a report for pashmina plant setup in leh ladakh
Transcription
a report for pashmina plant setup in leh ladakh
KARMABHOOMI PRESENTS A REPORT FOR PASHMINA PLANT SETUP IN LEH LADAKH A plant for the promotion of Indian handloom products in international market & for improvising quality, purity & efficiency in tradition methods of product manufacturing. EXECUTIVE SUMMARY Ladakh is among most difficult terrain & hard to access places in the world. Due to these reasons the economy & industrial development in Ladakh is overlooked. In this region there are places which are underdeveloped, and there is scope of industrial set-up at these places but the potential of such places is unexplored. Working in such conditions is a challenge for human being, that’s why big industrial players are not showing much interest in this place. This results in slow development of that area, unemployment, poor economy etc. So there is a need for the industrial development at this place with the help of government support to young entrepreneurs & local people. Ladakh has very rich and unique resources like Pashmina and other wool which are very much in demand, but these resources are being used by traders from outside for their individual profit. Also cheap fabric from China and different parts of India are invading Ladakh market, reducing the charm of local traditional garments/accessories and its effectiveness. This report is for the creation of such platform which would utilize the skills and resources available there optimally, which can produce local garments and accessories at competitive price and can provide employment opportunities to the local people at their place. We did market study to find the current scenario of demand &supply; it’s been found through market research that there is a need for the better & cheaper products that should be produced locally so that local people can extract the benefit from it. A business model is provided below which would include production planning, market feasibility, technical feasibility, financial feasibility, risk analysis, & the whole cash flow. 2 1. Work Plan: Type of Industry : Textile & Apparel Type of sector : Manufacturing/production Region of set-up : Ladakh Type of enterprise : 49% through local co-operative society/ local and corporate bodies/ personal Investors/ angel investors. 51% Karmabhoomi 2. Mission: Utilizing resources available in Ladakh optimally to produce local garment & Pashmina products with better quality & competitive price. Providing skills & employment to Ladakhi people by giving them an industrial platform. Recognition of these products in national & international market & hence maintaining & improving the cultural heritage of India. 3. Vision: Setting up of an integrated plant which will include all the processes under one roof & is near to the market, to manufacture competitive product. Starting from a small area & then worldwide Product range : Broadly divided into 2 categories:- Readymade Goncha (both, summer & winter): Pashmina products (shawls, stoles, caps, sleeping bags etc.) High value in national & international market, very effective in cold climate & considered as luxury item. 3 4. 1) a) b) c) Product range : Pashmina products range Basic Pashmina shawls Classic Pashmina shawls Luxury/ Exclusive Pashmina shawls Price range INR 5,000 –10,000 INR 10,000 – 20,000 INR 30,000- 90,000 2) a) b) c) Goncha range (for both men & women) Traditional winter’s Goncha Traditional summer’s Goncha Stylish Gonchas (general) Price range INR 2800-3000 INR 1500-2000 INR 7000-15000 5. Market scenario: 5.1. Pashmina products: Pashmina is considered as the elite and rich fabric having a very high demand in the national and international market. Also with the increase in tourism, market for pashmina products is also increasing. Almost every tourist want to buy Pashmina products from this place (derived from a survey conducted in Leh market), according to survey the demand is directly proportional to tourists arrived as Pashmina products are first choice of the tourists in their shopping list. According to the data collected from tourism dept., tourists arriving Leh is increasing at a good rate, so our market is also increasing every year. Sale of Pashmina products (mainly shawls and stoles) in one season (mid-April to midSeptember, main tourism season):7000 units. Whereas tourists arrived last year is more than 80,000 (& increasing every year). Reason of high price & less availability of the products is that most of the Pashmina products are not being manufactured in Ladakh; these are manufactured in Jammu, Srinagar & other places. Traders from these places procure raw Pashmina from Leh, process & make products at those places & sell it back to Leh market, so this process includes unnecessary steps which can be removed which otherwise are adding cost to the product. 