monenco catalogue.indd
Transcription
monenco catalogue.indd
Monenco Iran Consulting Engineers Pioneer & Dynamic in Energy Industries Playing a Proactive and central supporting role in Iran dynamic development Contents: Message from the management 1 Who we are 2 What we do 3 Goals & Prospects Key Dates in Monenco Iran 4 5 Top Chart 6 Main activity areas 7 Quality Assurance and Productiviy 8 Quality Certificates 9 Research and Development 10 Divisions 12 Power Generation Division Engineering Division 12 13 Power Transmission and Dispatching Division 18 System and Planning Division 22 Projects 23 Gas Turbine Power Plants 23 Combined Cycle Power Plants 24 Steam Turbine Power Plants, Utilities & Other Projects 24 HV & EHV Transmission Line Projects 25 Substation Projects 26 Dispatching and Automation Projects 28 Telecommunication Projects 29 Engineers of Monenco Iran 34 Monenco Iran in MAPNA Group 35 Company Shareholding 36 Company’s Offices and Branches 37 1 Message from the management Continuous industrialization and the emergence of new economies in the world have meant that the global demand for power increases drastically. Inevitably any such persistent demand brings with it the challenge of how to satisfy that demand while addressing issues of sustainability. Developing economies are also faced with considerable pressure to install the most economical and qualified and also cleanest possible means of generating power which their burgeoning industries so badly need. In this environment utilities around the world are under constantly increasing pressure to find an operating profit that expects ever-higher levels of investment, at the same time as keeping power costs competitive. Here the role of power engineering at different consequences is enormously high. Engineering works allocating a minor portion of the total cost has significant effect on project cost and therefore on power cost. Since its establishment in 1973 Monenco Iran has steadily forged a relationship of solid trustworthiness through its continuing contributions to the realization of a community in which electricity can be depended upon with complete piece of mind. To respond to the broad based trust we enjoy today, going forward we will continue to supply and deliver high-quality engineering and design services to power industry and at the same time make them to deliver secured energy. Today Iran's electric power industry is undergoing major transformations precipitated by phased rapid and increasingly developments. In response Monenco Iran is pursuing vigorous initiatives on diversified fronts both to build further on the trust now placed in it and to ensure the Company's sustained growth into the future. With respect to our design and engineering of power plants and power transmission/distribution networks, we are aggressively working to enhance related services and develop new rate schedules. On a Group wide basis, we are mustering our comprehensive resources in peripheral area already encompassing contribution and leading in submitting engineering services, amenities in support of lifecycle needs and information technology (IT) services. Through these and other undertakings across a broad spectrum, we aim to create new value for our customers and to support their business activities in unprecedented ways. Internally going forward we will seek greater management efficiency, more robust price competitiveness and an ever sounder financial structure. We will also continue to devote the full complement of our resources to research targeting technologies always at the vanguard of the field. In these ways we aim to achieve and maintain a competitive position at the top of our industry. We sincerely look forward to your ongoing support in the years ahead. Alireza Shirani President and CEO 2 Who we are Monenco Iran employs a wide range of talented engineers and project managers. They advise our clients on everything from front end engineering design through regulatory and environmental compliance, to project management and delivery. We work in diverse. Our scale and scope mean that whatever the territory or the technical challenges, we will have the experience and knowledge to help. Working on customers’ valuable assets, we have to take responsibility for their investment, treating our customers’ risk and reputation as our own. This has led us to build long-term relationships or partnerships with our customers, which have lasted over the lifetime of our company. We help our customers to create new lifestyles of enriched ease and comfort. The assets we look after often last for decades. To deliver value for money to our clients over the lifetime, we have to plan for the future from the very beginning of a contract. We also have to consider the long-term impact of what we do on other groups of stakeholders and on the community and environment. Our sustainability program, which runs right across the company commits us to progress not just against commercial achievements but also against broader objectives and values such as behaving ethically and respecting community concerns. We believe that we can only grow and succeed in the long term if we consider the long-term interests of all our stakeholders. By taking their needs into account, we ensure a healthy partnership with them and so safeguard our own future. 3 What we do We are Committed to the World Society Monenco Iran enjoying strong engineering capability and technical knowledge and committed to the national industry plays the main role in supporting industry of the country in a number of fields. We have commitment to apply highest level of standards and employ latest technology in our designs and engineering works and bring sustainability to development of the country. Today Monenco Iran has leading position in power plants engineering as well as in transmission / distribution of electricity while dispatching / telecommunication is one another branch of our challenges. In oil and gas industry we have a position although not proportional to our capabilities but very soon we get our position. We will upraise our position globally where we deserve and we will increase our share in the market. In other branches such as mine, civil engineering, geology and tectonic and all related technologies we have experienced many studies and