Hitachi Energy Solution
Transcription
Hitachi Energy Solution
ESCO Capacity Building Seminar Hitachi Energy Solution Dec 18th 2008 Hitachi , Ltd. Energy Solution Div. Kenichi Kuwabara, Department Manager Content Industrial Sector 1. ESCO Example in Thailand 2. ESCO Example in Philippine 3. ESCO Example in Singapore Commercial Sector 4. ESCO Example for Shopping Center 5. ESCO Example for City Government Office 1 1-1. Overview of customer Country : Thailand Production : Hard Disk Drive Established : Feb , 1997 Production : Dec , 1997 2 1-2. Example in Thailand (Before ESCO) Focus-1 OIL (30℃) Cooling Tower UDI water (50℃) HX CD Through flow Boilers CD HX H Steam Header Cleaning machines D S H Low temp high temp S P Dry air Compressor Waste Energy Air compressor H S Laundry ( Drying Machine ) D S : Steam D : Drain H : Hot water CD : Cooling water 3 1-3. Example in Thailand (After ESCO) Energy recovery from hot air of Air Compressor 4 1-4. Project Schedule - ESCO in Thailand No ITEM 1 Energy recovery for ZR300 After cooler -Order Delivery -Installation -Test & Commissioning 2006 September October November December 2007 J anuary February Comp #4 Shutdown 20days ,Comp #9 Shutdown 20days Total : 40days 2 Hot water Piping work -Design -Material Order -Installation -Test & Commissioning 3 DI water -Modification DI Pipe UDI Water Shutdown 12hr/each location Date to be discussion Test run Feb-Mar. ESCO Service started in April 2007 5 1-5. Project Overview - Thailand Case Implement of heat recovery system for existing air Compressors Global remote monitoring system ESCO Project Opening Ceremony : Apr/03 6 1-6. Effect of ESCO and Recognitions ESCO realizes 11% of the energy saving Advantage : Energy saving, Cost saving, and CO2 emission reduction May 13, 2008, the PEZA Outstanding Environmental Performer Award, granted by Executive Secretary Eduardo Ermita and Atty. Gen. Lilia de Lima ESCO reduces 750 t-CO2 / year Advantage : Energy saving, Cost saving, and CO2 emission reduction Jul 30, 2008, Thailand Energy Award granted by Lieutenant-General Poonpirom Liptapanlop, Minister of Energy, Thailand 7 Content Industrial Sector 1. ESCO Example in Thailand 2. ESCO Example in Philippine 3. ESCO Example in Singapore Commercial Sector 4. ESCO Example for Shopping Center 5. ESCO Example for City Government Office 8 2-1. Overview of customer Country : Philippine Production : Magnetic recording head Established : April , 1996 Energy Consumption Amount : Electricity 24,000 MWh : Oil 190,000 kL 9 2-2. ESCO Approach - Philippines Case ESCO Phase-1 : Feb. 2005 - Apr. 2006 Energy recovery from hot exhaust gas of power generators (Step-1) Replace aged turbo chillers with new high efficient chillers (Step-1) Energy recovery from hot water of power generators ESCO Phase-2 : Sep. 2006 - May 2007 Energy recovery from hot exhaust gas of power generators (Step-2) Replace aged turbo chillers with new high efficient chillers (Step-2) Install closed chilled water system 10 2-3. Power Generation Facilities(Before ESCO) Focus-1 NO.1 ・・・ Generator (1500kW) Exhaust gas (285deg.C) Diesel engines Power network silencer Cooling tower Heat-exchanger DeNOx Focus-2 Fuel Fuel NO.2 Focus-3 Turbo chiller 200RT 12℃ Generator (1500kW) Heat-exchanger Turbo chiller 200RT Focus-2 7℃ Hitachi Turbo chiller 380RT #5 ~ 7℃ Turbo chiller 200RT 12℃ Four aged chillers 7℃ Cooling