2. existing stormwater flows
Transcription
2. existing stormwater flows
STORMWATER DRAINAGE STRATEGY REPORT 140-204 WESTERN AVENUE WESTMEADOWS FOR SEPTEMBER 2014 Dalton Consulting Engineers Pty Ltd 255 Whitehorse Road ABN 78 429 221 049 PO Box 349 F 61 3 9888 6880 Balwyn Victoria 3103 E [email protected] Australia W www.dceprofile.com T 61 3 9888 6866 This report has been prepared solely for the benefit of Transpacific Industries Group Ltd and Dalton Consulting Engineers Pty Ltd. No liability is accepted by this company or any employee or sub-consultant of this company with respect to its use by any other person. This disclaimer shall apply notwithstanding that the report may be made available to other persons for an application for permission or approval or to fulfil a legal requirement. Revision No. 8 Date: September 2014 Description: Stormwater Strategy Report v8 Prepared: J Baumann AN: 401053 Reviewed: R Monkhouse AN: 642233 Approved: T Liakopoulos AN: 883107 11911se2614G Stormwater Strategy V8 September 2014 i Contents 1. INTRODUCTION................................................................................................ 1 1.1. 1.2. LOCATION AND ZONING.................................................................................. 1 SITE OVERVIEW ............................................................................................ 2 2. EXISTING STORMWATER FLOWS .................................................................. 2 3. DEVELOPED STORMWATER FLOWS............................................................. 4 3.1. 3.2. 3.3. 3.4. 3.5. EXTERNAL CATCHMENTS ............................................................................... 4 MINOR FLOWS .............................................................................................. 5 MAJOR FLOWS .............................................................................................. 5 STORMWATER RETENTION ............................................................................. 6 STORMWATER TREATMENT SYSTEM ............................................................... 7 APPENDIX A—SUBJECT AREA ............................................................................. 8 APPENDIX B—EXISTING CONDITIONS CATCHMENTS AND FLOWS ................. 9 APPENDIX C—DEVELOPED CONDITIONS CATCHMENTS, FLOWS AND RETENTION ........................................................................................................... 10 11911se2614G Stormwater Strategy V8 September 2014 ii 1. INTRODUCTION This report has been prepared for Transpacific Industries Group Ltd to support the rezoning of the subject site to Comprehensive Development Zone (CDZ). The report outlines the strategy proposed to treat stormwater runoff from a proposed development at 140-204 Western Avenue, Westmeadows. This report demonstrates that stormwater drainage from the proposed development on the subject site can be suitably drained and treated in accordance with both Hume City Council and Melbourne Water requirements. 1.1. Location and zoning The subject site is located adjacent to Melbourne Airport. The Airport Environs Planning Overlay does not impact the subject site. An aerial image of the subject area is shown in Figure 1 and a larger image is included as Appendix A. Figure 1—Property and Re-zone boundaries 11911se2614G Stormwater Strategy V8 September 2014 1 1.2. Site overview The property comprises a total area of 28.6 ha and is owned by Transpacific Industries Group Ltd. Approximately 22.5 ha is proposed to be rezoned from FZ3 to CDZ, 2.3 ha will become road reserves, and 3.8 ha will be reserves. The property is located near Melbourne Airport and abuts Tullamarine Freeway to the south, Wright Street to the east and Moonee Ponds Creek to the north. Victoria Street, which is not constructed, forms the western boundary of the site. Western Avenue traverses the southern portion of the site. The property has been used for grazing purposes. The subject site generally grades from the south-west to the north-east towards Moonee Ponds Creek. 