TO BE CONSIDERED BY THE ClTY COUNCIL ClTY OF
Transcription
TO BE CONSIDERED BY THE ClTY COUNCIL ClTY OF
TO BE CONSIDERED BY THE ClTY COUNCIL ClTY OF KERRVILLE, TEXAS SUBJECT: Council authorization for the City Manager to execute a contract with Ramming Paving Company Ltd. for street reconstruction related to the Asphalt Pavement Maintenance 2009 project in the amount of $1,270,853.45 and allocate $221,460.55 for contingency expenses and additional street reconstruction. FOR AGENDA OF: June 9,2009 DATE SUBMITTED: May 29,2009 SUBMITTED BY: Cheri Halford CIP Manager CLEARANCES: Charlie Hastings Director of Public Works *t EXHIBITS: Bid Log and Contract AGENDA MAILED TO: APPROVED FOR SUBMITTAL BY ClTY MANAGER: Expenditure Current Balance Amount Account Required: in Account: Budgeted: Number: $1,270,853.45 $1,492,314.00 $1,500,000.00 G85 $ 221,460.55 $1,492,314.00 $1,500,000.00 G85 PAYMENT TO BE MADE TO: Ramming Paving Company Ltd. 16409 Bratton Lane Austin, TX. 7 8 p 8 , REVIEWED BY THE FINANCE DIRECTOR: I ,% I SUMMARY STATEMENT The City of Kerrville budgeted and sold bonds in the amount of $1,500,000.00 for street reconstruction in FY09. Utilizing the Pavement Management System, a comprehensive list of failed streets was identified for reconstruction. Failed streets are those that have a Condition Index (CI) of 69 or below and require total reconstruction of the pavement including the base. The estimate for the planned construction utilized the full budgeted amount of $1,500,000.00; however the lowest qualified bidder provided a bid in the amount $1,270,853.45. This provides remaining funds in the amount of $221,460.55. Public Works anticipates unforeseen overages that will result in change orders such as utility relocations, replacement of the signal light looping system at Harper Hwy. and Jackson Road and additional pavement needed in the downtown area. Upon substantial completion of the original construction project with the change orders, additional streets could then be added for reconstruction. Public Works is asking for the remaining $221,460.55 to be available as contingency funding for these changes and additions. Sixteen (16) bids were opened and the lowest qualified bidder was Ramming Paving Company Ltd. The streets to be reconstructed are: Methodist Encampment between SH 27 and Lois Street; Woodlawn AvenueICircle Avenue between SH 27 and Jefferson Street; Jackson Road between Harper Road and Woodlawn Avenue; Harper Street between Galbraith Avenue and N. Lewis Avenue; Galbraith Avenue between W. Water Street and Culberson Avenue; W. Water Street between Jackson Road and Galbraith Avenue; portions of W. Water Street between Sidney Baker Street and SH 27; Jefferson Street between Tivy Street and Aransas Street; Washington Street between Water Street and Jefferson Street; Earl Garrett Street at the intersection of Main Street; Schreiner Street between Lewis Avenue and Wallace Street. The anticipated addition to the reconstruction schedule would be Earl Garrett between Water Street and Jefferson. The notice to proceed will be provided to the contractor on or about June 11, 2009, and construction is anticipated to last seventy (70) calendar days. RECOMMENDED ACTION The Public Works Director recommends that Council authorize the City Manager to execute a contract with Ramming Paving Company, LTD. in the amount of $1,270,853.45 for the Asphalt Pavement Maintenance 2009 project and authorize the remaining allocated funds in the amount of $221,460.55 to be used as contingency funding for the project and additional street reconstruction. Asphalt Pavement Maintenance Project 2009 - Bid Opening Date May 20, 2009 3:OOpm Bid Log Bidder Bond Attached Addendum Acknowledged