDERS PART 1 - GENERAL 1.01 1.02 INSTRUCTIONS TO BIDDERS A. Instructions to Bidders is the American Institute of Architects" AIA Document A701, "Instructions to Bidders," Fourth Edition, 1987 Edition, 5 pages, which is made part of the Project Manual with the same force and effect as though set forth in full. B. AIA Document A201 may be purchased separately from The American Institute of Architects at the following locations: 1. San Francisco Chapter, 130 Sutter Street, San Francisco CA 94109 (415) 362-7397. THE PROJECT IS Jefferson High School New Classrooms & Music Buildings 6996 Mission Street Daly City, CA 94014 1.03 THE OWNER IS Jefferson Union High School District 699 Serramonte Boulevard Daly City (San Mateo County) California, 94015-4132 1.04 THE ARCHITECT IS AEDIS Architecture & Planning 387 S. First Street, Suite 300 San Jose, CA 95113 Section 00100-1 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.05 DESCRIPTION OF THE PROJECT A. B. Jefferson High School New Classrooms & Music Buildings The work regarding this project will be performed under the supervision of a Construction Manager at Risk, Gonsalves & Stronck Construction Company, Inc. Each prime contractor wishing to bid a specific work scope or scopes must first prequalify as a competent contractor capable of performing the scope they apply for under the criteria set forth by the district. Prequalification packages must be submitted and approved prior to the pre-bid job walk. Upon being accepted as a prequalified contractor and a low bidder, the prime contractor will be issued a contract with the Construction Manager at Risk. The work of this contract is comprised of new steel framed buildings with stucco and veneer siding. 1. Installing and removing temporary fencing for security and safety of the project. 2. Demolition of existing portable foundations, underground utilities and paving as required to install new work described in the drawings and contract documents. 3. Remove existing sidewalks to install a new site entry. 4. Install new underground, storm, sewage, gas, electrical, data, signal, fire alarm, telephone and security wiring and conduits for relocated buildings. Data will require a new fiber line. New sound and signal system systems including clocks and speakers. 5. Earth work as required for new buildings, hardscape and landscape. 6. Installation of building foundations, erection, finishes and utilities as required by documents. 7. Installation of chain link enclosures and fencing. 8. Procurement of hauling permits as required by the City of Daly City and the maintenance of the haul routes. Permits as required by the National Pollutant Discharge Elimination System (NPDES). 9. Coordinate with other district contractors. 10. All other work as described in the documents. 11. Pavement, patching of new trenches to connect to existing utilities. 12. Cleanup as required of debris created by construction and demolition. 13. Coordination of activities with the school site calendar as it relates to special events (graduations, etc.). 14. Security of the construction site during construction. 15. Providing safe walkways for staff and students for any and all construction activities on the site. 16. Site demolition and excavation to form and place new footings and retaining walls. Section 00100-2 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings 17. Repairs to an existing bridge connecting buildings A, B and F including the elevator tower. Bridge repair and associated site work will take place June 5 through August 1 in both 2014 and 2015. 18. Additional site work and modernization projects will be on-going on the site at the same time limiting the contractor’s access to the site. The work will be done between March 31, 2014 and November 30, 2015 (610 calendar days). C. Additional items included 1. Procurement of hauling permits as required by the City of Daly City and the maintenance of the haul routes. Permits as required by the National Pollutant Discharge Elimination System (NPDES). Cost of the permits will be reimbursed by the district for the cost of the permit including no mark-up or administration fees for each subcontractor. 2. Special protection required for preservation of existing finishes. 3. Coordinate with other district contractors. 4. All other work as described in the documents. Section 00100-3 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.06 Jefferson High School New Classrooms & Music Buildings DOCUMENTS Drawings and specifications pertaining to this project will be available on December 9, 2013 at: ARC Document Solutions 835 West Julian Street San Jose, CA 95126 Main: 408.295.5770 | fax: 408.286.7122 e-mail: [email protected], PlanWell Department, contact Reg Berti www.e-arc.com Cost is approximately $210.00 per complete set. Documents are also available on line at the District website: www.JUHSD.net. Please note that you will need to obtain a voucher from Aedis Architecture and Planning in order for ARC Document Solutions to release plans. Please contact Aedis at (408) 300-5160 or www.aedisgroup.com. 1.07 EXAMINATION OF SITE AND CONTRACT DOCUMENTS Each bidder shall visit the site of the proposed work and fully acquaint himself/herself with the conditions relating to the construction and labor so that he/she may fully understand the facilities, difficulties, and restrictions attending to the execution of the work under the contract. A mandatory pre-bid job walk for all prequalified subcontractors will be held on Thursday, December 19, 2013 at 10:00 AM at the Jefferson High School flag pole, 6996 Mission Street, Daly City, CA 94014. Proof of attendance will be verified by the signature on the pre-bid job walk sign-in sheet. All bidders must attend this mandatory job walk. Execution of the contract is a representation that the contractor has examined all conditions affecting the work and is fully familiar with all those conditions. Section 00100-4 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings A. Each bidder shall thoroughly examine and become familiar with the drawings and specifications. The failure or omission of any bidder to receive or examine any bidding document, form, instrument, addendum, or other document or to visit the sites and acquaint himself/herself with conditions there existing shall not relieve that bidder from obligations with respect to his/her bid or to the contract. B. Contractor is informed that this is a DSA project. All project correspondence must be kept and submitted (i.e., submittals, billings, RFIs, change orders, etc.) per DSA project application number. This applies to the Construction Manager at Risk and all subcontractors and suppliers involved in the project. In addition, one complete, up-to-date set of documents must be kept on the school site at all times for the use of the IOR and DSA. In addition, per CBC, a current copy of the CCR Title 24 Part 1 and Part 2 requirements must be kept on site at all times for the use of the IOR and DSA. C. The contractor will be totally responsible for maintaining security on the site during the construction period. It will be the contractor’s responsibility to coordinate with the District for access. D. Pursuant to District Policy, the contractor is hereby notified that smoking, alcoholic beverages or drugs are not allowed on school grounds. No exceptions will be made. This includes the inside of any contractor trailers or containers, as long as they are sitting on school property. The general contractor will be responsible for enforcing this District Policy. Each violation of this policy will result in a $500.00 deduction from the final contract amount. E. The contractor is responsible for all utility location prior to any excavation or demolition, including in slab electrical conduits and plumbing lines, etc. The as built documents provided by the district are to be used for reference only. F. The contractor is responsible for the maintaining of all existing mechanical, plumbing, electrical, sprinkler and phone systems utilized by the existing school site. The contractor shall repair any systems that are damaged as a result of work performed by the contactor to as good as or better than the original condition of the work damaged. Additionally, any system modified as a result of work done under the contract shall be brought up to the specifications of the current code. Section 00100-5 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 G. 1.08 1.09 Jefferson High School New Classrooms & Music Buildings It is the contractor’s responsibility to verity that all grades are correct prior to placement of concrete walks, ramps or walls to insure they allow water to flow away from all structures. Notify Architect immediately in the case of a discrepancy. Any concrete or hard scape material placed by the Contractor directing water toward the building structures will be removed and properly re-installed at the contractor’s expense without an extension of time issued to the contractor. PRE-BID CONFERENCE A. A mandatory pre-bid job walk will be held in the location as described in Section 1.07. B. Bidders should have become thoroughly familiar with the terms and conditions of the bidding documents and local conditions (permits, etc.) affecting the performance and costs of the work prior to attending this conference. C. Representatives from the District, CM at Risk and the Architect's office will be present to answer questions regarding the project. It is required that all sub contractors bidding the project be present at this job walk. INTERPRETATION OF DRAWINGS AND SPECIFICATIONS The District shall have no responsibility for the interpretation of the bidding documents. Questions needing clarification shall be directed to the office of the Architect & CM at Risk in writing and a copy sent to the district office (Attention Bob Devine) for information purposes only. 1. AEDIS Architecture & Planning, 387 S. First Street, Suite 300, San Jose, CA 95113 PH: 408-300-5160 Attention: Glenn Ly, [email protected] 2. Gonsalves & Stronck Construction Company, Inc. 1000 Washington Street, San Carlos, CA.94070-5319 PH: 650-802-2960 Attention: Keith Gonsalves, [email protected] 3. JUHSD, 699 Serramonte Boulevard, Suite 100, Daly City, CA. 94015-4132 PH: 650-550-7932 Attention: Bob Devine, [email protected] Section 00100-6 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings Interpretation or correction of the drawings and specifications will be made only by addendum. A copy of such addendum will be issued to each person, firm, or corporation holding bidding documents and listed with the district office. Oral interpretation of any provision in the bidding documents will not be made to an individual bidder. 1.10 1.11 SUBSTITUTIONS DURING BIDDING A. Proposals shall be based on products and systems specified in bidding documents or listed in addenda. B. Contractors and materials suppliers may request substitutions to be accepted by Architect. C. Substitution Procedures: 1. Submit requests are due prior to bid by January 10, 2014. Substitutions requested after that date may not be considered. Products acceptable to the Architect will be published in the addendum prior to bid. 2. Request shall contain sufficient information to assess acceptability of product or system; insufficient information shall be grounds for rejection. 3. Accepted substitutions shall be listed in addenda. 4. Substitutions may be requested for any product specified unless otherwise noted. Note that no substitutions will be allowed for District Standard materials, which include but are not limited to: door closures, locksets and hinges, toilet partitions, carpet, VCT, ceramic tile or other items specified as such in the bid documents. PROPOSAL A. Bids shall be submitted upon the proposal forms provided in the Project Manual, properly executed, with all blank spaces properly filled in. The proposal form shall be submitted without interlineations, alterations, or erasures to the bid items listed. Any unauthorized additions, limitations, conditions, or provisions attached to the proposal form will not be considered. Bids shall not contain any recapitulation of the work to be done. No telegraphic or telephonic proposals or modifications of bid items will be considered. B. No bids received after the scheduled closing time for receipt of bids will be considered, and if so received, they will be returned to the bidders unopened. It is the sole responsibility of the bidder to see that a bid is received in proper time. Section 00100-7 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 C. Jefferson High School New Classrooms & Music Buildings No person, firm, or corporation shall be allowed to file more than one proposal for each individual package of this project. All signatures shall be in long hand by the principal duly authorized to make contracts. The bidder's legal name shall be fully stated. Each bid shall be addressed to the Board of Trustees of the Jefferson Union High School District, Reference: Jefferson High School New Classrooms & Music Buildings and shall be delivered to the District Office, 699 Serramonte Blvd., Suite 100, Daly City, California 94015 on or before, Thursday, January 23, 2014 at 2:00 P.M. The bid must be enclosed in a sealed envelope bearing the title of the work, the name of the bidder, the date and hour of the opening, and specific bid package identification. D. 1.12 The District shall not be responsible for errors or omissions in the bid. QUALIFICATIONS OF BIDDERS A. All Subcontractors whose contract is $10,000.00 or more are required to be pre-qualified with the District. B. Pursuant to Section 1706 of the Public Contracts Code, each bid shall be accompanied by a Noncollusion Declaration on the form provided in the Project Manual, duly executed by the bidder. C. Each bid shall also be accompanied by a Bidders Qualification statement on the form provided in the Project Manual, duly executed by the bidder. D. The bidder's responses to the Bidder's qualification Statement shall be executed by the bidder and verified under oath by the bidder in the same manner in which civil pleading in civil actions are verified. The responses and accompanying financial statements shall not be public records and shall not be open to public inspection pursuant to Public contract Code section 20111.5 E. In order to be deemed a responsible bidder, a bidder must have the quality, fitness and capacity to satisfactorily perform the proposed work. The District reserves the right to consider any factors pertinent to the proposed work in its evaluation of the bidders. A bidder must have substantial construction experience in public works construction and sufficient completion ability, financial resources, bonding capacity, and insurability in order to be deemed responsible. The minimum qualifications for a responsible bidder include the following: Section 00100-8 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings 1. The bidder and the bidder's field supervisor for the project have successfully completed, within the last five years, at least three public works construction contracts of comparable scope, type, value and complexity. 2. The bidder must be able to obtain performance and payment bonds for the full amount of the contract from a surety company authorized to do business in California with a Best's rating of A-VIII or higher. 3. The bidder must be able to obtain CGL liability insurance coverage in the amount or $2,000,000 from an insurance carrier authorized to do business in California with a Best's rating of A-VIII or higher. 4. The bidder must be able to obtain property insurance coverage in the amount of the contract from an insurance carrier authorized to do business in California with a Best's rating of A-VII or higher. 5. The bidder must have a net worth sufficient to be able to complete the project package as evidenced by financial statements for the last fiscal year that have been audited and for the last month that have been reviewed by a Certified Public Accountant. 