The compliance statement on behalf of CPCB for the order 15.09.14

Transcription

The compliance statement on behalf of CPCB for the order 15.09.14
BEFORE THE NATIONAL GREEN TRIBUNAL,
PRINCIPAL BENCH, NEW DELHI
M.A. No.879 of 2013
In
Original Application No.299 of 2013
IN THE MATTER OF:
Krishan Kant Singh & Anr.
Vs.
National Ganga River Basin Authority & Ors.
CORAM :
HON'BLE MR. JUSTICE SWATANTER KUMAR, CHAIRPERSON
HON'BLE MR. JUSTICE M.S. NAMBIAR, JUDICIAL MEMBER
HON'BLE DR. D.K. AGRAWAL, EXPERT MEMBER
HON'BLE DR. R.C. TRIVEDI, EXPERT MEMBER
Present:
Applicant :
Respondent No. 1&2:
Respondent No. 3:
Respondent No. 4:
Respondent No. 5:
Respondent No. 7:
Respondent No. 8:
Date and
Remarks
Item No.
11
September
15, 2014
Ms. Preeta Dhar and Ms. Pallavi Jalware,
Advocates
Mr. Aagney Sail, Local Commissioner
Mr. Vikas Malhotra and Mr. M.P. Sahay,
Advocates
Mr. Alpana Poddar and Mr. Raj Kumar,
Advocates with Mr. S.L. GuncUhi, Law Officer
Mr. B.V. Niren, Advocate
Mr. Mr. Raman Yadav and Ms. Nauras
Suhrawardy
Mr. Vikas Malhotra and Mr. Arjun Mahajan
Mr. Arvind Kumar Shukla, Advocate
Mr. Pradeep Misra and Mr. Daleep Kumar
Dhayani, Advocates, UPPCB
Mr. Anil Airi, Advocate for CETP
Mr. Rohit Gupta, Advocate for Rosa Power
Supply Co., Ltd.,
Noticee - IFFCO - Mr. Motish K. Singh
Noticee - Mr. M.Z. Chaudhary and Mr. S.A.
Zaida Advocates for Mr. Tonnery Kapur for Unit
Small Scale on a Large Scale
Noticee - Mr. Shiv Kumar for Mr. Anil Sharma,
Advocate
Noticee - Mr. Gitanshu Rushtagi and Mr.
Mishika Singh, Advocates for M/s. Yaov Sugar
Mills, M/s. Neoli Sugar Mills, M/s. Obeetee Pvt.
Ltd., and M/s. Lalji Board Industries
Noticee - Mr. Pawan Upadhyay, Advocate - DCM
for Shri Ram Industries
Noticee - Mr. Bharat Sangal, Ms. Srijana Lama
and Ms. I. Hsenla Aier, Advocates for NTPC
Noticee - Mr. V.N. Kovra, Ms. Angeli Dayal for
IOCL
Noticee - Ms. Ranjana Roy, Mr. Abhishek Rao,
Advocates for M/s. Bhushan Steel
Noticee - Mr. Sudhir Kulshreshtha, Ms. Sushma
Singh and Mr. Akhil Kulshreshtha, Advocates
for AI-Faheem Meatex Pvt. Ltd.,
Noticees - Mr. Ankur Khandelwal, Advocate for
M/s. Khaitan & Co., M/s. Radico Khaitan and
M/s. Ultratech Cements and M/s. United Spirits
Limited.
Noticees - Mr. Manoj Singh, Advocate for M/s.
Tat Chemicals Ltd.,
Orders of the Tribunal
Learned Counsel appearing for the Central Pollution
Control Board submits that they would file the Report
during the course of the day in the Registry. Liberty is
granted. Learned Local Commissioner submits that he
would also file the Report during the course of the day.
Liberty is granted.
We direct the Central Pollution Control Board as
well as the Learned Local Commissioner to put the Report
prepared by the Committee and as well as the Learned
Local Commissioner on the website of the Central
Pollution Control Board within three days from today. All
the industries which are mentioned in the respective
Report should accept Notice through the website and file
their Replies/objections of the Report, if any, within ten
days thereafter.
The matter in relation to pollution being caused by
Distillery and Sugar Industry directly or indirectly to River
Ganga shall be taken up on 29th October, 2014.
(Swatanter Kumar
,CP
,JM
M.S. Nambiar)
(Dr. D.K. Agrawal)
,EM
,EM
(Dr. R.C. Trivedi)
04.
(f,
BEFORE THE NATIONAL GREEN TRIBUNAL
PRINCIPAL BENCH, NEW DELHI
M.A No. 879 of 2013 in Original Application No. 299 of 2013
Applicant
Krishan Kant Singh & Anr. Vs
Respondent
National Ganga River Basin Authority & Ors Compliance Statement on behalf of Central Pollution Control Board.
In compliance of the order passed by the Hon'ble Tribunal dated 05-08-2014 the
status of Grossly Polluting Industries (GPI) operating in the state of Uttar
Pradesh is enclosed.
INDEX
Annexure
II.
IV.
VII.
VIII.
Page No.
Context
Inspection Reports with regards to the industries
listed in Annexure A of the report dated 2nd
July,2014 received from Zonal Office, CPCB,
Lucknow
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB,
Bijnor
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB,
Bulandshahar
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB,
Ghaziabad
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB,
Meerut
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB,
Moradabad
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB
Muzzaffarnagar
Inspection reports of GPIs (sugar mills & distillery
units) operating under Regional Office, UPPCB,
Saharanpur
12-54
55-73
74-103
104-133
134-191
192-241
242-278
Submission:
of the joint report
All the grossly polluting industries listed in the Annexure A
(dated July 2nd , 2014) and submitted to Hon'ble Tribunal have been inspected
except M/s Harduaganj Thermal Power Station, Kashimpur, Aligarh of M/s Uttar
Pradesh Rajya Vidyut Utpadan Ltd. The unit is scheduled to be inspected
during September 16-17, 2014.
25 units out of 63 distillery and fermenting units and 37 mills out of 125 sugar
mills have been inspected and monitored at the time of submission of this
compliance statement.
1
No sugar mill was found in operation due to off season. Only 2 distillery units
and emission
and 2 bottling plants were found in operation. The effluent samples, as and where applicable, were collected and are subjected to analysis.
The effluents analysis is complete and has been incorporated in the respective
reports, whereas the emission sample analysis is in progress at the time of
submission of this statement.
The sugar mills are expected to restart production sometime between OctoberNovember, 2014 which will follow the distillery units to restart their operation in
January,2015.The Hon'ble Tribunal may allow time for inspection until the sugar
mills and distillery units come into operation in their full production capacity.
DELHI
The September 10, 2014
Sun Da ve
Sr. Environmental Engineer & Incharge NGRBA
Central Pollution Control Board
Parivesh Bhawan
East Arjun Nagar
Delhi -110032
Encl. As Above
Through Raj Kumar
Advocate
Chamber No. 774
Lawyers Chamber
Saket New Delhi
2
Joint Inspection of identified Seriously polluting Industries which have
not installed Anti Pollution Devices, in Uttar Pradesh (UP)
In Compliance of
NGT Order dt. 05.08.2014,
Krishna Kant Singh & Anr. Ws National Ganga River Basin Authority & Ors.
A Report
01. Background
Taking note of the Report Dt. 02.07.2014 filed in the Registry of the Tribunal on 24.07.2014
wherein, 972 industries have been categorized under different heads, Hon'ble NGT vide its
order dated 05.08.2014 in the matter of MA 879 of 2013 in OA 299 of 2013, Krishna Kant Singh
& Anr. V/s National Ganga River Basin Authority & ors, directed ".....Central Pollution Control
Board and Uttar Pradesh Pollution Control Board to conduct a joint inspection of all the
industries which are shown in Annexure-A to this Report. These industries are categorized as
seriously polluting industries which have not installed any anti-pollution devices." Hon'ble NGT
further directed that "... . The Committee shall confirm that the contents of Annexure-A of the
Report are correct. In respect of the industries which were served with Show Cause Notice for
closure it shall be reported as to what is the fate after the issuance of such notices and the
present status of the industry whether they are operating or not ? "
In compliance to the order, CPCB Zonal Office Lucknow carried out joint inspection of
17 (seventeen) industries, as per Annexure-A under reference. These industries are located in
Kanpur, Farrukhabad, Meerut and Aligarh districts (UP)
The joint inspection was executed by a team comprising of following members:
Dr. R.K.Singh, Scientist 'D' CPCB ZO Lucknow
Sh T.U.Khan, Regional Officer, UPPCB
Sh J.P. Meena, Scientist 'B', CPCB ZO Lucknow
Sh Girish Arya, AEE, UPPCB
e. Sh Prakhar Katiyar, UPPCB
02. Scope of Investigation
In strict compliance of the Hon'ble NGT Order referenced above, the joint inspection was
focused on following aspects :
Confirmation of the contents of Annexure-A
Status of corrective measures taken by the industries, served with show Cause Notice
for Closure
c. Present Status of the industry whether they are operating or not.
NGT Report (OA 299 of 20131, Aug. 2014 Page 1 of 5
The joint inspection was undertaken for the following 17 (seventeen) industries as identified
Annexure-A:
M/s Popular Tannery, Dargah Road, Jajmau, Kanpur
" Kanpur Tannery, 9/6 Gajjupurwa, Jajmau, Kanpur
" A.S. Leather Finishers, 369 B, Sheetla Bazar, Jajmau, Kanpur
" Sumit Dyeing & Bleaching, 100 A ( i
nadvertently mentioned as 101 A,
Dadanagar, Kanpur
" Kanpur Texcel (P) Ltd., 12 B/3, Dadanagar, Kanpur
" Bhardwaj Textile,76 A, Dadanagar, Kanpur
" Slaughter House, Bakarganj, Babupurwa, Kanpur
" Slaughter House, Colonelgang, Kanpur
" Slaughter House, Bakarmandi, Kanpur
" Slaughter House, Fazalganj, Kanpur
" Kalpana Dyeing, Ambedkar Nagar, Narkasa, F arrukhabad
" Kushwaha Printers, Narkasa, Farrukhabad
" Sethu Sadh, Angoori Bagh, Farrukhabad
" Tandon Brothers, Angoori Bagh, Farrukhabad
" Slaughter House, Shamsabad, Farukhabad
" Pash uvadhshala, Nagar Nigam, Ghosipur, Meerut
17. " Harduaganj Thermal Power Station, Kasimp
ur(Unit-1), Aligarh
In order to execute surveillance and monitoring as per the order of Hon'ble NGT, joint
inspection of all the above industries was undertaken during Aug 27-29, 2014.
Findings
A. Abridged status
Except for a few units observed with evidence of operation, most of the industries
inspected
were observed closed for a considerable period of time. The closure have either been a
results of closure orders issued by UPPCB or due to Management Decision of the
industries.
In many cases it was noted that the industry p
remises were either vacant or used for
construction of p
ermanent residential flats and commercial activities.
The Committee experienced difficulty in locating industries in F
arrukhabad, as there were no
signboards outside industry premises to ascertain industry name and other relevant detail.
The industries issued with Show Cause Notice or Closure orders were observed with no
ap preciable corrective measures initiated.
NGT Report (OA 299 of 2013), Aug. 2014
Page 2 of 5
B. Specific issues
Out of all the fifteen industries inspected, there were three units classified as tanneries,
seven textile dyeing / printing and/or bleaching units and five slaughter houses.
Out of the three units at Kanpur, identified as tanneries, premises of two units namely
M/s Popular Tannery and M/s Kanpur Tannery, were observed with no industrial activity.
Prem1tes of M/s Popular Tannery was noted with an operational Weigh Bridge (Dharam
Kanta), built:up houses and commercial activities. Premises of M/s Kanpur Tannery was
partly a vacant land and partly occupied with residential flats. Premises of the third unit
namely M/s A.S. Leather Finishers, was noted with ongoing stitching operations of shoe
upper, a visibly dry operation. As such there was no infrastructure facility of leather
processing.
There were three textile units inspected at Kanpur. During inspection, production in all the
three units was found closed. Barring the exception of M/s Kanpur Texcel (P) Ltd., 12 B/3,
Dadanagar, Kanpur, wherein, provision of effluent collection and treatment was observed in
place, at the other two units namely M/s Sumit Dyeing & Bleaching, 100 A, Dadanagar,
Kanpur and M/s .Bhardwaj Textile,76 A, Dadanagar, Kanpur, there was no proper provision
of collection and treatment of industrial effluent. The ETP at these two latter units was poorly
damaged and practically defunct. The Committee observed evidence of occasional
operation of industry based on stored effluent in drains and in and around process areas
within industry premises.
Out of four slaughter houses inspected in Kanpur and the one inspected at Farrukhabad, it
was noted that UPPCB has issued closure orders (21.11.2013) under the Water Act 1974 to
all the above slaughter houses. Subsequently, Nagar Panchayat Farrukhabad and Kanpur
Nagar Nigam have submitted Compliance Report declaring closure of one slaughter house
at Farrukhabad and all the four slaughter houses in Kanpur vide reports dt. 21.12.2013 and
24.12.2013 respectively. It was noted that there have been no provision of effluent treatment
at all the above mentioned slaughter houses.
All the four identified Textile Printing units at Farrukhabad were observed closed.
Refer Annexure- A.1 and A.2 for summarized status of industries.
NGT Report (OA 299 of 2013), Aug. 2014 Page 3 of 5
k.
03. Recommendations
A. Action to be taken by Industries
All the industries issued with Show Cause Notice / Closure orders shall ensure that their
produclion is stopped till such time they establish organized system of effluent collection and
treatment in compliance of the notified standards for treated effluent.
Before resuming operations all the industries shall apply for seeking consent and
authorization (as the case may be) of UPPCB
M/s Kanpur Texcel (P) Ltd., 12 B/3, Dadanagar, Kanpur, the only unit granted consent by
UPPCB amongst all the identified fifteen industries under reference, shall undertake regular
operation of Effluent Treatment Plant (ETP). Additionally the industry shall ensure provision
of Oil and Grease removal unit at source (within the process yard), Water meter at the
borewell, Flow Meter at the outlet of ETP, sludge drying units (beds) and shall maintain
Logbook for ETP operation. The industry is operational as a result of shifting of dyeing plant,
earlier existed at its parent plant (self closed) at 19, Govt. Industrial Estate, Kalpi Road,
Kanpur.
Textile units operational in Farrukhabad shall jointly come up with a proposal for
establishment of a Common Effluent Treatment plant.
All the textile printing units in Farrukhabad shall display their name, address and relevant
detail outside their premises.
All the industries (self) closed due to their Management Decision shall resume their operation
only after seeking consent of UPPCB
B. Action to be taken by UPPCB
Undertake periodic surveillance of all the units served with Closure Orders to ensure their
operation remain stopped.
Possibility shall be explored to establish a Common Effluent Treatment Plant for printing units
at Farrukhabad.
NOT Report (OA 299 of 2013), Aug. 2014 Page 4 of 5
C. Action to be taken by District Administration
Kanpur
Considering that the existing slaughter houses in Kanpur city are served with closure orders
by UPPCB, the Municipal Corporation Kanpur shall strictly ensure that unauthorized
slaughtering in all the four slaughter house premises is not undertaken.
The Corporation shall further come out with a comprehensive action plan to explore
possibility to establish a modernized Slaughter House elsewhere, preferably in the city
outskirts appropriately.
Farrukhabad
Farrukhabad Nagar Palika and District Administration shall take note of the Dyeing and Printing
units served with closure orders by UPPCB under the Water Act 1974. In spite of the Closure
orders currently enforced, there is a generation of polluted (colored) effluent by a phenomenal
number of unauthorized printing units operational in non-attainment areas (houses).
Indiscriminate discharge of polluted (colored) effluent through drains in the city especially in
Angooribagh area was observed by the Committee. Farrukhabad District Administration and
Nagar Palika shall ensure that such unauthorized units are not allowed to operate in strict
accordance to Hon'ble Supreme Court, orders dt. 23.09.2013 under WP no. 4295 / 2011
NGT Report (OA 299 of 2013), Aug. 2014 Page 5 of
•
*6
0
L
4) al
c) 4.-.
1.. CO
=z
D a)
= -..
oN
il2
.......
3 .3
Q=
a) y
re -...
(1)
C
c
15
II)
C
7 (I) .._
-to Jo .--.
g ..- +(;)
L. 0 0
0 C -0
0...3 .0
0 nmn
$'
•
5
6.
I:
co
2
0-
c-
a .
-5
175
C
D (1) ..,_
..o .0 c..-.g
...,,._ y
„,_ U j
al) C 0)
a-0 . c
0= u)
0(3C
(130(0C
0 0 -0 .g '0 0 -0 CI)
1 • a) .(6 :_, • a) its
y E F. Le5 y E F yc )
co 5 to a oo 4) a
13 >007.3>o
0
0
D
0 --
.-
+0
C
c0
D ..-'
0 ti)
0
c
0g
V
-0 L.
-0
V L.
V L.
L.
c a)
D+
0
0 ---
c
8
-5
.7:,
6
171
C
U
7 >"
,s c ,, 17;
y_ 0 M
0
C
U) C -0
a -0 .0
0
N=
co
a/ 0 (13C (-C
0
-o 0 -0 .52 ,...-z
21 • a) ro ,1
0 E
E
co 6
: Ci5 2). "D V)
C a)
= .2 06
0
‘... al
0
0 g
a"
V L..
c0
D -.4
.-c
."
i'.'
-6;
=
C
TA
2 -,
-0
g If NZ
,_O=
a)C-0
O. -0 .0
0= 0
(150(t C
c
.....,
•
›,
"
=
n,
C
. g - 7)
,... 0 c
QL)C-0
0. -3 .0
V) 6 u)
CO 0 cal C
.0 0 -0 .P.
:.:1 • cu ra
y E LE
L-.
*L_ 17
'0 0 -0 . g
II . a) it5
y E F- .-tN mi a) 0. 0 ,,, w 0.
013> o,-15 > 0
ou>oSa)
0.
-o .7
c
0
a 01 4-
(1)
=
.1.
0.
co
(.4%)
Cl.
i.-
CJ
Iu.1
o
1- 0.1 Q)
CL 0) 4-CD
BOO
LLIE°
11E°
co -0
-0 cc
z
t.)
1:3
Q) D
=
Lu
N
cn
a.
a.
(1)
LII
LIJ
o
z
a,
1-
o -oc
-0
H
H
)7<
o
z
Lii
c
did
4n1
0
0c
c qt"
ai
>
0
C •
CO
ToC
44
N
N
0
.0
,a)
0
.....-,
en
c
'a
0
O
C
C
z
C
0
,
2 =6-
a) $
a
0
,_ 8
. '-.:
Z -
C crj
0 o Q
;I.
61.
t 0 n,_
to 0 -
co - a.=
CI
AA
0 43
C
v.
..:).
oo
o
oo
,co
0
.co
0
có
0
Lti
N
o6
0
c'5 2
c
cn.--c
11.)
'...
''C
O
a
(1) a) o
az
0- 0 (v
2 . a (jj
co a
Oco
c.: .., c
o „
0_
c 1:3 D 15
CD '0
a)
c3 a) v) a
Lo
> o (u
LU c 3 • c
C
O..
c
o C
la E c
,.. 0 .
- 4'-'
,....
a)
0
a c -0
ET)
00
- . ;.-, co
C 0,.. t
C0C
0 • -n• Ps
(D Ill 0
T. • 2
'CS a ..".:(0
T.
,„ • -c 2
7'. 7 E
C2 g. 4-)
0 10 (1)
4- 0) a
a ii
tco
O
,_
--
c ,_0
a)o • . '''''0-0 >,0M
O.
c -0 D r) „" • - ,,
Na
(1) 0 rt.) .;.',. "
70 a) u) a n m w ;9.)
5 0 a501:3 6.
LU c 3 _C. E o 73 .0
C
0_
..0
-: •-
C ca)
n
(1.) 1.-..
a0O -o
C
co
o
•
3
2
06 0.)
a)
aa)
>-.
0
@
f5 C
0
C
1'2
Om
a)
1.. U
0.
C0
3 a,
c
.2
tv E,^
- w
M 0
(:),0
C (..)
0 u)
Z ....
O
Z'
0
0)
Sa.i
•
0
cn c
C :-.-a) c
.›(!:
o
E o
a) c
›, •
rn op
..,, 4.co o,-.
a)
„,.... a)
0 t1
o_ c 5,
0 co cv
.c ti
-•
tr'
2)
a.,s E
44,
0 Li_
... c...) -
0
cc)
0
06 0)
0) c
C 47i5 •S
(.6-
x
t-
n
,-oo
O
0.
- o
85
06 0)
ac
C '-r-,>,
0 .cl-
..) •e
a)
64O
Le)
dm•
0
U Fa k
,...I.-. 0)
co
, -
0,^
0
T2s a
'0
< t,
17i
C43 Z
013
E ' C'
2
6
Z
U)
,co. .-
gi 2)
u)
.50.z
< -6
co' _
N-. -65 8
p, 0,
iv
. „,- ......,
.c
-;< _z
0W i
3._j7j.,:-
a,
1
_•• co
-62
.0 Oa 0 -0 03
?( 0
5 Z
co .c ,-- c -0
...
a) -2
>, di a) an3
. FT f0 (-)
0 c'15 11 a5
F.- a
oa_y
MC>-- 1..
`'''' I..• "- "
(D
Cm 1ti, )a_ D 1 5, , . - u
E =02 ,a, i, - „ ,. ' ' #•. e.e - LI; E. Ei. V, a
a ra . i. ,.. E cc 0 CO c 0 "'0 c g 1.1.1 C
c 1% co 5 ( N
To E co (6 o .9.) a- O ao ,.,Th
Y < Z LL c0 02 C) UJ Y - () UJ Y -- V`C
r-
N
CY')
"tt
1.a)2
c
,..0_ '0
0
C)
.0 - (0
ct
2z
=
a 3 ._
0 l... "
7 (IC) It.
co 0
-Cco000
"0
440
0
eo
U) z .c
, 8
=
D
-`- Ct) 1-
Y 2 LL
al cis
U) < U.
(C)
(0
21-
'3 ,_
C (0
3 4-'
0 C›°
1
1
-0 ,_
C0
3 -.-'
,
w
2 0 ..›
'
0 >
C
_
>,
1...
17)
C
= a)
1:I .0 t.'
. C ...., 17;
L. 0 0
(1,) C -0
,
*
1
CI -0 .0
0- 2 ...q.
(,) z 0
0 o co c
-0 o .0 o
-_-) ,. a) t';
y t E ,-.
.- i_ a)
o 0 a) a.
ce) T.3 > 0
E
co
cu
to
0
0 o al c
-c U -0 0
;..
H
CD CO
t ...z ,-c) (13 if) a
o 7.3
1 >o
-J
C
''''
;
C
+V)
D 0 >,,
17
.0
I..
C
.1.,
,... 0 z
0 C -0
Z5
,..:
0
I
co
L.)
,
CL
U
.0>,
ID
0_
}Lu
,
,
,
a)
.=
(i)
.c
o
z
.
E'
a)
-0
6 co
f §
3 eL
oC 0
- o n
c ,, >,
0 '-' 1:1
47, 4"
0 o ,_,
,_
ca
q 8
'
° 03 CV
•
,C
- Ti U
....., E a)
c
C
a.)
—
1-A
,_
72.
x
0
(1)
c
a
0 (ii
co a)
E .u)
.—
2 -t.'
,,)
Nr
,c6
0
0)
...=
'C.:
6.
L"
Ls
g
„,,.-
>:".
L..
7 n.
(13 0
22 r....
I-- < Li.
- .6
a. 0,
-)
s.
co
5
r.:-, E a
y
.
(13
a)
c
c ClRI 3
H :,„.
,_ w =- ,._
= 0 co g
a
c (.6 . E a
c
cr, -a-, ar MI
Y
0.)
0
R.
.0
a)
0. ,.
a.) t13
0) „,.E
L.- co r_
a) z a.
co.
w '3 ot
co o-,
c
C. 0 ° c
,„
0
— Z.v.,
«.. ,,, tNi L.Ey ..6 .- 03
_c:)
a) ..0 N,
0
0 0
..0 cl_
I-
c co
ir. 0
,-..7,
CD a)
..c Ill
t
0.a\O
cli ,_
E
w (L)
111 .
a) '03
-t
N
(/) 03
w
o
z
.
t
4, .."
n
....,
.„.„
c 63 c
0, o
cl
al
z`b
o '5 rf')s
0 ay.
co
c- 0 rm
oY
« >, cLi
CO jo 't,-.
a) -0 .1.
0_
(•1
0 :LI
0-
c 7- E
-'X
c
m
.0 0 )
Tr
,-
v
,06
o
,-
L., 3 .—
Z (/) Z
r-
ID: 0
.c u)
0) =
7 0
03 1
45 0)
...,
.c 0
co) D
7 0
(0 x
ET.)
co
76
E^
7
4)" ...t
,,c C
H
ID
2 id.,
(Is
.- E
-...,c,,E.0
m 0.)
..._ (/)
L., = 0)
1:1
Z(6 k 0
r-
I-
a.
1-
0
z
2,-
C
e0
1-
E
,:('
c
_
0
0 -75
0
a)
-- 0) ,_
t.- 0 C 0
4:2
as
(I)
c
a)
c
C
CO
0 .=
1:3 ° 2
R) 2.) (‘I
" ah S
" 11 ....
cr
,oo
o
oi
o
Tr
,co
o
oi
co
/a
0.) Ct
c
c=
(t3 0
1- -0
0) .
°
fo
*E 4) -0 45
' u
02 0.05
2 5)) cI
vt
,c6
o
c6
o
I-
c
.0 36 m
"etj
a) w
t.' 2
E E 7n'
E
a..2 8 -. dc.
Z :Pi
0
c
C
01
S2
U)
cD U
1... —
03
.0 a) . 0
iii co
._
002
o
'a cp
.. 5 .E a
0 0 V., 0
2 0) .-P,>,
ri)
Ia") th
t.... (:)
m , C
C cn 40 ----*
0 R .>
a) '`..-`'
0
E.
Z (1)
co (0. 0.
8.
0
o
26
,- co c
,9_ o co. >,
.0 s- tt
L.1
Lion
2 0 ....
L'5. .
cp
.c
.... . -0
2 .c ro
'2
co CO
c')-CO
c .0 .,c
,...
a)
.o
-..
co
._
a.
Ial
6
o
8
i
° \
«
5
a.
C
co
Y
E
co
...:.; , 2)
---:.
a.
C
co
y
0
o .-,. 8
c co
ai
cn
L. 03 .cr)
-0
.w L,,,
" c ,
2 (i)
n
w al ..° MZ
..-•
cu VJ 5 5-. 013
f7..
..E. 0) 6_ S, -C IT) ,.. "
...) co (ty E. i (..- E ,_ cs.) i_. 0 c
cy) c 0 0
a›) . v,
r..,a0)
a c
(13 0) C (0 —
co (t)
03Ca
0 0) ,E c cri >
m ..)C (t) a
. (ID tt '....•.- 0 CO .... .a. (I z CO —
en 0 z RI
c.)—
--) Y < CO -5 y za. y <oco—
.,.
.
.
-C
,„,
0
,
,
cv
S
co
,-
a_
L
a.
0
0
0
N
c
3
X
01
<<
..... hl-
C
1.
,
>, (1)
-0
-2 ao c
-2 a
o c
92 co
(3) En
tp
co .x
(D
a.)v2 ,_8
U) a.
.9_
w
..T u) ,,._, To
00 0.37- co lir, .!-:- .(12.„)c„,c1.,„0-•
>, 0 '4
in, -R, (t
"-..c
E -TicV)
M
0 c - co *"' - 2co
.0 . o_ 5 o
m- ,t Tow 5
U) CO .-'
'a- o
a (..)
IT
" Z 10
a.,
i'2 8
(3) ,...
.0
H c
C
l
>, (i
o
- ›,
t' c
U)
0.
.9. cli -.-.
c
o - 0
).>-' 2 U
''-'
a tt
U.)
_c9 0 a)
' c (/)
E' (9- 11.)
6c
0 ) "
11) 7y ) -a III
)
-C O. 0 >, 5i 2 cr)
(13
9- 0_
C.) 0
00
:04-•
5
.6 c .
c o-- -12o
)- 0 ,_ -0 a) 0., < Y
C)
U
'0
CO
o (..)
c.) 0.
0,
cu 0 03 8
z
- ... (,)
a 0 O.
0
0
E " E
0
3
-
a)
c
'5,
a
E
o
a)
a
'5,
a
E
o
C.)
0
-ci
Z
z
0) "
0 (I.)
03
0
'''
(1) 'U JP,
00
0
0
UV)
0
a.
C
al
2
0. c)
0
0
Tv
C73 If)
C.) 6
Ct. ES
0
01
+.1
C
z
0
(1)- _coo Co
03 C n"- •q0 10
° N.
CD '.
0
2 g -o-
2 (,)= -,, ....
0
u)
ou "
Z
> `N.
ci) GO CNI
_ El,
0 A"a) 4-.
c cl. ,,-•
a co
w o_ 0,
E c D c)
o o >,5.
() C.) .o a
U)
-ci
z
o
tn 47,
u9 43 oc
'a T...
0 C Vi 6
-0
0
Z
0
Z
Ns
a) °I
a) -A)
a) ''.- 8
0
tj 0
.2-1
c TO- a)
<N
2<0
C
ri
>
0
N
•
CO
.0 0
:E m
3 c
cn o
,„
44
<
g)
C2
42
th
a
E
0 1,5
0 ..
Z
ch
y
w
.E
a)
OA
0 Ch
,,
=
4.
ea
(7)
o
-0
w u)
's2 E
V
(/) 0
a)
Z
cr.
..'''
- ,.. a),,,.....
C1- (1)
7)
o0
. c
1:i
z
6
CO
a) CJO
z ‘... C
a)
,-.0o_z
u
4.(11
(1)
*'
(i)
< ,
0. 3
LI-ii5
LU
45 4=
a .476
0Z
<
<
E.' S
113- U.,0) t'..
a -5.
Z
<
0
13
,.-
7
`p_. 2
'Di -
'0 t.
)
< 17'
08 :
a) 13
E .5
Z
03
C
z
ui
a
co
-0
as
-0
-2
C "t3 2 .Y
LE -, 2
-(T) E (‘5 c̀B
< z
,-
U_
- 0 .-X
P3
a, c a)
.4.'
- o- Z
c
IT)
fa) - lb (I)
a
5c
)t.n-•
-(NO
.... ,... .-,
a) a o_ moo
.0 a) 6- i:
00)0
,_ 0. MCOOC
a) z ,.- a)
0.=
*E. .s9 2
D -o
a)
4- 12
o ai
<
- c
a ,
(3_ 0
--- 4.,L.1.1 CI3
U
45 4=
sa.'n-10
0Z
<
.
a)
(-) 15 ki
< 5-; g
,_, 0 (1)D z
`c" 0 '0 ca
.„,, ,- _c -0
`.', cii a) ma
0 c?
-.' IC- rp 6 5
t- i.'63.
' 0) 6.. Iii ca
(i) CD C) Ill Y
>
al ';''--5•'‹ T.
2
n, ay
a) L. 17;1..- 0 u j tb.-‘
co 0 - co(7)
3 0 23 z
CV
01
0
0;
c ..(.'i
5, z.
0 0-'
0
n .-1:3- c w
0
3
(0
cl)
,t,
= (I) '5 c
-(60
0 ,_ 4-.
(1) c. a CD
1.. (I)
,--va -aa)
.0 '-
uE
U)(1)
0
()
Tii to
o >,
Z 0 0_
tn
5 ._X
0
«,- ,...,
c
c
(-) E a)
V) ....
(1) 0
0 (I)
>, COZ th o_
Z 0 o.
o.
a) .- 0 ..ci)
%win.
-C
TA03
U
0 >,
03
, c (1)
-
i0
.0. s'U)
3
0
0
c
uE
w0
N
tn
C
)0,
-C
-C • uE
a a) w
u) .., 0
(i) O
0 >,,
,
m I: >4
co
14":
3
c
0CD
g. ..
''c S 08
T.15. 5
-o
E c cp
'a) .2 . 0
in' .-'
,, 5
>,
n 0
0 i-
_,,,, -5 L.
0.
sj
CD 0 -o-'
C
N 4,:--' 0)
'C'''
m aj, E
rl) E __
*-
3 0 (i)
0)
-0
c
Ot) '' (13
- E ..
(2).
0U
6.: ...-:.
a ,
a.
o
_
- .,-
a •;-•
0"
0 Z
<
24)
0Z
<
^ co
O. -0
co
li 0
(,-)‹ a) 5.2.
/- Cr-1
,-- cv
Y .)
a)
c
0. '0
(13
cb .o
.0 - (p
co (1) r
3 ia)
zCO _le
2
6- L-
..-. -
11.1 RI
,. U
wP3
0
(r) ..
12 ..... 5 2. -
co=-2gc
'5
2-
re,
-' (c) 2 (t) (0 „a3 zi a) (t
"' l's __ C) Y '.* 11 i! Y
v•
i (13 (13
Y Z u.
in
0
4('' ) z
a)
.0 N„, 0.c) >,
L7,
,_
=0 ,,,,),)
.E
W . F 0 ---,
a 0 c -It ,...
17) ,,-,0 2, in, a,a-,
co --0- 8 (:). 0
i.- 45„ = 0
E n 4) a a) 0°
O -.-co • (I))-7( ia)n ,o,_
Z 9 a) i u) a
c_
C
-5
c_
c
.5 =O
C ..p
s.>: a)
a
z
-0 0
∎
I
iii curc =, 0
*di c (,;)
"iii ,(1)
c. - 0
.6' c ,?•,)
a - -0 >-. E
E. >
•- 0L
ota
15.
'Co' cl)
a
-2, o
c
c
a
a)0
-a,
a)0
5
5
10 .?*.,'
o
E
-c>- ,_0
ota
Z 0
Z
cD
U)
U,
a)
0
2
a
a)
c -c.)
C
F-
C CO
(I3 0
I
CO
0
CO L 0
a
CO ,_ a)
0 () co
(...) .-1-, co
ay 0
00
(..)
CD
w 0. c
0 CL
c
,
12
2
nD
o
E D
0
0 n5 45 1-.. cp 0 ).:*
n
ci .Nor 0
2 -0 < a) 0 2 -0 < a) °
N
.,,; T'- 6i
s , r-. (Ni
u) w0 52
co
0 co 0 s . . r0 0 0 r, to ,,C2 u) o t c,i
5 12 3 < c) 0 .525 ct ,c
.c
(-) E
3 a)
a)
0
-o
0 >,(n co
Z o o_
c
-c.) E
(,9 a_) 8
0 (1)>,, (0
Zoa
c_
c
15 c
c LP
0
4 .' 2
7, .
O
g
c
-g 0c.
-0° col
_C
<c
'0
6,1
---..7,
uJ c0
0
45 €:
a tc
u) Z
<
c
_c
0E
c
a) a)0
- 44,
0 (4), M
Z o 0_
Tt)
To
e Tti
2
-cY'
,- a) ....,
..,
4'2 E w °
w a)
0—u E 00
Eac
-a E a c -a
0 0 C U 0 c, C 0
0_
.., ,__0 r.,
... 2
,.., u),
- (-) n
•. 2
,...,
;- - c '-'- c W M
CU) (13
a) ...= a.)- - a) 47....-. ai Cf.1) C LO >s , V) " 0 >,
Ea- a° ) 0 .">- t S
22`5t522=t)
CI_ c..- a. co Ct. c.. a ct)
in' a)
<
...-. .-,
0. 0
LI' r00
,̀:D 4._
a t
< ,
<
,--. C
0.
0
,___,•;LW CO
0
,,-.4. 1...
0. 0
.-----. -r-,
1.1.1 0
CI t
" t",o
a
`cr) 4---
0Z
<
0Z
<
V2.-c
5:
u
0Z
<
(1) C a3
u) < Li.
03 r k,
1.-- .‹ u_
(0
N
CO
.an "0
10 to .0
co
(13
0 C ..c
z0,
,..„,,....
..C„L..
a)
(5 - 10
i- = co
03 a) n
co co
Co -C2 5
-0
n
C Or, ‘..
O..
0
>,
.0
a
La)
u)
E
.o
a) c
z
co " 0
0 (1) .I. 0
: ,..„
N0
0 n s,:=, 6
T2 , . 0
o `6' t) c,i
a) 10 < N
,5 n ,..
- a)
0 n -, a)
..,CD
, f0
ca
'5
a))
.n
o
C.) :do 5 O
.c
8
fo
c
E
O
oE
cCn a)
-4, a)Q
C
0 >,u.) M
Zoa
0)
() z < cv
c
0 ) a)
0 .., 0
n
0 >,a) ca
CO
r)
0 °
a)
.6 45 co 't .0N
Z SO. Y C.\.I. 0
2V,,2>
CL (n O. E
u
4. ...,
0 4.4
°*--o
<
--.. -,
0_
o......r.,
UJ CO
0
<
...... _,..
0.. 0
--. 7.,
ILI M
u
ct.t
a 45
tti
'(f) =
Z
<
co
8i_ 0)
(0
N
N (1)
C
_ a, . . Ca :-N
5
-
L1J CS
1.- —
2 no"
.- 2
a) t co 0
a Z a
tn C CO a)
0.
--- -0o
.$3 0)
Z 3 ft 3 . . . . . .... "
(1)
D
al 0) Ln
<
.--.. .-,
71
en
.0
4..
0 ,-,-)
.c
NY to
,_ a)
a) c
'E o
o IT) 1,.. ,..0
2 <cr) 0)
. 7
au) m ‘• :- -0 15
>, ,,,
w
u) 0 E0 .-vi
E
- - • a)
c4,r., E z on" a)L..
,.
a)
a ,_
a a)
8 ' - ra
4_m0
-a 5, c 3
cpc cp
0
0 0n °a)
n ,_
-6 -,:-.3 0
<
a)
-0
a0 4- 4-,
a)
Z
r -> - E- - 00 g
._
5: 6
L,
45
c CC
cm
c ..c
c1
CIS (10
0 n
I-- cy)
F- —
6,0\00asz
- - Fs' 5 '-.
