2MVA Package sub-stations for British Telecom
Transcription
2MVA Package sub-stations for British Telecom
News 2MVA Package sub-stations for British Telecom By Damien Kane, Kane Engineering Ltd. Kane Engineering, a CUBIC partner, has recently completed a major LV switchgear project for BT Northern Ireland at its Belfast Telephone House Data Centre. The project comprised two HV/LV package sub-stations, Form 4 type 7, each with 3200 A mains and generator ACB incomers on each panel, with a synchronising generator and up to seven ACB outgoers on each panel, serving critical equipment within the data centre. All components are made as ABB draw-out pattern ACBs. Kane Engineering also supplied and installed the 2MVA cast resin transformers, close-coupled to each of the form 4 CUBIC panels. Apart from the two sub-stations, Kane also supplied two 800A Form 4 type 2 sub switchboards serving primary and secondary PDU supplies and two 630A Form 2 type 2 sub switchboards with auto source changeover MCCBs serving cooling condenser units in the data rooms. View of the switchboard room Finally, four 250 A rated power distribution units with inputs fed via Riello static transfer switches and individual branch circuit monitoring for outgoing ways. As a special feature to the project, it was necessary to create a new electrical switchboard room on the 7th floor of the BT building in order to be able to serve the new data centre a floor below. Moreover, all items of equipment including the 5,000 kg cast resin transformers had to be lifted by crane to the roof of the building as the existing goods lift only reached the 6th floor. 250 A Power distribution unit Continued next page News The 2MVA sub-station with ABB ACB’s A 2MVA sub-station during assembling.