albar database of ngo activities - Afghanistan Digital Collections

Transcription

albar database of ngo activities - Afghanistan Digital Collections
ALBAR
Agency Coordinating Body for Afghan Relief
*lb
DATABASE OF NGO ACTIVITIES
(Sixth Edition)
Volume I: Location - Province /District
October, 1993
2 Rehman Baba Road
Univ P. O. BOX 1084
University Town
Peshawar
N.W.F.P
Pakistan
Tel: (052 1) 44392, 40839, 45347
Fax: (0521) 840471
INTRODUCTION
I am very pleased to be able to make available the ACBAR Database for 1993. This is the sixth year that ACBAR has compiled a report on
NGO activities.
This publication, which stretches to some 1200 pages in total, has taken considerable time and effort to prepare. It provides a compilation
of all the activities (projects) as reported by some 240 mainly Non -Governmental Organizations (NGOs) working for Afghanistan. Whilst
the majority of these agencies are Peshawar based, agency activities are also reported for those located in Islamabad, Quetta and inside
Afghanistan.
The information is as reported by agencies and ACBAR has no ability to confirm the information provided. However, I am confident that
this publication provides as accurate a picture as possible of activities related to Afghanistan and refugees over the period to 1993.
As a change from previous editions the main part of the report covers projects that are: completed, ongoing, discontinued or approved
by donors. Proposed and surveyed projects, that have not as yet been approved for funding by donors, are listed in the Appendix.
Refugee programmes, for the first time, are presented in their own volume.
The Database is presented in four separate volumes:
Volume I Location - Province /District
Volume II Sector
Volume III Agency
Volume IV Refugees
I would like to express my gratitude to the staff of agencies for providing the data. However, most of all I should thank. Mohmmad
Ismail Shakir, Khalil- ur- Rehman, Zakir, Shafiq, Shenky Zahery and Sayed Mohammad, staff of the ACBAR Programme Office, for all their
considerable efforts in putting this together. They have spent considerable time, including their own free time, to ensure that this
publication is well presented and ready within a reasonable period.
We hope that the various users, the agencies themselves, the donor community, the Afghan Government and Provincial authorities, as well
as the Pakistani authorities and all others will find the data informative, useful and of significant value.
Charles MacFadden
Executive Director
5 September 1993.
INDEX.
PROVINCE DISTRICT
.ÀGE.
BADAKHSH Baharak
1
Darwaz
Eshkashem
Faizabad.
2
2
2
Jurm
Keran Monjan
Keshem
Khwahan
Ragh
Shar Bozurg
3
5
-
7
Sheghnan.
Wakhan.
Zebak
BADGHIS
7
8
8
Ghormach
Jawand
Kushk Kohna
Morghab
Qades
Qala Nau
8
8
8
9
9
-
BAGHLAN Anderab
9
10
Baghian
Burka
Dahrq Ghori
Dos hi
Khen jan.
Khost Fring
Nahrein.
Puli Khumri
Tala-Barfak.
11
.
11
11
12
12
13
13
14
PROVINC,
BALKH
14
15
15
Balkh
Char Bolak
Char Kant
ChemtaL
Dehdadi
Dowlatabad.
16
16
'
16
16
Keshende
Mazar Sharif
Nahr Shahi
Sholgera
Shortepa
BAMYAN
20
Bamyan
Kahmard.
Panjab
Saighan.
Shibar
Warns
Yakowlang
FARAH
17
18
18
19
Anar Dara
Bakwa
Bala Balouk.
Farah.
Farsi
Gulistan.
Khak Safid.
Lash Jaween
Purchaman
Qala Kah
Shindand
21
21
22
22
Z_3
,
23
24
24
25
25
26
26
27
27
29
29
30
PROVINCE : 1)15TRICT
HELMAND Baghran
Bust
Deshu
Garmser
Ka jaki
Musa Qala
;Nad -Ali.
Nahr Saraj.
Nauzad.
Nawae Barak.
Reg
Sarban Qala
Washare
HERAT
Adreskan
Chesht Sitar
EnjeeL
Ghoryan
Gozarah.
Gulran
Herat
Karokh
Kohsan
Kushk
Obey
Pashtun Zar
Zenda jan:
JAWZJAN
Aqcha
Balkhab
Faizabad ..............
Khamyab
Khanaqah
Kohistanat
Mardyan
Menga jek.
Qargin.
Sang Charak.
Sari PuL
Sheberghan.
57
57
58
58
59
60
60
61
62
62
63
63
63
-
63
64
65
66
66
68
-
58
68
68
68
69
69
69
70
70
70
70
70
70
71
PROVINCE DISTRICT
KABUL
Bagrami
Charasyab
Chardehi
Deh Sabz
Istalef
Kabul
Kalakan.
Khake Jabar
Mir Bachakot
Paghman.
Qara Bagh
Sarobi
Shakar Dara
KANDAHAR Arghandab
Arghistan.
Daman.
Dand.
Ghorak.
Kandahar
Khakraiz
Maruf
Maywand.
Nesh.
Panjwai
Reg
Shahwali Kot
Shega.
Shorabak
Spin Boldak
KAPISA
Alasay
Kapisa
Kohband.
Kohistan.
Nejrab
Panjshare
Panjsharel
Panjshare2
71
72
73
73
73
73
75
75
75
76
77
77
78
79
80
80
81
83
83
84
84
85
86
86
88
89
89
90
91
91
92
93
94
95
96
PROVINCE:: DISTRICT
KUNAR
KUNDUZ
Bar Kunar
Barg Matal
Chaghasarai.
Chapa Dara.
Chawki
Dongom
Kamdesh.
Khas Kunar
Narang
Naray
Nour Gul
Pech.
Sirkanay
Aliabad.
Archi
Char Dara
Hazrat Imam.
Khanabad
Kunduz
Qala Zal
LAGHMAN Alingar
Alishing
Dawlatsha
Mehterlam
Nooristan
Qarghaie
LOGAR
Azra
Baraki.
Charkh
Khoshi.
Mohd Agha
Puli Alam
PACE
98
100
100
102
103
105
106
106
108
110
111
111
115
116
117
117
118
119
122
123
123
125
127
127
1 29
130
132
133
136
138
14()
141
PROVINCE DISTRICT
NANGARHA Achin
Bati Kot
Behsud.
Chaparhar
Darae Noor
Deh Baia
Dorbaba
Goshta
Hesarak.
Jalalabad.
Kama
Khogiani
Kouz Konar
Lalpur
Mohma.nd Dara
Naziyan
Pachier/Agam.
Rodat
Sherzad.
Shinwar
Surkh Rod
NIMROZ
Chakhansur
Char Borjak
Kang/Kurki
Khosh Rod
Zaranj.
ORUZGAN Ajrestan
Chorah
Dai Kundi
Deh Raud
Gezab
Kajran
Oruzgan
Shahristan
Tirin
145
146
148
150
151
153
154
154
155
157
163
164
168
169
170
172
173
174
176
178
180
183
184
184
184
184
185
185
185
186
186
186
187
188
188
......................
.......................
......................
.......................
ROW.
PAKTEKA
IST
...........................
............................
........... ............
............................
189
189
190
190
Barmal
Dila
Gayan
Gomal
Jani Khel
Katawaz
Mata Khel
Neka
Omna
Sarhawza
Sarobi
Sharan.
Sultan Khan.
191
191
192
193
193
193
193
194
195
196
201
201
201
Urgoun
Wazakhwa
Wol-Mamay
Yusuf KheL
Zelok.
PAKTIA
202
Bak.
Chamkani.
Dand Patan.
Dara Darang
Gardaiz
Gurbuz.
Hasan KheL
Jadran
Jap.
Ja ji Maidan.
Janí KheL
Khost
LajmangaL
Mandozi.
Musa Khel
Nader Shah.
Qalandar
Sabari.
Sayed Karam
ShamaL
Shawak.
Sperah.
Tani
Trayzai.
Wolma
Zormat.
.
.
203
203
205
206
206
207
209
209
210
212
212
213
220
221
223
224
225
225
227
228
229
229
230
231
233
233
ASRICT
.....
...................... ....
... ....
.
.
.. _...
PARWAN
Bagram.
Charikar
Ghorband.
Jabul Sara}
Kohe Safi
Salang
Shekh Ali.
Shinwari
Surkh Parsa
235
235
236
237
239
239
240
240
241
SAMANGAN
Dara Souf
Hazrat Sultan.
242
242
Kaldar
Khulm
Roy Doab
Samangan
242
243
TAKHAR
Bangi.
Chah Ab
ChaL
Darqad.
Eshkamesh
Farkhar
Kalafgan
Khwajaghar
Rustaq
Taloqan
Warsaj.
Yangi Qala
WARDAK
Chak
Day Mirdad
Gardandewal
Jaghatu
Jairez.
Markaz Bes
Maydan Shar
Nerkh
Syed. Abad.
2143
244
245
245
246
246
246
248
248
249
250
253
253
254
257
257
258
262
263
264
265
266
:PROVX.,ËtiCE.'
DISTRICT
ZABUL
Arghandab
Atghar
Dai Chopan
Jaldak
Mizan
Qalat
Shah Joy
Sliemalzai
Shinkai
(PROPOSED & SURVYED ACTIVITIES)
P.:
270
270
271
272
272
272
273
274
214
276
FIRST REFCoRT Sl7RTED BY TCAT I OM
FUNDED
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
- --BY --
DURATION
Begin - -End
:ACTIVITY
DESCRIPTION>
Baharak
Badakshan
A -AID
MGRIC:
Fruit Trees
Baharak
Completed
DCP
5 92
4 93
Tree trials
A -AID
N RIC:
Research
Baharak
Completed
DCP
5 92
4 93
Wheat variety & fertilizer trials.
A -AID
AGRIC:
Research
Baharak
Ongoing
DCP
5 93
4 94
Wheat variety & fertilizer trials.
A -AID
4ATER:
Canal
Baharak
Completed
ODA
8 92 11 92
ARA
ERIC:
Fruit Trees
Center
;ngoing
ARCON
10 91 -- --
ARCON
lDNST:
Pub.Building
Baharak
Ongoing
ARCON
--
ATC
!EWES:
Clearance
Baharak
Completed
UNOCHA
10 92 10 92
Destroyed 54 devices. cleared 4395 59m agri.land.
AVICBN
BALM: Vaccination
41 villages
Ongoing
EC /UNICF
-- -- -- --
2 teams
CBR
TONST:
Center
Approved
WHO
-- 93 -- --
Compreheeeive health center 417 rooms).
MSH
RALTH: Distrot Hoop
Baharak
Ongoing
AID
9 91 -- --
2 MD / 2 nurses / 1 nurse helper / 1 admin assistant / 1 pharmacist 13 medical tech
/ 1 BHW / 1 lab tech (malaria) /
1 anaesthesia tech assistant / 1 lab tech assistant / 1 dental tech assistant
/ 1 dispenser / i X-ray tech assistant /
in- patient beds / surgery / lab / dental i pharmacy
X-ray & immunization.
MSH
WALTH: Basic Post
Mirdad
Ongoing
AID
8 88 -- --
2 BHWs
MSH
ilALTH: MCH
Mirdad
Ongoing
AID
12 92 -- --
Pub.Building
MSH
MATH: Vaccination
RAC
AGRIr:
Plant Protec
PRB
CONST:
Pub.Building
RAH
CONST:
Pub.Building
ACBAR
Baharak
Rehabilitation of Dashte Earaq canal.
Nurseries of 400,000 fruit trees (apple ! quince i walnut ! pear) - 20 ,ieribs,
Health unit
4 vaccinators
1 MD, 2 Diploma Nurses -Women I children under
5 care. health education and Dai training programs.
Ongoing
AID /UN
Completed
UNDP
City
Completed
DCP
7 91 it 91
Building of girls secondary school with 8 rooms - cement & other local materials.
Center
Ongoing
ICMC
4 92 -
Girl's High school (15 rooms).
7 92 -- --
12 90
8 91
13 vaccinators (8 additional vaccinators planned to be hired).
1 Cold Chain supervisor. 2 Cold Chain technicians
operate under an MD doctor supervision in Baharak
district, covering about 236 villages in 10 districts in Badakshan
province.
Target groups: children 0 -2 years, women 5 -45 years.
Application of 750 liter Peels in 12 villages.
--
DATABASE OF NGO ACTIVITIES
6TH EDITION
Page:
1
A6actrep Date: 26/08/93
ACTIVITY
- -VILLL.AGE(S) -_ -_
SECTOR
AGENCY
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
Baharak
Badakshan
DESCRIPTION>
Cleaning Ehair Abad canal / construction of intake & retaining wall.
RAFA
WATER:
Canal
Khair Abad
Ongoing
DCP
5.93 -- --
RAFA
WATER:
Canal
--
Completed
ARCON
4 92
SCA
HEALTH: Basic Clinic
Wordaj
Ongoing
SCA
7 90 -- --
3 mid -level as, 1 lab tech.
SCA
HEALTH: Basic Clinic
Bazaar Baharak
Ongoing
SCA
7 90 -- --
3 mid -level HWs
AO
EDUCAT: Primary
ongoing
AID
3 88 -- --
11 schools in Bhusdarab, Dasht Farakb. Baharak(2), Pichoch,
familiei.
Rehabilitation of 2 canals - total length 2 km - irrigate 300 hectares ofiand - benefit 1000
9 92
Maghiab, Patkhwab, Mahmodan. Bosht Razdiu & Dinha Razdio
villages.
Darwaz
Badakshan
MSH
HEALTH: Basic Post
RAFA
CONST:
Road
Sangarleech
Ongoing
AID
6 88 -- --
3 BMWs
Diff. villages
Completed
ARCON
3 92 12 92
Pedisterial road construction 124 km.
Eshkashem
Badakshan
2 MD.
IO 92 -- --
MSH
HEALTH: MCH
Eshkashem
Ongoing
AID
MSH
HEALTH: Vaccination
Eshkashem
Ongoing
AID /UN
7 92 -- --
Women r children under 5 care: health education and Dai training program.
COVERED FROM BAHARAK VSF. SEE BAHARAK LISTING FOR DETAILS.
Faizabad
Badakshan
A-AID
AGRIC:
Crop Product
Somdarah
Completed
DCP
5 92
4 93
Seed multiplication.
A -AID
AGRIC:
Crop Product
Faizabad
Ongoing
DCP
5 93
4 94
improved seed stock replerishment.
A -AID
AGRIC:
Fruit Trees
Argu
Ongoing
DCP
5 93
4 94
Tree trials
A -AID
CONST:
Bridge
Nawabad
Completed
ODA
10 92 l
A -AID
CONST:
Bridge
Somdarah
Completed
ODA
9 92 11 92
A -AID
CONST:
Bridge
Dell Magas
Completed
ODA
10 92 11 92
A -AID
WATER:
Canal
Dahgan Khana
Completed
ODA
AVICEN
HEALTH: Vaccination
44 villages
Ongoing
EC /UNICF
--
CBR
CONST:
CCSC
-- 92 -- --
ACBAR
Road
5 93
Replacement of foot bridge.
92
Construction of vehicle bridge.
Replacement of foot bridge.
Rehabilitation of canal.
6 93
1 team - 2 vaccinators
--
Survey of road from Keshim to Faizabad.
DATABASE OF NGO ACTIVITIES
Page:
2
A6actrep Date: 26/08/93
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
Badakshan
ARO
WATER:
MSH
- - -- VILLAGE(S) - - --
Structure
HEALTH: Basic Clinic
MSH
HEALTH: Basic Post
MSH
HEALTH: MCH
MSH
HEALTH: Vaccination
MSH
- --BY --
DURATION
Begin- -End
<ACTIVITY
Faizabad
HEALTH: Compr.Clinic
MSH
FUNDED
-- STATUS --
HEALTH: Other
Tai Nairang Paya.
Deh Bala
Sar Ghaia
Hafiz Mughul
Faizabad
Faizabad
Completed
CIDA
Ongoing
AID
Ongoing
AID
--.89 -- 90
Reconstruction of diversion dam.
1 91 -- --
1 MD,
8 89 -- --
AID
11 88 -- --
5 BHWs
Ongoing
AID
10 92 -- --
2 MD.
Ongoing
AID /UN
AID
1 MED. TECH..
4 MED. TECH,
Ongoing
Ongoing
DESCRIPTION>
i LAB. TSCH. ASST.
1 NURSE.
4 ROOMS. 5 BEDS
1 LAB. TECH. ASST.
3 ROOMS
Women /children under 5 care: health education and Dai training
program.
7 92 -- --
COVERED FROM BAHARAK VSF.
9 90 -- --
Regional Health Administration (RHA)
SEE BAHARAA LISTING FOR DETAILS.
administrative center and depot for issue of supplies and salaries and
monitoring and supervision of BHWs and health facilities.
NAC
CONST:
NAC
EDUCAT: Other
NAC
WATER:
PRB
CORSI:
PRB
PRB
SCA
SCA
SCA
SCA
SCA
UNO
CONST:
CONST:
Canal
Pub.Buïlding
Pub.Building
Pub.Building
EDUCAT: Primary
EDUCAT: Primary
HEALTH: Basic Clinic
HEALTH: Basic Clinic
HEALTH: Basic Clinic
Faizabad
Faizabad
Darayem
Argu
Sang More
Gazan
Rabat
Yaftal
Shahri Jadeed
Yaftal Uìya
Shahr Wandat (Argu
EDUCAT: Primary
Badakshan
A -AID
Pub.Building
AGRIC:
Ongoing
NAC
5 93
7 93
Repairing of primary school.
Completed
NAC
12 92
5 93
School desks & chair manufacturing.
Completed
NAC
11'91.10 92
Completed
DCP
7 91 12 92
Ongoing
ARCON
I0 92
9 93
BHC (14 rooms) material - brick / steel bar & concrete.
Ongoing
UNDP /WFP
10 92
8 93
BBC clinic 6 rooms / 2 bath rooms - stone i steel bar & cement.
Ongoing
SCA
Ongoing
Rehabilitation of it km canal - irrigate 2,000 jeribs & benefit 500 families.
Boys primary school with 6 rooms / 2 administration rooms / material
- atone / cement & wood beam.
8 86 -- --
10 schools / 52 teachers
SCA
B 86 -- --
6 schools
Ongoing
SCA
2 87 -- --
4 mid -level HWs / 1 Nurse
Ongoing
SCA
Ongoing
SCA
IO 92 -- --
Ongoing
AID
6 87 -- --
i
1.155 students
42 teachers / 1,115 students
9 mid -level HWs. 1 lab tech.. 1 dental tech.
5 mid -level HWs.
9 schools in Deh .M.ulayan, Munji,
Pamachian, Hafiz Mughal, Anardara, Toryab Mughul, Daydai, Shamgarchi & Kazaq.
Jurm
Crop Product
Jurm
Ongoing
DCP
5 93
4 94
Redistribution via markets of improved seed.
ACBAR
DATABASE OF NGO ACTIVITIES
6TH EDITION r
Page:
3
A6actrep Date: 26/08/93
ACTIVITY
AGENCY
SECTOR
Badakshan
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jurm
A -AID
AGRIC:
Crop Product
Jurm
Completed
DCP
5.92
4 93
Seed multiplication.
A -AID
AGRIC:
Fruit Trees
Jurm
Completed
DC?
5 92
4 93
Tree trials
A -AID
AGRIC:
Research
Jurm
Completed
DCP
5 92
4 93
Wheat variety & fertilizer trials.
A -AID
CONST:
Bridge
Hesarak
Ongoing
ODA
5 93
7 93
Replacement of foot bridge.
A -AID
CONST:
Bridge
Ali Mughul
Completed
ODA
A -AID
CONST:
Bridge
Hamdarreh
Ongoing
ODA
A -AID
CONST:
Bridge
Pari Khana
Completed
ODA
A -AID
CONST:
Bridge
Ehostak
Ongoing
ODA
5 93
A -AID
WATER:
Canal
Ehostak
Completed
ODA
7 92 11 92
ATC
MINES:
Clearance
Jurm
Completed
UNOCHA
11 92 12 92
Destroyed 1903 devices, cleared 37672 Sqm agri.land / village.
AVICEN
HEALTH: Vaccination
36 villages
Ongoing
EC /UNICF
--
--
1 team - 2 vaccinators
AVICEN
HEALTH: Other
Jurm
Ongoing
UNICEF
--
1 VSF / 1 CC technician & i supervisor
MSH
HEALTH: Coapr.Clinic
Jurm
Ongoing
AID
9 91 -- --
1 MD, 1 NURSE, 2 MED, TECH., 1 LAB. TECH. ASST.
MSH
HEALTH: Basic Post
Deh Parah
Ongoing
AID
9 91 -- --
1 BHW
MSH
HEALTH: MCH
Jurm
Ongoing
AID
7 91 -- --
1 MD, 2 Med. Tech., 3 Rooms; women / children under 5 care;
MSH
HEALTH: MCH
Shahran Kash
Ongoing
AID
1 93 -- --
1 MD. 2 Nurses -Women I children under 5 care;
MSH
HEALTH: Vaccination
Jurm
Ongoing
AID /UN
7 92 -- --
COVERED FEOM BAHARAK VSF.
NAC
AGRIC:
Plant Protec
Completed
UNDP
MAC
CONST:
Pub.Building
Jura
Ongoing
NAC
CONST:
Pub.Building
Center
PRB
CONST:
Pub.Building
PRB
WATER:
Canal
1ACBAR
.
10 92 11 92
5 93
Repairing of bridge (vehicle
7 93
Construction of vahicle bridge.
10 92 11 92
Repairing of bridge (vehicle).
7 93
Replacement of vehicle bridge.
Rehabilitation of canal.
LABORATORYi
health education and Dai training programs.
:,earth education and Dai training program.
SEE aA AF4E LISTING FOR DETAILS.
12 90
9 91
Application of 2.825 liter Decis in 20 villages.
NAC
5 93
7 93
Repairing of high school & construction of latrines.
Completed
NAC
B 91
2 92
Minor repair of a building with 2 rooms.
City
Completed
DCP
7 91 11 91
Building of girls secondary school with 9 rooms - cement A other local materials.
Sajad
Completed
DCP
7 91
Rehabilitation of 12 km Sajad canal & reconstruction of its intake - irrigate 700 hectares.
9 91
DATABASE OF NGO ACTIVITIES
Page:
4
A6actrep Date: 26/08/93
6TH EDITION
1
ACTIVITY
AGENCY
SECTOR
WATER:
RAFA
WATER:
RAFA
WATER:
RAFA
WATER:
RAFA
SCA
SCA
MSH
MSH
MSH
CBR
CBR
Nawa
Pub.Building
Eeran
Anjoman
HEALTH: Basic post
Iskazar
HEALTH: Vaccination
DCP
5 93 -- --
Cleaning Sultan canal & const :action of intake.
Ongoing
DCP
5 93 -- --
Cleaning of Nawa canal & construction of intake.
SCA
0 92 -- 92
3 crops variety testing trials
Ongoing.
Ongoing
Ongoing
9 92
Rehabilitation of 2 canals - total length 2.5 km - irrigate 400 hectares of land
Cleaning of Tajikan canal & ccnstruction of intake.
of wheat, barleay & triticale.
SCA
0 93 -- 93
Provi ',n.of 0.14 MT agrochemicals.
SCA
0 92 -- 92
Provision of 0. 27 MT agrochemicals.
SCA
0 93 -- 93
Agriculture survey on 80 villages.
CCA
3 91 -- --
8 schools 145 teacheres ; 975 students
SCa
7 90 -- --
1 mid -level HW,
8 90 -- --
8 schools in Khushk, Hazrat Sahed,
AID
- benefit 1000 families.
1 lab tech., i pharmacist
Farghana, Reranomanjan, Anjuman, Jurm(2) & zarnowz villages.
Keranomonjan
Approved
EG /UNICF
.
WHO
-- 93 -- --
1 team - 2 vaccinators
-- 93 -- --
Basic health center concrete
1 doctor assistant - 3 rooms.
Ongoing
AID
B 90 -- --
Ongoing
AID
8 90 -- --
2 BHWe
Ongoing
AID/UN
7 92 -- --
COVERED FROM BAHARAE VSF.
4 rooms).
SEE BAHAR.S LISTING FOR DETAILS.
KeaheIn
HEALTH: Vaccination
CONST:
te 100 hectares of land - benefits 120 fami'i,s.
Ongoing
Approved
HEALTH: Basic Clinic
CONST:
DESCRIPTION>
Reran Manjan
HEALTH: Vaccination
CONST:
Re^Rbilitaton cf 12 km canal - irr
4 93 -- --
Ongoing
--
91
DC?
Ongoing
Complete?
Center
:
4 92
Ongoing
Jure
12 69
ARCCON
Complu ed
EDUCAT: Primary
Bar.iakehan
AVICEN
Moghulan
Other
Badakshan
CBR
Tajikan
HEALTH: Basic Clinic
UNO
AVICEN
Canal
EDUCAT: Primary
SCA
Begin- -End
..DF.
Completed
Plant Protec
AGRIC:
SCA
Canal
Plant Prate^
AGRIC:
SCA
Completed
Research
AGRIC:
SCA
Canal
Canal
AGRIC:
DURATION
- --BY --
Jurm
Canal
WATER:
FUNDED
-- STATUS --
<ACTIVITY
Badakshan
RAFA
- - --41 LLAGE(S) - - --
Pub.Building
Pub.Buiïding
89 villages
Mash -Had
City
Ongoing
ECÍU NICE
-
Discontin
ARGON
-- 92 -- --
WHO
-- 91 -- --
Discontin
-- -- --
2 teams - 3 vaccinators
1 concrete middle school for 600 students.
Comprehensive health center.
IACBAR
DATABASE OF NGO ACTIVITIES
6TH EDITION
Page:
5
A6actrep Date: 26/08/93
ACTIVITY
- - -- VILLAGE(S) - - --
SECTOR
AGENCY
Badakshan
--STATUS --
FUNDED
DURATION
< ACTIVITY
- --BY --
DESCRIPTION>
Begin- -End
Keshem
Deh Saydan
Ongoing
AID
9 91 -- --
MSH
HEALTH: Basic Clinic
HEALTH: Basic Post
Keshem
Ongoing
AID
11 88 -- --
MSH
MSH
HEALTH: Vaccination
Keshem
Ongoing
AID /UN
NAC
AGRIC:
Fruit Trees
Kumbuk
Ongoing
NAC
MAC
AGRIC:
Plant Protec
Completed
UNDP
MAC
CONST:
Pub.Building
Hazrat
Completed
MAC
CONST:
Pub.Building
Bawe
NAC
CONST:
Pub.Building
NAC
CONST:
MAC
4 MED. TECH.1
16 BHWs
7 92 -- --
COVERED FROM BAHARAK VSF. SEE BAHARAK LISTING FOR DETAILS.
