II. Bond Program Financial Update
Transcription
II. Bond Program Financial Update
Special Board Meeting Measure K Bond Program January 29, 2013 Long Beach Unified School District BOARD OF EDUCATION WORKSHOP Presentation Summary I. Renaissance High School for the Arts II. Bond Program Financial Update • • • • Introduction and Overview State Funding Eligibility Current Influencing Factors Measure K Funding / Cash Flow Impacts Long Beach Unified School District 2 I. Renaissance HS for the Arts Facilities Information and History • The existing 3.44 acre campus has approximately 86,042 S.F. of facilities with 42 classrooms (30 located in permanent buildings and 12 portable classrooms). • All permanent structures were built in1935 and 1936 with additions in 1941 and 1962. Major renovations and alterations where constructed in 1952, 1980 and 2000. • The campus was originally constructed as a technical school (John Dewey HS) then changed to a continuation high school (Reid HS). • In 2001, the campus was converted to its current use as an art school (Renaissance HS for the Arts). • The current (2012/13) enrollment is 493 students. • 1 Permanent building is used by the Office of Media Services (OMS). Long Beach Unified School District 3 I. Renaissance HS for the Arts Piano Rehearsal Space Ceramics/ Art Studio Costume Design Band Chemistry Dance/ PE Library Computer/ Lab Kitchen Community Rm. Biology Auditorium Administration Existing Site / 1st Floor Plan Long Beach Unified School District 4 I. Renaissance HS for the Arts Choir Theater/ Drama Existing Site / 2nd Floor Plan Dance/ PE Long Beach Unified School District 5 I. Renaissance HS for the Arts Existing Condition and Issues • Small campus with aging facilities and infrastructures • Undersized classrooms and inadequate / insufficient spaces for performing arts program • Insufficient space for physical education program • Some building systems are past their useful life • • • • • • • Roofing on Bldg. 200 and 100 in poor condition Poor ventilation in Bldg. 200 and 300 Lack of air conditioning in Bldg. 200 and 300 Heating systems in Bldg. 200 and 300 are antiquated Electrical & Lighting systems in Bldg. 200 and 300 in fair condition Fire alarm system needs to be upgraded Public address & other communications systems antiquated • American with Disabilities Act (ADA) accessibility • Insufficient parking and poor vehicular access • Facility Master Plan recommends a moderate renovation for the campus Long Beach Unified School District 6 I. Renaissance HS for the Arts Existing Condition and Issues (Cont.) Air Conditioning Bldg 100 Bldg 200 Bldg 300 Yes No No Lighting & Electrical Good Fair Fair Roofing Poor Fair Poor Flooring Good Poor Fair Mechanical/Plumbing Fair Poor Poor Other Finishes Fair Fair Poor ADA Accessibility Good Poor Poor Doors & Windows Good Poor Fair Bldg 400 OMS - Not Assessed Building Systems Bldg 600 Yes Good Fair Good Good Good Good Good Long Beach Unified School District 7 I. Renaissance HS for the Arts Proposed Program • Master plan site capacity for 600 students • Major renovations and repairs of classroom Bldg. 200 • Minor repairs and improvements to Bldg. 100 and 600 • Major renovation or replacement of existing auditorium (Bldg. 300) • General improvements to specialty program spaces – art, music and dance • Remove portables and replace with permanent building containing classrooms, locker rooms, restrooms, storage, and large space for PE & dance • ADA accessibility improvement throughout site • Structural repairs if required • Improvements to fire