MOPSU Brochure (3mb pdf)
Transcription
MOPSU Brochure (3mb pdf)
Early Monetisation of Stranded Strande Assets e BACKGROUND Offshore oil and gas field developments typically adopt the “satellite principle", where existing pipeline network and production facilities in the vicinity are used to minimize CAPEX The remaining unexploited fields are often located in remote locations with little or no infrastructure and of a size or nature that often makes it impossible to predict with certainty the amount or composition of recoverable hydrocarbons in place These fields are often referred to as small, marginal, unconventional reservoirs or stranded assets. It is widely acknowledged that economics of exploiting stranded assets are easily affected by changes in basic economic parameters such as capital expenditure, time to first oil, operating costs, production levels, recoverable reserves and even abandonment costs which can have a major effect on the profitability of the venture If a field is marginal because of the uncertainty over the level of reserves, a period of pre-production often referred to as extended well testing will give additional reservoir information and will reduce uncertainty thereby leading to improved decision making Field owners or operators should be able to exploit these so called stranded assets in an incremental, optimal and cost effective manner There is therefore a need for a solution that offers the following:• Minimum CAPEX for the field owner or operator • First oil or gas in weeks to optimise cash flow – Improving IRR • Extended Well Testing (EWT) to determine reservoir profile • Minimum risk & development costs from optimal data evaluation • Operate in water depths of up to 120 metres • Fit-for-purpose to produce small hydrocarbon reserves • Operate with crude oil production rates as low as 2,500 bpd • Economically viable where recoverable reserves are as low as 5 million barrels • Flexible to cater for uncertainties surrounding remote field developments MOBILE OFFSHORE PRODUCTION AND STORAGE UNIT (MOPSU™) The International patent pending MOPSU™ offers field owners and operators solutions for all of the above and more. Unlike other systems that rely on drilling rigs, separate wellhead platforms, pipelines or an FSO, the MOPSU™ uses an optional modular drilling rig, integral storage and a MOPSU™ installed detachable wellhead platform with the entire system (with the exception of the wellhead platform) fully recoverable and reusable This technology, a ‘game changer’, will provide oil and gas industry complete solutions and set new paradigms in the development of offshore oil and gas fields using cost effective systems and facilities. The “Design One, Build Multiple” concept provides significant benefits on delivery times and costs The MOPSU™ paves the way for future hydrocarbon extraction in remote green fields and to assist in enhanced hydrocarbon recovery from existing brown fields UNIQUE ADVANTAGES OF THE MOPSUTM Early Production System (EPS) Produce As You Explore - During the exploration phase, a Drill Stem Test (DST) string can be deployed and the well completed with a subsurface valve used to flow in or shut the well. Pressure gauges will be installed down hole to measure changes and typically, instead of using a production tree, DST well control equipment will be utilised Drilling and well appraisal, including extended well testing can be performed with this configuration and production during this period can be stored and offloaded to shuttle tankers. Based on the results from the testing, recoverable reserves can be computed and full scale development strategy can be formulated. This will then determine the number of wells to be drilled and optimal process facilities required, making it a fit-for-purpose solution. If results of the appraisal and testing do not warrant a production facility at the site, the DST string can be retrieved and the MOPSU™, including the drilling template, can be redeployed to another suitable site MOPSUTM a driver for incremental field development Conventional design & thinking won’t work Development often only possible through early monetisation of reserves and pushing the technology envelope The size and location require additional up-front anaysis to determine optimal design Overdesign kills economics Minimum Capital Using Reusable Integrated Unit capable of drilling, production, evaluation, storage & offloading in remote locations Minimum Risk Produce As You Explore. First Oil in weeks with minimal production facility Extended Well Testing Optimal design for production from extended evaluation & interpretation Fit-for-Purpose Operators of small fields can now produce with minimum capital, minimum risk and optimal facilities Minimum CAPEX and OPEX Flexible Typically, conventional wellhead platforms are constructed based on assumptions on the likely outcomes of ultimate hydrocarbon recovery. This method has often resulted in over design and sub-optimised platforms resulting in unnecessary capital expenditure for the field owner/operator If the field is found to produce above initial expectations or if other hydrocarbon