. BRADLEY PROPERTY CONSULTANTS
Transcription
. BRADLEY PROPERTY CONSULTANTS
- ,...-. BRADLEY -- ........ PROPERTY .. ___ .. .-.a -... -_w..-_ -. CONSULTANTS Reserve Analysis • Property Inspection· Construction Consultants April 18, 2012 Plum Creek North Master Homeowners Association, Inc. c/o Premier Property Management P.O. Box 632018 Highlands Ranch, CO 80163-2018 Attention: Kim McGuire Re: Reserve Analysis, 2012 VERSION Dear Ms. McGuire and Board of Directors: As requested, Bradley Property Consultants, Inc. revised and updated the reserve analysis for the Plum Creek North Master Homeowners Association, Inc., located in Castle Rock, Colorado. This updated 2012 version of the reserve analysis was performed in April 20 12. The reserve analysis was reviewed and the property was inspected to verify the conditions on the property. The entire inventory list of the reserve analysis was reviewed as part of the updating process and current information was provided by the management company. The update reflects the expected position of the Association in 2012. The revision and updating has brought the reserve analysis up to date with current replacement costs for the project components. The proposed maintenance and replacement expectations of the Association are very valuable in revising this document. The Association may wish to consider adding or deleting some categories and possibly phasing more of the categories to spread the financial responsibilities over a number of years. The phasing and future comments can be added as a revision to this document. The reserve analysis is in two parts. The first section is an explanation of terms and a description of the methods involved in arriving at the data for the project. The second section starts with the reserve analysis table showing project categories and overall suggested reserve deposits. This table should be reviewed carefully and revised as necessary. The rest of the second section includes tables of reserve balances for the next 40 years, a section of graphs depicting capital expenses and reserve balances over the same 40 year period, and a table of projected capital expenses. CHANGES AND COMMENTS FOR THE 2012 UPDATE AND REVISION: Unit abbreviations used the Reserve Analysis table: SF= square feet, LF= lineal feet, SY= square yard, LS= lump sum, EA= each, REPL. = replacement, ECON. = economic 1588 South Clarkson Street· Denver, CO 80210· Phone 303-232-0252 • Fax 303-232-3243 Plum Creek North Master Homeowners Association, Inc. Reserve Analysis, 2012 VERSION April 18, 2012 Page 2 1. The categories were examined and aged to coordinate with their condition. Some categories were given an extended life if they had not deteriorated significantly or if they had been replaced. Major repairs or replacements were also considered for each category. 2. The Association has completed some renovation projects over the past few years. The benefit of these projects was included in the reserve analysis update. a. The Landscaping Refurbish category was increased slightly due to the maturing of the large trees and plants at the entry monument. b. A new category was added for the upgraded irrigation clock that was installed a couple of years ago c. The category for street signs was removed from the reserve analysis. In the original reserve analysis this category was for several custom wooden street signs and directional signs that were installed when the community was developed. Those signs have been replaced with standard metal post street signs. The Association did not replace those signs and it appears the signs were replaced by the Town of Castle Rock. d. The stone wall and sign category was increased due to the aging of the sign and wall and the increased cost of replacing the sign and wall. e. A new category for the lighting at the entry monument was added to the reserve analysis. 