table of contents - Official Website Of Kuching Water Board
Transcription
table of contents - Official Website Of Kuching Water Board
table of contents Vision, Mission and Slogan 1 Chairman’s Statement 2 Corporate Information 4 Members of the Board 5 Senior Management 7 Introduction 9 Organisation 9 Staff 9 Finance and Accounts 10 Consumption 10 Production 11 Quality Control 13 Maintenance, Repairs and Improvement 13 Development 13 Rural Water Supply 14 Main Extension 14 Non-Revenue Water 14 Training 15 ISO 9001:2000 Certification Programme 15 Visitors 16 Conclusion 16 Some Activities during the Year (2009) 17 Performance Indicators 21 Financial Performance – Five Years Trend 22 Annual Accounts 23 Appendice 43 Lembaga Air Kuching Kuching Water Board i Our Vision To Be a Dedicated and Dynamic Water Supply Agency With Culture and Values that are Excellence Driven and Performance Oriented which Consistently Provides Services that meet Full Consumers’ Satisfaction. Our Mission To Provide Adequate and Reliable, Quality Potable Water Supply at Acceptable Charges to All Consumers within its Area of Jurisdiction at the Highest Attainable Standards in Quality and Service. Our Slogan Towards Service Excellence 1 Lembaga Air Kuching Kuching Water Board CHAirmAn’S STATemenT Dato Sri Ahmad Tarmizi B. Hj. Sulaiman Chairman Kuching Water Board introduction On behalf of the Board, I am pleased to present the Annual Report and Audited Accounts of the Board for the financial year ended 31 December 2009. review Of Financial Performance The demand for potable water remains strong inspite of the slower growth in the economy in 2009. The Board recorded water sales of RM81.206 million during the year, an increase of 1.9% from 2008. The total revenue of the Board increased by 3.1% to RM96.318 million. The overall financial performance of the Board had improved during 2009 with Net Profit after Tax increasing by 52.4% to RM10.848 million. The Board will continue to seek soft loans from the government to finance major development projects with long payback period. Financially, the Board is still strong with cash reserves of RM115 million but with term loans of RM200 million. Planning And Development The Board’s development programme for the year had been drawn up to meet the projected increase in water demand due to growth and development in Kuching City and the surrounding areas in line with the State’s socio-economic development plan. To further increase the level of service to higher areas in Petra Jaya, particularly the Siol Kandis Areas, construction work for the 500mm pipeline along Jalan Astana to Siol Kandis commenced on 18 November 2008 and was completed on 23 October 2009. Construction work for another three (3) elevated reinforced concrete reservoirs (capacity of 4.5MI each) at Sama Jaya Free Industrial Zone to further increase the water storage and reliability of water supply in the area commenced on 11 June 2008. Construction work for the Module 8, Batu Kitang Water Treatment Plant commenced on the 29 August 2009. In order to enhance the raw water source from the Sungai Sarawak Kiri River Basin, construction works for the Bengoh Dam commenced on 7 August 2007. Production And Consumption In 2009, the Board produced a total of 145,935 megalitres of fully treated water representing a 1.93% increase over 2008 water production. An estimated 600,000 people in Kuching City and the surrounding areas enjoyed the supply of fully treated water. The average daily consumption rose from 392 megalitres in 2008 to 400 megalitres in 2009, an increase of 2.04%. The maximum daily consumption during the year was 443 megalitres per day whereas the minimum daily consumption was 353 megalitres per day. Lembaga Air Kuching Kuching Water Board 2 Water Quality Control In compliance with the National Drinking Water Quality Surveillance Programme, 1,437 water samples were collected for bacteriological examination and 402 water samples were collected for physico-chemical testing and sent to the Department of Chemistry for analysis. For treated water, Kuching Water Board registered a bacteriological compliance rate of 98.7%. Practically all or close to 99.7% of the treated water samples were free from Faecal Coliform bacteria throughout the year. information Technology In line with the Board’s effort to upgrade and enhance its computer systems in order to provide better service to its customers, the Board is also working with SAINS since 2005 for the development and implementation of a more sophisticated Customer Relations & Billing software to replace the current water billing software. The new software is expected to strengthen management credit control functions on outstanding water bills and also to enhance the customer relations management by the Board. The Board had also provided AUTOCAD software for use in the Drawing Office and staff had been sent for training. Human resource Development Human Resource Development had continued to be given emphasis in year 2009. During the year, the Board had also been collaborating with Jabatan Ketua Menteri (JKM), NIOSH, MfQ Asia, Red Cresent Society, SesCo and other training institute to help further develop and harness the human resource potential of Kuching Water Board thereby improving the quality of service to consumers. The year 2009 had seen an active participation by staff in Human Resource Development 3 Lembaga Air Kuching Kuching Water Board Programme. A total of 505 officers attended in house programmes and 226 officers attended various external programmes locally and in Semenanjung Malaysia. The Board had also provided industrial training for twenty five (25) students from various institutions of higher learning. Appreciation On behalf of the Board, I wish to thank the Management and staff for their hard work, dedication and loyalty throughout the year in their efforts to provide the best service to our consumers. To our Board Members, I wish to thank them for their dedicated service and valued contributions towards the positive progress and performance of Kuching Water Board. I also wish to thank both the State and Federal Governments for their continued support, the Minister of Public Utilities, the Permanent Secretary, Ministry of Public Utilities and JKR Personnel for their guidance, assistance and support. Last but not least, I wish to thank our customers for their support and cooperation especially in promptly reporting water leakages and other supply shortcomings to Kuching Water Board. We will continue to upgrade the level of service and enhance our capacity in our endeavour to provide safe, reliable and consistent supply of water to our customers. Dato Sri Ahmad Tarmizi B. Haji Sulaiman Chairman Kuching Water Board C O r P O r A T e i n F O r m A T i O n members of the Board CHAirmAn State Financial Secretary YBHG. DATO SRI AHMAD TARMIZI B. HJ. SULAIMAN, PNBS, DJBS memBerS Director of Public Works YBHG. DATU HUBERT THIAN CHONG HUI, DJBS, AMN, PBK, PPB Director of Medical Services DR. MOHD. KAMIL HASSAN, AMT Permanent Secretary, Ministry of Public Utilities TUAN HAJI UBAIDILLAH BIN HAJI ABDUL LATIP, PPC, PBK, PPB Chairman of Kota Padawan Municipal Council YB. KR. TAN JOO PHOI, ABS YB HAJJAH NANCY HAJI SHUKRI (until 31.3.2009) DR. ZAIEDI HAJI SUHAILI, KMN, PBS, ABS (until 31.3.2009) ENCIK ONG CHEE CHIANG (until 31.3.2009) ENCIK LAU TING PING ENCIK PETER ONG YII BOON, ABS, AMN ENCIK GOH LENG YEU (until 31.3.2009) DR. AZIZAH BINTI ABDULLAH (w.e.f. 1.4.2009) ENCIK MAHRAN BIN JAMEL (w.e.f. 1.4.2009) ENCIK LUCAS YONG KUET CHUNG (w.e.f. 1.4.2009) ENCIK CHAI MING LU (w.e.f. 1.4.2009) GenerAL mAnAGer ENCIK MOHAMMAD ARIS YUSOP SeCreTArY PUAN VESMAWATI JAFFAR (until 30.6.2009) Lembaga Air Kuching Kuching Water Board 4 members of The Board 1 2 3 6 9 1. 