6. The bidder or any officer of bidder or any employee of bidder who has a proprietary interest in bidder or the superintendent for the project must not have been disqualified, removed or otherwise prevented from bidding on or completing a federal, state, or local project because of a violation of a law or safety regulation. 7. The bidder must not have incurred within the past five years more than one sustained claim of $50,000 or greater from an owner or a surety based on poor workmanship, incomplete performance or unexcused delays in completion. 8. The bidder must not have failed, on more than one occasion in the last five years, to receive a recovery of at least 50% of the amount in dispute, not including attorneys' fees and costs, for claims filed against owners for extra compensation. 9. The bidder must not have a history or a pattern of violating federal, state, or local laws that govern worker pay, safety, conditions or training. Section 00100-9 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 10. F. 1.13 1.14 Jefferson High School New Classrooms & Music Buildings If the bidder intends to perform work with its own forces, the bidder must show proof of successfully completing three similar projects with its own forces for that specific type of work. If the bidder can not show proof of being capable to perform such work with its own forces, then said work must be subcontracted to a licensed specialty contractor who is, and can show being, capable of performing such specific work on at least 5-similar projects within the last 5-years. The District retains the right to accept insurance or bonds from a carrier or surety that has a comparable rating from some rating source other than Best's that the District deems comparable. BID SECURITY (Required for bids of at least $100,000.00.) A. Each bid shall be accompanied by a Bid Bond on the form designated in the Project Manual, duly executed by the bidder as principal and a corporation authorized to do business in the State of California as surety, naming the Jefferson Union High School District as obligee; or a cashier's check or certified check certified without qualification drawn on a solvent bank of the State of California, in the amount of 10% of the base bid and made payable to the Jefferson Union High School District. B. The bidder's bond shall guarantee payment of actual damages in case the successful bidder fails to file satisfactory bonds as required by the Bidding Documents or fails or refuses to enter into a contract within five days after Notice of Award by the District. If the bid is not accepted by the District within ninety days after the date set for the opening of bids or if the bidder to whom the contract is awarded, executes and delivers to the District the required Contract Documents, the bid bond or the amount of the certified or cashier's check will be returned to the bidder. C. The bid bond or the amount of the certified or cashier's check of each unsuccessful bidder will be returned to the bidder immediately following the award of the contract. If no contract is awarded, the bid bond or the amount of the certified or cashier's check or bid bond of all bidders will be returned to the bidders immediately following the rejection of all bids. BONDS REQUIRED BY THE CONTRACT DOCUMENTS ( Not Used) A. The successful bidder, simultaneously with the execution of the Agreement, shall furnish a Payment Bond and a Performance Bond, each in an amount equal to 100% of the Contract Price, each secured from a surety company authorized to do business in California with a Best's rating of A-VIII or higher. Section 00100-10 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.15 1.16 Jefferson High School New Classrooms & Music Buildings B. The Payment Bond will be released six months after completion of project. The Performance Bond will be reduced by 90% at completion. The remaining 10% will be released at the end of one year from acceptance of the project provided any deficiencies in the work have been corrected. C. Subcontractors shall be required to submit faithful performance and payment bonds, and this requirement shall be specified in the prime contractor’s written or published request for sub bids in accordance with Public Contract Code Section 4108. LISTING OF SUBCONTRACTORS A. Each bidder shall submit a list of the proposed subcontractors who will perform work or labor or render service to the bidder for a value in excess of one-half of one percent (1/2% or any amount over $12,050.00) of the bid as required by the Subletting and Subcontracting Fair Practices Act (Government Code Section 4100, et. seq.) B. Subcontractors to the subcontractors performing work in excess of $10,000.00 must show proof of performing similar work to this project, in size and scope on five past projects, within the last five years. Within 24 hours of the bid, the three apparent lowest bidders shall submit a list of the proposed subcontractors that are to be used on the project whose value of work is at least $10,000.00. Within 72 hours of the bid, the three apparent lowest bidders shall submit to the District the qualification statements of those subcontractors. Failure to do any of the above may render the bid non-responsive. C. The form for this purpose is included in the proposal form. D. If bidder elects to perform work with its own forces in lieu of listing a subcontractor for such work, the bidder’s attention is called to item 1.12 E.10 above, which requires bidder to show proof of the capability to perform such specific work with its own forces. WITHDRAWAL OF BIDS A. Any bidder may withdraw his/her bid either personally, by written request, or by telegraphic request confirmed in the manner specified above at any time prior to the scheduled closing time for receipt of bids. B. Bids may not be withdrawn for ninety (90) calendar days after submittal or for such extension as may be subsequently agreed in writing. Section 00100-11 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.17 1.18 Jefferson High School New Classrooms & Music Buildings DISQUALIFICATION OF BIDDERS A. No bid will be accepted from a bidder in arrears to the Jefferson Union High School District, or who is a defaulter to a surety. B. No bid will be accepted from a bidder who is not licensed in accordance with the provisions of chapter 9, Division 3 of the Business and Professions code. GOVERNING LAWS AND REGULATIONS A. Worker's compensation: Pursuant to the requirements of Section 1860 of the Labor Code, the successful bidder will be required to secure the payment of compensation to its employees in accordance with the provisions of Section 3700 or the Labor Code. Prior to the commencement of work, the contractor shall sign and file with the District a certification in the form provided by the District. B. Apprentices: The successful bidder will be required to conform to the provisions in sections 1777.5, 1777.6, and 1777.7 of the Labor Code concerning the employment of apprentices by his/her or any subcontractor under him or her. C. Anti-Discrimination: The successful bidder will be required to comply with all provisions of executive Order No. 10925 of March 6, 1961, as amended, and all rules, regulations, and relevant orders of the Presidents Committee on Equal Employment opportunity. No discrimination shall be made in the employment of persons because of the race, color, religious creed, national origin, ancestry, physical handicap, medical condition, marital status, or sex of such persons. D. Prevailing Wage: The successful bidder will be required to pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations in accordance with section 1770 of the Labor Code. E. Hours of Labor: The successful bidder will be required to comply with requirements of sections 1810 to 1815, inclusive, of the Labor code. F. California Education Code 17076.11 states: Any school district using funds allocated pursuant to this chapter for the construction or modernization of a school building, shall have a participation goal of at least 3 percent, per year, of the overall dollar amount expended each year by the school district, for disabled veteran business enterprises (DVBE). Refer to Document 00310 for requirements. Section 00100-12 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.19 LIQUIDATED DAMAGES A. 1.20 1.21 Jefferson High School New Classrooms & Music Buildings Should the Subcontractor fail to complete his contract within the contract times, due allowance being made for unavoidable delays, the Contractor will pay the Jefferson Union High School District the sum of $1,000.00 per calendar day (as published in the Supplementary Conditions) for each day the work remains uncompleted beyond the contract time as liquidated damages, and not as a penalty, it being expressly stipulated that it would be impracticable and extremely difficult to fix the actual amount or damage. EVALUATION AND CONSIDERATION OF BIDS A. The contract, if awarded, will be awarded to the responsible bidder submitting the lowest qualified bid price based on base bid which is in compliance with these Instructions and the Notice to Bidders. In order to be deemed a responsible bidder, a bidder must have the quality, fitness and capacity to satisfactorily perform the proposed work. The District reserves the right to consider any factors pertinent to the proposed work in its evaluation of the bidders. A bidder must have substantial public works construction experience and sufficient completion ability, financial resources, bonding capacity, and insurability in order to be deemed responsible. B. The competence and the responsibility of bidders and of their proposed subcontractors will be considered in making the award of contract. Any bidder, before being awarded a contract, may be required to furnish evidence satisfactory to the District that he/she and his/her proposed subcontractors have sufficient means and experience in the type of work called for to assure completion of the contract in a satisfactory manner. The District reserves the right to reject the bid of any bidder who has previously failed to perform properly or to complete on time contracts of a nature similar to this project. C. The District reserves the right to reject any or all bids and to waive any informality or irregularity in the bids or in the bidding. The District reserves the right to reject a bid or revoke a determination of the lowest responsible bidder if the District determines that any information provided by the bidder or its subcontractors was incomplete, misleading, or inaccurate in any material way. FORM OF AGREEMENT A. The Agreement for the work will be written on AIA Document A201, 1997, standard Form of Agreement between Owner and contractor where the Basis of Payment is a stipulated sum. A copy of the form of agreement is provided in the Project Manual. Section 00100-13 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 1.22 Jefferson High School New Classrooms & Music Buildings COMMENCEMENT OF WORK A. The Contractor shall begin work within five (5) calendar days after District's written Notice to proceed and complete the work in accordance with the specifications attached, to the entire satisfaction of the Jefferson Union High School District and within the contract time, due allowance being made for delays beyond the Contractor's control as outlined elsewhere. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) END OF SECTION Section 00100-14 Instructions to Bidders Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings SECTION 00300 PROPOSAL FORMS PART 1 - GENERAL 1.01 PROJECT In compliance with the Contract Documents for the Project: Jefferson High School New Classrooms & Music Buildings 6996 Mission Street Daly City, CA 94014 Name of Company Submitting Bid (please print): ________________________________________________________________________ Bidding Bib Package #:___________________________________ Bid Amount: (written)_________________________________________$____________ Having carefully examined the site of the work; and having carefully examined the Drawings dated _______________________________________ and the Project Manual dated _______________________________________ prepared by AEDIS Architecture & Planning; and having carefully examined addenda as follows: Addendum No. 1, dated Addendum No. 2, dated (List all others) Addendum No. 3, dated Addendum No. 4, dated We, the Contractor, based on the above documents, shall furnish all labor, materials, storage, transportation, permits (when stipulated), and taxes called for by them for the following stipulated sums as set forth below for the following item of work: • Please select the Bid Package you are bidding by checking the box next to that package on the following pages. Additionally please also check the box for the particular specification section you are bidding under the specification section. Section 00300B-1 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Bid Packages Bid Package 1: Concrete Work Includes all work in complete specification sections 00020 through 01 35 13 and 31000 Concrete Forming; 31513 – Water stops - New; 33000- Cast-In-Place Concrete; 35300Concrete Topping; 321212.1 - Cement Concrete Paving; 312316.1 – Trenching; 312323.1 – Backfill; 072600 – Under Slab Vapor Barrier; 321313.1 – Cement Concrete Paving, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #1, this bid package will also be responsible for the following: a. Layout, Excavate for footings and foundations b. Removal of spoils c. Supply and install all formwork, rebar, and concrete indicated on architectural and structural drawings. d. Supply and install all required expansion joints and caulking e. Install all embedded items supplied by others f. Install all steel anchor bolts supplied by others g. Furnish & install truncated domes at D.A. ramps h. Concrete stair fill @ metal framed stairs i. Concrete knee wall j. 3” wide contrasting warning stripes @ stairs k. Concrete column base & reveal l. Stair step nosing per Detail 12/A9.06 & 11/A9.06 m. Housekeeping pads for other trades n. Drilled concrete piers complete Section 00300B-2 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings o. 15 Mil Stego. Wrap p. Supply and install drilled dowels q. Clean-up of concrete debris on a daily basis r. Patching & sacking as required s. Patch existing concrete paving 25, 28/A6.03 t. All toilet rooms have a 6” concrete curb u. All concrete corners shall have ½ bevel typ. v. All concrete to have hand tooled joints. No saw cut joints allowed w. 8” cane detectable concrete curb x. Integral color cement per note 1/A3.06 Bid Package 1A: Shot Crete Includes all work in complete specification sections 00020 through 01 35 13 and 33713 Shot Crete, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #1A, this bid package will also be responsible for the following: a. Formwork as required b. Rebound removal c. Shot Crete benches per note 11/A3.04 Section 00300B-3 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Bid Package 2: Concrete Reinforcing Includes all work in complete specification sections 00020 through 01 35 13 and 032000 – Concrete Reinforcing, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #2, this bid package will also be responsible for the following: a. Lowering and hoisting of rebar b. Rebar protection caps Bid Package 3: Brick Masonry Includes all work in complete specification sections 00020 through 01 35 13 and 042113 – Brick Masonry, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #3, this bid package will also be responsible for the following: a. Supply and install thin brick veneer in accordance with the plans and specifications. b. All substrate is by others. Bid Package 4: Structural Steel Includes all work in complete specification sections 00020 through 01 35 13 and 05120 – Structural Steel; 053100 – Steel Decking; 055000 – Metal Fabrications; 055150 – Aluminum Access Ladders; 055200 – Metal Railings; 055300 – Gratings, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Section 00300B-4 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Package #4, this bid package will also be responsible