safety and logistics from factory to foundation
Transcription
safety and logistics from factory to foundation
SAFETY AND LOGISTICS FROM FACTORY TO FOUNDATION Lesson Learned Continuous Improvement VISUALIZING A ONE-STOP-SHOP Crane Work Port handling/logistics MAMMOET WIND AS A TURNKEY SUPPLIER Installation Consultancy Shipping Transportation Transportation Equipment Specialized Wind Equipment Nacelle Transport Blade Transport Tower Transport Other Component Transport Specialized HIAB trucks and mobile cranes Nacelle Transport 3-7 axle step frame trailers Modular trailers with customized solutions ( for self loading/offloading) Customized solution for heavy components (shown to the right) Blade Transport Extendable blade trailers up to 60m Customized blade trailers with dolly adapter (in right picture used for transportation of 83,5 m blade) Tower Transport Clamp sets/Tower adapters with various axle configurations (up to 160T tower weight – 6m Diameter) Turntables approved up to 85T – suitable for transporting longer tower sections on challenging routes Customized trailer solutions for extra heavy components (shown in the right picture) Other component transports Step frame trailers Low Bed Trailers Flat Bed Trailers All trailers for multiple purposes Specialized trucks and truck mounted cranes 8x4, 8x8 trucks for pulling assist Truck mounted cranes – HIAB Crane (up to 150TM) Mobile cranes can be provided on request – Mammoet owns and operates +1.200 cranes Engineering Services Route Survey Site Survey Test Run Configuration Drawings Site layout review Optimizing civil works design Support in product or equipment design phase Swept path analysis (on provided AutoCAD maps or scaled drawings) Supervision How do we suceed in Safety? - planning stage We carefully review client specifications and work instructions Create Tailor-made solution and equipment package to meet our safety, quality and environmental standards Carefully planning trough route/site surveys surveys, method statements and risk assessments Training/Selection of task specific people to comply with local legislation and manufacturer standards Cooperation with local authorities, police to secure that we comply with local legislation and safety standards including permit application Detailed handover/and project kick off from sales team to project team to secure that all project members do clearly understand our scope of work How do we suceed in Safety? - execution stage Site Induction to all involved on site Test run made to secure that we can safely access and deliver components from factory/port to designated delivery location Check of equipment and lashing methods according to checklists Documentation package including Rams, Lift studies, permits and CMR letter introduced to all drivers and supervisors Documented tool box meeting before any operation involving supervisors, drivers, steersmen and pilot cars Clear communication lines on two way radios between drivers, steersmen and pilot cars Lessons Learned session, involving proactive reporting from execution ISO Certification ISO 14001:2004 ISO 9001:2008 ISO 18001:2008 SHE-Q Policy Safety Health Environment Quality