RECAPP Facility Evaluation Report

Transcription

RECAPP Facility Evaluation Report
RECAPP Facility Evaluation Report
Greater St. Albert Catholic Regional Division No. 29
Ecole Secondaire Sainte Marguerite D' Youville School
B4068A
St. Albert
Report run on: March 5, 2009 11:22 AM
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
Facility Details
Building Name: Ecole Secondaire Sainte Mar
Address: 51 Boudreau Road
Location: St. Albert
Building Id:
Gross Area (sq. m):
Replacement Cost:
Construction Year:
B4068A
5,090.73
$11,625,973
1991
Evaluation Details
Evaluation Company: Kenneth M. Lee Architect
Evaluation Date: July 16 2008
Evaluator Name: Ken Lee
Total Maintenance Events Next 5 years:
5 year Facility Condition Index (FCI):
$424,500
3.65%
General Summary:
In 1991, the original one storey 4,225.00 sq.m. (concrete block, steel roof structure, brick & pre-finished aluminum
siding clad, non-combustible) school was constructed. The school is sprinklered and is in good condition.
The student capacity is 542.
Portables were installed in 1988, 1994, 1995 and 2000.
Structural Summary:
The foundation is concrete grade beams on concrete piles. The main floor is concrete slab on grade. The mezzanine
floors are reinforced concrete structural floor slab on concrete beams supported by concrete block walls.
There are a few types of roof structure frames. Plywood sheathing on wood joists or wood trusses supported by concrete
block walls. Steel deck on steel trusses or steel beams supported by concrete block walls. Some roof areas have
reinforced concrete slab supported by concrete block walls.
The structure is in acceptable condition.
No significant problems reported or observed at the site visit.
Envelope Summary:
The exterior walls are clad with brick and prefinished aluminum sidings. The building has aluminum windows and
hollow metal doors in pressed metal frames. The industrial arts workshop has 1 metal overhead door. SBS membrane
roofing for the flat roofs. Cedar shakes on the pitched roofs and sloping roofs. The building has skylights.
Vandalism has caused damage to some cedar shakes for a small area on the roof. Repair the cedar shakes.
The building envelope is in acceptable condition.
No significant problems reported or observed at the site visit.
The interior is in acceptable condition.
Interior Summary:
Walls are painted concrete block and gypsum board and ceramic wall tiles.
Ceilings are acoustic tiles, steel deck, painted gypsum board, painted concrete and gypsum
board with spray texture finish.
Corridors have terrazzo floor finish. Carpet in library, music room, administration office, offices and staff room.
Vinyl sheet flooring in science classrooms, science preparation room, cafeteria, fashion study area in home economics
classroom. and art room. Vinyl tiles in classrooms, computer classrooms, drama room, storage rooms and food study
area in home economics classroom. Hardwood flooring in gymnasium. Ceramic floor tiles in boys washrooms, boys
change room, boys shower room, girls washrooms, girls change room, girls shower room, staff kitchen, kitchen and
food serving area in cafeteria.
The hardwood floor in the gymnasium was re-finished in July, 2008.
Mechanical Summary:
Standard domestic water, sanitary & storm sewer and natural gas systems. Roof drainage connected to municipal
mains. Heating, ventilation provided from central air handling & hydronic boiler systems in main Mechanical rooms.
Conventional plumbing fixtures. Pneumatic and Electric control systems. DDC system. Building sprinkled throughout.
Portable fire extinguishers in cabinets.
Overall Mechanical systems in acceptable condition.
Report run on: March 5, 2009 11:22 AM
Page 2 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
Electrical Summary:
1200 Amp 120/208 volt three phase, fed underground from a pad mounted transformer. Main distribution panel is 70%
full. Branch circuits are 80% full. Wiring in conduit. Lighting fixtures are T8 lamps and electronic ballasts for interior
areas. HPS wall packs light fixtures are used outside around perimeter of school. Lighting is switched using line
voltage switches and low voltage relays. Exterior lighting is controlled by photcell. Emergency lighting and Exit signs
located at required Exits and areas in the school. Fire Alarm System is inspected on annual basis. Bells are located in
required areas. Security system is operational. Clocks in school is controlled by a master clock. Telephone handsets
located in main offices, classrooms and library. Public address is complete with tape player and radio and is
connected to telephone handsets. Super net is in school. Computer hardware and servers are located in server room
and computer lab. Cat5 cabling is used. Video surveillance is located inside and outside the school. Audio visual
equipment located in classrooms.
Upgrade visual signal appliances for the fire alarm system.
Rating is acceptable.
Condition Rating
1 - Critical
2 - Poor
3 - Marginal
4 - Acceptable
5 - Good
6 - Excellent
Rating Guide
Performance
Unsafe, high risk of injury or critical system failure.
Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.
Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Meets all present requirements. No deficiencies.
As new/state of the art, meets present and foreseeable requirements.
Report run on: March 5, 2009 11:22 AM
Page 3 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S1 STRUCTURAL
A1010 Standard Foundations - 1991 Section*
Concrete grade beams on concrete piles. The main floor is concrete slab on grade. The mezzanine floors are reinforced
concrete floor slab
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
A1030 Slab on Grade - 1991 Section*
Concrete slab on grade.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
B1010.01 Floor Structural Frame (Building Frame)* -1991 Section*
Mezzanines for mechanical rooms have reinforced structural concrete floor slab on concrete bond beams supported by
concrete block walls.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
B1010.02 Structural Interior Walls Supporting Floors (or Roof) - 1991 Section*
Concrete block walls.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
B1010.03 Floor Decks, Slabs, and Toppings - 1991 Section*
Main floor has concrete slab on grade.
The mezzanines for mechanical rooms have reinforced structural concrete floor slab on concrete bond beams supported
by concrete block walls.