2. 3. 4. 5. 6. 7. 8. YBhg. Dato Sri Ahmad Tarmizi Bin Haji Sulaiman YBhg. Datu Ir. Hubert Thian Chong Hui Dr. Mohd Kamil Hassan Tuan Haji Ubaidillah Bin Haji Abdul Latip YB. Cr. Tan Joo Phoi Encik Peter Ong Yii Boon YB Hajjah Nancy Haji Shukri Dr. Zaiedi Haji Suhaili 5 Lembaga Air Kuching Kuching Water Board 5 4 7 10 9. 10. 11. 12. 13. 14. 15. 16. 8 11 Encik Lau Ting Ping Encik Ong Chee Chiang Encik Goh Leng Yeu Dr. Zulkifli Bin Jantan Dr. Azizah Bt. Abdullah Encik Mahran Bin Jamel Encik Lucas Yong Kuet Chung Encik Chai Ming Lu Lembaga Air Kuching Kuching Water Board 6 SeniOr mAnAGemenT General manager Mohammad Aris Yusop 7 Lembaga Air Kuching Kuching Water Board Head Planning, Development & Production Department Deputy General Manager Paul Chan Phoo Thien, PPB Head Distribution Department Deputy General Manager Moses A. Joseph, ABK Auditors Auditor-General Malaysia Principal Office Kuching Water Board Batu Lintang Road 93200 Kuching Tel: 082-240371 Fax: 082-244546 Website: www.kwb.gov.my Head Finance Department Chief Accountant Su Yu Jit, PPB Lembaga Air Kuching Kuching Water Board 8 inTrODuCTiOn The annual report covers the fifty year of operations of the Kuching Water Board from 1 January 2009 to 31 December 2009. The Board was established on 1 January 1959, by authority of the Kuching Water Board Order 1959, Notification No. S.12 of 1959, made under Sections 2 and 3 of the Water Supply Ordinance to take over the Kuching Water Supply from the Public Works Department Sarawak. The Board is responsible for the administration, management and supervision of all waterworks situated within its area of supply and the policy of the Board is to extend mains and to develop other facilities to provide an adequate and reliable supply of fully treated quality water within its area of supply. The water supply system conforms in all respects to modern requirements and the development programme is drawn up to meet the projected growth in demand. Originally, the area of supply covered only 44.8km² (17.3 sq. miles). The supply area was subsequently increased in stages over the years to cater for the water demands of developments outside it as they could not be conveniently or feasibly supplied by Jabatan Kerja Raya. In 1963 and 1973, the supply area was increased to 90.7km² (35 sq. miles) and 225km² (87 sq. miles) respectively. The supply boundary was extended further in 1988 to cover the current area of 730km² (282 sq. miles) as shown in Appendix No.21. On 1 Jun 1995, the existing Water Supply Ordinance (Sarawak Cap. 141) was repealed and replaced by the Water Ordinance 1994. On 1 January 2001, the Board was re-established under the Kuching Water Board Order, 2001. From 1 January 2001, the Board consists of the following members:- the State Financial Secretary or his nominee (Chairman); the Director of Public Works, Sarawak; the Director of Health, Sarawak; the Permanent Secretary, Ministry of Public Utilities; the Chairman of Padawan Municipal Council; and six other members to be appointed by the Minister. Board Meetings were held on two occasions during the year as follows:- 27 April 2009 14 July 2009 9 December 2009 OrGAniSATiOn Since the Board’s inception in 1959, it has operated as an independent state owned organization. It has its own offices, treatment plants, workshops, stores and transport facilities. The Board operates two SBBS Counters to cater for the public’s needs, one at Jalan Song Thian Cheok and the other at the Head Office at Jalan Batu Lintang. STAFF In April 1966, legislation was passed specifying the Kuching Water Board as a public body for the purposes of the Pensions and Widows and Orphans Pensions Ordinance and in November 1968 the Gazette Notification in respect of the Board’s Pensionable Officers was approved by the Yang 9 Lembaga Air Kuching Kuching Water Board Dipertuan Agong. By early 1969 eligible contract staff and daily paid personnel were transferred to Pensionable Establishment. In September 1969, the Employees Provident Fund was extended to Sarawak and staff who were not on pensionable terms of employment were registered with the Employees Provident Fund. Commencing from 15 October 1973, the Board’s employees were covered by the Employment Injury Insurance Scheme under the Employees’ Social Security Act 1969. When SALA Act (Act 239, Pension for Statutory Bodies and Local Authorities) was implemented, the Board’s Established Staff who were holding pensionable posts under the Sarawak Pension Ordinance (Cap.89) became pensionable under this Pension Act and all staff who had completed 10 years’ service were emplaced into pensionable status. Those who have yet to complete 10 years’ service including daily paid staff continued to contribute to EPF until such time when they have completed 10 years’ service and eligible for emplacement into pensionable status. In 1976, all staff were absorbed under the Jawatankuasa Khas Kabinet (JKK) scheme of service. On 1.1.1992, a new scheme called Sistem Saraan Baru (SSB) was effective and all staff opted to join it. All staff opted to join the improved version of the SSB or the Sistem Saraan Malysia (SSM) which took effect from 1.11.2002. Under SSB staff could either opt for pensionable scheme after 10 years service or continue to contribute to the Employees Provident Fund (EPF). Under SSM probationary staff who have passed the requirements under their scheme of service can be confirmed in their service from 1 to 3 years and are given the option to either opt for pensionable scheme or continue to contribute to EPF. man Power The actual manpower for the year 2007, 2008 & 2009 are as follows:- FinAnCe AnD ACCOunTS The current water tariff rates was effective since 1 January 1992. Water sales increased by 1.9% during the year to RM81,206,480. The gross revenue increased by 3.1% during the year to RM96,317,782. The gross revenue included RM15,111,302 from other operating income. During the year operating expenditure decreased by 1% to RM85,469,894. Operating and Administrative expenditure were summarised as set out below :- Water Production Distribution & Sell & Selling Administration Other Operating Expenses Finance Cost Taxation RM 37,853,262 35,181,248 13,435,848 1,768,811 92,402 (2,861,677) ---------------85,469,894 In 2009, the Board made an operating profit after tax of RM10,847,788 which was transferred to Reserves. COnSumPTiOn (appendix nos.3, 4, 5 & 10) Professional & managerial Support Group Total Year About 600,000 people in Kuching City and surrounding areas enjoyed the supply of fully treated water. 