Link Progress Report January 2016
Transcription
Link Progress Report January 2016
Progress Report Link Light Rail Program Overhang ceiling tile installation at the Angle Lake Station January | 2016 Prepared by Project Control & VE l Design, Engineering & Construction Management TABLE of CONTENTS Program Overview ............................................................... 1 University Link Extension ................................................... 3 Tunnels ........................................................................ 13 Stations ....................................................................... 14 Systems ....................................................................... 18 Northgate Link Extension ................................................... 23 Lynnwood Link Extension .................................................. 37 I-90 Two-Way Transit & HOV Operations (Stage 3) ...........43 East Link Extension….. ....................................................... 47 S. 200th Link Extension ...................................................... 61 Federal Way Transit Extension .......................................... 77 Tacoma Link Expansion ..................................................... 81 Link Operations & Maintenance Satellite Facility ............. 85 ST2 LRV Fleet Expansion ................................................... 89 Staffing Report ..................................................................... 91 Acronyms ............................................................................. 115 Link Light Rail Program Overview Map of Sound Transit’s current and future light rail projects. Link Light Rail Program Overview 0;o` // Projects University Link Extension (U-Link): This project is a 3.15-mile light rail segment which is located entirely underground with tunnels traveling from Pine Street, under the I-5 freeway to an underground station at Capitol Hill, continuing north beneath SR 520 and the Montlake Cut to an underground station on the University of Washington campus, near Husky Stadium. Revenue Service is projected in the 1st QTR 2016. The Sound Transit Board adopted the baseline capital budget of $1.76B in July 2008. Northgate Link Extension: The University of Washington Station (UWS) to Northgate project is a 4.3-mile extension of light rail from the UWS north under campus via twin-bored tunnels to an underground station at NE 45th Street continuing to an underground station at NE 65th Street and via tunnel, retained cut and elevated sections to Northgate. The project is in Final Design and Construction. Revenue Service date is September 2021. The Sound Transit Board adopted the baseline capital budget of $2.13B originally in 2012 and revised the baseline budget to $1.89B in October 2015 (deleted LRV and added the UW TOD Overbuild). Lynnwood Link Extension : Lynnwood Link Extension extends light rail 8.5 miles to Snohomish County along I-5 from Northgate Mall in Seattle to the Lynnwood Transit Center, with four new light rail stations. The configuration includes at-grade, elevated, and retained cut/fill alignment. The proposed budget for this project is $1.89B. East Link Extension: East Link Extension expands light rail to East King County via I-90 from Downtown Seattle to the Overlake Transit Center area of Redmond, with stations serving Rainier Avenue/I-90, Mercer Island, South Bellevue, Downtown Bellevue, Overlake Hospital, the Bel-Red corridor, Overlake Village and the Redmond Technology Center (formerly Overlake Transit Center). Revenue service to the Redmond Technology Center is forecast for early 2023 with a tunnel route in Downtown Bellevue. The Sound Transit Board adopted the baseline capital budget of $3.67B in April 2015. South 200th Link Extension: S. 200th Link Extension consists of a 1.6-mile extension of the light rail from the SeaTac/Airport Station to an elevated station at South 200th Street. The Project is being developed through a designbuild (DB) delivery strategy and the anticipated service launch is September 2016. The Sound Transit Board adopted the baseline capital budget of $383M in 2011. Federal Way Link Extension: Sound Transit has identified the route and station location requirements for the extension of light rail to the Federal Way Transit Center; with preliminary engineering to be completed on the segment extending from S. 200th St. to Kent/Des Moines in the vicinity of Highline Community College. The proposed budget for this effort is $41.8M. Tacoma Link Expansion: In partnership with the City of Tacoma and Pierce Transit, Sound Transit is studying the potential of expanding Tacoma Link in the context of the City and Pierce Transit service and capital plans. Link Operations and Maintenance Satellite Facility: Sound Transit is reviewing and evaluating current and future light rail storage and maintenance requirements to support the development, design, and construction of a future light rail operations and maintenance facility for proposed system expansion. ST2 Light Rail Vehicles (LRV) Fleet Expansion: This project includes the design, manufacturing, inspection, testing and delivery of 122 low floor LRVs for service requirements of Northgate, East Link and Lynnwood Link Extensions. The Sound Transit Board adopted the baseline capital budget of $733M in September 2015. January 2016 Page 1 of 117 Link Light Rail Program Overview Program Budget Project Adopted Budget Committed to Date Incurred to Date Estimated Final Cost Adopted Budget vs. EFC University Link $1,756.0 $1,493.7 $1,466.6 $1,605.4 $150.6 Northgate Link Extension $1,899.8 $821.3 $631.4 $1,899.8 0 Lynnwood Link Extension $487.9 $55.0 $52.4 $487.9 0 $3,677.2 $645.3 $420.8 $3,677.1 0 $383.2 $318.3 $287.9 $343.2 $40.0 Federal Way Extension $42.9 $33.2 $21.9 $42.9 0 Tacoma Link Expansion $33.0 $7.6 $7.1 $33.0 0 Link O & M Satellite Facility $133.6 $33.2 $30.8 $133.6 0 ST2 LRV Expansion $733.0 $4.8 $1.1 $733.0 0 $9,146.5 $3,412.3 $2,920.1 $8,955.9 $190.6 East Link Extension South 200th Link Extension Total Link Table in millions. Program Schedule Schedules for active projects are summarized below. Changes this period: None. January 2016 Page 2 of 117 Link Light Rail University Link Extension Scope Limits: 3.15-mile extension of the Initial Segment light rail transit (LRT) system from the Pine Street Stub Tunnel (PSST) in downtown Seattle to University of Washington (UW) campus near Husky Stadium. Tunnels: Two twin bored tunnels. Two contract segments: U220 starts at Husky Stadium, continues beneath SR 520 and the Montlake Cut south to the Capitol Hill underground station. U230 commences at Capitol Hill Station and proceeds south under the I-5 freeway to the PSST. Stations: 2 underground center platform stations – Capitol Hill (U240) and University of Washington (U250). U240 is approximately 65’ underground with three station entrances. U250 is about 100’ below ground, with three station entrances and connections to the UW campus by a pedestrian bridge. System: 27 LRV; direct fixation tracks, signals, traction electrification, and SCADA communications Budget: $1.948 billion including finance cost (capital subtotal of $1.756 billion) Schedule: Project completion in the 1st QTR 2016 Key Project Issues U830 Systems - SCADA software development continues to be the highest risk critical path in Systems—now in the commissioning and integration testing phases. Repaired 26kV splices continue to be problematic. As of this writing, ST has now completed repairing one tunnel bore and target to complete all splices by Revenue Service. Only one redundant cable is required for operational redundancy. U240 Capitol Hill Station /U250 UW Station - Level 3 inter–station testing on the Emergency Ventilation System seems to be challenging. Modification to the fan modes and installation of additional stair and elevator dampers, power door operators is progressing. As of this writing, these mitigation work has been witness and bought off by the Seattle Fire Department. Substantial Completion was achieved on December 31, 2015. This is no longer an issue. LRV Fleet Wide Repairs - Fleet wide defect was discovered in the LRVs’ traction motor/gearbox unit. Priority are given to repair the older LRV. Without sufficient reliable LRVs by Revenue Service or Pre-Revenue Service, U-Link will be challenged to operate with six- minute headways. Cost is tracked and isolated from the U-Link project. The goal is to complete all repairs by Opening Day or at minimum, sufficient LRV with required spares to operate six- minute headways. Forty-two repaired car sets has been put into service and is being monitored for performance. All the higher mileage LRV which were the most unreliable are now repaired. This risk continues to subside. Advance Opening: Revenue Opening has been announced for the weekend of March 19, 2016. Pre-revenue Phase started on January 14, 2016. Testing and Start-Up Period is compressed - any impact or delay will be day to day. Coordination with regional stakeholders continues. Link Operation has initiated 6 minutes peak headways in the DSTT. Newly imposed new federal requirement for additional safety oversight responsibilities -“System Safety Readiness Review” for U-Link alignment took placed in November 2015. January 2016 Page 3 of 117 Link Light Rail University Link Extension Project Cost Summary The U-Link project cost is summarized in two types of cost classifications. In the first table, cost is classified in accordance with Sound Transit’s Work Breakdown Structure (WBS); and in the second table, cost is summarized in accordance to the FTA’s Standard Cost Categories (SCC) format. (Both tables’ figures in millions.) Baseline Budget WBS Phase Elements ADMINISTRATION PRELIMINARY ENGINEERING FINAL DESIGN CONSTRUCTION SERVICES 3rd PARTY AGREEMENTS CONSTRUCTION VEHICLES ROW Capital Total FINANCE COST Project Total $ $ $ $ $ $ $ 115.23 24.39 77.94 68.53 18.65 1,180.00 103.91 Current Commitment to Incurred to Date Adopted Budget Date* $ $ $ $ $ $ $ 113.55 24.26 90.31 94.81 18.65 1,158.18 103.91 $ $ $ $ $ $ $ 77.08 24.26 86.80 84.82 12.01 983.94 99.20 $ $ $ $ $ $ $ 75.26 24.26 84.91 83.74 11.08 962.56 99.19 Est. Final Cost Adopted Budget (EFC) vs. EFC $ $ $ $ $ $ $ 103.55 24.26 90.31 92.80 17.61 1,047.68 101.91 $ $ $ $ $ $ $ 10.00 (0.00) 2.01 1.03 110.50 2.00 $ 167.33 $ 152.33 $ 125.61 $ 125.60 $ 127.29 $ 25.04 $ 1,755.97 $ 1,756.01 $ 1,493.70 $ 1,466.59 $ 1,605.41 $ 150.59 $ 191.71 $ 191.71 $ 191.71 $ 162.15 $ 191.71 $ - $ 1,947.68 $ 1,947.72 $ 1,685.41 $ 1,628.74 $ 1,797.12 $ 150.59 (*)Totals may not equal column sums due to rounding of line entries. In January, the projected Estimated Final Cost (EFC) including Finance Cost continues to be about $1.8B. This period, approximately $2.8M was incurred, increasing the project Incurred to Date amount to about $1.5B (Finance Cost excluded). Direct construction cost accounted for about 40% of the cost incurred in January at $1M with the majority of the cost largely in work. The direct construction EFC trends approximately $1B. This trend continues to be intact as both the high risk tunnel scope and all excavation are now completed. The Capitol Hill Station (U240) Contractor achieved Substantial Completion on December 31, 2015 and continues on supporting commissioning testing and completing their punch list work, the Systems (U830) Contractor continues the end device installations, system integration and testing. Maintenance of Way continues on building finishes. The Total Incurred to Date for the Construction Phase is about $963M with a current commitments about $984M. Cost for LRV is at about $99.2M and repairs to the traction motor and gear unit continues. Cost of repairs are excluded from this project and tracked independently. Construction EFC under the SCC format for this period remains stable and relatively unchanged at about $1B. Construction SCC expenditures in January is at $0.44M. This period, the bulk of U-Link construction cost has been attributed Station punch list and Systems testing and change order work. Project Elements by SCC 10 Guidew ay & Track Elements 20 Stations 30 Support Facilities: Yards, Shops 40 Sitew ork & Special Conditions 50 Systems Construction Subtotal (SCC 10-50) 60 Row , Land, Existing Improvements 70 Vehicles 80 Professional Services 90 Unallocated Contingency Capital Cost Total (SCC 10-90) 100 Finance Cost Project Total Baseline Budget $ $ $ $ $ $ $ $ $ $ $ $ $ 626.83 366.33 7.01 59.03 69.63 1,128.82 167.33 99.76 306.41 53.65 1,755.97 191.71 1,947.68 Current Commitment to Estimated Final Adopted Budget Incurred to Date Adopted Budget Date* Cost (EFC) vs. EFC $ $ $ $ $ $ $ $ $ $ $ $ $ 450.46 350.75 24.83 67.39 116.42 1,009.85 125.77 100.16 346.58 173.64 1,756.01 191.71 1,947.72 $ $ $ $ $ $ $ $ $ $ $ $ $ 455.71 341.32 22.82 56.03 98.44 974.31 125.61 99.87 293.92 1,493.70 191.71 1,685.41 $ $ $ $ $ $ $ $ $ $ $ $ $ 456.02 338.60 21.63 52.41 86.01 954.67 125.60 99.32 287.01 1,466.59 162.15 1,628.74 $ $ $ $ $ $ $ $ $ $ $ $ $ 463.22 353.59 24.83 60.59 104.10 1,006.33 125.77 100.16 342.92 30.23 1,605.41 191.71 1,797.12 $ $ $ $ $ $ $ $ $ $ $ $ $ (12.76) (2.84) 6.80 12.32 3.52 0.00 0.00 3.66 143.41 150.59 150.59 (*)Totals may not equal column sums due to rounding of line entries. January 2016 Page 4 of 117 Link Light Rail University Link Extension Incurred to date for Construction under the SCC is almost $955M. Total capital cost incurred to date including non-construction cost (SCC 60 thru 90) now exceeds $1.46B or about 84% of total project budget scoped (excluding Finance Cost). Total cost incurred at the end of January 2016 including Finance Cost is nearing $1.63B. The project financing cost incurred to date about $163M. In the 4th QTR 2015, $10.38M of interest cost was recorded. The next finance cost update will be for the end of 1st QTR 2016. Overall, University Link cost to date is projection of approximately $1.65B by May 2016. At time of publication, EFC has been revised to show a trend of approximately over $200M under budget, unfortunately, the system numbers does not reflect this new trend as these numbers were frozen before the revised forecast was completed. The EFC for project Finance Cost continues to be projected at $191.7M. This cost represents booked financing cost and is generated based on allocation of appropriate level of financing cost to each capital project at Sound Transit. Despite an earlier than anticipated release of $44M of the FFGA funds due to the American Recovery Reinvestment Act that was used to pay down finance charges, it is premature to project any savings at this time. January 2016 Overall Construction Progress Summary 1/31/2016 Early Works U210 Early Utility Work 100% U211 Demo & Remediation 100% U215 I-5 Undercrossing 100% Tunnels U220 UWS to CHS 100% U230 CHS to PSST 100% Stations U240 Capitol Hill Station 99.5% U250 University of WA Station 100.0% . Systems U820 Yard Expansion 100% U830 Systemwide & Trackworks 99.0% Other Systems Contracts 95.0% Overall Major Construction 99.5% Note: The overall construction progress above is based on a weighted combination of duration, schedule and cost % complete for individual construction contracts as compared to the overall U-Link construction contracts. Page 5 of 117 Link Light Rail University Link Extension Cost Contingency Management Project contingencies continue to remain at a healthy level of a little over $269M due to the favorable construction bidding climate, ROW acquisition cost trends, diligent project risk management practices and excellent tunneling conditions. December’s overall contingency notched down by about $3M due to change orders and some administrative adjustments due to the budget transition from the previous fiscal year to the current. Contingency level continues to trend well above the Planned Contingency Drawdown; the projected planned balance between the end of 4th QTR 2015 and the end of 1st QTR 2016 ranges from $74M and $70M. Both the Contingency Buffer the planned Reserved Contingency balance is now officially removed (see contingency curve at the bottom of page). Construction has now surpassed 99% complete. Barring any catastrophic event, there is a high likelihood that this contingency trend will remain intact. A revised forecast at the time of this publication indicated that approximately 74% of these contingencies will be remain uncommitted. Design Allowance: The balance of design allowance has been reduced to less than $1M and is consistent with the project cycle as all the major design has been completed. The level of design allowance currently represents less than one-half percent of the total remaining scope in the project that has not been procured. Allocated Contingency: Allocated Contingency continues to remain stable approximately at $222M. Unallocated Contingency (UAC): The total UAC balance is at $47M and continues to remain stable compared to the Baseline Cost Estimate amount of $53.7M considering that the construction is now surpassed 99% complete. BCE Contingency Status Amount Design Allowance Allocated Contingency Unallocated Contingency $103.9 Total: Current Status % of Total R emaining A mo unt 7.8% $0.9 Contingency by Type Histogram % R emaining W o rk 4.5% $264.3 19.8% $220.8 1094.0% $53.7 4.0% $47.5 235.3% $421.9 31.6% $269.2 1333.8% $450.0 $400.0 $350.0 $300.0 $250.0 $200.0 $150.0 $100.0 $50.0 $0 Percentage = Contingency $ /(EFC or Remain. Work $ ex-Contingencies) $270 $270 $270 $269 $47 $47 $47 $47 $223 $1 $222 $222 $221 $1 $1 $1 Oct-15 Nov-15 Dec-15 Jan-16 UAC Allocated Contingency Design Allowance Available Contingency MINIMUM CONTINGENCY CURVES as of January 31, 2016 $ in millions $450.0 Substantial Completion of All Tunnels Substantial Completion of UW Station $400.0 $350.0 Substantial Completion of CH Station $300.0 $250.0 $269M $200.0 $150.0 January 2016 Reserved Contingency Planned Contingency Draw Down Minimum Contingency Buffer at +20% of Minimum Jun '17 Dec '16 Jun '16 Dec '15 Jun '15 Dec '14 Jun '14 Dec '13 Jun '13 Dec '12 Jun '12 Dec '11 Jun '11 Dec '10 Jun '10 Jun '09 Dec '08 $0 Jun '08 $50.0 Dec '09 Reserved Contingency $100.0 Contingency Balance Page 6 of 117 Link Light Rail University Link Extension Risk Management The University Link Risk Management Plan (RMP) established a risk management and oversight process for identifying, assessing, and monitoring risks and develop risk reduction/mitigation plans. On a quarterly basis, the risk register is reviewed and risks are updated to reflect condition at the end of the current quarter. The RMP is also executed in compliance to the Federal Transit Administration’s (FTA) guidance laid out as part of FTA’s Program Guidelines subtask 40E. Project Risk Overview: At the end of the 4th QTR 2015, U-Link project represents about 99% construction completion with U220 and U230 Tunnels at Acceptance; U240 Station is about 98% complete. U250 achieved substantial completion, and is now working on punch list and level 3 and 4 commissioning. U830 Systems approaches 97% complete with continued work on the SCADA development and installation as well as ongoing verification for current communication and signaling elements before the full system integration. Rail Activation phase is now in full swing. Sound Transit continues to identifying and update risks on the register that were both within the current management time horizon and posed considerable risk to project objectives by having both relatively high probability and impact. Currently, the register contained a total of 659 risks, of which 122 were active (537 closed). Closed risks were those that no longer presents a potential impact, e.g., risks associated with surface and tunnel excavation at the stations and design risks that have been resolved since the last update. The risks items remaining in the register continues to be high due to activities relating to Rail Activation phase and specifically the interfaces due to the commission of the extension system. University Link team will continue to manage the Rail Activation phase with careful deliberation to avoid any “down stream effect” as these are follow-on work and some of the risk may have already been captured upstream in the current active construction and rail activation phase. The top remaining risk subjects that will require at least partial mitigating action in the upcoming quarter are provided below along with their planned risk management strategies: Systems Software Development Development of the software systems to operate U-Link and the integration of the current operating system Systems Final Design, Installation, and Testing (U830, U835, System-wide Testing) All phases U-Link systems integration between the cut over of the current operating systems through to the commissioning and occupancy of the U-Link program Rail Activation As the project moves closer towards the transition from construction to rail activation, identification of new risks and its potential to impact cost and schedule needs to be more visible. LRV Fleet wide Repair A defect was discovered in the Traction Motor/Gear Unit in the LRVs. Repairs require long lead materials and careful coordination to minimize any impacts to current operations. If there are insufficient reliable LRVs by Revenue Start, the six-minute headways promised for U-Link will be at risk. As of writing (January), all the older vehicles that require immediate attention has been repaired. As it stands today, Operations are running with recommended spares and the six minutes headways plan are intact. The goal is now to complete all repair by May 2016. While this risk has been largely mitigated, it will continue to be monitored closely. FTA’s System Safety Readiness Review Late recommendations and findings of the FTA’s Safety and Security Readiness Review team allows insufficient time to respond and/or mitigate findings, delaying Revenue Service date. The draft report was issued with no findings but has eight recommendations. The recommendations will be implemented hence this risk will be fully mitigated. January 2016 Page 7 of 117 Link Light Rail University Link Extension Project Schedule Summary The University Link Master Schedule is provided below. The U240 Contractor achieved Substantial Completion. Punchlist and Final Inspections are well underway. It is expected that a Temporary Certificate of Occupancy may be achieved by end of March 2016. The U830 Contractor is nearing Substantial Completion and System Integration Testing will continue thru 1st QTR 2016. U835 EMI/Vibration design is underway and Factory Testing is complete. Field Tests are expected in February 2016. The U810 MOW Building is well underway with interior and exterior finishes nearing completion. Move in is expected in February 2016. The targeted Revenue Service date is now March 19, 2016. Progress and Critical Path Analysis The U-Link Master Schedule update contains the tunnel contractors’ schedules and interfaces with the stations and U830 (Track, Signal, Traction