for the following: a. Metal bracket supports for countertops b. H.S.S. walkway columns c. Structural support of decking openings d. Metal decking closures e. 3” I.D. x .216” galvanized steel pipe rainwater leader and rainwater leader anchorage. See 13,14,15/A8.21 f. Roof access ladder & pit ladder per 3/A9.06 g. Tube steel gates h. Guardrail at covered walkway i. Steel handrails j. 10 ga. Metal plate welded to (E) column per 12/A8.25 Bid Package 5: Sheet Waterproofing Includes all work in complete specification sections 00020 through 01 35 13 and 071326 – Self- Adhering Sheet Waterproofing, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 6: Insulation Includes all work in complete specification sections 00020 through 01 35 13 and 072100 – Thermal Insulation, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Section 00300B-5 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Bid Package 7: Roofing Includes all work in complete specification sections 00020 through 01 35 13 and 072200 – Roof Deck and Insulation; 073113 – Asphalt Shingles; 075500 – Modified Bitumen Hot Applied, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #7, this bid package will also be responsible for the following: a. T-24 compliant coating, over Rigid Insulation over 2-Ply vapor barrier b. 4” integral OSB/R-22 rigid insulation over vapor barrier at asphalt shingles c. Roof scupper per 8,9/A8.21 and note 21/A3.02 Bid Package 8: Metal Ceiling & Soffit Panels Includes all work in complete specification sections 00020 through 01 35 13 and 074100 – Metal Ceiling Panels; 074213 – Metal Soffit Panels, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 9: Applied Fireproofing Includes all work in complete specification sections 00020 through 01 35 13 and 078100 – Applied Fireproofing, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 10: Doors/Frames/Hardware Includes all work in complete specification sections 00020 through 01 35 13 and 08 11 13.16 – Custom Hollow Metal Doors & Frames 08 14 16 – Flush Wood Doors 08 71 00 – Door Hardware, less qualifications or exculsions ( List under Section 00300B-6 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #10, this bid package will also be responsible for the following: Bid Package 11: Glass & Glazing Includes all work in complete specification sections 00020 through 01 35 13 and 084113 – Aluminum Framed Entrances & Storefronts; 084400 – Glazed Aluminum Curtain Walls; 085113 – Aluminum Windows; 088100 – Glass & Glazing; 099100 – Louvers & Vents, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #11, this bid package will also be responsible for the following: a. Aluminum louver screen wall per note 7/A3.20 and P/A8.05, VA8.07 b. Aluminum louver per Detail 17/A10.03 c. All sealants required for your work d. Finish hardware for aluminum doors per 08 71 00 – Door Hardware Bid Package 12: Skylights Includes all work in complete specification sections 00020 through 01 35 13 and 086300 – Metal-Framed Skylights; 089050 – Translucent Skylight Panels, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 13: Drywall Includes all work in complete specification sections 00020 through 01 35 13 and 054000 – Cold Form Metal Framing; 092116 – Gypsum Board Assemblies, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Section 00300B-7 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings In addition to the work outlined in the specification sections contained within Bid Package #13, this bid package will also be responsible for the following: a. Scaffolding for your work b. In wall backing for other trades, see 2,6/A9.02 c. 1” thick core board for hourly rating of 1 hour minimum. d. Gyp board soffit per note 2/A4.01 e. Metal framing for column covers f. 5/8 Glass-mat gypsum sheathing g. Cement backer board for ceramic tile Bid Package 13A: Plaster Includes all work in complete specification sections 00020 through 01 35 13 and 092400 – Portland Cement Plaste, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #13A, this bid package will also be responsible for the following: a. Cement plaster over gyp board soffit b. Cement plaster behind thin brick veneer c. Cement plaster soffits d. Integral color for exterior plaster 11/A8.26 Bid Package 14: Ceramic Tile Includes all work in complete specification sections 00020 through 01 35 13 and 093013 Section 00300B-8 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings – Ceramic Tiling, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #14, this bid package will also be responsible for the following: a. Mortar leveling bed b. 5/8 Tile backer board Bid Package 15: Acoustical Ceilings Includes all work in complete specification sections 00020 through 01 35 13 and 095113 – Acoustical Panel Ceilings; 095123 – Acoustical Tile Ceilings; 098433 – SoundAbsorbing Wall Panels, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #15, this bid package will also be responsible for the following: a. Provide wires for light fixtures and HVAC registers Bid Package 16: Flooring Includes all work in complete specification sections 00020 through 01 35 13 and 096513 – Resilient Base and Accessories; 096519 – Resilient Tile Floor; 096813 – Tile Carpeting, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #16, this bid package will also be responsible for the following: a. Minor floor prep as required Bid Package 17: Painting/Wall Covering/Water Repellents Section 00300B-9 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Includes all work in complete specification sections 00020 through 01 35 13 and 099100 – Painting; 097216 – Vinyl Coated Fabric Wall Coverings; 0719000 – Water Repellents, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 18: Specialties/Equipment Includes all work in complete specification sections 00020 through 01 35 13 and 101100 – Visual Display Surfaces; 101400 – Signage; 102113 – Toilet Compartments; 102800 – Toilet Accessories; 104400 – Fire Protection Specialties; 105613 – Metal Grid Shelving; 115213 – Projection Screens; 115300 – Laboratory Equipment, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #18, this bid package will also be responsible for the following: a. Signage - Plaque Bid Package 19: Window Coverings Includes all work in complete specification sections 00020 through 01 35 13 and 122113 – Horizontal Louver Blinds; 122414 – Roller Shades, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 20: Educational/Library Casework Includes all work in complete specification sections 00020 through 01 35 13 and 123550 – Educational/Library Casework, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #20, this bid package will also be responsible for the following: a. Chemical resistant countertops b. Epoxy lab sinks c. Furnish wood trim for windows, similar to 3, 9, 21/A10.03 Section 00300B-10 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings d. Flammable storage cabinets e. Chemical storage cabinets f. Cabinet Hardware Bid Package 21: Elevator Includes all work in complete specification sections 00020 through 01 35 13 and 142400 – Hydraulic Elevators, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 22: Fire Suppression Includes all work in complete specification sections 00020 through 01 35 13 and 210050 – Basic Fire Sprinkler Material & Methods; 211000 – Fire Protection, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #22, this bid package will also be responsible for the following: a. Work to begin 6” A.F.F. Bid Package 23: Plumbing Includes all work in complete specification sections 00020 through 01 35 13 and 220050 – Basic Plumbing Materials & Methods; 220800 – Commissioning Plumbing Systems; 221000 – Plumbing Piping Systems; 224000 – Plumbing Fixtures; 225000 – Plumbing Equipment; 312316.1 – Trenching; 312323.1 – Backfill, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #23, this bid package will also be responsible for the following: a. Drinking fountain on pedestal per Detail 25/A1.05 b. Epoxy lab sinks c. Emergency shower & eyewash Section 00300B-11 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings d. Metal flashing sleeves per Detail 25/A8.21 e. Gas line and gas pressure regulator f. Acid neutralization tank complete Bid Package 24: HVAC & Sheet Metal & Integrated Automation Includes all work in complete specification sections 00020 through 01 35 13 and 230050 – Basic HVAC Materials and Methods; 230800 – Commissioning of HVAC; 238000 – Heating, Ventilating and Air Conditioning;250050 – Basic Automation Materials & Methods; 255000 – Integrated Automation Facility Controls; 076000 – Sheet metal Flashing & Trim; 089100 – Louvers & Vents, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #24, this bid package will also be responsible for the following: a. Fume Hoods b. Sheet metal flashings, reglets, cap flashings, gutters, closure strips, saddle flashings per sheet A8.21 c. Splash pan at rainwater leaders, see 15/A8.21 d. Continuous Kynar finished cont. aluminum drip flashing per 5, 10/A8.20 e. Metal coping at existing walkway columns f. Drip flashings at window head similar to 8/A10.03 g. Aluminum rainwater leaders h. Metal coping at parapet note 36/A3.02 Bid Package 25: Electrical/Communications/Electronic Safety & Security Section 00300B-12 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Includes all work in complete specification sections 00020 through 01 35 13 and 260510 – Electrical General Requirements; 260519 – Low Voltage Wire and Cables; 260526 – Grounding; 260530 – Rooftop Conduit Support for Electrical Systems; 260532 – Junction and Pull Boxes for Electrical Systems; 260533 – Raceways and Fitting for Electrical Systems; 260534 – Surface Nonmetallic Raceway for Electrical Systems; 260543 – Underground ducts and Raceway for Electrical Systems; 260544 – In Grade Pull Boxes for Electrical Systems; 260555 – Basic Elec Matls & Methods; 260923 – Lighting Occupancy Sensors; 260925 – Day lighting Control Systems; 260213 – Transformers; 262200 – Dry Type Transformers; 262416 – Panel boards; 262726 – Wiring Devices; 262816 – Circuit Breakers; 262817 – Disconnect Switches; 265000 – Lighting; Div 27: Communications – 270500 – Common Work, Results for Communications; 270526 – Grounding & Bonding for Communications Systems; 270528.32 – Junction and Pull Boxes for Communication Systems; 270528.33 – Raceways and Fitting for Communication Systems; 270528.34 – Rooftop Conduit Support for Communication Systems; 270528.38 – Surface Nonmetallic Raceway for Communication Systems; 270529 – Hangers & Supports for Communications Systems; 270533 – Conduits & Backbones for Communications Systems; 270536 – Cable Trays for Communications Systems; 270543 – Underground Ducts and Raceway for Communication Systems; 270553 – Identification for Communications Systems;271000 – Structured Cabling, Basic Materials & Methods; 271113 – Communications Entrance Protection; 271116 – Communications Cabinets, Racks, Frames & Enclosures; 271119 – Communications Termination Blocks & Patch Panels; 271123 – Communications Cable Management: 271126 – Communications Rack Mounted Power Protection & Power Strips; 271300 – Communications Indoor Backbone Cabling; 271400 Communications Outside Plant Backbone Cabling; 271500 – Communications Horizontal Cabling; 274116 – Integrated Audio-Video Systems & Equipment; 275113 – Public Address, Clock and Bell Systems; 277000 – Communications Broadband Systems; Div 28: Electronic Safety & Security – 280500 – Common work Results for Electronic Safety & Security; 280513 – Conductors & Cables for Electric Safety & Security; 280528.33 – Raceways and Fittings for Electrical Safety and Security; 281619 – Intrusion Detection Remote Devices & Sensors; 282300 – Video Surveillance Systems; 283000 – Fire Detection & Alarm System; 312316.1 – Trenching; 312323.1 – Backfill, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #25, this bid package will also be responsible for the following: a. Recessed electric hand dryer per Detail 1/A9.05 Section 00300B-13 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings b. Concrete light pole bases c. Trenching and backfilling for electrical work Bid Package 26: Earthwork Includes all work in complete specification sections 00020 through 01 35 13 and 310513 – Soils for Earthwork; 311000 – Site Clearing; 312213 – Rough Grading; 312300 – Excavation & Fill; 312316.1 – Trenching; 312323.1 – Backfill; 321216.1 – Asphalt Playground, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #26, this bid package will also be responsible for the following: a. Striping as required b. Parking lot signage as required c. Wheel stops Bid Package 27: Chain Link Fencing & Gates Includes all work in complete specification sections 00020 through 01 35 13 and 313113 – Chain Link Fencing & Gates; 323120 – Ornamental Steel Fence, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Bid Package 28: Landscape Includes all work in complete specification sections 00020 through 01 35 13 and 328400 – Irrigation; 329600 – Transplanting, less qualifications or exculsions ( List under Qualifications/Exclusions Section). Section 00300B-14 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Bid Package 29: Utilities Includes all work in complete specification sections 00020 through 01 35 13 and 333000 – Sanitary Sewerage Utilities; 334000 – Storm Drainage Utilities; 334600 – Subdrainage; 334750 – Modular Storm water Bio-retention System; 334913 – Storm Drainage Manholes, Frames & Covers; 312316.1 – Trenching; 312323.1 – Backfill, less qualifications or exculsions ( List under Qualifications/Exclusions Section). In addition to the work outlined in the specification sections contained within Bid Package #29, this bid package will also be responsible for the following: a. Retaining wall drainage per Detail 15/A8.20 including 4” perforated pipe, 140 N filter fabric, ¾” gravel. b. Site gas line c. Fire Sprinkler riser to 6” AFF. d. Fire Department connections e. Post indicator valves Proposal Specification Section or Sections: Please check the box next to the specification sections you are including in your bid. Your eligibility to be selected as low bidder will be compared to bidders including these scope items in their bid. DIVISION 3 - CONCRETE □ 03 10 00 Concrete Forming and Accessories □ 03 15 13 Water stops – New □ 03 20 00 Concrete Reinforcing □ 03 30 00 Cast-In-Place Concrete □ 03 37 13 Short Crete □ 03 48 60 Precast Architectural Features (GFRC) Section 00300B-15 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 03 53 00 Concrete Topping DIVISION 4 - MASONRY □ 04 21 13 Brick Masonry DIVISION 5 - METALS □ 05 12 00 Structural Steel Framing □ 05 31 00 Steel Decking □ 05 40 00 Cold Formed Metal Framing □ 05 50 00 Metal Fabrications □ 05 51 50 Aluminum Access Ladder □ 05 52 00 Metal Railings □ 05 53 00 Gratings DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES □ 06 10 00 Rough Carpentry DIVISION 7 – THERMAL AND MOISTURE PROTECTION □ 07 13 26 Self-Adhering Sheet Waterproofing □ 07 19 00 Water Repellents □ 07 21 00 Thermal Insulation □ 07 22 00 Roof Insulation □ 07 26 00 Under-Slab Vapor Barrier □ 07 31 13 Asphalt Shingles Section 00300B-16 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 07 41 00 Metal Ceiling Panels □ 07 42 13 Metal Soffit Panels □ 07 55 00 Modified Bituminous Roofing □ 07 60 00 Sheet Metal Flashing and Trim □ 07 72 00 Roof Accessories □ 07 81 00 Applied Fireproofing □ 07 92 00 Joint Sealants □ 07 95 13 Expansion Joint Cover Assemblies DIVISION 8 - OPENINGS □ 08 11 13.16 Custom Hollow Metal Doors and Frames □ 08 11 20 Flush Aluminum Doors & Frames □ 08 14 16 Flush Wood Doors □ 08 31 00 Access Door and Panels □ 08 41 13 Aluminum-Framed Entrances and Storefronts □ 08 44 00 Curtain Wall and Glazed Assemblies □ 08 51 13 Aluminum Windows □ 08 63 00 Metal-Framed Skylights □ 08 71 00 Door Hardware □ 08 81 00 Glass Glazing □ 08 90 50 Translucent Skylight Panels □ 08 91 00 Louvers and Vents Section 00300B-17 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings DIVISION 9 - FINISHES □ 09 21 16 Gypsum Board Assemblies □ 09 24 00 Portland Cement Plastering □ 09 30 13 Ceramic Tiling □ 09 51 13 Acoustical Panel Ceilings (T-Bar Ceilings) □ 09 51 23 Acoustical Tile Ceilings □ 09 65 13 Resilient Base and Accessories □ 09 65 19 Resilient Tile Flooring □ 09 68 13 Tile Carpeting □ 09 72 16 Vinyl-Coated Fabric Wall Coverings □ 09 77 50 Sanitary Wall Panels □ 09 84 33 Sound-Absorbing Wall Units □ 09 91 00 Painting DIVISION 10 - SPECIALTIES □ 10 11 00 Visual Display Surfaces □ 10 14 00 Signage □ 10 21 13 Toilet Compartments □ 10 28 00 Toilet Accessories □ 10 44 00 Fire Protection Specialties □ 10 56 13 Metal Grid Shelving Section 00300B-18 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings DIVISION 11 - EQUIPMENT □ 11 31 00 Appliances □ 11 52 13 Projection Screens □ 11 53 00 Laboratory Equipment (Glass Washer) DIVISION 12 - FURNISHINGS □ 12 21 13 Window Blinds □ 12 24 13 Roller Shades □ 12 35 50 Educational/Library Casework □ 12 35 51 Music Education Storage Casework □ 12 35 53 Laboratory Casework □ 12 93 00 Site Furnishings DIVISION 13 - SPECIAL CONSTRUCTION □ 13 21 48 Sound-Conditioned Rooms DIVISION 14 - CONVEYING SYSTEMS □ 14 24 00 Hydraulic Elevators DIVISION 15 – 19 (RESERVED FOR FUTURE EXPANSION) FACILITY SERVICE SUBGROUP DIVISION 20 (RESERVED FOR FUTURE EXPANSION) DIVISION 21 – FIRE SUPPRESSION □ 21 00 50 Basic Fire Sprinkler Materials & Methods Section 00300B-19 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 21 10 00 Fire Sprinkler System DIVISION 22 – PLUMBING □ 22 00 50 Basic Plumbing Materials & Methods □ 22 08 00 Commissioning of Plumbing Systems □ 22 10 00 Plumbing Piping System □ 22 40 00 Plumbing Fixtures □ 22 50 00 Plumbing Equipment DIVISION 23 – HEATING, VENTILATION AND AIR CONDITIONING □ 23 00 50 Basic HVAC Materials & Methods □ 23 08 00 Commissioning of HVAC □ 23 80 00 Heating, Ventilating and Air Conditioning DIVISION 24 - (RESERVED FOR FUTURE EXPANSION) DIVISION 25 – INTEGRATED AUTOMATION □ 25 00 50 Basic Automation Materials and Methods □ 25 50 00 Automation Facility Controls DIVISION 26 – ELECTRICAL □ 26 05 00 General Requirements for Electrical Systems □ 26 05 19 Low Voltage Wire and Cables □ 26 05 26 Electrical System Grounding □ 26 05 30 Rooftop Conduit Support for Electrical Systems □ 26 05 32 Junction and Pull Boxes for Electrical Systems Section 00300B-20 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 26 05 33 Raceways and Fitting for Electrical Systems □ 26 05 34 Surface Nonmetallic Raceway for Electrical Systems □ 26 05 43 Underground Ducts and Raceway for Electrical Systems □ 26 05 44 In Grade Pull Boxes for Electrical Systems □ 26 05 50 Basic Materials and Methods □ 26 09 23 Lighting Occupancy Sensors □ 26 09 25 Day lighting Control Systems □ 26 22 13 Transformers □ 26 24 16 Panel board and Distribution Panels □ 26 27 26 Wiring Devices □ 26 28 16 Circuit Breakers □ 26 28 17 Disconnect Switches □ 26 50 00 Lighting DIVISION 27 - COMMUNICATIONS □ 27 05 00 General Requirements for Communication Systems □ 27 05 26 Communications Systems Grounding □ 27 05 28.32 Junction and Pull Boxes for Communication Systems □ 27 05 28.33 Raceways and Fittings for Communication Systems □ 27 05 28.34 Rooftop Conduit Support for Communication Systems □ 27 05 28.38 Surface Nonmetallic Raceway for Communication Systems Section 00300B-21 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 27 05 29 Hangers and Supports for Communication Systems □ 27 05 33 Conduits and Back boxes for Communication Systems □ 27 05 36 Cable Trays for Communication Systems □ 27 05 43 Underground Ducts and Raceways for Communication Systems □ 27 05 53 Identification for Communication Systems □ 27 10 00 Structured Cabling, Basic Materials and Methods □ 27 11 16 Communications Cabinets, Racks, Frames, and Enclosures □ 27 11 19 Communications Termination Blocks and Patch Panels □ 27 11 23 Communications Cable Management □ 27 11 26 Communications Rack Mounted Power Protection and Power Strips □ 27 13 00 Communications Indoor Backbone Cabling □ 27 14 00 Communications Outside Plant Backbone Cabling □ 27 15 00 Communications Horizontal Cabling □ 27 41 16 Integrated Audio-Video Systems and Equipment □ 27 51 13 Public Address, Clock and Bell Systems □ 27 70 00 Communications Broadband Systems DIVISION 28 - ELECTRONIC SAFETY AND SECURITY □ 28 05 00 Common Work Results for Electronic Safety and Security □ 28 05 13 Conductors and Cables for Electronic Safety and Security □ 28 05 28.33 Raceways and Fittings for Electrical Safety and Security □ 28 16 19 Intrusion Detection Remote Devices and Sensors Section 00300B-22 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 28 23 00 Video Surveillance Systems □ 28 31 00 Fire Detection and Alarm DIVISION 29 - (RESERVED FOR FUTURE EXPANSION) SITE AND INFRASTRUCTURE SUBGROUP DIVISION 30 - (RESERVED FOR FUTURE EXPANSION) DIVISION 31 – EARTHWORK □ 31 05 13 Soils for Earthwork □ 31 10 00 Site Clearing □ 31 22 13 Rough Grading □ 31 23 00 Excavation & Fill □ 31 23 16.13 Trenching □ 31 23 23.13 Backfill □ SOILS REPORT AND SUPPLEMENTS (FOR REFERENCE ONLY) DIVISION 32 – EXTERIOR IMPROVEMENTS □ 32 12 16.1 Asphalt Paving - Pedestrian □ 32 13 13.1 Landscape Concrete Work □ 32 14 00 Unit Pavers □ 32 31 13 Chain Link Fence & Gates □ 32 31 20 Ornamental Steel Fence Section 00300B-23 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings □ 32 84 00 Irrigation Systems □ 32 96 00 Transplanting DIVISION 33 – UTILITIES □ 33 30 00 Sanitary Sewerage Utilities □ 33 40 00 Storm Drainage Utilities □ 33 46 00 Subdrainage □ 33 47 50 Modular Stormwater Bioretention System □ 33 49 13 Storm Drainage Manholes, Frames & Covers Qualifications/Exclusions Section. Please provide listed items:__________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Section 00300B-24 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Base bid, including all Addenda, for items checked above: Dollars $ (written amount) (numeric) Unit Prices: Unit Price No. A: Dollars $ (written amount) (numeric) Unit Price No. B: Dollars $ (written amount) (numeric) Unit Price No. C: Dollars $ (written amount) (numeric) Unit Price No. D: Dollars $ (written amount) (numeric) Unit Price No. 5: Dollars $ (written amount) (numeric) Unit Price No. 6: Dollars $ (written amount) (numeric) Unit Price No. 7: Section 00300B-25 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings Dollars $ (written amount) (numeric) Bid Bond (Required for bids of at least $100,000.00): Bid Bond, or cashiers check, is attached in the amount of 10% of the total proposal as required in the Instruction to Bidders. Non-Collusion Declaration: An executed Non-Collusion Declaration, 00480, is attached. Bidder’s Qualification Statement: (Not Required due to Prequalification Requirement) A completed bidder’s qualification statement, 00420, is attached, along with any other pertinent information necessary to evaluate the qualifications of the bidder. Contract Award, Commencement, and Completion: It is agreed that the Subcontractor shall not withdraw the bid for a period of ninety calendar days from date prescribed for its opening, and that the District reserves the right to reject any and all portions of this bid. If written District acceptance is mailed or delivered to the Subcontractor before bid is withdrawn, the Subcontractor agrees to execute and deliver a Contract to Gonsalves & Stronck within 10 calendar days from the date of such District notification. The Subcontractor agrees to commence Work under this Contract on the date specified in a written Notice to Proceed from the District and to complete the Project within the specified number of calendar days after the signing of the Contract. The Subcontractor further agrees that construction insurance certificates delivery to the District and the securing of building permits are prerequisites to site move-in. The Subcontractor agrees to District assessment of liquidated damages stipulated for incomplete Contractor work in Document 00800. Certification: Identification: Provide the names of all persons interested in the foregoing bid as principals below. If a corporation, give legal name of corporation, State where Section 00300B-26 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. January 17, 2014 RWD Jefferson High School New Classrooms & Music Buildings incorporated, and names of president and secretary. If a partnership, give name of firm and names of all individual co-partners composing the firm. If an individual, give first and last names in full. Signatures: Provide the signature and title of officer authorized to sign contracts. Signature: Name (please print): Title: Email: ______________________________________________ Company Name: ______________________________________________ Contractor’s License No.: Business Address: Telephone Number: Fax Number: ______________________________________________ Date of Bid: END OF SECTION Section 00300B-27 Proposal Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00310 DISABLED VETERANS FORMS PART 1 - GENERAL 1.01 SUMMARY A. Due to the fact that this is not a typical project in the fact that there is a typical General Contractor these forms are not required. However it is the Districts wish to invite all DVBE Sub-contractors to participate in this bid directly by submitting directly to the District. Challenge News will be notified of our intentions to receive bids. B. The following documents shall be received up to, but not later than, 24 hours following Bid Deadline: 1. Prime Bidder Good Faith Effort Worksheet. 2. Prime Bidder Certification of Disabled Veteran Business Enterprise Participation. Section 00310-1 Disabled Veterans Forms Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00410 BID BOND PART 1 - GENERAL 1.01 BID BOND A. A Bid Bond is not required for bids submitted under the amount of $100,000.00. B. Bid Bond is the American Institute of Architects" AIA Document A310, "Bid Bond," December 1970 Edition, 1 page, which is made part of the Project Manual with the same force and effect as though set forth in full. C. AIA Document A310 may be purchased separately from The American Institute of Architects at the following locations: 1. San Francisco Chapter, 130 Sutter Street, San Francisco CA 94109 (415) 362-7397. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) END OF SECTION Section 00410-1 Bid Bond Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00420 BIDDER’S QUALIFICATION STATEMENT (NOT REQUIRED FOR THIS PROJECT) (To be executed by Bidder and Submitted with Bid) Board of Trustees Jefferson Union High School District 699 Serramonte Boulevard Daly City (San Mateo County) California, 94015-4132 Firm Name:_______________________________________________________ Address:_________________________________________________________ Telephone:_______________________________________________________ By:______________________________________________________________ (Name of Individual Completing Statement) Date:____________________________________________________________ 1. Number of years in business under this name:________________ 2. Number of years in business under other names: ______________________________________ ____________________ Name Years ______________________________________ ____________________ Name Years ______________________________________ ____________________ Name Years 3. Current Contractor's License Number: ____________________________ Section 00420-1 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings Type or Specialty:__________________________________________ Date of Issue:______________________________________________ Expiration Date:____________________________________________ 4. Types of work performed with own forces: ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ 5. Number of years performing type of work called for in this Bid: ________ 6. Have you ever failed to complete any work awarded to you? ___________ If so, state: a. Name of owner and contact information of each such project:________________________________________________ _______________________________________________________ _______________________________________________________ b. Date of such an event and the circumstances:_________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ Section 00420-2 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 7. Jefferson High School New Classrooms & Music Buildings List three (five if Subcontractor) references where work comparable to that called for on this bid has been performed: a. Firm Name:_________________________________________________________ Address:_____________________________________________________________ Telephone:___________________________________________________________ Contact Person & Title:________________________________________________ Date of Work:________________________________________________________ Contract Amount: b. $________________________________________________ Firm Name:__________________________________________________________ Address:_____________________________________________________________ Telephone:___________________________________________________________ Contact Person & Title:________________________________________________ Date of Work:________________________________________________________ Contract Amount: c. $________________________________________________ Firm Name:__________________________________________________________ Address:_____________________________________________________________ Telephone:____________________________________________________________ Contact Person & Title:_________________________________________________ Date of Work:_________________________________________________________ Contract Amount: $_________________________________________________ Section 00420-3 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 8. Jefferson High School New Classrooms & Music Buildings Experience in K-12 public school construction in California: __________________________________________________________________________ __________________________________________________________________________ a. Type of work:________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ b. Number of years of experience in that type of work as: General contractor:____________________________________ Subcontractor:____________________________________ 9. K-12 public school projects completed by bidder during last five years in California. a. Type of work:__________________________________________ Value of work performed:_______________________________ Location of work:______________________________________ Name of school district for which work was performed: _______________________________________________________ Year completed:________________________________________ Names and addresses of major subcontractors: _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ Section 00420-4 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 b. Jefferson High School New Classrooms & Music Buildings Type of work:__________________________________________ Value of work performed:_______________________________ Location of work:______________________________________ Name of school district for which work was performed: _______________________________________________________ Year completed:________________________________________ Names and addresses of major subcontractors: _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ c. Type of work:__________________________________________ Value of work performed:_______________________________ Location of work:______________________________________ Name of school district for which work was performed: _______________________________________________________ Year completed:________________________________________ Names and addresses of major subcontractors: _______________________________________________________ _______________________________________________________ Section 00420-5 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings _______________________________________________________ d. _______________________________________________________ Type of work:__________________________________________ Value of work performed:_______________________________ Location of work:______________________________________ Name of school district for which work was performed: _______________________________________________________ Year completed:________________________________________ Names and addresses of major subcontractors: _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ e. Type of work:__________________________________________ Value of work performed:_______________________________ Location of work:______________________________________ Name of school district for which work was performed: _______________________________________________________ Year completed:________________________________________ Names and addresses of major subcontractors: Section 00420-6 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 10. Name of any firms currently pre-qualified with state of California in which bidder has controlling interest: ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ 11. Names of other businesses in which bidder has financial interests:__________________________________________________ ____________________________________________________________ ____________________________________________________________ 12. Names of persons with whom bidder has been associated in business as partners or associates for last five years: ____________________________________________________________ ____________________________________________________________ 13. Construction experience of principal members of bidder's present organization and of the person who will be the bidder's superintendent: a. Name of individual:____________________________________ Position with bidder:__________________________________ Years of construction experience:______________________ Magnitude and type of work:____________________________ Section 00420-7 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings _______________________________________________________ Capacity in which individual performed each type of work: _______________________________________________________ b. Name of individual:____________________________________ Position with bidder:__________________________________ Years of construction experience:______________________ Magnitude and type of work:____________________________ _______________________________________________________ Capacity in which individual performed each type of work: _______________________________________________________ c. Name of individual:____________________________________ Position with bidder:__________________________________ Years of construction experience:______________________ Magnitude and type of work:____________________________ _______________________________________________________ Capacity in which individual performed each type of work: _______________________________________________________ d. Name of individual:____________________________________ Position with bidder:__________________________________ Years of construction experience:______________________ Section 00420-8 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings Magnitude and type of work:____________________________ _______________________________________________________ Capacity in which individual performed each type of work: _______________________________________________________ e. Name of individual:____________________________________ Position with bidder:__________________________________ Years of construction experience:______________________ Magnitude and type of work:____________________________ _______________________________________________________ Capacity in which individual performed each type of work: _______________________________________________________ 14. If bidder is corporation: a. Capital paid in cash:__________________________________ b. Date of incorporation:_________________________________ c. State of incorporation:________________________________ d. If foreign corporation, date of qualification to do business in California:________________________________ e. Names of officers: i. President:________________________________________ ii. Vice-President:___________________________________ Section 00420-9 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings iii. Secretary:_________________________________________ iv. Treasurer:________________________________________ 15. If bidder is partnership: a. Whether general, limited, or association:______________ b. Name and address of each partner: _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 16. Any years in which bidder was pre-qualified as bidder for state construction projects:______________________________________ 17. Has the bidder or any officer of bidder or any employee of bidder who has a proprietary interest in bidder or the superintendent for the project ever been disqualified, removed or otherwise prevented from bidding on or completing a federal, state, or local project because of a violation of a law or safety regulation?___________________________________ If so, state: a. Name and relationship of each such person: ___________ _______________________________________________________ Section 00420-10 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings _______________________________________________________ b. Date of such an event and the circumstances:__________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 18. Has the bidder, within the past five years, had any claim of $50,000 or greater from an owner or a surety sustained against the bidder based on poor workmanship, incomplete performance or unexcused delays in completion? If so, state: a. Name of each such owner or surety:_____________________ _______________________________________________________ _______________________________________________________ b. Date of such an event and the circumstances:__________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 19. Has the bidder, within the last five years, failed to receive a recovery of at least 50% of the amount in dispute, not including attorneys' fees and costs, for claims filed against owners for extra compensation? If so, state: Section 00420-11 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 a. Jefferson High School New Classrooms & Music Buildings Name of each such owner:_______________________________ _______________________________________________________ b. _______________________________________________________ Date of such an event and the circumstances:__________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 20. Has the bidder, within the last five years, received any citations or had any claims or law suits filed against the bidder alleging a violation of any federal, state, or local laws that govern worker pay, safety, conditions or training? If so, state: a. Name of each such citing agency claimant or plaintiff: _______________________________________________________ _______________________________________________________ b. Date of such an event and the circumstances:__________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 21. Name of all surety bonding companies, with the name and address of the agent, that bidder has used in the last five years: Section 00420-12 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ 22. Has any surety which bonded bidder's jobs within the last five years been requested to complete any part of the work bidder was supposed to perform? If so, state: a. Name of each such surety:_______________ _______________________________________________________ _______________________________________________________ b. Date of such an event and the circumstances:__________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 23. Name of liability insurance company and name and address of agent:______________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ 24. Has liability insurance carrier which insured bidder's jobs within the last five years been Section 00420-13 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings requested to pay any claims in excess of $100,000 based on actions of bidder? If so, state: a. Name of each such insurer:_____________________________ _______________________________________________________ _______________________________________________________ b. Date of such an event and the circumstances:__________ _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ ENCLOSE THE FOLLOWING DOCUMENTS: 25. Copy of Contractor's license issued by state. 26. a. b. If partnership, copy of partnership agreement. If corporation, i. Copy of Articles of incorporation. ii. Copy of Bylaws. 27. Fictitious business name statement, if applicable. 28. Certificate of qualification to do business in California if foreign corporation or limited partnership. 29. Contracts for work on other K-12 public school projects. Section 00420-14 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings a. Contracts for work currently in progress. b. Contracts for work performed within last five years. c. Contracts, letters of intent, or notices of award for any work not yet in progress, but will be in progress during the same time period as this construction project. The District will evaluate the ability of your firm to perform the work of this project, in conjunction with and at the same time as the other work your firm will have in progress. Due to the fast track nature of this project, this element will be a critical factor in evaluating your firm’s qualifications to perform the work of this project. 30. Prequalification certificate previously issued by any state contracting entity. 31. Financial statements for the last fiscal year that have been audited and the prior month that have been audited or reviewed by a Certified Public Accountant. 32. List of bidder's backlog projects with name, location, the work bidder is still scheduled to do, the start and completion dates, and the contract amount. The above responses and accompanying financial statements shall not be public records and shall not be open to public inspection pursuant to Public Contract Code section 20111.5. SIGNATURE The undersigned declares: I have read the above Bidder's Qualification Statement and know the contents thereof. I am informed and believe that the matters stated therein are true and correct and make this verification on behalf of the Bidder which has designated me as its agent to execute this response to this Bidder's Qualification Statement. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed at_________________________ California on _______________________, 2007. Section 00420-15 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings BIDDER: By______________________________ Signature ________________________________ Name ________________________________ END OF SECTION Section 00420-16 Bidder’s Qualification Statement Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00430 LIST OF PROPOSED SUBCONTRACTORS Project Titled: Jefferson High School New Classrooms & Music Buildings 6996 Mission Street Daly City, CA 94014 Submitted by (Bidder) To be provided within 24 hours of submission of bid to the District Office. Category of Work, Name of Subcontractor, City of Business Exceeds $12,050.00 Yes No END OF SECTION Section 00430-1 List of Proposed Subcontractors Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00480 NONCOLLUSION DECLARATION (To be executed by Bidder and Submitted with Bid) I, ___________________________________________________________, declare as follows: That I am the __________________________ of ____________________________, the party making the attached bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding, that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true, and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this ________ day of _____________________________ at ____________________ ________________, California. ___________________________________ Signature Name of Company (Please Type):__________________________________________________ END OF SECTION Section 00480-1 Noncollusion Declaration Jefferson Union High School District Project Tracking No.68924-18 DSA File # 41-H2 DSA Application # 01-111055 Rev. December 9, 2013 Jefferson High School New Classrooms & Music Buildings SECTION 00600 PERFORMANCE BOND AND PAYMENT BOND PART 1 - GENERAL 1.01 PERFORMANCE BOND AND PAYMENT BOND A. Performance Bond and Payment Bond is the American Institute of Architects’AIA Document A312, "Performance Bond and Payment Bond," December 1984 Edition, 6 pages, which is made part of the Project Manual with the same force and effect as though set forth in full. B. AIA Document A312 may be purchased separately from the American Institute of Architects at the following location: 1. San Francisco Chapter, 130 Sutter Street, San Francisco CA 94109 (415) 362-7397 or online at www.aiasf.org. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) END OF SECTION Section 00600-1 Performance Bond and Payment Bond JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 SECTION 06 20 00 - FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. This Section includes the following: 1. 2. 3. 4. B. Related Sections include the following: 1. 2. 3. 4. 5. 6. 1.3 Exterior standing and running trim. Exterior lumber and plywood siding. Interior standing and running trim. Interior plywood and board paneling. Division 6 Section "Rough Carpentry" for furring, blocking, and other carpentry work not exposed to view and for framing exposed to view. Division 6 Section "Exterior Architectural Woodwork" for exterior woodwork not specified in this Section. Division 6 Section "Interior Architectural Woodwork" for interior woodwork not specified in this Section. Division 8 Section “Door Hardware” for Builders Hardware. Division 8 Section “ Wood Doors”. Division 9 Section "Painting" for priming and back-priming of finish carpentry. DEFINITIONS A. Inspection agencies, and the abbreviations used to reference them, include the following: 1. 2. 3. 4. 5. 6. 7. 8. 1.4 ANSI - American National Standards Institute ASTM - American Society for Testing and Materials AWI – American Woodwork Institute NHLA - National Hardwood Lumber Association. RIS - Redwood Inspection Service. WCLIB - West Coast Lumber Inspection Bureau. WI - Woodwork Institute “Manual of Millwork”. WWPA - Western Wood Products Association. SUBMITTALS A. Product Data: For each type of process and factory-fabricated product. Include construction details, material descriptions, dimensions of individual components and profiles, textures, and colors. Finish Carpentry 06 20 00 - 1 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 1. 2. 3. B. Samples for Verification: 1. 2. C. 1.5 Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Indicate type of preservative used, net amount of preservative retained, and chemical treatment manufacturer's written instructions for handling, storing, installing, and finishing treated material. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site. For each species and cut of lumber and panel products with non-factory-applied finish, with 1/2 of exposed surface finished, 50 sq. in. for lumber and 8 by 10 inches for panels. For each finish system and color of lumber and panel products with factory-applied finish, 50 sq. in. for lumber and 8 by 10 inches for panels. Research/Evaluation Reports: Showing that fire-retardant-treated wood complies with building code in effect for Project. QUALITY ASSURANCE A. Installer Qualifications: A qualified installer. B. Fire-Test-Response Characteristics: Where fire-retardant materials are indicated, provide materials with specified fire-test-response characteristics as determined by Underwriters Laboratory, Inc., or other testing and inspection agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency on surfaces of materials that will be concealed from view after installation. C. Treated Wood Materials: Submit chemical treatment manufacturer’s instructions for handling, storage, installation and finishing treated materials. For each type specified, include certification by treating plant stating chemical solutions used, submersion period and conformance with specified standards. D. Factory-mark each piece of lumber and plywood with type, grade, mill and grading agency identification; except omit marking from surfaces to receive transparent finish, and submit mill certificate that material has been inspected and graded in accordance with requirements if it cannot be marked on a concealed surface. E. Pre-installation Meeting: Meet at project site prior to delivery of finish carpentry materials and review coordination and environmental controls required for proper installation and ambient conditioning in areas to receive work. Include in the meeting the Contractor, Architect and other Owner Representatives (if any), Installers of finish carpentry, wet work including plastering, other finishes, painting, mechanical work and electrical work, and firms and persons responsible for continued operation (whether temporary or permanent) of HVAC system as required to maintain temperature and humidity conditions. Proceed with finish carpentry on interior only when everyone concerned agrees that required ambient conditions can be properly maintained. 