2007 2008 2009 16 18 19 511 508 541 527 526 560 The average daily consumption rose from 392 megalitres in 2008 to 400 megalitres in 2009 an increase of 2.04%. The maximum day consumption during the year was 443 megalitres Lembaga Air Kuching Kuching Water Board 10 and was completed in 1970. The extension of Module No.1 is designated as Module No. 2. In November 1976, construction work on Module No.3, with a present capacity of 9MgD and comprising of a new treatment plant and raw water intake, was started and commissioned in November 1978. To cope with the ever increasing demand for water, construction work on Module No. 4 commenced in November 1983. An extension of the Module No.3, the maximum capacity of Module No.4 is 12MgD. It was substantively commissioned towards the end of 1986. per day whereas the minimum day consumption was 353 megalitres per day. The total number of services as at end of 2009 was 133,167. PrODuCTiOn (appendix nos. 3, 8 & 15) The Board’s Treatment Plants at Batu Kitang and Matang produced a total of 145,935.188 megalitres of fully treated water in 2009. This represents a 1.93% increase over 2008 treated water production volume. Batu Kitang Waterworks The Batu Kitang Treatment Plant is situated near the bank of Sungai Sarawak Kiri about 40 miles from the sea. Raw water is pumped from the river to the Treatment Plant where it undergoes the conventional treatment process of coagulation, flocculation, sedimentation, filtration, disinfection and pH adjustment. Coagulation is by the alum lime process and disinfection is by chloramines. Fluoridation has been practiced since 1966. The fully treated water is pumped to the various reservoirs and service tanks in Kuching for distribution. Module No.1 of the Treatment Plant with its first raw water intake and a capacity of 3MgD was commissioned in 1957. In 1965 the capacity was increased to 4MgD by changing the pump impellers and the construction of a second stage pumping station and two underground reservoirs at Batu Lintang. Extension work to further increase the plant capacity to 6MgD commenced in October 1968 11 Lembaga Air Kuching Kuching Water Board The construction of Module No.5 Treatment Plant with a capacity of 100MlD including a new raw intake under the Stage 2 Expansion of Kuching Water Supply “Big Leap” Development Project commenced in December 1991 and was substantively completed and commissioned in August 1994. In order to cater for the increasing water demands and to ensure reliable supply up to the completion and commissioning of Module No.5 Plant in 1994, major staged improvement works to Raw Water Intake Nos. 1 and 2 including the laying of an 840mm steel raw water pumping main from Intake No.2 to Module Nos. 3 and 4 were commenced in 1990 and were substantively completed by the end of 1992. The improvement works included installation of new submersible pumpsets, booster pumpsets, back rack screens for debris removal and desludging systems at both intakes and refurbishment of existing Kubota pumpsets at Intake No.2. Other notable improvement works carried out in 1994 included the upgrading of standby power generator set for Module Nos. 3 and 4 and Intake No. 2. Around mid-1996 work commenced on the design and construction for the Batu Kitang Module 6 of 100MlD capacity to meet rapidly increasing water demands of Kuching City and surrounding areas for another 10 years. Construction works on the Module 6 Plant commenced on 24 March 1998 and was practically completed and commissioned in May 2000. The detailed design for the Module 7 Plant 4 was substantively completed in 1998. Earthwork for the Module 7 Plant commenced on 1 December 1997 and was practically completed in September 1998. Due to KWB’s tight financial position, however, the construction of the 100MlD capacity of the Plant had to be deferred to commence early in the 8MP. Construction work for Module 7 Plant actually commenced in June 2002 and was completed and commissioned in 9th August 2006. Construction work for the new Module 8, Plant 4 Water Treatment Plant commenced on 29 August 2009 and is scheduled to be completed on 28 February 2011. Batu Kitang Treatment Plant accounted for 98.60% of the total water production in 2009. matang Waterworks The original waterworks constructed by the Rajah to supply Kuching Town was situated in the Matang Hills some 12 miles from the town. The water was relatively clear and was distributed untreated. Matang Water Sources continued to be an important supply of treated water in particular to areas around Matang, which is being developed at a rapid pace. To ensure that Matang Treatment Plant can adequately sustain the reliability and meet the demands for treated water, upgrading and retrofitting works at the Matang Treatment Plant proper commenced in early January 2001 and works was substantively completed at the end of March 2002. Two other major works also implemented in tandem to ensure continued reliability and sustainability of Matang raw water sources were the renewal of the raw water pipeline from Sungai Cina to Matang Plant which commenced in March 2001 and the raising of the Sungai Sebubut basin catchment which commenced in January 2002 for increased live storage to 520 Ml. These works were substantively completed in July 2003 and April 2003 respectively. Matang Treatment Plant accounted for about 1.4% of the total water production in 2009. This source continued to be in use even after the Batu Kitang Plant was commissioned in 1957. In 1960, chlorination was introduced and the possibility of building a treatment plant in the Hills was investigated. Construction of a 2MgD treatment plant near the Matang Dam was commenced in 1964 and the plant was put into operation in March 1966. Raw water from the mountain streams was piped to the plant where full treatment similar to that at Batu Kitang Plant was carried out before it gravitates into the distribution system. However, production from Matang Treatment Plant was dependent on rainfall and during the dry months output may fall to as low as 10% of its maximum