The platform in drama classroom has plywood deck on wood joists on concrete floor.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
B1010.05 Mezzanine Construction - 1991 Section*
The mezzanines for mechanical rooms have reinforced structural concrete floor slab on concrete bond beams supported
by concrete block walls.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 4 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
B1010.06 Ramps: Exterior - 1991 Section*
A concrete ramp at the south entrance.
Rating
4 - Acceptable
Installed Design Life Updated
1991
40
MAR-09
A concrete ramp and concrete stair at the south entrance.
B1010.07 Exterior Stairs - 1991 Section*
Concrete stairs at the south entrance and a west entrance.
Rating
4 - Acceptable
Installed Design Life Updated
1991
40
MAR-09
Concrete stair at a west entrance.
B1020.01 Roof Structural Frame - 1991 Section*
Plywood sheathing on wood joists or wood trusses supported by concrete block walls.
Steel deck on steel trusses or steel beams supported by concrete block walls.
Some roof areas have reinforced structural concrete slab supported by concrete block walls.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 5 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
B1020.04 Canopies - 1991 Section*
Canopies are plywood sheathing on wood joists or wood trusses on steel beams with steel frame structure supported by
concrete block walls and concrete columns.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 6 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S2 ENVELOPE
B2010.01.02.01 Brick Masonry: Ext. Wall Skin - 1991 Section*
Brick masonry cladding on exterior walls.
Rating
Installed Design Life Updated
4 - Acceptable
1991
75
MAR-09
B2010.01.06.03 Metal Siding** - 1991 Section
Prefinished aluminum sidings on some exterior walls above roof.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace aluminum sidings. (Approx. 230.00 sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$33,460
Updated: MAR-09
B2010.01.09 Expansion Control: Exterior Wall Skin - 1991 Section*
It has the original expansion control joints.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
B2010.01.11 Joint Sealers (caulking): Ext. Wall - 1991 Section**
It has the original joint sealers (caulking).
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Repair joint sealers (Approx. 1,075.00 m.)
Concern:
It will reach the theoretical design life in 2011.
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$31,500
Updated: MAR-09
B2010.02.03 Masonry Units: Ext. Wall Const. - 1991 Section*
Concrete block exterior walls.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 7 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
B2010.06 Exterior Louvers, Grilles, and Screens - 1991 Section*
Aluminum louvers and grilles.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
B2010.09 Exterior Soffits - 1991 Section*
Prefinished aluminum soffits except the main entrance canopy. Cement plaster finish for the main entrance canopy.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
B2020.01 Exterior Standard Windows - 1991 Section
Aluminum double glazed windows with integral horizontial blinds and opener units.
Rating
Installed Design Life Updated
4 - Acceptable
1991
40
MAR-09
Aluminum double glazed windows with integral horizontal blinds.
Event:
Replace aluminum windows.
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$180,556
Updated: MAR-09
B2030.01.02 Steel-Framed Storefronts: Doors** - 1991 Section
Hollow metal doors in pressed metal frames.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace steel-framed storefront doors.
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$48,093
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 8 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
B2030.02 Exterior Utility Doors - 1991 Section**
Hollow metal doors in pressed metal frames.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace exterior metal doors.
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$20,613
Updated: MAR-09
Event:
Replace metal overhead door. (1)
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$13,500
Updated: MAR-09
B2030.03.02 Sectional Overhead Doors ** - 1991 Section
One metal overhead door at industrial arts workshop.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
Metal overhead door for industrial arts workshop.
Report run on: March 5, 2009 11:22 AM
Page 9 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
B3010.02.01.08 Wood Shakes** - 1991 Section - Cedar shakes
Cedar shakes on pitched roofs and sloping roofs. (Note: The original pine shakes were replaced by cedar shakes in
2004.)
Rating
Installed Design Life Updated
4 - Acceptable
2004
25
MAR-09
Cedar shakes and SBS membrane roofing on roofs.
Event:
Replace cedar shakes. (Approx. 2,550.00 sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2029
Unassigned
$263,400
Updated: MAR-09
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1991 Section
SBS membrane roofing on flat roofs.
Rating
Installed Design Life Updated
4 - Acceptable
1991
25
MAR-09
SBS membrane roofing and cedar shakes on roofs.
Event:
Replace [B3010.04 Membrane Roofing - 1991
Section]
Type
Year Cost
Priority
Lifecycle Replacement
2016
Unassigned
$559,250
Updated: APR-08
Report run on: March 5, 2009 11:22 AM
Page 10 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
B3020.01 Skylights** - 1991 Section
One dome skylight on the main entrance canopy.
There are 6 skylights on the roofs (5 pyramid skylights, 1 long skylight with pyramid skylights.)
Rating
Installed Design Life Updated
4 - Acceptable
1991
25
MAR-09
Pyramid skylight.
Event:
Replace skylights. (5 pyramid, 1 dome, 1 long
skylight with pyramids)
Type
Year Cost
Priority
Lifecycle Replacement
2016
Unassigned
$195,000
Updated: MAR-09
B3020.02 Other Roofing Openings (Hatch,Vent, etc) - 1991 Section*
There are vents, chimneys and exhaust hoods on the roof.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 11 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S3 INTERIOR
C1010.01.03 Unit Masonry Assemblies: Partitions Concrete block walls throughout.
Rating
Installed Design Life Updated
5 - Good
1991
0
MAR-09
C1010.01.07 Framed Partitions (Stud) There are some gypsum board on metal stud frame partitions.
Rating
Installed Design Life Updated
5 - Good
1991
0
MAR-09
C1010.03 Interior Operable Folding Panel Partitions - **
A folding partition between drama room and cafeteria.
Rating
Installed Design Life Updated
4 - Acceptable
1991
30
MAR-09
View of folding partition from cafeteria.
Event:
Replace 1 folding partition.
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$19,309
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 12 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C1010.04 Interior Balustrades and Screens, Interior Railings - *
Stainless steel guard railings at serving counter in cafeteria.
