1
1-1. Overview of customer
Country : Thailand
Production : Hard Disk Drive
Established : Feb , 1997
Production : Dec , 1997
2
1-2. Example in Thailand (Before ESCO)
Focus-1
OIL
(30℃)
Cooling Tower
UDI water
(50℃)
HX
CD
Through
flow
Boilers
CD
HX
H
Steam
Header
Cleaning
machines
D
S
H
Low
temp
high
temp
S
P
Dry
air
Compressor
Waste Energy
Air compressor
H
S
Laundry
( Drying
Machine )
D
S : Steam
D : Drain
H : Hot water
CD : Cooling water
3
1-3. Example in Thailand (After ESCO)
„
Energy recovery from hot air of Air Compressor
4
1-4. Project Schedule - ESCO in Thailand
No ITEM
1 Energy recovery for ZR300
After cooler
-Order Delivery
-Installation
-Test & Commissioning
2006
September
October
November
December
2007
J anuary
February
Comp #4 Shutdown 20days ,Comp #9 Shutdown 20days
Total : 40days
2 Hot water Piping work
-Design
-Material Order
-Installation
-Test & Commissioning
3 DI water
-Modification DI Pipe
UDI Water Shutdown 12hr/each location
Date to be discussion
Test run Feb-Mar.
ESCO Service started in April 2007
5
1-5. Project Overview - Thailand Case
„
„
Implement of heat recovery system for existing air Compressors
Global remote monitoring system
ESCO Project Opening
Ceremony : Apr/03
6
1-6. Effect of ESCO and Recognitions
ESCO realizes 11% of the energy saving
Advantage : Energy saving, Cost saving, and CO2 emission reduction
May 13, 2008, the PEZA
Outstanding
Environmental Performer
Award, granted by Executive
Secretary Eduardo Ermita
and Atty. Gen. Lilia de Lima
ESCO reduces 750 t-CO2 / year
Advantage : Energy saving, Cost saving, and CO2 emission reduction
Jul 30, 2008, Thailand
Energy Award granted by
Lieutenant-General
Poonpirom Liptapanlop,
Minister of Energy, Thailand
7
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
Commercial Sector
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
8
2-1. Overview of customer
Country : Philippine
Production : Magnetic recording head
Established : April , 1996
Energy Consumption Amount
: Electricity 24,000 MWh
: Oil 190,000 kL
9
2-2. ESCO Approach - Philippines Case
ESCO Phase-1 : Feb. 2005 - Apr. 2006
„
Energy recovery from hot exhaust gas of power generators (Step-1)
„
Replace aged turbo chillers with new high efficient chillers (Step-1)
„
Energy recovery from hot water of power generators
ESCO Phase-2 : Sep. 2006 - May 2007
„
Energy recovery from hot exhaust gas of power generators (Step-2)
„
Replace aged turbo chillers with new high efficient chillers (Step-2)
„
Install closed chilled water system
10
2-3. Power Generation Facilities(Before
ESCO)
Focus-1
NO.1
・・・
Generator
(1500kW)
Exhaust gas (285deg.C)
Diesel
engines
Power network
silencer
Cooling tower
Heat-exchanger
DeNOx
Focus-2
Fuel
Fuel
NO.2
Focus-3
Turbo chiller
200RT
12℃
Generator
(1500kW)
Heat-exchanger
Turbo chiller
200RT
Focus-2
7℃
Hitachi
Turbo chiller
380RT #5
~
7℃
Turbo chiller
200RT
12℃
Four aged
chillers
7℃
Cooling tower
12℃
Turbo chiller
300RT
Diesel
engines
NO.8 Diesel engine
12℃
Hitachi
