Powering MediaCityUK`s ice rink
Transcription
Powering MediaCityUK`s ice rink
Powering MediaCityUK’s ice rink Speedy skates to success! Home to the biggest German markets in the UK and hailed as the capital of Christmas, Manchester was transformed into a winter wonderland at the end of 2014 and hosted more than six weeks of fantastic Yuletide celebrations. Dotted around Manchester were various ice rinks including one situated at The Quays on the plaza at MediaCityUK, which had a pop-up tipi bar called The Lodge. Peel Media, the company responsible for operating the event, called on Speedy’s expertise to support the running of rental chillers to run the ice rink, supply power to The Lodge and provide around the clock maintenance service. Key achievements • Supplied 200kVA generators, a 3,000 litre fuel tank and fuel, providing a bespoke power solution at a public site • Ensured that public safety was paramount at all times • Site visits by a dedicated Speedy manager on to ensure efficient operations • Responded quickly and efficiently resulting in a tight build and break down schedule • Provided an Emergency Response Service and 24-hour maintenance “We turned to Speedy to supply temporary power for the ice rink and The Lodge because of the team’s extensive experience in providing equipment and support services for large-scale events. Ensuring that the ice was maintained at the correct temperature was absolutely paramount and so we needed a supplier that we could rely on. The service Speedy provided was absolutely exceptional and it was very reassuring to know that we could contact the team 24 hours a day, seven days a week.” - Peel Media www.speedyservices.com Project background MediaCityUK is a 200-acre mixed-use property development site on the banks of the Manchester Ship Canal. Home to major BBC and ITV departments, the University of Salford and over 80 businesses across the creative and digital sectors, it is recognised as one of the most innovative developments in Britain. The ice rink officially opened on Thursday 6th November 2014 with Dancing on Ice finalist and Coronation Street star Hayley Tamaddon, performing two of her winning routines, and it remained open until Christmas Eve. More than 40,000 litres of water and 6,000 litres of refrigerant were pumped along 12,000 metres of piping to create the 600 square metre ice rink, which required a huge amount of power to keep the liquid frozen. With a fleet of over 2,000 generator assets, competitive fuel prices and access to a supply network of over six billion litres of fuel, all backed by a team of highly specialised engineers, Speedy was Peel Media’s natural supplier of choice. Speedy solution Speedy provided two 200kVA generators, a fuel tank and a 3,000 litre fuel tank and delivered fuel to site outside of peak times to minimise disruption. Thousands of members of the public relied on Speedy’s provision of power, with the generators operating 24/7 over a 10-week period. Speedy’s tight build and break down schedule meant that the efficient delivery, installation and collection was a complete success. www.speedyservices.com About The Peel Group The Peel Group is one of the leading infrastructure, real estate and investment enterprises in the UK. Peel’s diverse network of businesses ranges from ports to airports; land to leisure; media to hotels; wind farms to shopping centres, and a portfolio of investments in major public companies.