Nawarat PataNakarN

Transcription

Nawarat PataNakarN
Nawarat
Patanakarn
Public Company Limited
The Legacy of Quality Benchmark
Nawarat WORLD
Supporting Facilities:
Who we are & What we do
Precast & Prestressed Concrete Production 28-29
• Introduction, Vision & Mission
• History
• Message from the President
4-5
6-7
8-9
Steel & Structure Fabrication
Nawarat affiliates
•Subsidiary & Associated Company
Nawarat Success
30-31
Products and Services
Nawarat Community
Contracting:
1.Industrial Work
12-13
2.Civil Work
14-17
3.Underground Work
18-19
4.Building Work
20-21
5.Marine Work
22-23
Design Service, Engineering,
24-25
Procurement & Construction (EPC)
Property Development
Our PRactice and Responsibility
• Corporate Governance (CG)
32-33
• Corporate Social Responsibility (CSR)
34-35
Nawarat Accomplishment
Awards & Recognitions
• Our Achievement
• Project References
26-27
Nawarat Patanakarn Public Company Limited
37-38
Contact
• Maps
content
36
39
Professional
Practice
on Trusted
Standard
4
Nawarat WORLD : Introduction
Nawarat WORLD : Introduction
Excellent
Benchmark,
Exceptional
World
View
Established in May 1976, Nawarat Patanakarn Public
Company Limited (NAWARAT) stands today as one of
Thailand’s largest construction and engineering firms.
With more than 30 years of growing
experience in Thailand as well
as other countries, NAWARAT is
distinguished by its wide range of
technical capabilities,
which enable the Company to undertake various types
of works including:
• High Rise Buildings, Hospitals and
Shopping Centres.
• Hotels, Resorts and Housing Estates.
• Roads, Highways, Expressways, Railways
and Bridges.
Vision
•Pre-cast Segmental Tunnel Lining and Jacking Pipes
•Pre-stressed Concrete Piles and Girders
•Steel Fabrications
•Computerised Steel Cutting
•Stainless Steel Slide Gates, Sluice Gates, Trash Racks
and Stop Log
•Fibreglass Flap Gates and Accessories
• Warehouses, Power Plants, Industrial
Plants and Various Steel Structures.
•Other Related Civil Engineering Services
• Dams, Reservoirs, Ports, Berths and Jetties.
both in Thailand and overseas. To be number one
top five in general contracting business in Thailand.
•Pre-cast Concrete Manufacturing
• Wastewater Treatment Plants, Tunnelling
and Pipe Jacking Works.
Concentrate on construction and related business,
in our specialized area and to be within
In addition NAWARAT has a highly qualified engineering team, four concrete
manufacturing plants, a steel fabrication workshop, several offshore construction
barges and an extensive inventory of construction equipment and
machinery that is maintained by its own service centre. With these
facilities the Company can also provide the following:
Mission
Develop planning, working procedure and
measurement system, to increase
efficiency and
effectiveness
for the benefit of all stakeholder.
5
6
Nawarat WORLD : history
Nawarat WORLD : history
7
Nature of Main
Product/Service
History
Construction Contracting Business
Nawarat Patanakarn Public Company Limited
Nawarat Patanakarn Public Company Limited is involved in the
construction contracting business providing construction services
1976
31 May
to the government sectors, state enterprises, as well as private
sectors. It undertakes works of construction as a main contractor, a
Founded by Mr. Mana Karnasuta with registered
capital of Baht 4 million to provide general
construction service.
sub-contractor, or through a joint venture business. The Company
is considered a leading contractor by several entities; for example,
Pre-stressed Concrete
Piles and Precast
Concrete Products
it has been designated a Category 1 A contractor by Department of
1994
20 February
Highways having the right to make bids in all sorts of the Department’s
The Company established its precast concrete
Full scale precast concrete production plant
and steel fabrication plant were established
in Bangnampriao, Chacheangsao province
to support internal construction works as well
as supplying to other clients.
road construction. Also, the Company has already registered with
product factories to supply its construction
various government agencies such as Royal Irrigation Department,
projects and sell to customer both by bidding
Public Works Department, Communication Authority of Thailand,
and direct employment. The Company’s products
Metropolitan
Waterworks
include pre-stressed concrete piles, pre-stressed
Authority. The Company acquires construction projects by way
concrete girders and precast concrete pipes for
of bidding and direct contract with the project owners, with
construction of wastewater treatment projects,
its reputation and impressive track record being the main
parapets, concrete pre-cast slabs and sheet
factors of building its customers’ trust.
pile to protect from land subsidence.
1995
27 September
Listed on the Stock Exchange of Thailand
(SET) and increased its registered capital to
Baht 500 million with initial offering to public.
2001
28 June
Utility Business Alliance Company Limited as
subsidiary was established to provide design,
construction and operation/maintenance service
in the area of wastewater treatment.