1 93 12 93
Fruit tree & forest tree nursery.
12 90
9 91
Application of 3.575 liter Decis in 40 villages.
NAC
9 92
6 93
Repairing of secondary school & construction
Ongoing
NAC
5 93
7 93
Repairing of primary school.
Jarahababr
Ongoing
NAC
9 92
7 93
Construction of primary school (8 rooms).
Kumbuk
Ongoing
SCA
6 93
9 93
Reconstruction of primary school (8 rooms).
Pub.Building
Pub.Building
--
Completed
NAC
9 91
5 92
materials.
3 buildings each with 8 rooms in Yawarzan. Sangab & Teshman - cement + local
CONST:
Pub.Building
Yawarzan
Ongoing
NAC
9 93
Construction of primary school (8 rooms).
CONST:
7 93
NAC
CONST:
Pub.Building
Darayem
Ongoing
NAC
10 92
7 93
Construction of primary schooi(8 rooms).
NAC
Pub.Building
Kau
Ongoing
SCA
9 93
Reconstruction of secondary school (8 rooms).
CONST:
6 93
NAC
Mash -Had
Ongoing
MAC
6 93
Repairing of primary girls school.
CONST:
Pub.Building
7 93
MAC
Namazgah
Ongoing
NAC
9 92
Construction of primary school (8 rooms).
CONST:
Pub.Building
7 93
NAC
EDUCAT: Other
Yawarzan
Completed
NAC
12 91 -- --
NAC
--
Completed
NAC
11 91
latrines.
Provision of 200 chairs 1 60 blackboards to a school.
3 canal in Keshem (7km ! irrigates 1.500 Jeribs), Para Jim (10.3 km
8 92
NAC
WATER.
Canal
Farmangholi
Ongoing
NAC
Reconstruction of Tarnabs.
Structure
8 93
WATER:
6 93
NAC
Ongoing
NAC
Superpassage & Tarnab.
Structure
Rabat
7 93
WATER:
5 93
NAC
Ongoing
NAC
Reconstruction of intake.
Structure
Dashtak
8 93
WATER:
7 93
NAC
SOCIAL:Animation
Ongoing
RBS
1 93 -- --
RBS
,
irrigates 300 v'eribs) & Rubat Khumbak (2.7km ï
irrigates 300 Jeribs)
Training of social animators.
6TH EDITION
!
DATABASE OF NGO ACTIVITIES
A C B A R
Page:
6
A6actrep Date: 26/08/93
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
Badakshan
SCA
3rA
SCA
3CA
SCA
Plant Protec
AGRIC:
AGRIC:
SCA
SCA
;NO
Provision of 0.25 MT agrochemicals.
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provison of 0.15 MT agrochemical!".
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 116 villages.
Other
Ongoing
SCA
0 93 -- 93
Agrielture survey on 80 villages.
Ongoing
SCA
IO 85 -- --
MSH
MSH
A-AID
25 schools
161 teachers
.
3.950 students
SCA
-- 92 -- --
Mash -Had
Ongoing
SCA
1 90 -- --
1 MD / 8 mid -level HWs i i Dental Tech. í 1 Lab Tech. 13 FA
Ongoing
AID
7 87 -- --
19 schools in 18 different villages.
Ragh
Ongoing
AID
9 91 -- --
3 MED. TECH.
Do Damn
Ongoing
AID
7 90 -- --
3 BHWs
Completed
ARCON
4 92
Rehabilitation of 1 canal total length 2 km - irrigates 300 hectares of land - benefits 1000 families.
Ragh
Ongoing
SCA
9 87 -- --
Center of Yawan
ongoing
SCA
--
Ongoing
AID
6 3" -- --
Shahre Bozurg
Ongoing
AI. r
11 88 -- --
HEALTH: Buie Poet
Wandiyan
Ongoing
AID
l'
HEALTH: Vaccination
Shahre Bozurg
Ongoing
AID/UN
HEALTH: Compr.Clinic
EDUCAT: Primary
HEALTH: Basic Post
WATER:
Canal
EDUCAT: Primary
HEALTH: Basic Clinic
EDUCAT: P A.m p
AGRIC:
ACLU, R
9 92
1 NURSE HELPERI
4 schools 120 teachers 1 540 students
4 mid -level HWe.
y
2 schools in Ch akra n k Maiden villages.
Shar Bozurg
HEALTH: Basic Clinic
AGRIC:
5 schools / 29 teachers 1 725 students
Ragh
HEALTH: Basic Clinic
Badakshan
A -AID
Eeehem
Ongoing
Badakshan
MSH
--
0 92 -- 92
Badakshan
RAFA
DESCRIPTION>
Darayem
UNO
MSH
<:ACTIVITY
SCA
EDUCAT: Primary
SCA
MSH
Begin - -End
Completed
EDUCAT: Primary
SCA
DURATION
- --BY --
Keshem
AGRIC:
AGRIC:
FUNDED
-- STATUS --
2 MED. TECH., 3 BHW
89 -- --
7 22 -- --
6 ROOMS, IMMUNIZATION
1 BHW
COVERED FROM BAHAR AK V Sr
.
3EE BAH ARAE LISTING FOR DETAILS.
AILS.
Sheghnan
Crop Product
Sheghnan
Ongoing
DCP
5 93
4 94
Vegetable diversification / improvement.
Fruit Trees
Sheghnan
Ongoing
DCP
5 93
4 94
Tree nurseries
DATABASE OF NGO ACTIVITIES
6TH EDITION
1
Page:
7
A6actrep Date: 26/08/93
ACTIVITY
SECTOR
AGENCY
Badakshan
-VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY -,
DURATION
<ACTIVITY
Begin -- End
DESCRIPTION>
Sheghnan
A -AID
CONST:
Road
Shewa /Sheghnan
Ongoing
ODA
B 92 -- --
Construcation of rural road between Shewa -Sheghnan.
A -AID
CONST:
Road
Hamdarreh
Ongoing
ODA
7 93 12 93
Construction of rural road between Shewa - Sheghnan.
A -AID
WATER:
Canal
Weir
Ongoing
ODA
6 93
A -AID
WATER:
Canai
Wei:
Completed
ODA
10 92 11 92
KSH
HEALTH: Compr.Clinic
Bashar
Ongoing
AID
9 91 -- --
2
MSH
HEALTH: Vaccination
Sheghnan
Ongoing
AID /UN
7 92 -- --
COVERED FROM BAHARAK VSF. SEE BAHARAK LISTING FOR DETAILS.
SCA
EDUCAT: Primary
Sheghnan
Ongoing
SCA
Wakhan
Ongoing
AID/UN
7 92 -- --
5 91
9 91
Reconstruction of Garam Cheshma- Dozakh Dara road (78,4 km) with machinery.
10 90
9 92
Destroyed 14350 devices, cleared 453368 Som road / hill side.
-- 92 -- --
Rehabilitation of canal.
Rehabilitation of Weir canal.
D. 2 NURSES, 1 LAB. TECH. ASST.
LABORATORY, IMMUNIZATION
7 schools i 43 teachers ! 1.050 students
Wakhan
Badakshan
MSH
7 93
HEALTH: Vaccination
Badakshan
COVERED FROM BAHARAK VSF. SEE BAHARAK LISTING FOR DETAILS.
Zebak
ACLU
CONST:
Road
Guam Cheshna
Completed
AID
ATC
MINES:
Clearance
Tope Ehana
Completed
UNOCHA
MSH
HEALTH: Vaccination
Zebak
Ongoing
AID /UN
7 92 -- --
COVERED FROM BAHARAK VSF. SEE BAHARAK LISTING FOR DETAILS.
OMAR
MINES:
Awareness
Completed
UNOCHA
6 92 12 92
Safety lessons - 5412 people participated.
PRB
CONST:
Pub.Building
Ongoing
UNDP /WFP
Gh6rmach
Ongoing
AID
4 90 --
2 BHWe
Badghis
MSH
10 92
8 93
Boys primary school with 6 rooms ! 2 administration rooms ! material - stone / cement A wood beam.
Ghormach
HEALTH: Basic Post
Badghis
Gazan
Jawand
MSH
HEALTH: Basic Clinic
Jawand
Ongoing
AID
3 90 -- --
3 MED. TECH. 1 NURSE.
MSH
HEALTH: Basic Poet
Do Aabl
Ongoing
AID
7 88 -- --
2 BHWs
Ongoing
AID
Badghis
IMC
Kushk Kohna
HEALTH: Basic Clinic
ACHAR
Buza Ehorak
3 mid -level HWs - OPD.
DATABASE OF NGO ACTIVITIES
Page:
8
A6actrep Date: 26/08/93
6TH EDITION
AGliVal
AGENCY
SECTOR
MSH
HEALTH: Basic ?oat
Badghie
MSH
Badghia
HEALTH: Basic Post
MSH
- --BY --
DURATIvii
Begin -find
<ACTIVITY
Ongoing
AID
7 90 -- --
Panerak
Ongoing
AID
12 66 -- --
Qadea
Ongoing
AID
5 90 -- --
3 mid -level HWsí 1 lab tech - OPD ! lab.
Ongoing
AID
4 88 -- --
6 BHWa
Ongoing
AID
9 90 -- --
Regional Health Administrtion (RHA)
DESCRIPTION>
2 BHWs
1 BHW
Qade
HEALTH: Compr.Clinic
MSH
Zznda Hashm
¿,A1AL
-- STATUS --
Morghab
HEALTH: Basic Post
IMC
- - -- VILLAGE(S) - ---
HEALTH: Other
Gunbad Ulta
Deh Beranj
administrative center and depot for issue of supplies and salaries and monitoring
and supervision of the BHWs and health facilities under its jurisdiction.
UNO
EDUCAT: Primary
Baghlan
ARA
AGRIC:
ARA
ARA
ARA
MSH
MSH
MSH
RAFA
SCA
SCA
SCA
SCA
AGRIC:
AGRIC:
AGRIC:
Crop Product
Crop Product
Fruit Trees
Fruit Trees
HEALTH: Basic Post
HEALTH: Vaccination.,
AGRIC:
AGRIC:
AID
6 88 -- --
Completed
ARA
5 92 12 92
4 schools in Gunbad, Langar, Nizab & Langar Sharif villages.
Anderab
HEALTH: Distrot Hosp
CONST:
Ongoing
Lain
Lain
Arzingan
Bosh Dare
Deh Salah
Qazah
Anderab
Road
Plant Protec
Other
HEALTH: Basic Clinic
HEALTH: Basic Clinic
Shahshan
Deh Salah
Ongoing
ARA
Ongoing
*Donors
Ongoing
ARCON
-
-- 93 -- 93
Distribution of i MT of 44 tested varieties of beans.
9 91 -- --
Nurseries Of 300,000 fruit trees (Pear / apple / peach / apricot / walnut / plums)
- 17.5 jeribs.
10 91 -- --
Ongoing
AID
6 90 -- --
Ongoing
AID
6 66 -- --
Ongoing
AID /UN
Multiplication of 52 varieties of beans.
Nurseries of 250,000 fruit trees (mulberry)
-
14 jeribs.
1 MD i 6 medical tech í 1 doctor assistant I 1 admin
1 anaesthesia tech assistant / 1 nurse / 1 nurse helper 1 2
BHWs ! 1 lab tech assistant - 3 rooms r in- patient bed / surgery & immunization.
15 BHWs
10 89 -- --
COVERED BY TALO AN VSF.
SEE !ANON LISTING FOR DETAILS.
Ongoing
ARCON
4 92 -- --
Ongoing
SCA
0 93 -- 93
Provision of 0.075 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ongoing
SCA
1 85 -
1 mid -level HW ! 1 Nurse
Ongoing,
SCA
Repair of Andarab -Nahreen road 50 km by hand tools & benefits 90,000 people.
--
6 mid -level HWs
1ACBAR
DATABASE OF NCO ACTIVITIES
6TH EDITION 1
Page:
9
A6actrep Date: 26/08/93
¡MUITf
SECTOR
AGENCY
UNO
- - -- VILLAGE (S) - - --
EDUCAT: Primary
-- STATUS --
'L tiau
- --BY --
DURATi &fir
<ACTIVITY
Begin- -End
Ongoing
AIi
3 87 -- --
-- 33 -- --
DESCRIPTION>
4 schools in Shahshan, Qesan, New Bahar & Guìmir Ghazi villages.
Baghian
Baghian
Rehabilitation of
?,m foot road(FFW - 35 MT).
AACRP
CONST:
Road
Kohna Qala
Approved
WFP
AACRP
WATER:
Canal
Shahr Jadeed
Completed
WFP
5 93
7 93
Rehabilitation of 8 Em sub -canal.
AACRP
WATER:
Canai
3hahr Jadeed
Completed
WFP
5 93
6 93
Rehabilitation of 15 Km canal (FFW - 25 MT).
BRC
AGRIC:
Crop Product
Center
Comp'e*P^
'IDA
-- 89 -- 90
Industrial Baghian potato production project.
BRC
AGRIC:
Crop Product
Center
Completed
CIDA
-- 90 -- 91
Baghlan potato production project.
BRC
CONST:
Road
Bysagal
Completed
CIDA
-- 91 -- 92
Bysagal road repairing project.
BRC
CONST:
Road
Center
Completed
CIDA
-- 91 -- 92
Industrial Baghian road repairing k culvert reconstruction project.
GAA
RELIEF :Food Items
Ongoing
GAA
-- 93 -- --
See GAA -R2 project in Kabul for details.
HT
MINES:
Entire Province
Ongoing
EC /ODA
-- 89 -- 94
Deminingiincìuding mine field survey and nine awareness) in all districts.
MSH
HEALTH: Basi.- Post
Tahir
Ongoing
AID
11 89 -- --
1 BHW
MSH
HEALTH: MCH
Sarak Awal
Ongoing
AID
1 93 -- --
2 MD,
MPO
SOCIAL :Other
Baghian
Ongoing
NRC /NCA
OXFAM
AGRIC:
Crop ?rcduct
Completed
FAO
-- 92 -- 92
PRB
AGRIC:
Vet
Industrial Baghian
Completed
UNDP
12 91
6 93
VFU with 1 asstt. DVM, 2 parave': & 1 guard providing veterinary scrvices to the whole district.
PRA
AGRIC:
'let
Industrial Baghlan
Completed
UNDP
11 91
6 92
1 DVM /
SCA
AGRIC:
Crop Pr;dL t
Completed
SCA
0 92 -- 92
Distribution of 4.1 MT wheat seed & 4.1 MT DAP to 40 villages.
SCA
AGRIC:
Crcp Pr,:au,.
Ongoing
o
SCA
0 93 -- 93
Distribution of 0.56 MT rice seed.
SCA
AGRIC:
Researc.
Completed
SCA
0 32 -- 92
10 crops variety tes tin g trials of w he at, barley any triticale.
SCA
AGRIC:
Researc'
Ongoing
SCA
00
SCA
AGRIC:
Plant
Ongoing
SCA
0 93 -- 93
1
A C B A R
Clearance
.tec
--
15
Women / children under 5 care; health education and Dai training programs.
Survey to be started for schools k running cost SCA.
Distribution of 7.5 MT Urea.
.
par:aveta.
13 crops variety testing trials of wheat. 6 of chickpea & 1 dry bean.
93 -- 93
Provision of 0.415 MT agrochemicals.
DATABASE OF NGO ACTIVITIES
6TH RDiTION
4
Page:
10
A6actrep Date: 26/08/93
ACTIVITY
AGENCY
SECTOR
Baghlan
- --- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin -- End
<ACTIVITY
Biaghlan
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
AGRIC:
SCA
DUCAT: Primary
UNO
JN
DUCAT:
E.
P riaiary
VITA
1HST:
Road
ET!'
WATER:
Structlre
--
Completed
SCA
0 92 -- 92
Provision of 0.295 MT ag%chemicale.
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 79 viiiag.s.
Other
Ongoing
SCA
0 97 -- 33
Agricultu:e survey rr. 80 villages.
Ongoing
SCA
3 88 -- --
15 Schools I 92 teachers I 2.450 etlients
o
ng.ng
AID
,
.
8
14 schools
Jh V1J ;.n
in ,ii +f rp nt
Baghlan
Discontin
AID
- --
Â.,waja Khan
Ongoing
:. :D
5 92 -- --
Baghlan
8
8--
-- --
-
vi
o
..ïaq,,,,.
Rehabilitation of 25 km road from Baghlan to Kot Sdo °.. gene :it 9.000 families.
Construction of 180 m ilumefconerete lc stone), benefit 8.5 71 families.
Burka
Bagh l ar_
CllR
CONST:
Pab,Bizilding
Bll.rke
Discontin
WHO
-- 91 -- --
Basic health center (4 rooms).
MSF
HEALTH: Basic Clinic
Buzka
Ongcing
AID
10 88 -- --
3 MED. TECH.
MSH
HEATH: Basic 'net
Saye Hasar'h
Ongoing
A :D
7 88 -- --
MSH
1ALTi: Vaccination
Burka
V 1..
Ongoing
AID UN
SCA
AGRIC:.
Plant Protec
Ongi ing
SCA
i 93 -- 93
Provision of 0.1 MT agroahemicals.
SCA
AGRIC:
Plans Protec
Completed
,CA
0 92 -- 92
Provision of 0.25 MT sgrochemicals.
SCA
AGdTC:
Other
Ong,107
SCA
0
-- 93
bgriculturA suf'r°; 04 40 rl:Ja9e,.
UNO
EDOCATT Primary
Ongot.eg
AID
6
--
4
Dahna
Baghlan
!VICEN
MSH
DRB
HEALm i;
Ja; Aghel
Ongoing
AID
Dahna uncrl
Completed
UNDP
9 92
.::hlawan Trish. Todc 1'.Iash A Sharshar.
Walian
Ongoing
AID
5 88 -- --
-- -- --
. .JA. I
-
z
--
1
6 93
team - 2 vac::ins..t rs
D.
i
icc o .
aeLis tant,
2 medical tech.,
.
lab tech assistant - 2 rooms,
1 bed 4 laboratory.
VFU with ï DIM. 2 paravets & 1 guard providing veterinary services to the whole district.
Dushi
HEALTH: Compr.tlinic
A C B A R
q :'oois in Me:iias
Griot i
EC UNICF
Vet
COVERED BY TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.
-
Ongoing
C ompt.C.iaic
1 ROOM
3 ?HWs
10 N -- --
26 villages
BaghlRn
'MC
.
HEALTH: Vaccination
PGRIt.:
DESCRIPTION>
3 mid -level HWs
,
1 lab to -h,
DATABASE OF NGO ACTIVITIES
- OPD
,
lab.
6TH EDITION
1
Page:
11
A6actrep Date: 26/08/93
ACTIVITY
AGENCY
SECTOR
Baghian
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin- -End
<. ACTIVITY
DESCRIPTION>
Dashi
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
0'93 -- 93'
Provision of 0.19 MT agrochemicals.
SCA
AGRIC:
Other
--
Completed
SCA
0 22 -- 92
Agriculture survey on 83 villages.
SCA
AGRIC:
Other
ongoing
SCA
0 93 -- 93
Agriculture survey on 49 villages.
SCA
HEALTH: Basic Clinic
Yakhak
Ongoing
SCA
--
UNO
EDUCAT: Primary
--
Ongoing
AID
3 87 -- --
2 schools in Tala & Barfak villages.
Baghian
4 mid -level HWs.
Khenjan
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Khoet Fring
Baghian
CBR
CONST:
Road
Bangi
Completed
AID
DCA
AGRIC:
,let
Char Qaria
Ongoing
UNDP
4 92 -- --
1 paravet.
MSH
HEALTH: Distrct Hosp
Ehost -Fring
Ongoing
AID
1 88 -- --
1 MD
-- 91
S 92
25 Km road from Kunduz Highway to Bangi center.
2 MED TECH
,
i DENTAL TECH ASST / 2 BHW / 1 MALARIA LAB TECH / 1 LAB TECH ASST / 2 X -RAY TECH ASST / 1 ADMIN i
30 ROOMS / 20 BEDS i SURGERY /DENTAL / LABORATORY i X -RAY / OPD.
MSH
HEALTH: Basic Poet
Char Qarya- Farang
Ongoing
MSH
HEALTH: Vaccination
Ehost -Fring
Ongoing
AID
AID /UN
7
88. -- --
13 BH'Ws
10 89 -- --
COVERED FROM TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.
A SECOND TEAM WITH 4 VACCINATORS UNDER PMD SUPERVISION
IS ALSO IMPLEMENTING IMMUNIZATION PROGRAMS WITH VACCINES SUPPLIED BY THE TALOQAN VSF.
,.,
A R::.
Plant ..,.e
JCA
AGRIC:
Other
'CA
;,.;..
SCA
SCA
UNO
SCA
0 93 -- 93
Provision cf 0.1 MT agorchemicaìs.
--
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
EDUCAT: Primary
i oUr-Ñr l ng
Ongoing
J'A
3 87
20 schools / 133 teachers / 315++ students
HEALTH: Basic Clinic
Char Bagh
Ongoing
SCA
HEALTH: Basic Clinic
Do Abi.
Ongoing
.i.
.,.
SCA
EDUCAT: Primary
1ACBAR
Ongoing
..
--
11 89 - -. --
I ^ -- -.
4 mid -level HWs /
2
.,
mid-i'.`lel HW
1 ..c'.
11 87 -- --
.
..,
.
Nurse
.
in :r°,.:hara. Witch, ..har;. -.ran.
..
.
DATABASE OF NGO ACTIVITIES
Page:
12
A6actrep Date: 26/08/93
..
J"üSiS.n Â. -i'Snolli.
:..
.acni. ,'arisy
..
.
.
'.!
haro
'i..age2.
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Baghlan
CBR
AGRIC:
DCA
AGRIC:
DCA
AGRIC:
IMC
CONST:
MSH
CONST:
SC -US
SCA
SCA
SCA
UNO
Vet
Vet
Pub.Building
AGRIC:
AGRIC:
AGRIC:
AGRIC:
AVICEN
AVICEN
CCA
<ACTIVITY
Nahrein Bazaar
Ongoing
UNDP
6 89 -- --
Central clinic with 1 veterinarian.
Arakash
Ongoing
UNDP
5 89 --
-
1 paravet.
Doabi
Ongoing
UNDP
5 39: - --
1 paravet.
Bazaar
:Ongoing
WHO
5 37 -- --
Hospital building.
Khwaja Khezer
Ongoing
AID
4 88 -- --
5 BHWs
Nahrein
Ongoing
AID /UN
Ongoing
ARCON
4 92 -- --
RAP
5 92 -- 93
15 villages
Other
Other
HEALTH: Basic Clinic
Nahrein
Godri
EDUCAT: Primary
DESCRIPTION>
Ongoing
-- 93 -- --
Comprehensive health center wooden roof (17 rooms).
10 90 -- --
COVERED FROM TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS. A SECOND TEAM WITH 4 VACCINATORS IMPLEMENTS IMMUNIZATION
PROGRAMS UNDER PMD SUPERVISION WITH VACCINES SUPPLIED BY THE TALOQAN VSF.
Repair of Nahrien- Eshkamesh road 38 km by hand tools - benefits 70.000 people.
800 women are involved in handicraft
embroidery product which are sold SC -US carft -shop in Peshawar Pakistan.
Ongoing
SCA
0 93 -- 93
Provision of 0.125 MT agrochemicals.
Completed
SCA
0 92 -- 92
Provision of 0.189 MT agrochemicle.
Ongoing
SCA
0 93 -- 93
Agriculture suret' on 50 villages.
Completed
SCA
0 92 -- 92
Agriculture survey on 98 villages.
Ongoing
SCA
4 86 -- --
20 schools / 140 teachers / 3,450 students
Ongoing
SCA
. 89
Ongoing
AID
mid-level ti s
7 87 -- --
,
2 Dental Tech.' 1 Lab Tech.
11 schools in Jelawgir. Baitop, Jaiga,
Talia, Khwaja Ulia. Arakash. Kor Pesho. Bashgala, Shorgadaq, Madrasa & Ghadri.
Pull Khumri
Road
HEALTH: Vaccination
HEALTH: Other
WATER:
DURATION
Begin --End
WHO
Plant Protec
EDUCAT: Primary
CONST:
- --BY --
Approved
Plant Proteo
Baghlan
AACRP
City
Road
INCOME: Handicrafts
SCA
SCA
Vet
HEALTH: Vaccination
RAFA
SCA
Pub.Building
HEALTH: Basic Post
MSH
FUNDED
-- STATUS --
Nahrein
CONST:
DCA
- - -- VILLAGE(S) - - --
Karez
Dand Ghori
Ongoing
WFP
Approved
EC/UNICF
-- 93 -- --
., teams -
Puli Khumri
Ongoing
EC
-- -
1 VSF / 1 CC technician & 1 supervisor
Dand Ghori
Completed
CIDA
11 91
61 villages
7 93 -- --
Rehabilitation of 8 Km foot roa'd(FFW - 35 MT).
-- -
5 92
4 vaccinators
Cleaning & escay. cf 22,000 cub.m karez
.
irrigate 1.120 H & benefit
700 families.
ACBAR
DATABASE OF NGO ACTIVITIES
6TH EDITION
Plgr.
13
A6actrep Date: 26/08/93
FUNDED
ACTIVITY
---- VILLAGE(S)- - --
SECTOR
AGENCY
- --BY --
-- STATUS --
DURATION
:ACTIVITY
Begin --End
DESCRIPTION>
Puli Khumri
Baghlan
Training dis.bled people in different skills,
GP -UK
INCOME: Skill Train.
City
Ongoing
ILO
MSH
HEALTH: Basic Post
Bala Dawri
Ongoing
AID
II 88 -- --
I
OXFAM
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 10.25 MT wheat seed and 0.3 MT barley.
SCA
AGRIO:
Plant Protes
Completed
SCA
0 92 -- 92
Provision of 0.295 MT agrochemic31s.
SCA
AGRIC:
Plant Protes
Ongoing
3(A
93 -- 93
Provision of 0.225 MT agrochemic:als.
SCA
AGRIC:
Other
Completed
SCA
-- 92 -- 92
Agriculture survey on 85 villages.
SCA
AGRIC:
Other
Ongoing
SCA
O 93 -- 93
Agriculture survey on 50 ;iliagee.
SCA
EDUCAT: Primary
Puli Khumri
Ongoing
SCA
4 92 -- --
8 schools / 35 teachers ! 1,020 students
SCA
HEALTH: Basic Clinic
Shekh Kali
Ongoing
SCA
10 89 -- --
5 mid -level HWs
SCA
HEALTH: Basic Clinic
Shahabudin
Ongoing
SCA
1 90 -- --
2 mid -level HWs.
UNO
EDUCAT: Primary
Ongoing
AID
3 88 -- --
14 schools in different villages.