2 06 20 00 - Finish Carpentry JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 1.6 DELIVERY, STORAGE, AND HANDLING A. Protect materials against weather and contact with damp or wet surfaces. Stack lumber, plywood, and other panels. Provide for air circulation within and around stacks and under temporary coverings. B. Deliver interior finish carpentry only when environmental conditions meet requirements specified for installation areas. If finish carpentry must be stored in other than installation areas, store only where environmental conditions meet requirements specified for installation areas. 1.7 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install interior finish carpentry until building is enclosed and weatherproof, wet work in space is completed and nominally dry, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period. B. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit work to be performed according to manufacturer's written instructions and warranty requirements and at least one coat of specified finish to be applied without exposure to rain, snow, or dampness. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Plywood Siding: a. b. c. d. e. 2. Hardwood Veneer Plywood Paneling: a. b. c. 2.2 Champion International Corp. Georgia-Pacific Corp. Louisiana-Pacific Corporation. Pacific Wood Laminates, Inc. Simpson Timber Co. Champion International Corp. Georgia-Pacific Corp. Weyerhaeuser Company. MATERIALS, GENERAL A. Lumber: DOC PS 20 and applicable grading rules of inspection agencies certified by the American Lumber Standards' Committee Board of Review. Finish Carpentry 06 20 00 - 3 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 1. 2. Factory mark each piece of lumber with grade stamp of inspection agency indicating grade, species, moisture content at time of surfacing, and mill. For exposed lumber, mark grade stamp on end or back of each piece, or omit grade stamp and provide certificates of grade compliance issued by inspection agency. B. Softwood Plywood: DOC PS 1/ANSI A199.1. C. Hardwood Plywood: HPVA HP-1. D. Hardboard: AHA A135.4 E. Medium-Density Fiberboard: ANSI A208.2, Grade MD-Exterior Glue. F. Particleboard: ANSI A208.1, Grade M-2-Exterior Glue. 2.3 WOOD-PRESERVATIVE-TREATED MATERIALS (Trt-Wd) A. Water-Repellent Preservative Treatment by Non-pressure Process: AWPA N1. 1. 2. 3. 2.4 Preservative Chemicals: 3-iodo-2-propynyl butyl carbamate (IPBC), combined with an insecticide containing chloropyrifos. Use chemical formulations that do not bleed through or otherwise adversely affect finishes. Do not use colorants in solution to distinguish treated material from untreated material. Application: Exterior trim and wood siding. FIRE-RETARDANT-TREATED MATERIALS (F Trt-Wd) A. General: Where fire-retardant-treated lumber and plywood are indicated, use materials impregnated with fire-retardant chemicals by a pressure process or other means acceptable to authorities having jurisdiction to produce products with the following fire-test-response characteristics: 1. Flame-spread index of not greater than 25 when tested according to ASTM E 84. B. For exposed items indicated to receive transparent finish, do not use chemical formulations that contain colorants or that bleed through or otherwise adversely affect finishes. C. Exterior-Type Fire-Retardant Treatment: Organic-resin-based formulation that shows no increase in flame spread of treated material after being weathered according to ASTM D 2898, Method A. D. Interior, Low-Hygroscopic-Type, Fire-Retardant Treatment: Formulation that results in treated material with an apparent moisture content of not more than 28 percent when tested according to ASTM D 3201 at 92 percent relative humidity. E. Mill lumber before treatment and implement special procedures during treatment and drying processes that prevent lumber and plywood from warping and developing discolorations from drying sticks or other causes, marring, and other defects affecting appearance of treated woodwork. 4 06 20 00 - Finish Carpentry JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 F. 2.5 Kiln-dry material after treatment to levels required for untreated material. Do not use material that does not comply with requirements for untreated material or is warped or discolored. EXTERIOR STANDING AND RUNNING TRIM A. Lumber Trim for Painted Applications: Kiln-dried, finger-jointed or solid lumber with surfaced smooth face and of the following species and grade: 1. 2. B. Moldings: Made to patterns included in WMMPA WM 7. Wood moldings made from kilndried stock and graded under WMMPA WM 4. 1. 2. 3. C. 2.6 Clear redwood; RIS. Grade B & B Btr. - 1 & 2 Western red cedar; WCLIB, or WWPA. Moldings for Semitransparent Finish (Stained Finish): N-grade redwood, western red cedar, or sugar pine as indicated. Moldings for Opaque Finish (Painted): P-grade redwood, western red cedar, or sugar pine. Patterns as indicated. MDO Trim: Exterior Grade B-B, MDO plywood. SIDING A. Plywood Siding for Painted Finish: MDO/EXT-APA-Rated siding. 1. 2. B. Siding Colors, Textures, and Patterns: Where manufacturer's standard products are indicated, provide siding with the following requirements: 1. 2.7 Thickness: As indicated. Pattern: As indicated. As selected by Architect from manufacturer's full range. INTERIOR STANDING AND RUNNING TRIM A. Lumber Trim for Opaque Finish (Painted): Finished lumber (S4S), either finger-jointed or solid lumber, of one of the following species and grades: 1. 2. 3. B. Grade D Select (Quality) Idaho white, lodgepole, ponderosa, or sugar pine; WWPA. Grade D Select white woods; WWPA. Grade A Finish alder, aspen, basswood, cottonwood, gum, magnolia, soft maple, sycamore, tupelo, or yellow poplar; NHLA. Moldings: Made to patterns included in WMMPA WM 7. Wood moldings made from kilndried stock and graded under WMMPA WM 4. 1. Moldings for Transparent Finish (Stain or Clear Finish): N-grade Idaho white, lodgepole, ponderosa, or sugar pine, western red cedar, douglas fir, or yellow poplar]. Finish Carpentry 06 20 00 - 5 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 a. 2. 3. 2.8 Provide material selected for compatible grain and color. Moldings for Opaque Finish (Painted): P-grade Idaho white, lodgepole, ponderosa, or sugar pine, or yellow poplar. Manufactured to sizes and patterns (profiles) shown. PANELING A. Hardwood Veneer Plywood Paneling: Manufacturer's stock hardwood plywood panels complying with applicable requirements in HPVA HP-1. 1. 2. 3. 4. 5. 6. 7. 8. 2.9 Face Veneer Species: Plain-sliced red oak. Backing Veneer Species: Any hardwood compatible with face species. Construction: Veneer core. Thickness: 7/16 inch. Panel Size: As indicated on the drawings. Glue Bond: Type II (interior). Face Pattern: As selected by Architect form manufacturer's standard patterns. Finish: As selected by Architect from manufacturer's full range. MISCELLANEOUS MATERIALS A. Fasteners for Exterior Finish Carpentry: Provide nails or screws of the following materials, in sufficient length to penetrate minimum of 1-1/2 inches into substrate, unless otherwise recommended by manufacturer: 1. 2. B. Hot-dip galvanized steel. Pre-finished aluminum in color to match stain, where face fastening of material to receive stain is unavoidable. Fasteners for Interior Finish Carpentry: Nails, screws, and other anchoring devices of type, size, material, and finish required for application indicated to provide secure attachment, concealed where possible. 1. Where finish carpentry materials are exposed in areas of high humidity, provide fasteners and anchorages with hot-dip galvanized coating complying with ASTM A 153/A 153M. C. Paneling Adhesives: adhesives. D. Flashing: Comply with requirements in Division 7 Section "Sheet Metal Flashing and Trim" for flashing materials installed in finish carpentry. 1. E. Comply with paneling manufacturer's written recommendations for Horizontal Joint Flashing for Siding: Preformed galvanized steel Z-shaped flashing. Sealants: Comply with requirements in Division 7 Section "Joint Sealants" for materials required for sealing siding work. 6 06 20 00 - Finish Carpentry JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 2.10 FABRICATION A. Wood Moisture Content: Comply with requirements of specified inspection agencies and with manufacturer's written recommendations for moisture content of finish carpentry at relative humidity conditions existing during time of fabrication and in installation areas. B. Back out or kerf backs of the following members, except members with ends exposed in finished work: 1. 2. 3. C. Exterior standing and running trim wider than 5 inches. Interior standing and running trim, except shoe and crown molds. Wood board paneling. Ease edges of lumber less than 1 inch in nominal thickness to 1/16-inch radius and edges of lumber 1 inch or more in nominal thickness to 1/8-inch radius. PART 3 - EXECUTION 3.1 EXAMINATION A. 3.2 Pre-installation Meeting: Meet at project site prior to delivery of finish carpentry materials and review coordination and environmental controls required for proper installation and ambient conditioning in areas to receive work. Include in meeting the Contractor, Architect and other Owner Representatives (if any), Installers of finish carpentry, wet work including plastering, other finishes, painting, mechanical work and electrical work, and firms and persons responsible for continued operation (whether temporary or permanent) of HVAC system as required to maintain temperature and humidity conditions. Proceed with finish carpentry on interior only when everyone concerned agrees that required ambient conditions can be properly maintained. PREPARATION A. Clean substrates of projections and substances detrimental to application. B. Before installing finish carpentry, condition materials to average prevailing humidity in installation areas for a minimum of 24 hours, unless longer conditioning is recommended by manufacturer. C. Painted Lumber: Prime lumber for exterior applications to be painted, including both faces and edges. Cut to required lengths and prime ends. Comply with requirements in Division 9 Section "Painting." 3.3 INSTALLATION, GENERAL A. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements. 1. Do not use manufactured units with defective surfaces, sizes, or patterns. Finish Carpentry 06 20 00 - 7 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 B. Install finish carpentry level, plumb, true, and aligned with adjacent materials. concealed shims where necessary for alignment. 1. 2. 3. 4. 3.4 Use Scribe and cut finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer. Countersink fasteners, fill surface flush, and sand where face fastening is unavoidable. Install to tolerance of 1/8 inch in 96 inches for level and plumb. Install adjoining finish carpentry with 1/32-inch maximum offset for flush installation and 1/16-inch maximum offset for reveal installation. Coordinate finish carpentry with materials and systems in or adjacent to it. Provide cutouts for mechanical and electrical items that penetrate finish carpentry. STANDING AND RUNNING TRIM INSTALLATION A. Install with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches long, except where necessary. Stagger joints in adjacent and related standing and running trim. Cope at returns and miter at corners to produce tight-fitting joints with full-surface contact throughout length of joint. Use scarf joints for end-to-end joints. Plane backs of casings to provide uniform thickness across joints, where necessary for alignment. 1. 2. 3. 4. 3.5 Match color and grain pattern across joints. Install trim after gypsum board joint finishing operations are completed. Drill pilot holes in hardwood before fastening to prevent splitting. Fasten to prevent movement or warping. Countersink fastener heads on exposed carpentry work and fill holes. Fit exterior joints to exclude water. Apply flat grain lumber with bark side exposed to weather. SIDING INSTALLATION A. Plywood Siding: Install panels with edges over framing or blocking. Nail at 6 inches o.c. at panel perimeter and 12 inches o.c. at intermediate supports, unless manufacturer recommends closer spacing. Leave 1/16-inch gap between adjacent panels and 1/8-inch gap at perimeter and openings, unless otherwise recommended by panel manufacturer. 1. 2. 3. 4. Seal butt joints at inside and outside corners and at trim locations. Install continuous metal flashing at horizontal panel joints with 1/8-inch expansion gap. Apply battens and corner trim as indicated. Conceal fasteners to greatest practical extent by countersinking and filling, by placing in grooves of siding pattern, or by concealing with applied trim or battens as detailed. Do not nail through overlapping pieces. B. Flashing: Install metal flashing as indicated on Drawings and as recommended by siding manufacturer. C. Finish: Apply finish within two weeks of installation. D. Install siding to comply with manufacturer's warranty requirements. 8 06 20 00 - Finish Carpentry JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 3.6 PANELING INSTALLATION A. Plywood Paneling: Select and arrange panels on each wall to minimize noticeable variations in grain character and color between adjacent panels. Leave 1/4-inch gap to be covered with trim at top, bottom, and openings. Install with uniform tight joints between panels. 1. 2. 3. 3.7 Attach panels to supports with manufacturer's recommended panel adhesive and fasteners. Space fasteners as recommended by panel manufacturer. Conceal fasteners to greatest practical extent. Arrange panels with grooves and joints over supports. Fasten to supports with nails of type and at spacing recommended by panel manufacturer. Use fasteners with prefinished heads matching groove color. ADJUSTING A. 3.8 Replace finish carpentry that is damaged or does not comply with requirements. Finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing. Adjust joinery for uniform appearance. CLEANING A. 3.9 Clean finish carpentry on exposed and semi-exposed surfaces. Touch up factory-applied finishes to restore damaged or soiled areas. PROTECTION A. Installer of finish carpentry work shall advise Contractor of final protection and maintained conditions necessary to ensure that the work will be without damage or deterioration at time of acceptance. END OF SECTION 06 20 00 Finish Carpentry 06 20 00 - 9 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 SECTION 07 18 13 – PEDESTRIAN TRAFFIC COATINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY A. This Section includes traffic coatings for the following applications: 1. B. Related Sections include the following: 1. 2. 