Maintenance Branch ZRM Zdzieszowice

Transcription

Maintenance Branch ZRM Zdzieszowice
1
Informations about the Company
Zarmen Sp. z o.o. is a commercial law limited liability company. It was established based
on a notarial deed on 26 March 2003. The company's registered office is located
in Warsaw, 51 Chłodna Street, while its headquarters is located in Chorzów,
44 Stefana Batorego Street.
Statistical Classification
Number Regon
: 532383555
Tax Identification Number NIP
: 754-27-39-320
National Court Register
Number KRS
: 160402
Share capital
: PLN 561 000.00
2
Board of Directors
President– Zbigniew Koncewicz
VP– Financial Director – Aneta Rokicka
VP – Commercial Director– Krzysztof Górniak
Contact Informations:
Tel.: +48 032/ 790 99 01
Fax: +48 032/790 99 99
e-mail: [email protected]
3
Zarmen’s branches
Zarmen’s sp. z o.o. branches main activity is complex maintenance of industry plants,
renovations and modernizations of industry objects and installations, manufacturing
and erections of steel constructions as also general contractor of industrial
investments.
 Maintenance Branch ZRM Warszawa (ArcelorMittal Warszawa Sp. z o. o.)
 Maintenance Branch ZRM Zdzieszowice (ArcelorMittal Poland S.A.
Zdzieszowice Branch)
 Maintenance Branch Dabrowa Górnicza - ZRM Częstochowa
(Coke Plant Czestochowa Nowa)
Maintenance Branch ZRM Warszawa
Branch was established in 2003 to provide maintenance services as
an outsourcing in Huta Warszawa – now it is branch of ARCELLORMITTAL
WARSZAWA
Branch address: Warsaw, Kasprowicza Street 132, Poland
Tel. no (+48 22) 835 89 00
Manager of ZRM Warszawa
Jarosław Topolski
 Maintenance Section UR PWG – 35 employees
 Steel Constructions Section W00 – 60 employees
 Mechanical Section W02 – 40 employees
 Electrical Works Section W03 - 14 employees
 Civil Works Section W05 – 21 employees
 P&I Section W08 – 11 employees
Scope of offered works
 Maintenance of metallurgical machines and equipment, modernization and
all levels of renovation of steelworks machinery
 Periodic inspections of ventialtion and air-conditiong devices
 comprehensive maintenance of lifting equipment
(total qty. 97 devices in ArcellorMittal)
 Steel construction manufacturing, single element weight up to 70To
 modernization, repairs and installtion of power supply and technological
 Manufacturing of technological, energetics and heating pipelines
 Manufacturing and assembly of technological installations
 Diagnostics of rotating machinery
Maintenance Branch Dabrowa Górnicza ZRM Częstochowa
Name: Zarmen Sp. z o.o. Branch: ZRM Częstochowa
Branch address : Częstochowa, Odlewników Street 20, Poland
Tel. No. (+48 32) 757 56 34
Manager of ZRM Częstochowa
Zdzisław Grabowski
Employment
Manager staff
Engineers staff
Technical supervisors
Logistics and transport
Administrative staff
Direct production
Employment
Maintenance employment
}
– 19 employees
– 2 employees
– 16 employees
– 149 employees
– 96 employees
Scope of works
 Investments works in the field of civil works erections, installations and
technology in coking, metallurgical and steelworks industries
 Renovations and modernization of technological systems in the coking,
steelworks and cement-limes systems
 Current maintenance works of industrial plants
 Industrial electrical and P&I installations
 Steel constructions manufacturing for civil branch, machinery and road
industries
Construction and civil works
 Construction of industrial buildings
 Coke oven batteries with all auxiliary constructions
 Foundations for buildings as also constructions and
technological machinery
 Biological treatment of industrial waste water
 Industrial furnaces
Mechanical devices
 Screeners and enriching devices
 Mills
 Centrifugal and reciprocating pumps and compressors
 Gears and drivetrains
 Bucket feeders and conveyors
Maintenance Branch ZRM Zdzieszowice
Name: Zarmen Sp. z o.o. Branch : ZRM Zdzieszowice
Branch address : Zdzieszowice, Powstancow Sląskich Street 1, Poland
Tel. No. (77) 484 12 90
Manager of ZRM Zdzieszowice
Krystian Kern
Scope of works
ZRM Zdzieszowice activities are maintenance and investmens works of facilities and
equipment of coke plants.
Main scopes of works of ZRM Zdzieszowice are:
 Manufacturing and erection
of steel constructions
 Manufacturing and erection of industrial
machinery and equipment
 Civil works executions
 Repair services and maintenance
ZRM Zdzieszowice is also performing:
 Renovations of primary and secondary coolers
 Repair of heat exchangers