3. Each category was revised to reflect current replacement costs. Some category costs have not increased significantly in replacement cost values while others have increased dramatically. The community appears to be aging as expected and the reserve analysis reflects the general condition of the capital assets. 4. The reserves available for this update were $40,000.00. The work performed consisted of a review of the previous reserve study, site inspections, an interview with the property manager, and some field measurements to determine the condition and value of items for which the Association is responsible for repair and replacement. This information was used to compile and revise the reserve analysis inventory list. The reserve analysis estimates remaining economic life of the items in the inventory list, replacement costs, and prorates existing reserves to these items. The analysis then estimates future contributions to project reserves so adequate funds will be available for future repairs and replacements. Plum Creek North Master Homeowners Association, Inc. Reserve Analysis, 2012 VERSION April 18, 2012 Page 3 Reserve Analysis Summary and Explanation of Terms The analysis covers the common areas and items the Association is responsible for repairing and replacing. The Association has determined these items, or inventory list, by interpretation of the Declarations and Covenants for the Association and the historical maintenance schedule on the project. The inventory list should be reviewed and modified according to the actual needs of the Association. The analysis also uses the relationship of cost replacement and remaining life to determine future reserve needs. An explanation of the terms and column headings as used within the reserve analysis follows: COMMON AREA The common area covers the Association's elements termed as capital reserve items. It includes the landscaping, sign, stone wall, irrigation, and lighting at the entry monument located at Emerald Drive and Plum Creek Boulevard. The capital reserves inventory list for the Association is listed in the reserve analysis tables. Please refer to the inventory list and the other sections of the report for specific comments on individual reserve analysis items. Some long-lasting items were not included in the analysis since they should survive the assumed economic life of the project. This analysis uses a 50-year useful economic life as a basis for replacement items. Most items considered to have an expected life of 50 years or longer were not included in the replacement schedule. These items include building foundations and internal structural components. Please see any special notes within the analysis that pertain to items that will last 50 years or more. Small or low cost items under $2,500.00 were not included since these repairs and replacements tend to be funded through the annual operating budget rather than from capital reserves. DEFINITION OF TERMS USED IN THE RESERVE ANALYSIS TABLE Estimated Salvaee Value "Estimated Salvage Value" specifically relates to items which, by their nature, will not need total replacement at the end of their assumed economic life. The considerations affecting salvage value are its long-lasting components or