Rating
Installed Design Life Updated
5 - Good
1991
0
MAR-09
Stainless steel guard railings at serving counter in cafeteria.
C1010.05 Interior Windows - *
Georgian wired glass and tempered glass set in pressed metal frames in vision sidelites & vision panels at doors and
windows throughout.
Rating
5 - Good
Installed Design Life Updated
1991
0
MAR-09
C1020.01 Interior Swinging Doors (& Hardware) - *
Solid core wood doors in pressed metal frames throughout except rooms with hollow metal doors and fire doors.
The door between the kitchen and home economics classroom is hollow metal door in pressed metal frame.
Rating
4 - Acceptable
Installed Design Life Updated
1991
40
MAR-09
C1020.03 Interior Fire Doors - *
Fire-rated hollow metal doors in pressed metal frames for storage rooms, mechanical rooms, at partitions between
science preparation room & science classrooms and at the corridor to the portables.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 13 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C1020.04 Interior Sliding and Folding Doors - *
A wood bi-fold door for the closet in kitchen. A vinyl sliding multi-fold door for the coat closet in staff room.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
114_3161.jpg
C1020.05.01 Coiling Doors and Grilles - *
Two overhead coiling metal doors between the kitchen and the cafeteria.
Rating
Installed Design Life Updated
5 - Good
1991
0
MAR-09
View of 2 overhead coiling metal doors from kitchen.
C1030.01 Visual Display Boards - **
Chalkboards, whiteboards and tackboards located throughout the the school.
Rating
Installed Design Life Updated
5 - Good
Event:
1991
20
MAR-09
Replace 30white boards, 14 Black boards and 30
Tack boards
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$52,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 14 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C1030.02 Fabricated Compartments(Toilets/Showers) - **
Floor supported metal toilet partitions in boys washrooms, boys shower room, girls washroms and girls shower room.
Floor supported metal shower partitions in boys shower room and girls shower room.
Rating
Installed Design Life Updated
4 - Acceptable
1991
30
MAR-09
Floor supported metal toilet partitions in boys washroom.
Event:
Replace floor supported metal toilet partitions &
metal shoer partions.
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$16,893
Updated: MAR-09
C1030.06 Handrails - *
Painted steel pipe handrails for the stairs in northwest mechanical room and in southeast mechanical room.
Painted steel pipe handrail for the ramp in drama room.
Rating
5 - Good
Installed Design Life Updated
1991
0
MAR-09
C1030.08 Interior Identifying Devices - *
Plastic signs in most areas.
Rating
5 - Good
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 15 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C1030.10 Lockers - **
320 Single tier metal lockers in the corridors of the building.
14 double tier metal lockers in boys change room.
14 double tier metal lockers in girls locker room.
164 single tier metal lockers in the corridors of the portables.
Rating
Installed Design Life Updated
4 - Acceptable
1991
30
MAR-09
Single tier metal lockers in the corridor of the building.
Event:
Replace metal lockers. (484 single tier, 28 double
tier)
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$103,950
Updated: MAR-09
C1030.12 Storage Shelving - *
Painted and plastic laminated plywood shelving throughout.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
C1030.14 Toilet, Bath, and Laundry Accessories - *
Commercial grade mirrors, soap dispensers, paper towel dispensers and toilet tissue holders located in all washrooms.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 16 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C2010 Stair Construction - *
Painted steel stairs in northwest wing mechanical room and in southeast wing mechanical room.
A concrete landing and stair in music room.
Rating
Installed Design Life Updated
5 - Good
1991
0
MAR-09
Concrete stair in music room.
C2020.06 Carpet Stair Finishes** Carpet for the stair in music room.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace carpet on stair. (4.00 sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$1,000
Updated: MAR-09
C2020.08 Stair Railings and Balustrades - *
Painted steel pipe railing and balustrades for the stair in music room.
Painted steel pipe railing and balustrades for the stairs in northwest mechanical room and in southeast mechanical room.
Rating
5 - Good
Installed Design Life Updated
1991
0
MAR-09
Painted steel pipe railing & balustrades for the stair in music room.
Report run on: March 5, 2009 11:22 AM
Page 17 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C2020.10 Stair Painting*
Painted steel stairs in northwest wing mechanical room and in southeast wing mechanical room.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
C2030.01 Ramp Construction*
A concrete ramp in drama room.
Rating
5 - Good
Installed Design Life Updated
1991
100
MAR-09
Concrete ramp in drama room.
C2030.02 Ramp Finishes*
Vinyl floor tiles for the ramp in drama room.
Rating
4 - Acceptable
Installed Design Life Updated
1991
30
MAR-09
C2030.03 Ramp Railings*
Painted steel pipe railing for the ramp in drama room.
Rating
5 - Good
Installed Design Life Updated
1991
50
MAR-09
C3010.04 Gypsum Board Wall Finishes (Unpainted) - *
Gypsum board and concrete block throughout.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
60
MAR-09
Page 18 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C3010.06 Tile Wall Finishes - **
Ceramic wall tires in boys washrooms, boys change room, boys shower room, girls washrooms, girls change room, girls
shower room, kitchen, shower & washroom in special needs room and walls between kitchen counter tops and bottom of
above counter cabinets in home economics classroom.
Rating
Installed Design Life Updated
5 - Good
Event:
1991
40
MAR-09
Replace ceramic wall tiles.
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$62,837
Updated: MAR-09
C3010.09 Acoustical Wall Treatment - ** - Wall panel
Acoustic wall panels in music room.
Rating
Installed Design Life Updated
5 - Good
1991
20
MAR-09
Acoustic wall panels in music room.