VITA
CONST:
Road
Jang Aghaly
Ongoing
AID
VITA
WATER:
FloodControi
Gadan Bibiaenia
Ongoing
AID
--
-
BHW
Pehabilitation of 20 km road. benefit 2,000 familie:,.
Construction of 61 m retaining wall (stone masonry). benefit 12,000 families.
` 93 --
Tala-Barfak
BaBhlan
?iì.
'1i no
fá...,_
AiI"áy
HEALTH:
MSH
HEALTH: Compr.Clinic
Tala
MS,,
HEALTH: Aoo.e Pct
Tala-Barfak
?
lv:nati; 1
UNICF
Ongoing
Ongoing
AID
AID
1
1 MED. TECH..
10 90 -- --
,
teas - 1 vaccinator
48 -- --
y
I NURSE.
?
LAB. TECH. ASST.
3 ROOMS. LABORATORY
BHW.`';
Balkh
Balkh
AMI -A
HEALTH: Other
MSH
HEALTH: Distrct Hosp
Approved
Balkh
Ongoing
SNT
á 93 11 93
AID
9 91 -- --
,Tes.
Healtl survey of existing facilites.
LAB TECH ASST /
AMIN /
3 MD / 4 MED ThCH / 1 NURSE /_ NURSE HELFEN. /_ DISPENSER
X
-RAY
/
IMMUNISATION,
SURGERY
DENTAL
IN- PATIENT BEDS / PHARMACY / LAB
'
1
X -RAY TECH ASST !
-
MSH
1
HEALTH: Basic Post
A C B A R
Mollwandan
Ongoing
AID
5 BHWs
4 88 -- --
DATABASE OF RGO aCTIVITIES ---
Page:
14
A6actrei Date: 26/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
HEALTH: MCH
KSH
HEALTH: Med.Training
MSH
HEALTH: Vaccination
PRB
CONST:
Pub.Buildìng
Balkh
ARCAR
DURATION
- --BY --
Begin --End
<ACTIVITY
Balkh
Ongoing
AID
12 92 -- --
--
Ongoing
AID
8 90 -- --
Balkh
Paiz gar
Ongoing
Ongoing
AID /UN
ARCON
DESCRIPTION'
1 MD, 2 Nurses, 1 Vaccinator- Women I children under 5
care, vaccination, health education and Dai training programs.
Trained the following: 65 BHWs i3 months initial training). 13 health workers in PHC & management workshops. 5 BHWs
refresher training.
11 90 -- --
COVERED FROM BALKH VSF.
10 92 10 93
BHC (14 rooms) - brick
SEE MAZAR- i- SHARIF LISTING FOR DETAILS.
steel bar & concrete.
,
Char Bolak
WATER:
MSH
iumoiD
-- STATUS --
Balkh
Balkh
MSH
- - -- VILLAGE(S) - - --
Structure
HEALTH: Distrct Hosp
Char Bolak
Sabzi far
Approved
UNDP
Ongoing
AID
Construction of diversion dam.
10 89 -- --
3 MD
3 medical tech
2 nurse helpers
,
1 dispenser i 2 :anaesthesia tech assistant
TB control & immunization.
2 lab tech assistants
12 rooms i 10 beds
1 dental tech assistant
I lab / dental
'
1 X -ray tech assistant
X -ray / pharmacy i surgery 1 OPD
-
MSH
HEALTH: Basic Post
MSH
HEALTH: Vaccination
SCA
AGRIC:
SCA
AGRIC:
SCA
AGRIC:
UMO
MSH
MSH
MSH
SCA
UNO
Ongoing
AID
It 88 -- --
7 BHWs
Char Bolak
ongoing
AID /UN
11 90 -- --
COVERED FROM BALKH VSF.
Plant Protec
SEE MAZAR-l-SHARIF LISTING FOR DETAILS.
'';mpleted
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
0ngoing
SCA
0 93 -- 93
Provision of 0.13 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ongoing
AID
11 87 -- --
Pas Chah Ay: ;
Ongoing
AID
Tandorak
Ongoing
AID
Charkent
Ongoing
AID /(1N
Ongoing
SCA
Plant Prater,
Other
EDUCAT: Primary
Balkh
Wachs Nona Watani
--
3 schools in Toghanchi, Dagh Jabeen & Korachi villages.
Char Kant
HEALTH: Basic Clinic
HEALTH: Basic Post
HEALTH: Vaccination
EDUCAT: Primary
EDUCAT: Primary
Charkent
Ongoing
AID
? 1
i '
-- --
^ ME D. TECH.
a7 -- --
v BHWe
11 90 -- --
COVERED FROM BALKH VSF. SEE MAZAR- I- SiiARIF LISTING FOR DETAILS.
3 90 -- --
8 87 -- --
DENTAL
TAL
7 schools / 37 teachers
.
640 students
3 schools in gara, Char Mahaìa & Khwaja Banda). villages.
IACBAR
DATABASE, OF NGO ACTIVITIES
6TH EDITION
Page:
15
A6aetrep Date: 26/08/93
.
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - ---
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Chemtal
Balkh
MSH
HEALTH: Basic Post
Pashmak Qala
Ongoing
AID
11 87 -- --
3 BHWs
MSH
HEALTH: Vaccination
Chemtal
Ongoing
AID /UN
11 90 -- --
COVERED FROM BALKH VSF. SEE MAZAR-I-SHARIF LISTING FOR DETAILS.
?RB
CONST:
Pub.Building
Imam Sahib
Completed
ARCON
8 92
1 93
Boys primary school with 6 classrooms ; 2 administration rooms
SCA
,AGRIC:
Plant Protes
Ongoing
SCA
0 93 -- 93
Provision of 0.14 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 77 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
UNO
EDUCAT: Primary
Ongoing
AID
191 -- --
1 school in Jar Qala village.
-
brick / steel bar & concrete.
Dehdadi
Balkh
MSH
HEALTH: Basic Post
Tokhta
Ongoing
AID
7 88 -- --
4 BHWs
MSH
HEALTH: MCH
Dehdadi
Ongoing
AID
1 93 -- --
1 MD. 3 Nurses -Women /children under 5 care,
NPO
INCOME: Skill Train.
Dehdadi
Ongoing
NRC /NCA
3 93 -- --
Vocational training in skills needed in community.
3 MED. TECH.,
health education and Dai training program.
Dowlatabad
Balkh
1 FIRST AIDER, DENTAL TECH. ASST.
DENTAL
MSH
HEALTH: Basic Clinic
Sadrabad
Ongoing
AID
6 90 -- --
MSH
HEALTH: Basic Post
Daheshtan
Ongoing
AID
11 87 -- --
4 BIPAs
MSH
HEALTH: Vaccination
7awiatabad
Ongoing
AID /UN
11 90 -- --
COVERED FROM BALKH VSF. SEE MAZAR- I- SHARIF LISTING FOR DETAILS.
SCA
AGRIC:
Completed
SCA
0 92 -- 92
UNO
EDUCAT: Primary
Ongoing
AID
11 87 -- --
Fe eh naeh Baia
Ongoing
AID
6 90 -- --
2 MED. TECH..
Plant Protec
Provision of 0.165 MT agrochemicals.
5 schools in darchigak, Qara Gajaia, Gulabad. Zadian & Shekh Mughilan villages.
KFshende
Balkh
Basic Clinic
MSH
iAAuTH
MSH
HEALTH: Basic Clinic
Gor Tepa
Ongoing
AID
9 91 -- --
3 MED. TECH.,
?PH
HEALTH: Basic Post
Qarabaee Dowom
Ongoing
AID'
9 91 -- --
6 BHWs
JA C B A R
.
.
FIRST AIDER.
1
:V+'2SE1
DATABASE OF NGO ACTIVITIES
Page:
16
A6actrep Date: 26/08/93
.
DENTAL TECH. ASST.
3 ROOMS. 2 BEDS
6TH EDITION
ACTIVITY
SECTOR
AGENCY
MSH
HEALTH: Vaccination
- - -- VILLAGE(S) - - --
Eeshendeh
-- STATUS --
FUNDED
Begin --End
Ongoing
AID /UN
11 90 -- --
<ACTIVITY
DESCRIPTION>
COVERED FROM BALKH VSF. SEE MAZAR -I- SHARIF LISTING FOR DETAILS.
Mazar Sharif
Balkh
ACRU
INCOME: Skill Train.
Mazar Sharif
Completed
UNDP
ARCON
CONST:
Pub.Building
Mazar Sharif
Ongoing
ARCON
ARCON
CONST:
Pub.Building
Mazar Sharif
Ongoing
ARCON
ARCON
HEALTH: Other
Center
Ongoing
ARCON
AVICEN
HEALTH: Other
Mazar Sharif
Ongoing
EC
Ongoing
GAA
AA
DURATION
- --BY --
RELIEF :Food items
4 93
4 94
120 trainees, engraving training center(self -helping).
Mazar Sharif Islamic center.
--
Construction of San Jerk school.
Balkh hospital - equipment & supplies.
--
office for EPI.
-- 93 -- --
Distribution of 2.20t1 MT food (wheat
,
chick peas
,
oil) through FFW for emergency fC',dingl.in Mazar
.
Darzab /
Mardyan / Samangan.
IAM
HEALTH: Compr.Clinic
Mazar Sharif
Ongoing
IAM
IAM
HEALTH: Mobile /F -Aid
Mazar Sharif
Ongoing
IAM
K V:
IAM
SOCIAL:Commu.Particp
Mazar Sharif
Ongoing
IAM
5 93 -- --
:CRC
HEALTH: Disabled Reh
City
Ongoing
ICRC
NSF -F /B
HEALTH: Other
Mazar/Sakhi
Ongoing
EC/MSF
1 93 -- --
NSF -F /B
HEALTH: Other
Mazar/Sakhi
Ongoing
EC /MSF
-- --
NSH
HEALTH: Basic Clinic
Shadiyan
Ongoing
AID
MSH
HEALTH: Basic Clinic
Marino.
Ongoing
AID
MSH
HEALTH: Vaccination
Mazar Sharif
Ongoing
AID /UN
93 -- --
Eye clinic.
93
Mobile clinic for displaced rc}hlP in 50 schools,
Community based development.
-- 92 -- --
3';=!
2
-- --
:L
11 90 -- --
Orthopaedic workshop (produces 100 limbs -per month).
1,000 consultations/ week / 30 IPD / 5 MD / 12 nurses
2 MED. TECH..
1 NURSE
4 MED. TECH..
. DENTAL TECH. ASST.
sanitation - latrines in Tajiks refugee camp (30,000).
6 ROOMS 6 BEDS
h ROOM. DENTAL. LABORATORY
ORY
22 VACCINATORS ;2 ADDITIONAL VACCINATORS PLANNED TO BE HIRED) 1 COLD CHAIN SUPERVISOR. 1 COLD CHAIN TECHNICIAN
OPERATE UNDER AN MD DOCTOR SUPERVISION WITH TRAINED IMMUNIZATION TECHNICIANS OUT OF THE VSF IN MAZAR -I- SHARIF COVERING
,
113 VILLAGES IN
DISTRICTS IN BALKH. JAWZJA4'AND SAMANGAN PROVINCES.
OPERATE IN ZHULM AND SANG CHARAX DISTRICTS.
MSH
HEALTH: Other
Mazar Sharif
Ongoing
AID
9 90 -- --
.
A SECOND TEAM CONSISTING OF 5 VACCINATORS
TARGET GROUPS: CHILDREN 0 -2 YEARS, WOMEN 5 -45 YEARS.
Regional Health Administration (RHA) adminstrative center and depot for issue of supplies and salaries and monitoring
and supervision of the BHWs and health fari1ifies under its .jurisdiction.
PRB
CONST:
A/C BAR
Pub.Building
Ali Chopan
Ongoing
ARCON
9 92
9 93
BH`'
( 14 rooms) material - steel tar & concrete.
DATABASE OF NGO ACTIVITIES
6TH EDITION 1
4
Page:
17
A6actrep Date: 26/08/93
ACTIVITY
SECTOR
AGENCY
- --- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Mazar Sharif
Balkh
steel bar & concrete.
PRE
CONST:
Pub.Building
All Chopan
Completed
ARCON
B 92
1 93
Boyó primary school with 6 rooms
PRB
CONST:
Pub.Building
Ali Chopan
Ongoing
ARCON
9 92
9 93
BHC (14 rooms) material - steel bar & concrete.
SCA
AGRIC:
Research
Ongoing
SCA
0 93 -- 93
1 crop variety testing trial of chickpeas.
SCA
HEALTH: Compr.Clinic
Alam Ehel
Ongoing
SCA
2 91 -- --
1MD.
SERVE
HEALTH: Disabled Reh
M.zAr Sharif
Ongoing
UNDP
6 :93
Coordination of UNDP-disabled Afghan project in Balkh.
SERVE
HEALTH: Disabled Reh
Mazar Sharif
approved
CBM
9 93 -- --
Training of disability workers working with the hearing impaired.
SERVE
HEALTH: Disabled Reh
Mazar Sharif
Approved
CBM
8 93 -- --
Training of disability workers working with the Blind.
UNO
EDUCAT: Primary
Ongoing
AID
9 90 -- --
1 school in Dubaiï village.
-- --
1
lab tech.
Nahr Shahi
Balkh
AVICEN
HEALTH: Vaccine. ion
14 villages
Ongoing
EC /UNICF
MA:
EDUCAT: Primary
Marma:
Ongoing
wA'
v.N
HEALTH: Basic Pst
Langar Khana Eilord
Ongoing
AI.
..
HEALTH: Vaccination
Nahrshahi
Ongoing
AID /UN
11 90 -- --
Ongoing
5^d
y,r`,N
3 mid -level HW.e.
2 administration rooms -
Plant P,,tec
SCA
AGRIC:
SCA
HEALTH: Basic Clinic
Maria'
Ongoing
',{'.A
CA
HEALTH: Basic Clinic
3ha'dian
Ongoing
;..A
-- -- --
-
.
7
--
ñ
COVERED FROM BALEH VSF.
SEE MAZAR-i- SHARIF LISTING FOR DETAILS.
Provision of 0.12 MT agr rhá mi^ al s
07
.
á mid- level .Ws.
h ST -- --
T
achool
BHWsJ
--
7 93 -- 93
Ongoing
LD'i':..: Primary
1 team -'2 vaccinators
3 mid-level HWs.
-
3 school:. in
. Jn.;:i]::.
7:aií}.'.
:'
i{
:}"'b:.rl
v 1'.
t7
i : ! es.
Sholgera
Balkh
AGRIC:
Livestock
Center
Ongoing
:R:JN
COW! farm
;VICES
HEALTH: Vaccination
22 villages
Ongoing
EC/UNiCF
-- -- -- --
1 team - 2 vaccinators
..AR
HEALTH: Mobile/F-Aid
9 villages
Ongoing
*Donors
--
Dental services 00-100 patients da. ly.
HEALTH: Distrct Hasp
Aa9 ëupruk
Ongoing
LBI
-- 89 -- --
CPA
1
A C B A R
--
General hospital.
DATABASE OF NGO ACTIVITIES
Page:
18
A6actrep Date: 26/08/93
6TH EDITION
l
ACTIVITY
AGENCY
SECTOR
-VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
;ACTIVITY
DESCRIPTION>
Sholgera
Balkh
HCNPA
HEALTH: Ned.Training
Aa9 Kupruk
Ongoing
MSH
MSH
HEALTH: Basic ?oat
Bahnrat Abad
Ongoing
AID
It ' -- --
MSH
HEALTH: Vaccination
Sholgera
Ongoing
AID /UN
11 90 -- --
PRB
CONST:
Road
Several
Ongoing
ARCON
9 92
PRB
CONST:
Bridge,
Ailtan
Completed
UNDP
9 91 10 92
Construction of
6 91 10 91
Mosque building - capacity for 200 prayers at a time - local materials.
PRE
DAB
PRE
Training of HWs - -65 have been trained so far.
l:s R41!
COVERED FROM BALKH VSF.
9 93
SEE MAZAR-I- SHARIF LISTING FOR DETAILS.
Reconstruction of 100 km road between Shoigra - Sang Charak & contruction of 17 culverts & i km retaining wall.
1
bridge (54 meter) - cement & brick.
CONST:
Pub.Buiìding
aadeem
Completed
SEN
CONST:
Pub.Building
Qadeem
Completed
. .,:,1h
3 9:
1 93
Boys primary school with 6 classrooms r 2 administration rooms - brick / steel bar & concrete.
WATER:
Canal
Abdurrahim Zai
Completed
CIDA
1 91
7 91
Rehabilitation of 10 km canai + reconstruction of its intake
Completed
UNOCHA
,
PRB
WATER:
Canai
SCA
AGRIC:
Crop Product
COmpieted
SCA
-- 92
Diatribution of 2 MT wheat aced .& Z MT DAP.
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
--
Provision of ..:F MT agrochemical!.
AGRIC:
Plant Protec
Completed
SCA
Ongoing
SCA
SCA
SCA
SCA
SCA
'!NO
Qebehaq
EDUCAT: Primary
EDUCAT: Primary
HEALTH: Compr.Clinic
E}i01ger9
Sholgera
Sholgera
EDUCAT: Primary
Ongoing
Ongoing
Ongoing
1
SCA
SCA
10 91 il 91
i
-
irrigate 500 hectares.
Cleaning of 10 km canal.
`a,î
92 -- 92
Provision of 0.27 MT agrochemicais.
11 84 -- --
:.
IC 39 -- --
3cnoo13
I: schools
6 87 -- --
1
AID
MD
.
,
.
^': teacher!
65 teachers
.
,
1.640 studnets
1.730 students
6 mid -level HWs / 1 Dental Tech. / 2 Vaccinators
:: 3eh0o1s in Marka: Haq Eaprak. Q.sdim Bala. +adim. riaq Kaprakt2
.
Toni, Aushinda, Baba Aiwas, Tor Ghar & Dalan(Z)
villages.
Balkh
Shortepa
MSH
HEALTH: 3a
MSH
HEALTH: "CH
MSH
i
Pon
HEALTH: Vaccination
1ACBAR
Esiam Sufis
Jngoing
Ai-
Roc Ar?gh
:ngoing
AID
Shortepa
Ongoing
AIDíUN
9 ?i -- --
2 EHWv
3 Nuraes,
il 90 -- --
1
Room: Women / onii:ren under 5 care. health education and Dai training programs.
COVERED FROM EALEH VSF. SEE MAZAR-I- SHARIF LISTING FOR DETAILS.
DATABASE OF NGO ACTIVITIES
Page:
19
A6actrep Date: 26/08/93
6TH EDiTION 1
ACTIVITY
AGENCY
SECTOR
Bamyan
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
- - -BY --
DURATION
Begin --End
<ACTIVITY
DESCRIPTION>
Bamyan
AMI -A
HEALTH: Other
AVICEN
HEALTH: Vaccination
AVICEN
Approved
AMI
151 villages
Ongoing
EC.UNICF
HEALTH: .Other
Bamyan
Ongoing
EC
"^A
CONST:
Road
ad
7
iacs
'ar
Completed
.ompl ' t
)NL.
OCA
Pr rm.
J
ib.Aui:::nó
City
Completed
Pvt
CCA
HEALTH: Provinc.dosp
City
Ongoing
Self
9 93 11 93
Health survey of existing facilities.
-- -- -- --
; teams - 6 vaccinators
1 vaccine storage facility
P
q2.
,
iG
4
93
i CC technician & 1 supervisor.
y of 163 km road from Shasnpul to 4ardak.
Survey
Repairing ; f A. jan hospital building i. i rin si
:: 89
5 89 -- --
4 MD ! 3 D ass.. 7 nurses / surgery ! mobile first aid i TB / dental ! 20 rooms /
2 OT 12 X-ray / 2 lab / 1 ambu1.
í
60 -10r0 pats. day.
CCA
INCOME: Skill Train.
City
Ongoing
OXFAM
8 91 -- --
Training i auto repairing i carpentry i masonry / 60 trainees i year.
GAA
AGRIC:
B9IDyin
Ongoing
.NDP
4 90
93
1 DVM / 2 paravets
GAF
HEALTH: Vaccination
Ongoing
.N'C'RlS
-- 89
--
Mobile vaccination t eam with 4 vaccinators.
:AAAE
CONST:
Road
Approved
UNDP
-- 23 -- --
Repair of 20 km road from Bamyan to
raaAE
CONST:
Cr3 d
Road
Approved
U DP
-- :3 -- --
Repair of ?
"Ai
EDUCE: Primary
Ongoing
MA:
N' :
HEALTH: Basic Clinic
K-7:.
'ï.?.
Vet
Mula Hussain
..
..
^.".al.::
Baso
'O.': .::
d
a.
3n.ti.
-
..noJn...:16,
;..
.d': ..
Ongoing
A..,
+n 51z
Completed
OXFAM
.
0 92 -- 92
:e:
.
TECH.,
3
. NURSE
3
.
FatWast: village.
ROOMS
s.
-- --
L
Tra.,
AGRIC:
Crop Product
Completed
SCA
Snx
AGRIC.
Plant Proteo
i nd}:n g
...
SCA
AGRIC:
Plant Prote',
Completed
1'!A
SCA
AGRIC:
Other
Completed
SCA
;CP
A1R:C,
ether
Ongoing
SCA
Ongoing
Si; A
EDUCAT: primary
C B A R
: .J -- --
Maiaan - with machinery & hand tools.
t0 Maldan - ii: Cu .vert 3 - with machinery i hand :cols.
km road frJ ID Bam y an
' schools in G1°riñ Abad, .+y °k
al!:l.;ái
:,"A
SCA
1 guard curative ÿ preventive service.
iCe.
=amyan
.
,,
D"
92
Winter trai n in g
.
n rural development
Provision of 0. 3 Mm agroche i ,.l s.
92 -- 92
Provision of 0.352 MT agrocneIDi,als.
-- 92
Agriculture survey on 90 villages.
93 -- 93
Agriculture survey on 40 villages.
`I5 -- --
17 schools 7 108 teachers R
DATABASE OF HGO ACTIVITIES
Page:
.
agriculture for shura representatives.
Distribution of 1 MT wheat seed & 1 MT DAP.
93 -- 93
lj 92
:
.
20
A6actrep Date: 26 /08/93
3.074 sta euts
6TH EDITION
j
ACÎIViPY
AGENCY
SECTOR
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
VITA
CONST:
Bridge
Bamyan
- --- VILLAGES) - - --
Fatmaeti
Pay Mori
FUNDED
-- STATUS --
- --BY --
DURATION
Begin --End
<ACTIVITY
Ongoing
SCA
1 89 -- --
4 mid -level HWe.
Ongoing
AID
3 20 -- --
2 schools in Foladi. Do Ab Foladi villages.
Discontin
AID
Ongoing
3C /UNICFF
Ongoing
UNICEF /S
Outreach EPI program from Bamyan.
2 schools.
Construction of 22 m bridge(concrete & masonry), benefit 500 families.
Kahmard
AVICEN
HEALTH: Vaccination
GAF
HEALTH: Vaccination
96 villages
-- -- -- --
1 team -
2 vaccinators
MAI
EDUCAT: Primary
Doab /Roy Sang
Ongoing
MAI
MSH
HEALTH: Basic Clinic
Darband
Ongoing
AID
6 90 -- --
4 MED. TECH.,
MSH
HEALTH: Basic Post
Banaq
Ongoing
AID
4 88 -- --
8 BHWs
MSH
HEALTH: Vaccination
Kahmard
Ongoing
AID /UN
SCA
SCA
SCA
SCA
SCA
UNO
VITA
Completed
SCA
0 32 -- 92
Provision of 0.155 MT agrochemicais.
AGRIC:
Plant Pr'vtec
Ongoing
o
0 93 -- 93
'rci +ia:on :i :.'" MT agrcchemi ^51s.
AGRIC:
Other
Ongoing
SCA
0 93
Agriculture survey on 30 vilisgee.
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 32 villages.
Ongoing
SCA
9 92 -- --
3 mid -level HWs.
3 ping
Ongoing
AID
8' -- --
Doshakh
Discontin
AID
8 92 -- --
HEALTH: Vaccination
134 villages
Ongoing
EC /UNICF
HEALTH: Basic Clinic
Panjab
Ongoing
AID
9 91 -- --
3 MED. TECH.i
HEALTH: Basic Post
Godar
Ongoing
AID
3 91 -- --
7 BHWs
HEALTH: Basic Clinic
MSH
MSH
Payeen Bagh
i
EDUCAT:
Prim;.,
Primary
Structure
3 ROOMS, IMMUNIZATION
COVERED FROM KAJAB VSF. SEE KAJAB LISTING FOR DETAILS.
A SECOND TEAM WHICH BEGAN WORK IN OCTOBER 1990 WITH 4
VACCINATORS IS COVERING 13 VILLAGES IN KAHMARD DISTRICT (2803) OF BANYAN PROVINCE.
Plant Protec
Bamyan
AVICEN
11 89 -- --
1 DENTAL TECH. ASST.
AGRIC:
WATER:
DESCRIPTION>
93
14 schools in different village!.
..
Construction of 1.5 km intake(gabion work), benefit 3.000 families.
Pani ab
3 teams - 6 vaccinators
--
ACBAR
DATABASE OF NGO ACTIVITIES
Page:
21
A6actrep Date: 26/08/93
6TH EDITION
ACTIVITY
SECTOR
AGSNCT
---- VILLAGE(SI - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Panj ab
Bamyan
o
OXFAM
AGRIC:
Other
Panjab
Ongoing
OXFAM
á,
OXFAM
AGRIC:
Other
Warns
Ongoing
OXFAM
8 91 -- --
Multi - activity agriculture development program.
SCA
HEALTH: Basic Clinic
Narges
Ongoing
SCA
2 39 -- --
3 mid -level HWs.
`JNO
EDUCAT: Primary
Ongoing
AID
3 8- -- --
. school
Multi -activity agriculture development program.
in Sangraiz.
Saighan
Barcyan
AVICEN
HEALTH: Vaccination
65 villages
Ongoing
EC 1iNICE
.
MAI
EDUCAT: Primary
Khwajaha/Jangalak
Ongoing
MAI
2 schools.
MSH
HEALTH: Basic Poet
Qgrghan
Ongoing
AID
R 47 -- --
8 Bhi>Is
SCA
AGRIC:
Pla nt Protec
Completed
SC:.
A
0 92 -- 92
Provision ,. 0.1 MT agrochemical!.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Completed
S3
99
Agriculture sarred o n 37 viliagee.
SCA
AGRIC:
Other
Ongoing
SCA
93 -- 93
Agriculture survey on 30 villages.
SCA
HEALTH: Basic Clinic
Center
Ongoing
SCA
9 9Z --
7 mid-level HWs.
