Climbing Systems CB 240 and CB 160 Safe working
Transcription
Climbing Systems CB 240 and CB 160 Safe working conditions with wall formwork at all heights Edition 01/2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel. +49 (0)7309.950 - 0 Fax +49 (0)7309.951- 0 [email protected] www.peri.com Important Notes: Without exception, all current safety regulations must be observed in those countries where our products are used. The illustrations in this brochure are photographs of real site situations. Safety or anchor details are therefore not to be taken as a definitive guide to the way the equipment is to be used. Safety precautions and allowable loads are to be strictly observed at all times. Separate structural calculations are required for any deviations from the standard design data. The information contained herein is subject to technical changes in the interests of progress. Errors and typographical mistakes reserved. Contents 2 Climbing Systems CB 240 and CB 160 Type-tested safety at all heights 4 For all heights and every ground plan 6 With VARIO GT 24, MAXIMO, TRIO or RUNDFLEX 8 Construction-compliant load assumptions, simple formwork adjustment 10 Wind loads, over-sized formwork elements 12 Even platform planking, Formwork Carriage CB 240 14 CB 240 climbing cycle sequence 16 Type-tested safety measures, moving procedure of the CB 160 18 Certified scaffolding anchoring 20 High level of working safety with system components 22 BR shaft platforms Application, support, details 24 Tables Load Tables and Charts CB 160 26 Load tables and Charts CB 240 28 Components 48 PERI International 1 Climbing System CB Type-tested safety at all heights CB climbing scaffold system with type tests provide high levels of safety in all areas of application. With the CB 240, the formwork is mounted on a carriage with roller bearings and can be moved by approx. 75 cm. This means sufficient space is available for cleaning the formwork and reinforcement work. The 2.40 m wide platform planking is flush with the Carriage CB and free of any tripping hazards. Test Type CB 240 and CB 160 are type-tested. This makes time-consuming static calculations unnecessary. With the CB 160, the formwork is simply tipped backwards for striking. For both systems, the formwork is moved together with the scaffold in only one crane lift. Photo on the right Bridge pier Architectural concrete with CB 240 and VARIO GT 24. Environmental construction High-quality architectural concrete with CB 240 brackets and VARIO GT 24. Apartments CB 240 and CB 160 brackets with VARIO GT 24. 2 3 Climbing System CB For all heights and every ground plan Hotel construction CB 240 scaffold brackets complete with finishing platform and TRIO. CB 240 Safe working areas and access with system components on the formwork and CB climbing scaffold. 30-storey apartment building CB 240 and CB 160 scaffold brackets with VARIO GT 24. 4 LNG liquid gas tanks Circular walls ø 77.50 m with CB 240 and VARIO GT 24. Bridge pier Architectural concrete with CB 240 and VARIO GT 24. Administration building CB 240 with TRIO and VARIO GT 24. Safety PERI ladder for safe access to the finishing platform. 5 Climbing System CB With VARIO GT 24, MAXIMO, TRIO or RUNDFLEX CB 240 with VARIO GT 24 CB 160 with MAXIMO or TRIO Concreting height 3.60 – 5.40 m Concreting height 3.60 – 5.40 m Strongback CB 270 Strongback CB 380 Strongback CB 270 Strongback CB 380 Strongback Connector U 100-120 Adjustable Brace CB 164-224 Adjustable Brace CB 164-224 Adapter TRIO/CB Height Adjusting Unit CB Adjusting Unit CB 160 Carriage CB 240 with rack Square-shaped timber or GT 24 girders, single or double Square-shaped timber or Girder GT 24 CB 160 CB 240 Handrail Post 200 Handrail Post 200 Post Extension 180 Post Extension 180 Tension Anchor CB Tension Anchor CB 6 Handrail Post 370 Handrail Post 370 Platform Post 225 Platform Post 225 Platform Cantilever Beam CB Platform Cantilever Beam CB Administration building CB 240 with finishing platform and TRIO. Airport control tower 46 m high, external Ø 6,85 m. With PERI RUNDFLEX and CB 240 brackets. 7 Climbing System CB 160 Construction-compliant load assumptions, simple formwork adjustment Construction-compliant load assumptions The high loading capacity of the CB climbing system allows wide spans resulting in large scaffold units with high load assumptions. On the PERI CB 240, for example, reinforcing bars can therefore be stored when the formwork is retracted. CB 240 Formwork carriage in working position Concreting platform 150 kg/m2 300 kg/m2 Working platform 200 kg/m2 Finishing platform 75 kg/m2 8 CB 160 Formwork carriage in concreting postition Concreting platform 150 kg/m2 Working platform 200 kg/m2 Finishing platform 75 kg/m2 Concreting platform 150 kg/m2 Working platform 200 kg/m2 Finishing platform 75 kg/m2 ▲ ▲ Simple adjustment of the formwork elements for neat and tidy concrete joints Move element sideways. By releasing the Strongback Connector U 100-120. ▲ ▲ Precise adjustment of the angle of inclination. With Adjustable Brace CB 164-224. Element height adjustment For VARIO GT 24 With Height Adjusting Unit CB For MAXIMO and TRIO With Adapter TRIO-CB ▲ ▲ 9 ▲ ▲ Climbing System CB Wind loads, over-sized formwork elements Wind loads CB 240 and CB 160 are type tested and designed to handle high wind speeds. CB 240 and CB 160 type tests are available on request from PERI. The PERI CB 240 provides type-tested wind safety at any position which means: Locking the formwork on the carriage takes place quickly and securely by means of a wedge. Complete safety against the wind immediately after mounting the tie rod. hS/2 350 ZO 100 4 3 ne ne DU hS in d ind Zo Zo Zo ind W W 50 W nd Zo ne ne 2 1 1,80 QO ZZ 0 0.30 0.40 0.50 0.60 0.70 Wind dynamic pressure [kN/m2] 10 hG Wind loads for shoring according to EN 12812 Wi Operating height above ground [m] 150 Wind dynamic pressure for transition zone inland and with load reduction factor* for period of application < 24 months. *κ = 0.7 hS Wind forces increase accordingly with the height. The DIN 1055, which forms the basis for the design, determines the wind loads according to wind zones, ground profiles and operating heights. 