5 N , a a c a
01.1.1... C C C,..- c c
0,_600*,,a)
0.0-,, yy a) --)Y
.6 -- co
2
0 (;)., c0
Zoa
,... 0_ (13 0
0
0 0-
o
0 >:*6 .12 -° < 6-- 8
-a cy)
CD
(0
0 D Cf) - 0
2 0 t") (Ni
0 2). a < N
Q) +,
Lsr,2
C
-
c
n
0E
- -0 ua)
-a
a)
45 ro
8
r.)
0
a)
I- 73
a
-0
E
m
a)
Z
<
- L. .....
C w -;
co
7,-_,
0C
1.., a. ?.._ ,„
wco
a
I
474
...
Z
E
a)
,_
co
0 E._
@Lij' m
a) a) (t5 5 '..-(1c3 a.
a)
co -E- a) , a
_.cc0m
<U. 0 --)Y
.,, (0 4_ ...:-.
2 ,.. 8 8
(0 70 6 Et- n
I E0E,_ - - co °
a) 0 a4,, a a
ui 2 76 y2 2) (o. 4, t (73 g
w— 0 8 z
...-YY
ZI-WY<
o
1--
re-
-.J.c
0
N
e-
v
a)o
,
o
,
,
-0
a)
0
v
a)o
v
a)
0
E
al
0
Z..5
5
1—
0
o
0
o
0
a)
I
-0
-0
a)
-to
0
0
(/) s- •-•
u)
a)
CD
. n,..
CO
0
Q)
12
0
0
u)
Tr co
27,...,
<
r8 s , A- r8.(4
' -il ,
5=<
a)
N
-0
Ts
s- -,
a) a)
(L)
CI). CO
,... CO
-2
o0
25
0 V/
(..) = < CV
0 7 < f \I
1- 1--
— ..., o r-
c
o
'0
a)
r
p_ — o
,:r
r-- co
-
••00 N-
o
>N
.0
0.) z c
.E c
0
6- "a •tr
r--. co
2 5 cm ‘-7,•
co co ,
o 0—
'a
0
O
Z
la)
(/) s- 4-,
(I) Q) CO
Iii 0
a.)
,.. OS 0
c
0
0 "6
-0
1:3
a)
ao
(..)
o_
e-
. 1-
u) Ur
— ,
.0
0 46 •4.
c
r-- c''
2 .<, CY) 7
,..'
0 (.°
a)
= • • e- v-
-12 (1) '
,
C.) ..-
0
0 = < (•1
C
0
.C.
c)
„
C
C
E
(-) E
-- co
c„
a)
co
>, co
Z (r) a.
co
,w 8
O u)
'E 2
.0 0
w 7i) 4.. (6
,7- c 1 ) (3:6
15 a c x
a)
it) a) O
ui --,
0 F2') - s
(I
*ro
0 ,al 8
6.L-
.., o cora
C V) n a)
n -8 a 1.-,
QC
.7,
tr co
E0
u
5 ;'A-‹
a) .. c0 ci,
z:1
- -,-,
et, (1)
a.) a)
±-; L- 5 a)
(00E
2 -oc —
n
' --,
—
co
u) Z
al a.)
— a) -,.-=
c _T-a a)
@ .6
2
u) 46
,t'-- O _ R'
a) a.0- a)
-0(i) (1)0) -ti) -'C-'
4-, 6- 5 a)
ca as 2 E
2) -c0 —a,co
.-
D -c) c ...,
D -6 c .-..,
n '6 c .67,
< —
t...
--..
<
---. c
a. 0
_
< ,..,
...,
2 (I; "
0
C
C 0 0
z
<0 z
-4.
(IT
N
a).
7
0 _E
_..
u)
co
E
E, al
03 57)
.:12 in z ,....;
.c 2 ,
,,5 E E
0) a
a)0 _o co
c c°L.
GS
M
,-
2Q
, -=
(a a)
=
— a) E
c .-8 0
a) (7)
2 Oin 6* 0R
o 0_ c 0
-cs0 0CD) 00
- ...
7
.-, 6- 5 a)
vocu0 E
2z
.,...
o It——ci
a t:
0
O
u)
E
t)
"E
_
a)
°
o 11)
>, ss
Z u) ci
Z u) a_
8 =t
a) —
4E. z0,,,
@ . 6 ".' u)
0.. o
.,
LLJ a)
L. o
Z6'4
0- f5
En 8 z
c1)
Z co
coIsa
4)=
C
c) Ea)
C
.c .
of
,cna)
,.., 0
u) as
O >,
7
a)
U)
C (.11 0
a)
liJ It
0
vr
,-•
C In 0
a)
< ,_
—
....
a.
o
.......rz
LIJ a)
,.. 0
€
a.
0
...—.7,
LLJ ca
o
4
4
<0 z
sr.
ai
ai
7
V)
7
45
0- '4
0
CD
0 . 4
,...
0
" '5
2
_.
0
-.k
2
4--;
u)
0
E
CO
- .0)
it) 2 2 __, o E 2 _....,
,..*: ,.. :E.al ‘_. ,..
1' E
a) 6. (ii = i 0)2 d` i =
a) 0) 0. Cl. = ay a) 0. 0.
coz.yrocca3Nalcc
(75 c2 z 21 w P.. 2 (1 ('
J- -5 a
U)
1
L.
in
,-•
a)>
a)
M
-c0 V
74- c
5
ca .oa.3
a) ri.
.c -2 -c
0*) ,„ N5
= c 0) 2
alcai I.-
Fa .
c7 (T) z 2
(!illz 02
(0
e-
N.
e.-
0
I
.c E
.c as
-0
cv 01
— 6 ->z a—
7` — 2
.c co (4) w
gz a,
0
Vil
12.
CENTRAL POLLUTION CONTROL BOARD
(Co-ordination Cell)
Date :05-09-2014
Sub: Joint inspection of Sugar and Distilleries operating and
discharging the effluent in river Ganga and Yamuna-reg
As per Office order No B-190153/NGRBA/CPCB/2013-14/2035 Dated
25-08-2014 and subsequent meeting with Member Secretary,
undersigned was deputed to carry out the inspection of the sugar and
distillery industries in the region of Bijnor (UP) jointly with concerned
regional officer of UPPCB.
Following industries were inspected during 1-2September, 2014 jointly
with representative of UPPCB.
SN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Name of Industry
Bajaj Hindustan Ltd., Bilai, Bijnor (UP)
Dhampur Sugar Industries Ltd.
Dhampur, Dist-Bijnor (UP)
Dwarikesh Sugar Industries Ltd., Sugar Unit,
Dwarikesh Nagar, PO Bundki, Bijnor (UP)
Kisan Sehkari Chini Mills Ltd.
Sneh Road, Nazibabad, Dist-Bijnor (UP)
PBS Foods (sugar) Pvt. Ltd, Sugar Unit, Chandpur,
Bijnor (UP)
Upper Ganges Sugar & Industries Ltd.
Sugar Unit, Seohara, Dist-Bijnor (UP)
Uttam Sugar Mills Pvt. Ltd., Sugar Unit, Barkatpur,
Bijnor (UP)
Wave Industries Pvt. Ltd., Sugar Unit, Bijnor (UP)
Dhampur Sugar Industries Ltd.
Dhampur, Dist- Bijnor (UP)
•
M/s Dwarikesh Sugar Industries Ltd.
Distillery Division, Dwarikesh Nagar,
Bundki, Dist-Bijnor
Jain Distillery Pvt. Ltd., 8 tt' Km stone, Nagina road,
Village Khadanpur, Bijnor
Mohit Petro Chemicals Pvt. Ltd.
8°' Km stone, Nagina road, Bijnor
Upper Ganges Sugar & Industries Ltd.
Distillery Unit, Seohara, Dist-Bijnor
Uttam Sugar Mills Ltd., Distillery Division, Barkatpur
Dist-Bijnor (UP)
Type
Sugar
Sugar
Sugar
Sugar
Sugar
Sugar
Sugar
Sugar
Distillery
Distillery
Distillery
Distillery
Distillery
Distillery
During inspection all the above industries were found closed. The
inspection reports of individual industries are placed below for further
necessary action please.
(Vijay Push Yadav)
Scientist 'D'
I/c NGRBA
VIFr
CE)4(0
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: General InTormation
Name of the unit and address
Wave Industries Pvt. Ltd.
Sugar Unit, Bijnor (UP)
Name of the Proprietor/ Contact person — Uttam Kumar Singh, Sr. Manager
Designation
Contact No.
1930
Year of Commissioning.
Private
Sector
Production details.
Sugar
• Products
Cane crushing capacity
3500 TCD
Cane crushed last year
28,58,000 Qts
Operational Status
It is seasonal industry and presently
Industry is not in operation due to off
season.
B: Water Pollution and its Control:
Water Supply Source(s)
Water Meter to show consumption
GW through tube well
Installed
Flow measuring device installed at outlet of No arrangement
ETP
No effluent was found generated due to
Waste Water generation
non-operation of unit.
Waste Water treatment capacity (KLD)
Details of ETP
ETP Description with flow diagram
7.
water
Waste
treatment)(KLD)
discharged
1000 KLD
Industry has installed the ETP which is
comprising of Oil & grease Trap,
Equalization Tank, Chemical dosing,
Aeration Tank, followed by Secondary
clarifier
(after No effluent discharge was found during
inspection
IH
2
8.
Mode of disposal of treated effluent On own land adjacent to ETP having
eucalyptus plantation.
(Details)
Poll utio nAir
5.
its Control
Sources of Air Pollution
Boiler 2 Nos. 35 TPH each
> Type of Fuel used with consumption
...
Bagasse
â Stack details
stack of 40 m Height
> APCS details
Wet scrubber
Samples collections points
(if collected)
Sample could not be collected due to non-
Photographs indicating locations:
operation of unit.
►5
3
Remarks
Due to off season the industry was not in operation and no effluent was observed
to be generated from the factory premises.
The ETP was found in ruined condition and all around the ETP water logging was
observed. The ETP is also not easily accessible. ETP requires complete renovation
and modification before start of cane crushing.
Since the industry has no proper discharge outlet so it is require for the industry to
utilize its 100% effluent after proper treatment and no way can it be allowed to
discharge on land in unscientific manner.
Adequacy of the pollution control system may be assessed once the industry
resumes its operation.
Date of Inspection: 01-09-2014
Name of officials inspecting :
(Name & Designations) Sh. V. P. Yadav, Sc. 'ID', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
16
G711:10)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A:
ienerai inTormation
Name of the unit and address
Uttam Sugar Mills Pvt. Ltd.
Sugar Unit, Barkatpur,
Bijnor (UP)
Name of the Proprietor/ Contact person - Sh Shailendra Singh
HOD, Production
Designation
7.
Sector
Production details.
• Products
Private
Cane crushing capacity
7000 TCD
Cane crushed last year
79,50,000 Qts
Operational Status
It is seasonal industry and presently
Industry is not in operation due to off
season.
Sugar
B: Water Pollution and its Control:
Water Supply Source(s)
Ground Water through 2 tube well
Installed
Water Meter to show consumption
Flow measuring device installed at outlet of Not installed
ETP
No effluent was generated due to nonWaste Water generation
operation of unit.
Waste Water treatment capacity (KLD)
Details of ETP
ETP Description with flow diagram
water
Waste
treatment)(KLD)
discharged
Mode of disposal
(Details)
of treated
750kld
Industry has installed ETP which comprises
of Oil trap, Equalization Tank, Primary
Clarifier, Aeration Tank, Secondary
Clarifier, Sludge drying Beds and Lagoon
(after No effluent discharge was observed
during inspection
effluent As per information provided by the
industry most of the treated effluent is
reused in the process and balance is used
2
for irrigation on their 58 Acre land.
C: Air Pollution and its Control
Sources of Air Pollution
Boiler 2 Nos. 70 TPH each
Type of Fuel used with consumption
Bagasse
Stack details
One stack of 60 m Height
APCS details
Wet scrubber
Samples collections points
(if collected)
Photographs indicating locations:
Sample could not be collected due to nonoperation of unit.
3
Remarks
Due to off season the industry was not found in operation. Also no effleunts was
observed to be discharged from factory premises.
For the treatment of effluent generated from industrial process, industry has
installed an ETP. The ETP consists of Equalization.. Tank, Primary Clarifier,
Aeration Tank, Secondary Clarifier, Sludge drying Bed and Lagoon.
As per information provided by the industry representative, the treated effluent is
collected in a lagoon and used for ferti-irrigation on own land and no effluent is
discharged to any drain /river.
Adequacy of the pollution control system may be assessed once the industry
resumes its operation.
Date of report inspection
01/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
(frn
Sh. Shashi Vindkar, AEE, UPPCB
Ms. GArima Dublish, RA, CPCB
r(j
3
cep
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
General Information
Name of the unit and address
Upper Ganges Sugar & Industries Ltd.
Sugar Unit, Seohara, Dist-Bijnor (UP)
Name of the Proprietor/ Contact person - Sukhveer Singh, Executive President
Designation
1959
Private
Year of Commissioning.
Sector
Production details.
• Products
7.
Sugar( Double sulphitation process)
Cane crushing capacity
10,000 TCD
Cane crushed last year
6,21,238 Qts
Water Pollution and its Control:
Water Supply Source(s)
Ground Water through tube well
Water Meter to show consumption
Installed
Flow measuring device installed at outlet of V-notch available
ETP
No effluent was generated due to nonWaste Water generation
operation of unit.
Waste Water treatment capacity (KLD)
Details of ETP
ETP Description with flow diagram
â
2000 KLD
Industry has installed a full-fledged
Effluent Treatment Plant which
Skimmer,
Oil
of
comprises.
Equalization/Effluent storage Tank,
Primary clarifier 2 Nos, Diffuse
Tank,
Aeration
tank,
aeration
Secondary Clarifier, Treated water
receiving Tank, Activated carbon filter
and sand filter, Sludge drying beds,
,
2,0
2
water
Waste
treatment)(KLD)
discharged
(after No effluent generation was observed
during inspection
Mode of disposal
(Details)
of treated
effluent On own land, 78 Acre, and recycling
60% recycle and 40% for irrigation as
reported by industry
If at all any discharge comes from
industry it will go to Nasiya drain which
flows to 19 Km before meeting to River
Ram•an•a.
C: Air Pollution and its Control
Sources of Air Pollution
Type of Fuel used with consumption
â
â
â
Stack details
Three stack of 74 m and 2 nos of 40 m
Height
APCS details
Wet scrubber on two stacks and one
.
ESP
Samples collections points
(if collected)
5.
Boilers
Fuel: Bagasse
Sample could not be collected due to
non-operation of unit.
Photographs indicating locations:
....,,,;
V.:41
,,,,,
.-..,
2.1
3
Remarks
Due to off season the industry was not in operation and also no industrial effluent
was observed to be generated from the industry premises.
As it is a time for maintenance work of sugar industries to be ready for next
crushing season, the maintenance is going on.
Industry has installed full-fledged ETP based on primary, secondary and tertiary
treatment process. ETP comprises of Oil Skimmer, Equalization/Effluent storage
Tank, Primary clarifier 2 Nos, Diffuse aeration Tank, Aeration Tank, Secondary
Clarifier, Treated water receiving Tank, Activated carbon filter and sand filter,
Sludge drying bed.
No effluent was found generated from the industry premises and ETP units were
observed empty except some rainy water.
As per information provided by industry representative, most of the effluent
generated from the industry is reused in the process and balance is used for
irrigation on own land of 78 acre. If at all any discharge comes from industry it will
go to Nasiya drain which flows to 19 Km before meeting to River Ramganga.
Adequacy of the pollution control system and its water and effluent management
may be assessed once the industry resume its in operation.
Date of report inspection
02/09/2014 ,.
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
____,
( -,
o".,'
22
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: General Information
Dhampur Sugar Industries Ltd.
Dhampur, Dist-Bijnor (UP)
Name of the unit and address
Name of the Proprietor/ Contact person - Sh Vijay Mishra,
Manager, Co-ordination
Designation
Contact No.
1933
Year of Commissioning.
7.
.
Sector
Product
Private
Sugar
Cane crushing capacity
14,000 TCD
Operational status
Not in operation due to off season
B: Water Pollution and its Control:
Water Supply Source(s)
Ground Water through 4 tube well
Installed
Water Meter to show consumption
Flow measuring device installed at outlet of Not installed
ETP
No effluent was generated due to nonWaste Water generation
operation of unit.
4500 KLD
Waste Water treatment capacity (KLD)
Details of ETP
ETP Description with flow diagram
water
Waste
treatment)(KLD)
Mode of
(Details)
disposal
discharged
of treated
L Oil & grease Trap, Screen, Equalization
Tank, Primary Clarifier, Aeration Tank,
Secondary Clarifier, Sludge drying beds
(after
No effluent generation was found during
inspection
effluent
Any discharge comes from industry will
go to Ikra Nala which joins Karula river,
river Karula meets to river Gagan which
is a tributary of river Ramganga
23
2
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with consumption
3.
Stack details
4.
â APCSt eta ils
Samples collections points
(if collected)
Photographs indicating locations:
........n....nn•nn•nnnnnn•
Boiler 2 Nos. 170 TPH each
Bagasse
Coal
One stack of 60 m Height
Sample could not be collected due to
non-operation of unit.
2 L1
3
Remarks
Due to off season the industry was not operation and due to agitation of farmers
maintenance work has also been stopped.
No effluent was found generated from the industry premises and ETP units were
observed empty except some rainy water.
Industry has ,installed an ETP for the treatment of effluent generated during
operation. ETP consists of Oil & grease Trap, Screen, Equalization Tank, Primary
Clarifier, Aeration Tank, Secondary Clarifier, Sludge drying bed.
Adequacy of the pollution control system may be assessed once the industry
resumes its operation.
Date of report inspection
02/09/2014
Name of officials inspecting
Sh. V. P. Yadav, Sc. 'D', CPCB
(Name & Designations)
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
C-(47'
25
low
euxe)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: General Information
Name of the unit and address
Dwarikesh Sugar Industries Ltd.
Sugar Unit, Dwarikesh Nagar
PO Bundki, Bijnor (UP)
Name of the Proprietor/ Contact person —
Designation
Contact No.
Year of Commissioning.
Sector
Production details.
• Products
Sugar
Cane crushing capacity
7500 TCD
Cane crushed last year
7263772 Qts
Operational status of industry
Due to off season industry is not in
operation.
B: Water Pollution and its Control:
Water Supply Source(s)
Salil S. Arya, CGM
1995
Private
Ground Water through tube well
Water Meter to show consumption
Installed
Flow measuring device installed at outlet of V-notch
ETP
Waste Water generation
No effluent was generated due to nonoperation of unit.
Waste Water treatment capacity (KLD)
Details of ETP
> ETP Description with flow diagram
Waste
water
treatment)(KLD)
discharged
Mode of disposal
(Details)
of treated
750 KLD
ETP comprises of Oil & grease Trap,
Equalization Tank, Primary clarifier,
Aeration Tank 2 nos., Secondary
clarifier followed by Settling tank.
(after No effluent generation was found
during inspection
effluent Effluent is discharged to road side drain
which meets with river Gagan , a
2
tributary of River Ramganga.
C: Air Pollution and its Control
Sources of Air Pollution
Boiler 2 no, 60 TPH each
â Type of Fuel used with consumption
Bagasse
> Stack details
stack of 60 m
â APCS details
Wet scrubbers
Samples collections points
(if collected)
5.
Sample could not be collected due to
non-operation of unit.
Photographs depicting status of industry:
..
:.-.*:, •
,
1.:
-
.
.
.
,.
...4
t q.,..-
...,.:4,-,....4...
•
.
...
2.
3
Remarks
Due to off season the industry was not in operation and also no industrial effluent
was observed to be generated from the industry premises.
Industry has installed ETP based on primary, secondary. treatment process. ETP
comprises of Oil Skimmer, Equalization/Effluent storage Tank, Primary clarifier,
Aeration Tank, Secondary Clarifier, Treated water receiving tank and Sludge drying
bed.
No effluent was found generated from the industry premises and ETP units were
observed empty except some rainy water.
As per information provided by industry representative, most of the effluent
generated from the industry is reused in the process and balance is used for green
belt development inside the factory premises. Any discharge if comes out from the
industry, it will go to road side drain which meets with river Gagan which flows to
70 Km before meeting to River Ramganga.
Adequacy of the pollution control system and its water and effluent management
may be assessed once the industry resumes its operation.
Date of report inspection
02;09/2014
Name of officials inspecting
Sh. V. P. Yadav, Sc. 'D', CPCB
(Name &, Designations)
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
•
2.8
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: General Information
Name of the unit and address
Bajaj Hindustan Ltd.
Bilai, Bijnor (UP)
Name of the Proprietor/ Contact person - Amod Bishnoi, Sr. DGM
Designation
Contact No.
Year of Commissioning.
2005
Sector
Private
Production details.
• Products
Sugar
B:
Cane crushing capacity
9000 TCD
Cane crushed last year
8538847.9 Qts
Operational status
It is seasonal industry and presently
industry is not in operation due to off
season.
Water Pollution and its Control:
Water Supply Source(s)
Ground Water through 3 tube wells
Water Meter to show consumption
Installed
Flow measuring device installed at outlet of V-notch (dismantled)
ETP
Waste Water generation
No effluent was observed to be generated
from the industry.
Waste Water treatment capacity (KLD)
Details of ETP
> ETP Description with flow diagram
_
7.
Mode of disposal
(Details)
of treated
1000 KLD
Industry has installed Effluent Treatment
Plant comprising of Oil & grease Trap,
Equalization Tank (chemical mixing
Tank), Primary Clarifier, Aeration Tank,
Secondary Clarifier and Sludge drying
beds
effluent Road side drains which after 5 Km joins
Ban River. Ban river meets to river
Gagan, a tributary of river Ramganga
.7
2
C: Air Pollution and its Control
5.
Sources of Air Pollution
Type of Fuel used with consumption
Boiler 2 Nos,90 TPH each
Bagasse
Stack details
One stack of 30 m Height
APCS details
Wet scrubbers
Samples collections points
(if collected)
Sample could not be collected due to nonoperation of unit.
Photograph depicting status of industry:
.
—
--...-,
.
.
-.
1
rit,
'0,....
'...1.- ..'
3o
3
''..4
.04
near
I— 4 we
1, 1
71A11111TMI
.UT!
Itt
ling
*Mrlit,r-1
7.77'
Remarks
Due to off season the industry was not in operation and no worker was inside the
premises and industry was found locked out due to agitation of local farmers (cane
growers).
Although it is a time for maintenance work of sugar industries to be ready for next
crushing season but due to agitation no maintenance work was observed.
Industry has installed Effluent Treatment Plant for the treatment of its effluent. ETP
comprises of Oil & grease Trap, Equalization Tank, Primary Clarifier, Aeration Tank
& Secondary Clarifier. In addition to this industry has constructed a storage lagoon.
Due to rainy season the wild grass was observed around the ETP area giving it the
deserted look.
No effluent was found being generated in the industry premises and ETP units
were observed empty except some rainy water.
Adequacy of the pollution control system may be assessed once the industry
resumes its operation.
Date of Inspection: 01-09-2014
Name of officials inspecting : (Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
31
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: cienerai imormation
Name of the unit and address
Kisan Sehkari Chini Mills Ltd.
Sneh Road, Nazibabad
Dist-Bijnor (UP)
Name of the Proprietor/ Contact person Designation
Contact No.
Year of Commissioning.
Sector
Production details.
• Products
P.K. Shrivastav, Chief Chemist
1989
Co-operative
..
Sugar
Cane crushing capacity
3000 TCD
Cane crushed last year
45,00,000 Qts
Operational status
It is seasonal industry and presently
Industry is not in operation due to off
season.
B: Water Pollution and its Control:
Water Supply Source(s)
Water Meter to show consumption
Ground Water through tube well
Installed
.
Flow measuring device installed at outlet of No arrangement
ETP
No effluent was generated due to nonWaste Water generation
operation of unit.
Waste Water treatment capacity (KLD)
Details of ETP
ETP Description with flow diagram
â
7.
water
Waste
treatment)(KLD)
discharged
1200 KLD
Industry has installed ETP which comprises
of Oil and grease trap, Equalization Tank,
Tank,
Aeration
Clarifier,
Primary
Secondary Clarifier, Sludge drying Beds
was observed
(after No effluent discharge
during inspection
32.
2
Mode of disposal of treated effluent
(Details)
8.
.Air Pollution and its Contro l
Sources of Air Pollution
5.
It was informed that balance treated
effluent of industry is used for irrigation on
own nearby cane fields (about 75 Acre
area
Boiler 2 Nos. 32 TPH each
> Type of Fue used with consumption
Bagasse
â Stack details
One stack of 30 m Height
â APCS details
Wet scrubber
Samples collections points
(if collected)
Sample could not be collected due to non-
Photographs depicting status of industry:
operation of unit.
3
Remarks
Due to off season the industry was not found in operation. Also no effleunts was
observed to be discharged from factory premises.
For the treatment of effluent generated from industrial process, industry has
installed an ETP. The ETP consists of Equalization Tank, Primary Clarifier,
Aeration-Tank, Secondary Clarifier, Sludge drying Beds.
Thick wild grass was observed all around ETP and units of ETP were not easily
accessible.
As per information provided by the industry representative, the excess treated
effluent is used for irrigation on own land and no effluent is discharged to any drain
/river.
Adequacy of the pollution control system may be assessed once the industry
resumes its operation.
Date of report inspection
02/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
(.../
<1,•(''
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: General Information
PBS Foods (sugar) Pvt. Ltd.
Sugar Unit, Chandpur
Bijnor (UP)
Name of the unit and address
Name of the Proprietor/ Contact person - Sh Israr Ahmed
Chief General Manager
Designation
1976
Private
Year of Commissioning.
Sector
Production details.
• Products
Sugar
Cane crushing capacity
4500 TCD
Cane crushed last year
39,74,000 Qts
Operational Status
Due to off season industry is not in
operation.
B: Water
Pollution and its Control:
Water Supply Source(s)
Ground Water through 2 tube well
Water Meter to show consumption
Installed
Flow measuring device installed at outlet of No arrangement
ETP
No effluent was generated due to nonWaste Water generation
operation of unit.
Waste Water treatment capacity (KLD)
Details of ETP
ETP Description with flow diagram
â
water
Waste
treatment)(KLD)
discharged
Mode of disposal
(Details)
of treated
1800 KLD
ETP comprises of Oil and grease trap,
Aeration Tank,
receiving pit,
Secondary Clarifier, polishing Tank,
Sludge drying beds,
(after No effluent discharge was observed
during inspection
effluent Treated effluent is used for irrigation in
adjacent cane fields owned by industry.
2
No facility for storage of treated
wastewater exists
C: Air Pollution and its Control
Sources of Air Pollution
Boiler 4 Nos.
3 nos in operation
70, 20, 20 TPH in operation
20 TPH non-operation
'
>
Type of Fuel used with consumption
Fuel: Bagasse
>
Stack details
Two stack of 40 m Height
(One Non-Operation)
>
APCS details
Wet scrubber on 70 TPH Boiler
Cyclone on 20 TPH boilers
5.
Samples collections points
(if collected)
Sample could not be collected due to
•
non-operation of unit.
Photographs depicting status of industry:
..„
4.4.'
x.•
If •-•',
-,:-....-..
3
Remarks
Due to off season the industry was not found in operation. Also no effleunts was
observed to be discharged from factory premises.
For the treatment of effluent generated from industrial process, industry has
installed an ETP. The ETP consists of receiving pit, chemical dosing, Aeration
Tank, Secondary Clarifie r , polishing pond and Sludge drying Beds.
ETP is not properly accessible. Thick wild grass was observed all around ETP.
As per information provided by the industry representative, the excess treated
effluent is used for irrigation on own land and no effluent is discharged to any drain
/river.
Adequacy of the pollution control system may be assessed once the industry
resumes its operation.
Date of report inspection
02/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
(6A
wir
CSOD
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery,
A: General Information
Name of the unit and address
Uttam Sugar Mills Ltd.
Distillery Division, Barkatpur
Dist-Bijnor (UP)
6.
Name of the Proprietor/ Contact Sh 3. P. Tripathi
General Manager
person - Designation
Contact No.
2012
Year of Commissioning.
Private
Sector
Production details.
Rectified Sprit, ENA, Ethanol
Products
75 KLD
Installed Prod. Cap.
Molasses
Raw materials
7.
Operational status
5.
B: Water Pollution and its Control:
5.
Non-operational due rainy season
Water Supply Source
Ground water, 1 Tubewell
Water Consumption (KLD)
Industrial
Water Meter to show consumption
Installed
Waste Water generation (KLD)
No effluent generation was observed, the
industry was not in operation
Details of Effluent Management
Industry has installed Bio-gas digester, MEE
and bio-composting facilities for management
of its effluent.
As per information provided by industry
representative, the effluent from the digester
goes to MEE and concentrate of MEE is used
with press mud for bio-composting or mixed
with bagasse and fired in boiler.
Industry has developed about 10 Acre of HDPE
lined bio compost platform with catch drain and
catch pit.
Waste water discharged
(after treatment)(KLD)
Industry claims to operate on Zero Discharge
however it can be verified at the time, once
industry comes operational.
750 KLD (when industry was in
operation)
•
2
6.
Mode of disposal of treated effluent There are chances of discharge of effluent into
Malan River a tributary of River Ganga.
(Details)
C: Air Pollution and its Control
Sources of Air Pollution
â
â
â
5.
used
Type of Fuel
consumption
35 TPH boiler
with Bagasse
Stack details
50 m
APCS details
Bag filter and wet scrubber
Sample could not be collected due to nonoperation of unit.
Samples collections points
(if collected)
Photographs indicating locations:
•-=
y
I
a
.
:
,
:,..
..4
,
1
et
-
....
-
a-wf‘
:Jar,
,:.
r
.
,
3
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
If at all any discharge comes from industry it will go to Malan River a tributary of River
Ganga.
Remarks
During inspection the industry was not found in operation due to rainy season and
no effluent was observed generating from the industry.
The industry has installed the system for utilization of spent wash generated from
the process. The spent wash generated goes to bio-gas digester. The effluent
from the digester goes to MEE and concentrate of MEE is used with press mud for
making bio-compost.
Industry has also developed the facility of mixing concentrated spent wash with
bagasse and using it as a fuel in the boiler.
Rows of semi finished bio compost was observed on the bio-compost yard.
Bio-compost yard was observed having liner, catch drain and catch pit.
Industry may be inspected for adequacy of its system once it comes in operation
and also its claim for zero liquid discharge may be verified.
Date of report inspection
01/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. ID', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
tr.-
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
A: General Information
6.
Upper Ganges Sugar & Industries Ltd.
Distillery Unit, Seohara
Dist-Bijnor (UP)
Name of the Proprietor/ Contact Sukhveer Singh, Executive
person - Designation
Contact No.
1959
Year of Commissioning.
Private
Sector
Production details.
Rectified Sprit, Absolute alcohol, ENA
Products
30,000 KL/Annum
Installed Prod. Cap.
Molasses
Raw materials
7.
Operational status
Name of the unit and address
5.
Non-operational due to rainy season
B: Water Pollution and its Control:
Ground water, Tube well
Water Supply Source
Water Consumption (KLD)
Industrial
Water Meter to show consumption
Installed
Waste Water generation (KLD)
No effluent generation was observed, the
industry was not in operation
Industry has installed 2 no Bio-digesters for
the treatment of its effluent. Treated effluent
from bio-digesters is further treated through
RO Plant and Multi effect Evaporators for
recovery of permeate and condensate
respectively. Permeate and condensate is
reused in the process while concentrate / RO
Reject is utilized for making bio compost with
press-mud.
Industry has constructed about 23 Acre lined
platform for bio-composting having catch
drain and catch pit.
Requirement of press-mud is met through its
own sister sugar mill . adjacent to it.
Details of Effluent Management
5.
2200-2300 KLD (when industry
was in operation)
Waste water discharged
(after treatment)(KLD)
Industry claims to operate on Zero Discharge
however it can be verified at the time, once
industry come operational.
2
Mode of disposal of treated effluent If at all any discharge comes from industry it
will go to Nasiya drain which flows to 19 Km
(Details)
before meetin • to River Ram • an • a.
C: Air Pollution and its Control
Boiler
Sources of Air Pollution
Bio-gas 55,000-60,000 m 3/day with Bagasse
with
used
Fuel
Type of
145-155 Ton/day
consumption
6.
â
â
â
5.
Stack details
45 m
APCS details
1. Wet Scrubber
Samples collections points
(if collected)
Sample could not be collected due to nonoperation of unit.
Photographs depicting status of industry:
3
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
If at all any discharge comes from industry it will go to Nasiya drain which flows to 19 Km
before meeting to River Ramganga and Ramganga meets with river Ganga after travelling
about 200km.
Remarks
During inspection the industry was not found in operation due to rainy season and
no effluent was observed generating from the industry.
The industry has installed the system for utilization of spent wash generated from
biothe process. The spent wash generated from the process is taken into digester and effluent of bio-gas digester goes to RO/MEE, the reject of RO and
concentrate of MEE is beIng used for making bio compost using press-mud.
Bio-compost was observed lying on bio-compost yard. It was covered by tarpaulin
sheet to protect with rain.
Bio-compost yard has been provided with catch drain and catch pit.
Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection
02/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
106
'Now
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
A: General Information
Name of the unit and address
Mohit Petro Chemicals Pvt. Ltd.
8th Km stone, Nagina road
Bijnor (UP)
Sh.
Suresh Parmar
Name of the Proprietor/ Contact
Director
person - Designation
Contact No.
2005
Year of Commissioning.
Private
Sector
Production details.
5.
Rectified Sprit, Ethyl alcohol, ENA
Products
40
KLD
Installed Prod. Cap.
Molasses
Raw materials
6.
Non-operational due to rainy season and as per
Operational status
7.
record , Industry is not in operation since 30th
July, 2014
B: Water Pollution and its Control:
Ground water, Tubewell
Water Supply Source
550 KLD (when industry was in
operation)
Water Consumption (KLD)
Industrial
Water Meter to show consumption
Installed
3.
Waste Water generation (KLD)
4.
Details of Effluent Management
No effluent generation was observed, the
industry was not in operation. It is estimated
that industry will generate about 400 KLD
effluents at full production.
Industry has installed Bio digester for
treatment of effluent (spent wash and
other effluent) generated from distillery.
The effluent from the digester goes to
RO plant and reject of RO Plant is used
with press mud for bio-composting.
Capacity of RO plant is 400m3/day.
Industry has constructed 12.8 Acre lined
platform for bio composting. Bio
composting area is provided with catch
drain and catch pit.
Industry has constructed lined storage
lagoon of for bio composting purpose of
capacity 18000 m3.
2
Industry claims to operate on Zero Discharge
however it can be verified at the time, once
industry come operational.
If
at all any discharge comes from industry it
Mode of disposal of treated effluent
will
go to Chuiyya drain which flows about 60(Details)
70 Km before meeting with River Ganga.
C: A'r Pollution and its Control
boiler, 8TPH
Sources of Air Pollution
Waste water discharged
(after treatment)(KLD)
â Type
of Fuel
consumption
â
â
5.
used
with Bio-gas+ rice husk
Stack details
31 m
APCS details
Wet Scrubber
Sample could not be collected due to non-
Samples collections points
(if collected)
operation of unit.
Photographs depicting status of industry:
•
. ,..,
.e,
h5
3
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Discharge from industry will go to Chuiyya drain which travels about 60-70 Km before
meeting with River Ganga.
Remarks
During inspection the industry was not found in operation due to rainy season and
no effluent was observed generating from the industry.
The industry has installed the system for utilization of spent wash generated from
the process. The spent wash generated from the process is taken into the biodigester and effluent of bio-gas digester goes to RO Plant. The reject of RO is
being used for making bio-compost along with press.
It was observed that press mud and Bio-compost both was observed lying on biocompost yard. Industry has not made any arrangement for protection of Biocompost with rain.
Bio-compost yard was observed having liner, catch drain and catch pit.
Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection
01/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
,/
103
Nor
(0211
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
A: General Information
1.
4.
Jain Distillery Pvt. Ltd.
8 th Km stone, Nagina road,
Village Khadanpur, Bijnor
Name of the Proprietor/ Contact Sh. Navneet Jain, Director
person - Designation
Contact No.
2008
Year of Commissioning.
Private
Sector
Production details.
Rectified Sprit, ENA
Products
40 KLD
Installed Prod. Cap.
Molasses
Raw materials
Non-operational due to rainy season
Operational status
Name of the unit and address
B: Water Pollution and its Control:
1.
Water Supply Source
Ground water, Tubewell
Water Consumption (KLD)
Industrial
Water Meter to show consumption
Installed
Waste Water generation (KLD)
No effluent generation was observed, the
industry was not in operation. It is estimated
that industry will generate about 320 KLD
effluents at full production.
Industry has installed Bio digester for
treatment of effluent (spent wash and
other effluent) generated from distillery.
The effluent from the digester goes to
RO plant of • capacity 400 m 3/day and
reject of RO Plant is used with press
mud for bio-compostin g while permeate
is reused in the process.
Industry has constructed 11 Acre lined
platform for bio composting. Bio
composting area is provided with catch
drain and catch pit.
Industry has constructed lined storage
lagoon for bio composting purpose.
Details of Effluent Management
Waste water discharged
(after treatment)(KLD)
700 KLD (when industry was in
operation)
Industry claims to operate on Zero Discharge
however it can be verified at the time, once
industry come operational.
2
Mode of disposal of treated effluent If at all any discharge comes from industry it
will go to Chuiyya drain which flows 60-70 Km
(Details)
before meeting to River Ganga.
C: Air Pollution and its Control
Sources of Air Pollution
1.
)%. Type of Fuel
consumption
used
boiler, 8TPH
with Bio-gas+ rice husk
â Stack details
30 m
â APCS details
Wet Scrubber + MDC
Samples collections points
(if collected)
Sample could not be collected due to non-
Photographs indicating locations:
operation of unit.
3
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate startin g from the outlet drain of the unit)
If at all any discharge comes from industry it will goes to Chuiyya drain which flows to 6070 Km before meeting to River Ganga.
Remarks
During inspection the industry was not found in operation due to rainy season and
no effluent was observed generatin g from the industry.
The industry has installed the system for utilization of spent wash generated from
the process. The spent wash generated from the process is taken into bio-gas
digester and effluent of bio-gas digester goes to RO Plant, the reject of RO is
being used with press mud for bio-composting.