 „Hot” repairs on coke oven batteries in civil works and technological scopes
 Manufacturing and assembly of steel constructions
 Manufacturing of technological installtion, above- as also underground
 Civil works (excavation, foundations, building’s repairs)
Within maintenance services ZRM Zdzieszowice
is performing works such as:
 Mechanical scope: machinery and equipment of
coke oven batteries as also coal associated
products lines and coal object
 Civil works: „hot” repairs of ceramics nest of COB
and auxiliaries
 Ceramics welding in FIB Service of COB
copartmens
We employ approximately 500 skilled employees. We offer professional, fair
and time-meeting assignated works and availability of qualified personnel, high level
of technical organization of our services.
 Integrated Management System Certificate according to ISO 9001-2001, ISO 14001, PN-N-8001
 TÜV Rheinland certificate [PED 97/23/EC]
 Qualification Certificate of Welding Committee of the Institute of Industrial Plant Welding IS
Gliwice
 Eligibility for welding services in scope of manufacturing, assembly and construction of building
structures of classes I, II and III
 Eligibility for services related to the building constructions according to norm PN-B-06200
 Certificate of Polish Technical Inspection for production of mobile platforms, overhead cranes,
hoists, winches, fixed cranes, steam and hot water boilers, high-, low- and no- pressure tanks and
vessels
 STALKON authorization for repairs, maintenance and installation of fans type WPK, WOK, WPR
In its business activities, ZARMEN is committed to a continuous assurance of a high
quality of its products and services. The Company is proud to have implemented
an Integrated Business Management System according to the ISO 9001, ISO 14001
and ISO 18001 standards
Furthermore, the Company holds certificates confirming the high quality of its products
and services issued by the following renowned international certification bodies:
 TÜV Rheinland
 Lloyd’s Register
 DNV – Det Norske Veritas
 Germianischer Lloyd
The Company's offer has been well received not only by its customers but also by business
monitoring agencies which have granted ZARMEN many awards and honorary titles, e.g.
 the Forbes Diamond 2009 in the category of companies with a turnover of more than
PLN 200 million (the third place in the Śląskie Province and and the thirty-second place
in Poland)
 the Golden Laurel of Skills and Competencies /2006/
 the Business Gazelle 2007 – the top position in the ranking of the most dynamically
developing enterprises of the “Puls Biznesu” daily /2007/
Zarmen Group
HPH Hutmaszprojekt
engineering and execution of investment projects for the
metallurgical, energy generation and coke manufacture industries
RZN production and repair of industrial large-size machinery and
Rybnickie Zakłady Naprawcze equipment
Remak
RUE
repair and modernization services, assembling power generation
equpiment
control and instrumentation equipment as well as electric
installation assembly plant
Opolrem general industrial overhaul and modernization services
Energomontaż Zachód Wrocław industrial construction and assembly services
Koksownia Częstochowa „Nowa” a coke plant
FPA Wytwórnia Wyrobów Kutych
a forging products manufacturing plant
Production facilities
Zarmen Group has:
 38 000 m2 of production premises
 18 mobile cranes with a lifting capacity of up to 200 tons
 120 machining workstations with a load capacity of up to 120 tons
 17 building machines (excavators, loading machines, derricks, etc.)
 4 presses with a pressure of up to 3000 tons
 15 trucks with a loading capacity of up to 65 tons
 31 emergency service vans
 115 fitting and assembling teams
Production capacities
Zarmen Group has an annual manufacturing capabilities of:
 8000 tons of building structures
 6000 tons of machine structures
 30 000 tons of forgings
 15 000 tons of industrial installations and containers
 50 000 tons on materials assembled at construction sites
 18 000 tons of M3 reinforced concrete structures
 700 000 tons of metallurgical coke
 17 000 24V low-voltage measuring points
 11 000 240V-100KV power supply points
 20 000 tons of ceramic structures for various types of furnaces
HPH Hutmaszprojekt Sp. z o. o.
HPH Hutmaszprojekt Sp. z o.o. is engineering company providing services:
 Designing for steelworks, coke, energy and environmental industry
 Delivery of machines and equipment
The company was established on the basis of the Project Office and Metallurgical