600 CB 240 with VARIO GT 24 for construction of bridge piers. 0.80 0.90 1.00 1.10 1.20 1.30 Over-sized formwork elements The strong CB 240 und CB 160 scaffold brackets allow the formation of large elements. 5.40 x 5.00 m = 27 m2 formwork surface area is possible on only 2 scaffold brackets also with wind speeds of 164 km/h (1.3 kN/m2) with standard arrangement of the brackets. With less wind loads, larger elements and bracket spacings are possible. Extremely long platforms are also no problem with the CB 240 and CB 160. max. 5.00 m CB 240 with finishing platform and VARIO GT 24 for construction of LNG gas tanks. max. 5.40 m Instead of the usual square-shaped timbers, GT 24 girders can be used as platform main beams. With a double GT 24 girder position, platform lengths of up to maximum 12.00 m are possible. max. 7.20 m max. 12.00 m 11 Climbing System CB Even platform planking, Formwork Carriage CB 240 Even platform planking The 2.40 m wide planking has no tripping hazards and allows easy and safe movement on the working platform – in front of and behind the formwork. Safe working conditions on the CB 240 in protection of the formwork element. With the PERI CB 240, the planking is positioned above the brackets. All possible tripping hazards are below the working platform. The working platform can be transported pre-assembled thus saving space and connected with the CB 240 brackets on the construction site. Closed platform decking for safe working. Safe and secure movement on the CB 240 working platform. 12 Carriage CB 240 With roller bearings for easy shuttering and striking. This means that large formwork elements can also be easily moved forwards and backwards. Ratchet Lever SW 19 Rack drive 75 cm working area when the formwork is retracted This creates sufficient space for cleaning the formlining as well as installing the reinforcement. Securing wedge Formwork Carriage Roller bearings Bracket CB 240 75 cm With the captive wedge, the carriage can be fixed in any moving position. The Carriage CB 240 is moved using the Ratchet Lever SW 19, Item no. 027180. 13 Climbing System CB CB 240 climbing cycle sequence 1. The first wall section is concreted. Install the leading anchor according to specifications. 14 2. After reaching the required concrete strength, mount the Scaffold Mounting Ring M24 and then attach the pre-assembled scaffold unit. Install the formwork and concrete the second section. 3. Retract the formwork and then mount the Scaffold Mounting Ring M24. 4. Lift the complete unit to the next section by means of the crane. If required, the finishing platform can be fitted. 5. Reinforcement work is now carried out and, if required, the formwork is placed at an angle. 6. Move the formwork forwards and concrete. At this point. cycles continue as in Point 3. Note: Load-bearing capacity of the crane eye on the Strongback CB is 1.9 t. 15 Climbing System CB Type-tested safety measures, moving procedure of the CB 160 and climbing traverse Type-tested safety measures A type test is also available for the use of the PERI climbing system CB 160. The formwork is simply tilted backwards when striking. With a platform width of 1.60 m, a sufficient working area is available. CB 160 combined with CB 240 Safe working conditions also on the CB 160 climbing system. An integrated ladder allows safe and secure access to the finishing platform. Adjusting Unit CB 160 Item no. 051130 CB 160 16 CB 240 Ratchet Lever SW 19 Item no. 027180 Combining CB 160 and CB 240 is the cost-effective solution for high walls. CB 160 moving procedure 1. Lift the unit with the crane. 2. Lift and then place in position. Moving procedure with Climbing Traverse RCS 3. Attach unit on the Scaffold Mounting Ring M24. The PERI Climbing Traverse RCS 10 t, Item no. 112986, is used when moving larger or non-symmetrical units. Use a guide rope to ensure that the moving preocedure is fully under control. 17 Climbing System CB Certified scaffold anchorage With climbing systems, safety is significantly determined through the quality of the tie system. Therefore, PERI tie systems are approved by the building authorities. d by rove App ding buil ties ori auth The anchoring of the brackets is officially apprioved by the building authorities. The PERI Climbing Anchor M24/DW 15 and M24/DW 20 are efficient in their use as well as guaranteeing safe handling. System Reusable components Variant 1 Standard anchoring with variable anchoring depth. With PERI Climbing Cone-2 M24/DW 15 Building Authority Approval No. Z-21.6-1767 Variant 2 Anchoring for thin walls and limited anchor forces. With PERI Screw-On Cone-2 M24/DW 20 Building Authority Approval No. Z-21.6-1766 M24/ DW 15 M24x120-10.9 Scaffold Mounting Climbing Cone-2 Tie Rod DW 15 Item no. 030030 M24/DW15 Item no. 029560 Ring M24 Item no. 029470 Item no. 031220 Threaded Anchor Plate 15 Item no. 030840 Scaffold Mounting Screw-On Cone-2 M24/DW 20 Ring M24 Item no. 029470 Item no. 030960 Threaded Anchor Plate 20 Item no. 030860 M24/ DW 20 M24x120-10.9 Item no. 029560 Variant 2 With PERI Screw-On Cone-2 M24/DW 20 and Threaded Anchor Plate 20. 450 350 Variant 1 With PERI Climbing Cone-2 M24/DW 15 and Threaded Anchor Plate 15. CB 240 18 Lost components CB 160 Mounting of leading anchor Advancing Bolt M24 Anchor Positioning M24 Plywood is drilled through. E.g. with Wall Formwork VARIO GT 24. Plywood is not drilled through. E.g. with panel formwork MAXIMO TRIO. 1. Leading anchor during striking Position leading anchor drill through plywood Ø 25 mm. Screw climbing anchor and Advancing Bolt tightly together. 1. Leading anchor during striking Position Anchor Positioning M24 and fix by nailing into the plywood. Turn Climbing Anchor on the Anchor positioning. Secure the Threaded Anchor Plate by means of tie wire to the reinforcement. 