Press mud and Bio-compost both was observed lying on bio-compost yard and
was covered under polythene sheet to protect it from rain.
nearby .Bio-compos t
Bio-compost yard was observed having liner, catch drain and catch pit.
Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection
01/09/2014
Name of officials
inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
Z11,2011
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
A: General Information
Name of the unit and address
Dhampur Sugar Industries Ltd.
Dhampur, Dist- Bijnor (UP)
Name of the Proprietor/ Contact Sh. Vijay Mishra
Manager (Co-ordination)
person - Designation
Contact No.
Year of Commissioning.
5.
Sector
Production details.
Products
Installed Prod. Cap.
Raw materials
Operational status
B: Water
1990
Private
Rectified Sprit, Ethyl Acetate, ENA
200 KLD
Molasses
Non-operational due to rainy season as per
direction from UPPCB
Pollution and its Control:
Water Supply Source
Ground water, 3 Tube wells
Water Consumption (KLD)
Industrial
Water Meter to show consumption
Installed
3.
Waste Water generation (KLD)
4,
Details of Effluent Management
4700 KLD (when industry was in
operation)
No effluent generation was observed, the
industry was not in operation. It is estimated
that industry will generate about 2400 KLD
effluent at full production.
Industry has installed Bio digesters for
treatment of effluent (spent wash and
other effluent) generated from distillery.
The effluent from the digester goes to
RO plant/MEE and reject of RO Plant and
MEE concentrate is used with press mud
for bio-composting.
Industry has constructed 16 Acre active
lined platform for bio composting. Bio
composting area is provided with catch
drain and catch pit.
Industry has constructed 36000 KL lined
storage lagoon of for bio composting
purpose.
Press-mud generated from its own sugar
industry is used for making bio compost.
5t
2
Industry claims to operate on Zero Liquid
Discharge however it can be verified at the
time, once industry resumes its operation.
If
at all any discharge comes from industry it
Mode of disposal of treated effluent
will go to Ikra drain which joins Karula river,
(Details)
river Karula meets to river Gagan which is a
tributary of river Ramganga.
Waste water discharged
(after treatment)(KLD)
C: Air Pollution and its Control
Sources of Air Pollution Boiler
> Type of Fuel used with Bio-gas+ rice husk
consumption
3.
> Stack details
60 m height
4.
â APCS details
Wet Scrubber
5.
Samples collections points
(if collected)
Photographs indicating locations:
Sample could not be collected due to nonoperation of unit.
51
3
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Any discharge comes from industry leads to Ikra drain which joins Karula river, river Karula
meets to river Gagan which is a tributary of river Ramganga. River Ramganga meets with
river Gana after traversin g about 200km.
Remarks
During inspection the industry was not found in operation due to rainy season and
no effluent was observed generating from the industry.
The industry has installed the system for utilization of spent wash generated from
the process. The spent wash generated goes to bio-gas digesters and outlet of
bio-gas digester goes to RO/MEE, the reject of RO and MEE concentrate is being
used for making bio-compost using press mud.
All the process units of the industry were not in operation during inspection.
Press mud and Bio-compost both was observed lying on bio-compost yard covered
under tarpaulin sheets to protect with rain.
Bio-compost yard was observed having liner, catch drain and catch pit.
Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection
02/09/2014
Name of officials
inspecting
(Name &
Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
oc.-i
52
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint ins p ection Re p ort: Distiller
A: General Information
Name of the unit and address
1.
M/s Dwarikesh Sugar Ind. Ltd.
Distillery Division, Dwarikesh Nagar,
Bundki, Dist-Bijnor
Name of the Proprietor/ Contact Sh. Salil S. Arya
CGM
person - Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. C
Raw materials
Operationa l status
7.
B: Water Pollution and its Control:
Water Supply Source
1.
Rectified Sprit, ENA
30 KLD
Molasses
Non-operatio nal due rainy season
Ground water, Tubewell
Water Consumpti on (KLD)
Industrial Water Meter to show consumption
Installed
Waste Water generation (KLD)
4.
2005
Private
ls of Effluent Management
Detai
450 . KLD (when industry was in
0 eration
No effluent generation was observed since
industry was not in operation. It is estimated
that industry will generate about 300KLD
effluent at full •roduction.
Industry has installed Bio digester for
treatment of effluent (spent wash and
other effluent) generated from distillery.
Treated effluent from Bio-gas digester is
used for bio compostin g using pressmud generated from its sugar mill.
Industry has constructed 30283 m2 lined
platform for bio composting. Bio
composting area is provided with catch
drain and catch pit.
Industry has constructed lined storage
lagoon of capacity 4500 m3 for bio
composting purpose.
se6
2
Requirement of press-mud is met
through adjacent sister sugar factory.
Industry claims to operate on Zero Discharge
Waste water discharged
however it can be verified at the time, once
(after treatment)(KLD)
industr resumes its o•eration.
If at all any discharge comes from industry it
Mode of disposal of treated effluent will go to nearby drain which will meet with
(Details)
Gagan which finally meets to river
river
Ramganga.Rive r Ramganga meets with river
Gana at Kannau'
C: Air Pollution and its Control
Sources of Air Pollution
1
Type of Fuel used
consumption
with No boiler in distillery unit, the steam is supplied
by their own adjacent sugar unit
Stack details
APCS details
Samples collections points
(if collected)
Photographs indicatin g locations:
Sample could not be collected due to non-operation
of unit.
3
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Discharge from industry will go to road side drain which leads to Gagan river which finally
meets to river Ramganga after traversing about 60km and River Ramganga meets with river
Ganga after traversing about 200km.
Remarks
During inspection the industry was not found in operation due to rainy season and
no effluent was observed generating from the industry.
The industry has installed the system for utilization of effluent generated from the
process. Industry has installed bio digester for recovery of energy from its effluent
and treated effluent from bio-digester is utilized for making bio compost along
with press-mud. Industry claims that it operates on zero liquid discharge.
Bio compost was observed lying on Bio compost yard under tarpaulin cover for
protection of rain.
Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection
02/09/2014
Name of officials inspecting
(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
55
Central Pollution Control Board
PCI-Ill Division
Dated: 09/09/2014
Sub: Inspection report of 04 industries under NGT order-Regd.
Placed below at flag 'A' is the inspection reports of the following 04 industries
conducted in accordance to the NGT order dated 06 1) August 2014M/s A.B. Mauri Yeast Ltd. Ind. Area, Sikandrabad, Distt. Bulandshahr
M/s Jagatjeet Industries Ltd. Ind. Area, Sikandrabad, Distt.
Bulandshahr
M/s Kothari Fermentation & Biochem Ltd. Ind. Area, Sikandrabad,
Distt. Bulandshahr
4. M/s Wave Industries Ltd. (Sugar Unit), Panni Nagar, Bulandshahr, UP
Submitted for kind perusal and further necessary action please.
I/c NGRBA CELL
Kamlesh Singh
Sc 'C'
loI Dr,
CerjE0
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar Mill
Date of Inspection: 01/09/2014
A: General Information
Name of the unit and address
1.
M/s Wave Industries Ltd. (Sugar Unit),
Panni Nagar, Bulandshahr, UP
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning,
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Private
,
Cane crushing capacity
3500 TCD
7,
Cane crushed last year
Molasses generation
Press Mud generation
Operational status
Closed since March,2014 due to off season
10.
B: Water Pollution and its Control:
Water Supply Source(s)
Sugar
Consent expired on 31.12.2012
No record available with Unit
No records available with Unit
CLOSED due to off season/Non crushing
season
Tubewell-2 No; No logbooks available
Industrial
Water Consumption (KLD)
Domestic
V
Available / Not available
V
Flow measuring device installed at
Not
available
/
Available
outlet of ETP
Waste Water generation (KLD) No records available
(before treatment)
> Industrial
';0 Domestic
Waste Water treatment capacity
(KLD)
Industrial
Domestic
Water Meter to show consumption
3.
1500 KLD
â
ngrba.cpcb(ugnuil.com Sugar Format modified considering NGT directions
.
2
ETP Details: ETP in Defunct state and Hot
Details of ETP
â
>
ETP Description with flow
diagram
Details of Reverse Osmosis
plant, if any
approachable due to plant grointth around
ETP.
Equalization tank-)
Primary Clarifier-)
Aeration tank (surface aerators)-* 4
Secondary clarifier-* Kali(E) ( after 01 km)
Sludge drying beds
Waste water discharged (after
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated
V
On land/ Surface water
effluent (Details)
Sample distributed into no. of No samples taken as sugar mill was closed
since March 2014
parts (2/3)
Sludge disposal mode
Sludge drying beds
Effluent collection locations
analysis results (if collected)
&
Locations
Parameters
pH
BOD
Ong/0
COD
Ong/0
Outlet
Others
(I) Information regarding Ferti-irrigation N/A
Details of treatment effluent
NA
before Ferti-irrigation
Command area for irrigation
NA
(available land area)
System for dilution of treated
NA
effluent required for ferti-irrigation
System of transportation of
NA
treated effluent upto field.
Formal agreements with farmers
NA
for using treated effluent
Storage facility available for
NA
treated effluent during low
demand period
7.
Quality of effluent being used for
NA
ferti-irrigation
.
8,
(Available /Not available)
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
Two Boiler of 32 TPH each; P-32Kg
Cogeneration plant of 2x2.5 MW
â Type
of Fuel used with Bagasse as fuel
consumption
â
Stack details
â
APCS details
Cyclone dust collector
ngrba.cpcb(i;gmail.corn Sugar Format modified considering NGT directions
TSS
Ong/0
3
Boilers were non-operational due to off
Samples collections points
season therefore, nor stack monitoring done.
(if collected)
Photo
• ra ' hs indicatin • locations: ETP was not a ..roachable
,- ,,,, ,
5,
..,.
.,.—
.
*
-
4 1
•,
.
Pic 1: Oil&Grease screen-Filled with sludge
,,,,..
Pic 2: Equalization tank-Filled with sludge
:•itn, ':' .
t.•
-
.
.,
,
1
Pic:3 Aeration tank- Empty
Picture shows residential area around the
alant
Pic 4: Secondary clarifier-Defunct state and
with plants grown around the ETP
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Treated effluent is discharge into the local nallah which meets River Kali (E) after 01 KM.
Treated effluent---Local Drain----Kali(E)----> Ganga
ha c
mail.coin Sugar Format modified considering NGT directions
4
1
Name of officials
inspecting
,
2
of
Date
Submission
Signature
Name & Designations
Sh. Kamlesh Singh,
Scientist 'C', CPCB
Sh. A.K. Chaudhary,
RO, UPPCB
Sh. J.B Singh,
AEE, UPPCB
Miss. Shradha Lonarkar,
Research Associate, NGRBA
report 01/09/2014
ngrba.cpcb(4nutil.com Sugar Format modified considering NGT directions
of
i
t5T\
ir.,
hio..
., .. v
G
a v.
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Yeast
Date of Inspection: 01/09/2014
A: General Information
Name of the unit and address
M/s Kothari Fermentation & Biochem
Ltd. Ind. Area, Sikandrabad, Distt.
Bulandshahr
3,
6,
7.
Name of the Proprietor/ Contact Mr. Pramod Kothari,
person - Designation
••
Contact No.
Year of Commissioning.
1993
Sector
Private
Production details.
Products
Yeast
40 TPD
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw
materials
&
their Molasses from Sugar mills
requirement
Operational status
Operating at 33 TPD
•
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
Borewell -3 Logbooks were Maintained
Industrial
300
Domestic
Water
Meter
consumption
to
show Available
Total
fresh
water
consumption=5639
m 3/month(Aug'14); (@29.52 TPD production)
- 6.36 m 3/Ton of production
Flow measuring device installed NA; Unit informed to be on Zero Liquid
at outlet of ETP
Discharge (ZLD)
Waste Water generation (KLD)
(before treatment)
Industrial
280 KLD
> Domestic
â
ngrba.cpcWgmail.corn Distillery Format modified considering NGT directions
r.
5,
Waste Water treatment capacity
(KLD)
'i, Industrial
Domestic
ETP:
Details of ETP
â ETP Description with flow Effluent-*Tube settler---Sand
Filter-) Ultra
Filtration- Nano Filtration4 R.O. Filtration-)
diagram
Polishing R.O.--> Gardening & cooling towers
â Details of Reverse Osmosis
plant, ,-if any
RO Reject -) MEE Feed Tank -) MEE -) MEE
â Details
of Multi
Effect Concentrate + Mustard Husk--Agro Fuel Mixer
Evaporator (MEE), if any
—> Agro fuel based Boiler
â
Sand Filter, Ulta Filter, Reverse Osmosis, MEE
was found operational.
Bio-digester was non-operational.
MEE Detail: Capacity=300 KLD
g.
11.
Industry has installed five effect forced
circulation evaporator of capacity 300 KLD feed.
Evaporation takes place in five stages in
calandria having tubes where spent wash (RO
Reject) is heated through steam under vacuum.
MEE Feed rate during inspection:
193 litr/min
MEE condensate rate:
162.5 litr/min
Waste water discharged (after ZLD
treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated On land/ Surface water
effluent (Details)
RO Permeate- Used in Gardening & cooling
tower
RO Reject- Mixed with mustard husk and burnt
in boiler
Sample distributed into no. of 2
parts (2/3)
The unit had 14 sludge drying beds filled with
Sludge disOosal mode
molasses sludge (obtain after decanting the raw
molasses) but they did not have any proper
system for its disposal. It was informed that the
sludge was dried and disposed off on land fill
sites but no proper arrangement was seen for
the same.
About 90 0/0 of the sludge drying beds
were filled with molasses sludge.
Effluent collection locations & Locations
Parameters
ngrba.cpcb(c-egmail.corn Distillery Format modified considering NGT directions
3
BOD
(mg/I)
pH
analysis results (if collected)
Outlet
Others
(I) Information regarding Bio-composting - No Bio-composting
Active area for bio compost
1.
preparation (m2)
Area for press mud storage NA
(m2)
• •
Area for bio compost storage NA
(m2)
Spent wash storage capacity
NA
Availability of pressmud
NA
Quantity of compost prepared
NA
(Monthly statement of last year)
Quantity of pressmen procured
NA
(Monthly statement)
.
Details of wind roses (Number, NA
length,
height,
width
of
stacking, space between two
wind rose)
.
Quantity of Effluent being used NA
for composting ( m3/day)
Quantity of press mud being NA
used for one cycle
Maturity time in days for one NA
cycle
Arrangement for rainy season
NA
Quality of ground water in the
area and depth of ground water
table
(II) Information regarding Ferti-irrigation- no fertiirrigation
n,grba.cpc1Wgmail.com Distillery Format modified considering NGT directions
COD
(mg/I
)
TSS
(mg/I)
3
4
Details of treatment of spent
wash (details of bio
methanisation, primary and
secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
3.
effluent required for fertiirrigation
System of transportation of
4,
treated effluent upto field.
Formal agreements with
farmers for using treated
effluent
Storage facility available for
treated effluent during low
demand period
7,
Quality of effluent being used
for ferti-irrigation
8.
Ground water monitoring
network
C: Air Pollution and its Control
Sources of Air Pollution
â Type of Fuel used with
consumption
Stack details
NA
NA
NA
NA
NA
Not available
Boilers
Three boilers
lx10 TPH (MEE Reject + mustard husk) and
2x02 TPH (furnace oil)
10 TPH was operational
35 mt height
4.
â APCS details
Multi-cyclone
5.
Samples collections points
(if collected)
Boiler of 10 TPH was operational.
Photographs indicating locations:
ngrba.cpcb(ii)gmail.com Distillery Format modified considering NGT directions
5
Sand filter and Tube settlerPic 1:
O•erational
Pic 3: Sludge drying beds-90 % filled
Pic 4: Mustard husk used for mixing MEE
concentrated reject lying in the open field
ngrba.cpcb(dgmail.00 171 Distillery Format modified considering NGT directions.
6
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
UPSIDC drain River Kali---River Yamuna
The Unit claims to be on Zero Liquid Discharge however the significant amount of
molasses sludge was found stored and needs to be disposed off in a scientific
manner.
The Unit mixes the MEE concentrate with mustard husk (40:60 ratio) and after
sun drying, uses it in boiler (10 TPH) as fuel. MEE Condensate is treated with RO
and RO permeate is stored in polishing tank from where it is re-used for boiler.
No discharge was found
1
Name of officials
inspecting
Name & Designations
Sh. Kamlesh Singh,
Scientist 'C', CPCB
Sh. A.K. Chaudhary,
RO, UPPCB
Sh. J.B Singh,
AEE, UPPCB
Miss. Shradha Lonarkar,
Research Associate, NGRBA
2
Date of report 01/09/2014
Submission
ngrba.cocb66gmail.corn Distillery Format modified considering NGT directions
Signature
416
-4-4
11a or,
X-J-)113
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: DISTILLERY
Date of Inspection: 01/09/2014
A: General Information
Name of the unit and address
M/s Jagatjeet Industries Ltd. Ind.
Area, Sikandrabad, Distt. Bulandshahr
3,
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
1997
Sector
Private
Production details.
Unit closed since 04 years
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement Molasses
Operational status
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
Unit is closed since 04 Years and verified
by UPPCB officials.
Only security guards were present.
No Datas available
Industrial
NO Datas
Domestic
Water Meter to show consumption
5.
Available / Not available
Flow measuring device installed at Available / Not available
outlet of ETP
Waste Water generation (KLD) NO Data
(before treatment)
â Industrial
â Domestic
Waste Water treatment capacity
(KLD)
> Industrial
â Domestic
ngrba.cpcb(iisigniail.coni Distillery Format modified considering NGT directions
2
6.
ETP in Defunct state
Details of ETP
flow
with
ETP comprises of equalization tank-- ETP Description
clarifier----aeration
diagram
primary
Osmosis
Reverse
Details of
tank----secondary
tank/collection
plant, if any
clarifier
Effect
Multi
of
.)e Details
Evaporator, if any
Waste water discharged (after NO DATA
treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated effluent On land/ Surface water
(Details)
â
â
7,
Sample distributed into no. of None
parts (2/3)
Not availbie
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
Parameters
Locations
BOD
Ong/0
pH
Outlet
Others
(I) Information regarding Bio-composting
Active area for
preparation (m2)
3,
4.
5,
bio
compost
Area for press mud storage (m2)
Area for bio compost storage (m2)
Spent wash storage capacity
Availability of pressmud
Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured
(Monthly statement)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used for
composting ( rn 3Jday) :
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle
Arrangement for rainy season
Quality of ground water in the area
and depth of ground water table
(II) Information regarding Ferti-irrigation
ngrba.cpcWgmail.com Distillery Format modified considering NGT directions
•
COD
Ong/0
TSS
(mg/0
'
3
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
.
(availabl&land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
5.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network (Available /Not available)
C: A • r Pollution and its Control
Sources of Air Pollution
1.
Boiler
> Type of Fuel used with NO DATA
consumption
â
5.
•
Stack details
)=. APCS details
NO DATA
Samples collections points
(if collected)
PM (mg/Nm :
Photographs indicating locations:
ft, I
1A.
, .1- 14 L;it'i0
J
'3(.".'ic,
IG*'..,,:t.. ,
, 1. . IL...
OW
tit,f.
r...
.4 .
it
Ilk-
' ili4
Pic 1: Entry of unit
Pic 2:
ETP-Non-operational
ngrba.cpcb(ii)gmail.com Distillery Format modified considering NGT directions
..
4
Pic 3: ETP-Non operational
Pic 4: Industry campus
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
UPSIDC Drain----Karval River---Yamuna
1
Name & Designations
Name of officials
inspecting
Sh. Kamlesh Singh,
Scientist 'C', CPCB
Sh. A.K. Chaudhary,
RO, UPPCB
Sh. J.B Singh,
AEE, UPPCB
Miss
Shradha
Lonarkar,
Research Associate, NGRBA
2
Date
of
Submission
report
ngrba.cpcb(Mgmail.coni Distillery Format modified considering NGT directions
Signature
(,,,,
07
40MA
A...
I vtliobn-1-
4-1110ire
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Yeast
Date of Inspection: 01/09/2014
A: General Information
Name of the unit and address
3,
M/s A.B. Mauri Yeast Ltd. Ind. Area,
Sikandrabad, Distt. Bulandshahr
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
Operational status
B: Water Pollution and its Control:
Water Supply Source
Private
Closed since March,2014
Bakers Yeast
Consent rejected by UPPCB
Molasses-1150-1200 tons/month
from Anamika or Wave sugar)
Non-operational
UPPCB has rejected the consent under
Water and Air Acts vide letter dated
17.04.2014
Borewell-2 No.
Industrial
Water Consumption (KLD)
221.4 KLD(12
production)
Domestic
V
Available / Not available
Flow measuring device installed at Available / Not available
outlet of ETP
Waste Water generation (KLD)
500 KLD at full capacity
(before treatment)
Industrial
)%. Domestic
Waste Water treatment capacity
(KLD)
â Industrial
â Domestic
Water Meter to show consumption
3.
4,
â
5.
tigrf (bought
Distillery Format modified considering NGT directions
m 3/ton
of
-11
2
Details of ETP
Description
> ETP
diagram
>
â
with
flow
Equalization tank-) Digester 4 RO --- RO
Reject mixed with Rice husk within the plant
and sold to outside agencies for final disposal
of RO Reject.
Details of Reverse Osmosis
Inadequate ETP
plant, if any
Effect
Multi
of
Details
No MEE installed
Evaporator (MEE), if any
to
Waste water discharged (after No treatment technology installed
treat the RO Reject within the plant
treatment)(KLD)
)>. Industrial
Domestic
Mode of disposal of treated effluent The effluent was being treated in the Digester
and RO but after the Reverse osmosis the
(Details)
Unit doesn't have any treatment technology
for the treatment of RO Reject within the
plant.
However, Unit informed that the RO
Reject is mixed with Rice husk and dried
and finally given to the agency outside
which burns the dried mixer in their
boilers.
Unit did not provided the list of agency
which uses their mixed fuel (Reject +Rice
husk) as fuel in boilers.
Sample distributed into no. of None
parts (2/3)
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
Parameters
Locations
pH
Outlet
Others
(I) Information regarding Bio-composting N/A
Active area for bio compost
1.
preparation (m2)
2,
Area for press mud storage (m 2 )
NA
1
Area for bio compost storage (m 2 )
NA
Spent wash storage capacity
NA
Availability of pressmud
NA
Quantity of compost prepared
NA
6.
ngrba.cpcb(kmail.com Distillery Format modified considering NGT directions
• •
BOD
Ong/0
COD
Ong/0
TSS
Ong/0
3
(Monthly statement of last year)
7.
Quantity of pressmen procured NA
(Monthly statement)
.
Details of wind roses (Number, NA
length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used for NA
composting ( m3/day)
Quantity of press mud being used
NA
•
for one cycle
13.
Maturity time in days for one cycle
NA
Arrangement for rainy season
NA
Quality of ground water in the area
and depth of ground water table
(II)_ Information regarding Ferti-irrigation N/A
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
of Fuel used with
â Type
consumption
3.
â
NA
NA
NA
NA
NA
NA
.
(Available /Not available)
Stack details
ngrba.cpcb(ci)gmail.com Distillery Format modified considering NGT directions
1a
4
APCS details
Samples collections points
(if collected)
â
No-operational therefore no stack monitoring
done
Photographs indicating locations:
•i
Pic 2: Reverse Osmosis-Non-operational
Pic 1: Equalization tank- effluent present
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Kali (E)----Ganga
1
Name of officials
inspecting
Name & Designations
Sh. Kamlesh Singh,
Scientist 'C', CPCB
Sh. A.K. Chaudhary,
RO, UPPCB
Sh. J,B Singh,
..
AEE, UPPCB
Miss. Shradha Lonarkar,
Research Associate, NGRBA
2
Date
of
Submission
report
ngrba.cpcWgmail.coni Distillery Format modified considering NGT directions
Signature
l-H,M\‘'
I r.,ago.
CPI_P?- n104 t-I,H1
to
j
_
/LTA_ IriebAAtyl 1- 41 I'5b
ettv,ativu del
b ,rottA- No - F,Mo 6 25. 08
-
2-01
*-114-
c,r1
A t_e t,
9
_
IAA.u.A)P-kA
ad
)2"-.,,r, 3 :si09 1, 2.: C
A 1)P
.A.4Pc-i) 0' 20 I41
are
A-
Art;t4 11?4.1
ra,,,,-44. GLMC v dm mo
w'r
9 /y‘,61,0); A
p
.a,„,.
g
"
4VIA-O et.e-4-7--i' 16 41-.
1
,t6, ,
C 6,r u t grwt,131„,u,
Civlocti",r)
ti
Y1:)s l'Ut it,
L4
-1°4‘1.
L4-1 w .
yizu
yi
AAAA4A-
GI
oVc No-K.et/
4
016'3/W104V
Cp).A.1,...„)
ticdr
(Pa.);--ttitipv
!lilt
kf-ct
tA34)
1,00t1
P P
th-c AAA;rai:
y
1/C IJG
R13) CMG
.,,t 30,-Al t1
,_ervu Pf 04,u
ca."-Pwv job-0.4
ftAk Tm-1
tAt "hove_ LAA,Zt
For Sugar Unit
dole - 0
A: General Information
Name of the unit and address
,zp
Modi Industries ltd (Sugar Section)
Modinagar 201204
•
5.
6.
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Sector
Production details.
,
Products
Installed Prod. Cap
Operating capacity
M.C. Tyagi Mgr (Personnel Manager)
Cane crushing capacity
5000 TCD
1980
Private
Sugar
6834035.29 Qtls.
Cane crushed last year
/)-1, l)-Q' olOis - 111S 1 1 4 "(;244".
347808.35 Qtls.
Molasses generation
Press Mud generation
270270.00 Qtls.
Operational status
1. Operating - NA
A. 2!Non operational due Off Season 0 ► 'S 1
Closed by direction - NA CA5po- R.
Closed by own -NA
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
3.
.
1. Bore Well - 14- 0 h P
Industrial
6200 KLD
Domestic
50 KLD
2 14
97)) ta H E i
show Available
to
Meter
Water
consumption
V , nu to, ,
Flow measuring device installed Available —
at outlet of ETP
-,1 co K L b
'
Waste Water generation (KLD) --'---3-0-'i)
(before treatment)
Industrial
40 1c l_ D (Ii 0 k L b)
> Domestic
ngrbacpcb®gmail.coin Sugar Format modified considering NGT directions
8(0
46
2
Waste Water treatment capacity 1000KL/D
(KLD)
â Industrial
(3
.4D.nraestit
Details of ETP
ETP Description
diagram
â
ErsilWed
flow u., 4e,314 Elitto-.-0-3.--) Cr: -/ 6 .
with
re-4-A '-"-,- -4r'\ -')
. .4, 1,.dio
e46 7
â Details of Reverse Osmosis
plpnt, if any
â Details
of
Multi
Effect
Evaporator, if any
._......
1
N '
-—
C
5..ri l't‘-' 41 N---. e4
'v.1.1... . 1.4 /3 4A..19*....4-1_ L
Waste water discharged (after ZeFe-elfstharge
Fxrk,...),0,„ _ex ,,
e,y
treatment)(KLD)
ci-u4.-ct, ,-.1,Z, 0,,,,,,i, k
â Industrial
d
Domestic
Mode of disposal of treated
.-Ceoilliaziete.,-.
,
-
effluent (Details)
1,vazt ,Sc.,,,w,w,t , G CLici.,
4 e - ,
- r
4 4-icte 01-4*il
Sample distributed into no. of
—
—1).A.,,,,,
parts (2/3)
Sludge disposal mode
Used for levcianti=f=i+ling —G;(e/),)
11.
Effluent collection locations
analysis results (if collected)
..A.A.,: rk, ),,, 3,, ..),..4..4 '
►--V.4.4 e),--:y t.',..
& Locations
Parameters
pH
Outlet
_2,50
BOD
(mg/I)
74
COD
(mg/I)
1 qa.
TSS
(mg/I)
38
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent
NA
before Ferti-irrigation
Command area for irrigation
NA
(available land area)
System for dilution of treated
NA
effluent required for fertiirrigation
System of transportation of
NA
treated effluent upto field.
Formal agreements with farmers
NA
for using treated effluent
Storage facility available for
NA
treated effluent during low
demand period
1,grbu cpsky.swailcom Sugar Format modUied considering NGT directions
A
'',.
•
•
r
*„.4,..44,(tn
-1-64-45X
3
Quality of effluent being used for NA
ferti-irrigation
Ground water monitoring network Available
C: Air Pollution and its Control Sources of Air Pollution
used
> Type of Fuel
consumption
5.
In)
Boiler — a)
with Bagasse
3 oT P H
2 (7,06=v
"T ,PH )
â
Stack details
60M
>
APCS details
1. Venturi wet scrubber —
Samples collections points
(if collected)
ekulngiNg4244.4.29
f,,i 40..„-t,
N cmAm, CAOY.d>e
gi
l—
AE--)uP0c-G.
sg)e)ki
ngrhugclYiLgmail.com Sugar Formal modified considering NGT directions
For Sugar Unit
A: General Information
Name of the unit and address
5.
6.
10.
Name+of the Proprietor/ Contact Shri Parmender Singh(GM)
person - Designation
0122-2953458
Contact No.
Otr P . S. cika,.).,,, - 9 G 3? Mil
Year of Commissioning.
2006
Sector
Public
Production details.
Crystal Sugar
Products
3000TCD
Installed Prod. Cap
3000TCD
Operating capacity
Cane crushing capacity
3000TCD
Cane crushed last year
5391549.60Qt1s.
Molasses generation
240085.00Qt1s.
Press Mud generation
4.5% on cane
Water Consumption (KLD)
1. Closed due to off season(cane)
30 11'AA I>>4
14,-3 i>“_ R-r ei (c_ j
1. Tube well — L E
Industrial
3000m3
Domestic
14m3
Water
Meter
to
show Available
consumption
Flow measuring device installed Available
at outlet of ETP
Waste Water generation (KLD) 300KL/D
(before treatment)
,
> Industrial
> Domestic
'2°./. C
...
,
.
....,
1.1)A"•-i.
0•-')
Li
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Simbhaoli Sugars Ltd
Unit-Brijnathpur Hapur-Bulandsheer Road
Brijnathpur
Hapur-245101
►1-%-4
itk 4c,.., , S,--K11.,1-/
LA,N-4
ctex;,-)4‘0,-- air Svrt
A'j-nrt.n 04Ch,
ngrha.cpcbr !'. mailcom Sugar Format modified considering NGT directions
Ia
2
Enclosed
Details of ETP
v ETP Description with flow _;),,2„:1 t,...--4. --1 t.,-,
diagra m
V Details of Reverse Osmosis
plant, if any
Multi
Effect
V Details
of
Evaporator, if any
-
(.i 1 , <-,'d pi,
1.;,
---
c.0,- .--4-
-
fi,")
Waste mater discharged (after
,
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
.._.
`r"
06.,) e,.?'
- in.,-,1 acka-4 te-1-( LI o D - t-f J-0 1.-3i Ai
Lt,--c
—tot`-it- ()-trr
P)rt,tAse); cri,, ..14
JAIL-L.4x 1,', ko-dLateLLI
NIL
66-0a...;..,) X
NIL
On land/ Surface water :- Zero discharge
Bio-composting
Sample distributed into no. of
parts (2/3)
N.A
Sludge disposal mode
"13i 0 Cerl+P-4 .- PC4-4Ley,, aAjit : A
a-,_,--
[ 11.
Effluent collection locations
analysis result's (if collected)
& Locations
Parameters
pH
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
Outlet
NIA
Others
ti) Information regarding Bio-composting
Active
area
for
bio
compost 1i,57 acre
preparation (m2)
Area for press mud storage ( m 2 )
3.0acre
Area for bio compost storage (m 2 )
Equivalent to 33% of total production of
finished product/annum (approx 10.0acre)
1.
Spent wash storage capacity
20,000+16000=36,000KL I
5.
Availability of pressmud
232000Qtls
6
Quantity of compost prepared
-Enclosed
(Monthly statement of last year)
7.
Quantity of pressmud procured -Enclosed
(Monthly statement)
e.
Details of wind roses (Number, Number-30nos,space
between
two
wind
length, height, width of stacking, rose:-1.0M
Length-200M
space between two wind rose)
Height-1.25M
,icrhuscpcfragnail.coin Distillery Format modified considering NGT directions
x
L
E T P cfre "e'eAlt 0-47
Sa
3
Width-3.0M
Quantity of Effluent being used for 3-99l< LPD
0
-.2
composting ( m 3 /day) :
Quantity of press mud being used 50000Qtls
for one cycle
Maturity time in days for one cycle
13.
.
60day
Arrangement for rainy season
Spent wash stored in lagoon
Quality of ground water in the area
NA
and depth of ground water table
N z 0A-cc–I
.1 ,s-
,.J
(II) Information regarding Ferti-irrigation
:.
..
,' 7.
Details of treatment of spent wash
(ctetails of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
..,.
' V..1 Kr Pollution and its Control
Sources of Air Pollution
1,
of Fuel used
> Type
13
consumption
NA
NA
NA
NA
NA
NA
Available
.1, 'g-1-01, P N
Boiler r — ‘
Bazasse+Bio
gas(iiittishaWY0)/y_Y
with
a.-T- pi) ,
t:),.,..._Ism-,) 1,,s3i4^ cLt
45M
> Stack details
I^ .
NA
Dust collector – e.),.,
APCS details
ell
-1-1,--,...
.
Lei cArr-t )
.
es
Samples collections points
if collected
; !-...
[
)64-1i
,.... ......
felt
17
j bo.cpc1)Agnail.com Distillery Format modified considering NGT directions St.4....:11,4
rjA
4 ta-An-.,r,,,...dt 0,44.
C.
.4=CfaX=VIP•.•19014/9"Ch.
p
fr,,Y"
Oh
9c
).-e-e-oty 2- =.- )14,-=C04.-,t
gt
For Sugar Unit
A: General Information
Name of the unit and address
5.
6.
Simbhaoli Sugars Limited
(Unit:SimbhaoliSugar)
P.O. Simbhaoli Distt. Hapur (U.P.)
PIN-245207
Name of the Proprietor/ Contact Mr. Karan Singh (Chief General Manager)
person - Designation
Contact No.
(05731) 223117-18/223039 , vi4r, 111‘1--, ' C'ecid
ac,e4t
Year of Commissioning.
I g '3 3
Sector
Limited co. in Private Sector
Production details.
Products
White Crystal Sugar
Installed Prod. Cap
10000TCD
Operating capacity
10000TCD
Cane crushing capacity
10000 TCD
Cane crushed last year
11126088.12 Qtls. (season 2013-2014)
Molasses generation
475280
Press Mud generation
4.68% on sugarcane crushed (season 20132014)
Operational status
Qtls. (season 2013-2014)
Closed by own due to Off-Season
026' (-f" ; oi`'
Ae) 1244 , A 7 e C c)
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
Water
show
Meter
to
consumption
Flow measuring device installed
at outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
(kLif le-f)14.,)9„1
11-4 Ckt
evi
Ste
Tube wells — n4
Industrial
10000 K.L./day Maximum
Dortiestic
300 K.L./day MAX.
Available
Available
1000K.L./Day Maximum
70 K.L./Day C _Ce_pAk‘c.,-1--,--k
.2)1.0
ngrba.cpcb@gmaitcorn Sugar Format modified considering NGT directions
_
e,-,-,_k IA+
11-0
2
Waste Water treatment capacity
(KLD)
1,1 cb 0 . n <-, L I) ,
â Industrial
> Domestic
-Details of ETP
Bar screen ► oil& grease traps -. Eq. Tank .---)
> ETP
Description with flow --• Primary clarifier* Aeration chambeF- ► -s''''
diagram
Secondary clarifier ► carbon& sand filter+V__notch. Sludge drying beds for drying primary and
secondary clarifier's sludge.
0,,,,,L,Lu,_ ct,,,:,_ _
activated Sludge process with Extended Aeration
followed by Carbon & Sand filter has been
installed for the treatment of industrial effluent.
Details of Reverse Osmosis N.A.
plant, if any
> Details
of
Multi
Effect N.A,
Evaporator, if any
Waste water discharged (after
treatment)(KLD)
> Industrial
1000 K.L/Day Maximum for irrigation
purpose during
days.
_
1_ season
.
Domestic (5.04404)-
-.,'`---1 70 K.L. /D -.---5 I k)..
c:1-0-4...=
Mode of disposal oftreat%r On landiCh-v-Y-01-0-/ XI op.L.-(- 141 d, .d
effluent (Details)
Storage Lagoons for use in irrigation purpose in
the adjoining areas
Sample distributed into no. of
—T
•
—1/4-parts (2/3)
Sludge disposal mode
The sludge obtained from E.T.P. is dried on Sludge
drying beds ancl-used-as4arteifri+ or as filler material
mixed with press mud for Bio-composting
processing in the Distillery.
Effluent collection locations & Locations
Parameters
pH
BOD
COD
TSS
analysis results (if co
>
11.
54,11
Co c.I.v..,4.1-1, u.,:i .4.4.,...4
ALars....4
pl-,/,e i-,4,;,- ,
0,1144,4:.
.
.4.044, •,,..r4,..,- mq.,,;1>LA
_, adj.A.Le_or .1114
.t„, 44
,
44,4.:-., .4....L.14 Li .10.4,4., A.t.n....0-4;
(mg/I) (mg/I) (mg/I)
__,7-4--1-6--5G----e
outlet
n,
Cc Pc 6 (4)
Niels
I. )
(54 •C G -
6'?
kil.
6 5
13.c
07
7 6 ii ki 4,
(I) Information regarding Ferti-irrigation
Details of treatment effluent
Activated Sludge process with Extended Aeration
before Ferti-irrigation
followed by Carbon
&
Sand filter has been
installed for the treatment of industrial effluent.
Command area for irrigation
150
hectare
(available land area)
3.
System for dilution of treated
N.A.
effluent required for fertiirrigation
•
f∎
k,44-
jiLL d,„.
[email protected] Sugar Format modified considering NGT directions
3
Treated effluent is disposed in to storage
04.441 ,h-7
lagoons out side of factory premises. It is
r...
either pumped or drawn through opening in
System of transportation of
treated effluent upto field.
the lagoon wall to neighboring field of
farmers.
Formal agreements with farmers
Yes
for using treated effluent
Storage facility available for
Brick lined lagoons with capacity of 15000
treated effluent during low
cubic meters. Storage capacity for 15 days.
demand period
8.