Total Base Bid Total Additive Alternate Total Bid 1 Edmund Jenschke Yes No $1,214,779.90 2 Ramming Paving Yes Yes $1,041,630.20 $229,223.25 $1,270,853.45 3 Clark Construction Yes Yes $1,326,223.37 $324,734.01 $1,650,957.38 4 V K Knowlton Construction Yes Yes $1,090,569.60 $212,005.40 $1,302,575.00 5 Wagner Materials and Construction Yes Yes $1,220,575.00 $238,651.50 $1,459,226.50 6 Double S Paving Yes Yes $1,124,660.97 $213,799.45 $1,338,460.42 $237,276.50 $1,452,056.40 Section 070 CITY OF KERRVI1,LE CONSTRUCTION CONTRACT This agreement made this day by and between the City of Kerrville, Texas, called "City," and the undersigned "Contractor" as follows: 1. THE WORK The Contractor shall perform all the work as required by this contract for: Reconstruction and maintenance of various asphalt st~xetsin existing neighborhoods throughout Kerrville, Texas, as detailed in Section 090 "Description of Work". The following are incorporated herein: a. General Provisions b. Technical Specifications c. Addenda issued psior to receipt of Bid d. Plans e. Instructions to Bidders f. Proposal Some of such documents may not be physically attached hereto but are on file at City I-Iall, and copies may be obtained upon request. 2. TIME Construction substailtial cornpletioi~time will be 70 calendar days and 10 calendar days after for final completion fiorn the date of written notice to proceed. Working days ase defined in specification section 123.20. The Contractor's obligations to the project however, are not complete and retainage will not be released until all disturbed areas within KerrvilIe right-of-way have been revegetated to the satisfaction of the City Engineer. 3. LIQUIDATED DAMAGES Liquidated damages are hereby established for work which is not substnntiaIly complete in the amou~ltof Three Hundred Dollars 1$300.00) per working day for each working day after the date established in the Notice to l'roceed. The City may offset any such liquidated damages against any sums fiom time to time due by the City to Contractor. The completion time assumes that fifteen percent of the working days are "bad weather days," days on which the work cannot proceed; therefore, the time for completion shall not be extended on account of bad weather until the said number of assumed "bad weather days" has been exceeded. The time for completion shall not be extended except by written memorandum executed by the Contractor and the City Manager. Contractor shall make written application to the City not later than ten (10) days after the day, event, or cause claimed by Contractor to be a delay. Failure to make such City of Kcnville - Sln~~dar(f Specificatio~~s - 070 I Cons!~.u'ctior~ Contract n~td13id Form written claim within such time shall result in a waiver by Contractor of an extension based on those particular days, events, or causes. If, for example, this contract assumes twenty (20) bad weather days and Contractor desired a one-day extension for the twenty-first day of rain, Contractor shall make a written claim not later than ten (1 0) days after the occurrence of such twenty-first day. The said amount per day is not a penalty but an agreed amount of actual damages which are difficult to calculate. Such damages include loss of staff time, answering conlplaints by citizens who have been inconvenienced by the work, City Council time, loss of use, and other damages difficult to reasonably anticipate or calculate. 