capacity. To improve the reliability of the water supply, work was commenced in December 1973 on the construction of a 60 million gallon earth storage basin at Matang below the Sungai Sebubut catchment. The storage basin was completed in February 1976. With the development of the Kuching North Bank it was decided to extend the Matang Treatment Plant to increase the capacity from 2MgD to 3.5MgD. Extension works which included the construction of a 1.5 million gallon balancing reservoir commenced in January 1976 and was completed in April 1977. The extension was commissioned in July 1977. Lembaga Air Kuching Kuching Water Board 12 QuALiTY COnTrOL (appendix nos. 6 & 7) The execution of the Board’s stringent water surveillance programme augmented by the National Drinking Water Quality Programme ensured that safe and wholesome drinking water supply was maintained throughout the year. During the year, 26,866 water samples from Raw Water Source, Treatment Plant Pumping Mains, Reservoirs & Tanks and Distribution Systems were taken for Physico-chemical and Bacteriological Examination. Out of the total number, 20,573 samples were analysed physico-chemically while the remaining 6,293 samples were examined bacteriologically. A total of 25,108 samples or 93.46% of the total were analysed at the Board’s Water Quality Control Laboratory while the rest of 1,758 samples or 6.54% were sent to the Department of Chemistry for analysis. The breakdown of samples analysed is shown below: Board’s Laboratory Chemistry Department Physico-chemical examination Intakes & Sources 973 Water Treatment Processes 14,763 Treatment Plant P.M. 1,728 Reservoirs & S. Tanks 640 Distribution System 1,587 Special Sample (Sungai Sarawak) 502 Total 20,193 47 84 73 166 10 380 Parameter/Location Bacteriological examination Intakes & Sources Treatment Plant P.M. Reservoirs & S. Tanks Distribution System Special Sample (Sungai Sarawak) 973 1,726 640 1,576 - 192 343 306 527 10 Total 4,915 1,378 mAinTenAnCe, rePAirS AnD imPrOvemenTS mains During the year, 468 repairs were carried out on trunk and distribution mains. 13 Lembaga Air Kuching Kuching Water Board The Board’s emergency service was operated on a 24 hours basis with the number of service calls and minor repairs attended to during the year at 5,199. Regular flushing of dead end mains were carried out during the year and exposed mains and valve boxes were repainted. Pipelines and valves were also inspected regularly. meters Routine checking on water meters were carried out. A total of 239 meters were repaired and 8,269 meters renewed during the year. New Service Connections (Appendix No. 17) The total number of new services connected during the year was 4,888. Of this 3,981 or 81.44% of connections were for domestic consumers and 907 or 18.56 % were for commercial consumers. DeveLOPmenT During the year the Board spent RM33,259,751 on development works and the major water supply projects are briefly given as follows: i. TreATmenT PLAnTS Batu Kitang Module 7 Water Treatment Plant The detailed design for the Module 7 Plant was substantively completed in 1998. Earthworks for the Module 7 Plant commenced on 1 December 1997 and was practically completed in September 1998. Due to KWB’s tight financial position, however, the construction had been deferred to commence early in the 8th Malaysia Plan (2001 – 2005). Construction work for Module 7 Plant actually commenced in June 2002 and was completed and commissioned on 9 August 2006. Batu Kitang Module 8 Water Treatment Plant The construction work for the Module 8 Water Treatment Plant commenced on 29 August 2009 and is scheduled for completion on 28 February 2011. ii. mAJOr PiPeLineS One (1) major pipeline totaling 2.68km was commenced in 2009 as follows:1. Construction work for the proposed 500mm D.I. pipeline along Jalan Astana to Siol Kandis commenced in November 2008 and was completed on 23 October 2009. rurAL WATer SuPPLY Under the 9th Malaysia Plan, the Rural Water Supply Schemes were implemented on turnkey basis through 100% Federal Grant by the Federal Ministry of Rural & Regional Development instead of the previous 80% loan and 20% grant in the previous Malaysia Plan. In 2009, a sum of RM6,888.02 was spent on the laying of minor pipelines to serve rural areas. mAin exTenSiOn (appendix no. 9) A total length of 50.97km of new water mains ranging in size from 100mm to 600mm was laid inhouse during the year. They were all laid by developers to serve housing estates and commercial developments. Appendix 9 gives a comparison of pipe lengths laid (km) against pipe type and size (mm) for 2008. nOn-revenue WATer (appendix no. 16) Active Leakage Control Since 1993, leakage control programmes were implemented with the setting up of Leakage control zones (LCZ) each comprising of 200-2000 consumers. The leakage control zones have to be continuously monitored and its leakage level controlled and maintained at an achievable economic level. As at 31 December 2009, a total of 171 leakage control zones had been set up within the Kuching Water Board Supply Boundary to monitor and control leakage level of the Board’s distribution system. Since the implementation of active leakage control in year 1993, a total of 2,525 numbers of leaks from pipes and services and 871 numbers of water theft had been detected and addressed. NRW Level The Board’s Non-Revenue Water (NRW) level for the year was 32.26% as compared with the national average of about 40% and the nationally accepted satisfactory level of 25%. The Board targets to reduce the NRW level to 25% by the end of 9th Malaysian Plan. The table in Appendix 16 indicates the NRW levels for the year 2000-2009. Approach in Reducing NRW The Board had implemented a total approach towards reducing its NRW by ensuring faster renewal/upgrading of leakage prone and particularly asbestos cement pipelines, prompt detection and prompt repair of all leakages, a continuous replacement of old water meters to minimize meter under-registration, quality design and quality construction of new distribution system and pressure/flow control of the distribution system. Inculcating a culture of reporting leaks and other supply shortcomings both within the Department and from the public such as through the introduction of “Friends of KWB” System is part of the Board’s strategy to help achieve earlier detection and repair of leakages. During the year, a total of 3,629 numbers of leaks from pipes and services and 152 cases of water stealing were repaired/addressed. The Board’s NRW Task Force Committee had in 2000 concluded that most of the NRW was attributed to leakages from the pipeline network system and particularly from the aged asbestos cement pipes. About 40% of the Board’s total pipelines then was of asbestos cement and they contributed to