2006
6 September
C.I.N. Estate Company Limited was established,
a joint venture with Charn Issara Development
Public Company Limited, to develop a high rise
condominium “The Issara Ladprao” as its first
project. And the second project is “ISSI Condo”
on Suksawat Road Bangkok.
2013
1 April
Increased its registered capital to Baht
2,221.6 million.
5 April
Mana Patanakarn Company Limited was
established to expand its business in low rise
property development with “Baranee” brand.
OUr Pride,
Our Legacy
Nawarat Patanakarn Public
Company Limited is involved in
the construction contracting
business providing construction
services to the government
sectors, state enterprises,
as well as private sectors.
Waterworks
Authority,
Provincial
Pre-stressed
Concrete Piles and
Concrete Products
Pre-cast Concrete
Jacking Pipes and Pre-cast
Concrete Shaft Plant
1796 Bangna-Trad Road Km. 4.5,
Bangna, Bangkok
31/13 Moo 2, Rama II Road Km. 33.5,
Bang Krachao, Muang District,
Samutsakhon
53/4 Moo 9, Prong Akat,
Bang Nampriao, Chachoengsao
Steel Structure
Fabrication
Processed Steel
Plants
The Company has manufactured fabricated
steel product for supplying its construction
projects and selling to customer
53/4 Moo 9, Prong Akat,
Bang Nampriao, Chachoengsao
8
Nawarat WORLD : Message from the President
Nawarat WORLD : Message from the President
9
Message
from the President
Looking back on Thailand four decades ago, NAWARAT is
always honoured to be a part of the country’s development. Our
construction works in both public and private sectors have stood
out as one of Thailand’s successful leading general construction
contracting companies. In parallel with the growing economy, we
have also expanded our capacity as well as integrity and strength
to provide our clients with services in a wide range of construction
works, including large infrastructure, highway, bridge, thermal and
hydro power plant, dams, reservoir, jetty, port, tunnel, buildings,
residential, industrial plant, wastewater treatment, and more. With
a broad range of technical capabilities from our experienced staff
in combination with our own precast concrete and steel fabrication
plants, we are able to efficiently provide quality standard services for
both internal and external projects commissioned by outside clients.
Looking back on Thailand
four decades ago, NAWARAT
is honoured to be a part of
the country's development.
Our ability to deal with
many different types
of construction and
sophisticated work is our
key competitive strength.
Mr. Polpat Karnasuta
President
Approximately 70% of our work is government projects. As a result,
our client base varies in different government agencies such as
Electricity Generating Authority of Thailand (EGAT), Bangkok
Metropolitan Administration (BMA), Metropolitan Waterworks Authority
(MWA), Royal Irrigation Department (RID), Highway Department,
etc., including quasi-government companies such as PTT Group.
In addition, we also work as a subcontractor for multinational EPC
contractors in many large scale and sophisticated projects. The
remaining portion of our clients is private company in manufacturing,
petrochemical, property development, commercial retail, hospitality,
healthcare, etc. NAWARAT operates mainly in Thailand but we
have also completed projects in neighbouring countries such
as Myanmar, Laos, Cambodia, Vietnam and the UAE. In recent
years, NAWARAT began to expand our business segment further
into property development and wastewater treatment plant operation
and maintenance services.
Our ability to deal with many different types of construction and
sophisticated work is our key competitive strength. With a wide array
of capabilities at NAWARAT, it enables us to successfully serve a
wide range of integrated turnkey contracting. For example, with the
Nam Sana hydropower plant in Laos, we are able to provide the design,
construction, buildings, access roads and steel works. Our experience
in management of procurement and logistics also ensure our optimum
performance in supporting the field construction work.
Furthermore the majority of our business depends largely on
government spending. With the budget planned for infrastructure
development in areas such as transportation, logistics, utilities, water
management, etc., it allows us as an expert in this field to foresee the
direction of the company’s growth in the future.
Currently, Thai contractors are the third largest exporters in contracting
business after Malaysia and Singapore. With the introduction to AEC, it
is inevitable and, like any change, will have both positive and negative
impact on our business. Contractors will need to adjust themselves to
the open market system. In the short term, it may well have a negative
impact on some that have not made the adjustment. In the long term,
however it should give our business an advantage as the open market
means more opportunities for Thai contractors. We are thankful that
Thailand is strategically located in the centre of ASEAN. With growing
demand for construction work in Laos, Cambodia, Myanmar and
Vietnam, the AEC will make it manageable for Thai contractors to work
in these countries.
NAWARAT achievement today is a result of hard work and support
from everyone in the company. To maintain the success and quality
standard, we aim to strengthen our core capabilities and strive to adapt
to the changing needs of our clients both locally and overseas. With
this in mind, we also wish to create higher value for our stakeholders.
Not to mention the need to steadily grow our construction business
and build up competency of our people and systems. Ultimately,
we foresee a more steady growth of diverse sources of revenue, a
healthier margin, and lower average fixed cost.