4 5.2. Goncha: Goncha is Ladakhi traditional dress made up of sheep wool available in Ladakh. It is made on handlooms by local weavers & then stitched by tailors. It is a tradition in Leh to wear Goncha on every festival, prayers & social gatherings etc. so almost every person in Leh has Gonchas. Some wear it occasionally & some wear it regularly. There are three ways by which people can buy Goncha Tailors shops Readymade Goncha Self-made Total sales of Goncha by 1st two means (in 1 year) are = 4000 units approx. Whereas population wearing Goncha is much more (explained in the separate document), so we can see the lack of supply in market which can be fulfilled by mass production. 5.3. Competitors : Retailers in Leh, Delhi and Srinagar market. Goncha – Readymade Goncha shops, local tailors. 5.4. Our competitive Edge: Integrated plant. Quality, Purity & cheaper rates. Organized production & retail. Low price & purity as we are planning to manufacture in Ladakh only, in an organized way. These retailors either buy the Pashmina products from vendors or manufacture it outside Ladakh, which adds to the cost. Also, they deceive the customers by selling blended products on behalf of pure Pashmina at very high rates. 5 Goncha: Rates of available Gonchas are very high because many steps are involved in its manufacturing & if we can integrate these steps under one roof then definitely we can reduce the price of Gonchas. Readymade Goncha’s quality is not satisfactory & fit is also very bad most of the time, that’s why most of the people don’t prefer to buy readymade Gonchas, but if we can make Readymade Gonchas with proper quality system & sizing system suitable for that region then we can improve fit & quality issues, & that’s exactly we are planning to do in this plant set up. Market of our products is growing & can further grow if we can bring some innovation in the current products (which we are planning to). We will sell the products under a brand which would assure the customers about quality & price. This brand will also be used to market our products in international market. This brand will help to standardize the quality & price of the products & will help in organizing the unorganized sector. Also, it will help to put traditional heritage & culture of India on the international stage. 5.5. Availability of raw material in that region, projected in the sheep & husbandry dept. reports. Complete Sale of the manufactured products (as calculated by demand in present conditions) will not fluctuate due to uncontrolled reasons. After skill impartation, the required skill level would be achieved in given frame of time. 5.6. Main assumptions: Risk assessment: Projects propose area is near to the LOC, the conflict between the countries can disturb the working of the plant. The new generation of Turtuk doesn’t know much about the Pashmina breeding. 6 5.7. Technical feasibility: We are not planning to use advanced technologies in this plant. Most of the m/c used are either handlooms or hand driven m/cs. Working of these m/c is not a problem in that weather. Also, we are following the traditional methods of manufacturing which are being carried out there in an unorganized & inefficient manner, what we are planning to do is organizing the whole process flow to make it more efficient by implementing lean manufacturing. 7 6. Working of the enterprises: The proposed plant will be located in Turtuk near to river and on the main road so that water and hydro energy can be utilized. Plant area would be 20 kanal means approximately 2.7 acres. This area will be divided into various sections where different work has to be done. 6.1. Capacity: Raw materials available in Diskit block*: a) Pashmina : Approx. 2000 kg. Pashmina* is available in Diskit block for commercial use. Total shawls that can be made with given wool = 2400 shawls. Total labor required to produce 2400 shawls = 48 skilled labor. Total looms required for this production. = 48 b) Goncha : Goncha wool raw wool for commercial use = 6500kg Total Goncha (winter’s Gonchas) that can be made = 6000 For 3000 winter’s Goncha total people required = 42 weavers For 3000 winter’s Goncha total looms required = 42 Our target would be 3000 Goncha for winters and 2000 Gonchas for summers. For stitching these 5000 Gonchas/ year skilled labors are required = 20 Our target capacity would be: 2400 Pashmina shawls 3000 winter’s Goncha 2000 summer’s Goncha (*Source: LAHDC yearly reports and primary study by karmabhoomi and fpc pvt. Ltd.) 8 6.2. Work plan: The working of the plant is divided into 3 steps broadly. 1) Procurement of the raw material from different villages in Diskit block and Leh de-haring plant. 2) Processing, manufacturing, finishing and packing of goods within the plant in an efficient manner. 