alarm & communications systems • Improvements to site utilities and landscaping • Target Project Budget = $40,000,000 Long Beach Unified School District 8 I. Renaissance HS for the Arts Minor repairs and improvements 503 504 Remove portables, expand parking or add basketball courts 70 502 501 600 505 706 Remove portables and construct new permanent building 705 704 200 OMS 701 702 703 400 300 Major renovation/ repairs or replacement of Auditorium/kitchen Proposed Improvement Plan 100 Major renovation and repairs Minor repairs and improvements Long Beach Unified School District 9 II. Bond Program Financial Update Introduction and Overview Introduction and Overview • Original financial structure of Measure K Bond Program in 2008: • 10 - 15 year build-out plan • Long-term Assessed Value (AV) growth assumption = 5.0% annually • State funding programs available with funds for apportionments • Since passage of Measure K Bond: • 2 consecutive years (2010 and 2011) of decline in AV • 2012 and 2013 AV growth has increased, but sill behind original assumptions • Projects reprioritized and schedules have been adjusted to match projected cash flow needs and bond issuance schedule • State funding programs unavailable Long Beach Unified School District 10 II. Bond Program Financial Update Introduction and Overview Introduction and Overview (Cont.) • There has been recent public controversy over a type of general obligation bond - called CABs - that has been issued by school districts. • We will: • Provide information on CABs and discuss their role in an overall bond program; and • Seek board feedback on future Measure K issuances. Long Beach Unified School District 11 II. Bond Program Financial Update Introduction and Overview What is a general obligation bond? • A bond backed by the credit and property tax base of the district • Begins with an election to authorize a specific total amount to be issued • Local property taxes levied to pay the principal and interest (debt service) due on the bonds • Bonds sold when cash is needed for facilities projects and are usually issued in several series Long Beach Unified School District 12 II. Bond Program Financial Update Introduction and Overview What is a CAB? • Principal and interest paid in one lump sum at the bond maturity date • An alternative CIBs • Interest paid semi-annually, starting once the bond is issued • Principal paid in lump sum at bond maturity date • Cost to issue CABs is higher than CIBs • Interest rates for CABs are higher than CIBs • Interest is calculated using compounding versus simple interest Long Beach Unified School District 13 II. Bond Program Financial Update Introduction and Overview Bond comparison illustrated CABs Payment Payment CIBs Year Year Long Beach Unified School District 14 II. Bond Program Financial Update Current Influencing Factors Recent controversy about CABs • Poway Unified School District • Issued $105 million of non-callable CABs that matured in 22-40 years with a total repayment cost of $981 million (9.35 to 1 ratio) • Financing draws attention of media nationwide • Los Angeles Times • November 2012 article about the use of CABs by California school and community college districts • Included a database of 200 districts that issued CABs Long Beach Unified School District 15 II. Bond Program Financial Update Current Influencing Factors Proposed legislation to change bond financings • Legislation introduced January 24, 2013: • Maximum maturity of bonds from 40 years to 25 years • Maximum interest rate on bonds from 12 to 8 percent • Public