designs and we have the knowledge and expert. We have well done studies and engineering services of coal fired power plants and coal mines. Study of tectonic and geology in many projects and in many sites of the country is done by us. To render the services we have been well supported by engineers and scientist with valuable knowledge and experience in the related fields and based on that we are honored with the first grade in the branch of “Mines and Geology Consultants” by Iran Management and Programming Organization. We help our clients in engineering and design of civil works, mines, installations and geological projects etc. We offer life-of-asset support by which we mean we look after a client’s investment from beginning to end. Working with our clients from the very start of their investment, we can help develop the initial concept, plan, funding and add value from the initial concepts through to detailed designs. When it comes to installation of the plant, we can manage the delivery, taking care of procurement and relationships with and between contractors as well as actual commissioning. Once the plant is commissioned, we offer long-term care and support services from maintenance to specialist support services such as energy efficiency audits or environmental testing. We also offer a wide range of technical services tailored to the needs of a particular industry or customer system. 4 Goals & Prospects As a dependable partner, we forge relationships built on trust. In the horizon of 10 years we make Monenco Iran a company on top of all of the consulting engineers in our field and we will be the leader in design, engineering, supervision and management of projects in energy and power industry, in electricity, oil and gas, petrochemical industry, mines and all other heavy industries and infrastructure. We must be one of the top international consulting engineers, well equipped with the latest know how and standards, and with all the modern tools and instruments. We are committed to customer’s requirements and will save their assets and investments. We have to reach to ideals in training high qualified engineers. We are committed to social health and to our environmental protection responsibilities. In power generation and power transmission in all sections we have the major portion of the home market. We will expand it to the neighboring countries and all over the world. We will expand to all the fields and support the industries everywhere. We will expand Monenco family worldwide. In oil and gas and all other heavy industries we will improve our position and reach to a deserving position. We support our customers to achieve sustainable development. We pursue our strategy plan precisely and reach all of our goals. 5 Key Dates in Monenco Iran Monenco Iran has started in 1973 as a joint venture company between private sector of Iran and Montreal Engineering Company of Canada. In 1991 Monenco Iran reorganized with participation of the Ministry of Energy of Iran and this time with Monenco Agra of Canada. In 1997 Ministry of Energy sold its shares to MAPNA and a part to the members of Monenco. In 1999 AMEC from UK acquired Monenco Agra and therefore became the share holder of Monenco Iran. Finally the shareholders of Monenco are MAPNA, AMEC, and MIR . 6 Top Chart Board of Directors Managing Director Quality Management R&D Business Development Administration Division Transmission and Dispatching Gas Turbine and Utilities Advisers Power Generation Oil & Gas System & Planning Combined Cycle & Steam Turnbine Engineering Division 7 Main activity areas We are leader in power plant design in Iran. Gas Turbine power plants Combined cycle power plants Coal fired power plants Cogeneration plants Oil and gas industries Process control, basic and detailed designs Plant rehabilitation, optimization and retrofitting Solar-thermal power plants Electrical systems and network studies Dispatching, SCADA and Control systems Telecommunication and data transmission Over head HV and EHV transmission lines Distribution system, load & energy managment system Substations Transformers Civil and architectural designs Mechanical installation designs Towers and foundations Study of optimization, rehabilitation & retrofiting Mines and geology 8 Quality Assurance and Productiviy The Quality Assurance and Productivity Department is responsible for Company productivity and quality of products including productivity control, monitoring and analyzing the processes, permanent improvement of the system and enhancing customer satisfaction. In line with ISO 9001-2000 requirements, this department has developed procedures and policies to aid employees compliance with procedures which are being constantly enhanced and measured to ensure conformity to customer need and applicable regulatory requirements and therefore total client satisfaction. This office is responsible for control the quality policy and aims internal audits and management review to ensure the quality management system suitability, sufficiency and effectiveness of monitoring, measuring and controlling the quality of processes. The Quality Assurance and Productivity Office has important responsibilities including: • Identifying work processes and determining appropriate work flows especially for product related activities. • Determining, monitoring and measurement indicators for work processes and set specific target for each indicator such as reject rates, project delays, reworks, etc. • Monitoring and measuring the processes at specified time intervals. • Collecting required data from previous steps and categorizing. • Analyzing the categorized data preferably by statistical methods. • Reporting the results to the related departments or individuals. • Making decision based on real and analyzed data and determining appropriate corrective & preventive actions • Defining and performing improvement projects . 