UNO
EDUCAT: Primary
--
Ongoing
AID
7 87 -- --
3 schools in Khwaja Namazgai2
VITA
CONST:
Road
Center
Discon:in
Ai::
8 91 -- --
Rehab{1it ;tion of 12 km road from Bamyan to Shahan. benefit 11.500 families.
VITA
WATER:
FloodContrcl
Bagani
Discontin
AID
8 91 -- --
Construction of 60 m retaining wall(gabion work. benefit 100 families.
'.D: villages
Ongoing
E,'iUNI.'F
Bamyan
ATICEN
92
.
.
team - 2 vaccinators
& Karwana.
Shibar
.HEALTH: Vaccination
-- -- -- --
1
team
2
r accina toro
CCA
CONST:
Road
áaabí;
Completed
P,t
7 88
CCA
COwST:
Pub.Building
Shashpui
Completed
Pvt
4 87 10 88
Clinic building í10 rooms) - stone.
CONST:
Pub.Building
3hashpul
Completed
Pvt
3 87 11 88
School building 08 rooms
Shashpui
Ongoing
;Doncrs
3 85
3 teachers
CCA
CCA
DUCAT: Primary
IACBAR
!Z
20 Sm from Shasnpuì to jadba'rg.
58
--
- stone.
150 students.
.
DATABASE OF NGO ACTIVITIES
Page:
22
A6actrep Date: 26/08/93
6TH EDITION g
ACTIVITY
AGENCY
SECTOR
Bamyan
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
<ACTIVITY
Begin- -End
- --BY --
DESCRIPTION>
Shibar
WA
HEALTH: Med.Training
Shashpul
Completed
GAF
GAF
AGRIC:
Sbiber
Ongoing
UNDP
MAI
EDUCAT: Primary
Ghandak
Ongoing
MAI
MSH
HEALTH: Basic Post
Ghandak
Ongoing
AID
4 88 -- --
4 BHVe
MSH
HEALTH: MCH`
Shunbul
Ongoing
AID
5 91 -- --
2 M.D.s 2 BHN, 5 Rooms; women children under 5 care; health education and Dai training facility
MSH
HEALTH: MCH
laic)
Ongoing
AID
6 92 -- --
1 MCHO.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.075 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
SCA
EDUCAT: Primary
Ongoing
SCA
8 90 -- --
9 schools / 48 teachers / 954 students
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
4 schools in Jalnesh, Shunbul, Gunbad & Shibar villages.
VITA
CONST:
Shibar
Discontin
AID
8 91 -- --
Rehabilitation of 8.5 km road from Shebar to Surthdar, benefit 11,000 families.
Vet
Road
Ghandak
7.89 10 89
11 91
40 female were trained for 4 months as FHN & TBA.
7 93
1 assist DVM / 2 paravets / i guard curative & preventive service.
2 schools in Sarkhoshak & Shakhtaka.
Women / children under 5 care; health eduction and Dai training program.
Warae
Banyan
AVICEN
HEALTH: Vaccination
162 villages
Ongoing
EC/UNICF
MSH
HEALTH: Basic Clinic
Tagab i Sha I Surk
Ongoing
AID
4 92 -- --
3 M.P.
MSH
HEALTH: Basic Clinic
Beni Gaw
Ongoing
AID
9 91 -- --
3 MED. TECH.i
MSH
HEALTH: Basic Post
Chambar
Ongoing
AID
11 87 -- --
4 BHNs
SCA
HEALTH: Basirw Clinic
Shini Takht
'?ngoing
SCA
12 88 -- --
4 mid-level HNs.
UMO
EDUCAT: Primary
Ongoing
AID
8 87 -- --
Banyan
--
4 teams - 6 vaccinators
--
2 ROOMS
4 schools in Ser Takht, Cbijeeì, Sultan Rubat & Sewak Abdel villages.
Yakawlang
AVICEN
HEALTH: Vaccination
358 villages
Ongoing
BC /UNICF
DCA
AGRIC:
Vet
Shorshouri
Ongoing
UNDP
9 90 -- --
i paravet.
DCA
AGRIC:
Vet
Dare
Ongoing
UNDP
4 92 -- --
i paravet.
1ACBAR
-
--
4 teams - 7 vaccinators
DATABASE OF NGO ACTIVITIES
Page:
23
A6actrep Date: 26/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Yakowlang
Bamyan
DCA
AGRIC:
Vet
Chelbari
:Ongoing
UNDP
9 90 -- --
1 paravet.
DCA
AGRIC:
Vet
Sari Gui
Ongoing
UNDP
2 91 -- --
1 vaccinator.
DCA
AGRIC:
Vet
Takhak
Ongoing
UNDP
4 92 -- --
1 paravet.
MSH
HEALTH: Basic Clinic
Na -Yak
Ongoing
AID
5 92 -- --
1 NURSE, 2 M.T.,1 DENTAL TECH. ASST.
MSH
HEALTH: Basic Post
Sarnia Qol
Ongoing
AID
3 91 -- --
1 BHW
MSH
HEALTH: MCH
Na -Yak
Ongoing
AID
5 92 -- --
1 Med. Tech. -1 Room: women i children under 5 care: health education.
OXFAM
AGRIC:
Yakawlang
Ongoing
OXFAM
1 92 -- --
Multi- activity agriculture development prograt.
3CA
EDUCAT: Primary
Yakawïahg '.
Ongoing
'.NO
DUCAT: Primary
Other
Farah
:,*..
....v
!1
3zA
11 38 -- --
12 schools
78 teachers
.
7 ROOMS. IN- PATIENT BEDS,DENTAL
2.385 studente
Ongoing
AID
3 37 -- --
1 school in Shattoc village.
Ongoing
3C.UNICF
- -- -- --
1 vaccinator
Rehabilitation of 19 karezes.
Anar Dara
.;.,
HEALTH:
Vaccination
.:av.intiv.:.n
: ,..
.
",HA
WATER:
ÿaNAz
Ongoing
A3J
9 90 -- --
Cr,"
WATER:
Karez
Completed
RAP
10 89 12 90
Rehabilitation of 12 karezes.- irrigate 3990 jeribs & benefit 416 families.
CHA
WATER:
Canal
Completed
RAP
1089 12 90
Rehabilitation of 2 canals.
CHA
WATER :
Canai-
Ongoing
RAP
9 90 -- --
Rehabilitation of 14 canals & construction of protective wall.
'!SH
HEALTH: Basic Post
Anar Dare
Ongoing
AID
5 89 -- --
1 BHW
CONST:
22 villages
Completed
NRC
9 91 12 91
Detail survey of 22 villages of the district.
Ongoing
AID
1 89 -- --
2 schools in Kank & Zahkeen villages.
Completed
RAP
10 89 12 90
Completed
RAP
3 92
Ongoing
RAP
9 90 -- --
1T3RT
UNO
Other
--
EDUCAT: Primary
Farah
Bakwa
CHA
WATER:
Karez
CHA
WATER:
Karez
CHA
WATER:
Karez
16 villages
Rehabilitation of 7 karezes - irrigate 2,830 benefit 292 families.
Cleaning of karez.
5 93
Rehabilitation of 21 karezes in 21 villages, total length 46 km.
DATABASE OF NGO ACTIVITIES
Page:
24
A6actrep Date: 26 /08/93
6TH EDITION
AGENCY
---- YILLAfl(S) -
SiCTDI
- --
ACTIVITY
FUNDID
DURATION
-- STATUS --
--BY --
Begin--Ind
<ACTIVITY
DESCRIPTION>
Bakwa
Farah
villages
Completed
RAP
22 villages
Ongoing
4 villages
CIA
WATER:
Canal
FRF
AGRIC:
Vet
FRF
WATER:
lares
SCA
AGRIC:
SCA
AGRIC:
SCA
AGRIC:, Other
VARA
AGRIC:
Crop Product,' =25 villages
VARA
AGRIC:
Machinery
VARA
AGRIC:
VARA
WATER:
3 92
5 93
Cleaning of canal.
UNDP
12 92
6 93
1 DVM ! 2 paravets - vaccination & treatment.
Completed
JNDP
10 92 11 92
Plaint Protec'
Completed
SCA
0 92 -- 92
Provision of 0.075 MT agrochemicals.
Plant Protec
Ongoing
SCA
O 93 -- 93
Provision of 0.005 MT agrochemicals.
Ongoing
SCA
0 93 -- 93.
Agriculture survey on 30 villages.
Completed
FAO
11 91 12 91
Distribution of IO MT wheat seed f 10 MT DAP & 10 MT Urea.
25 villages
Ongoing
FAO
12 92 -- --
2 thresher & 2500 forming families.
,Machinery
25 villages
Ongoing
FAO
9 92 -- --
1 thresher & 300 farmers.
Canal
Mehdadi
Completed
Comunity
8 91
Cleaning of 7 km canal / irrigates 1300 jeribs & benefit 255 families.
'-
Cleaning of 4 karezes i irrigate 510 jeribs land & benefit 105 families.
9 91
Bala Balouk
Farah
CHA
WATER:
tarez
Completed
RAP
10 89'12-90
Rehabilitation of 39 karezes - irrigate 4,686 jeribs & benefit 1.210 families.
CHA
WATER:
Canal
Completed
RAP
10 89 12 90
Rehabilitation of 3 canals.
FRF
WATER:
Canal
Shaiwan
Completed
ARP
10 92
Cleaning of 12 km canal / irrigates 3500 jeribs land & benefit 2,000 families.
MSH
HEALTH: Basic Post:
Shaiwan
Ongoing
AID
7 88 -- --
1 BHW
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.065 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
UNO
DUCAT: Primary
Ongoing
AID
12 88 -- --
1 school in Azo village.
Farah
Ongoing
EC
-- -- -- --
1 VSF / 1 CC technician & 1 supervisor
45 villages
Ongoing
EC
Farah
Farah
HEALTH: Other
AVICEN
CHA
-
2 93
AGRIC:
IA C B A R
Machinery
5 93
Farm traction & agricultural extension.
6 94
DATABASE OF NGO ACTIVITIES
Page:
25
A$actrep Date: 26/08/93
6TH EDITION
1
ACTIVITY
AGENCY
SECTOR
Farah
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
WFP
4 92
8 92
Road repairing.
INCOME: Other
11 villages
Completed
RAP
3 92
5 93
Mechanical workshop.
RELIEF:Non -Food Item
9 villages
Completed
NRC
3 93
5 93
Distribution of wheel barrow /shovel & waterpump.
CHA
DESCRIPTION>
Farah
Completed
CONST:
-
-- STATUS --
26 villages
CHA
CHA
- - -- VILLAGE(S) - - --
Road
CHA
WATER:
Earn
13 villages
Completed
WFP
4 92
8 92
Cleaning of karez.
CHA
WATER:
Kern
23,vilìages
Completed
RAP
3 92
5 93
Cleaning of 28 karezes.
CHA
WATER:
Canal
23 villages
Completed
RAP
3 92
5 93
Cleaning of 11 canals.
CHA
WATER: Canal?
Completed
SV
9 92
3 93
Cleaning of 2 canals.
CHA
WATER:
Canal
Completed
WFP
4 92
8 92
Cleaning of canal.
FRF
WATER:
Canal
Completed
UNDP
1 93
3 93
Cleaning of 25 km canal ¡ irrigates 8,500 jeribs land & benefit 815 families.
MCPA
MINES:
Survey
6 minefields
Completed
UNOCHA
1 92 12 92
74.892 Sqm irrigation & road.
MSH
HEALTH: Basic Poet
Goeha
Ongoing
AID
7 87 -- --
^ BHWs
SCA
HEALTH: Basic Clinic
Center
Ongoing
SCA
1 87 -- --
1 mid -level HWs:
SWAAD.
MINES:
Clearance
4 villages
Completed
UNOCHA
1 92 12 92
12600 Sqm houses ! 17718 So road ! 8820 Sqm canal.
SWAAD
MINES:
Clearance
Center
Completed
UNOCHA
1 93
3 93
40351 So road.
VARA
AGRIC:
Crop Product
33 villages
Ongoing
FAO /UNDP
12 92
7 93
Multiplication of 7 MT wheat seed & 8 MT DAP.
VARA
WATER:
Karez
áhor Maliq
Completed
WFP
5 92
6 92
Cleaning of 2.7 km karez
Completed
UNDP
1 93
3 93
Cleaning of 25 kt canal i irrigates 8,500 jeribs land & benefit 815 families.
Ongoing
AID /UN
4 92 -- --
Farah
villages
13 villages
irrigates 800 jeribs & benefit 285 families.
Farsi
FRF
WATER:
MSH
HEALTH: Vaccination
Canal
Farah
Farsi
COVERED FROM SHINDAND VSF.
SEE SHINDAND LISTING FOR DETAILS.
Gulietan
CHA
CONST:
Road
Completed
RAP
10 89 12 90
CHA
WATER:
Karez
Ongoing
RAP
9 90 -- --
ACBAR
Repair of road from Gorzanak to north of Parchaman center(50 km)by and tools.
Rehabilitation of 8 karezes in 8 villages, total length 19 km.
DATABASE OF NGÓ ACTIVITIES
Page:
26
A6actrep Date: 26/08/93
6TH EDITION
ACT!vITY
AGENCY
SECTOR
---- VILLAGE(S) - - --
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
VARA
0 92 -- 92
Provision of 0.08 MT agrochemicais.
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.055 MT agrochemicais.
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
AGRIC:
Crop Product
Completed
FAO
6 92 10 92
Multiplication of 2 MT maize seed r 3 MT DAP & 6 Urea.
33 villages
Completed
FAO
11 92 12 92
Bagh Rud
Completed
Comunity
Approved
RONCO
Completed
WFP
Crop Product
WATER:
Canal
Farah
HEALTH; Vaccination
CHA
WATER
CHA
CHA
CHA
CHA
CHA
CHA
CHA
CHA
25 villages
Mehdadi
Distribution of 10 MT wheat seed V 10 MT DAP.
8 91 10 91
1 school / 2 teachers & 38 students.
-- 93 -- --
5 92
Distribution of 140 MT wheat to 6,277 persons.
6 92
Cleaning of 4.36 km canal i irrigates 300 jeribs & benefit 55 families.
30 villages
Ongoing
EC /UNICF
-- -- -- --
1 team - 2 vaccinators
Earn
--
Completed
RAP
10 89 12 90
Rehabilitation of 11 karezes - irrigate 2160 jeribs & benefit 123 families.
WATER:
larez
Mug
Ongoing
RAP
9 90 -- -
WATER:
Canal
Completed
RAP
10 89 12 90
WATER:
Canal
Ongoing
RAP
9 90 -- --
Rehabilitation of 8 canals & a deversion dam.
Farah
CHA
DESCRIPTION>
Khak Safid
AVICEK
CHA
--
RELIEF:Food Items
VARA
<ACTIVITY
SCA
EDUCAT: Primary
VARA
DURATION
Begin --End
Completed
AGRIC:
VARA
FUNDED
- --BY --
Gulistan
Farah
SCA
VARA
-- STATUS --
Khusf
Rehabilitation of 12 karezes.
Rehabilitation of 1 canal.
Laeh Jaween
CONST:
Road
20 villages
Completed
WFP
4 92
8 92
goad repairing.
CONST:
Road
18 villages
Completed
WFP
4 92
8 92
Road repairing.
WATER:
larez
23 villages
Completed
WFP
4 92
8 92
Karez cleaning.
WATER:
Karez
17 villages
Completed
WFP
4 92
8 92
Karez cleaning.
WATER:
Karez
Ongoing
RAP
9 90 -- --
Rehabilitation of 2 karezes.
WATER:
Karez
11 villages
Completed
RAP
3 92
5 93
Cleaning of 6 karezes.
WATER:
Karez
19 villages
Completed
WFP
4 92
8 92
Cleaning of karez.
A C B A R
DATABASE OF N80 ACTIVITIES
Page:
27
ARectrep Date: 26/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Farah
-VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
:ACTIVITY
DESCRIPTION>
Lash Jaween
CHA
WATER:
Canal
CAA
WATER:
Canal
:HA
WATER:
;HA
Ongoing
RAP
9 90 -- --
Rehabilitation of 21 canals.
19 villages
Completed
WFP
4 92
8 92
Cleaning of canai.
Canal
17 villages
Completed
WFP
4 92
8 92
Canal cleaning.
WATER:
FloodControl
Il Tillages
Completed_
WFP
4 92
8 92
Bank protection.
IHA
WÀTER:
FloodControl
11 villages
Completed
RAP
3 92
5 -'93-
Bank -protection.
;HA
WATER:
FloodControl
Completed
RAP
2 91 :6 91
Construction of a temporary flood control dam to save about 22 families.
;HA
WATER:
Drinking
Completed
RAP
2 91
1 well - water pump.
ICIV1
HEALTH: Basic Post
Completed
AID
8 89 -- --
2 F.AID
Completed
UNOCHA
1 92 12 92
1,456,222 Sqm agri.iand & road.
.Lash Jaween
Ongoing
AiD
2 94 -- --
1 NURSE
Lash Jaween
Ongoing
AID
7 89 -- --
2 BHWs
Ongoing
AID
1 91 -- --
1 school in Darak
Survey
6 91
,
i nurse. - OPD.
!CPA
MINES:
ISE
HEALTH: Basic Clinic
ISH
HEALTH: Basic Post
MO
DUCAT: Primary
IRA
AGRIC:
Crop Product
45 villages
Completed
FAO.
it 91 12 91
ARA
AGRIC:
Machinery
45 villages
Ongoing
FAO
9 92 -- --
1 thresher & 300 farmers.
ARA
WATER:
Canal
Iohgah
Completed
Comunity
8 91
Cleaning of 12 km canal / irrigates 15000 jeribs & benefit 700 families.
'ITA
COOT:
Road
Salven
Ongoing
AID
6 92 -- --
Rehabilitation of 25 km road, benefit 30.000 families.
ITA
CORBY:
Road
Dachte Rabat
Completed
AID
-- --
2 92
Rehabilitation of 15 ka road. benefit 30.000 families.
ITA
MATER:
Canal
Iona Souukhta
Completed
AID
-- -- 12 92
ITA
WATER:
Canal
Zang -e -Shadi
Completed
AID
--
6 92
Cleaning of 13 km canal. benefit 35 families.
ITA
WATER:
Canal
Markaz Laween
Completed
AID
--
1 93
Cleaning of 8 km canal. benefit 30 families.
--
1 93
Cleaning of 7.5 km canal. benefit 90 families.
-- -- il 92
Cleaning of 13 km canal. benefit 120 families.
11 minefields
9 91
5 ROOM. 5 BEDS;
f
Markaz Wuluswalil.
Distribution of 10 MT wheat seed
10 MT DAP & 10 MT Urea.
Cleaning of 8 km canal. benefit 42 families.
r
ITA
WATER:
Canal
Jahdoorq
Completed
AID
ITA
WATER:
Canal
Sajak
Completed
AID
ACHAR
DATABASE OF NGO ACTIVITIES
Page:
28
A6actrep Date: 26/08/93
6TH EDITION
AGENCY
VITA
VILLAGES) - - --
SECTOR
WATER:
Canal
Road Kohn
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Completed
AID
-- -- 12 92
Cleaning of 12 km canal, benefit 65 families.
Completed
RAP
10 89 12 90
Rehabilitation of 2 canals-- irrigate 250 jeribs & benefit 44 families.
Ongoing
AID
5 90 -- --
3 mid -level HWs - OPD.
Purchaman
Farah
Canal
CHA
WATER:
INC
HEALTH: Basic Clinic
Waria Nizgan
MSH
HEALTH: Basic Post
Rabat
Ongoing
AID
3 88 -- --
5 BHWs
MSH
HEALTH: Vaccination
Purchaman
Ongoing
AID/UN
4 92 -- --
COVERED FROM SHINDAND VSF.
SCA
AGRIO:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.16 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 86 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
8 89 -- --
4 mid -level HWs.
UNO
EDUCAT: Primary
Ongoing
AID
3 88 -- --
8 schools in Narghar, Sar Houz, Takhat Parchaman, Larwand Rubat, Pemishgan, Deb Sabeel, Sar Mishgan & Deh Rabat
Center
.
SEE SHINDAND LISTING FOE DETAILS.
Shagla.
Crop Product
VARA
AGRIC:
VARA
RELIEF:Food Items
li 92 12 92
13 villages
Completed
FAO
55 villages
Completed
AID
3 93
Ongoing
RAP
9 90 -- --
Rehabilitation of 10 karezee.
6 93
Distribution of 10 MT wheat seed & 10 MT DAP.
Distribution of 220 NT wheat for 12;200 food shortages people.
Qala Kah
Farah
CHA
WATER:
Larez
CHA
WATER:
larez
19 villages
Completed
WFP
4 92
8 92
Cleaning of karez.
CHA
WATER:
larez
17 villages
Completed
RAP
3 92
5 93
Cleaing of karez.
CHA
WATER:
Canal
17 villages
Completed
RAP
3 92
5 93
Cleaning of canal.
CHA
WATER:
Canal
19 villages
Completed
WFP
4 92
8 92
Cleaning of canal.
CHA
WATER:
Drinking
Completed
RAP
2 91
6 91
1 well.
ACBAR
DATABASE OF NGO ACTIVITIES
PaQe:
29
A6actrep Date: 26/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
VILLAGE(S) - - --
Farah
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
<ACTIVITY
DESCRIPTION>
Gala Kah
Oar
Ongoing
AID
5 89 -- --
i BHW
Other
16 villages
Completed
NRC
9 91 12 91
Detail survey of 16 villages of the district.
AGRIC:
Crop Product
65 villages
Ongoing
FAO /UNDP
12 92
7 93
Multiplication of 7 MT wheat seed & 8 MT DAP.
VARA
AGRiC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 7 MT wheat seed and 8 MT DAP.
VARA
INCOME: Handicrafts
Completed
WFP
11 92
54 persons. weaving looms & materials.
Ongoing
EC /UNICF
--
Ongoing
RAP
9 90 -- --
Rehabilitation of 5 canals
1 dental tech i í mid -level HW & 1 lab tech. - Dental / OPD & lab.
MSH
HEALTH: Basic Post
START
CONST:
VARA
Dóadabad
1 93
Shindand
Farah
AVICEN
HEALTH: Vaccination
CHA
WATER:
MCI
HEALTH: Basic Clinic
--
Discontin
AID
4 89 -- --
MSH
HEALTH: Basic Post
Aukul Tajiki
Ongoing
AID
12 88 -- --
MSH
HEALTH: Vaccination
Shindand
Ongoing,
AID /UN
IISH
HEALTH: Other
Shindand
Ongoing
AID
11 90 -- --
NAC
WATER:
Shindand
Completed
NAC
i 91 -- --
SCA
HEALTH: Coapt.Cìínic
Center
Ongoing
SCA
1 90 -- --
1 MD, 5 mid -level HWs
START
CONST:
Shindand
Completed
NRC
9 91 12 91
Detail survey of villages of tae district.
UNO
EDUCAI: Primary
Ongoing
-AID
9 89 -- --
1 school in Masian village.
Faryab
39 villages
Canal
Drinking
Other
1 team - 2 vaccinators
--
some stone masonry work.
7 BHWs
4 92 -- --
8 VACCINATORS, 2 COLD CHAIN TECHNICIANS OPERATE UNDER A COLD CHAIN SUPERVISOR SUPERVISION IN SHINDAND DISTRICT
COVERING 56 VILLAGES IN 3 DISTRICTS IN FARAH PROVINCE.
TARGET GROUPS: CHILDREN 0 -2 YEARS, WOMEN 5 -45 YEARS.
Regional Health Administration (RHA) adminstrative center and depot for issue of supplies and salaries and monitoring
and supervision of the BHWs and health facilities under its jurisdiction.
Almar
MSH
HEALTH: Basic Clinic
Qarah Tana
Ongoing
AID
7 91 -- --
4 MED. TECH., 1 DENTAL TECH. ASST.
MSH
HEALTH: Basic Post
Almar
Ongoing
AID
8 87 -- --
1 BHW
MSH
HEALTH: Vaccination
Altar
Ongoing
AID/UN
S.^.f.
AGRI".:
Ongoing
SCA
.
,.
CEAA
V
Plant Protec
12 22 -- --
5 ROOMS, 5 BEDS, DENTAL. IMMUNIZATION
COVERED FROM FARYAB VSF. SEE MAYMANA LISTING FOR DETAILS.
0 93 -- 93
Provision of 0.12 MT agrochemìcaïs.
DATABASE OF NGO ACTIVITIES
Page:
30
A6actrep Date: 26/08/93
6TH EDITION
ACTIVITY
-VILLAGE(S) - - --
SECTOR
AGENCY
AGR.T.
':?{J
úL'JCAT: Primar;
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ün :ng
AID
? 86 --
4 schools in Sarfali. Khudai Bakht, Yaka Ehana & Najar +gala.
Ongoing
AID /UN
' :agab Ishan
Ongoing
AID
4 92 -- --
1 MD,1 NURSE,
4 88 -- -
5 BHWs
-.
Andk}toy
Faryab
!!SR
FUNDED
---BY--
Ongoing
Other
SCA
-- STATUS --
HEALTH: Vaccination
Andk ov
SEE MAMMA LISTING FOR DETAILS.
COVERED FROM FARYAB VSF.
12 92 --
Belcheragh
Faryab
Cì
MSH
HEALTH: Compr
MSH
HEALTH: Basic Poet
D.-Yra Zang
Ongoing
AI.
MSH
HEALTH: Vaccination
Beicheragh
Ongoing
AID /UN
^,T, Primary
EDUnI
hgoing
AID
6 87 -
,;4C
.Jfilg
;AA
-- 93 --
.4.:.1ií'.`'
1 LAB.TECH.ASST..1 DENTAL TECH.ASST.
IMMUNIZATION, DENTAL,
COVERED FROM FARYAB VSF. SEE MAYMANA LISTING FOR DETAILS.
12 92 -- --
5 schools in Markaz Belchiragh, Kohlian, Gawarchi, Dare Zang & Sarchakan villages.
--
Daiyzab
Fa.ryal'i
See GAA-R2 project in Mazar for details.
GAA
R^u L i 00i items '
HEALTH Basic Clinic
Sar Darac
ongoing
AID
6 91 -- --
MSH
CH
HEAi,i.:
HEALTH: Mme
uu g.
hul
Ongoing
g
AID
L1 91 -- --
1 Nurse,
MoH
HEALTH: Vaccination
Dar:ab'
Ongoing
AID /UN
12 92 -- --
,:.
vn DEi
COVERED FROM FARYAB VSF. SEE E MAYMANA LISTING FOR
DETAILS.
MSH
SCA
Provision of 0.1 MT agrochemicals.