Event:
Replace acoustic wall panel. (Approx. 80.00 sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$72,000
Updated: MAR-09
C3010.11 Interior Wall Painting - *
Concrete block and gypsum board are painted.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
10
MAR-09
Page 19 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C3010.14 Other Wall Finishes* - Spray texture finish
Spray texture finish for the bulkheads (walls & ceilings) and the walls below the skylight in the main lobby.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
Spray texture finish for the bulkheads (walls & ceilings) and walls
below the skylight in the main lobby.
C3020.01.02 Paint Concrete Floor Finishes - *
Painted concrete floors in mechanical rooms, gym storage room, industrial arts workshop, storage rooms in industrial arts
work shop and 1 storage room.
Rating
Installed Design Life Updated
4 - Acceptable
1991
10
MAR-09
C3020.02 Tile Floor Finishes - **
Ceramic floor tiles in boys washrooms, boys change room, boys shower room, girls washrooms, girls change room, girls
shower, shower & washroom of special needs room, staff kitchen, kitchen and food serving area in cafeteria.
Rating
Installed Design Life Updated
5 - Good
Event:
1991
50
MAR-09
Replace ceramic floor tiles.
Type
Year Cost
Priority
Lifecycle Replacement
2041
Unassigned
$26,469
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 20 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C3020.03 Terrazzo Floor Finishes - *
Terrazzo floor finish in corridors, main lobby and vestibules. (Note: These area also have ceramic floor tiles.)
Rating
Installed Design Life Updated
5 - Good
1991
75
MAR-09
Terrazzo floor finish and ceramic floor tiles in a corridor.
C3020.04 Wood Flooring - **
Hardwood gym flooring in gymnasium. Refinished the hardwood flooring in July, 2008.
Rating
Installed Design Life Updated
4 - Acceptable
1991
30
MAR-09
Gymnasium.
Event:
Replace hardwood flooring.
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$24,775
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 21 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C3020.07.01 Resilient Tile Flooring - **
Vinyl tiles in computer classroom, drama room, platform in drama room, drama storage rooms, fashion study area &
office in home economics classroom and classrooms.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
0
MAR-09
Replace vinyl tiles. (Aprx. 779.90 sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$48,000
Updated: MAR-09
C3020.07.02 Resilient Sheet Flooring - **
Vinyl sheet flooring in staff washrooms, infirmary room, administration office, staff workroom, server room, science
classrooms, science preparation room, 2 storage rooms, cafeteria, food study area & storage room in home economics
classroom, classroom & washroom in industrial arts, art room, and storage room in art room.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace vinyl sheet flooring. (Approx. 679.30
sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$64,000
Updated: MAR-09
C3020.08 Carpet Flooring - **
Carpet in staff room, offices, conference rooms, library, music room, darkroom in industrial arts, office & practice rooms
in music room,
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
15
MAR-09
Replace carpet. (Approx. 287.15 sq.m.)
Concern:
It had reached the theoretical design life in 2006.
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$18,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 22 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C3030.02 Ceiling Paneling (Wood) - *
Concrete ceilings of mechanical rooms on main floor of both wings and mechanical room in mezzanine of northwest wing
are painted. Gypsum board ceilings are painted except gypsum board ceilings with spray texture finish.
Rating
Installed Design Life Updated
4 - Acceptable
1991
60
MAR-09
C3030.04 Gypsum Board Ceiling Finishes (Unpainted) - *
Gypsum board ceilings in main lobby, staff washrooms, boys washrooms, boys change room, boys shower room, girls
washrooms, girls change room, girls shower room, gym storage room, practice room in music room, kitchen, cafeteria,
food study area in home economics classroom, washroom & storage rooms in industrial arts and storage rooms.
Rating
Installed Design Life Updated
4 - Acceptable
1991
60
MAR-09
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar) - **
Suspended T-bar ceiling with acoustic tiles in staff room, offices, conference rooms,infirmary room, administration office,
corridor in offices & conference rooms area, library, classrooms, science classrooms, science preparation room, server
room, computer classrooms, special needs room, office in music room, drama room, art room, fashion study area in
home economics classroom, office in home economics classroom, classroom & darkroom in industrial arts, corridors and
vestibules.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
25
MAR-09
Replace acoustic ceiling tiles. (Aprox. 2,383.35
sq.m.)
Type
Year Cost
Priority
Lifecycle Replacement
2016
Unassigned
$107,490
Updated: MAR-09
C3030.07 Interior Ceiling Painting - *
Concrete ceilings of mechanical room in both wings and mechanical room in mezzanine of northwest wing are painted.
Gypsum board ceilings are painted except gypsum board ceilings with spray texture finish.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
20
MAR-09
Page 23 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
C3030.09 Other Ceiling Finishes* - Acoustic Panel
Acoustic ceiling panels in music room.
Rating
5 - Good
Installed Design Life Updated
1991
0
MAR-09
Acoustic ceiling panels in music room.
C3030.09 Other Ceiling Finishes* - Spray texture finish
Spray texture finish for the bulkheads (walls & ceilings) and walls below the skylight in the main lobby.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
Spray texture finish for the bulkheads (walls & ceilings) and walls
below the skylight in the main lobby.
C3030.09 Other Ceiling Finishes* - Steel Deck
Steel deck ceilings in gymnasium, industrial arts workshop and mechanical room in mezzanine of southeast wing.
Rating
5 - Good
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 24 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S4 MECHANICAL
D2010.04 Sinks - **
Various single and 2 compartment stainless steel sinks throughout school. Floor mounted, mop service sinks in Janitor
rooms. Scullery sink in Kitchen.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace 10 sinks
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$12,500
Updated: MAR-09
D2010.05 Showers - **
Shower stations with individual shower stalls in Gymnasium change rooms.Telephone shower heads and metering
valves.
