Natural gas sector highlights –
 Security of supply – strategic significance for each country gas sector;
 Upgrading
pg
g of security
y of supply
pp y is one of p
priorities and therefore European
p
energy strategy envisages trans european development corridors, in order
to connect European gas network with natural gas sources of Caspian
region, Middle East and North Africa (confirmed reserves for over 100
years), all in connection with diversification of supply sources;
 Providing customers of natural gas with only one transportation direction
and only one supply source puts BiH in the group of countries with the
lowest degree of security of supply, i.e. countries of „high risk”, with the
assigned
i
d risk
i k factor
f t
off 4.0
4 0 (risk
( i k factor
f t
off West
W t Europe
E
i in
is
i a range
between 1.2 – 1.7);
 Priority development projects are those that provide new connections, and
i particular
in
ti l new transportation
t
t ti
routes
t and
d possibly
ibl new supply
l source.
Development strategy
Project name
asification of the
tral Bosnia Canton
(40 km)
Gas pipeline
Brod – Zenica
(130 km)
Gasification of
Cantons NK/ZHK/Canton 10
ptions I/II 107/175
km)
Design documentation
Design company
Year
Current status
Detailed Design
Consortium Bosna S,
INP, Sarajinžinjering,
ZEDIS
2010
Effective loan of EBRD:
Ongoing project
Preliminary Feasibility
Study
BH-Gas and INA
Zagreb
2006
Aplication for FS,
FS EIA/SIA/CBA
and Basic Design approved by
WBIF Board (6th round) – Dec
2011 – 1 mil EUR
2009
Aplication
p
for PFS,, EIA/SIA/CBA
approved by WBIF Board (6th
round) – Dec 2011 – 0,4 mil EUR
– connected with IAP project
Investment Study
EiHP
asification of UnaSana Canton
(80 km)
Investiciona Study
IGT Sarajevo
2008
Regional project with Croatia.
Aplication for Basic design,
EIA; SIA and CBA, WBIF (7th
round) – Feb 2012 – 0,7 mil
EUR. Preparation for Detailed
Design
w CCGT facility in
TPP Kakanj
Techno-economic
Study
IBE Sarajevo
2010
Signed Preinvestment contract
with EP BIH
ew CCGT facility–
P – nott partt off SPP
Basic design invested
b KTG Lugano
L
by
Ferrostaal, Germany
and Cristoff Holding
g
Austria
2011
Signed Preinvestment contract
with KTG Lugano
g
atural gas development
trategy is completely in
ompliance with „EC Gas
Ring”, which connects
„north and south entry
point„ through
p
of
implementation
terconnection projects:
Gas pipeline Brod Z i
Zenica
Gas pipeline Ploče Mostar - Sarajevo or
g
- Posušje
j Zagvozd
Travnik
osition of BiH in regional interconnections
Length: cca 130 km
Diameter: 16 inch/20 inch
Pressure: 50 bar/75 bar
Max. capacity: 1.0/2.0 billion m3
nvestement value:
-
16 inch approx. 45 milion EUR
20 inch approx. 57 milion EUR
Current status:
-
Completed feasibility study
nvestment cycle: 2011 – 2014
Aplication for FS, EIA/SIA/CBA and
Basic Design approved by WBIF
Board (6th round) – Dec 2011 – 1 mill
EUR
G
C
 IAP Gas
Pipeline Project – Albania, Montenegro, Croatia,
Bosnia
and Herzegovina;
 Memorandum of understanding signed by all participating countries
of IAP Project, which gave full support to the Project;
 Memorandum of understanding
g with TAP – Trans Adriatic Pipeline
p
(Greece, Albania – Italy) signed by participating countries of IAP
Project; TSO (Croatia and Bosnia and Herzegovina) and Ministries
(Albania and Montenegro);
 Established Interstate Committee – commitee for preparation of ToR
and monitoring of IAP Study; mutual work within Joint Working
Group TAP and IAP;
 Technical assistance – FS, EIA&SIA – approved funds of 3.5 mil.
EUR by WBIF Board – ToR is approved by EC DG Enlargement.
AP – Ioanian – Adriatic Gas Pipeline Project
 Initiated process within ongoing construction of the high pressure
gas pipeline Zenica – Travnik
 The loan signed with EBRD envisages time schedule of legal and
account unbundling, including establishment of the independent
regulatory authority for natural gas distribution market in FBiH
 Account unbundling ongoing
 No later than 31/12/2013 ensure that those persons responsible for
BH-Gas’s
the management of BH
Gas s transmission activity do not participate
in company structures of BH-Gas responsible, directly or indirectly,
for the day-to-day operation of the supply of natural gas
 No later than 31/12/2014, BH
BH-Gas
Gas will separate its transmission and
trading activities in two distinct legal entities
„Unbundling“ of the company
 November 2007: the Government of FBiH issued the Decree on
organization and regulation of gas sector in FBiH, as an interim
solution
on issuance
off the
l ti pending
di
i
th legislation
l i l ti att the
th state
t t level;
l
l
 Open letter of ECS on initiation of dispute case against Bosnia
and Herzegovina due to failure to fulfil obligations from the
Energy Community Treaty of SEE in the natural gas sector;
 Ongoing activities on preparation of the Law on Gas of FBiH;
 Representatives of BH-Gas
BH Gas are members of the WG for
preparation of the Law on Gas of FBiH.
cal legislation in the natural gas sector (FBiH)
The building of compressor station in
order to improve the performance of
the existing pipeline
Increase the
Increase
consumption and
improve
improv
e the
competitiveness
of natural gas
The building and supply with
natural gas of at least one
cogeneration TPP
The realization of other
development projects based
on synergies
i with
ith regional
i
l gas
corridors
Development goals for the coming period...