Years Worth
of Work and
Experience
Contracting
portfolio
nawarat Success
Products and Services
1.Industrial Work
12-13
2.Civil Work
14-17
3.Underground Work
18-19
4.Building Work
20-21
5.Marine Work
22-23
Design Service, 24-25
Engineering, Procurement & Construction (EPC)
12-23
24-25
26-27
28-29
Property Development26-27
Contracting
Design Service,
Engineering, Procurement
& Construction (EPC)
Property Development
Supporting Facilities
Supporting Facilities
Precast & Prestressed Concrete Production 28-29
Steel & Structure Fabrication
12
01
13
PROJECT:
Wangnoi Combined Cycle Plant (block 1,2,3)
Treatment Plants
Wastewater treatment plant (WWTP) is one area that NAWARAT has successfully
provided full scope service as Engineering, Procurement & Construction (EPC)
Contractor. The largest Bangkok central WWTP owned by Bangkok
Metropolitan Administration (BMA) is one of NAWARAT great success project
besides other private owned projects.
PROJECT:
SINGHA BEVERAGE
02
Power plant
Contracting
Industrial
Work
Along with growing economy, Thailand power generation
is one of major infrastructure that has to be developed
and NAWARAT is also part of the success in many power
plants construction, as civil work subcontracting partner.
NAWARAT has experience under stringent standard
in various combined-cycle and co-generation projects
with Electricity Generating Authority of Thailand
(EGAT) such as at Bangpakong, Wangnoi and Chana,
as well as with IPP and SPP to feed the national
grid or internal industrial estate demand.
Factories / Warehouse
Many factories and warehouse for many kind of
industries including bottling, consumer food and
frozen food processing, electrical appliances, high
technology electronics, logistics distribution, etc.,
owned by multinational and local corporations
were contracted to NAWARAT with trust of integrity
to fulfill the cost, quality and handover schedule.
portfolio
03
PROJECT:
NongkhaEm Wastewater Treatment plant
PROJECT:
VRM Magotteaux
04
14
15
Contracting
CIVIL
Work
portfolio
01
PROJECT:
lamtakong reservoir
PROJECT:
thuen hinboun expansion
02
03
PROJECT:
Rojana Industrial Estate Flood Protection
Dams/Reservoirs/Hydro Power
Dealing with water is another strong area of
NAWARAT with proven track record in dam,
reservoirs and hydropower plant construction.
Ability to innovate machinery and working
methodology in order to cope with difficult site
condition is always NAWARAT’s people challenge.
flood protection
NAWARAT is also being part of many flood
protection systems with its own design and
installation know-how for both municipalities and
industrial estates.
16
17
05
PROJECT:
BTS S12 STATION (TAKSIN-PHETKASEM)
Highways/Roads/Bridges/Railways
Contracting
CIVIL
Work
Another area of NAWARAT’s success record is transportation
infrastructure such as roads, highways, bridges and railway
station in Thailand and nearby countries i.e. Lao PDR,
Cambodia. With construction capability to handle
superstructure and sophisticated installation method,
NAWARAT is able to ensure completion of the project for
many authorities in Thailand and nearby countries i.e.
Department of Highways, Department of Rural Roads,
Bangkok Mass Transit System (BTS), Asian Development
Bank.
portfolio
PROJECT:
Highway 357 Suphanburi
Outer Ring Road Section 3
04
PROJECT:
PREK PNOV BRIDGE , Cambodia
PROJECT:
national highway & package b, lao pdr
07
06
18
PROJECT:
BMA7 Wastewater Collection System North Bang Sue
Contracting
underground
Work
portfolio
Tunneling/Pipejacking
01
NAWARAT is the pioneer in underground work,
tunneling and pipe/jacking projects. Many challenging
works for Bangkok’s wastewater collection system,
potable water transmission system, electrical
transmission system and city drainage system
were completed by NAWARAT. Lately, the gigantic
drainage water tunnel to protect Bangkok Metropolitan
from seasonal flood is contracted to NAWARAT.
PROJECT:
MWA Water Transmission Tunnel from Outer Ring Road
to Rama II Road
PROJECT:
EGAT Lamtakhong Reservoir and Pumped Storage
03
02
19
20
21
Contracting
building
Work
portfolio
Hotels/Resorts/Recreational
03
Joining NAWARAT’s reference, premium seaside
resort, hotel and recreational projects are included
with high satisfaction of customers to ensure their
business success from the asset.
PROJECT:
Madison Condominium
residences/housing estateS
05
Commercial & office Buildings
Since establishment of the company, various kind of
commercial and office buildings are constructed with high
recognition of quality such as national convention center,
shopping mall, office building, hospital, university, etc.