about 70% of all pipeline bursts. A most important way for the Board to reduce NRW is therefore to accelerate the renewal/upgrading of the typically old asbestos cement and some lead jointed cast iron pipes with priority accorded to the worst areas. Lembaga Air Kuching Kuching Water Board 14 Mains Renewal/Upgrading Commencing from year 2000, action was initiated to renew/upgrade the existing aged asbestos cement pipes and other old pipes in a more systematic manner. A total length of 18.94 km of pipelines had been renewed/upgraded in 2009. As at the end of 2009, 37.16% or about 222.98 km of some 600 km of old asbestos cement and cast iron pipes had been renewed/upgraded. TrAininG and Security Section. It was held on 24 -26 April 2009 and 26-28 June 2009 respectively. First Aid Training for the Batu Kitang Treatment Staffs was carried out at the Red Cresent Headquaters, Kuching for two (2) sessions on 18-19 August 2009 and 28-29 October 2009. An e-Procurement training by SAINS was done on 30 July 2009 in two (2) batches. The Security unit personnels started off their ‘Latihan Kawad Kaki’ on 27-28 October 2009. A refresher course for the frontliners was conducted on 31 October 2009. Kuching Water Board is committed to Human Resource Development. For the year 2009, a total sum of RM270,000.00 was allocated for training to cater in house programmes and external courses. A total of 492 officers attended in-house programmes and 216 officers attended external courses both locally and in Semenanjung Malaysia. The Management Team had attended the Health Talk on 26 November 2009 whilst the support group attended Financial Management talk on 30 November 2009. The last In house programme for 2009 was the Safe Handling of Liquid Chlorine briefing for the Batu Kitang Treatment Plant staffs on 10 December 2009. Fifteen (15) in-house programmes was conducted to cater training needs for all levels of staff in Kuching Water Board. Perkins Generator Set Maintenance Training was the first in-house training been conducted. The training was for the Electrical staffs in Batu Kitang Treatment Plant on 20 January 2009. A Productivity Improvements Teams MS ISO 9001:2000 was held in Damai Puri Resort on 7-8 February 2009. A collaboration training between NIOSH and KWB namely Permit To Work And Job Safety Analysis Training was done for the Batu Kitang Treament Plant on 24-25 February 2009. An Internal Induction for the newly recruited staff was carried out on 14 May 2009 and throughout the year, ten (10) staff has attended the induction course organised by the Chief Minister Office. The Security Unit training was held on Enhancing Personal Qualities In Crime Prevention divided into two (2) sessions on 30-31 April 2009 and 1- 4 April 2009 respectively at Harbour View Hotel, Kuching. The Network Modelling joined training with Bentley on Cadastral Mapping Digitalization was conducted on 7-9 April 2009 at the Headquaters of Kuching Water Board. An Awareness Training on The Management System 9001:2008 was held for all Heads of Department and Section included the supervisory level on 16 -17 June 2009 at Riverside Majestic, Kuching. In order to develop the teamwork among staff in Kuching Water Board a Teambuilding programme was held in Permai Rainforest. Administration and Human Resource Department was the first batch followed by Enforcement Section 15 Lembaga Air Kuching Kuching Water Board In year 2009, the Board had also provided industrial training for five (5) students pursuing Degree courses, four (4) students in Chemical Engineering and one (1) student in Mechanical Engineering. Ten (10) students pursuing Diploma courses whereby two (2) students from Mechanical Engineering and two (2) Civil Engineering students. Six (6) Office Management students were attached to Administration Section. As for students pursuing their certificate courses, there were nine (9) students, four (4) students in Sanitation Piping and Water Recticulation, four (4) students in ‘Teknologi Bekalan Air dan Pembentungan’ and one (1) student in Electrical Engineering. The students and trainers had gained valuable exposure and hands-on experience during their vacation training periods in Kuching Water Board. iSO 9001:2008 CerTiFiCATiOn PrOGrAmme For the year 2009, ISO 9001:2008 Quality Management System was upgraded to ISO 9001:2008. The Internal Quality Audit for 2009 was conducted from 13 -15 October 2009. External Re-Audit was conducted by the auditor M/s Moody International on 9 -10 November 2009. The ISO 9001:2008 Certification was granted on 16 December 2009, three (3) years to expire on 15 December 2012. viSiTOrS A total of 814 visitors comprising of Waterworks Engineers, Consultants, Students and Teachers, Health Inspectors and Tutors, Overseas Specialists and VIPs visited the Batu Kitang and Matang Treatment Plants during 2009 compared with 512 in 2008. COnCLuSiOn The year under review saw steady growth of the Board. Average daily consumption rose by 2.3% over that of the previous year. The capital works carried out during the year may be summarized as follows:(a) The completion of 2.68km of trunk main (b) The laying of 50.97km of mains in-house including through developers and the renewal of 18.90km of mains. (c) The connection of 4,888 new services. Progress since the Board’s inception in 1959 are as follows:-Area of supply was increased from 44.8km² (17.3 sq. miles) to 730km² (282 sq. miles). (a) Area of supply was increased from 44.8km² (17.3 sq. miles) to 730km² (282 sq. miles). (g) The average daily consumption has risen from 9.9 megalitres to 400 megalitres. (h) The cumulative capital development expenditure up to the end of 2009 was RM778,723,671. (i) The annual water sales revenue had increased from RM0.782 million in 1959 to RM81.206 million in 2009. (j) The cumulative capital development expenditure spent up to the end of 2009 was RM811,983,422. (b) The capacity of the Batu Kitang Treatment Plant was increased from 14MID (3MgD) to 464MID (102MgD). (c) A Weir across Sg. Sarawak Kiri was constructed to increase source reliability at Batu Kitang. (d) Storages with a total capacity of 164.5MI (35MgD) was constructed. (e) The number of services has risen from 4,472 to 133,167. (f) The annual water sales revenue had increased from RM0.782 million in 1959 to RM79.66 million in 2008. Lembaga Air Kuching Kuching Water Board 16 Kuching Water Board 50th Anniversary Dinner on 16th July 2009 17 Lembaga Air Kuching Kuching Water Board Lembaga Air Kuching Kuching Water Board 18 Membership Drive Campaign by The Malaysian Water Association on 9th April 2009 Award Presentation to Retirees during Full Board Meeting on 9th December 2009 Prize Giving Ceremony in conjunction with Essay Writing Competition at Kolej Datuk Patinggi Abang Haji Abdillah on 18th April 