AGRIC:
Completed
0 92 -- 92
SCA
Ongoing
SCA
3
HEALTH: Basic Clinic
9 92 -- --
SCA
EDUCAT: Primary
Ongoing
AID
3 88 -- --
' schools in Khan.aga, Awl ad & Mughul villages.
.INC
Ongoing
AID
4 88 -- --
1 BHW
Ongoing
AID/UN
otgoi g
AID
Faryab
LABORATORY
Plant Protes
Center
3 MED. TECH.
6 ROOMS,IMMUNIZATION
h'ld
under 5 care; healt h education and Dai training programs.
i Tech. Nurse - 3. Rooms; women / children
;,
mid-level
,.
HWs.
Itiowlatabe_dl-
MSH
HEALTH: Basic Post
MSH
HEALTH: Vaccination
UNO
EDUCAT: Primary
Dawiatahad
12 92 -- --
COVER ED FROM FARYAB VSF. SEE MAYMANA LISTING FOR DETAILS.
.
3 89 -- --
1 school in Shor Daryab villages.
DATABASE OF liso ACTIVITIES
Page:
31
A6a_trep Date: 26/08/93
6TH EDITION
11
AGENCY
SECTOR
ACTIVITY
FUNDED
-STATUS-
---BY--
Ongoing
AID
DURATION
Begin--End
-ACTIVITY
HEALTH: Basic Clinic
Qurogn
--
9.1
1
D. TECH.,
1 NURSE
-
MSH
HEALTH: Basic Clinic
Takhayui
Ongoing
AID
MSH
HEALTH: Basic Post
Khamlash
Lingoing
AID
vH
HEALTH: Vaccination
Kohistan
Ongoing
A:DIUN
":NO
DESCRIPTIO-
Kohistan
Faryab
MSH
-VILLAGE(S)-
EDUCAT: Primary
Faryab
11 91 --
4
38 --
2 MED. TECH., 1-D?LOA NURSE
A:D
3 66
j)ngoing
AID
11 38
7 ROOMS
3 :No
--
12 92
ngìng
3 NON, :MMUIZATION
--
COVERED FROM FARYAB VSF. SEE HUMANA LIST:NG FCR )F.T4.:LS.
1 ehcol in Markao AlaqaCeri.
MaYMana
MSH
HEALTH: Basic Post
MSH
HEALTH: MCH
Maymana
Ongoing
AID
11 91 -- --
2 Med. loch.
MSH
HEALTH: Vaccination
Maymana
Ongoing
AID/UN
12 92 -- --
9 VACCINATORS
1 Tech. Nurse 3 Rooms: women j children under '5 can! health education and Dai training programs.
12 ADDITIONAL VACCINATORS PLANNED TO BE HIRED)
AN MD DOCTOR SUPERVISION OPERATE FROM MAYMANA (1601
CHILDREN O-2 YEARS, WOMEN 5-45
RES
EDUCAT: Primary
RBS
SOCIAL:Commu.Particp
RBS
SOCIAL:Other
Ongoing
SCA
AGRIC:
Crop Product
SCA
AGRIC:
SCA
CA
RBS
1 93
Self help 3C.T.IMI fot children.
Ongoing
RBS
1 93 -- --
Training i).*:
RBS
1
Completed
SCA
O
Distribution (.%f 2 MT wheat seed & 2 MT DAP.
Plant Protec
Ongoing
SCA
0 93 -- 93
provision of 0.2 MT agrochemicals.
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.19 MT agrochemical!.
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 70 villages.
-
93
TARGET GROUPS:
YEARS.
Ongoing
--
COLD CHAIN SUPERVISOR, 1 COLD CHAIN TECHNICIAN UNDER
COVERING 9 DISTRICTS IN FARYAB PROVINCE.
70lInteers !community workers).
Established ebld club & child support groups.
--SCA
AGRIC:
SCA
HEALTH: Basic Clinic
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
1ACBAR
Other
Ongoing
SCA
Nawabad, Qadoghak
Ongoing
SCA
Chartoot
Ongoing
SCA
Ongoing
AID
0 93 -- 93
Agriculture survey on 40 villages.
9 mid-level HWs.
5 86 -
4 mid-level HWs.
Ii 37 -- --
5 schools in Imam Sahib, Balooch. Takali, Qatoor & Deh Sayedan villages.
DATABASE OF NGO ACTIVITIES
Page:
32
A6aetrep Date: 26/08/93
6TH EDITION
1
ACTIVITY
AGEiCY
,<._
SECTOR
Faryab
MSH
HEALTH
HEALTH
!ASH
SCA
AGRIC:
AGRIC:
Sc A
SCA
UNO
MSH
MSH
SCA
SCA
UNO
MSH
MSH
SCA
Plant
AGRIC:
FUNDED
DURATION
- --BY --
Begin- -End
<- ACTIVITY
war
r Toot
Ongoing
AI.
11 31 -
4 MED. TECH.
and
Ongoing
AID
.. 87 --
11 BHWs
Ongoing
AID /UN
12 92 --
Ongoing
SCA
0 93 -- 93
Completed
SCA
j
Completed
SCA
0 92 -- 92
Agriculture survey on 87 villages.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ongoing
AID
11 87 -- --
Ongoing
AID
-
Ongoing
AID
4 91 -- --
Pashtcen Eot
..
te.
EDUCAT: Primary
DESCRIPTION)
IMMUNIZATION
COVERED FROM FARYAB VSF.
-
SEE MAYMANA LISTING FOR DETAILS.
Provision of 0.2 MT agrochemicais.
92 -- 92
Provision of 0.19 MT agrochemicais.
12 schools in different villages.
Qaramgul
HEALTH: Basic Clinic
Qaram Qui
-- --
2 mid -level HWs - OPD.
Qaysawr
HEALTH: Basic Clinic
Hazarah Qala
'I NURSE. 3 MED. TECH., i BHÏ, DENTAL TECH. ASST.
2 ROOMS, DENTAL, IMMUNIZATION
HEALTH: Basic Poet
Borgh.an Kalan
Ongoing
AID
12 92 -- --
2 BHWs
HEALTH: Vaccination
QQayswar
Ongoing
AID /UN
12 92 -- --
COVERED FROM FARYAB VSF. SEE MAYMANA LISTING FOR DETAILS.
Research
Completed
SCA
0 92 -- 92
2 crops variety testing trials of wheat.
Plant Protec
Completed
S+ A
0 92 -- 94
Provision of 0.1 MT ag r^ A mi c 9ïÇ
AGRIC:
AGRIC:
EDUCAT: Primary
Faryab
MAI
"h&
Pians ?rcte7
Othe >,
Faryab
MSH
ost
`<.accinztion
Othe
Faryab
INC
.psi'
AGRIC:
SCA
-- STATUS --
Pashtoon Kot
HEALTH' F;asic " n:.
MSH.
<LAGE(S) - - --
Ongoing
AID
1 school in Karak Mir Shadi.
Shirin Tagab
EDUCAT: Primary
Gorziwan
Ongoing
MAI
HEALTH: Basic Poet
Unspecified
Ongoing
AID
HEALTH: Vaccination
Shirin Tagab
Ongoing
AID /UN
Ongoing
SCA
AGRIC:
7 87 -- --
.
Plant Protec
i school.
4 88 -- --
12 92 -- --
2 BHWs
COVERED FROM FARYAB VSF.
0 93 -- 93
SEE MAYMANA LISTING FOR DETAILS.
Provision of 0.1 MT agrochemicais.
A C B A R
DATABASE OF NGO ACTIVITIES
Page:
33
A6actrep Date: 26/08/93
6T11 EDITION I
ACTIVITY
- - -- VILLAGE(S) -- --
SECTOR
AGENCY
Other
SCA
AGRIC:
UNO
EDUCAT: Primary
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
Ongoing
SCA
0 Q3 -- 93
Agriculture survey on 30 villages.
Ongoing
AID
9 8' -- --
2 schools in 3adghisi & Chil Tapa villages.
DESCRIPTION>
Al) Band
Ghazni
AGRIC:
Research
AbïBand
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety & proper use
AFRANE
AGRIC:
Crop Product
Ab Band
Ongoing
RA PF.
-- 93 -- --
Multiplication of see d & fertilizer.
CoAR
AGRIC:
Fruit Trees
Ab Band
Ongoing
RA
FAO
-- 93 -- --
Saplings distribution.
CoAR
AGRIC:
Other
Ab Band
Ongoing
RAP /FAO
-- 92 -- --
Repair agriculture machinery.
CoAR
HEAI;TH: Basic Post
Buzai
Ongoing
AID
7 88 -- --
3 BHWs
MSH
AGRIC:
Ongoing
SCA
0 93 -- 93
Agriculture survey on 20 villages.
SCA
Other
of fertilizer & demonstration plots.
Andar
Ghazni
AGRIC:
Research
Chardewal
Ongoing
RAP
10 93 -- --
demonstration plots.
Variety & agronomical trials to know good variety & proper use of fertilizer &
AFRANE
AFRANE
Research
Waghaz
Ongoing
RAP
10 93 -- --
plots.
Variely & agronomical trials to know good variety & proper use of fertilizer & demonstration
AGRIC:
ATC
MINES:
Clearance
3 villages
Completed
UNOCHA
AVICEN
HEALTH: Vaccination
23'villages
Ongoing
EC /UNICF
AVICEN
HEALTH: Other
'hardewai
ongoing
EC
AVICEN
HEALTH: Other
Bande .ar ie
Ongoing
EC
BDA
WATER:
Éarez
Approved
WFP
-- 93 -- 93
DCA
AGRIC:
Vet
Aman Chardewal
Ongoing
NAC
1 92 -- --
DCA
AGRIC:
Vet
Chalzae
Ongoing
NAC
AGRIC:
Vet
Nani
Ongoing
UNDP
1 92 -- --
Central clinic with 1 asst. veterinarian.
DCA
DCA
AGRIC:
Vet
Mash
Ongoing
UNDP
4 89 -- --
1 paravet.
DCA
AGRIC:
Vet
Mohd Sediq
Ongoing
UNDP
4 89 -- --
1
Destroyed 1123 devices, cleared 568266 3qm village.
6 91 11 91
1 vaccine storage facility & 1 cold chain technician
1 administrator
5 medical t a :nere
3 field trainers
3 buildings &: zonal vaccine storage facility.
Rehabilitation of karezes iFFW}.
. paravet.
1 paravet.
paravet.
6TH EDITION
ACBAR
DATABASE OF NGO ACTIVITIES
Page:
34
A6actrep Date: 26/08/93
ACTIVITY
SECTOR
AGENCY
-
---- VILLAGE(3) - - --
-- STATUS --
FUNDED
- --BY --
DDURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Andar
Ghazni
:?CA
AGRIC:
ie;
andahier
Ongoing
UNDP
4
89 --
--
1 vaccinator.
DCA
AGRIC:
7e:
Mohd Khan
Ongoing
UNDP
4
39 --
--
1 paravet.
DCA
AGRIC:
Vet
Nawabad Nani
Ongoing
UNDP
10
91 -- --
1 paravet.
MSH
HEALTH: Basic Post
Rustam
Ongoing
AID
11
87
7 BHWs
NAC
AGRIC:
Crop Product
Completed
SAC,
9
90
VAC
AGRIC:
Forestry
Chardewal
Ongoing
NAC
10
92 10 94
Forestry tree nursery project.
VAC
AGRIC:
Vet
District level
Ongoing
MAC
--
91
Animal vaccination program.
NAC
AGRIC:
Research
Chardewal
Completed
NAC
9
91
8
92
Complex trial & demonstration plots of different varieties of wheats.
NAC
AGRIC:
Research
Chardewal
Completed
NAC
9
91
8
92
Complex trial of different varieties of wheat.
NAC
CONST:
Road
City
Ongoing
NAC
9 92
9
93
Reconstruction of Band- i- 3ardeh - Miray & Ghazni city road.
VA,
C} 4r.
Pub.Building
Chardewal
Completed
N "
NAC
CONST:
Pub.Building
Miray
Ongoing
VAC
11 92
VAC
EDUCAT: Primary
Bata
Ongoing
NAC
-- 87 -- --
9 teachers / 211 students.
NAC
EDUCAT: Primary
Zurmati
Ongoing
NAC
-- 37 -- --
9 teachers / 105 students.
NAC
EDUCAT: Primary
Shamshi Diwi
Ongoing
NAC
-- 87 -- --
9 teachers / 159 students.
VAC
EDUCAT: Primary
Qaia- e -Khani
':ngoing
NAC
-- 87 -- --
9 teachers ! 244 students.
VAC
EDUCAT: Primary
Alam Khei
Ongoing
NAC
-- 8
9 teachers / 187 students.
VAC
EDUCAT: Primary
Alah Mohammad
Ongoing
NAC
-- 87 -- --
9 teachers / 115 students.
NAC
EDUCAT: Primary
Mangcor
Ongoing
NA!:
NAC
EDUCAT: Primary
Joi -8
Ongoing
SAC
-- 87 -- --
8 teachers i 84 students.
VAC
EDUCAT: Primary
Hakim Khan
Ongoing
MAC
-- 8? -- --
9 teachers / 196 students.
MAC
EDUCAT: Secondary
Ali Kai
Ongoing
NAC
-- 87 -- --
10 teachers & 231 students.
-
G
yi
-- --
7
Distribution of 2 MT improved wheat seed / 2 MT Urea & 2 MT DAP to 50 farmers in 30 villages.
91
-- --
7 91
s.
Reconstruction of a hospital - cement, atone & glass.
9 93
Repairing of high school.
teachers / 149 students.
DATABASE OF NGO ACTIVITIES
Page:
35
A6actrep Date: 26/06/93
ACTIVITY
AGENCY
SECTOR
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
DBSCRIPTION?-
:ACTIVITY
Andar
Ghazni
DUCAT:
SAC
- - -- VILLAGES) - - --
Secondary
aecondarf
'oi-4
n:;,g.:.,r
,;,,-
,?AC
_-
,eacher :
-_
,
,x
:,
.., s>>den ts.
VAC
3DUCAT: Secondary
rshnoon
Ongoing
NAC
-- 37 -- --
12 teachers k 447 students.
NAC
EDUCAT: Secondary
Shahal Ehei
Ongoing
NAC
-- 87 -- --
11 teachers & 305 students.
NAC
EDUCAT: Secondary
Miray
Ongoing
NAC
-- 37 -- --
13 teachers & 542 students.
NAC
EDUCAT: Secondary
Eundai
Ongoing
NAC
-- 87 -- --
10 teachers & 193 students.
NAC
EDUCAT: Secondary
Zakooni
Ongoing
NAC
-- 87 -- --
10 teachers & 173 students.
NAC
HEALTH: Distrct Hosp
Chardewal
Ongoing
NAC
-- 89 -- --
12 bed hospital - X-ray r lab /- surgical / dental / MCH services í 100 pts.OPD per day.
NAC
HEALTH: Med.Training
Chardewal
Ongoing
NAC
NAC
HEALTH: Vaccination
Provincial level
Ongoing
UNICEF /S
-- 89 -- --
RDA
AGRIO:
Crop Product
Ongoing
FAO
10 92
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.085 MT agrochemicals.
SCR
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 85 villages.
SCA
AGRIC:
Other
--
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
EDUCAT: Primary
Payendeh
Ongoing
SCA
5 86 -
2 schools ! 14 teachers / 280 students
SCA
HEALTH: Compr.Cïinic
Nani
Ongoing
SCA
4 86 -- --
i MD
Ongoing
SA
SCA
8 39 -- --
3 mid-level d«s
,
,
,
Clinic
HEALTH: Basic .i
Abdullah Qala
ala
5 93
7 93
Dai (midwife) training program.
Freeze point with 200,000 doses / 10 vaccinators / 2 cold chain supervisros.
7 93
Distribution of 15 MT wheat & 15 MT DAP.
--
4 mid -level HWs
1 Dental Tech.
,
1 Lab Tech.
L Dental Tech.: 1:,ab cecn.
Tech.
EDUCAT: Primary
Ongoing
AID
6 87 -- --
23 schools in different villages.
WROR
AGRIC:
Crop Product
Ongoing
FAO
4 93 -- --
Distribution of 5 MT wheat see' & 5 MT DAP.
`+iROR
WATER:
Lares
Completed
UNDP
-- 92
5 93
Rehabilitation of 6 karezes.
Ongoing
HCR
-- 89 -- --
3 tractors & 30 water pumps.
Ghazni
AFRANE
AGRIC:
IACBAR
i X-ray Tech.
.
.
UNO
--
ì
Deli Yak
Machinery
Deh Yak
DATABASE OF NGO ACTIVITIES
Page:
36
A6actrep Date: 26/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR-
TILLAGE(S) - - --
Ghazni
FUNDED
-- STATUS --
DURATION
AGRIC:
APWO
RELIEF:Food
Crop Product
terns
`5
vi::iage:
l'Llak
-
FAO /UNDP
9'92
7 93
5 MT improved wheat seed and 5 MT DAP for multiplication.
Completed
WFP
1 90
6 90
Emergency food distribution - 430 MT wheat to
8 91
9 91
Emergency food distribution - 98 MT wheat to 780 families.
RELIEF:Food items
Rabat
Completed
WFP
AVICEN
HEALTH: Vaccination
28 villages
Ongoing
EC /UNICF
-- -
?SAR
WATER:
Sondar
Completed
UNDP
12 90
5 91
Deh Yak
Ongoing
UNIT
i 93
6 93
Ongoing
;Donors
10 92
4 94
HRD
DESCRIPTION>
Ongoing
APWO
AGRIC:
<ACTIVITY
Deh Yak
AFS
GAF
__.. -__.
Begin-End
- --BY --
Karez
Vet
INCOME: Skill Train.
Nani
1562 families.
1 team - 2 vaccinators
Rehabilitation of 6 km karez - irrigate 2,000 jeribs & benefit 40 farmers.
:
assist DVM ! 2 paravet í 1 guard curative & preventive service.
Basic trade skills - masonry
carpentry / automechanics .' welding i plumbing i house wiring & tinsmith (20 -25
students for 3 -4 monthsl.
íRD
LL'I
MAI
INCOME: Skill Train.
Sardeh
Ongoing
;Donors
HEALTH: Basic Clinic
Rabat
Ongoing
.EDUCAT: Primary
Rabat/Ramak /Bachak
Ongoing
MAI
10 92
4 34
Basic trade skills - masonry / carpentry / automechanics i welding i plumbing ! house wiring & tinsmith (20 -25
studens for 3 -4 months).
3 mid-level HWs/ 2 F - aiders - OPD.
-
--
--
5 schools.
.
MSH
HEALTH: Basic Post
Rabat
Ongoing
AID
7 88 -- --
PGRO
WATER:
Canal
Deh Yak
Completed
CIDA
-- 90 -- 91.
WATER:
Karez
12 villages
Ongoing
UNDP
4 93 11 93
Rehabilitation of 21 karezes.
AGRIC:
Plant Prote.
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
Completed
SCA
92 -- 92
RDM
SCA
Ongoing
'
3 BHWs
Rehabilitation of irrigation syetem & agricultural land.
SCA
AGRIC.
Pleat Proteo
SCA
ASPI':
Other
Completed
SCA
+1 92 -- 92
Agriculture survey on 72 villages.
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ongoing
AID
h h?
ECA
UNO
EDUCA": Primary
--
-
Provision of 0.095 MT agrochemicals.
il schools in Shasham. Rubat(3), Red. Tasun, Ramak, Balai Deh Yak, Rozi(Ibrahim Zai), Sar Andaz & Gala Alim
villages.
Ghazni
AFRANE
AGRIC:
1ACBAR
Gelan
Research
Gelan
RAP
i
át
-
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
-
DATABASE OF NGO ACTIVITIES
6TH EDITION
4
Page:
3?
A6actrep Date: 26/08/93
SECTOR
AGENCY
-- .- VILLAGEIS1 - - --
Ghazni
FUNDED
DURATION
- --BY --
Begin --End
<ACTIVITY
130 villages
Ongoing
3C'UNICF
2 teams - 4 vaccinators
,OAR
AGRIC:
Crop Product
Galan
Ongoing
RAP/FAO
-- 92 -- -
Multiplication of seed & fertilizer.
-,0AR
AGRIC:
Fruit Trees
Galan
Ongoing
RAP /FAO
-- 92 -- --
Saplings distribution.
;)AR,
CONST:
Road
Galan
Ongoing
WFP
-- 32 --
Repairing of road (Galan - Mogor;.
.,;AF.
CONSTT:
Pub.Buiìding
Getan
Ongoing
WFP
-- 92 -- --
MSH
HEALTH: Basic Post
Gawhar
Ongoing
AID'
3CA
AGRIC:
Plant Proteo
Ongoing
FA
3CA
AGRIC:
Other
Ongoing
SCA
'
-
Rehabilitation of ¡elan secondary 3ehoc::8 moms
5 BHWs
" 88 -- --
:i
Provision of 0.05 MT agrochemicais.
93 -- 93
Agriculture survey on 30 villages.
9 93 -- 93
Ghazni
Ghazni
AAWDV
DESCRIPTION>
Gelan
HEALTH: Vaccination
AVICEN
ACTIVITY
-- STATUS --
INCOME: Handicrafts
Pir ähel
Ongoing
Offering tailoring training & facilities to disabled people.
92 -- --
Multiplication of maize & sung seed.
-- 93 -- 93
-FAO
?BANE
:.ERIC:
Crop Product
Ghazni
Ongoing
,FRANE
AGRIC:
Machinery
Waghaz
Ongoing
H
AGRIC:
Crop Product
12 villages
Ongoing
FAOiUNDP
9 92
7 93
5 MT improved wheat seed and 5 MT DAP for multiplication.
MATER:
garez
Waghaz
,ompìeted
VAC
3 33
5 95
.: karezes: total length 2.6 Km - irrigates 1600 jeribs - benefits 280 families.
3halez
Ongoing
CID(US)
5 villages
.,.r;:ïet;d
',HOCHA
AFC
'.RD{-
HEALTH: Ccmpr.Clinio
'LINES:
Clearance
HEALTH: Vaccination
60
'EC
village?
-
.
38
4 tractors & 3 threshers.
..-
91 -- _-
1 MD
.
3 HWs - it has 2 sub -clinics: 1 in Torgan
1 nurse
grazing land
.
.
2 HWs) &
1
in 7hogiani i2 nurses i 2 HWsi.
village & road.
:1m2 - 3 vaccinators
,
rain nd :f 30 women in spinning.
Various
Ongoing
;+:A
WATER:
garez
Bakawuì
Completed
:A?
Ai3...-,
';et
Center
Ongoing
"..
HEATH: Disabled Re::
spandi
Ongoing.
AID
:Arn
'îNS
Cther
Spandi
Ongoing
NOVIB
BAR
I nurse
Destroyed 1092 devices. cleared 310058 Sqm agri.iand
92
F
INCOME: ;gii1 Train.
A
'
CIDP
2 91
á
GO
Rehabilitation of 1.454 m karezes tunnel & exca. of 1,600 5gm benefit 614 families.
w 91
r
.
12 g0
D!M
",navet
1
guar: curative & preventive service.
4 orthopaedic technicians manufacture -..t,:^.e° & prostheses.
2 brick -kilns with capacity of producing 500,000 bricks & lime.
DATABASE OF NGO ACTIVITIES
Page:
38
A6actrep Date: 26/08/93
6TH EDITION 1
ACTIVITY
AGENCY
SECTOR
Ghazni
-VILLAGE(S) - - --
EDUCAT: Primary
IAHC
HEALTH: Provinc.Hosp
HEALTH: Compr.Clinic
IAHC
IAHC
HEALTH: Disabled Reh
ISRA
EAt;
LDI
MCPA
MSH
tACTIVITY
16 villages
DESCRIPTION>
52 villages
Spandi
Ongoing
HEKS
15 schools / 97 teachers i 351 female & 1846 male students.
Ongoing
NOVIB
100 beds
Ongoing
NOVIB
16 mid-level HWs i i female MD ¡
6 MD ! 20 nurses r X-ray r vaccination
1
female nurse
RAP
Ongoing
NOVIB
Spandi
Ongoing
NOVI?
Snalez
Ongoing
NOVIB
INCOME: Help Vuïner.
Center
Ongoing
ISRA
8 92 -- --
Assistance to 106 orphans.
SOCIAL:Magazine
Ghazni
Completed
ME/AID
7 91
Pubication of a monthly magazine(Saday -e- Rosta).
HEALTH: Compr.Clinic
Qadam Daran
Ongoing
LDT
1 MD / 1 murse i
Ongoing
LDI
3 mid - level his
HEALTH: Other
INCOME: Other
WATER:
Kares
ddAL1I:. Basic Clinic
MAI
DURATION
Begin- -End
Ongoing
:AHC
IAHC
FUNDED
- --BY --
Ghazni
IAHC
IAHC
-- STATUS --
ry.:A1
MINES:
Laghari
Primary
Nabat
at
Ongoing
MAI
Survey
18 minefields
Completed
UNOCHA
Mangor
Ongoing
A..!
io
HEALTH: Compr.Clinic
--
MCH ¡ dental i surgery / 200 -250 patients OPD /day.
! lab
,'
X -ray
6 beds & 80 OPD patients I day.
4 technicians
1 supervisor /13 support staff i making AL,BE protheses / crutches & minor physiotherapy / production
of 4 protheses in a month.
1
--
lab with 4 technicians i urine analysis / stool exam i blood test / 30 patients OPD /day.
4 water pumps / 2 tractors f 14 staff the benefit of this project is for rural development program..
Rehabilitation of karez. irrigate 300 jeribs land.
2 93
lab tech - OPD.
1
2 nurses
.
.
2 med students - OPD.
. school.
5 92
8 92
12 vV
--
338,528 Som grazing lands / agri.lands / road / irrigation & residential.
2 MD, 1 MED. TECH.,
. LAB. TECH ASST.
3 ROOMS, L n BOnAnr Ri,ORl O AED n SURGERY, DENTAL. VOLUNTEER Hn AL1H SISTER (VHS
AND DAI TRAINING
HyAL.r.. Basic Pos
1
^
1
i. .L.. v
.Dy
:.C:
:,f.n
SCA
SCA
rlëm.a.^..
.
E:Ns
/NCA
Kars:
..ant ;roten
A:::,iC.
Plant Proter.
Other
EDUCAT: Primary
ACHAR
,-.
..a..
AGRI'.:
AGRIC:
;.,s
.n_ in_
Aad Waghaz
... the
4
.. 93
'1 i:.v.vv
..
..
1..
Rehabilitation of 4 ia"ezes
.
irrigate
CAA
0 92 -- 92
Provision of 0,095 MT 9gr^cRemica''s.
Ongoing
SCA
0 93 -- 93
Provision of 0.14 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
Ongoing
SCA
11 87 -- --
4 schools
,
28 teachers
39
oR
benefit 1.700 families.