9 Quality certificates 10 Research and Development Research and Development (R&D) in Monenco Iran aims to increase efficiency and improve quality of products. Improvement of design, manufacturing procedures and engineering methods cause increase of efficiency and reliability and decrease of expenses and wastes and finally cause increase client's satisfaction. Research groups of Monenco work closely with manufacturers, Universities and clients to develop the systems and products which are improved and meet future requirement by using new technologies. R&D of Monenco steps up the challenge of creating the pioneer systems and engineering services that enhance energy efficiency, reliability and productivity. Monenco meets the present and future demands of industries, while helping clients to make a better use of available resources, preserves the environmental impact and maintenance costs as low as possible. R&D duties include: Developing technical software’s for study, design, engineering and system rehabilitation of plants. Conducting technical and economy studies in order to maximize efficiency of systems and to minimize costs. Improvement of plant performances, development of engineering and design of equipment and parts for manufacturers. Obtaining technical know how of new design and engineering and solution for optimization of plants. Modifying the procedures of operation, maintenance, protection and utilization of plants. 11 Research and Development Helping the clients to apply updated and high technology equipment in plants in order to achieve more reliable out puts and products. Design and engineering of renewable and new energies power plants due to their large potential in the country and in the world. Creating new methods to control more efficiently the air, water and solid pollutants and to reuse and recycle wastes. Goals of R&D Department Exploring research capabilities and capacities in different Monenco Disciplines and help them to use the capabilities in their engineering works. Coordination between Monenco and MAPNA groups as major manufacturers in order to compile executive approaches in order to choose suitable technology. Seeking for improved approaches to attract and naturalize the selected technologies. Guiding the planning and design disciplines to identify useful research projects and allocate financial supports for the projects. Providing required facilities for especial scientific training of the engineers in order to update their engineering and technical knowledge. Communication with academic and research centers inside and outside the country in order to activate necessary research projects. 12 Divisions Power Generation Division Power Generation Division is responsible for project management of power plant projects and has a number of project managers within its structure. According to the structure of Monenco Iran each project is managed by a project manager. Project managers are responsible to meet and observe the requirements of their projects in every engineering aspect according to the relevant contract and shall report to higher managers and also to their client. We have designed and engineered construction of more than 50 power plants with more than 22000 MW power generated. They keep project schedule on time and care about quality of the products. Design and engineering works are done in engineering disciplines and project managers are responsible for proper distribution of the works among different departments and disciplines of the Engineering Division. Head of Power Generation Division acts as Deputy Managing Director for all the projects of power plants and subsequent related projects. Power Generation Division has three departments namely: Gas turbine and utilities Combined cycle & Steam turbines Oil & Gas All the projects awarded to the division are distributed among the departments according to their responsibilities. Each department has a department manager, project managers and project coordinators. 13 Divisions Engineering Division Engineering Division has the following discipline Departments. The engineers design different aspects of power plants, oil & gas Refineries and other plants. Engineering Division consists of the following departments: • • • • • • • Electrical Engineering Department Mechanical Engineering Department Civil Engineering Department I&C Engineering Department Process Engineering Department General Engineering Department 3D Modeling Department Our Engineering Service: • • • • • • • • • • • • • • • • • Project identification and development support Project management Expertise, project appraisal and consulting Energy studies Feasibility studies and process evaluation Financial studies Environmental impact studies Conceptual design Basic and detailed design Project estimation and optimization Tender documents Bid evaluation and contract documents Project estimation and optimization Project cost control Project control and site supervision Commissioning, acceptance test and start up 3D modeling to design and calculate systems 14 Engineering Division Electrical Engineering Department Electrical Engineering Department is responsible to deal with all the matters related to the electrical equipment and plants of power plants of any kind and capacity, Refineries and all industial plants. The engineers are expert in the following activities: Design of electrical sections of power plants, transmission & distribution grids. Tender document and technical specification for generators, transformers, accessories and electrical equipment. Design and design review of all electrical Installations of power plants and all other plants including all auxiliary supplies etc. Design and calculation of grounding grids (all the grid sections, NGR calculation, layout, etc). DC / UPS system (battery, battery charger, design and calculation) Cabling (sizing, routing). Diesel generator (sizing and specification / data sheet) Transformers of all size and voltage levels ( design and review, calculation, specification and data sheet). LV MCC Load flow & short circuit study, power system study MV&LV protection systems, specification, calculation & coordination Electrical tender documents preparation Bid evaluation Switchgear schematic and Installation details Electrical I / O list preparation Design and review of electrical interface between generator, transformer etc Generator design review IPBD review MV & LV motor design and review Applying latest edition of all software’s for LV switchgear design, Lighting calculation, lightning protection calculation, load flow and short circuit calculation, and grounding grid calculation etc. 15 Engineering Division Mechanical Engineering Department The mecanical engineers