Equipment Supply HPH SA operating since 1976 and established the implementation of
the documentation for the steel and coke, supplies, machinery and equipment with
particular emphasis on the optimization of technological processes, environmental
protection, energy conservation, safety, handling, reduce noise and increase the
efficiency of the devices, and the degree of processing products.
Scope of activities
Design activities of the company is provided in the following categories:
 coke equipment and machinery
 rolling mill equipment
 casting, compacting, wire plants
 steelworks furnaces
 transport eqipment
Achievements
In 30 years of activity completed nearly 3000 major projects, including a lot
of machinery and equipment with the original, patented solutions.
The majority was destined for the
domestic market, however export
services, provided to more than 30
countries in Europe, Asia and Africa
accounted for a significant share of
the total backlog.
Among them are:
 Continous rolling mill in Magnitogorsk (Russia)
 Carbonizing node for Power Plant CHVALETICE (Czech Republic)
 Modernization of the mill for Alumina Steelworks KONIN SA
 Transhipment hubs for loading and unloading
 Raw materials preparation object
 Supply of extinguishing cars for Coke Plant ZK Zdzieszowice
 Supply of wagon tippler for Coke Plant ZK Zdzieszowice
 Supply of extinguishing cars for Coke Plant WZK "Victoria" in Wałbrzych
 Modernization of rail wagon broaching in Coke Plant Przyjaźń
 Supply of equipment for U.S. Steel Koszyce
 Supply of equipment and mechanical and electrical parts to contractor in Egypt
 Manufacturing of broaching in LOTOS Gdansk
Last years main projects accomplished by
HPH-HUTMASZPROJEKT Sp. z o.o.:
 Executive and as-built documentation of machinery and equipment of COB No.1 in Czestochowa Coke
Plant „Nowa”
 Excavators platforms documentation for Górażdże
 Documentation of elestric locomotive for Power Plant Trinec
 Supply equipment and parts for Egyptalum
 Supply of lid lifting equipment for US Steel Koszyce
 Documentation of Clean Coal Technology Center for Polish National Institute ICHPW in Zabrze
 Supply and assembly of logistic system for Power Plant Energa Ostrołęka
 Executive documentation of carbon-based installation with participation of HUTNI PROJEKT Frydek
Mistek
 Documentation of auxillery objects in Żmigród
 Documentation of machinery and equipment for Coke Plant Czestochowa Nowa
 Together with RZN filter press for mining
Rybnickie Zakłady
Naprawcze Sp. z o. o.
Scope of works
 production of steel constructions and their parts
 works associated with the structure of industrial pipelines and
 roboty związane z budową rurociągów przemysłowych oraz of distribution networks
 manufacture of machinery for mining and construction
 implementation of projects associated with the construction
 manufacture of metal tanks
 Treatment of metal elements
 inspections and repairs of fans
The company specializes in production of
outsized machines as:
 Flotation machines RZN type
 Fine coal jigs RZN type
 Chamber filter presses RZN type
 Belt conveyors RZN type
 Bucket elevators
 Drum crushers
 DISA enriching devices
Siedziba firmy
Chember filter press
Filter presses are devices used in the filtration
process in the sugar industry, coal, chemical, food,
minerals, as well as in sewage treatment plants,
tanneries. They are used for separating solids from
liquid fractions.
Flotation machines
Flotation machines are used in the process of
enriching metal ores, minerals, chemicals rare
grains and a whole range of other minerals.
Fine coal jigs
This jig fine coal ore enrichment device,
wherein the result of the pulsating water
action spoil separated into layers grains.
Grains of carbon arranged in the highest
layer in the bottom of the grain gangue.
Bucket elevators
Bucket elevators are designed to short range
transport of loose bulk materials by means of a
large number of buckets or pockets which are
attached one by one to the tendons closed circuit.
Mechanical equipment
 Axial and radial main ventilation fans
 Centrifugal and piston pumps
 Centrifugal, reciprocating and screw compressors,
together with research, diagnostics and
component regeneration
 Gas-suction devices
 Refrigeration and air-conditioning devices for
mining
Energy pipelines
 In plants, boiler rooms, air compressor and gas stations
 Thermo-technology systems , heating, heat-exchange, cooling and pressure
