Newbrook School B3827A - Alberta Infrastructure
Transcription
Newbrook School B3827A - Alberta Infrastructure
RECAPP Facility Evaluation Report Aspen View Regional Div #19 Newbrook School B3827A Newbrook Report run on: February 25, 2008 11:21 AM Newbrook - Newbrook School (B3827A) Facility Details Building Name: Newbrook School Address: P. O. Box 218 Location: Newbrook Building Id: B3827A Gross Area (sq. m): 2,460.18 Replacement Cost: $6,434,274 Construction Year: 1947 Evaluation Details Evaluation Company: A&E Architectural & Engineering Group Inc. Evaluation Date: June 14 2007 Evaluator Name: Vic Maybroda Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $1,122,179 17.44% General Summary: The Newbrook School has a split level floor configuration containing a total area of 2,460.18 square metres. The original school constructed in 1947 contained 513.09 square metres with additions of 485.96 square metres constructed in 1954, 1,312.12 square metres constructed in 1956 and 149.01 square metres constructed in 1962. A major modernization was undertaken in 1985 to upgrade the building envelope and interior finishes. The school contains six classrooms, a library, a computer room, a science room, a gymnasium with stage area, administration and ancillary support spaces. At time of the site visit/inspection there were 49 enrolled students. Structural Summary: All sections of the school are constructed on cast-in-place concrete foundations with cast-in-place concrete slab basement floor located in the original 1947 school building section. The superstructure is of load bearing wood framed walls with wood floor and roof decking supported by wood joists. Isolated floor sections indicate structural movement. The structure appears to be in acceptable condition. Envelope Summary: Existing Built-Up Roof is in poor condition causing water damage in interior areas. Exterior walls are stucco finished with painted wood fascias, painted wood soffits and painted metal flashing. Windows are sealed fixed and operable units in prefinished aluminum frames. Exterior doors are painted metal set in painted metal frames. With exception of the roof the building envelope appears to be in acceptable condition. Interior Summary: Sheet vinyl flooring is located in corridors, science room and support spaces with carpeted areas located in the video conference room, library and administration areas. Vinyl Composite Tile flooring is located food preparation room and classrooms. Ceramic tile floors and walls are located in washroom spaces. Wood strip flooring is located in the gymnasium. Painted gypsum wallboard walls are located throughout with "desco" coated walls located in main vestibule and gymnasium. Single clarestory glazing units are located in the 1956 addition corridor. Suspended acoustical tile ceilings are located in corridor, classroom and administration spaces. Painted gypsum wallboard ceilings are located in washroom and support spaces. Painted wood millwork and shelving units are located in classrooms, library, administration and related spaces. Basement area of the 1946 original school contains mould covered basement walls and moisture deteriorated wood framed construction resulting from accumulating moisture problems. Moisture conditions also exist in the basement of the 1956 addition. With exception of basement spaces, Interior finishes appear to be in acceptable condition. Mechanical Summary: Generally, the school is in poor mechanical condition. Ventilation is provided by two air handling units serving the school via low velocity floor mounted ductwork. Heating is provided by two boilers which serve the radiant panels, force flow heaters, radiant panels, two combustion air unit heaters and heat exchangers. Domestic hot water system serving Original Building is provided by a single gas fired domestic water heater in the mechanical room and a hot water recirculation system. Standard plumbing fixtures located Report run on: February 25, 2008 11:21 AM Page 2 of 40 Newbrook - Newbrook School (B3827A) throughout the school. Pneumatic control system that does not have remote access controls the air handling units. Water service from the Town's mains on north side of building. Gas service entering the school from the north side from Town's main. There are two sanitary lines entering the school with only one line being used, one line abandoned as the school nor the Town of Newbrook knows where the line discharges the sewage to. Ventilation system is in acceptable condition. Heating and storm system are in poor condition. Server room located in the basement of the building, basement is prone to flooding. Computer room does not have Air Conditioning, and it is recommended for an A/C system to be installed in order to cover the heat gain from computers in the room. Electrical Summary: The school was initially built in 1946 and added on in 1954 and 1956. The entire building electrical was modernized in 1986. The lighting systems are adequate and meet accepted standards for lighting levels. The energy efficiency upgrading has been implemented during last seven years. The electrical systems are well maintained and in operational condition. Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: February 25, 2008 11:21 AM Page 3 of 40 Newbrook - Newbrook School (B3827A) S1 STRUCTURAL A1010 Standard Foundations* - 1947 Section Cast-in-place concrete footings and walls. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 A1010 Standard Foundations* - 1954 Section Cast-in-place concrete footings and walls. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 A1010 Standard Foundations* - 1956 Section Cast-in-place concrete footings, walls and concrete piles. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 A1010 Standard Foundations* - 1962 Section Cast-in-place concrete footings and foundation walls. Rating 4 - Acceptable Installed Design Life Updated 1962 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 4 of 40 Newbrook - Newbrook School (B3827A) A1030 Slab on Grade* - 1947 Section Cast-in-place reinforced concrete basement slab. Moisture laden concrete slab damaging wood framed elements and floor finish. Rating Installed Design Life Updated 2 - Poor Event: 1947 0 JAN-08 Replace 64 Sq. M Concrete Basement Slab. Concern: Wood framed elements in contact with basement slab badly deteriorated due to basement moisture conditions. Recommendation: Budget for review of cause to basement moisture conditions and replacement of concrete slab. Type Year Cost Priority Failure Replacement 2009 $27,500 High Updated: JAN-08 A1030 Slab on Grade* - 1954 Section Cast-in-place reinforced concrete basement slab. Similar condition to that of 1947 section. Rating Installed Design Life Updated 2 - Poor Event: 1954 0 JAN-08 Replace 62 Sq. M Concrete Slab Concern: Moisture deteriorating concrete slab and related elements. Recommendation: Budget for review cause of basement moisture condition and replace damaged concrete slab. Type Year Cost Priority Failure Replacement 2009 $27,500 High Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 5 of 40 Newbrook - Newbrook School (B3827A) A1030 xSlab on Grade* - 1956 Section Cast-in-place reinforced concrete slabs located in mechanical room spaces and under stage area. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 A2020 Basement Walls (& Crawl Space)* - 1947 Section Cast-in-place concrete foundation walls in acceptable condition but covered with mould. Wood framed pony walls above concrete walls. Refer to item F2020.04 for mould removal. Refer to item A1030 - 1947 Section - for cost associated with concrete slab replacement. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 A2020 Basement Walls (& Crawl Space)* - 1954 Section Cast-in-place concrete foundation walls with wood framed pony walls. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 A2020 Basement Walls (& Crawl Space)* - 1956 Section Crawl space clean and dry. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 A2020 Basement Walls (& Crawl Space)* - 1962 Section Crawl space clean and dry. Rating 4 - Acceptable Installed Design Life Updated 1962 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 6 of 40 Newbrook - Newbrook School (B3827A) B1010.01 Floor Structural Frame (Building Frame)* - 1947 Section Wood framed floor and stair members. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B1010.01 Floor Structural Frame (Building Frame)* - 1954 Section Wood framed floor and stair members. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 B1010.01 Floor Structural Frame (Building Frame)* - 1956 Section Wood framed members. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 B1010.01 Floor Structural Frame (Building Frame)* - 1962 Section Wood framed members. Rating 4 - Acceptable Installed Design Life Updated 1962 0 JAN-08 B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1947 Section Wood stud framing members supporting roof structure. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1954 Section Wood studs supporting roof members. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1956 Section Wood stud members supporting roof structure. Rating 4 - Acceptable Installed Design Life Updated 1956 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 7 of 40 Newbrook - Newbrook School (B3827A) B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1962 Section Wood studs supporting roof structure. Rating 4 - Acceptable Installed Design Life Updated 1962 0 JAN-08 B1010.06 Ramps: Exterior* - 1954 Section Concrete formed ramp at main school entry. Rating 4 - Acceptable Installed Design Life Updated 1954 40 JAN-08 B1010.07 Exterior Stairs* - 1947 Section Concrete stairs and landing at south end of section. Rating 4 - Acceptable Installed Design Life Updated 1947 Report run on: February 25, 2008 11:21 AM 40 JAN-08 Page 8 of 40 Newbrook - Newbrook School (B3827A) B1010.09 Floor Construction Fireproofing* - 1947 Section No fire resistant ceiling elements provided between basement ceiling and wood framed floor structure. Rating Installed Design Life Updated 2 - Poor 1947 0 JAN-08 Event: Install 185 Sq. M Fire Fated Ceiling Assembly Concern: No fire rated ceiling assembly provided between basement and wood framed floor assembly. Recommendation: Install fire rated gypsum wallboard assembly to meet Alberta Building Code requirements. Type Year Cost Priority Code Upgrade 2008 $5,550 High Updated: JAN-08 B1010.09 Floor Construction Fireproofing* - 1954 Section No fire rated ceiling assembly provided between basement and wood framed flooring members. Rating Installed Design Life Updated 2 - Poor Event: 1954 0 JAN-08 Install 175 Sq. M. Fire Rated Ceiling Concern: No fire rated ceiling elements provided between basement and wood framed floor elements. Recommendation: Install fire rated gypsum wallboard assembly to meet Alberta Building Code requirements. Type Year Cost Priority Code Upgrade 2008 $5,400 High Updated: JAN-08 B1010.09 Floor Construction Fireproofing* - 1956 Section Concrete foundation walled crawl space under wood framed floor structure. Rating 4 - Acceptable Installed Design Life Updated 1956 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 9 of 40 Newbrook - Newbrook School (B3827A) B1010.09 Floor Construction Fireproofing* - 1962 Section Concrete foundation walled structure containing crawl space under wood framed floor structure. Rating 4 - Acceptable Installed Design Life Updated 1962 0 JAN-08 B1020.01 Roof Structural Frame* - 1947 Section Wood joists supporting wood deck. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B1020.01 Roof Structural Frame* - 1954 Section Wood joists supporting wood deck. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 B1020.01 Roof Structural Frame* - 1956 Section Wood joists supporting wood deck. Glue-lam beams supporting wood joists with wood deck in gymnasium. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 B1020.01 Roof Structural Frame* - 1962 Section Wood joists supporting wood deck. Rating 4 - Acceptable Installed Design Life Updated 1962 0 JAN-08 B1020.04 Canopies* - 1947 Section Wood joists supporting wood deck. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B1020.04 Canopies* - 1954 Section Wood framed joist supporting wood deck. Rating 4 - Acceptable Installed Design Life Updated 1954 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 10 of 40 Newbrook - Newbrook School (B3827A) B1020.04 Canopies* - 1956 Section Wood joists supporting wood deck. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 B1020.06 Roof Construction Fireproofing* - 1947 Section Elements not visible at time of inspection. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B1020.06 Roof Construction Fireproofing* - 1954 Section Elements not visible at time of inspection. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 B1020.06 Roof Construction Fireproofing* - 1956 Section Glue-on ceiling tiles applied to gypsum wallboard in gymnasium. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 B1020.06 Roof Construction Fireproofing* - 1962 Section Elements not visible at time of inspection. Rating 4 - Acceptable Installed Design Life Updated 1962 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 11 of 40 Newbrook - Newbrook School (B3827A) S2 ENVELOPE B2010.01.08 Cement Plaster (Stucco): Ext. Wall* Stucco finish to entire school installed in 1986. Minor vandalism damage in isolated locations. Rating Installed Design Life Updated 4 - Acceptable 1986 75 JAN-08 B2010.01.09 Expansion Control: Exterior Wall Skin* Horizontal control joints only on stucco finish. Rating Installed Design Life Updated 4 - Acceptable 1986 0 JAN-08 B2010.01.11 Joint Sealers (caulking): Ext. Wall** - All Sections Sealants around windows, doors and related exterior openings. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 20 JAN-08 Replace Joint Sealants - All Sections Type Year Cost Priority Repair 2011 $36,600 Unassigned Updated: JAN-08 B2010.01.13 Paints (& Stains): Exterior Wall** Wood fascias and canopy soffits. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 15 JAN-08 Repaint Exterior Building Elements Type Year Cost Priority Repair 2011 $12,500 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 12 of 40 Newbrook - Newbrook School (B3827A) B2010.02.05 Wood Framing : Ext. Wall Const.* - 1947 Section Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B2010.02.05 Wood Framing : Ext. Wall Const.* - 1954 Section Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 B2010.02.05 Wood Framing : Ext. Wall Const.* - 1956 Section Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 B2010.02.05 Wood Framing : Ext. Wall Const.* - 1962 Section Rating 4 - Acceptable Installed Design Life Updated 1962 0 JAN-08 B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* - 1947 Section Elements not visible. No effervescence seen on exterior finish. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* - 1954 Section Elements not visible. No effervescence seen on exterior finish. Rating 4 - Acceptable Installed Design Life Updated 1954 0 JAN-08 B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* - 1956 Section Elements not visible. No effervescence seen on exterior finish. Rating 4 - Acceptable Installed Design Life Updated 1956 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 13 of 40 Newbrook - Newbrook School (B3827A) B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* - 1962 Section Elements not visible. No effervescence seen on exterior finish. Rating Installed Design Life Updated 4 - Acceptable 1962 0 JAN-08 B2010.09 Exterior Soffits* Painted plywood soffits over building entry areas. Refinishing costs included in B2010.01.13 Paints - Exterior Wall. Rating Installed Design Life Updated 4 - Acceptable 1986 0 JAN-08 B2020.01 Exterior Standard Windows Aluminum framed vertical slider units set in wood frames. Rating Installed Design Life Updated 3 - Marginal Event: 1986 40 JAN-08 Replace 32 Window Units Concern: Existing window performing poorly. Recommendation: Replace existing units and surrounding frames. Type Year Cost Priority Lifecycle Replacement 2009 $64,000 Medium Updated: JAN-08 B2030.01 Exterior Entrance Doors Painted metal doors with sealed glazing units set in painted metal frames. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 30 JAN-08 Replace 3 - Double Metal Exterior Entry Doors Type Year Cost Priority Lifecycle Replacement 2011 $15,500 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 14 of 40 Newbrook - Newbrook School (B3827A) B2030.02 Exterior Utility Doors** Painted flush metal doors and painted metal frames. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 40 JAN-08 Replace 4 Metal Exterior Utility Doors Type Year Cost Priority Lifecycle Replacement 2011 $2,800 Unassigned Updated: JAN-08 B3010.01 Deck Vapor Retarder and Insulation* Various roof sections experiencing water leaks suggesting vapor retarder and insulation of built-up roofing requires replacement. Cost part of B3010.04.01 Built-up Bituminous Roofing. Rating Installed Design Life Updated 3 - Marginal 1956 0 JAN-08 B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** All sections of school roof are of Built-up Roofing (Asphalt & Gravel). Rating Installed Design Life Updated 2 - Poor Event: 1956 25 JAN-08 Replace 2,500 Sq. M Built-up Roofing Concern: Existing roof leaks damaging interior building components particularly to basement mechanical room of 1956 addition. Recommendation: Replace existing built-up roofing, vapor barrier, insulation and metal flashing to all sections. Type Year Cost Priority Failure Replacement 2008 $225,500 High Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 15 of 40 Newbrook - Newbrook School (B3827A) B3010.08 Flashing and Sheet Metal Perimeter roof flashing. Replacement cost part of B3010.04.01. Rating Installed Design Life Updated 3 - Marginal 1956 0 JAN-08 B3020.02 Other Roofing Openings (Hatch,Vent, etc)* Exhaust fan housings, chimney vents, roof drains and similar elements to all roof sections. Elements require height adjustment/replacement in conjunction with roof replacement. Rating Installed Design Life Updated 3 - Marginal Event: 1947 0 JAN-08 Repair/replace Vents and Drains Concern: Roof drains, exhaust vents, and similar elements require height adjustment/replacement in conjunction with roof replacement to all sections. Recommendation: Adjust/replace roofing elements to suit replaced roofing. Type Year Cost Priority Repair 2008 $3,500 Low Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 16 of 40 Newbrook - Newbrook School (B3827A) S3 INTERIOR C1010.01.07 Framed Partitions (Stud)* - Rating Installed Design Life Updated 4 - Acceptable 1947 0 JAN-08 C1010.05 Interior Windows* - Rating Installed Design Life Updated 4 - Acceptable 1956 0 JAN-08 C1020.01 Interior Swinging Doors (& Hardware)* Stained solid core wood doors in pressed steel frames with original hardware. Rating Installed Design Life Updated 4 - Acceptable 1947 40 JAN-08 C1030.01 Visual Display Boards** Tackboards and whiteboards in classrooms and administration area. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 20 JAN-08 Replace Visual Display Boards Type Year Cost Priority Lifecycle Replacement 2011 $47,739 Unassigned Updated: JAN-08 C1030.02 Fabricated Compartments(Toilets/Showers)** Prefinished partitions located located in student washrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1956 30 JAN-08 Replace 5 Toilet Partitions Type Year Cost Priority Lifecycle Replacement 2011 $6,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 17 of 40 Newbrook - Newbrook School (B3827A) C1030.08 Interior Identifying Devices* Door/room names and numbers. Rating Installed Design Life Updated 4 - Acceptable 1986 0 JAN-08 C1030.10 Lockers** - 1947 Section Stained open face wood clothes storage units located in corridor. Rating Installed Design Life Updated 2 - Poor Event: 1947 30 JAN-08 Install 32 Metal Lockers Type Year Cost Priority Lifecycle Replacement 2011 $21,120 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 18 of 40 Newbrook - Newbrook School (B3827A) C1030.10 Lockers** - 1956 Section Prefinished metal lockers located in corridor. Rating Installed Design Life Updated 4 - Acceptable Event: 1956 30 JAN-08 Replace 36 Lockers - 1956 Section Type Year Cost Priority Lifecycle Replacement 2011 $23,400 Unassigned Updated: JAN-08 C1030.12 Storage Shelving* Painted wood shelving located in all sections of the school. Rating Installed Design Life Updated 4 - Acceptable 0 0 JAN-08 C1030.14 Toilet, Bath, and Laundry Accessories* Mirrors, toilet paper dispensers, paper towel dispensers, waste containers and soap dispensers. Rating Installed Design Life Updated 4 - Acceptable 1986 0 JAN-08 C2010 Stair Construction* Wood stairs in 1947, 1954 and gymnasium stage of 1956 sections of the school. Cast-in-place concrete stairs located in 1956 addition. Rating Installed Design Life Updated 4 - Acceptable 0 0 JAN-08 C2020.05 Resilient Stair Finishes** Resilient finish to stairs in 1947 and 1954 sections of the school and to stage stairs of 1956 section. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 20 JAN-08 Replace Resilient Stair Finishes Type Year Cost Priority Lifecycle Replacement 2011 $1,750 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 19 of 40 Newbrook - Newbrook School (B3827A) C2020.10 Stair Painting Paint finish to concrete basement stairs of 1956 Section. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 0 JAN-08 Lifecycle Replacement Type Year Cost Priority Lifecycle Replacement 2011 $1,000 Unassigned Updated: JAN-08 C3010.02 Wall Paneling** Prefinished wall paneling located in library. Rating Installed Design Life Updated 4 - Acceptable 1986 30 JAN-08 C3010.06 Tile Wall Finishes** Ceramic wall tiles located in student washrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 40 JAN-08 Replace 60 Sq. M Ceramic Tile Wall Finishes** Type Year Cost Priority Lifecycle Replacement 2011 $14,100 Unassigned Updated: JAN-08 C3010.11 Interior Wall Painting* Painted gypsum wallboard in classrooms, administration area and ancillary spaces. Desco coated walls in vestibules, corridors and gymnasium. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 10 JAN-08 Refinish Walls Type Year Cost Priority Lifecycle Replacement 2011 $32,500 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 20 of 40 Newbrook - Newbrook School (B3827A) C3020.01.02 Paint Concrete Floor Finishes* Painted floors located in mechanical/storage rooms. Rating Installed Design Life Updated 3 - Marginal Event: 1956 10 JAN-08 Refinish 24 Sq. M Concrete Floors Type Year Cost Priority Lifecycle Replacement 2011 $1,320 Unassigned Updated: JAN-08 C3020.02 Tile Floor Finishes** Ceramic tile floors located in student washrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 50 JAN-08 Replace 32 Sq. M. Ceramic Tile Floor Finishes** Type Year Cost Priority Lifecycle Replacement 2011 $7,525 Unassigned Updated: JAN-08 C3020.04 Wood Flooring** Wood strip flooring located in gymnasium. Rating Installed Design Life Updated 4 - Acceptable Event: 1996 30 JAN-08 Replace 345 Sq. M Wood Flooring** Type Year Cost Priority Lifecycle Replacement 2026 $96,600 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 21 of 40 Newbrook - Newbrook School (B3827A) C3020.07 Resilient Flooring** VCT Flooring located in various classrooms. Sheet vinyl flooring located in corridors, science room and ancillary spaces. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 20 JAN-08 Replace 280 Sq. M Sheet Vinyl Resilient Flooring** Type Year Cost Priority Lifecycle Replacement 2011 $26,600 Unassigned Updated: JAN-08 Event: Replace 336 Sq. M VCT Resilient Flooring** Type Year Cost Priority Lifecycle Replacement 2011 $15,500 Unassigned Updated: JAN-08 C3020.08 Carpet Flooring** Carpet flooring located in video conference room, library and administration spaces. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 15 JAN-08 Replace 185 Sq. M Carpeted Floors Type Year Cost Priority Lifecycle Replacement 2011 $13,875 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 22 of 40 Newbrook - Newbrook School (B3827A) C3030.04 Gypsum Board Ceiling Finishes (Unpainted)* Severely water damaged ceiling in mechanical room. Rating Installed Design Life Updated 2 - Poor Event: 1956 60 JAN-08 Replace Fire Rated Ceiling Assembly Concern: Fire rating destroyed between mechanical room and main floor spaces. Recommendation: Remove damaged ceiling and replace with rated assembly meeting Alberta Building Code requirements. Type Year Cost Priority Code Repair 2008 $3,750 High Updated: JAN-08 C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)** Suspended ceilings located in classrooms, corridors and administration spaces. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 25 JAN-08 Replace 780 Sq. M Acoustical Tile Ceilings Type Year Cost Priority Lifecycle Replacement 2011 $35,100 Unassigned Updated: JAN-08 C3030.07 Interior Ceiling Painting* Painted ceilings located in washrooms and ancillary spaces. Lifecycle cost included with item C3010.11. Rating 4 - Acceptable Installed Design Life Updated 1986 Report run on: February 25, 2008 11:21 AM 20 JAN-08 Page 23 of 40 Newbrook - Newbrook School (B3827A) S4 MECHANICAL D2010.04 Sinks** Science Classroom is served with single bowl, ledge back, stainless steel sink complete with sink faucet and swing spout. Single bowl, ledge back, stainless steel sink complete with sink faucet serving Classroom. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 30 JAN-08 Replace 4 Sinks Type Year Cost Priority Lifecycle Replacement 2015 $5,000 Unassigned Updated: JAN-08 D2010.08 Drinking Fountains / Coolers** Wall hung, stainless steel, drinking fountains with turn handle. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 35 JAN-08 Replace 5 Drinking Fountainst Type Year Cost Priority Lifecycle Replacement 2020 $6,500 Unassigned Updated: JAN-08 D2010.10 Washroom Fixtures (WC, Lav, Urnl)** Water closets serving Student Washrooms are floor mounted, vitreous china, two piece, flush tank, close coupled toilet with open front seat. Urinals are stall type vitreous china top inlet, complete with flush tank. Lavatories are vitreous china, single bowl, with overflow protection, some faucets are mixing valve type others have a hot/cold water handles. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 30 JAN-08 Replace Plumbing Fixtures ( 14 Lavs & WC, 4 Urinals Type Year Cost Priority Lifecycle Replacement 2015 $48,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 24 of 40 Newbrook - Newbrook School (B3827A) D2020.01.01 Pipes and Tubes: Domestic Water* Domestic water main enters building into Mechanical room from north side of building it is circulated in copper and PVC piping. Water lines that are running to supply the lavatories in Girl's Washroom are in an outside wall, and freeze up in winter time, cold water has to be constantly flowing in these lavatories to prevent water from freezing in cold water line. Water is leaking in crawl space underneath main hallway that runs east to west out of unidentified piping, the water leak has been noticed during inspection and is estimated to have been leaking since late July. Domestic water lines and tubes are in a critical condition. Rating Installed Design Life Updated 2 - Poor Event: 1985 0 JAN-08 Replace Domestic Piping Concern: Water lines are worn and deteriorated. Water is leaking in Crawl Space underneath Hallway that runs east to west from an unidentified source. The water lines that serve lavatories in the Girl's Washroom are located in an outside wall and freeze during winter months, freezing is prevented by leaving the taps on constantly. Recommendation: Replace existing domestic water pipes, relocate the lavatories and water pipes in Girl's Washroom from the outside wall to the inside wall. Type Year Cost Priority Failure Replacement 2008 $235,000 High Updated: JAN-08 D2020.01.02 Valves: Domestic Water** Domestic water system is complete with gate valves. Balancing valves in some faucets and showers. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 40 JAN-08 Replace Valves Type Year Cost Priority Lifecycle Replacement 2025 $21,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 25 of 40 Newbrook - Newbrook School (B3827A) D2020.02.02 Plumbing Pumps: Domestic Water** Grundfos, flange connection pump circulating hot water in the system. Rating Installed Design Life Updated 5 - Good Event: 2004 20 JAN-08 Replace Pump Type Year Cost Priority Lifecycle Replacement 2024 $1,500 Unassigned Updated: JAN-08 D2020.02.06 Domestic Water Heaters** One Bradford-White domestic water heater with an input capacity of (139.5 MBH) 40,883 KW and 152 liter capacity supplies hot water to the school, it is located in the mechanical room in the basement, installed in 2004. Does not have backup capabilities as only one domestic water heater is serving the school. Rating Installed Design Life Updated 5 - Good Event: 2004 20 JAN-08 Replace Water Heater Type Year Cost Priority Lifecycle Replacement 2024 $6,000 Unassigned Updated: JAN-08 D2020.03 Water Supply Insulation: Domestic* Domestic hot water pipes are insulated. Rating 4 - Acceptable Installed Design Life Updated 1985 0 JAN-08 D2030.01 Waste and Vent Piping* PVC and ABS piping system throughout the school. Each fixture vented to atmosphere. Traps are provided where necessary. Two sanitary lines are connected to the school, one of the lines has been disconnected as the school nor the Town knows where the sanitary line leads to. Rating 4 - Acceptable Installed Design Life Updated 1985 0 JAN-08 D2030.03 Waste Piping Equipment* Two pumps serving sewer lift station in Mechanical Room. Sewer lift station serves basement portion of the building below the sanitary line that is in use pumping out the waste to main sanitary line level. Rating 4 - Acceptable Installed Design Life Updated 1956 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 26 of 40 Newbrook - Newbrook School (B3827A) D2040.01 Rain Water Drainage Piping Systems* Roof drains down to splash pad, storm water is managed by surface drainage away from building. It is uknown whether a weeping tile is installed in the school, basement is constantly getting flooded, mold is present on walls in basement. Temporary sump pumps are being used to pump out water from west side of basement to east side of building. Rating Installed Design Life Updated 1 - Critical Event: 1985 0 JAN-08 Repair Concern: A high water level constantly floods the basement. There are a series of water leaks from the foundation. Recommendation: Determine condition of existing weeping tile and replace or install a new weeping tile if necessary. Provide two sumps complete with duplex pumps and service lid. Provide 50mm discharge line to splash pad. Type Year Cost Priority Repair 2008 $64,000 High Updated: JAN-08 D3010.02 Gas Supply Systems* Buried steel schedule 40 natural gas service from Town's main. Gas meter located outside on the north side of the school. Rating 4 - Acceptable Installed Design Life Updated 1956 Report run on: February 25, 2008 11:21 AM 60 JAN-08 Page 27 of 40 Newbrook - Newbrook School (B3827A) D3020.02.01 Heating Boilers and Accessories: H.W.** Two packaged boilers are installed in Mechanical Room to provide 50% hot water heating capacity each. Units supply hot water to glycol heat exchanger, force flow heaters and a combustion air unit heater . Two boiler GRUNDFOS circulation pumps circulate the hot water in the system. Glycol heating loops supply heated glycol to the air systems AS-1 and AS-2 heating coils. Glycol system consist of a Armstrong hot water/ glycol tube heat exchanger model UN-120-H3, glycol circulation pump, expansion tank, glycol fill pump, glycol fill tank and Armstrong vortex air separator model YAS-3. Rating Installed Design Life Updated 3 - Marginal Event: 1985 35 JAN-08 Replace 2 Boilers Concern: Boilers and piping around boilers show signs of corrosion, damage, and are in marginal condition. Recommendation: Replace existing boilers. Type Year Cost Priority Failure Replacement 2008 $137,000 High Updated: JAN-08 D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler** Galvanized steel vents in basement Mechanical Rooms. 