3) Marketing & retailing of the finished goods under the brand name Julley. Elaboration of above steps: 1) Procurement of the raw material from different villages in Diskit block and Leh Dehairing plant: Raw material for the proposed plant is wool (Pashmina & sheep wool), this is procured once in a year. So procurement process & channels should be effective. This raw material will be procured from different villages in Diskit block. There will be collection of wool in each village with the help of local people at one place in that particular village. Head of the village would be responsible for this process as this activity is providing earning opportunities to the villagers. Then after the collection of wool in all villages, we can transport this collected wool to our central storage department in the plant. 2) Processing & manufacturing of goods within the plant in an efficient manner. After the procurement of raw material, real manufacturing starts, there will be many departments within the plant for the systematic production, these departments are mentioned & explained as: a) Raw material storage: To store raw wool collected from different parts of the region, different sections will be made to segregate different types of wool. 1 in charge & 1 helper is required, to take care of raw material and maintain register for all the transactions. 9 b) Processing room: Processing of the raw wool would be done in this section. Different chemicals and dyes are required here. Most of the work is hand done. To process the required amount of wool per week the number of labor required 13 people and 2 helpers. 1 in charge and 1 supervisor is needed, to keep the record and check the workers. c) Spinning room: This section is for spinning the woolen fibers into yarns by hand spinning (using charkha and other hand tools). Total number of people required = 52 spinners 1 in charge and 1 supervisor is needed, to keep the record and check the workers. d) Weaving section: In this section weaving of shawls and Goncha fabric would be done. There will be two sections, one for Pashmina and one for Goncha each having 48 and 42 handlooms respectively. Total human resource requirement 90 skilled + 10 helpers = 100 1 in charge and 1 supervisor, to keep the record and check of each section and 2 inspectors to check the quality of output. e) Value addition section: In this section value addition on Pashmina is to be done. This process will increase the value of the product up to double in market with the addition of surface ornamentation like needle work etc. 10 *Value addition An average surface ornamentation takes 3 week for value addition in 1 shawl by 1 skilled person. (* surface ornamentation time can vary from design to design) f) Pattern making, cutting department: In this department patent making and cutting of goncha fabric will be done by using hand cutting tools. The cut fabric will be transferred to the stitching department. 10 skilled, 5 semi-skilled, 5 unskilled and 2 supervisors will be required for smooth functioning of this department. g) Stitching section: The cut fabric will be feed in to the assembly stitching lines, to get the unfinished Goncha, 22 skilled tailors, 5 helpers, 5 semi-skilled, 2 quality controller and 2 supervisors are required for smooth functioning of this department. h) Finishing and Packaging Dept.: In this dept finishing of produced goods will be done and packaging is to be done as per specifications. This will require at least 7 people for finishing and 5 for packaging, means total 12 workers, with one supervisor who will control the records and check the workers. i) Inventory: In this section finished goods will be kept with different sections which could be transported to the showrooms directly. 1 in charge and 1 supervisor is needed, to track the records and take care of finished goods. 3) Marketing & retailing of the finished goods under the brand name “Julley”. These finished gods will be launched in market under the brand name “Julley”. This brand will be the symbol of quality, purity & competitive price of the products we are offering. The marketing team will have 5 experts from the premier institutions like Nifts and IIMs. This brand will attract customers by different means of marketing. Steps involved in the brand development are: 1. Introduction of the brand in the market 2. Introduction to the values of the brand, like: C.S.R, Fair trade, rural development, cultural heritage, purity, quality, better price etc. 3. Marketing of the brand nationally & internationally by: Advertisements 11 Internet Banners, hoardings, sponsorship & other Media. Govt. support Lucrative offers on the products. 