analysis presented on use of CABs when bond resolution on agenda for board adoption • CABs to be subject to redemption after 10 years • Debt service repayment ratio for bond series cannot be in excess of 4 to 1 • Moratorium on issuing CABs urged by CDE Long Beach Unified School District 16 II. Bond Program Financial Update Current Influencing Factors Why would a district issue up to 40 year bonds? Why would a district issue CABs? • Proposition 39 tax levy limit - $60 per $100,000 of AV • Problem: Stalled (or even negative) growth in property values • To raise funds to cover current facilities needs and stay under its tax rate limit, a District may choose to defer payments Long Beach Unified School District 17 II. Bond Program Financial Update Current Influencing Factors Building a bond program • How much funding is needed and when? • Facilities project needs often require multiple issuances (example, issuing every two years) • Early issuances take up tax rate capacity • Later issuances may require deferred payments in order to stay under tax rate limit Long Beach Unified School District 18 II. Bond Program Financial Update Current Influencing Factors Building a bond program (Cont.) Long Beach Unified School District 19 II. Bond Program Financial Update Current Influencing Factors Building a bond program (Cont.) Long Beach Unified School District 20 II. Bond Program Financial Update Current Influencing Factors Building a bond program (Cont.) Long Beach Unified School District 21 II. Bond Program Financial Update Current Influencing Factors Building a bond program (Cont.) Long Beach Unified School District 22 II. Bond Program Financial Update Current Influencing Factors Other considerations • The useful life of most facilities projects exceeds the term of longer bonds • Municipal interest rates currently at historic lows Long Beach Unified School District 23 II. Bond Program Financial Update Current Influencing Factors Other considerations (cont.) • Time value of money: money today ≠ money tomorrow • Project costs today versus future costs • Future debt repaid with cheaper dollars Long Beach Unified School District 24 II. Bond Program Financial Update Current Influencing Factors Long Beach Unified School District 25 II. Bond Program Financial Update Current Influencing Factors Measure K debt schedule Long Beach Unified School District 26 II. Bond Program Financial Update Current Influencing Factors Measure K projected tax rates • Tax rate capacity in 2014-2018, when the bond program cash needs are greatest, has been limited by prior issuances. (1) Assumes AV growth rates of 2% for 2013-14, 3% for 2014-15 and 4% annually thereafter. Long Beach Unified School District 27 II. Bond Program Financial Update Current Influencing Factors Four scenarios for future issuances • 40-year bonds with use of CABs when necessary • 25-year bonds with use of CABs when necessary • 40-year bonds without CABS • 25-year bonds without CABs Long Beach Unified School District 28 II. Bond Program Financial Update Current Influencing Factors Scenario assumptions • Following are scenarios for the remaining Measure K authorization based on the below assumptions: • Annual AV growth rates: • 2013-14: 2.0% • 2014-15: 3.0% • Thereafter: 4.0% • Current interest rates: • Financings with CABs: 4.40% - 5.60% • Financings without CABs: 3.40% - 4.00% • Program cash goals • $50 million in 2013 • Up to $375 million in 2014 • Remaining authorization split in two series Long Beach Unified School District 29 II. Bond Program Financial Update Current