20" x 20" combustion air duct complete with indirectly fired Engineered Air unit heater. Rating Installed Design Life Updated 4 - Acceptable 1985 30 JAN-08 D3040.01.01 Air Handling Units: Air Distribution** Two air handling units provide ventilation to the school through low velocity ductwork. Air handling unit is an Engineered Air model LM-4-W serves the main school and is located in the Mechanical Room. Air handling unit AS-2 serves the school Gymnasium and is located in Mechanical Room under the Gymnasium Stage. Air Handling Units are complete with motorized O/A, R/A, E/A dampers, heating coils, supply and return air fans. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 30 JAN-08 Replace 2 Air Handling Units Type Year Cost Priority Lifecycle Replacement 2020 $285,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 28 of 40 Newbrook - Newbrook School (B3827A) D3040.01.03 Air Cleaning Devices:Air Distribution* Replaceable media filters installed. Rating Installed Design Life Updated 4 - Acceptable 1985 0 JAN-08 D3040.01.04 Ducts: Air Distribution* Galvanized steel, low velocity, constant volume system providing supply air through ducts in each classroom. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 0 JAN-08 Cleaning of Ductwork Concern: Several ducts showed dust and debris build-up. Recommendation: Complete a thorough cleaning of air distribution system. Type Year Cost Priority Preventative Maintenance 2008 $9,000 Medium Updated: JAN-08 D3040.01.07 Air Outlets & Inlets:Air Distribution* Linear bar grilles and registers are connected to low velocity ductwork, typical of each classroom. Rating Installed Design Life Updated 4 - Acceptable 1947 0 JAN-08 D3040.03.01 Hot Water Distribution Systems** Direct return copper piping distribution to perimeter radiation (classrooms and gymnasium), force flow heaters, glycol heat exchangers, and combustion air unit heater. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 40 JAN-08 Replace Heating Lines Type Year Cost Priority Lifecycle Replacement 2025 $155,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 29 of 40 Newbrook - Newbrook School (B3827A) D3050.01 Unitary Air Conditioning Equipment Computer room does not have Air Conditioning. Rating Installed Design Life Updated 2 - Poor Event: 0 30 JAN-08 Install AC Concern: Computer room does not have Air Conditioning. Recommendation: It is recommended for an A/C system to be installed in the Computer Room in order to cover the heat gain from computers in the room. Type Year Cost Priority Indoor Air Quality Upgrade 2007 $2,500 Medium Updated: JAN-08 D3050.05.03 Finned Tube Radiation** Perimeter radiation of unknown model installed in classrooms running under windows. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 40 JAN-08 Replace Radiation Type Year Cost Priority Lifecycle Replacement 2025 $143,000 Unassigned Updated: JAN-08 D3050.05.06 Unit Heaters** Unit heater serving C/A duct. 29kW heating capacity. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 30 JAN-08 Replace Unit Heater Type Year Cost Priority Lifecycle Replacement 2015 $2,500 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 30 of 40 Newbrook - Newbrook School (B3827A) D4030.01 Fire Extinguisher, Cabinets and Accessories* Hand held 2.3kg multi-purpose Flag ABC-50-HW fire extinguishers are provided throughout the school, housed in recessed fire extinguisher cabinets. The building is not equipped with a sprinkler system. Rating 5 - Good Installed Design Life Updated 2000 Report run on: February 25, 2008 11:21 AM 30 JAN-08 Page 31 of 40 Newbrook - Newbrook School (B3827A) S5 ELECTRICAL D5010.03 Main Electrical Switchboards (Main Distribution)** Federal Pioneer 500A, 120/208V, 3 phase, 4 wire panel board was installed in 1986 and has sufficient space for future expansion. Rating Installed Design Life Updated 5 - Good Event: 1986 40 JAN-08 Capacity Size Capacity Unit 500 amps Replace Main Electrical Switchboards Type Year Cost Priority Lifecycle Replacement 2026 $30,000 Unassigned Updated: JAN-08 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 1986 Panels were installed during 1986 modernization and have 25% space for addition loads Rating Installed Design Life Updated 5 - Good Event: 1986 30 JAN-08 Replace 6 Branch Circuit Panelboards Type Year Cost Priority Lifecycle Replacement 2016 $32,000 Unassigned Updated: JAN-08 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**-2005 Panels were installed for new computer room Rating Installed Design Life Updated 6 - Excellent Event: 2005 30 JAN-08 Replace 2 Branch Circuit Panelboards Type Year Cost Priority Lifecycle Replacement 2035 $8,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 32 of 40 Newbrook - Newbrook School (B3827A) D5010.07.02 Motor Starters and Accessories** The individual start/stop magnetic starters are used by couple of make air units. Rating Installed Design Life Updated 5 - Good Event: 1986 30 JAN-08 Replace 10 Motor Starters and Accessories Type Year Cost Priority Lifecycle Replacement 2016 $3,000 Unassigned Updated: JAN-08 D5020.01 Electrical Branch Wiring* Most wires in the building were replaced during modernization in 1986. Rating Installed Design Life Updated 5 - Good 1986 0 JAN-08 D5020.02.01 Lighting Accessories (Lighting Controls)* The lights are controlled by local switches Rating Installed Design Life Updated 5 - Good 1986 0 JAN-08 D5020.02.02.01 Interior Incandescent Fixtures* Light fixtures are installed in the crawl space. Rating Installed Design Life Updated 4 - Acceptable 1947 30 JAN-08 D5020.02.02.02 Interior Florescent Fixtures** - 2002 Fixtures are energy efficient T-8 fluorescent located in all the offices, hallways and classrooms Rating Installed Design Life Updated 5 - Good Event: 2000 30 JAN-08 Replacement 250 Florescent Fixtures Type Year Cost Priority Lifecycle Replacement 2030 $35,000 Unassigned Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 33 of 40 Newbrook - Newbrook School (B3827A) D5020.02.02.02 Interior Florescent Fixtures**-1986 T-12 fluorescent light fixtures installed in mechanical and storage rooms Rating Installed Design Life Updated 5 - Good Event: 1986 30 JAN-08 Replace 40 Florescent Fixtures Type Year Cost Priority Lifecycle Replacement 2016 $6,400 Unassigned Updated: JAN-08 D5020.02.03.02 Emergency Lighting Battery Packs** All the fixtures were replaced during modernization in 1986. Rating Installed Design Life Updated 5 - Good Event: 1986 20 JAN-08 Replace 12 Emergency Lighting Battery Packs** - ] Type Year Cost Priority Lifecycle Replacement 2011 $3,000 