power and Communications System) schedules. The critical path, this period, is tracking through Emergency Ventilation and the Fire Department Witness Test as the project moves closer to receiving a Temporary Certification of Occupancy. Elevator Inspections by L & I are also being closely watched due to their required sign off prior to the issuance of a Temporary Certificate of Occupancy by the City of Seattle. Pre-Revenue Service has commenced and is expected to be completed in March. Revenue Service date is March 19, 2016. January 2016 Page 8 of 117 Link Light Rail University Link Extension Schedule Performance Index The Schedule Performance Index (SPI) for U-Link remains at 0.99 this period. The U240 Contractor achieved Substantial Completion this period. Punchlist and Final Inspections are ongoing. The U830 Contractor is working through System Integration Testing. (See details on individual contract sections.) Progress will continue to be monitored closely. Cost Progress Analysis U220 and U230 are complete. U250 is complete with punchlist and final inspections outstanding. U240 CHS Station achieved Substantial Completion. U830 is nearing Substantial Completion. Overall U-Link physical percent complete is at 99% against 99% of contract time expended. The graph below shows the progress of major construction contracts cost compared to the early/late projections. January 2016 Page 9 of 117 Link Light Rail University Link Extension Schedule Contingency Management The “Minimum Schedule Contingency Curves” were established in the Project Execution Plan (PEP). The PEP segregated Schedule Contingency into “Forced Lag,” which is a built-in float on the Critical Path; “Buffer Float,” which is the duration between Sound Transit’s targeted Revenue Operation Date and the Schedule Revenue Operation Date; “Contingency Float,” which is the duration between Sound Transit targeted Revenue Operation Date and the FFGA Revenue Operation Date, and “Desired Minimum Float” which is the amount of schedule float the FTA requires Sound Transit to maintain. The current schedule contingency balance was reduced by six months in November 2013. All contingency float was removed based on the completion of the tunneling contracts in the 3rd QTR 2013. Schedule Contingency Plan 4th QTR 2015 Right-of-Way The U-Link project involved the acquisition of a range of property interests, including fee takings for stations and staging areas, tunnel easements for the running tunnels, acquisitions from the University of Washington and airspace leases with the Washington Department of Transportation. These acquisitions required relocation of 141 owners and tenants. The right-of-way program status is summarized below. Line Section Total Parcels Certified Offers Made Capitol Hill Station 19 Tunnel Easements TOTAL Signed Agreements Admin. Settlements Possession and Use Closings to date Relocations Required Relocations Completed 19 19 140 140 223 222 222 1 1 242 241 241 141 141 Capitol Hill Station: The acquisitions and relocations for the station site are complete. January 2016 Page 10 of 117 Link Light Rail University Link Extension Construction Safety Safety statistics for the reporting period and year-to-date are summarized in the table and charts. Data/Measure Recordable Injury/Illness Cases Days Away From Work Cases Total Days Away From Work Restricted or Modified Work Cases Total Days Restricted or Modified Work First Aid Cases Reported Near Mishaps Ave. Nos. of Employees on Worksite Total # of Hours (GC & Subs) OSHA Incident Rates Recordable Injury Rate DART Rate Recordable National Average DART National Average Recordable WA State Average DART WA State Average January 2016 Year to Date Project to Date 0 0 0 0 0 0 0 0 0 0 0 0 0 0 91 19 922 34 1,561 152 243 24 6,747 6,747 3,918,834 Monthly Average Year to Date Project to Date 0.00 0.00 3.60 2.00 7.20 3.30 0.00 0.00 3.60 2.00 7.20 3.30 4.64 2.70 3.60 2.00 7.20 3.30 The charts to the right show University Link’s Recordable Injury Rates (RIR) and University Link’s Days Away, Restricted or Modified (DART) Injury Rate as compared to the national average. January 2016 Page 11 of 117 Link Light Rail University Link Extension Quality Assurance Activities Activities U240: Material Review Board has dispositioned as Acceptable three Notification of Change Reports. Sound Transit Board Actions Board motions and resolutions directly related to University Link are summarized in the table below. Issues Motion Number None to report. Summary Jan 2016 Notes No. of Audits Planned 0 None No. of Audits Completed 0 None Reports in Progress 0 None 0 None Description No. of Audits Postponed Description Date None to report. Community Outreach Emailed construction alert to the CHS and UWS listserv regarding station alarm testing. Also hand delivered flyers to the immediate neighbors of both stations. Environmental Continued Environmental Oversight of construction. January 2016 Page 12 of 117 Link Light Rail University Link Extension– Tunnels U220 Contract - TBM Tunnel (UWS to CHS) U230 Contract -TBM Tunnel (CHS to PSST) The U220 contract achieved Substantial Completion on June 7, 2013. All work is done. Substantial Completion was achieved in March 2013. All work is done. Cost Summary Cost Summary Present Financial Status Amount U220 Contractor— Traylor FrontierKemper Joint Venture (TFK) Original Contract Value Change Order Value Present Financial Status Amount U230 Contractor— JCM Joint Venture $309,175,274 $12,067,459 Original Contract Value Change Order Value $153,556,000 $9,866,998 Current Contract Value $ 321,408,334 Current Contract Value $163,452,998 Total Actual Cost (Incurred to date) $ 315,071,655 Total Actual Cost (Incurred to date) $156,979,939 Financial Percent Complete 100% Financial Percent Complete 100% Physical Percent Complete: 100% Physical Percent Complete 100% Authorized Contingency $30,917,527 Authorized Contingency $15,355,600 Contingency Drawdown $12,233,060 Contingency Drawdown $9,896,998 Contingency Index* *Physical % complete / % contingency drawn down January 2016 2.53 Contingency Index* 1.56 *Physical % complete / % contingency drawn down Page 13 of 117 Link Light Rail University Link Extension – Stations U240 Contract – Capitol Hill Station Current Progress The U240 Contractor achieved Substantial Completion on December 31, 2015. Punchlist work is underway. Final Inspections are expected to be complete in February 2016. Elevator/Escalator work continue along with late design changes. Hardscape and Landscape work is nearing completion. Schedule/Critical Path Milestone #4, Substantial Completion, was achieved last period. Punchlist work and final inspections are underway. Schedule Performance Index At U240, work directives and change orders are now driving the work at U240. No updates to SPI. January 2016 Schedule Performance Index Page 14 of 117 Link Light Rail University Link Extension– Stations Closely Monitored Issues Key Activities Current Period Multiple commercial issues remain open including various notice of intents to claim and actual claims. These Substantial Completion was achieved in December; conclaims continue to be reviewed and assessed by Sound tinued working on completing the punch list items. Transit. Continued finalizing escalators and elevators in preparation for final inspections from L&I and Seattle Fire Dept. There are modifications that are still needed for elevators 1, 2, & 3 before L&I and the Seattle Fire Dept. can fully Continued with final commissioning and testing. sign off. Continued cleaning throughout the station. Contractor is working on leak remediation which contin Began installation of station signage. ues to develop new leaks on a weekly basis. ST remains concerned about schedule to complete leak remediation Site work continued, including installation of permanent work. Contractor indicated plan is to complete leak refencing around site, and began preparations for CMC mediation and grout port locations by early March. They trailer removal and relocation. will continue focusing on public areas at this time. Next Period Continue working off all punch list and work directive items throughout the station. Contractor to obtain all final inspection sign offs. Signage subcontractor to complete station sign installation. Continue to work on stopping water leaks throughout the station and specifically at the platform level. Complete all site restoration activities. Cost Summary Present Financial Status Amount U240 Contractor - Turner Construction Co Original Contract Value Change Order Value $104,850,276 $9,468,591 Current Contract Value $114,318,867 Total Actual Cost (Incurred to date) $111,222,256 Financial Percent Complete: 97% Physical Percent Complete: 97% Authorized Contingency $11,742,514 Contingency Drawdown $9,468,591 Contingency Index 1.21 TVM installation at CHS. January 2016 Page 15 of 117 Link Light Rail University Link Extension – Stations U250 Contract –University of Washington Station Current Progress Milestone #7, Substantial Completion, was granted in November 2014. U250 continued punchlist work and is expected to be complete thru end of 1st QTR 2016, subject to final inspections by L&I . Work progress continued with approximately 100% physical completion against 100% contract time expended. Schedule/Critical Path Punchlist and commissioning work is ongoing and is expected to be end of 1st QTR 2016. Schedule Performance Index Schedule Performance Index Substantial Completion was granted in November 2014. Punchlist and handrail are expected to be completed end of 1st QTR 2016. January 2016 Page 16 of 117 Link Light Rail University Link Extension– Stations Key Activities Closely Monitored Issues Current Period All four U250 elevators have now received operating permits. ST is seeking alteration permits from L&I to install the final systems-activated equipment. Alteration work is ongoing. Continued Level 3 inter-station commissioning. The GC/CM, MC/CM, and EC/CM continue to provide support as requested. Continued closing out of all remaining commercial issues. Continued installation of the “One Bus Away” dynamic signage. Continued installation of door operator hardware, wiring, and interface with the U830 access control system. Continued station signage installation. Next Period Complete installation of dampers and door assist operators necessary to mitigate the tunnel ventilation issue. Complete installation of the “One Bus Away” dynamic signage. Complete final inspections for elevator and escalator operation. Continue closing out of all remaining commercial issues. Continue Level 3 inter-station commissioning. Multiple commercial issues remain unresolved. These issues continue to be reviewed and assessed by Sound Transit. Three Notices of Intent to Claim have been filed by the GC/CM. All three claims were denied at the Resident Engineer level based on merit. Appeals have been received for all three claims. The Engineer of Record has recommended additional stair and elevator dampers as well as powered door operators to mitigate excessive egress door opening forces while tunnel ventilation modes are active, an issue identified during Level 3 testing. Final installation of door operator hardware, wiring, and interface with the U830 access control system remains incomplete, and coordination is underway to ensure the operators function as intended. Cost Summary Present Financial Status U250 Contractor - Hoffman Construction Co. Original Contract Value Change Order Value Amount 141,745,898 7,473,449 Current Contract Value 149,219,347 Total Actual Cost (Incurred to date) 148,883,457 Financial Percent Complete: 99% Physical Percent Complete: 99% Authorized Contingency 8,452,295 Contingency Drawdown 7,473,449 Contingency Index January 2016 1.13 UWS at night. Page 17 of 117 Link Light Rail University Link Extension – Systems U810 Contract – Maintenance of Way Current Progress The U830 MOW structural steel erection and roofing are complete. Exterior siding is nearing completion. MEP finishes and interior finishes are now underway. Work progress continued with approximately 92% physically complete against 98% contract time expended. Schedule/Critical Path Milestone revisions are expected to be negotiated with the contractor due to permit issuance delays. Milestone #1 is currently reporting 48 days of negative float. Milestone #2 is reporting 63 days of negative float as Elevator drives the completion of this milestone. No milestones revisions have been made at this time but are expected. Schedule Performance Index Schedule Performance Index The SPI based on early forecasts is reporting below 1.00 this period to 0.97 but continues to rise as the Contractor recovers from earlier project delays. The Contractor has improved the schedule by working concurrently on MEP rough-in and exterior and interior finishes. Elevator and Bridge Crane are a risk to Substantial Completion of the project. January 2016 Page 18 of 117 Link Light Rail University Link Extension – Systems Key Activities Drywall and texture activities will continue throughout building B. Continued interior finishes throughout the main build MEP will continue throughout building B. ing A and began punchlist activities. Completed plumbing and electrical work on building A, Continue interior finishes throughout building B. Continue placing curbs, sidewalks, and concrete around and energized the building. the exterior of the site. Continued commissioning of boilers and mechanical Continue landscaping activities. systems in building A. Current Period Continued final cleaning of building A and continued Closely Monitored Issues painting touch up throughout. Contractor submitted a claim for the removal of hazard Commenced installation of appliances, lockers, and ous and contaminated material, which ST continues to office furniture. review for possible merit. Continued MEP rough-in throughout building B. The installation of the elevator continues to be delayed Continued placing curbs, sidewalks, and asphalt around due to permitting issues. The contractor continues the exterior of the site. working with the jurisdiction having authority on getting this resolved. Next Period Continue interior finishes of main building and closing The fire safety system permit sign off could potentially impact the plan to obtain a Temporary Certificate of out punch list items and obtain Temporary Certificate Occupancy (TCO). A letter was drafted and sent to the of Occupancy (TCO). Fire Marshall’s office by the Contractor to mitigate any Commence elevator installation in main building. issues and possible delays. Commence bridge crane installation in the high bay area of building A. Complete main building office furniture installation and IT equipment trimmed out. Relocate the police department personnel into the main building and remove the existing trailers where they were being stationed to begin restoration activities. Cost Summary Present Financial Status Amount U810– Forma Construction (Design/ Build) Original Contract Value Change Order Value $11,998,725 $307,368 Current Contract Value $12,306,093 Total Actual Cost (Incurred to date) $11,830,036 Financial Percent Complete 96% Physical Percent Complete: 96% Authorized Contingency $959,898 Contingency Drawdown $307,368 Contingency Index January 2016 3.0 Landscaping activities are ongoing. Page 19 of 117 Link Light Rail University Link Extension - Systems U830 Contract – Track, Signal, Traction Power and Communications Current Progress System Integration Testing is well underway. The Contractor is continuing work through 26 kv splicing issues and SCADA programming items. Coordination between station contractors continues. Work progress continued with approximately 99.5% physically complete against 98% contract time expended. Schedule/Critical Path A January 2015 schedule update was not received from the Cntractor this period. The schedule below is the December 2015 update. System Integration Testing is well underway. Milestone revisions were made the schedule but Milestone 6 Substantial Completion may not be met next period. The proposed milestone revisions identify critical System Integration Testing and U830 start up and commissioning activities that are critical to Pre-Revenue Service and Revenue Service. Milestone 6 Substantial Completion is expected to be completed by March 2016 and Milestones 6a and 6b are expected to be completed by March 2016. Schedule Performance Index No application for payment has been formally submitted this period. SPI has not been updated. January 2016 Page 20 of 117 Link Light Rail University Link Extension - Systems Key Activities Current Period Trackwork Ongoing repair of tunnel leaks and cross passages. Complete systems integration testing and commissioning and submit test reports. Ongoing work on Systems punch list items. Ongoing delivery of spare parts. Ongoing training for Operations and Maintenance staff. Ongoing systems safety certification. Traction Power/Signal/Com-SCADA Systems Nearly completed installation and testing of communiClosely Monitored Issues cation devices at stations, and submittals of test reports. Nearly completed OCS punchlist and submittals of test Completion of systems test reports and submittals. reports. Closely monitoring ongoing systems testing and commissioning. Nearly completed signal systems testing and submittals of test reports. Nearly completed systems integration testing and commissioning and submittals of test reports. Ongoing work on Systems punch list items. Ongoing delivery of spare parts. Ongoing training for Operations and Maintenance staff. Ongoing systems safety certification. Next Period Complete installation and testing of communication devices at stations and submit test reports. Complete OCS punchlist and submit test reports. Complete signal systems test and submit test reports. Cost Summary Present Financial Status Amount U830 GC/CM Contractor - Stacy & Witbeck Original Contract Value Change Order Value $119,167,433 $3,708,079 Current Contract Value $122,875,512 Total Actual Cost (Incurred to date) $112,660,185 Financial Percent Complete 91.7% Physical Percent Complete: 98.5% Authorized Contingency $5,958,373 Contingency Drawdown $3,708,079 Contingency Index January 2016 1.6 BMS testing at the OMF. Page 21 of 117 Link Light Rail University Link Extension – Systems U820 Contract - LRV Storage and Yard Expansion P821 Contract - Light Rail Vehicles C802 Contract - Signals Systems (Yard Expansion) Other Systems - Radio Console, Fare Collection. Key Activities Next Period Closed Contracts C802 Signals Yard Expansion U820 LRV Storage and Yard Expansion U826 Radio Console Upgrade U860 Network Fiber U820- LRV Storage and Yard Expansion P821 – Light Rail Vehicles Contract Close Out on hold until the completion of the Traction Motor/Gear Unit repairs. Continue with repair collaboration with manufacturer on the TM/GU fleet. Current Period P821 – Light Rail Vehicles Contract Close Out on hold until the completion of the Traction Motor/Gear Unit repairs. Completed 24 car sets of TM/GU. Other Systems U835 EMI/Vibration & Wheel Flat Monitoring – Continue testing and submit test results U829 Fare Collection Contracts – TVM work continues. Closely Monitored Issues Timely repair of the TM/GU is critical to provide suffiOther Systems cient LRV units to adequately support a 6-minute head U835 EMI/Vibration & Wheel Flat Monitoring – conways operation when University Link commences. tinue installation and testing and submit functional installation test results. U829 Fare Collection Contracts – TVM work continues. C802 Cost Summary P821 Cost Summary Present Financial Status Amount Change Order Value $94,576,095 $4,598,480 Current Contract Value $99,174,575 Total Actual Cost (Incurred To Date) $99,174,575 Financial Percent Complete: 100% Physical Percent Complete: 100% Authorized Contingency $4,608,904 Contingency Drawdown $4,598,480 Contingency Index *Change Order to Initial Segment LRV Contract January 2016 Amount C802 Train Control —GETS Global Signaling, LLC* P821 Manufacturer — Kinkisharyo Intl.* Original Contract Value (U-Link Option) Present Financial Status N/A Original Contract Value (U-Link Option) Change Order Value $1,996,269 $15,390 Current Contract Value $2,011,659 Total Actual Cost (Incurred To Date) $2,011,659 Financial Percent Complete: 100% Physical Percent Complete: 100% Authorized Contingency $103,731 Contingency Drawdown $15,390 Contingency Index N/A *Change Order to Initial Segment Train Control Contract. 55% of contract costs are assigned to U-Link 45% Northgate Link. Page 22 of 117 Link Light Rail Northgate Link Extension Scope Limits: The Northgate Link Extension consists of 4.3 miles of light rail extending from the University of Washington to Northgate. Alignment: The extension begins at the UW Station, boring tunnels under campus then continues north to a portal located north of NE 94th Street on the east side of I-5, then transitioning to an aerial structure running north to the Northgate Mall. Stations: The U District Station is an underground station located on the west side of the UW campus near Brooklyn Ave. and NE 45th St. The Roosevelt Station is an underground station located near NE 65th St. and 12th Ave NE. The Northgate Station is an elevated station located at the southwest edge of the Northgate Mall property. Systems: Include Signals, track electrification, and SCADA communications. Budget: $1.899 Billion Service: September 2021 Phase: Final Design and Construction Map of Northgate Link Extension route and stations. For N140 U District Station ― Began coordination with UW regarding access and schedule for vibration moni Construction personnel hosted the ST Board Chair and toring during tunneling work on UW campus. Crews CEO to a press conference and site tour on Jan. 13. continue dewatering well operations, maintaining freeze Project staff coordinated with KCM for their final review formation for SB tunnel arrival at north headwall. of interagency transit integration term sheet. Key Project Activities Briefed the ELT on Northgate Link project and status of tunneling and KCM property negotiations on 1/26. Closely Monitored Issues On December 28, 2015, TBM No. 2 mining stopped approx. 