2. EXISTING STORMWATER FLOWS The subject site drains to the north-east via overland flow to Moonee Ponds Creek. Existing underground drainage within Western Avenue connects to a 600-mm diameter drain in Wright Street. This drain discharges at the northern end of Wright Street to an open earth channel which connects to the creek. The responsible authorities for stormwater drainage are Hume City Council and Melbourne Water. Council is responsible for drainage catchments up to 60 ha; Melbourne Water is responsible for larger catchments, including any works within the Moonee Ponds Creek Reserve. Currently, stormwater runoff sheet flows from two catchments within the site, as shown in Figure 3. A large-scale image of the existing stormwater catchments is included in Appendix B. The pre-development 1-year, 10-year and 100-year average recurrence interval (ARI) flows have been calculated using the Rational Method from Australian Rainfall and Runoff (AR&R) and are detailed in Figure 2. Full calculations are included in Appendix C. Figure 2—Existing catchments and associated major and minor flows Catchment Catchment 1 Catchment 2 Total area (ha) 10.1 35.1 11911se2614G Stormwater Strategy V8 September 2014 1-year ARI flow (m3/s) 0.1 0.3 10-year ARI flow (m3/s) 0.4 0.9 100-year ARI flow (m3/s) 0.8 1.8 2 Figure 3—Existing condition stormwater catchments 11911se2614G Stormwater Strategy V8 September 2014 3 3. DEVELOPED STORMWATER FLOWS The subject site is proposed to be rezoned to CDZ and will be developed for industrial/commercial use. Figure 4 shows the future developed catchments at the subject site. The developed catchments are similar to the existing catchments, but in the developed condition, the boundary between the two catchments will change as a result of site earthworks benching. The layout of stormwater drains shall be incorporated into the road reserves with easement drains minimised where possible. Figure 4—Developed stormwater catchments 3.1. External catchments As shown in Figure 4, an external, undeveloped catchment ‘downstream’ of Developed Catchment 1 drains directly to Moonee Ponds Creek. This area is proposed to become a reserve. As it will be undeveloped, stormwater from the ‘downstream’ catchment will continue to drain overland to Moonee Ponds Creek. Developed Catchment 2 also extends beyond the boundary of the subject site. A downstream sub-catchment of Developed Catchment 2 comprising 9.2 ha of land not 11911se2614G Stormwater Strategy V8 September 2014 4 owned by Transpacific Industries Group is external to the subject site. This land may be rezoned and developed in the future. Retention of stormwater flows from this adjacent land as well as treatment for it as fully developed have been included in the stormwater strategy. Tullamarine Freeway Reserve drains to the south and towards Steele Creek, not through the subject site. 3.2. Minor flows The minor drainage system will be designed and constructed to Hume City Council standards for a 10-year ARI. Developed 10-year flows have been calculated using the Rational Method from AR&R and are detailed in Figure 5 and Appendix C. In Developed Catchment 1, shown in yellow in Figure 4, the undeveloped reserve downstream sub-catchment will continue to drain overland to Moonee Ponds Creek. Within the re-zone area, minor flows (up to and including the 10-year ARI event) from Developed Catchment 1 will be conveyed via a piped drainage system. Flows equal to and less than the 1-year (Q1) flows will