RECAPP Facility Evaluation Report
Transcription
RECAPP Facility Evaluation Report Greater St. Albert Catholic Regional Division No. 29 Ecole Secondaire Sainte Marguerite D' Youville School B4068A St. Albert Report run on: March 5, 2009 11:22 AM St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) Facility Details Building Name: Ecole Secondaire Sainte Mar Address: 51 Boudreau Road Location: St. Albert Building Id: Gross Area (sq. m): Replacement Cost: Construction Year: B4068A 5,090.73 $11,625,973 1991 Evaluation Details Evaluation Company: Kenneth M. Lee Architect Evaluation Date: July 16 2008 Evaluator Name: Ken Lee Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $424,500 3.65% General Summary: In 1991, the original one storey 4,225.00 sq.m. (concrete block, steel roof structure, brick & pre-finished aluminum siding clad, non-combustible) school was constructed. The school is sprinklered and is in good condition. The student capacity is 542. Portables were installed in 1988, 1994, 1995 and 2000. Structural Summary: The foundation is concrete grade beams on concrete piles. The main floor is concrete slab on grade. The mezzanine floors are reinforced concrete structural floor slab on concrete beams supported by concrete block walls. There are a few types of roof structure frames. Plywood sheathing on wood joists or wood trusses supported by concrete block walls. Steel deck on steel trusses or steel beams supported by concrete block walls. Some roof areas have reinforced concrete slab supported by concrete block walls. The structure is in acceptable condition. No significant problems reported or observed at the site visit. Envelope Summary: The exterior walls are clad with brick and prefinished aluminum sidings. The building has aluminum windows and hollow metal doors in pressed metal frames. The industrial arts workshop has 1 metal overhead door. SBS membrane roofing for the flat roofs. Cedar shakes on the pitched roofs and sloping roofs. The building has skylights. Vandalism has caused damage to some cedar shakes for a small area on the roof. Repair the cedar shakes. The building envelope is in acceptable condition. No significant problems reported or observed at the site visit. The interior is in acceptable condition. Interior Summary: Walls are painted concrete block and gypsum board and ceramic wall tiles. Ceilings are acoustic tiles, steel deck, painted gypsum board, painted concrete and gypsum board with spray texture finish. Corridors have terrazzo floor finish. Carpet in library, music room, administration office, offices and staff room. Vinyl sheet flooring in science classrooms, science preparation room, cafeteria, fashion study area in home economics classroom. and art room. Vinyl tiles in classrooms, computer classrooms, drama room, storage rooms and food study area in home economics classroom. Hardwood flooring in gymnasium. Ceramic floor tiles in boys washrooms, boys change room, boys shower room, girls washrooms, girls change room, girls shower room, staff kitchen, kitchen and food serving area in cafeteria. The hardwood floor in the gymnasium was re-finished in July, 2008. Mechanical Summary: Standard domestic water, sanitary & storm sewer and natural gas systems. Roof drainage connected to municipal mains. Heating, ventilation provided from central air handling & hydronic boiler systems in main Mechanical rooms. Conventional plumbing fixtures. Pneumatic and Electric control systems. DDC system. Building sprinkled throughout. Portable fire extinguishers in cabinets. Overall Mechanical systems in acceptable condition. Report run on: March 5, 2009 11:22 AM Page 2 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) Electrical Summary: 1200 Amp 120/208 volt three phase, fed underground from a pad mounted transformer. Main distribution panel is 70% full. Branch circuits are 80% full. Wiring in conduit. Lighting fixtures are T8 lamps and electronic ballasts for interior areas. HPS wall packs light fixtures are used outside around perimeter of school. Lighting is switched using line voltage switches and low voltage relays. Exterior lighting is controlled by photcell. Emergency lighting and Exit signs located at required Exits and areas in the school. Fire Alarm System is inspected on annual basis. Bells are located in required areas. Security system is operational. Clocks in school is controlled by a master clock. Telephone handsets located in main offices, classrooms and library. Public address is complete with tape player and radio and is connected to telephone handsets. Super net is in school. Computer hardware and servers are located in server room and computer lab. Cat5 cabling is used. Video surveillance is located inside and outside the school. Audio visual equipment located in classrooms. Upgrade visual signal appliances for the fire alarm system. Rating is acceptable. Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: March 5, 2009 11:22 AM Page 3 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S1 STRUCTURAL A1010 Standard Foundations - 1991 Section* Concrete grade beams on concrete piles. The main floor is concrete slab on grade. The mezzanine floors are reinforced concrete floor slab Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 A1030 Slab on Grade - 1991 Section* Concrete slab on grade. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 B1010.01 Floor Structural Frame (Building Frame)* -1991 Section* Mezzanines for mechanical rooms have reinforced structural concrete floor slab on concrete bond beams supported by concrete block walls. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 B1010.02 Structural Interior Walls Supporting Floors (or Roof) - 1991 Section* Concrete block walls. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 B1010.03 Floor Decks, Slabs, and Toppings - 1991 Section* Main floor has concrete slab on grade. The mezzanines for mechanical rooms have reinforced structural concrete floor slab on concrete bond beams supported by concrete block walls. The platform in drama classroom has plywood deck on wood joists on concrete floor. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 B1010.05 Mezzanine Construction - 1991 Section* The mezzanines for mechanical rooms have reinforced structural concrete floor slab on concrete bond beams supported by concrete block walls. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 4 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) B1010.06 Ramps: Exterior - 1991 Section* A concrete ramp at the south entrance. Rating 4 - Acceptable Installed Design Life Updated 1991 40 MAR-09 A concrete ramp and concrete stair at the south entrance. B1010.07 Exterior Stairs - 1991 Section* Concrete stairs at the south entrance and a west entrance. Rating 4 - Acceptable Installed Design Life Updated 1991 40 MAR-09 Concrete stair at a west entrance. B1020.01 Roof Structural Frame - 1991 Section* Plywood sheathing on wood joists or wood trusses supported by concrete block walls. Steel deck on steel trusses or steel beams supported by concrete block walls. Some roof areas have reinforced structural concrete slab supported by concrete block walls. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 5 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) B1020.04 Canopies - 1991 Section* Canopies are plywood sheathing on wood joists or wood trusses on steel beams with steel frame structure supported by concrete block walls and concrete columns. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 6 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S2 ENVELOPE B2010.01.02.01 Brick Masonry: Ext. Wall Skin - 1991 Section* Brick masonry cladding on exterior walls. Rating Installed Design Life Updated 4 - Acceptable 1991 75 MAR-09 B2010.01.06.03 Metal Siding** - 1991 Section Prefinished aluminum sidings on some exterior walls above roof. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace aluminum sidings. (Approx. 230.00 sq.m.) Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $33,460 Updated: MAR-09 B2010.01.09 Expansion Control: Exterior Wall Skin - 1991 Section* It has the original expansion control joints. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 B2010.01.11 Joint Sealers (caulking): Ext. Wall - 1991 Section** It has the original joint sealers (caulking). Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Repair joint sealers (Approx. 1,075.00 m.) Concern: It will reach the theoretical design life in 2011. Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $31,500 Updated: MAR-09 B2010.02.03 Masonry Units: Ext. Wall Const. - 1991 Section* Concrete block exterior walls. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 7 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) B2010.06 Exterior Louvers, Grilles, and Screens - 1991 Section* Aluminum louvers and grilles. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 B2010.09 Exterior Soffits - 1991 Section* Prefinished aluminum soffits except the main entrance canopy. Cement plaster finish for the main entrance canopy. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 B2020.01 Exterior Standard Windows - 1991 Section Aluminum double glazed windows with integral horizontial blinds and opener units. Rating Installed Design Life Updated 4 - Acceptable 1991 40 MAR-09 Aluminum double glazed windows with integral horizontal blinds. Event: Replace aluminum windows. Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $180,556 Updated: MAR-09 B2030.01.02 Steel-Framed Storefronts: Doors** - 1991 Section Hollow metal doors in pressed metal frames. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace steel-framed storefront doors. Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $48,093 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 8 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) B2030.02 Exterior Utility Doors - 1991 Section** Hollow metal doors in pressed metal frames. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace exterior metal doors. Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $20,613 Updated: MAR-09 Event: Replace metal overhead door. (1) Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $13,500 Updated: MAR-09 B2030.03.02 Sectional Overhead Doors ** - 1991 Section One metal overhead door at industrial arts workshop. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 Metal overhead door for industrial arts workshop. Report run on: March 5, 2009 11:22 AM Page 9 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) B3010.02.01.08 Wood Shakes** - 1991 Section - Cedar shakes Cedar shakes on pitched roofs and sloping roofs. (Note: The original pine shakes were replaced by cedar shakes in 2004.) Rating Installed Design Life Updated 4 - Acceptable 2004 25 MAR-09 Cedar shakes and SBS membrane roofing on roofs. Event: Replace cedar shakes. (Approx. 2,550.00 sq.m.) Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $263,400 Updated: MAR-09 B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1991 Section SBS membrane roofing on flat roofs. Rating Installed Design Life Updated 4 - Acceptable 1991 25 MAR-09 SBS membrane roofing and cedar shakes on roofs. Event: Replace [B3010.04 Membrane Roofing - 1991 Section] Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $559,250 Updated: APR-08 Report run on: March 5, 2009 11:22 AM Page 10 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) B3020.01 Skylights** - 1991 Section One dome skylight on the main entrance canopy. There are 6 skylights on the roofs (5 pyramid skylights, 1 long skylight with pyramid skylights.) Rating Installed Design Life Updated 4 - Acceptable 1991 25 MAR-09 Pyramid skylight. Event: Replace skylights. (5 pyramid, 1 dome, 1 long skylight with pyramids) Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $195,000 Updated: MAR-09 B3020.02 Other Roofing Openings (Hatch,Vent, etc) - 1991 Section* There are vents, chimneys and exhaust hoods on the roof. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 11 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S3 INTERIOR C1010.01.03 Unit Masonry Assemblies: Partitions Concrete block walls throughout. Rating Installed Design Life Updated 5 - Good 1991 0 MAR-09 C1010.01.07 Framed Partitions (Stud) There are some gypsum board on metal stud frame partitions. Rating Installed Design Life Updated 5 - Good 1991 0 MAR-09 C1010.03 Interior Operable Folding Panel Partitions - ** A folding partition between drama room and cafeteria. Rating Installed Design Life Updated 4 - Acceptable 1991 30 MAR-09 View of folding partition from cafeteria. Event: Replace 1 folding partition. Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $19,309 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 12 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C1010.04 Interior Balustrades and Screens, Interior Railings - * Stainless steel guard railings at serving counter in cafeteria. Rating Installed Design Life Updated 5 - Good 1991 0 MAR-09 Stainless steel guard railings at serving counter in cafeteria. C1010.05 Interior Windows - * Georgian wired glass and tempered glass set in pressed metal frames in vision sidelites & vision panels at doors and windows throughout. Rating 5 - Good Installed Design Life Updated 1991 0 MAR-09 C1020.01 Interior Swinging Doors (& Hardware) - * Solid core wood doors in pressed metal frames throughout except rooms with hollow metal doors and fire doors. The door between the kitchen and home economics classroom is hollow metal door in pressed metal frame. Rating 4 - Acceptable Installed Design Life Updated 1991 40 MAR-09 C1020.03 Interior Fire Doors - * Fire-rated hollow metal doors in pressed metal frames for storage rooms, mechanical rooms, at partitions between science preparation room & science classrooms and at the corridor to the portables. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 13 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C1020.04 Interior Sliding and Folding Doors - * A wood bi-fold door for the closet in kitchen. A vinyl sliding multi-fold door for the coat closet in staff room. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 114_3161.jpg C1020.05.01 Coiling Doors and Grilles - * Two overhead coiling metal doors between the kitchen and the cafeteria. Rating Installed Design Life Updated 5 - Good 1991 0 MAR-09 View of 2 overhead coiling metal doors from kitchen. C1030.01 Visual Display Boards - ** Chalkboards, whiteboards and tackboards located throughout the the school. Rating Installed Design Life Updated 5 - Good Event: 1991 20 MAR-09 Replace 30white boards, 14 Black boards and 30 Tack boards Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $52,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 14 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C1030.02 Fabricated Compartments(Toilets/Showers) - ** Floor supported metal toilet partitions in boys washrooms, boys shower room, girls washroms and girls shower room. Floor supported metal shower partitions in boys shower room and girls shower room. Rating Installed Design Life Updated 4 - Acceptable 1991 30 MAR-09 Floor supported metal toilet partitions in boys washroom. Event: Replace floor supported metal toilet partitions & metal shoer partions. Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $16,893 Updated: MAR-09 C1030.06 Handrails - * Painted steel pipe handrails for the stairs in northwest mechanical room and in southeast mechanical room. Painted steel pipe handrail for the ramp in drama room. Rating 5 - Good Installed Design Life Updated 1991 0 MAR-09 C1030.08 Interior Identifying Devices - * Plastic signs in most areas. Rating 5 - Good Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 15 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C1030.10 Lockers - ** 320 Single tier metal lockers in the corridors of the building. 14 double tier metal lockers in boys change room. 14 double tier metal lockers in girls locker room. 164 single tier metal lockers in the corridors of the portables. Rating Installed Design Life Updated 4 - Acceptable 1991 30 MAR-09 Single tier metal lockers in the corridor of the building. Event: Replace metal lockers. (484 single tier, 28 double tier) Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $103,950 Updated: MAR-09 C1030.12 Storage Shelving - * Painted and plastic laminated plywood shelving throughout. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 C1030.14 Toilet, Bath, and Laundry Accessories - * Commercial grade mirrors, soap dispensers, paper towel dispensers and toilet tissue holders located in all washrooms. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 16 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C2010 Stair Construction - * Painted steel stairs in northwest wing mechanical room and in southeast wing mechanical room. A concrete landing and stair in music room. Rating Installed Design Life Updated 5 - Good 1991 0 MAR-09 Concrete stair in music room. C2020.06 Carpet Stair Finishes** Carpet for the stair in music room. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace carpet on stair. (4.00 sq.m.) Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $1,000 Updated: MAR-09 C2020.08 Stair Railings and Balustrades - * Painted steel pipe railing and balustrades for the stair in music room. Painted steel pipe railing and balustrades for the stairs in northwest mechanical room and in southeast mechanical room. Rating 5 - Good Installed Design Life Updated 1991 0 MAR-09 Painted steel pipe railing & balustrades for the stair in music room. Report run on: March 5, 2009 11:22 AM Page 17 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C2020.10 Stair Painting* Painted steel stairs in northwest wing mechanical room and in southeast wing mechanical room. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 C2030.01 Ramp Construction* A concrete ramp in drama room. Rating 5 - Good Installed Design Life Updated 1991 100 MAR-09 Concrete ramp in drama room. C2030.02 Ramp Finishes* Vinyl floor tiles for the ramp in drama room. Rating 4 - Acceptable Installed Design Life Updated 1991 30 MAR-09 C2030.03 Ramp Railings* Painted steel pipe railing for the ramp in drama room. Rating 5 - Good Installed Design Life Updated 1991 50 MAR-09 C3010.04 Gypsum Board Wall Finishes (Unpainted) - * Gypsum board and concrete block throughout. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 60 MAR-09 Page 18 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C3010.06 Tile Wall Finishes - ** Ceramic wall tires in boys washrooms, boys change room, boys shower room, girls washrooms, girls change room, girls shower room, kitchen, shower & washroom in special needs room and walls between kitchen counter tops and bottom of above counter cabinets in home economics classroom. Rating Installed Design Life Updated 5 - Good Event: 1991 40 MAR-09 Replace ceramic wall tiles. Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $62,837 Updated: MAR-09 C3010.09 Acoustical Wall Treatment - ** - Wall panel Acoustic wall panels in music room. Rating Installed Design Life Updated 5 - Good 1991 20 MAR-09 Acoustic wall panels in music room. Event: Replace acoustic wall panel. (Approx. 80.00 sq.m.) Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $72,000 Updated: MAR-09 C3010.11 Interior Wall Painting - * Concrete block and gypsum board are painted. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 10 MAR-09 Page 19 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C3010.14 Other Wall Finishes* - Spray texture finish Spray texture finish for the bulkheads (walls & ceilings) and the walls below the skylight in the main lobby. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 Spray texture finish for the bulkheads (walls & ceilings) and walls below the skylight in the main lobby. C3020.01.02 Paint Concrete Floor Finishes - * Painted concrete floors in mechanical rooms, gym storage room, industrial arts workshop, storage rooms in industrial arts work shop and 1 storage room. Rating Installed Design Life Updated 4 - Acceptable 1991 10 MAR-09 C3020.02 Tile Floor Finishes - ** Ceramic floor tiles in boys washrooms, boys change room, boys shower room, girls washrooms, girls change room, girls shower, shower & washroom of special needs room, staff kitchen, kitchen and food serving area in cafeteria. Rating Installed Design Life Updated 5 - Good Event: 1991 50 MAR-09 Replace ceramic floor tiles. Type Year Cost Priority Lifecycle Replacement 2041 Unassigned $26,469 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 20 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C3020.03 Terrazzo Floor Finishes - * Terrazzo floor finish in corridors, main lobby and vestibules. (Note: These area also have ceramic floor tiles.) Rating Installed Design Life Updated 5 - Good 1991 75 MAR-09 Terrazzo floor finish and ceramic floor tiles in a corridor. C3020.04 Wood Flooring - ** Hardwood gym flooring in gymnasium. Refinished the hardwood flooring in July, 2008. Rating Installed Design Life Updated 4 - Acceptable 1991 30 MAR-09 Gymnasium. Event: Replace hardwood flooring. Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $24,775 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 21 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C3020.07.01 Resilient Tile Flooring - ** Vinyl tiles in computer classroom, drama room, platform in drama room, drama storage rooms, fashion study area & office in home economics classroom and classrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 0 MAR-09 Replace vinyl tiles. (Aprx. 779.90 sq.m.) Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $48,000 Updated: MAR-09 C3020.07.02 Resilient Sheet Flooring - ** Vinyl sheet flooring in staff washrooms, infirmary room, administration office, staff workroom, server room, science classrooms, science preparation room, 2 storage rooms, cafeteria, food study area & storage room in home economics classroom, classroom & washroom in industrial arts, art room, and storage room in art room. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace vinyl sheet flooring. (Approx. 679.30 sq.m.) Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $64,000 Updated: MAR-09 C3020.08 Carpet Flooring - ** Carpet in staff room, offices, conference rooms, library, music room, darkroom in industrial arts, office & practice rooms in music room, Rating Installed Design Life Updated 4 - Acceptable Event: 1991 15 MAR-09 Replace carpet. (Approx. 287.15 sq.m.) Concern: It had reached the theoretical design life in 2006. Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $18,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 22 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C3030.02 Ceiling Paneling (Wood) - * Concrete ceilings of mechanical rooms on main floor of both wings and mechanical room in mezzanine of northwest wing are painted. Gypsum board ceilings are painted except gypsum board ceilings with spray texture finish. Rating Installed Design Life Updated 4 - Acceptable 1991 60 MAR-09 C3030.04 Gypsum Board Ceiling Finishes (Unpainted) - * Gypsum board ceilings in main lobby, staff washrooms, boys washrooms, boys change room, boys shower room, girls washrooms, girls change room, girls shower room, gym storage room, practice room in music room, kitchen, cafeteria, food study area in home economics classroom, washroom & storage rooms in industrial arts and storage rooms. Rating Installed Design Life Updated 4 - Acceptable 1991 60 MAR-09 C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar) - ** Suspended T-bar ceiling with acoustic tiles in staff room, offices, conference rooms,infirmary room, administration office, corridor in offices & conference rooms area, library, classrooms, science classrooms, science preparation room, server room, computer classrooms, special needs room, office in music room, drama room, art room, fashion study area in home economics classroom, office in home economics classroom, classroom & darkroom in industrial arts, corridors and vestibules. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 25 MAR-09 Replace acoustic ceiling tiles. (Aprox. 2,383.35 sq.m.) Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $107,490 Updated: MAR-09 C3030.07 Interior Ceiling Painting - * Concrete ceilings of mechanical room in both wings and mechanical room in mezzanine of northwest wing are painted. Gypsum board ceilings are painted except gypsum board ceilings with spray texture finish. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 20 MAR-09 Page 23 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) C3030.09 Other Ceiling Finishes* - Acoustic Panel Acoustic ceiling panels in music room. Rating 5 - Good Installed Design Life Updated 1991 0 MAR-09 Acoustic ceiling panels in music room. C3030.09 Other Ceiling Finishes* - Spray texture finish Spray texture finish for the bulkheads (walls & ceilings) and walls below the skylight in the main lobby. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 Spray texture finish for the bulkheads (walls & ceilings) and walls below the skylight in the main lobby. C3030.09 Other Ceiling Finishes* - Steel Deck Steel deck ceilings in gymnasium, industrial arts workshop and mechanical room in mezzanine of southeast wing. Rating 5 - Good Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 24 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S4 MECHANICAL D2010.04 Sinks - ** Various single and 2 compartment stainless steel sinks throughout school. Floor mounted, mop service sinks in Janitor rooms. Scullery sink in Kitchen. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace 10 sinks Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $12,500 Updated: MAR-09 D2010.05 Showers - ** Shower stations with individual shower stalls in Gymnasium change rooms.Telephone shower heads and metering valves. Rating Installed Design Life Updated 5 - Good Event: 1991 30 MAR-09 Replace 2 Shower stations Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $3,000 Updated: MAR-09 D2010.08 Drinking Fountains / Coolers - ** Various wall mounted vitreous china, single bubblerl, non-refrigerated drinking fountains and stainless steel, wall mounted water coolers throughout building - mainly in corridors. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 35 MAR-09 Replace 4 Drinking Fountains / Coolers Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $10,000 Updated: MAR-09 D2010.09 Other Plumbing Fixtures - * Semi-circular, stainless steel wash fountain and eye wash in CTS area. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 25 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D2010.10 Washroom Fixtures (WC, Lav, Urnl) - ** Vitreous china water closets, floor mounted with flush tanks Various countertop stainless steel lavs. Conventional and push button metering faucets. Stall type vitreous china urinals with manual and auto-sensor flush valves. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace 12 Lavs, 12 WC's and 6 Urinals Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $80,000 Updated: MAR-09 D2020.01.01 Pipes and Tubes: Domestic Water - * Mainly insulated copper domestic water piping. Solder joints. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D2020.01.02 Valves: Domestic Water - ** Various gate and ball valves throughout building. Mainly isolation service. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace 50 Valves Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $30,000 Updated: MAR-09 D2020.01.03 Piping Specialties (Backflow Preventors) - ** Backflow prevention device on Boiler make up water line Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace Backflow Preventor on boiler make up water line Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $5,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 26 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D2020.02.06 Domestic Water Heaters - ** 2 - Bradford White model B65T3703N gas fired storage water heaters. 370,000 Btuh input. 65 gallon storage capacity each, c/w in line recirc. pump. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace 2 Domestic Water Heaters Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $20,000 Updated: MAR-09 D2020.03 Water Supply Insulation: Domestic - * Mainly preformed fiberglass pipe insulation. Canvas jacket in exposed areas. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 D2030.01 Waste and Vent Piping - * Cast iron, copper, ABS piping throughout building. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 D2040.01 Rain Water Drainage Piping Systems - * Flat roofs & sloped roofs connected to roof drains & piped to municipal mains. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 D2040.02.04 Roof Drains - * Conventional roof drains on flat roof areas. Dome strainers. Rating 4 - Acceptable Installed Design Life Updated 1991 40 MAR-09 D3010.02 Gas Supply Systems - * Schedule 40 steel piping connecting incoming natural gas supply to boilers, make up air unit and domestic water heaters. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 60 MAR-09 Page 27 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D3020.02.01 Heating Boilers and Accessories: H.W. - ** In Main Mechanical room: 2 Superhot hot water boilers (model AAE-3000-N-M. Capacity 3000 mbh input) c/w all safety and operating controls. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 35 MAR-09 Replace 2 Heating Boilers and Accessories Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $120,000 Updated: MAR-09 D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler - ** Insulated metal chimney and vent connectors, up to weather caps on roof. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace Boiler Chimneys Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $25,000 Updated: MAR-09 D3020.02.03 Water Treatment: H. W. Boiler - * Chemical pot feeder on hydronic system loops. Located in Main Mechanical room. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3040.01.01 Air Handling Units: Air Distribution - ** Main building air handling units, located in main Mechanical room. Haakon packaged units c/w supply & return fans, heating coil, mixing section, humidifier, filters. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace 2 Air Handling Units Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $150,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 28 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D3040.01.03 Air Cleaning Devices:Air Distribution - * Dust Collector in Industrial Arts area. Make / model unknown. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3040.01.04 Ducts: Air Distribution - * Mainly overhead, low velocity supply & return ductwork throughout school. Ductwork connects Air Handling units (and make up air unit) to air outlets and inlets. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3040.01.07 Air Outlets & Inlets:Air Distribution - * Various overhead ceiling diffusers and sidewall supply & return grilles throughout the building. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3040.03.01 Hot Water Distribution Systems - ** Schedule 40 steel with threaded joints. Copper piping with solder joints. Heating pumps: Grundfoss vertical in-line heating circulators. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace Hot Water Distribution Systems Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $200,000 Updated: MAR-09 D3040.04.01 Fans: Exhaust - ** Various ceiling exhaust fans and roof mounted centrifugal exhausters. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace 6 exhaust fans Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $20,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 29 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D3040.04.03 Ducts: Exhaust - * Galvanized steel, low velocity - connecting exhaust grilles and hoods to roof mounted exhaust fans or outlets. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3040.04.05 Air Outlets and Inlets: Exhaust - * Various exhaust grilles and hoods ducted to exhaust fans. Mainly Washrooms, CTS and Home Ec. areas. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3050.05.02 Fan Coil Units - ** Hydronic Force Flow units - mainly in entrance vestibules throughout school. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace 4 Fan Coil Units Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $12,000 Updated: MAR-09 D3050.05.03 Finned Tube Radiation - ** Perimeter radiation, various locations throughout school. Sloped top. Various enclosure heights. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace 50 m of Finned Tube Radiation Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $50,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 30 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D3050.05.06 Unit Heaters** Horizontal, hydronic unit heaters in Mechanical room and CTS areas. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace 3 Unit heaters Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $7,500 Updated: MAR-09 D3050.07 Other Terminal and Packaged Units - * Engineered Air make up air unit serving the CTS area. Provides make up air for exhaust fans in this area. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D3060.02.01 Electric and Electronic Controls** Electric controls of entrance force flow units, unit heaters, make up air unit and exhaust fans. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace force flow, unit heater, make up air unit and exhaust fan controls. Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $35,000 Updated: MAR-09 D3060.02.02 Pneumatic Controls** Pneumatic control of heating and ventilation systems. Powers duplex Air compressor in main boiler room, c/w 1 HP motors. Devilbiss refrigerated air dryer. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace Heating and Vent system controls Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $50,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 31 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D3060.02.05 Building Systems Controls (BMCS, EMCS)** Powers System 600 DDC system controlling heating, ventilation systems. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace DDC system Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $60,000 Updated: MAR-09 D4010 Sprinklers: Fire Protection - * Wet pipe sprinkler system throughout school. Fire department connection at main entrance. Rating 4 - Acceptable Installed Design Life Updated 1991 60 MAR-09 D4030.01 Fire Extinguisher, Cabinets and Accessories - * Portable dry chemical fire extinguishers throughout building. Wall mounting brackets & cabinets. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 30 MAR-09 Page 32 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S5 ELECTRICAL D5010.03 Main Electrical Switchboards (Main Distribution) - ** 1200 Amp 120/208 volt three phase manufactured by Siemens . Distribution is 70% full. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 40 MAR-09 Replace Main Electrical Switchboards (Main Distribution)** Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $138,058 Updated: MAR-09 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution) - ** Eight Siemens panels located throughout the school in the hallways. Panels are 80% full. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace Eight Electrical Branch Circuit Panelboards (Secondary Distribution)** Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $41,681 Updated: MAR-09 D5010.07.02 Motor Starters and Accessories - ** Two Siemens Motor Control Centers rated 600 Amp, 208 volt each. One is five sections the second is three sections. 20% spare capacity. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace Motor Starters and Accessories** Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $8,215 Updated: MAR-09 D5020.01 Electrical Branch Wiring - * Wiring is run in conduit. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 33 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D5020.02.01 Lighting Accessories (Lighting Controls) - * 120 volt line voltage switches used for lighting in some classrooms. Douglas relays low voltage switching in other areas. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D5020.02.02.02 Interior Florescent Fixtures - ** All sections are equipped with surface mounted wrap around fluorescent light fixtures, deep cell parabolic lenses, and recessed 2x4 fixtures, T8 lamps and electronic ballasts. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace Interior Florescent Fixtures** Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $247,832 Updated: MAR-09 D5020.02.03.02 Emergency Lighting Battery Packs - ** Emergency battery packs located at required areas. Manufactured by Lumacell. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace 15 Emergency Lighting Battery Packs** Concern: Equipment is reaching end of theoretical life. Recommendation: Replace 15 emergency battery packs. Consequences of Deferral: Possible loss of emergency lighting in school due to equipment failure. Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $34,500 Updated: MAR-09 D5020.02.03.03 Exit Signs - * Led exit signs located as required, with built in battery backup. Rating 4 - Acceptable Installed Design Life Updated 2006 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 34 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D5020.03.01.04 Exterior H.P. Sodium Fixtures - * HPS over exits and light standards around perimeter of school. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D5020.03.02 Lighting Accessories: Exterior (Lighting Controls) - * Photocell control used to operate exterior lighting. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 D5030.01 Detection and Fire Alarm - ** Hard wired, zoned Simplex 4000 fire alarm control panel. Detection devices and bells located as required. One hallway has bell strobe combination. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 25 MAR-09 Add 15 strobes Concern: Strobes not available for hearing impaired. Recommendation: Install 20 strobes in school. Add bell and strobe in music room. Consequences of Deferral: Visual signal appliances not available for the hearing impaired. Type Year Cost Operating Efficiency Upgrade 2009 $7,500 Priority Medium Updated: MAR-09 Event: Replace Detection and Fire Alarm** Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $77,337 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 35 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D5030.02.02 Intrusion Detection - ** Kanteck KT300. Motion sensors are located in required areas. Rating Installed Design Life Updated 4 - Acceptable Event: 2006 25 MAR-09 Replace Intrusion Detection** Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $45,492 Updated: MAR-09 D5030.02.04 Video Surveillance - ** 20 video cameras located inside and out side the school. Manufactured by Flamen. DVR manufactured by Dell. Tied in to central over the internet. Rating Installed Design Life Updated 4 - Acceptable Event: 2006 25 MAR-09 Replace Video Surveillance** Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $7,026 Updated: MAR-09 D5030.03 Clock and Program Systems - * Simplex Time Control master clock. Clocks locate din hallways and classrooms. Rating 4 - Acceptable Installed Design Life Updated 1991 25 MAR-09 D5030.04.01 Telephone Systems - * Northern Telecom phone system. Handsets located in classrooms. Tied to PA system. Rating 4 - Acceptable Installed Design Life Updated 1991 25 MAR-09 D5030.04.05 Local Area Network Systems - * Supernet in school. One Dell Server. Apple Computers for computer lab. ABCDD Server. Six Amp patch panels.Four 3com, and Dell switches. One UPS unit. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 36 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) D5030.05 Public Address and Music Systems - ** Rauland Intercom system. Intercom connected to telephone handsets in school. Gym sound system. FM system in classrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 20 MAR-09 Replace Public Address and Music Systems** Concern: Equipment is reaching end of its theoretical life. Recommendation: Replace public address system amplifier. Consequences of Deferral: Possible loss of communication within the school due to equipment failure. Type Year Cost Priority Lifecycle Replacement 2012 Unassigned $18,500 Updated: MAR-09 D5030.06 Television Systems - * Projectors and Smart boards located in classrooms. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 37 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E1020.07 Laboratory Equipment - * One fume hood in a science classroom. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 Fume hood in a Science classroom. E1090 Other Equipment - Industrial Arts The industrial arts workshop has a variety of manual and power wood working equipment with dust collection system, a kiln & equipment for ceramic, equipment for graphics. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 Kiln in industrial arts workshop. Report run on: March 5, 2009 11:22 AM Page 38 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) E1090.03 Food Service Equipment - * Commercial grade freezer, cooler, food preparation, cooking, washing and serving equipment in the kitchen. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 Partial view of commercial kitchen. E1090.04 Residential Equipment - * Residential grade ranges, refrigerators, microwave ovens, sewing machines, washer and dryer in home economics classrooms. Residential grade refrigerator, dishwasher and microwave oven in staff room. Rating 4 - Acceptable Installed Design Life Updated 1991 0 MAR-09 Partial view of staff room. Report run on: March 5, 2009 11:22 AM Page 39 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) E1090.07 Athletic, Recreational, and Therapeutic Equipment - * Six basketball backboards and 1 score board in gymnasium. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 Gymnasium. E2010.02 Fixed Casework - ** Plastic laminated and painted plywood casework throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 35 MAR-09 Replace casework. Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $276,300 Updated: MAR-09 E2010.03.01 Blinds - ** Venetian blinds throughout. Rating Installed Design Life Updated 4 - Acceptable Event: 1991 30 MAR-09 Replace blinds. Type Year Cost Priority Lifecycle Replacement 2021 Unassigned $42,097 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 40 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) E2010.03.06 Curtains and Drapes** Two wall-mounted curtains for the platform in drama classroom. One ceiling-mounted curtain in home economics classroom. Rating Installed Design Life Updated 4 - Acceptable 2000 30 MAR-09 Wall-mounted curtains for the platform in drama classroom. Event: Replace curtains. (3) Type Year Cost Priority Lifecycle Replacement 2030 Unassigned $4,000 Updated: MAR-09 E2010.06 Fixed Interior Landscaping - * Two concrete planters with ceramic tiles finish in the main lobby. Rating 5 - Good Installed Design Life Updated 1991 0 MAR-09 Two planters in the main lobby. F1010.02.04 Portable and Mobile Buildings* - Rating N/A Installed Design Life Updated 0 Report run on: March 5, 2009 11:22 AM 30 MAR-09 Page 41 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) F1010.02.04 Portable and Mobile Buildings* - 1988 Architectural: Wood frame construction bearing on concrete piles with stucco cladding, SBS membrane roofing, aluminum glazed windows with integral horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls, suspended T-bar ceiling with acoustic tiles, plastic laminated & painted millwork, green boards and tack boards. The classroom door to the corridor and the furnace room door are hollow metal doors in pressed metal frames. It has 4 classrooms and a corridor to other portables and to the building. There are metal lockers in the corridor. The gross area is 298,96 sq.m.. The gross area includes the areas of the 4 classrooms. These classrooms have same areas and each classroom has 72.70 sq.m.. (Note: These portables were manufactured in 1988 and installed at this location in 1991.) (Note: The cost of the lockers is in " C1030.10 lockers ".) Mechanical: - Heating & ventilation provided by Climatemaster Furnaces located in the corner of each room - connected to sill mounted diffusers. Sidewall return air grille., high on wall. Due to age, furnace should be replaced. Condition: 3 (marginal) - Sill supply diffusers. Condition: 4 (acceptable) - Sill supply ductwork. Condition. 4 (acceptable) - Gas line to furnace. Condition: 4 (acceptable) - Chimney - metal, up to weather cap on roof. Condition: 4 (acceptable) - Portable fire extinguisher in cabinet. Electrical: Westinghouse Electrical panel connected to school's electrical system via feeders inside conduit. Fluorescent lighting, 1x 4 surface mounted T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tiedin to school's auxiliary systems. Rating is acceptable. Rating Installed Design Life Updated 4 - Acceptable 1991 30 MAR-09 Exterior of the 1988, 1994, 1995 and 2000 portables. Event: Replace 2 furnaces. Concern: Due to age. The furnaces should be replaced. Recommendation: Replace 2 furnaces in 2013. Type Year Cost Priority Lifecycle Replacement 2013 Medium $15,000 Updated: MAR-09 Report run on: March 5, 2009 11:22 AM Page 42 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) F1010.02.04 Portable and Mobile Buildings* - 1994 Architectural Wood frame construction bearing on concrete piles with stucco cladding, SBS membrane roofing, aluminum glazed windows with integral horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls, suspended T-bar ceiling with acoustic tiles, plastic laminated & painted millwork, black boards and tack boards. The classroom door to the corridor is a solid core wood door in pressed metal frame. The furnace room door is a hollow metal door in pressed metal frame. It has 2 classrooms and a corridor to other portables. There are metal lockers in the corridor. The gross area is 181.00 sq.m.. The gross area includes 68.00 sq.m. for classroom 153 and 68.00 sq.m. for classroom 154. (Note: The cost of lockers is in " C1030.10 lockers ".) Mechanical: - Heating & ventilation provided by Silent Aire Furnaces located in the corner of each room - connected to sill mounted supply registers. Sidewall return air grille, high on