Rating
Installed Design Life Updated
5 - Good
Event:
1991
30
MAR-09
Replace 2 Shower stations
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$3,000
Updated: MAR-09
D2010.08 Drinking Fountains / Coolers - **
Various wall mounted vitreous china, single bubblerl, non-refrigerated drinking fountains and stainless steel, wall mounted
water coolers throughout building - mainly in corridors.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
35
MAR-09
Replace 4 Drinking Fountains / Coolers
Type
Year Cost
Priority
Lifecycle Replacement
2026
Unassigned
$10,000
Updated: MAR-09
D2010.09 Other Plumbing Fixtures - *
Semi-circular, stainless steel wash fountain and eye wash in CTS area.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 25 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D2010.10 Washroom Fixtures (WC, Lav, Urnl) - **
Vitreous china water closets, floor mounted with flush tanks
Various countertop stainless steel lavs. Conventional and push button metering faucets.
Stall type vitreous china urinals with manual and auto-sensor flush valves.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace 12 Lavs, 12 WC's and 6 Urinals
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$80,000
Updated: MAR-09
D2020.01.01 Pipes and Tubes: Domestic Water - *
Mainly insulated copper domestic water piping. Solder joints.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D2020.01.02 Valves: Domestic Water - **
Various gate and ball valves throughout building. Mainly isolation service.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace 50 Valves
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$30,000
Updated: MAR-09
D2020.01.03 Piping Specialties (Backflow Preventors) - **
Backflow prevention device on Boiler make up water line
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace Backflow Preventor on boiler make up
water line
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$5,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 26 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D2020.02.06 Domestic Water Heaters - **
2 - Bradford White model B65T3703N gas fired storage water heaters. 370,000 Btuh input. 65 gallon storage capacity
each, c/w in line recirc. pump.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace 2 Domestic Water Heaters
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$20,000
Updated: MAR-09
D2020.03 Water Supply Insulation: Domestic - *
Mainly preformed fiberglass pipe insulation. Canvas jacket in exposed areas.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
D2030.01 Waste and Vent Piping - *
Cast iron, copper, ABS piping throughout building.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
D2040.01 Rain Water Drainage Piping Systems - *
Flat roofs & sloped roofs connected to roof drains & piped to municipal mains.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
D2040.02.04 Roof Drains - *
Conventional roof drains on flat roof areas. Dome strainers.
Rating
4 - Acceptable
Installed Design Life Updated
1991
40
MAR-09
D3010.02 Gas Supply Systems - *
Schedule 40 steel piping connecting incoming natural gas supply to boilers, make up air unit and domestic water heaters.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
60
MAR-09
Page 27 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D3020.02.01 Heating Boilers and Accessories: H.W. - **
In Main Mechanical room:
2 Superhot hot water boilers (model AAE-3000-N-M. Capacity 3000 mbh input) c/w all safety and operating controls.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
35
MAR-09
Replace 2 Heating Boilers and Accessories
Type
Year Cost
Priority
Lifecycle Replacement
2026
Unassigned
$120,000
Updated: MAR-09
D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler - **
Insulated metal chimney and vent connectors, up to weather caps on roof.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace Boiler Chimneys
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$25,000
Updated: MAR-09
D3020.02.03 Water Treatment: H. W. Boiler - *
Chemical pot feeder on hydronic system loops. Located in Main Mechanical room.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3040.01.01 Air Handling Units: Air Distribution - **
Main building air handling units, located in main Mechanical room. Haakon packaged units c/w supply & return fans,
heating coil, mixing section, humidifier, filters.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace 2 Air Handling Units
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$150,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 28 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D3040.01.03 Air Cleaning Devices:Air Distribution - *
Dust Collector in Industrial Arts area. Make / model unknown.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3040.01.04 Ducts: Air Distribution - *
Mainly overhead, low velocity supply & return ductwork throughout school. Ductwork connects Air Handling units (and
make up air unit) to air outlets and inlets.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3040.01.07 Air Outlets & Inlets:Air Distribution - *
Various overhead ceiling diffusers and sidewall supply & return grilles throughout the building.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3040.03.01 Hot Water Distribution Systems - **
Schedule 40 steel with threaded joints. Copper piping with solder joints. Heating pumps: Grundfoss vertical in-line heating
circulators.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace Hot Water Distribution Systems
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$200,000
Updated: MAR-09
D3040.04.01 Fans: Exhaust - **
Various ceiling exhaust fans and roof mounted centrifugal exhausters.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace 6 exhaust fans
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$20,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 29 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D3040.04.03 Ducts: Exhaust - *
Galvanized steel, low velocity - connecting exhaust grilles and hoods to roof mounted exhaust fans or outlets.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3040.04.05 Air Outlets and Inlets: Exhaust - *
Various exhaust grilles and hoods ducted to exhaust fans. Mainly Washrooms, CTS and Home Ec. areas.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3050.05.02 Fan Coil Units - **
Hydronic Force Flow units - mainly in entrance vestibules throughout school.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace 4 Fan Coil Units
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$12,000
Updated: MAR-09
D3050.05.03 Finned Tube Radiation - **
Perimeter radiation, various locations throughout school. Sloped top. Various enclosure heights.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace 50 m of Finned Tube Radiation
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$50,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 30 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D3050.05.06 Unit Heaters**
Horizontal, hydronic unit heaters in Mechanical room and CTS areas.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace 3 Unit heaters
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$7,500
Updated: MAR-09
D3050.07 Other Terminal and Packaged Units - *
Engineered Air make up air unit serving the CTS area. Provides make up air for exhaust fans in this area.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D3060.02.01 Electric and Electronic Controls**
Electric controls of entrance force flow units, unit heaters, make up air unit and exhaust fans.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace force flow, unit heater, make up air unit
and exhaust fan controls.