be conveyed via a drainage pipe to a proposed wetland located east of the subject site in Melbourne Water’s Tarnuk Reserve, as shown in Figure 4 and Figure 7. Flow greater than the 1-year flow will surcharge from the pipe and drain directly to Moonee Ponds Creek. In Developed Catchment 2, shown in blue in Figure 4, minor flows (up to and including the 10-year ARI event) from the developed areas will be conveyed via a piped drainage system as shown in Figure 7. Flows equal to and less than the 1-year (Q1) flows will be conveyed via drainage pipes to a proposed wetland located east of the subject site in Melbourne Water’s Tarnuk Reserve, as shown in Figure 4 and Figure 7. Flow greater than the 1-year flow will surcharge from the pipe and follow the existing overland flow path to Moonee Ponds Creek. Figure 5—Developed catchments and flows Catchment Developed Catchment 1 Developed Catchment 2 (Subject site and external downstream) 3.3. Developed area (ha) 5.8 1-year ARI flow (m3/s) 0.2 10-year ARI flow (m3/s) 0.6 100-year ARI flow (m3/s) 1.3 31.1 1.2 3.0 6.3 Major flows When the capacity of the minor drainage system within Catchments 1 and 2 is exceeded by flows in excess of 10-year ARI event, overland flow will occur in both catchments. Road reserves and open channel drainage reserves will be designed to safely convey up to 100-year ARI events through the development without exceeding Melbourne Water’s safety criteria for maximum depth and velocity. In Catchment 1, overland flows in excess of 10-year ARI flows shall be directed overland to Moonee Ponds Creek. In Catchment 2, overland flows in excess of 10- 11911se2614G Stormwater Strategy V8 September 2014 5 year ARI flows shall drain overland to Moonee Ponds Creek via the existing gully in the external downstream catchment. Major event flows are shown in Figure 5. 3.4. Stormwater retention The approximate volume of required storage has been calculated using Boyds Method and is summarised in Figure 6 and detailed in Appendix C. Stormwater retention will be provided (as shown in Figure 7) for 1-year flow from Catchment 2. The retention storage will be located in the airspace overhead of the water quality treatment system to minimise the footprint of the off-site stormwater treatment. Approximately 4,500 m3 of storage are available in the airspace overhead of the water quality treatment. Melbourne Water has provided the 100-year flood levels along Moonee Ponds Creek. The subject land is not affected by inundation, as shown in Figure 7. A creek buffer zone, external to the re-zoned land, provides open space adjacent to the creek in accordance with Melbourne Water guidelines. Figure 6—Required retention storage volume Catchment Catchments 1 and 2 3.5. Existing 1-year ARI flow (m3/s) 0.4 Developed 1-year ARI flow (m3/s) 1.4 Approximate volume of required retention (m3) 2,025 Stormwater treatment system The current stormwater quality objectives as set out in the Urban Stormwater—Best Practice Environmental Guidelines (CSIRO, 2000) are: • • • • Total Suspended Solids (TSS)—80% reduction Total Phosphorus (TP)—45% reduction Total Nitrogen (TN)—45% reduction Gross Pollutants (litter)—70% reduction The stormwater quality treatment is proposed to comprise a sedimentation basin, wetland and bioretention system located within Melbourne Water’s Tarnuk Reserve. A total treatment area of 7,000 m2 has been preliminarily sized using the Model for Urban Stormwater Improvement Conceptualisation (MUSIC), version 6.0.1. The stormwater quality treatment is shown in Figure 7 and included as Appendix D. 11911se2614G Stormwater Strategy V8 September 2014 6 Figure 7—Stormwater treatment and retention 11911se2614G Stormwater Strategy V8 September 2014 7 APPENDIX A—Subject area 11911se2614G Stormwater