the esmil approach
Transcription
the esmil approach
Esmil Presentation At PRODUCED WATER WORKSHOP ABERDEEN Esmil Process Systems Ltd DEV CHABBA JUNE 8 - 2016 Esmil Process Systems Capability Statement INTRODUCTION • Esmil Process Systems Ltd • Membrane Concept, different types of Membranes • Pilot Plant Approach • Ultra High Pressure RO for secondary enhanced recovery • Discussion Esmil Process Systems Capability Statement COMPANY HISTORY • Formed in 1978 • Awarded Queens Award for the Environment Achievement in 1999 for the “Zero Discharge Process” • DTI best supplier award in 2000 • 2012 Esmil supply specialist plant to Halliburton in PNG • 2012 Esmil awarded large project for BTEX and Hydrocarbon removal from effluent stream • 2013 Waste water treatment and recovery plant in Russia • 2015 Esmil complete largest project so far at over £5.0 million for Shell E&P at Corrib. Esmil Process Systems Capability Statement EXTENSIVE MEMBRANE EXPERIENCE • • • • • ULTRAFILTRATION NANOFILTRATION REVERSE OSMOSIS VSEP (Vibratory Shear Enhanced Process) CERAMIC MEMBRANES Esmil Process Systems Capability Statement WASTE WATER TREATMENT • • • • • Industrial Effluent treatment Oily Waste Water treatment Produced Water Treatment Gas Condensate Treatment Refinery Waste Water Treatment Esmil Process Systems Capability Statement PROCESS CAPABILITY • • • • • • MEMBRANE SPECIALISTS, UF/NF/RO VSEP (Vibratory Shear Enhanced Process) Detailed Process Design Detailed Engineering Design and Specification Equipment Procurement Supply and Installation Commissioning and Operation Esmil Process Systems Capability Statement Membranes Simplified Esmil Process Systems Capability Statement Esmil Process Systems Capability Statement THE ESMIL APPROACH • The Laboratory Scale Test Evaluation • The Pilot Plant Site Trials for New Applications • The Design Team and Engineering Team • The Project Team • The Installation and Commissioning Team Esmil Process Systems Capability Statement Spiral and VSEP Pilot Plants Esmil Process Systems Capability Statement Esmil Process Systems Capability Statement Esmil Process Systems Capability Statement Esmil Process Systems Capability Statement Parameter Design Design Design Composition Composition Composition PW-A PW-B PW-C Treated Water EQS Sodium (mg/l) 23050 28174 8 Potassium (mg/l) 3106 1376 0.1 Calcium (mg/l) 2050 2410 98 Magnesium (mg/l) 737 272 1 Barium (mg/l) 0.4 3.25 1 0.5 Dissolved Iron (mg/l) 185 38.25 - 1 Chloride (mg/l) 41200 49365 100 Sulphate (mg/l) 4093 85.5 6 Bicarbonate (mg/l) 195 1.25 0 4 8.1 0.43 2 Aluminium (mg/l) 1.3 0.18 0.1 0.2 Silicon (mg/l) 4.6 2.8 0.1 1 0.8 0.4 2.3 7 0 Boron (mg/l) Phosphorus (mg/l) Lithium (mg/l) Parameter Design Design Design Composition Composition Composition PW-A PW-B PW-C Treated Water EQS Chromium (mg/l) 0.5 1.24 0 0.1 Manganese (mg/l) 3.1 5.13 2.54 0.3 Nickel (mg/l) 15.7 0.19 0.1 Copper (mg/l) 0.44 0.43 0.05 Zinc (mg/l) 25 16.4 Arsenic (mg/l) 0.5 0.003 0.05 Selenium (mg/l) 0.1 0.001 0.02 Silver (mg/l) 0.1 0.0013 0.01 Cadmium (mg/l) 0.05 0.013 0.005 Mercury (mg/l) 1 0.00004 0.0001 0.5 1.51 0.005 0.03 0.01 Lead (mg/l) Tin (mg/l) Oil, Fat & Grease (mg/l) 15 15 3.83 15 0.1 0.3 Parameter Design Composition PW-A Design Composition PW-B Phenol (mg/l) 10 0.00025 Ammonia (mg/l) 5 0.3 BTEX (mg/l) 25 0.01 PAH (mg/l) 1 0.0008 Methanol (mg/l) 150 150 150 TOC (mg/l) 200 200 200 COD (mg/l) 500 500 Suspended Solids (mg/l) 320 320 320 Visually Neutral 4.8 to 7.4 4.56 4.56 6 to 9 TDS (mg/l) 76000 81900 250 SG 1.053 1.053 1.0001 pH * TOC includes methanol Design Composition PW-C Treated Water EQS 0.0005 0.0002 150* 400 AS BUILT PLANT PHOTOS Esmil Process Systems Capability Statement Corrib Project Over view Esmil Process Systems Capability Statement Membrane Skid for Corrib Project Esmil Process Systems Capability Statement Corrib Project As Built Esmil Process Systems Capability Statement ULTRA HIGH PRESSURE RO • Dow Water and Process Launched and Successfully Tested UHP RO Membrane in 2015. • Esmil and Dow Working on Concept to Reduce the Concentrate Volumes of Existing RO Systems to Enable Higher Recovery Optimisation. Esmil Process Systems Capability Statement Example: 60 m3/h UHPRO Plant Stage 1 BWRO 60m3/h 30 bar TDS: 1.3% Stage 2 SWRO Stage 3 UHPRO Permeate 39 + 8 + 5 m3/h 65% recovery 40% recovery 21 m3/h 75 bar TDS: 3.6% Break tank 1 vessel in the scheme stands for, 6 elements each 12.5 m3/h 120bar TDS 6% 18 elements @ 13 L/m2/h 36+24 elements @ 18.6 L/m2/h 40% recovery 24 elements @ 8 L/m2/h Break tank Concentrate/Brine 7.5 m3/h Final TDS: 10% (To thermal treatment) ANY QUESTIONS ? Esmil Process Systems Capability Statement