2. Attach scaffold suspension Remove Advancing Bolt M24. Retract formwork. Attach Scaffold Mounting Ring M24 with Hex. Bolt M24 x 120. 2. Attach scaffold suspension Release the formwork from the concrete and retract (the nails are pulled through the plywood). Dismantle Anchor Positioning M24 using a pin wrench SW 14. Mount Scaffold Mounting Ring M24 using a Hex. Bolt M24 x 120. 3. Mount scaffold brackets Mount Scaffold Brackets CB 240 or CB 160 and immediately secure by means of safety pins. 5. Close anchor points The remaining anchor hole is closed by means of the Concrete Cone KK. This results in an opticallypleasing concrete surface. 4. Reusable anchor components Screw out the Hex. Bolt M24 x 120 and cone from the finishing platform using the socket wrench SW 36. 19 Climbing System CB High level of working safety with system components The system components for the CB 240 and CB 160 climbing systems provide a very high degree of safety. Integrated ladders with hinged hatches and ladder cages ensure safe access to the finishing and concreting platforms. Handrail post for fixing the end and side handrails. Using VARIO platforms, the CB 240 climbing system ensures safe access to the concreting level. Accessing the two finishing platforms is carried out with CB 240 and CB 160 system components. Easy access to the finishing platform with the PERI ladder. 20 Access ladder Safe and secure access to the CB 240 and CB 160 finishing platform at all heights. A B Sliding or hinged hatches Ladder safety cage Ladder 220/6 Ladder 180/6 A) Side handrail post For fixing end handrails. It is mounted on the outer main beam at the end. B) End handrail post With larger cantivers, it is attached to the outer main beam. Ladder Base 30, adjustable 21 BR shaft platforms Application, support, details Tie Rod B15 or Scaffold Tube Tie Rod B15 or Scaffold Tube Application Note: For suspension of the finishing platforms, only use Tie Rods B15 or Scaffold Tube Ø 48.3 mm. Table of permissible bearing forces for gravity pivot plate Concrete cube Concrete cylin- perm. vertical der strength bearing load strength [N/mm2] [kN] [N/mm2] 10.0 22 8.0 20.0 12.0 9.6 14.0 11.2 Reinforcement Diameter of against tensile reinforcement [mm] splitting BST 500 [cm2] 0.15 1x5 23.9 0.18 1x5 27.9 0.21 1x6 16.0 12.8 31.9 0.24 1x6 18.0 14.4 35.9 0.27 1x6 Considered tolerances: Clear width of the shaft ± 20 mm. Length of platform beam ± 3 mm. Clearance in the box out + 10 mm. 19.1 15.3 38.0 0.29 1x8 Remaining supporting depth min. 27 mm. Support on Folding Bracket 25 Support on gravity pivot plate Perm. load-bearing capacity 25 kN Perm. load-bearing capacity max. 38 kN 70 25 115 442 327 Note: The external platform beam (timber) may not obstruct the unhindered folding of the gravity pivot plate. Assembly sequence Platform Beam BR with gravity pivot plate 1. Bearing Box BR installed 2. Struck 3. Platform supported 4. Platform lifted Installation of platform decking 2. With square-shaped timber 80 1. With Girder GT 24 max. 100 mm timber Hook Strap HB 24-100/120 for Profile U 100 / U 120 Hook Strap HB 24-140/160 for Profile U 140 / U 160 Drilled hole Ø 20 Hook Strap HB for Profile U 100 / U 120 Hook Strap HB2 for Profile U 140 / U 160 23 Climbing System CB 160 Load Combination A – Working The charts are for detailed determination of the bearing reactions whilst taking into account realistic load combinations. For all load combinations (A – working and B – storm), the safe transfer of the bearing forces into the building structure has to be verified. Wind load: q = 0.25 kN/m² 600 Static system and load combinations v = 72 km/h v = 129 km/h q = 1.1 kN/m2 v = 151 km/h q = 1.3 kN/m2 v = 164 km/h hS ZO QO – Working not permitted – Material can be left on the working platform. 1.80 Width of influence b Application height hG Formwork height hS Formwork weight max. 60 kg/m2 Wind flow pressure q Aerodynamic wind factor cW = 1.3 Wind load: q = 0.8 kN/m2 hG 350 Load Combination B – Storm With higher wind loads, the permissible widths of influence must be reduced accordingly and the bearing forces determined through a static calculation. hS/2 – Working on all platforms is allowed. – Material storage on the working platform is allowed. hS DU ZZ Wind from the front Wind from the rear Load assumptions Platform Platform width [m] Dead load of the platform [kg/m²] Permissible live load* [kg/m²] Concreting platform 0.80 30 150 Intermediate platform** 0.80 30 150 – – – – Working platform 1.60 50 200 200 kg/m2 133 kg/m2 133 kg/m2 – Finishing platform 1.15 50 75 Wind direction Decisive load combinations [kg/m²] for calculating the bearing reactions Storm B1 Storm B2 Storm B3 75 kg/m2 – – – 37.5 kg/m2 – – – from the front from the front from the rear from the rear **if necessary * Maximum permissible live load for operating condition “Working”. – Loads are evenly distributed. One-sided loading of cantilevered platform areas is not permitted. – Working: if loading of several platform levels, only one level can be fully loaded – all other platform levels only up to 50%. – Storm: Reduced load on the working platform for material left behind. 24 Working A Climbing System CB 160 Load Tables and Charts CB 160 Bearing reactions for the permissible width of influence (perm. b) Load case max. wind flow pressure during storm q = 0.8 kN/m2 A B1 B2 B3 q = 1.1 kN/m2 q = 1.3 kN/m2 hS 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m perm. b 6.55 m 4.40 m 2.90 m 5.55 m 3.60 m 2.40 m 5.05 m 3.25 m 2.05 m QO 47.2 kN 36.9 kN 28.1 kN 40.4 kN 30.9 kN 23.9 kN 37.1 kN 28.3 kN 21.0 kN ZO 30.6 kN 26.2 kN 23.0 kN 26.1 kN 21.7 kN 19.3 kN 23.8 kN 19.7 kN 16.6 kN DU 23.8 kN 20.2 kN 17.7 kN 20.3 kN 16.8 kN 14.9 kN 18.6 kN 15.3 kN 12.9 kN QO 34.7 kN 28.6 kN 22.6 kN 29.9 kN 24.1 kN 19.3 kN 27.5 kN 22.1 kN 17.1 kN ZO 51.7 kN 49.1 kN 47.8 kN 56.9 kN 52.9 kN 52.7 kN 59.7 kN 55.4 kN 52.5 kN DU 32.2 kN 31.9 kN 32.6 kN 34.1 kN 33.5 kN 35.4 kN 35.2 kN 34.7 kN 35.1 kN QO 44.8 kN 44.0 kN 44.0 kN 45.0 kN 43.8 kN 45.5 kN 45.2 kN 44.3 kN 44.2 kN Z O* -25.6 kN -23.9 kN -21.9 kN -31.8 kN -28.0 