Low Updated: JAN-08 D5020.02.03.03 Exit Signs* All the exit signs are still incandescent lamp type fixtures. Rating 4 - Acceptable Installed Design Life Updated 1986 0 JAN-08 D5020.03.01.04 Exterior H.P. Sodium Fixtures* The fixtures were installed during 1986 modernization. Rating 5 - Good Installed Design Life Updated 1986 0 JAN-08 D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)* The outdoor lights are controlled by photocell Rating 5 - Good Installed Design Life Updated 1986 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 34 of 40 Newbrook - Newbrook School (B3827A) D5030.01 Detection and Fire Alarm** Simplex 2001 fire alarm system is installed and system is hard wired system Rating Installed Design Life Updated 5 - Good Event: 1990 25 JAN-08 Replace Detection and Fire Alarm System Type Year Cost Priority Lifecycle Replacement 2015 $30,000 Unassigned Updated: JAN-08 D5030.02.02 Intrusion Detection** Motion sensors installed in the hallway through entire school Rating Installed Design Life Updated 5 - Good Event: 2002 25 JAN-08 Replace Intrusion Detection System Type Year Cost Priority Lifecycle Replacement 2025 $7,500 Unassigned Updated: JAN-08 D5030.03 Clock and Program Systems* Digital program system was installed and make annunciation through PA system Rating 5 - Good Installed Design Life Updated 2002 25 JAN-08 D5030.04.01 Telephone Systems* Panasonic 4CO telephone machine are used for school telephone system and can perform Call and paging functions through PA system. Rating 5 - Good Installed Design Life Updated 2002 25 JAN-08 D5030.04.05 Local Area Network Systems* The computer outlets are installed in all the offices and classrooms. Video conference system is installed and connect to school district through super net system. Rating 5 - Good Installed Design Life Updated 2002 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 35 of 40 Newbrook - Newbrook School (B3827A) D5030.05 Public Address and Music Systems** The Peavey amplifier IPA 150T system is installed to perform paging, call, clock and program system functions. Rating Installed Design Life Updated 5 - Good Event: 2002 20 JAN-08 Replace Public Address and Music Systems Type Year Cost Priority Lifecycle Replacement 2020 $25,000 Unassigned Updated: JAN-08 D5030.06 Television Systems* The TV control center is installed in the administration office and through cable TV system send the TV program to each classroom Rating 5 - Good Installed Design Life Updated 2002 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 36 of 40 Newbrook - Newbrook School (B3827A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E1090.07 Athletic, Recreational, and Therapeutic Equipment* Basketball, volleyball and similar gymnasium equipment. Rating Installed Design Life Updated 4 - Acceptable 1956 0 JAN-08 E2010.02 Fixed Casework** Fixed casework consists of stained wood finish cupboards, shelving units and plastic laminated counter top units located in video conference room, classrooms, library, science room, administration spaces and ancillary spaces. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 35 JAN-08 Replace Fixed Casework Type Year Cost Priority Lifecycle Replacement 2021 $161,434 Unassigned Updated: JAN-08 E2010.03.01 Blinds** Vertical louverd blinds cover all window units. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 30 JAN-08 Replace 65 Sq. M Vertical Louvred Window Blinds** Type Year Cost Priority Lifecycle Replacement 2016 $5,000 Unassigned Updated: JAN-08 F2020.01 Asbestos* No known asbestos visible or reports available at time of inspection. Rating 4 - Acceptable Installed Design Life Updated 1947 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 37 of 40 Newbrook - Newbrook School (B3827A) F2020.04 Mould* Mould present in basement of original 1947 school. Rating Installed Design Life Updated 1 - Critical Event: 1947 0 JAN-08 Remove mould 1947 and 1954 Sections Concern: Health and safety to school occupants. Recommendation: Undertake mould removal in basement areas of 1947 and 1954 sections of school. Type Year Cost Priority Hazardous Materials Abatement 2008 $7,500 High Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 38 of 40 Newbrook - Newbrook School (B3827A) S8 FUNCTIONAL ASSESSMENT K4010.01 Barrier Free Route: Parking to Entrance* Graveled surfaced drop-off area to main entry ramp. Rating Installed Design Life Updated 3 - Marginal Event: 1986 0 JAN-08 Install Concrete Surfaced Entry Pad Concern: Gravel surface no suitable for BF access. Recommendation: Provide hard surface area at drop-off area and access to entry ramp. Type Year Barrier Free Access Upgrade 2008 Cost Priority $1,500 High Updated: JAN-08 K4010.02 Barrier Free Entrances* Entry doors not equipped for BFA access. Rating Installed Design Life Updated 2 - Poor Event: 1954 0 JAN-08 Install Power Actuated Equipment Concern: Entry doors not equipped for BF access. Recommendation: Provide power actuated entry vestiblue doors at main entry. Type Year Barrier Free Access Upgrade 2008 Cost Priority $7,500 High Updated: JAN-08 Report run on: February 25, 2008 11:21 AM Page 39 of 40 Newbrook - Newbrook School (B3827A) K4010.03 Barrier Free Interior Circulation* BF access to 1947 and 1954 sections of school is denied by stairs from main entry area of 1956 section of school. Rating Installed Design Life Updated 2 - Poor Event: 1954 0 JAN-08 Install Stair Lift Concern: Stairs inhibit access to 1947 and 1954 sections of the school. Recommendation: Install stair lift to stairs adjacent main school entry vestibule. Type Year Barrier Free Access Upgrade 2008 Cost Priority $7,500 High Updated: JAN-08 K4010.04 Barrier Free Washrooms* Washroom partitions and lavatory units equipped for BFA. Rating 4 - Acceptable Installed Design Life Updated 1986 Report run on: February 25, 2008 11:21 AM 0 JAN-08 Page 40 of 40 RECAPP Facility Evaluation Report Newbrook School S3827 Newbrook Report run on: February 25, 2008 9:06 AM Newbrook - Newbrook School (S3827) Facility Details Building Name: Newbrook School Address: Location: Newbrook Evaluation Details Evaluation Company: A&E Architectural & Engineering Group Inc. Building Id: S3827 Gross Area (sq. m): 0.00 Replacement Cost: $0 Construction Year: 0 Evaluation Date: June 14 2007 Evaluator Name: Vic Maybroda Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $66,654 0% General Summary: The site of Newbrook School is serviced by a looped gravel surfaced driveway to a gravel surface