reduction stations
 Inter energetical, heating and technological pipelines
 Technological ZPMW pipelines manufactured in steel and PE technology, with size
Ø 50÷1000
Transport devices
 Mechnical and pneumatic handling equipment
 Hoisting machine systems
 Belt and screw conveyors, bucket elevators
Hoists machines
 Braking systems regeneration
 Routes and shaft towers supporting structures renovations
 Anti rust protection for shaft towers
RZN Sp. z o.o. has a workshop with area of 4000 m2.
It is equipped with a several specialized machines and workstations.
All machining tools, instrumentation and mesurement tool have been completed
in a manner to allow to complete technological production process.
We employ highly qualified employees and the best professionals in the field
of engineering – in technical and managing fields. Our employees have all the
required regulatory approvals and certifications.
The company has been certified for :
 Qualification Record of Poland Welding Institute in Gliwice – our company has been
qualify as 1st group of small plants
 Abbilities Assessment Certificate issued by the Department of Construction and
Maintenance Research Centre and Certification OBAC Sp. z o.o.
Major tasks and realizations accomplished
by Rybnickie Zakłady Naprawcze Sp. z o.o.
Reconstruction of the Small Grains
Classification in ZPMW KWK Sośnica –
Makoszowy Ruch Sośnica
Execution of construction and installation
for Industrial Fire Tank
Soundproofing of the main fan station
for the 5th shaft in KWK Borynia –
Zofiówka Ruch Borynia
Expansion of sludge product dewatering
Enterprise for Modernizations
of Power Engineering Equipment
REMAK S. A
The last decade was the period of adding the erection of supercritical boilers
up to 1100 MW
Currently the basic scope of the services rendered by the Company includes:
 erections, modernizations and overhauls of all type boilers
 erections and modernizations of electrostatic precipitators
 erections and modernizations of auxiliary power plants equipment
 erections of power engineering and industrial pipelines
 erections of steel structures and industrial installations
 erections of NOX burners and installations
Emplyment
Currently the Company employs 650 permanent employees:
In the Head Office Opole:
 Project and Technology Department : 18 Engineers
 Welding Department: 12 European Welding Engineers
 Quality Department: 17 Engineers
 OHS Department:
12 Specialists
On Site employment:
 Site Management – 14
 Welding Engineers - 11
5
 Quality Engineers – 14
 EHS Specialists – 12
 welders with UDT, TŰV, ASME, locksmiths and others - 540
Authorizations
REMAK S.A. possesses all authorizations necessary for the assembly, repairs and modernization activities
of all boilers, auxiliary equipment and installations of environment protection currently assembled in
Poland and the EU member states, including the following:
 Certificates: ISO 9001/2008 Management System, ISO 14001:2004 Environmental Management
Systems, OHSAS 18001:2007 Occupational Health and Safety Management Systems, PN-N 18001:2004
 ASME Certification: assembly of Power Boilers („A” STAMP) and fabrication and assembly
of pressure piping („PP” STAMP)
 POLISH OFFICE OF TECHNICAL INSPECTION - Authorization for assembly, modernization
and repairs of steam boilers and water boilers
 POLISH OFFICE OF TECHNICAL INSPECTION - License to perform repairs, modernization
and manufacture of industrial pipelines
 INSTITUTE OF WELDING - POLAND: Qualification Certificate for The "1" Group Large Establishments
qualifying REMAK S.A. to weld all types of power engineering appliances
 TÜV Certificate in accordance with PED 97/23WE/AD2000-Merkblatt HPO/HP7/TRD201/DIN EN ISO
3834-2 authorizing REMAK S.A. to perform welding works in manufacturing and to perform assembly
of vessels, pipelines, drums and appliances using all welding methods and all types of materials used
in power industry
 TÜV Certificate authorizing REMAK S.A. to weld steel structures – class E according to DIN 18800-7
 POLISH OFFICE OF TECHNICAL INSPECTION - Certificate approving the competences REMAK S.A.
Laboratory to perform examinations in the scope of technical supervision activities
 - Company has been audited by Alstom regarding Quality Assurance and HSE with good result
Equpment
REMAK’S equipment for realization of
contractual works:
 tower cranes
2
 mobile cranes
6
 welding machines
400
 annealing machines
 scaffolding
35
13 750 m2
Executed contracts
BOILERS