parts, maintenance schedule, recent repairs or replacements, and importance to the appearance of the project. Items that directly affect the appearance and function of the project tend to be maintained more completely and more often. Hard scape items such as asphalt and concrete tend to be repaired as necessary rather than all at once. Some portions will last as long as the economic life of the project while other parts will need repairs, but not full replacement. The "Estimated Salvage Value" identifies those items that will not need total replacement upon reaching their assumed economic life. The percentages noted on the schedule are based on our Plum Creek North Master Homeowners Association, Inc. Reserve Analysis, 2012 VERSION April 18, 2012 Page 4 experience. They can be modified after discussions with the Board of Directors regarding areas and percentages best fitting with the overall maintenance philosophy of the project. Some items have had recent major repairs or replacements. Replacement Costs Replacement costs were arrived at using estimating procedures and our experience with bidding current market prices. The amounts are in current dollars and are estimates. They assume major repairs or replacements will be done all at the same time. The actual costs for replacements may vary considerably depending on economic conditions, contract specifications, technological advances, regulatory changes, and maintenance schedules. No adjustments for inflation were made for replacement costs. Inflation values fluctuate and are not reliably defmed. Over a long period of time, inflation is often offset by investment credits or interest earned. The varying rates and changes to the project can be reflected by annual updates to the reserve analysis. We recommend annual updates to the reserve analysis to account for any substantial chanees directly affectine the cost of replacements. Such chanees would include insurance settlements, natural disasters, or unknown conditions requirine sienificant expenditures. Estimated Economic Life The estimated economic life and life left are our estimates obtained from published manuals, accepted industry standards, and our experience with similar projects. The estimated life remaining for the reserve items was determined after our visual inspections and discussions with the management company and contractors familiar with the community. The project began construction in 1999. The average age of the components had to be interpreted for each inventory item since some items will age faster than others. Some items have been repaired and replaced. The major replacements and repairs are reflected in the "Remaining Economic Life" and "Estimated Salvage Value" columns. The "Desired Reserve Budget," "Reserves Available," and" Annual Deposit" are arrived at after determining the estimated replacement costs and economic life span of the reserve items. Desired Reserve Budeet The "Desired Reserve Budget" is the estimated amount that would have been deposited by now if the inventory items had been included in a reserve deposit schedule from the beginning of the project. Each item's estimated replacement cost is divided by its proposed economic life and then mUltiplied by its age to arrive at the desired reserve budget. This is a "best case" scenario to show what would have been reserved to date for each item. These figures are used to develop a percentage or proportional relationship for each item as it relates to the total "Desired Reserve Budget." The item percentage is used to distribute the