tower 12℃ Turbo chiller 300RT Diesel engines NO.8 Diesel engine 12℃ Hitachi Turbo chiller 7℃ 380RT #7 12℃ 7℃ 12℃ Hitachi Turbo chiller 7℃ 380RT #8 Hitachi Turbo chiller 380RT #6 Hitachi Turbo chiller 380RT #9 12℃ 7℃ 12℃ 7℃ 11 2-4. Final Configuration(After ESCO) :Scope of ESCO(Phase2) Exhaust gas NO.1, NO.2 silencer Action-4 DeNOx Diesel engines Exhaust heat steam boiler < Phase1 > Back-up Carrier chiller 200RT < Phase1 > Through flow boiler Steam Exhaust gas NO.3, NO.4 silencer Back-up Carrier chiller 200RT Exhaust heat steam boiler DeNOx Diesel engines < Phase2> water supply Steam Back-up 85℃ Carrier chiller 200RT NO.5,NO.6 Diesel engine 80℃ NO.7,NO.8 Diesel engine Steam Absorption chiller < 450RT Phase1> Hot water absorption chiller < Phase1 > 350RT 12℃ 7℃ 12℃ 7℃ Action-4 < Phase1 > 12℃ High efficiency Turbo chiller 450RT Tube cleaning system 7℃ < Phase2> High efficiency 12℃ Turbo chiller 450RT 7℃ < Phase2> High efficiency Turbo chiller 450RT 12℃ 7℃ Tube cleaning system < Phase2> Hitachi Turbo chiller 380RT #7 12℃ 7℃ Hitachi Turbo chiller 380RT #8 12℃ 7℃ Hitachi Turbo chiller 380RT #9 12℃ 7℃ < Phase2> Action-5 12 2-5. Project Schedule - ESCO Phase 1 in Philippines 2005 2 3 ESCO Monitoring Design and Piping Exhaust heat steam boiler Hot water recovery Aged Turbo chiller Removal Steam absorption chiller Hot water absorption chiller Turbo chiller Estimation 4 5 6 7 8 9 2006 10 11 12 1 2 Design Set up CP 3 4 Monitor Check energy consumption Common Pipe Design exhaust and absorption chiller Hot water recovery pipe Installation Installation Installation 13 2-6. Project Schedule - ESCO Phase 2 in Philippines 2006 9 ESCO Exhaust piping modificatio n Exhaust heat steam boiler Turbo chiller Removal Turbo chiller HCF500GX #2 Turbo chiller HCF500GX #3 Tube c leaning system Chilled water system Estimation 10 11 12 CP 200 71 2 Design Set up 3 4 5 Monitor Design Common piping Installation Installation Installation Installation Design Installation 14 2-7. Project Overview - Philippines Case Modification of existing diesel engines to cogeneration system Adoption of three high-efficiency centrifugal chillers and two type Global remote monitoring system JAPAN ESCO Exhaust gas Chilled water Monitoring system Power Chilled water Steam Diesel engines ( existing ) Fuel Cooling water Steam Absorption chiller Exhaust heat steam boiler [2 units] Chilled water Hot water Hot water Absorption chiller Tube cleaning system Chilled water Power Centrifugal chiller [3 units] Tube cleaning system Centrifugal chiller (existing) [3 units] ESCO Opening Ceremony, April 20, 2006 Chilled water 15 2-8. Media News - Philippines Case Hitachi To Help Overseas Firms Conserve Energy 2005/06/18, 03:07, Nikkei English News, 279 words TOKYO (Nikkei)--Hitachi Ltd. (6501) is expanding its energy service company (ESCO), which helps firms cut electricity use at factories, to businesses abroad. In ESCO operations, Hitachi examines a production site, sets up energy-saving equipment and then receives a service fee based on the resulting cost reductions. Hitachi started the service at the Philippines hard-disk drive plant of its U.S. subsidiary. It plans to install a boiler that recovers heat from the factory's diesel engine generator and powers a freezer that cools electronic parts. 