kN -25.5 kN -35.1 kN -30.4 kN -26.0 kN ZZ 11.8 kN 16.8 kN 22.5 kN 17.6 kN 21.6 kN 27.4 kN 20.6 kN 24.2 kN 28.4 kN QO 39.4 kN 40.5 kN 41.8 kN 40.4 kN 41.0 kN 43.7 kN 41.0 kN 41.7 kN 42.6 kN Z O* -29.2 kN -25.8 kN -22.8 kN -34.8 kN -29.5 kN -26.2 kN -37.8 kN -31.7 kN -26.6 kN ZZ 18.7 kN 21.3 kN 25.4 kN 23.5 kN 25.3 kN 29.9 kN 26.0 kN 27.5 kN 30.5 kN *if ZO < 0, then a compressive force affects the anchorage. intermediate values can be interpolated linear. Maximum values are in bold. Load factor – wind loads: Load Combination A = 1.0. Load Combination B = 0.9 The permissible widths of influence correspond to the type test. The bearing reactions differ to the type test, because the type test does not distinguish between different operating conditions. Formulae to calculate the forces for actual width of influence (actual b) QO (actual b) = ZO (actual b) = DU (actual b) = ZZ (actual b) = actual b perm. b actual b perm. b actual b perm. b actual b perm. b The calculation of types according to current standards is being prepared. ∙ (QO (perm. b) - 3.8 kN) + 3.8 kN ∙ (ZO (perm. b) - 1.3 kN) + 1.3 kN ∙ (DU (perm. b) - 1.3 kN) + 1.3 kN ∙ ZZ (actual b) Width of influence CB 160 Formwork height hS [m] 5.40 5.00 4.50 q = 0.8 kN/m2 q = 1.3 kN/m2 4.00 q = 1.1 kN/m2 3.50 3.00 2.00 3.00 4.00 5.00 6.00 7.00 Width of influence perm. b [m] 25 Static system and load combinations Load combination A – working The charts are for detailed determination of the bearing reactions whilst taking into account realistic load combinations. For all load combinations (A – working and B – storm), the safe transfer of the bearing forces into the building structure has to be verified. Wind load: q = 0.25 kN/m² hS/2 hG hS – The formwork is retracted (75 cm), or is in the concreting position. – Working on all platforms is permitted. – Storage of materials on the working platform is permitted. Wind load: q = 0.8 kN/m2 v = 129 km/h q = 1.1 kN/m2 v = 151 km/h q = 1.3 kN/m2 v = 164 km/h 450 Load combination B – storm ZO QO 1.80 Width of influence b Application height hG Formwork height hS Formwork weight max. 60 kg/m² Wind flow pressure q Aerodynamic wind factor cW = 1.3 v = 72 km/h – Formwork in concreting position – Working not permitted – Material can be left on the working platform. DU hS With higher wind loads, the permissible widths of influence must be reduced accordingly and the bearing forces determined through a static calculation. 600 Climbing System CB 240 ZZ Wind from the front Platform Dead load of the platform [kg/m²] Permissible live load* [kg/m²] Concreting platform 30 150 Intermediate platform (if required) 30 Working platform Wall side Guardrail side 50 Finishing platform 50 Wind direction Decisive load combinations [kg/m²] for calculating the bearing reactions Working A Storm B1 Storm B2 Storm B3 75 – – – 150 – – – – 300 300 – – – 200 200 133 133 – 75 37.5 – – – from the front from the front from the rear from the rear * Maximum permissible live load for operating condition “Working”. – Loads are evenly distributed. One-sided loading through cantilevered platform areas is not permitted. – Working: if loading several platform levels, only one level can be fully loaded – all other platform levels only up to 50%. – Storm: reduced load on the working platform for material left behind. 26 Wind from the rear Climbing System CB 240 Load tables and charts CB 240 Bearing reactions for permissible widths of influence (perm. b) Load case max. wind flow pressure q = 0.8 kN/m2 A B1 B2 B3 q = 1.1 kN/m2 q = 1.3 kN/m2 hS 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m perm. b 4.80 m 3.90 m 3.16 m 4.28 m 3.40 m 2.68 m 3.95 m 3.12 m 2.50 m QO 48.8 kN 44.2 kN 39.3 kN 44.0 kN 39.1 kN 34.0 kN 40.9 kN 36.3 kN 32.1 kN ZO 39.1 kN 38.4 kN 38.6 kN 35.1 kN 33.8 kN 33.1 kN 32.6 kN 31.2 kN 31.1 kN DU 34.1 kN 33.1 kN 32.8 kN 30.7 kN 29.2 kN 28.2 kN 28.5 kN 27.0 kN 26.5 kN QO 33.6 kN 31.8 kN 29.3 kN 30.3 kN 28.3 kN 25.5 kN 28.3 kN 26.3 kN 24.1 kN 69.4 kN ZO 46.9 kN 51.1 kN 58.3 kN 52.2 kN 56.8 kN 64.4 kN 54.6 kN 59.7 kN DU 32.6 kN 35.8 kN 41.8 kN 34.7 kN 38.5 kN 45.2 kN 35.5 kN 39.8 kN 48.2 kN QO 33.6 kN 37.2 kN 42.3 kN 34.1 kN 38.0 kN 43.3 kN 34.1 kN 38.2 kN 44.9 kN Z O* -14.3 kN -18.6 kN -22.4 kN -20.7 kN -24.3 kN -27.3 kN -23.9 kN -27.2 kN -30.7 kN ZZ 0.0 kN 6.3 kN 14.3 kN 4.9 kN 11.4 kN 19.5 kN 7.6 kN 14.0 kN 22.9 kN QO 27.4 kN 32.2 kN 38.3 kN 28.6 kN 33.7 kN 39.9 kN 29.0 kN 34.3 kN 41.8 kN Z O* -20.3 kN -22.3 kN -24.6 kN -26.1 kN -27.5 kN -29.2 kN -28.9 kN -30.1 kN -32.4 kN ZZ 9.4 kN 13.3 kN 19.7 kN 13.4 kN 17.5 kN 24.1 kN 15.4 kN 19.6 kN 27.1 kN *if ZO < 0, a compressive force then affects the anchorage. Intermediate values can be linear interpoliert. Maximum values are in bold. Load factor – wind loads: Load combination A = 1.0. Load Combination B = 0.9 The permissible widths of influence correspond to the type test. The specified bearing reactions differ to those of the type test because no differentiation between several operating conditions are given there. The type calculation according to current standards is being prepared. Formulae to calculate values for actual width of influence (actual b) QO (actual b) = ZO (actual b) = DU (actual b) = ZZ (actual b) = actual b perm. b actual b perm. b actual b perm. b actual b perm. b ∙ (QO (actual b) - 4.6 kN) + 4.6 kN ∙ (ZO (actual b) - 2.7 kN) + 2.7 kN ∙ (DU (perm. b) - 2.7 kN) + 2.7 kN ∙ ZZ (perm. b) Width of influence CB 240 Formwork height hS [m] 5.40 5.00 q = 0.8 kN/m2 4.50 q = 1.1 kN/m2 q = 1.3 kN/m2 4.00 3.50 3.00 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Width of influence perm. b [m] 27 CB Climbing System, BR Shaft Platform Climbing Bracket CB 240 Complete Climbing Scaffold Bracket CB 240. Complete with 2 x 017040 Screw-On Coupling AK 48, galv. 1 x 715977 Handrail Post CB 240 1 x 710222 Hex. Bolt ISO 4014 M16 x 80-8.8, galv. 1 x 070890 Nut ISO 7042 M16-8, galv. Note Delivery condition: handrail post attached to transportation bracket. 