MOSTOSTAL WARSZAWA; Siersza Power Plant - Poland; erection of 2 CFB boilers for units of 161 MW each

FOSTER WHEELER; Eesti and Balti Power Plant - Estonia; erection of 4 CFB boilers for units of 215 MW each

FOSTER WHEELER; Turów Power Plant - Poland; erection of 5 CFB boilers for units of 235 MW each

FOSTER WHEELER ENERGIA POLAND; Łagisza Power Plant - Poland; erection of the biggest at time of erection, in
the world supercritical CFB boiler for unit of 460 MW

ALSTOM POWER - ELEKTRIM MEGADEX; Pątnów Power Plant - Poland; erection
of supercritical boiler for unit of 460 MW

ANSALDO CALDAIE SPA; Knapsack Power Plant – Germany; erection of 2 HRSG
boilers for units of 425 MW each

ALSTOM POWER Sp. z o.o. - RAFAKO S.A.; Bełchatów Power Plant - Poland;
erection of pressure part of supercritical boiler for unit of 858 MW

ALSTOM POWER GmbH - RWE POWER AG; Emsland Power Plant,
Lingen - Germany; erection of 2 HRSG boilers for units of 425 MW each

ALSTOM POWER SYSTEMS GmbH; Westfalen Power Plant, Hamm-Uetrop - Germany; erection of 2 supercritical
boilers for units of 800MW each

ALSTOM POWER BOILER GmbH, HITACHI POWER EUROPE GmbH; Neurath Power Plant - Germany; erection of 2
supercritical boilers for units of 1100 MW each

ALSTOM POWER Ltd. U.K.; GRAIN Power Plant - England; erection of 3 HRSG boilers for units of 425 MW each

FOSTER WHEELER ENERGIA POLAND; Połaniec - Poland; rection of CFB boiler for unit of 447 MW
ELECTROPRECIPITATORS

ELWO S.A. PSZCZYNA; Pątnów Power Plant - Poland; erection of 460 MW unit electroprecipitator.

ELWO S.A. PSZCZYNA; Łagisza Power Plant - Poland; erection of 460 MW unit electroprecipitator.

ALSTOM POWER Sp. z o.o.; Bełchatów Power Plant - Poland; erection of 360 MW unit electroprecipitator.