do followings very well: • • • • • Tender specification for Boilers and Recovery boilers Tender specification for purchase of all balance of plant Design of power units Design of general layout of plants Optimization of power unit sizes and finding the most suitable and profitable power units combination by running GTPRO • Design of cooling system • Design of compressed air system • Design of HVAC systems • Design of fire fighting systems • Overall engineering in power plant • Piping design • Piping stress analysis • Design of pressure vessels and atmospheric tanks • Applying the best software’s to design and calculate sysystems as well as their 3 D modeling Civil Engineering Department The engineers of Civil Department are well trained to design heavy duty buildings and structures and following works are very well done by them: • • • • • • Design architecture of high standard buildings including industrial buildings, offices and residentials Design structures of heavy duty standard Design special foundations for dynamical installations Design layouts and landscapes. Design and calculation of buildings and structures to meet requirements of the latest international standards. Applying newest software’s in design and calculation of structures, foundations and buildings. 16 Engineering Division I & C Engineering Department The engineers design and establish: Determining control system architecture and automation system philosophy in order to reach the level of automation required for the system. Choosing proper system and preparing the control structure according to process and protection main requirements. Specifying data exchanging protocols according to the required topology, speed and capacity and data traffic and control system layout & configuration. Specifying control system software requirements Data traffic analysis and control system layout & configuration. Preparing P&ID, PFD, instrument list/ index , data sheets and sizing based on the standards and latest supplier catalogues. Open and closed loop control diagrams design and preparing logic diagrams required for all layers and levels. Preparing cause and effect document, digital and analog I/O list, data acquisition structure and remote I/O for control systems. Preparing cable route diagrams, interconnection drawings, junction box layout, cabling, wiring and terminal diagrams, detailed interlocking drawings for systems and alarm drawings and documents. Control room design based on safety, environmental conditions, process and ergonomic standards. Preparing detailed instrument hookup drawings and instrument location layout. Process Engineering Department The engineering works done by prosess engineering department are: Design of water treatment plant, waste water treatment plant, water supply and distribution systems, waste water collection systems. Technical specification for water treatment plant, waste water treatment plant, condensate polishing plant, electrochlorination plant, chemical laboratory, painting and coating. Steam & Water Cycle Quality Control. 17 Engineering Division General Engineering Department The engineers are expert in: • Conceptual design • Technical specification for installation and test of equipment anand commissioning • Instruction manuals for factory and field tests • Instruction manuals for erection and commissioning • Training courses for clients engineers and technicians • Safety manuals and instructions • Welding specification and procedure • Quality control planning • Spare parts list • Pressure and strength testing manual • N.D.T specification and test instructions • Inspection and test plan documents • Insulation manuals • Tender document for installation works • Review technical specification 3D Modeling Department • Administration (installation & data base creation) of major 333D modeling software’s. • 3D modeling of equipment, piping, structure, and electrical • parts of different plants. • Extracting plan, view, section, and detailed drawings from 3d3d model of a plant. • Extracting different reports (material take off, line list, valve listlist, etc.) from 3D models. • Training programs in the above mentioned subjects. 18 Divisions Power Transmission and Dispatching Division The Division of Power Transmission and Dispatching is responsible for all projects in power transmission, networks, substations, transmission lines, dispatching centers and telecommunication networks of all kinds and voltage levels. The division is responsible for the project management and also for the design and engineering works of the projects. It has departments and disciplines within its structure which are responsible for engineering and design of different projects in all different sectors as mentioned above. Head of Power Transmission and Dispatching Division acts as Deputy to Managing Director of the Company for transmission projects and also for dispatching and telecommunication projects. The studies of power transmission line as a part of power system study of Iran in 1970s was originated by Monenco Iran. The 15000 km of transmission lines we engineered over the past 35 years include 400, 230 kV important transmission lines such as Karun 3, Chehel Sotun, Tiran etc and many other projects at 400, 230, 132, and 63 kV voltage levels. We have done engineering of optical fiber ground wires on more than 2000 km of 400 and 230 kV transmission lines. Automation, assessment, power loss reduction, rehabilitation of distribution networks and also stability and load shedding studies are among the projects rendered by Monenco Iran. In Power Transmission We Design: Extra high voltage transmission lines and substations Power transformers and shunt reactors Integrated protection and control systems SCADA and telecommunication Dispatching centers Distribution networks Substation automation and distribution networks Power supply to industry complexes Network and system studies The Division of Transmission and Dispatching have designed more than 15000 kilometer transmission line up to the highest voltage level in vast areas and conditions and more than 6000 MVA substations from 63 kV up to 400 kV including power transformers. Four departments namely Substations and Distribution Networks, Transmission Lines, Telecommunication, Dispatching and Automation are the structure of this division. 