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$35,000
Updated: MAR-09
D3060.02.02 Pneumatic Controls**
Pneumatic control of heating and ventilation systems. Powers duplex Air compressor in main boiler room, c/w 1 HP
motors. Devilbiss refrigerated air dryer.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace Heating and Vent system controls
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$50,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 31 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
Powers System 600 DDC system controlling heating, ventilation systems.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace DDC system
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$60,000
Updated: MAR-09
D4010 Sprinklers: Fire Protection - *
Wet pipe sprinkler system throughout school. Fire department connection at main entrance.
Rating
4 - Acceptable
Installed Design Life Updated
1991
60
MAR-09
D4030.01 Fire Extinguisher, Cabinets and Accessories - *
Portable dry chemical fire extinguishers throughout building. Wall mounting brackets & cabinets.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
30
MAR-09
Page 32 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S5 ELECTRICAL
D5010.03 Main Electrical Switchboards (Main Distribution) - **
1200 Amp 120/208 volt three phase manufactured by Siemens . Distribution is 70% full.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
40
MAR-09
Replace Main Electrical Switchboards (Main
Distribution)**
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$138,058
Updated: MAR-09
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution) - **
Eight Siemens panels located throughout the school in the hallways. Panels are 80% full.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace Eight Electrical Branch Circuit
Panelboards (Secondary Distribution)**
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$41,681
Updated: MAR-09
D5010.07.02 Motor Starters and Accessories - **
Two Siemens Motor Control Centers rated 600 Amp, 208 volt each. One is five sections the second is three sections.
20% spare capacity.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace Motor Starters and Accessories**
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$8,215
Updated: MAR-09
D5020.01 Electrical Branch Wiring - *
Wiring is run in conduit.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 33 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D5020.02.01 Lighting Accessories (Lighting Controls) - *
120 volt line voltage switches used for lighting in some classrooms. Douglas relays low voltage switching in other areas.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D5020.02.02.02 Interior Florescent Fixtures - **
All sections are equipped with surface mounted wrap around fluorescent light fixtures, deep cell parabolic lenses, and
recessed 2x4 fixtures, T8 lamps and electronic ballasts.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace Interior Florescent Fixtures**
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$247,832
Updated: MAR-09
D5020.02.03.02 Emergency Lighting Battery Packs - **
Emergency battery packs located at required areas. Manufactured by Lumacell.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace 15 Emergency Lighting Battery Packs**
Concern:
Equipment is reaching end of theoretical life.
Recommendation:
Replace 15 emergency battery packs.
Consequences of Deferral:
Possible loss of emergency lighting in school due to
equipment failure.
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$34,500
Updated: MAR-09
D5020.02.03.03 Exit Signs - *
Led exit signs located as required, with built in battery backup.
Rating
4 - Acceptable
Installed Design Life Updated
2006
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 34 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D5020.03.01.04 Exterior H.P. Sodium Fixtures - *
HPS over exits and light standards around perimeter of school.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls) - *
Photocell control used to operate exterior lighting.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
D5030.01 Detection and Fire Alarm - **
Hard wired, zoned Simplex 4000 fire alarm control panel. Detection devices and bells located as required. One hallway
has bell strobe combination.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
25
MAR-09
Add 15 strobes
Concern:
Strobes not available for hearing impaired.
Recommendation:
Install 20 strobes in school. Add bell and strobe in music
room.
Consequences of Deferral:
Visual signal appliances not available for the hearing
impaired.
Type
Year Cost
Operating Efficiency Upgrade 2009
$7,500
Priority
Medium
Updated: MAR-09
Event:
Replace Detection and Fire Alarm**
Type
Year Cost
Priority
Lifecycle Replacement
2016
Unassigned
$77,337
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 35 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D5030.02.02 Intrusion Detection - **
Kanteck KT300. Motion sensors are located in required areas.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
2006
25
MAR-09
Replace Intrusion Detection**
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$45,492
Updated: MAR-09
D5030.02.04 Video Surveillance - **
20 video cameras located inside and out side the school. Manufactured by Flamen. DVR manufactured by Dell. Tied in to
central over the internet.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
2006
25
MAR-09
Replace Video Surveillance**
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$7,026
Updated: MAR-09
D5030.03 Clock and Program Systems - *
Simplex Time Control master clock. Clocks locate din hallways and classrooms.
Rating
4 - Acceptable
Installed Design Life Updated
1991
25
MAR-09
D5030.04.01 Telephone Systems - *
Northern Telecom phone system. Handsets located in classrooms. Tied to PA system.
Rating
4 - Acceptable
Installed Design Life Updated
1991
25
MAR-09
D5030.04.05 Local Area Network Systems - *
Supernet in school. One Dell Server. Apple Computers for computer lab. ABCDD Server. Six Amp patch panels.Four
3com, and Dell switches. One UPS unit.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 36 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
D5030.05 Public Address and Music Systems - **
Rauland Intercom system. Intercom connected to telephone handsets in school. Gym sound system. FM system in
classrooms.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
20
MAR-09
Replace Public Address and Music Systems**
Concern:
Equipment is reaching end of its theoretical life.
Recommendation:
Replace public address system amplifier.
Consequences of Deferral:
Possible loss of communication within the school due to
equipment failure.
Type
Year Cost
Priority
Lifecycle Replacement
2012
Unassigned
$18,500
Updated: MAR-09
D5030.06 Television Systems - *
Projectors and Smart boards located in classrooms.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 37 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
E1020.07 Laboratory Equipment - *
One fume hood in a science classroom.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
Fume hood in a Science classroom.
E1090 Other Equipment - Industrial Arts
The industrial arts workshop has a variety of manual and power wood working equipment with dust collection system, a
kiln & equipment for ceramic, equipment for graphics.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
Kiln in industrial arts workshop.
Report run on: March 5, 2009 11:22 AM
Page 38 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
E1090.03 Food Service Equipment - *
Commercial grade freezer, cooler, food preparation, cooking, washing and serving equipment in the kitchen.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
Partial view of commercial kitchen.