Influencing Factors Scenario 1: Up to 40-year bonds with CABs (1) (2) Previously issued financings. Assumes AV growth rates of 2% for 2013-14, 3% for 2014-15 and 4% annually thereafter. Long Beach Unified School District 30 II. Bond Program Financial Update Current Influencing Factors Scenario 2: Up to 25-year bonds with CABs (1) (2) Previously issued financings. Assumes AV growth rates of 2% for 2013-14, 3% for 2014-15 and 4% annually thereafter. Long Beach Unified School District 31 II. Bond Program Financial Update Current Influencing Factors Scenario 3: Up to 40-year bonds without CABs (1) (2) Previously issued financings. Assumes AV growth rates of 2% for 2013-14, 3% for 2014-15 and 4% annually thereafter. Long Beach Unified School District 32 II. Bond Program Financial Update Current Influencing Factors Scenario 4: Up to 25-year bonds without CABs (1) (2) Previously issued financings. Assumes AV growth rates of 2% for 2013-14, 3% for 2014-15 and 4% annually thereafter. Long Beach Unified School District 33 II. Bond Program Financial Update Current Influencing Factors Using CABs Pros Cons Access dollars when they are needed for projects Higher interest rates More actively manage tax rate Compounding interest Less reliance on AV for planning Negative public perception Long Beach Unified School District 34 II. Bond Program Financial Update Current Influencing Factors Major Project Reprioritization Summary Long Beach Unified School District 35 II. Bond Program Financial Update Bond Issuance E and F Bond Issuance A, B, B1, C, and D Measure K Funding / Cash Flow Impacts Scenario 1 Projects Scenario 2 Projects Scenario 3 Projects Scenario 4 Projects Nelson MS McBride, Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS Ph. 1 NHS #3 (JFA Site) NHS #4 (Butler) NHS #5 (TBD) Newcomb K-8 Bancroft MS Gym Hoover MS Gym District-Wide Projects Polytechnic Auditorium Wilson Auditorium NHS #2 (Browning) Hamilton MS Gym Hill MS Gym Nelson MS McBride, Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS Ph. 1 NHS #3 (JFA Site) NHS #4 (Butler) NHS #5 (TBD) Newcomb K-8 Bancroft MS Gym Hoover MS Gym District-Wide Projects Polytechnic Auditorium Wilson Auditorium NHS #2 (Browning) Hamilton MS Gym Hill MS Gym Nelson MS McBride, Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS Ph. 1 NHS #3 (JFA Site) NHS #4 (Butler) NHS #5 (TBD) Newcomb K-8 Bancroft MS Gym Hoover MS Gym District-Wide Projects Nelson MS McBride, Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS Ph. 1 NHS #3 (JFA Site) NHS #4 (Butler) NHS #5 (TBD) Newcomb K-8 Bancroft MS Gym Hoover MS Gym District-Wide Projects Jordan HS Ph. 2 Jordan HS Ph. 3 Jordan HS Ph. 4 Jordan HS Ph. 5 Jordan HS Ph. 6 Hill MS Hamilton MS Millikan HS Avalon K-12 Willard ES Renaissance HS Jordan HS Ph. 2 Jordan HS Ph. 3 Jordan HS Ph. 4 Jordan HS Ph. 5 Jordan HS Ph. 6 Hill MS Hamilton MS Millikan HS Avalon K-12 Willard ES Renaissance HS NHS #2 (Browning) Hamilton MS Gym Hill MS Gym Polytechnic Auditorium Wilson Auditorium Jordan HS Ph. 2 Jordan HS Ph. 3 Jordan HS Ph. 4 Jordan HS Ph. 5 Jordan HS Ph. 6 Hill MS Hamilton MS Millikan HS Avalon K-12 Willard ES Renaissance HS NHS #2 (Browning) Hamilton MS Gym Hill MS Gym Polytechnic Auditorium Wilson Auditorium Jordan HS Ph. 2 Jordan HS Ph. 3 Jordan HS Ph. 4 Jordan HS Ph. 5 Jordan HS Ph. 6 Hill MS Hamilton MS Millikan HS Avalon K-12 Willard ES Renaissance HS Note: Measure K funding may not be sufficient for projects highlighted in red. Long Beach Unified School District 36 II. Bond Program Financial Update Measure K Funding / Cash Flow Impacts Scenario 