4. PAYMENTS The City shall pay the Contractor ninety-five percent (95%) of the portion of Contract Sum properly allocable to labor, materials, and equipment incorporated in the Work and ninety-five percellt (95%) of the portion of the Contract Sum properly allocable to materiaIs mid equipment suitably stored at the site or at some other locatio~lagreed upon in writing, less the aggregate of previous payments made by the City, and, upon substantial completion of the entire Work, a sum sufficient to increase the total payments to ninety-five percent (95%) of the Contract Sum. All retainages from progress payments shall be witl~heldwithout liability for interest.. Upon acceptance, the City shall make payment to Contractor such that one hundred percent (1 00%) of the Contract Sum has been paid. 5. LIABILITY INDEMNITY TIiE CONTRACTOR AGREES TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY OF KERRVILLE, 'TEXAS, AND ALL OF THEIR RESPECTIVE OFFICERS, AGENTS AND EMPLOYEES FROM ALL SIJITS, ACTIONS, CLAIMS, DAMAGES, PERSONAL INJURIES, LOSSES, I'ROPEI1TY DAMAGES, AND EXPENSES OF ANY CHARACTER WHATSOEVER, INCLUDING A?TORNEY'S FEES BROIJGHT FOR OR ON ACCOUNT OF ANY INJURIES OF DAMAGES RECEIVED OIi SUSTAINED BY ANY PERSON OR PROPERTY ON ACCOUNT OF ANY NEGLIGENT ACT OI: TI-IE CONTKACTOR,'TI-IE CITY OF KBRRVILIZ, TEXAS, OR ANY OF TI-IEIR RESPECTIVE OFFICERS, EMPLOYEES, AGENTS, REPRESENTATIVES, OR SUBCONTRACTORS IN THE EXECU'TION, SUPERVISION, AND OPERATIONS GIiOWING OUT OF OR IN ANY WAY CONNECTED WITH TI-IE PPERFOIUUIANCE OF TI-IIS ACiREEMENT, WHETHER OR NOT THE ACT OR OMISSION OF THE CITY OR ANY OF THEIR RESPECTIVE OFFICERS, EMPLOYEES, OR AGENTS WAS TI-IE SOLE PROXIMATE CAIJSE OF THE INJURY OR DAMAGE OR A PROXIMATE CAUSE JOINTLY AND CONCURRENTLY WITH THE NEGLIGENCE OF THE CONTRACTOR OIi ITS OFFICERS, EMI'LOYEES, AGEN'I'S, CON'1'IUCTORS, OR SUBCONTRACTORS, IN THE EXECUTION, SUPERVISION AND OPERA'TIONS GROWING OUT OF OR IN ANY WAY CONNECTED WITI-I THE PERFORMANCE OF THIS AGREEMENT. 6. LIABILITY INSURANCE Prior to the commencement of any work and not later than fifteen (1 5 ) days following the execution of this contract, the Contractor shall furnish the City copies of paid-up policies (to the City Risk MatlagerJCity Hall) providing Liability and Workman's Compensation Coverage as follows minimum limits): ' ' TYPE OF INSURANCE a. IdMITS Workman's Compei~sationcovering all employees Statutoty b. Employer's Liability $100,000.00 c. Coxnprehensive General Liability Bodily Injury & Property Damage (per occurrence) $1,000,000.00 Aggregate $1,000,000.00 (Premises/Operations Products/Completed Operations/Independetlt Contractors/Contractual Liabilitylcoverages may not be excluded). XCU must be supplied if any exposure. d. Business Automobile Liability covering owned vehicles, rented and non-owned vehicles and employee non-ownership Bodily Injury Properly Damage (per occurrence) $1,000.000.00 Aggregate $1,000,000.00 The Commercial General Liability and the Automobile Liability policies shall name the'Citv of Kerrville. Texas, as additional insured and all policies shall provide for a waiver of subrogation in favor of the City of Kerrville. The policy and any renewal certificate shall provide that the City be notified thirty (30) days prior to cancellation or modification ofany coverage. Language to the effect that the company wilI "Endeavor" or "Attempt" to so notify the City oFKenville is not sufficient. Reilewal certificates must be received by the City at least ten (10) days prior to any cancellation date. Policies will be in effect until final acceptance or cancellation of this contract, unless otherwise specified. The City may, at its sole option, terminate this agreement and file a claim on the Contractor's bid bond if the Contractor fails to deliver the required policies and certificates within 15 days after execution of this contract. It shall be the responsibility of the Contractor to insure that all Subcontsactors comply with the same insurance requirements as the said Contractor. 