Ph 7.6,T.S.S. 20 mg/I, T.D.S. 780 mg/I,
Quality of effluent being used for
ferti-irrigation
C.O.D. 50 mg/I, B.O.D. 16mg/I. --) iti),4.1<
Ground water monitoring network
(Available /Not available) by-A
C: A r Pollution and its Control
Sources of Air Pollution
â Type
of Fuel used
consumption
>
,-e-i-rx.,\--6
Det14,./ -6.6
4,4--k)N ►
BOILERS — '3 , Li p -4- 7 r l p T i() 14
with Bagasse 1925 M.T./Day
Height 52 meters (J: 0 + 7-'3-)
Stack details
1. ESP & Multi-Cyclone
> APCS details
'-' 0 ---) rl
type dust collector is
.--4-1-4- io)
("/
installed with our boilers.
S.
R.ItIcalgi-N-Fni)-:--1-34-rrrg/N-M3 43—
Samples collections points
(if collected)
N 16
No
y.
nAcT-fr-71
S
A Esu
SJ-414,112R—i cn, —
e 03.,
a el'd„Lip
c ‘ ► (l
ngrba.cpcb(gmail.com Sugar Format modified considering NGT directions
et
For Distillery Unit
i 5h4)-i-cie3148.4 - 01 • 0 ci .20)k-4
A: General Information
Name of the unit and address
MODI DISTILLERY ( Modi ind. Ltd.)
MODINAGAR.
Distt : Ghaziabad.
Pin : 201204
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
7.
Modi Industries Ltd.
Mukesh Sharma—General Manager (Plant)
9219440607 / o 9.2)9 6S" 'F"9-- 0 h
September 1959
Public Ltd.
Rectified Spirit
4842 KL Per Annum
4842 KL Per Annum
olasses-2100 MT Per nor
. ....„., , 46.4-J 6.-WG cakp,) (
— A.Alz,
Pe R
Operational status
-
8kL
h(L ,
lc' 06*e-*.b
"(m'
N n opera ional due to rainy season (D ,11;11,
sate
B:
o'
Water Pollution and its Control:
Water Supply Source
2
Rare Ck) e tt
I' C)
1 1CM
4 o h p
'pre .),2cD14
a P'
9'b,WIlled
Water Consumption (KLD)
5.
Industrial
9000 Ltrs per hour
Domestic
8000 Ltrs per day
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
Industrial
> Domestic
,
Avail-a-ble-at-ETR--1, '—
Co'nce)lica
ac
2
i-
birj,
L b
Q e c
Spen -}
book
6,,,c01)
rIcoOct.t )'‘ 04
le y\ e/odio.,.
- FQot,,i `01-eK "
het 344Lit, - 1-0,44. 04 ;:.Cr,
200 KL PER DAY Capp'bk L i))
8 KL PER DAY
225 KL Per day -3
i
2 11 i< 1.--
iptLIDelj
y et f
nw. bctcyclqgrnail.com Distillery Format modified considering NGT directions
ci), - ' 01V
1 04
k L i Da(7
—
9 Y0 0
— Si2 P1(
.
et v
2
Waste Water treatment capacity 500 KLD
(KLD)
> Industrial
> Domestic
Activated
Details of ETP
attached.
flow
> ETP Description with
diagram
Waste water discharged (after
treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated
effluent (Details)
flow
/I °I
seiat— N 0
I
a
Effect
> Details
process
sheet
r31‘06±44-
> Details of Reverse Osmosis
plant, if any
Multi
of
Evaporator, if any
sludge
kl.
elo-eJ CLi.
Added two Venturi Scrubber tanks a
balance as make up water in spray pond
cc) ut,-*,
tAke,st4 vu,-4.1.44
/
P;"nct_.)
.
icirsEstgeo c+fraa
0 arn
,(. 0t j r 4 (,-9 1
vqoy p )13. ka Qi cLA )1._)
0
- ka_,P_A 'y l o-e i --- 64 v`il
of
no.
into
Sample distributed
parts (2/3)
Mixed in filter cake at bio-compost plant
Sludge disposal mode
11.
Effluent collection locations
analysis results (if collected)
& Locations
(Analysis report enclosed)
N 0 64,--frti Giloote--4(2A-:-- LA.
Outlet
i
ag--m-A4-4 ••n/‘-‘ft.1".-v-A'41Aerft._..... ....w.......,.
(I) Information re Warding
Others
Ferti-irrigation - NA
Details of treatment effluent
before Ferti-irrigation
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for fertiirrigation
System of transportation of
treated effluent upto field.
5.
Formal agreements with farmers
for using treated effluent
6,
Storage facility available for
treated effluent during low
demand period
Parameters
pH
..
ngrba.cpcb@gmail,com Sugar Format modified considering NGT directions
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
3
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network (Ayailalf.,-/Nat-a ai able)
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used
consumption
> Stack details
> APCS details
with Bagasse
45 TP1.1
Stack no. 1- dia 2.3 mtr x 30.5 mtr height
Stack no. 2 - dia 3.33 mtr x 40.0 mtr ht.
Venturi type wet scrubber for a cap. Of
35 tons for each (3 nos.) boiler separately.
Venturi type wet scrubber for a cap. Of
25 tons for boiler no 4 Which is not in
operation.
5.
Samples collections points
(if collected)
PM (mg/Nm3):
Stack 1. 135 mg/Nm3/day
Stack 2. 129 mg/Nm3/day
51" ipt 0,4
CL.
CSAci,,A)-4,I 3Ai Sc. D
A CE,uP Pc6) a a 3504,-c4
14H (14,),,tte-4
.2 on.,
nkrba.cpcb(a,gmail.corn Sugar Format modified considering A IGT directions
cPc
4
1
For Distillery Unit
A: General Information
Name of the unit and address
Simbhaoli Sugars Ltd
Unit-Brijnathpur, Hapur-Bulandsheer Road
Brijnathpur
Hapur-245101
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Shri Parmender Singh(GM)
0122-2953458
Mr. P . , ci,",, 1,.__:_a11,t
2007
Public
ENA,RS,Ethanol C Gxx. 1.4, 1\4 4 (--1-,-- A i oi-Tut '
,.lt 1
Kci-fici4..0_,
60KL/D
30KL/D
30KL/D
6.
Sector
Production details.
Products
Installed. Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
7.
Operational status
1. Non operational due to rainy season
Sr i i 7 .1 k --sj.7 , ,.1„1 1 ( A4 t>(.11.11,11.01, tt,Citic
C c x ).-- a,.--4 te)-A4A-. o-tfois,,, , 9-C, I -! /
5.
Molasses 368182Qtls/Annum
,1363Qtls/day
( a t, - N
If
E: Water Pollution and its Control:
Water Supply Source
1.
Water Consumption (KLD)
Tube well —
I-4 - 1 0
300M3
Industrial
14M3
Domestic
z.
Water Meter to show consumption
Available
3,
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
â Domestic
Waste Water treatment capacity
Available -
(KLD)
â Industrial
> Domestic
•3,.$42,/c( C_koc3)
20‘,,,
i....-.,
i K 1. - i p I'- l_ kt.-0-1.11
300M3
14M3
c0-.-4-"4:- 720m3/day (Bio methanization)
:- Bio-composting
:- N.A f
).t.i./ gAiJ,i 'c 4-6--0()
L.
ngrbet.c.pulYti2gmail.com Distillery Format modified considering NGT directions
J
f
2
6.
dux,.
Details of ETP
> ETP Description
diagram
pe.,J .,u,--14, ---)
with
flow
ENCLOSED
Gioes+,4- <— Le,-
4.1t......,;,.
> Details of Reverse Osmosis Cap. 300 KL PER DAY plant, if any
> Details
of
Multi
Effect NA
Evaporator, if any
11.
it;tiorr—o—ifingtO
., — cliaer
si e'A
e
ov--,-,-.
t.-.;:.:;4....--
,c,--------- --
..
Waste water discharged (after
treatment)(KLD)
Zero Discharge
> Industrial
Domestic
671Esnoa),4:t.t1741___L___
Mode of disposal of treated effluent
—"„C-(Details)
Zero Discharge v,(4, Cw.417),()).0, ( w, 1 ,0v4 h'
—1_5 , 72 ac re.
Sample distributed into no. of
NJA
parts (2/3)
Sludge disposal mode
After drying beds sent to Bio Compost
. .,(2c,ap-, 1 D_I-Q)P Y
Effluent collection locations
& Locations
Parameters
analysis results (if collected)
pH
BOD
COD
TSS
.v..\,
(mg/I)
.
(mg/I)
(mg/I)
J Lt-
d
utlet
Others
(I) Information regarding Bio-composting
Active area for bio compost
preparation
23147.839
( m 2)
LA
...,
5.7
2 a--,r rk
Area for press mud storage (m 2)
4050 square meter
Area for bio compost storage ( m 2)
1620
Spent wash storage capacity
6820 KL
Availability of pressmud
30000 MT From Sugar
Quantity of compost prepared
1380 MT Per month
(Monthly statement of last year)
Quantity of pressmud procured
(Monthly statement)
12500 MT
Details of wind roses (Number, 19 Windrows
length, height, width of stacking, 5 Windrows
space between two wind rose)
9.
225 Mtr each
30 Mtr
each
ool
Ct; )1 e - "4
7 ruii
'
Ht 1.0 mtr, Width 3.0 Mtr,Gap - 1.0 Mtr t ,t it,
Quantity of Effluent being used for 170
composting ( m 3/day) :
ngrba.cpcb(i ,gmail.com Distillery Format modified considering NGT directions
PLAA-4-(41,
11?i
cyl;e.rk
et)4'.0-01
+c,1,/
c.-de,t,
A
2,3
3
Quantity of press mud being used
for one cycle
4000 MT
Maturity time in days for one cycle
60
Arrangement for rainy season
e.121
Quality of ground water in the area LatestOn.
enc :.
and depth of ground water table
elf"i
1
(II) Information regarding Ferti-irrigation ---NA
3.
4:
report from approved lab
- r)-y0,A:ctrd 6.1 -1k4 t.44,4
ou .1' Pb‘...y 1..4,-,-.. .,,.4 •
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
—
(available land area)
System for dilution of treated
reffluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network (Available /Not available)
C: Air Pollution and its Control
Sources of Air Pollution
D Type of Fuel used
consumption
Stack details
3,
â
4.
D APCS details
5.
Samples collections points
(if collected)
with Partially Baggass and approx. 98 % Bio Gas
utilized to generate steam whenever We
operate our boiler. Generally steam and
power are utilized from Su•ar Plant
01 No. Sa rn e4e-,
Multi cyclone dust collector – S tfo
l- cl-y)),141/1 -e d
HolO- re ll cAY (A Y‘ e 741 0 ,,
PM (mg/Nm3):
Sample point is at the top of the Stack 30
mtr above from ground floor.
ngrbacpcb(4)gmail.com Distillery Format modified considering NGT directions
i7k )
(iv
.b.cmo)>^
A-e
PPOI,
c Pc 6/
Ltlk,s
.
nn44
NSW"
30
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Repor t:
Date of Inspection: 0 r 0 9 ,2 t1
A:
General Information
1.
Name of the unit and address
..,
M IS t1441-0,1, Nte,J44: 11-0(‘
koka4-- KA T-t, i-k_ct,.ida..4.
2.
Name of the Proprietor/ Contact
.„, Siwi Ha,iAk 1:ittito,
(i i 01“
,,, (c(
person - Designation
-0W(i'tev (Min pauo,(,
Contact No.
s-3 I, 1 3 2._ 9 321 3
Year of Commissioning.
1 9 ,6 I
Sector
Cooperative/Public/Private
Production details.
p il
30,c kam
9
Products
_.,46 , cLo._ i )
S
Installed Prod. Cap.
Consented Prod. Cap
4 cinCali;---1-11a`'
Restricted Prod. Cap.
Raw materials & their requirement -3 6 ° 1 " °',TC 1)) 1 I ( '`I f..))
5.'
1
1
( foi
OuGU)1A)
p Hwtx - 117
4—(76-4;;;.' '
toli . --)44,),t,
Operational status
Operating - GM() P- t &I) (.112in
Non operational due rainy season"
4.-.,-Closed by direction
Closed by own
Water Pollution and its Control: aoecodC
Water Supply Source
1,
0,
1
.
Lo ti p ,
____%13
0 p
i /1),.
kk I / e d "
Industrial
Water Consumption (KLD)
Im4 g lici
.2 rto
r g
.2p i4 P ., I
4.
9sp„,
aLl'ill("4)
TQCN
—
60
i
Co (0'
G
Domestic ..--) -r I 66
Availab ve / Not available
Water Meter to show consumption
,o1
Po-)
C,sea fey
to
r5. 7 eoey
A
., .,._."
„.„,(4..,
'
L+ r`'`
Flow measuring device installed at Available / 14et-rwa-i-lerbte
V AO
outlet of ETP _r_D5
,,e,..) 1.1
we
Waste Water generation (KLD)
- k_i_ D Ices T uw‘ tris-------6------)
y
(before treatment)
> Industrial
f-6
E TP
1.-t° /,
L
f etW- 4
g ej
KL
>
Domestic
.-
Waste Water treatment capacity
(KLD)
> Industrial
Domestic
1r7u)(
30
6 c, p.0 1
Ul,h_t 1
v,,5 1op
S r t.- B
.)
k
4-
C;QcNk
I-
13cr 1-fik)v) ITN)
ngrba.cpcb(agmail.corn Distillery Format modified considering .IVGT directions
--to-J p e
LtA-
cJo-A
4-kt
lokflt,
ETP
jc ) the
IS 14 le (,)(k.1)"1)
10) t.1,4A
t
Poti 'Pl.,
-) ColWfi vi, -1-c1 h k -a i.),
Details of ETP
> ETP Description
diagram
with
flow
> Details of • Reverse Osmosis
plant, if any
> Details
of
Multi
Effect
Evaporator, if any
Ei,
7. -
A. -(4_,)_)
4) ( 1 )
1--) - ) , I .1- ) --.)
r Z 1 st 0 1-( ' 9- a
Trio- t'
—') k 0 Nil .10,-,k. .....) je,kA, '
Pi) Jo
1-1 , A
vi . A
Waste water discharged (after..) 9-1 h, 3 /Av..Cal mck,-, 1,Z-in, )
treatment)(KLD)
.2 hcx-t. ;1 ° 1,...,41 -0 1 H P -h...iv)-s 4•T, N{cte. Ai4ott.
Q, Pur....t, ...4
â Industrial
}- . 4"40 ,7,-.40.3+ter kity14..... 1;,- fx..1 .P.44,41.4 4,,
Domestic
Mode of disposal of treated effluent On land/ Surface water
(Details)
-1-tcl .fe } 1- k .-) lip fl t''}
I\ Ci cold
Sample distributed into no. of
parts (2/3)
Sludge disposal mode
-71,v•-t.,
1n
-C
Effluent collection locations
& Locations
analysis results (if collected)
..,Ca-is-14 tit-ilk-L.4 a-a.,,,„ E—role,,d
e.-4-0x. h..ttiti
, 132...?-14
frbirttiA,L t i,o1.4 +I 6,...........), .4(
.._ .
Outlet
Ce-PC 8 Wi)
ethers
Cs6,1L4)
(I) Information regarding Biro-composting
Active
area
for
bio
compost '
preparation (m2)
Area for press mud storage (m )
Area for bio compost storage (m2)
Spent wash storage capacity
5.
Availability of pressmud
6.'
Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured
(Monthly statement)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
9.
Quantity of Effluent being used for
composting ( m3/day)
[email protected] Distillery Format modified considering NGT directions
Ct-,1
J
r16)-0-AY ( ' O\
e) e
niAik•,
Parameters
pH
BOD
COD
(mg/I) (mg/I)
t.,/
L7
V
g,„? .?
I t,
34
.?
11
TSS
(mg/I)
1---'
1 If
19
3
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle
Arrangement for rainy season
Quality of ground water in the area and depth of ground water table irev-,;c6/ )21
i.e_p_r), - Apo , 60v-,
(II) Information regarding Ferti-irrig ation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
c,-12
loo
(available land area)
3.
System for dilution of treated
effluent required for ferti-irrigation
hyij p,„tylp vH System of transportation of treated "Throcli,
effluent upto field.
vbi f or kyrteco„,
Aerviiat
Formal agreements with farmers
L04- 11.4,00, AO( ci-Ort
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
8.
Ground water monitoring network
(Available /Not available)
C: Air Pollution and its Control
1.
Sources of Air Pollution
2.
> Type of Fuel used with
consumption
3.
> Stack details
4.,
> APCS details
1.
4.
5.
Samples collections points
(if collected)
PM (mg/Nm3):
ngrba.cpcb(a),gmail.corn Distillery Format modified considering NGT directions
00
4_
A,' ,M LQ )-
4
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry of unit
Pic 2: ETP (at least 1)
Pic 3: Compost Yard
Pic 4: RO & MEE
ngrba.cpcb(a),gmail.com Distillery Format modified considering NGT directions
5
Pic 6: Discharge points
Pic: 5 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
kirk, te, 6404,- etaciA4
()=4P-t-
"ck
..
cAtt-).04.,J
"64% Lei-QA -L4
Signature
Name 8 Designations
Name of officials
inspecting
( I / Negitil,
k ,
,b
0: 1 f
ita:t
roc6, 4E6
‹kAlz
2
of
Date
Submission
ciA4
!--fc:c4
report
[email protected] rn Distillery Format modified considering NGT directions
WiW
COD
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection: 0 I ' a 9 'c2-0 / I-(
A: General Information
1.
Name of the unit and address
,
3.
4,
5.
AI s GC S A-a6,4,
t31,.4j).:, , Oto-rk N
li-ct.
Name of the Proprietor/ Contact itito,,,:„4, Atej1 .).0, . e k 47),,_ _ ce_
s..
..9ss.94,
person - Designation
co, cm,,,,( Nii„.„,., (4 .e 0,,,,,: (.4)
Contact No.
okAN-e-4.-11-1•
''--.0 3 ..)- 2
Year of Commissioning.
6.
Sector
Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
7.
Operational status
Cooperative/Public/Pr.v e
Sils:=-' i-i er CPI/
Ce, PC L___
1. Operating
‘ 2 Non operational due rainy season
Al Closed by direction
V Closed by own i
C5 I I
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
Industrial
q)-cuy,ek LA-e;
Domestic
Water Meter to show consumption
5.
c2.
Available / Not ayable
Flow measuring device installed at Available / Not avilable
outlet of ETP
Waste Water generation (KLD)
4,--.
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
—
> Industrial
> Domestic
[email protected] Distillery Format modified considering NGT directions
li
.94
2
D etails of ETP
> ETP Description with flow
diagram
U S )1
> D
etails of Reverse Osmosis
plant, if any
> D etails
of
Multi
Effect
Evap orator, if any
N
( \e,
a -n1-1‘62-910,)-'—)
LiP1H
ye
\i/
C+7-1
On land/ Surface water
Sample distributed into no. of
arts 2/3
Sludge disposal mode
Effluent collection locations analysis results (if collected)
& Locations
I I nformation re s ardin Bio-com i ostin
Active area for bio compost
p reparation (m2)
Spent wash storage capacity
Availability of pressmud
Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured
(Monthly statement)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used for
composting ( m3/day)
rigrbcpck@r
vicLils2Ln Distillery Format modified c onsidering NGT directions
I
Parameters
3
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle
12,
Arrangement for rainy season
13.
Quality of ground water in the area
—
.,_-
and depth of ground water table
(II) Information regarding Ferti-irrigation
1,
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
2.
Command area for irrigation
(available land area)
.
System for dilution of treated
effluent required for ferti-irrigation
4.
System of transportation of treated
effluent upto field.
S.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
8.
Ground water monitoring network (Available /Not available)
C: A r Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with
consumption
3.
â Stack details
4.
> APCS details
5.
Samples collections points
(if collected)
—
_
—
C°vNrKe diz,../ -to:. 'U 9-c c,w,g_i,
PM (mg/Nm ):
[email protected] Distillery Format modified considering NGT directions
_
4
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry of unit
Pic 2: ETP (at least 1)
•
Pic 3: Compost Yard
Pic 4: RO & MEE
[email protected] Distillery Format modified considering NGT directions
99
5
Pic 6: Discharge points
Pic: 5 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
----)
1
Signature
Name & Designations
Name of officials.
inspecting
,i
NI cxv,e,:, C-1104k.eb-,.
Nx.**-t.
t ,
sc_ 1.) , cec 6,, ildim,
W
6' 120-1,4
gt,:neki , A E E
U PP( 8 G,clirisab,_.4
2
of
Date
Submission
report
--.' q '
,c3ty
[email protected] Distillery Format modified considering NGT directions
I00
For Distillery Unit
A: General Information
Name of the unit and address
Simbhaoli Spirits Limited
P.O. Simbhaoli Distt. Hapur (U.P.)
PIN-245207
Name of the Proprietor/ Contact R.K. Singh (C.G.M.)
person - Designation
Mob.No. 09927200836
Contact No.
P.S. Chauhan G.M.(W)
Mob.No. 09837781148
Year of Commissioning.
1943
Sector
Limited Co. in Private Sector
5.
Production details.
-,44 !.-. _6 C O P P=
Alcohol
Products
ekl -I-Lt .17,:-, c+
Installed Prod. Cap.
90 K.L. PD
..e. c__PC5
Consented Prod. Cap
Restricted Prod. Cap.
c k t-D C."- - 4 42- -f 43r -A r *- - t t : - 4
6.
Raw materials & their requirement Molasses 40 MT/Day(approximate)
For 90 KLPD of Alcohol
t
7.
Operational status
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
Water Meter to show consumption
Closed *cli;teetkm eL.J, Ire er":444 ')I-c:
ue p C 6
..._
) n y ,) , 14
A4 k...t, ilifki,+z, G/ C-i--ye b..+0 .
Tube wells — ‘-2Industrial
2214M 3 /Day (maximum)
Domestic
50 M3/Day
Available
Flow measuring device installed at Available
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
1080 M3/Day(maximum)
> Domestic
50 M3 /Day t
&
[email protected] Distillery Format modified considering NGT directions
4< I, Se-0c )))-)
3e4IOar
INA—
74 d
'
0I
,2
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
0
c
ko
g,,: A.
,
,,,,x-i.vy
Anaerobic digester-3 Nos.(375+650+550 K.L. RSW
/Day), Reverse Osmosis Plant 72Q m3/day, MultiEffect Evaporator , . 720 m3/day ,BIO-composting
plant. — a..0,4,,,,,V,1 & 0 i., 6(2_4 n.A.-k...4
<liraj").Ceir-.c.-4
,
Soak Lt/SettI'ank_...-
Details of ETP
Description
> ETP
diagram
with
NEC
Distillery Doling tower4 An. Digestor
flow 9'. Lagoons ► R.O. /MEE- ► Storage lagoons
-p Bio-composting plant. Sludge drying beds for
drying of sludge.
Details of Reverse Osmosis
plant, if any
Effect
Multi
of
> Details
Evaporator, if any
Waste water discharged (after
,...v4t- '
treatment)(KLD)
> Industrial
Zero discharge/ in bio-composting. )
Domestic
50 K.L./Day ts
Mode of disposal of treated effluent On land/ Surface. water : zora=liiaeherrge in
Bio-composting.
(Details)
>
7.
.
Sample distributed into no. of
parts (2/3)
Sludge disposal mode
11.
Effluent collection locations
analysis results (if collected)
&
..-.----
/0144,f4.-
The sludge obtained from E.T.P. is being used for
manufacturing of good quality orBio-manure in the
Bio-composting process with the help of Sugar mills
Press Mud and primary treated and concentrated
effluent of Disti lery.+ ET P 4- t-• 4. a)v - --C1-
Parameters
Locations
BOD
(mg/I)
pH
COD
(mg/I)
TSS
(mg/I)
Outlet
(\) / A-
Others
(I) Information regarding Bio-composting
1.
Active area for bio
preparation (m2)
compost 1 ha =10,000m ZActive area 16 Acres
1 acre = 0.4046863 h
1 acre = 4046.825 m2
2.
Area for press mud storage (m )
2 Acres
Area for bio compost storage (m2)
1200m2 .
Spent wash storage capacity
20000 m3
Availability of press mud
50000 M.T.
Quantity of compost prepared
17000 M.T.
[email protected] Distillery Format modified considering NGT directions
L0-74,.. ) 0
3
b fro k l_.
,;
0
(Monthly statement of last year)
Quantity of press mud procured Press mud is being procured from our Sugar
Unit.
(Monthly statement)
Details of wind roses (Number, Plot A: L 150 M,W 3.0 M, H 1.5 M
length, height, width of stacking, Plot B: L 125 M,W 3.0 M, H 1.5 M
Plot D: L 185 M,W 3.0 M, H 1.5 M
space between two wind rose)
Space 3.0 meters
Quantity of Effluent being used for Bio-composting process stopped due to rainy
season. 3 K.L./M.T of Press mud.
composting ( m 3/day) :
Quantity of press mud being used 13200 M.T.
for one cycle
Maturity time in days for one cycle
12.
Arrangement for rainy season
45-60 days
A shade is made for sto ge of prepared
manure„)ress_ncovered- with
1413:erve-dttrifig-rainy-season
13
Quality of ground water in the area
4.v4w=aa;ALIA.PideP#'
and depth of ground water table
(II) Information regarding Ferti-irrigation
Details of treatment of spent wash N.A.
1.
(details of bio methanisation,
primary and secondary treatment)
N.A.
Command area for irrigation
(available land area)
N.A.
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated N.A.
effluent upto field.
N.A.
Formal agreements with farmers
for using treated effluent
N.A.
Storage facility available for
treated effluent during low demand
period
N.A.
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network (Available /Not available): N.A.
8.
C: Air Pollution and its Control
7.5 TPH AND 10.5 TPH Boiler
Sources of Air Pollution
1.
Type of Fuel used with Bio-gas 40000 m3/day .
2
[email protected] Distillery Format modified considering NGT directions
1..'"31D-e-CD
e-c141
t9)„.„);'
ctitc
-0-46
Co-v-vt-d AA A-04 '
-0,o* Je.
4
Bagasse 60 M.T. /DAY
consumption
Height 52 meters, dia 2.4 meters.
â Stack details
Bagasse fired boiler 7.5 TPH is equipped with
â APCS details
Multi cyclone type dust collector.
Samples collections points
(if collected)
A
NoAAL cikrk,c(44, b\&,)
5i.;..e.1► ET) v P
0),
10)
[email protected] rn Distillery Format modified considering NGT directions
Central Pollution Control Board
Sub: Visit Report of the Units of Baghpat
& Meerut
As per the office order no. i3.190153/NGRB A/CPCB/2013-14/2035 dated 25.08201
and the discussions held in the chamber of MS on 29.08.2014, a team of officials
from Head Office comprising of Shri Shriance
Jain, Scientist 'D', Dr. Sananda Sinha.
RA and Shri K.S. Rawat, JLA visited the following industries on 0ili.09.2014 under
the project "National Ganga River Basin Authority (NGRBA)":
M/s. Bagpat Cooperative Sugar Mills Ltd. Bagpat, Uttar Pradesh
M/s. Ramala Sahkari Chini Mill Ltd., Baraut, Bagpat, Uttar Pradesh
M/s. Bajaj Hindustan Limited (Sugar Unit), Kinauni 850 502, Meerut,
.
5.
. Uttar Pradesh
M/s. SBEC Sugar Limited, Village Layon, Mallakhpur, Baraut, Bagpat,
Uttar Pradesh
M/s. Bajaj Hindustan Limited (Distillery Unit), Kinauni - 850 502,
Meerut, Uttar Pradesh
The inspection reports are submitted for further necessary action please.
N^
62e OS1114
Te)141,
b'Y‘
1
5
j
(Shriance Jain)
Team Leader
l/c. NGRBA Cell
Central Pollution Control Board
Sub: Visit Report of the Units of Meerut
As per the office order no. B-190153/NGRBA/CPCB/2013-14/2035 dated
25.08.2014 and the discussions held in the chamber of MS on 29.08.2014, a team
of officials from Head Office comprising of Shri Shriance Jain, Scientist 'D', Dr.
Sananda Sinha, RA and Shri Girish Chand, Attendant visited the following
industries on 10.09.2014 under the project "National Ganga River Basin
Authority (NGRBA)":
M/s. U. P. State Sugar Corporation Ltd. Unit - Mohiuddinpur,
Meerut, Uttar Pradesh - 250 205
M/s. Nagar Nigam Pashuvadhshala, Ghoshipur, Meerut, U.P.
The inspection reports are submitted for further necessary action please.
(Shriance Jain)
Team Leader
10.09.2014
1/c. NGRBA Cell
106
VW"
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 10.09.2014
A: General Information
1. Name of the unit and address
M/s. U. P. State Sugar Corporation Ltd.
Unit - Mohiuddinpur, Meerut, U.P. - 250 205
Name of the Proprietor/ Contact Mr. Sheeshpal Singh, I/c. Chief Chemist
8954002210
person - Designation
[email protected]
Contact No.
Year of Commissioning. 1992-93
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Cane crushing capacity
Cane crushed last year
Molasses generation
Press Mud generation
10. Operational status
B: Water
1.
Pollution and its Control:
Water Supply Source(s)
Corporation / Public
White Sugar
250 Ton/day on 10% recovery
2500 TCD
3331374.60 Quintals
168899.00 Quintals
75 ton/day
Non operational
1. Tubewell (2-Operational +1 standby)
Industrial
Domestic 780 KLD
Water Consumption (KLD)
Water Meter to show consumption
Not available
Flow measuring device installed at Not available
outlet of ETP
Waste Water generation (KLD)
(before treatment)
690 KLD
Industrial
â
Domestic
Waste Water treatment capacity
(KLD)
1000 KLD
Industrial
Septic
Tank
Domestic
Annexure - I.
Details of ETP
);, ETP Description with flow
diagram
â Details of Reverse Osmosis
plant, if any
Effect
Multi
of
Details
Evaporator, if any
670 KLD (Non Operational)
Waste water discharged (after
treatment)(KLD)
Industrial
s)=. Domestic
Mode of disposal of treated effluent Surface Water.
ails)
Sample distributed into no. of parts N.A.
(2/3)
Used by farmers
Sludge disposal mode
Locations
&
11. Effluent collection locations
pH
analysis results (if collected)
Outlet
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before
Ferti-irrigation
Command area for irrigation
,(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
of Fuel
consumption
> Stack details
> Type
5.
used
> APCS details
Samples collections points
(if collected)
Parameters
BOD
(mg/0
COD
(mg/I)
-
-
-
TSS
(mg/I)
-
-
Boilers - 3 nos.
25 tonnes/hr, 25 tonnes/hr
tonnes/hr.
with Bagasse - 750 Ton/day
and
30
2 stacks
Both the Boiler of 25 tonnes/hr connected to
one stack of height 30 m and 30 tonnes/hr
boiler connected to another stack of height
40 m.
Multi cyclone
N.A.
Photographs indicating locations:
Entr Gate
Multicyclone
Chimney
Drain to carry effluent to ETP
Pipe from industry to ETP after crossing
drain
Inlet to ETP
got
Secondary Clarifier Non Approachable ETP
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Shekhpura drain 4 Kadrabad drain 4 Kali East River 4 River Ganga
Remarks :
The wild grass was observed all around the ETP area giving it the deserted look
and was also not accessible.
No effluent was found being generated in the industry premises and ETP units
were observed empty except rainy water.
Adequacy of pollution control system may be assessed once the industry
resumes its operation.
No railings on ETP.
No attention given on maintenance of pollution control measures.
As per their information, effluent is used in irrigation by farmers.
Poor maintenance of the ETP.
As per the information given by the plant representative they had awarded the
work for operation and maintenance of the entire sugar plant including ETP to a
private party which will resume its work very soon.
1
Name of officials
inspecting
Name & Designations
Signature
Shri Shriance Jain, Sc. 'D', CPCB
Shri Ankit Singh, AEE, UPPCB,
Meerut
Shri N.K. Tyagi, AEE, UPPCB,
Meerut
Shri N.M. Tripathi, S.A. UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
Shri Girish Chand, Attendant
of
Date
Submission
, report 10.09.2014
,
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 05.09.2014
A: General Information
Name of the unit and address
1.
M/s. Bajaj Hindustan Limited (Sugar Unit),
Kinauni - 850 502, Meerut, Uttar Pradesh
Name of the Proprietor/ Contact Mr. K.P. Singh, Unit Head
0121-3290521
person - Designation
Contact No.
November 2004
Year of Commissioning.
Private
Sector
Production details.
Sugar
Products
12000 MT/day
Installed Prod. Cap
Operating capacity
12000 TCD
Cane crushing capacity
137738.2 MT (2013-14)
Cane crushed last ear
70690 MT (2013-14)
Molasses generation
49613 MT (2013-14)
Press Mud generation
Non operational
Operational status
10.
B: Water Pollution and its Control:
Water Supply Source(s)
3.
6.
1. Tubewell (2 nos.)
12000 KLD
Industrial
70 KLD
Domestic
Water Consumption (KLD)
Not available
Water Meter to show consumption
Flow measuring device installed at V-Notch could not be observed as the entire
area for discharge of treated effluent full of
outlet of ETP
shrubs.
Waste Water generation (KLD)
(before treatment)
1200 KLD
> Industrial
70 KLD
> Domestic
Waste Water treatment capacity
(KLD)
1200 KLD
Industrial
70
KLD
> Domestic
Annexure - I.
Details of ETP
> ETP Description with flow
diagram
> Details of Reverse Osmosis
plant, if any
Effect
Multi
of
> Details
Evaporator,Tany
ngrbacpclyikignail.com Sugar Format modified considering NGT directions
10-
11.
Waste water discharged (after
treatment)(KLD)
Y Industrial
â Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts
(2/31
Sludge disposal mode
&
Effluent collection locations
analysis results (if collected)
Non Operational
Direct into Hindon River.
N.A.
Non operational.
For farming
Parameters
Locations
pH
Outlet
Others
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
-
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Ferti-irrigation
Command area for irrigation
(available land area) .
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent u •to field.
Formal agreements with farmers
for using treated effluent
Storage facility available for treated effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
Air
Pollution
and
its
Control
C:
Boilers - 2 nos. (90 TPH each)
Sources of Air Pollution
of Fuel used with Bagasse
â Type
consumption
RCC made, Height - 55 m each
â Stack details
Multi-cyclone and Wet scrubber in each boiler
APCS
details
>
N.A.
Samples collections points
5.
(if collected)
ngrba.cpcbtgmail.com Sugar Format' modified considering NGT directions
111
Photo_g_ra hs indicatin
Primar Clarifier
Aeration Tank
Secondary Clarifier
ogrbu.cocfra)ginail.coin Sugar Format modified considering NGT directions
Carbon Filter
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Direct discharge into Hindon River.
Remarks:
No effluent was found being generated in the industry premises and ETP units were
observed empty except rainy water.
Adequacy of pollution control system may be assessed once the industry resumes its
operation.
Name of officials
inspecting
Name & Designations
Signature
Sh. Shriance Jain, Sc 'D', CPCB
Dr. B.B. Awasthi, R.O. UPPCB,
Meerut
Shri A.K. Tiwari, AEE, UPPCB,
Meerut
Shri J.N. Tiwari, JEE, UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB
et'
of
Date
Submission
report 08.09.2014
[email protected] Sugar Format modified considering NGT directions
•
OXE2)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar,
Date of Inspection: 05.09.2014
k:
..
benerat mormayon
Name of the unit and address
!.
3.
3.
5.
5.
7.
3.
).
30.
M/s. SBEC Sugar Limited, Village Layon,
Mallakhpur, Baraut, Bagpat, Uttar Pradesh
Name of the Proprietor/ Contact Mr. Vijay Kr. Jain,
Manager (Commercial)
person - Designation
09927921119
Contact No.
1998
Year of Commissioning.
Private
Sector
Production details.
Sugar
Products
8000 TCD
Installed Prod. Cap
8000 TCD
Operating capacity
8000 TCD
Cane crushing capacity
10281538 Quintals
Cane crushed last year
504000
Quintals
Molasses generation
429241 Quintals
Press Mud generation
Non-operational
Operational status
3: Water Pollution and its Control:
L.
Z.
3.
1.
5.
5.
Water Supply Source(s)
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
Industrial
,- Domestic
Waste Water treatment capacity
(KLD)
Industrial
‘i- Domestic
Details of ETP
'.. ETP Description with flow
diagram
Details of Reverse Osmosis
plant, if any
Effect
Multi
of
' Details
Evaporator, if any
1. Tubewell (4 nos.) 230 m 3ihr each
3600 KLD
Industrial
No colony
Domestic
Not observed
V-Notch not found.
1500 KLD
70 KLD
2000 KLD
70 KLD
Annexure - I.
nkrba.cpcbfilsmail.coin Sugar Format modified considering NGT directions
11.
Waste water discharged (after
treatment)(KLD)
> Industrial
> Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of
parts 2/31
Sludge disposal mode
&
Effluent collection locations
analysis results (if collected)
Khas Nalla which ultimately meets Yamuna
River after 25 K.M. however as per the
information given by the unit the treated
effluent is used by farmers for irrigation.
Through Drain.
N.A.
Non-operational
For farming
Locations
pH
Parameters
BOD
( m 9/0
COD
011 9/0
TSS
(1119/0
Outlet
Others
(I) Information re' ardin . Ferti-irri . ation
Details of treatment effluent before Ferti-irrigation
Command area for irrigation
(available land area)
27. System for dilution of treated
effluent re•uired for ferti-irrigation
System of transportation of treated effluent uoto field.
Formal agreements with farmers
for using treated effluent
30. Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irr
Ground water monitoring network
C: A r Pollution and its Control
Sources of Air Pollution
of Fuel used with Bagasse
> Type
68 TPH
consum •flon
Boilers - 2 nos.
> Stack details
Height 50 mtr, dia. 4.2 mtr.
Height 40 mtr, dia. 3.0 mtr.
Fluidized Bed Nye-Tray followed by Wet
> APCS details
scrubber in each boiler
N.A.
Samples
collections
points
10.