650 feet from the U District Station due to damage Staff completed the Quarterly updates to NL ROD Envito the gear box of drive motor #1. It is undergoing reronmental Commitments. pairs in place and is expected to re-start in mid-February. The extended repair period would mean further delay in Jacobs finished N180 Verification Matrix, responding to crossover conveyor installation at UDS. ST review comments Progressing various Final Design contract packages. (See Several tunnel cross passages have registered much higher ground water levels than anticipated; Contractor is Final Design section for details.) implementing ground freezing at several cross passages For N125 TBM Tunnels, Total to date progress for NB sites to reduce risk and minimize water to be pumped. TBM No. 1 is 2,886 rings (14,430ft). Total to date pro- Ground water freezing activities at several cross passages sites may require extensive site preparation which might generate community complaints. Sound Transit continues to meet with residents to notify them of upcoming For N150 Roosevelt Station: GC/CM preparing bid packagactivities and address concerns. es for concrete and miscellaneous station finishes. gress for SB TBM No. 2 is 2,586 rings (12,930ft). Crews completed repairing SB TBM No. 2 drive motors and bull gearing and began cutterhead tools repair. January 2016 Page 23 of 117 Link Light Rail Northgate Link Extension Project Cost Summary The Northgate Link project cost is summarized below by two cost categories. In the first table, the cost is summarized in accordance with Sound Transit’s Work Breakdown Structure (WBS). The second table summarizes the project in accordance with the FTA’s Standard Cost Category (SCC) format. The figures in both tables are shown in millions. Cost Summary by Phase The Estimated Final Cost (EFC) for the project as of this reporting period is $1,899.8M, which is equal to the current project budget. This period, approximately $16.7M was incurred, of which $7.4M was for the N125 tunneling contract, the N111 Utility Relocation project at Northgate and other miscellaneous construction, $0.9M was incurred for Civil and Systems Final Design and Design Support During Construction, and $1.5M was for Construction Management. The remaining expenditures were for third party coordination, permits, staff, legal, right-of-way and other direct charges. Cost Summary by SCC The Estimated Final Cost (EFC) for some contract packages have been reassessed and revised as a result of updated design development estimates and the award of Contract N125 at an amount lower than the adopted budget. The current adopted budget values have been updated to reflect the 2016 budget revisions and updated contingency amounts. Cost Contingency Status Compared to the baseline amount of $396.2M, the Total Contingency has decreased by $66.8M to $329.4M, which is 26% of project work remaining. During this reporting period, a net decrease of $0.8M in the overall project contingency occurred. Detailed information is provided below. Design Allowance (DA)– The baseline Design Allowance of $113.9M has been fully depleted following the receipt of updated construction cost estimates on the N140, N150, and N160 Station Finishes contracts. DA has been utilized as scope development has progressed to 60% on N140, and 90% on N150 and N160. No changes to DA occurred during this period. January 2016 Page 24 of 117 Link Light Rail Northgate Link Extension Cost Contingency Status, continued Allocated Contingency (AC) – Compared to the baseline amount of $184M, Allocated Contingency has increased by $37.2 M to $221.2 M. During this reporting period, a decrease in AC of $5.6 million occurred due to the issuance of change orders totaling $0.5M on the N125 Tunneling contract, the Civil Final Design contract and the N160 Preconstruction services contract. The remaining $5.1M reduction reflects contingency adjustments made during the 2016 budget cycle which moved some latent contingency amounts to Unallocated Contingency and corrected an administrative error in the financial report from previous months. Unallocated Contingency (UAC)– Compared to the baseline amount of $98.3M, Unallocated Contingency has increased by $9.9M to $108.2 M. During this reporting period, UAC increased by $4.8M to reflect contingency adjustments made during the 2016 budget cycle which moved some latent contingency amounts from Allocated Contingency. Project Schedule The N105 Key Bank Site Demolition schedule slipped again this period due to the continued revision of the Division 00 Specifications. The IFB Package is also being held for possible scope changes. Bid Advertisement has remained Feb -16 absorbing the float in the bid process. NTP remains May 12, 2016. Construction completion is anticipated by midNovember 2016. The N111 Advanced Utilities Relocation contractor continues to await resolution of SCL/SPU utility conflicts. Substantial Completion slipped from mid-February to mid-March 2016 according to the December 2015 update. ST has received a revised schedule reforecasting the remaining work and documenting the issues that have been encountered. Given the magnitude of the issues to be resolved, work is now forecast to complete in March. The N113 115kV Relocation project has received final comments from WSDOT on the 100% design. The bid date is still scheduled for February 17, 2016, with Capital Committee approval on April 14, 2016. The N125 Contractor has determined that TBM No. 2 can be repaired in place, to a degree that will allow the machine to re-start (expected in mid– February) and continue mining the remaining 650 ft. to UDS, where it will likely undergo a 2-month repair. TBM No. 1 is nearing the University of Washington and is scheduled to cross onto University property early February. Construction of Cross Passages 32 and 39-43 continues. The N140 U District Station 90% design review completed in January. The 100% design package is scheduled for end of July 2016. The GC/CM, Hoffman Construction, has begun preparing bid packages and cost estimates based on the 90% set. The MUP submittal has been pushed back to mid-February 2016. Completion of the appraisals for the permanent Tie-Back easements is slipping into February. The N150 Roosevelt Station GC/CM is currently working with the pricing set of plans and specs to develop the MACC. Sound Transit is responding to comments received from the city on the last MUP submission and will respond in mid-February. Delivery of the N160 100% design package slipped one week to February 12, 2016. ST is currently in MACC negotiations with the GC/CM. A subcontractor has been selected for the Advanced Work Package at the strip mall property. January 2016 Page 25 of 117 Link Light Rail Northgate Link Extension Project Schedule, continued The N180 100% Design Package was submitted on December 18, 2015. ST is currently preparing the bid documents and is targeting March 23, 2016 for advertisement. The contract procurement remains on schedule but could be jeopardized by the ability of ST and the UW to agree on the “Ultra Straight Rail” composition. The 90% design effort for N830 contract continues with the 90% design submittal expected in February 2016. January 2016 Page 26 of 117 Link Light Rail Northgate Link Extension Critical Path Analysis The longest path through the Northgate projects for January has changed due to slippage in the N160 MACC process. The path continues to be driven by the N125 work with N160 now occupying the path to the Systems work. N160 has always been near critical. At this point the MACC negotiations have pushed N160 onto the critical path. Northbound and southbound tunneling remain critical, with post tunneling work including cross passages and completion of the Maple Leaf Portal as the driving elements of the N125 contract. Critical Path Float The Northgate Link Extension currently retains 165 days of unallocated project float. The N125 construction schedule currently shows a late completion of Milestone 5 - Turnover of N140 to the Station Contractor. However, the Contractor has not established entitlement for those days, and none of the 30 days of Owner Controlled float for this contract has been allocated to the Contractor. Northgate Link Extension Float NORTHGATE LINK EXTENSION FLOAT 165 165 165 165 The Revenue Service date for the Northgate Link Extension remains September 2021. Nov - 15 January 2016 Dec – 15 Jan—16 Page 27 of 117 Link Light Rail Northgate Link Extension Construction Safety Data/ Measure Jan 2016 Year to Date Project to Date Recordable Injury/Illness Cases 0 0 35 Days Away From Work Cases 0 0 2 Total Days Away From Work 0 0 214 Restricted or Modified Work Cases 0 0 18 Total Days Restricted or Modified Work 0 0 863 First Aid Cases 2 2 27 Reported Near Mishaps 0 0 41 286 - - 49,294 49,294 1,318,494 Monthly Average Year to Date Project to Date Recordable Injury Rate 0.00 0.00 5.31 DART Rate 0.00 0.00 3.03 Recordable National Average 3.60 3.60 3.60 DART National Average 2.00 2.00 2.00 Recordable WA State Average 7.20 7.20 7.20 DART WA State Average 3.30 3.30 3.30 Average Number of Employees on Worksite Total # of Hours (GC & Subs) OSHA Incident Rates Right of Way Northgate Station - Condemnation for two parcels filed; Draft for the third TCE extension began for two parcels; Signed documents received for one parcel. The U District and Roosevelt stations require the acquisition of a range of property interests including fee takings for stations and staging areas; tunnel easements are required for the running tunnel. These acquisitions will result in owner and tenant, residential and commercial relocations. Tunnel Easements: All parcels have been acquired. Roosevelt Station – All parcels have been acquired. U District Station – All parcels have been acquired. Total Parcels Certified Offers Made Signed Agreements Admin. Settlements Possession and Use (P&U) Closings to date Baseline Relocations Required Relocations Completed U District Station 15 15 0 0 0 15 4 3 Roosevelt Station 19 19 0 0 0 18 26 26 Tunnel Easements 190 188 0 0 0 188 0 0 Northgate Station 11 11 0 0 2 3 13 12 Total 235 233 0 0 2 224 43 41 Line Section January 2016 Page 28 of 117 Link Light Rail Northgate Link Extension Quality Assurance Activities Community Outreach Activities Hosted the U District Station 90% design open house at Neptune Theatre on January 14, 2016. None to report. Distributed alert to 15 residents or the start of the 24hour a day ground freezing equipment use. Issues None to report. Emailed construction alert to Northgate Station subscribers regarding lane closures. Summary Description Jan 2016 No. of Audits Planned 0 None No. of Audits Completed 0 None Reports in Progress 0 None No. of Audits Postponed 0 None Distributed TBM progress alerts to businesses in the U District. Notes Sent construction alert to 5,800 email subscribers concerning upcoming work on Montlake Boulevard. Environmental None to report. Sound Transit Board Actions Board Action Description Date None to report. January 2016 Page 29 of 117 Link Light Rail Northgate Link Extension - Final Design Final Design Overview Sound Transit has executed two key contracts with professional services consultants for the Final Design of the Northgate Link Extension. Jacobs Associates (JA) is providing civil engineering and architectural final design services. LTK Engineering Services (LTK) is providing systems engineering final design services. Final Design Activities Contract Package N160 - Northgate Station, Aerial Guideway and Parking Garage Civil and Finishes: Completed 100% design effort for station, guideway and garage. Contract Package N180 – Trackwork: Completed and submitted 100% design package. Continued QC checking of the 100% design package. Contract Package N830 – Traction Electrification, Signals, and Communications: Completed 90% for the N830/E730 90% design package and submitted for ST review. Contract Package N105 – Key Bank Demo and Remediation: Completed updated IFB package and assisted with bid process. Contract Package N113 – 115kV Relocation at Northgate Station: Continued preparation of IFB package. Contract Package N140 - U District Station Civil and Finishes: Began 100% design effort. Continued preconstruction phase activities and coordination with the GC/CM contractor. Continued Green Street and TOD 240-ft overbuild design effort. Continued research support/product research for cost reduction effort in conjunction with GC/CM. Contract Package N150 - Roosevelt Station Civil and Finishes: Reviewed and prepared response to 100% comments. Continued research support/product research for cost reduction effort in conjunction with GC/CM. Final Design Schedule The table below summarizes the current civil Final Design submittal schedule for each contract package. Work Packages 60% 90% 100% to ST Plan F/A* Plan F/A* Plan F/A* N105 Key Bank Demolition and Remediation 7/31/2014 7/31/2014A 10/3/2014 10/3/2014A 2/23/2015 6/18/2015A N111 Advanced Utility Relocation – Northgate 12/21/2012 5/23/2013A 3/29/2013 10/14/2013A 7/12/2013 1/31/2014A N113 115kV Relocation at Northgate 10/29/2013 11/21/2014A 3/27/2014 8/5/2015A 6/19/2014 10/2/15A N140 U District Station Finishes 12/24/2011 4/27/2012A 9/18/2012 12/11/2015A 5/10/2013 7/30/16 N150 Roosevelt Station Finishes 4/13/2012 2/27/2012A 1/28/2013 12/18/2014 10/23/2013 11/20/15A N160 Northgate Sta. Civil/Finishes/Guideway 6/27/2012 10/5/2012A 4/17/2013 3/7/2014A 11/26/2013 2/5/16 N180 Trackwork 8/23/2012 8/23/2012A 5/22/2013 4/8/2013A 8/26/2013 1/14/16A N830 Traction Electrification, Signals, Communications 12/12/2012 12/20/2012A 4/10/2014 2/15/16 12/9/2014 7/21/16 F/A* = Forecast/Actual January 2016 Page 30 of 117 Link Light Rail Northgate Link Extension - Final Design Northgate Link Extension Final Design SPI Final Design Schedule Performance For Final Design activities only, the Schedule Performance Index (SPI) reported this period is 1.03 based on the early start date, and the late start SPI is 1.04. The design consultant has had some design deliverable milestones for N140, N150, N160 and N180 pushed back, and some change orders executed, which has impacted the SPI, but the overall deliverable schedule remains on track as adjusted for approved scope changes. Final Design Cost Performance Through this period, the total amount spent for civil final design is $80.1M, which is approximately 87% of the total contract amount including change orders. For final design activities only, the total amount spent is $75.2M, which is approximately 100.9% (pending execution of outstanding change orders for work that has been completed). The consultant reported 99.5% complete for final design activities, resulting in an Earned Value of $74.1M. The current period Cost Performance Index (CPI) is reported at 0.6 which reflects the planned earnings had the final contract packages been delivered per the original schedule, and does not reflect incorporation of unexecuted change order funds. The cumulative CPI remains 1.0, which indicates that overall expenditures are in line with planned cost. Northgate Link Extension Final Design EV Performance Amount Invoiced Spent Earned Value % Complete CPI Other Key Final Design Activities Geotechnical Investigation Continued geotechnical support as required. Surveying and ROW Conducted potholing as needed for N113. Updated control sheets and ROW sheets for N160 submittal. Traffic Engineering Report None to report this period. Permits Continued work on the 90% SIP applications for N150 and N160 including responses to 90% ST comments. Completed N150 100% ROD matrix and completed draft of N140 90% ROD matrix. Noise Mitigation for At Grade and Elevated Guideway None to report. Ground Borne Noise and Vibration Completed review of floating track slab drawings and specifications N180 100% submittal. January 2016 Previous Period Current Period Cumulative To Date $74,358,671 $878,132 $75,236,803 99.8% 1.2% 100.9% $72,148,896 $2,043,689 $74,192,585 96.8% 2.7% 99.5% 1.0 0.6 1.0 Construction Cost Estimating Completed and submitted N140 90% cost estimate and the N180 100% cost estimate. Illustrative Graphics Completed graphics for the N140 90% LRRP presentation. Quality Assurance Continued QC tasks on active design packages Completed and submitted N140 90% and N150 100% QA Audit reports. Completed the N180 100% QA Audit. Began N160 100% QA Audit. Design and Project Integration Provided coordination and integration between all contracts in the Northgate area. Integration and coordination with Systems Consultant (LTK), Art Consultant and Station Artists continued as required. Page 31 of 117 Link Light Rail Northgate Link Extension– Construction Major Construction Contract Packages Below are the major construction contract packages for the Northgate Link Extension with a brief scope description of each. N105 Key Bank Demolition and Remediation - Demo of Key Bank Building, remove underground storage tanks and remediate contaminated soil. N110 Utility Relocation at Roosevelt Station Area - Relocation of electrical and communication facilities at the Roosevelt Station site. (Complete) N140 U District Station Finishes - Civil and architectural finishes work for the U District Station. N150 Roosevelt Station Finishes– Civil and architectural finishes work for the Roosevelt Station. N160 Northgate Station & Elevated Guideway & Parking Garage- Civil and architectural finishes work for the N111 Advanced Utility Relocation at Northgate Area Maple Leaf Portal, the aerial guideway, and the Northgate Relocation of 26kV and communication lines at the Station and Tail Track. Construction of a 450 stall parking Northgate Station vicinity. garage to be located at the south corner of the existing N112 U District and Roosevelt Station Site Preparation - Northgate Mall surface parking lot at NE 103rd St. near 1st Avenue NE. Demolition of existing structures, grading and paving at the U District and Roosevelt Station sites. (Complete) N180 Trackwork - Installation of all trackwork through N113 115kV Relocation at Northgate Station Area - Re- two tunnels and three stations between UW Station and Northgate Station, including tail track. location of overhead electrical facilities at the Northgate Station area. N830 Track Electrification, Signals, Communication N125 TBM Tunnels UW Station to Maple Leaf Portal - System - Installation of the major system elements – TracTunneling work and support of excavation of station boxes tion Electrification, 26kV Distribution, Signals, and Communications. for the U District and Roosevelt stations. Construction Schedule Highlights Bid Advertisement NTP Substantial Completion Jan 2016 May 2016 Dec 2016 Sept 2014A Jan 2015A Jan 2016 Jan 2016 May 2016 Jan 2017 Jan 2013A Sep 2013A Feb 2018 N140-U District Station Finishes Oct 2013A (GC/CM-Precon) Mar 2017 (construction) Jan 2020 N150-Roosevelt Station Finishes Apr 2013A (GC/CM-Precon) Jan 2017 (construction) Sep 2019 N160-Northgate Station & Guideway & Parking Garage Feb 2015A (GC/CM –Precon) Feb 2016 Nov 2019 N180-Trackwork to Northgate Station Feb 2016 Jun 2016 Jul 2019 N830-Traction Power, Signals & Com May 2015 (GC/CM-RFQ) Jan 2018 (construction) Oct 2020 Package N105-Key Bank Remediation/Demo N111-Advanced Utility Relocation N113-SCL 115kV Relocate N125-Station Box Exc. & TBM Tunnels A = Actual January 2016 Page 32 of 117 Link Light Rail Northgate Link Extension - Construction Contract N111 – Advanced Utility Relocation Current Progress Vault & Ductbank Installation- The Contractor continues to clean and adjust installed vaults throughout the site. Resolution of SPU utility conflicts at Pole 2 remains an obstacle to completion of the contract work. No date has been targeted for a solution. Resolution of conflicts at SCL Vault 756 continue to delay the completion of work in that area. A revised schedule for completion of the work, which takes into account the delays experienced to this point, has been requested from Walsh with the review of their December schedule update. As of this writing, Walsh submitted the schedule update for January 2016 and it is currently in review. Storm Sewer & Water Line –TCE and Encroachment issues have halted work on the retaining walls north of NE 105th St. Work is expected to resume in early February. Curb and gutter restoration is ongoing. Schedule Summary Critical Path The critical path remains largely unchanged with the utility conflict at Terminal Pole No. 2 continuing to prevent completion of the ED-2 ductbank. The CM team is currently working on the SPU conflict resolution, and believes work can completed in late February or early March. The schedule now forecasts a mid-March date for completion of the work. January 2016 Page 33 of 117 Link Light Rail Northgate Link Extension - Construction Schedule Performance Index The SPI for the project was 0.9 in January 2016 up from the 0.8 reported in December 2015 based on the submitted but unapproved pay estimate from Walsh. The increase reflects progress on the ductbanks leading to SCL Vault 756, and curb and sidewalk work in Block 1, as well as payment for change orders and provisional sums, which amounted to over 50% of the pay application. Implement solutions to the various issues in the vicinity of previously existing SCL Vault 756 identified earlier Current Period (RFIs 92, 93, 95 and 100). Continued to adjust, clean, and grout SCL vaults along Continue work on communications and street lighting 1st Ave NE (Blocks 1, 2, 3, 4 and 5). ductbanks and storm drain lines at the intersection of 1st Restored curb and gutter along NE 103rd St and began Ave NE and NE 100th St (Block 2). preparation of sidewalk restoration (Block 3). Begin pavement restoration at the intersection of 1st Ave Continued work related to several conduit and drain line NE and NE 100th St as utility work is completed. crossings in the vicinity of 1st Ave NE and NE 100th St. Continue to mandrel SCL ductbanks throughout the Completed construction of a temporary pedestrian pathproject. way through the former “strip mall” in preparation for Closely Monitored Issues mobilization of the N160 Contractor. Received delivery of blocks for temporary retaining Sound Transit met with senior management of Walsh walls (on hold pending resolution of RFIs 78A and 98). Construction for a general review of outstanding Work Directives. Awaiting detailed proposals from Walsh to Next Period fully assess cost and schedule impacts. Proceed with temporary retaining walls north of NE 105th St along 1st Ave. NE, subject to resolution of RFIs 78A and 98 (Block 5). Key Activities Cost Summary Present Financial Status Amount N111 Contractor - Walsh Construction Original Contract Value Change Order Value $9,370,000 $478,557 Current Contract Value $9,848,557 Total Actual Cost (Incurred to date) $8,812,865 Financial Percent Complete: 89.5% Physical Percent Complete: 84.0% Authorized Contingency $937,000 Contingency Drawdown $478,557 Contingency Index January 2016 1.64 Preparing for temporary retaining wall construction. Page 34 of 117 Link Light Rail Northgate Link Extension - Construction Contract N125 – TBM Tunnels Current Progress The schedule update for January 2016 continues to forecast a late completion for Milestone 2 RVS Turnover, Milestone 5 UDS & Tunnels, and Milestone 6 Substantial Completion. Tunnel mining in the southbound bore (TBM No. 2) drives the critical path. Cross passage work continues to drive the achievement of Milestone 5. JCM has added activities to describe a differing site condition precedent to the start of Cross Passage (CP) 34. The activities do not drive the start of CP 34, this is driven by the completion of the spiles for CP 24. Tunneling Operations - TBM No. 1 was 17% complete with the drive between UDS and UWS, approaching the boundary of the University of Washington’s property and expected to cross that boundary Feb.4, 2016. TBM No. 2 is undergoing repairs in place to the drive motors and is expected to re-start in mid-February. JCM has ceased work on TBM No. 3 preparation although the activities for the machine remain in the project schedule. Maple Leaf Portal (MLP)- Construction of Cross Passages 39 through 43 continues, and planning/installation of ground freezing systems are in progress at CPs 29 through 33. U-District Station (UDS) -JCM is currently preparing the north headwall for reception of TBM No. 2. Ground freezing continues at the south headwall. Schedule Summary The longest path through the schedule is still driven by the southbound tunneling, followed by cross passages, and completion of the Maple Leaf Portal. ST is assessing the options regarding TBM No. 2 including the possibility that TBM No. 1 could be re-used to mine the southbound bore. January 2016 Page 35 of 117 Link Light Rail Northgate Link Extension - Construction Schedule Performance Index The SPI for this period is 0.9, unchanged from the 0.9 obtained in December. An intervention for TBM No. 1 and breakdown of TBM No. 2 hampered progress this month. Cross Passage construction continues to make progress with 5 CPs in active construction and 7 CPs being either frozen or dewatered. The Contractor’s estimated Performance Percent Complete is 74.4% with a Cost Percent Complete of 74.4% based on the January Status Schedule Update. Next Period Key Activities Continue installation of ground freezing pipes at CPs 29 and 30. Tunnels & Cross Passages (CPs) Begin installation of ground freeze system and manifolds Continued installation of ground freeze pipes at CP 29 & at CP 31 location. 