Turbo chiller
7℃
380RT #7
12℃
7℃
12℃
Hitachi
Turbo chiller
7℃
380RT #8
Hitachi
Turbo chiller
380RT #6
Hitachi
Turbo chiller
380RT #9
12℃
7℃
12℃
7℃
11
2-4. Final Configuration(After ESCO)
:Scope of ESCO(Phase2)
Exhaust gas
NO.1, NO.2
silencer
Action-4
DeNOx
Diesel engines
Exhaust heat
steam boiler
< Phase1 >
Back-up
Carrier chiller
200RT
< Phase1 >
Through
flow boiler
Steam
Exhaust gas
NO.3, NO.4
silencer
Back-up
Carrier chiller
200RT
Exhaust heat
steam boiler
DeNOx
Diesel engines
< Phase2>
water
supply
Steam
Back-up
85℃
Carrier chiller
200RT
NO.5,NO.6 Diesel engine
80℃
NO.7,NO.8 Diesel engine
Steam
Absorption chiller <
450RT
Phase1>
Hot water
absorption chiller
< Phase1 >
350RT
12℃
7℃
12℃
7℃
Action-4
< Phase1 >
12℃
High efficiency
Turbo chiller
450RT
Tube
cleaning
system
7℃
< Phase2>
High efficiency 12℃
Turbo chiller
450RT
7℃
< Phase2>
High efficiency
Turbo chiller
450RT
12℃
7℃
Tube
cleaning
system
< Phase2>
Hitachi
Turbo chiller
380RT #7
12℃
7℃
Hitachi
Turbo chiller
380RT #8
12℃
7℃
Hitachi
Turbo chiller
380RT #9
12℃
7℃
< Phase2>
Action-5
12
2-5. Project Schedule - ESCO Phase 1 in
Philippines
2005
2
3
ESCO
Monitoring
Design and
Piping
Exhaust heat
steam boiler
Hot water
recovery
Aged Turbo
chiller
Removal
Steam
absorption
chiller
Hot water
absorption
chiller
Turbo
chiller
Estimation
4
5
6
7
8
9
2006
10 11 12 1
2
Design
Set up
CP
3
4
Monitor
Check energy consumption
Common Pipe
Design exhaust and absorption chiller
Hot water recovery pipe
Installation
Installation
Installation
13
2-6. Project Schedule - ESCO Phase 2 in
Philippines
2006
9
ESCO
Exhaust
piping
modificatio
n
Exhaust
heat steam
boiler
Turbo
chiller
Removal
Turbo
chiller HCF500GX #2
Turbo
chiller HCF500GX #3
Tube c
leaning
system
Chilled
water
system
Estimation
10
11
12
CP
200
71
2
Design
Set up
3
4
5
Monitor
Design
Common piping
Installation
Installation
Installation
Installation
Design
Installation
14
2-7. Project Overview - Philippines Case
„
„
„
Modification of existing diesel engines to cogeneration system
Adoption of three high-efficiency centrifugal chillers and two type
Global remote monitoring system
JAPAN
ESCO
Exhaust gas
Chilled water
Monitoring
system
Power
Chilled water
Steam
Diesel engines
( existing )
Fuel
Cooling
water
Steam
Absorption chiller
Exhaust heat
steam boiler
[2 units]
Chilled water
Hot water
Hot water Absorption chiller
Tube cleaning
system
Chilled water
Power
Centrifugal chiller [3 units]
Tube cleaning
system
Centrifugal chiller
(existing)
[3 units]
ESCO Opening Ceremony,
April 20, 2006
Chilled water
15
2-8. Media News - Philippines Case
Hitachi To Help Overseas Firms
Conserve Energy
2005/06/18, 03:07, Nikkei English News,
279 words
TOKYO (Nikkei)--Hitachi Ltd. (6501) is
expanding its energy service company
(ESCO), which helps firms cut electricity
use at factories, to businesses abroad.
In ESCO operations, Hitachi examines a
production site, sets up energy-saving
equipment and then receives a service
fee based on the resulting cost
reductions.