E1090.04 Residential Equipment - *
Residential grade ranges, refrigerators, microwave ovens, sewing machines, washer and dryer in home economics
classrooms.
Residential grade refrigerator, dishwasher and microwave oven in staff room.
Rating
4 - Acceptable
Installed Design Life Updated
1991
0
MAR-09
Partial view of staff room.
Report run on: March 5, 2009 11:22 AM
Page 39 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
E1090.07 Athletic, Recreational, and Therapeutic Equipment - *
Six basketball backboards and 1 score board in gymnasium.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
Gymnasium.
E2010.02 Fixed Casework - **
Plastic laminated and painted plywood casework throughout.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
35
MAR-09
Replace casework.
Type
Year Cost
Priority
Lifecycle Replacement
2026
Unassigned
$276,300
Updated: MAR-09
E2010.03.01 Blinds - **
Venetian blinds throughout.
Rating
Installed Design Life Updated
4 - Acceptable
Event:
1991
30
MAR-09
Replace blinds.
Type
Year Cost
Priority
Lifecycle Replacement
2021
Unassigned
$42,097
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 40 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
E2010.03.06 Curtains and Drapes**
Two wall-mounted curtains for the platform in drama classroom. One ceiling-mounted curtain in home economics
classroom.
Rating
Installed Design Life Updated
4 - Acceptable
2000
30
MAR-09
Wall-mounted curtains for the platform in drama classroom.
Event:
Replace curtains. (3)
Type
Year Cost
Priority
Lifecycle Replacement
2030
Unassigned
$4,000
Updated: MAR-09
E2010.06 Fixed Interior Landscaping - *
Two concrete planters with ceramic tiles finish in the main lobby.
Rating
5 - Good
Installed Design Life Updated
1991
0
MAR-09
Two planters in the main lobby.
F1010.02.04 Portable and Mobile Buildings* -
Rating
N/A
Installed Design Life Updated
0
Report run on: March 5, 2009 11:22 AM
30
MAR-09
Page 41 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
F1010.02.04 Portable and Mobile Buildings* - 1988
Architectural:
Wood frame construction bearing on concrete piles with stucco cladding, SBS membrane roofing, aluminum glazed
windows with integral horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls,
suspended T-bar ceiling with acoustic tiles, plastic laminated & painted millwork, green boards and tack boards. The
classroom door to the corridor and the furnace room door are hollow metal doors in pressed metal frames. It has 4
classrooms and a corridor to other portables and to the building. There are metal lockers in the corridor.
The gross area is 298,96 sq.m.. The gross area includes the areas of the 4 classrooms. These classrooms have same
areas and each classroom has 72.70 sq.m..
(Note: These portables were manufactured in 1988 and installed at this location in 1991.)
(Note: The cost of the lockers is in " C1030.10 lockers ".)
Mechanical:
- Heating & ventilation provided by Climatemaster Furnaces located in the corner of each room - connected to sill
mounted diffusers. Sidewall return air
grille., high on wall. Due to age, furnace should be replaced.
Condition: 3 (marginal)
- Sill supply diffusers. Condition: 4 (acceptable)
- Sill supply ductwork. Condition. 4 (acceptable)
- Gas line to furnace. Condition: 4 (acceptable)
- Chimney - metal, up to weather cap on roof. Condition: 4 (acceptable)
- Portable fire extinguisher in cabinet.
Electrical:
Westinghouse Electrical panel connected to school's electrical system via feeders inside conduit. Fluorescent lighting, 1x
4 surface mounted T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tiedin to school's auxiliary systems.
Rating is acceptable.
Rating
Installed Design Life Updated
4 - Acceptable
1991
30
MAR-09
Exterior of the 1988, 1994, 1995 and 2000 portables.
Event:
Replace 2 furnaces.
Concern:
Due to age. The furnaces should be replaced.
Recommendation:
Replace 2 furnaces in 2013.
Type
Year Cost
Priority
Lifecycle Replacement
2013
Medium
$15,000
Updated: MAR-09
Report run on: March 5, 2009 11:22 AM
Page 42 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
F1010.02.04 Portable and Mobile Buildings* - 1994
Architectural
Wood frame construction bearing on concrete piles with stucco cladding, SBS membrane roofing, aluminum glazed
windows with integral horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls,
suspended T-bar ceiling with acoustic tiles, plastic laminated & painted millwork, black boards and tack boards. The
classroom door to the corridor is a solid core wood door in pressed metal frame. The furnace room door is a hollow metal
door in pressed metal frame. It has 2 classrooms and a corridor to other portables. There are metal lockers in the
corridor.
The gross area is 181.00 sq.m.. The gross area includes 68.00 sq.m. for classroom 153 and 68.00 sq.m. for classroom
154.
(Note: The cost of lockers is in " C1030.10 lockers ".)
Mechanical:
- Heating & ventilation provided by Silent Aire Furnaces located in the corner of each room - connected to sill mounted
supply registers. Sidewall return
air grille, high on wall.
Condition: 4 (acceptable)
- Sill supply diffusers. Condition: 4 (acceptable)
- Sill supply ductwork. Condition: 4 (acceptable)
- Gas lines to furnace. Condition: 4 (acceptable)
- Chimneys - metal, up to weather cap on roof. Condition: 4 (acceptable)
- Controls - low voltage to wall mounted thermostat. Condition: 4 (acceptable)
- Portable fire extinguisher in cabinet.
Electrical:
Federal Pioneer Electrical panel connected to school's electrical system via feeders inside conduit. Fluorescent lighting,
2x 4 recessed T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tied-in to
school's auxiliary systems.
Rating is acceptable.
Rating
4 - Acceptable
Installed Design Life Updated
1994
0
MAR-09
Portable classroom.