Strategy V8 September 2014 8 APPENDIX B—Existing conditions catchments and flows 11911se2614G Stormwater Strategy V8 September 2014 9 PEAK FLOW CALCULATION SHEET (RATIONAL METHOD) JOB NAME: JOB No.: Western Ave 11911 Based on GAA Engineering design and construction manual Table 16 C'10 Rural (RUZ) Industrial Fraction Impervious Fraction Impervious 0.1 COEFFICIENT OF RUNOFF C1 C2 C10 C5 C100 C'10 From the GAA Engineering design and construction manual Table 17 0.16 0.187 0.199 0.234 0.223 0.281 = 0.9 COEFFICIENT OF RUNOFF C1 C2 C10 C5 C100 C200 0.1 + 0.0133 (10i1 -25) 0.16 0.661 0.702 0.826 0.785 0.991 1.033 given as for above 10i1 is the 10-year, 1-hour duration rainfall intensity ARI table for DURATION 5Mins 6Mins 10Mins 20Mins 30Mins 1Hr 2Hrs 3Hrs 6Hrs 12Hrs 24Hrs 48Hrs 72Hrs 1 Year 47.9 44.6 36.3 26.3 21.2 14.2 9.31 7.26 4.73 3.03 1.87 1.09 0.78 2 years 5 years 64.1 59.7 48.4 34.9 28.1 18.7 12.2 9.48 6.12 3.9 2.42 1.43 1.02 10 years 88.6 82.6 66.6 47.5 38.1 25.1 16.1 12.3 7.79 4.92 3.09 1.89 1.37 105 98.2 79 56.1 44.8 29.4 18.7 14.2 8.85 5.56 3.52 2.19 1.6 20 years 50 years 128 119 95.5 67.5 53.8 35.2 22.2 16.7 10.3 6.44 4.1 2.59 1.91 100 years 160 149 119 83.9 66.7 43.4 27 20.3 12.3 7.66 4.92 3.16 2.35 187 174 139 97.5 77.4 50.1 31 23.1 13.9 8.63 5.57 3.63 2.71 37.675 South 144.875 East Job Description: Job Number: Compiled by: Western Avenue 11911 JMB Location and ARI WesternAve_1 1‐year pre‐development Date: a 2.651540 26‐Jun‐14 b c d e f ‐0.598621 ‐0.019480 0.011766 ‐0.001946 ‐0.000769 g 0.000138 C Ae ƩAe I1 Q1 Total ha 10.1 0.19 ha 1.893 ha 1.893 mm/hr 26.734 m3/s 0.1 41 35.1 0.19 6.579 6.579 17.743 0.3 41 45.2 0.19 8.472 8.472 17.743 0.4 Outlet of Length Overland velocity Tc Area C1All m 400 m/s 0.5 mins 19 C2All 1050 0.5 All 1200 0.5 G:\Designdata\11900\11911-Western Ave Tullamarine\MUSIC\11911jn2614G_RationalFlows 1 Job Description: Job Number: Compiled by: Western Avenue 11911 JMB Location and ARI WesternAve_10 10‐year pre‐development Date: a 3.382109 26‐Jun‐14 b c d e f ‐0.634951 ‐0.035928 0.008127 0.000906 ‐0.000189 g ‐0.000034 C Ae ƩAe I10 Q10 Total ha 10.1 0.23 ha 2.366 ha 2.366 mm/hr 57.116 m3/s 0.4 41 35.1 0.23 8.223 8.223 37.272 0.9 41 45.2 0.23 10.590 10.590 37.272 1.1 Outlet of Length Overland velocity Tc Area C1All m 400 m/s 0.5 mins 19 C2All 1050 0.5 All 1200 0.5 G:\Designdata\11900\11911-Western Ave Tullamarine\MUSIC\11911jn2614G_RationalFlows 1 Job Description: Job Number: Compiled by: Western Avenue 11911 JMB Location and ARI WesternAve_100 100‐year pre‐development Date: a 3.914350 b c d e ‐0.661794 ‐0.048348 0.005543 0.003007 26‐Jun‐14 f 0.000219 g ‐0.000157 C Ae ƩAe I100 Q100 Total ha 10.1 0.28 ha 2.840 ha 2.840 mm/hr 99.284 m3/s 0.8 41 35.1 0.28 9.868 9.868 64.013 1.8 41 45.2 0.28 12.707 12.707 64.013 2.3 Outlet of Length Overland velocity Tc Area C1All m 400 m/s 0.5 mins 19 C2All 1050 0.5 All 1200 0.5 G:\Designdata\11900\11911-Western Ave Tullamarine\MUSIC\11911jn2614G_RationalFlows 1 APPENDIX C—Developed conditions catchments, flows and retention 11911se2614G Stormwater Strategy V8 September 2014 10 PEAK FLOW CALCULATION SHEET (RATIONAL METHOD) JOB NAME: JOB No.: Western Ave 11911 Based on GAA Engineering design and construction manual Table 16 C'10 Rural (RUZ) Industrial Fraction Impervious Fraction Impervious 0.1 COEFFICIENT OF RUNOFF C1 C2 C10 C5 C100 C'10 From the GAA Engineering design and construction manual Table 17 0.16 0.187 0.199 0.234 0.223 0.281 = 0.9 COEFFICIENT OF RUNOFF C1 C2 C10 C5 C100 C200 0.1 + 0.0133 (10i1 -25) 0.16 0.661 0.702 0.826 0.785 0.991 1.033 given as for above 10i1 is the 10-year, 1-hour duration rainfall intensity ARI table for DURATION 5Mins 6Mins 10Mins 20Mins 30Mins 1Hr 2Hrs 3Hrs 6Hrs 12Hrs 24Hrs 48Hrs 72Hrs 1 Year 47.9 44.6 36.3 26.3 21.2 14.2 9.31 7.26 