30. Begin freezing down at CP32 location. Awaiting soil freeze to plumb in pipes and chiller to in Await SCL for power hookup at CP 33. stall ground freeze system at CP 31. Chiller#2 delivered Begin invert waterproofing at CP 39. on site. Continue excavation/support at CPs 40 and 41. Completed and tested CP 32 ground freeze system. Noise level tested and inspected by DPD. Complete invert protection slab and begin invert rebar/ embedment installation at CP42 & CP43. Awaiting SCL to hookup power at CP 33. Begin installation of pump, discharge pipes and electrical Continued pumping with two wells using line power at at CP25. CP 39. Continue well drilling at UWS location for TBM retriev Completed invert waterproofing at CP 43 & 42. al. Continued excavation at CP 40 and 41 locations. Continued mining with TBM No. 1 at the northbound Closely Monitored Issues bore between UDS and UWS. The repair period of TBM No. 2 would mean further Worked on repairs in place on TBM No. 2 drive motors delay in crossover conveyor installation at UDS, which north of UDS. in turn would delay removal of the conveyor from the NB tunnel between RVS and UDS. This would have the Completed installation of NB tunnel invert drain and follow-on effect of delaying the start of cross passage invert pour from UDS to RVS. construction between RVS and UDS. Current Period Cost Summary Present Financial Status Amount N125Contractor - JCM Northlink Original Contract Value Change Order Value $440,321,000 $ 4,685,893 Current Contract Value $444,006,893 Total Actual Cost (Incurred to date) $329,914,607 Financial Percent Complete: 74.1% Physical Percent Complete: 74.4% Authorized Contingency $22,016,050 Contingency Drawdown $4,685,893 Contingency Index January 2016 3.50 Preparing invert waterproofing. Page 36 of 117 Link Light Rail Lynnwood Link Extension Scope Limits: North Seattle to Shoreline, Mountlake Terrace, and Lynnwood Transit Center Alignment: Lynnwood Link extends light rail 8.5 miles to Snohomish County along I-5 from Northgate Mall in Seattle to the Lynnwood Transit Center, with four new light rail stations. The configuration includes at-grade, elevated, and retained cut/fill alignment. Stations: NE 145th (Shoreline), NE185th (Shoreline), Mountlake Terrace Transit Center, Lynnwood Transit Center Systems: Signals, traction power, and communications (SCADA). Budget: $487.9 Million Phase Gate 4 budget; excludes Construction (Year of Expenditure Dollars) Phase: Final Design Const. Starts: 2018 Service: Late 2023 Map of Lynnwood Link Extension Alignment. Key Project Activities Final Design Procuring consultants for civil/architectural and systems final design. Anticipate starting civil final design work in 2nd QTR 2016 and systems final design work in 3rd QTR 2016. Pre-Construction Services Procuring construction management consultant and GC/CM contractors for pre-construction services. Anticipate starting civil pre-construction services in 2nd QTR 2016 and systems pre-construction services in 4th QTR 2016. Third Parties Advancing various agreements with WSDOT, City of Seattle, City of Shoreline, City of Mountlake Terrace, City of Lynnwood, and utility providers. Right of Way Beginning early right -of –way acquisition activities. January 2016 Page 37 of 117 Link Light Rail Lynnwood Link Extension Project Cost Summary The Lynnwood Link project cost is summarized below in two cost categories. The first table summarizes costs in accordance with Sound Transit’s budget Work Breakdown Structure (WBS). The second table summarizes costs in accordance with the FTA’s Standard Cost Categories (SCC) format. The figures in both tables are shown in millions. Cost Summary by Phase Project Phase Current Adopted Budget Commitment to Date Incurred to Date Estimated Final Cost (EFC) Adopted Budget vs. EFC Administration $88.3 $7.7 $7.6 $88.3 $0.0 Preliminary Engineering $42.0 $40.2 $38.2 $42.0 $0.0 Final Design $111.5 $0.0 $0.0 $111.5 $0.0 Construction Services $104.9 $0.0 $0.0 $104.9 $0.0 3rd Party Agreements $17.4 $0.8 $0.4 $17.4 $0.0 Construction $0.0 $0.0 $0.0 $0.0 $0.0 Light Rail Vehicles $0.0 $0.0 $0.0 $0.0 $0.0 $123.8 $6.3 $6.1 $123.8 $0.0 $487.9 $55.0 $52.4 $487.9 $0.0 ROW Total Cost Summary by SCC SCC Element Current Adopted Budget Commitment to Date Incurred to Date Estimated Final Cost (EFC) Adopted Budget vs. EFC 10 Guideway & Track $0.0 $0.0 $0.0 $0.0 $0.0 20 Stations $0.0 $0.0 $0.0 $0.0 $0.0 30 Support Facilities $0.0 $0.0 $0.0 $0.0 $0.0 40 Sitework & Special Conditions $0.0 $0.0 $0.0 $0.0 $0.0 50 Systems $0.0 $0.0 $0.0 $0.0 $0.0 Construction Subtotal (10 - 50) 60 Row, Land 70 Vehicles (non-revenue) 80 Professional Services 90 Unallocated Contingency Total (10 - 90) $0.0 $0.0 $0.0 $0.0 $0.0 $123.8 $6.3 $6.1 $123.8 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $364.1 $48.7 $46.3 $364.1 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $487.9 $55.0 $51.3 $487.9 $0.0 Risk Management The Lynnwood Link Risk and Contingency Management Plan (RCMP) establishes a risk management and oversight process for identifying, assessing, and monitoring risks and develops risk reduction/mitigation plans. It provides a tool for the project team to proactively manage risks on the project. It is Sound Transit’s responsibility for continuously monitoring project status and associated risks, taking mitigation actions for known risks identified on the risk register, and effectively responding in a timely manner to those risks that pose a significant impact to the project cost or schedule forecast. The next Lynnwood Link Quarterly Risk Review Meeting is scheduled for March 2016. January 2016 Page 38 of 117 Link Light Rail Lynnwood Link Extension Project Schedule The project schedule is shown below. The schedule is at high risk; delays to permitting, right-of-way acquisition, or final design completion could push the anticipated revenue service date into 2024. Sound Transit Board Actions Board Action Description Community Outreach Date None to report this period. Environmental Facilitated a discussion of seven requests by property owners for early acquisition. Participated in Shoreline’s public meeting to gather public input on the station design guiding principles to prepare residents for Sound Transit’s station design public process to start later this year. About 125 residents listened to the presentation, provided comments, and asked questions. FTA issued environmental Record of Decision (ROD) in July 2015. Quality Assurance Activities Activities/Issues None to report. Summary Description Jan 2016 Notes No. of Audits Planned 0 None No. of Audits Completed 0 None Reports in Progress 0 No. of Audits Postponed 0 None None January 2016 Page 39 of 117 This page left intentionally blank. January 2016 Page 40 of 117 Link Light Rail Lynnwood Link Extension– PE & Final EIS Phase 3 Preliminary Engineering and Final EIS Sound Transit executed a contract amendment for Phase 3, Preliminary Engineering and Final EIS for Lynnwood Link, in December 2013. Phase 3 Key Activities Continuing final Preliminary Engineering documentation in preparation for the start of the Final Design Phase. Phase 3 Schedule Performance The cumulative Schedule Performance Index (SPI) for the Phase 3 contract is 0.97 through January 2016, indicating overall the work performed to date is close to the amount originally planned. Consistent with the original Phase 3 schedule, planned values for the project ended in December. The Phase 3 work is nearly finished (97% complete overall), and the overall SPI will trend toward a value of 1.00 upon completion. Phase 3 Cost Performance $37.2 M of the total contract amount, approximately 96%, has been spent through January. Phase 3 contract expenditures through January totaled $20.8 M, approximately 92% of the Phase 3 contract total. The Phase 3 contract percent complete reported at the end of January is 97%, with an earned value of $21.8 M. The cumulative Cost Performance Index (CPI) through January is 1.05; indicating costs are lower than the budget planned for work accomplished. The monthly CPI is low at 0.56 due to only a small increase in earned value. An independent Estimate at Completion indicates that the consultant will finish the current Phase 3 scope of work under budget. Phase 3 Performance Previous Period Current Period Cumulative To-date Amount Invoiced $20,588,792 $173,621 $20,762,413 92% <1% 92% Earned Value $21,688,884 $115,030 $21,803,914 % Complete 97% <1% 97% SPI 0.96 N/A 0.97 CPI 1.05 0.30 1.05 % Spent January 2016 Page 41 of 117 This page left intentionally blank. January 2016 Page 42 of 117 Link Light Rail I-90 Two–Way Transit & HOV Operations (Stage 3) The project, when completed, will enable 24/7 HOV access on I-90 between Seattle, Mercer Island and Bellevue. Scope: The I-90 Two-Way Transit and HOV Operations (Stage 3) project will provide approximately four miles of the HOV lanes in each direction of the outer roadway between 80th Avenue South on Mercer Island and Rainier Avenue in Seattle. The project includes upgrades and retrofits to the fire, life, safety, and other systems in the Mount Baker and Mercer Island/First Hill tunnels. The project also includes remaining dowel bar retrofit work on the west side of Lake Washington, the installation of screening on the shared–use pathway on the I-90 floating bridge. Following completion of this project, the center roadway will be closed to allow for the construction of East Link Extension. Budget: $225.6 Million Phase: Construction Construction Start: January 2015 Construction Completes: June 2017 Major Contracts Scope Final Design Agreement/Contract Amount $ 20,942,000 WSDOT WSDOT CM Services $ 16,358,000 IMCO Construction $122,021,000 Key Project Activities Mercer Island Tunnel – Continued the following tunnel work: installation of plenum lighting; control room and generator conduit installation; modifications to foam room fire alarm system; form egress walkway; installation of fan supports; demolition of generator equipment; in-fill of concrete at westbound Saccardo nozzle; testing and commissioning of switch gear; installation of conduit, racks and J-boxes; installation of uninterrupted power supply; installation of 1000KW generator. Mount Baker Ridge Tunnel – Continued emergency lighting installation; diaphragm in-fill at westbound nozzle; testing and commissioning; installation of structural steel, louver and supply duct damper; raceway and conduit installation for IR detection system. SCADA – Panel production; installation of supporting IT equipment at Dayton Data Center; Site Acceptance Testing (SAT) and 60-day endurance testing underway. Continuing review of performance and schedule adherence (on-going). January 2016 Page 43 of 117 Link Light Rail I-90 Two–Way Transit & HOV Operations (Stage 3) Key Project Activities, continued Simplex – Panel procurement and SCADA interface programming (on-going); Tru-Site workstation configuration (on-going); Simplex/SCADA field server interface (ongoing); Mercer Island Tunnel foam room system programming (on-going). Roadway Closures – Full westbound (WB) closure weekend of January 8 was a success. All planned work was completed. A WB closure occurred January 22 to 25 as well. Project Cost Summary Total Project Costs expended in December were $5.8M. The following tables summarize the cost information for the I-90 Two- way Transit and HOV Operations (Stage 3) project. Tables in millions. Project Elements by Phase Baseline Budget Current Adopted Budget Commitment to Incurred to Date Estimated Final Cost (EFC) Adopted Budget vs. EFC Administration $3.6 $3.6 $1.5 $1.5 $3.6 $0.0 Preliminary Engineering $1.5 $1.5 $1.5 $1.5 $1.5 $0.0 $22.1 $22.1 $18.6 $17.9 $22.1 $0.0 Construction Services $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 3rd Party Services $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $198.3 $198.3 $166.3 $60.1 $198.3 $0.0 $80.9 $225.6 $0.0 Incurred to Date Estimated Final Cost (EFC) Final Design Construction Total $225.6 $225.6 $187.9 Cost Summary by SCC Project Elements by SCC 40 Sitework & Special Conditions Baseline Budget Current Adopted Budget Commitment to Date Adopted Budget vs. EFC $180.6 $180.6 $166.3 $60.1 $180.6 $0.0 80 Professional Services $26.3 $26.3 $21.6 $20.9 $26.3 $0.0 90 Unallocated Contingency $18.7 $18.7 $0.0 $0.0 $18.7 $0.0 $225.6 $225.6 $187.9 $80.9 $225.6 $0.0 Project Total (SCC 10-90) Cost Contingency Management All unallocated contingencies are budgeted and controlled by Sound Transit. Allocated Contingencies include $7.7M in WSDOT-controlled construction contingencies that are part of the ST-WSDOT Task Order. WSDOT reports the monthly status of any change orders that will be drawn upon the WSDOT-controlled contingency, as well as any pending changes. In the table, the Current Status Remaining allocated contingency amount is based on adding the combined WSDOTcontrolled construction contingency & the total ST-controlled remaining allocated contingencies; the unallocated total is solely the remaining ST unallocated contingency amount. These amounts are then compared to the current remaining authorized budget to develop the Percent of Work Remaining figures. (Table on the following page). January 2016 Page 44 of 117 Link Light Rail I-90 Two–Way Transit & HOV Operations (Stage 3) Cost Contingency Management, continued Contingency Status Baseline % of Amount Total Current % of Work Amount Remaining Design Allowance $.0.0 0.0% $0.0 0.0% Allocated Contingency $17.0 7.5% $16.2 11.2% Unallocated Contingency $18.7 8.3% $18.7 12.9% Total $35.7 15.8% $34.9 24.1% Note: Table in millions. Contract does not carry Design Allowance. Contingency % of Work Remaining based on Contingency Remaining as a % Budget Remaining. Project Schedule Current project schedule and milestones are shown below. In conjunction with WSDOT, the schedule is being closely monitored, particularly the milestones for delivery and installation of fans, and the installation and testing of SCADA equipment. WSDOT’s oversight and coordination with the Contractor on these issues is occurring more frequently with an emphasis on identifying any potential schedule impacts as early as possible such that they can be mitigated. Contract I-90 Two-Way Transit & HOV Operations Stage 3 Start of Final Tunnel Commissioning Period Final Tunnel Commissioning Complete Substantial Completion Final Pavement Marking Physical Completion & Center Roadway Turnover Baseline Forecast / Actual Baseline Forecast / Actual Baseline Forecast / Actual Baseline Forecast / Actual Baseline Forecast / Actual 12/6/2016 11/24/2016 2/16/2017 2/17/2017 2/20/2017 2/17/2017 4/3/2017 4/3/2017 5/31/2017 5/31/2017 Changes are indicated in RED January 2016 Page 45 of 117 This page left intentionally blank. January 2016 Page 46 of 117 Link Light Rail East Link Extension Map of East Link Extension Alignment. Scope Limits: Downtown Seattle to Mercer Island, Bellevue and the Overlake area of Redmond. Alignment: East Link extends light rail 14 miles to East King County from Downtown Seattle serving Mercer Island via I-90, Bellevue and the Overlake area of Redmond, with ten new light rail stations. The alignment configuration includes at-grade, elevated, bridges, new and retrofitted tunnels. Stations: Judkins Park (formerly Rainier), Mercer Island, South Bellevue, East Main, Bellevue Downtown, Wilburton (formerly Hospital), Spring District/120th, Bel-Red/130th, Overlake Village and Redmond Technology Center (RTC). Systems: Signals, traction power, and communications (SCADA). Budget: $3.677 Billion Baseline Budget (Year of Expenditure Dollars) Phase: Final Design transitioning to Construction Construction Starts: 2016 Service: June 2023 Key Project Activities Held the monthly ST/FTA/PMOC meeting. Seattle to South Bellevue Floating Bridge: Field work in support of Flood Assessment and Post Tensioning design was completed and 30% design report is due in February 2016. Independent Review Team (IRT): Letter for IRT Issue K finalized January 29 and is circulating for signature. Mercer Island: The public comment period for the Shoreline Permit will end on February 5. The civil GC/CM and CMC are under contract performing preconstruction services. South Bellevue to Redmond Working with City of Bellevue on draft Collaborative Construction Plan; coordinating with ROW and Real Estate on property acquisitions. Shared project informational materials with Greater Redmond Transportation Management Association. January 2016 Page 47 of 117 Link Light Rail East Link Extension South Bellevue to Redmond (continued) E320: Building updated construction schedule and reviewing private utility interfaces; Continue working on special conditions; finalizing noise permit application; HJH submitted E320 IFB package. E330: Reviewing submittals and RFI’s; coordinating with DSDC; reviewing contractor proposed tunneling approach; Reviewing property access with respect to CCR’s and MOU properties; Working with IT and Property management on field office set up; Provided south portal plan views and profile to Surrey Downs residents. E335: Coordinating with the City of Bellevue on Zone 1; Continue review of contract documents. E340: Working with engineering on private utility work coordination; OPL essentially complete with restoration work underway. E360: Working with Real Estate on Microsoft TCE requirements; Working with WSDOT on ASL and O&M terms; Reviewing ATC’s; one on one meetings have concluded; Continued working on E360 final addendum, proposals are due February 12, 2016. Project Cost Summary The East Link project cost is summarized below in two cost categories. In the first table, the cost is summarized in accordance with Sound Transit’s Work Breakdown Structure (WBS). The second table summarizes the project in accordance with the FTA’s Standard Cost Category (SCC) format. The figures in both tables are shown in millions. The Estimated Final Cost (EFC) for this project is $3,677.2M in year of expenditure dollars. Approximately $15M was incurred this period. Cost Summary by Phase Project Phase Administration Preliminary Engineering Final Design Construction Services 3rd Party Agreements Construction Light Rail Vehicles ROW Total $186.2 $55.9 $283.0 $257.5 Current Adopted Budget $186.2 $55.9 $283.0 $257.5 Commitment to Date $42.4 $54.4 $220.5 $16.4 $52.2 $2,544.3 $0.0 $298.2 $3,677.2 $52.2 $2,544.3 $0.0 $298.2 $3,677.2 $26.7 $144.4 $0.0 $140.4 $645.3 Commitment to Date $108.5 $0.0 $0.0 Baseline Budget $41.8 $54.3 $156.9 $5.7 Estimated Final Cost (EFC) $186.2 $55.9 $283.0 $257.5 Adopted Budget vs. EFC $0.0 $0.0 $0.0 $0.0 $5.8 $20.8 $0.0 $135.5 $420.8 $52.2 $2,544.3 $0.0 $298.2 $3,677.2 $0.0 $0.0 $0.0 $0.0 $0.0 $1.0 $0.0 $0.0 Estimated Final Cost (EFC) $744.1 $397.7 $0.0 Adopted Budget vs. EFC $0.5 $0.0 $0.0 Incurred to Date Cost Summary by SCC 10 Guideway & Track 20 Stations 30 Support Facilities $744.6 $397.7 $0.0 Current Adopted Budget $744.6 $397.7 $0.0 40 Sitework & Special Conditions $808.5 $808.5 $34.5 $19.8 $809.0 ($0.5) 50 Systems Construction Subtotal (10 - 50) 60 Row, Land 70 Vehicles (non-revenue) 80 Professional Services 90 Unallocated Contingency Total (10 - 90) $353.8 $2,304.6 $288.5 $2.8 $898.4 $182.9 $3,677.2 $353.8 $2,304.6 $288.5 $2.8 $900.2 $181.0 $3,677.1 $1.4 $144.4 $140.4 $0.0 $360.5 $0.0 $645.3 $0.0 $20.8 $135.5 $0.0 $264.5 $0.0 $420.8 $353.8 $2,304.6 $288.5 $2.8 $900.2 $181.0 $3,677.1 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 SCC Element January 2016 Baseline Budget Incurred to Date Page 48 of 117 Link Light Rail East Link Extension Risk and Contingency Management Contingency Status Sound Transit has completed a draft Risk and Contingency Management Plan (RCMP) for East Link, and is currently addressing review comments from the Project Management Oversight Consultant (PMOC). The project’s baseline budget, which was approved by the Sound Transit Board in April 2015, contains a total of $795.9M Total Contingency. This period, total contingency decreased by the amount of $1.6 M, when compared to the previous period, to a new total amount of $821.8M . Total Contingency is made up of the following: Design Allowance is used to account for scope that could not be quantified at the time of the cost estimate. The total amount of design allowance in the baseline cost estimate is $184.1M. Design allowance remained the same as the previous period, which was $177M. In the next coming period, as the designs are progressed to 100% level and the engineer’s cost estimates are prepared, design allowance is expected to be reduced. Allocated Contingency is used to address risks, complexity and unforeseen conditions during the execution of work, including procurement (market risk). The total amount of allocated contingency has a net decrease of $1.6M. This was due to the execution of change orders on South Bellevue to OTC final design contract to address the design changes in Bellevue corridor, and amendment of an agreement with WSDOT to extend duration of the design coordination services in the I-90 corridor. Total allocated contingency balance is now $463.8M. Unallocated Contingency is used to address general project phase level cost risks and uncertainties. The total amount of unallocated contingency in the baseline cost