(if collected)
ryba.cocbriOmail.com Sugar Format modified considering NGT directions
Photo ra • hs indicatin • locations:
;,0414*L;
1
1.L
iit#11
ETP (Secondary Clarifier)
Discharge Point
Chimney-1
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Khas Nala 4 Baraut Drain 4 Yamuna River (total length 25 km)
ngrba.cpcbiitIonail.com Sugar Format modified considering NGT directions
Remarks:
The wild grass was observed around the ETP area giving it the deserted look and
was also not accessible.
No effluent was found being generated in the industry premises and ETP units
were observed empty except rainy water.
Adequacy of pollution control system may be assessed once the industry resumes
its operation.
Boiler ash disposed along the approached road to the unit.
Discharge point was concealed and only outside the industry's premises the outlet
was found after crossing the road.
No attention given on maintenance of pollution control measures and as informed
by the unit representative they have been allowed to enter the premises only after
four months.
7. As per their information, effluent is used in irrigation by farmers.
Disposal of press mud along roadside and fields
Name of officials
inspecting
Name & Designations
Signature
Sh. Shriance Jain, Sc 'D', CPCB
q)141—
---'"
'
Dr. B.B. Awasthi, R.O. UPPCB,
Meerut
Shri A.K. Tiwari, AEE, UPPCB,
Meerut
Shri J.N. Tiwari, JEE, UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB
of
Date
Submission
report 08.09.2014
[email protected] Sugar Format modified considering NGT directions
or."
.. t,
7,b
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 5.9.2014
A: General Information
Name of the unit and address
M/s. Ramala Sahkari Chini Mill Ltd., Baraut,
Bagpat, Uttar Pradesh
Mr.
S.K. Verma, Chief Chemist
Name of the Proprietor/ Contact
9758083953
person - Designation
Contact No.
1979
Year of Commissioning.
Cooperative
Sector
Production details.
Sugar
Products
2750 TCD
Installed Prod. Cap
2750 TCD
operating capacity
45.98 Lakh Quintal
Cane crushing capacity
2.32 Lakh Quintals
Cane crushed last year
0.16 Lakh Quintals
Molassesgeneration
3.5% of total cane crushed
Press Mud generation
Non operational
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
1.
6.
1. Tubewell (3 nos.) - 40 HP, 40 HP & 15 HP
2700 KLD
Industrial
193 KLD
Domestic
Water Consumption (KLD)
Not available
Water Meter to show consumption
Flow measuring device installed at V-Notch found broken.
outlet of ETP
Waste Water generation (KLD)
(before treatment)
1200 KLD
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
1200 m 3/day - drain
-)-. Industrial
Septic Tank
),- Domestic
Oil & Grease Trap, Equalization Tank, Aeration
Details of ETP
`:. ETP Description with flow Chamber, Clarifier, Sludge Sump & Pump and
Sludge Drying Beds.
diagram
Osmosis
Reverse
> Details of
plant, if any
Effect
Multi
of
'>- Details
Evaporator, if any
ngrba.cpcfrii)gtnail.com Sugar Format modified considering NGT directions
11.
Waste water discharged (after
treatment)(KLD)
, Industrial
r, Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts
(2/3)
Sludge disposal mode
&
Effluent collection locations
analysis results (if collected)
Drain
Septic Tank
On land.
N.A.
..
For farming
Parameters
Locations
pH
Outlet
Others
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
-
-
-
(I) I nformation regarding Ferti-irrigation
Details of treatment effluent before Ferti-irrigation
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for treated effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
1.
Sources of Air Pollution
:= Type of Fuel
consumption
used
Stack details
Chimney - 2 nos. (15 T & 15 T) (30 T)
Boilers - 3 nos. (15 tonnes, 15 tonnes and 30
tonnes)
with Bagasse
Stack - 2 nos.
Height - 30 m each
'>=. APCS details
Wet scrubber in each boiler
Samples collections points
(if collected)
N.A.
nizrba.cpcbralzmail.com Sugar Format modified considering NGT directions
Photographs indicating locations:
Discharge Point
Chimney and pollution control system E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Local drain 4 Krishna River 4 Hindon River 4 Yamuna
ngrba.cpcbialgmail.com Sugar Format modified considering NGT directions
Remarks :
The wild grass was observed around the ETP area giving it the deserted look and was
also not accessible.
No effluent was found being generated in the industry premises and ETP units were
observed empty except rainy water.
Adequacy of pollution control system may be assessed once the industry resumes its
operation.
Poor maintenance of the ETP.
Effluent from wet scrubbers attached to the boilers is directly discharged outside the
industry's premises.
The maintenance work was going on in the unit and oil and grease was being
discharged directly in the drain.
Direct discharge of oil and greases into drain
Name of officials
inspecting
Name & Designations
Sh. Shriance Jain, Sc 'D', CPCB
Signature
C154:...,--
Dr. B.B. Awasthi, R.O. UPPCB,
Meerut
Shri A.K. Tiwari, AEE, UPPCB,
Meerut
Shri J.N. Tiwari, JEE, UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB
Date
of
Submission
ngrha.cocb ir
report 08.09.2014
Sugar Format modified considering NGT directions
41
+-
2
(71)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 05.09.2014
A: General Information
Name of the unit and address
5.
M/s. Bagpat Cooperative Sugar Mills Ltd.
Bagpat, Uttar Pradesh
Mr. Narendra K. Sharma, Chief Chemist
Contact
Proprietor/
of
the
Name
9411287498
person - Designation
0121-2221029
Contact No.
1965
Year of Commissioning.
Cooperative
Sector
Production details.
Sugar
Products
2500 TCD
Installed Prod. Cap
2500 TCD
Operating capacity
2500 TCD
Cane crushing capacity
4567182 Quintals
Cane crushed last year
267130 Quintals
Molasses generation
138430 Quintals
Press Mud_generation
Non
operational
Operational status
10.
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
r Industrial
r Domestic
Waste Water treatment capacity
(KLD)
r Industrial
r Domestic
Details of ETP
ETP Description with flow
diagram
fr Details of Reverse Osmosis
plant, if any
Effect
Multi
of
fr.Details
Evaporator, if any
1. Tubewell (2 nos.) - 35000 GPM/tubewell
375.50 KLD
Industrial
200 KLD
Domestic
Not available
Not available
1200 KLD
160 KLD
1200 m3/day
Septic Tank
ETP consist of following units namely:Primary Clarifier, Aeration Tank, Secondary
Clarifier and Sludge Drying Beds.
ngrba.cparkmail.com Sugar Format modified considering NGT directions
11.
Waste water discharged (after Non Operational
treatment)(KLD)
fr. Industrial
`fr Domestic
Mode of disposal of treated effluent In local drain, outside the premises, stretch
length 5 kms. Meets River Yamuna. However
(Details)
as informed by the unit the treated effluent is
being used by farmers for irrigation and
reaching River Yamuna.
Sample distributed into no. of parts (2/3)_
For farmin•
Sludge disposal mode
Parameters
& Locations
Effluent collection locations
TSS
BOA
COD
pH
analysis results (if collected)
11911
Outlet Others
m • /II
m• /I
-
(I) Information regarding Ferti-irrigation
1.
Details of treatment effluent before
Ferti-irrigation
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
8.
C: Air Pollution and its Control
Sources of Air Pollution
Type of Fuel used
consumption
Stack details
APCS details
Samples collections points
if collected
'fr
3.
-
-
-
-
Boilers - 3 nos.
30 tonnes, 30 tonnes and 20 tonnes.
with Bagasse
Hei•ht - 30 m each
Multi cyclone & Wet scrubber in each boiler
N.A.
ngrba.cpcb(agmail.com Sugar Format modified considering NGT directions
Photo ra • hs indicatin
Entry Gate
ETP (Aerator)
ETP (Secondary Clarifier
Chimne
Discha
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Through local drain (5 km) 4 Yamuna
ligrbacycbfa'Lginail.com Sugar Format modified considering NGT directions
Point
Remarks:
The wild grass was observed around the ETP area giving it the deserted look and was
also not accessible.
No effluent was found being generated in the industry premises and ETP units were
observed empty except rainy water.
Adequacy of pollution control system may be assessed once the industry resumes its
operation.
No railings on ETP.
Boiler ash disposed at backyard.
Discharge point was concealed and only outside the industry's premises the outlet
was found after crossing the road.
No attention given on maintenance of pollution control measures.
As per their information, effluent is used in irrigation by farmers.
Disposal of boiler ash at backyard
1
Name of officials
inspecting
Name & Designations
Sh. Shriance Jain, Sc 'D', CPCB
Dr. B.B. Awasthi, R.O. UPPCB,
Meerut
Shri A.K. Tiwari, AEE, UPPCB,
Meerut
Shri J.N. Tiwari, JEE, UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB
of
Date
Submission
report 08.09.2014
rt,grbacocb, i,i),zmail.com Sugar Format modified considering NGT directions
Signature
vow
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection: 5.9.2014
A: ;eneral Information
Name of the unit and address
M/s. Bajaj Hindustan Limited (Distillery
Division), Kinauni - 250502, Meerut, UP
Name of the Proprietor/ Contact Mr. Mukesh Bhatnagar, Gen. Manager
person - Designation
Contact No.
0121-3290501
Year of Commissioning.
January 2006
Sector
Private
Production details.
Products
RS & ENA
Installed Prod. Cap.
160 KLPD
Consented Prod. Cap
Restricted Prod. Cap.
Raw
&
materials
their Molasses - 200000 MT/Annum
requirement
7.
Operational status
Non-operational
B: water Pollution and its Control:
"
Water Supply Source
Tube well (1 no.)
Industrial
3450 KLPD
Water Consumption (KLD)
Domestic
15 KLD
Water
Meter
to
show The unit was under lockout hence could not
consumption
be observed
Flow measuring device installed The unit was under lockout hence could not
at outlet of ETP
be observed
Waste Water generation (KLD)
(before treatment)
> Industrial
1280 KLPD
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
1280 KLPD
â Domestic
Details of ETP
6.
The unit was under lockout and hence could
> ETP Description with flow not be observed.
diagram
> Details of Reverse Osmosis
plant, if any
> Details
of
Multi
Effect
Evaporator, if any
Waste water discharged (after Industry claims to operate on zero
treatment)(KLD)
discharge however, it can be verified at the
Industrial
time once industry comes operational.
> Domestic
8.
Mode of disposal of treated Direct into Hindon River.
effluent (Details)
9.
Sample distributed into no. of
parts (2/3)
[email protected] Distillery Format modified considering NGT directions
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
___,
&
Locations
Parameters
pH
BOD
COD
(mg/I) (mg/I)
TSS
(mg/I)
Outlet
Others
',I) Information regarding Bio-composting
I.
L.
3.
I.
3.
i.
1.
I.
I.
1 .
3.
Active area for
preparation (m 2)
bio
compost 18 acres
[1 ha = 10,000m 2 , 1 acre = 0.4046863 hectare,
1 acre = 4046.825 m21
Area for press mud storage (m2) 7 acres
Area for bio compost storage 7.23 acres
(m2)
Spent wash storage capacity
Availability of press mud
Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured
(Monthly statement)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used
for composting ( m 3/day) :
Quantity of press mud being used
for one cycle
Maturity time in days for one
cycle
Arrangement for rainy season
Quality of ground water in the
area and depth of ground water
table
1 month
From sugar unit
15751 MT (2012-13)
As per manufacturing data of sugar
production
Length of window as per yard dimension.
640 m3/day
11000 MT/cycle
60 days
Shut down.
-
(II) Information regarding Ferti-irrigation
.
2 .
.
4 .
5 .
6 .
7 .
.
Details of treatment of spent
N.A.
wash (details of bio
methanisation, primary and
secondary treatment)
Command area for irrigation N.A.
(available land area)
System for dilution of treated
N.A.
effluent required for fertiirrigation
System of transportation of
N.A.
treated effluent upto field.
Formal agreements with farmers N.A.
for using treated effluent
Storage facility available for N.A.
treated effluent during low
demand period
Quality of effluent being used for N.A.
ferti-irrigation
Ground water monitoring network N.A.
n2rbacbcb(alvnail.com Distillery Format modified considering NGT directions
C: Air Pollution and its Control
Sources of Air Pollution
Type of Fuel used
consumption
â
Boiler (Cap. 40 TPH)
with Bagasse and Bio Gas
Stack details
APCS details
Samples collections points
(if collected)
>
>
5.
RCC made, H=45 m and dia = 2.2 mtr.
Wet scrubber
N.A. due to non-operational due to rainly
season.
Photographs indicating locations:
Entry Gate
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Direct discharge into Hindon River.
Remarks:
Unit was under lock out by the Farmers hence could not be inspected and
photographs could not be taken.
1
Name of officials
Name & Designations
Signature
inspecting
Sh. Shriance Jain, Sc 'D', CPCB
S1/1.11./
Dr. B.B. Awasthi, R.O. UPPCB,
Meerut
Shri A.K. Tiwari, AEE, UPPCB,
Meerut
Shri J.N. Tiwari, JEE, UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
______
Sh. K.S. Rawat, JLA, CPCB
2
Date
of
Submission
report 08.09.2014
n.Qrba.cpcb , algmail.com Distillery Format modified considering NGT directions
uk„S.
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
joint inspection Report: Slaughter House
A:
General Information
Date of Inspection: 10.9.2014
_
Name of the unit and address
M/s. Nagar Nigam Pashuvaishala, Village
Ghoshipur, Meerut, Uttar Pradesh
Name of the Proprietor/ Contact Mr. Mohd Naseer S/o Mr. Khacheru, Gate
person - Designation
Keeper
Contact No.
-
Photographs indicating locations:
Blood Coa.ulation Unit
Prima Clarifier
Seconda Treatment
—
LIE II al MIS um. wiriera it al 1111121a
Activated Carbon Filter & Sand Filter
AMPS I I If
Sheds
Remarks:
The industry was found closed.
Industry Is closed since 16-01-2013 as per closure order dated 15.01.2013 issued by
Uttar Pradesh Pollution Control Board (copy enclosed) for the reason of discharging the
effluent directly into East Kali River without having completing their construction work of
ETP.
Name of officials
inspecting
Name & Designations
Shri Shriance Jain, Sc. 'D', CPCB
Shri Ankit Singh, AEE, UPPCB,
Meerut
Shri N.K. Tyagi, AEE, UPPCB,
Meerut
Shri N.M. Tripathi, S.A. UPPCB,
Meerut
Dr. Sananda Sinha, RA, CPCB
.
Shri Girish Chand, Attendant
2
.411111441V12411.W."""'......".*
Date
of
Submission
report 10.09.2014
Signature
colv,,,.
.,,
C
t44, 4, 4"
011.0111•11111n0011
nicc1 sr TtV WOVE 140-4[T (fl A
vdmr,"
MAR PRADESH POLLUTION oN Rol I
,
Ti4TI
RD
6
cs:
/Tft.---3/1,7-c4-189/4v-e/zti1o;int12
Rim 7k-4T 14,
r;(1
quzwair
FAITR, ttRty,
()8. 311 rhj
ki-a
11"gd
f;133 -60 Ili tigl'cl ;11 ib I z.1k 153
O7711117Trei T'17 4 M,
:1
.1974 -,•;;/
(Treft71 f24IIIPT
W211, tr? 014,1t7 t,
71; w=t1 ,11 t't
,
771.: ilt vito; ri. g .]:1 114 ii() IT31.7414-racr1
;;
;r;
TTZ11 • f sr114-7-7
1,,r7Itt ti 'et g rrir(7.. ti 3t-TWItr
Th
.3Bmg sttcb-711zf
T f411 7/lit 111,
(9:41) PAtpTI \7171
fkriTur '430 ;T11 f$T..1
rAf$7T,1
fir 71 7.111 ctI
1 1ZIT t
4)-4
ui
<ji
7ROZ:AtfuT fk<17'
rat 7-tre-zi
ct)R4Ici
t(13
T i i TTF:nt)
1,-) 74
i'-
1'
ITT-H
RI 1'1,:c171 1.16'; ;::
771-71
12 ;;:
Thin()
Z5F,,i'I
2H';
Trff3-280 P:i.n/ttO cP1I
fkrz/o,
3a'<fiI
7ra:
LITZ1 --33(tZ)
'
tot,t.7. 1 ,) 0 0 TTvi .,441-1T71
Z;11:4 411
74 7(111 3) .00(fiWl
Fokter',51x....
! Vii* ?•1
17.1
i
:-
(Owl *or& qkln 013. 41 kV+, prbet, V.4 .4:.
n 1141(1 Tr4, Kwa - 7115w,
‘7n114 ; Oh22- 2120E111. 277t1M. vneol
latii.-0%22.-2?,0704
-A74- itru?;tippeb.cuin
4-411;ve- re wwmprch.com
;
t17
TITTZ`'21
3 ,-1 :<)54: 1
3110171/1 - 1974
-frtzt
•
zut745 T1
3lThii
%TIT TRIT t I r4"--11.T.T) 25.12.12 :61 rlit4.17
TiT7lei
t -1:17 -,FTZ ":27
;'
tt5tM--714311/
WiT3t1 41ft'fi -ttig
31-3-17T 1; ; r i ;
tif)t
1-1. 1q crc-4711e11 UTZT t u e").i .
t * ct) t.i
i qi?t
1i ThT ?IIt
ZT1'7';=:71 ki-s'3
t
-;;Tcy,:1;;=!;,.
. l ,!,/iIIII kl!ao,1,
t'"
l'tv ;III l',I. I, .; Ii.
I. ;4; ti N....:,t, I t.,.I. n ,,,, !1( oft
Pho;K: (15r.- : - N s; I.
F.,. ;IS!: 27211,41
c-maii: id.: a upeci,,,,,,
\N f I) Site; ,s•Am.,11.1,vt...o.,
l it'.
I
1() -,1 ,1'zi"c•RThc;11. -TV ft MI r.17:
3tZ4
ft
'41 37e, TR. I
c
17 1797 7.5TTRThi
2
1
.
1 =.7;1. Ort57, ir477,rn fkm .
iblZ -it
"d-ct710 1;11.17,
I 4117111'11 .1)
' ,.! ;,;1. •
i)()
I,i
II
,
(,,;!1.171 10 41,111
q7.7".F.; 4,017:1(74)
2,
31f7;f2i..0)d I
1^1-t10.1-5t, i'173
9-7, 3171,-, , 7, TR fkr,-...7,tqz w)).;;
retti
3T1kAT ifEr-f
4 zo)1117511, *ao 'TrcF
34 • M711-
/5.
' 3TRITT't 3ftz1Tc-fl irT#R11-1, 1451
7014077713,7i---Tur .4.'ri,A73
4)71141
35,TN.:F, ;;I p.7 :77,
;. :cq
.17.n-,:71
73
,':1
Joint Inspection Report
Sugar & Distillery Industries
Moradabad, Rampur and Sambhal Region (UP)
Hon'ble Tribunal directed, vide order dated August 5, 2014, CPCB & UPPCB
to carry out the Joint Inspection of the Sugar & Distillery units functioning on the
banks and nearby ricer Ganga and Yamuma and discharging their effluents into
river.
In this view, a team of CPCB & UPPCB comprises of the following officials
visited the Sugar Distillery units in Moradabad, Rampur and Sambhal Regions
(UP)
Officials from CPCB, Delhi
ShM K Biswas, Sc 'C'
Shri Ananda Kumar Ngangom, JRF
Officials from RO Moradabad UPPCB
Shri Vijay, AEE
Shri P P Singh, JE
The following industries were inspected by the above team during 2nd
September, 2014 to 4th September, 2014. The summery table indicating the desired
information is given below;
Summery Table: Status of Sugar and Distillery Units operating in Moradabad,
Rampur and Sambhal Region (Under regional office Moradabad, UPPCB)
SI.
No.
Name &
Address of
Industry
. Cat
ego
ry
Date
of
Operational
Status
luspe
ETP
Status
APCS . Water
Status
Re q uireme
Y/N
YIN
nt
(Industrial)
(2013-14)
YES
YES
2570
ction
M/s Triveni
2
3
4
5
Engineering &
Ind. Ltd.(Sugar
Unit), Milak
Narayanpur,
Tends, Rampur
M/s Rana Sugar
Ltd. (Unit 3),
Belwara,
Manpur,
Moradabad.
M/s Triveni
Engineering &
Ind. Ltd.(Sugar
Unit), Rani
Nagai, TehsilThakurdwara,
Moradabad
M/s Deewan
Sugar Ltd.,
Agwanpur,
Kanth Road,
Moradabad
M/s D.S.M.
Siigar (Distillery
Division),
Asmauli,
Moradabad
M/s DSM Sugar,
Sug
ar
2/9/
2014
Nonoperational
Resource
of Water
Ground
Water Meter
installed for
Possibl
e
Detailed
'
i-•
inspecao
consumptio
n (Yes/ No)
recipie
nt
water
Bodies
n report
Yes
water
River
Koal
Annexure
(Ramganga) 4
due to off
season
Sug
ar
Sug
or
2/9/
2014
2/9/
2014
Nonoperational
due to off
season
r--
YES
4404
Ground
No
water
Nonoperational
due to off
season
YES
Nonoperational
due to off
season
YES
Dist
iUer
3/9/
2014
Nonoperational
YES
YES
2700
Ground
water
Yes
YES
YES
2265
1800
Ground
water
No
Non-
-II
Lapakana
Aix le X LI 11:
cirri'
-Ill
Ground
Water
Yes
YES
YES
4050
Ground
No
Ramganga 1 AnnexureH
-IV
closed by
own since
9th June 2014
3/9/
Annexure
drain
(Ramganga)
3/9/
2014
y
RaJUilard
(Ramganga)
Sug
ar
Sug
YES
Soar River
(Gauge)
Annexure
-V
.
Soat River Annexure .
)3.5
(Ganga)
ar
Asmoli, DistSambhal
7s DSM Sugar
Mills, VillRajpura, Dist! Sam bloat
M/s Rana Sugar
8
Ltd. (Unit 4),
Karimganj,
Shahabad,
Ram • ur
10
M/s Rudra Bilas
Kisan Sahkari
Chini Mill,
Bilaspur,
Rampur
Sug
ar
Sug
ar
operational
due to off
season
Non3/9/
2014 i operational
3/9/
2014
4/9/
2014
Sug
ar
YES
4/9/— Nonoperational
2014
duo to off
season
Ground
Water
3000
Ground
water
YES
Nonoperational
due to off
season
Operational
YES 1-3400
12
M/s National Industrial
Corporatio n Ltd.
Raja ka
sahaspur , Bilari,
Moradabad.
M/s Ajudhya
Sugar Mills, Raja ka sahaspur,
Bilari
Moradabad
tviahava 7,,Glexure
(Gangs) -v11
RagWg AnneLTe
-VIII
Yes
YES
YES
6600
Ground
water
YES
YES,
Howev
1320
Ground
Water
Kosi River
Annexure.
(Ramganga)
Yes
Kulli River Annexure
West Regul -X
River (
Ramganga)`
as,
Show
c asu s e
notie
issued
by
Spas
to
upgrad
11
-VI
2014
filler
y
T4/9/
2014
r—OperatitTnal
YES
No
tS —7050
•
Sug
ar
4/9/
2014
Nonoperational
due to off
season
YES
Th—T,
Sahaspura r Annexu
Drains-Aril _xi
Rivet.
1.(Ramganga)1
Ground
Water
Yes
1900
Sahaspura Anneure
Ground
water
Drains-Aril -XII
River
(Ramganga)
No
Overall Observations:
All the nine sugar units were not in operation during inspection due to off
season. The units are having ETP and APCS installed. However, the APCS
installed in M/s Rudra Bilas Kisan Sahkari Chini Mill, Bilaspur, Rampur,
needs upgradation and UPPCB has already issued show cause notice for the
same. Since, the units were not in
operation, the performan.ce. of Cne
ETP/ APCS were not be evaluated.
Two distilleries among three were in operation on the day of inspection and
June, 2014.
one unit was closed by its own since 9 th
Samples (Air & effluent) were collected from the two operational distillery
units; the analysis result is awaited from laboratories.
9
iswascirClit
Shri M
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
SS
(Pit{1)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General Information
Name of the unit and address
5.
6.
M/S Triveni E ngineering and Industries Ltd.
Vill-Milak Na rayanpur, Tehsil-Tanda, DistRampur.
Name of the Proprietor/ Contact person -Shri Amej Ku mar Singh,
Designation
AGM, HR & A dmin,
Contact No.
MOB. No- 09 719402388
Year of Commissioning.
2007
Sector
Private
Production details.
Products
Sugar
Installed Prod. Cap
500 MTD
Operating capacity
Cane crushing capacity
5000 TCD
Cane crushed last year
3600200.799 MT
Molasses generation (2013-14)
17909.6 MT
Press Mud generation (2013-14)
16777.9 MT
Operational status
B: Water Pollution and its Control:
5.
Non operatio al due to off season
Water Supply Source(s)
Tube well
Water Consumption (KLD)
Industrial
2570 KLD
Domestic
330 KLD
Water Meter to show consumption
Available
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment) (2013-14)
> Industrial
> Domestic
Waste Water treatment capacity (KLD)
> Industrial
> Domestic
Not Available
750 KLD
260 KLD
750 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETP
> ETP Description with flow diagram
â
>
•
Oil Skimmer- Equalization Tank - Primary
Details of Reverse Osmosis plant, if any Clarifier —Aeration Tank (I & II)
Details of Multi Effect Evaporator, if any —,Secondary Clarifier --> Carbon & Sand filter
—Sludge Thinker
Waste
water
discharged
(after
treatment)(KLD)
> Industrial
750 KLD
Domestic
260 KLD
Mode of disposal of treated effluent On Land (Ferti Irrigation)
(Details)
Sample distributed into no. of parts (2/3)
N/A
Sludge disposal mode
On land as manure
Effluent collection locations
results (if collected)
&
analysis Locations
Parameters
pH
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Fertiirrigation
Treated effluent after Carbon
stord in lined lagoon
2800 KL
Command area for irrigation (available
50 Acres
land area)
System for dilution of treated effluent
Not Required
required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for using
Flexible pipe line
..
Consent by farmers
treated effluent
Storage facility available for treated
As per (1)
effluent during low demand period
Quality of effluent being used for fertiirrigation
Ground water monitoring network
Not available
Not available
ngrba.cpcb c„Q-mail.com Sugar Format modified considering NGT directions
&
Sand filter is
3
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with consumption
5.
Boiler of 90 TPH
Bagasse- 1080 MTD
> Stack details
65 Meter Stack, I.D. of Stack-3.4 M
> APCS details
1. Wet Scrubber System.
Samples collections points
(if collected)
otographs depicting status of industries:
PM (mg/Nm3):
Pic 2: Aeration tank II
Pic 4: Treated effluents stored at Lagoons
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna
No Drain nearby, River Kosi about 5 KM
1
Signature
Name & Designations
Name of officials
inspecting
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Nangom, JRF
CPCB Delhi
2
of
Date
Submission
report
oiht
r.e.e/d;*.scvt
/
[email protected] Sugar Format modified considering NGT directions
D-4 /
191-141Ceettfr2-C —
17
4e
co
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General Information
Name of the unit and address
5.
6.
Name of the Proprietor/ Contact Shri Sunil Kumar Srivanstava
person - Designation
GM (Production)
Contact No.
Mob. No.: 9997199316
Year of Commissioning.
2008
Sector
Private
Production details.
Products
Sugar
Installed Prod. Cap
600 MTD
Operating capacity
Cane crushing capacity
6500 TCD
Cane crushed last year
5,10,432 MT
Molasses generation (2013-14)
26763 MT
Press Mud generation (2013-14)
19944.5 MT
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
M/s Rana Sugar Limited
(Unit: BELWARA)
P.O. Manpur, Teh. & Distt-Moradabad (U.P.)
__.
Non operational due to off season
1. Tube well
Industrial
4404 KLD
Domestic
20 KLD
Water Meter to show consumption
Not available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment) (2013-14)
> Industrial
â Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Not available
2000 KLD
16 KLD
Capacity-2000 KLD
rigrba.cpcbagmail.corn Sugar Format modified considering NGT directions
6
Pi
2
Details of ETP
Description
> ETP
diagram
â
>
with
flow Oil
&
Grease
- Primary
Trap
Clarifier
- Equalization
Tank
- Aeration
Tank
Details of Reverse Osmosis plant, - Secondary Clarifier - Sludge Drying Bed
if any
Details of Multi Effect Evaporator,
irany
Waste water discharged (after
treatment)( KLD)
2000 KLD
> Industrial
16 KLD
Domestic
Mode of disposal of treated effluent On land (Ferti Irrigation)
(Details)
10.
11.
Sample distributed into no. of parts Not Required
(2/3)
Oil & Grease burned in Boiler mixed with
Sludge disposal mode
bagasse
used as manure
Parameters
& Locations
Effluent collection locations
TSS
COD
BOD
pH
analysis results (if collected)
(mg/I)
(mg/I)
(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before -Ferti-irrigation
Command area for irrigation
79 Hectare own (Nearby Farmers Also)
(available land area)
System for dilution of treated Not Required.
effluent required for ferti-irrigation
System of transportation of treated Through Flexible pipe line
effluent upto field.
Formal agreements with farmers for Consent by Farmers
using treated effluent
Storage facility available for treated
Not Available
effluent during low demand period
Quality of effluent being used for ferti-irrigation
Ground water monitoring network
Not Available
Not available
[email protected] Sugar Format modified considering NGT directions
1
3
C: Air Pollution and its Control
Sources of Air Pollution
> Type
of Fuel used
consum @don
> Stack details
Boiler of 120 TPH
with Bagasse- 55 MTH
60 Meter (One) I.D.-4.0 Meter
APCS details
>
1. ESP
Samples collections points
(if collected)
PM (mg/Nm3)
Photographs indicating locations:
.4,0----
-
...y h
-.4,,'
',
- -, At
r
'
,
.---.---:—=
7,—
r
-
4.TY-4....2.1
ic 2: ETP (Primary Clarifier)
Pic 1: Entr
7 ,
I): s
tl
a
4
I
'
i
/
:
1 ,
ti
'
, 41,
n
,
.141
4. " 1 .;n
. Kt ' , .
E
.,,,,e
1.,‘ ii::!1!..,', .,..
Pic: 3 Chimne
,
. -,,-,
I
Thl
:, -,
All visible
Pic 4:Cooling ,Tower
[email protected] Sugar Format modified considering NGT directions
Aka ....
za.
4
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Road side drain- Rajhra Drain- Ramganga
(15 Km travel to reach Ganga)
1
Name & Designations
Name of officials
inspecting
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Nangom, JRF
CPCB Delhi
2
Date
of
Submission
report
q et Sefilarwhan, ,3•4,
rigrba.cocb5,gmail.corn Sugar Format modified considering NGT directions
Signature
41.1"r"
47 NU& e (" IL
-r
NIOr
COD
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General Information
Name of the unit and address
5.
6.
Name of the Proprietor/ Contact Shri V. P. Singh,
person - Designation
Head HR & Admin.
Contact No.
Mob No- 09690021630
Year of Commissioning.
2007
Sector
Private
Production details.
Products
Sugar
Installed Prod. Cap
500 MTD
Operating capacity
Cane crushing capacity
5000 TCD
Cane crushed last year(2013-14)
448909.076 MT
Molasses generation(2013-14)
22273.45 MT
Press Mud generation(2013-14)
20918.8 MT
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
M/S Triveni Engineering and Industries Ltd.
Unit-Rani Nagai, Thakurdwara,
Moradabad.
Non operational due to off season
1. Tube well
Industrial
2700 KLD
Domestic
260 KLD
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Available
750 KLD
200 KLD
750 KLD
[email protected] Sugar Format modified considering NGT directions
1115
2
Details of ETP
ETP Description
diagram
>
â
>
with
flow Oil
Grease
Trap
- Equalization
Tank
- Primary Clarifier - Aeration Tank (I
& II)
&
Details of Reverse Osmosis plant, - Secondary Clarifier - Sludge Thinker if any
Details of Multi Effect Evaporator, Sand filter
if any
Waste water discharged (after
treatment)(KLD)
â Industrial
750 KLD
Domestic
200 KLD
Mode of disposal of treated effluent On land (Ferti Irrigation)
(Details)
,
Sample distributed into no. of parts N/A
(2/3)
Sludge disposal mode
On land as manure
Effluent collection locations
analysis results (if collected)
&
Locations
•
Parameters
pH
BOD
(mg/I)
COD
(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Line lagoons 10,500 m3
Ferti-irrigation
Command area for irrigation
..
14 Acres own (Nearby Farmers Also)
(available land area)
System for dilution of treated
Not Required
effluent required for ferti-irrigation
System of transportation of treated
Flexible pipe
effluent upto field.
Formal agreements with farmers for Consent by farmers
using treated effluent
Storage facility available for treated
As per (1)
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
No measuring device
Not available
C: Air Pollution and its Control
ngrba.cpcbggmail.corn Sugar Format modified considering NGT directions
Carbon &
TSS
(mg/I)
3.
Sources of Air Pollution
of Fuel used
> Type
consumption
â Stack details
4,
>
5.
Samples collections points
(if collected)
Boiler of 80 TPH
with Bagasse- 864 MTD
60 Meter combined stack Inner dia-5.0 meter
1. ESP
APCS details
PM (mg/Nm ):
Photographs indicating locations:
Pic 1: Primary Clarifier
Pic 2: Chimney
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Local forestry Drain- Lapakana - Ramganga (Approx. 11Km travels to reach Ramganga)
1
2
Name of officials
inspecting
of
Date
Submission
report
Name & Designations
Signature
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Nangom, JRF
CPCB Delhi
4Mr51`4""
1 It SeekrInboit )..-Ø/Y
[email protected] Sugar Format modified considering NGT directions
^^^
491t,ti0e.,e41
11:(
CD&
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Insoection: 03-09-2014
A: General Information
5.
6.
Name of the unit and address
M/s Deewan Sugars Ltd.,
Vill- Agwanpur, Kanth Road,
Distt-Moradabad (U.P.)
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Shri Atul Goel,
G.M. (Production)
Mob. No.-07500457555
2000
Private
Sugar
250 MTD
Cane crushing capacity
2500 TCD
Cane crushed last year
344228.428 MT
Molasses generation(2013-14)
17995.400 MT
Press Mud generation(2013-14)
15146.032 MT
Operational status
Non-operational due to off season
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
1. Tube well
Industrial
2265 KLD
Domestic
130 KLD
Water Meter to show consumption
Not available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
Domestic
Not available
1000 KLD
100 KLD
1000 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETP
ETP Description
diagram
â
â
â
with
flow Bar
Screen- Oil
Equalization
Tank
and
Grease
- Primary
TrapClarifier-
Details of Reverse Osmosis Aeration Tank - Secondary Clarifier- Polishing
plant, if any
Details
of
Multi
Effect Tank- Sludge Drying Beds.
Evaporator, if any
Waste water discharged (after
treatment)(KLD)
â Industrial
1000 KLD
Domestic
100 KLD
Mode of disposal of treated On land (Ferti Irrigation)
effluent (Details)
Sample distributed into no. of N/A
parts (2/3)
Sludge disposal mode
On land as manure
Effluent collection locations
analysis results (if collected)
&
Locations
Parameters
pH
BOD
(mg/0
COD
(mg/0
Outlet
Others
(I) Informatio n regarding Ferti-irrigation
Details of treatment effluent
Storage lagoon
before Ferti-irrigation
Command area for irrigation
50 Acres own (Nearby farmers also)
(available land area)
System for dilution of treated
Not Required
effluent required for ferti-irrigation
System of transportation of
Through Drain/Flexible pipe line
treated effluent upto field.
Formal agreements with farmers
Consent by farmers
for using treated effluent
Storage facility available for
As per (1)
treated effluent during low
demand period
Quality of effluent being used for
ferti-irrigation
Ground water, monitoring network
No measuring device
Not available
[email protected] Sugar Format modified considering NGT directions
TSS
(mg/0
I 50
3
C: Air Pollution and its Control
Sources of Air Pollution
Type of Fuel used
consumption
> Stack details
APCS details
5.
Samples collections points
(if collected)
Boiler of 77 TPH
with Bagasse- 850 MTD
50 Meter, Inner dia 3.0 Meter
Wet Scrubber System
PM (mg/Nm3):
Photographs indicating locations:
Pic 1: ETP flow diagram Pic 2: ETP
Pic: 3 Chimney
Pic 4: Treated effluent Storage lagoon
[email protected] Sugar Format modified considering NGT directions
151
4
E. Route of effluent to reach river Ganga/Yamuna
No Nearby Drain, River Ramganga about 2 Icrn. (after Railway crossing)
1
2
Name of officials
inspecting
Date
of
Submission
Name & Designations
Signature
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
-k }4t-h4.0
report Stn
9 September, 2014
ngrba.cocKkgmail.corn Sugar Format modified considering NGT directions
152`ieSkr;
WY
COXEI
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection: 03-09-2014
A: General Information
Name of the unit and address
5.
6.
7.
M/S DSM Sugar (Distillery Division),
(A Unit of Dhampur Sugar Mills Ltd.)
Vill-Asmoli, Dist- Sambhal.
Name of the Proprietor/ Contact Shri Subhash Pandey
person - Designation
Vice President
Contact No.
Ph. No.- 05923-241438
-221441
Year of Commissioning.
2008
Sector
Private
Production details.
Rectified Spirit, ENA, Ethanol
Products
Installed Prod. Cap.
100 KLD
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
Molasses - 450 TPD
Operational status
Closed by own since 9 th June, 2014
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
5.
Tube well
Industrial
1800 KLD
Domestic
184KLD
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Not available
1000 KLD
160 KLD
1000KLD
[email protected] Distillery Format modified considering NGT directions
2
Details of ETP
ETP Description
diagram
â
â
â
BioR0-->MEE-->Bio compost
with
flow
Details of Reverse Osmosis plant,
if any
Details of Multi Effect Evaporator,
if any
Two Reverse Osmosis -500 KLD each followed
by
MEE-1400 KLD (5 stage) and Bio Compost19.5 Acre
Waste water discharged (after treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated effluent NA
(Details)
Sample distributed into no. of parts Not Required
(2/3)
Not required
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
Parameters
Locations
pH
BOD
Ong/0
Outlet
Others
(I) Information regarding Bio-composting
Active area for bio compost 19.5 Acres
preparation (m2)
Area for press mud storage (m 2 )
3.0 Acres
Area for bio compost storage (m 2 )
3.0 Acres
Spent wash storage capacity
20,000 KL
Availability of pressmud
From own Sugar Mills
Quantity of compost prepared
8400 MT
(Monthly statement of last year)
Quantity
of
pressmen
procured 21600 MT
(Monthly statement)
Details of wind roses (Number, Stopped due to rainy season
length, height, width of stacking,
space between two wind rose)
9.