12 6.3. Hierarchy of the enterprises: a) Higher level management/Managing board: It will consist of 5 people having knowledge about this field & industrial experience with good education background. This board will be responsible for the decision making, problem solving & smooth functioning of the plant on a bigger level (long term approach). It will be the top level management. All the reports will be shown to this committee & approval of any report will also be done by this panel. Management of human resource at higher level will also be its main concern. b) Middle level management 1. Planning team: It will consist of 5 members & the role of this team will be to plan what to do? When to do & how to do? 1 member will take care of whole procurement process & storage room planning. 2 members will plan about the working in different departments in the plant, production issues, labor issues, maintenance issues, training issues etc. Remaining 2 members will plan about dispatching the finished products to retail outlet. These 2 will be concerned about brand promotion, sales activities, customer relations & other retail related activities. Reports generated by these 5 planning members will be presented in front of managing board on weekly basis & approval is to be taken from them. 2. Commerce team: This team will take care of company’s accounts & weekly transactions. Monthly reports & annual reports will also be generated for accounts purposes. Salary, expenditure, revenue generated etc. will be taken care by this team. c) Lower level management/Different department’s team: Rest of the working & decisions will be made by the corresponding department heads. Smooth working of one department is the responsibility of the concerned person there & if some problem arises which can’t be solved at department level then they should approach higher management. Generation of daily & weekly reports at department level is the responsibility of department heads. 13 6.4. Human resource requirement*: S.NO. Activity/Department Unskilled semi-skilled skilled executives Top 1 Procurement 2 2 0 1 0 2 Raw material storage 2 1 0 1 0 3 Raw wool processing 2 5 10 1 0 4 Spinning 5 5 30 2 0 5 Weaving 7 7 92 5 1 6 Pattern making & cutting 2 3 5 2 0 7 Stitching 5 5 22 2 1 8 Value addition 5 5 20 1 0 9 Finishing and packaging 2 5 10 1 0 10 Inventory 4 1 1 1 0 11 Marketing and retailing 0 0 4 6 1 12 Planning team 0 0 2 4 2 13 Higher level management 0 0 0 0 2 14 Commerce team 0 0 6 3 1 Total 36 39 202 28 8 (*Maximum projection) Total number of people required = 313 14 7. Financial statements: 7.1. Fixed cost a) Feasibility study cost : ` 225,000* b) Administrative costs : ` 391,000* *Cost already accrued by Karmabhoomi and FPC Pvt. Ltd. Details of which can be provided. c) Land, building and other fixtures: 1. Land cost deposit ` 100,000 (State govt lease rate for 90 year lease) 2. Building cost*(Manufacturing and training facility) ` 9,750,000 *glass houses designe will be made to increase the efficiency and decrease the building setup cost and heating cost in winters. The report of which can be submitted If asked. d) Machines and other tool cost. 1. Handloom @ 9,000 per unit (110) machines = 110 X 9,000 ` 990,000 2. Hand spinners @4000 per unit (40) spinners= 40 X 4000 ` 160,000 3. Pattern making tables, mannequins, cutting knives and other tools= ` 483,000 4. Stitching machines (Second hand) @ 35000 per unit, (22) units ` 770,000 5. Embroidery machines and other tools ` 560,000 6. D G sets 100kv ` 980,000 7. Fiber, fabric and yarn testing with other physical and 8. Chemical testing equipments. ` 1,390,000 Solar Water pump /tube well (2) 10 HP ,for humidifying, ` 1,976,000 15 dyeing and washing 16 Other cost: 1. Brand development & promotion cost Trademark e) development & registration cost for 1st year. ` 4,365,000 2. Training costs Targeted no of people to be trained in first year: 240 Batch size of trainees: 40 persons No of batches: 240/40 = 6 batches No of days of training for each batch: 60 days No of trainers required per batch: 4 persons Training cost for 1 batch for a duration of 60 days. 1. Trainers compensation @ Rs 600 per day for two months = 600x60x4= ` 144,000 2. Trainers travel costs (Flight tickets, taxi etc.) @ Rs 15,000 per trainer ` 60,000 = 4 x 15000 = 3. Trainers stay and food expenses @ Rs 400 per day = 60 x 4 x 400 = ` 96,000 4. Stipend to trainees @ Rs 50 per day = 50 x 60 x 40 = ` 120,000 5. Training Equipment purchase and rental = ` 520,000 Total number of looms= 10units No. of spindles: 10 units Sewing M/c- 5 units (at expected second hand cost) Embroidery M/c- 5units (at expected second hand cost) 6. Consumables (Raw Pashmina, wool, yarn, needles and other equipments) electricity, fuel, heating equipment @Rs 1000 per day = 60 x1000 = ` 60,000 ` 87,000 7. Overheads and Misc = Total cost for training for 1 batch ` 1,087,000* *Note: The above mentioned cost is for a 2 month training period with equipments mentioned in pointer 5 above being fixed and one time with 20%yearly depreciation. Total cost of