3214 400 440 2326 350 30 1100 440 50 Item no. Weight kg 051000 112,000 1800 228 2411 051020 33,900 Carriage CB 240 For mounting to the Climbing Bracket CB 240. Can be assembled in 2 positions: for platform beams with Girder GT 24 or timber 8 x 16 cm. Complete with 1 x 710944 Toothed Wedge, FW Note Spanner size SW 19. 625 90 1175 027180 051040 28 1,760 8,440 Accessories Ratchet Lever SW 19 Rack CB 240 250 165 / 245 SW 19 CB Climbing System, BR Shaft Platform Item no. Weight kg 051040 8,440 Rack CB 240 For Carriage CB 240. Complete with 1 x 018050 Pin Ø 16 x 65/86, galv. 1 x 018060 Cotter Pin 4/1, galv. 10 30 33 2240 73 64 0,930 Lifting Eye CB 240, galv. For mounting to the Climbing Bracket CB 240 when used as a working platform. Complete with 1 x 018050 Pin Ø 16 x 65/86, galv. 1 x 018060 Cotter Pin 4/1, galv. Safety instructions Load-bearing point: lifting capacity 700 kg. 140 051010 62 440 50 Complete with 2 x 017040 Screw-On Coupling AK 48, galv. 1 x 715977 Handrail Post CB 240 1 x 710222 Hex, Bolt ISO 4014 M16 x 80-8.8, galv. 1 x 070890 Nut ISO 7042 M16-8, galv. Note Delivery condition: handrail post attached to transportation bracket. 440 1521 3135 30 1025 Climbing Bracket CB 160 Complete Climbing Bracket CB 160. 630 79,000 1800 051100 228 1606 29 CB Climbing System, BR Shaft Platform Item no. Weight kg 051130 12,900 Adjusting Unit CB 160 For Climbing Bracket CB 160. Complete with 2 x 711084 Hex. Bolt ISO 4014 M20 x 150-8.8, galv. 2 x 781053 Nut ISO 7042 M20-8, galv. Note Spanner size SW 19. 237 SW 19 260 4,560 Platform Connection CB 160 For connection of platform decking to the Climbing Bracket CB 160 for use as working scaffold. Complete with 2 x 711078 Hex. Bolt ISO 4014 M20 x 130-8.8, galv. 2 x 781053 Nut ISO 7042 M20-8, galv. Safety instructions Load-bearing point: load capacity 500 kg. 235 55 70 051120 83 130 Strongback CB Strongback CB 270 Strongback CB 380 For mounting of system formwork to the Climbing Brackets CB 240 and CB 160. For formwork heights up to 5.40 m. Complete with 1 x 715936 Pin with Tension Sleeve 1 x 018060 Cotter Pin 4/1, galv. Safety instructions Load-bearing point: load capacity 1.9 t. 120 196 90 / 160 73,400 103,000 86 240 7 x 60 = 420 30 2730 / 3800 1430 N x 60= 480 / 1620 051060 051150 90 CB Climbing System, BR Shaft Platform Item no. Weight kg 051030 5,320 Height Adjusting Unit CB For height adjustment of VARIO GT 24 elements on the Strongback CB. Complete with 1 x 715936 Pin with Tension Sleeve 1 x 018060 Cotter Pin 4/1, galv. Note Spanner size SW 19. 240 max 182 82 Ø25 SW 19 60 051110 25,000 Adjustable Brace CB 164-224 For exact adjustment of the Strongback CB. 190 55 Complete with 2 x 715936 Pin with Tension Sleeve 2 x 018060 Cotter Pin 4/1, galv. 89 1580 min 1640 Complete with 1 x 715936 Pin with Tension Sleeve 1 x 018060 Cotter Pin 4/1, galv. Note Spanner size SW 19. SW 19 400 Ø25 415 180 Adapter TRIO-CB For the connection of TRIO panels to the Strongback CB. Horizontal or vertical use is possible. With built-in height adjustment. 100 13,500 82 051090 max 2240 31 CB Climbing System, BR Shaft Platform Item no. Weight kg 110059 2,620 Strongback Connector U 100-120 For the connection of VARIO GT 24 elements on the Strongback CB or Steel Waler SRU. 80 126 Ø16 107007 3,410 Tension Anchor Connector CB For securing against tilting due to wind loads using DW 15 Tie Rod. 80 - 145 76 284 120 Complete with 1 x 710219 Hex. Bolt ISO 4014 M16 x 100-8.8, galv. 1 x 070890 Nut ISO 7042 M16-8, galv. 60 400 M 16x100 64 30 DW 15 Wall Tension Connector For securing against tilting due to wind loads using DW 15 Tie Rod. Complete with 1 x 027170 Pin Ø 16 x 42, galv. 1 x 018060 Cotter Pin 4/1, galv. Ø26 180 4,100 100 107008 DW 15 50 255 100 026430 0,334 051260 3,300 331 Accessories Hex. Bolt ISO 4014 M24 x 70-10.9 Belt Connector CB For securing against tilting due to wind loads with Tension Belt. Complete with 1 x 710219 Bolt ISO 4014 M16 x 100-8.8, galv. 1 x 070890 Nut ISO 7042 M16-8, galv. 60 400 M 16x100 59 25 Ø20 32 CB Climbing System, BR Shaft Platform Belt Connector Wall For securing against tilting due to wind loads using a Tension Belt. 0 Item no. Weight kg 051270 1,620 12 Ø50 80 Ø25 100 026430 0,334 026430 0,334 12 Accessories Hex. Bolt 4014 M24 x 70-10.9 Hex. Bolt ISO 4014 M24 x 70-10.9 High tensile bolt for the anchoring of climbing systems. Note Spanner size SW 36. 70 SW 36 M24 051250 2,790 Tension Belt l = 5,70 m, 25 kN Technical data Permissible tension force 25.0 kN. 1000 min 1600 Complete with 4 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv. 4 x 070890 Nut ISO 7042 M16-8, galv. 232 M 16x130 16 86 965 Ø17 965 270 Platform Cantilever Beam CB For mounting finishing platforms. 249 80 17,000 150 051230 max 5700 80 1230 33 CB Climbing System, BR Shaft Platform Item no. Weight kg 051200 44,400 Platform Post CB 225 For mounting finishing platforms. For concreting heights up to 3.60 m. In combination with Post Extension CB 180 for concreting heights 3.60 to 5.40 m. Complete with 2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv. 2 x 070890 Nut ISO 7042 M16-8, galv. M 16x130 1000 Ø22 30 200 500 800 200 Ø17 2510 1750 710 200 30 86 051050 26,400 Post Extension CB 180 For mounting finishing platforms. In combination with Platform Post CB 225 for concreting heights from 3.60 m up to 5.40 m. Complete with 2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv. 2 x 070890 Nut ISO 7042 M16-8, galv. 85 1195 1300 2040 200 995 500 200 20 M 16x130 20 200 Ø17 34 CB Climbing System, BR Shaft Platform Item no. Weight kg 051190 17,400 Handrail Post CB 200 For assembling guardrails to the finishing platforms. Basic extension for Handrail Post CB 190 and 370. Complete with 2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv. 2 x 070890 Nut ISO 7042 M16-8, galv. 30 86 2225 80 280 440 500 1125 460 M 16x130 385 30 60 200 500 820 80 440 200 Ø17 30 Complete with 2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv. 2 x 070890 Nut ISO 7042 M16-8, galv. 200 M 16x130 440 80 80 440 2155 / 3955 N x 500 Ø9 1895 / 3695 80 Ø17 330 Handrail Post CB Handrail Post CB 190 Handrail Post CB 