View presentation - Building a Better NZ
Transcription
View presentation - Building a Better NZ
ENERGY UPGRADE TO PASSIVE HOUSE STANDARD FOR HISTORIC PUBLIC HOUSING IN NEW ZEALAND Dr. PAOLA LEARDINI Dr. MANFREDO MANFREDINI School of Architecture and Planning The University of Auckland-New Zealand BUILDING A BETTER NEW ZEALAND [Auckland, 3-5/09/2014] LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 GARDEN CITY Suburbs NZ DREAM distributed antipodean post-colonial city LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 SOCIO-ECONOMIC sustainability The Auckland Plan - Housing continuity and sense of place Robert Pemberton , The happy colony, 1854 Ebenezer Howard, Garden Cities of Tomorrow, 1902 Hurst Seager, Village, 1910 Tamaki Heights Garden Suburb, 1920s LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 SOCIO-ECONOMIC sustainability The Auckland Plan - Housing continuity and sense of place Robert Pemberton , The happy colony, 1854 Ebenezer Howard, Garden Cities of Tomorrow, 1902 Hurst Seager, Village, 1910 Tamaki Heights Garden Suburb, 1920s LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 CULTURAL HERITAGE conservation the modern ‘garden suburb’ continuity and sense of place Robert Pemberton , The happy colony, 1854 Ebenezer Howard, Garden Cities of Tomorrow, 1902 Hurst Seager, Village, 1910 Tamaki Heights Garden Suburb, 1920s LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 CULTURAL HERITAGE conservation 3 levels The Auckland Unitary Plan Historic Heritage areas/places [Cultural Heritage inventory: Scheduled Historic places and items] Special Character areas [business or residential] pre-1944 demolition control overlay 2013 last notified version of PRE-1944 DEMOLITION CONTROL OVERLAY LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 housing issues LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 THERMAL performance Mean Indoor Air Temperature (°C) in NZ Houses BRANZ-HEEP Study. Sample: 397 randomly selected houses Type of Room Living room Bedroom Ambient Day Evening Night Average over entire day * 7am - 9am 9am - 5 pm 5pm - 11pm 12am - 7am 13.5 15.8 17.8 14.8 15.8 12.6 14.2 15.0 13.6 14.1 7.8 12.0 9.4 7.6 * The hour from 11pm to 12pm is not included due to software limitations L.J. French et.al.(2006), Winter Temperatures in New Zealand Houses BRANZ (2011), House Condition survey Sample: 573 houses throughout New Zealand LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 VENTILATION airtightness Classification of airtightness NZ residential building TYPE AIRTIGHTNESS AC/H 50 PA BUILDING DESCRIPTION AIRTIGHT 5 ac/h* post 1960 houses with a simple rectangular single story floor plan of less than 120 m2 and airtight joinery (windows with airtight seals) AVERAGE 10 ac/h post 1960 houses of larger simple designs with airtight joinery LEAKY 15 ac/h post 1960 houses of more complex building shapes and with unsealed windows DRAUGHTY 20 ac/h All pre 1960’s houses with strip flooring and timber windows *air-leakage for natural pressure difference around 0.5 ac/h (Bassett, 2001) openings + infiltration [NZBC-G4] LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 INDOOR AIR QUALITY health Performance New Zealand has the second highest http://adsoftheworld.com/media/ambient/asthma_foundation_suffocation?size=_original prevalence of asthma in the world (after the UK) the asthma foundation Asthma is more prevalent among Maori (22%) and Pacific Island adults (20%) than other adults Asthma is the most common cause of admission to hospital for children Hospitalisation rates for asthma have more than doubled in the past 30 years Asthma is the highest-ranking specific disease in terms of Years Lost to Disability in males, and third highest for females In 2006, according to Ministry of Health, 132 New Zealanders died from asthma LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 http://adsoftheworld.com/media/ambient/asthma_foundation_suffocation?size=_original OPERATIONAL COSTS fuel poverty State house density and Performance socioeconomic deprivation Map of State houses in the Auckland Isthmus [Source: Housing New Zealand Corporation] State housing density and areas’ deprivation status [Source: Motu, 2010; DHB, 2006] LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ENERGY UPGRADE programmes Energy Efficiency and Conservation Strategy 2011–16 LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 RETROFITTING current practice common renovation strategies for pre-1978 State housing [source: Cumberpatch, 2011] [source: Gronert, 2011] LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 RETROFITTING current practice RH = 100% condensation [source: de Groot, 2009] LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 retrofit standard LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING Passive House Standard A Passive House is a building, for which thermal comfort (ISO 7730) can be achieved solely by post-heating or postcooling of the fresh air mass that is required to achieve healthy indoor