estimate is $182.9M. This period, $1.8M of unallocated contingency was drawn down to help offset the higher than anticipated E130 GC/CM Pre-construction Services contract amount. Risk Management The RCMP established a risk management and oversight process for identifying, assessing, and monitoring risks and develops risk reduction/mitigation plans. It provides a tool for the project team to proactively manage risks on the project. It is Sound Transit’s responsibility for continuously monitoring project status and associated risks, taking mitigation actions for known risks identified on the risk register, and effectively responding in a timely manner to those risks that pose a significant impact to the project cost or schedule forecast. This period, Sound Transit began putting together the 4th QTR 2015 Quarterly Risk Report. Additional reviews of risks are still being done to capture the status and updates to risk mitigation strategies of the top risks. January 2016 Page 49 of 117 Link Light Rail East Link Extension Project Schedule The East Link Extension (EL) is in Final Design transitioning to Construction. Sound Transit Board baselined EL on April 23, 2015. The first early construction contract, early utilities for E340 Bel Red started in May 2015. The first major EL construction contract E330 Downtown Tunnel was issued Limited Notice to Proceed on December 15, 2015 with planned Notice to Proceed (NTP) in early February 2016. Contract procurement continues: E130 GC/CM (I-90 Heavy Civil) and I-90 Segment Construction Management Consultant (CMC) were awarded in December 2015; E360 D/B (SR520 to Overlake Transit Center) currently in procurement and scheduled to be awarded 2nd QTR 2016; and E750 GC/CM (East Link Systems) was awarded on January 8, 2016. Revenue Service is forecasted for June 2023. *Note: This schedule represents East Link Schedule Progress. EL Baseline Schedule is represented by lower bar (yellow). January 2016 Page 50 of 117 Link Light Rail East Link Extension Critical Path Analysis The East Link critical path remains the same as last period, which runs through completion of E130 design and MACC negotiations, which then drives E130 NTP for construction. Issuance of the I-90 TCAL/ASL is on the near critical path with less than a month of float before becoming the critical driver for E130 NTP for construction. The EL critical path schedule is shown below. ASL coordination with WSDOT is recognized as a high priority. Right of Way The East Link Extension involves the acquisition of a range of property interests including fee acquisitions for stations, guideway, staging areas, support facilities, and tunnel and guideway easements as well as permanent and temporary easements for construction. These acquisitions will result in owner and tenant residential and commercial relocations. The East Link Extension included the advance acquisition of approximately one mile of an existing railroad parcel (“Bellevue Mile”) that the Sound Transit Board approved in June 2011. The right-of-way program status for this period is summarized in the following table. Market value trends in both residential and commercial properties are exhibiting strong upward pressure. Appraisals are being adjusted to reflect this increasing trend in the market. The overall impact on the Right-of-Way budget is being closely monitored. Efforts are also underway to prioritize acquisitions by contract package to help ensure timely availability of property. Property acquisition is recognized as a high priority and is receiving the appropriate level of attention from the management team. East Link Extension Property Acquisition Status Signed Offers Possession Closings to AgreeMade and Use date ments Baseline Relocations Required Relocations Completed 0 0 0 1 94 230 156 1 0 1 0 0 10 1 95 230 156 Line Section Board Approved Seattle to S. Bellevue 2 1 0 0 S. Bellevue to OTC 239 188 9 1 1 242 190 Bellevue Mile Total Seattle to S. Bellevue E130 IDS Rail Connection & IDS & I-90 Upgrades - Air Space Lease discussions with WSDOT continue. S. Bellevue to OTC parcels E320 S. Bellevue– Seven offers made, one agreement signed, and one parcel closed and one vacated. Air Space Lease discussions with WSDOT continue. E335 – Six offers made and one agreement signed. E340 Bel-Red - Seven offers made, one parcel signed. E360 SR 520 to OTC – two parcels closed and two parcels vacated; one parcel de-certified. Air Space Lease discussions with WSDOT continue. E330 Downtown Bellevue – One parcel closed. January 2016 Page 51 of 117 Link Light Rail East Link Extension Quality Assurance Activities Community Outreach Activities Door–to-door outreach with the City of Bellevue staff to 15 properties directly adjacent to E330 Downtown Tunnel south portal site. Distributed invitation to upcoming public meeting. Hosted E330 Downtown Bellevue tunnel construction kickoff public meeting and there were 105 attendees. Held Judkins Park Station briefings with Coleman Neighborhood Association (18 attendees) and Jackson Community Council (24 attendees). Published the Mercer Island newsletter with an audience of approximately 500, which included information pertaining next steps of the issues identified during the listening tour. None to report. Issues None to report. Summary Jan 2016 Description Notes No. of Audits Planned 0 None No. of Audits Completed 0 None Reports in Progress 1 E750/N830 90% Design Submittal Audit No. of Audits Postponed 0 None Environmental Continued developing environmental permit application packages. Environmental commitments are being incorporated into the design, program, and specifications of the project. Sound Transit Board Actions Board Action Description Date None to report. January 2016 Page 52 of 117 Link Light Rail East Link Extension Final Design - S. Bellevue to RTC Final Design Scope Final Design for the East Link Extension includes three major design contracts: two for civil improvements and one for systems improvements. This contract is for civil and architectural design services from South Bellevue to the Redmond Technology Center (RTC). The contract was awarded to H-J-H Final Design Partners, a joint venture of HNTB Corporation, Jacobs Engineering Group, Inc., and Hatch Mott MacDonald. The scope of H-J-H services includes detailed designs of the corridor, preparation of comprehensive construction contract documents, permitting support, surveying, geotechnical investigations, right-of-way planning, third party coordination, systems coordination, cost estimating, scheduling, sustainability report, bid support, Preliminary Hazards Analysis, and community outreach. The design is grouped into five Contract Packages: (1) E320 South Bellevue; (2) E330 Downtown Bellevue Tunnel; (3) E335 Downtown Bellevue to Spring District; (4) E340 Bel-Red, and (5) E360 SR-520 to Redmond Technology Center. Map of South Bellevue to Redmond Technology Center. Final Design Key Activities E320 So. Bellevue Completed the QC and QA processes for the IFB submittal. Issued the IFB package, including contract drawings and specifications. Provided on-going support and updates to WSDOT and City of Bellevue for approval of maintenance of traffic special conditions. Coordinated with the Construction Management team, and prepared for bid-readiness review. E330 Downtown Bellevue Tunnel Design of the E330 contract package is complete. Commenced Design Services During Construction. E335 Downtown Bellevue to Spring District Performed interdisciplinary review of 100% submittal drawings and responded to comments. Resolved 90% comments from Sound Transit and City of Bellevue. Continued to work on maintenance of traffic drawings for GC/CM concept of cast-in-place long-span guideway structure over I-405. Locked down design of East Main Station for QC review. January 2016 Coordinated design of lights, fire alarms and exit signs for the Bellevue Transit Center Station. Coordinated interior mechanical penetrations of Wilburton Station with architects. Produced Progress Print of Spring District Station, and participated in over-the-shoulder review. E340 Bel-Red Worked on advancing the 100% design to IFB set, and coordinated with CMC on comments resolution. Provided technical support for the right-of-way, private owner property, and third party utility easements. Updated and validated construction easements. Updated the basemap reference files with as-build information provided by Sound Transit for Comcast, PSE, and the Olympic Pipeline third party utilities. E360 SR 520 to Redmond Technology Center Preparation of procurement documents for the E360 contract package is complete. Page 53 of 117 Link Light Rail East Link Extension Final Design - S. Bellevue to RTC Final Design Schedule The table below shows the design submittal dates for each of the contract. 60% Submittal Forecast/ Baseline* Actual 90% Submittal Forecast/ Baseline* Actual 100% Submittal Forecast/ Baseline* Actual IFB Submittal Forecast/ Baseline* Actual E320 So. Bellevue 12/6/2013 12/6/2013 9/19/2014 9/19/2014 4/3/2015 4/3/2015 E330 Downtown Bellevue Tunnel 11/18/2013 11/18/2013 6/2/2014 6/2/2014 10/20/2014 10/20/2014 E335 Downtown Bellevue to Spring District 12/20/2013 12/20/2013 10/19/2015 10/19/2015 3/8/2016 3/8/2016 1/25/2016 5/11/2015 6/15/2015 (2nd IFB) 6/13/2016 (9/6/2016 120th Sta.) 1/25/2016 5/11/2015 6/15/2015 (2nd IFB) 6/13/2016 (9/6/2016 120th Sta,) E340 Bel-Red 7/15/2013 7/15/2013 4/04/2014 7/21/2014 12/8/2014 12/8/2014 5/23/2016 5/23/2016 Contract Packages Draft RFP Submittal E360 SR-520 to RTC Final RFP Submittal Baseline* Forecast/ Actual Baseline* Forecast/ Actual 2/18/2014 2/18/2014 8/14/2015 8/14/2015 *Baseline schedule dates revised to reflect final contract packaging and construction delivery methods. Final Design Schedule Performance Excluding Other Direct Expenses (ODC’s), Profits and DSDC, the Schedule Performance Index (SPI) reported this period is at 0.99 when measuring against the Early Schedule Baseline, and 1.10 when measuring against the Late Schedule Baseline. E320 construction documents IFB was submitted this period. Advertisement is planned for April 2016. E335 design is progressing on schedule. E340 design is progressing ahead of schedule and likely to be completed before May 2016. Final Design Cost Performance Labor cost (for Phase 2 Final Design) to-date is $78.3M, or 93.5%* of the budget. Progress earned through the same period is approximately 93.7%* or $78.4 M of earned value. This yields a cumulative Cost Performance Index (CPI) of 1.00, which indicates approximately on-budget cost efficiency of the current contract budget, including executed change orders. Change orders are being negotiated and executed to address several changes that have to be done in the design. However, Estimate At Completion (EAC) is within the approved budget by Sound Transit Board. * Please note – due to recent execution of multiple change orders for this contract, the contract value (budget) has increased. Therefore, while the $ expenditure and $ value earned have gone up compared to last period, the % expenditures and % earned have not increased proportionally. Performance Labor Amt. Invoiced % Spent Current Period $77,022,223 $1,281,532 $78,303,755 93.4% 0.1% 93.5% Earned Value $76,207,985 $2,201,801 $78,409,786 % Complete 92.4% 1.3% 0.99 1.72 93.7% 1.00 CPI January 2016 Cumulative To Date Previous Period Page 54 of 117 Link Light Rail East Link Extension Final Design - Seattle to S. Bellevue Map of International District Station to South Bellevue. Final Design Scope Final Design for the East Link Extension is delivered by three major design contracts: two for civil improvements and one for systems improvements. This Contract is for the civil and architectural design services from International District Station (IDS) to South Bellevue. The contract was awarded to Parsons Brinkerhoff, Inc. (PB). The scope of the services includes detailed design of the corridor, preparation of comprehensive construction contract documents, permitting support, surveying, geotechnical investigation, right-of-way planning, third party coordination, systems coordination, cost estimating, scheduling, sustainability report, bid support, preliminary hazards analysis, and community outreach support. The project in this segment has been aggregated into one Contract Package: E130 Rail Connection and Upgrades at IDS; seismic Retrofits of WSDOT Structures; and I-90 Civil/Architectural, which also includes the two at-grade stations, and Electrical/Mechanical Upgrades to existing Tunnels. Final Design Key Activities The I-90 civil final design team is fully engaged in advancing the design toward the 90% milestone (2nd QTR 2016). The Consultant has supplemented the Design Team with additional staff and expertise. The Sound Transit and Consultant management teams are actively monitoring progress, quality and deliverables to ensure contract requirements and expectations are met. The team is effectively executing the scope of work consistent with the needs of the project. I-90 Corridor Floating Bridge: Flood Assessment, post-tensioning design underway, 30% design report due February 2016. Independent Review Team: Letter for Issue K finalized January 29, now circulating for signature. Fixed Structures: WSDOT Review 60% comments received on E120 Package. Mercer Island: Public comment period for Shoreline Permit ended February 5. Judkins Park Station: Inter Departmental review completed; LRRP meeting held January 7. Preparing for Quarterly ST/WSDOT Executive Team Meeting. Third Party, Agreements, & Permits Met with SDOT to discuss the pending amendment to the MOA for design review. Met with WSDOT to discuss East Link ASL. Reached out to Mercer Island to reset the Mercer Island Advisory Group for station design. January 2016 Page 55 of 117 Link Light Rail East Link Extension Final Design - Seattle to S. Bellevue Final Design Schedule 60% Submittal Contract Packages E130 – Rail connection & IDS upgrades; Seismic retrofits; and I-90 Civil/Arch./Elect. & Mech. Upgrades 90% Submittal 100% Submittal IFB Submittal Baseline Actual Baseline Forecast/ Actual Baseline Forecast/ Actual Baseline Forecast/ Actual 4/4/2014 7/11/2014 June 2016 June 2016 4th QTR 2016 4th QTR 2016 TBD TBD Final Design Schedule Performance Schedule information was not reported by the Consultant for the current reporting period, however, Sound Transit and the Consultant are managing the work closely and agreed that the June 2016 submittal date is on target. A revised baseline schedule was re-submitted by the Consultant; it is currently under review by ST. Once accepted, baseline milestones above will be revised by an administrative change order, and Earned Value reporting will commence. Final Design Cost Performance Because the baseline schedule has not been accepted, Cost Performance data was not submitted by the consultant for the current reporting period. The current budget includes $25.8M in executed change orders, including a change order for $17.9M for budget to complete Final Design (the negotiated Cost to Complete). A change order for $482K to include Post Tension Design in the contract has been authorized and is pending execution; this change includes a $399.7K credit from the Bolt Testing Program, which is replaced by the Post Tension design. Including professional fee, total Labor and Other Direct Costs for Final Design invoiced to-date is $38.2M, or 70.54% of the current authorized budget. Upon acceptance of the revised baseline schedule, a revised baseline cash flow for all remaining work will be submitted by the consultant and monthly cost performance reporting will resume. Cost performance is being closely monitored to ensure project completion in a cost-effective and successful manner. January 2016 Page 56 of 117 Link Light Rail East Link Extension Final Design - Systems Final Design Scope Final Design for the East Link Extension is delivered by three major design contracts: two for civil improvements and one for systems improvements. This contract is for the systems design services for the entire alignment. The contract was awarded to LTK Engineering Services, Inc. The scope of the services include detailed design of the corridor, preparation of comprehensive construction contract documents, 3rd party coordination, cost estimating, scheduling, and bid support. Final Design Key Activities Consultant submitted the 90% N830/E750 Systems design to Sound Transit for review. Final Design Schedule 60% Submittal E750– LRT Systems 90% Submittal 100% Submittal IFB Submittal Baseline Actual Baseline Forecast/ Actual Baseline Forecast/ Actual Baseline Forecast/ Actual 10/24/2014 10/24/2014 Actual 2/1/2016 1/29/2016 8/1/2016 8/1/2016 12/1/2016 12/12/2016 Final Design Schedule Performance In December 2015*, the project is 68.5% complete resulting in an Earned Value of $12.1M. The project has an early SPI of 1.01 and a late SPI of 1.09 which indicates that the contract is on schedule. *Note: The January 2016 invoice was not received from the Consultant (LTK was unable to accumulate all the data from its subcontractors to submit invoice before the cut-off date for this reporting period). January 2016 Page 57 of 117 Link Light Rail East Link Extension Final Design - Systems Final Design Cost Performance Through the end of December 2015 the project has spent approximately 63.9% of the budget resulting in CPI of 1.07. The current Estimate at Completion (EAC) is expected to be less than the current budget of $17.9M. . Performance Labor Amt. Invoiced % Spent Current Period Cumulative To Date $10,769,798 $482,499 $11,252,297 61.1% 2.8% 63.9% Earned Value $11,435,790 $635,709 $12,071,499 % Complete 64.9% 3.6% 68.5% 1.1 1.3 1.1 CPI January 2016 Previous Period Page 58 of 117 Link Light Rail East Link Extension - Construction Major East Link Construction Contract Packages Below are the major construction contract packages for the East Link Extension with a brief scope description and status of each. R8A Stage 3A – Modification of HOV Ramp between I-90 E335 Downtown Bellevue to Spring District – Four light rail stations; aerial, at-grade and retained-cut guideway and Bellevue Way SE. [Design-bid-build] from Downtown Bellevue, over I-405 to 124th Ave. NE. Status: Substantial Completion. [Heavy Civil GC/CM] E130 Seattle to South Bellevue – International District Status: Preconstruction Services contract awarded Station (IDS) modification, Retrofit of existing WSDOT structures, I-90 Center Roadway and two light rail stations. E340 Bel-Red – One light rail station, aerial and at-grade guideway from 124th Ave. NE to NE 20th. [Design-bid[Heavy Civil GC/CM] build] Status: Pre-construction services contract awarded. Status: Advertise 3rd QTR 2016 E160 Track Bridge System – Fabrication, delivery and E360 SR520 to Redmond Technology Center – Two light install eight track bridges that will span over fixed strucrail stations; aerial and retained-cut guideway along SRtures and the floating bridge. [Furnish and Install] 520 in the Overlake area of Bellevue and Redmond. Status: Prototype Design, Fabrication, and testing complete [Design-Build] E320 South Bellevue – One light rail station and a parking Status: Procurement underway, scheduled to be awarded 2nd garage at South Bellevue P&R; aerial, at-grade and reQTR 2016. tained-cut guideway along Bellevue Way SE and 112th E750 Systems – Light rail systems elements, including Avenue SE. [Design-bid-build] Traction Power Electrification, Overhead Catenary SysStatus: IFB submittal occurred in January 2016. Advertisement tem, Train Signals and Communication System. Comin April 2016. bined with Northgate Link N830. [Heavy Civil GC/CM] E330 Downtown Bellevue Tunnel – SEM Tunneling Status: Procurement Underway. Pre-construction contract award along 110th Ave. NE in Downtown Bellevue. [Design-bid- and NTP issued on January 8, 2016. build] Status: ST Board approved the award of the contract. LNTP issued in December 2015.NTP is anticipated in February 2016. January 2016 Page 59 of 117 This page left intentionally blank. January 2016 Page 60 of 117 Link Light Rail S. 200th Link Extension Scope Limits: South 200th Link Extension consists of 1.6mile extension of light rail from the SeaTac/Airport Station to South 200th Street. Alignment: The extension continues in an aerial configuration heading south of the existing SeaTac/Airport Station, east of Air Cargo Road across South 188th Street, and continuing south along the east side of 28th Avenue South to the elevated Angle Lake Station located at South 200th Street. A passenger pickup/drop-off area, bus transfer, plaza, and a minimum 700-space structured park and ride facility will be located at Angle Lake Station. Up to 400 additional spaces may be developed for interim parking while Angle Lake Station is the interim southern terminus of the Link system. Guideway/Station and Parking Garage/ Plaza are being delivered under a Design Build contract. Station: Angle Lake Station is located at South 200th Street. Systems: Signals, track electrification, and SCADA communications Budget: $383.2 Million Service: September 2016 Phase: Final Design and Construction Angle Lake Station Map of S. 200th Link Extension. Key Project Activities Closely Monitored Issues Design Build Guideway and Station (S440): Major con Project-wide: Issue of delayed permit issuance to the struction activities continue for the station and plaza; Contractors was elevated to City of SeaTac manageOCS poles & wiring, handrail, guardrail, and handrail ment. There is a disagreement between Sound Transit & drainage installations on the guideway; need to recand City of SeaTac over jurisdictional permitting and oncile various cost issues (existing crack street panels, inspection responsibilities over railway systems electri54-inch storm repairs, and fee-in-lieu agr) with the City cal installation. ST proposed a division of COS/L&I/ of SeaTac. Discussions with City Planning Director ST permitting responsibilities for COS and L&I accontinues. ceptance. Design Build Parking Garage (S445): Construction contin- S445 DB Parking Garage: Concern of late delivery and ues with garage structure/plaza area; revised BMS sysinstallation of elevator impacting critical path. tem design continues. S447 Roadway Improvements : Wall design and utility Military Road/South 200th (S446): ) In January, ST Capiissues are some major items impeding Contractor pertal Committee approved WSDOT Construction Task formance. Sound Transit Board approved to increase Order. WSDOT’s bid ad date is currently set for Februcontract contingency by $1.8M in January. ary 2016. This work to be managed by WSDOT and is not necessary to complete prior to the start of Revenue Service. January 2016 Page 61 of 117 Link Light Rail S. 200th Link Extension Project Cost Summary The S. 200th Link Extension project cost is summarized in two cost tables. The current Adopted Budget column reflects the 2015 Adopted Budget approved by the ST Board in December 2014. However next period, the adopted budget will be adjusted to reflect 2016 figures. The first table in in accordance with Sound Transit’s Work Breakdown Structure (WBS), and in the second table, cost is summarize in accordance to the FTA’s Standard Cost Categories (SCC) format. (Both tables’ figures in millions). WBS Phase Elements Administration Preliminary Engineering Final Design Construction Services 3rd Party Agreements Construction Vehicles ROW Capital Total Finance Cost Project Total Current Adopted Budget Baseline Budget Commitment to Date Incurred to Date Est. Final Cost (EFC) Adopted Budget vs. EFC $16.1 $16.8 $12.7 $12.5 $16.8 $0.0 $5.9 $5.7 $5.7 $5.7 $5.7 $0.0 $20.0 $9.9 $8.7 $8.7 $8.8 $1.1 $15.1 $17.3 $15.0 $11.6 $16.9 $0.5 $6.9 $7.1 $5.6 $3.5 $5.9 $1.2 $275.7 $282.9 $227.9 $208.2 $245.6 $37.3 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $43.5 $43.5 $42.6 $37.8 $43.5 $383.2 $383.2 $318.3 $287.9 $343.2 $0.0 $40.