1: Up to 40-year bonds with CABs Major Projects (Based on Current Prioritization) Nelson MS McBride Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS (Phase 1A-1C) Jordan HS (Phase 2A - 2B) Jordan HS (Phase 3A - 3B) Jordan HS (Phase 5 Athletic Fields) Jordan HS (Phase 6 Gymnasium) New HS #2 (Browning Site) New HS #3 (Jordan Plus Site) New HS #4 (Butler Site) New HS #5 (TBD Site) Willard ES Planning Construction Completed Completed Underway Completed Underway Aug 2016 - Jul 2018 Aug 2014 - Jul 2016 Aug 2018 - Jul 2020 Aug 2020 - Jul 2022 Underway Underway Underway Underway Underway Completed Nov 2010 - May 2013 Jul 2013 - Jan 2015 Jul 2012 - Aug 2013 Jan 2014 - Feb 2018 Aug 2018 - July 2020 Aug 2016 - Jan 2018 Aug 2020 - Jan 2022 Aug 2022 - Jan 2024 Jun 2014 - Feb 2016 Aug 2013 - Jan 2014 Aug 2015 - Oct 2017 Jun 2015 - Oct 2017 Jun 2015 - Oct 2016 Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Nov 2013 - Jun 2015 Aug 2013 - Jan 2014 Jan 2014 - Dec 2014 Jun 2015 - May 2016 Aug 2013 - Jan 2014 Aug 2014 - Oct 2015 Aug 2014 - Oct 2015 Aug 2016 - Jan 2018 May 2011 - Aug 2014 Jun 2013 - Aug 2014 Sep 2012 - Aug 2016 Jan 2010 - Dec 2014 Jan 2012 - Dec 2016 Jul 2020 - Jun 2022 (TBD) (TBD) (TBD) (TBD) (TBD) Jul 2022 - Dec 2024 (TBD) (TBD) (TBD) (TBD) (TBD) District-Wide Projects AB300 Projects Newcomb K-8 Bancroft Gym Hamilton Gym Hill Gym Hoover Gym Polytechnic Auditorium Wilson Auditorium Jordan Auditorium (JHS Phase 4) Deportabilization Projects Building System Improvements Technology Projects DSA Certification Projects ADA Projects Future Unassigned Major Projects Millikan HS Avalon K-12 Hill MS Hamilton MS Renaissance High School for the Arts Impacts to Current Prioritization • No impact to current project prioritization Long Beach Unified School District 37 II. Bond Program Financial Update Measure K Funding / Cash Flow Impacts Scenario 2: Up to 25-year bonds with CABs Major Projects (Based on Current Prioritization) Nelson MS McBride Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS (Phase 1A-1C) Jordan HS (Phase 2A - 2B) Jordan HS (Phase 3A - 3B) Jordan HS (Phase 5 Athletic Fields) Jordan HS (Phase 6 Gymnasium) New HS #2 (Browning Site) New HS #3 (Jordan Plus Site) New HS #4 (Butler Site) New HS #5 (TBD Site) Willard ES Planning Construction Completed Completed Underway Completed Underway Aug 2016 - Jul 2018 Aug 2014 - Jul 2016 Jun 2025- Jul 2027 Jun 2025- Jul 2027 Underway Underway Underway Underway Underway Completed Nov 2010 - May 2013 Jul 2013 - Jan 2015 Jul 2012 - Aug 2013 Jan 2014 - Feb 2018 Aug 2018 - July 2020 (TBD) Jul 2027- Dec 2029 Jul 2027- Dec 2029 Jun 2014 - Feb 2016 Aug 2013 - Jan 2014 Aug 2015 - Oct 2017 Jun 2015 - Oct 2017 (TBD) Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Underway Nov 2013 - Jun 2015 Aug 2013 - Jan 2014 (TBD) (TBD) Aug 2013 - Jan 2014 Aug 2014 - Oct 2015 Aug 2014 - Oct 2015 (TBD) May 2011 - Aug 2014 Jun 2013 - Aug 2014 Sep 2012 - Aug 2016 Jan 2010 - Dec 2014 Jan 2012 - Dec 2016 Jun 2025- Jul 2027 (TBD) (TBD) (TBD) (TBD) (TBD) Jul 2027- Dec 2029 (TBD) (TBD) (TBD) (TBD) (TBD) District-Wide Projects AB300 Projects Newcomb K-8 Bancroft Gym Hamilton Gym Hill Gym Hoover Gym Polytechnic Auditorium Wilson Auditorium Jordan Auditorium (JHS Phase 4) Deportabilization Projects Building System Improvements Technology Projects DSA Certification Projects ADA Projects Future Unassigned Major Projects Millikan HS Avalon K-12 Hill MS Hamilton MS Renaissance High School for the Arts Impacts to Current Prioritization: • No impact to current project prioritization • Possible