details

Transcription

details
www.vikingpark.co.uk
THOR
V I K I N G PA R K
50,000 sq ft to 250,000 sq ft
THOR
Manufacturing and distribution
build to suit opportunities
V I K I N G PA R K
Viking Park, Widnes
THOR
V I K I N G PA R K
VIKING PARK
THOR
V I K I N G PA R K
the best logistics location in the North West
10
St Helens
21a
M6
M62
A49
M57
1
6
M62
7
A57
Warrington
A568
A50
A5300
M
Widnes
A562
ip C
r Sh
A561
te
hes
l
ana
W
es
tC
st
oa
This outstanding service will be available
to all new occupiers at Viking Park.
A56
A49
nc
Ma
A533
In 2010 Halton Employment Partnership
undertook the recruitment of new
staff for Tesco at Viking Park. The project
involved a dedicated enquiry line
and a dedicated team that:
• Processed 7,000 expressions of interest
• Organised 1,250 interviews
• Helped Tesco appoint 422 new staff
ai
nl
ine
A562
Halton Borough Council
will find and train your
workforce
A558
Runcorn
M56
KEY
A557
Stobart Park
Rail Network
A533
Motorways
A Roads
Mersey
Gateway Port
Mersey
Gateway Bridge
12
HGV Drive Times
Liverpool
Manchester
Leeds
Birmingham
M4 Corridor
Central London
27 mins
40 mins
1 hr 15 mins
1 hr 37 mins
2 hrs 49 mins
3 hrs 38 mins
All times are approximate. Source: UKHaulier.co.uk
THOR
V I K I N G PA R K
Option A
50,000 sq ft to 250,000 sq ft
THOR
Manufacturing and distribution
build to suit opportunities
V I K I N G PA R K
DC250
250,000 sq ft
Warehouse
INDICATIVE LAYOUT OPTIONS
THOR
V I K I N G PA R K
Option B
DC50
THOR
50,000 sq ft
Warehouse
V I K I N G PA R K
CONTAINER PORT
DC145
145,000 sq ft
Warehouse
THOR
V I K I N G PA R K
50,000 sq ft to 250,000 sq ft
T H O Rbuild to suit opportunities
Manufacturing and distribution
V I K I N G PA R K
WEST COAST MAINLINE
Phase 1
M62 J6
Future Phase
5.6 MILES
NEW 600M
LONG SPINE ROAD
THOR
V I K I N G PA R K
Phase 2
NEW ROUNDABOUT INTO
VIKING PARK AND NEW
PORTS ENTRANCE SLIP ROAD
THOR
Future Phase
V I K I N G PA R K
A533
• O
utline planning
consent granted
for a further
1.4 million sq ft
of B2/B8 units
with up to 40m
eaves height
• O
ver £6 million
of infrastructure
works have been
undertaken to
prepare the site
for immediate
delivery
• B
uild to suit
packages are
available to
suit occupiers’
individual
requirements
on a freehold or
leasehold basis
Phase 1
M62 J6
5.7 MILES
THOR
V I K I N G PA R K
• Established • Sustainable • Multi-modal
NOW UNDER
CONSTRUCTION
CONTAINER PORT
Immediately adjacent to the
region’s leading container port.
• Linked directly to West Coast Mainline
• The port can accept up to twelve trains per day
•C
onstruction of four new rail reception sidings will
increase capacity to SIXTEEN trains per day
• 12 minute vehicle turn around – the fastest in the UK
THOR
V I K I N G PA R K
The new Mersey
Gateway Bridge
World-class location
meets world-class retailer
Thor at Viking Park offers occupiers direct access to
the new Mersey Gateway Bridge, due to open in 2016.
This £431 million project will:
•C
ross the river around 1 mile to the east of the iconic
Silver Jubilee Bridge
• Provide three lanes across the Mersey in each direction
•F
urther enhance supply chain resilience for operators
based at Viking Park
Viking Park offered Tesco a clean slate for a tailored
regional distribution centre and unrivalled transport
links to maximise the efficiency of its transport
network. The chilled distribution facility, comprising a
total of 528,000 sq ft, was delivered in just 12 months
and sold to L&G.
• 1,100 vehicles handled per day
• 24 hour operation 5 days per week
• Secure storage for over 6,000 containers
•F
our rail-mounted cranes with automated container
positional and recovery system and advanced GPS
planning and tracking system
“This new modern facility has allowed
us to greatly enhance the service
to our stores and customers across
the North West of England.”
Juliette Bishop, Corporate Affairs Manager, Tesco
THOR
V I K I N G PA R K
M6
A5300
Leeds
A562
M60
A562
Sheffield
THOR
V I K I N G PA R K
CONTAINER
PORT
FUTURE
PHASE
Doncaster
A628
THOR
A558
V I K I N G PA R K
M56
A533
THOR
V I K I N G PA R K
A50
To
M56 J12
12
Nottingham
M56
M54
Leicester
A533
A533
Derby
M42
THOR
V I K I N G PA R K
A557
M1
A568
M
AC
D
Run
Stoke-on-Trent
D E SO T O RD E
ge
THOR
V I K I N G PA R K
A5
THOR
V I K I N G PA R K
A533
M6
To
M62 J7
A533
Y
WA
NS
EE
QU
D
TR
M62
N
OR L
ASHLEY
DITTON RD
A562
M62
MO
AY
OT
M
ER
Warrington
M62
QUEEN
SW
A562 WAY W
A5080
A568
A562
A1
Misrepresentation Act: Particulars contained in this brochure
have been produced in good faith, are set out as a general
A6
guide and do not constitute Birmingham
the whole or part of any contract. All liability in negligence or otherwise, arising from use of
these particulars are hereby excluded.
Contact the agents:
www.vikingpark.co.uk
M40
M1
0161 834 7187
A development by:
M5
[email protected]
[email protected]
[email protected]
[email protected]
reachmarketing.co.uk 22889 07/14
Manchester
To
M62 J6
A57
A5080
M6
M58
7
M62
RD
EKE
SP
Brid
6
Liverpool
M62
A562
1
corn
M57
A1
RD
ELS
HA
MIC
ST
Satnav: WA8 0PE