Quantity of Effluent being used for 2.5 m 3/tonnes of press mud
composting ( m 3/day) :
[email protected] Distillery Format modified considering NGT directions
COD
TSS
Ong/0
Ong/0
3
Quantity of press mud being used
10,800 MT
for one cycle
Maturity time in days for one cycle
45-50 days
Arrangement for rainy season
Bio Composting Closed
Quality Of ground water in the area No measuring device
and depth of ground water table
(II) Information regarding Ferti-irrigation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
Type of Fuel used
consumption
> Stack details
5.
Not Required
Not Required
..
Not available
170 TPH Boiler
MTD,
with 1632
Bagasse
and
(10000m3/day)
72 Meters (Inner Dia 3.4 Meter)
â APCS details
1. ESP
Samples collections points
(if collected)
PM (mg/Nm3):
[email protected] Distillery Format modified considering NGT directions
'
Biogas
I 55
4
Photographs depicting status of industry.
Pic 1: Entry of unit
Pic 2:RO
Pic 3: Compost Yard
Pic: 5 Chimney
Pic 6: Spent wash storage Lagoon
[email protected] Distillery Format modified considering NGT directions
156
5
E. Route of effluent to reach river Ganga/Yamuna
Soat River-River Ganga
1
Name of officials
inspecting
Name & Designations
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
..
RO Moradabad, UPPCB
Shri Ananda Kumar Nangom, JRF
CPCB Delhi
2
of
Date
Submission
report
9 th September, 2014
[email protected] Distillery Format modified considering NGT directions
Signature
444ks-F,A.,
IL)11.1.14 i t/ )(
acs
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 03-09-2014
A: General Information
Name of the unit and address
5.
6.
Name of the Proprietor/ Contact person Shri Subhah Pandey,
- Designation
Vice President,
Mob. No.- 05923221438
Contact No.
Year of Commissioning.
1994
Private
Sector
Production details.
Products
Sugar
900 MTD
Installed Prod. Cap
Operating capacity
Cane crushing capacity
9000 TCD
Cane crushed last year
837647.314 MT
Molasses generation (2013-14)
40946.00 MT
Press Mud generation(2013-14)
32333 MT
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
M/s D.S.M. Sugar,
Asmoli,
Dist-Sambhal.
Non operational due to off season
1. Tube well
Industrial
4050 KLD
Domestic
180 KLD
Water Meter to show consumption
Not available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD) (before
treatment)
> Industrial
> Domestic
Waste Water treatment capacity (KLD)
> Industrial
> Domestic
Not available
•
1800 KLD
140 KLD
2500KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETP
ETP Description with flow diagram
â
â
â
Bar Screen- Oil & Grease Trap - Equalization
Tank - Primary Settling Tank- Aeration Tank
Details of Reverse Osmosis plant, if
- Secondary Settling Tank- Sludge Drying Bed
any
Details of Multi Effect Evaporator, if
any,
(after
discharged
water
Waste
treatment)(KLD)
1800 KLD
â Industrial
140 KLD
Domestic
On
land (Ferti Irrigation)
effluent
treated
Mode of disposal of
(Details)
Sample distributed into no. of parts N/A
(2/3)
On land as manure
Sludge disposal mode
Effluent collection locations
results (if collected)
&
Parameters
analysis Locations
pH
SOD
(mg/I)
COD
(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before
40000 KL Lined Lagoon
Ferti-irrigation
Command area for irrigation (available
50 Acres own (Nearby Farmers Also)
land area)
System for dilution of treated effluent
Not Required
required for ferti-irrigation
System of transportation of treated
Flexible Pipe line
effluent upto field.
Formal agreements with farmers for
Consent by farmers
using treated effluent
Storage facility available for treated
As (1)
effluent during low demand period
Quality of effluent being used for fertiirrigation
Ground water monitoring network
No Measuring device
(Not available)
C: Air Pollution and its Control
ngrba.cpcbCcSgmail.com Sugar Format modified considering NGT directions
TSS
(mg/I)
160
3
Sources of Air Pollution
Type of Fuel used with consumption
> Stack details
Boiler of 60 TPH (2 no. ․ )
Bagasse- 672 MTD
60 Meter combined (Inner Dia 3.4 Meter)
> APCS details
1. Wet Scrubber System
5.
Samples collections points
PM (mg/Nm3):
(if collected)
Photographs depicting the status of the Industry:
,,..
--
hipi pirTitigar Mills Lipitoci • Asmot
MR:
)s..
41.-
.
'
.
.
al
.0
f;;TZ
Pic 1: Entry
Pic 2: ETP
•
E. Route of effluent to reach river Ganga/Yamuna
Nearby River Soat
1
2
Name of officials
inspecting
Date
of
Submission
report
Name & Designations
Signature
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
'"1-4)1"-
9 th September, 2014
[email protected] Sugar Format modified considering NGT directions
,
162.
•••••••n•nnn•n••
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 03-09-2014
A: General Information
Name of the unit and address
5.
6.
M/s Dhampur Sugar Mills,
Vill & Post- Rajpura, Tehsil- Gunnaur,
Dist-Sambhal.
Name of the Proprietor/ Contact Shri Subodh Singh
person - Designation
A.G.M.
Contact No.
Mob. No.- 07895003355
Year of Commissioning.
2006
Sector
Private
Production details.
Products
Sugar
Installed Prod. Cap
700 MTD
Operating capacity
Cane crushing capacity(2013-14)
7000 TCD
Cane crushed last year(2013-14)
623775.436 MT
Molasses generation(2013-14)
35128.80 MT
Press Mud generation(2013-14)
23828 MT
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
Water Meter to show consumption
Non operational due to off season
1. Tube well
Industrial
3400 KLD
Domestic
200 KLD
Not available
Flow measuring device installed at Not available
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
2100 KLD
D Domestic
160 KLD
[email protected] Sugar Format modified considering NGT directions
163
2
Waste Water treatment capacity Capacity-2100 KLD
,
(KLD)
> Industrial
> Domestic
Details of ETP
> ETP Description with flow diagram
Bar Screen- Oil & Grease Trap - Primary
> Details of Reverse Osmosis plant, Settling Tank- Aeration Tank - Secondary
if any
Settling Tank- Sludge Drying Bed
> Details of Multi Effect Evaporator,
if any
Waste water discharged (after
treatment)(KLD)
> Industrial
2100 KLD
Domestic
160 KLD
Mode of disposal of treated effluent On land (Ferti Irrigation)
(Details)
Sample distributed into no. of parts N/A
(2/3)
Sludge disposal mode
On land as manure
11.
Effluent collection locations
analysis results (if collected)
Locations
&
Parameters
pH
Outlet
BOD
(mg/I)
COD
(mg/I)
Others
(I) Information regarding Ferti-irrigation
1,
Details of treatment effluent before
lined lagoons
Ferti-irrigation
Command area for irrigation
70 Acre own (Nearby Farmers Also)
(available land area)
System for dilution of treated effluent Not Required
required for ferti-irrigation
System of transportation of treated
Flexible Pipe line
effluent upto field.
Formal agreements with farmers for
Consent by farmers
using treated effluent
6.
Storage facility available for treated
As (1)
effluent during low demand period
[email protected] Sugar Format modified considering NGT directions
TSS
(mg/I)
1“1
3
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used
consumption
5.
No Measuring device
(Not available)
Boiler of 120 TN
with Baggase- 1250 MTD
> Stack details
60 Meter (ID 3.5m)
> APCS details
1. Wet Scrubber System
Samples collections points
(if collected)
PM (mg/Nm3):
Photographs indicating the status of the Industry
e
-
_
-
_,_
_
t
\. \
aL-----:—
^
-.... ”stret=
I
le,
,.,
Pic 1: Aeration Tank
'
Pic: 2 Chimne
All visible
—,
to ',•,,
>
Arigir-i,
, .
Pic 3:Treated effluent storage tank
Pic 4: Discharge
pipeline)
[email protected] Sugar Format modified considering NGT directions
points
(underground
IS
4
Pic 5: Underground pipeline being closed
Pic 6: Underground pipeline closed
E. Route of effluent to reach river Ganga/Yamuna
Under Ground Drain (blocked), which meets. River Mahava about 1 km and finally meets
Ganga
1
Name & Designations
Name of officials
inspecting
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
2
of
Date
Submission
report
"th
7
September, 2014
ngrba.cpcbasmail.corn Sugar Format modified considering NGT directions
Signature
.kik!)0,4,
DTI
coxe
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 03-09-2014
*
A: General Information
Name of the unit and address
5,
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Shri Sudhir Kumar,
Chief General Manager,
Mob. No.-09634090209
2008
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Cane crushing capacity
Private
Cane crushed last year
561761.621 MT
Molasses generation
28782 MT
Press Mud generation
21066 MT
10. Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
M/s Rana Sugar Limited,
Unit- Karimganj, Post-Shahabad,
Distt-Rampur (U.P.)
•
Sugar
500 MTD
5000 TCD
Non operational due to off season
1. Tube well
Industrial
3000 KLD
Domestic
20 KLD
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
â Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
â Domestic
Not available
2000 KLD
16 KLD
Capacity-2000 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETP
ETP Description
diagram
â
â
â
with
flow Bar
Screen- Oil
Equalization
and
Grease
- Primary
Tank
TrapSettling
Details of Reverse Osmosis Tank- Aeration Tank - Secondary Settling
plant, if any
of
Multi
Effect Tank -Carbon sand filter- Sludge Drying
Details
Evaporator, if any
Beds.
Waste water discharged (after
treatment)(KLD)
2000 KLD
â Industrial
Domestic
Mode of disposal of treated On land (Ferti Irrigation)
effluent (Details)
Sample distributed into no. of Not Required
parts (2/3)
On land as manure and oil and grease is
Sludge disposal mode
burnt with bagasse in boiler
Parameters
& Locations
Effluent collection locations
COD
TSS
pH
BOD
analysis results (if collected)
(mg/0
(mg/0
Outlet
Others
(I) Information regarding Ferti-irrigation
line lagoons 4500 K.L.
Details of treatment effluent
before Ferti-irrigation
Command area for irrigation
30 Acres own (nearby farmers also)
(available land area)
System for dilution of treated
Not Required
effluent required for ferti-irrigation
System of transportation of
Flexible pipe line
treated effluent upto field.
Formal agreements with farmers
Consent by farmers
for using treated effluent
Storage facility available for
As per (1)
treated effluent during low
demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
No measuring device
(Not available)
ngrba.cpcbtemail.com Sugar Format modified considering NGT directions
(mg/0
I68
3
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used
consumption
Boiler of 120 TPH
with Bagasse- 1100 MTD
> Stack-details
72 Meter, Inner dia 4.0 meter
â APCS details
1. ESP
PM (mg/Nm3):
Samples collections points
(if collected)
Photographs indicating the status of the Industry
5.
F
Pic 1: Aeration tank
Pic: 2 Chimney
E. Route of effluent to reach river Ganga/Yamuna
No nearby drain. River Ramganga about 10 KM
1
Name & Designations
Name of officials
inspecting
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
2
of
Date
Submission
report
9 in September, 2014
[email protected] Sugar Format modified considering NGT directions
Signature
-"ters—`-`"
Iq
13 LA-tv ic PA4
E
4-0
CM[I)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection: 04-09-2014
A: General Information
Name of the unit and address
M/S Radico Khetan Ltd.,
Bareilly Road,
District-Rampur.
Name of the Proprietor/ Contact Shri Devendra Singh,
person - Designation
Senior Vice President
Contact No.
Mob No- 09837471443
Year of Commissioning.
1943
6.
Sector
Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
Molasses, Grain, Malt
7.
Operational status
Operating
5.
Private
Rectified Spirit, ENA, Absolute Alcohol
(Molasses based 220 KLD, Grain based 80 KLD,
Malt based 2.5 KLD)
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
5.
.
Tube well
Industrial
6600 KLD
Domestic
380 KLD
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
â Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Not available
2900 KLD
300 KLD
240 KLD
[email protected] Distillery Format modified considering NGT directions
141
2
Molasses- MEE-) Biomethanisation4 RO-) Bio
with flow Composting, Lagoons (58000 KL, 20000KL,
12000 KL)
Grain- Cyclone separator --MEE -Cattle feed,
Details of Reverse Osmosis plant, Malt- Biomethanisation
if any
Details of Multi Effect Evaporator,
if arty
Details of ETP
Description
â ETP
diagram
>
>
Waste water discharged (after
treatment)(KLD)
240 KLD ( bottle washing, boiler blowdown)
Industrial
Domestic
Mode of disposal of treated effluent Surface water (Municipal Drain)
(Details)
Sample distributed into no. of parts 03
(2/3)
Mixed with Biocompost
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
Locations
pH
Parameters
COD
BOD
(mg/I) (mg/I)
TSS
(mg/I)
Outlet
Others
(I) Information regarding Bio-composting
Active area for bio compost 52 Acre (two locations)
preparation (m2)
Area for press mud storage (m 2 )
3.0 Acre
Area for bio compost storage (m 2 )
3.0 Acre
Spent wash storage capacity
3 Lagoons(58000 KL, 20000KL, 12000 KL)
Availability of pressmud
Sugar Mills
Quantity of compost prepared
26036 MT
(Monthly statement of last year)
Quantity of press mud procured 89350 MT
(Monthly statement)
Details of wind roses (Number, 31, length--100)
length, height, width of stacking, Height-1.5 m
space between two wind rose)
Width 2.5 m
Gap-1.5 m
ngrba.cpcbggmail.com Distillery Format modified considering NGT directions
3
Quantity of Effluent being used for 550 KLD (provision made to burn 120 KLD in
boiler)
composting ( m 3/day) :
Quantity of press mud being used 36,000 MT per cycle
for one cycle
13.
Maturity , time in days for one cycle
50-55 days
Arrangement for rainy season
6.5 Acres covered land for Bio composting
Quality of ground water in the area Not measuring device
and depth of ground water table
(II) Information regarding Ferti-irrigation N/A
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
>
Type of Fuel
consumption
used
Not Required
Not Required
Not available
2 Boilers of 26 TPH & 30 TPH
with Biogass-69600 M 3/day with 26 TPH Boiler
Rice Husk-120 MTD & Biogass 32000 M3/day
with 30 TPH Boiler
â
Stack details
45 M (Inner Dia 1.5 M) with 26 TPH Boiler
45 M (Inner Dia 1.5 M) with 30 TPH Boiler
>
APCS details
1. ESP with 30 TPH Boiler
[email protected] Distillery Format modified considering NGT directions
4
Samples collections points
(if collected)
Photographs indicating the status of the Industry
Pic 4: MEE ad'acent to distillation column
ngrba.cpcbgmail.corn Distillery Format modified considering NGT directions
I '4. 4
5
Pic 6: Discharge points (V notch
available)
E. Route of effluent to reach river Ganga/Yamuna
Outlet of Unit-Municipal Drain-) Kosi Rive-) Ramganga
1
2
Name of officials
inspecting
of
Date
Submission
Name & Designations
Signature
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri U C Shukla, ASO,
Moradabad, UPPCB
Shri A K Vishwakarma, SA,
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
Shri D C Mishra, Monitoring Asst.
RO Moradabad, UPPCB
4'14e113-1/$1
report 9 th
9 September, 2014
[email protected] Distillery Format modified considering NGT directions
not
RLA
P A4 E
•••n•••••••n11.n
`''
%1Ifir&-(17s
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection: 04-09-2014
A: General Information
Name of the unit and address
M/S Radico Khetan Ltd.,
Bareilly Road,
District-Rampur.
6.
Name of the Proprietor/ Contact Shri Devendra Singh,
Senior Vice President
person — Designation
Mob No- 09837471443
Contact No.
1943
Year of Commissioning.
Private
Sector
Rectified Spirit, ENA, Absolute Alcohol
Production details.
(Molasses based 220 KLD, Grain based 80 KLD,
Products
Malt based 2.5 KLD)
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Molasses, Grain, Malt
Raw materials & their requirement
7.
Operational status
5.
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
Operating
Tube well
Industrial
Domestic
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
Industrial
Domestic
Waste Water treatment capacity
(KLD)
â Industrial
)=. Domestic
Not available
â
â
5.
6600 KLD
380 KLD
2900 KLD
300 KLD
240 KLD
ngrba.cpcbgmail.com Distillery Format modified considering NGT directions
/4+
2
Molasses- MEE- Biornethanisation4 RO4 Bio
flow Composting, Lagoons (58000 KL, 20000KL,
12000 KL)
Grain- Cyclone separator -MEE -Katie feed,
Details of Reverse Osmosis plant, Malt- Biomethanisation
if any
Details of Multi Effect Evaporator,
if any
Details of ETP
ETP
Description
diagram
>
>
>
with
Waste water discharged (after
treatment)(KLD)
240 KLD ( bottle washing, boiler blowdown)
> Industrial
Domestic
Mode of disposal of treated effluent Surface water (Municipal Drain)
(Details)
Sample distributed into no. of parts 03
(2/3)
Mixed with Biocompost
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
Parameters
Locations
(,,,,c, D 0
pH
Outlet Cer-f9
Others
9
CS
ou.4-6.4-
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
7.%
/0
24
8DL
7. 6
3
ii
7. 0
(I) Information regarding Bio-compostin
Active
area
for
bio
compost 52 Acre (two locations)
preparation (m2)
3.0 Acre
3.0 Acre
Spent wash storage capacity
4
•
oons(58000 KL, 20000KL, 12000 KL)
Availability of pressmud
Sugar Mills
Quantity of compost prepared
26036 MT
(Monthly statement of last year)
Quantity of press mud procured 89350 MT
(Monthly statement)
Details of wind roses (Number, 31, length--100)
length, height, width of stacking, Height-1.5 m
space between two wind rose)
Width 2.5 m
Gap-1.5 m
ngrba.epcbrd),gmail.com Distillery Format modified considering NGT directions
3
Quantity of Effluent being used for 550 KLD (provision made to burn 120 KLD in
boiler)
composting ( m 3/day) :
Quantity of press mud being used 36,000 MT per cycle
for one cycle
13.
Maturity time in days for one cycle
50-55 days
Arrangement for rainy season
6.5 Acres covered land for Bio composting
Quality of ground water in the area Not measuring device
and depth of ground water table
(II) Information regarding Ferti-irrigation N/A
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Not Required
Command area for irrigation
(available land area)
Not Required
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Not available
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
â
Type of Fuel
consumption
used
•
2 Boilers of 26 TPH & 30 TPH
with Biogass-69600 M 3 /day with 26 TPH Boiler
Rice Husk-120 MTD & Biogass 32000 M3/day
with 30 TPH Boiler
>
Stack details
45 M (Inner Dia 1.5 M) with 26 TPH Boiler
45 M (Inner Dia 1.5 M) with 30 TPH Boiler
> APCS
details
oci
tisiLbAspsas
.
1. ESP with 30 TPH Boiler
Distillery Format modified considering NGT directions
I 1.3
4
Samples collections points
(if collected)
PM (mg/Nm3):
Result Awaited
Photographs indicating the status of the Industry
Pic 3: Covered Compost Yard
Pic 4: MEE adjacent to distillation column
ngrba.cpcbagmail.com Distillery Format modified considering NGT directions
5
• '41-.4.
Pic 6: Discharge points (V notch
available
E. Route of effluent to reach river Ganga/Yamuna
Outlet of Unit-Municipal Drain4 Kosi Rive-* Ramganga
1
Name of officials
inspecting
Name & Designations
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri U C Shukla, ASO,
Moradabad, UPPCB
Shri A K Vishwakarma, SA,
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
Shri D C Mishra, Monitoring Asst.
RO Moradabad, UPPCB
2
Date
of
Submission
report
Stn
u September, 2014
[email protected] Distillery Format modified considering NGT directions
Signature
"kitejrivA
4,1
n•nn•nn••n••••n••••
Wwf
CDID
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 04-09-2014
A: General Information
Name of the unit and address
5.
6.
M/S Rudra Bilas Kisan Sahkari Chini Mills Ltd.,
Bilaspur,
Rampur
Name of the Proprietor/ Contact Shri A. K. Sahni,
person - Designation
Chief Chemist
Contact No.
MOB. No- 09412849864
Year of Commissioning.
1978
Sector
Cooperative
Production details.
Products
Sugar
Installed Prod. Cap
220 MTD
Operating capacity
Cane crushing capacity
2200 TCD
Cane crushed last year
172315.499 MT
Molasses generation
7852.9 MT
Press Mud generation
5169.45 MT
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
No Operational due to off season
Tube well
Industrial
1320 KLD
Domestic
302.94 KLD
Water Meter to show consumption
Not Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Not Available
400 KLD
240 KLD
400 KLD
[email protected] Sugar Format modified considering NGT directions
..
Sources of Air Pollution
> Type
of Fuel used
consumption
Two Boilers of 20 TPH each
with Bagasse- 575 MTD
D Stack details
>
30 Meter combined stack, Inner dia of Stack2,3 M
1. Dust collector (Show cause notice issued by
APCS details
UPPCB to upgrade AMCS)
5.
Samples collections points
(if collected)
Photographs indicating locations:
PM (mg/Nm3):
., I A,-,
.
'II
.
r
III
Ita
II
Pic 1:Clarifier
Pic: 2 Chimney (one in operation)
E. Route of effluent to reach river Ganga/Yamuna
Kulli River-) West Begul River 4 Ramganga
1
Name of officials
inspecting
Name & Designations
Signature
Shri M K Biswas, Sc 'C'
-kilVftrk/A
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
..
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
2
Date
of
Submission
report
9 th September, 2014
[email protected] Sugar Format modified considering NGT directions
1;1
3 (4
2
Details of ETP
ETP Description
diagram
>
>
with
flow Bar Screen- Oil & Grease Trap- Equalization
Tank - Aeration Tank —Secondary Clarifier ,
Details of Reverse Osmosis plant, Sludge Drying Beds
if any
..
Details of Multi Effect Evaporator,
if any
Waste water discharged (after
treatment)(KLD)
> Industrial
400 KLD
Domestic
240 KLD
Mode of disposal of treated effluent On Land (Ferti Irrigation)
(Details)
Sample distributed into no. of parts N/A
(2/3)
Sludge disposal mode
On land as manure
Effluent collection locations
analysis results (if collected)
&
Locations
pH
Outlet
Parameters
SOD
(mg/I)
COD
(mg/I)
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before
Storage Lined Lagoon 4000 KL
Ferti-irrigation
Command area for irrigation
50 Acre own (Nearby Farmers Also)
(available land area)
System for dilution of treated
Not Required
effluent required for ferti-irrigation
System of transportation of treated
through Flexible pipe line
effluent upto field.
Formal agreements with farmers for Consent by farmers
using treated effluent
Storage facility available for treated
As per (1)
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
around water monitoring network
No measuring device
Not available
C: Air Pollution and its Control
[email protected] Sugar Format modified considering NGT directions
TSS
(mg/I)
ow...armor
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
pate of Insnection: 04-09-2014
A: General Information
Name of the unit and address
M/S National Industrial Corporation Ltd.,
Raja Ka Sahaspur, Billari,
District- Moradabad.
Name of the Proprietor/ Contact Shri V.N. Ojha,
General Manager,
person - Designation
Ph. NO-09012270066
Contact No.
1943
Year of Commissioning.
Private
Sector
Production details.
5.
ENA/RS/Absolute Alcohol
Products
60 KLD
Installed Prod. Cap.
40 KLD
Consented Prod. Cap
40 KLD
Restricted Prod. Cap.
Molasses-200 MTD
Raw materials & their requirement
6.
Operating
Operational status
7.
B: Water Pollution and its Control:
Tube well
Water Supply Source
Water Consumption (KLD)
5.
Industrial
1050 KLD
Domestic
12 KLD
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
I=. Industrial
> Domestic
Waste Water treatment capacity
(KLD)
)%. Industrial
â Domestic
Not available
10 KL/kl oppr at 40 KLD
400 KLD
10 KLD
750 KLD
rtgrba.cpcbggmail.coin Distillery Format modified considering NGT directions
.
2
Details of ETP
ETP Description
diagram
>
>
with
flow
Details of Reverse Osmosis plant,
if any
Details of Multi Effect Evaporator,
if any
Waste water discharged (after
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts
(2/3)
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
Bio digester 4 Settling pit- RO-Concentrated
Effluent used in Bio composition
Capacity of R 0 Plant-750 KLD
Not installed
RO permeate after degasification used in
cooling tower and Agriculture
About 10 KLD
On land (other than spent wash)
3
--Locations
ENQA2s27)
pH
Parameters
COD
son
(mg/1) (mg/1)
Rs!, RaOtzeretmeal.‘ $' 21
22
y
Zia
ict
47
"lees"
11
7. 9
3
(I) Information regarding Bio-composting
Active area for bio compost 7.5 Acre
preparation (m2)
Area for press mud storage (m 2 )
2.0 Acre
Area for bio compost storage (m 2 )
2.5 Acre
Spent wash storage capacity
22500 KL
Availability of pressmud
Sugar Mills
Quantity of compost prepared
(Monthly statement of last year)
Quantity
of
pressmen
5400 MT
procured
(Monthly statement)
17500 MT
Details of wind roses (Number, 30, L-90 M, H-1.8 M, W-3 M.
length, height, width of stacking, Distance between two windows 2 M.
space between two wind rose)
Quantity of Effluent being used for 190-200 M3/day
composting ( m3/day)
Quantity of press mud being used 3500-4200 MT
[email protected] Distillery Format modified considering NGT directions
TSS
(mg/1)
$„D L.
90
3
for one cycle
• •
Maturity time in days for one cycle
55-60 days
Arrangement for rainy season
No such arrangement for covered composting
observed however, Lining, catch pits and patch
drains were present.
13.
Quality of ground water in the area
No measuring device
and depth of ground water table
(II) Information regarding Ferti-irrigation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Not Required
Command area for irrigation
(available land area)
Not Required
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
(Available /Not available)
Ground water monitoring network
C: Air Pollution and its Control
10 TPH
Sources of Air Pollution
of Fuel used with Pet coke - 4.0 MTD
> Type
Bio gas - 13000 m3/day
consumption
5.
.
>
Stack details
33 Meters (Inner Dia 1.8 Meter)
>
APCS details
Multi cyclone Dust Collector
Samples collections points
(if collected)
PM (mg/Nm3):
Result Awaited
[email protected] Distillery Format modified considering NGT directions
I3.1.
4
Photographs depicting status of the industry:
Pic 2: RO
Pic 3: RO permeate after degasifier
Pic 3: Compost Yard
ngrba.cpcbaxmaii.corn Distillery Format modified considering NGT directions
5
Pic 6: Multi cyclone
Pic: 5 Chimney
E. Route of effluent to reach river Ganga/Yamuna
Sahaspura Drains--Aril Rive-) Ramganga River
Name of officials
inspecting
Name & Designations
Signature
Shri M K Biswas, Sc 'C'
"kA6e1r1‘44
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri U C Shukla, ASO,
Moradabad, UPPCB
Shri A K Vishwakarma, SA,
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
Shri D C Mishra, Monitoring Asst.
RO Moradabad, UPPCB
2
of
Date
Submission
report 9 th September, 2014
ngrba.cocbggmail.com Distillery Format modified considering NGT directions
4 .414 Ws/ (.1/:,
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 04-09-2014
A: General Information
Name of the unit and address
5.
6.
Name of the Proprietor/ Contact
person - Designation
Contact No,
Year of Commissioning.
Shri Sachendra Singh,
D.G.M. Production
Mob. No.-08392912302
1940 New group operating since 2006
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Private
Sugar
300 MTD
Cane crushing capacity
3000 TCD
Cane crushed last year
224269.531 MT
Molasses generation(2013-14)
10272.8 MT
Press Mud generation (2013-14)
8881.06 MT
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
5.
M/s Ajudhya Sugar Mills,
Raja ka sahaspur, Bilari,
Distt-Moradabad (U.P.)
Non operational due to off season
1. Tube well
Industrial
1900 KLD
Domestic
62 KLD
Water Meter to show consumption
Not available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Not available
1070 KLD
50 KLD
Capacity-650 KLD
[email protected] Sugar Format modified considering NGT directions
IBS
01)
2
Details of ETP
Description
â ETP
diagram
>
flow Bar
with
Details of Reverse
plant, if any
Multi
of
Detail's
Evaporator, if any
Grease
and
Screen- Oil
Trap- Equalization Tank - Primary Settling
Osmosis Tank- Aeration Tank - Secondary Settling
sand filter- Sludge Drying
Effect Tank - Carbon
Beds.
Waste water discharged (after
treatment)(KLD)
1070 KLD
Industrial
50 KLD
Domestic
Mode of disposal of treated On land (Ferti Irrigation)
effluent (Details)
Sample distributed into no. of N/A
parts (2/3)
On land as manure
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
•
Parameters
Locations
pH
SOD
(mg/0
COD
(mg/0
Outlet
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent
Under Construction
before Ferti-irrigation
Command area for irrigation
22 Acres own (Nearby farmers also)
(available land area)
System for dilution of treated
Not Required
effluent required for ferti-irrigation
System of transportation of
Flexible pipe line
treated effluent upto field.
Formal agreements with farmers
Consent by farmers
for using treated effluent
Storage facility available for
As (1)
treated effluent during low
demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
Not available
Not available
[email protected] Sugar Format modified considering NGT directions
TSS
(mg/0
Kati
3
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used
consum stion
â Stack details
â APCS'details
Boiler of 26 TPH and 32 TPH
Bagasse312 MTD with 26 TPH Boiler
with
Basasse- 360 MTD with 32 TPH Boiler
with 26 TPH Boiler - Height 60 M, I.D. 2.5 m
with 32 TPH Boiler- Hei g ht 40 M I.D.3.0 m
1. Cyclone Type Dust Collector Separately
with both boilers.
Unit under Maintenance
PM (mg/Nm3):
Samples collections points
if collected
Photographs depicting status of the industry
5.
. .
Pic 1: Entry
Pic 2: ETP (at least 1)
E. Route of effluent to reach river Ganga/Yamuna
Sahas•ura Nala - Aril River - Ramsan•a - Gan•a
1
Name of officials
inspecting
Name & Designations
Shri M K Biswas, Sc 'C'
CPCB Delhi
Shri Vijay, AEE
Moradabad, UPPCB
Shri P P Singh, JEE
RO Moradabad, UPPCB
Shri Ananda Kumar Ngangom, JRF
CPCB Delhi
2
of
Date
Submission
report 9 th
9 September, 2014
[email protected] Sugar Format modified considering NGT directions
Signature
"bt-1. '
Joint Inspection Report
Sugar & Distillery Industries
Muzaffarnagar (U.P)
Hon'ble Tribunal directed CPCB & UPPCB to carry out the Joint Inspection of the Sugar &
Distillery industrial units operating and discharging the effluents in Rivers Ganga and Yumuna.
In this view, a team of CPCB & UPPCB comprises of following officials visited the Sugar &
Distillery industrial units in Muzaffarnagar area:
Officials from CPCB, Delhi
Sh. Suneel Dave, Sc. `D' & I/c NGRBA Cell
Sh. Azad Singh, RA-I
Official/s from UPPCB
Sh. Vivek Rai , 11,0 .
Sh. Yogender, Semuyt-orii---
The following industries were inspected by the above team during 1 5 September, 2014 to 2nd
September, 2014:
Sr. No.
Name & Address of Industrial Unit, visited
M/s D.S.M Sugar, Mansurpur, Meerut Road
Muzaffarnagar (U,P).
M/s Sir Shadi Lal Distillery & Chemical Works,
Mansurpur, Muzaffarnagar (U.P).
M/s Triveni Enggineering & Industries Ltd (Sugar unit),
Khatauli, Muzaffarnagar (U.P).
M/s Tikaula Sugar Mills Lts; Tikaula, Ramray,
Muzaffarnagar (U.P).
M/s Tikaula Distillery, Tikaula, Muzaffarngar (U.P).
M/s Triveni Engg. & Industries Ltd., Bilaspur, Jolly Road,
Muzaffarnagar (U.P).
M/s Bajaj Hindustan Ltd., Bhaisana, Muzaffarrnagar
(U.P).
______
M/s Upper Doab Sugar Mill, Shamli, Muzaffarnagar (U.P)
II.
M/s Shamli Distilleries & Chemical Works, Shamli,
Muzaffarnagar (U.P).
M/s Unn Sugar Complex, Unn, Shamli, Muzaffarnagar
(U.P).
M/s Bajaj Hindustan Ltd.,Thanabhawan, Shamli,
Muzaffarnagar (U.P).
Joint Inspection Report
Annexure-I
Annexure-Il
Annexure-III
Annexure-IV
Annexure-V
Annexure-VI
Annexure-VII
Annexure-VIII
Annexure-IX
Annexure-X
Annexure-XI
Observations:
All the Industrial plants were found not in operation during inspection and hence no
production.
This implies that the Effluent Treatment Plants were also not in operation.
n0410‘11(1°11-\
v
(Su jDafe)
Sc. `D' & 1/c NGRBA Cell
CPCB, Delhi
RtAtt-?
k
(Vivek Rai)
Regional Officer
UPPCB, Muzaffarnagar
193
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General Information
Name of the unit and address
5.
6.
Name of the Proprietor/ Contact person Sh. Sanjay T ipathi (V.P)
Designation
Contact No.
2005
Year of Commissioning.
Private
Sector
Production details.
Products
Sugar
Installed Prod. Cap
10000 TCD
Operating capacity
Cane crushing capacity
10000 TCD
Cane crushed last year
850897.192 Tonns
Molasses generation
45276.800 Tonns
Press Mud generation
37269.297 Tonns
Operational status
Closed by direction.
B: Water Pollution and its Control:
Water Supply Source(s)
5.
M/s Bajaj Hindustan Ltd., Thanabhawan
Shamli, Muzaffarnagar (U.P).
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment)
â Industrial
Domestic
Waste Water treatment capacity (KLD)
â Industrial
Domestic
1.
Tube Well
Industrial
Domestic
3280
70
Available
V notch (Flow measurement
calibration and manual means).
â
1000 (approx.)
50
â
1000
50
ngrba.cpcb@gmaitcom Sugar Format modified considering NGT directions
through
I9
2
Details of ETP
ETP Description with flow diagram
Oil & Grease trap --0 Chemical mixing Tank
--0 Equalisation Tank --0 Primary
Clarifier-0 Aeration Tank--► Secondary
Clarifier—► ACF/Sand filter & Sludge drying
beds.
â Details of Reverse Osmosis plant, if any
â
â
Details of Multi Effect Evaporator, if
any
Waste
water
discharged
(after
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts (2/3)
Sludge disposal mode
Effluent collection locations
results (if collected)
&
1000 (approx)
50
On land (Within factory premises),Howevei
no assessment of same due to non-operatior
of unit.
Sample not collected as unit was not it
operation.
On Horticulture land as manure.
analysis Locations
(No Sample)
Parameters
pH
Outlet
Others
-
BOD
COD
TSS
Ong/0 Ong/0 (mg/r,
-
-
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Fertiirrigation
Activated sludge Treatment followed by
sludge separation.
Command area for irrigation (available
land area)
Factory premises
System for dilution of treated effluent
required for ferti-irrigation
No details provided.
System of transportation of treated
effluent upto field.
Nill
Formal agreements with farmers for
using treated effluent
No record provided.
Storage facility available for treated
effluent during low demand period
No storage provided.
Quality of effluent being used for fertiirrigation
After secondary Treatment
Ground water monitoring network
Available
ngrba.cpcb@gmaiLcorn Sugar Format modified considering NGT directions
3
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with consumption
>
>
5.
Stack details
APCS details
Samples collections points
(if collected)
(No Sample)
Boilers
Bagasses
Stack Height > 30 mtrs.
Wet Scrubber
PM
(mg/Nm
:
___
Photographs indicating locations: Photographs could not be taken due to out o.
battery-power of smart phone.
3.2" x3.2"
Pic 1: Entry
Pic 2: ETP (at least 1)
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
Effluent (Raw/Treated) from outlet drain of unit
►
Discharge to
River Yamuna via seasonal drain.
1
Name & Designations
Name of officials
inspecting
Signature
(-ono/
Sh. Suneel Dave, Sc 'D', CPCB
$70i& °'\\
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
2
of
Date
Submission
report
[email protected] Sugar Format modified considering NGT directions
,‘,04
oti iite
\`--\
c7
/5---
/
Oc6,"\ c\i‘°(
nn•nnnn•••••nn•nn
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General Information
Name of the unit and address
5.
6.
Unn, Shamli
Name of the Proprietor/ Contact person Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Sugar
4200 TCD
4000-4200 TCD
Cane crushing capacity
4200 TCD
Cane crushed last year
517634.970 Tonns
Molasses generation
27339.500 Tonns
Press Mud generation
25208.823 Tonns
Operational status
Non Operational (Seasonal industry)
B: Water Pollution and its Control:
Water Supply Source(s)
5.
M/s Unn Sugar Complex,
Muzaffarnagar (U.P).
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment)
â Industrial
â Domestic
Waste Water treatment capacity (KLD)
Industrial
â Domestic
â
Sh. Anil Gupta (G.M; Engg.)
0975921563 5
1996
Private
1.
Tube Well
Industrial
Domestic
2000
231
Available
Available-V notch. Flow measurement by
calibration and manual means.
1000 (approx.)
170
1200
170
[email protected] Sugar Formal modified considering NGT directions
► 92
2
Details of ETP
ETP Description with flow diagram
â
â
Details of Reverse Osmosis plant, if
any
Screens--► Oil & Grease trap ---n Lime
Tank—* Primary Clarifier
► Aeration
Tank—* Secondary Clarifier—+ Lagoon &
Sludge drying beds.
_
â
Details of Multi Effect Evaporator, if
any
Waste
water
(after
discharged
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts (2/3)
-
1000 (approx)
Nill
On land. However no assessment of same
due to non-operation of unit.
Sample not collected as unit was not it
operation.
Sludge disposal mode
On Agriculture land as manure.
Effluent collection locations & analysis Locations
Parameters
pH
SOD
COD
results (if collected)
TSS
Ong/0 Ong/0 (mg/IJ
Outlet
(No Sampe)
Others
(I) Information regarding Ferti-irrigation
Details of treatment effluent before FertiAerobic Treatment followed by secondary
irrigation
clarifier & lagooning.