deposits are found to be present in close proximity, then the wellhead platform which is an integral part of the MOPSU™ can be detached easily from the MOPSU™ and independently hooked-up to central processing facilities or pipeline network as the field evolves in size Considerable savings can be achieved by deploying the MOPSU™ instead of installing a conventional wellhead platform for operation in conjunction with a MOPU and an FSO. Immediate CAPEX savings can be realised as heavy lift vessels or jack-up rigs are not required for the installation of the MOPSU™ and the MOPSU™ site-installed Detachable Wellhead Platform (MDWHPTM) EXPECTED RECOVERABLE RESERVES (RR) & FLOW RATES LOW Meets Basic Development Viability Criteria MOPSUTM + MDWHPTM As expected The integral crude and condensate storage and offloading facilities eliminate the need to install pipelines or deploy an FSO. Savings can also be achieved in OPEX since there are no pipelines or FSO to operate and maintain and less coordination as all the facilities are being accommodated on a single platform. At the end of field life, huge savings can be recognised since abandonment of the production and storage facility involves only jacking and mooring operations RR Higher • Facilitates extended well testing and early production • Fully assembled at fabrication yard / quayside and wet-towed to offshore site • Re-locatable, making incremental field development or re-use attractive, with negligible environmental impact Integral production storage provided in the foundation mat Drilling can be done with modular drilling rig, tender assisted rig or jack-up Modular drilling rig is suitable for both exploration and production • • RR or FLOW RATE Flow Rate Higher Add FSO RR & Flow Rate Higher Phase 1 Add FSO Drop in FLOW RATE Upgrade MDWHPTM to Full Facilities For low production rates the MOPSUTM can be used independently. For higher production rates, especially in the initial years, it can be used in conjunction with an FSO which will be demobilised when production declines SIGNIFICANT BENEFITS • Immediate CAPEX savings on wellhead platform and pipeline/FSO • Self-installing – No requirement for Heavy Lift Vessels for the installation of substructure and topsides RELOCATE MOPSU Higher Scalable • Lower RECOVERABLE VOLUME DEPLETE RESERVOIR Phase 2 Install Pipelines to CPP in Vicinty RELOCATE MOPSUTM RELOCATE FSO • Self-supporting detachable wellhead platform for attachment to conventional platforms or to pipeline network if further development is envisaged • Fixed installation which floats only during mobilisation and demobilisation, therefore no requirement for marine classification • Packaged equipment philosophy to develop topsides facilities, allowing flexibility to change processes • Removable strand jack system is used to lower the mat and to elevate the deck, eliminating the need for permanent jack-houses, which require periodical maintenance • Platform-deployed mooring hawser and crude transfer system for offloading to shuttle tankers; no subsea offloading connections MOPSUTM MK1 Specifications STABILITY / FOUNDATION CAPACITY METOCEAN Water Depth (max.) 80m MSL Tides HAT = MSL +1.7m LAT = MSL -1.4m Storm surge +0.6m, -0.3m Air gap 11.0 m WAVES, WIND & CURRENT Max. Wave Height, Hmax (m) Assoc. Wave Period, Tass (sec) Significant Wave Height, Hs (m) Mat bearing capacity 1 year return (operating) 100 yr return (extreme storm) Cyclone conditions Operating Extreme storm Cyclone 8.7 13.0 11.5 9.3 11.4 10.7 2359 psf 2752 psf 2517 psf Factor of Safety - Overturning 1 year return (operating) 100 yr return (extreme storm) Cyclone conditions > 1.30 (ABS req.) 3.68 2.72 1.82 Factor of Safety - Sliding 16.05 DRILLING / WORKOVER 4.7 7.0 6.6 Period, Ts (sec) 7.9 9.6 9.9 Peak Period (sec) 9.2 11.2 10.5 Zero Crossing Period (sec) 6.5 8.0 8.2 Wind Speed (m/s) 17 23 30 Current Speed (m/s) Surface Mid-depth Seabed 0.7 0.5 0.3 0.8 0.6 0.3 1.0 0.7 0.3 FACILITIES Supports self-contained, tender assisted & jack-up rigs Self-contained modular rig Working load / push / pull Pipe handling Operating singles Top drive torque / speed Pumping capacity BOP Norsok and UK regulations 350 - 400 sT hook 2.5” – 20” Up to range 3 (45ft) 42 - 85 kNm / 150 - 190 rpm 4200 l/min 13 5/8”, 5000 - 10,000 psi LEGS Number of legs 4, circular Internals Piping, insulation, access Function EWT / EPS / Optimal Production Topsides payload 2500 MT ACCOMMODATION / ACCESS Hull dimension 40m x 40m x 6m (nominal) Living Quarters Deck area 1800 sq m Facilities Hull tanks capacity Processing 1435 cu. m for fuel oil, drilling mud, brine, chemicals, lube, seawater & potable water 12,000 bpd (standard) 45,000 bpd (enhanced) Crude storage 90,000 - 200,000 barrels Crude offloading 100,000 – 200,000 barrels per day, via floating hoses & mooring hawser deployed from hull Cranes 2 nos. - 30 MT and 50 MT Power 2 x 1.3 MW 20-man (standard) 40-man (enhanced) Radio room, offices, galley, dining, hospital, laundry Sikorsky S-76 (standard) Sikorsky S-92 (enhanced) Helideck Boatlanding 3-levels JACKING SYSTEM Drilling Unit Rack & pinion Production Unit Strand jacking ® AMERICAS DIVISION APPROVAL IN PRINCIPLE