04
01
PROJECT:
SCG Experience
PROJECT:
ban poo lom condominium, hua-hin
02
PROJECT:
Sirikit Convention Center
PROJECT:
moevenpicK resort & spa and palm
laguna residence, dubai uae
06
PROJECT:
VILLA BARANEE
Either premium or low cost, high-rise or low-rise
residential development, NAWARAT has experience
as turnkey contractor and able to work with both local
and foreign designers. The reference projects
are not only in Thailand but also in nearby
countries i.e. Myanmar, United Arab Emirates.
22
23
Contracting
marine
Work
02
PROJECT:
Container Terminals
scg - dow chemical
(rayong terminal jetty)
To support the country’s marine logistics, NAWARAT
is part of the container terminal infrastructure
construction i.e. Container Terminal owned by
Hutchison Laemchabang Terminal Limited in the
Eastern Seaboard.
portfolio
Ports/Berths/Jetties
Waterfront working condition is very specialized area
that again is NAWARAT strength as civil work partner.
Various projects for public and private industrial ports,
berths and jetties in Thailand’s Eastern Seaboard
and Southern Seaboard are evidence of its success.
Land reclaimation/Dredging
Land reclaimation and dredging are being part of
NAWARAT’s capability to service its customers in waterfront
and waterway channel development.
01
03
PROJECT:
04
PROJECT:
Prachuab Kirikan Port Extension
PROJECT:
PTT LNG jetty
Area C1-C2 Development Laem Chabang Port
24
25
Design Service,
Engineering,
Procurement &
Construction (EPC)
PROJECT:
02
PROJECT:
03
ts-tech
NAWARAT is capable to provide design service as well as Engineering,
Procurement & Construction (EPC) service with ability to work with both local
and multinational partners. Its experience with large scale projects such as large scale
wasterwater treatment plant, hydropower plant, etc., are proven to both its customers
and partners.
PTT Wastewater Treatment Plant
PROJECT:
NAMSANA, LAO PDR HYDROPOWER PLANT
01
PROJECT:
nongkhaem wastewater treatment plant
04
26
27
property
development
03
PROJECT:
VILLA BARANEE
To extend its business from strength, NAWARAT
has expanded activity into property development,
both high rise and low rise residential projects.
As always, quality of product and service are key
success factor that is the highest priority commitment.
01
PROJECT:
ISSARA LADPRAO Condominium
PROJECT:
SEA BREEZE VILLA
02
PROJECT:
ISSI Condominium
04
28
29
Supporting
Facilities
Precast & PRESTRESSED
Concrete PRODUCTION
Steel & Structure
FABRICATION
• Bangna-Trad Concrete Yard
• Bang Nampriao Concrete Yard
• Asphaltic Concrete Plant
• Mahachai Steel Fabrication
• Bang Nampriao Steel Fabrication
30
31
subsidiary &
Associated Company
1.
2.
3.
C.I.N.
Estate
Company
Limited
VSPN
Property
Limited
In September, 2006, the Company invested in C.I.N. Estate Company Limited
to procure a land and develop it into a 47-storey condominium Named
“The Issara Ladprao”, the condominium is located on Ladprao Road, between
Soi 12 and 14 , with the project price amounting to Baht 1,868.68 million.
The construction has commenced since January 2007 and completed
in September 2011. The second project named “ISSI Condominium
Suksawat” is located on Suksawat Road, Bangpakok (north side), Ratburana,
Bangkok, with the project price amounting to Baht 1,850 million.
1.
Myanmar
NWR Company
Limited
In 2000, the Company invested in Myanmar NWR Company Limited situated
at International Business Center, Suite No.106, 88 Pyay Road, Hlaing Township,
Yangon, Myanmar. The Company holds 100 percent of the shares for the purpose
of supporting expansion of its construction contracting in The Union of Myanmar.
2.
Utility
Business
Alliance
Company
Limited
In 2001, the company made an investment in Utility Business Alliance Co., Ltd. which
is involved in the management business of wastewater treatment plant. The
investment portion was at 50 percent. On November 11, 2003, the company sold
its investment to the third party partially so the investment portion was reduced to
33.33%. In the third quarter of 2006 the company purchased the investment
back from the third party so the investment portion was 60 percent of the
registered capital of 40 million baht.
3.
NWR
(Cambodia)
Company
Limited
In 2007, the company incorporated NWR (Cambodia) Company Limited
in Cambodia with total 100 percent shareholding to facilitate the service work
and construction supervision in Cambodia.
In February 2007, the Company invested in VSPN Property Limited to develop
a land in Banglamung District, Chonburi into a seaside village comprising
45 units for sale under the name “Sea Breeze Villa Pattaya” The project
value is around Baht 500 million. The project was commenced in June 2007.
In 2013, The company established Mana Patanakarn Company Limited with
total 100 percent shareholding of Baht 200 million registered capital.
The new subsidiary shall expand company’s business in property development.