present reserves and analyze future needs. Plum Creek North Master Homeowners Association, Inc. Reserve Analysis, 2012 VERSION April 18, 2012 PageS Reserves Available The actual reserves available are distributed to each inventory item in proportion to the "Desired Reserve Budget" figures. The proportion or percentage for each item as determined by the "Desired Reserve Budget" is multiplied by the actual reserves on hand to arrive at the reserve value for each item. The reserves available for the reserve analysis update were $40,000.00. Annual Deposits The actual reserves available are distributed to each inventory item in proportion to the "Desired Reserve Budget" figures. The proportion or percentage for each item as determined by the "Desired Reserve Budget" is multiplied by the actual reserves on hand to arrive at the reserve value for each item. Averaee Annual Contribution The annual deposits required over the life of the project will fluctuate as reserves are saved and spent in anticipated cycles. We have attempted to account for these cycles by calculating the average annual deposits necessary for a 40 year period. In calculating your requirements, the initial deposit brings your reserve balance closer to what it should be now and the average deposit lets the association gauge what level savings to achieve in the future. You must consider that these amounts are determined as the best possible condition and to achieve the best reserve balance requires some long term planning. In most cases this amount is hard to achieve, especially if the reserves have not been analyzed for a long period of time. Most communities are doing very well if they can achieve 70-80% of the proposed annual contributions. A part of the planning process may be to establish a reasonable goal and attempt to reach the best result possible without extravagant demands on the homeowners. The Association appears to have an adequate reserve balance at the present time and the Association should continue to make their scheduled reserve deposits so adequate funds are available for future capital asset replacements As stated previously, we recommend annual updates to the reserve analysis to account for replacements, changes in replacement costs, and changing interest rates. Interest earned will tend to offset inflation. Attempting to forecast into the future is tenuous at best. We believe it is preferable to make simple annual changes to the analysis and make decisions based on the most recent information available. The reserve analysis is a working document and should be adjusted as necessary to meet the needs and desires of the Association and reflect changing conditions. We performed this analysis at the request of the Board of Directors of Plum Creek North Master Homeowners Association, Inc. The report is intended for the Association's exclusive use and should not be used for contracting work or relied upon by any other party. The analysis reflects conditions Plum Creek North Master Homeowners Association, Inc. Reserve Analysis, 2012 VERSION April 18, 2012 Page 6 within the property that could be examined visually and is limited to the extent of the report. The analysis is also based upon representations made by Plum Creek North Master Homeowners Association, Inc. in regard to existing reserve fund balances, recent replacements or repairs, and interpretation of the Declarations and Covenants for the project. While reasonable effort was made to ascertain the condition of the property and/or equipment within, it is not to be construed as a