19 Divisions Power Transmission and Dispatching Substations and Distribution Networks Department The department is responsible for engineering, design and design review of high voltage and medium voltage substations and distribution networks. The projects of this department include all voltage levels from 33kV up to 400 kV substations and switchgears of any capacity. Power transformers and shunt reactors are part of our common practice in this department. Some of important projects of the Department are: Shahmaran 2 substation 400/132/20 kV. Bam substation 400/132/20 kV. South Esfahan power plant 400kV substation. Jask 230/63/20 kV substation. Dehloran 230/132kV substation. Loshan 2 substation 230/63 kV. Chelshahid Amol 230/132 kV substation. Nowshahr 230/20 kV substation. 4n GIS substations 66/20 kV Sadra, Eghlid, Chougan, Galedar. Transmission Lines Department Transmission Lines Department has performed lots of projects in many difficult and hard to access areas. We have completed many projects at various voltage levels up to 400 kV. More than 15000 kilometer transmission lines of any kind and design are built by us. Some of important projects of the Department are: Karoun3 dam to Tiran transmission line, 400 kV single circuit, 3 bundles. South Esfahan (power plant) to Karoun3 transmission line, 400 kV single circuit 3 bundles. Karoun3 dam to Karun3 S/S 400 kV transmission line, double circuit, 2 bundles and 4 strings OPGW. 230 kV transmission line from Kerman power plant to Rafsanjan 230 kV S/S, double circuit, curlew conductor and OPGW. Engineering services for installation of OPGW on many 400 kV and 230kV transmission lines Engineering services for purchase of 1000km OPGW and underground cable carrying OPGW. 20 Divisions Power Transmission and Dispatching We have designed and built more than 15000 kilometers EHV and HV transmission line all over the country in variable conditions and circumstances. Masjed Soleiman 400kV transmission line, single circuit to Ahwaz 400/132/20 kV substation 400kV transmission line, single circuit, 3 bundles, curlew conductor from Bisotoun to Islam Abad and khaneghin (Iraq) 400kV transmission line, single circuit from Ahar to Armenia 400kV substation 230kV transmission line, double circuit Sarab to Ardebil 230kV substation Several transmission lines 132 & 63 kV all over the country Telecommunication Department In Telecommunication department we are expert in power line carrier (PLC), Tele protection systems and wireless networks such as land mobile radio systems, spread spectrum and microwave links and of course in fiber optics systems and cables. We have finished many projects involving the latest world class techniques satisfactorily. All power networks’ needs to data, voice and video transfer is satisfactorily supplied by us. All engineering works at different stages of projects such as feasibility study, data acquisition and processing, site survey, present status report, design review, tender documents, technical specification, bid evaluation, etc is handled perfectly by us. Some of important projects of the Department are: Supervision and site engineering works for purchase, installation and commissioning of fiber optics equipment for IPDC. Feasibility study for Purchase of fiber optics network for Tehran Regional Electric Company for world bank loan assessment. Design of master plans of UHF and VHF radio networks for West Regional Electric Company. Design of master plan of fiber optics and PLC network for Gilan regional electric company. Design of master plan and bid evaluation of telecommunications network including fiber optics, PLC, trunk radio and Tele protection systems for Khuzestan Regional Electric Company. Design of master plan of fiber optics network for Tehran, Azerbaijan and Khorasan Regional Electric Companies. 21 Divisions Power Transmission and Dispatching Dispatching and Automation Department The department of Dispatching and Automation has the responsibility to design, design review, tender documents preparation and all other engineering works related to dispatching centers and automation of substations and power plants control rooms. Design and engineering of National Dispatching Center and many Regional Dispatching Centers are well done and completed by this department. Some of key project done by the department: Engineering and project management of Iran National Dispatching Center. Bid technical and commercial evaluation of the project of Iran North East and South East Transmission Network Dispatching Centers. Tender document, evaluation, review and supervision for Karaj Dispatching Center. Tender document, evaluation, review and supervision for Semnan Dispatching Center. Tender document, evaluation, review and supervision for North Regional Dispatching Center. Tender document, evaluation, review and supervision for Yazd Dispatching Center. Supervision of West Regional Dispatching Center (WAOC) 22 Divisions Contractor Monenco Iran Process Map Infrastructure & Work Environment Management General & detailed planning, identification & design of the systems, monitoring & control, bidding and contract management are the main responsibilities of this division. Major duties of the division are summarized as follows: Human Resource Management Supporting Processes Evaluation Project Control & Planning Supervision on Construction Customer Contractors Contractors Evaluation Design Review Design Client Customer Relationship Main Processes Implementation Supplier Improvement Monitoring & Analysis of Data Management Processes Control of Documents & Records System and Planning Division Strategic, Roadmap & Long-term Planning Design & Implementation of the Systems (e.g. PMS, EDMS, WFMS, EDP, KM) Development & Optimization of the Systems Planning & Analysis of the Projects Projects Monitoring & Control Portfolio & Project Analysis Preparation of Action Plans for Company's Divisions Monitoring & Control of Divisions activities Training, Publishing & Knowledge Management Development of the Electronic Design Processes Methodology Analysis Development of the Reference Design Processes Electrical Archiving & Library Electronic Document management System Economical/Technical Feasibility Studies Enterprise Resource Planning Systems, Software’s & Networks Administration Monitoring & Supporting