REliability in Business
Partnership
32
33
CG
Corporate
GovernancE
3. The role of interested parties
3
law. The Board of Directors shall take into account the setting up of a promotional activity
which help encourage the cooperation between the Company and the internal parties in
creation of financial prosperity and stability, and the business long-lasting existence.
The Board of Directors shall establish a policy in which there is a treatment to the interested
parties in such a way that all their legal rights or ones according to the agreement made with
the Company are concerned. There should not be any breach of the rights, and compensation
measures for those who suffer damages from the infringement of right should be imposed.
In Good Practice
The Board of Directors strongly believes that good
corporate governance is one of the important factors
to ensure the success of the company and enable the
company to sustain continuous growth. The Principle
on Corporate Governance is therefore adopted so that
company’s directors, management and employees
can use it as the guidelines.
The interested parties should be cared for by the Company in accordance with the applicable
4. Disclosure and Transparency
4
The Board of Directors should pay attention to the Company’s activities in disclosing important
information. This includes the disclosure of both financial information and other information,
performed correctly, completely, transparently, and timely through an easy access and with
equality and credibility.
The Company’s important information includes financial report and non-financial information in
accordance with the Securities and Exchange Commission and the Stock Exchange of Thailand
and other related information such as the duty performed throughout the year by the directors
and the commissioner, business governance policy, the policy on social and environmental
responsibility and observation of the aforesaid policies.
5. Responsibilities of the Board
1. Shareholder’s rights
1
Shareholders have their ownership right in which they can control the Company by
appointing the Board of Directors to act as their representative who has the right to make
decisions on the Company’s important changes. The Company should therefore encourage
its shareholders to exercise their right.
5
The Board of Directors has an important role in governing the business for the best interest of
the Company. The Board is responsible for performance of duties to the shareholders and is
independent from the management.
The Board should have leadership, vision, and freedom in decision making for the best interest of
the Company and shareholders as a whole. The Board should adopt a mechanism in which the
Board and the Management can work under duty and role separation and govern the Company
and adopt the system to ensure the Company’s activities are carried out in compliance with
laws and with good ethics.
The Company’s committee has to put much importance to shareholder’s rights and must
not perform any actions that are considered a breach of their right.
2. Equality among individual shareholders
2
All shareholders, be its executives, a non-executives, or foreigner, be equally and equitably
treated. The minority shareholders whose rights are breached should be compensated.
Since the shareholders’ confidence that the Board of Directors and the management are
committed to the appropriate use of their money is an important investment factor, the
Board shall govern to ensure that shareholders receive equal treatment and are equally
protected from infringement of their basic right as stated in the first principle.
Paving Pathway
to Sustainable
Growth
34
35
The policy to promote social activities and
sanitation
CSR
Corporate
Social
Responsibility
[Below] The company provided
financial support for the project
called “Ruam Raeng Thai Raksa
Namsai Tuk Koo Klong” in which
the Government by the Ministry
of Finance
The Company has constantly contributed support in activities
of foundations and public charities to give help to socially
disadvantageous people to improve their quality of life.
Also, donations to those who suffered from several natural
disasters with focus to relieve their hardship in many forms.
The policy on supporting communities
• The Company has performed its duty in dealing with people
surrounding the communities with friendship and give help
and support to make them live good life including being
responsible when problems arises in relation to its
operation; this is to be done with equality and being
for Sustainable GrowtH
equitable.
The Company has executed works according to
management principles with the focus on customers’
best benefits and satisfaction. In addition, it has a
policy on social responsibility which is supported
and cooperated well along side government
agencies and various local authorities to create
benefit for those communities. The following :
• The Company and its employees have to act and behave
properly as a good citizen for the benefit to community
and society.
• The Company has a duty in supporting and promoting
useful activities with willingness which benefit the
society and in cooperation with the government
and other agencies with dedication for the public.
01
02
The policy on educational development
activities
The Company has placed much importance to education and
committed to participate in educational development to ensure
Thailand becomes a learning society that leads to its
The policy on sustaining the environment
• has to fulfill its duty in executing works while sustaining
the environment to protect it from being affected with the
least impact.
• has a duty to initiate promoting programs to encourage
environmental protection measure both in communities,
around its work sites as a whole. All initiative projects have
to be proposed to and approved by the Company’s Board
of Directors.
• has a duty in promptly correcting when a complaint on
environmental problems from the community arises.
And this will be done with seriousness and urgency.
The policy on the promotion of religious
activities and charity
The Company has realized the importance in maintenance of all
religious. It has donated money for restoration of religious places,
shrines, sermon halls in monasteries, toilets, utilities infrastructure,
electricity, water supply, telephone lines for temples in remote areas.
leading companies
witH customers'
trustworthy.
create benefit
for LOCAL
communities
sustainable development.
03
[Image 1-2] The Company in cooperation with Electricite
du laos (EDL) have jointy implemented afforesting activities
in areas around the construction site and the community nearby.
