jupem2u
Transcription
jupem2u
“Striving for Efficiency” www.jupem.gov.my by Dr. Teng Chee Hua Department of Survey and Mapping Malaysia 15 October 2009 Contents www.jupem.gov.my 1 BACKGROUND 2 NEW APPROACH 3 e-CADASTRE WORKFLOW 4 e-CADASTRE APPLICATION 5 CONCLUSION Computerisation eKadaster • e-Cadastre started in 2009 for 13 states. Include NDCDB & Strata database. Revamp workflow SAPD upgrade • SAPD Upgrade started in 2002. Improve handshake with between District Office & State HQ SPDK upgrade • SPDK Upgrade started in 2002. Include automated checking of LLS jobs. SAPD • Sistem Automasi Pejabat Ukur Daerah started in 2000. Automation of field survey & District Offices SPDK • Sistem Pengurusan Data Kadaster started in 1999. Generate PDUK & CP Image database. MiniCALS • Mini Computer Assisted Land System 1993 after CALS Johor. For all States with PDUK via keyboard entry. CALS • Computer Assisted Land System 1985 for Johor ONLY. Database generated via digitisation of Standard Sheets. www.jupem.gov.my Old Workflow (office) Registeration of RS in eSRS RS from Land Office 1 2 PA berdigit 3 e-SRS Entry of RS Info & allocate Lot number Digitisation of RS plan & upload to RS layer 4 GLMS E-Commerce Lot digital cadastral Store physical files map SPEK PDUK SPID Scan related documents to storage 5 Update & post to PDUK post to SPID 6 SAPD Field Survey Handshaking between SPDK & SAPD SKL DEP 9 Computation sheet & CP emboss with digital certification 8 7 CPS Generate digital field tracing Computation & generation of CP Old Workflow (field work) District Office receive Digital Field Tracing, Location Plan and CP from State HQ Registration into District Office Record System Completed Jobs transmitted to State HQ for office processing District Surveyor Field Surveyor locate assign Job to field survey site assisted with surveyor & store digital TeleGPS info into field surveyor pocket PC Field survey based on digital Field Tracing & data captured into pocket PC supported with various filed survey modules Field Communicator District Surveyor validate Job www.jupem.gov.my Transmit processed data to District Office System for checking by District Surveyor Field Communicator Pocket PC Upload observed data from pocket PC to Field Communicator for subsequent processing New Approach www.jupem.gov.my New Approach New technology being used GNSS Web based application modules Conform to homogenous NDCDB Simplify & speed-up field data collection More feasibility for surveyor Allow access to information at all time Improve monitoring of Jobs Modern Equipments Fast processing Improve Security Large Storage www.jupem.gov.my New Approach Global Navigation Satellite System www.jupem.gov.my e-CADASTRE Application Modules Web GIS JUPEM2U • eLodgement • eKadasOnLine CSRS • • • • • • SUM • SUM LSA Desktop GIS eSIM eBorang Ecadasonline eKiosk eReporting eMonitoring eNotification eSPID Strata • Strata 3D viewer •Strata Data Entry LS DRP • ePU eGLMS • • • • • • • eJalan eTownKg eAdminBdy eHidrografi eBangunan eWarta eGrid • • • • • • • • ePA ePA(B) ePA(S) ePA(M) ePA(W) eB1 eB4 ePetakadas eFEE • eFee Database Field eTSM Total Stn Survey eCRM GNSS Control eSSM NDCDB Bldg Verification PDUSSM • eNotification Strata GIS ePU GLMS Non GIS eMedmAS Calibration eSupport Maintenance eReporting • eReporting SPPK • SPPK ePKI • • • • eSigning eVerifier PKI 2D Barcode eAnnotation SPAK • SPAK • EDM/GPS Calibration Security • SSO SPEK eSPEK • DB Merging eQC • Lot overlap NDCDB OLD AND NEW GEODETIC INFRASTRUCTURE: GEODETIC TRIANGULATION PENINSULAR MALAYSIA GPS BASED REFERENCE SYSTEM 6.50 G058 G071 G028 G035 G023 G029 6.00 G047 G031 G030 G044 G054 G003 G057 G040 G025 G032 G033 G077 G042 G059 5.50 G076 G019 G021 G017 G063 G027 G013 G069 G050 G048 G026 G060 G072 G016 G053 G008 G022 5.00 G024 G034 G067 G037 G005 4.50 G004 4.00 G007 G041 G001 G070 G075 G074 G061 3.50 G036 G073 G009 G011 G015 3.00 G052 G055G065 G068 G038 G020 G066 G039 G012 G010 2.50 G051 G046 G014 2.00 G049 G002 G062 G043 1.50 G084 G045 P075 G056 G018 G064 P4 1.00 99.00 99.50 100.00 100.50 101.00 101.50 102.00 102.50 103.00 103.50 104.00 Cadastral Control Infrastructures STATE Perlis Kedah P Pinang Perak Selangor WPKL N Sembilan Johor Pahang Terengganu Kelantan Total NO_CCI 203 1,694 934 3,941 4,324 1,071 1,608 4,221 3,145 1,810 2,048 24,999 www.jupem.gov.my NDCDB – Background of DCDB DIFFERENT TYPES OF CADASTRAL COORDINATES RIGID COORDINATE Homogenous and Systematically Adjusted PLOTTING COORDINATE For cadastral map plotting purposes SYSTEM COORDINATE System/Software generated coordinate based on features location Rigid Coordinate Plotting Coordinate System Coordinate NDCDB – Background of DCDB