guarantee or warranty of the property or equipment therein, nor does it imply that all components will function properly on or after the date of this report. Acceptance of this report by the Association constitutes the agreement of the Association that the liability of Bradley Property Consultants, Inc. for any errors or omissions on negligent misrepresentations herein is limited to the fee paid for this report and that there shall be no liability whatsoever for incidental or consequential damages. Unless otherwise noted in the report, no sampling, testing, or dismantling of any equipment, systems or structural components of the property, other than the visual inspection, was performed. Further, no inspections or tests for soil quality or stability, asbestos, PCBs, or any other hazardous materials were undertaken nor was the quality or adequacy of the water and sewer service to the property analyzed. The inspections addressed herein were not undertaken to address any specific use or purpose contemplated by the Association other than what was stated in the report. This report does not in any way address the property's compliance with any federal, state, or local laws, rules, regulations, or ordinances. We believe the analysis will provide a useful planning guide. Actual experience in replacing items may differ significantly from the estimates given. Again, we recommend annual updates to the analysis to reflect changes to current conditions. If you have any questions or require further information, please contact our office at any time. Very truly yours, BRADLEY PROPERTY CONSULTANTS, INC. Stephen M. Bradley, President Enclosures and Attachments: 2012 Update and Revision - Replacement and Reserve Analysis Table - Tables and Graphs of Reserve Balances Over Remaining Life of Components - Table of Projected Capital Expenses By Year -===- BRADLEY t =laC; PROPERTY PLUM CREEK NORTH MASTER ASSOCIATION CONSULTANTS RESERVE ANALYSIS 2012 VERSION: 4-18-12 Property Inspection • Construction Consultants Project date: 1999 Jii~~I~:f fllt ~illi~I~Ii~1 ::S$t;:: II j~stn :est{ )$.1R~P : ECbN;: :L1Fe: dJiF£f: LEFT : ~EPL: COST /::,:/: RiEsiERve: :suooeT:: HfR$:: : :Xf($:: ::::::::::$/:::::: ......... ........ : ~~~~~~~ :AVAlLABLE :::::::::::::$:::::::::::: :mfflPp~ffim: .;.;.:lNtTIAL.:-:-: m~~f-~@ CO"~Q.N: ARf;A~ :::::::::::::::::::::::::::::: :::::::1 3,100 1 1 Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign 3.50 9,000 2,000 0 )0 20 25 9 12 I CONTINGENCY 22,042 1 0%1 01 TOTAL REPLACEMENT COST 4~_850 1TOTAL DESIRED RESERVES ~ 22,042 1 1 TOTAL RESERVES AVAILABLE ~ 1 TOTAL INITIAL CONTRIBUTION 1 nnP 1 140 YR AVERAGE ANNUAL CONTRIBUTION BPC, Inc., 05/2012 1 - ~ 1,985 / -Ii" ,:. PLUM CREEK NORTH MASTER ASSOCIATION BRADLEY PROPERTY CONSULTANTS RESERVE ANALYSIS- Reserve Balances Over Remaining Life of Components Property Inspection· Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St, Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 I~J~~~~~J~~ :ytAif d&.i2:H V~~l( y~~~ !Uf }! Hf > :2011::: HdU} )1 ~~~ :VEAR / i :\ HHfH ::~oj~!:: ::;i01S::: : ~otf : )~It.