This is a project to construct a hydropower dam that has a capacity
of 14 MW.,locationed on Nam Sana River, kasi district, Vientiane,
Lao PDR. The project area is 96 sq.km.
[Image 3-4] The Company inspected the Sana
River’s Surface Water Quality aroud both ends
of the river of the river during construction period
in order to assess the impact on the community
and the environment around the project area.
This is also an additional measure for reduction,
protection, and correction of impact on the
community and the environment that may occur
during the time of construction.
04
36
37
PROJECT REFERENCES
past experience in recent years
industrial Work
01 02
Awards &
RecognitionS
OUR ACHEIVEMENT
Warehouse and Industrial Plants
Aug-13
Workshop and Warehouse Building Construction
Amata B.Grimm Power 3 Limited
Sep-12
Laemchabang Container X-Ray Scan Project Phase 4
Nutech Company Limited
Sep-11
Drinking Water Production Plant, Phranakhon Si Ayutthaya
Wang Noi Beverage Co., Ltd.
2
Sep-11
Construction of VRM Factory MCL4 Project (310 MB)
Magotteaux Co,.Ltd.
3
Dec-10
Singha Brewery at Banglen, Nakhonpathom, Thailand
Singha Beverage Co.,Ltd.
4
Aug-08
Terminal Area C1-C2 Development Laemchabang Port [1st Contract]
Hutchison Laemchabang Terminal Limited
5
Oct-07
Terminal Area C1-C2 Development Laemchabang Port [3rd Contract]
Hutchison Laemchabang Terminal Limited
6
Jul-07
Terminal Area C1-C2 Development Laemchabang Port [2nd Contract]
Hutchison Laemchabang Terminal Limited
Jun-07
Construction of Garbage Transfer Station (New system) (NWR-Samcon JV)
BMA : Bangkok Metropolitan Administration
May-06
Construction of Siam-Press Printing Factory at Sinsakorn Industrial Estate,
Siam Press Printing Factory
1
03 04
7
Samutakorn, Thailand
05 06
Apr-06
Laemchabang Container X-Ray Scan Project Phase II
Nutech Company Limited
Feb-06
New Factory (Boonthavorn Section 2) Project, Patumthani Province
Asia Motor Service Center Co.,Ltd.(A.M.C)
Jul-05
OSBL Building at ASIA Industrial Estate, Rayong, Thailand
Indorama Petrochem Limited.
Apr-05
Construction of Turbine & Generator Rotor Repair Building
EGAT : Electricity Generating Authority of Thailand
Feb-05
BPB TGP Laem Chabang Line 2 Project (Trade Package No. TP-02)
BPB Thai Gypsum Products PCL.
Dec-04
MAIS Building Project - at Amata Nakarn Industrial Estate
Monde Nissin (Thailand) Co.,Ltd.
Feb-04
Lubricant Factory at Samutsakhon
PSP. Specialty Co., Ltd.
Wastewater Treatment System Project
Nawarat Patanakarn PCL. is currently holding
several certification of quality such as:
8
Dec-11
The Comprehensive Wastewater Treatment and Recycling Plant Project : EPC Contract
PTT Public Company Limited
Aug-10
The Wastewater Treatment System at the area of On-Nuch garbage
BMA : Bangkok Metropolitan Administration
elimination station, Bangkok
ISO 9001:2008 for quality management OSHAS
18001:2007 and TIS18001-2542 Occupational
Health and Safety Management System
Feb-10
Construction the Oleaginous Trap for develop environment at the area of On-Nuch
BMA : Bangkok Metropolitan Administration
garbage elimination station, Bangkok
07 08
Feb-10
Reconstruction the Wastewater System in 904 Palace
BMA : Bangkok Metropolitan Administration
Aug-09
Construction and Revamp of the Wastewater Treatment System within the Area
BMA : Bangkok Metropolitan Administration
of Amporn- Sathan and Taweewattana Places.
May-06
Turnkey Construction of Bangkok Wastewater Project Stage-4 / (BMA4)
Sep-04
Bangkok Wastewater Project Stage 4 Works Zone 2 (Laterral A,Lateral B)
Christiani & Nielsen (THAI) PCL.
Nov-02
Bangkok Wastwater Project Stage 1 (Part 2 )
BMA : Bangkok Metropolitan Administration
BMA : Bangkok Metropolitan Administration
(NWR, ITD, CNT & AS JV)
Not only these document issued by third party
organizations, but we also awarded several
commendation letters and certificates from our
clients
(Subcontract of Italian - Thai Development PCL. )
power plant
9
2014
10 2014
09
10
Wang Noi Combined Cycle Power Plant block 4 Project
Marubeni Corporation - EGAT
Chana Combined Cycle Power Plant block 2 Project
Marubeni Corporation - EGAT
CIVIL WORK
Jan-13
Construction of drainage system , Klong Bang Toei
Bangkok Metropolitan Administration[BMA]
May-12
Construction of drainage system , Aomnoi : Stage 1
Department of Public Works and Town & Country Planning
Aug-10
The Oleagenious Trap and Wastewater Treatment System, the Areas of On-Nutch
Bangkok Metropolitan Administration[BMA]
garbage elimination station, Bangkok.