Command area for irrigation (available
land area)
23 Hectare approx (Own farm)
System for dilution of treated effluent
required for ferti-irrigation
Nill
System of transportation of treated
effluent upto field.
Direct (via channel) as well as through Tankers
Formal agreements with farmers for
using treated effluent
No record provided/
Storage facility available for treated
effluent during low demand period
Lagoon
Quality of effluent being used for fertiirrigation
After Secondary treatment
Ground water monitoring network
Available
C: Air Pollution and its Control
[email protected] Sugar Format modified considering NGT directions
3
Sources of Air Pollution
â Type of Fuel used with consumption
Boilers
Bagasses 900 TPD (approx.)
>
>
5.
Stack details
APCS details
Samples collections points
(if collected)
Stack Height >30 mtrs.
PM (mg/Nm3):
(No sample)
Photographs indicating locations: Photographs could not be saved due to low battery.
3.2" x3.2"
Pic 1: Entry
Pic 2: ETP (at least 1)
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
ngrba.cpcbQgmaiLcom Sugar Format modified considering NGT directions
2,0 5
4
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
►
Effluent (Raw/Treated) from outlet drain of unit
Discharge to
River Yamuna via seasonal drain.
1
Name of officials
inspecting
Name & Designations
Signature
Sh. Suneel Dave, Sc 'D', CPCB
I
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
,
Vi i.va'
al,1104,
4004A`M
(7 4-- /' '-------
2
Date
of
Submission
report
[email protected] Sugar Format modified considering NGT directions
o`Pft \
(41k
sir
NIP/
00)CD
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General Information
Name of the unit and address
5.
6.
M/s Upper Doab Sugar Mill, Shamli, DisttMuzaffarnagar (U.P).
Name of the Proprietor/ Contact person Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Sugar
600 Tonns/day
-
Cane crushing capacity
6250 Tonn/d y
Cane crushed last year
879203.500 Tonns
Molasses generation
43676.100 Tonns (During last year)
Press Mud generation
37102.400 Tonns (During last year)
Operational status
Closed by Owner (due to off-season)
Pollution and its Control:
Water Supply Source(s)
Sh. A.M. Garg (A.G.M)
09412212082
1933
Private
B: Water
1.
Tube Well
Industrial
Domestic
Water Consumption (KLD)
Water Meter to show consumption
Available
Flow measuring device installed at outlet Not available
of ETP
Waste Water generation (KLD) (before
treatment)
1500 (approx.)
Industrial
â Domestic
350
Waste Water treatment capacity (KLD)
)=. Industrial
1600 (approx.)
Domestic
â
5.
2900 (approx.)
500
â
nrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETP
> ETP Description with flow diagram
>
Details of Reverse Osmosis plant, if
any
Details of Multi Effect Evaporator, if
any
Waste
water
discharged
(after
treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts (2/3)
Roori filter—, Oil & Grease trap --► Lime
Tank—, Aerobic Lagoon —, Clarifier—♦
Sludge drying beds.
_
>
Sludge disposal mode
Effluent collection locations
results (if collected)
&
1500 (approx).
On land. However no assessment of same
due to non-operation of unit.
Sample not collected as unit was not in
operation.
On Agriculture/Horticulture land as manure.
analysis Locations
Parameters
(No Sample)
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Fertiirrigation
pH
Outlet
Others
Aerobic
lagooning
BOD
(mg/I)
-
COD
(mg/I)
-
TSS
-
-
-
followed
separation.
Command area for irrigation (available
land area)
20 acre app
System for dilution of treated effluent
required for ferti-irrigation
System of transportation of treated
effluent upto field.
Not provided.
,.
Not provided.
Formal agreements with farmers for
using treated effluent
N/A
Storage facility available for treated
effluent during low demand period
Storage Tank provided
Quality of effluent being used for fertiirrigation
After Secondary treatment
Ground water monitoring network
Available
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with consumption
Boilers 4 Nos
[email protected] Sugar Format modified considering NGT directions
by
(mg/I)
-
sludge
3
Bagasses approx. 1500 TPD
Stack Height> 30 mtrs.
Wet Scrubber
Stack details
APCS details
>
>
PM (mg/Nm3):
Samples collections points
(if collected)
5.
(No Sample)
Photographs indicating locations:
3.2" x3.2"
,,
.,.
.
.
SL
I
1111
0
.
NS i
*Iimmoses4
o
,
L.:—
4,
1
_
ii
r
,,
--
.-
..
..0,
t
'
•
.11" ti
i
•
A
ri
fill00
1
,,
i
.
'
I
I
III
Pic 1: Entry
Pic 2: ETP (at least 1)
[email protected] Sugar Format modified considering NGT directions
4..6
4
.
'
, I
7•
i IA,
"
4...
10"pifl?,*
.
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
E Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
Effluent (Raw/Treated) from outlet drain of unit *Municipal main sewer/Nalla
line ► Storm-line/ Sewer
*Discharge to River Yamuna via
seasonal drain.
1
Name & Designations
Name of officials
inspecting
Signature
Sh. Suneel Dave, Sc `D', CPCB
itcli
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
2
of
Date
Submission
report
[email protected] Sugar Format modified considering NGT directions
11,41- PI
o eid i(//1
-47--%oq,\11H
/7
C7 P----s"
,
8/Pcf/e1^914f
(011)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: tienerai inrormatlini
5.
6.
Name of the Proprietor/ Contact person Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Sh. R.S.Choudhary (Vice President & unit
head)
Cane crushing capacity
10000 TCD
Cane crushed last year
1084824.320 Tonns
Molasses generation
58044.200 Tonns
Press Mud generation
47406.822 Tonns
Operational status
Closed by direction.
Water Supply Source(s)
5.
Bhaisana,
M/s Bajaj Hindustan
Muzaffarrnagar (U.P).
B: Water Pollution and its Control:
Ltd.,
Name of the unit and address
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment)
> Industrial
> Domestic
Waste Water treatment capacity (KLD)
Industrial
Domestic
2005
Private
Sugar
10000 TCD
-
1. Tube Well
3460
Industrial
70
Domestic
Available
V notch (Flow measurement
calibration and manual means)
1000
50
1000 (approx.)
50 (Septic Tank)
g±gzpcb@gmaiLcom Sugar Format modified considering NGT directions
nr
through
06
2
Details of ETP
ETP Description with flow diagram
â
â
Oil & Grease trap ---n Chemical mixing lank
--• Equalisation Tank —,. Primary
Clarifier—* Aeration Tank —, Secondary
Clarifier—► ACF/Sand filter & Sludge drying
beds.
Details of Reverse Osmosis plant, if _
any
Details of Multi Effect Evaporator, if
any
Waste
water
discharged
(after
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
â
Sample distributed into no. of parts (2/3)
Sludge disposal mode
Effluent collection locations
results (if collected)
&
-
1000 (approx)
50
On land (Within factory premises). However
no assessment of same due to non-operation
of unit.
Sample not collected as unit was not in
operation.
On Horticulture land as manure.
analysis Locations
(No Sample)
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Fertiirrigation
Outlet
Others
Parameters
pH
BOD
Ong/0
-
-
sludge separation.
Factory premises
System for dilution of treated effluent
required for ferti-irrigation
No details provided.
System of transportation of treated
effluent upto field.
Nill
Formal agreements with farmers'for
using treated effluent
TSS
Ong/0
-
-
-
Activated sludge Treatment followed by
Command area for irrigation (available
land area)
COD
Ong/0
-
No record provided.
Storage facility available for treated
effluent during low demand period
No storage provided.
Quality of effluent being used for fertiirrigation
After secondary Treatment
Ground water monitoring network
Available
ngrbacpcb@gmaiLcom Sugar Format modified considering NGT directions
C144
C: Air Pollution and its Control
Boilers
Sources of Air Pollution
> Type of Fuel used with consumption
Bagasses
details
> APCS details
Stack Height >30 meters.
Wet Scrubber
Samples collections points
(if collected)
PM (mg/Nm
â
5.
Stack
(No Sample)
:
___
Photographs indicating locations:
3.2" x3.2"
0,
,.
t ''
1
1
'
11.
101
'
PPini
Ft
't4
t,
1
' 9,
''. 44 '
‘
v
.
1
.
--,
°
1
4
.
Pic 1: Entry
Pic 2: ETP (at least 1)
[email protected] Sugar Format modified considering NGT directions
,
4
Pic: 3 Chimney (All visible)
Pic 4: Discharge points
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
Effluent (Raw/Treated) from outlet drain of unit
►
Discharge to
River Yamuna via seasonal drain.
Name of officials
inspecting
Name & Designations
Sh. Suneel Dave, Sc 'D', CPCB
Signature
k,octP
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
(LI,
d di,
‘,1
-4:7--0419 \ kl
c4- of
2
Date
of
Submission
report
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
0 9A
/9
°6\1 1,
0'
2CO3„
Nat"
CITCO31
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 01-09-2014
A: General Information
5.
6.
Name of the unit and address
M/s Tikaula Sugar Mills Lts; Tikaula, Ramray
Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Sh. R.K Jain (Occupier)
Sugar
700 MT
700 MT
Cane crushing capacity
7000 Tonn/day
Cane crushed last year
651342.171 Tonns
Molasses generation
30850.00 Tonns
Press Mud generation
28791.9 Tonns
Operational status
Closed by Own ( due to off- season)
1998-1999
Private
B: Water Pollution and its Control:
Water Supply Source(s)
5.
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment)
) Industrial
) Domestic
Waste Water treatment capacity (KLD)
) Industrial
Domestic
1.
2 Nos. Tube Well
Industrial
3600
200
Domestic
Not available
V Notch available (Flow recording through
calibration & manual measurement).
1200
40
1200
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETP
ETP Description with flow diagram
Oil & Grease trap —+ Primary Clarifier ---•
Aeration Tank —+ Secondary Clarifier--*
Sludge drying beds.
D Details of Reverse Osmosis plant, if
any
_
D Details of Multi Effect Evaporator, if
any
(after
discharged
water
Waste
treatment)(KLD)
Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts (2/3)
Sludge disposal mode
Effluent collection locations
results (if collected)
&
1200
On land. However no assessment of samE
due to non-operation of unit.
Sample not collected as unit was not it
operation.
Bio-composting.
Parameters
analysis Locations
( No Sample)
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Fertiirrigation
pH
Outlet
Others
-
Aerobic
treatment
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
followed
by
sludgE
separation.
Command area for irrigation (available
land area)
Nearby agriculture land
System for dilution of treated effluent
required for ferti-irrigation
Not available
System of transportation of treated
effluent upto field.
Through tankers.
Formal agreements with farmers for
using treated effluent
Record not provided.
Storage facility available for treated
effluent during low demand period
Lagoons in ETP of Tikaula distillery.
Quality of effluent being used for fertiirrigation
Ground water monitoring network
After secondary Treatment
C: Air Pollution and its Control
Sources of Air Pollution
D Type of Fuel used with consumption
Available
Boilers 3 Nos; (Total capacity 145 Tonns)
Bagasses
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
3
â
â
5.
Stack Height >30 mtrs.
Wet scrubber
Stack details
APCS details
PM (mg/Nm :
Samples collections points
(if collected)
(No Sample)
Photographs indicating locations:
3.2" x3.2"
yJ
n i
.
•
vit
Pic 1: Entry
Pic 2: ETP (at least 1)
[email protected] Sugar Format modified considering NGT directions
4
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Effluent (Raw/Treated) from outlet drain of unit
via Surface run-off from catchment
-•
Discharge to
River Ganga via tributary/seasonal drain.
Name of officials
inspecting
Name & Designations
Sh. Suneel Dave, Sc 'D', CPCB
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
2
Date
of
Submission
report
[email protected] Sugar Format modified considering NGT directions
Signature
,
fA\thCb(
v,;41.((,4
--i0GO \c1 \\''
c /t,,—/'_-,
711)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 01-09-2014
•
A: benerai inrormation
5.
6.
Name of the unit and address
M/s Triveni Enggineering & Industries Ltc
(Sugar unit), Khatauli, Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person Designation
Contact No.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Sh. Niranjan Singh (AGM;legal)/
Sh. Deep Malik (Sr. Manager; Process)
09897055900/09634105999
1933
Private
Cane crushing capacity
16000 Tonn/ ay
Cane crushed last year
1264959.556 Tonns
Molasses generation
62532.80 Tonns
Press Mud generation
62615.495 Tonns
Operational status
Closed by Own (due to off-season)
B: Water Pollution and its Control:
Water Supply Source(s)
5.
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment)
> Industrial
> Domestic
Waste Water treatment capacity (KLD)
Industrial
Domestic
Refined Sugar
1600 TPD
,
Tube Well
1.
5500
Industrial
1000
Domestic
Available
V Notch; flow measurement
calibration and manual means.
1800 (approx.)
600
1650
600
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
through
2
Oil & Grease trap —, Anaerobic Pond —+
Details of ETP
>
ETP Description with flow diagram
â
Details of Reverse Osmosis plant, if
any
Details of Multi Effect Evaporator, if
any
Waste
water
discharged
(after
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts (2/3)
>
11.
Sludge disposal mode
Effluent collection locations
results (if collected)
&
Aeration Tank --* Clarifier-- , Lagoon &
Sludge drying beds.
_
r =7p ti.,
41,
1,,„/,), 6
iko-te, Ca
lA ck.„,,,
_
(„(Q.kr,
a. CZ cg-.:1
0,,a( '
1650.
600
On land. However no assessment of same
due to non-operation of unit.
Sample not collected as unit was not in
operation.
As manure on land for agriculture.
analysis Locations
Parameters
(No Sample)
(I) Information regarding Ferti-irrigation
Details of treatment effluent before Fertiirrigation
Outlet
Others
pH
BOD
(mg/I)
COD
(mg/I)
TSS
(mg/I)
-
-
-
-
Anaerobic-Aerobic treatment followed by sludge
separation and lagooning.
Command area for irrigation (available
land area)
Nearby agriculture land ( approx. 34 hectare)
System for dilution of treated effluent
required for ferti-irrigation
Mixing with ground water.
System of transportation of treated
effluent upto field.
Through Hume Pipe
Formal agreements with farmers for
using treated effluent
No record provided.
Storage facility available for treated
effluent during low demand period
Lagoons
Quality of effluent being used for fertiirrigation
Ground water monitoring network
After secondary Treatment
Available
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with consumption
Boilers 3 Nos; (Total capacity 145 Tonns)
Bagasses
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
3
5.
> Stack details
> APCS details
Stack Height >30 mtrs,
Samples collections points
(if collected)
PM (mg/Nm :
(No Sample)
Photographs indicating locations:
3.2" x3.2"
...,
..
_,.
..„-....
.---_ --,,
,
,
.
,,
4,1 .,-,,r----- --,-
,
, .
...
,
,
Pic 1:
Entry
Pic 2: ETP (at least 1)
Sugar Format modified considering NGT directions
_gLbs•[email protected]
nt
, _ _
_
—
- - - ' • we: F-: z
-.,.....
,
,
,
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
Effluent (Raw/Treated) from outlet drain of unit ► Municipal main sewer/Nalla
line ► Storm-line/ Sewer
► Discharge to River Ganga via
tributary/seasonal drain.
Name of officials
inspecting
Name & Designations
Signature
,
Sh. Suneel Dave, Sc 'D', CPCB
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad' Singh, RA-1, CPCB
.
2
Date
of
Submission
,,,,,A tol
‘660.1tcl ------—
ocblc\\''1
d
7
-
report
[email protected] Sugar Format modified con
Illy,
0`316q1(1-811-t
ering NGT directions
1)-ikeTW
CD&
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 01-09-2014
A: General Information
5.
6.
Name of the unit and address
M/s D.S.M Sugar, Mansurpur, Meerut Road
Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person Designation
Contact Nb.
Year of Commissioning.
Sector
Production details.
Products
Installed Prod. Cap
Operating capacity
Sh. Sanjay Sharma (V.P)/
Sh. Sarad Raz Khan (Dy Mgr, Q.C)
0171717833
1933
Private
Cane crushing capacity
7000 Tonn/d y
Cane crushed last year
848700 Tonns
Molasses generation
42100 Tonns (During last year)
Press Mud generation
29700 Tonns (During last year)
Operational status
Closed by Own ( due to off season)
B: Water
Pollution and its Control:
Water Supply Source(s)
5.
Sugar
7000 TCD
-
Water Consumption (KLD)
Water Meter to show consumption
Flow measuring device installed at outlet
of ETP
Waste Water generation (KLD) (before
treatment)
) Industrial
â Domestic
Waste Water treatment capacity (KLD)
â Industrial
Domestic
3 Nos. Tube Well
1.
2500 (approx.)
Industrial
100
Domestic
Not available
Not available
1500 (approx.)
100
1500 (approx.)
-
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETP
ETP Description with flow diagram
Details of Reverse Osmosis plant, if
any
_
Details of Multi Effect Evaporator, i f
any
Waste
water
discharged
(after
treatment)(KLD)
â Industrial
Domestic
Mode of disposal of treated effluent
(Details)
Sample distributed into no. of parts (2/3)
-
â
>
Sludge disposal mode
Effluent collection locations
results (if collected)
&
1500 (approx.)
In Surface Water (through nalla/drain).
Sample not collected as unit was not in
operation.
On Agriculture land as manure.
analysis Locations
(No Sample)
(I)
Oil & Grease trap --n Primary Clarifier --*
Equalization Tank---► Aeration Tank—*
Secondary Clarifier
Information regarding Ferti-irrigation - Parameters
pH
Outlet
Others
-
BOD
(mg/I)
-
COD
(mg/l)
-
TSS
(mg/I)
-
Not practiced
Details of treatment effluent before Ferti-
-
irrigation
Command area for irrigation (available
land area)
-
System for dilution of treated effluent
required for ferti-irrigation
-
System of transportation of treated
effluent upto field.
-
Formal agreements with farmers for
using treated effluent
-
Storage facility available for treated
_
effluent during low demand period
Quality of effluent being used for fertiirrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
> Type of Fuel used with consumption
3.
>
Stack details
-
-
Boilers2 Nos;capacity 90Tonns & 100 Tonns)
Bagasses
Stack Height >30 mtrs.
[email protected] Sugar Format modified considering NO' directions
3
4.
> APCS details
5.
Samples collections points
(if collected)
Electro-static precipitator
PM (mg/Nm3):
(No Sample)
-
Photographs indicating locations:
3.2" x3.2"
,.
:
...
,
.•
f
r
.
'r
v .„
\
\\
/'
%,
,-.
'I
Pic 2: ETP (at least 1)
Pic 1: Entry
. ;
.
.
J_,r , -
_
41 4
' n WM-
n
-
f
I
)
— t-
-r.S1
I
I
/
I
1---
I,
I
f
1
,
••
0 t '
..,,
.
-
.
Pic: 3 Chimney (All visible)
,
..hi--
v
Pic 4: Discharge points
[email protected] Sugar Format modified considering NGT directions
n
• .
4
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Effluent (Raw/Treated) from outlet drain of unit
r Nearb Nalla
lo• Municipal main sewer/Nalla *Discharge to River Ganga via
tributary/seasonal drain.
Name of officials
inspecting
Name & Designations
Signature
Sh. Suneel Dave, Sc 'D', CPCB
14A
adik
Sh. Vivek Roy, R,0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
cVoi
li
4ct---
V\\'''\
/,
f----`` /
2
Date
of
Submission
report
61
olo
rglii
[email protected] Sugar Format modified considering NGT directions
vv./
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection:01/09/2014
A: General Information
Name of the unit and address
M/s Sir Shadi Lal Distillery & Chemical Works,
Mansurpur, Muzaffarnagar.
Name of the Proprietor/ Contact Sh. S.K. Gupta (Associate V.P)/
person - Designation
Sh. Ompal Singh (G.M Prouction)
Contact No.
01396-252249
Year of Commissioning.
1961
6.
Sector
Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
7.
Operational status
5.
B: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
5.
Private
Rectified Sprit
82 KLD
-
Molasses; 350 MT/day
Closed by own.
Tube well
Industrial
8200 KLD
Domestic
5 KLD
Water Meter to show consumption
Not available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
Industrial
> Domestic
Waste Water treatment capacity
I (KLD)
Industrial
> Domestic
Not available
1148 KLD
5 KLD
.
1225 KLD (Ana. digestion & Bio composting)
5 KLD (Soak Pit)
[email protected] Distillery Format modified considering NGT directions
._,
2
Waste Water treatment capacity
(KLD)
Industrial
> Domestic
Details of ETP
â ETP Description with flow diagram
1225 KLD (Ana. digestion & Bio composting)
5 KLD (Soak Pit)
Primary Sedimentation Tank—. Anaerobic
digester coupled with gas holder —, R.0
Li
Li
Lagoon & composting
Details of Reverse Osmosis plant,
if any
â Details of Multi Effect Evaporator,
if any
Waste water discharged (after
treatment)(KLD)
Industrial
Domestic
Mode of disposal of treated effluent
(Details)
>
R.0 of capacity 540
KLD has been provided.
No MEE has been provided.
Zero-liquid discharge as UPPCB has stipulated
consent condition of Zero-liquid discharge.
However no assessment of same due to nonoperation of unit,
On land/ Surface water: N/A.
Bio-composting leading to Zero liquid
discharge. However no assessment of same
due to non-operation of unit.
Sample distributed into no. of parts Samples not collected as the unit was not in
operation.
(2/3)
Bio-composting
Sludge disposal mode
11.
Effluent collection locations
analysis results (if collected)
&
Parameters
Locations
pH
Outlet
(No Sample)
Others
-
-
COD
(mg/I)
-
TSS
(mg/I)
-
-
-
-
BOD
(mg/I)
(I) Information regarding Bio-composting
Active
area
for
compost
bio
59880.8
preparation (m2)
Area for press mud storage (m 2 )
16187.2
Area for bio compost storage (m 2 )
6474.912
Spent wash storage capacity
20,275 cum
Availability of pressmud
9301 MT approx
Quantity of compost prepared
1133 MT/month
(Monthly statement of last year)
Quantity
of
pressmen
procured 7121.69 MT/month approx
(Monthly statement)
Details of wind
roses
(Number, Approx 20 No per cycle and of dimension
ngrba.cpcbAgtnail.corn Distillery Format modified considering NGT directions
3
length, height, width of stacking, 120mx3mx1.25m
at a spacing
Approx 10 cycle per annum.
space between two wind rose)
Quantity of Effluent being used for 550 KLD approx
composting ( m3/day)
Quantity of press mud being used for Approx 7500MT
one cyCle
13.
Maturity time in days for one cyCle
60 days
Arrangement for rainy season
Effluent storage lagoons provided.
Quality of ground water in the area and depth of ground water table
(II) Information regarding Ferti-irrigation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
N/A
-
-
-
C: Air Pollution and its Control
Sources of Air Pollution
used
of Fuel
> Type
consumption
> Stack details
> APCS details
5.
Samples collections points
(if collected)
Boiler
with Bio-gas, Rice Husk
Stack height > 30 mtrs.
Dust collectors
PM (mg/Nm :
[email protected] Distillery Format modified considering NGT directions
of 2-3m.
4
(No Sample)
Photographs indicating locations:
Entry of Bottling plant
3.2" x3.2"
Pic : Entry of unit
Pic : ETP (at least 1)
[email protected] Distillery Format modified considering NGT directions
S
6
k
•
4
14 1
1
/
1
4 '
04
i '
n
,"
2
1
,.,..
(•
.,..-
,
....,-
.....v..2.,-..., -,..n .7.
"4 ''' 1*
,.._
. ;1. 1,1 1 II1,0'"°
"
•
Pic : Compost Yard
Pic : RO
.
,
, .
1
''
1
t
l''
-
..
t-
4
o
n
4 ..,
1
i ll
.
•
A
i
,
:f
a-46
qi.• ''' '' ...g f
:Pi ,7`
li, ‘(,..)
&,,t
Pic : Discharge points
Pic: Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
Effluent (Raw/Treated) from outlet drain of unit
sewer/Nalla
► Municipal main
► Discharge to River Ganga via tributary/seasonal drain.
[email protected] Distillery Format modified considering NGT directions
434
C"vt (
)
Name of officials
inspecting
6 5444.61-./- bi‘c+f
Mks
r
Name & Designations
V ' 1_1_,_
Signature
Sh. Suneel Dave, Sc 'D', CPCB
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
2
Date
of
Submission
ok1
b,
6?)1,6 0 '
-A--\—
0% \9 )N
report
[email protected] Distillery Format modified considering NGT directions
11,
0`0°11v*
Nr
"arai
VW
COO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection:01/09/2014
A: General Information
Name of the unit and address
M/s Tikaula Distillery, Tikaula, Muzaffarnagar.
6.
Name of the Proprietor/ Contact Sh. 0.P Sharma (V.P)/
Sh. G.K.Gupta (G.M)
person - Designation
01396-246508/246528
Contact No.
2003
Year of Commissioning.
Private
Sector
.
Production details.
Rectified
Sprit, Special Denatured Sprit
Products
30 KLD
Installed Prod. Cap.
30 KLD
Consented Prod. Cap
Restricted Prod. Cap.
Molasses; 1100-1200 MT/day (Approx.)
Raw materials & their requirement
7.
Operational status
5.
B: Water Pollution and its Control:
Water Supply Source
Closed by own/Non-operational.
Tube well
Industrial
612 KLD
Domestic
Nill
Water Consumption (KLD)
5.
Water Meter to show consumption
Not available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
> Industrial
Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Not available
300 KLD
Nill
300 KLD (Ana. digestion & Bio composting)
Nill
[email protected] Distillery Format modified considering NGT directions
2
Details of ETP
ETP Description with flow diagram
>
Details of Reverse Osmosis plant,
if any
â, Details of Multi Effect Evaporator,
if any
Waste water discharged (after
treatment)(KLD)
Industrial
Domestic
j
Mode of disposal of treated effluent
(Details)
>
► Buffer Tank---*
Primary Sedimentation Tank
Anaerobic digester coupled with gas holder
i
Ll'
r—0
-
A ° (./"1`
-
iNi d ir7"
Li
Lagoon & compost yard
)--- • U.
Zero-liquid discharge as UPPCB has stipulated
consent condition of Zero-liquid discharge.
However no assessment of same due to nonoperation of unit.
On land/ Surface water: N/A.
Bio-composting leading to Zero liquid discharge.
However no assessment of same due to nonoperation of unit.
Sample distributed into no. of parts Samples not collected as the unit was not in
operation.
(2/3)
Bio-composting
Sludge disposal mode
Effluent collection locations
analysis results (if collected)
&
(No Sample)
Parameters
Locations
pH
Outlet
-
Others
-
BOD
m•/1
-
COD
TSS
-
/II (ing/1)
-
-
-
(I) Information regarding Bio-composting
Active
area
for
compost
bio
36000
preparation (m2)
Area for press mud storage (m )
25600
Area for bio compost storage ( m2 )
2100
Spent wash storage capacity
28987.5 KL
Availability of pressmud
10780 MT approx
Quantity of compost prepared
6916 MT
(Monthly statement of last year)
Quantity
of
pressmen
•
procured 28792 MT approx
(Monthly statement)
Details
of wind
roses
(Number, 40 Wind roses (120mx3mx1.25m)
length, height, width of stacking,
space between two wind rose)
[email protected] Distiller)) Format modified considering NGT directions
@
2m c/c
3
Quantity of Effluent being used for 250-300 KLD approx
composting ( m 3/day) :
Quantity of press mud being used for Approx 2750MT
one cycle
13.
Maturity time in days for one cycle
45-60 days
Arrangement for rainy season
Lagoons are available.
Quality of ground water in the area
-
and depth of ground water table
Information regarding Ferti-irrigation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
Ai r Pollution and its Control
Sources of Air Pollution
Type
of Fuel
used
consumption
â
> Stack details
> APCS details
5.
Samples collections points
(if collected)
N/A
-
-
-
j
Boiler ( 12 T.P.H)
with Bio-gas, Bagasses
Stack of height 30 m s
Multi-cyclone
..
PM (mg/Nm :
(No. Sample)
[email protected] Distillery Format modified considering NGT directions
4
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry of unit
Pic 2: ETP (at least 1)
Pic 4: RO & MEE
Pic 3: Compost Yard
[email protected] Distillery Format modified considering NGT directions
5
Pic 6: Discharge points
Pic: 5 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
Effluent (Raw/Treated) from outlet drain of unit
►
Discharge to
River Ganga via tributary/seasonal drain.
1
Name
Name of officials
inspecting
& Designations
Signature
Sh. Suneel Dave, Sc 'D', CPCB
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-L, CPCB
2
of
Date
Submission
1, „ki
q6. itJ,
d
—i,_.\0S\e*1\`-\
/i-4-----" /
is ,91/1
O oh
report
[email protected] Distillery Format modifie \
nsidering NGT directions
fa
"Ir
ccO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection:01/09/2014
Ils VGIIGI PI ailiva ...".1.....
Name of the unit and address
M/s Triveni Engg. & Industries Ltd (Alco-chemical
complex), Bilaspur, Jolly road, Muzaffarnagar.
6.
Name of the Proprietor/ Contact
Sh. R. Kandpal (G.M)
person - Designation
07895900632
Contact No.
2007
Year of Commissioning.
Private
Sector
Production details.
ENA, Absolute alcohol & Rectified Sprit
Products
160 KLD
Installed Prod. Cap.
160 KLD
Consented Prod. Cap
Restricted Prod. Cap.
Molasses; 720 Tonns/day (approx.)
Raw materials & their requirement
7.
Operational status
5.
B: Water
Pollution and its Control:
Water Supply Source
Closed by own/Non-operational.
Tube well
Industrial
2620
Domestic
16
Water Consumption (KLD)
5.
Water Meter to show consumption
Available
Flow measuring device installed at
outlet of ETP
Waste Water generation (KLD)
(before treatment)
Industrial
Domestic
Waste Water treatment capacity
(KLD)
> Industrial
Domestic
Available
1600
12
1600
12
[email protected] Distillery Format modified considering NGT directions
2
Details of ETP
ETP Description with flow diagram
â
Details of Reverse Osmosis plant,
if any
Details of Multi Effect Evaporator,
if any
Waste water discharged (after
treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated effluent
(Details)
>
Primary Sedimentation Tank/Collection tank -----+
Anaerobic digester coupled with gas holder--+ R.0
L
i
Lagoon & compost yard
R.0 of capacity1600 [LLD has been provided.
No MEE has provided.
Zero-liquid discharge as UPPCB has stipulated
consent condition of Zero-liquid discharge.
However no assessment of same due to nonoperation of unit.
-J
On land/ Surface water: N/A.
Bio-composting leading to Zero liquid discharge.
However no assessment of same due to nonoperation of unit.
Sample distributed into no. of parts Samples not collected as the unit was not in
oseration.
(2/3)
Bio-composting
Sludge disposal mode
, Effluent collection locations
analysis results (if collected)
&
Locations
Parameters
pH
COD
( m 9/ I )
011 9_/ 1 /
Outlet
(No Sample)
TSS
ITO/
-
-
Others
(I)
BOD
-
-
-
Information regarding Bio-composting
Active
area
for
bio
compost
80936.5
preparation (m2)
Area for press mud storage (m2)
20234.12
Area for bio compost storage (m2)
26709
Spent wash storage capacity
48000 KL
Availability of pressmud
100000 MT (from own sugar unit).
Quantity of compost prepared
20460 MT
(Monthly statement of last year)
Quantity
of
pressmen
procured 66500 MT (approx.)
(Monthly statement)
Details of wind
roses (Number, 85
Nos
of
Wind " roses
of
dimension
length, height, width of stacking, 100mx3mx1.5m at a distance of 2m c/c
space between two wind rose)
[email protected] Distillery Format modified considering NGT directions
I
Quantity of Effluent being used for 800 KLD (approx.)
composting ( m 3/day) :
Quantity of press mud being used
15000-16000 MT (Approx.)
for one cycle
13.
Maturity time in days for one cycle
60 days (approx.)
Arrangement for rainy season
Lagoons are available.
Quality of ground water in the area and depth of ground water table
(II) Information regarding Ferti-irrigation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers for
using treated effluent
Storage facility available for treated
effluent during low demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
used
> Type of Fuel
consumption
> Stack details
> APCS details
5.
Samples collections points
(if collected)
N/A
-
-
Boiler
with Bio-gas, Bagasses
Stack of height >30 mts
Wet Scrubber
PM (mg/Nm3):
(No. Sample)
ngrbacpcbggmail.com Distillery Format modified considering NGT directions
Photographs indicating locations:
Pic 1: Entry of unit
Pic 2: ETP (at least 1)
[email protected] Distillery Format modified considering NGT directions
5
Pic 6: Discharge points
Pic: 5 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
Discharge to
Effluent (Raw/Treated) from outlet drain of unit
River Ganga via tributary/seasonal drain.
1
Name & Designations
Name of officials
inspecting
Sh. Suneel Dave, Sc 'D', CPCB
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
2
of
Date
Submission
report
[email protected] Distillery Format modified considering N91 directions
Signature
0011,
q,oIA
6 dt(l t-l .021-1
,A
-V 0 cbv.n \ \1
7 C.--
citekrA111-
vrr
CDT{I)
MCENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint insp ection Re p ort: Distillery
Date of Inspection:02/09/2014
A:
General Information
Name of the unit and address
3.
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
Sector Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prod. Cap.
Raw materials & their requirement
Operational status
B: Water Pollution and its Control:
Water Supply Source
M/s Shamli Distilleries & Chemical Works, Shamli,
Muzaffarnagar (U.P).
Sh. S.P Singh (V.P)
09411276220
1945
Private
Rectified Sprit
7364 KL/Annum
7364 KL/Annum
Molasses; 30765.2 Tonns/Annum
Closed by own/Non-operational.
Tube well
Industrial
950 KLD.
Domestic
-
Water Consumption (KLD)
show
to
Meter
Water
consumption
Flow measuring device installed
at outlet of ETP
Waste Water generation (KLD)
(before treatment)
â Industrial
â Domestic
Available
Not available
300 KLD (approx.)
-
ngrba.cpcb • ,gmail.corn Distillery Format modified considering NGT directions
IC
--I
2
Waste Water treatment capacity
(KLD)
300 KLD
Industrial
â Domestic
Anaerobic digester coupled with gas holder ----" Settling
Details of ETP
Compost Yard.
Tank/Lagoon--+
flow
with
ETP Description
diagram
(1.)â Details of Reverse Osmosis Dias+ R.0 Plant has been provided. , rg 0 Pe----/X4-44---r
6wect.-1 4, 4A,
plant, if any
Effect
Multi
of
Details
No MEE has been provided.
b...k.-6-i
Evaporator, if any
Waste water discharged (after Zero-liquid discharge as UPPCB has stipulated
consent condition of Zero-liquid discharge. However
treatment)(KLD)
no assessment of same due to non-operation of,unit.
â Industrial
Domestic
Mode of disposal of treated On land/ Surface water: N/A.
Bio-composting leading to Zero liquid discharge.
effluent (Details)
However no assessment of same due to nonoperation of unit.
Samples not collected as the unit was not in
of
no.
into
distributed
Sample
operation.
parts (2/3)
Bio-composting. Compost yard is located at a
Sludge disposal mode
distance of more than 12 km from the unit &
the effluent of the distillery is taken to the
com . ost and b tankers.
Parameters
11. Effluent collection locations & Locations
TSS
COD
D
B
0
pH
analysis results (if collected)
019
1 ID_ _A
C.nri_9 /0
( TVA
Outlet
â
â
â
(No Sample)
Others
-
-
-
-
l
(I) Information regardin . Bio-com I ostin
Active
area
for
bio
compost
preparation (m2)
10 acre (Approx.)
Area for press mud storage (m 2 )
1.0 acre (Approx.)
Area for bio compost storage (m 2 )
1.0 acre (Approx.)
Spent wash storage capacity
Approx. 20 days
Availability of pressmud
From own sugar mil!
Quantity of compost prepared
5500 MT/Annum (Approx.)
(Monthly statement of last year)
7.
Quantity of pressmen procured
16491.105 Tonns during last financial year.
(Monthly statement)
[email protected] Distillery Format modified considering NGT directions
100mx1.5mx3m
Details of wind roses (Number,
Wind roses 20-25 No./ cycle
length, height, width of stacking,
in dimension at spacing of 2-3 meters.
&
space between two wind rose)
130-170 KLD approx
Quantity of Effluent being used for
composting ( m3/day)
Approx 3500-4000 MT
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle
60 days
Arrangement for rainy season
Storage not provided.
Quality of ground water in the
-
area and depth of ground water
table
(II) Information regarding Ferti-irri • ation
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of
treated effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low
demand period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
C: Air Pollution and its Control
Sources of Air Pollution
)=. Type of Fuel used
consumption
â
Stack details
â
APCS details
N/A
-
-
-
-
Boiler
Bio-gas
approx. 14400 cum/day
with
Bagasse approx. 40 MT/Day
Stack height >30 mtrs.
Twin cyclone
[email protected] Distillery Format modified considering NGT directions
4
5.
Samples collections points
(if collected)
PM (mg/Nm3):
(No Sample)
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry of unit
Pic 2: ETP (at least 1)
Pic 3: Compost Yard
[email protected] Distillery Format modified considering NGT directions
5
Pic: 5 Chimney (All visible)
Pic 6: Discharge points
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
Effluent (Raw/Treated) from outlet drain of unit ► Municipal main sewer/Nalla
line ►
► Storm-line/ Sewer
Discharge to River Yamuna via
seasonal drain.
1
Name of officials
inspecting
Name & Designations
Signature
Sh. Suneel Dave, Sc 'D', CPCB
Sh. Vivek Roy, R.0
UPPCB, Muzaffarnagar.
Sh. Yogender,
UPPCB, Muzaffarnagar.
Sh. Azad Singh, RA-1, CPCB
2
Date
of
Submission
01t710111'°\1'/
o'3
Lii
SOL('
ec, \;\\-\
/ cam_
c? f,------/
tk%
report
,.
[email protected] Distillery Format modified considering IVGT directions
0('
Joint Inspection Report
Sugar & Distillery Industries
Saharanpur Distt. U.P
Hon'ble Tribunal directed CPCB & UPPCB to carry out the Joint Inspection of the Sugar and Distilleries
Industries operating and discharging the effluent in Rivers Ganga and Yarnuna..