air quality conditions ENERGY EFFICIENCY THERMAL COMFORT 1991: First Passivhaus Darmstadt Kranichstein Bott/Ridder/Westermeyer LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING Passive House Standard PERFORMANCE REQUIREMENTS PHs require less than 15 kWh/(m²yr) for heating or cooling (relating to the living space) The heating/cooling load is limited to a maximum of 10 W/m2 Primary energy use may not exceed 120 kWh/(m²a) Passive Houses must be airtight with air change rates being limited to n50 = 0.6/h In warmer climates and/or during summer months, excessive temperatures may not occur more than 10 % of the time LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING Passive House Standard in Europe 1998 Germany Prima casa singola PH, Bretten (Baden-Württemberg) Oehler Faigle Archkom solar architektur 2008 Austria Residenza Reinhold Hammerer (doppia), Sistrans (A), Maaars 2010 Francia Prima casa passiva, Bessancourt (F), Karawitz 2010 Passivhaus Architecture Award Edificio per appartamenti, Berna (CH) Peter Schurch LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING Passive House Standard worldwide Canada 2010 Austria House , Olympic and Paralympic Games 2010, Whistler USA 2003 First PH in Nord America, Urbana, Illinois, Katrin Klingenberg China 2010 Expo Land/UBPA (Shanghai), Arge Hamburg Haus Spengler Wiescholek, Dittert&Reumschüssel Japan 2009 First PH in Kamakura, Key Architects LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING Passive House Standard Specific Heating Load kWh/(m²a) NEW BUILDING HEATING LOAD 90% exiting stock low energy CEPHEUS = Cost Efficient Passive Houses as European Standard CEPHEUS Passive Houses LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING EnerPHit Standard EXISTING BUILDINGS Guideline and incentive for an optimal efficiency standard Quality assurance for building owners Market transparency Energy Retrofit with Passive House Components LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING EnerPHit criteria Derived from criteria for Certified Passive House Components Component Limit value Opaque exterior components to outdoor air U ≤ 0.150 W/(m²K) Opaque exterior components to soil and unheated basement f * U ≤ 0.150 W/(m²K) where f: “reduction factor soil” from PHPP “Ground” worksheet Windows Uw,installed ≤ 0.85 W/(m²K) Ventilation system hheat recovery,eff ≥ 75 % (incl. duct losses) Airtightness limit value: n50 ≤ 1.0 h-1; target value: n50 ≤ 0.6 h-1 Alternatively: Heating demand below 25 kWh/m²a LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING EnerPHit 1st step: International requirements for Passive House components 2nd step: International EnerPHit criteria Thermal comfort No moisture/mould problems reduction of CO2 emissions minimal life cycle costs LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING EnerPHit COMPONENT METHOD LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING EnerPHit HEATING DEMAND METHOD Draft version of the criteria to be published in 2014 Certification of pilot projects by PHI New EnerPHit classes for higher efficiency of technical systems and renewable energy generation Official start of international certification criteria end 2014/2015 LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 applied research LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING 1940-60s SH research phases Collection, systematization and analysis of pre1978 low density State housing types in Auckland Selection, documentation and evaluation of case study house types Comparative evaluation and adaptation to the NZ context of internationally recognized diagnostic and measurement protocols, and building performance standards [EnerPHit] Measurement campaign of selected case studies Development of retrofit packages for a pilot-project in Auckland [up to EnerPHit standard] 01 02 03 04 05 LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 RESEARCH existing stock 1. early colonial timber cottage 2. developed colonial cottage 3. victorian villa 4. victorian cottage 5. californian bungalow 6. english cottage style house 7. art deco 8. labour party state house 9. star flat block LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING 1940-60s SH cohort selection G. Wilson, State flats, 1945-47 Sir George Grey Special Collections Auckland Libraries, 435-B5-185 Māori Affairs state house Archives New Zealand Ref: AAQT 6539 A95,413 LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING 1940-60s SH Phase 1. 