RAFAKO S.A.; Kozienice Power Plant - Poland; erection of 200 MW unit electroprecipitator.
Remak’s realizations in Poland
1- Starogard Gdański
2- Kwidzyn
3- Świecie
4- Toruń
5- Warszawa Siekierki Żerań,
Wola
6- Pątnów, Adamów, Konin
7- Łódź
8- Bełchatów
9- Radomsko
10- Zielona Góra
11- Głógów
12- Lubin
13- Turoszów
14- Wrocław
15- Siechnice
16- Brzeg
17- Zdzieszowice
18- Kędzierzyn
19- Blachownia
20- Gliwice
21- Chorzów
22- Jaworzno
23- Siersza
24- Skawina
25- Kraków
26- Praszka
27- Stalowa Wola
28- Częstochowa
29- Będzin - Łagisza
30- OPOLE
Włocławek
Remak’s realizations in Europe
GERMANY
Emden
Magdeburg
Buschhaus
Delitzsch
Leuna
Zeitz
Zorbau
Zwickau
Suhl/ Raba/
Bischofferode
Sondreuth
Frankfurt /M
Mannheim
Bergheim
Weisweiler
Wuppertal
Bergkammen
Hamm
Emlichheim
Hamburg
Inglostadt
Herbrechtingen
Burghausen
Knapsack
Herdecke
Hameln
Lingen
Westfalen
Neurath
UNITED
FRANCE
KINGDOM
Chapelle
Allington
Ruxeley
Shannonbridge
Grain
AUSTRIA
Wels
Hallein
Ernsdorf
Ernsthoff
Dürnrohr
HUNGARY
Borsod
Szazhalobatta
Dunaujuaros
HOLLAND
Amsterdam
Delfzijl
Alkmaar
Eemshaven
THE CZECH
REPUBLIC
Komorzany
SLOVENIA
Šoštanj
SWITZERLAND
Niederbipp
LITHUANIA
Kłajpeda
ESTONIA
Balti, Esti
BULGARIA
Devnya
BELGUM
Ostende, Oostrozebeke
RUE Sp. z o. o.
Main areas of activity
 Elecrical assembly works
 Installation and commissioning of overhead lines and cables
 Installation and commissioning of low and medium voltage switchgears
 Installation of industrial electrical networks
 Installation of lightning protectors
 Installation and commissioning of IT, alarm and fire protection networks
 Installation and commissioning of transformer stations
 Installation and commissioning of frequency modulators
Elecrical assembly works
Switchgears
Elecrical assembly works
Frequency modulators
Elecrical assembly works
Control board of fire protection systems
Elecrical assembly works
Cable trays
Installation works of P&I elements:
 installation and commissioning temperature sensors and transducers
 installation and commissioning thermometers
 installation and commissioning of registrators and regulators
 installation and commissioning of flow and heat meters
 installation and commissioning of analyzers
 installation and commissioning of metering stations
 installation and commissioning of control cabinets
 installation and commissioning of gas detectors
 installation and commissioning of drives
Installation works of P&I elements
Measurements stations
Installation works of P&I elements
P&I control pannel
Installation works of P&I elements
Control cabinet
Example of realized works
 Modernization of switchgears in coal mine KWK „Jas-Mos”
 Installation of switchgear in ZG „Rudna” KGHM Polska Miedź
 Modernization of switchgears 110kV in KWK „Krupiński” i EC „Marcel”
 Electrical and instrumental works by the COB in coke plant Radlin
 Modernization of power station 15kV in Służewiec and Sielce – RWE Stoen Warszawa
 Modernization of cable lines powering 15kV switchgear in FIAT AUTO POLAND
in Bielsko Biala
 Electrical and instrumental works in the new power unit in Power Plant Bełchatów
 Electrical and instrumental works in COB Coke Plant KCN Czestochowa
 Electrical and instrumental modernization works in Power Plant EC Nowa in Dąbrowa
Górnicza
 Electrical and instrumental works for Clean Coke Gas Technology in Polish institute ICHPW
 Electrical and instrumental works for coal products section in Coke Plant Krakow for
ArcelorMittal
Certificates and awards
Distinction in the rank Forbes Diamonds 2014
Category of companies 5-50 millions PLN
Gazeele of Business in 13th edition of most
dynamic edition for small and medium business
CertificateTUV NORD
Opolrem Sp. z o. o.
Scope of activities
 Manufacturing of steel constructions
 Manufacturing of machinery constructions – mchine, devices and technological lines
 Manufacturing of equipment for cement, lime and coke plants
 Industrial services with machining of conventional and specialized machine tools
 Maintenance and construction services
 Technical services made by own service and installation teams
 Designing of equipment parts in CAD tools
Annual capacity
1.000 To of civil constructions
500 To of machinery construction
500 To of industry installation
Machining possibilities
TURNING:
claw max. Ø 1.000 x 7.000 mm
grip max. Ø 1.300 x 1.000 mm
BORING:
Table’s working area 1.600 x 1.800 mm , max. weight 4 To
CHISELING: max. Knife travel 500mm
MACHINING OF METAL PLATES AND SHEETS:
cutting, rolling plates with thickness up to 20 mm
Bending plates up to 160 To force (vertical press)
and 630 To force (horizontal press)
OTHERS:
Drilling holes with diameter up to 75 mm
Bevelling
Plasma and oxy-cutting
Welding methods 135 , 136 , 311 , 141 i 111
Permissions