2009 ion cum Tran 8 Re-Certificat ISO 9001:200 09 November 20 2009 on 9-10 sition Audit ISO9001:2000 In-House Worksyop Development for Productivity Improvement Team at Damai Puri Resort & Spa on 7-8 February 2009 19 Lembaga Air Kuching Kuching Water Board Hi-Tea in conjunction with KWB 50th Anniversary Celebration Majlis Sambutan Israk & Mikraj on 1st August 2009 World Water Day at Batu Kitang Treatment Plant on 18th April 2009. Lembaga Air Kuching Kuching Water Board 20 Performance Indicators 2009 I Physical Performance Indicator Average 2008 1 Annual Treatment Plant Reserve Margin (%) Total Plant Capacity-Actual Production x 100 Total Plant Capacity 18.29 16.70 2 Network Density = Total km of Pipeline Total Sq.km Area 2.88 2.94 3 Population/km of pipeline = Total Population Total km of Pipeline 305.5 325.2 II Service Performance Indicator 1 2 3 4 5 6 7 No. of connections per employee No. of connections per meter reader Length of pipeline (km) per employee Total output of treated water (Ml) per employee No. of pipeline breakages per km No of complaints received per 1000 connections Actual No. of meters replaced/ Expected No. of meters to be replaced % of Non-Revenue Water Actual consumption (cu.m) per capita -overall % of no. treated water NTU > 5.0 violation % of no. of treated water bacteria/E-coli violation % of no. treated water true color > 5.0 violation 8 9 10 11 12 III Financial Performance Indicator 2008 2009 220.19 3,020.55 3.65 20.66 0.021 25.09 0.66 227.28 3,137.33 3.75 21.1 0.023 24.55 1.6 33.72 11.9 0.16% 1.14% 0.00% 32.26 11.52 0.68% 0.68% 0.43% 2008 1 (I) Average O & M cost increase, % (ii) Average increase in water production cost, % 2009 11.72 15.89 (1.01) 2.57 2 Unit Production Cost (sen) 0.60 0.59 3 0.92 0.89 0.85 0.84 1.08 1.05 1.12 1.18 0.71 0.74 1.00 1.03 75 56 4 5 6 7 8 9 = Total O & M cost Total cu.m water produced Average Cost of Water Sold (sen) = Total O & M cost Total cu.m water sold Average tariff (sen) = Total Revenue Total cu.m water sold Operating ratio = Total O & M Cost Total Revenue (exclude interest) Ratio of Total Domestic Consumption Total Industrial Consumption Ratio of Total Revenue of Domestic Consumption Total Revenue of Industrial Consumption Collection Efficiency = Total Annual Collection Total Annual Billing Average Collection = Total Debt x 365 days (Period of Debts (days) Total Billed Notes: Average O & M Cost = Average Annual Expenditure Total O & M Cost = Total Expenditure Total Revenue = Total Water Sales Only Domestic = Domestic + Standpipe Only Industrial = Domestic/Commercial, Commercial, Special Commercial, & Ship Supply NRW Target for Year 2010= 30% 21 Average 2009 Lembaga Air Kuching Kuching Water Board Financial Performance Five YeArS TrenD 2006 2006 2007 2008 2009 Water Sales (RM'000) 64,952 70,353 76,706 79,664 81,206 Total Revenue (RM'000) 75,646 82,937 89,511 93,466 96,318 Operating Expenditure (RM'000) 64,507 72,220 77,285 86,346 85,470 Net Profit (RM'000) 11,138 10,717 12,226 7,120 10,848 Total Net Assets (RM'000) 595,245 632734 421,602 439,676 457,866 Long Term Loan (RM'000) 204,078 221,046 209,824 210,228 199,754 14.7% 12.9% 13.7% 7.6% 11.3% 2.4 3.3 3.7 3.2 3.6 1.9% 1.7% 2.9% 1.6% 2.4% 2.5 2.4 0.5 0.5 0.4 Performance ratio Net Profit Ratio Current Ratio Return on Total Net Assets Long Term Debt to Equity (Reserves) Lembaga Air Kuching Kuching Water Board 22 Financial Statements Penyata Pengerusi dan Seorang Ahli Lembaga Pengarah 23 Lembaga Air Kuching Kuching Water Board Financial Statements Pengakuan oleh Pegawai Utama Yang Bertanggung Jawab Ke Atas Pengurusan Kewangan Lembaga Air Kuching Lembaga Air Kuching Kuching Water Board 24 Financial Statements 25 Lembaga Air Kuching Kuching Water Board Balance Sheet as at 31 December 2009 Lembaga Air Kuching Kuching Water Board 26 Income Statement for the year ended 31 December 2009 27 Lembaga Air Kuching Kuching Water Board Statement of Changes in Equity for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 28 Cash Flow Statement for the year ended 31 December 2009 29 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 30 Notes to the Financial Statements for the year ended 31 December 2009 31 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 32 Notes to the Financial Statements for the year ended 31 December 2009 33 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 34 Notes to the Financial Statements for the year ended 31 December 2009 35 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 36 Notes to the Financial Statements for the year ended 31 December 2009 37 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 38 Notes to the Financial Statements for the year ended 31 December 2009 39 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 40 Notes to the Financial Statements for the year ended 31 December 2009 41 Lembaga Air Kuching Kuching Water Board Notes to the Financial Statements for the year ended 31 December 2009 Lembaga Air Kuching Kuching Water Board 42 APPENDICES APPENDICES 43 Appendix Description 1 Carta Organisasi Lembaga Air Kuching 2 Senior Staff List for 2009 3 Water Production & Gross Consumption – 2009 4 Water Consumption Analysis – 2009 5 Consumers’ Normal Monthly Consumption – 2009 6 Kuching Water Board Raw Water Quality – Extracted from the Report of Chemistry Department for the Year 2009 7 Kuching Water Board Treated Water Quality – Extracted from the Report of Chemistry Department for the Year 2009 8 Treatment Plants and Pumping Stations 2009 9 Comparison Pipe Lengths Laid (Km) Against Pipe Type and Size (mm) for 2009 10 Metered Water Consumption – 2009 11 Profitability Trend 2000 - 2009 12 Annual Water Sales 2000 – 2009 13 Revenue and Expenditure 2000 – 2009 14 Analysis of Consumers Connections, Consumption and Revenue for 2009 15 Daily Water Production 2000 – 2009 16 Percentage of NRW for Years 2000 – 2009 17 KWB New Water Connections 2000 – 2009 18 KWB Mains Laid 2000 – 2009 19 KWB Mains Renewed 2000 – 2009 20 Scale of Water Charges 21 Statutory Boundary of Kuching Water Board Lembaga Air Kuching Kuching Water Board APPENDIX 1 Lembaga Air Kuching Kuching Water Board 44 SENIor oFFICErS StAFF LISt For 2009 APPENDIX 2 GenerAL mAnAGer - MOHAMMAD ARIS YUSOP B.Eng. (Mechanical) DePuTY GenerAL mAnAGer (PDP) - PAUL CHAN PHOO THIEN, PPB B.Sc.(Hons.)(Civil Eng.),P.Eng.,M.I.E.M., MBA DePuTY GenerAL mAnAGer (D) - MOSES A. JOSEPH, ABK B.Sc.(Civil Eng.) P.Eng., M.I.E.M., SeCreTArY - CHieF ACCOunTAnT - SeniOr CHemiST - VESMAWATI BTE. JAFFAR, ADIA, DIA (resigned on 1.7.2009) SU YU JIT, PPB B.COM. MBA (Public Sector Management), Diploma Management,NZ.,C.A.(M),C.A.T(N.Z.),FTH(M),M.N.ZI.M. WONG SOON SING, PPB B.Sc(Hons)(Chemistry), A.M.I.C., MBA exeCuTive enGineer - TEO SEO LIN, PPB B.Eng(MONASH), P.Eng.M.I.E.M., M.I.E.AUST. MBA - IGNATIUS CHANG YI LEE B.Eng(Hons)(MONASH),B.Sc.