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $383.2 $383.2 $318.3 $287.9 $343.2 $40.0 The overall project Estimated Final Cost (EFC) for this period reflects $343M, a savings projection of $40M. This period incurred cost increased by approximately $4.5M, of this $3.7M was for construction activities. S440 Guideway & Station Design Build contract was $2.7M, S445 Parking Garage Design Build contract was $0.2M, S447 was $0.7M, and other construction cost (startup and permitting) was $0.1M. Construction services were $0.4M and the remaining expenditures for $0.4M were related to administrative and third party charges. The EFC grouped by SCC is also reflecting $343M, a savings projection of $40M. The work remaining can be achieved under the adopted budget. Project Elements by SCC Baseline Budget Current Adopted Budget Commitment to Date Incurred to Date Est. Final Cost (EFC) Adopted Budget vs. EFC $144.8 $133.0 $98.5 $96.2 $108.3 $24.7 $46.4 $51.3 $39.0 $33.1 $39.7 $11.7 30 Support Facilities:Yards, Shops $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 40 Sitework & Special Conditions $34.6 $55.3 $51.2 $40.6 $57.6 -$2.3 50 Systems Construction Subtotal (SCC 10-50) $30.8 $19.9 $19.2 $18.6 $19.4 $0.6 $256.6 $259.6 $207.8 $188.5 $224.9 $34.6 $43.5 $43.5 $42.6 $37.8 $43.5 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 80 Professional Services $64.1 $72.1 $67.8 $61.7 $68.0 $4.1 90 Unallocated Contingency Project Total (SCC 10-90) $19.0 $8.0 $0.0 $0.0 $6.8 $1.3 $343.2 $40.0 10 Guideway & Track Elements 20 Stations 60 Row, Land, Existing Improvements 70 Vehicles 100 Finance Cost Project Total (SCC 10-90) January 2016 $383.2 $383.2 $318.3 $287.9 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $383.2 $383.2 $318.3 $287.9 $343.2 $40.0 Page 62 of 117 Link Light Rail S. 200th Link Extension Cost Contingency Management The overall project contingency balance as of this period is $65.3M. Design Allowance (DA): After baselining the project the design allowance of $26.7M was added to the base estimate for the design build work package. There will be no future reporting of DA. Allocated Contingency (AC): This period the AC shows a current balance of $58.1M, a decrease of $0.4M from the previous period. The reduction was primarily due to change orders from S447 construction contract and startup commitments, and administration commitments. Unallocated Contingency (UAC): ): This period the UAC balance remains unchanged from last period at $6.8M. Contingency Status Baseline Current Amount % of Total Amount Design Allowance $26.7 7.0% $ Allocated Contingency $29.8 8.0% $58.1 105.0% Unallocated Contingency $19.0 5.0% $ 6.8 12.3% Total $75.5 20.0% $64.9 117.3% - Contingency Histogram % of Work Remaining 0.0% Risk Management The South 200th Link Extension Risk Management Plan (RMP) established a risk management and oversight process for assessing and monitoring risks to determine how risks have been reduced or mitigated. RMP captures scope growth, schedule delay, and cost growth risks that could arise during any phase of the project and potentially affect parts of the project scope. On a quarterly basis, the South 200th Link Extension team reviews and updates risk to reflect conditions. Below is a list of the top five major risk review items identified through 4th QTR 2015: Construction: Delays due to City of SeaTac electrical inspections (S440). Third Party: City of SeaTac permit approval of crucial elements of work at times is a hindrance (S440, S445, S447). Construction: Delays due to L&I inspections and Certificate of Occupancy for elevators (S440 and S445). Construction: Contract documents with design errors could impact cost and schedule (S447). Construction: Poor engineering and limited involvement of Engineer of Record during Design Support During Construction lead to additional delays and cost (S447). January 2016 Page 63 of 117 Link Light Rail S. 200th Link Extension Project Schedule S440 Guideway is complete and the System Contractor continues to install OCS poles. S445 DB Parking Garage Design/Builder continues construction of the parking garage structure. The S. 200th Master Schedule has been tied to the Rail Activation Schedule but commissioning activities in the S440 schedule require more detail and logic to be tied properly. The S. 200th Link Extension anticipated service launch is September 2016. (See Project Schedule Summary below). Roadway improvement ongoing at Angle Lake Station area. January 2016 Guideway Station post installation. Page 64 of 117 Link Light Rail S. 200th Link Extension Critical Path Analysis The critical path this period runs through procurement of OCS and Communications equipment through installation and commissioning and system wide testing and integration and Pre-Revenue Service. Near critical path activities include the completion of trackwork and procurement of signal equipment. U830 SCADA programming continues to be monitored closely. The S445 Parking Garage construction is also being monitored closely due to its impact to the Revenue Service. The Contractor is assessing the late elevator cab delivery and expects an update from the supplier next period. Critical Path Float S. 200th Link Extension Float The float contingency for S. 200th Link Extension remains at 146 days but may require some float to be utilized for System Integration Testing and the late completion of elevators at the S445 parking garage. The Rail Activation Schedule is reporting 64 days of float. 165 165 January 2016 146 146 146 Nov –15 Dec- 15 Jan –16 165 Page 65 of 117 Link Light Rail S. 200th Link Extension Schedule Performance Index The Schedule Performance Index (SPI) for S.200th has risen slightly this period to 0.95 as work focuses on the train systems this period. Systems installers are on site and OCS commissioning has commenced and station work is nearing completion. (See details on individual contract sections.) Progress will continue to be monitored closely. S. 200th SPI - January 2016 Cost Progress Analysis Overall S. 200th physical % complete is at 89.6%. Graphic below is a representation of the progress of major construction contracts cost compared to the early/late projections. S440 will be the main driver for performance levels for S. 200th. S. 200th Progress and Earned Value Curves– January 2016 January 2016 Page 66 of 117 Link Light Rail S. 200th Link Extension Right-of-Way The South 200th Link Extension (S440) will extend from the SeaTac Airport Station along an elevated guideway to a station combined with a park and ride garage at South 200th Street. The South 200th Link Extension involves the acquisition of a range of property interests, including fee acquisitions, permanent and temporary easements, and both business and residential relocations. S447 covers road and utility improvements necessary as a result of the increased traffic that is anticipated with the new station. S447 initially covered 28 parcels of which 10 were previously certified for S440. Six (6) parcels that had ST acquisitions on S440 will also have acquisitions on S447. The right-of-way program is summarized below. Line Section Total Parcels Certified* Offers Made Signed Agreements Admin. Settlements Possession and Use Closings to date Baseline Relocations Required Relocations Completed S440 64 59 0 0 0 56 8 8 S445 1 1 0 0 0 1 0 0 S447 27 16 0 0 0 16 0 0 Total 92 76 0 0 0 73 8 8 Note: *Seven of these parcels are in two different contracts and three parcels are in the S440 contract twice.These 10 parcels are counted twice as they have 2 different milestones. S440 DB Guideway and Station - One utility easement closed. S445 Parking Garage and Plaza– Completed. S447 Station Area Roadways - No new activity. January 2016 Page 67 of 117 Link Light Rail S. 200th Link Extension Construction Safety Safety Statistics for the reporting period and year-to-date are summarized in the table below. Data/Measure Jan 2016 Year to Date Project to Date Recordable Injury/Illness Cases 1 1 13 Days Away From Work Cases 0 0 2 Total Days Away From Work 0 0 14 Restricted or Modified Work Cases 1 1 9 Total Days Restricted or Modified Work 51 51 471 First Aid Cases 1 1 34 0 274 97,933 0 97,933 20 951,305 Monthly Average Year to Date Project to Date Recordable Injury Rate 2.04 2.04 2.73 DART Rate 2.04 2.04 2.31 Recordable National Average 3.60 3.60 3.60 DART National Average 2.00 2.00 2.00 Recordable WA State Average 7.20 7.20 7.20 DART WA State Average 3.30 3.30 3.30 Reported Near Mishaps Average Number of Employees on Worksite Total # of Hours (GC & Subs) OSHA Incident Rates Quality Assurance Activities Activities S440: MRB has dispositioned as Acceptable 1 NCR. Issues None to report. Summary Description Notes No. of Audits Planned 0 None No. of Audits Completed 0 None 0 None 0 None Reports in Progress No. of Audits Postponed January 2016 Jan 2016 Page 68 of 117 Link Light Rail S. 200th Link Extension Community Outreach Continued coordination with affected businesses for landscaping and driveway restoration. Met with businesses and provided construction updates/alerts. Sound Transit Board Actions Board Actions Postage wayfinding signage for three businesses. Facilitated a meeting between a business and consultant to discuss planning, marketing and distribution. Conducted a parking garage and station tour with the City of SeaTac Planning Department. M2016-05 M2016-06 Description Execute a task order agreement with WSDOT to provide construction services for South 200th Street/ Military Road South/I-5 Ramp Intersection Improvements, an element of the South 200th Link Extension in the amount of $3,085,237 with a 10% contingency, for a total authorized agreement amount not to exceed $3,393,761. Increase the contingency for the construction services contract with Johansen Excavating for the Station Area Roadways and Surface Parking work within the South 200th Link Extension in the amount of $1,800,00 for a total authorized contract amount not to exceed $11,069,040. Date Jan 14 Jan 14 Contract Packages The South 200th Link Extension consists of two major contract packages, both by Design Build methods, and two minor contracts. Below is a brief scope description of each package. S440 Design Build Guideway and Station - This contract involves the design and construction of an elevated guideway (1.6 miles) and station, site work, civil /roadwork, and systems. See S440 contract page for detailed information on the following page. S445 Design Build – Parking Garage and Plaza – This contract involves the design and construction of a parking garage (700 space structure), passenger pick-up and drop-off lot, plaza area, retail space and surface parking. See S445 contract page for details. S446 Military Road & South 200th Street Improvements – This contract package consists of construction of roadway and traffic signals work. S447 Station Area Roadways & Surface Parking- This contract package consists of station area roadway, surface parking, and non-motorized Improvements (sidewalks, traffic signals, pedestrian/bicycle connection, roadwork). January 2016 Page 69 of 117 Link Light Rail S. 200th Link Extension – Design-Build S440 Contract—Design -Build (Guideway and Station) Current Progress Continuing drainage and handrail installation. OCS pole erection is complete. Register Wire installation will continue through February 2016. OCS is expected to be energized in early 2016. Station is nearing completion. Overall the progress of this contract represents 94% physical completion as compared to 96% time to date. Schedule/Critical Path The schedule update has been received and is expected to be rejected due to the negative float on Milestone #7 (Systems Commissioning) which is reporting 61 days of negative float as the Contractor prepares to understand the commissioning requirements for the train systems and coordination with the System Integration Testing. Milestone #5 (Guideway Commissioning) is reported to be complete. Milestone #10 (Substantial Completion) is reporting 51 days of negative float. The critical path this period runs through the Communications activities and System Testing and Integration. Schedule coordination with the System Integration Testing Plan is expected to continue. Production rates will also be monitored closely. Schedule Performance Index The SPI has risen slightly this period with guideway complete, plinth and rail nearing completion, and OCS pole installation commencement but remains below 1.0 at 0.98. Delays to the commencement of station construction, span erection, and an aggressive baseline schedule continue to plague S440. The Contractor has been able to absorb these delays by shifting the various work sequences. Testing and Commissioning Activities for the station have been added to the schedule. Train Systems commissioning activities durations seem to be under represented in this schedule update. January 2016 Page 70 of 117 Link Light Rail S. 200th Link Extension – Design-Build tion. Key Activities Current Period Angle Lake Station/Plaza activities: Signal House arrived and installed; continued elevator and escalator installation; continue ancillary building interior finishes; continued platform cowling; continued install tiling, continue canopy ceiling and lights, wiring for fire alarm, speakers, VMS signs and sprinklers; communication lines pulled to rooms; continue Building Management System (BMS) design. Next Period Continue guideway work. Continue Station work. Continue Artwork work. Continue various site work. Continue other miscellaneous work: post tensioning, grouting, seismic buffers/shear keys. Guideway activities: Continued track punchlist, inside and TPSS testing. on top of guideway; completed switch pads at double crossover & pocket track; continued handrail and noise wall installation; completed OCS pole, guy wires, cantile- Closely Monitored Issues ST and RE team reviewing all points list prior to formal ver arms, messenger wire; and continued contact wire installations; continued drainage installation; continued submittal to U830. TPSS, Train Control (Signals), and cable tray and grounding; continued expansion joints Communications have been accepted. Second BMS suband completed hatch installation; continued began bird mittal came in, Fire Panel points lists for U830 SCADA programing were returned for re-submittal. netting. Continued painting columns with pigment sealer. Continued the following activities throughout the alignment: form and place PT pour backs and permanent bearings, closure pours, shock transmission unit (STU) and seismic buffers. ST & PCL are near agreement on 30 to 60 days noncompensable contract time extension due to vandalism, weather and late delivery of signal houses which puts non-revenue testing in June 2016, but the base-lined service opening date remains September 2016. Continue site work: restoration, irrigation, drainage, and concrete panel replacement. I/O points list for SCADA programming are nearing completion. Delivered and installed signal house near Airport Sta- Cost Summary Present Financial Status Amount S440 Contractor—PCL Civil Contractors, Inc. Original Contract Value Change Order Value $169,000,000 $4,615,122 Current Contract Value $173,615,122 Total Actual Cost (Amount Billed) $166,992,859 Financial Percent Complete: 96% Physical Percent Complete: 94% Authorized Contingency $13,520,000 Contingency Drawdown $4,615,122 Contingency Index* 2.8 Installation of the metal ceiling panels at the Angle Lake Station. January 2016 Page 71 of 117 Link Light Rail S. 200th Link Extension – Design-Build S445 Contract—Design -Build Parking Garage Current Progress At S445, parking garage concrete work is expected to be complete in February 2016. Garage Finishes have commenced but delays to elevator equipment procurement are impacting the completion date for this project. Production will be watched closely. Overall progress of this contract: construction is 77% physical completion and against 95% duration complete. Schedule/Critical Path The January schedule update has been submitted. The critical path this period runs through submittal review and elevator installation which was expected based on discussions this month. Milestone #2 Substantial Completion, is reporting 98 days of negative float with 5 days of owner controlled float intact. Delays persist in procurement of elevator and near critical slab construction. It is expected that a recovery schedule will submitted next period. Schedule Performance Index The SPI has risen slightly this period to 0.81 based on early forecasts. Elevator procurement delays may hamper any recovery efforts. January 2016 Page 72 of 117 Link Light Rail S. 200th Link Extension – Design-Build Key Activities Current Period Continued coordination meetings with ST, RE team and other third party agencies. Continued design and construction interface coordination meetings with S440 DB Contractor, and continue construction coordination with S447 contractor. Continued BMS design. Continued building elevated deck and beam formwork (Level 3, 6, 7). Continued formwork, rebar, pour and stressing of post tensioned deck (Level 3, 7). Continued installation of fire sprinkler room and electrical room installation. Continued prepping and staining of garage ceilings. Continued MEP rough-in at retail space within garage structure. Continued field painting of transom and wind post. Began installation of Stairs (1, 3). Continue prepping and staining of garage ceilings. Continue MEP rough-in at retail space within garage structure. Continue field painting transom and wind post. Continue installation of stairs. Complete testing and acceptance of fire protection water line. Closely Monitored Issues The fabrication, delivery and installation of the elevator as well as the façade installation remain on the critical path. Contractor is working with the elevator manufacturer to identify efficiencies and potential mitigation measures to reduce the current timeframe. Next Period Continue design and coordination meetings. Continue BMS design. Continue building elevated deck and beam formwork. Continue formwork, rebar, pour and stressing of post tensioned deck. Continue installation of fire sprinkler room and electrical room installation. Cost Summary Present Financial Status Amount S445 Contractor—Harbor Pacific/Graham Original Contract Value Change Order Value $29,978,000 $1,656,261 Current Contract Value $31,634,261 Total Actual Cost (Amount Billed) $24,939,971 Financial Percent Complete: 79% Physical Percent Complete: 75% Authorized Contingency $2,398,240 Contingency Drawdown $1,656,261 Contingency Index* 1.1 Installation of pre-cast stairs are ongoing at the garage. January 2016 Page 73 of 117 Link Light Rail S. 200th Link Extension – Design-Build S447 Contract – Station Area Roadway Improvements and Surface Parking Current Progress In January, S447 Contractor continues to mitigate for continued constructability issues. physical completion and 88% schedule complete. Overall this contract is 82% Schedule/Critical Path The January 2016 schedule update has been submitted but contract milestones have not been recognized in this update due to the ongoing negotiations between the Contractor and ST. It is expected that this schedule will be rejected to due logic revisions that need to be made to represent progress in the field. Substantial completion is now forecast for July 8, 2016 as design revisions to work on S. 200th continue. Meetings with the Contractor have been scheduled to determine the extent of delays. The Contractor will continue to focus efforts on adjacent Contractor interfaces. Schedule Performance Index The SPI for S447 has risen slightly to 0.74 this period as the Contractor continues to adjust their work due to delays. Unrealistic schedule projection will be rejected and the Contractor will be required to revise logic to represent actual progress in the field. January 2016 Page 74 of 117 Link Light Rail S. 200th Link Extension – Design-Build Key Activities Closely Monitored Issues Current Period Continue weekly construction progress meetings. Continue coordination meetings with S440 and S445 Contractors. South 200th St activities: Continue grading, sidewalk and curbs, electrical conduit installation; continue utility adjustments. 