training of 6 batches ` 3,506,000 Total fixed cost ` 32,576,000 = a+b+c+d+e+f 17 18 a) Variable Cost Cost occur per year starting from year 2012-2013 1. Land lease @ Rs 3000/ Kanal/year for 100 kanals `300,000 2. Raw material (De-haired Pashmina) procurement cost for 500 kg. @ ` 8000/ kg. ` 4,000,000 3. Raw material (Camel, sheep and yak wool) Procurement cost 6000kg @ ` 1000 ` 6,000,000 4. Transportation cost = @ `1/kg for local area + ` 3/ kg from Leh/Changthang ` 160,500 And @ 20 /kg road, 80/kg by air Nubra to Delhi/NCR 5. Power and fuel cost ` 175,000 6. Storage, maintenance and housekeeping cost `105,000 7. Packaging cost = Average @ 45 per unit for 10400 units ` 468,000 8. Cost of Marketing/promotion of the brand `350,000 19 9. Wages and salaries:(* Based on NREGA and recommendation by fpc pvt. Ltd. ) Average* Human power Unskilled semi-skilled skilled executives Top management Total /Month Total/ Year Number 36 39 202 28 8 Wages/month (INR) 6000 8000 15000 25000 50000 4658000 55896000 Base High Wages/month Wages/month (INR) (INR) 4000 8000 6000 10000 10000 18000 20000 30000 35000 75000 3238000 5754000 38856000 69,048,000 Total wages for 12 months @ Average Wage = ` 55,896,000 Total wages for 12 months @ Base Wage = ` 38,856,000 Total wages for 12 months @ High Wage = ` 69,048,000 = ` 995,000 = ` 55621500 10. Overheads Total variable cost (1+2+3+4+5+6+7+8+9+10) 20 8. Project viability and cost benefit analysis. 1. Product range : 1) Pashmina products range a) Basic Pashmina shawls b) Classic Pashmina shawls c) Luxury/ Exclusive Pashmina shawls Total 1) Goncha range a) Traditional winter’s Goncha b) Traditional summer’s Goncha c) Stylish Gonchas (general) Total Price Quntity Value 7000 1000 7000000 15000 800 12000000 40000 600 24000000 43000000 Price Quantity Value 4000 2500 10000000 2200 1700 3740000 6000 1800 10800000 24540000 67540000 Grand total 1+2 Grand total considering 100% sales of the product = ` 67,540,000 Grand total considering 70% of the total sales 1 + 2 = ` 47,278,000 Cost benift analysis 70000000 60000000 50000000 40000000 value (INR) 30000000 20000000 10000000 0 fixed variable sales 21 9. Comment on the possibilities of the activity becoming self-sustainable. Project Julley has designed on the principles of self-sustainable model in Buddhist economics of self sustainable model. Project “Julley” is inspired by Mr. George Soros and Mr. Jim Roger’s investment model in the current economics. We are investing in the basic skills and local commodities, getting wasted in the absence of sustainable infrastructure. The profit generated by the project will invested in the education of the local people an education based on the dynamic philosophy of life. Karmabhoomi has taken an initiation to educate the youth of Turtuk, around 320 students and school dropouts are getting education with the collaboration of premier institution and student bodies The project will help in boosting the economy of the villages which inturn will improve the education and social structure of the society. The project has been designed to engage the unemployed youth specially girls and women of the society which are suffering due to lack of source of income. The project will bring a self sustainability in the women of these border villages. The income flow will help and build the confidence of people for entrepreneurship. The depreciation is taken as 10% year on year, the project will reach the break-even in less than 4 years. 22 10. BUDGET ESTIMATES* A.Recurring : ` 55,621,500 B.Non-Recurring : ` 32,576,000 In the initial phase the organization is planning to setup a plant of 40% of the total capacity and increase the capacity to 100 % by 2013-2014. Financial Year : 2012-2013 *After the approval of the project, installation charges, inland transport and budgetary quotations would be submitted by the project implementing agency. 23 Name of Principal Investigator Designation : : Mr. Siddharth Tiwari Treasurer Department : Social Development Sector – NGO Sex (M/F) : Male Date of Birth : 30-09-1985 Organisation/Inst. Name : Karmabhoomi Address : flat 31, Pocket-2 Dwarka sector 19 New Delhi 110075 Telephone: 08826747666 Email: [email protected] Name of Co-Investigator : Mr. Mahesh Kumar Designation : Senior consultant PWC. Department : Merger and Acquisition Sex (M/F) : Male Date of Birth : 21-07-1981 Organization/Inst. Name : Price Water House Cooper 24 11. Details of Purposing Organization: Organization Name: KARMABHOOMI Address: 15 Bharat Vandana, Sector 19, Dwarka New Delhi 110075 Web Address: www.karmabhoomi.org Accounts Details: A/C Name, KARMABHOOMI Dwarka Branch, New Delhi 110075 911010046542815 IFC Code: Details of the contact person: UTIB000027 Atul Kumar [email protected] +919968378289 +919622973301 Siddharth Tiwari [email protected] +918826747666 About karmabhoomi Karmabhoomi is an open society, registered under society’s registration act 1860. It works for socioeconomic development of rural India. We are currently focused on the education and creation of economic alternatives in remote parts of India. We intend to synergize the vastness and diversity of India in such a way that it results in the socio-economic development of the country. We cherish and respect the thoughts, culture, language, religion or broadly speaking, the existence of every individual and want to accomplish a unified society seasoned with love and harmony. 