(Maths/Stats),P.Eng.M.I.E.M. MBA - ROZITA BT. MOHD. IBRAHIM, B.Eng.(Hons.), Dip.Civil, Eng., UTM - ISMAIL BIN ALI, B.Eng.(Civil) UTM - SAMHARIS BIN AHMAD OSMAN, B.Eng.(Civil, UTM) - WAHAB HJ. LIAS, B.Eng (Civil) UTM, Dip. Eng. (Civil) - YII MING ANG, B.Eng. (Electrical) (On Contract) - FRIDDY BIN SONONG, B. Eng. (Civil) UTM, Dip. Eng. (Civil) ACCOunTAnT - ANNA RICHARD, B.Accountancy, C.A.(M) ASSiSTAnT SeCreTArY - AGATHA AHAM SUNI, MBA, BPA (Hons), DPA ADminiSTrATive OFFiCer (COnTrACT) - CHemiST - FATMAH'TUL HIDAYAH BT AHMAD ZAINI, B.Sc.(Gen. Mgt) MBA( Public Sector Mgt), Diploma Mgt, NZ RAHAYU BT AHMAD BOHARI, B.Sc (Hons.) (Resource Chemistry) AMI ADminiSTrATive OFFiCer (COnTrACT) - DYG. NUR HAIDA BTE. ABG. SAUDI, DBS, HRD (wef. 2.3.2009) ADminiSTrATive OFFiCer (COnTrACT) - RATNA DEWI BT. MOHAMAD, HRD (wef. 6.4.2009) 45 Lembaga Air Kuching Kuching Water Board SeniOr TeCHniCAL ASSiSTAnT - RAYMOND LEE MOH LIM, PPT (on contract w.e.f. 3.6.2004) - ROGER AK HOWELL, B.Eng (Civil)UTM, Dip.Eng. (Civil) - PATRICK KUEH TECK HENG, PPT Dip. Mech. & Marine Eng - GEPAIRI BIN JOL, Dip. Land Surveying - THEN YEN LING, Dip. Civil Eng. - YEO SIE JUAY, Dip. Mechanical Eng. SeniOr PrOGrAmmer - YEE WUI MEN, PPT (retired on 16.8.2009) (on contract w.e.f 1.9.2009) SeniOr ASST. ACCOunTAnT - HAJJAH SAPTUYAH ZAMAHARI, PPT, Dip.Accountancy SeniOr exeCuTive OFFiCer - JOSEPHINE NAGAI, B.Sc(HRD), Dip. in Stenography PrOGrAmmer - LAI CHOON NGA, B. Business - HAYATI BINTI MORSHIDI, BBA (Finance)Dip. Comp. Science - CHUNG NGEE KWONG, PPT TeCHniCAL ASSiSTAnT (CiviL) - HOSSEN BIN SONDONG, PPT TeCHniCAL ASSiSTAnT (eLeCTriC) - MARIA BT CAREONO, Dip. Electrical Eng. TeCHniCAL ASSiSTAnT (meTer) - HO TUNG HIN, PPT CHieF STOre OFFiCer - NANCY HJ. HOSSEN, PPT, BBA (Marketing), Dip.B.Studies, ASSiSTAnT STOre OFFiCer - MOHAMAD RAHIM BIN SUHAILI, Dip. P.A. exeCuTive OFFiCer - RAYMOND CHONG ASSiSTAnT CHemiST - JEFFREY ONG TIONG HEE, PPT ASSiSTAnT ACCOunTAnT - RONNIE AK DICKIE, Dip. Accountancy SeniOr enFOrCemenT OFFiCer - PAUL TAMPUNG AK MUMIN, MBA, B.A. Business Admin. (Hons), Dip. P.A. enFOrCemenT OFFiCer - EDMUND ANAK AMBAU, B.B.A. Dip. P.A. Lembaga Air Kuching Kuching Water Board 46 APPENDIX 3 WATer PrODuCTiOn & GrOSS COnSumPTiOn - 2009 (in meGALiTreS) YEAR 2009 Modules 1&2 WATer PrODuCTiOn Batu Kitang Plant Modules Modules Module 7 3&4 5&6 Matang Plant GrOSS COnSumPTiOn Total Average Daily Minimum Daily Maximum Daily January 1,477.29 2,062.61 5,367.58 2,909.88 205.972 12,023.33 387.94 364.49 407.865 February 1,370.93 1,750.21 5,016.73 2,671.04 198.85 11,007.77 393.314 364.57 412.695 March 1,512.32 1,875.19 5,675.87 2,836.36 213.669 1 2,113.41 390.472 375.531 403.706 April 1,436.41 1,944.14 5,150.65 2,911.31 197.548 11,640.06 388.493 368.972 404.627 May 1,368.13 2,050.31 5,823.15 2,971.32 184.059 12,396.97 399.678 378.943 426.973 June 1,410.35 1,986.90 5,501.47 2,808.23 160.032 11,866.99 395.931 369.485 417.5 July 1,226.60 2,053.13 5,870.94 3,302.02 157.447 12,610.14 406.95 389.226 443.302 August 1,462.66 2,053.13 5,833.69 3,023.30 131.094 12,503.87 403.413 365.162 418.874 September 1,427.61 1,986.90 5,697.45 2,830.90 109.432 12,052.29 402.181 353.248 421.32 October 1,487.47 2,053.13 6,019.75 3,075.80 116.649 12,752.80 411.469 393.658 437.878 November 1,388.36 1,986.90 5,693.64 3,014.19 171.748 12,254.84 407.946 395.666 427.191 December 1,380.91 2,053.13 5,890.69 3,188.16 199.841 12,712.72 409.797 388.618 432.528 Total: 16,949.06 23,855.68 67,541.59 35,542.52 2,046.34 145,935.19 4,797.58 4,507.57 5,054.46 Total metered consumption: 98822.6 megalitres Non-Revenue Water: 32.26% * Max. Daily Consumption: 443.302 megalitres *+ Min. Daily Consumption: 353.248 megalitres APPENDIX 4 WATer COnSumPTiOn AnALYSiS 2009 (in meGALiTreS) APPENDIX 5 COnSumerS' nOrmAL mOnTHLY COnSumPTiOn - 2009 47 Lembaga Air Kuching Kuching Water Board APPENDIX 6 KuCHinG WATer BOArD rAW WATer QuALiTY extracted from the report of Chemistry Department For the Year 2009 raw Water Location Parameter Batu Kitang intakes Sungai Cina matang Dam Sebubut Basin 12 11 12 12 5.5 - 9.0 300 1000 6.9 85 50 6.9 12 1.0 6.3 4 1.4 6.1 32 4.9 1500 10 6 1.5 10 1.0 500 1.5 250 1.0 0.2 33 7 <2 <0.1 0.5 <0.5 29 <0.1 <1 0.58 0.05 13 <6 <2 <0.1 <0.5 <0.5 5 <0.1 2 0.05 <0.01 <10 <6 <2 <0.1 <0.5 <0.5 3 <0.1 1 0.55 0.06 <10 7 <2 <0.1 <0.5 <0.5 3 <0.1 1 0.57 0.05 0.05 0.001 0.005 0.1 0.05 0.05 1.0 1.5 150 200 0.01 400 <0.001 <0.001 <0.0002 <0.001 0.001 <0.002 0.010 <0.002 0.93 2 <0.001 <5 <0.001 <0.001 <0.0002 <0.001 <0.001 <0.002 0.002 <0.002 0.44 2 <0.001 <5 <0.001 <0.001 <0.0002 <0.001 <0.001 <0.002 0.026 0.004 0.36 1 <0.001 <5 <0.001 <0.001 <0.0002 <0.001 <0.001 <0.002 0.006 0.017 0.33 <1 <0.001 <5 <0.050 <0.030 <0.040 <0.040 <0.005 <0.005 <0.040 <0.050 <0.040 <0.040 <0.040 <0.090 <0.005 <0.005 <0.050 <0.100 <0.040 <0.050 <0.050 <0.050 <0.030 <0.040 <0.040 <0.005 <0.005 <0.040 <0.050 <0.040 <0.040 <0.040 <0.090 <0.005 <0.005 <0.050 <0.100 <0.040 <0.050 <0.050 <0.050 <0.030 <0.040 <0.040 <0.005 <0.005 <0.040 <0.050 <0.040 <0.040 <0.040 <0.090 <0.005 <0.005 <0.050 <0.100 <0.040 <0.050 <0.050 <0.050 <0.030 <0.040 <0.040 <0.005 <0.005 <0.040 <0.050 <0.040 <0.040 <0.040 <0.090 <0.005 <0.005 <0.050 <0.100 <0.040 <0.050 <0.050 recommended Criteria no. of Samples Analysed Group i Parameter pH (H+) Color (Hazen) Turbidity (NTU) Group ii Parameter (unit in ppm) TDS at 105o- 110oC Chemical Oxygen Demand COD Biochem. Oxygen Demand BOD Ammonia (N) Nitrate (N) Detergent (MBAS) Total Hardness (CaCO3) Fluoride (F) Chloride (Cl) Iron (Fe) Manganese (Mn) Group iii Parameter (unit in ppm) Arsenic (As) Mercury (Hg) Cadmium (Cd) Lead (Pb) Chromium (Cr) Silver (Ag) Copper (Cu) Zinc (Zn) Magnesium (Mg) Sodium (Na) Selenium (Se) Sulphate (SO4 ) Group iv Parameter (unit in ppb) Alpha-BHC Beta-BHC Gamma-BHC Delta-BHC Heptachlor Heptac-Epo Alpha-Endo Beta-Endo Endos-SO4 4,4-DDE 4,4-DDD 4,4'-DDT Aldrin Dieldrin Endrin Metaoxychlor Endrin-Ald Alph-Chlo Gamma-Chlo 2 0.03 0.03 2 0.03 0.03 20 0.2 0.2 Lembaga Air Kuching Kuching Water Board 48 APPENDIX 7 KuCHinG WATer BOArD TreATeD WATer QuALiTY extracted from the report of Chemistry Department For the Year 2009 raw Water Batu Kitang Location national Guidelines for Drinking Water Quality Parameter C Coliform Organism Plant 1 Plant 2 Plant 3 Plant 4 matang Plant m1&2 m3 m4 m5 m6 m7 0* 0* 0* 0* 0* 0* 0* 0* 0* 0* 0* 0* 0* 0* - - - - - - - MPN / Membrance Filteration Method : - Must not be detected in any 100 ml sample Membrance Filteration Method : E. Coli - Absent in 100 ml sample Membrance Filteration Method : Taste and Odour - Group i Parameter Re. Chlorine (Re) 1.9 1.8 1.9 1.4 1.7 2.0 1.7 6.5 - 9.0 8.4 8.3 8.0 8.1 8.0 7.9 7.8 Color (Hazen) 15 <10 <10 <10 <10 <10 <10 <10 Turbidity (NTU) 5 3.4 2.7 2 1.8 1.5 3.9 0.6 1000 51 59 59 56 53 55 25 Ammonia (N) 1.5 <0.1 <0.1 <0.1 <0.1 