1.3 Interior, Exterior, pedestrian traffic. Division 3 Section "Concrete Floor Topping" for traffic-bearing toppings applied over base slabs or precast concrete units. Division 9 Section "Resinous Flooring" for decorative and general-use resinous floorings. SUBMITTALS A. Product Data: For each product indicated. B. Shop Drawings: Show extent of each traffic coating. Include details for treating substrate joints and cracks, flashings, deck penetrations, and other termination conditions. Include layout of traffic striping and markings. C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors, textures, and patterns available for each type of product indicated. D. Samples for Verification: For each type of traffic coating required, prepared on rigid backing and of same thickness and material indicated for the Work. 1. Provide stepped samples on backing large enough to illustrate build-up of traffic coatings. E. Material Certificates: Signed by manufacturer certifying that traffic coatings comply with requirements, based on comprehensive testing of current product formulations within the last three years. F. Maintenance Data: To include in maintenance manuals specified in Division 1. Identify substrates and types of traffic coatings applied. Include recommendations for periodic inspections, cleaning, care, maintenance, and repair of traffic coatings. G. LEED Submittals: Pedestrian Traffic Coatings 07 18 13 - 1 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 1. 2. 3. 1.4 Product Test Reports for Credit SS 7.2: For traffic coatings that are roof coverings, documentation indicating compliance with Solar Reflectance Index requirement. Product Data for Credit IEQ 4.2: For interior field-applied traffic coatings, documentation including printed statement of VOC content. Provide VOC documentation for all products that are past of the coating system, i.e.: primers, catalysts, base coat, and top coat. Laboratory Test Reports for Credit IEQ 4.2: For interior traffic coatings, documentation indicating that products comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers." QUALITY ASSURANCE A. Installer (Applicator) Qualifications: An experienced applicator who has specialized in installing work similar in material, design, and extent to that indicated for this Project and who is certified by manufacturer. 1. B. Source Limitations: As follows: 1. 2. C. 2. Fire-response testing was performed by UL, ITS, or another independent testing and inspecting agency that is acceptable to authorities having jurisdiction and that performs testing and follow-up services. Provide materials identical to those of traffic coatings tested according to ASTM E 108 for deck type and slopes indicated and that comply with requirements for roofcovering Class indicated. Mockups: Architect will select one representative surface for each traffic coating and each substrate to receive traffic coatings. Apply each coating to at least 200 sq. ft. of each substrate to demonstrate surface preparation, joint and crack treatment, thickness, texture, color, and standard of workmanship. 1. 2. E. Use traffic coatings of a single manufacturer. Obtain primary traffic coating materials, including primers, from traffic coating manufacturer. Obtain secondary materials including aggregates, sheet flashings, joint sealants, and substrate repair materials of type and from source recommended by traffic coating manufacturer. All materials used in the system have to comply with VOC limits of SCAQMD rule 1113 effective as of 1/1/2004. Fire-Test-Response Characteristics: For traffic coatings as follows: 1. D. Certification: Written approval or license of applicator by traffic coating manufacturer. Remove and reapply mockups until they are approved by Architect. Keep approved mockups undisturbed during construction as a standard for judging completed traffic coatings. Undamaged mockups may be incorporated into the Work. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Meetings." 1. Before installing traffic coatings, meet with representatives of authorities having jurisdiction, manufacturer's technical representative, Owner, Architect, consultants, 2 - 07 18 13 - Pedestrian Traffic Coatings JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 independent testing agency, and other concerned entities. Review requirements for traffic coatings. Notify participants at least seven days before conference. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in original packages and containers with seals unbroken and bearing manufacturer's labels showing the following information: 1. 2. 3. 4. 5. 6. 7. B. 1.6 Manufacturer's brand name. Type of material. Directions for storage. Date of manufacture and shelf life. Lot or batch number. Mixing and application instructions. Color. Store materials in a clean, dry location protected from exposure to direct sunlight. In storage areas, maintain environmental conditions within range recommended in writing by manufacturer. PROJECT CONDITIONS A. Environmental Limitations: Apply traffic coatings within the range of ambient and substrate temperatures recommended in writing by manufacturer. Do not apply traffic coatings to damp or wet substrates, when temperatures are below 40 deg F, when relative humidity exceeds 85 percent, or when temperatures are less than 5 deg F above dew point. 1. 1.7 Do not apply traffic coatings in snow, rain, fog, or mist, or when such weather conditions are imminent during the application and curing period. Apply only when frost-free conditions occur throughout the depth of the substrate. WARRANTY A. General Warranty: Special warranty specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents. B. Special Warranty: Written warranty, signed by traffic coating manufacturer agreeing to repair or replace traffic coatings that do not comply with requirements or that deteriorate during the specified warranty period. Warranty does not include deterioration or failure of traffic coating due to unusual weather phenomena, failure of prepared and treated substrate, formation of new substrate cracks exceeding 1/16 inch in width, fire, vandalism, or abuse by snowplow, maintenance equipment, and truck traffic. 1. Deterioration of traffic coatings includes, but is not limited to, the following: a. b. c. Adhesive or cohesive failures. Abrasion or tearing failures. Surface crazing or spalling. Pedestrian Traffic Coatings 07 18 13 - 3 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 d. C. Intrusion of water, oils, gasoline, grease, salt, deicer chemicals, or acids into deck substrate. Warranty Period: Five years from date of Substantial Completion. (Project Close-Out Item) PART 2 - PRODUCTS 2.1 MATERIALS A. Physical Requirements: Provide traffic coatings complying with ASTM C 957. B. Material Compatibility: Provide primers; base, intermediate, and top coats; and miscellaneous materials that are compatible with one another and with substrate under conditions of service and application, as demonstrated by the manufacturer based on testing and field experience. 2.2 TRAFFIC COATING A. Products: Subject to compliance with requirements, provide the following or equal: 1. 2. PEDA-GARD LT System by Neogard. RESINYTE “U” System by Pli Dek B. Primer: Manufacturer's standard factory-formulated primer recommended for substrate and conditions indicated. C. Preparatory and Base Coats: Manufacturer’s standard factory formulated prep and base coat recommended for the system. D. Intermediate Coat: Manufacturer’s standard factory formulated prep and base coat recommended for the system E. Top Coat: Manufacturer’s standard factory formulated prep and base coat recommended for the system 1. Color & Slip-Resistance: As selected by Architect from manufacturer's full range. F. Component Coat Thicknesses: 3 coats as recommended by manufacturer for substrate and service conditions indicated, but not less than 3/16” total thickness. G. Aggregate: As recommended in writing by traffic coating manufacturer for the slip resistance selected by architect. 1. Spreading Rate: As recommended by manufacturer for substrate and service conditions indicated, but not less than the following: a. b. H. Intermediate Coat: To refusal. Top Coat: As required to achieve slip-resistant finish. Fire-Test-Response Characteristics: Class A roof covering per ASTM E 108. 4 - 07 18 13 - Pedestrian Traffic Coatings JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 2.3 MISCELLANEOUS MATERIALS A. Joint Sealants: Multicomponent urethane sealant recommended in writing by manufacturer for substrate and joint conditions indicated and for compatibility with traffic coatings; complying with ASTM C 920, Type M, Class 25, Grade NS for sloping and vertical applications or Grade P for deck applications, and Use T where subject to traffic or Use NT elsewhere. Sealant VOC shall comply with SCAQMD rule 1113 effective as of 1/1/2004. B. Sheet Flashing: manufacturer. C. Adhesive: Manufacturer's recommended contact adhesive complaint with VOC limits of SCAQMD rule 1113 effective as of 1/1/2004. D. Reinforcing Strip: Manufacturer's recommended fiberglass mesh. E. Traffic Paint: Alkyd-resin ready mixed, complying with AASHTO M 248, Type N. 1. 60-mil minimum, nonstaining sheet material recommended by Color: White. a. Use blue for spaces accessible to the disabled. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, with Applicator present, for compliance with requirements and for other conditions affecting performance of traffic coatings. 1. 2. 3. 4. 5. 3.2 For the record, prepare written report, endorsed by Applicator, listing conditions detrimental to performance. Verify compatibility with and suitability of substrates. Begin coating application only after minimum concrete curing and drying period recommended by traffic coating manufacturer has passed, after unsatisfactory conditions have been corrected, and after surfaces are dry. Verify that substrates are visibly dry and free of moisture. Test for moisture by method recommended in writing by manufacturer. Application of coating indicates acceptance of surfaces and conditions. PREPARATION A. Clean and prepare substrates according to manufacturer's written recommendations to produce clean, dust-free, dry substrate for traffic coating application. B. Mask adjoining surfaces not receiving traffic coatings, deck drains, and other deck substrate penetrations to prevent spillage, leaking, and migration of coatings. C. Concrete Substrates: Mechanically abrade concrete surfaces to a uniform profile according to ASTM D 4259. Do not acid etch. 1. Remove grease, oil, paints, and other penetrating contaminants from concrete. Pedestrian Traffic Coatings 07 18 13 - 5 JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 2. 3. 4. 3.3 Remove concrete fins, ridges, and other projections. Remove laitance, glaze, efflorescence, curing compounds, concrete hardeners, formrelease agents, and other incompatible materials that might affect coating adhesion. Remove remaining loose material to provide a sound surface, and clean surfaces according to ASTM D 4258. TERMINATIONS AND PENETRATIONS A. Prepare vertical and horizontal surfaces at terminations and penetrations through traffic coatings and at expansion joints, drains, and sleeves according to ASTM C 1127 and manufacturer's written recommendations. B. Provide sealant cants at penetrations and at reinforced and non-reinforced deck-to-wall butt joints. C. Terminate edges of deck-to-deck expansion joints with preparatory base-coat strip. D. Install sheet flashings at deck-to-wall expansion and dynamic joints, and bond to deck and wall substrates according to manufacturer's written recommendations. 3.4 JOINT AND CRACK TREATMENT A. Prepare, treat, rout, and fill joints and cracks in substrates according to ASTM C 1127 and traffic coating manufacturer's written recommendations. Before coating surfaces, remove dust and dirt from joints and cracks according to ASTM D 4258. 1. 3.5 Comply with recommendations in ASTM C 1193 for joint-sealant installation. TRAFFIC COATING APPLICATION A. Apply traffic coating material according to ASTM C 1127 and manufacturer's written recommendations. 1. 2. 3. B. 3.6 Start traffic coating application in presence of manufacturer's technical representative. Verify that wet film thickness of each component coat complies with requirements every 100 sq. ft. Apply traffic coatings to prepared wall terminations and vertical surfaces to height indicated and omit aggregate on vertical surfaces. Apply traffic paint for striping and other markings with mechanical equipment to produce uniform straight edges. Apply at manufacturer's recommended rates for a 15-mil minimum wet film thickness. FIELD QUALITY CONTROL A. Testing: Owner will engage a qualified testing agency to perform the following field qualitycontrol testing: 1. Samples of material delivered to Project site shall be taken, identified, sealed, and certified in presence of Owner representative and Contractor. 6 - 07 18 13 - Pedestrian Traffic Coatings JEFFERSON HS NEW CLASSROOM AND MUSIC BUILDINGS Jefferson Union High School District Project No. 28042 ADDENDUM #1 2. 3. Testing agency shall perform tests for characteristics specified, using applicable referenced testing procedures or, if not referenced, using tests cited in manufacturer's product data. Testing agency shall verify thickness of coatings during traffic coating application. B. If test results show traffic coating materials do not comply with requirements, remove noncomplying materials, prepare surfaces, and reapply traffic coatings. C. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 3.7 CURING AND PROTECTING A. Cure traffic coatings according to manufacturer's written recommendations. contamination and damage during application and curing stages. B. Protect traffic coatings from damage and wear during remainder of construction period. END OF SECTION 07 18 00 Prevent (3/06) Pedestrian Traffic Coatings 07 18 13 - 7 www.aedisarchitects.com 387 S. 1st Street, Suite 300 San Jose, CA 95113 tel: (408)-300-5160 fax: (408)-300-5121 PROJECT JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS EN S ED J A RCH E L . YI UN IT EC P JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT CONSULTANT T LIC JEFFERSON UNION HIGH SCHOOL DISTRICT AT N. 1 06 /30 / 5 RN ST E RE IA NO. C-27443 O F CA L I FO FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - T1a 28042 1/16/14 REFERENCE T1 a a b c d a 2 12" SCIENCE LAB. 47 J106 6' - 0" 10 39 TYP. T.O. RETAINING WALL 25 3 W-1 1 25 PS 6' - 0" A8.20 7 1/2" 16' - 6" A8.10 17 12" 48 J105c PS 14 31 36 J105 4.4 W1a 4.5 7' - 6" ø 35 18" PREP. RM. 5' - 0" 34 PS FLM 60" MIN. CHM A6.01 90' - 0" 12" 50 1' - 0" 30"x48 " CLR. 30"x48 " CLR. MIN. 4' - 0" 11 1 25' - 0" 26 4 1 8 J105b 27 30"x48 " CLR. 23 5 2' - 6" 18" REF. 4'-0" MIN. DW 21 5.2 24 T.O. EN S ED J A RCH E L . YI UN JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT IT EC P T LIC SCALE: 1/8" = 1'-0" AT N. 1 06 /30 / O F CA L I 5 RN ST E RE IA NO. C-27443 FO FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - A3.01a 28042 1/16/14 REFERENCE - A3.01 N 10' - 4 3/8" PROPERTY LINE M 3' - 2 3/4" (E) CHAINLINK FENCE TO REMAIN 4 3/4" 2' - 0" 9 1/2" 5' - 6 1/8" (E) 2ND STORY WOOD FRAMED HOUSE 8 1/2" 1' - 7 1/2" 6" T.O.CULVERT WALL AT SIDEWALK LANDING (279.10) T.O.P. @ SIDEWALK LANDING (278.65) T.O.C @ CULVERT T.O.CULVERT WALL. AT STAIR LANDING (276.88) (N) FIRE WATER LINE (N) WEEP HOLES TO DRAIN NEIGHBORS WALKWAY 8" 6" 7' - 10" 5' - 0" 2' - 2 29/32" 6" (278.95) T.O.W 1' - 0" S.S. T.O EXISTING CULVERT WALL (274.88) 3' - 4 1/2" 1' - 1 5/8" TRANSITION SQUARE CULVERT TO (E) V-DITCH CULVERT IN (E) RETAINING WALL NORTH OF BUILDING 'E'. (271.12) F.F. 1 T.O.P. @ STAIR LANDING (276.90) T.O. 1ST FLR 0' - 0" SOLDIER PILE AND LAGGING 3' - 0" 3' - 7" (270.20) T.O. TOE FOOTING (PER 10/S5.03) BUILDING RETAINING WALL. 1' - 0" 2' - 0" EN S ED J A RCH E L . YI UN JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT IT P T 4' - 6 5/8" LIC 2' - 2" EC 2' - 0" (269.62) T.O. HEAL FOOTING (PER 20/S5.03) AT 3/8" = 1'-0" E RE N. 1 06 /30 / O F CA L I 5 RN ST 1 SECTION THROUGH GRIDLINE M, N, CULVERT AND ADJACENT RESIDENCE IA NO. C-27443 FO FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - A8.10a 28042 1/16/14 REFERENCE A8.10 STRUCTURAL CALCULATIONS REVISIONS ADDENDUM #1 FOR JEFFERSON H.S. NEW CLASSROOM & MUSIC BUILDINGS DALY CITY, CA ARCHITECT: Aedis Architecture & Planning 1494 Hamilton Ave. San Jose, CA 95125 Telephone: (408) 264 - 2000 Facsimile: (408) 264 - 2500 