delays of current and future projects by 3-5 years Long Beach Unified School District 38 II. Bond Program Financial Update Measure K Funding / Cash Flow Impacts Scenario 3: Up to 40-year bonds without CABs Major Projects (Based on Current Prioritization) Nelson MS McBride Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS (Phase 1A-1C) Jordan HS (Phase 2A - 2B) Jordan HS (Phase 3A - 3B) Jordan HS (Phase 5 Athletic Fields) Jordan HS (Phase 6 Gymnasium) New HS #2 (Browning Site) New HS #3 (Jordan Plus Site) New HS #4 (Butler Site) New HS #5 (TBD Site) Willard ES Planning Construction Completed Completed Underway Completed Underway Aug 2016 - Jul 2018 (TBD) (TBD) (TBD) Underway Underway Underway Underway (TBD) Completed Nov 2010 - May 2013 Jul 2013 - Jan 2015 Jul 2012 - Aug 2013 Jan 2014 - Feb 2018 Aug 2018 - July 2020 (TBD) (TBD) (TBD) (TBD) Aug 2013 - Jan 2014 Aug 2015 - Oct 2017 Jun 2015 - Oct 2017 (TBD) Underway Underway (TBD) (TBD) Underway (TBD) (TBD) (TBD) Underway Underway Underway Underway Underway Nov 2013 - Jun 2015 Aug 2013 - Jan 2014 (TBD) (TBD) Aug 2013 - Jan 2014 (TBD) (TBD) (TBD) May 2011 - Aug 2014 Jun 2013 - Aug 2014 Sep 2012 - Aug 2016 Jan 2010 - Dec 2014 Jan 2012 - Dec 2016 Jan 2023 - Jul 2023 (TBD) (TBD) (TBD) (TBD) (TBD) Aug 2025 -Dec 2030 (TBD) (TBD) (TBD) (TBD) (TBD) District-Wide Projects AB300 Projects Newcomb K-8 Bancroft Gym Hamilton Gym Hill Gym Hoover Gym Polytechnic Auditorium Wilson Auditorium Jordan Auditorium (JHS Phase 4) Deportabilization Projects Building System Improvements Technology Projects DSA Certification Projects ADA Projects Future Unassigned Major Projects Millikan HS Avalon K-12 Hill MS Hamilton MS Renaissance High School for the Arts Impacts to Current Prioritization • Will impact current project prioritization • Possible delays of current and future projects by 8-12 years Long Beach Unified School District 39 II. Bond Program Financial Update Measure K Funding / Cash Flow Impacts Scenario 4: Up to 25-year bonds without CABs Major Projects (Based on Current Prioritization) Nelson MS McBride Sr. HS Roosevelt ES Cabrillo HS Pool Jordan HS (Phase 1A-1C) Jordan HS (Phase 2A - 2B) Jordan HS (Phase 3A - 3B) Jordan HS (Phase 5 Athletic Fields) Jordan HS (Phase 6 Gymnasium) New HS #2 (Browning Site) New HS #3 (Jordan Plus Site) New HS #4 (Butler Site) New HS #5 (TBD Site) Willard ES Planning Construction Completed Completed Underway Completed Underway Aug 2016 - Jul 2018 (TBD) (TBD) (TBD) Underway Underway Underway Underway (TBD) Completed Nov 2010 - May 2013 Jul 2013 - Jan 2015 Jul 2012 - Aug 2013 Jan 2014 - Feb 2018 Aug 2018 - July 2020 (TBD) (TBD) (TBD) (TBD) Aug 2013 - Jan 2014 Aug 2015 - Oct 2017 Jun 2015 - Oct 2017 (TBD) Underway Underway (TBD) (TBD) Underway (TBD) (TBD) (TBD) Underway Underway Underway Underway Underway Nov 2013 - Jun 2015 Aug 2013 - Jan 2014 (TBD) (TBD) Aug 2013 - Jan 2014 (TBD) (TBD) (TBD) May 2011 - Aug 2014 Jun 2013 - Aug 2014 Sep 2012 - Aug 2016 Jan 2010 - Dec 2014 Jan 2012 - Dec 2016 Jan 2023 - Jul 2023 (TBD) (TBD) (TBD) (TBD) (TBD) Aug 2025 -Dec 2030 (TBD) (TBD) (TBD) (TBD) (TBD) District-Wide Projects AB300 Projects Newcomb K-8 Bancroft Gym Hamilton Gym Hill Gym Hoover Gym Polytechnic Auditorium Wilson Auditorium Jordan Auditorium (JHS Phase 4) Deportabilization Projects Building System Improvements Technology Projects DSA Certification Projects ADA Projects Future Unassigned Major Projects Millikan HS Avalon K-12 Hill MS Hamilton MS Renaissance High School for the Arts Impacts to Current Prioritization • Will impact current project