0.1 0.2 0.3 Nitrate (N) 10 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 pH (H+) Not less than 1.00 Group ii Parameter (unit in ppm) TDS at 105 - 110 C Total Hardness (CaCO3) 500 52 57 58 55 52 52 12 Fluoride (F) 0.4 - 0.6 0.1 0.23 <0.1 0.32 <0.1 0.24 0.49 Chloride (Cl) 250 6 8 9 3 3 3 3 Iron (Fe) 0.3 0.16 0.12 0.10 0.11 0.11 0.12 0.05 Manganese (Mn) 0.1 0.02 0.03 0.03 0.02 0.02 0.01 0.01 Aluminium (Al) 0.2 0.44 0.22 0.12 0.22 0.17 0.30 0.13 Arsenic (As) 0.01 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Mercury (Hg) 0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Cadmium (Cd) 0.003 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 Group iii Parameter (unit in ppm) Lead (Pb) 0.01 <0.001 <0.001 <0.001 <0.001 <0.001 0.002 <0.001 Chromium (Cr) 0.05 0.001 0.001 0.001 <0.001 0.001 0.001 <0.001 Silver (Ag) 0.05 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 Copper (Cu) 1.0 0.003 0.005 0.004 0.007 <0.001 0.012 0.005 3 <0.002 <0.002 <0.002 <0.002 <0.002 0.003 <0.002 150 1.16 1.15 1.26 1.19 1.18 1.16 0.45 Zinc (Zn) Magnesium (Mg) Sodium (Na) 200 2 2 2 2 2 Selenium (Se) 0.01 <0.001 <0.001 <0.001 <0.001 <0.001 2 Sulphate (SO4) 250 18 18 18 24 21 19 5 Choloform (CHCl3) 0.2 0.044 0.043 0.047 0.022 0.007 0.013 0.004 <0.001 <0.001 Bromoform (CHBr3) 0.1 0.002 <0.003 0.003 <0.003 <0.003 <0.003 <0.003 Dibromochloromethane (CHClBr2) 0.1 <0.001 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Bromodichloromethane (CHCl2Br) 0.06 <0.001 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Note : * number of violation 49 Lembaga Air Kuching Kuching Water Board APPENDIX 8 TreATmenT PLAnTS AnD PumPinG STATiOnS 2009 item Particulars 1 Total Production, ML 2 Production cost per 1,000 Litres (in cents) 3 Plant Operation Daily Hours 4 Chemical Consumption (Kgs) Aluminium Sulphate Hydrated Lime Liquid Chlorine [Post] Liquid Chlorine [Intm] Anhydrous ammonia Sodium Silicofluoride Sodium Silicate Sodium Bicarbonate Polymer Coagulant Polymer Flocculant : Average : Minimum : Maximum raw Water 16,949.06 23,855.68 67,541.59 35,542.52 2,046.34 145,935.19 19.262 21.363 18.819 16.802 43.585 19.14 23:59 23:39 24:00 23:58 23:39 24:00 24:00 23:43 24:00 21:58 23:41 24:00 23:54 21:06 24:00 658,876.45 224,985.91 72,636.08 0.00 8,667.25 4,328.00 88.49 932.28 917,450.42 529,139.59 214,491.90 0.00 20,175.03 2,842.00 8,787.60 1,841.35 2,757,588.17 1,052,458.14 196,980.45 0.00 17,409.72 28,900.00 16,872 1,470.21 1,384,443.99 607,694.80 136,762.30 0.00 33,199.18 21,605.50 14,260.51 2,559.36 33,638.41 39,273.30 9,386.29 0.00 3,362.51 3,040.13 4,872.20 1,279.69 - 5,751,997.44 2,453,551.74 630,257.02 0.00 82,813.69 60,715.63 4,872.20 1,279.69 40,008.90 6,803.20 6,681,497 28,260,964 10,473,220.00 482,774 50,862,911 - Electricty Consumption (KWH) 4,964,456.00 6 Pumping Hours (a) Treated Water Pumps No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 (b) Raw Water Pumps No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 (c) Lowlift Pumps (Raw Water) No.1 No.2 Hours Mins Hours 2,685 3,637 442 1,230 6,467 - 55 35 40 43 38 - 3,871 4,966 2,743 5,884 - 3,128 5,590 - 20 55 - 5,519 6,010 5,541 - 1 0 7 Plant Operating Hours 8 Water Filter Backwashing 9 Maximum Daily Output Megalitres Mininum Daily Output Megalitres 10 Nos. of Pipe Burst 400mm dia. DI (R/W Sg. Cina) 375mm dia. CIMatang Main 11 SESCo Power Failure Trip No. of Visitors 13 Total Rainfall (mm) remarks modules 3 & 4 5 12 matang Plant modules 1 & 2 modules 5 & 6 Mins module 7 - Hours Mins Hours Mins 8,304 6,375 862 7,737 6,384 6,514 6,396 5,802 45 45 5 35 38 18 18 25 4,612 6,051 5,753 5,814 2,413 - 13 44 33 45 33 - - 7,477 4,817 5,853 5,194 6,426 6,154 6,438 5,459 33 27 15 20 30 38 28 45 5,852 5,670 5,944 - 43 42 52 - 1 0 - - - - 7,558 50 7,821 58.592 276.103 55.261 13.04.09 11.438 03.09.09 72.150 27.03.09 41.400 23.02.09 213.941 08.07.09 142.255 21.09.09 132.952 06.12.09 82.000 10.08.09 11.208 07.02.09 1.755 28.03.09 - - - - - 14 14 12 14 22 - - 57 8,539 18 8,446 30 69.84 647.6 0 243.065 814 66,587.5 2,719.0 Matang Dam Lembaga Air Kuching Kuching Water Board 50 APPENDIX 9 COmPAriSOn OF PiPe LenGTHS LAiD (Km) AGAinST PiPe TYPe AnD SiZe (mm) FOr 2009 Types of Pipes 100mm-150mm (in km) 200mm-400mm (in km) 450mm-600mm (in km) 700mm-1000mm (in km) >1000mm (in km) Mains Laid by KWB A.C. - - D.I. 23.15 18.36 HDPE 6.95 2.51 Steel - - Subtotal 30.10 - 20.87 - - - - - - - - Mains Laid through Consultants D.I. - - - - - HDPE - - - - - Steel - - - - Subtotal - - - - Total 30.10 20.87 APPENDIX 10 meTereD WATer COnSumPTiOn 2009 Month 51 Lembaga Air Kuching Kuching Water Board APPENDIX 11 PrOFiTABiLiTY TrenD 2000 - 2009 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Year Year APPENDIX 12 AnnuAL WATer SALeS 2000 - 2009 Water Sales ( RM millions ) 79,663,657.00 82 80 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 81,206,480.00 76,706,165.00 70,353,113.00 64,951,807.00 63,032,606.00 59,019,225.00 56,340,667.00 52,225,820.00 47,689,640.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Year Lembaga Air Kuching Kuching Water Board 52 APPENDIX 13 revenue AnD exPenDiTure 2000 - 2009 100 90 80 70 60 50 40 30 20 10 0 APPENDIX 14 AnALYSiS OF COnSumerS COnneCTiOnS, COnSumPTiOn AnD revenue in 2009 100 90 80 70 60 50 40 30 20 10 0 53 Lembaga Air Kuching Kuching Water Board APPENDIX 15 DAiLY WATer PrODuCTiOn (2000-2009) Year Year APPENDIX 16 % OF nrW FOr YeArS 2000 - 2009 Year Lembaga Air Kuching Kuching Water Board 54 APPENDIX 17 80 KWB new Service Connections 2000-2009 70 60 50 40 30 20 10 0 Year APPENDIX 18 KWB mAinS LAiD 2000-2009 Year APPENDIX 19 KWB mAinS reneWeD 2000 - 2009 18.94 2000 2001 2002 2003 2004 Year 55 Lembaga Air Kuching Kuching Water Board 2005 2006 2007 2008 2009 APPENDIX 20 SCALe OF WATer CHArGeS Effective From 1st January 1992 Domestic rate Per 1,000 litre Minimum Charge in any one month RM4.40 1,000 to 15,000 litres in any one month RM0.48 In excess of 15,000 litres but not exceeding 50,000 litres in any one month RM0.72 The excess over 50,000 litres in any one month RM0.76 Domestic/Commercial rate Minimum Charge in any one month RM18.70 1,000 to 25,000 litres in any one month RM0.83 The excess over 25,000 litres in any one month RM0.95 Commercial rate Minimum Charge in any one month RM22.00 1,000 to 25,000 litres in any one month RM0.97 The excess over 25,000 litres in any one month RM1.06 Special Commercial Rate for Water Processed for Sale Minimun Charge in any one month RM27.50 1,000 to 25,000 litres in any one month RM1.21 The excess over 25,000 litres in any one month RM1.33 Public Standpipes RM0.43 Water Collected at Depot (Customer’s Transport) RM0.43 Water to Ships RM1.70 meter rents Per month or Part of a month 15mm RM0.55 20mm RM1.65 25mm RM2.20 Lembaga Air Kuching Kuching Water Board 56 APPENDIX 21 57 Lembaga Air Kuching Kuching Water Board