STRUCTURAL ENGINEER: Thornton Tomasetti 135 Main St. Suite 850 San Francisco, CA 94105 Telephone: (415) 365 - 6900 Facsimile: (415) 365 - 6901 TT Project No.: 09B128.03 Date: January August 29, 16,2013 2013 K L M 10'-0" SLRS 10'-0" N 7'-2 5/8" (E) RETAINING WALL T.O.W. (TBD) 14 1 CL OF RETAINING WALL S5.03 20 S5.02 OUTLINE OF (N) RET WALL FTG 14'-2 1/2" 6'-0" 0 14 10 S5.03 BFF-1 S5.04 6' MAX SIM T.O.W. (+6'-0") BFC-1 1 SLRS 1 6' MAX BFC-1 6' MAX BFC-1 TEMPORARY SHORING WALL 4'-0" BFF-1 (-0'-11") TYP. S2.06 TYP. 3 6' MAX 1 17'-6" 4 BF-M CF-1 1 4 S2.06 6' MAX 4'-0" 25'-0" TYP S5.03 16'-3" 9 6' MAX BF-1 OUTLINE OF RET WALL FTG 18" DRILLED PIER W/ W8X35 OR HP8X36,TYP. 6' MAX F6 17'-6" 6' MAX BFC-1 C1 SLRS 7'-6" 6' MAX CF-1 CF-1 4 F5 CF-1 T.O.W. (+7'-10") T.O.W. (+8'-1") 6'-0" 5 5.2 RETAINING WALL FTG 1 9 S5.03 FOUNDATION & FIRST FLOOR PLAN Dependent on FOUNDATION & FIRST FLOOR PLAN O FESS IO N PR A S T R A UC T UR N TE R O F C A L I FO IA ST A JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: L NO. S4116 JEFFERSON H.S. NEW CLASSROOM & MUSIC BUILDINGS L RD CA J . W IL F L O R D ER GINE EN ER E 1/8" = 1'-0" REG IST 1 1 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 41-H2 APPL NO.: 01-111055 JOB NO. 09B128.00 01/16/14 DATE SHEET AD1-S2.01a REFERENCE: S2.01 J J.2 T.O.S. (+ 13' - 5" ) 10'-0" T.O.S. (+13'-2 1/4") T.O.S. (+13'-5 3/4") 14 S5.03 2'-5 5/8" 3'-4" S7.01 S7.02 4" W14X22 SLOPE TO DRAIN. MAINTAIN MIN SLAB THICKNESS 1 S7.06 5" CONC SLAB W/ #4 @ 12" OC EA WAY 4 1/2" 19a W12X19 T.O.S. (+13'-2 1/4") 10 AT STAIR LANDING W16X31 T.O.S. (+13'-2 1/4") 20'-0" N SLRS L SLRS K W18X50 W18X35 14 S5.03 SIM 1 1 W18X35 W12X19 L A UC T UR N TE R O F C A L I FO R IA ST A JEFFERSON H.S. NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT L L NO. S4116 S T J . W IL F RD CA R O FES S IO N PR A O R EG IST D ER G INE EN ER E DependentFLOOR (2) on FRAMING SECOND FLOOR PLAN FRAMING PLAN 1 SECOND 1/8" = 1'-0" 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 FILE NO.: 41-H2 APPL NO.: 01-111055 JOB NO. 09B128.00 DATE 01/16/14 SHEET AD1-S2.02a REFERENCE: S2.02 BUILDING 'A' BUILDING 'F' (TYP.) Z2 Z1 Z1 Z1 Z2 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT SCALE: 1/16" = 1'-0" FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E1.02a 28042 1/16/14 REFERENCE - E1.02 1 1 (TYP.) JL1-25 JL1-27 1 1 JL1-27 1 JL1-25 JL1-27 1 JL1-27 1 (E) (TYP.) 1 JL1-29 1 1 JL1-29 JL1-31 1 1 JL1-31 JL1-31 JL1-31 1 1 E6.02 1 (E JL1-29 1 1 JL1-29 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT SCALE: 1/16" = 1'-0" FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E1.02b 28042 1/16/14 REFERENCE - E1.02 JL1-29 JL1-31 1 1 ELEC. ROOM J116 DISTRIBUTION PANEL "DSBJ" 1 1 1 JL1-29 JL1-31 BUILDING "K" ELEC. RM. K103 1 1 (TYP.) (TYP.) (TYP.) 1 SCALE: 1/16" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E1.02c 28042 REFERENCE - E1.02 1/16/14 (TYP.) EP1-30 IRRIGATION CONTROLLER JL1-25 1 JL1-27 1 SCALE: 1/16" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E1.02d 28042 1/16/14 REFERENCE - E1.02 TED STEEL 1 SIGNAL CONDUITS STUB INTO IDF ROOM #J107, ELECTRICAL ROOM #J116, AND ELECTRICAL ROOM #K103. SEE S, F & M PLANS AND SPECIFICATION FOR MORE INFORMATION. ALL PARKING LOT, RAMPS, COURTYARD, AND EXTERIOR BUILDING SHALL BE WIRED AND CONTROLLED BY THE SCHOOL'S ENERGY MANAGEMENT SYSTEM (EMS). COORDINATE WITH MECHANICAL AND SCHOOL DISTRICT'S EMS CONSULTANT PRIOR TO CONSTRUCTION. CONNECT TO BUILDING (E) EXTERIOR LIGHTING CIRCUIT. ENTIRE AREA HAS (E) UNDERGROUND POWER, LOW VOLTAGE SYSTEMS CONDUITS AND OTHER UTILITIES. THE CONTRACTOR SHALL HIRE AN UNDERGROUND LOCATION SERVICE, HAVE ALL UTILITIES CLEARLY IDENTIFIED, AND POT HOLE TO IDENTIFY DEPTHS OF ALL SYSTEMS PRIOR TO CONSTRUCTION. CONNECT ARCHWAY FIXTURES TO BRIDGE LIGHTING (E) CIRCUIT AND CONTROLS. POLE BASE SHALL BE TO ONE SIDE EDGE OF BIOSWALE DIRECT BORE AND INSTALL 4"C. UNDERNEATH THE EXISTING BUILDING AND EXTEND INTO THE (E) VAULT. THE CONTRACTOR SHALL DRILL THROUGH THE SUMP IN BOTTOM OF VAULT DIAMETER OF SUMP, 2' DEEP MINIMUM AND INSTALL "ROCK-IN-SOCK" FOR DRAINAGE. PROVIDE AND INSTALL 120V, 20 AMP, 1-POLE CIRCUIT BREAKER IN (E) PANEL 'EP1' AND 3/4" C, WITH (2) #12 AND (1) #12 GROUND. CONNECT POWER AND DATA PER THE MANUFACTURER'S INSTALLATION MANUAL LOCATE 'Z1' FIXTURES EQUAL DISTANT ABOUT AND OVER "JEFFERSON" RAISED LETTERS. 1 1"C., WITH (4) #10 AND (1) #10 GND FOR LANDSCAPE LIGHTING, JL1-25,27 1"C., WITH (4) #8 AND (1) #10 GND FOR PARKING LOT LIGHTING FL1-29,31. JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 28042 1/16/14 SHEET AD1 - E1.02e REFERENCE - E1.02 1.4 25 25 1 25 GROUND BAR, SEE DETAIL #6/E6.02 17,19 21,23 9 TY SYSTEM T 25 7 9 SAC 3 1 3.4 GROUND BAR, SEE DETAIL #6/E6.02 3 IDF ROOM J107 ENLARGED PLAN 1/4" = 1'-0" KEYNOTES 29. DEDICATED 4-PLEX FOR SECURITY SYSTEMS. 30. CONTINUE 208V, 1PHASE CIRCUIT TO SPLIT SYSTEM COMPRESSOR. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 28042 1/16/14 SHEET AD1 - E3.10a REFERENCE - E3.10 USTODIAN J109 21,23 GIRLS 9 J110 7 SECURITY SYSTEM CABINET 25 CLOCK SYSTEM PANEL 9 SAC 3 1 3.4 GROUND BAR, SEE DETAIL #6/E6.02 MACH. DISTRIBUTION RM. PANEL "DPJ" J111 ELECT. PANEL "JL1" (LIGHTING) DISTRIBUTION SWITCHBOARD "DSBJ" J114 14 PANEL "JP2" STAFF J113 TRANSFORMER "TJ1" T 27 FACP ENERGY MANAGEMENT SYSTEM PANEL (EMS) JP1-47,49 1 PANEL 'JL2' (FOR MECH. EQUIPMENT) 14 4.1 FIRE RISER J112 SAC 2 2 1/4" = 1'-0" WP ELECTRICAL ROOM J114 ENLARGED PLAN KEYNOTES 29. DEDICATED 4-PLEX FOR SECURITY SYSTEMS. JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT 30. CONTINUE 208V, 1PHASE CIRCUIT TO SPLIT SYSTEM COMPRESSOR. 1 FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E3.10b 28042 1/16/14 REFERENCE - E3.10 K102 T.V. PANEL "KL1" 4 TRANSFORMER "TK1" BAND ROOM KP1-15,17 1 SAC 1 PANEL "KP1" ELECT. K101 KP1-1,3,5 T 4.9 K103 2 KP1-2,4 UNIFORM STORAGE K104 KP1-42 2 3 7 PRACTICE PRACTICE PRACTICE K105 K106 K107 7 9 11 8 SCALE: 1/8" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E3.10c 28042 1/16/14 REFERENCE - E3.10 KP1-30 4 30 DOWN TO PANEL 'KP1' IN ELEC. ROOM AT FIRST FLOOR WP 4.9 KL1-(2,4,6) KP1-15,17 7 WP 1 8 SCALE: 1/8" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 28042 1/16/14 SHEET AD1 - E3.30a REFERENCE - A1.04 11 13 3 3.4 FHF 2 WP 24 WP JL2 (20-24) WP JP2-24 J JP2-22 WP JL2 (1-5) WP J 1 WP JP1-47,49 WP WP JP2 -38,40 1 SCU 3 HV 2 J JP2-36 WP WP J JP2-3 J WP JL2 (7-11) J J WP J WP FHF 1 EF 12 WP WP 1 JP2 (24-28) WP HV 6 DOWN TO FIRST FLOOR ELECTRICAL ROOM. (TYP) SCALE: 1/8" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E3.30b 28042 1/16/14 REFERENCE - E3.30 1.4 B.O.S. COVERED WALKWAY 2 2 CUSTO 9' - 0" 9' - 0" 1 J10 9' - 0" 3 10' - 8" 3.1 1 MACH LIBRARY K102 J1 10' - 8" 9' - 0" 4 1 TCC FIRE BAND ROOM 9' - 0" 1 J1 K101 SEE SECOND FLOOR REFLECTED CEILING PLAN 4.9 7' - 2" 1 1 ELECT. B.O.S. K103 1 10' - 8" 9' - 0" 1 UNIFORM STORAGE K104 7 1 1 9' - 0" 8 1 1 1 1 PRACTICE PRACTICE PRACTICE BAND OFFICE K105 K106 K107 K108 SCALE: 1/8" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E4.10a 28042 REFERENCE - E4.10 1/16/14 1 1 1.4 1 8' - 6" BOYS J108 1IDF B.O.S. J107 B.O.S. a GIRLS b J110 1 1 8' - 6" 1 3.4 ELECT. 9' - 0" T B.O.S. J114 B.O.S. STAFF 9' - 0" 4.1 1 J113 1 1 COVERED WALKWAY 1A 1 1 10' - 0" 1 A1 X 3a 3b 3b 3a N1EM N1 TCC N1 N1EM N1 D 6 E7.2 B.O.S. TYP. N1 N1EM N1 1c,d D SCIENCE LAB. N2 N2 A1 1d 1d N1 1d N2 A N1EM N1 1a,b,c 1a,b,c 1 N2 1c,d 1d 10' - 0" D N2 10' - 0" 1 N1EM N1 1a,b,c 1a,b,c 1 1c,d 1d 1a,b,c 1a,b,c 1a,b,c 1a,b,c 1a,b,c N2 N1 3d A 1d N1EM N1 J101D 3c N2 N2 1 3a 3b 3c 3d 1a,b,c 1a,b,c 1a,b,c 1a,b,c 1a,b,c X TCC X 1d D 1d 1c,d D N1 N1EM N1 N1EM N1 1a,b,c 1a,b,c 1a,b,c 1a,b,c 1a,b,c N1 N1EM A 1 1a,b,c 1a,b,c 1a, 1c,d PREP. RM. D E E.4 1 F 1 J102 G SCALE: 1/8" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E4.10b 28042 REFERENCE - E4.10 1/16/14 G.9 H J J.2 K L M N 1 1 1 N1EM X 3a 5a,b,c N1EM 5a,b,c N1 N1 3b 1 1 5a,b,c 5a,b,c 5a,b,c 5a,b,c N1EM 5a,b,c N1 5a,b,c 1 5a,b,c 5a,b,c 3a,b,c N2 1 3b 3a 1 3d 3c 1 A1 N1EM N1 1a,b,c 1a,b,c 1a,b,c 5a,b,c 5a,b,c N2 5d 5d N1EM N1 N1EM N1 N1 4.4 4d 4c A D 3c,d 1a,b,c 1a,b,c 1a,b,c N1EM N1 1 12' - 0" 1 A1 1 3c,d 4.5 3c,d 10' - 0" 3d 3c 5 3a 3b 5.2 N1EM N1 D PREP. RM. J105 N2 3d 1 6 3d N1EM N1 3a,b,c 3a,b,c 3a,b,c 3a,b,c 3a,b,c 3a,b,c N2 SCIENCE LAB. SCIENCE LAB. J103 D 10' - 0" N1 N1EM N1EM 5d N2 D 3 3a,b,c 3a,b,c 3a,b,c 3a,b,c 3a,b,c 3a,b,c D N1 N1EM N2 D N1EM N1 N1 N1 3a 3b N1EM N1 N1EM 5a,b,c A 3c,d 12' - 0" TCC N1 X 3a 3b 5a,b,c 1 N1 5a,b,c 1 X 5a,b,c 10' - 0" N1 N2 5d X TCC 1 J106 5a,b,c 5a,b,c 1 N1EM N1EM D N1 SCIENCE LAB. 5a,b,c N1 5a,b,c N1EM D N1EM 5a,b,c N1 5a,b,c N1 5a,b,c N1EM N1EM 3d N2 J104 N1 N1EM N1 1a,b,c 1a,b,c 1a,b,c N1EM N1 8 3d 10' - 0" 1 N1EM N1 3a,b,c 3a,b,c 3a,b,c 3a,b,c 3a,b,c 3a,b,c 4b 4a 9 X 1 TYP H J.2 1 K L M N JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS SCALE: 1/8" = 1'-0" JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E4.10c 28042 REFERENCE - E4.10 1/16/14 J205a CHASE FOR ELECTRICAL CONDUITS 4.1 JL1-19,21 COVERED WALKWAY 1B JL1-11,13 19 L1EM WP 19 1 19 L1 L1EM 6 E7.2 1 1 X X D 3a 3b N3EM N3 N3EM N3 L1EM L1 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c X D 3b 3a N3EM N3 1 J 21 19 TYP. TCC 21 1 L1EM 21 L1 3c 3c 3dA1 3d X D 3a 3b N3 10' - 0" N3EM N3 TCC 1 1 1 N3EM N3 3a 3 N3EM 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10' - 0" 1 N3 13 L1EM B.O.S. 10a,b,c N3EM 13 L1EM 13 L1EM 10a,b,c 13 L1EM N2 10a,b,c N3EM 10a,b,c B.O.S. 10a,b,c 10a,b,c N3 10c,d N2 LAB. N3 SCIENCE N3 J201 a,b 13 L1EM N3 10d 10a,b,c N2 N2 10d 1 10a,b,c N3EM 10a,b,c B.O.S. 10a,b,c 10a,b,c N3 10' - 0"10c,d 10d D J203 N2 A1 N2 10a,b,c LAB. N3 SCIENCE N3 N3EM N2 N3 10a,b,c 10d 10d a,b 10c,d 10d N3 10a,b,c A N3 N2 N3 10d 10a,b,c 10d 10a,b,c D A N3EM N3 N3EM N3 N3 N3EM N3EM N3 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10' - 0" N3 N3EM N3 N3EM 10c,d 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c 10a,b,c D 10' - 0" PREP. RM. TYP J202 D E E.4 F JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT G SCALE: 1/8" = 1'-0" FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E4.20a 28042 1/16/14 REFERENCE - E4.20 G.9 H J J.2 K L M 1 1 (TYP.) WP 1 X 19 N1EM 3a 19 L1 N1EM 14a,b,c 1 3b 14a,b,c 14a,b,c 14a,b,c 14a,b,c N1EM 14a,b,c N1 D N1 N1 10' - 0" N1EM 14a,b,c N1 14a,b,c N1EM N1EM 14a,b,c N1 N1 19 1 21 14a,b,c L1EM 14a,b,c N1EM 14a,b,c 14a,b,c N1 14a,b,c N1 N1 14a,b,c N1EM 14a,b,c D 14a,b,c N1 3b 3a 1 N1EM SCIENCE LAB. 14a,b,c N1EM J206 14a,b,c E 14a,b,c N1EM 19 X L1 14a,b,c N110' - 0" N2 N2 N2 N2 14d 14d N1 14a,b,c 14a,b,c 14a,b,c N1EM 14d 14d TCC D JL1-10,12,14 13 L1EM 1 3d 3c 1 A1 A D A 4d 4c P A1 3d 3c 12c,d 12c,d 12c,d 10' - 0" 12c,d 3a 3b X 3a 3b N3EM N1 N1EM N1 10a,b,c 12a,b,c 12a,b,c 12a,b,c 12a,b,c D TCC 3a 3b X N1EM TYP CLASSROOM N2 J204 N2 12d 1 SCALE: 1/8" = 1'-0" JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E4.20b 28042 REFERENCE - E4.20 1/16/14 1 DISTRIBUTION SWITCHBOARD "DSBJ" (LOCATED IN NEW CLASSROOMS ELEC. RM.) 400A 3P 400A, 480/277V, 3Ø, 4W + G, 125A 3P (25,000AIC) 100A 3P ST 100A 3P 225A 3P 225A 3P 1 1 F 1 1 31.9KVA MAIN LCP PANEL "JL1" PANEL "JL2" EXTERIOR LIGHTING CONTROL PANEL LIGHTING PANEL MECH. EQUIP. 15.9KVA 15.3KVA PANEL "KL1" ELEVATOR C.P. 1.5"C, 3#4, 1#8(G) XFMR "TK1" 22.4KVA XFMR "TJ1" 1 (L 500A 3P PANEL "KP1" 225A 3P 1 150A 5 FOR BUILDING "K", BAND ROOM 31.9KVA KEYNOTES: THE CONTRACTOR SHALL COORDINATE THE ELEVATOR CIRCUIT BREAKER AND FEEDER SIZE WITH THE APPROVED ELEVATOR SUBMITTAL, PROVIDE, INSTALL ACCORDINGLY AND PROVIDE CREDIT IF SMALLER. TIE ELEVATOR SHUNT TRIP INTO THE FIRE ALARM SYSTEM PER THE ELEVATOR CODE AND THE APPROVED MANUFACTURER'S REQUIREMENTS. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E5.01a 28042 REFERENCE - E5.01 1/16/14 "TJ1" DISTRIBUTION PANEL "DPJ" 122.4KVA (LOCATED IN NEW CLASSROOMS ELEC. RM.) 500A 3P 1 1 500A, 120/208V, 3Ø, 4W + G, 200% NEUTRAL 225A 3P 225A 3P 225A 3P 225A 3P 225A 3P 225A 3P SPARE (TYP) PANEL "JP1" PANEL "JP2" PANEL "JP3" PANEL "JP4" 30.1KVA 22KVA 23.8KVA 25.5KVA 1 PANEL "JP5" (TYP.) 21KVA 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E5.01b 28042 1/16/14 REFERENCE - E5.01 SAME AS TYPE "A" EXCEPT WITH EMERGENCY BATTERY BALLAST (1100 LUMENS). NOTE 1. 1 NOT USED 1 NOT USED NOTE 1. 4' LONG SURFACE MOUNTED WRAPAROUND LUMINAIRE, WHITE STEEL HOUSING AND ENDCAPS, IMPACT RESISTANT PRISMATIC LENS, TAMPERPROOF SCREWS, ELECTRONIC COOPER LIGHTING, FAIL-SAFE "TC" SERIES NOT USED. 4' LONG, 6" WIDE (NOMINAL) WALL MOUNTED VANDALPROOF FLUORESCENT LIGHTING FIXTURE, WHITE HIGH REFLECTANCE POWDER COAT FINISH, IMPACT PRISMATIC LENSE, SS TAMPERPROOF SCREWS, 2-F32T8 LAMPS, 277V WITH EMERGENCY BATTERY BALLAST, NOTE 1. COOPER LIGHTING, FAIL-SAFE "FWW" SERIES 1 DIRECT/INDIRECT, FULLY ADJUSTABLE AIRCRAFT CABLE SUSPENDED LINEAR ICLS 4 ROW WITH NOT USED. NOT USED 1 SURFACE MOUNTED CFL VANDAL RESISTANT DOWNLIGHT, 15" ROUND POLYCARBONATE JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E6.01a 28042 REFERENCE - E6.01 1/16/14 LIGHTING FIXTURE SCHEDULE TYPE DESCRITION NOTE NOT USED. 1 8" DIAMETER x 5.63"H, RECESSED FLUORESCENT DOWNLIGHT, CLEAR SPECULAR ALZAK SEE DETAIL HADCO LIGHTING GX2-M-H-L-A-2-(FINISH AS DIRECTED BY THE ARCHITECT)-N-N-A-N EXIT SIGN LIGHT, LED TYPE, UNIVERSAL MOUNTING, DIE-CAST ALUMINIUM HOUSING (COLOR PER ARCHITECT), CLEAR FACE WITH GREEN LETTERING, NICKEL CADMIUM BATTERY BACK UP, DIAGNOSTIC/ SELF-TEST CIRCUITRY, 120V CONNECTED TO UNSWITCHED HOT, UL LISTED. EMERGI-LITE PRESTIGE EDGE-LIT LED - SERIES W-LXN SAME AS 'X' BUT WEATHER PROOF. 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E6.01b 28042 1/16/14 REFERENCE - E6.01 PANEL: "JL1" DESCRIPTION LOCATION: ELEC. ROOM J116 KVA LOAD ØA ØB ØC 20A 0.9 0.9 0.9 SPARE 1.0 LTG-COVERED WALKWAY 1.0 LTG-EXT. WALKWAY - LTG - LANDSCAPE - LTG - PARKING LOT SPARE 1 TRIM STYLE: BUS RATING: MAIN CB MAIN LUGS ONLY NOTE: CB FLUSH 100 A A 1P VOLTAGE: 277/480V, 3Ø, 4W + G C C T C C T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SURFACE 200 A 225 A DOUBLE LUGS CB 20A KVA LOAD DESCRIPTION ØA ØB ØC 1P 0.9 LTG- CLASSROOM J104 1.2 1.2 LTG- CLASSROOM J108 1.6 0.9 LTG- CLASSROOM J206 0.9 LTG- CLASSROOM J205 LTG- CLASSROOM J204 0.9 LTG- CLASSROOM J203 1.6 2.0 SPARE - SPACE 20A 1P 0.5 LCP-ELEC. RM. J116 SPACE CONNECTED LOAD 400 A ØA ØB ØC 5.3 KVA 4.6 KVA 6.0 KVA TOTAL 15.9 KVA JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E6.03a 28042 REFERENCE - E6.03 1/16/14 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E6.03b 28042 REFERENCE - E6.03 1/16/14 1 1 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: 41 - H2 APPL NO.: 01-111055 JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE SHEET AD1 - E6.03c 28042 1/16/14 REFERENCE - E6.03 PANEL: "KP1" DESCRIPTION RECEPT-BAND RM K101 LOCATION: ELEC. ROOM K103 KVA LOAD ØA ØB ØC CB 20A .54 1P .54 0.5 REC/LTG-PRACT.RM K105 1.0 1.0 REC/LTG-PRACT.RM K106 1.0 REC/LTG-PRACT.RM K107 RECEPT-OFFICE RM K108 .36 20A 0.2 SAC-1 & SCU-1 2P 0.2 1 SPARE - SPACE SCHOOL SIGN-SITE 20A 0.1 0.1 TRIM STYLE: FLUSH BUS RATING: 100 A A MAIN CB MAIN LUGS ONLY NOTE: WITH 200% NEUTRAL BUS 3P VOLTAGE: 120/208V, 3Ø, 4W + G C C T C C T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 CB 20A KVA LOAD DESCRIPTION ØA ØB ØC 1P .36 RECEPT-RMS K103/K104 .36 RECEPT-LIBRARY K102 .36 .72 RECEPT-OFFICE K111 RECEPT-RMS K110/K109 - SPARE - ROOF RECEPT 0.1 SPACE 20A SURFACE 200 A 225 A 1P MOTORIZED DAMPER-ROOF 0.1 0.1 CONNECTED LOAD 400 A DOUBLE LUGS ØA ØB ØC 3.0 KVA 2.2 KVA 2.1 KVA TOTAL 7.3 KVA JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT FILE NO.: APPL NO.: JOB NO. 387 S. 1st Street, Suite 300 tel: (408) 300 - 5160 San Jose, CA., 95113 fax: (408) 300 - 5121 DATE 41 - H2 SHEET 01-111055 AD1 - E6.03d 28042 REFERENCE - E6.03 1/16/14 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT 41 - H2 01-111055 28042 1/16/14 AD1 - T0.02a REFERENCE XX/AX.XX 1.4 J107a 3.4 JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT 41 - H2 01-111055 28042 1/16/14 AD1 - T4.01a REFERENCE XX/AX.XX JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT 41 - H2 01-111055 28042 1/16/14 AD1 - T4.01b REFERENCE XX/AX.XX JEFFERSON HIGH SCHOOL NEW CLASSROOM & MUSIC BUILDINGS JEFFERSON UNION HIGH SCHOOL DISTRICT 41 - H2 01-111055 28042 1/16/14 AD1 - T4.01c REFERENCE XX/AX.XX