Development Strategies Proposals Preparation and Bidding Contract Management assistance Budgeting & Cash flow Control 23 Projects Reference and Experience Records Gas Turbine Power Plants Power plant Capacity (MW) Completion Date 1 Kazeroun 6 × 159 2003 Fars 2 Abadan 4 × 123 2003 Khuzestan 3 Damavand Tehran 4 12 × 159 6 × 159 2004 Hormozgan 2004 Hormozgan 5 Sanandaj 4 × 159 2005 Kurdestan 6 Shirvan 6 × 159 2005 Khorasan 7 Isfahan 3 × 30 2006 Isfahan 8 Hamedan 2 × 30 2006 Hamedan 9 South Isfahan 6 × 159 2006 Isfahan 10 Parand 6 × 159 2007 Tehran 11 Ali Abad 6 × 159 2007 Golestan 12 Oroumiyeh 4 × 159 2007 West Azerbaijan 13 Ardebil 4 × 159 2008 Ardebil 14 South Pars Central (Besat) 6 × 159 2008 Bushehr 15 Ghaen 4 × 159 2009 Khorasan 16 Chabahar 2 × 159 2009 Sistan & Baluchestan 17 Khoramshahr 4 × 159 2009 Khuzestan 18 Kashan 2 × 159 2009 Isfahan 19 Fajr 4 × 159 2010 20 Raysut ( Sultanate Of Oman) 1 × 30 1999 Khuzestan Oman Region 24 Projects Combined Cycle Power Plants 1 2 3 4 5 6 7 8 9 10 Montazer Ghaem Shahid Rajaie Khoy Fars Neyshabour Shariati Neka 11 Yazd Kerman Kazeroun Damavand 12 Pare Sar (MW) Completion Date 3×105 3×105 1×105 3×105 3×105 1×105 1×160 2000 2002 2002 2003 2003 2003 2006 Tehran Qazvin West Azerbaijan Fars khorasan Khorasan Mazandaran 1×160 4×160 3×160 6×160 4 x 159+ 2 x 160 2006 2007 2007 2008 Yazd Kerman Fars Tehran 2012 Gilan Capacity Power plant Region Steam Turbine Power Plants, Utilities & Other Projects Power Plant / Utility Capacity (MW) Completion Date 1 Mobin Utility Complex Combined Heat & Power Plant 6 × 123.4 2006 Bushehr 2 Bakhtar Petrochemical Utilities (Kermanshah,Lorestan,Mahabad, Kordestan,Gachsaran) Utility 2006 West Regions of IRAN 3 Tabas Coal Fired Steam Power Plant And Mazino I Coal Mine 2 × 325 2007 Yazd 4 Yazd Solar -Thermal Power Plant (Solar Portion) 2 × 159 (G.T)+ 1 × 149 (S.T) 2008 Yazd 5 Mobin Utility Complex Combined Heat & Power Plant (Extention Plants Unit 7&8) 2 × 150(G.T)+ 1×HRSG 2008 Bushehr 6 Mobin Utility Complex Combined Heat & Power Plant (Extention Plants 7&8)- Pipe Rack 3 × 150(G.T)+ 1×HRSG 2008 Bushehr 7 Yazd Solar-Thermal Power Plant (Gas Turbine & Steam Turbine Portion) 2 × 159 (G.T)+ 1 × 149 (S.T) 2009 Yazd 8 Fajr 2 Utility Complex (Combined Heat And Power Plant) 4 × 159(G.T)+ 2×HRSG 2010 Khuzestan 9 Phase 15&16 - South Pars Gas Field Utility Project Utility 2010 Bushehr Region 25 Projects HV & EHV Transmission Line Projects Project 1 2 3 4 Karoun 3 take off Yard Karoun 3 - Tiran Karoun 3 - South Isfahan Sirjan-Khatounabad (OPGW) 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Shadmehr - Neyshaboor (OPGW) Kerman - Bam Masjed Soleyman - Ahwaz2 Ali Abad - Esfarayen (OPGW) Tabriz - Khoy (OPGW) Shahmaran2 Neyshabour - Esfarayen (OPGW) Bandar Abbas - Sirdjan (OPGW) Shadmehr - Ghaen (OPGW) Bistoon - Eslam Abad - Khanegheyn Ahar - Armenia Bistoon - Eslam Abad - Khanegheyn Khorramabad - Kermanshah (OPGW) Zangi Abad Trandmission Lines Cheshmeh Sefid & Mahidasht Gilan Power Plant - Chabocksar (OPGW) Zanjan - myane - Tabriz (OPGW) Kerman - Rafsandjan (OPGW) Laft - Dargahan (OPGW) Bandar Lengeh - Jenah (OPGW) Bandar Abbas - Dorahi Minab (OPGW) Bandar Abbas - Bandar Pohl (OPGW) Kermanshah Ring (OPGW) Rafsandjan - Sarcheshmeh (OPGW) Hamedan - Sanandaj (OPGW) Kermanshah - Sanandaj (OPGW) Sarcheshmeh - Sirdjan (OPGW) Sarab - Ardebil Jahrom PowerPlant - Jahrom2 Lar – Emaddeh (Beyram - Eshkenan) 36 37 Voltage level (kV) Completion Date Client 400 400 400 400 2001 2003 2003 2005 400 400 400 400 400 400 400 400 400 400 400 400 400 230,132 230,63 230,63 230 230 230 230 230 230 230 230 230 230 230 230 230 132,63 132,63 2007 2007 2007 2004 2005 2006 2006 2006 2004 2006 2009 2007 2005 2008 2007 2006 2004 2004 2002 2003 2002 2005 2005 2005 2005 2005 2005 2006 2006 2004 2006 South Ahwaz - De’bel 132 2001 SUGER CANE REFINERY Tabas - Eshghabad 132 2002 KHREC Mehran – Dehloran - Zarrin Abad & Arcovaz FARAB EREC EREC KREC KHREC KREC IPDC IPDC IPDC KHREC IPDC IPDC KHREC WREC IPDC WREC IPDC KREC WREC GREC IPDC KREC IPDC IPDC IPDC IPDC WREC IPDC IPDC IPDC IPDC AREC FREC FREC WREC 26 Projects Project Voltage level (kV) Completion Date Client 38 Rafsandjan - Zarand - Bafgh (OPGW) 132 2005 IPDC 39 Mobin Petrochemical Industries 132 2006 MOBIN PETROCHEMICAL Co. 40 41 42 43 44 45 Islam Abad - Ghal’e Ganj & Shahmaran 1 to2 OEID - Dehloran Kermanshah Ring (OPGW) Bistoon - Siman Gharb Hava Nirooz - Nassadji Modification of Marivan - Sanandaj Gilan Systems Study , Transmission & Distribution Networks Planning Network and Load Flow Study Gilan Network Study (Package) Engineering of 1000 km OPGW Distribution Network of Bonab (Study) Gharb Network Study (Package) Kermanshah Distribution Network (Supervision) Ilam & Sanandaj Distribution Network (Supervision) Tehran’s Network OPGW (Study) Upgrading Conductor size for using in Khouzestan transmission lines (Study) OPGW installation on Kermanshah Ring (Study) Distribution of Bonab 2 - (Supervision) Azerbaijan Distribution Master Plan (Study) 132 132 63 63 63 63 2007 2007 2005 2005 2005 2006 KREC OEID WREC WREC WREC WREC 1998 GREC 2002 2004 2005 2005 2005 2005 2005 2005 TAVANIR GREC IPDC AREC WREC WREC WREC TREC 2006 KWPA 2005 2005 2006 WREC AREC AREC 46 47 48 49 50 51 52 53 54 55 56 57 58 Substation Projects Project 1 2 3 4 5 6 7 Voltage level (kV) Shahmaran 2 & Bam 400/132/20 400/63 Extension of Shahre Kord Substation Lordegan DCS Substation 400/63 Naghshe Jahan & Ravand Kashan Substations Extension 230/63, 63/20 Cheshmeh Sefid & Mahidasht Substations Extension 230/63, 63/20 Extension of Mehran, Dehloran, Zarrin Abbad Substations 230/132/20 Jask. GIS & DCS Substation 230/63/20 Completion Date Client 2008 2009 2009 2005 2007 2007 2005 KREC EREC EREC EREC WREC WREC HREC 27 Projects Voltage level (kV) Completion Date 230/63/20 230/63 230/63 230/63 2004 2007 2009 2005 WREC 12 Noshahr Substation 230/63 2008 MREC 13 Loshan Substation 14 Mapna Buildings Complex In Fardis 230/63 2008 GREC 230/63 230/63 2008 MAPNA 2006 230 2008 MREC MAPNA Project 8 9 10 11 Jask Substation Naghshe Jahan & Ravand Kashan Substations Extensio Jahrom2 Substation Sanandaj - Eslam Abad - Sarcheshme Substations 15 Chel Shahid Amol Substation Extension 16 Pareh Sar 17 Fars Substations (6) Client HREC EREC FREC 132/66/20 2006 FREC 18 Azadvar Substation 19 Dashte Abbas Substation 132/20 2003 KHREC 