557 ;students
DATABASE OF NGO ACTIVITIES
Page:
..
A6actrep Date: 26/08/93
6TH EDiTION
II
ACTIVITY
AGENCY
- - -- -- SECTOR
VILLAGE(S) - - --
SCA
HEI.TH: Compr.Clinic
UNO
EDt ;AT: Primary
Ghazni
Rawza
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
< ACTIVITY
Ongoing
SCA
6 92 -- --
1 MD / 4 mid -level HWs / 1 Nurse
Ongoing
AID
6 87 -- --
19 schools in 17 different villages.
DESCRIPTION>
Giro
AFRANE
AGRIC:
Machinery
Giro
Ongoing
EC /FAO
-- 88 -- --
2 tractors & 2 threshers.
AFRANE
&ERIC:
Research
Giro
Ongoing
RAP.,
10 93 -- --
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
AFRANE
WATER:
Canal
Giro
Ongoing
UNDP
-- 93 -- 93
Irrigation repair.
MSH
HBALTH:,Basic Post
Nani Ghund
Ongoing
AID
5 89 -- --
2 BHWs
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.05 MT agrochemiçals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Ghazni
Jaghatu
.
&FRANE
AGRIC:
Machinery
AFRANE
AGRIC:
Research
AFRANE
WATER:
Canai
AVICEN
áakrak
Ongoing
RAP
-- 90 -- --
2 tractors'& 2 threshers.
Kakark
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety & proper use of ferilizer & demonstration plots.
Jaghatu
Ongoing
UNDP
-- 93 -- 93
Irrigation repair.
HEALTH: Vaccination
210 villages
Ongoing
EC/UNICF
--
3 teams - 7 vaccinators.
AVICEN
HEALTH: Other
Kakrak
Ongoing
EC
CCA
WATER:
Canai
Qiaq
Completed
WFP
DACAAR
CONST:
Púb:Building
Torgam
Completed
DACAAR
DACAAR
WATER:
Garez
Jaghatu
Completed
DACAAR
DCA
AGRIC:
Vet-
Kafshi 3arab
Ongoing
UNDP
IO 89 -- -
2 paravets.
DCA
AGRIC:
Vet
Cha'ma
Ongoing
UNDP
10 91 -- --
1 paravet.
IMC
CONST:
Pub.Building
Eakrak /Shaki
Completed
WHO
5 90 12 92
MAI
EDUCAT: Primary
Suleiman
Ongoing
MAI
-- -- -- --
A C R A R
-
1 VSF & i CC technician
4 91 11 91
-- 92 -- 92
6 91
3
92
Rehabilitation of 9.5 km irrigation channes' & irrigation wells.
Primary school building
Rehabilitation of 3 karezes(Shahniager.Boygara Mirak & Lalandar) total length 2.70 km.
Clinic building.
1 school.
DATABASE OF NG0 ACTIVITIES
Page:
40
A6actrep Date: 26/08/93
AGENCY
SECTOR
-VILLAGE(S1-
ACTIVITY
FUNDID
- STATUS-
- --BY --
Begin --End
-- -
MAI
EDUCAT: Primary
Eashaf,Omarwai Cha
Ongoing
MAI
MSH -
HEALTH:.Distrct Hosp
Eakrak
Ongoing
AID
MSH
MSH
'
<ACTIVITY
DESCRIPTION>
Jaghatu
Ghazni
MSH
DURATION
-- --
3 schools in Xashaf. Omarwal Waghaz & Chardewal.
9 91 -- --
2 MD / 1 NURSE / 1 ADMIN. / 2 MED TECH / 1 LAB TECH ASST / 1 X -RAY TECH ASST i
SURGERY / IMMUNIZATION.
10 BEDS
LAB i X -RAY i GENERAL
HEALTH:Basic Post
Qaïa Mohd Khan
Ongoing
AID
11 87 -- --
HEALTH: MCH
Deh Ghulam Shah
Ongoing
AID
5 91 -- --
i MD. 2 Nurses 1 Lab.. Tech.
AID /!UN
7 91 -- --
12 VACCINATORS, 1 COLD CHAIN TECHNICIAN OPERATE UNDER A COLD CHAIN SUPERVISOR WITH IMMUNIZATION TECHNICIANS TRAINED
BY AN IMMUNIZATION TRAINER OUT OF THE VSF IN EAIRAE, JAGHATU (606) COVERING ABOUT 45 VILLAGES
IN 4 DISTRICTS OF
GHAZNI PROVINCE. BEFORE THE ESTABLISHMENT OF KAUAI VSF THE ABOVE VILLAGES WERE COVERED BY THE KAJAB (407) VSF
HEALTH: Vaccination.
Eakrak
Ongoing
13 BHWs
2 Rooms: women
children under 5 care: health education and Dai training programs.
.
TARGET GROUPS: CHILDREN 0 -2 YEARS AND WOMEN 5 -45 YEARS.
MSH
MSH
NAC
NAC
NAC
NAC
HEALTH: Other
HEALTH: Other
AGRIC:
AGRIC:
Crop Product
Crop Product
Eakrak
Ongoing
AID
7 90 -- --
Regional Health Administration (RHA) administrative center and depot for issue of supplies and salaries and
monitoring and Supervision of the BHWs and health facilities under its jurisdiction.
Surkhi Jaghatu
Ongoing
AID
6 93 -- --
Regional Health Administration (RNA) administrative center and depot for issue of medical supplies and salaries and
monitoring and supervision of the BHWs and health facilities under its jurisdiction
Ehogiani
Ongoing
FAO
Eakrak
Ongoing
FAO
Ongoing
NAC
Completed
NAC
HEALTH: Compr.Clinic
Ehogiani
RELIEF :Food Items
Eakrak
.
.
'
11 92
8 93
Multiplication of improved wheat seed.
'3 93
8 93
Multiplication of improved wheat seed.
-- 91 -- --
5 93
1 MD - 5 beds / minor surgery ! OPD.
6 93
Emergency ration for 400 displaced families from Kabul.
NAC
WATER:
Earez
Cómpleted
NAC
11 91 -- --
RDA
AGRIC:
Crop Product
Completed
FAO
10 91
7 92
Multiplication of seed at the coat of Rs. 351,160.
10 91
3 92
5,600 saplings
RDA
SCA
SCA
SCA
SCA
38 karezes in different villages - Total length : 18.66 km including digging new tunnel / wells & stone work.
irrigate 3,8877 J. 1 benefit 709 families.
AGRIC:
Fruit Trees
Completed
FAO
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.05 MT agrochemical!.
AGRIC:
Plant Protes
Completed
SCA
0 92 -- 92
Provision of 0.09 MT agrochemicals.
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 87 villages.
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
AGRIC:
IA'C B A R
DATABASE OF NGO ACTIVITIES
Page:
41
A6actrep Date: 26/08/93
6TH EDITION]
ACTIVITY
SECTOR
IGENCY
- - -- VILLAGE(S) - - --
3hazni
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jaghatu
;CA
EDUCAT: Primary
Musa Ehel
Ongoing
SCA
9 89 -- --
4 schools
MCA
EDUCAT: Primary
Q1aq
Ongoing
SCA
¡ 90 -- --
3 schools / 20 teachers
;CA
HEALTH: Compr.Clinic
Gandab Tugan
Ongoing
SCA
1 90 -- --
1 MD
EDUCAT: Primary
--
Ongoing
AID
6 8' -- --
12 schools in different villages.
'ITA
CONST:
Bridge
Qala.Naw
Ongoing
AID
6 32 -- --
Construction of 18 m bridgeiconcrete & masonry, benefit 20'
'ITP.
WATER:
Canal
Qaia Naw
Completed
AID
-- -- 10 92
Cleaning of 7 km canal. benefit 171 families.
'ITA
WATER:
Canal
Sokhta Sandal
Completed
AID
-- -- 10 92
Cleaning of 2.3 km canal. benefit IOO families.
'ITA
WATER:
Canal
Eushk
Completed
AID
-- -- 10 92
Cleaning of .O km canal, benefit 700 families.
'ITA
WATER:
Structure
Pirakay
Discontin
AID
-- -- --
NO
3hazni
RC
29 teachers / 356 students
10 mid -level HWs
;
.
800 students
1 Pharmacist
families.
Construction of 100 m intakeigabion =work;, benefit 171 families.
Jaighori
4 93
593
Distribution of vegetable seedlings.
9.i
3 93
Designing extension education for horticulture.
*Donors
3 93
9 93
Distribution of fruit saplings.
Approved
*Donors
3 93 10 93
Nursery establishment.
Ongoing
*Donors
3 83
6 93
Recording & data from wheat
Ongoing
*Donors
8 93
8 93
Preparing of seed & fertilizer next wheat seed trials.
Plant :roter,
Complete':
*Donors
..
9:
3 93
Testing 2-3 new method n f local material for ne at & disease e .ontrol.
AGRIC:
Other
Ongoing
*Donors
g 93 10
RC
AGRIC:
Other.
Completed
*Donors
2 93
2 93
Obtain amount of vegetable seed.
RC
AGRIC:
Other
Completed
*Donors
2 93
3 93
Designing extension education for vegetables.
RC
CONST:
Bridge
Tekol Goo
Ongoing
'!Donors
4 93
9 93
Length 18 m i tonnage 0.5 T
CONST:
Bridge
Ab Borda
Ongoing
*Donors
5 93
8 93
Length 21 m ! tonnage 30 T
AGRIC:
Crop Product
Completed
*r onors
RC
AGRIC:
Fruit Trees
Completed
*Donors
RC
AGRIC:
Fruit Trees
Ongoing
RC
AGRIC:
Fruit Trees
RC
AGRIC:
Research
RC
AGRIC:
Research
RC
AGRIC:
RC
RC
A C B A R
--
--
.,
seed trials.
Perparing of land and sowing.
:93
DATABASE OF NGO ACTIVITIES
Page:
42
A6actrep Date: 26/08/93
material use cable i wood r steel & cement.
material use scone i cement & pole wood.
6TH EDITION 1
AGENCY
SECTOR
Ghazni
ARC
HEALTH: Mobile /: -Aid
ZAG
AGRIC:
ZAG
AG RIiC:
.Aü
.G.¿^.
ZA:
WATER:
LEEPCO
MSH
DISH
Fruit Trees
..
Kares
HEALTH: Compr.Clinic
, ompr.0 ïinic
HEALTH: Basic Clinic
HEALTH :
Sabz Sang
Rahi Za a
211 villages
Sangi Masha
Angori /6
Agor: ,6
Arger:/;
Angor:/6
HEALTH: Other
HEALTH:
2 villages
Angori
DUCAT: Teacher
ZAG
MSH
Crop Product
EDUCA?. literacy
KAG
M C;
Crop Product
CONS:':
ï;:
MSH
Structure
HEALTH: Vaccination
INDOORS
MSH
Structure
WATER:
AVICEN
MSH
Structure
WATER:
ARC
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
<ACTIVITY
Jaghori
WATER:
SRC
- - -- VILLAGE(S) - ---
Basic Post
HEALTH: MCH
HEALTH: MCH
HEALTH: MCH
Angori/6
Angori /5
Qadi
Sangi I!asha
Dawood
Miyana Loman
'l b
a . : Angoori
Zeerak
Zeerak
Shughla
Jngoing
*Donors
Ongoing
=Donors
Ongoing
*Donors
irrig +ring
5 93
9 93
4 33
4 93
Construction of 200 m retaining wail ¡
9 93
Gabion construction length 80 m
9 93
Construction of 34 m aqueduct
EC /UNICF
3 teams -
:ongoing
INDOORS
i MD / 3 nurses - 2 ambulances.
Completed
FAO /UNDP
Completed
FAO/UND:
Completed
+ái
Completed
yáD/i?Ej
Completed
AF/UNES
4 90 10 91
1+efor
rT 4
200 students & 20 teachers
4
3 months.
SI
Completed
OXFAM
6 89 12 90
38 teachers in 2 weeks.
Completed
UNDP!WFP
4 91
3980 m karez rehabilitated.
Ongoing
Germany
Ongoing
AID
Ongoing
AID
Ongoing
AID
91
Provides health care for leprosy & general patients
assistant.
2 300 -- --
1 90 --
nB -- --
Ongoing
AID
8 90 -- --
Ongoing
AID
2 M D.
--
AID
AID
1 MD, 2 MED. TECH.,
2 90 -- --
Ongoing
Ongoing
2 MED. TECH... LAB TECH. ASST. 1 DENTAL TECH. ASS ".
1 doctor assistant.
1 BHW.
HEALTH: Vaccination
Jaghori
Ongoing
AID /UN
91 -- --
6 ROOMS. 1 BED, LABORATORY. DENTAL,IMMUNIZATION
ROOMS. 3 BEDS, LABORATORY, IMMUNIZATION
1 dental tech assistant - 6 rooms, 9 beds, dental & immunization.
; BHW s
1 Nurse.
3 92 -- --
11 90 -- --
a -full lab. testing service / 1 leprosy technician & 1 field
I LAB. TECH. ASST., 1 DENTAL TECH. ASST.
1 BHW
i Room: women /children under 5 care
i MD.
1 Med Tech. 3 Rooms:
1 MD:
1 Assist. Lab. Tech. 1 Dental Tech.
training.
MSH
distributed :' extension work.
school
C34Ci 011:ld. G repaired a upgraded.
9':
8
material use stone r steel bar & cement.
6.000 saplings 1f apple x plum have been distributed.
j 90 .l 90
.
material use stone & gabion box,
4^ seed & 1.5 Ni fertilizer distributed.
.. 30,1. 90
:
material use stone í cement & gabion box.
vaccinators
21.5 MT seed & 1.5 MT fertilizer
90
DESCRIPTION>
COVERED FROM KAKRAK VSF.
,
healt
education and Dai training programs.
women i children under 5 care: health education and Dai training program.
Women I children under 5 care: dental care, hellth education, dai-
SEE KAKRAK /JAGHATU LISTING FOR DETAILS.
IACBAR
DATABASE OF NGO ACTIVITIES
6TH EDITION
Page:
43
A6actrep Date: 26/08/93
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jaghori
Ghazni
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
Ongoing'
SCA
O 93 -- 93
Agriculture survey on 40 villages.
Mian Chel
Ongoing'
SCA
3 88 -- --
6 schools /.43 teachers ! 1.007 students
Pub.Building
Center
Completed
INDOORS
-- --
CONST:
Pub.Building
Sangi Masha
Completed
INDOORS
-- 87 -- 92
Hospital with 40 rooms - stone -& cement.
SCO
GUST:
Pub.Building
Sangi Masha
Completed
INDOORS
-- 88 -- 89
High school with 20 rooms - stone & cement.
SCO
EDUCAT: Primary
Naiq Ala
Ongoing
INDOORS
-- 89 -- --
1 school for boys / 12 teachers & 530 students.
SCO
EDUCAT: Primary
Chil -Baghto
Ongoing
INDOORS
-- 89 -- --
1 School for boys / 12 teachers & 656 students.
SCO
EDUCAT: Primary
Aicha
Ongoing
INDOORS
-- 89 -- --
1 School for boys i 12 teachers & 460 students.
SCO
EDUCAT
Baba
Ongoing
INDOORS
-- 89 -- --
1 School for boys / 12 teachers / 450 students.
SCO
EDUCAT: Primary
Dan -Merda
Ongoing
INDOORS
-- 89 -- -
1 School for boys / 12 teachers & 480 students.
SCO
EDUCAT: Secondary
Sangi Masha
Ongoing
INDOORS
-- 89 -- --
Boys & girls high school for 1260 students.
SCO
EDUCAT: Secondary
Bosaid
Ongoing
INDOORS
-- 89 -- --
School for,boys & girls / 15 teachers & 810 students.
SCO
EDUCAT: Secondary
Dawood
Ongoing
INDOORS
-- 89 -
School for boys / 12 teachers & 620 students..
SCO
EDUCAT: Secondary
Hutqul
Ongoing
INDOORS
-- 89 -- --
School for boys / 14 teachers & 760 students..
SCO
EDUCAT: Secondary
Pushti -Chub
Ongoing
INDOORS
-- 89 -- --
School for boys
SCO
EDUCAT: Secondary
Tabqus
Ongoing
INDOORS
-- 93 -- --
School for girls / 12 teachers & 403 students.
3CO
EDUCAT: Literacy
Jaghori
Ongoing
TAF
sCOe
EDUCAT: Literacy
Sangi Masha
Ongoing
TAF
-- 89 -- --
Literacy for women / 2 teachers & 45 students.
SCO
EDUCAT: Literacy
Sangi Masha
Completed
TAF
12 91
Literacy. basic health training for 40 women - 6 month sessions
SCO
HEALTH: Provinc.Hosp
Center
Ongoing
INDOORS
-- 92 -- --
50 bed hospital - surgical / medical / orthopaedic & OPD services.
SCO
HEALT**
Sangi Masha
Ongoing
INDOORS
-- 88 -- --
45 patients / day.
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Other
SCA
EDUCAT: Primary
SCO
CONST:
SCO
A C B A`
Primary
Basic Post
--
-
9 91
1 92
--
A hospital building (50 beds)
,
15 teachers & 820 students.
85 women trained.
9 93
3 93
DATABASE OF NGO ACTIVITIES
Page:
44
A6actrep Date: 27/08/93
.
6TH EDITION
ACTIVITY
-- STATUS --
---- VILLAGE(5' - - --
SECTOR
AGENCY
FUNDED
- --BY --
DURATION
:ACTIVITY
Begin --End
DESCRIPTION>
3 schools in Karez Batoo, Batoo & Sabz -Sang Haider villages.
3 98 -- --
Ongoing
AID
Laghari
Ongoing
ASDAA
-J84
Khwaja Omri
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety & proper use of fertilizer + demonstration plots.
HEALTH: Vaccination'
39 villages
Ongoing
ECiUNiCF
-- -- -- --
1 team -.3 vaccinators
CCA
HEALTH: ted,Training
Tormay
Completed
OXFAM
l0 91'
5 92
20 women were trained in 3 months as FHW & TBA.
GAF:.
AGRIC:
Khwaja Omri
Ongoing
.UNDP
4 90
6 93
1 DVM í 2 paravet i 1 guard curative & preventive service.
GAF
HEALTH: Compr.Clinic
Ongoing
GAF
Ongoing
AID
7 88 -- --
Ongoing
AID
11 90 -- --
EDUCAT: Primary
UNO,
Khwaja Omri
Ghazni
ACRD.
HEALTH: Basic Clinic
AFRANE
AGRIC:
'AYICEN
Research
Vet
'HEALTH: Basic Post
MSS
MSH
Barakat
No Burja
HEALTH: tlCH
-
BHU with dressing ! consultation
-- --
dentistry facilities.
OPD i 1 doctor / 2 nurses & 1 guard.
-- 92 -- -
2 Billie
i MD.
1 Nurse / Midwife i Compounder, 1 Lab. Tech.
i Dental Tech; 4 Rooms; Women / Children under,5 care, heallth
education. dai training
Cleaning of 22 karezes.
NAC
WATER:
éarez
Barakat/Deh,Haji
Ongoing
NAC
9 92
7 93
SCA
AGRIC:
Plant Protec
--
Completed
SCA
0 92
92
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.05 agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ongoing
AID
5 87 -
2 schools in Bahadar & Cha Asp villages.
ongoing
AID
7 87 -- --
4 schools in Gaia Naw Bala, 9 Burja, Ali Abed & Bini Sang villages.
Distribution of vegetable seedlings.
UNO
.UNO
.
EDUCAT: Primary
--
EDUCAT: Primary
Ghazni
Provision of 0.05 MT agrochemicais.
--
Malestan
ARC
AGRIC:
Crop Product
--
Completed
*Donors
4 93
ARC
AGRIC:
Fruit Trees
--
Approved
*Donors
8 93 10 93-
Nursery establishment.
ARC
AGRIC:
Fruit Trees
--
Ongoing
*Donors
3 93
9 93
Distribution of fruit saplings.
ARC
AGRIC:
Fruit Trees
Completed
*Donors
2 93
3 93
Designing extension education for hortjculture.
A C B A R
5 93
DATABASE OFNGO ACTIVITIES
Page:
45
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
-VILLAGE(S) ----
FUNDED
-- STATUS --
- --BY --
DURATION
Begin --End
.ACTIVITY
DESCRIPTION>
Malestan
Ghazni
ARC
AGRIC:
Research
Approvëd
*Donors
8 93
8 93
Perparing of seed & fertilizer for next seed trials.
ARC,
A{' RIi;.
'
earoh
Research
Ongoing
*Donors
3 93
8 93
Recording & data from wheat seed trials.
ARC
AGRIC:
Plant Protec
Completed
*Donors
2 93
3 93
Testing 2-3 new method of lacol material for pest & disease control.
AGRIC:
Other
Completed
*Donors
2 93
3 93
Designing extension education for vegetables.
AGRIC:
Other
Completed
*Donors
2 93
2 93
Obtain amount of vegetable seed.
AGRIC:
Other
Approved
*Donors
3 93 10 93
Preparing of land and sowing.
CONST:
Bridge
Kohi Sang
Ongoing
*Donors
5 93
8 93
Construction of 20 m bridge i tonnage 30 T / material use cement i steel bar & stone.
CONST:
Bridge
Different areas
Ongoing
;Donors
5 93
7 93
Construction of 4 mini bridges length 2 -3 m / tonnage 30 T /material use stone l cement & steel bar.
Storage
Miradina
Ongoing
*Donors
4 93
6 93
Capacity 120 cub.: I material use stone / pole wood & cement.
--
Approved
ADC
Ongoing
*Donors
ARC
ARC
ARC
ARC
ARC
ARC
ARC
ARC
ARC
Awr
RC
ARC
ARC
CONST:
HEALTH: Basic Clinic
INCOME: Handicrafts
INCOME: Skill Train.
5 93 12 93
.
OPD / dental i lab i malaria control.
68 women are involved in Glims & Namads knitting
soap making
Ongoing
NOVIB
6 93 -- --
INCOME: Skill Train.
Shenadeh
Approved
NOVIB
-- 93 -- --
WATER:
Diba
Ongoing
*Donors
6 93
9 93
Construction of 150 m retaining wall, material use stone
Miradina
Ongoing
*Donors
4 93
6 93
Water reservoir: capacity cub.mimateria
Differen` areae
Ongoing
*Donors
:t:3 villages
Ongoing
EC /UNICF
Bughra
Ongoing
*Donors
Ongoing
GP(UK)
WATER:
W-+r,,
:7{{s'E:,.
Structure
Structure
Other
iaAlil;::
'SEA
EDUCAT: Primary
GP-UK
EDUCE: Primary
KAG
1 doctor
Shenadeh
AVICEN
7AÇ
Miradina area
-- 93 -- --
. ..:ia L l .°r
.
Training of 60 people in auto wiring i blacksmithry
93 -- 93
Distribution of tools (bucket l rOpe
,
spinning products to be marketed by NGO in Ghazni.
carpentry % tinsmithry & masonry.
gabion box & cement.
use stone / cement & sand.
tike
for cleaning 30 3a. ez es.
3 teams - 7 vaccinators
9 93 -- --
8 teachers & 200 students.
-- 9'' -- --
. school.
EDUCAI: Secondary
Miradina
Completed
OVI::
1 32 12 92
1 school / 10 teachers & 385 students.
EDUCE: Secondary
Miradina
Completed
NOV15
1 91 12 91
1 school / 8 teachers & 397 students.
EDUCE: Literacy
Miradina
Completed
TAF /DPI
5 93
85 students for 9 months.
4 93
DATABASE OF 'iG;t ACTIVITIES
Page:
46
A6actrep Date: 27/08/93
nT:? EDITION
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
- -BY--
Begin --End
<ACTIVITY
DESCRIPTION>
Malestan
Ghazni.
LEPCO
HEALTH: Other
Bughra
Ongoing
Germany
MSH
HEALTH: Compr.Clinic
Wardah Malang
Ongoing
AID
--
Provides health care for leprosy & general patients i 1 leprosy technician & i field assistant.
i 91 -- --
1 MD, 3 MED. TECH.. i LAB. TECH. ASST.. i DENTAL TECH. ASST.
4 ROOMS, LABORATORY, DENTAL, ORTHOPAEDIC SURGERY.
VOLUNTEER HEALTH SISTER (VHS) AND DAI TRAINING
MSH
HEALTH: Basic Clinic
Miradina
Ongoing
AID
5 91 -- --
1 doctor assistant & i medical technician.
HEALTH: Basic, Clinic
Shenadeh
Ongoing
AID
5 89 -- --
2 MED. TECH.
MSH
HEALTH: Basic Post
Qarya Dala
Ongoing
AID,
4 90 -- --
1 BHW
MSH
HEALTH: Vaccination
Malestan
Ongoing
AID /UN
7 91 -- --
COVERED FROM IAIRAI VSF. SEE IAIRAI/JAGHATU LISTING FOR DETAILS.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.065 agrocheiicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
.Agriculture survey on 30 villages.
Miradina
Ongoing
INDOORS
-- 89 -- --
1 School for boys / 12 teachers & 590 students..
10 93 -- --
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
MSH
.
,SCO
EDUCAT: Primary
Ghazni
4 ROOMS, IMMUNIZATION
Moqor
AFRANI
AGRIC:
Research
Moqor
Ongoing
RAP
ATC.
MINES:
Clearance
6 villages
Completed
UNOCHA
AVICEN
HEALTH: Vaccination
144 villages
Ongoing
EC /UNICF
--
1 team - 3 vaccinators
CoAR
AGRIC:
Fruit Trees
Moqor
Ongoing
RAP /FAQ
-- 92 -- --
Nursery & saplings distribution.
CoAR
AGRIC:
Machinery
Moqor
Ongoing
RAP
-- 92 -- --
11 tractors & 5 threshers.
COAR
CONST:
Road
Moqor
Ongoing
WFP
-- 92 -- --
Road repairing (Moqor - Gelan - Nawa).
CoAR
CONST:
Bridge
Moqor
Ongoing
WFP
-- 92 -- --
Construction of bridge on Nawa road east of Mogor bazar.
CoAR
CONST:
Pub.Building
Moor
Completed
WFP
-- 92 -- --
Repair of Mosque.
CoAR
CONST:
Pub.Buiidíng
Moor
Ongoing
WFP
-- 92 -- --
Repair of warehouses.
DCA
AGRIC:
Vet
Moqor
Approved
UNDP
-- 93 -- --
3 paravets in training.
MCI
HEALTH: Compr.Clinic
Ghazni
Completed
AID
A C B A R
.
7 90 11 90
1 88 -- --
Destroyed 1874 devices, cleared 206970 Sqm village.
i dental -tech i 1 MD i blab -tech i 2 mid -level HWs i 1 nurse & 1 EPI vaccinator - dental / lab ! OPD & EPI.