4.73 3.03 1.87 1.09 0.78 2 years 5 years 64.1 59.7 48.4 34.9 28.1 18.7 12.2 9.48 6.12 3.9 2.42 1.43 1.02 10 years 88.6 82.6 66.6 47.5 38.1 25.1 16.1 12.3 7.79 4.92 3.09 1.89 1.37 105 98.2 79 56.1 44.8 29.4 18.7 14.2 8.85 5.56 3.52 2.19 1.6 20 years 50 years 128 119 95.5 67.5 53.8 35.2 22.2 16.7 10.3 6.44 4.1 2.59 1.91 100 years 160 149 119 83.9 66.7 43.4 27 20.3 12.3 7.66 4.92 3.16 2.35 187 174 139 97.5 77.4 50.1 31 23.1 13.9 8.63 5.57 3.63 2.71 37.675 South 144.875 East Job Description: Job Number: Compiled by: Western Avenue 11911 JMB 1‐year developed Date: 26‐Jun‐14 Location and ARI WesternAve_1 a b c d 2.651540 ‐0.598621 ‐0.019480 0.011766 e ‐0.001946 f ‐0.000769 g 0.000138 C Ae SAe I1 Q1 Total ha 3.833 mm/hr 22.898 m /s 0.2 Outlet of Length Velocity Tc Area C1Industrial m 600 m/s 0.5 mins 26 ha 5.8 0.661 ha 3.833 C2 NorthIndustrial and Reserve 300 0.5 16 6.4 0.661 4.229 4.229 29.355 0.3 C2 SouthIndustrial and Reserve 800 0.5 33 15.5 0.661 10.243 10.243 20.195 0.6 C2Internal total 800 0.5 33 21.9 0.661 14.472 14.472 20.195 0.8 C2Internal and External 1200 0.5 33 31.1 0.661 20.552 20.552 20.195 1.2 All 1200 0.5 33 36.9 0.661 24.384 24.384 20.195 1.4 G:\Designdata\11900\11911-Western Ave Tullamarine\MUSIC\11911jn2614G_RationalFlows 3 1 of 1 Job Description: Job Number: Compiled by: Western Avenue 11911 JMB 10‐year developed Date: 26‐Jun‐14 Location and ARI WesternAve_10 ARI 10 a b c d 3.382109 ‐0.634951 ‐0.035928 0.008127 e 0.000906 f ‐0.000189 g ‐0.000034 C Ae SAe I10 Q10 Total ha 4.791 mm/hr 48.605 m /s 0.6 Outlet of Length Velocity Tc Area C1Industrial m 600 m/s 0.5 mins 26 ha 5.8 0.826 ha 4.791 C2 NorthIndustrial and Reserve 300 0.5 16 6.4 0.826 5.287 5.287 63.002 0.9 C2 SouthIndustrial and Reserve 800 0.5 33 15.5 0.826 12.803 12.803 42.657 1.5 C2Internal total 800 0.5 33 21.9 0.826 18.090 18.090 42.657 2.1 C2Internal and External 1200 0.5 33 31.1 0.826 25.690 25.690 42.657 3.0 All 1200 0.5 33 36.9 0.826 30.481 30.481 42.657 3.6 G:\Designdata\11900\11911-Western Ave Tullamarine\MUSIC\11911jn2614G_RationalFlows 3 1 of 1 Job Description: Job Number: Compiled by: Western Avenue 11911 JMB Location and ARI WesternAve_100 100‐year developed Date: 26‐Jun‐14 ARI 100 a 3.914350 b ‐0.661794 c ‐0.048348 d 0.005543 e 0.003007 f 0.000219 g ‐0.000157 Outlet of Length Velocity Tc Area C Ae SAe I100 Q100 C1Industrial m 600 m/s 0.5 mins 26 ha 5.8 0.991 ha 5.749 ha 5.749 mm/hr 84.104 m3/s 1.3 C2 NorthIndustrial and Reserve 300 0.5 16 6.4 0.991 6.344 6.344 109.867 1.9 C2 SouthIndustrial and Reserve 800 0.5 33 15.5 0.991 15.364 15.364 73.551 3.1 C2Internal total 800 0.5 33 21.9 0.991 21.708 21.708 73.551 4.4 C2Internal and External 1200 0.5 33 31.1 0.991 30.827 30.827 73.551 6.3 All 1200 0.5 33 36.9 0.991 36.577 36.577 73.551 7.5 G:\Designdata\11900\11911-Western Ave Tullamarine\MUSIC\11911jn2614G_RationalFlows 1 BOYDS FORMULA 1-YEAR REQUIRED RETENTION All future industrial areas 26‐Jun‐14 Input by user Calculated by spreadsheet Catchment Area (A) = Runoff Coefficient (1-year) = 1-year Effective Catchment Area = ∑CA = Restricted outflow requirement = 36.9 ha 0.661 24.38 ha 3 0.40 m /s Storage requirement is highest value of S max calculated in the table below Critical storm duration is the storm duration when S max occurs Storm Duration 1-year Ip 3 (min) Intensity (mm/hr) (m /s) 5 6 10 20 30 60 120 180 360 720 1440 2880 4320 47.9 44.6 36.3 26.3 21.2 14.2 9.31 7.26 4.73 3.03 1.87 1.09 0.78 3.24 3.02 2.46 1.78 1.44 0.96 0.63 0.49 0.32 0.21 0.13 0.07 0.05 Qp (m3/s) 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 Max Storage V1 (m3) Smax (m3) 973 853.3 1,088 943.5 1,475 1,235.3 2,138 1,657.7 2,585 1,864.8 3,463 2,022.6 4,540 1,660.4 5,311 990.9 6,920 ‐1,719.7 8,866 ‐8,413.8 10,944 ‐23,616.3 12,758 ‐56,362.1 13,694 ‐89,985.7 2,022.6 3 m