CH-RWSR-PH-Holcim Philippines Embankment Dam
Transcription
CH-RWSR-PH-Holcim Philippines Embankment Dam
CASE HISTORY Rev: 01, Issue Date: May 2015 HOLCIM PHILIPPINES EMBANKMENT DAM Agno, Pangasinan, Philippines ENVIRONMENTAL / GEOTECHNICAL / EMBANKMENT DAM Products: Maccaferri PVC-coated Gabions, MacTex Nonwoven Geotextile Problem Holcim Philippines, Inc. owns a silica quarry operation in the town of Agno, Pangasinan, but which they have decided to closed after several years of operation. At site, several stockpiles of silt were left exposed, which during rainy season, are eroded and caused disturbances on a nearby residential area below the site. HPI constructed three temporary silt trap dams to address the problem. However, the materials used in the construction of the dams were just ordinary sand bags thus the structures eventually collapsed. HPI decided to asked recommendations from Maccaferri regarding the matter. Solution Maccaferri has designed a small embankment dam made of PVC-coated Gabions and a layer of MacTex Nonwoven Geotextile. MPI has recommended to construct one weir as replacement to the three damaged temporary silt trap dams. The embankment dam was designed to contain sediments during rainy season, with an opening in the middle top portion akin to a spillway aimed to release excess water when it reaches a critical level. Before Construction January 2009 Before Construction January 2009 Project Owner Holcim Philippines, Inc. (Manufacturing) General Contractor Wang Construction Consultant HPI (Technology and Engineering) Maccaferri Products 1,350 cu.m. Maccaferri PVC-coated Gabions 300 sq.m. MacTex Nonwoven Geotextile Construction Info Start of Construction : November 2009 Completion Date : January 2010 Engineering a Better Solution HOLCIM PHILIPPINES EMBANKMENT DAM Agno, Pangasinan, Philippines Proposed Section During Construction November 2009 MACCAFERRI (PHILIPPINES), INC. th Unit 30-C, 30 Floor , Rufino Pacific Tower, 6784 Ayala Avenue, Makati City 1226, Philippines Tel. and Fax. (+63-2) 813-0211 E-mail: [email protected] Web site: www.maccaferri.com.ph Engineering a Better Solution HOLCIM PHILIPPINES EMBANKMENT DAM Agno, Pangasinan, Philippines During Construction November 2009 Near Completion January 2010 MACCAFERRI (PHILIPPINES), INC. th Unit 30-C, 30 Floor , Rufino Pacific Tower, 6784 Ayala Avenue, Makati City 1226, Philippines Tel. and Fax. (+63-2) 813-0211 E-mail: [email protected] Web site: www.maccaferri.com.ph Engineering a Better Solution