prioritization • Possible delays of current and future projects by 8-12 years Long Beach Unified School District 40 II. Bond Program Financial Update State Funding Eligibility State Funding Eligibility • The District has received the following State funds: • • Nelson Middle School McBride High School $12,903,722 $15,024,878 COS Funds Modernization and CTE Funds • Current State funds have been depleted for all programs except the Seismic Mitigation Program (SMP) • The District has received DSA’s concurrence for eligibility of SMP funding for the following projects: • • • • Bancroft MS Gym Hill MS Gym Hamilton MS Gym Hoover MS Gym • • • Jordan HS Auditorium Polytechnic HS Auditorium Wilson HS Auditorium • Discussions are underway for a possible State-wide 2014 school bond measure to replenish the funding source for Modernization, New Construction, and other grant programs. Long Beach Unified School District 41 II. Bond Program Financial Update State Funding Eligibility State Funding Eligibility • Future availability of State funds could allow the District to leverage Modernization eligibility for current district-wide projects such as fire alarm and clock/intercom replacement projects and ADA upgrades. • Other funding opportunities: • Received $913,896 in ERATE for the Core Switch & UPS Replacement Phase 1 project • Anticipate receiving an estimated $7,250,000 in ERATE funds for the Telecommunication Phase II and Wireless Data Communication Phase II projects Long Beach Unified School District 42 II. Bond Program Financial Update State Funding Eligibility State Funding Eligibility Current Projects (Based on Current Prioritization) • • • • Estimated State Funding (1) Roosevelt ES New Construction Newcomb K8 AB300 / New Construction Jordan HS Major Renovation Willard ES Minor Renovation / Addition Future Projects • Hill MS Major Renovation • Hamilton MS Major Renovation • Millikan HS Major Renovation • Avalon K12 Moderate Renovation / Addition • Renaissance HS for the Arts Current AB300 Projects • Bancroft MS Gym AB300 • Hamilton MS Gym AB300 • Hill MS Gym AB300 • Hoover MS Gym AB300 • Polytechnic HS Auditorium AB300 • Wilson HS Auditorium AB300 • Jordan HS Auditorium AB300 . Notes: (1) Funding dependent on State’s ability to sell bonds and voter approval of future State-wide bond measures. Funding Type $7,156,975 $11,731,465 $36,776,657 $6,831,301 $62,496,398 Mod. / New Const. / ORG / AB801 / HPS Mod. / New Const. / ORG / SMP / HPS Mod. / New Const. / ORG / HPS Modernization / ORG $6,446,034 $13,290,237 $39,483,315 $5,417,690 $7,412,999 $72,050,275 Modernization Modernization / ORG Modernization / ORG Modernization / Facility Hardship Modernization / ORG $2,200,000 $2,500,000 $2,500,000 $2,100,000 $6,000,000 $4,500,000 $6,500,000 $26,300,000 SMP SMP SMP SMP SMP SMP SMP Long Beach Unified School District 43 II. Bond Program Financial Update Staff Recommendations Staff recommendations • Advocate for: • Continued use of 40 year bonds for existing bond programs • Application of repayment ratio test for entire bond program • Issue Series C without CABs in consideration of current moratorium and proposed legislation We are seeking preliminary Board feedback on the use of CABs for future issuances. However, we will revisit this topic with the Board before the issuance of Series D, when relevant legislation is clarified and AV is revised. Long Beach Unified School District 44 For More Information This Presentation along with Measure K Bond Program information is available at: www.lbschools.net Long Beach Unified School District 45