wall. Condition: 4 (acceptable) - Sill supply diffusers. Condition: 4 (acceptable) - Sill supply ductwork. Condition: 4 (acceptable) - Gas lines to furnace. Condition: 4 (acceptable) - Chimneys - metal, up to weather cap on roof. Condition: 4 (acceptable) - Controls - low voltage to wall mounted thermostat. Condition: 4 (acceptable) - Portable fire extinguisher in cabinet. Electrical: Federal Pioneer Electrical panel connected to school's electrical system via feeders inside conduit. Fluorescent lighting, 2x 4 recessed T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tied-in to school's auxiliary systems. Rating is acceptable. Rating 4 - Acceptable Installed Design Life Updated 1994 0 MAR-09 Portable classroom. Report run on: March 5, 2009 11:22 AM Page 43 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) F1010.02.04 Portable and Mobile Buildings* - 1995 Architectural: Wood frame construction bearing on concrete piles with stucco cladding, SBS membrane roofing, aluminum glazed windows with integral horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls, suspended T-bar ceiling with acoustic tiles, plastic laminated & painted millwork, white boards and tack boards. The classroom door to the corridor is a solid core wood door in pressed metal frame. The furnace room door is a hollow metal door in pressed metal frame. It has a corridor to other portables. There are metal lockers in the corridor. The gross area is 182.70 sq.m.. The gross area includes 69.60 sq.m. for classroom 155 and 69.60 sq.m. for classroom 156. (Note: The cost of the metal lockers is in " C1030.10 lockers ". Mechanical: - Heating & ventilation provided by Silent Aire Furnaces located in the corner of each room - connected to sill mounted supply registers.Sidewall return air grille, high on wall. Condition: 4 (acceptable) - Sill supply diffusers. Condition: 4 (acceptable) - Sill supply ductwork. Condition: 4 (acceptable) - Gas lines to furnace. Condition: 4 (acceptable) - Chimneys - metal, up to weather cap on roof. Condition: 4 (acceptable) - Controls - low voltage to wall mounted thermostat. Condition: 4 (acceptable) - Portable fire extinguisher in cabinet. Electrical: Federal Pioneer Electrical panel connected to school's electrical system via feeders inside conduit. Fluorescent lighting, 2x 4 recessed T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tied-in to school's auxiliary systems. Rating is acceptable. Rating 4 - Acceptable Installed Design Life Updated 1995 30 MAR-09 Portable classroom. Report run on: March 5, 2009 11:22 AM Page 44 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) F1010.02.04 Portable and Mobile Buildings* - 2000 Architectural: Wood frame construction bearing on concrete piles, SBS membrane roofing, pvc windows with horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls, suspended T-bar ceiling with acoustic tile, white boards and tack boards. The classroom door to the corridor and the furnace room doors are solid core wood door in pressed metal frames. It has a corridor to other portables and to the exterior. There are metal lockers in the corridor.The corridor has a double exterior metal door in pressed metal frame. A wood exterior deck with wood stairs. The gross area is approximately 203.00 sq.m.. The gross area include 77.40 sq.m. for classroom 157 and 77.4.0 sq.m. for classroom 158. (note: The cost of metal lockers is in " C1030.10 lockers ".) Mechanical: - Heating & ventilation provided by Lennox Furnace located in the corner of each room - connected to overhead ceiling diffusers. Sidewall return air grille - low level in millwork. Condition: 4 (acceptable) - Ceiling supply diffusers. Condition: 4 (acceptable) - Ceiling supply ductwork. Condition: 4 (acceptable) - Gas lines to furnace. Condition: 4 (acceptable) - Chimney - metal, up to weather cap on roof. Condition: 4 (acceptable) - Controls - low voltage to wall mounted thermostat. Condition: 4 (acceptable) - Portable fire extinguisher on wall mounting bracket. Electrical: Federal Pioneer Electrical panel connected to school's electrical systems via feeders inside conduit. Fluorescent lighting, 2x 4 recessed T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tied-in to school's auxiliary systems. Rating is acceptable. Rating 4 - Acceptable Installed Design Life Updated 2000 30 MAR-09 Portable classroom. Report run on: March 5, 2009 11:22 AM Page 45 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) F1010.02.05 Grandstands and Bleachers - ** Pull out bleaches in gymnasium. Rating Installed Design Life Updated 4 - Acceptable 1991 40 MAR-09 Pull out bleaches in gymnasium. Event: Replace bleaches. Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $113,556 Updated: MAR-09 F1020.02.13 Paint Booths - * A paint booth in industrial arts workshop. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 46 of 47 St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A) S8 FUNCTIONAL ASSESSMENT K4010.01 Barrier Free Route: Parking to Entrance - * It has barrier free route from parking lots to main entrance and other entrances. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 K4010.02 Barrier Free Entrances - * It has barrier free entrances. It has barrier free power operators on the east entrance doors of the southeast wing. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 K4010.03 Barrier Free Interior Circulation - * Barrier free access to all areas except to the mechanical mezzanines. Rating Installed Design Life Updated 4 - Acceptable 1991 0 MAR-09 K4010.04 Barrier Free Washrooms - * It has barrier free washrooms. Rating 4 - Acceptable Installed Design Life Updated 1991 Report run on: March 5, 2009 11:22 AM 0 MAR-09 Page 47 of 47
Similar documents
Ottewell Junior High School
This school for Grades 7 through 9 was originally built in Edmonton in 1960. The school faces four streets - 94B Avenue on the North, Ottewell Road on the East, 94 Avenue on the South and 73 Street...
More informationRECAPP Facility Evaluation Report
those items noted in report. Standard domestic water, sanitary sewer and natural gas systems. Roof drainage discharged to grade around building. Heating, ventilation provided from central air handl...
More informationJoussard School
Interior is in good condition in the 1954, 1958, 1960, and 1987 sections. 1972 section requires flooring, ceilings, and millwork to be replaced. Interior walls to be patched, repaired and refinishe...
More informationRECAPP Facility Evaluation Report
C1010.03 Interior Operable Folding Panel Partitions** Aluminum framed folding partition between two classrooms. Rating
More information