 Certificates of competency to perform VT , MT
 European welding certificate
 Electrical SEP permission (E and D levels)
 Welding permissions
Certificates
 TÜV quality certificate ISO9001
 SLV welding certificae acc. to DIN EN ISO 3834-2
 SLV rail caertificate acc. to DIN EN 15085-2
 Certificate for manufacturing civil constructions acc. to DIN 18800/1090-1
Award and prizes
 Forbes Diamonds in category 5 – 50 million PLN (2010)
 Title of Opole Quality Laurels ( 2014 )
 Silver Skill Laurel ( 2015 )
Energomontaż Zachód
Wrocław Sp. z o. o.
Energomontaż Zachód Wrocław operates
in the following areas:
 Construction and modernization of faciliteies for the power generation industry
 Production of equipment and steel structures
 Maintenance of power plants
 Special transportation services
Production capacity
Steel structures
Devices
20 000 ton/year
10 000 ton/year
Ducts and vessels
6 000 ton/year
Pipelines
3 000 ton/year
Basic production range:
 Large size tanks, silos and bunkers
 Flue gas ducts and pipelines
 Double-wall steel chimneys
 Bag filters
 Equipment for power generation and mining industries
 Crusher housing
 Steam boilers
 Condtruction of buildings, indusrtial halls and warehouses
 Bridge structures trestles and working platforms
 Structures for hosting towers, masts and chimneys
 Metal sheets rollers
The production plant in Żmigród
features include:
 CNC 3000 x 8000 cutting machine
 CNC 300 T press brake
 PERSON press brake
 Horizontal and vertical hydraulic press
 Column-and-boom manipulator for welding operations
 Milling machine, boring machine
 Turning latches
 Band sawing machines
 Metal sheet guillotine
Horizontal and vertical transport
 mobile cranes with a lifting capacity of from 16 to 200 tons
 special JCB terrain hoist with a lifting capacity of up to 5 tons
and a range of 12m
 fork-lift trucks with a loading capacity of up to 6 tons
 tractors with trailers with a loading capacity of up to 60 tons
 multi-axle tippers with a loading capacity of up to 24 tons
 maintenance service vans
 9-person passenger cars
 supervision and monitoring service cars
Equipment for ground works
 caterpillar excavators – buckets with a capacity of up to
1.5m3
 wheel excavators – buckets with a capacity of up to 1.2m3
 wheel loaders – buckets with a capacity of up to 4m3
 thickening rollers with a capacity of up to 10 Mg – 3
Our Certificates
Completed projects
A lower element of a container ordered by Sipro
An element of a dust collecting system
ordered by Metso Lindemann
A housing of a crusher ordered
by Aubema Sandvik
A conveyor ordered by Thyssenkrupp
The assembly of columns ordered by
Petrochemia Blachownia
in Kędzierzyn-Koźle
The assembly of an absorber in
the Pątnów Power Plant by means
of the pushing method
Selected investments
completed by
Zarmen Group
Construction of Coke Oven Battery no. 1 in Coke Plant
„Nowa”
Construction of Coke Oven Battery no. 1 in Coke Plant „Nowa”
Construction of Coke Oven Battery no. 1 in Coke Plant „Nowa”
Construction of Coke Oven Battery no. 1 in Coke Plant „Nowa”
Modernization of existing installation for Coke Gas cleaniang
whithin By-products Department and erection of new
installation on turnkey basis in Arcelor Mittal in Zdzieszowice
Modernization of Coke Gas installation in Arcelor Mittal in Zdzieszowice
Construction of Coke Oven Battery no.5 with belonging
technological installations and additional auxiliary objects in
Coke Plant „Przyjazn”
Construction of battery No. 5 in the Coking Plant " Przyjaźń "
The second stage of the modernization of the Radlin
Coke Plant
The second stage of the modernization of the Radlin Coke Plant
The second stage of the modernization of the Radlin Coke Plant
The second stage of the modernization of the Radlin Coke Plant
A catalytic ammonia decomposition and sulphur production plant
order by ArcelorMittal Poland in Krakow
A catalytic ammonia decomposition and sulphur production ArcelorMittal Poland in Krakow
Construction of Coke Oven Battery no.12 In Trzyniec
Construction of Coke Oven Battery no.12 In Trzyniec
Engineering and manufacturing new installation for
coke gas purification in Coke Plant Czestochowa „Nowa”
Building new installation for coke gas purification in Coke Plant Czestochowa „Nowa”
Building new installation for coke gas purification in Coke Plant Czestochowa „Nowa”
The construction of the Clean Carbon
Technologies Centre of the Chemical Coal Processing
Institute
Building Center for Clean Carbon Technologies
Water treatment plant
ArcelorMittal Zdzieszowice
Water treatment plant ArcelorMittal Zdzieszowice
Water treatment plant
ArcelorMittal Kraków
Contact person
President of Board Mr. Krzysztof Górniak
tel. +48 790 99 48
mob. +48 606 971 000
mail [email protected]
119