370 For assembling guardrails to the finishing platforms. Handrail Post CB 190 for concreting heights up to 3.60 m. Handrail Post CB 370 for concreting heights from 3.60 m up to 5.40 m. 200 19,000 34,600 30 051210 051220 35 CB Climbing System, BR Shaft Platform Item no. Weight kg 026415 026417 026411 026412 026413 026414 026419 026418 3,550 0,000 3,550 7,100 10,650 14,200 17,750 21,600 Scaffold Tube Steel Ø 48,3 x 3,2 Scaffold Tube Steel Ø 48.3 x 3.2, special lengths Cutting costs for scaffold tubes Scaffold Tube Steel Ø 48.3 x 3.2, l = 1.0 m Scaffold Tube Steel Ø 48.3 x 3.2, l = 2.0 m Scaffold Tube Steel Ø 48.3 x 3.2, l = 3.0 m Scaffold Tube Steel Ø 48.3 x 3.2, l = 4.0 m Scaffold Tube Steel Ø 48.3 x 3.2, l = 5.0 m Scaffold Tube Steel Ø 48.3 x 3.2, l = 6.0 m L 1000 2000 3000 4000 5000 6000 L Ø48,3x3,2 1,400 Swivel Coupling DK 48/48, galv. For Scaffold Tubes Ø 48 mm. Note Spanner size SW 19. (27) 017010 SW 19 017040 0,850 Screw-On Coupling AK 48, galv. For Scaffold Tubes Ø 48 mm. Note Spanner size SW 30, SW 19. ( 12) SW 30 SW 19 051160 0,894 Handrail Connector CB For mounting Scaffold Tubes Ø 48 mm to handrail posts. Note Spanner size SW 19. 60 SW 19 024140 36 0,033 Accessories F.H. Bolt DIN 603 M8 x 70 MU, galv. 95 9 Ø48 CB Climbing System, BR Shaft Platform Side Handrail Post For mounting handrails at the front side. Screwed to platform main beam. 40 1270 440 440 50 Item no. Weight kg 051610 6,940 Ø7 50 190 Ø9 100 340 0,014 051630 11,000 Accessories Hex. Wood Screw DIN 571 6 x 80, galv. End Handrail Post For assembling of handrails on larger cantilevers. Screwed to platform main beam. 440 1270 440 50 051640 Ø9 190 230 Ø7 110 30 051640 0,014 Accessories Hex. Wood Screw DIN 571 6 x 80, galv. 051640 0,014 Hex. Wood Screw DIN 571 6 x 80, galv. 120 50 280 Note Spanner size SW 10. 80 SW 10 37 CB Climbing System, BR Shaft Platform End Guardrail Frame 55 Clampable end guardrail frame for all PERI scaffold platforms and climbing systems. max 417 1360 1020 Item no. Weight kg 065066 15,100 560 051650 0,060 F. H. Bolt DIN 603 M6 x 180 MU, galv. With nut. 400 Note Spanner size SW 10. 17 180 24 M6 SW 10 710240 024360 108834 0,050 0,058 0,085 F. H. Bolt F. H. Bolt F. H. Bolt F. H. Bolt With nut. DIN DIN DIN DIN 603 603 603 603 M8, galv. M8 x 100 MU, galv. M8 x 125 MU, galv. M8 x 180 MU, galv. L 100 125 180 B 80 115 28 Note Spanner size SW 13. Ø17 / Ø 21 L B M6/M8 SW 10 / SW 13 0,723 Scaffold Mounting Ring M24, galv. Anchoring System M24. For anchoring climbing systems. Note Permissible load: see PERI product information. Ø73 029470 73 029560 38 0,535 Accessories Hex. Bolt ISO 4014 M24 x 120-10.9 CB Climbing System, BR Shaft Platform Item no. Weight kg 029560 0,535 Hex. Bolt ISO 4014 M24 x 120-10.9 High tensile bolt for anchoring climbing systems. Note Spanner size SW 36. 120 M24 SW 36 114158 1,030 Screw-On Cone-2 M24/DW 20, galv. Anchoring System M24. For anchoring of climbing systems. Note Permissible load: see PERI product information. Spanner size SW 36. 150 70 65 M 24 DW 20 SW 36 Accessories Threaded Anchor Plate DW 20 030860 0,801 030860 0,801 Threaded Anchor Plate DW 20 For the use with Tie Rod DW 20, B 20 or Screw-On Cone-2 M24/DW 20. For anchoring into the concrete. Note Permissible load: see PERI product information. Lost anchor component. 031220 1,010 Climbing Cone-2 M24/DW 15, galv. Anchoring System M24. For anchoring of climbing systems. Note Permissible load: see PERI product information. Spanner size SW 36. 100 030840 0,516 Accessories Threaded Anchor Plate DW 15 Tie Rod DW 15 special length Tie Rod B 15 special length Threaded Anchor Plate DW 15 For use with Tie Rod DW 15 or B 15. For anchoring in concrete. Note Permissible load: see PERI product information. Lost anchor component. 60 DW 15 Ø27 0,516 1,440 1,550 Ø6 Ø 80 030840 030030 030740 25 50 M 24 70 DW 15 SW 36 39 CB Climbing System, BR Shaft Platform Item no. Weight kg 030030 030050 1,440 0,000 Tie Rod DW 15 Tie Rod DW 15 special length Cutting Costs DW 15, B 15 Note Non-weldable! Observe construction approval! Technical data Permissible load 90 kN. DW 15 030740 030050 1,550 0,000 Tie Rod B 15 Tie Rod B 15 special length Cutting Costs DW 15, B 15 Note Weldable! Observe construction approval! Technical data Permissible load 85 kN. B 15 029270 0,331 Advancing Bolt M24, galv. For connecting Anchor System M24 if the formlining can be drilled through. Note Spanner size SW 19. 70 M 24 SW 19 029280 0,196 029280 0,196 Accessories Anchor Positioning Plate M24, galv. Anchor Positioning Plate M24, galv. For connecting Anchor System M24 if the formlining can be drilled through. 80 Ø7 Ø25 60 029440 40 0,005 Accessories Hex. Wood Screw DIN 571 6 x 20, galv. 6 CB Climbing System, BR Shaft Platform Item no. Weight kg 029440 0,005 Hex. Wood Screw DIN 571 6 x 20, galv. Note Spanner size SW 10. 20 SW 10 M6 026420 0,123 Anchor Positioning Stud M24, galv. For mounting Anchor System M24 if the plywood is not drilled through. Note Allen Key SW 14. 60 SW 14 Ø5 M 24 40 0,445 0,005 051410 11,700 Accessories Allen Key SW 14, long Wire nails 3 x 80 Ladder 180/6, galv. For accessing PERI formwork systems. Complete with 4 x 710224 Hex. Bolt ISO 4017 M12 x 40-8.8, galv. 4 x 710381 Nut ISO 7042 M12-8 450 027212 710312 5 x 298 = 1490 83 1960 Ladder 220/6, galv. For accessing PERI formwork systems. Complete with 4 x 710224 Hex. Bolt ISO 4017 M12 x 40-8.8, galv. 4 x 710381 Nut ISO 7042 M12-8 450 12,800 400 051420 3 x 298 = 894 2265 41 CB Climbing System, BR Shaft Platform Item no. Weight kg 109105 5,070 Ladder Base 30 adjustable, galv. For horizontally fixing ladders on the platform decking. 95 170 443 0 - 320 525 13,5 423 2,180 Ladder Base, galv. As bottom end piece and for preventing the ladders sliding on platform decking. 