132/20 2006 20 Mobin DCS Substations 21 Beyhagh Substation 132/20 2008 WREC MOBINPETRO 132/20 2004 KHREC 22 South Pars Substation 132/20 2007 NIPC 23 Khosf Substation 132/20 KHREC 24 Nil Abad and kalat Substations 132/20 2005 2004 25 OEID - Dehloran Substation 26 Isfahan Substations II ( Moorook, Padena, Tchadegan, Anarak, Kavire Kashan & Golab Substations Substations II (Mobarake, Farrokhshahr, 27 Isfahan Shalamzar, Oshtordjan & Montazeriyeh) 28 Pirbazar and Shaft Substation 132/12 2007 KHREC OIED 63/20 2004 EREC 63/20 2004 EREC 63/20 63/20 2005 WREC 2006 63/20 2006 TREC EREC 63/20 2007 EREC MV/LV 2003 NICICO MV/LV 2004 NICICO MV/LV 2006 NICICO 29 Tehran Substations 30 Isfahan 11 Substations Oshtordjan, Montazeriyeh, Mobarake, Malek shahr 31 & Moorook DCS Substations 32 Electrical Energy Supply & Distribution of Sarcheshmeh Copper Complex and Equipment Optimization Electrical Energy Supply & Distribution of Sungun 33 Copper Complex 34 Load Flow, Short Circuit & Protection Coordination of Sungun Copper Complex 35 Zandjan Dispatching Building 2004 ZREC 36 Yazd Dispatching Building 2005 YREC 37 Evaluation of Contractors, Consultants & Manufacturers 2006 WREC 28 Projects Dispatching and Automation Projects Project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 SAOC (Supervision) Tehran Dispatching Center NAOC Dispatching Center Mazandaran Regional Dispatching Center Tehran Dispatching Center NAOC Dispatching Interface Azerbaijan Regional Dispatching Center Mazandaran RDC - Feasibility & Extension Zanjan RDC- Dispatching Bakhtar Dispatching Interface System YAZD Dispatching Center MRDC Dispatching Center Connection to Zimavar NAOC Interface System, Site Supervision Semnan Dispatching Center Azerbaijan Interface Isfahan Network Automation Azerbaijan Interface System NAOC Dispatching Center Tabriz & Orumieh Automation of Distribution Network Gharb Dispatching Center(Supervision) Markazi Region, Interface System Provisional Acceptance of Kermanshah Interface System NAOC Dispatching, Site Supervision Markazi Region, Interface System and Supervision Jask 230kV DCS Substation Yazd RDC Dispatching Yazd Regional Dispatching Center Interface System Kermanshah DDC Automation of Distribution Network Yazd RDC Inspection Arak & Hamedan Dispatching & Telecommunication Yazd DDC Automation of Distribution Network Dehloran, Dashte Abbas & Zarrin Abad Substations SCADA System Tehran RDC Dispatching NAOC DCS Systems Yazd RDC Arak Interface System (Supervision) Lorestan RDC Fars RDC Dispatching Centers Azerbaijan Interface System Mazandaran Interface System Completion Date 1998 1998 1999 2000 2000 2001 2001 2003 2003 2003 2003 2003 2003 2003 2003 2004 2004 2005 2005 2005 2005 2005 2005 2005 2006 2005 2005 2005 2005 2007 2007 2007 2007 2007 2008 2008 2008 2008 2008 2008 Client FREC TREC MREC MREC TREC MREC AREC MREC ZREC BREC YREC MREC MREC SREC AREC EDEC AREC MREC ADEC WREC BRDC WREC MREC BREC HREC YREC YREC WREC YREC BREC YREC WREC TREC MREC YREC BREC BREC FREC AREC MREC 29 Projects Telecommunication Projects Completion Date Client Design of master plan of PLC network of Yazd REC Supervision over installation and commissioning of telecommunication equipment of Yazd REC Tender documents for supply, installation and commissioning of Metropolitan optical network for Khorasan REC Tender documents and technical specification for purchase of PLC outdoor equipment for Fars REC Design of Master Plan of Fiber Optical Network for West REC Design of telecommunication network for radio equipment of South Yazd Substations (Yazd REC) Design of Master Plan of fiber optic network for Azerbaijan REC Supervision over installation and commissioning of optical equipment of Tehran REC 2002 YREC 2003 YREC 2003 KHREC 2003 FREC 2003 WREC 2005 YREC 2006 AREC 2006 TREC Feasibility Study for TREC Optical Network for World Bank Planning of RDC communications over fiber optics network for Tehran REC Technical specification & tender documents for purchase of PLC & Tele - protection terminals for Iran Power Development Company Design of Master Plan of PLC network for West REC Design of telecommunication network in Fuman & Siah-kalteh Substations (Gilan REC) Design of Master Plan of telecommunication (Optic/Radio/PLC) network for Khouzestan REC Design of fiber optics network of Tehran Regional Electric Distribution Company Design of Master Plan of fiber optical network for Tehran REC Design of RDC telecommunication network and preparation of tender documents for purchase of equipment, installation and commissioning of fiber optics, radio and PLC equipment for Bakhtar REC Design of VHF & UHF radio network For West REC Design of fiber optic network for Khorasan REC Design of Master Plan of telecommunication network of Gilan REC Supervision over installation and commissioning of optical equipment for IPDC Supervision over installation and commissioning of PLC/Radio equipment for Bakhtar RDC Design of comprehensive telecommunication network for Khorasan REC Supervision on installation and commissioning of optical equipment for West REC Tender document and technical specification for purchase of PLC & Tele - protection terminals for Tehran REC 2006 TREC 2007 TREC 2007 IPDC 2007 WREC 2007 GREC 2008 KZREC 2008 TBTB 2008 TREC 2008 BREC 2008 2008 2008 WREC KHREC GREC 2008 IPDC 2008 BREC 2008 KHREC 2008 WREC 2008 TREC Project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 *REC: Regional Electric Company 30 Projects We have designed and supervised construction of more than 22000 MW gas turbine and combined cycle power plants of the country: DAMAVAND Damavand power plant is located in the east of capital Tehran. Damavand combined cycle power plant has 12 gas turbine units V 94.2 each 159.5 MW which are completed and are in service. 6 units steam turbines of160 MW capacity and heat recovery steam generators are under construction. The plant feeds power to 400 kV national grid. PARAND Parand power plant is located in the south west of capital Tehran. Parand has 6 gas turbine units V 94.2 each with 159.5 MW capacity and all are in service. The plant shall be extended to 6 more gas turbine units and to combined cycle packages. 