Report run on: March 5, 2009 11:22 AM
Page 43 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
F1010.02.04 Portable and Mobile Buildings* - 1995
Architectural:
Wood frame construction bearing on concrete piles with stucco cladding, SBS membrane roofing, aluminum glazed
windows with integral horizontal blinds. Interior components include sheet vinyl flooring, painted gypsum board walls,
suspended T-bar ceiling with acoustic tiles, plastic laminated & painted millwork, white boards and tack boards. The
classroom door to the corridor is a solid core wood door in pressed metal frame. The furnace room door is a hollow metal
door in pressed metal frame. It has a corridor to other portables. There are metal lockers in the corridor.
The gross area is 182.70 sq.m.. The gross area includes 69.60 sq.m. for classroom 155 and 69.60 sq.m. for classroom
156.
(Note: The cost of the metal lockers is in " C1030.10 lockers ".
Mechanical:
- Heating & ventilation provided by Silent Aire Furnaces located in the corner of each room - connected to sill mounted
supply registers.Sidewall return
air grille, high on wall.
Condition: 4 (acceptable)
- Sill supply diffusers. Condition: 4 (acceptable)
- Sill supply ductwork. Condition: 4 (acceptable)
- Gas lines to furnace. Condition: 4 (acceptable)
- Chimneys - metal, up to weather cap on roof. Condition: 4 (acceptable)
- Controls - low voltage to wall mounted thermostat. Condition: 4 (acceptable)
- Portable fire extinguisher in cabinet.
Electrical:
Federal Pioneer Electrical panel connected to school's electrical system via feeders inside conduit. Fluorescent lighting,
2x 4 recessed T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tied-in to
school's auxiliary systems.
Rating is acceptable.
Rating
4 - Acceptable
Installed Design Life Updated
1995
30
MAR-09
Portable classroom.
Report run on: March 5, 2009 11:22 AM
Page 44 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
F1010.02.04 Portable and Mobile Buildings* - 2000
Architectural:
Wood frame construction bearing on concrete piles, SBS membrane roofing, pvc windows with horizontal blinds. Interior
components include sheet vinyl flooring, painted gypsum board walls, suspended T-bar ceiling with acoustic tile, white
boards and tack boards. The classroom door to the corridor and the furnace room doors are solid core wood door in
pressed metal frames. It has a corridor to other portables and to the exterior. There are metal lockers in the corridor.The
corridor has a double exterior metal door in pressed metal frame. A wood exterior deck with wood stairs.
The gross area is approximately 203.00 sq.m.. The gross area include 77.40 sq.m. for classroom 157 and 77.4.0 sq.m.
for classroom 158.
(note: The cost of metal lockers is in " C1030.10 lockers ".)
Mechanical:
- Heating & ventilation provided by Lennox Furnace located in the corner of each room - connected to overhead ceiling
diffusers. Sidewall return air
grille - low level in millwork.
Condition: 4 (acceptable)
- Ceiling supply diffusers. Condition: 4 (acceptable)
- Ceiling supply ductwork. Condition: 4 (acceptable)
- Gas lines to furnace. Condition: 4 (acceptable)
- Chimney - metal, up to weather cap on roof. Condition: 4 (acceptable)
- Controls - low voltage to wall mounted thermostat. Condition: 4 (acceptable)
- Portable fire extinguisher on wall mounting bracket.
Electrical:
Federal Pioneer Electrical panel connected to school's electrical systems via feeders inside conduit. Fluorescent lighting,
2x 4 recessed T8 with electronic ballasts. Emergency lighting and exit signage by Emerge-Lite. Classrooms are tied-in to
school's auxiliary systems.
Rating is acceptable.
Rating
4 - Acceptable
Installed Design Life Updated
2000
30
MAR-09
Portable classroom.
Report run on: March 5, 2009 11:22 AM
Page 45 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
F1010.02.05 Grandstands and Bleachers - **
Pull out bleaches in gymnasium.
Rating
Installed Design Life Updated
4 - Acceptable
1991
40
MAR-09
Pull out bleaches in gymnasium.
Event:
Replace bleaches.
Type
Year Cost
Priority
Lifecycle Replacement
2031
Unassigned
$113,556
Updated: MAR-09
F1020.02.13 Paint Booths - *
A paint booth in industrial arts workshop.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 46 of 47
St. Albert - Ecole Secondaire Sainte Marguerite D' Youville School (B4068A)
S8 FUNCTIONAL ASSESSMENT
K4010.01 Barrier Free Route: Parking to Entrance - *
It has barrier free route from parking lots to main entrance and other entrances.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
K4010.02 Barrier Free Entrances - *
It has barrier free entrances. It has barrier free power operators on the east entrance doors of the southeast wing.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
K4010.03 Barrier Free Interior Circulation - *
Barrier free access to all areas except to the mechanical mezzanines.
Rating
Installed Design Life Updated
4 - Acceptable
1991
0
MAR-09
K4010.04 Barrier Free Washrooms - *
It has barrier free washrooms.
Rating
4 - Acceptable
Installed Design Life Updated
1991
Report run on: March 5, 2009 11:22 AM
0
MAR-09
Page 47 of 47

Similar documents

Ottewell Junior High School

Ottewell Junior High School This school for Grades 7 through 9 was originally built in Edmonton in 1960. The school faces four streets - 94B Avenue on the North, Ottewell Road on the East, 94 Avenue on the South and 73 Street...

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report those items noted in report. Standard domestic water, sanitary sewer and natural gas systems. Roof drainage discharged to grade around building. Heating, ventilation provided from central air handl...

More information

Joussard School

Joussard School Interior is in good condition in the 1954, 1958, 1960, and 1987 sections. 1972 section requires flooring, ceilings, and millwork to be replaced. Interior walls to be patched, repaired and refinishe...

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report C1010.03 Interior Operable Folding Panel Partitions** Aluminum framed folding partition between two classrooms. Rating

More information