210 051460 405 0,684 Ladder Hook, galv. To adjust the lower ladder. Always use in pairs. Complete with 2 x 710266 Hex. Bolt ISO 4017 M12 x 25-8.8, galv. 2 x 710381 Nut ISO 7042 M12-8 330 103718 50 104132 051450 15,600 25,200 Ladder Safety Cage Ladder Safety Cage 75, galv. Ladder Safety Cage 150, galv. Safety cage for PERI access ladders. SW 18 Complete with 4 px 710266 Hex. Bolt ISO 4017 M12 x 25-8.8, galv. 4 x 701763 Clamping Plate Fl 25 x 10 x 90 42 704 750 / 1500 710 CB Climbing System, BR Shaft Platform Complete with 4 x 710266 Hex. Bolt ISO 4017 M12 x 25-8.8, galv. 4 x 710381 Nut ISO 7042 M12-8 830 Sliding Hatch Cover Non self-closing hatch for ladder access. Clear opening dimensions approx. 73 x 55 cm. 730 Item no. Weight kg 051430 37,900 550 103 1140 15,600 Hatch 55 x 60, foldable Self-closing hatchway for ladder access. Clear opening dimensions approx. 55 x 60 cm. 560 662 550 6 386 6 110608 60 600 820 710 027180 1,760 Ratchet Lever SW 19 For moving Carriage CB 240 and SKSF 240. Note Spanner size SW 19. 795 031480 2,460 Socket Spanner SW 36, chrome-plated For diverse uses. 510 43 CB Climbing System, BR Shaft Platform Item no. Weight kg 027212 0,445 Hex. Wrench Key SW 14, long To remove the Anchor Positioning Studs M24, M30 and M36. SW 14 230 020320 020510 020310 020520 21,800 27,400 32,800 38,600 Platform Beam BR Platform Beam BR U100 Platform Beam BR U120 Platform Beam BR U140 Platform Beam BR U160 As cross beam for shaft platforms. Note The specified item no. applies only to the 2 Platform Beam profiles. The required accessories are to be ordered separately. Permissible load: see PERI Design Tables. 700 700 700 52 020620 105401 020330 020600 0,561 2,210 12,100 6,740 020620 0,561 50 L 50 50 U 100 U 120 U 140 U 160 = = 700 115 273 Spacer por Platform Beam BR For Platform Beam BR. Complete with 1 x 710226 Hex. Bolt ISO 4014 M20 x 90-8.8, galv. 1 x 781053 Nut ISO 7042 M20-8, galv. Note Spacing; maximum 700 mm. Number according to length of the Platform Beam. Spanner size SW 30. M 20x90 SW 30 Technical data Load-bearing point: laod capacity 2.5 t. 245 Crane Eye BR 2.5 t As attachment point for moving climbing systems or Platform Beam BR. 135 2,210 Ø60 100 020620 44 0,561 123 Accessories Spacer for Platform Beam BR Crane Eye BR 2.5 t Folding Bearing Plate 25 Gravity Pivot Plate BR 52 105401 54 Accessories Spacer for Platform Beam BR 15 75 CB Climbing System, BR Shaft Platform Item no. Weight kg 020600 6,740 Gravity Pivot Plate BR For supporting the Platform Beam BR in wall box-outs. 2 pieces per platform beam. Complete with 1 x 781053 Nut ISO 7042 M20-8, galv. 1 x 710226 Hex. Bolt ISO 4014 M20 x 90-8.8, galv. Note Spanner size SW 30. Technical data Permissible load: see PERI product information 130 237 65 48 70 SW 30 75 125 437 108162 1,610 108162 1,610 Accessories Bearing Box BR Bearing Box BR To create wall box-outs for supporting with the Gravity Pivot Plate. 140 70 30 ° 210 M 24 170 029270 0,331 020330 12,100 52 45 80 M 20x90 Accessories Advancing Bolt M24, galv. Folding Bearing Plate 25 For supporting the Platform Beam BR with the Anchor System M24. 2 pieces per platform beam. Technical data Permissible load 25.0 kN. 258 162 234 50 026430 0,334 350 291 140 25 Accessories Hex. Bolt ISO 4014 M24 x 70-10.9 45 CB Climbing System, BR Shaft Platform Item no. Weight kg 024070 0,460 Hook Strap HB 24-100/120, galv. For mounting GT 24 Girders to Steel Walers SRZ and SRU, Profile U100 - U 120. M 8x70 152 (U 100) 82 162 (U 120) 024080 0,676 Hook Strap HB 24-140/160, galv. For mounting GT 24 Girders to Steel Walers SRZ and SRU, Profile U140 - U 160. M 8x70 172 (U 140) 82 182 (U 160) 030740 030050 030150 1,550 0,000 0,420 Tie Rod B 15 Tie Rod B 15 special length Cutting Costs DW 15, B 15 Tie Rod B 15 l = 0.30 m Note Weldable! Observe construction approval! Technical data Permissible load 85 kN. B 15 030370 1,560 Wingnut Pivot Plate DW 15, galv. With articulated, captive nut. Maximum angle of inclination of the anchors 8°. Technical data Permissible load 90 kN. 117 72 Ø10 030070 0,222 Hex. Nut DW 15 SW 30/50, galv. For anchoring with Tie Rod DW 15. Note Spanner size SW 30. Technical data Permissible load 90 kN. 50 SW 30 DW 15 46 CB Climbing System, BR Shaft Platform Item no. Weight kg 026230 1,010 Anchor Sleeve M24 For anchoring of platform systems. Note Permissible load: see Product information. 100 68 8 120 12 Ø 31 15 M 24 026240 026250 0,013 0,005 026240 0,013 Accessories Cone for Anchor Sleeve M24 Plug Ø 26 mm for Anchor Sleeve M24 Cone for Anchor Sleeve M24 Results in a concrete covering of 24 mm. 39 Ø31 50 24 026250 0,005 Plug Ø 26 mm for Anchor Sleeve M24 For closing Cones for Anchor Sleeve M24. Ø 26 Ø 23 27 026430 0,334 Hex. Bolt ISO 4014 M24 x 70-10.9 High strength bolt for anchoring climbing systems. Note Spanner size SW 36. 70 SW 36 M24 47 PERI International 42 19 20 22 32 44 34 18 38 11 52 6 21 01 PERI GmbH Rudolf-Diesel-Strasse 89264 Weissenhorn info @ peri.com www.peri.com 1 5 46 17 30 2 3 16 13 29 28 9 24 53 4 48 41 61 33 12 02 France PERI S.A.S. 77109 Meaux Cedex [email protected] www.peri.fr 09 Italy PERI S.p.A. 20060 Basiano [email protected] www.peri.it 16 Austria PERI Ges.mbH 3134 Nußdorf ob der Traisen offi[email protected] www.peri.at 23 Korea PERI (Korea) Ltd. Seoul 135-080 [email protected] www.perikorea.com 29 Slovania PERI Slowenien 2000 Maribor [email protected] www.peri.com 03 Switzerland PERI AG 8472 Ohringen [email protected] www.peri.ch 10 Japan PERI Japan K.K. Tokyo 103-0015 [email protected] www.perijapan.jp 17 Czech Republic PERI spol. s r.o. 252 42 Jesenice u Prahy [email protected] www.peri.cz 24 Portugal PERIcofragens Lda 2790-326 Queijas [email protected] www.peri.pt 30 Slovakia PERI spol. s r.o. 903 01 Senec [email protected] www.peri.sk 04 Spain PERI S.A. 28110 Algete - Madrid [email protected] www.peri.es 11 United Kingdom/Ireland PERI Ltd. Rugby, CV23 0AN [email protected] www.peri.ltd.uk 18 Denmark PERI Danmark A/S 2670 Greve [email protected] www.peri.dk 25 Argentina PERI S.A. B1625GPA Escobar – Bs. As. [email protected] www.peri.com.ar 31 Australia PERI Australia Pty. Ltd. Glendenning NSW 2761 [email protected] www.periaus.com.au 05 Belgium/Luxembourg N.V. PERI S.A. 1840 Londerzeel [email protected] www.peri.be 12 Turkey PERI Kalıp ve İskeleleri Esenyurt / İstanbul 34510 [email