25 12. Implementation strategy covering aspects: (a) Information about local economy, relevant artisanal skills, market availability and link up, etc. For the cascading effect and smooth implementation of the program in the proposed project area, the organization has initiated its strategic plan of action in a better conducive way to minimize the stableness of the local economy imprinting the values on the access and control over the resources like the groves, usufructs as the domains of pristine years by the tribes in the project area. It is planned to initiate the innovative approach of spinning, weaving and stitching in downsizing technology for the value addition of the wool providing the better marketing prices and benefits to the people imparting the skill development training and entrepreneurship techniques. Simultaneously, due adherence has also been taken by the Centre selecting and identifying the appropriate market availability, exploring the details of the marketing system say to the existence of the rural market, collaborating with Indian Army for the proposed project area and has also taken the initiation for the better market link up and tie up by collaborating, ultimately providing the solution for better economic standardization of the poor tribal farmers. (b) Science and technology competency of the project: Karmabhoomi is ensuring the following specialized components of science and technology while to implement the project in the area. Maintaining the well defined partnership with the scientific and research institutions like IITs, IIMs and NIFT for the engagement in the project. Due attention may be preferred for the better utilization of the scientific devices and instruments while running the processing unit. The entire project will be based on the appropriate science and technology guidance and supervision of the experts. (c) Linkages with institutions/resource persons/R&D agencies for technical back up in following the format: - I. Name of Experts DR. Kashmir Singh : II. Mr. Atul kumar III. Mr. A.P Singh IV. Mr. Akhil Sood : Area of specialization Community building (Retd. ADG, IPS) Graduate NIFT Mumbai (Apparel manufacturing and IPR) Graduate NIFT Delhi (Apparel manufacturing) NIFT Delhi, Delhi University (Economics and Finance) 26 Name of Experts Area of specialization V. Mr. Mahesh Kumar : Consultant PWC New Delhi (Merger and Acquisition) VI. Mr. Naveen Kumar : : Operation Management (Sr. Manager Jindal Steel and Oil) VII. Mr. Paramvir Ahlawat : VIII. Mr. Prasoon Majumdar : IX. Mr. Siddharth Tiwari : X. Ms. Versha Verma : XI. Mr. Misbah Ansari : Graduate NIFT Mumbai (Apparel manufacturing and retailing) Graduate NIFT Delhi (Brand Development) Graduate NIFT Delhi (Apparel manufacturing and retailing) NIFT Delhi, IIM A (Branding and Marketing) Post graduate, NIFT MUMBAI (Marketing & merchandising) : 27 Current status of the project: All the feasibility phases of the project have been completed by the experts and members of karmabhoomi in the collaboration of fpc. Pvt. Ltd. India. A documentary “Finding Turtuk”, the priview was launched in the year 2011 will be completed by May 2012. Karmabhoomi has signed Memorandum of Understanding with Village Representatives of Chulunkha, Turtuk, Tyakshi and Thang. The registration of the unit has been filed in the DIC Leh. Training centre at Turtuk village nubra valley Leh, Ladkh India. The organization consulted to setup and weaving The organization is also working for the Education development of these Villages. A photo of exhibition in May 2012. The logo to represent the brand “Julley” was exhibited in the most innovative design exhibition. The profit from food processing will further be invested in the future of children these villages. The report of projected has been verified by the expert consultants. A team of experts are consciously working on the project in the harsh climate of winter season of Ladakh. The Land area and all the major details have been cleared from the concerned departments. A cooperative society has been formed for the smooth and self-governing functioning of the plant. Project “julley” will be shown as a documentary movie in various institutions and universities of India and abroad to incline the interest of youth in nation and community building. 28