Aug-11
Advance Earthworks (Contract 1) - Terminals D1, D2 & D3 at Laemchabang
Hutchison Laemchabang Terminal Limited
Dec-07
Road and Public Utility Rehabitilation (No.2) at Amporn Sathan Palace, Bangkok
Department of Public Works
Solid Waste Transfer Station [SAMCON NWR-JV]
Bangkok Metropolitan Administration[BMA]
Utilities System of Promenade-Home
Tararom Enterprise Public Co.,Ltd.
Utilities System of Ayodthaya Golf Course
Ayodhaya Golf Course/Bangpa-in Co.,Ltd.
Road and Public Utility Rehabitilation at Amporn Sathan Palace, Bangkok
Department of Public Works
11 Aug-07
Hall of Qualified
PRactice & Trusted
Operation
11 12
Sep-06
12 Jun-06
Jan-06
Bridge, Highway and Expressway
13 Feb-06
13 14
Construction of Access A&E Highway of Interchange Rom Klao
Tipakorn Company Limited
Dec-10
The Link between Bang Phli-Suksawat Expressway and the Industrial Ring Road
Aug-11
The Elevated Covered Path Beneath Expressway, Connecting Faculty of
DOH : Department of Highways
Medicine Building, Rama Hospital
Tipakorn Company Limited
Construction of Highway No.7 Chonburi - Pattaya Section 3
Rama Hospital
Construction of The Bridge Crossing Chongsadao Canal, Rojana Industrial Park Project,
Rojana Industrial Park PCL.
14 Sep-09
Apr-09
Section 6 (Phase 8).
Jun-08
Bridges Over River Along National Road No.4 section; Koh Kong-Sre Ambel, Cambodia
DOH : Department of Highways Thailand
Jun-07
Road Support NBIA (Part1), At intersection of Highway Soi On-Nuch (3.4km.)
Department of Rural Roads
Dec-06
Turnkey Construction Bridge and Road at Rojana Industrial Park
Rojana Industrial Park PLC.
Turnkey Construction Over-pass Bridge at Buddhamonthon sai2-Boromratchonnee road
Sino-Thai Engineering & Construction PLC.
Construction of Highway NO.357 By- pass - A.Muang Phase 3 (Section 1)
DOH : Department of Highways
15 Nov-06
Aug-06
Suphanburi, Thailand
May-06
Construction of Highway No.408 Namkrajai-Koh Yor - A.Singhanakorn (Section 2)
DOH : Department of Highways
Songkhla, Thailand
16 May-06
15 16
Construction of Over pass at Route No.323 Railway Crossing at A.Ban Pong, Thailand
DOH : Department of Highways
38
39
PROJECT REFERENCES
past experience in recent years
Bridge, Highway and Expressway
17 Sep-05
17
18
19
20
21
22
Maps
(continued)
Construction of Highway A.Bang Pare - A.Damnoensaduak (Section 1)
Sub contractor for Sahakarnwisawakorn Co.,Ltd.
Ratchaburi, Thailand
18 May-05
Construction of Extraordinary Highway No.7 (Bangkok-Chonburi,
DOH : Department of Highways
Srinakarin-Suwanabhumi Airport Section)
Dams, Canals and Waterworks
19 Nov-11
Theun-Hinboun Expansion Project : Hydro Power Plant
Thrun Hinboun Power Company Limited,
Sub contractor for Cooperativamuratori & Cementisti
- C.M.C.DI Ravenna
UNDERGROUND WORK
Manhole, Underground Duct Bank, Pipe Jacking and Tunneling Work
20
21
Jul-12
Water main Pipeline Transmission, Rachada Phisek Road
MWA : Metropolitan Waterworks Authority
Jan-10
Water Transmission Tunnel, Outer Ring Road (G-MC-7D/2)
MWA : Metropolitan Waterworks Authority
Jul-09
Underground Transmission Line for Bang Bua Thong Substation [NWR-Straga 80:20]
MEA : Metropolitan Electricity Authority
Feb-13
Water Transmission Tunnel From Outer Ring Road to Rama II Road G-TN-6C
MWA : Metropolitan Waterworks Authority
[NWR-AS JV]
Mar-06
Utility Tunnel (TMT. Banpho Plant)
Nantawan Company Limited
Apr-05
Construction of Waste Water Collection System at Taweewattana Palace
BMA : Bangkok Metropolitan Administration
GPS Location
13.664338, 100.679820
23
24
25
26
27
28
29
30
31
32
BUILDING WORK
22
Sep-09
Baan Ua-arthorn at Bangkaew, Samutsongkram
National Housing Authority
Mar-09
Design and Construction of Lifestyle Center (SCG Experience), Leab Ramintra
Siam Cement Group
Expressway road
23
Jan-09
Baan Ua-arthorn at Soi Wat Sri Varee Noi, Samutprakarn [3,053 unit]
National Housing Authority
Nov-08
Baan Ua-arthorn at Soi Wat Sa Kla, Samutprakarn
National Housing Authority
24
Jun-07
The Madison Codominium
Rojana Property Co.,Ltd.