DATABASE OF NGO ACTIVITIES
Page:
47
A6actrep Date: 27/08/93
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
Ghazni
MSH
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
.
< ACTIVITY
Begin- -End
DESCRIPTION>
Mogor,
HEALTH: Distrot Hosp
Moor
Ongoing
AID
9 91 -- --
2 MD I 1 DISPENSER I 1 NURSE / 2 NURSE HELPERS I i LAB TECH ASST / 2 MID TECH I PHARMACY / LAB / IN- PATIENT BEDS I
SURGERY.
MSH
HEALTH: Basic Clinic
Moor
Ongoing
AID
6 88 -- --
1 NURSE, 2 MID TECH
MSH
HEALTH: Basic Post
Chambari Hashim
Ongoing
AID
7 88 -- --
4 BHWs
MSH
HEALTH: Vaccination
Mogor
Ongoing
AID /UN
3 92 -- --
6 VACCINATORS UNDER PMD SUPERVISION COVER 26 VILLAGES IN MOQUR DISTRICT (610), GHAZNI PROVINCE.
6 ROOMS 2 BEDS
TARGET GROUPS:
CHILDREN 0 -2 YEARS AND WOMEN 5 -45 YEARS.
Completed
SCA
0 92 -- 92
Distribution of 2 MT wheat seed & 2 MT DAP.
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.03 MT agrochemicals.
AGRIC:
Plant Protec
Completed
SCA
O 92 -- 92
Provision of 0.15 MT agrocheaicaïs.
SCA
AGRIC:
Other
Ongoing
SCA
0) 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
--
Completed
SCA
0 92 -- 92
Agriculture survey on 3 villages.
SCA
EDUCAT: Primary
Mogor
Ongoing
SCA
3 88 -- --
6 schools / 44 teachers / 1,188 students
SCA
HEALTH: Basic Clinic
Gelan Jandah
Ongoing
SCA
5 89 -- --
4 aid -level HWs.
SCA
HEALTH: Basic Clinic
Center
Ongoing
SCA
11 88 -- --
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
SCA
AGRIC:
Crop Product
SCA
AGRIC:
SCA
--
4 aid -level HWs
16 schools in Gada Ebel, Chaka. Ranson), Ishlea, Rawrozi, Char Qala, Seyganzai, Bazar, We Sarfaraz, Mud Ebel,
Akhtar 1
Ghazni
Nawa
Nawa
Ongoing
RAP
HEALTH: Vaccination
58 villages
Ongoing
EC /UNICF
CoAR
AGRIC:
Crop Product
Nawa
Ongoing
RAP /FAO
-- 92 -- --
CoAR
AGRIC:
Fruit Trees
Nawa
Ongoing
RAP /FAO
-- 92 -- --
CoAR
AGRIC:
Machinery
Nawa
Ongoing
RAP
-- 92 -- --
DCA
AGRIC:
Vet
Ango
Ongoing
UNDP
4 91 -- --
AFRANE
AGRIC:
AVICEN
l'ACBAR
Research
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
10 93 -- --
2 teams - 3 vaccinators
Fruit trees nursery.
1 vaccinator.
6TH EDITION
DATABASE OF NGO ACTIVITIES
Page:
48
A6actrep Date: 27/08/93
-
ACTIVITY
AGENCY
SECTOR
---- VILLAGE(S) - - --
DCA
AGRIC:
MCI
HEALTH: Basic Clinic
MSH
HEALTH: Basic Post
RAFA
RELIEF:Food Items
AGRIC:
FUNDED
- - -BY --
DURATION
Begin --End
<ACTIVITY
DESCRIPTION>
Nawa
Ghazni
SCA
-- STATUS --
Vet
Malikdin
Ghaybi Ehel
Plant Protec
Ongoing
UNDP
4 91 -- --
Completed
AID
3 88 -- -
Ongoing
AID
11 89 -- --
Completed
WFP
8 90
Completed
SCA
0 92 -- 92
1 paravet.
mid -level HWs/ dental tech / lab tech & midlevel -WARD. - OPD 1 dental / lab / WARD.
i BHW
9 90
Distribution of 200 MT wheat to 400 families to help the needy people & decrease the
Provision of 0.18 MT agrochemicals.
..
SCA
EDUCAT: Primary
Rango
Ongoing
SCA
9 90 -- --
HEALTH: Basic Ç,linic
Nava (Center)
Ongoing
SCA
7 87 -- --
3 mid -leve Hais.
Ongoing
AID
5 87 -- --
3 schools in Malik Dim, Mohd Ihel & Zarin Ebel villages.
--
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed and 10 MT DAP.
HEALTH: Vaccination
270 villages
Ongoing
EC/UNICF
--
4 teams - 8 vaccinators
GAF
AGRIC:
Vet
Nawor
Ongoing
UNDP
10 91
EAG
AGRIC:
Crop Product
Sar Asiab
Completed
FAO/UNDP
10 90 11 91
MSH
HEALTH: Basic Clinic
Qarya Bator
Ongoing
AID
6 91 -- --
2 MED. TECH.
MSE
HEALTH: Basic Clinic
Baee
Ongoing
AID
9 91 -- --
4 MED. TECH.1
MSH
HEALTH: Basic Clinic
Jeska
Ongoing
AID
10 90 -- --
2 MED. TECH.. 1 BHW
MSH
HEALTH: Basic: Post
Sabz Nela
Ongoing
AID
12 90 -- -
4 Ms
MSH
HEALTH: Vaccination
Nawor
Ongoing
AID. /UN
SCA
UNO
.
EDUCAT: Primary
Ghazni
AIR
. AVICEN
AGRIC:
Ghazni
ATC
MINES:
'4 schools / 23 teachers / 365 students
Nawor
Crop Product
--
6 93
7 91 -- --
1 DVN / 2 paravet / 1 guard curative & preventive service.
30.5 MT seed distributed.
DENTAL
COVERED FROM IAIRAI VSF.
SEE IAIRAI /JAGHAUT LISTING FOR DETAILS.
Qarabagh
Clearance
Bazaar
Completed
UNOCHA
AMEN
HEALTH: Vaccination
191 villages
Ongoing
EC /UNICF
CCA
WATER:
Langer
Completed
CIDA
Iarez
10 90 10 90
Destroyed 1 device, cleared 30000 Sqi village.
2 teams - 4 vaccinators
2 91
5 91
T
Page:
Rehabilitation of 4 ka tarez tunnel
49
A6actrep Date: 27/08/93
-
benefits 140 families.
rate of wheat.
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S)- ---
-- STATUS --
FUNDED
- --BY --
DURATION
Begin- -End
:ACTIVITY
DESCRIPTION>
Qarabagh
Ghazni
DACAAR
AGRIC:
Crop Product
--
Completed
FAO /Seif
3 90 12 91
:DACAAR
AGRIC:
Crop Product
40 villages
Discontin
FAO /Self
8 92
Distribution of 46.5 MT DAP
9 92
183.4 MT Urea to 3.809 farmers in 46 villages.
1000 kg wheat seed collected from the farmers & redistributed to 13 selected farmers in 10 villages for seed
multiplication.
DACAAR
AGRIC:
Crop Product
DACAAR
AGRIC:
Crop Product
Tamaki/Zardalo'
Completed
FAO /Self
9 91 -- --
Distribution of 500 kg improved wheat seed i 600 kg Urea & 425 kg DAP to 15 farmers.
Completed
FAO/Self
4 21 12 91
Distribution of 34.4 kg vegetable seeds to 220 farmers / 10,000 vegetable seedlings to 150 farmers / 32 sprayers to
32 farmers.
)04R
AGRIC:
Crop Product
Highlands
Completed
FAO
9 91 -- --
Demonstration of wheat seed, vegetables & seedlings.
DACAAR
AGRIC:
Crop Product
40 villages
Completed
DACAAR
3 92
3 92
8 kg vegetable seed distributed to 201 farmers in 15 villages.
DACAAR
AGRIC:
Fruit Trees
40 villages
Completed
FAO
12 91
4 92
12.000 fruit trees distributed to 362 growers in 23 villages.
DACAAR
AGRIC:
Fruit Trees
Highlands
Completed
FAO
3 92 -- --
Distribution of 14.000 fruit saplings to the farmers.
DACAAR
AGRIC:
Fruit Trees
Completed
FAO /Self
3 90 -- --
Distribution of 30,000 fruit saplings to 1,160 farmers.
DACAAR
.AGRIC:
Fruit'Trees
40 villages
Discontin
FAO /Self
4 92 -- --
4 demonstration orchard established in 4 villages.
DACAAR
AGRIC:
Fruit Trees
Highlands
Completed
FAO
4 92 -- --
Fruit & vegetables nurseries.
DACAAR
AGRI:
Machinery
Completed
FAO /Self
6 91 12 91
4 tractors i 4 threshers covered 8800 jeribs land of 725 farmers.
DACAAR
AGRIC:
Research
40 villages
Completed
FAO /Self
9 91
3 wheat yield trials & 1 wheat test plot conducted.
DACAAR
AGRIC:
Research
40 villages
Completed
FAO /Self
5 22 10 92
C'&CAAR
AGRIC:
Peseareh
40 villages
..is;;::t::
FAO/Self
v 92 --
AC A R
ASR. ::
Plant Prcteo
Completed
vi;
DACAAR
AGRIC:
Plant Protec
40 virages
Completed
DACAAR
AGRIC:
Plant Protec
40 villages
DACAAR
AGRIC:
Training
40 villages
DACAAR
AGRIC:
Other
DACAAR
CONST:
Pub.Buiiding
A C B A R
Center
7 92
--
4 potato test plots conducted.
. wheat yield trial & l5
wheat observation lines.
5 92
Plant protection program.
DACAAR
6 92 12 92
900 shovels / 700 pruner / 39 sprayers
Completed
DACAAR
3 92 11 92
365 kg agrochemicals applied on 741 orchards in 17 villages.
Discontin
DACAAR
3 92 -- --
1,362 farmers technically trained.
Completed
FAO /Self
7 91 12 91
Distribution of 390
Completed
DACAAR
5 91
Primary school - cement / sand / gravel
8 91
shovels / 260 wind fork / 100 sickles to 1.000 farmers.
DATABASE OF NGO ACTIVITIES
Page:
50
147 wind -forks distributed to 1,786 needy farmers in 28 villages.
A6actrep Date: 27/08/93
lime / wood / iron sheet / oil & gypson.
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Ghazni
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITI
Qarabagh
DACAAR
CONST:
Pub.Building
Center
Completed
DACHAR
-- 91 -- --
Primary school building
DACAAR
CONST:
Pub.Building
Center
Completed
DACAAR
-- 91 -- 91
Veterinary clinic building
DACAAR
CONST:
Pub.Building
Center
Completed
DACAAR
DACAAR
CONST:.
Pub.Building
Ain
Ongoing
DACAAR
-- 92 -- 93
DACAAR
WATER:
Karez
Qarabagh
Completed
DACAAR
12 90
DACAAR
WATER:
Karez
Several villages
Completed
DACAAR
-- 89 -- 92
48 Karezes cleaned in Pashtun & Hazara Areas.
DACAAR
WATER:
Canal
Several villages
Completed
DACAAR
-- 89 -- 92
1 canal cleaned in Pashtun & Hazara Areas.
DACAAR
WATER:
Canal
Qarabagh
Completed
DACAAR
12 90
DCA
AGRIC:
Vet
Nowra
Ongoing
UNDP
10 91 -- --
DCA
AGRIC:
Vet
Bazaar
Ongoing
UNDP
2 90 -- --
Central clinic with 1 vet. assistant.
DCA
AGRIC:
Vet
Lagharjoy
Ongoing
UNDP
6 89 -- --
1 vaccinator.
DCA
'AGRIC:
Vet
Naykhta
Ongoing
UNDP
10 90 -- --
1 paravet.
DCA
AGRIC:
Vet
Roshan
Ongoing
UNDP
10 91 -- --
1 paravet.
DCA
AGRIC:
Vet
Tochi
Ongoing
UNDP
10 91 -- --
i paravet.
DCA
AGRIC:
Vet
Zersank
Ongoing
UNDP
an g?
. paravet.
HRA
HEALTH: Distrct Hosp
Bazaar
Ongoing
BRA
1AG.,
AGRIC:
Crop Product
Aiiabadii3
Completed
FAO
LAG
AGRIC:
Crop Product
Aiiabad /13
Completed
FAO /UNDP
KAG
AGRIC:
Fruit Trees
Aiiabad/8
Completed
FAO
5 91
1 admin building
8 91
7 92
Rehabilitation of 44 karezes - total length 33.6 km - j7.5 km has been cleaned so far.
Rehabilitation of 2 canals.
7 92
1 paravet.
20 beds i surg.
2 93 --
IO lO
Primary school building
i med.
i orthop. / 4 spec. / 3 MD / 10 tech. / 8 nurses / X -ray / lab / OPD & ECG.
6.5 MT seed & 1.5 MT DAP distributed.
91
21 MT seed & 1.5 MT fertilizer distributed i extension work.
4 90 10 90
6.000 saplings of apple & plum have been distributed.
10 90 11 90
6 teachers i 317 students.
KA;,
EDUCAT: rrimary.
Jangalak
Completed
NOVïB
i 92
KAG
EDUCAT: Primary
Quliaqul
Completed
NOVIB
i
91 12 91
1 school / 8 teachers / 317 students.
KAG
DUCAT: Primary
Shakinoka
Completed
MOVIE
i
92 12 92
1 school
ACBAR
DESCRIPTION>
12
1 school
9.:
'
,'
8 teachers / 308 students.
DATABASE OF NGO ACTIVITIES
Page:
51
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Ghazni
---- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
<ACTIVITY
DESCRIPTION>
Qarabagh
KAG
EDUCAT: Primary
Shakinoka
Completed
NOVIB
1 91 12 91
1 school / 7 teachers / 370 students.
KAG
EDUCAT: Primary
Quliagul
Completed
NOVIB
1 92 12 92
1 school / 7 teachers / 281 studenta.
KAG
EDUCAT: Primary
Tamaki
Completed
NOVIB
1 91 12 91
1 school / 8 teachers / 367 students.
KAG
EDUCAT: Primary
Tamaki
Completed
NOVIB
1 92 12 92
1 school / 8 teachers / 386 students,
KAG
EDUCAT: Primary
Jangalak
Completed
NOVIB
1 91 12 92
1 school i 8 teachers / 273 students.
KAG
EDUCAT: Literacy
Aliabad /19
Completed
TAF /DPI
8 92
4 93
240 students in 9 months period.
KAG
EDUCAT: Literacy
Qarabagh
Completed
TAF
12 90
5 93
400 men trained in literacy.
KAG
WATER:
Earez
Aliabad /4
Completed
HAC/WFP
10 90
3 91
Cleaning of karez 2.56 km / 240 i repairing benefit 625 farmers.
KAG
WATER:
Karez
Aliabad /56
Completed
RAP
3 92 12 92
Cleaning of 27.7 km karez / 4.2 repairing / 2 km new digging / 11.3 km land irrigated & benefit 3129 farmers.
Mohor Wardak
Ongoing
LDI
9 88 -- --
3 nurses / 1 sed. student - OPD.
Ongoing
AID
7 88 -- --
i dental tech / i nurse / i lab tech & I mid -level HW - Dental / lab / nurse & OPD.
LDI
HEALTH: Basic Clinic
MCI
HEALTH: Basic Clinic
MSH
HEALTH: Compr.Clinic
Tamaki
Ongoing
AID
7 91 -- --
1 MD, 3 MED. TECH:, i LAB. TECH. ASST.
HEALTH: Basic Clinic
Rana Ebel
Ongoing
AID
2 89 -- --
2 MED. TECH. i NURSE
HEALTH: Basic Clinic
Khan Zeman Ehel
Ongoing
AID
9-89 -- --
2 medical tech., i doctor assistant, 1 lab tech, assistant - 3 rooms, laboratory & dental.
HEALTH: Basic Clinic
Berla
Ongoing
AID
11 87 -- --
MSH
HEALTH: Basic Post
Gam Meshak
Ongoing
AID
MSH
HEALTH: Vaccination
Qarabagh
Ongoing
AID /UN
MSH
MSH
MSH
6
2 NURSES, 1 MED. TECH,
7 87 -- --
EDUCAT: Primary
Jangelak
9 88 -- --
2 ROOKS, DENTAL
5 VACCINATORS COVER 126 VILLAGES IN GARABAGH DISTRICT OF GHAZNI PROVINCE.
TARGET GROUPS: CHILDREN 0 -2 YEARS AND
YEARS.
Pvt
4 91 -- --
3 schools (Shaheed GGulistani / Shaheed Suleiman Ali / Shaheed Nijati) each has 3 teachers & one headmaster.
Rehabilitation of 29.300 linear M karez - benefit 1,430 farming families.
WATER:
Karen
Ongoing
WFP
6 93
RDA
WATER:
Karen
Ongoing
WFP
7 93 11 93
SC -US
AGRIC:
Crop Product
Ongoing
FAO /UNDP
ACHAR
i DENTAL TECH.
Ongoing
RDA
--
2 ROOMS
21 BMWs
WOMEN 5 -45
CCA
LABORATORYi
8 93
11 92 11 93
Rehabilitation of 29.300 linear M karez - benefit 1.430 families.
Wheat seed multiplication.
DATABASE OF NGO ACTIVITIES
Page:
52
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S)- - --
-- STATUS --
FUNDED
- --BY --
DURATION
< ACTIVITY
Begin- -End
DESCRIPTI,.
Garabagh
Ghazni
SC -US
CONST:
Road
Bazaar
Completed
RAP
5 92
4
93
Road construction from Bazaar to Sark length 5.9 km.
SC -US
CONST:
Road
Bazaar
Completed
RAP
5
92
4
93
Road construction from Bazaar to the Hain road length 9.2 km.
SC -US
HEALTH: MCH
Shama Dah
Ongoing
NAG
9
92
8 93
SC -US
INCOME: Handicrafts
9 villages
Ongoing
RAP
5 92
-- 93
SC -US
WATER:
Iarez
Bazaar
Completed
RAP
5 92
4 93
SC -US
WATER:
Canal
Bazaar
Completed
RAP
5
92
4
93
Canal cleaning - length 2.3 km.
SC -US
WATER:
Canal
Bazaar
Completed
RAP
5
92
4 93
Canal cleaning - length 4.2 km.
SC -US
WATER:
Structure
Bazaar
Completed
RAP
92
4
93
Culvert No 2.
SC -US
WATER:
FloodControl
Bazaar
Completed
RAP
5
92
4
93
Flood control length 27 m.
SC -US
WATER:
FloodControl
Bazaar
Completed
. RAP
5
92
4
93
Flood control length 210 m.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0
93 -- 93
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92
SCA
AGRIC:
Other
Ongoing
SCA
0
SCA
AGRIC:
Other
Completed
SCA
0 92 --
SCA
EDUCAT: Primary
Gm What
Ongoing
SCA
SCA
EDUCAT: Primary
Qarabagh
Ongoing
SCA
3
88 -- --
10 schools / 70 teachers / 1,816 students
SCA
HEALTH: Basic: Clinic
Kai Qala
Ongoing
SCA
5
89 -- --
2 nurses, 3 mid -level HWs, i lab tech
SCA
HEALTH: Basic Clinic
Center
Ongoing
SCA-
UNO
EDUCAT: Primary
Ongoing
AID
6
87 -- --
20 schools in different villages.
VITA
COAST:
Bridge
Jabar Khan
Ongoing
AID
7
92 -- --
Construction of 30 m bridge(concrete & masonry), benefit 4,000 families.
VITA
CONST:
Bridge
Jan Murad
Ongoing
AID
7
92 -- --
Construction of 100 m cable bridge, benefit 20,000 families.
VITA
WATER:
FloodControl
Bigi Khei
Ongoing
AID
1 A C B A R
5
--
92
Provision of Ante -Natal care & training of TBA +FHW.
700 women are involved in handicraft / embroidery product which are sold SC/US carft -shop in Peshawar Pakistan.
Rehabilitation of 70 karezes.
Provisión of 0.03 MT agrochemicals.
Provision of 0.014 MT agrochemicals.
93 -- 93
Agriculture survey on 50 villages.
92
Agriculture survey on 86 villages.
11 87
-- --
-- -- -- --
12 92
6 schools 136 teachers / 278 students
4 mid -level HWs /
i Pharmacist
Construction of 100m retaining wall(gabion work), benefit 150 families.
-- --
DATABASE OF NGO ACTIVITIES
Page:
53
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
AGENCY
--
VITA
WATER:
-SECTOR
FloodControl
Ghazni
-VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
<ACTIVITY
Ongoing
AID
Zena than
Ongoing
RAP
Ongoing
ECiUNICF
Ongoing
RAP,FAO
-- 92 -- --
Multiplication of seed & fprti'ì'er
Malang Khei
Construction of. 200 m' retaining weil(gabion work), benefit 200 families.
Zena Khan
AFRANE
AGRIC:
AVICEN
HEALTH: Vaccination
37 villages
AGRIC:
!Crop Product
Zena Khan
"cA
AGRIC:
Fruit Trees
Zena Khan
Ongoing
RAP /FAO
-- 92 -- --
Fruit trees distribution & 106 so nursery.
CoAR
CONST:
Road
Zena Khan
Completed
WFP
-- 92 -- --
Repairing of Zenakhan road.
CoAR
CONST:
Bridge
Zena Khan
Completed
WFP
-- 92 -- --
Construction of small culverts.
CoAR
CONST:
Pub.Buiiding
Zena than
Ongoing
WFP
-- 92 -- --
Rehabilitation of Zenakhan school.
RDM
AGRIC:
Livestock
20 villages
Ongoing
UNDP
4
93
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0
93 -- 93
Provision of 0.1 MT agrochemicaïs.
SCA
AGRIC:
Other
Ongoing
SCA
0 93
-- 93
Agriculture survey on 30 villages.
UNO
EDUCAT: Primary
Ongoing
AID
3
.;A
DESCRIPTION>
Research
-
10 93 -- --
Variety &- agronomical trials to know good variety & proger use of fertilizer & demonstration pacts.
1 team - 2 vaccinators
8 93
Distribution of 1,700 chickens for 160 families.
87 -- --
8 schools in Qawl Zabsi, Ihwaja Ihel, Kotal Sabzi. Safaidar. Char gala, Haybat Kheì, Qader Khel & Rahat Khel
villages.
Ghor
Chaghoharan
MDM.
HEALTH: Other
City
Ongoing
MDM
-- 93
MSH
HEALTH: Basic Post
Soofak
Ongoing
AID
88 88 -- --
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93.
Provision of 0.1 MT agrochemicais.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Ghor
Health assessment.
--
2 BHWs
Lal Surjangal
AVICEN
HEALTH: Vaccination
74 villages
Ongoing
BC /UNICF
--
1 team - 2 vaccinators
LEPCO
HEALTH: Other
Dan- i- Manjow
Ongoing
Germany
--
Provides health service for leprosy & general patients i full lab. testing service i 1 leprosy technician & I field
assistant.
A C B A R
DATABASE OF NGO ACTIVITIES
Page:
54
A6actrep Date: 27/08/93
6TH EDITION
FUNDED
ACTIVITY
SECTOR
AGENCY
---- VILLAGEES) - - --
MSH
HEALTH: Basic Clinic
OXFAM
AGRIC:
Other
-- STATUS --
- - -BY --
DURATION
<ACTIVITY
Begin- -End
Qaehi Safald Chad
Ongoing
AID
4 92 -- --
4 M.T.
Lal
Ongoing
OXFAM
8 91 -- --
Agriculture development program with many activities.
DESCRIPTION>
Pasaband
Ghor
1 team - 2 vaccinators
AVICEN
HEALTH: Vaccination
54 villages
Ongoing
EC/UNICF
INC
HEALTH: Basic Clinic
Doghor
Ongoing
AID
5 86 -- --
2 mid -level health- workers.
MSH
HEALTH: Basic Post
Xhangegï
Ongoing
AID
4 88 -- --
8 BIIWe
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.12 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
O 92 -- 92
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 90 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
UNO
EDUCAT: Primars
Ongoing
AIf
3 90 -- --
3 schools in Odkal, garamzar & Chini villages.
Ongoing
AID
7 88 -= --
3 BHiis
Completed
SCA
0 92 -- 92
Provision of 0.055 MT agrochemicals.
Ongoing
AID
3 89 -- --
2 schools in Tarzai & Ser Saib villages.
AID
5 87 -- - -.
2 mid -level HNs - OPD.
1 88 -- --
1 MED. STUDENT 4TH
--
--
Saghar
Ghor
MSH
HEALTH: Basic Post
SCA
AGRIC:
UNO
EDUCAT: Primary
Plant Protec
Shahrak
Ghoz
IMC
HEALTH: Basic Clinic
Eamenj
Ongoing
MSH
HEALTH: Basic Clinic
Shahrak
Ongoing
AID
MSH
HEALTH: Basic Poet
Oshan
Ongoing
AID
MSH
HEALTH: Vaccination
Shahrak
Ongoing
AID/UN
9 93 -- --
PLANNED TO BE COVERED FROM THE HERAT VSF. SEE HERAT LISTING FOR DETAILS.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
O 93 -- 93
Provision of 0.06 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.06 MT agrochemicals.
-
1 MED.TECH, i LAB TECH. ASST. 2 BHWS
DATABASE OF NGO ACTIVITIES
Page:
2 ROOMS, LABORATORY, IMMUNIZATION
4 BHWs
12.88 --
AMR
,
55
A6actrep Date: 21/08/93
6TH EDITION
I
ACTIVITY
AGENCY
SECTOR
SCA
AGRIC:
UNO
EDUCAT: Primary
- - -- VILLAGE(S) - - --
Other
Ghor
-- STATUS --
FUNDED
- - -BY --
DURATION
Begin- -End
- --< ACTIVITY
DESCRIPTION>
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Ongoing
AID
6 88 -- --
5 schools in Tangi Alan, Sarmulan Puïakhak, Sar Ihak, Zahran & Gul Chaim villages.
Repair of jeep road between Southern Taywara & Parchaman of Farah (76 km) by hand tools.
Taywara
CHA
CONST:
Road
--
Completed
RAP
5 90 12 90
CHA
WATER:
Karez
1l'villagee
Completed
RAP
3 92
5 92
Iarez cleaning.
CHA
WATER:
£arez
Completed
RAP
2 91
6 91
Rehabilitation of 4 karezes (8.4 km) 1 water pump - irrigate 20,000 jeribs & benefit 574 families.