16 Content Industrial Sector 1. ESCO Example in Thailand 2. ESCO Example in Philippine 3. ESCO Example in Singapore Commercial Sector 4. ESCO Example for Shopping Center 5. ESCO Example for City Government Office 17 3-1. Overview of customer Country : Singapore Production : DRAM(Dynamic random access memory) Established : July , 1996 Energy Consumption Amount : Electricity 160,000 GWh 18 3-2. ESCO Example in Singapore High Efficiency Centrifugal Chiller CO CO22 Reduction Reduction 5,000ton/year 5,000ton/year Overview Overview Monitoring Center ■ Series counter flow high efficiency for centrifugal chiller(2set ) This is the best method for wide range temperature system JAPAN ■ Modification for Ball Cleaning System ■ Global remote monitoring system Hitachi Centrifugal Chiller:Series Counter Flow Metering System Chilled Water-In Chilled Water-Out 14℃ 10℃ Lead Unit 6℃ Lag Uni t 2600RT : 2 set⇒ Total 5200RT 19 3-3. System flow (Before ESCO) Before ESCO 6℃ NORTH SIDE (12.4℃) (12.4℃) 6℃ SOUTH SIDE M M C/R & INSPN RM M 12℃ 6℃ M 16℃ M 16℃ COP = 4.6 (Spec.) Existing chillers (1,200USRT) 10units 16℃ 6℃ 20 3-4. System flow (After ESCO) After ESCO 6℃ NORTH SIDE (12.4℃) (12.4℃) 6℃ SOUTH SIDE M M C/R & INSPN RM M 12℃ 6℃ M 16℃ M 16℃ COP = 4.6 (Spec.) COP = 5.8 (Spec.) Existing chillers (1,200USRT) 6units 16℃ New chiller New chiller New chiller New chiller 6℃ 21 Content Industrial Sector 1. ESCO Example in Thailand 2. ESCO Example in Philippine 3. ESCO Example in Singapore Commercial Sector 4. ESCO Example for Shopping Center 5. ESCO Example for City Government Office 22 4-1 Example for Shopping Center Country : Japan Customer : Shopping Center Total Floor Space : 76,000m2 Installation Equipment : Gas Engine Co-generation System (720kW-630RT : 3 sets) ● Energy conservation and CO emissions reduction effect 2 Annual energy amount (KL) Reduction amount Reduction rate 1,060 CO2 gas emissions (tonCO2) 3,000 13% 15% 23 4-2 Example for Shopping Center Gas Eco-Pack system diagram Electricit y Electrici ty Exhaust gas Cooling Tower Cooling Water Absorption Generator Gas Engine He Chilled Water hot water Gas Cooling Tower Electrici ty Exhaust gas Generator Cooling Water Gas Engine Absorption Chilled Water hot water Gas 24 Content Industrial Sector 1. ESCO Example in Thailand 2. ESCO Example in Philippine 3. ESCO Example in Singapore Commercial Sector 4. ESCO Example for Shopping Center 5. ESCO Example for City Government Office 25 5-1 Example for City Government Office Country : Japan Guaranteed Savings 3 years’ contract Number of floors: 8 above ground level 2 under ground level Total floor area: 18,875 m2 Contract demand: 680 kW Air conditioning equipment: Absorption chiller Air cooled chiller 26 5-2 Example for City Government Office Energy Conservation Measures Energy Saving Effect Introduction of high-efficiency Lighting equipment(2,053unit) 5.0% Inverter Control on Chilled water pump(3unit) and AHU(9unit) 8.0% Unutilized Energy Generator Total 0.2% 13.2% 27 5-3 Example for City Government Office Unused energy recovery system diagram AHU Energy recovery system Control panel Inlet valve Water flow P Pump for chilled/ hot water supply Generator integrated type in-line hydraulic turbine Drain protective Drain valve protective valve Pressure gauge To grid Outlet valve Storage tank (chilled and hot water) 28 Hitachi Energy Solution Dec 18th 2008 Hitachi , Ltd. Energy Solution Div. Kenichi Kuwabara, Department Manager