~~ )o."W :::::6:: == :YEA;R )~,~T :YEAR ::20l~F :H,L} >:1'=< :y~~ :YEAR !::::iVY <to:) ::202tL YEAR kioiiL !U{) ::%oil:H 10,290 8,333 1,543 5,990 14,225 10,341 8,500 1,635 5,991 14,296 10,391 8,666 1,726 5,992 14,366 10,442 8,833 1,817 5,994 14,437 10,493 9,000 1,909 5,995 14,507 10,544 900 2,000 5,996 14,577 10,595 1,800 200 5,997 14,648 10,646 2,700 400 5,999 14,718 10,697 3,600 600 6,000 14,789 10,748 4,500 800 300 14,859 10,799 5,400 1,000 600 14,930 40,381 40,762 41,142 41,523 41,904 34,018 33,241 34,463 35,686 31,207 32,729 0 0 0 0 0 0 0 0 0 (9,000) 0 (2,000) 0 0 0 0 0 0 0 0 ANNUAL DEPOSIT 381 381 381 381 381 1,114 1,223 1,223 1,223 1,521 1,521 TOTAL RESERVES 40,381 40,762 41,142 41,523 32,904 32,018 33,241 34,463 29,686 31,207 32,729 1 Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign BASE RESERVES CONTINGENCY CAPITAL EXPENSES BPC, IDe., 0512011 0 (6,000) I Ul, «:" PLUM CREEK NORTH MASTER ASSOCIATION BRADLEY PROPERTY CONSULTANTS P~rty ~ • RESERVE ANALYSIS- Reserve Balances Over Remaining Life of Components Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St. , Denver, CO 80210 Phone: 303-232-0252 Fax: 303·232·3243 i~~~~~m~~1 :YEAR Hio2iL Hil:/ Y~A~ :[ioiiC x¢.~~: :YEAa / If) / (4/[ / lS/ Yi$M{ dDl~ H ::2021;< :2riii:: /i~ i/ YEAR: [1 '1: iiijfi ?H[/ YEAR: YEAR: YEA'{ [ fi~2f : ) i8 )[ !I m ·: YEAR: :YEAR: [i[ if/ :i[:li:[i[[ [ i~3f H d~jj H[ CQ.MMON:AREA:::::[:[:::::::::[:::::::::::::[:::[ Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign 10,850 6,300 1,200 900 15,000 434 7,200 1,400 1,200 600 868 8, 100 1,600 1,500 1,200 1,302 9,000 1,800 1,800 1,800 1,736 900 2,000 2,100 2,400 2, 170 1,800 200 2,400 3,000 2,604 2,700 400 2,700 3,600 3,038 3,600 600 3,000 4,200 3,472 4,500 800 3,300 4,800 3,906 5,400 1,000 3,600 5,400 BASE RESERVES CONTINGENCY CAPITAL EXPENSES 34,250 10,834 13,268 15,702 9,136 9,570 12,004 14,438 16,872 19,306 0 (25,850) 0 0 0 0 0 (9,000) 0 {2,000} 0 0 0 0 0 0 0 0 0 0 ANNUAL DEPOSIT 1,521 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 1 TOTAL RESERVES 8,400 10,834 13,268 6,702 7,136 9,570 12,004 14,438 16,872 19,306 21,740 1 - BPC, Inc., 0512012 2 4,340 6,300 1,200 3,900 6,000 74 21. i · la' BRADLEY PROPERTY PLUM CREEK NORTH MASTER ASSOCIATION , :. • CONSULTANTS RESERVE ANALYSIS- Reserve Balances Over Remaining Life of Components Property Inspection • Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St. , Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 ,~~~t66~y~~~ 1 :COMMON:AREAi \ :::::: ... YEAR: :YEAR: :::23::> < l~f < :vEAR ::~~l,~::i :~~~~:i: :YEAR :m~~!!I: :.i!:: =:2036:: }Z5 / : ¥~4i~ jQj~::: :VEAR > i!2:~:~:! i·i:::; ) 27:: Y :Yif*~ :' ~~:Oi: :YM~ :xItAR : :' Jti4F / 3l):< YEAR ::2.943.::: \ 3i:/ ::2042::: / 3l:\ YEAR ::2044::: }3iU :::::::>::: Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign 4,774 7,200 1,400 4,200 6,600 5,208 8, 100 1,600 4,500 7,200 5,642 9,000 1,800 4,800 7,800 6,076 900 2,000 5, 100 8,400 6,510 1,800 200 5,400 9,000 6,944 2,700 400 5,700 9,600 7,378 3,600 600 6,000 10,200 7,812 4,500 800 300 10,800 8,246 5,400 1,000 600 11 ,400 8,680 6,300 1,200 900 12,000 9, 114 7,200 1,400 1,200 12,600 BASE RESERVES CONTINGENCY CAPITAL EXPENSES 24,174 26,608 29,042 22,476 22,910 25,344 27,778 24,212 o o 31,514 o o 29,080 o o (9,000) (2,000) o (6,000) o o o o o o o 26,646 o o o o ANNUAL DEPOSIT 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 2,434 1 TOTAL RESERVES 24,174 26,608 20,042 20,476 22,910 25,344 21,778 24,212 26,646 29,080 31,514 1 c= o BPC, IDC., 0512012 3 i, ,:. BRADLEY PROPERTY CONSULTANTS PLUM CREEK NORTH MASTER ASSOCIATION RESERVE ANAL YSIS- Reserve Balances Over Remaining Life of Components Property Inspection· Construction Consultants 2012 VERSION: 4-18-12 1566 S. Clarkson St. , Denver, CO 60210 Phone. 