In this view; team of CPCB & UPPCB comprises of following officials visited the Sugar & Distillery
Industries in Saharanpur areas:
Team from CPCB, Delhi
Team from UPPCB
Sh. Sharandeep Singh , Scientist 'C'
Sh. Rajiv, Regional Officer, Saharanpur Distt
Dr. Ishaq Ahmad ,RA-I
Sh. A.K Mishra , SA, Saharanpur
The following Industries were inspected by the above team between 2" d September, 2014 & 3 rd September,
2014
S.No
Units Visited
Industrial Detail
I
M/s Kissan Cooperative Sugar Factory Ltd, Sarsawa
Annexure -I
2
M/s Pilakhni Distillery & Chemical Works , Pilakhni ,Saharanpur
Annexure -II
3
M/s U.P Cooperative Sugar Factory Federation, Nanautaa Distillery Unit, Nanautaa
Annexure —III
4
M/sThe Kisan Sahkari Chini Mill,Nanauta, Saharanpur
Annexure —IV
5
M/s Triveni Engg & Industries Ltd (Sugar Unit) —Deoband, Distt Saharanpur
Annexure —V
6
M/s Bajaj Hindusthan Ltd.Unit Gangnauli (Distillery Unit) ,Saharanpur
Annexure —VIA
7
M/s Bajaj Hindusthan Ltd.Unit Gangnauli (Sugar Unit ) ,Saharanpur
Annexure —VIB .
Overall Observations:
All the Plants were found closed during inspection
There was no production process going on during the period of inspection.
3. In all the above industries Effluent Treatment Plant. were not operational
(Sharandeep Singh)
Scientist "C"
CPCB, Delhi
(Raji )
Regional Officer
Saharanpur, (UPPCB)
I-A)Nqucktl-e_ 4016-01;6
cut
CENTRAL POLLUTION CONTR.OL
NGREA Ca.
kmection Reg_Lit3u
c
ar
Date of Inspection:
A: General Inform i
1.
Name of the unit and address
j<i'lori
i
i
n
Name of the Proprietor/ Contact 1
Person-Designation .
1
Contact No.
Year of Commissioning.
Sector
Production details.
e
Products
Installed Prod. Cap
0 Operating capacity
I
,
0 1
,
-i'vk_f 4S -54-C
„C -4
4
c
4 °-,
g ci ,
,
1
,
p
fr
,,,,, t!..... , ,
.,..„,r4..----;,:-._1--'...'•,:, !
:.,...y.,'
I oo
,
1>
(e',,,:c2t-irvi.
1 1 3) iA. )
,,,,_
COK_Ick c).-
.
1A
'-'
c
n
5.
L.c7c -', P k_ ,.
r. c_IT rk„1
)
c1
,
- :1
1
2.
rq91!1-1'
,
4 .0 .
r"-; ,
3 i -- ,-7 ll ( 1
o-0(
R33— 1
rative/Pc/Pri(die -1
Netqc k
,ip?..g
1. ,4e hoi C 41.L. IOC: C)' if- e. i-'
.:-... 2_ SC,
Cane crushing capacity
'7 ',..- 0
' I ' LI i / 7 C,cl i-Tie r i
vz,
....-
Cane crushed last year
19929
C.,Itis..t,i,
f f'.Y4--
Molasses generation
4ro-e_kf
7 CI)
NI A
Ye-44 tkv
( -it t
;') -CrC''.
Olt-, "Pt
ec-up,-) 20, 3 r- )‘.,.
°- I ..- 7 ; 74
cc - ifiki t i C3
- ‘r-
Press Mud generation
10.
-
Operational status •
081,106-6W(
t)6.-f tl /v.
eE
r t
as 04-..,2c 1-..1
1, Operating
Non operational due raily season
Closed by direction
4. Closed by own
B: Water Pollution and its Control:
1
..
uppi
ource (s:
; ItA1.--• — r-.
_ __I.
y
.- _
„
Water Consumption (KLD)
b 4 ri 115 cx_tskf
1 :
3.
'Weer
' e Prto
O
t.
1, Ot.O
Industrial
i. ar.._
thOW Car: Star rfCi r; '=1
c
IA
Domestic /4-PP0 19'
A,--,qabt-
Flow measuring device instaHeaat Available Not available:
Outlet of ETP
Ligrbacpcb(et;amai on SUM' Forma! modified considerin NGT directions
1
.
c[1.,A
N
Ntnkth
._
It
4.
Waste Water g eneration (KLD) treatrnent)
t
c
Indu.striai
> Domestic
1
. 1 -Va ste --.17ate —
5—
r treatment capacity
(KLD)
i
Industrial
/ 9
et
;.; i 4
,f.4) 01-, ,h1,1
< f :,._ L'il
t
4 i
1 (bef or e
! )
,'
1
6.
Details of ETP
> ETP Descriparr--with
diagram
tPS°
1
7r., 1\,) :2)/
6411 kit
flow
Y
1
•
r"
r
j
t-
•
f
Details of Reverse Osmosi.sH
plant, if any
L;.<'.. Details
of
Multi
Effect
Ev aporator, if any
7,
1
Waste water discharged (after
treatment)(KLD)
0:4
C
Industrial
e (if
,
Domestic
--Mode of disposal of treated
effluent On land/ Surface water
(Details)
7111</re-f.,0,h , fi
Sample distributed into no, of
parts 2)
Sludge disposal mode
4
8.
ti
•
Effluent collection locations
analysis results (if collected)
04 c?S,
pH
Outlet
Others
TI.Information regardi
1
2.
rrigation
Details of treatment effluent before
Ferti-irrigation
_
Command area for irrigation
(available land area)
System for dilution of treated
f 4.
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field,
'armal ag reements witri farmers
for using treated effluent
lgt-ligszag
71
4 4'h 04
& Locations
1^ -
Sugar Format modified considering NGT directions
.47)
-Z`-'c
Parameters
BOO
COD r-TSS
jrngf I) ! { 91 9,10_ 0-91/2)
7
Storage facility availanIP for
L.Q 1,0 c- f!..42& •
U-.eated effluent di u ri n g low demand
Quality of effluent being used for
ferti-irrigation
Ground water monitorin g network
C: Air Pollution and its Control
Sources of Air Pollution
Type of Fuel used
consumption
cu..c
.
period
•
(Available /Not available)
-1Aoitc.
witTj
> Stack details
.C
•
. -i;;
APCS details
L•
tTeTR(7)-(..01tp.,,L
1.
Ili
5.
, g.1 It2-7-
Samples collections points
(if collected)
6)-o ek
PM (mg/Nm3):
Photographs indicating locations:
3.2" x3.2"
nzrbo.cwobasmaii.con7 :S'ugar ormat ndfied considering :V07 &rec.! ions
k(V
1
4
,Pic
Pic 1: Entry
ETP (at least 1)
Pic 4: Discharge points
Pic: 3 Chimney__(All
E, Route of effluent to reach river CangaiYarnuna
(Please indicate starting from the outlet drain of the unit)
1
Name DetSignations
Name of officials
inspecting
Date
of
Submission
report
[email protected] Sugar Format modified eonsiderMg T directions
Picture of MjS Kissan Co-op erative Sugar Mills Ltd. Sarsawa
Equalization tank
aceD
CENTRAL P OLLUTION CONTROL BOARD
NGRBA Cell
Joint in e Lion Re p ort: Di tiller
Date'ofilnSpection: 0 2--
A: General
Information
Name of the unit and address
,
P;akketAA.A'
Name ofthe Proprietor/ Contact
person - Designation
Contact No.
-1.7e7ar of Cornmissionin
Production details.
Products
Installed Prod. Cap.
Consented Prod. Cap
Restricted Prai. Capes
Raw it
& their requirement
! 5.
C—
oope—
rativeja_
Po—i—
lciP"rivrtel.7_?
1_
ArjoiA71117:13C,-014-LPD
Pet t4...owt16
rational status
1.Sbi MT ckia_tr_
Operating
Ho
N on. operational due ratny season ‘ite...6i
Closed by direction N L.)
Closed by own
Water Pollution and its. Control:
Water Supply Source
[ 1
Water Consumption (KLD)
2.
Water Nileter to show consumption
1,3c-A
Available Not •available
Flow measuring device installed at Available/ Not available se_
tt ALA.
outlet of ETP
Waste Water generation (KL,D)
Li 3 2- L. P-13
(before treatment)
to L. v_t_i) D
Industrial
Domestic
tti
Waste Water treatment capacity
(KLD)
Industrial
101- 14.1 P,D
olyiestic
444'&4. cp
ca
*m44,1 c2r,v,
141, 9D
Divitiery
la/ modified convdern T dire
-4-'n 13-tri o -
2fr,
2
6,
Details of ETP
ETP
De.scription
diagram
with
flow
GLZ,
C
r
Details of
plant, if any
>Details
of
Reverse Osmosis
Multi
3c.,6
effect
Evaporator, if any
7,
Waste water discharged (after
treatment)(KLD)
Industrial
Domestic
8,
Mode of disposal of treated effluent
(Details)
n land/. Surface water
Sample distributed into no. : of iNst„../r .
parts L213)
Sludge disposal mode
4
IbAtAzt
"44 C41:1_
Effluent collection locations analysis results (if cciilected)
(PAct&J ilse14-41 Ari:Att.
—13, 9A..tigAAtta8.- JAA
Advixffrou_
Locatons
i —r--Parameters
- pK
6a
1 ODD
COD
TSS
..019 / )
et
Others
(1) information
revrdin.Bio-composting
1.
Active area
for ho cornpo-i-t-r
Pvutur
preparation (ma)
2,
Area for press mud storage {mI-)
Area for bio compost storage (m2'
0.“
Pt,u).41
rpsi
4,; Spent wash storage capacity
Availability of pressmTudr
t11, 6Lt ov5
Quantity of compost prepared
(Monthly statement of last year)
; Quantity of pressmen procured 190. e v,‘T (
tkLv bL J
my\ Le_ fr-La,„1-
-
(Monthly statement)
Derails
etails or wind roses (Number,
length, height, width
space between two
of
stacking,
'4140A , 7,34 w1/41-1,--T •/e,,,vvs.f.Y.
I , s-4r -
.3.0r
Z
0,
wind rose)
Quantity of Effluent being used far
composting ( rn3/clay)
Yvl
r.tdi
Vibe? iiy7,n22,= ail corn Oisrillery Ih rICIC iffied C57151"d:ilr
NO.dirctions
3
10, emntity—of7press rriud —
'7-- us"-beind
ed
for on'e cycle
Maturity time in days for one cycle
Arrangement for r t..iirry season
13.
RILL_
thve44-4.
76,47-crts,,,,t— 64,44 +-1)
c_zoaA,4,4
P1/41,,,Arti'4 .14W akt-9,al
Quality of ground water in the area
and depth of ground water table
(U) Information repAnafertl-irrig
1. Details of treatment of spent wash a tion
(details of hio methanisation,
primary' and secondary treatment)
7—ConTrnTniTat'—
ea forirrIgation
(avallable land area)
System for dilution of treated
effluent required for fenti-irrfgation
SystenTc7F transp ortation of treated
effluent upto field,
5,
Formal a g reements with farmers
for using treated effluent
Storage facility available for
treated effluent during low
demand
l
period
-.1
1
_
8,
,/
i
,
y
i
Quality of effluent being used for-1
fat-irrigation
Ground water monitenng network i (Available
, . ,
c; A r Pollqtion and its Control
.I, ,, _ .. Sources of Air Polluti.on
2.Type of Fuel
consumption
used
/Not available)
,_____ Afttt..rx,
e.O.pti4A, 9i,u
.
with l a:
WI° --(
*04.43
+
fl
gArAt
ihyli 2,0
-
(
3,
Stack details
4.'
APCS details
I
•1
*S-vvOtr 41Ak
1.
YY) tJL-tdSt
. Samples COneCtians points
(if collected)
pterbarpzi:111,3 ?!?.: Ir. Cotn, nksaen, Formw
PM ,ing/Nlm
cmidering NGT dIrf arms.
L
r
r-vrt t,,,, ,
4
hotographs indicating locations:
3,2" x32"
Pic I: Entry of unit
Pic 3: Compost Yard
Pic 2: ETP (at least 1)
Plc
RO & MEE
2119,cpcb(iSivrod cot Dtsaery Forrrat wodyiedvotisiderfpg NOT efirvertions
r, )
Picture of M/S Pilakhni Distillary & Chemical Works, Pilakhni, Saharanpur
Bio-digester (Methanation Plant)
Gas Holder Under Construction
,
" !
Nu/
R)1INIC
I
1.1
,
!
I!
• •
III.
1
,---
f
CO)
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery
Date of Inspection:
Al General Information Name of the unit and address
Li , P. 69oioer
47r/e4
Cede./;:a-Alwv,
li's
Ial coci Unfl 1 ' Al
a.,,: I ,''' 1 j ,,
fil (4; r)
rla.
,retikwyet,,,,I4tw .
!II 1
cA , .13 c tu t), iik 1 t.), ;,) e, ref Oct.'11,, ' 1
f
H 3,
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning.
6.
Sector
Production details.
Products
Installed Prod. Cap,
Consented Prod. Cap
Restricted Prod. Cap:.
Raw materials & their requirement
7.
Operational status
. rAtitY hleA 4..j (ria/t..o 4/ P'
l
'
1
lcIeC-8k
Ji l Cl C
-b/3(
perative/Public/Private
p cl Skin 4-
PCC Al
36
ki
titmo /31*4-L/
It it 8 L ..,00rlir
Cozoli-gij
1. Operating
Non operational due rainy season •
Closed by direction
Closed by own
'1 '
!
El: Water Pollution and its Control:
1, i Water Supply Source
Water Consumption (KLD)
Industrial
0800 kA
Domestic
'CT 15ti_
Water Meter to show consumption
3.
Flow measuring device installed at Available / Not available
outlet of ETP
Waste Water generation (KLD)
(before treatment)
14S
tt-1
Industrial
Itik) K).1Pc,"
?
Waste Water treatment capacity
(KLD)
Industrial
`i-Domestic
juri a&Qt-q_ Distillery
i
7-c,b0 ufta
2.
I. 5,
,
.;.;•
Available / Not avble
Format modified considering NGT directions
,
-1.
1
,1
,
---fifis
Detof ESP
I> ETP Description with flow
diagram
> DetailS of Reverse Osmosis
plant, if any
Effect
Multi
of
> Details
Evaporator, if any
Waste water discharged (after
I treatment)(KLD)
> Industrial
Domestic
On land/ Surface water
. Mbde of disposal of treated effluent
i (Details)
Sample distributed into no.
arts 2 3
0. Sludge•dis os l mode
pa
1
r—
lecton iodatiOnt:
)11. Effluent coli
analysis results (If collected)
I
I
ardli
10' mr • ostin
LinInformat i o n rekt'll3
for bio compost
are a
11. 1-Tai
i
11 preparation (102)
1
,_.___
(m )
2 ' 'I Area forr press mud storage
storage (m )
1 Area for bio compost
.
Spent wash storage capacity
yyy
Availability of pressmud
Quantity of compost prepared
(Monthl statement of last year)
Quantit of pressmen procured
6.
B.
(Monthl statement)
Deta)16fowind
win roses (Number,
length, height, width of stacking,
1
"
7 • (UK ---
,
6 30 acre
,
o o ok(fe
1 ,
62.01.111)
goof
n
,
I
g
g)?
.q111.(4)
space between two wind rose)
Quantity of Effluent being used for
compostin ( m3/day)
Cel Jed, /pal
NGT directions
tla Distillery forMat orohfted eonstdFrtng
tadgafiattnk
14 ti 620 © /11 T
'0, I Quantity of press mud being used
for one cycle
11,
Maturity time in days for one cycle
12.
Arrangement for rainy season
13,
Quality of ground water in the area
ctucili.mi r
p
rs '11)0/0114-e4 ,'
1
•
T
and depth of ground water table TT
1,1
:
0(1 , A .
III
l ' Ti
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
4.
effluent upto field.
Formal agreements with farmers
S.
' T
for using treated effluent
A-T-1-,-----,,
i---- Storage facility available for
,
6,
di- II,
treated effluent during low demand
i 1
period
Quality of effluent being used for
7.
i
ferti-irrigation
Ground water monitoring network (Available /Not available)
S.
C: Air Pollution and its Control
a-TO:err.
,e
f to
1Sources of Air Pollution
A
of Fuel used with
•A. Type
4 Occ At444-Consumption
/
._„
',, Stack details
I
le' 0 ivvM. i.ose-p- rritdhi t am( ,
II. Information regarding . Ferti-irrigiation
roh
4._ -';.. APCS details
1'
ni,1.14 1 cyan) . e ,
oUl ArS .
l
5.,
PM (mg/Nrri
Samples collections points
(if collected)
!
.
iffbigmdil. pm Distiller y Forme]; modified c'onsie ring Nor directions
‘54,6e„AmPial4
p
uvAt-
''s\ott
cL/)
1
T
Picture of M/S
U.P. Cooperative Sugar Factory Nanauta,SaharanPur
Bio-compostin g Yard Showing Compost
Another Side View of the Bio-compostin g Yard
Side View of the Bio-composting Yard Showing over flow of the spent wash to nearby drain meeting river Trishini
Bio-composting Yard
r
r
cEI NTRAL POLLUTION CONTROL BOARD
NGRBA CeH
Jjfltj sectonReport: Sugar
Date of Inspection: _12_19 , \ I
A:
1.
•
Name of the unit and address
V.,Q4)V S
Name of the Proprietor/ c ontact
person - Designation
Contact No.
....,..,. _
Year of Commissioning,
--- - -Sector
5.
Production details,
. Products
0 Installed Prod. Cap
Operating capacity
ET,
7.
Cane crushing capacity c
(
(q7q - n cls(=,
Cooperative/P-Pate
,ix.
0144)
E°-2-
___ _
Operational status
B: Water Pollution and its Controi:
Water Supply Source(s)
Water Consumption (KLD)
ti,:=3q
cc, 7b,-;
0 i .22 ecak.-tcm_A
Meter to show consumotion
'
2). e--.1, (Tv,- (62.(3,-...
Operating
Non operational due rainy
Closed by direction
4. Closed by own
,,.
—
t21.
1.
season
TiL wX"-
Industrial
Domestic
9
5,5-- M3 i ci-cp
5O
Avajat-ie; Not available
Flow
measuring device installed at Available / Not av-allable
/
outlet of ETP
Sugar Format modified considering NGT threat 011,3
11-CL4'
/D-G
-, --.)
Press Mud generation
3.
- --
c.c.t, et -- l,rDcuLd--
--gly0 T
Cane crushed last year 'v n i'ater
11 7 ILL [:-
A.CutAziyL0t--, ,______
q (-t- 9 cu_
5-nst-' -1-4..
_....._........
Molasses generation
10.
ffl-rlivi
N )1100 TA , ,g (I I/ A 12 An) P v
n I S14- J S- 4 PO'
9 S-c4 5 S----
,
,L.
q f-1 V_A-1?-1
v iv t_0,_,,_
,
'
4.
2
Waste Water generation (KLD)
(before treatment)
Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
> Domestic
Details of ETP
'-> ETP Description with flow
diagram
'Rt.20 1.\'\3/1d
1.,{00 M3iCioj
e ,
A tfati----L.
Y Details of Reverse Osmosis
plant, if any
Details
of
Multi
Effect
Evaporator any
S.
11.
—
,
'
!k,,.\ _ eryact.L.---Ctl)-
Waste water discharged (after
treatment)(KLD)
> Industrial
Domestic
Mode of disposal of treated effluent On land/ Surface water
(Details)
Sample distributed into no. of
_parts (2/3)_
Sludge disposal mode
_
I
Effluent collection locations
analysis results (if collected)
&
,---
3
1)},..ark co) -)v.c..i."-iirw
Locations
Parameters
pK
Outlet
GOD
(11 9/ 1 )
730 2
COD
TSS
(,jr1 9/ 1 ) _PIN/ILI
'--. 0-1 D
'.(al
Others
_
reardin Ferti-irrigation
Details of treatment effluent before
_(A) Information
Ferti-irrigation
-----Command area for irrigation
_i
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
—
System of transportation of treated
effluent upto field.
5.
Formal agreements with farmers
for using treated effluent
-17j1--k. oi(Agawt--
(---
ngzha.cpcb&mail.com -Sugar Format modified considering NOT directions
------
3
Storage facility available for
treated effluent during low demand
period
NtL
Quality of effluent being used for
ferti-irrigation
8.
Ground water monitoring network
(A y a).1-eire—/Not available)
Air Pa (Aeon avid ts Control
Sources of Air Pollution
> Type
of Fuel used with
const4mption
&easr,,c
1-----;7.S.tack details
4.
> APCS details
Samples collections points
(if collected)
Ph otographs i nelftating Vocations:
W'20 1116(_
\A1i-Qt
PM (mg/Nrrr3):
2 117
s 99-7
3.2" x3.2"
?1,t
_
.ca [email protected] Sugar Format modified considering NGT directions
4
Pic 1: Entry
Pic 2: ETP (at least 1)
Pic: 3 Chimney (All visible)
Pic 4: Discharge points
ra Route of effluent to reach river Gariga/Yarnuaa
(Piease indicate sta3rting from the out drain of the. unit)
Lat,,i- to a)
1
Name of officials
inspecting
Name & Designations\(
Signature
(0
------------,
I
——
CA:A
,
.itkOlkAta,t.l.
2
I_
Date
of
Submission .
;„
__,........
---
: -.- t-k ,‘A--- IL,
L
ik%tf -Gvy6,
14nn,i
1.4.„....1,
,-
report
1_______ _
[email protected] Sugar Format' modified considering NGT directions
1
- .----
Picture of WS Kisan Shakari Chini Mills Nanauta
Entry of Unit
Clarifier
Aeration Tank
Stack
(Jp
R'11VQ (1.-riLQA _
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02 -09 A: General Information
Name of the unit and address
zol
g_A/44 c/— -7-X10. Z--77-),
—rg(vEAl I
SU4/4"Z
uAirr-
1)6 /1,)'4A/ L)
/p.m
02,4-4
PC/R - u. '
S
.24_•s c - If
4.
5,
Name of the Proprietor/ Contact Di , 1) gs_N 4 NA--TH fki 1 sH24
person -- Designation
( iff e..._' pizas ),D6A1 T )
Contact No.
of33b -2-2-2-I gr, 22.2.49-, 222$66
Year of Commissioning.
I 9 %a
Sector
Cooperative/Public/Private
___
Production details.
Products
.,C 04 42,
Installed Prod. Cap
1400o7'e-C.
Operating capacity
9 voo '7-CA
Cane crushing capacity
/ 14 boo -ref)
Cane crushed last year
Sotio 7-22- 6 s- alqr
Molasses generation
(./ 2-9s
Press Mud generation
10.
Operational status
B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
li S 7-2
3.
azrt_s
2 . 9/ WI-3
1. Operating
t.--2. Non operational due rainy season Co
Closed by direction
Closed by own
1.
020 c)^ I D
Industrial
Domestic
Water Meter to show consumption
tir
14er-ER
A.pizit_ 20/ if c6ALcum,or/o^/
kf_P0127" Zr
Available / Not available
Flow measuring device installed at Available / Not available
outlet of ETP
[email protected] Sugar Format modified considering NGT directions
./47771(....fie4,0
A vq- 1t,_
1/_ iveyrce
1.
Waste Water generation (before treatment)
industrial
D.
(KLD)
1 -.:2 .
I
Waste Water treatment capacity I
(KW)
,
Industrial
1 .
li.
Domestic
4.Details of ETP
‘.,:. ETP Description
with flow
diagr,,.:1li)
i 6.
e) o k, L. ()
2..e-c- '7 2- K L-10
I
__•_____
e
/1-77)€.4cfcL)
D I9 . ; 1M- 1\1
V-.!--.0A/
Dct,a;1 5of
Osnios
plant, if: any
E)etails
of
Multi
Effect
Evaporator, if any
Waste water discharged (after
treatment)(KI_D)
industrial
Domestic
Mode of disposal of treated effluent On land/ Surface water
(Details)
Sample distributed into no. of
,,..
.
parts (,2/31
i ..... i..u,..)e„cl. f) 2.A
Sludge disnosal mode
10 / e,
,
11
Effluent collection locations
analysis rcsults (if collected)
Locations
ic' tz.‘
Outlet
A
Re.Pn
gfr
O,C
2-0/
1.
TSS
019J1)_ j_019;111 L(rn911)
2J
Others
...
Information regarding Ferti-irrigation
f Details of treatment effluent: before
.
Ferti-irrigation
7.
Parameters
ty.
—
(1)
6 L.)
BOP TC. OD
PH
cc
L.7.',
.
.
Command area for imoation
(available land area)
System for dilution of treated
3.
effluent required for ferti-irrigation
n 4,
5.
System of transportation of treated
'/-f' R. 0 c) 1:, f-I • 1)12 A:WS
•
effluent ..ipt.o field. . 1 •
.
.
•
•
•
..
.
.
.
.1
_._________
..
iI Formal agreements lith farmers . .
.. ., . .
.
, for usin g treated effluerlt
.
I;
(.11) cb PS: m a
•• . •
•
n. 7. ,-,, T‘r,
..
,
•
.
?nod? ti
6)1 ;de qr.;
.
c; icon
•.
,
\aQ Kv..,
. .
.
_
b.
(S.)torage facility available for
' 'created effluent during low demand i
Y67---
neriod
,-- -
7
l
C : Aft
1
_.__ _ ____
_
• - -
Quality of effluent 'being iscil for
`erti-irrigation
water monillOting petworl< ,
I (AYailoble /Hot avail-:ible) 1
Pollution and its Control
I,_1„_____1_;.:;01,1rCeS of Air Pollution _ _
l (1)
6...)
_OD_
-!,,,
1 !.. —
T ype- of
Fuel
usedwith 2--c)r"i.i.:77-P'f.
consuptlon
m
.'
,
--------- -- --------s-i-------6-2;)------6)
!..).
! , St a ck details (df_141-r;r- IN' A77:,Z,)
so IS-
\..
1
4.
1y
I
4
l ,
(Jcvilf
'II
,
_c>.---..)
)'<17.-‘)W
. -Ci:P:-.I.")
(....)
.
yo."D
t-)S
z-tr,).D
S
(4gr
l 1.
APCS details
'?, 0
_62) .
,
i,,, g:,--r
kJ 7. C. 1Z.(1)
I
!
A. E 12_
1
!
!
. !,
• • ______ ...
I PM (ft,gi .\] II ,';
Samples collecticins points
(if collected)
I
-Ca J / PL. /.' c___0 LI-L" (--7-5_1)
,
.
Yi 4
. l
()),!) I (i .);?. )
Photographs indicating locations:
3.2" x3.2"
.;)\ •
Lt
..,
I.I.El1:1,(pckajgniail,com Sugar Formal P713diliM (70 . 1.5idering NGT
cti
\ ,,
\
' I,
..,_\
i,
(1'--1' 2,
1
((1
R. v,
,
,
s
L
)
.D 7 , 6, l.'-/ (
-T.); /,
1\4 '
14,
)
,_ 1).e:e", )- ka '.-',,i'Y • •
••
26)
4
Pic 2: ETP (at least 1)
Pic 1: Entry
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna
(Please indicate starting from the outlet drain of the unit)
1
L\ kiV
.1(),
1,\
2
Date
of
Submission
Signature
Name & Designations
Nate of officials
inspecting
,,
-()
L:;-(NJAA..otAAcVel
A • tt Qi-i.
report
nt
[email protected] Sugar Format modified considering NGT directions
n
---*
--)."-ct,'`4>--1(1---
1,
Picture of M/S Triveni Engg & Industries Ltd. Sugar Unit Deoband Saharanpur
Drain
In let
.„„
t
trl nnn
r
Clarifier
Aeration
-
41,
...n..mnow.•n•••••
(01[b
CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Distillery.
Date of Inspection:
General Information
Name of the unit and address
Name of the Proprietor/ Contact
person - Designation
Contact No.
Year of Commissioning,
2.
I 3.
4.
r5,
1
Sector
Production details.
• Products
* Installed Prod. Cap.
* Consented Prod. Cap
• Restricted Prod, Cap,
-1 Raw materials 81 their requirement
Y
.
. <
Cooperative/Public/PriYate
v.",,-_,,
1
1
+
f
Operational status
1, Operating
Non operational due rainy season
Closed by direction
4. Closed by own
B: Water Pollution and its Control:
I,
Water Supply Source
Industrial
,
Water Consumption (KLD)
Domestic
2.
, 3.
Water Meter to show consumption
Available / Not available
Flow measuring device installed at Available / Not available
outlet of ETP
i,e; ,
-
, , '„"'n
Waste Water generation (KLD)
(before treatment)
'-x- Industrial
> Domestic
Waste Water treatment capacity
(KLD)
> Industrial
Domestic
jpgrba.cpcbagrnail.com Distillery Format modified considering NGT directions
"-
2
Details of ETP
ETP Description
diagram
with
.,
flow
•
Details of Reverse Osmosis
plant, if any
>. Details
of
Multi
Effect
Evaporator, if any
.•
,
Waste water discharged (after
treatment)(KLD)
Industrial
•
Dornestic
Mode of disposa of treated effluent On land/ Surface water
(Details)
.,
Sample distributed into no. of
parts (2/3)
Sludge disposal mode
8.
•
9.
10.
•
11,
Effluent collection locations
analysis results (if collected)
& Locations
Outlet
Others
Information regardin9 Bio-compostin9
Active
area
for
bin
compost
preparation (rn2)
Area for press mud storage (m2)
Area for bio compost storage (m2)
3,
I,
:
4,
Spent wash storage capacity
Availability of pressmud
5.
-46,
Quantity of compost prepared
(Monthly statement of last year)
7.
Quantity of pressmen procured
(Monthly statement)
S.
Details of wind roses (Number;
length, height, width of stacking,
space between two wind rose)
9.
Quantity of Effluent being used for
composting ( m3/day)
W'bo. P cbgt-kiwI C0171
=
FOrMat PrICdified
Parameters
P HBOO
considering NGT direct ion
Lrn 91 1)_
COD
( m 9/i) TSS
1
( m 9/ 1 ) 1
9-
3
10,
Quantity of press mud being used
1
for one cycle
1 11.
Maturity time in days for one cycle
.
..
.
:,:-- . '-. .:,
Arrangement for rainy season
Quality of ground water in the area
,
.
,
,
4
i
, :.7,1 "-; i, i ' 1 1:.' c:,7:.)1'
to, ,!
and depth of ground water table
(II) Information regarding Ferti-irrigation
i
7.
Details of treatment of spent wash
(details of bio methanisation,
primary and secondary treatment)
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation
System of transportation of treated
effluent upto field.
Formal agreements with farmers
for using treated effluent
Storage facility available for
treated effluent during low demand
period
Quality of effluent being used for
ferti-irrigation
Ground water monitoring network
8.
C: Air Pollution and its Control
Sources of Air Pollution
> Type
of Fuel used
consumption
>
Stack details
>-
APCS
details
with
_
.
Samples collections points
(if collected)
q
(Available /Not available)
P...,6 i (..Q .k, .i4,04.1.‹.. r,',.- 17-1. A Eit Cc7r:
cl..) ,,,,i ek c...,3 ,4•- co:, ,-,:.1,ca,,, , , VI, k,
1,'..„ C..
1 '
4.
5.
,.,
•
PM (mg/Nm3):
[email protected] Distille ry Format modified cOnNidering NGT directions
Y :_k\ •:"I
t-,
.ff
1 ,1:;
.
'-.
‘: i ''-', t 1,,,
4
Pic 2: ETP (at least 1)
Pic 1: Entry
—.
,rekevA,ce..._
, •
.
\CV(6
Pic 4: Discharge points
Pic: 3 Chimney (All visible
E. Route of effluent to reach river Gangariamuna
(Please indicate starting from the outlet drain of the unit)
1) 1,t--
71---
Li 34 ()j.,..,,,1
Name & Designations
Name of officials
inspecting
I<
1.
ko ,
signature
‘ii'v
i
, 0,-vxmo,,,,tn
. ctcap
1-,. A
2
_
Date
of
k.
M nch Ira ,
report
Submission
_s_temaiLom Sugar Format modified considering NGT directions
nr
%1
.
Picture of WS Bajaj Hindusthan Ltd. Unit Gangnoli, Saharanpur (Distillery)
Top view of Buffer Tank
Lagoon
Bio- methanation Plant Gas Holder
40
0
t
^17.,rie
,-; t \ l a, lript'.1
. 11tli LM 1 ,.i.
\ \ )," 1
ol.,...
\ \,, A \
's
\ .
\ n '-'
i
211
i
I
t
,i .1
—i
t....--....,
\
( z';'),
-..-L-
1:qtgl?.
l " r
'4,!txt
Flow Diagram
Stack
,
ANA,\l"
1-
kO\
N'EtV
WO'
',',71-r'f7;t.N., POLLUTION CONTROL ROARU
NiGRBA Ceg
joint jrA
- uction Report : ,Sups
Date of Inspection:
•fm!Gesterii.7,1 Information
the unit and address
......
-
Name of fl !a Prop! i eLo!! ,/ Contact
person - Designation
Contact No.
Year of Commissioning.
:
! .3,
' 4.
-•
J.
Sector
Production rjetai!c.
Products
In ctall e= d Prod, Can
Operating capacitY
I
"'
'
i:..,-:
- :.
._ _
...-. ....--
__
,.. -
, • . ,•. ..:,..
. Cooperative/Public/Private
Cane crushing capacity
7.
Cane crushed lastyc.,ar
B.
Molasses generation
Press Nod OPFiral7i(T
'ra3onei stfi.!s
.10
apEra:i..0nai dueP. Closed by kection
!!!•-•!.•-:•
• • •. 4. Closed by own
'
L
its Control:
Water Supply Source(s)
I 6: Water Pollution and
!
i
i
•
Water Consumption (KL.D),
.
1 Industrial
1
i
1 DornestiC
:•
outlet o f "7"-r";
ilgrba.cpaibpnail, ...con Riga? . For-;at moji /fed c:ons:idehn , z NGT
•
•-• • -
V\
a4
L,,\!:.--3c.t.e ),P,.':-,,J,c- ,,-,,,,,--,c..,„;,,,--,:
. ,. befor.-. .-.!-2&,-,',-.,•,-n ,..-4,:;
.
1..--.0_,)) :
ipoi-ne_,sijc
Waste Water treatment capacity
1 (LD)
l •,? Industrial
Domestic
eta I :..--, o f ET P
',/,‘,iti-, fi cyoi
:1
;, ---, !c-----i1:,,Pqr.iTr.),escH,rql-_),,.
. 5
,
-
• -
,
.
•
,
jetc,;!s
of
oevero
Osniosis, •
olant : •.,f•
l vluiti
of
Details
-c. vaporator, if any
1
•
.
, •
-
Effect
Waste water discharged (after "
'treatment)(KLD)
1 ,
--;, ,L
,
„,'
,
,
.
,
.
•
p
,,
,
industrial
—
I
Domestic
i Mode of disposal of treated effluent On land; Surface water '.... '.....
;Details)
S.
.
. .
-'
'-_--Srnple distibute ,.t ,.ito nc,. of I,
i
is (2/3)
1C. 1 Sludge d!s p osal
'
mode
..,_
1 11,
Pameters
ar
& 1 LOCatiO 11S
1 Effluent collection locations
1COD' TSS
1
BOO
;
laK
1
analysis results (if collected)
____
i
,
1
0 utiei
•.
;
Others
1
eri.-krigation
mni.. Ft
1.1 Information _...
efflu&,:.
before l ', ' '''• ....'
1. i Details of treatmer q
.
,' ...,. .
.." '
.-en.-.I-irrici.,,,Lic_),c;
,
,
i
I
i
• Pmman d a rP a for irrigation. 2 Command
i
1 3.
1 (available land area)
.
System for dilution of treated
effluent required for ferti-irrigation
4.
.1 system of transportation of treated
effluent kipto flekd,
_ •
,
• 0 '.. .,
:.
7 -:
--3c.ii,,,,,,e;',,...ii...'.:::.
_
.;?,,,-0.-.
i ",•:.•,;: ;..,.3h).,••,.... •-......-.ai..e,..i ,e',.'ili...,,.
. 7 7a i. 1. ( 77i .2gc.' Forma,' motial !Igli)::-L(pc )). (.71) 3
.
l
,
nsidcrtHg
3G1 dircction
;*-
-
;IA6
_
treated effluent duriri,rj iow demand
period
I Quality of effluent being u.sed for . Ground water monitorinone.twork
.: I 1,
z;
Hiii. ;;.
,
fertiirrigation
Air PoHntion and its C9ntroll
I Sources of Air Pollutlx',
used
Fuel
o f
(ype.
i :=->
,i,'. . , ,
[
viitti
• .
I;", l-,-).,,..,-..';'4, [ i ,' .'; -.,'
v--...c.. .;,.. . i.in . [,-...',,, ,..,..[,-....ii .
..
[ (Available /Not available),
-----.-----.---
1
consumption
I
I
3.
1 ..._
I 4.,
,
i
l Ii----
Stack details
.
..i
1 -‘,.-
.
.
. _
APCS details
,
1 .:)
I
I
;
4.
l
;
1
,.
5.
i PM ,mq„[Niii ii,
I Samples collections p oints
(if is:cilected)
Photographs indicating locations:
3.2" x3.2'
bamail.con2 Sugar Forma n: 1nock:fied considerilig I‘/G7' di io
/41
(7.e
S'
,
,
&St I
Pic 1: Entry
! Pbc 4 Discharge points
Pic: 3 Chimney;.(All visible)
Route of e,ffimeh lt to reach t;lver CiangalYagrizim:
(Neese indicate staicrting from th utiet drJr of the ti;nit'.;.
(V)
1
C.a--C)
_.
Name & Designations
1 Name of officials
inspecting
,
1 ,
---- _—_-----. _
1
I
,- L
oi-
i Date
i ..:;,ubmissioii
repor'c- 1
i
Sug:r Form
Ze. V--
_
coilsidei-in,c,.:
_
7
Picture of M/S Bajaj Hindusthan Ltd. Unit Gangnoli, Saharanpur (Sugar)
! imp
.4.,
100410i
IT 0 (AM t NOW'?
moR ET P
4
Fr:141
Aeration Tank
Block Diagram ..Vra-4,;177A,
Clarifier