Hitachi started the service at the
Philippines hard-disk drive plant of its
U.S. subsidiary. It plans to install a boiler
that recovers heat from the factory's
diesel engine generator and powers a
freezer that cools electronic parts.
16
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
Commercial Sector
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
17
3-1. Overview of customer
Country : Singapore
Production : DRAM(Dynamic random access memory)
Established : July , 1996
Energy Consumption Amount
: Electricity 160,000 GWh
18
3-2. ESCO Example in Singapore
High Efficiency Centrifugal Chiller
CO
CO22 Reduction
Reduction
5,000ton/year
5,000ton/year
Overview
Overview
Monitoring
Center
■ Series counter flow high efficiency for centrifugal chiller(2set )
This is the best method for wide range temperature system
JAPAN
■ Modification for Ball Cleaning System
■ Global remote monitoring system
Hitachi Centrifugal Chiller:Series Counter Flow
Metering
System
Chilled Water-In
Chilled Water-Out
14℃
10℃
Lead Unit
6℃
Lag Uni t
2600RT : 2 set⇒ Total 5200RT
19
3-3. System flow (Before ESCO)
Before ESCO
6℃
NORTH SIDE
(12.4℃)
(12.4℃)
6℃
SOUTH SIDE
M
M
C/R & INSPN RM
M
12℃
6℃
M
16℃
M
16℃
COP = 4.6
(Spec.)
Existing chillers (1,200USRT)
10units
16℃
6℃
20
3-4. System flow (After ESCO)
After ESCO
6℃
NORTH SIDE
(12.4℃)
(12.4℃)
6℃
SOUTH SIDE
M
M
C/R & INSPN RM
M
12℃
6℃
M
16℃
M
16℃
COP = 4.6 (Spec.)
COP = 5.8
(Spec.)
Existing chillers (1,200USRT) 6units
16℃
New chiller
New chiller
New chiller
New chiller
6℃
21
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
Commercial Sector
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
22
4-1 Example for Shopping Center
Country : Japan
Customer :
Shopping Center
Total Floor Space : 76,000m2
Installation Equipment : Gas Engine Co-generation
System
(720kW-630RT : 3
sets)
● Energy conservation and CO emissions reduction effect
2
Annual energy amount (KL)
Reduction amount
Reduction rate
1,060
CO2 gas emissions (tonCO2)
3,000
13%
15%
23
4-2 Example for Shopping Center
Gas Eco-Pack system diagram
Electricit
y
Electrici
ty
Exhaust gas
Cooling
Tower
Cooling
Water
Absorption
Generator Gas Engine
He
Chilled
Water
hot water
Gas
Cooling
Tower
Electrici
ty
Exhaust gas
Generator
Cooling
Water
Gas Engine
Absorption
Chilled
Water
hot water
Gas
24
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
Commercial Sector
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
25
5-1 Example for City Government Office
Country : Japan
Guaranteed Savings
3 years’ contract
Number of floors: 8 above ground level
2 under ground level
Total floor area: 18,875 m2
Contract demand: 680 kW
Air conditioning equipment:
Absorption chiller
Air cooled chiller
26
5-2 Example for City Government Office
Energy Conservation Measures
Energy Saving Effect
Introduction of high-efficiency
Lighting equipment(2,053unit)
5.0%
Inverter Control on
Chilled water pump(3unit)
and AHU(9unit)
8.0%
Unutilized Energy Generator
Total
0.2%
13.2%
27
5-3 Example for City Government Office
Unused energy recovery system diagram
AHU
Energy recovery
system
Control panel
Inlet
valve
Water flow
P
Pump for
chilled/
hot water
supply
Generator integrated
type
in-line hydraulic
turbine
Drain protective
Drain
valve
protective
valve
Pressure
gauge
To grid
Outlet
valve
Storage tank
(chilled and hot
water)
28
Hitachi Energy
Solution
Dec 18th 2008
Hitachi , Ltd.
Energy Solution Div.
Kenichi Kuwabara, Department Manager