Bowditch Least Squares GPS GPS Bowditch adjustment distributes closing errors linearly but not able to provide a unique coordinates solution. Least Squares adjustment technique determine a unique set of coordinates for each boundary mark from a set of observed values NDCDB Updating of NDCDB in eCADASTRE LS 600 Parties JUPEM JUPEM2U SUM eQC 300 Parties District Surveyors CSRS eSPEK NDCDB JUPEM2U JUPEM2U Lodgement Precomp data login Lodgement Survey Data ePU Land Offices Digital RS Qualified Title eKOMMS ePU Licensed Land Surveyors Digital Pre-comp www.jupem2u.gov.my Digital RS Data ePU Module ePU Section Land Offices 3 PU Hardcopy PU Softcopy (PU ASCII) *.pub (boundary) *.pud (detail) *.pul (lot) 1 Store physical File 2 • PU Registration CSRS • Creating File • Key-in PU Info • generate lot number Scan, Digitise, Update PU layer (PU ASCII) 5 4 Generate SKL layer- SKL ASCII Pre_survey_layer CSRS JUPEM2U Field Surveyors SKL ASCII *.skl (Lot) *.skb (Boundary) *.job (Details) CRM Section CRM Layer eCRM RTK net 1 GEOPORTAL 2 eCRM Extract PU/QT & CRM Layer Internet 3 Update CRM Layer CRM/CCI Layer Database JUPEM2U - Planning Establish CRM Observation Processing Transform Module eTSM Module Module develop to assist Field Surveyor perform digital data collection. Adjustment using least square adjustment GIS application to assist graphical interaction Developed to reduce possible field error. www.jupem.gov.my eTSM .Sob .Cor .Job . Tps .Fah .Edm . lot . Bcs .Fbk .Coo .Tpo .Acs . Bdy .ncp .po . bln 6 Jupem2u + HQ .Lst IMS Server ASCII DB PASSED Update Database SUM Server Jupem2u FAILED/ Extract SKL, CRM into Tablet PC for field survey. 6A PASSED . Err/.LS 5 LSA (. Dat . Prj) T 16 ASCII Tablet PC + 3G . Fbk .Coo Jupem2u . Lot . Bdy 4 2 . Job . Ncp • Field Observation • Create JUPEM ASCII • Data validation . Tps .Edm . Fah . Tpo . Po . Bln Create Lot District Surveyor 1 . Cor . Bcs . Sob .Acs Upload Jupem2u 3 Login jupem2u 1. Open Inbox, view & select Files. 2. Assign Job File to Surveyor eSUM Sistem Ukur Maya (SUM) is a web-based Least Square Adjustment, fully automated to assist Field Surveyor s 1 2 Sta te JUPEM2U .LST 3 SUM Module SUM Servers designed to operate with no downtime CSRS & eQC & eSPEK 4 CSRS Server Surveyors eQC Module eQC module – checking and Verification of 16 ASCII via JUPEM2U Function; Load job from DS/LLS Verify digital files Detect false editing of observation Check for overlapping lots View attached files Commit files (16 ASCII) to FBK ASCII database www.jupem.gov.my eSPEK 2 SUM Module SUM Server - LSA Validation - Reporting Surveyors Survey Verification if rejected by JUPEM2U 5 JUPEM2U Web CSRS eQC JUPEM2U Web LS/DS JUPEM2U Web/GSRS CS 1 CSRS DB Stat e Job Profile Stat e JUPEM2U Server - Job Verification - NDCDB Validation - Reporting(DSM/LLSM) NDCDB Update DB 7 3 4 JUPEM2U Server ASCII DB ASCII Repository Update 8 NDCDB GSRS Server 6 - Temp. NDCDB Layer - Pending for Approval & Updating - Reporting for CS Signing 9 NDCDB Layer Stat e DRP DATABASES Certified Plans PDUSSM DB NDCDB GLMS DB FBK ASCII DB SPID DB DRP Module PA_1 , PA_2 PA, PA(B) PA(S), PA(M) B1, B4 FBK KIOSK GAZETTE STD SHEET Standar d Sheet STD SHEET Strata Certified Plans PA(B) PA(B Stratum Certified Plans PA(S) Title Plans Strata Title Plans B4 B1 Gazette Plans Warta Field Book Diagram KIOSK Kiosk FBK ePKI 2D BARCODE PDUSSM, eSSM 1st Phase Survey 1 LS States States JUPEM2U 2 Land Offices 3 Strata Data Lodgement, Verifier, Updating Module + Strata Extraction FB ASCII www.jupem2u. gov.my 8 7 7 Query In Order/ GSRS Not In Order Advise to PTD/PTG and cc to LS, LJT , JUPEM HQ and Land Owner 6 TEMP PDUSSM Layer Download Internet PU/TPU 4 Data Temp. Repository PDUSSM System Generate PA(B) Number FIELD 5 signing Strata Survey Module Upload LJT Update Status Doers SUM Internet • Strata XML •16 Fieldbook ASCII • Building Raster Plan •Lst File OFFICE 2 LAYER VERIFICATION Provisional Block DATA Strata Block + Survey Costing Module PDUSSM, eSSM 2nd Phase Survey JUPEM States PTG/PTD 2 PTG Final approval GSRS 1 6 JUPEM 2U 5 Internet www.jupem2u.gov .my 3 Update & Generate Scheme Number PDUSSM KOMMS KOMMS B4 Title Plan Preparation Module + PA(B) Preparation Module B4 Title Plan Generate B4 Title Plan / PA(B) G te en er a 4 3D Strata Viewer CONCLUSION DSMM believe the eCadastre project will make a paradigm shift to the current cadastral survey process; Able to improve the delivery system from 2 years to 2 months for its land title survey process; The NDCDB with survey accurate coordinate will allow DSMM to expedite the cadastral survey process with the use of satellite technology (GPS) and provide fully GIS-ready information; www.jupem.gov.my