303-232-0252 Fax: 303-232-3243 VEAk ~iNvEmoRyt$+: ::)::: H:: : ~::~:::::n::::n ~ y~~~ :~~~~:: ~m~~~ii: ~\j4 < ~ v EAk d04~H / 36/: ~YE.AR !I ~~~~··! :~:I~! ):M~ )q~f YEAR l U3~U/ <38<~ j osiH / 40/: :¢OM.ftllQN~ AReAi :~:~~::>:::::::::::::::::::::::: Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign BASE RESERVES CONTINGENCY CAPITAL EXPENSES 9,548 8,100 1,600 1,500 13,200 9,982 9,000 1,800 1,800 13,800 10,416 900 2,000 2, 100 14,400 10,850 1,800 200 2,400 15,000 434 2,700 400 2,700 600 868 3,600 600 3,000 1,200 1,302 4,500 800 3,300 1,800 33,948 36,382 29,816 30,250 6,834 9,268 11,702 0 (9,000) 0 (2,000) 0 (25,850) 0 0 0 0 0 0 0 0 ANNUAL DEPOSIT 2,434 2,434 2,434 2,434 2,434 2,434 2,434 1 TOTAL RESERVES 33,948 27,382 27,816 4,400 6,834 9,268 11,702 1 BPC, In c., osno 12 4 ·~, ,; W' BRADLEY PROPERTY CONSUL TANTS PLUM CREEK NORTH MASTER ASSOCIATION RESERVE ANAL YSIS- Reserve Balances Over Remaining Life of Components Property Inspection· Construction Consultants 1588 S. Clarkson St , Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 50 40 ~ r:::: 30 I'll VI :::l o .J::. f- 20 10 o 2021 2022 YEAR • CAPITAL EXPENSES . ANNUAL DEPOSITS . TOTAL RESERVES 2012 VERSION : 4-18-12 RESERVES ON HAND YEAR 1 ENDING BALANCE YEAR 11 AVERAGE BALANCE YEAR CAPITAL EXPENSES ANNUAL DEPOSITS TOTAL RESERVES BPC, 11IC-, 0512011 2012 0 381 40.381 22013 0 381 40.762 3 201. 0 381 41142 4 5 $42,850 $1,545 $884 VALUE OF RESERVE ITEMS AVERAGE CAPITAL EXPENSE AVERAGE DEPOSIT $40,000 $32,729 $35.460 -_.- -_ .. -_.- 8 9 -_.- -- .- ---- 0 381 41.523 (9,000) 381 32904 (2,000) 1,114 32.018 0 1,223 33241 0 1,223 34.463 (6,000) 1,223 29.686 6 7 10 0 1,521 31207 - 11 ---- OJ 1,5211 32,7291 ~BRADLEY ~PROPERTY CONSULTANTS PLUM CREEK NORTH MASTER ASSOCIATION RESERVE ANALYSIS- Reserve Balances Over Remaining Life of Components Proptrty IrlSpKtion • Construction Consultants 1588 S. Clarkson St., Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 30 25 20 III "0 c: l}l :::l 15 o .c t- 10 5 o 2032 2033 YEAR • 2012 VERSION : CAPITAL EXPENSES . 12 OP(~ 2023 (25,850) 1,521 8.400 TOTAL RESERVES 4~~ RESERVES ON HAND YEAR 12 ENDING BALANCE YEAR 22 AVERAGE BALANCE YEAR CAPITAL EXPENSES ANNUAL DEPOSITS TOTAL RESERVES ANNUAL DEPOSITS . 13 14 2024 0 2,434 10.834 2025 0 2,434 13.268 15 16 2026 (9,000) 2,434 6702 2027 (2,000) 2,434 7136 Inc., O~Ol1 2 $42,850 $3,350 2.351 VALUE OF RESERVE ITEMS AVERAGE CAPITAL EXPENSE AVERAGE DEPOSIT $34,463 $21,740 12.752 17 18 19 20 21 2028 0 2,434 9570 2029 0 2,434 12.004 2030 0 2,434 14438 2031 0 2,434 16.872 2032 0 2,434 19.306 22 2033 01 2,4341 21.7401 ~. C: W' BRADLEY PROPERTY CONSULTANTS PLUM CREEK NORTH MASTER ASSOCIATION RESERVE ANALYSIS- Reserve Balances Over Remaining Life of Components Property Irnptction • Construction Consultants 1588 S. Clarkson St , Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 35 30 25 VI -g 20 «I VI :;, ~ ~ 15 10 5 o 2043 2044 YEAR • CAPITAL EXPENSES . ANNUAL DEPOSITS . TOTAL RESERVES 2012 VERSION: 4-1S- tz] RESERVES ON HAND YEAR 23 ENDING BALANCE YEAR 33 AVERAGE BALANCE 23 YEAR CAPITAL EXPENSES ANNUAL DEPOSITS TOTAL RESERVES 2034 0 2,434 24,174 24 2035 0 2,434 26608 25 2036 (9,000) 2,434 20,042 26 27 2038 0 2,434 22,910 2037 (2,000) 2,434 20476 BPC,Inc..05I2012 3 $42,850 $1,545 $2.434 VALUE OF RESERVE ITEMS AVERAGE CAPITAL EXPENSE AVERAGE DEPOSIT $14,438 $31,514 24.799 28 2039 0 2,434 25344 29 2040 (6,000) 2,434 21,778 30 31 32 2041 0 2,434 24,212 2042 0 2,434 26646 2043 0 2,434 29,080 33 2044 01 2,434J 3h514J ~. BRADLEY ~PROPERTY CONSUL TANTS PLUM CREEK NORTH MASTER ASSOCIATION RESERVE ANALYSIS- Reserve Balances Over Remaining Life of Components Property InspKtion • Construction Consultants 1588 S. Clarkson 51., Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 40 30 IJl 'C C III:J 20 o .c I- 10 o 2051 YEAR • 2012 VERSION : 34 2045 0 2,434 33.948 ANNUAL DEPOSITS . TOTAL RESERVES 4~~ RESERVES ON HAND YEAR 34 ENDING BALANCE YEAR 40 AVERAGE BALANCE YEAR CAPITAL EXPENSES ANNUAL DEPOSITS TOTAL RESERVES CAPITAL EXPENSES . 