CH-EC-PH-Hanjin Subic Shipyard Erosion Protection
Transcription
CH-EC-PH-Hanjin Subic Shipyard Erosion Protection
CASE HISTORY Rev: 02, Issue Date : May 2015 HANJIN SUBIC SHIPYARD EROSION CONTROL Subic Freeport Zone, Zambales, Philippines ENVIRONMENTAL / GEOTECHNICAL Product: BioMac ’C’ Coconut Fibers / EROSION CONTROL Problem The Hanjin Subic Shipyard in Subic Freport Zone, Zambales is the biggest shipyard ever built in the Philippines, and is known to be the fourth largest in the world. To make the development of the shipyard possible, cutting of slopes up to 40m-high and filling of some areas are required especially for the construction of access roads. During rainy season, erosion of exposed cut slopes occur, which results to damage of property and work stoppage. The Project Owner (Hanjin Heavy Industries Construction Inc.) required to have a permanent solution to this problem. As a result, their Consultant (E.R. Sibulan Construction) requested the assistance of Maccaferri (Philippines), Inc. to come up with a recommendation. Solution After site investigation, Maccaferri proposed a cheap erosion control mat made of 100% coconut fibers, BioMac “C”, combined with hydroseeding and adequate surface drainage system. BioMac ‘C’ provides necessary erosion protection for this application considering high rainfall, exposed slopes, strong water run-off and an erodible soil condition. BioMac ’C’ acts as ground protection, seed protection and moisture retention for vegetation, soil and root insulation and grass reinforcement, and it minimized rain penetration. It is cheap, light in weight, very convenient to handle and easy to install. During Construction March 2009 During Construction March 2009 After a thorough evaluation on the proposal, the Client agreed and proceeded with the project. Project Owner Hanjin Heavy Industries Construction Inc. General Contractor E.R Simbulan Construction Consultant E.R Simbulan Construction Maccaferri Products 178 rolls BioMac ‘C’ Construction Info Start of Construction : March 2009 Completion Date : April 2009 Engineering a Better Solution HANJIN SUBIC SHIPYARD EROSION CONTROL Subic Freeport Zone, Zambales, Philippines Project Completed May 2009 Project Completed May 2009 MACCAFERRI (PHILIPPINES), INC. th Unit 30-C, 30 Floor , Rufino Pacific Tower, 6784 Ayala Avenue, Makati City 1226, Philippines Tel. and Fax. (+63-2) 813-0211 E-mail: [email protected] Web site: www.maccaferri.com.ph Engineering a Better Solution HANJIN SUBIC SHIPYARD EROSION CONTROL Subic Freeport Zone, Zambales, Philippines Project Completed May 2009 Project Completed May 2009 MACCAFERRI (PHILIPPINES), INC. th Unit 30-C, 30 Floor , Rufino Pacific Tower, 6784 Ayala Avenue, Makati City 1226, Philippines Tel. and Fax. (+63-2) 813-0211 E-mail: [email protected] Web site: www.maccaferri.com.ph Engineering a Better Solution