vehicle parking and bus drop-off area on the west side of the school. An additional gravel surfaced driveway on the north side of the school serves as a student drop-off area. The vehicle parking area is separated from the adjacent municipal street by a painted metal guard rail fence with vehicle plug-ins. Concrete walkways extend from the main north side entry, along the east and south side of the school and to the playground area on the south side of the school. A well developed landscaped area is located between the 1947 and 1956 sections of the school. Well developed trees extend along the south and east sides of the school site with a chain link fence extending from the south parking lot entry to the south tree line. A sand surface play area is located south of the school with soccer fields located south of the gymnasium. Overall, site conditions appear to be in adequate condition. Structural Summary: Envelope Summary: Interior Summary: Mechanical Summary: Electrical Summary: Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: February 25, 2008 9:06 AM Page 2 of 7 Newbrook - Newbrook School (S3827) S7 SITE G2020.02.01 Aggregate Parking Lots (Gravel)* Gravel surfaced parking area. Rating Installed Design Life Updated 4 - Acceptable Event: 1956 10 JAN-08 Replace Type Year Cost Priority Lifecycle Replacement 2011 $9,500 Unassigned Updated: JAN-08 G2020.06.03 Parking Lot Signs* No signage provided for staff, visitor, bus or BFA parking. Rating Installed Design Life Updated 2 - Poor Event: 1947 0 JAN-08 Install Parking Area Signage Concern: No signage provided for parking area (Staff, Visitor, Bus, BFA). Recommendation: Install new parking area signs. Type Year Cost Priority Failure Replacement 2008 $2,500 High Updated: JAN-08 Report run on: February 25, 2008 9:06 AM Page 3 of 7 Newbrook - Newbrook School (S3827) G2030.04 Rigid Pedestrian Pavement (Concrete)** Concrete walkway adjacent west side of 1947 and 1954 Sections. South entry at walkway at 1947 Section. Walkway from south entry to play area, combination of concrete and asphalt surfaces. Walkway along east side of 1947 and 1954 Sections. Rating Installed Design Life Updated 3 - Marginal Event: 1956 25 JAN-08 Replace concrete walkways. Concern: Walkways deteriorated and present tripping hazard. Recommendation: Replace concrete walkways. Type Year Cost Priority Failure Replacement 2009 $18,439 High Updated: JAN-08 G2030.06 Exterior Steps and Ramps* Concrete ramp at main entry (1954 Section). Concrete steps and landings at entry/egress points to 1956 and 1962 Sections. Rating Installed Design Life Updated 4 - Acceptable 1947 0 JAN-08 G2040.02 Fences and Gates Chain link fencings, approximately 2400 mm high, located at west boundary of school site separating site from municipal roadway. Similar fencing separating parking/vehicle access to play area south of school. Rating Installed Design Life Updated 4 - Acceptable Event: 1986 30 JAN-08 Replace Fences and Gates Type Year Cost Priority Lifecycle Replacement 2011 $6,215 Unassigned Updated: JAN-08 G2040.03 Athletic and Recreational Surfaces** Sand surface to creative play area. Grassed soccer play surfaces. Rating 4 - Acceptable Installed Design Life Updated 1986 Report run on: February 25, 2008 9:06 AM 25 JAN-08 Page 4 of 7 Newbrook - Newbrook School (S3827) G2040.05 Site and Street Furnishings* Bike racks located between parking area and south school entry. Planters and seating area located on south side of the school between 1947/1954 and gymnasium sections. Rating 4 - Acceptable Installed Design Life Updated 1986 0 JAN-08 G2040.06 Exterior Signs* School identification sign located on school facade. Rating 4 - Acceptable Installed Design Life Updated 1947 0 JAN-08 G2040.08 Flagpoles* One flagpole located in landscaped area. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 G2050.04 Lawns and Grasses* - Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 G2050.05 Trees, Plants and Ground Covers* South and east perimeter of school site contain well developed tress. Grassed soccer fields and planting area between 1947/195 and gymnasium school sections. Rating 4 - Acceptable Installed Design Life Updated 1962 0 JAN-08 G3010.02 Site Domestic Water Distribution* Underground municipal service. Rating 4 - Acceptable Installed Design Life Updated 1947 Report run on: February 25, 2008 9:06 AM 0 JAN-08 Page 5 of 7 Newbrook - Newbrook School (S3827) G3010.03 Site Fire Protection Water Distribution* Fire hydrant located on municipal street adjacent school. Rating Installed Design Life Updated 4 - Acceptable 1956 50 JAN-08 G3020.01 Sanitary Sewage Collection* Sewage disposal underground line to undefined disposal area. Rating Installed Design Life Updated 3 - Marginal Event: 1956 0 JAN-08 Repair Sanitary Sewer Concern: Sewer backs up when heavy rains occur. Recommendation: Repair or replace sewer after study identifies the location of the problem. Type Year Cost Priority Repair 2008 $30,000 Medium Updated: JAN-08 Event: Study Concern: Disposal line causing water/sewage back-up during heavy rain fall periods. Recommendation: Review existing capacity/slope of disposal line and recommend options. Type Year Cost Priority Study 2008 $3,500 High Updated: JAN-08 G3030.01 Storm Water Collection* Roof drains to grade. Rating 4 - Acceptable Installed Design Life Updated 1956 Report run on: February 25, 2008 9:06 AM 0 JAN-08 Page 6 of 7 Newbrook - Newbrook School (S3827) G3060.01 Gas Distribution* Underground from municipal roadway. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 G4010.02 Electrical Power Distribution Lines* Overhead power line from municipal street. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 G4010.04 Car Plugs-ins* Vehicle plug-ins mounted on painted metal railing separating parking area from municipal street. Rating 4 - Acceptable Installed Design Life Updated 1956 0 JAN-08 G4020.01 Area Lighting* Lighting pods mounted on school roof directed at parking lot. Pole mounted fixture between south school entry and creative play area. Soffit mounted fixtures over school entries. Rating 4 - Acceptable Installed Design Life Updated 1986 Report run on: February 25, 2008 9:06 AM 0 JAN-08 Page 7 of 7
Similar documents
Ottewell Junior High School
This school for Grades 7 through 9 was originally built in Edmonton in 1960. The school faces four streets - 94B Avenue on the North, Ottewell Road on the East, 94 Avenue on the South and 73 Street...
More information