35 2046 (9,000) 2,434 27.382 36 2047 (2,000) 2,434 27816 VALUE OF RESERVE ITEMS AVERAGE CAPITAL EXPENSE AVERAGE DEPOSIT $24,212 $11,702 $17.336 37 2048 (25,850) 2,434 4.400 39 2050 0 2,434 9268 38 2049 0 2,434 6834 BPC. lnc:., 05I2012 4 40 2051 01 2,4341 11,7021 $42,850 $4,942 $2.434 -la, BRADLEY PROPERTY PLUM CREEK NORTH MASTER ASSOCIATION ,: ~ CONSULTANTS RESERVE ANALYSIS- Projected Capital Expenses By Year Property I~tion· Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St., Denver, CO 80210 Phone: 303-232-0252 FalC: 303-232-3243 i~~~~~~~~ •.•. ~Al( YEAR: YEAR ~ ~oli ~ ~~': f ~ :\f \ t :YEAR : ~2(WL ~/f / :¥EAif : ~D~mll!:,:,: ~ ~iQ~$~:~ W VEAR: : 1~1¥ ~: \ ~ :::::: ~~~~ :2iiiH / ~H \ YEAR' :YEAR :Ug :\~ HUr t jOl(H : 1~19::: ):~M~ Jo,~~::: VEAR :loli: ~ :::jjU: lO: co.MMQ~fAREAi ~/ : ~:~: ~:~: ~ :~: ~:~: ~ : ~: ~:~::::: Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign Capital Expense BPe, I .... , 0512012 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9,000 0 0 0 9,000 0 0 2,000 0 0 2,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,000 0 6,000 0 0 0 0 0 0 0 0 0 0 0 0 t:Ja- BRADLEY PROPERTY CONSUL TANTS PLUM CREEK NORTH MASTER ASSOCIATION RESERVE ANALYSIS- Projected Capital Expenses By Year Property lnsptction • Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St. , Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-3243 i~m~~~~~~ Co.MMQN),,~eA:I: @.~~{ ,:H :1.13::: ?if/ )W1Mt. YEAR :[2024::: iHiU :)1¢#R ::l016::: :jTI~;~ij: :Hs): :YEAif li 1~;m:ij V~AI( YEAR:.: :~~tij:)) :l028::: :::1+:/ YEAR: :VEAR: :YEAR :YEAR : 203:( ?ii? :i203L ?io?i i l~3(k >ii~ ?: dOl!) ?l£? ,,;:::; :,:,,;,,: TF Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign Capital Expense 10,850 0 0 0 15,000 0 0 0 0 0 0 0 0 0 0 0 9,000 0 0 0 0 0 2,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,850 0 0 9,000 2,000 0 0 0 0 0 0 BPC, Inc., 0512012 2 -lA, ,:. BRADLEY PLUM CREEK NORTH MASTER ASSOCIATION PROPERTY CONSUL TANTS RESERVE ANALYSIS- Projected Capital Expenses By Year Property InspKtion • Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St., Denver, CO 80210 Phone: 303-232-{)252 Fax: 303-232· 3243 .'. YEAll' ~~~iill~J: ~~~~:: Co.MMON:AREAT> ",,:, :" ",,:. 'YEAR: YEAR : l~lf : i F:~~lli >ii/ ::i036~:: \ 25::::: 'VEAa : i037: : / i6::::: ~~i ¥~~~: :¥tMf jQ~*- ::: ' l~n ~~~ )1f) ::: ~ ::::: 'df/ ::~q4~::: <a~/' ~ ~20iU~ ~~ /3.:: : ) j(jj ( y~~~: ~ YEAR ' rM~ j~i '1044:::: :jj: ::: :::::::: Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign Capital Expense 0 0 0 0 0 0 0 0 0 0 0 0 0 9,000 0 0 0 0 0 2,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9,000 2,000 0 0 6,000 0 0 0 0 BPe. l ..... 0512012 3 • _ _ . BRADLEY PLUM CREEK NORTH MASTER ASSOCIATION 'lla!' PROPERTY CONSULTANTS RESERVE ANALYSIS- Projected Capital Expenses By Year Property Inspection • Construction Consultants 2012 VERSION: 4-18-12 1588 S. Clarkson St., Denver, CO 80210 Phone: 303-232-0252 Fax: 303-232-32.3 !~~~b~Y~!~ :¢OM:Mott~ReA(~»: :VEAR :r~~ J046? Ul5/: n~Q~$~:~ /~f ::: ~ VEAR ~ ~ :204'} Ya6Y:: Y~M;{ ~~: )~~*- ::: ~:~ ~;f < :y@~ Y.t:~~: : ~QS( : >40 ~< ~ l"S(F ::: ~~ :/ :~ )8 ?: ):( ::\\ Sprinkler system Landscape refurbish & tree replace Upgraded irrigaion clock Sign lighting Stone wall/project sign Capital Expense 0 0 0 0 0 0 0 9,000 0 0 0 9,000 0 0 2,000 0 0 2,000 BPe, Inc., 05/2012 4 10,850 0 0 0 15,000 25,850 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0