WAC Bennett and Peace Canyon Dam Safety Projects
Transcription
WAC Bennett and Peace Canyon Dam Safety Projects
BC HYDRO W.A.C. BENNETT AND PEACE CANYON DAM SAFETY PROJECTS UPDATE November 2013 The W.A.C. Bennett Dam and Gordon M. Shrum (GMS) Generating Station were built in the 1960s and are cornerstones of BC Hydro’s system. The facilities are located on the Peace River, about 20 kilometres west of Hudson’s Hope. The Peace Canyon Dam was completed in 1980 and is located downstream of the Bennett Dam on the edge of Hudson’s Hope. As part of BC Hydro’s plan to ensure safe, reliable power, a number of engineering assessments and projects are underway, or planned to start soon, at the Bennett and Peace Canyon dams. W.A.C. Bennett Embankment Dam Several project activities are underway all aimed at improving monitoring of the dam performance. The project also verifies the effectiveness of the dam’s filter system and evaluates the stability of the dam. W.A.C. Bennett Dam Core Instrument Upgrade A new capital project will be initiated this year to address the open casings left in the core of the dam that were installed during the sink hole repairs in the late 1990s. The project will implement upgrades to the casings, as required, and potentially install new instruments for better monitoring of the dam core performance. W.A.C. Bennett Spillway Chute Upgrade (Phase 2) The Bennett Dam spillway chute requires upgrades and repairs, based on findings of field investigations completed in 2011 and 2012. The scope of the project is to resurface a length of approximately 45 metres across the full width (30 metres) of the lower portion of the chute, upstream of the flip bucket. Repairs will be similar to the work completed in the vicinity of the spillway gate structure in 2012 and will involve concrete removal, installation of new rebar, dowels, new waterstops at construction joints and concrete placement. Planning for construction is underway. Construction activities are expected to start in April 2014, subject to an acceptable reservoir level forecast for summer 2014. It is expected that two construction seasons (April to October) will be required to complete the work. A comprehensive Return to Service Plan has been prepared in case spilling is required during construction. Extent of resurfacing The highlighted area shows the portion of the Bennett Dam spillway chute that requires upgrades. bchydro.com Peace Canyon Spillway Gate Reliability Project Similar to the W.A.C. Bennett Spillway Gate Reliability Project, upgrading the Peace Canyon spillway gate system will ensure that the facility continues to provide reliable power. The project is in the definition phase and the team is currently undertaking the preliminary design, which is expected to be completed in March 2014. Construction activities are expected to start in early 2015. The spillway gate system at the Peace Canyon Generating Station consists of six spillway bays with radial gates. W.A.C. Bennett Spillway Gate Reliability Project Upgrading the spillway gate system will ensure continued reliable operation. The project is in the definition phase and the team is currently undertaking the preliminary design, which is expected to be completed in January 2014. Construction activities are expected to start in the first quarter of 2015. Constructability and safety by design meetings took place on site in November. Spillway gate at W.A.C. Bennett Dam opened during spill operation in July 2012. W.A.C. Bennett Dam Rip-Rap Upgrade Since the construction of the Bennett Dam more than 40 years ago, there has been steady deterioration of the rip-rap (rock) protecting the upstream slope of the dam. Upgrading the deteriorated portions of the rip-rap will ensure long-term dam safety and erosion protection of the upstream dam slope from impact of waves in the reservoir during wind storms. Trial blasting for rip-rap at the Sand Flat limestone site was successfully completed in the summer. The project is now evaluating results of the trial blasting to establish this site as a borrow source for rock to be used for the rip-rap upgrade. This update is provided to keep residents of the Peace region informed about upgrades and refurbishments being made to the G.M. Shrum Generating Station, W.A.C. Bennett Dam and Peace Canyon Dam. Please contact BC Hydro Community Relations at 250 561 4858 or [email protected], or BC Hydro Aboriginal Relations at 604 528 8394 or [email protected] for more information on any of the above projects. bchydro.com GDS13-415