1940-60s AUCKLAND STATE HOUSING ANALYSIS [Housing New Zealand Corporation typological classification ] MAIN HOUSING TYPE VARIABLES BUILDING TYPE [single/double storey, partial/expanding houses, single/semidetached/collective, flat/sloping grounds] -Single storey -Detached -Flat ground CONSTRUCTION TECHNOLOGY [traditional, experimental, semi-industrialized, prefabricated] -timber framed house [traditional and pre-cut, incl. imported houses] -Wood panel house [prefabricated] DWELLING SIZE [bedroom number] -Three bedroom house SPATIAL LAYOUT [traditional/open plan, compact/linear, zoned/distributed] - No prevailing spatial layout LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING 1940-60s SH Phase 2. SELECTION, MAPPING AND DOCUMENTATION OF [10 representative samples] REPRESENTATIVE HOUSE TYPES Source: Housing New Zealand Corporation Archive LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 pilot project LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING pilot project Apirana Avenue Glenn Innes Auckland, NZ Pilot Project Type 6/37/1165 (1947) Building type Construction technology single storey detached house traditional timber frame houses ext. wall cladding: timber weatherboards Dwelling size Spatial layout Insulation upgrades Occupancy three bedroom house, 93 m2 traditional (hall/corridor), zoned HNZC enhanced retrofit package owner occupied (2+2 DEWKS) LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING pilot project data collection Measured drawings, stratigraphyc and 3D models, photographs, occupants’ survey Diagnostic survey and analysis of building pathologies [airtightness measurement (Blower Door test), heat loss measurement (thermography), stratigraphic inspection and analysis of structural and functional inadequacies] Measurement campaign 1. indoor and outdoor environmental parameters (ibutton and HOBO): air temperature, RH, CO2 2. energy metering systems (smart meters)3. NIWA climate data (air temperature, RH, wind speed and direction, and global solar radiation) LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 Upgrade Base Case PH S1 PH S2 PH S3 PH S4 Ex SH NZBC ECO-RETROFITTING thermal model Insulation Ceiling Floor Walls Window House as built (no insulation) 0.6 0.5 0.7 0.19 Airtightness (n50) Poor (20 h-1) Ceiling insulation As PH S1 + Floor insulation As PH S2 + Wall insulation As PH S2 + Windows upgrade and improved airtightness SH insulated with basic package House to comply with NZBC 5.80 5.8 5.8 5.8 0.5 2.40 2.40 2.40 0.7 0.7 2.80 2.80 0.19 0.19 0.19 0.71 Poor (20 h-1) Poor (20 h-1) Improved (10 h-1) Best (1 h-1) 3.5 1.3 0.7 0.19 Poor (20 h-1) 2.9 1.3 1.9 0.26 Improved R values (m²K/W) of upgrade levels for thermal modeling LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING PHPP calculation R values (m²K/W) of upgrade levels for PHPP calculation Ceiling Floor Walls m²K/W m²K/W m²K/W m²K/W (n50) h-1 Base Case House as built (no insulation) 0.27 0.74 0.60 0.22 20 PH C Ceiling insulation 4.80 0.74 0.60 0.22 15 PH C+F As PH C + Floor insulation 4.80 4.15 0.60 0.22 15 PH C+F+W As PH CF + Wall insulation 4.80 4.15 3.21 0.22 8 PH 4.80 4.15 3.21 0.60 1 SH BP As PH CFW + Windows upgrade and airtightness SH insulated with basic package (As-it-is) 2.42 1.73 0.60 0.22 15 SH NZBC House to comply with NZBC 2.90 1.30 1.90 0.26 8 Upgrade Insulation Window Airtightness LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING PHPP calculation results HEATING DEMAND OVERHEATING 10% 25 kWh/(m2a) LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING PHPP calculation Heating energy balance - monthly method results n50 = 1 h-1 -1 -1 nn50 50 ==88h h LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING PHPP calculation Heating energy balance - monthly method results LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING construction [?] Thermal insulation Thermal bridge free construction Airtightness [continuous internal layer] deep retrofitting light intervention detail 1: wall to ceiling [source: Ong 2011] Mechanical ventilation with heat recovery [balanced system] winter + summer MVHR winter MVHR + summer natural ventilation winter MVHR + summer mechanical ventilation detail 2: wall to floor LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 CONCLUSIONS Conservation, upgrade and reuse of existing housing stock are fundamental to address both heritage and sustainability concerns Pre-1978 State housing is repository of ‘authenticity’ that needs to be respected, studied, protected and re-vitalised The performance-based retrofitting is a key factor for the enactment of adequate policies to address dwelling issues that particularly hit the disadvantaged people the houses of the ‘happy dream’ were built to cater for The Passive House standard, already applied in New Zealand for new construction, represents a suitable solution for retrofitting (EnerPHit) Only a holistic approach to retrofitting, including insulation, ventilation and airtightness can guarantee the survival of this mass housing types and their legacy LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING phinz.org.nz LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 ECO-RETROFITTING education passivehouseacademy.ac.nz LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014 Alexander Turnbull Library Reference: DCDL-0002620 Cartoon by Allan Charles Hawkey Paola Leardini [email protected] Manfredo Manfredini [email protected] 44 LEARDINI - MANFREDINI I Energy Upgrade to PH Standard for Historic Public Housing in New Zealand BBNZ Auckland, 3-5 September 2014