31 Projects KERMAN Kerman power plant is located in south east of Iran. Kerman combined cycle power plant has 8 gas turbine units V 94.2 MW and feed 4 steam turbines 160 MW through 8 heat recovery boilers. KHOY Khoy power plant is located in the north west of Iran in Azerbaijan region. Khoy combined cycle power plant has two gas turbine units and feed 1 steam turbine 105 MW through 2 heat recovery boilers. 32 Projects FARS Fars power plant is located in the center of Iran in Fars region near to Shiraz. Fars combined cycle power plant has 6 gas turbine units feeding 6 heat recovery boilers and 3 steam turbines each 105 MW. SHAHID RAJAEE Shahid Rajaee power plant is located in the west of capital Tehran near to Qazvin. The plant has the capacity of more than 2000 MW. Shahid Rajaee combined cycle section has 3 steam turbines 105 MW which are fed by 6 gas turbines through heat recovery boilers. 33 Projects NEKA Neka power plant is located in the north of Iran at the coast of Caspian Sea. Neka is a famous and large power plant playing important role in supplying power need of the country grid (altogether more than 2000 MW). Neka combined cycle section has one steam turbine 160 MW fed by two gas turbines through two heat recovery boilers. KAZEROUN Kazeroun power plant is located in south west of Iran. Kazeroun combined cycle power plant has 6 gas turbine units V 94.2 MW and 3 steam turbines 160 MW. 34 Engineers of Monenco Iran Electrical and I&C Engineers 127 Mechanical and Process Engineers 68 Civil Engineers 67 Industrial Engineers 25 Computer Engineers 12 Economists: 10 Geologists and Mine Engineers 8 Technicians & CADists 90 Others 62 19% 2% 5% 13% 27% 14% 2% 15% 3% 35 Monenco Iran in MAPNA Group Monenco Consulting Engineers is the engineering member of MAPNA Group. MAPNA is the leading manufacturer and general turnkey contractor in the region. MAPNA has mainly concentrated in power plants, utilities, Refinery plants, railway and construction projects. MAPNA Group consists of investment, manufacturing, engineering and contracting companies. MAPNA GROUP Among the Group members i.e. MAPNA Turbine Manufacturing (TUGA), MAPNA Generator Manufacturing (PARS), MAPNA Turbine Blade Manufacturing (PARTO), MAPNA Electrical & Control Manufacturing (MECO), MAPNA Boiler Manufacturing, MAPNA Railroad Industries, Mavadkaran, Sepahan Equipment Manufacturing, MAPNA International F.Z.E, MAPNA Tous Power Generation, MAPNA Assalooyeh Power Generation, MAPNA Power Plants Construction & Development. (MD -1), MAPNA Combined Cycle Power Plants Construction & Development (MD -2), MAPNA Special Projects Construction & Development (MD -3), MAPNA Operation & Maintenance, Nasb Niroo, Iran Power Plant Investment (SANA), Non-Governmental Fund for Research and Technology in Iran Power Industry, Shahriar Turbine Parts, Faraz Niroo Transformer Manufacturing, Iran Power Plant Repair and Azarakhsh Power Generation Companies Monenco supports and cooperates with all other members of the group in construction and installation of new power plants and utilities, railway etc. The role of Monenco in this position is substantial and is responsible for all of engineering services, tender documents and evaluation, procurement services, basic design, detailed design, etc. In this position Monenco Iran has also the duty of supervision of the projects, which means, Monenco Iran shall have supervision and auditing offices in different places of the Country and outside of the Country where ever there is an active project. For this reason Monenco Iran has presently 9 supervision offices in various Regions of the Country. 36 Company Shareholding MAPNA 72% Iran Power Plant Project Management Company (MAPNA) MAPNA Group is parent enterprise engaged in the development and implementation of thermal power plants, utilities and industrial projects under EPC & IPP schemes through its subsidiaries relying on 15 years of constant and outstanding performance. Since 1992, when MAPNA was established, the Company has constructed or has under-construction power plant projects generating more than 42000 MW of electricity with a total value of almost Euro 14 billion, having a share of 85% of the country’s total grid capacity. We pride our strategic role in the sustainable industrial growth and economic development of I.R Iran. AMEC 15% AMEC plc. (UK) The AMEC story in Canada begins on September 16, 1907, with the incorporation of the Montreal Engineering Company Ltd., which did business for 85 years before being acquired by AGRA Inc. AGRA came into being in 1960, acquired Montreal Engineering (then known as Monenco) in 1992. AGRA itself was acquired by AMEC in 2000. AMEC celebrates 100 years in Canada. A century, they have led projects that transformed the landscape and helped shape the country. MIR 13% MIR Investment Company All engineers, managers and other staff of Monenco Iran are owners of their company and they sacrifice for the company. MIR is an investment enterprise built up by the personnel of Monenco Iran in order to take part in building Monenco’s structure higher and stronger as possible. 37 Company’s Offices and Branches Main Offices: Office 1: No.16, St 23 Gandhi Ave. Tehran, Iran Office 2: No.17, St 23 Gandhi Ave. Tehran, Iran Office 3: No.10, St 23 Gandhi Ave. Tehran, Iran Office 4: No. 19, St 21 Gandhi Ave. Tehran, Iran Office 5: No.51, Gandhi Ave, Floor 1 Tehran, Iran Office 6: No.51, Gandhi Ave, Floor 4 Tehran, Iran Branches all around the Country: Tabriz: No.69, St 2 Golchin Ave, Baharestan Ave, Shahrak-e-Noor Tabriz Iran Kermanshah: No.49 -51, Hafez Ave, Golestan Boulevard, Kermanshah, Iran Ilam: Shahryar Ave, Farhangian phase, Hazrate Abolfazl Boulevard, Ilam, Iran Eslam Abad: Shahid Cheraghi Ave, Yadegar-e-Emam Boulevard, Eslam Abad, Iran Bam: No.2, Chape Farshid Besat 8 Ave, Moalem Boulevard, Bam, Iran Mahan: Next to Rahdarkhane, Shahrak-eEnghelab, Mahan, Kerman Lamard: Central Post, Ashkenan city, Lamard, Fars Province, Iran Kahnuj: Heidar Abad Khasili, Kahnuj, Kerman Shahmaran: Emam Djomehe ghadeem alley Shahmaran, Kerman www.monenco.com Designed by: Elahe Alavi Amlashi www.monenco.com No.16 & 17, St 23 Gandhi Ave., Tehran, Iran P. O. Box: 15875-8717 Tel: +9821 81961 Fax: +9821 88777394 Email: [email protected]
Similar documents
Monenco Iran
universities and clients providing engineering services that enhance energy efficiency, reliability and productivity. Monenco meets the present and future demands of industries, while helping clien...
More information