28th Ave activities: Completed curb and gutter; began placing asphalt; forming driveways; conduit installation; adjusting utilities. Continued parking lot improvements –grading and curbs. PSE continue pole removal. The culvert design at Des Moines creek is causing schedule and cost impacts. Delays are being analyzed and not expected to affect overall project completion. Soil improvement design is under evaluation. Next Period Continue roadwork, sidewalk, curb and retaining wall work. Continue parking lot work. Continue installing transportation system work on roadway. Continue utility work. Project wide erosion control. Cost Summary Present Financial Status Amount S447 Contractor – Johansen Excavating, Inc Original Contract Value Change Order Value $8,426,400 $621,852 Current Contract Value $9,048,252 Total Actual Cost (Amount Billed) $6,679,257 Financial Percent Complete: 74% Physical Percent Complete: 72% Authorized Contingency $2,642,640 Contingency Drawdown $621,852 Contingency Index* 3.1 28th Avenue grading near column B3. January 2016 Page 75 of 117 This page left blank intentionally. January 2016 Page 76 of 117 Link Light Rail Federal Way Link Extension Scope The Federal Way Link Extension includes alternatives analysis, environmental work and conceptual engineering for an extension of Link Light Rail from S. 200th St. in SeaTac to the Federal Way Transit Center. Preliminary engineering will be performed only for the segment from S. 200th St. to Kent/Des Moines (in the vicinity of Highline College). Key Project Activities/Issues Completed Phase 1 work (Alternatives Analysis) in Sept. 2013. DEIS alternatives identified by the Board in Sept. 2013. Executed Phase 2 contract amendment with HDR for Conceptual Engineering and Draft EIS work in October 2013. Published Draft EIS on April 2015. Comment period ended May 26, 2015. Board identified a Preferred Alternative and approved Phase 3 contract amendment on July 23, 2015. Executed Phase 3 contract amendment with HDR for Final EIS and Preliminary Engineering on July 24, 2015. Map of Federal Way Link Extension. Project Cost Summary In July 2015, the Sound Transit Board identified the preferred alternative and station locations and approved the Federal Way Link Extension Phase 3 (PE and Final EIS) contract amendment. The Federal Way Link Extension is currently funded through the completion of preliminary engineering (PE) and environmental documentation, with the exception of the segment from Kent/Des Moines to Federal Way, which is only funded through environmental documentation. Table (below) figures in millions. Adopted Budget Phase Commitment to Date Incurred to Date Forecasts and Trends Estimated Final Cost (EFC) Budget Versus EFC $9.4 $3.4 $3.4 $6.0 $9.4 $0.0 $30.9 $28.5 $17.9 $2.3 $30.9 $0.0 Third Parties $1.6 $0.4 $0.2 $1.2 $1.6 $0.0 Right of Way $1.0 $1.0 $0.5 $0.1 $1.0 $0.0 $42.9 $33.2 $21.9 $9.6 $42.9 $0.0 Administration Preliminary Engineering Total January 2016 Page 77 of 117 Link Light Rail Federal Way Link Extension Project Schedule The Final EIS and Preliminary Engineering will run through 4th QTR 2016. It is anticipated that the Board will adopt the project and the FTA will issue the ROD in late 2016. Sound Transit Board Actions Community Outreach Board motions and resolutions directly related to Federal Way Link Extension is summarized in the table below. Held an outreach coordination meeting with WDOT’s SR 509 project team as some parcels may be needed by both projects. Continued meeting with property owners regarding potential impact of the project. Motion Number Description Date None to report. Environmental None to report. January 2016 Page 78 of 117 Link Light Rail Federal Way Link Extension– Preliminary Engineering Phase 3 Preliminary Engineering (PE) In July 2015, Sound Transit executed an amendment to the professional services agreement with HDR Engineering, Inc. for Phase 3 professional services, including completion of a Final Environmental Impact Statement (FEIS) using the preferred alternative and the other alternatives in the Draft EIS, preliminary engineering of the preferred alternative to Kent/Des Moines and additional engineering as needed to support receipt of environmental approvals. Phase 3 Key Activities Continued field survey activities including geotechnical borings, wetland surveys, noise monitoring and tree surveys. Continued coordination with key stakeholders to refine the design of the Kent/Des Moines, S. 272nd and Federal Way Transit Center station concepts. Continued engineering activities associated with advancing the design of the preferred alternative. Continued development of the Final EIS. Phase 3 Schedule Performance The cumulative Schedule Performance Index (SPI) is 1.08 through January 2016, indicating the overall amount of work accomplished is more than planned. Review of the consultants draft Phase 3 schedule indicates that completion of the FEIS document is currently on the critical path. Phase 3 Cost Performance $17.2M of the total contract amount, approximately 61%, has been spent through January 2016. Phase 3 expenditures through December totaled $5.3M, approximately 33% of the Phase 3 contract total. The Phase 3 percent complete reported at the end of January is 33%, with an earned value of $5.5M. The cumulative Cost Performance Index (CPI) through January is 1.02, indicating costs are slightly less than work accomplished. Based on the current trend, the Phase 3 cost is expected to be on budget. Phase 3 Performance Previous Period Current Period Cumulative To Date Amount Invoiced $4,060,034 $1,282,626 $5,342,660 25% 8% 33% Earned Value $4,024,671 $1,447,816 $5,472,487 % Complete 25% 8% 33% SPI 1.01 1.36 1.08 CPI 0.99 1.13 1.02 % Spent January 2016 Page 79 of 117 This page left blank intentionally. January 2016 Page 80 of 117 Link Light Rail Tacoma Link Expansion Scope In cooperation with the City of Tacoma and Pierce Transit, Sound Transit is studying the potential of expanding the Tacoma Link light rail system in the context of the City and Pierce Transit service and capital plans. A technical advisory committee comprised of the City, Pierce Transit and Sound Transit staff convened to provide technical feedback and guidance throughout the Alternative Analysis (AA) process. Sound Transit, the City of Tacoma and Pierce Transit signed a cooperative agreement term sheet. In February 2014, the Tacoma City Council unanimously recommended and the Sound Transit Board unanimously identified one alignment to undergo environmental review. In December 2015, the Board authorized the project to advance to Final Design. Tacoma Link Key Project Activities Environmental: The FTA made a preliminary decision to proceed with DCE. The environmental review process was completed in August 2015. Preliminary Engineering (PE): Final PE plans were submitted in November 2015. On December 9, 2015, the Sound Transit Board authorized the project to advance through Phase Gate 4: Final Design and increased the lifetime capital budget to $33M. Project Cost Summary On December 17, 2015, a resolution was passed by the Sound Transit Board to amend the Adopted 2015 Lifetime Budget for Tacoma Link Expansion to $33M and authorized the project to advance through Gate 4 with the Phase Gate Process. (Table in millions.) Phase Administration Adopted Budget Commitment to Date Incurred to Date Forecasts and Trends Estimated Final Cost (EFC) Budget Versus EFC $10.6 $1.8 $1.9 $8.7 $10.6 $0.0 $5.9 $5.5 $5.0 $0.4 $5.9 $0.0 $10.8 $0.0 $0.0 $10.8 $10.8 $0.0 Vehicles $2.0 $0.0 $0.0 $2.0 $2.0 $0.0 Right of Way $3.2 $0.0 $0.0 $3.2 $3.2 $0.0 $33.0 $7.3 $7.0 $25.6 $33.0 $0.0 Preliminary Engineering Final Design Total January 2016 Page 81 of 117 Link Light Rail Tacoma Link Expansion Project Schedule The project schedule is presented below. Environmental Sound Transit Board Actions Board motions and resolutions directly related to Tacoma Link Expansion is summarized in the table below. Motion Number Description R2016-02 To acquire certain real property interests, including acquisition by condemnation to the extent authorized by law, and to reimburse eligible relocation and reestablishment expenses incurred by affected owners and tenants as necessary for the Tacoma Link Expansion Project. January 2016 Date The environmental review process was completed in August 2015. Community Outreach Provided geotech drilling updates to impacted businesses. Jan 28 Presented project overview to Overlook Condo Association and 25 residents attended. Provided project update to Tacoma Housing Authority. Also provided updates other associations. Page 82 of 117 Link Light Rail Tacoma Link Expansion—Preliminary Engineering Phase 3 Conceptual Engineering In February 2015 Sound Transit executed an amendment to the professional services agreement with CH2M Hill, Inc. for Phase 3 professional services, including preliminary engineering and environmental work. Phase 3 Key Activities Continued public outreach efforts. Prepared detailed Phase 3 work plan and schedule. Updated design criteria and various conceptual engineering technical memos. Geotechnical, Structural, Drainage, Utility, and Safety & Security Certification Analysis ongoing. Phase 3 Schedule and Cost Performance This project will begin reporting earned value data for the Phase 3 contract soon. January 2016 Page 83 of 117 This page left blank intentionally. January 2016 Page 84 of 117 Link Light Rail Link Operations and Maintenance Satellite Facility Scope Sound Transit is reviewing and evaluating current and future light rail storage and maintenance requirements to support the development, design, and construction of a future light rail operations and maintenance facility for proposed system expansion. Sound Transit Board identified Draft Environmental Impact Statement (DEIS) alternatives in 2012 and identified the preferred alternative on July 24, 2014. Key Project Activities MOU with the City of Bellevue approved by the Bellevue City Council and Sound Transit Board in April 2015. FEIS was published on October 2, 2015 and the ST Board selected the project to be built on October 22, 2015. FTA signed the project Record of Decision on November 4, 2015. ST Board approved Phase Gate 4: Entry to Final Design on December 17, 2015. ST Board approved property acquisition on December 17, 2015. The property needed for the OMSF includes multiple relocations and the purchase cost and schedule is one of the top risks for the project. The City of Bellevue initiated a code amendment process to provide an administrative permitting process for land use approvals. Renegotiated consultant scope of work to support developing design build procurement documents. Consultant continued work on procurement documents. Drat expected at the end of March. ST is negotiating task orders with consultants to produce a market and TOD feasibility study as required by the MOU with Bellevue. Pre solicitation notification being drafted for issuance in February. Program Cost In December 2015, the Sound Transit Board authorized the project to advance through Phase Gate 4 Final Design and increased the lifetime capital budget for the OMSF from $36.8M to $133.6M. Table shown in millions. Adopted Budget Phase Administration Commitment to Date Incurred to Date Forecasts and Trends Estimated Final Cost (EFC) Budget Versus EFC $3.2 $1.3 $1.3 $1.9 $3.2 $0.0 Preliminary Engineering $10.2 $8.7 $6.3 $1.5 $10.2 $0.0 Construction Services $0.6 $0.0 $0.0 $0.6 $0.6 $0.0 3rd Party Agreements $1.7 $0.0 $0.0 $1.7 $1.7 $0.0 $118.0 $23.2 $23.2 $94.8 $117.9 $0.0 $133.6 $33.2 $30.8 $100.4 $133.6 $0.0 ROW Total January 2016 Page 85 of 117 Link Light Rail Link Operations and Maintenance Satellite Facility Program Schedule The project schedule is presented below. The schedule reflects the current Design Build approach that has been determined through multiple project delivery workshops. Sound Transit is preparing a conceptual schedule to show the remaining preliminary engineering duration to support the design build procurement. Sound Transit Board Actions Environmental Board motions and resolutions directly related to OMSF is summarized in the table below. Motion Number Description Date Environmental publication of the FEIS on October 2, 2015. Community Outreach None to report. None to report. January 2016 Page 86 of 117 Link Light Rail Link Operations and Maintenance Satellite Facility Phase 2 Preliminary Engineering and FEIS Sound Transit executed a professional services agreement with Huitt-Zollars, Inc. for civil engineering and architectural design services and issued NTP for Phase 2, Preliminary Engineering and FEIS for the Link Operations and Maintenance Satellite Facility (OMSF) project in September 2014. Delivered Final Phase 2 Baseline Schedule December 2014. Phase 2 Key Activities Finalized contract amendment for Phase 2A scope of work. No Cost Change. Met with King County to discuss options for main sewer line protection or replacement. Developed 3 approaches and associated costs. Consultant continued work to finalize cost model update from last spring’s interim PE workshops. Phase 2 Schedule Performance The cumulative Schedule Performance Index (SPI) trends at 0.67 through January 2016, which means that cumulative work accomplished is less than the planned work. The remaining Phase 2 scope has been renegotiated to reflect the recent Design Build Project Delivery decision. The consultant has been directed to focus efforts on delivering Design Build bridging documents to help inform the procurement of the final design build team starting February 2016 as Phase 2A. Phase 2 Cost Performance $3.M of the total Phase 2 contract amount, approximately 56%, was spent through January 2016. The Phase 2 percent complete is 65%, with an earned value of $3.5M. The cumulative Cost Performance Index (CPI) is 1.15, meaning that expenditures are less than the earned value. In January 2016 a change order restructuring the remaining scope to provide Design Build bridging documents was approved and executed. Starting in February, the remaining contract value will be tracked based on the restructured scope for Phase 2A. Phase 2 Performance Previous Period Current Period Cumulative To Date Amount Invoiced $2,898,637 $92,756 $2,991,393 54% 2% 56% Earned Value $3,360,897 $92,756 $3,453,653 % Spent January 2016 % Complete 63% 2% 65% SPI 0.65 2.14 0.67 CPI 1.16 1.00 1.15 Page 87 of 117 January 2016 Page 88 of 117 Link Light Rail ST2 LRV Fleet Expansion Project Summary Scope: Design, manufacturing, assembly, inspection, testing and delivery of 122 low floor light rail vehicles for service requirements of Northgate, East Link and Lynnwood Link Extensions. Budget: $733 Million (Baseline September 2015) Schedule: Project completion 3rd QTR 2024 Key Activities Request For Proposals was issued on November 6, 2015. Contractor proposals are due by February 18, 2016. Project Cost Summary The ST2 LRV Fleet Expansion project cost is summarized below by two cost categorizations. In the first table, the cost is summarized in accordance with Sound Transit’s Work Breakdown Structure (WBS) at the Phase Level. The second table summarizes the project in accordance with the FTA’s Standard Cost Category (SCC) format. Both tables below are shown in millions. TIFIA is financing 28% of this project. To date, approximately $1.1M has been expended. This period saw expenditures for drafting RFI responses and addenda coordination. Cost Summary by Phase Project Phase Administration Baseline Budget Current Adopted Budget Commitment to Date Incurred to Date Estimated Final Cost (EFC) Adopted Budget Vs. EFC $4.7 $4.7 $0.0 $0.0 $4.7 $0.0 $14.1 $14.1 $4.8 $1.1 $14.1 $0.0 Vehicles $714.2 $714.2 $0.0 $0.0 $714.2 $0.0 Total $733.0 $733.0 $4.8 $1.1 $733.0 $0.0 $0.0 Current Adopted Budget $0.0 Commitment to Date $0.0 $0.0 $0.0 $696.7 Construction Services Cost Summary by SCC SCC Element Construction Subtotal (SCC 10-50) 60 ROW, Land, Existing Improvements 70 Vehicles 80 Professional Services 90 Contingency Capital Total (SCC 10-90) January 2016 $0.0 Estimated Final Cost (EFC) $0.0 Adopted Budget Vs. EFC $0.0 $0.0 $0.0 $0.0 $0.0 $696.7 $4.8 $1.1 $696.7 $0.0 $4.5 $4.5 $0.0 $0.0 $4.5 $0.0 $31.7 $31.7 $0.0 $0.0 $31.7 $0.0 $733.0 $733.0 $4.8 $1.1 $733.0 $0.0 Baseline Budget Incurred to Date Page 89 of 117 Link Light Rail ST2 LRV Fleet Expansion Cost Contingency Management Contingency Status The project’s baseline budget, which was approved by the Sound Transit Board in September 2015 and includes a total of $78.0M of Total Contingency. Overall contingency is currently 10.7% of remaining work. Design Allowance – This project contains $0 design allowance. Allocated Contingency – The project baseline contains $46.3M of allocated contingency. There was no change in allocated contingency this period. Unallocated Contingency – The project baseline contains $31.7M of unallocated contingency. There was no change in unallocated contingency this period. Contingency by Type Histogram Risk Management The ST2 LRV Expansion project currently has 24 active risks that are being monitored. The top five risks are as follows: Buy America Requirements Bid Selection Issues Sub-Supplier Performance Issues Availabilities of Spare Parts Commissioning Requirements Project Schedule The ST2 LRV Expansion project schedule is shown below. January 2016 Page 90 of 117 Link Light Rail Staffing Report Annual Staffing Summary 2015 - Link Light Rail Capital Program During 2015 the following 29 positions were filled to support the Link capital program: Position Project Assignment Deputy Project Director Link O&M Satellite Facility Deputy Executive Director Lynnwood Link Extension Project Director Tacoma Link Expansion Assistant Permit Administrator Link/Sounder Capital Program Design Technology Specialist (2) Link/Sounder Capital Program Structural Engineer Link/Sounder Capital Program Sr. Structural Engineer Link/Sounder Capital Program Civil Engineering Supervisor Right-of-Way Deputy Director Systems Fire Protection Engineer Link/Sounder Capital Program Sr. Mechanical Engineer Link/Sounder Capital Program Configuration Coordinator Link/Sounder Capital Program Document Control Coordinator Link/Sounder Capital Program Sr. Cost Engineer Link/Sounder Capital Program Sr. Systems Cost Engineer Link/Sounder Capital Program Deputy Construction Manager S. 200th Link Extension Construction Manager East Link Extension Construction Contracts Claims Specialist Link/Sounder Capital Program Deputy Director Construction Management Sr. Property Management Specialist Property Management Community Outreach Specialist (2) North and South Corridors Community Outreach Corridor Supervisor (2) South and East Corridors Community Outreach Assistant East Link Extension Principal Architect (2) Northgate and Lynnwood Link Extensions Director Real Property ROW acquisition and surplus property mgmt. *Attrition resulting from internal promotion January 2016 Page 91 of 117 Link Light Rail Staffing Report Annual Staffing Summary 2015, continued An average of 522.8 FTE/mo. consultant and in house staff participated in the major Link light rail projects in 2015. Overall, staffing was 21% over Plan for the year with internal staffing at 86% and consultant staffing 129% of plan. Staffing met resource needs for maintaining schedule, addressing project technical challenges and issues and providing stakeholder outreach. In the case of the University Link Extension sufficient technical capacity and capability was a key factor in the planned opening of the Extension for revenue service 6 months ahead of schedule and $150 million below budget. Variance by project for 2015 follows. Table 1: 2015 Link Staffing 2015 Average Staffing (FTE/mo.) Consultant Staff Sound Transit Staff Total Project Staffing FTE Variance FTE Variance FTE Variance % of Plan Planned % of Plan Planned Actual % of Plan Planned Actual FTE Actual FTE FTE Project University Link Extension 36.9 49.4 12.5 134% 39.5 45.6 6.1 115% 69.5 95.0 25.6 137% Northgate Link Extension 73.6 125.0 51.4 170% 48.7 37.6 -11.1 77% 111.2 162.5 51.4 146% South 200th Extension 20.1 25.3 5.2 126% 20.6 17.6 -3.0 85% 37.0 42.9 5.9 116% East Link Extension 109.2 123.6 14.4 113% 73.2 62.2 -11.0 85% 165.8 185.8 20.0 112% Lynnwood Link Extension 27.0 21.1 -5.9 78% 26.6 15.5 -11.1 58% 48.7 36.6 -12.1 75% 266.8 344.3 77.5 129% 208.6 178.5 -30.1 86% 432.2 522.8 90.6 121% Total University Link Extension: Staffing for 2015 was 137% of plan. Consultant staffing exceeded plan by 34% and internal staffing by 15% largely because of the decision to advance station finishes and systems contractors activity and complete the Maintenance-of-Way Building to achieve early opening in the first quarter of 2016. Northgate Link Extension: Staffing for 2015 was 146% of plan. Consultant staffing was 70% above plan with the early procurement of the General Contractor/Construction Manager GC/CM contractors and the Construction Management Consultants (CMC) and the progression of tunneling and cross passage installation, and construction of the Roosevelt and U District Station boxes. A larger number of consultant resources were used to provide additional capacity; internal staffing was 77% of plan for the year. South 200th Link Extension: Staffing for 2015 was 116% of plan. Consultant staffing for the South 200th Extension was 126% of plan as construction of the guideway and parking garage neared substantial completion. Internal staffing in 2015 was 85% of plan East Link Extension: Staffing for 2015 was 112% of plan. Consultant staffing was 113% of plan and internal staffing 85% of plan. During 2015 final design was advanced and early procurement activities completed for the use of GC/CM and the Design/Build (D/B) project delivery strategies. In addition the first of multiple construction contracts, E330, Downtown Bellevue Tunnel was awarded and negotiations with third parties continued. Lynnwood Link Extension: Staffing for 2015 was 75% of plan. Internal and consultant staffing for 2015 trended 58% and 78% of plan respectively. During the development of the 2015 plan it was anticipated that final design activities would begin in 4th QTR 2015; while the procurement activities were initiated, the design contracts were not awarded. January 2016 Page 92 of 117 Link Light Rail Staffing Report Annual Staffing Summary 2015, continued In 2015, of the 13 Agency’s 33 annual milestones (See Milestones) were related to the capital program; Sound Transit successfully met 10 of these milestones and met all but two of the milestones established for the major Link Extensions: University, East, Northgate, South 200th and Lynnwood Link Extensions. The reasons for the unmet milestones were unrelated to Agency technical capacity and capabilities. The unmet Link-related milestones: (1) Completion of construction of the S. 200th Link Extension and (2) East Link design/build contract from SR 520 to the Overlake Transit Center begins are now forecast for 2Q 2016. The inability to meet these Link milestones does not impact the ability to open the S. 200th Link Extension for service in 3rd QTR 2016 or complete the East Link Extension as scheduled in 2023. Other unmet capital program milestones include the completion of the south platform of the Mukilteo Station, and beginning of construction for the Sounder Yard Expansion and the Tacoma Trestle Replacement. These are also now forecast for 2nd QTR 2016. To meet the staffing requirements of on-going projects, 29 positions were filled in Design Engineering and Construction Management (DECM) in 2015 including systems engineering and construction management staff that we had experienced some difficulty in recruiting. Eighteen of these positions were approved by the Board and had remained unfilled. In keeping with our commitment to retain institutional knowledge, capitalize on experience working on completed Sound Transit projects and familiarity with our processes, systems, policies and procedures and to provide advancement opportunities for our staff, 10 of these positions were filled through internal promotions. The voluntary attrition rate for DECM in 2015 was 4.2% (7 of the 235 FTE working in DECM voluntarily left the Agency in to pursue other opportunities; 3 DECM staff retired from Sound Transit in 2015). Over $240 million in engineering and construction service contracts were awarded in 2015. We continue to recognize value in using GC/CM and D/B alternative procurement methods, four of the 13 contracts awarded in 2015 were for preconstruction services for GC/CM; the SR 520 – Redmond Transit Center, Link Operations and Maintenance Satellite Facility and Sounder Yard Expansion are being procured using a D/B delivery strategy (Table 2). We are also in the process of procuring final design and GC/CM preconstruction