25
Oct-07
Army Building(Tor Mor) at Thaweewattana Palace
BMA : Bangkok Metropolitan Administration
Apr-07
Teepungkorn Rasmeechoj Nursery Center Building at Ampornsathan Palace
BMA : Bangkok Metropolitan Administration
Jan-07
Gymnasium and Meeting Hall Building at Thaweewattana Palace
BMA : Bangkok Metropolitan Administration
Dec-06
Construction of Alpha ‘N.2’ Building at Thaweewattana Palace
BMA : Bangkok Metropolitan Administration
Nov-06
Ayodthaya Golf Club House
Bangpa-in Golf Co.,Ltd.
Feb-06
Construction of Residences at Ban Issara Project Part 2,3,4
Chan issara Development Public Company Limited
Sep-05
Construction of Ban Poo Lom Condominium at Hua-Hin
Ban Poo-Lom Company Limited
Nov-05
Construction of Ban San-Ploen Condominium at Hua-Hin
Sansiri Public Company Limited
26
Aug-05
Construction of Residences at Manthana Project (On-Nuch Ring Road)
Land and house Public Company Limited
27
May-05
Construction of Residences at Chaiyapruck Teparak (Part I+II)
Land and house Public Company Limited
28
Apr-05
Construction of Residences 200 units at Ban Baranee Project
Ruengrapee Company Limited
(Rangsit Klong Sam Road)
Aug-04
Construction of Residences at Bangbon and Udomsuk Property Project
Krungthep Land Co.,Ltd.
Jan-04
Construction of Three Building in Sukhothai Palace
BMA : Bangkok Metropolitan Administration
MARINE WORK
Waterfronts and Jetties
Sep-13
The Construction of Service Boat Berth Project
Port Authority of Thailand
29
Jul-11
Jetty Development and PTT LNG Receiving Terminal (Subcontractor work)
GS Engineering & Construction Corporation / PTT
30
Feb-11
Jetty Work for Rayong Terminal (Subcontractor work)
Daewoo Engineering (Thailand) Co.,Ltd. /
31
Sep-06
TurnKey Construction of Western Wharf and Additional Wharf Prachaup Port
32
Jan-06
SCG - Dow Chemical
Prachaub Port Co., Ltd
18th - 19th FLOOR, BANGNA TOWER A,
2/3 MOO 14, BANGNA - TRAD ROAD, KM.6.5
BANGKAEW, BANGPLEE, SAMUTPRAKARN 10540 THAILAND
Tel: +66 (0) 2730 2100 Fax: +66 (0) 2751 9484
Works Bangsaphan Prachaupkirikhan
Construction of Extension Berths B1, Laemchabang Port
LCB Container Terminal 1 Limited
OVERSEA PROJECTS
33
Nov-10
Prek Pnov Construction Bridge (Over Tonle Sap River)
L.Y.P. Group Co.,Ltd.
34
Jun-10
Road Work Construction part : Prek Pnov Bridge to Road No.6A
L.Y.P. Group Co.,Ltd.
Nov-08
HCMC Environmental Sanitation Project, Ho Chi Minh City, Vietnam
People’s Committee of Ho Chi Minh city
35
Sep-07
National Highway R3 Package B : Ban Sod-Nam Lung, Laos PDR. (km.84.0-km 160.8)
Minitry of Communication Transports Road and
36
Jun-07
Moevenpick Resort & Spa and Paim Laguna Residences, Dubai, UAE
Construction of Laos PDR. Seven Tides Limited
Jul-04
Rehabilitation of NR3 & NR61, Cambodia
Ministry of Public Works and Transport, Cambodia
Sep-03
Primary Road Reconstruction Project Package No.5B, 5C
Ministry of Public Works and Transport, Cambodia
Feb-03
Battambang Town Drainage (D2F2), Cambodia
Ministry of Public Works and Transport, Cambodia
NAWARAT PATANAKARN PUBLIC COMPANY LIMITED
33
34
35
36
Nawarat Patanakarn Public Company Limited
www.nawarat.co.th
T : +662 730 2100 F : +662 751 9484 E : [email protected]
A : 18th-19th Floor, Bangna Tower A, 2/3 Moo 14, Bangna-Trad Road, 6.5 km,
Bangkaew, Bangplee, Samutprakarn 10540, Thailand