7. CASUALTY INSUMNCE In the event the work includes structures or buildings susceptible to damage by fire, windstorm, or otller casualty, then the Contractor before being authorized to begin work shall furnish the City a duplicate original of an insurance policy naming the City of Kesrville as an additionally insured. Such insurance shall insure both the City of Kerrville and Contractor, during the term of the work, against loss by fire, windstorm, vandalism, theft, or other casualty. Such policy shall be in the total amount of this contract. 8. QUALITY OF WORK All work shall be of good workmanship. Contractor shall comply with all applicable City of Kerrville Codes as well as all applicable professional and technical standards. Materials shall be of fisst quality. 9. CI-IANGES AND EXTRAS No cl~angeof this Contract, whether for additional work, additional compensation, or other, shalI be effective unless prior thereto a written change order has been authorized by the City Engineer. 10. ADDENDA Contractor acknowledges the receipt ofthe following addenda: 1. Dated: - Acknowledged by: 2. Dated: Acknowledged by: 1I . AWARD OF CONTRACT The lowest qualified bidder will be awarded the base bid plus any combination of additive alternates pending availability of funds and City Cou~lcilapproval. 12. CON'TRACT SUM Proposal: Contractor agrees to provide all labor, materials, and all incidentals necessary to complete "The Work" for the following Unit I'rices: City of Kerrvillc - Slanda~rlSpccificn~io~~s - 070 4 <:onsfr~~ctio~l Co~llrncrnad Bid 1:orm ITEM NO. BASE BID I UNIT TOTAL AMOUNT APPROX. QUANTITY UNIT DESCRIPTION OF ITEM 1 LS Mobilization and Bonds CY Mill asphalt and base material $ 1 4 ~ $116259~ CY Haul millings to City property at Spur 100 (approximately 14 miles round-trip from site) $ 1 2 ~$77,342" Tons Type 'B' Asphalt Base Course, complete in place per drawing and specifications $ 60- $177,540- Tons Type 'C' or 'D' Asphalt Surface Course, complete in place per drawing and specifications $ '06 PRICE $14,UQOI $ 5991238c 6 62 EA Water Valve Adjustment 7 39 EA Manhole Adjustment 8 7600 LF Thermoplastic Pavement Markings 9 1 LS Barricades, signs, and traffic handling including traffic control plan $ 2 ,soo- 10 1 LS Contingency to be used only as directed and approved by City Engineer $10,000 $ 075 $ 5,700- TOTAL BASE BID ADDITIVE ALTERNATE II 1407 12 1407 CY 4-inch Mill asphalt and base material CY Haul millings to City property at Spur 100 (approximately 14 miles round-trip from site) $ 4-inch Type 'C' or 'D' Asphalt Surface Course, complete in place per drawing and specifications $ 13 2785 Tons 14 1900 LF Thermoplastic Pavement Markings 15 8 EA Manhole Adjustment - City of Kerrvillc Slantklrd Spccificatio~ts 070 - 5 $ 17- 63$lG 24,q74z s 23,91qc 115,455$2,375- Construction Contract and Bid 170rni LS Barricades, signs, and traffic handling including traffic control plan TOTAL ADDITIVE ALTERNATE TOTAL BID COMPLETED BY GENERAL CONTRACTOR J.D. RAMMIFJ~P A V I N ~Lo. General Contractor Name Date General Contractor Representative Title Sub-Contractors: NAME PI-IONE ADDRESS WORK TO BE PERFORMED (Attach additional sheet if required) INSURANCE AGENT NAME ADDRESS PHONE POLICY PHONE POLdCY BONDING AGENT NAME ADDRESS City of Kcnvillc - Slar~dnrdSpccificalions - 070 6 Construction Conlract and Hid Form Signed this Attest: day of ,2009 -- Secretary T3Y: (if bid by a Col.poration Contractor Title: Business Address: I'hone: Fax: ACCEPTED THIS day of ,2009 By: Todd Parton, City Manager City of Kerrville, Texas. ATTEST: Brenda G . Craig, City Secretary APPROVED AS TO FORM: City Attorney Cify oPKerrville - Standard Spcciticatio~~s 070 - 7 Cotlslructior~Conlmct and Uid For111