protected] www.peri.com.tr 19 Finland PERI Suomi Ltd. Oy 05460 Hyvinkää info@perisuomi.fi www.perisuomi.fi 32 Estonia PERI AS 76406 Saku vald Harjumaa [email protected] www.peri.ee 06 Netherlands PERI B.V. 5480 AH-Schijndel [email protected] www.peri.nl 13 Hungary PERI Kft.. 1181 Budapest [email protected] www.peri.hu 20 Norway PERI Norge AS 3036 Drammen [email protected] www.peri.no 26 Brazil PERI Formas e Escoramentos Ltda. Vargem Grande Paulista São Paulo [email protected] www.peribrasil.com.br 14 Malaysia 07 USA PERI Formwork Malaysia PERI Formwork Systems, Inc. Sdn. Bhd. Elkridge, MD 21075 43300 Seri Kembangan, [email protected] Selangor Darul Ehsan www.peri-usa.com [email protected] www.perimalaysia.com 08 Indonesia PT Beton Perkasa Wijaksana 15 Singapore Jakarta 10210 PERI ASIA Pte. Ltd [email protected] Singapore 387355 www.peri.com [email protected] www.periasia.com 48 21 Poland PERI Polska Sp. z o.o. 05-860 Płochocin [email protected] www.peri.pl.pl 22 Sweden PERIform Sverige AB 30013 Halmstad [email protected] www.periform.se 27 Chile PERI Chile Ltda. Colina, Santiago de Chile [email protected] www.peri.cl 28 Romania PERI România SRL 077015 Baloteşti [email protected] www.peri.ro 33 Greece PERI Hellas Ltd. 194 00 Koropi [email protected] www.perihellas.gr 34 Latvia PERI SIA 2118 Salaspils novads, Rigas rajons [email protected] www.peri-latvija.lv 35 United Arab Emirates PERI (L.L.C.) Dubai [email protected] www.perime.com 44 36 43 7 50 37 40 57 56 39 60 49 47 23 51 10 54 59 58 35 66 55 65 63 14 15 8 26 62 64 27 31 45 25 42 Iceland 36 Canada Armar ehf. PERI Formwork Systems, Inc. 220 Hafnarfjörður Bolton, ON – L7E 1K1 www.armar.is [email protected] www.peri.ca 43 Kazakhstan TOO PERI Kazakhstan 37 Lebanon 050014 Almaty Lebanon Representative Office [email protected] Jdeideh www.peri.kz [email protected] www.peri.de 44 Russian Federation OOO PERI 38 Lithuania 142407, Noginsk District PERI UAB [email protected] 02300 Vilnius www.peri.ru [email protected] www.peri.lt 45 South Africa Wiehahn Formwork and 39 Morocco Scaffolding (Pty) Ltd. PERI S.A. 7600 Stellenbosch Tanger [email protected] [email protected] www.wiehahn.co.za www.peri.com 40 Israel PERI Formwork Engineering Ltd Petach Tikva, 49002 [email protected] www.peri.co.il 41 Bulgaria PERI Bulgaria EOOD 1839 Sofia [email protected] www.peri.bg 46 Ukraine TOW PERI Ukraina 07400 Brovary [email protected] www.peri.ua 47 Egypt Egypt Branch Office 11361 Heliopolis / Cairo [email protected] www.peri.com.eg 48 Serbia PERI Oplate d.o.o. 11272 Dobanovci offi[email protected] www.peri.rs 49 Mexico PERI Cimbras y Andamios, S.A. de C.V. Estado de México, [email protected] www.peri.com.mx 50 Azerbaijan PERI Kalıp ve İskeleleri Baku [email protected] www.peri.com.tr 51 Turkmenistan PERI Kalıp ve İskeleleri Aşgabat [email protected] www.peri.com.tr 52 Belorussia PERI Belarus 220030 Minsk [email protected] www.peri.com 53 Croatia PERI oplate i skele d.o.o. 10 250 Donji Stupnik/ Zagreb [email protected] www.peri.com.hr 54 Iran PERI GmbH Iran Branch Office Tehran [email protected] www.peri.ir 55 India PERI (India) Pvt Ltd Mumbai – 400064 [email protected] www.peri.in 62 Peru PERI Peruana SAC Chorrillos, Lima [email protected] www.peri.com.pe 56 Jordan PERI GmbH - Jordan 11947 Amman [email protected] www.peri.com 63 Panama PERI Panama Inc. 0832-00155 Panama City [email protected] www.peri.com.pa 57 Kuwait PERI Kuwait 13011 Kuwait [email protected] www.peri.com 64 Angola PERIcofragens, Lda. Luanda [email protected] www.peri.pt 58 Saudi Arabia PERI Engineering Division of Jamjoom Consult Saudi Arabia 21463 Jeddah [email protected] www.peri.com.sa 65 Nigeria Heights Access Nigeria Ltd. Victoria Island, Lagos [email protected] www. heightsaccessng.com 59 Qatar PERI Qatar LLC P.O.Box: 31295 - Doha [email protected] www.periqatar.com 66 Oman PERI (L.L.C.) Muscat [email protected] www.perime.com 60 Algeria Société PERI S.A.S. Kouba - Alger [email protected] www.peri.fr 61 Albania PERI Sh.p.k. Tirane [email protected] www.peri.com.tr 49 Wall Formwork Panel Formwork Girder Formwork Circular Formwork Facade Formwork Brace Frame Climbing Systems Climbing Scaffold Self-Climbing System Climbing Protection Panel Platform Systems Column Formwork Square Rectangular Circular Scaffold, Stairways, Working Platforms Facade Scaffold Working Platform Weather Protection Roof Stairway Access Slab Formwork Panel Formwork Beam Grid Formwork Girder Formwork Slab Table Beam Formwork Bridge and Tunnel Formwork Cantilevered Parapet Carriage Cantilevered Parapet Platform Engineer’s Construction Kit Shoring Systems Steel Slab Props Aluminium Slab Props Tower Systems Heavy-Duty Props Services Formwork Assembly Cleaning / Repairs Formwork Planning Software Statics Special Constructions Additional Systems Safety Systems Plywood Formwork Girders Stopend Systems Pallets Transportation Containers PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel. +49 (0)7309.950-0 Fax +49 (0)7309.951-0 [email protected] www.peri.com D e 01/2011 5ma Art.-Nr.: 790187 © Copyright by PERI GmbH PERI Product Range
Similar documents
MULTIPROP Aluminium Post Shores – low weight with high
Edition 01/2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel. +49 (0)7309.950 - 0 Fax +49 (0)7309.951- 0 [email protected] www.peri.com
More informationSKYDECK The proven, fast slab formwork made of high
system provides a high level of safety
More informationHD 200 Heavy-Duty Prop Heavy-duty support system with 200
for enabling work on the support scaffolding and abutments to be carried out
More informationGRV Circular Formwork Tie-less Circular Formwork with
Edition 08/2009 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)73 09.9 50-0 Fax +49 (0)73 09.9 51-0 [email protected] www.peri.de
More informationSKYDECK Panel Slab Formwork
the person in charge has given the goahead for striking to take place. 2. Anchoring is to take place only if the anchorage has sufficient concrete strength. 3. During striking, do not tear off the f...
More information