services (two contracts) for the Lynnwood Link Extension and final design for the Tacoma Link Expansion which like the Tacoma Trestle replacement is being procured using a Design-Bid-Build contracting strategy. A summary of contracts to be awarded in 2016 follows (Table 3). In 2015, Sound Transit continued the Lean, Continuous Process Improvement (CPI) and Management Excellence programs. Sound Transit provided Kaizen training to an additional 157 staff members bringing the total trained to 307 or 40% of Sound Transit staff approved for 2015. In its second year, 22 staff members participated in our yearlong Management Excellence Program (MEP). Through this program participants receive 100 hours of training in advanced project management, interpersonal relations, and Continuous Process Improvement (CPI). In 2015 the Program was awarded the Achievements in Transit Training Model Program Award by the National Transit Institute. Sound Transit has accepted an additional 41 staff members to participate in the 2016 MEP starting in 2Q 2016. Sound Transit continues to enjoy a partnership with the American Council of Consulting Engineers (ACEC) and the Association of General Contractors (AGC) of Washington whose membership work with Sound Transit to gain a better understanding of the work program and the systems and processes put in place to ensure on time and budget project performance. These trade groups share industry trends, lessons-learned and experiences with other transit providers and Sound Transit. Sound Transit is fortunate that a number of its consultants and contractors also have direct experience with both Link and non-Link related transit infrastructure development, minimizing the learning curve and enhancing project delivery. January 2016 Page 93 of 117 Link Light Rail Staffing Report 2015 Milestones January 2016 Page 94 of 117 Link Light Rail Staffing Report Table 2: Capital Program Contracts Awarded in 2015 Contract On Call Appraisal Services On Call Title Services Preconstruction Services Northgate Station Finishes Supporting Real Property Acquisition Real Property Acquisition Northgate Link Extension Station Access Roadways and Surface Parking S. 200 Link Extension East, Lynnwood and Federal Way Link Extensions and Tacoma Link Expansion All capital projects Sounder Projects Sounder/WSDOT Independent Project and Constructability Reviews and Value Engineering East Link Seattle to S. Bellevue East Link Seattle to S. Bellevue East Link Seattle to S. Bellevue East and Northgate Link Extensions Total On Call Environmental Due Diligence (2 Contracts) On Call Safety and Quality Assurance Services On Call Flagging Services Point Defiance By-pass Construction On call Project Review Services (3 Contracts) Preconstruction Construction Management Services Preconstruction Construction Services Downtown Bellevue Tunnel Construction Preconstruction Services Systems Construction th Contract Amount $000 $2,227 $2,028 $1,518 $9,269 $7,040 $1,665 $2,351 $61,870 $7,950 $4,958 $5,271 $133,591 $3,292 $243,030 Table 3: Contracts in Procurement (as of 12/31/15) Civil Construction Management Consultant (CMC) Services for Lynnwood Link Extension Systems CMC Services for East Link/North Link Extensions Final Design Services for Lynnwood Link Extension Northgate to Lynnwood Transit Center Lynnwood Link Extension Systems Final Design Systems Quality Assurance Services Tacoma Link Expansion Final Design Job Order Contracting (JOC): Construction Services for Capital Projects Northgate Link Extension Key Bank Demolition & Remediation ‐ N105 NE 200th Street to Lynnwood Transit Center (Heavy Civil GC/CM) ‐ L300 Northgate Link Extension 115KV Line Relocation ‐ N113 Northgate Link Extension, UW Station to Northgate Trackwork ‐ N180 Northgate Station to NE 200th Street (Heavy Civil GC/CM) ‐ L200 Operations Maintenance Satellite Facility (OMSF) Design Build OMSF Design Build Project Management Services Consultant East Link Extension South Bellevue ‐ E320 East Link Extension SR 520 to Overlake Transit Center Design‐Build ‐ E360 Light Rail Vehicle (LRV) Procurement January 2016 Page 95 of 117 Link Light Rail Staffing Report Project Staffing – Link Light Rail Program – December 2015 There were no new positions filled to support the Link capital program in December. Recruiting is on-going for the following design, engineering and construction management staff. Position Project Assignment Planned Hire Date Sr. Systems Engineer Traction Power 2013 Attrition Construction Manager Systems April 2014 Systems Engineer Link 2014 Attrition Architect Sr. Real Property Agent East Link Extension East/Lynnwood Extension 2014 Attrition June 2015 Construction Manager East Link Extension 2015 Reclassification Real Property Agent Lynnwood Link Extension 2015 Reclassification Sr. Project Manager O&M Satellite Facility 2015 Reclassification Corridor Design Manager Mechanical Engineer Sr. Project Control Specialist Real Property Agent Project Coordinator Deputy Executive Director Lynnwood Link Extension Systems Northgate Link Extension East/Lynnwood Extension Art & Architecture Design and Engineering 2015 Attrition * 2015 Attrition* 2015 Attrition 2015 Attrition 2015 Attrition 2015 Attrition *Attrition resulting from internal promotion There were 547.5 (115% of plan) consultant and internal staff full time equivalents (FTE) participated in the on-going planning, design and construction of Link light rail extensions. Average year-to-date staffing remains at 522.8 FTE/ mo. and is 21% (90.6 FTE/mo.) above plan. December staffing for the each of the Link Extensions with the exception of the Lynnwood Link Extension was above plan by over 10%. Staffing for the University Link exceeded plan because of the planned early opening. Staffing for the East and Northgate Link Extensions exceeded to plan to provide appropriate staffing for early procurement of the GC/CM, and D/B contractors and Construction Management Consultants (CMC). Early procurement has become standard practice for GC/CM and D/B contracting to allow for closer coordination with the contractors, designers and construction managers and improved constructability. Consultant staffing for the Lynnwood Link Extension was 31% of plan; internal staffing was 68% of plan. During plan development it was assumed that final design would begin in 4th QTR 2015; final design is now scheduled to begin in 1st QTR 2016. Staffing variance to plan for the month by project follows. December 2015 2015 Average Staffing (FTE/mo.) Consultant Staff Sound Transit Staff Total Project Staffing FTE Variance FTE Variance FTE Variance % of Plan Planned Actual % of Plan Planned Actual % of Plan Planned Actual FTE FTE FTE Project University Link Extension 36.9 44.8 7.9 121% 39.5 48.3 8.8 122% 69.5 95.0 25.6 137% Northgate Link Extension 73.6 116.9 43.3 159% 48.7 34.2 -14.5 70% 111.2 162.5 51.4 146% South 200th Extension 20.1 14.5 -5.6 72% 20.6 18.1 -2.5 88% 37.0 42.9 5.9 116% East Link Extension 109.2 157.8 48.6 145% 73.2 66.4 -6.8 91% 165.8 185.8 20.0 112% Lynnwood Link Extension 27.0 8.4 -18.6 31% 26.6 18.0 -8.6 68% 48.7 36.6 -12.1 75% Total 266.8 342.4 75.6 128% 208.6 185.0 -23.6 89% 432.2 522.8 90.6 121% January 2016 Page 96 of 117 Link Light Rail Staffing Report University Link Extension Staffing Total Internal and External Staffing – University Link Extension There were 93 FTE assigned to the University Link Extension in December including 44.8 consultant and 48.3 internal FTE. Staffing for the month increased 5% (4.2 FTE) from November and was above plan by 22% (16.6 FTE). Average year to date staffing of 95 FTE/mo. is trending above plan by 37% (25.6/mo. FTE). Cumulatively, since August 2006, average monthly project staffing is consistent with plan. Current Period Dec 2015 Labor Hours to Date Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 1,906,173.7 1,941,914.0 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 35,740.3 101.9% 12,224.0 14,883.8 2,659.8 121.8% 76.4 93.0 16.6 16,868.8 17,185.1 316.3 105.4 107.4 2.0 Page 97 of 117 Link Light Rail Staffing Report University Link Extension Staffing Internal Resource Commitments to University Link Extension There were 48.3 internal FTE assigned to the University Link Extension in December. Internal staffing was 22% (8.8 FTE) above plan and 9% (3.9 FTE) above November staffing. Cumulatively, since August 2006, average monthly internal staffing is trending with plan. Current Period Dec 2015 Labor Hours to Date No. of Hours Monthly Average Monthly FTE January 2016 Total Planned Total Actual Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 644,403.6 5,702.7 35.6 656,089.4 5,806.1 36.3 11,685.8 103.4 0.6 101.8% 6,320.0 7,721.8 1,401.8 122.2% 39.5 48.3 8.8 Page 98 of 117 Link Light Rail Staffing Report University Link Extension Staffing Consultant Resource Commitments to University Link Extension During December 44.8 consultant FTE were assigned to the University Link Extension; consultant staffing was 21% (7.9 FTE) above plan and was consistent with November staffing. Cumulatively, since August 2006, average monthly consultant staffing is trending with plan. Current Period Dec 2015 Labor Hours to Date Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 1,261,770.1 1,285,824.5 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 24,054.5 101.9% 5,904.0 7,162.0 1,258.0 121.3% 36.9 44.8 7.9 11,166.1 11,379.0 212.9 69.8 71.1 1.3 Page 99 of 117 Link Light Rail Staffing Report University Link Extension Staffing Consultant Resource Commitments to University Link Extension, continued Consultant utilization by discipline for the University Link Extension since January 2011 is illustrated below. In December, civil engineering consultant staffing (3.2 FTE) for the University Link Extension was 28% (1.3 FTE) below plan and was 16% (0.5 FTE) above November staffing. Systems consultant staffing (16.8 FTE) was 31% (3.9 FTE) above plan and 11.1% (2.1 FTE) below Systems consultant staffing in November. Construction management consultant staffing (24.7 FTE) was 8.6% (1.9 FTE) above November staffing. Cumulative staffing for civil and systems consultants are trending 0.39% (0.1 FTE/mo.), and 3.1% (0.5 FTE/mo.) above plan respectively. Cumulative construction management consultant staffing is trending 2.3% (0.7FTE/mo.) above plan. January 2016 Page 100 of 117 Link Light Rail Staffing Report Northgate Link Extension Staffing Total Internal and External Staffing – Northgate Link Extension During December, 34.2 internal and 116.9 consultant FTE were assigned to the Northgate Link Extension. This is a 2% (3.8 FTE) decrease from November but is 24% (28.9 FTE) above plan. Average year to date staffing of 162.5 FTE/ mo. is 46% (51.4 FTE/mo.) above plan; cumulatively since January 2011 average monthly staffing is 7% (8.1 FTE/ mo.) above plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 No. of Hours Monthly Average Monthly FTE January 2016 Total Planned Total Actual Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 1,152,819.3 1,230,103.3 77,284.0 106.7% 19,568.0 24,185.0 4,617.0 123.6% 122.3 151.2 28.9 19,213.7 20,501.7 1,288.1 120.1 128.1 8.1 Page 101 of 117 Link Light Rail Staffing Report Northgate Link Extension Staffing Internal Resource Commitments to Northgate Link Extension Internal staffing in December (34.2 FTE) increased 16% (4.8 FTE) from November and was 30% (14.5 FTE) below plan. Cumulatively, since January 2011, average monthly internal staffing is 5.9% (2.2 FTE/mo.) below plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 Total Planned Total Actual No. of Hours Monthly Average Monthly FTE January 2016 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 94.1% 7,792.0 5,478.8 -2,313.2 70.3% 48.7 34.2 -14.5 362,757.4 341,417.1 -21,340.3 6,046.0 5,690.3 -355.7 37.8 35.6 -2.2 Page 102 of 117 Link Light Rail Staffing Report Northgate Link Extension Staffing Consultant Resource Commitments to Northgate Link Extension In December 116.9 consultant FTE were assigned to the Northgate Link Extension; consultant staffing was above plan by 59% (43.3 FTE) and was 7% (8.5 FTE) below November staffing. Cumulatively, since January 2011, average consultant utilization is trending 12% (10.3 FTE/mo.) above plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 No. of Hours Monthly Average Monthly FTE January 2016 Total Planned Total Actual Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 790,061.9 13,167.7 82.3 888,686.2 14,811.4 92.6 98,624.3 1,643.7 10.3 112.5% 11,776.0 18,706.2 6,930.2 158.9% 73.6 116.9 43.3 Page 103 of 117 Link Light Rail Staffing Report Northgate Link Extension Staffing Consultant Resource Commitments to Northgate Link Extension Consultant utilization by discipline follows: Civil/architecture consultant utilization in December (62.6 FTE) increased 5.5% (3.3 FTE) from November and was 144% (37 FTE) above plan. Cumulatively since January 2011, civil engineering/architecture consultant staffing of 68.1 FTE/mo. is 16% (9.2 FTE/mo.) above plan. Systems consultant utilization (6.8 FTE) increased 24% (1.3 FTE) from November staffing and was 16% (0.9 FTE) above plan. Since January 2011, average monthly Systems consultant staffing (4.5 FTE/mo.) is trending 1% (0.1 FTE/mo.) below plan. CM consultant staffing in December (47.5 FTE) was 21% (13.1 FTE) below November staffing and 13% (5.4 FTE) above plan. Cumulatively, since January 2011, average monthly CM consultant staffing (20.3 FTE/mo.) is trending 6% (1.2 FTE/mo.) above plan. January 2016 Page 104 of 117 Link Light Rail Staffing Report East Link Extension Staffing Total Internal and External Staffing – East ink Extension Staffing for the East Link Extension in December (224.2 FTE) increased 34% (57.1 FTE) from November and was 23% (41.8 FTE) above plan. Average year to date staffing of 185.8 FTE/mo. is 12% (20 FTE/mo.) above; cumulatively since January 2011, average monthly staffing is trending with plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 1,650,490.7 1,663,116.1 27,508.2 27,718.6 171.9 173.2 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 12,625.4 210.4 1.3 100.8% 29,184.0 35,878.1 6,694.1 122.9% 182.4 224.2 41.8 Page 105 of 117 Link Light Rail Staffing Report East Link Extension Staffing Internal Resource Commitments to East Link Extension During December internal staffing for the East Link Extension (66.4 FTE) was 18% (9.9 FTE) above November staffing and was 9% (6.8 FTE) below plan. Cumulatively, since January 2011, average monthly internal staffing is trending 4.4% (2.2 FTE/mo.) below plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 No. of Hours Monthly Average Monthly FTE January 2016 Total Planned Total Actual Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 476,501.4 455,432.5 -21,069.0 95.6% 11,712.0 10,631.0 -1,081.0 90.8% 7,941.7 7,590.5 -351.1 49.6 47.4 -2.2 73.2 66.4 -6.8 Page 106 of 117 Link Light Rail Staffing Report East Link Extension Staffing Consultant Resource Commitments to East Link Extension There were 157.8 consultant FTE assigned to the East Link Extension during December. Consultant staffing increased 43% (47.2 FTE) from November and was 45% (48.6 FTE) above plan. Cumulatively since January 2011, average monthly consultant staffing is trending 2.9% (3.5 FTE/mo.) above plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 1,173,989.3 1,207,683.7 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 33,694.4 102.9% 17,472.0 25,247.1 7,775.1 144.5% 109.2 157.8 48.6 19,566.5 20,128.1 561.6 122.3 125.8 3.5 Page 107 of 117 Link Light Rail Staffing Report East Link Staffing Consultant Resource Commitments to East Link, continued In December, civil engineering consultant staffing (124.6 FTE) was 79% of consultant staffing. Civil engineering consultant staffing was 55% (37 FTE) above November staffing and 58% (45.6 FTE) above plan. Systems consultant staffing (6.8 FTE) was 21.3% (3.4 FTE) above November staffing but 3% (0.7 FTE) below plan. There was one consultant FTE performing Preliminary Engineering (PE) and 12.8 FTE (107% of plan) providing construction management. January 2016 Page 108 of 117 Link Light Rail Staffing Report S. 200th Link Extension Staffing Total Internal and External Staffing – S. 200th Link Extension Staffing for the South 200th Link Extension in December (52.7 FTE) was 29% (12 FTE) above plan and 54% (18.5 FTE) above November staffing; average year to date staffing of 42.9 FTE/mo. is 16% (5.9 FTE/mo.) above plan. Since January 2011, average monthly internal and consultant staffing is trending with plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 329,561.6 336,883.8 5,492.7 5,614.7 34.3 35.1 7,322.2 122.0 0.8 102.2% 6,512.0 8,428.8 1,916.8 129.4% 40.7 52.7 12.0 Page 109 of 117 Link Light Rail Staffing Report S. 200th Link Extension Staffing Internal Resource Commitments South Link to S.200th Link Extension Internal staffing in December (18.1 FTE) increased 25% (3.9 FTE) from November staffing and was 12% (2.5 FTE) below plan. Cumulatively, since January 2011, average monthly internal staffing is trending 3.5% (0.6 FTE/mo.) below plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 165,056.9 159,313.8 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended -5,743.2 96.5% 3,296.0 2,897.8 -398.2 87.9% 20.6 18.1 -2.5 2,750.9 2,655.2 -95.7 17.2 16.6 -0.6 Page 110 of 117 Link Light Rail Staffing Report S. 200th Link Extension Staffing Consultant Resource Commitments to S. 200th Link Extension Consultant staffing on the S. 200th Link Extension in December (34.6 FTE) increased 76% (14.9 FTE) from November was 72% (14.5 FTE) above plan. Cumulatively since January 2011, average consultant staffing is trending 7.9% (1.4 FTE/mo.) above plan. Current Period Dec 2015 Labor Hours Jan 2011 - Dec 2015 Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 164,504.7 177,570.1 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended 13,065.4 107.9% 3,216.0 5,531.0 2,315.0 172.0% 20.1 34.6 14.5 2,741.7 2,959.5 217.8 17.1 18.5 1.4 Page 111 of 117 Link Light Rail Staffing Report S. 200th Link Extension Staffing Consultant Resource Commitments to S. 200th Link Extension Design/build project management consultants accounted for 100% of consultant staffing in December. January 2016 Page 112 of 117 Link Light Rail Staffing Report Lynnwood Link Extension Staffing Total Internal and Consultant Staffing – Lynnwood Link Extension During December, there were 8.4 (31% of plan) consultant and 18 internal FTE (88% of plan) assigned to the Lynnwood Link Extension. Internal staffing for December was 31% (4.2 FTE) above November staffing and 32% (8.6 FTE) below plan. Consultant staffing (8.4 FTE) was 15% (1.1 FTE) above November and 69% (18.6 FTE) below plan. All consultant staff assigned to the project were supportng preliminary engineering. Average year to date project staffing (36.6 FTE/mo.) is 25% (12.1 FTE/mo) below plan; cumulatively since January 2013, staffing for the Lynnwood Link Extension (44.5 FTE/mo.) is 11.3% (5.7 FTE/mo.) below plan. Current Period Dec 2015 Labor Hours Jan 2013 - Dec 2015 Total Planned No. of Hours Monthly Average Monthly FTE January 2016 Total Actual 288,800.1 256,231.8 Total Variance Percent Expended Period Planned Period Actual Period Variance Percent Expended -32,568.3 88.7% 8,576.0 4,220.3 -4,355.7 49.2% 53.6 26.4 -27.2 8,022.2 7,117.5 -904.7 50.1 44.5 -5.7 Page 113 of 117 Link Light Rail Staffing Report This page left blank intentionally. January 2016 Page 114 of 117 Link Light Rail Acronyms ACRONYMS AA Alternative Analysis APE Area of Potential Impact BCE Baseline Cost Estimate BCWS Budgeted Cost of Work BIM Building Information Modeling BNSF Burlington Northern Santa Fe Railway CCB Change Control Board CDF Controlled Density Fill CHS Capitol Hill Station CM Construction Management CMU Concrete Masonry Unit CO Change Order CPI Cost Performance Index CPM Critical Path Method DAHP Department of Archaeology & History Preservation DART Days Away, Restricted or Modified DB Design -Build DECM Design, Engineering and Construction Management DEIS Draft Environmental Impact Statement DPD Seattle Department of Planning and Development DSC Differing Site Conditions DSDC Design Support During Construction DSTT Downtown Seattle Transit Tunnel EFC Estimated Final Cost EMI Electro Magnetic Interference FD Final Design FHWA Federal Highway Administration FSEIS Final Supplemental Environmental Impact Statement FFGA Full Funding Grant Agreement FTA Federal Transit Administration FTE Full Time Employee GC/CM General Contractor /Construction Management HVAC Heating, Ventilation and Air Conditioning ICD Integration Control Document IRT Independent Review Team IWP Industrial Waste Permit JA Jacobs Associates JARPA Joint Aquatic Resource Permit Application KCM King County Metro LNTP Limited Notice to Proceed January 2016 Page 115 of 117 Link Light Rail Acronyms ACRONYMS, continued LRRP Light Rail Review Panel LRT Light Rail Transit LRV Light Rail Vehicle LTK LTK Engineering Services MACC Maximum Allowable Construction Cost MDA Major Discharge Authorization MLK Martin Luther King, Jr. Way MOA Memorandum of Agreement MOS Minimum Operable Segment MOU Memorandum of Understanding MPPCV Major Public Project Construction Variance MRB Material Review Board MTP Montlake Triangle Project MUP Master Use Permit NB Northbound NCR Notification of Change Report NCTP North Corridor Transit Partners NEPA National Environmental Policy Act NOAA National Oceanic and Atmospheric Administration NTP Notice to Proceed OCS Overhead Catenary System OMF Operations and Maintenance Facility OMSF Operations and Maintenance Satellite Facility PE Preliminary Engineering PEP Project Execution Plan PEPD Planning, Environment and Project Development PMOC Project Management Oversight Consultant PSST Pine Street Stub Tunnel QA Quality Assurance QC Quality Control QTR Quarter RE Resident Engineer RFC Request for Change RFD Request for Deviation RFI Request for Information RFP Request for Proposal RFQ Request for Qualifications RIR Recordable Injury Rates January 2016 Page 116 of 117 Link Light Rail Acronyms ACRONYMS, continued RMP Risk Management Plan ROD Record of Decision ROW Right of Way SB Southbound SCADA Supervisory Central and Data Acquisition SCC Standard Cost Categories SCL Seattle City Light SDEIS Supplemental Draft Environmental Impact Statement SEPA State Environmental Policy Act SIP Street Improvement Permitting SPI Schedule Performance Index SR State Route ST Sound Transit START Seattle Tunnel and Rail Team SWI Stacy & Witbeck, Inc. TBM Tunnel Boring Machine TCE Temporary Construction Easement TE Traction Electrification TFK Traylor Frontier Kemper Joint Venture TOD Transit Oriented Development TVM Ticket Vending Machine UAC Unallocated Contingency U-Link University Link project USFWS U.S. Fish and Wildlife Service UW University Of Washington UWS University of Washington Station VE Value Engineering VECP Value Engineering Cost Proposal WBS Work Breakdown Structure WSDOT Washington Department of Transportation January 2016 Page 117 of 117