CHA
WATER:
Karez
Ongoing
RAP
9 90 -- --
CHA
WATER:
Canai
11 villages
Completed
RAP
3 92
IMC
HEALTH: Compr.Clinic
Gughur
Ongoing
AID
5 87 -- --
2 mid -level HWs / lab tech. - OPD / lab.
Ongoing
AID
4 87 -- --
2 midlevel OPD / i mid -level HW - WARD / dental -tech & lab -tech.
Rehabilitation of 15 karezes.
5 92
Canal cleaning.
MCI
HEALTH: Basic Clinic
MSH
HEALTH: Compr.Clinic
Zirgak
Ongoing
AID
9 91 -- --
i MD, 1 MID. TEC$., i LAB.TECH. ASST.
MSH
HEALTH: Basic Post
Jawz Chadar
Ongoing
AID
7 88 -- --
24 BHWs
MSH
HEALTH: Vaccination
Taywara
Ongoing
AID/UN
9 93 -- --
PLANNED TO BE COVERED FROM THE HERAT VSF. SEE HERAT LISTING FOR DETAILS.
MSH
HEALTH: Other
Zirgak
Ongoing
AID_
-- -- -- --
- OPD / WARD i dental & lab.
IMMUNIZATION
Regional Health Administration ¡BHA) administrative center and depot for issue of supplies and salaries and
monitoring and supervision of the BHWs and health facilities under its jurisdiction
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
--
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.15 MT agrochemicals.
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 90 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH :' Basic Clinic
Ongoing
SCA
10 92 -- --
UNO
EDUCAT: Primary
Ongoing
AID
3 88 -- --
bale Surkh
4 mid -level HWs / 1 Dental Tech.
7 schools in Yakhan Ulia, lard Bail, Seen, Mehala, Zilzilagak, Ashigan & ,Arpatoo.
DATABASE OF NGO ACTIVITIES
Page:
56
A6actrep Date: 27/08/93
ACTIVITY
AGENCY
SECTOR
Ghor
- - -- VILLAGES) - - --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Toulak
INC
HEALTH: Basic Clinic
MCI
HEALTH: Basic Clinic
MSH
HEALTH: -Basic Post
Helmand
GRC
-- STATUS --
CONST:
Guldan
Ongoing
AID
5 86 -- --
i mid -level HW - OPD.
Ongoing
AID
3 88 -
1 First aid / i dental tech & 1 rid -level HW
Ongoing
AID
7 88 -- --
3 BHWs
6 villages
Completed
UNDP
7 90 10 90
Survey of 27 km road from Nawa -Nish te Sartighan.
3 90
50 MT wheat for 439 families due to shortage of food in the area.
Ihameen Ibwaja
--
- First aid
dental & OFD.
Baghran
Road
GRC
RELIEF:Food Items
25 villages
Completed
WFP
HI
HEALTH: Disabled Reh
Dara
Ongoing
AID
MCI
CONST:
Baghran
Completed
CHC
Road
.
4 90
12 90 -- --
5 90
4 orthpaedic technicians manufacture crutches & prostheses.
3 91
Road repiar project -to create a district-level NGO to jointly pian & implement a project to rebuild, repair &
resurface 28.5 Em of primary roads.
MCI
CONST:
MCI
HEALTH: Distrct Hoap
Road
Paisang-Tangi
Ongoing
AID/WFP
11 92 -- --
Repairing Paisang -Tangi road.
--
Completed
AID
11 87 -- --
I MD 12 lab -tech / 1 X-ray tech / 1 dental -tech / 1 mid -level. HW I l ML -OT / 2 ML -ward & 4 tech. - lab/X-ray í
dental.I OPD I OT & Ward facilities.
MCI
:
ALTA: Basic Clinic
MCI
WATER: 'Structure
MSH
HEALTH: Basic Post
SCA
HEALTH: Basic Clinic
Helmand
'
Completed
AID
7 89 -- --
Baghran
Completed
CRC
10 89 12 90
Irrigation improvement -to clean, repair & improve flow capacity of apx. 150 irrigation systems.
Chachar Nawa Mesh
Ongoing
AID
11 87 -- --
4 BHWs
Newa Mesh
Ongoing
SCA
1 90 -- --
Bust
Ongoing
AID
-- 93 -- --
Hospital equipment supplied.
Ongoing
UNICEF /S
-- 90 -- --
Outreach BPI program from Nadi Ali.
Completed
FAO
-- 92 -- 92
Distribution of 10' MT wheat seed and 10 MT DAP.
Approved
DCP
-- 93 -- --
Repairing òf road Lashkargah -Dorai.
11 92 -- --
Ihushk Aba canal cleaning and repair.
HEALTH: Other
GAF
HEALTH: Vaccination
HRO
AGRIC:
Crop Product
MCI
CORST:
Road
WATER:
Canal
Ongoing
AIDS
WATER:
Canai
Completed
AID/WFP
NCI
.
ACBAR
2 mid -level HWs I 1 Dental Tech.
Bust
IRO
MCI
1 dental tech I 1 lab tech & 1 mid -level HW - Dental i lab & OPD.
-
.
Lashkargah
2 93
4 93
Cleaning of 2 canals.
DATABASE OF NGO ACTIVITIES
6TH EDITION 1
_
Page:
57
A6actrep Date: 27/08/93
_
ACTIVITY
AGRNCY
-VILLAGE(S)-
SECTOR
FUNDED
-BY
- STATUS-
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Bust
Helmand
Clewing of canal.
MC:
WATER:
Canal
Completed
UNDP
11 92 .4 93
Mv.
WATER:
Structure
Completed
UNDP
11 92
4 93
Construction of protection dike.
MC:
WATER:
Structure
Completed
UNDP
11 92
4 93
Rehabilitation of New Shamaìan intake.
ICI
WATER:
Structure
Bust
Completed
UNDP
11 91
4 93
Rehabilitation of intake structure on the Derveehan river.
MCPA
MINES:
Survey
1 minefield
Completed
UNOCBA
RIFRA
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
SCA
AGRIC:
Research
Completed
SCA
0 92 -- 92
1 crop variety testing trial of wheat.
SCA
AGRIC:
Plant Protec
SCA
0 92 -- 92
Provision of 0.2 MT agrochemicals.
SCA
'AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.16 MT agrochemicals.
--
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Laehkargah
Ongoing
BBCF
11 92 10 93
Chuto
Ongoing
INDOORS
--
S&
A &RIC:
SWFAO
INCOME: Handicrafts
Helm i4
Other
--
Completed
.
1 92 12 92
6,696 Sqm road.
Distribution of 4 MT wheat seed and 4 MT DAP.
Handicraft for volea.
De ehu
INDOORS, REALTB: Coipr.Clinic
Helmand
--
1 MD / 3 nurses
OPD.
Garmeer
ARR
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed and 10 MT DAP.
MCI
CONST:
Storage
Approved
AID
-- 93 -- --
Grain Storage Bin project.
MCI
WATER:
Canal
Darweshan
Ongoing
AID/WFP
11 92 -- --
Darwaishan canal system repair.
MCI
WATER:
Structure
Darveshan
Completed
UNDP/DCP
MCI
WATER:
FloodControl
Mien Puahta
Completed
UNDP
MCPA
MINES:
Survey
1 minefield
Completed
MOCHA
kRORA
AGRIC:
Crop Product
13 villages
Ongoing
FAO
12 92 -- --
Multiplication of 5 MT wheat seed 5 MT DAP to 51 farmers.
CB
HEáLTH:. Basic Post -
DdrMeahen
Ongoing
AID
12 90 -- --
1 BHW
IACBAR
9 92
4 93
Repairing of intake.
11 92
4 93
Construction of flood protection.
38,500 Sqm road.
1 92 12 92
DATABASE OF NGO ACTIVITIES
--
Page:
58
!Cactrep Date: 27/08/93
6TH EDITION
-- -VILLAGE(S)-
SECTOR
AGENCY
FUNDED
DURATION
STATUS-
-BY-
Begin --End
<ACTIVITY
DESCRIPTION>
Garmser
Helmand
RIFRA
AGRIC:
Crop Product
SWAAD
MINES:
Clearance
UNO
EDUCAT: Primary
VARA
WATER:
Helmand
ACTL ITY
Canal
--
village
Bazar Juft
Completed
FAO
Compléted
UNOCHI
Ongoing
AID
Ongoing
UNDP
Completed
CIDA
--
92 -- 92
Distribution of 4 MT wheat seed and 4 MT DAP.
1
92 12 92
39680 S9m road.
12 87 -- --
4
93
2 schools in Dewala `village.
,
Cleaning of 5.5 km card / irrigates 6350 jeriba & benefit 240 families.
9 93
He imand
NWRC
AGRIC:
Crop Product
MCI
AGRIC:
Livestock
Completed
UNDP
3 93
6
MCI
AGRIC:
Other
Ongoing
AID
7 90
4 94
Center
Babaji cotton production project.
-- 89 -- 90
93
Animal mass vaccination.
PVC Support: ag rehab. (wheat production
orchard rehab. ¡irrigation repair i cash crop pilot projects / ag
assessment i animal health.
Helmand
ARCH
Sajaki
COKST:
Bridge
Eajaki
Ongoing
ARCON
--
WATER:
Canal
Ia;aki
Ongoing
ARCON
-- -- -- --
AGRIC:
Crop Product
10 villages
Ongoing
FAO
12 92
7 93
5 MT wheat seed ! 5 MT DAP k benefit 3100 farmers & 2000 families indirectly.
ARPD
WATER:
!area
6 villages
Ongoing
UNDP/WFP
2 93
5 83
6 karezes - length 13 km - benefit 2110 families.
IAHC
AGRIC:
Other
Ongoing
BEES
-- -
IAHC
::ALTH: Distrct Hosp
30 villages
Ongoing
NOVIB
-- -- -- --
10 beds / 13 MDWHs / TB A malaria lab / small surgery / OPD.
IAHC
HEALTH: Basic Clinic
30 villages
Ongoing
NOVIB
-- -- -- --
5 MLBWs i TB k malaria lab / 25 patients OPD / day.
MCI
HEALTH: Basic Post
Completed
AID
6 90 -- --
2 first ciders & 1 mid -level HW - first aid & OPD.
MCI
WATER:
Structure
Kajaki
Completed
UNDP
10 90
MRORA
AGRIC:
Crop Product
13 villages
Ongoing
FAO
12 92 -- --
NSH
HEALTH: Basic Post
Shah Earez
Ongoing
AID
5 89 -- --
1 BHW
MSS
HEALTH: Vaccination
Eajaki
Ongoing
AID/UN
1 92 -- --
4 VACCINATORS COVER 29 VILLAGES IN EAJAKI
.
ARCON
ARPD
,
-- -- --
-- -
Construction of Kajaki bridge.
Survey of Helmand canal.
1 farm (300 jeribs) is maintained with a tractor & 4'agri. staff.
9 91
Irrigation improvement -to clean, repair & improve the flow capacity of apz. 150 irrigation systems.
Multiplication of 5 MT wheat seed k 5 MT DAP to 100 farmers.
DISTRICT (2306), HELMAND PROVINCE.
TARGET GROUPS: CHILDREN 0 -2 YEARS
AND WOMEN 5 -45 YEARS.
IACBAR
---
DATABASE OF NGO ACTIVITIES
Page:
59
A6actrep Date: 27/08/93
6TH EDITION i
ACTIVITY
AGENCY
SECTOR
VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- - -BY --
Begin- -End
-- 92- -- 92
<ACTIVITY
RIFRA
AGRIC:
Crop Product
--
Completed
FAO
SWAAD
MINES:
Clearance
li villages
Completed
UNOCHA
1
92 12 92
27507 Sqm agri.land /163256 Sip griz.land.
VIM
COAST:
Bridge
Kajaki
Discontin
AID
9
92 -- --
Construction of (wooden) bridge.
lelmand
DESCRIPTION>
Distribution of 4 MT wheat seed and 4 MT DAP.
Musa Qala
AVICEN
HEALTH: Vaccination
30 villages
Ongoing
EC.IUNICF
FRF
WATER:
18 villages
Completed
UNDP /WFP
5
92 11 92
Cleaning of 70.97 km karez / irrigates 4430 jer bs land & benefit 1415 families.
HI
HEALTH: Disabled Reh
Karni Manda
Discontin
AID
2
92
4 orthopaedic technicians manufacture crutches & prostheses.
HRAy
WATER:
Karez
16 villages
Approved
UNDP
-- 93 -- --
Cleaning of.25 km karez benefit 12831 people.
HRO
AGRIC:
Crop Paduct
--
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed and 10 MT DAP
IAHC
HEALTH: Distrct Hcsp
60 villages
Ongoing
NOVIB
MSH
HEALTH: Basic Poet
Toghai
Ongoing
AID
Karez
Helmand'"
1 team - 2 vaccinators
5
7 88 --
92
--
30 beds /15 NLBWs /R- ray /TB & malaria lab /surgery of war wounded & mine injured/1 ambulance /50 -60 patients OPD /day.
--
2 BMWs
Nad -Ali
ARO
AGRIC:
Crop Product
Nad All
Ongoing
FAO/UNDP
12 92 -- --
DCA
AGRIC:
Vet
Nawabad
Ongoing
Dutch G.
9 90 -- --
i paravet.
DCA
AGRIC:
Vet
Loymanda
Ongoing°
Dutch G.
9 90 -- -
1 paravet.
DCA
AGRIC:
Vet
Kopek
Ongoing
Dutch G.
9 90 -- --
1 paravet.
DCA
AGRIC:
Vet
Dahan 31 Sheri
Ongoing
Dutch G.
9 90 -- --
1 paravet.
GAF
HEALTH: Vaccination
Ongoing
UNICEF /S
-- 90 -- --
Mobile vaccination team with 3 vaccinators.
HRO
AGRIC
Completed
FAO
-- 92 -- 92
Distribution of 24 MT DAP, 6 MT urea, 4 MT maize seed and 1 MT cotton seed.
INC
HEALTH: Compr.Clinic
Had Ali
Completed
AID
5 90 -- --
1 MD / 1 dentist / 1 lab tech. - OPD / lab / dental.
LDI
HEALTH: Basic Clinic
Maria Center
Ongoing
LDI
4 91 -- --
1 mid -level HW / 1 nurse - OPD.
MCI
HEALTH: Basic Clinic
Completed
AID
6 88 -- --
1 BPI vaccinator i 1 first aider / i aid -level HV & 1 lab tech.
IACBAR
Crop Product
Multiplication of 10 MT wheat.
DATABASE OF NGO ACTIVITIES
Page:
60
A6actrep Date: 27/08/93
EPI / F.AID i OPD & lab.
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
Helmand
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- - -BY --
Begin- -End
-- 93 -- -
<ACTIVITY
DESCRIPTION>
Nad -Ali
MCI
WATER:
MSH
HEALTH: Basic Post
OMAR
MINES:
SCA
Canal
Old Sbamalan
Approved
UNDP
Marja Gharbi
Ongoing
AID
5 89 -- --
4 BHWs
Awareness
Completed
UNOCHA
1 92
Safety lessons - 7238 people participated.
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0..2 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.3 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SWFAO
AGRIC:
Crop Product
Completed
FAO /UNDP
5 92
8 92
Multiplication of maize seed & sung bean with -fertilizer.
SWFAO
AGRIC: 'Crop Product
Ongoing
FAO
5 93 -- --
Multiplication of maize seed & mung bean with fertilizer.
SWFAO
AGRIC:
Crop Product
All villages
Ongoing
FAO /UNDP
8 92
7 93
Multiplication of wheat seed with fertilizer.
SWFAO
AGRIC:
Fruit Trees
All villages
Completed
EIL/HCR
10 92
1 93
Fruit trees distribution.
UNO
EDUCAT: Primary
Ongoing
AID
12 87 -- --
7 schools in Shinkalai, Bastan Ghana, Blaock 5 /C, Galf Abdullah. Naqilabad, 3.B & Aim.
VARA
RELIEF:Non -Food Item
Marja
Completed.
AID
--
Distribution of 450 pairs of trousers to 450 labors.
VARA
WATER:
Canal
Marja
Completed
UNDP/WFP
VITA
WATER:
Canal
Block 5
Ongoing
AID
12 92 -- --
VITA
WATER:
Canal
Block 5
Completed
AID
-- -- .11 92
'Cleaning of 17.5 km canal, benefit 850 families.
VITA
WATER:
Canal
Camp Balkh No.4
Completed
AID
-- -- Ii 92
Cleaning of 21 km canal, benefit 1100 families.
Ongoing
UNICEF /S
-- 90 -- --
Outreach IPI program from Nadi Ali.
Helmand
GAF
`
ti
i7
All villages
1 93
6 92
--
4 93
HEALTH: Vaccination
AGRIC:
Crop Product
12 villages
Ongoing
SV /FAO
12 92
HRO
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
MCI
HEALTH: Basic Clinic
Completed
AID
3 88 -- --
Ongoing
AID
12 88 -- --
s :ALTH: Basic Post
IACBAR
Cleaning of 10 km canal / irrigates 2,000 jeribs & benefit 950 families.
Cleaning of 25 km canal, benefit 450 families.
Sarai
HAFO
MSH
Cleaning of canal & reconstruction of flood control.
Deh Adam Khan
7 93
Multiplication of improved wheat, maize, cotton seed & fertilizer.
Distribution of 29 MT wheat seed and 30 MT DAP.
1 nurse
i dental tech 1
1 lab tech & 1 mid -level HW - OPI' I Dental
lab.
4 BHWs
DATABASE OF NGO ACTIVITIES
Page:
61
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
-VILLAGE(S) - - --
SECTOR
AGENCY
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
Nahr. Saraj
elmand
Distribution of 4 MT wheat seed and 4 MT DAP.
RFRA
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
SCA
AGRIC:
Crop Product
--
Completed
SCA
0 92 -- 92
Distribution of 2 MT wheat seed & 2 MT DAP.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.155 MT agrochemicals.
SCP.
HEALTH: Compr.Clinic
Ongoing
SCA
9 92 -- --
2 MDs / 1 mid -level HWs.
SWFAO
AGRIC:
Ongoing
FAO
5 93 -- --
Distribution of lung bean & fertilizer.
Ongoing
AID
12 87 -- --
2 schools in Maligar & Malgir villages.
Center
Crop Product
"EDUCAT: Primary
UNo
Nauzad
Helmand
Multiplication of wheat & maize seed with fertilizer.
7 93
HAFO
AGRIC:
Crop Product
2f villages
Ongoing
SV'FAO
12 92
HRO
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
MCI
HEALTH: Basic Clinic
Completed
AID
1 89 -- --
VARA
AGRIC:
Completed
FAO
11 92 12 92
Distribution of 10 MT wheat seed & 10 MT DAP.
Approved
EC/UNICF
-- 93 -- --
1 teas
Helmand
AVICEN
Crop Product
.
30 villages
Distribution of 10 MT wheat seed and 10 MT DAP.
1 lab tech / 1 dental -tech & 1 mid -level HW - OPD.
Nawae Barak.
ALTH: Vaccination
2 vaccinators
IMC
CONST:
Pub.Building
Ghuam Khan
Completed
WHO
5 89 -- --
Clinic building.
INC
HEALTH: Basic Clinic
Ghat Khan
Ongoing
AID
5 89 -- --
1 mid -level BW - OPD.
MCPA
MINES:
Survey
9 minefields
Completed
UNOCHA
1 92 12 92
196,402 Sqm agri.land /residential
NRORA
AGRIC:
Crop Product
13 villages
Ongoing
FAO
12 92 -- --
MSH
HEALTH: Basic Post
Kharaba
Ongoing
AID
7 88 -- --
SWAAD
MINES:
Clearance
Cnawa
Completed
UNOCHA
1 93
SWARD
MINES:
Clearance
6 villages
Completed
UNOCHA
1 92 12 92
UNO
EDUCAT: Primary
--
Ongoing
AID
A
C B- A R
DESCRIPTION>
d`road
Multiplication of 5 MT wheat seed & 5 MT DAP to 58 farmers.
3 BBWs
32069 Sum houses / 7615 Sim road / 5725 Sqa 357435 So canal.
3 93
9678 Sqn agri.land /48446 Sum houses.
8 schools in Khalash(2), Bazar Dasht(2), Razrat Asp, Basulan, Tapan Khalaj & Sarver Khan villages.
12 87 -- --
DATABASE OF NGO ACTIVITIES
Page:
62
A6actrep Date: 27/08/93
6TH EDITION
I
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S)-
Helmand
-- STATUS --
FUNDED
DURATION
<ACTIVITY
Begin- -End
- - -BY --
Reg
HAFO
WATER:
Drinking
15 villages
Ongoing
SV/WFP
BRO
AGRIC:
Crop Product
--
Completed
FAO
OMAR
MINES:
Awareness
Completed
UNOCHA
Helmand
--
-- 92 -- 92
1 92
6 92
Reconstruction of 15 wells for drinking water & watering animals
Distribution of 10 MT wheat seed and 10 MT DAP
Safety lessons - 1974 people participated.
Sarban Qala
MCI
HEALTH: Basic Clinic
--
Completed
MSH
HEALTH: Basic Poet
Malmand
Ongoing
AID
MSH
HEALTH: Vaccination
Sarban Qala
Ongoing
AID/UN
,AID
.
2 90 -- --
3 mid -level BWe / 1 dental tech & 1 lab tech
4 89 -- --
2 BHWs
3 93 -- --
RIFRA
AGRIC:
Crop Product
SCA
AGRIC:
Plant Proteo
HRO
AGRIC:
--
- Lab i dental & OP D
4 VACCINATORS UNDER PHD SUPERVISION IMPLEMENT IMMUNIZATION PROGRAM.
WOMEN
Helmand
DESCRIPTION > -
TARGET GROUPS: CHILDREN 0 -2 YEARS AND 5 -45
YEARS
Completed
FAO
-- 92 -- 92
Completed
SCA
0 92 -- 92
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed and 10 MT DAP
-- 93 -- --
For detials see ARRA Crop Production in Gozarah-
Distribution of 4 MT wheat seed and 4 MT DAP
Provision of 0.1 MT agrochemicals
Washare
Crop Product
--
Enjeel
Herat
ARRA
AGRIC:
Crop Product
--
Approved
FAO
ARCO
WATER:
Canal
Shadi Bara
Completed
ARCON
6 92
9 92
Cleaning of 10 km canal benefit 20 villages.
BRCO
WATER:
Canal
Nugra
Completed
ARCON
6 92
9 92
Cleaning 8 km canal + construction of 3 water dividers
BRCO
WATER:
Canal
Talab
Completed
ARCON
6 92
9 92
Cleaning of 6 km
BRCO
WATER:
Canal
Rezishk
Completed
ARCON
6 92
9 92
Cleaning of 6 km canal.
BRCO
WATER:
Canal
Enieel
Completed
ARGON
6 92
9 92
Cleaning of 10 km canal benefit 20 villages
MCPA
MINES:
Survey
it minefields
Completed
UNOCHA
1 92 12 92
1,241,080 Sqm agri.land residential & road
MSE
HEALTH: Basic Post
Shadel Jan
Ongoing
AID
7 08 -- --
5 BMWs
MSB
:rALTH: Vaccination
Enjeel
Ongoing
AID/UI
9 90 -- --
COVERED FROM HERAT VSF. SEE HERAT LISTING FOR DETAILS
-
canal.
DATABASE OF 1GO ACTIVITIES
Page:
63
ASactrep Date: 27'"41'Á3
------------------------- - - - - -- 6TB EDITION
ACTIVITY
----VILLAGE(5)----
SECTOR
AGENCY
Herat
FUNDED
---BY--
DURATION
4ACTIVITY
Begin--End
DESCRIPTION>
Enjeel
HEALTH: Other
MSE
--STATUS--
Enjeel
Ongoing
AID
Regional Health Administration (RBA) administrative center and dépot for issue of supplies and salaries and
5 90 -- --
supervision and monitoring of the BBWs and health facilities under its jurisdiction.
Demining program.
-- 93 -- --
Ongoing
EC
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provisión of 0.05 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
ONO
EDUCAT: Primary
Ongoing
AID
1 91 -- --
2 schools,in Nissan & Nawbadam villages.
VITA
CONS!:
Road
Puli Hashimi
Ongoing
AID
VITA
CONST:
Bridge
Enjeel
Ongoing
AID
VITA
WATER:
Canal
Maladan
Completed
AID
VITA
WATER:
Canal
10 villages
Completed
VITA
WATER:
FloodControl
Hashimi
OMAS
MINES:
Clearance
3CA
AGRIC:
SCA
Enjeel
Rehabilitation of 24 km road from Herat to Hasbimi, benefit 14,285 families.
Construction of 12 m bridge(stone & concrete), benefit 3,000 families.
--
2 93
Cleaning of 10 km canal, benefit 300 families.
AID
-- -- 11 92
Cleaning of 10 km canal, benefit 210 families.
Ongoing
AID
--
--
Construction of 250 m retaining wall(stone work), benefit 40,000 families.
Ghoryan
Herat
AGRIC:
Crop Product
Ghoryan
Ongoing
ARCON
11 91 -- --
Cultivation of 20 hectares land with wheat.
BRCO
AGRIC:
Machinery
Ghoryan
Ongoing
ARCON
11 91 -- --
i tractor - contracted with farmers.
BRCO
CONS!:
Road
Ghoryan Gaza
Completed
ARCON
11 91
BRCO
CONST:
Pub.Building
Ghoryan
Ongoing
ARCON
11 91 -- --
BRCO
WATER:
Karez
Moor Mohd Khan
Discontin
ARCON
11 91
4 92
Cleaning of 1 karez.
BRCO
WATER:
Canal
Rooch
Completed
ARCON
5 92
7 92
Cleaning 10 km canal - benefit 80 families.
BRCO
WATER:
Canal
Chishma Shair
Discontin
ARCON
11 91
4 92
Cleaning of 1 canal.
BRCO
WATER:
Drinking
Ghoryan
Ongoing
ARCON
11 91 -- --
Ghoryan
Completed
TAF
10 91
BRCO
C
-
INCOME: Other
;ACBAR
5 92.
Repairing of 6 km road - construction of 13 culverts.
Repairing of general mosque.
3 wells have been dug and pumps have been installed.
100 women trained in poultry.
3 92
DATABASE OF WGO ACTIVITIES
Page:
64
A6actrep Date: 27/08/93
--- 6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
< ACTIVITY
Begin- -End
DESCRIPTION>
Ghoryan
Herat
MSH
HEALTH: Compr.Clinic
Ghoryan
Ongoing
AID
11 87 -- --
1 MD, 2 NURSES,1 DENTAL TECH. ASST.,1 LAB. TECH. ASST.,1 MED.TEC.,. i
MSH
HEALTH: Basic Clinic
Qaysan
Ongoing
AID
11 89.-- --
i nurse, l doctor assistant, i local dai, 1 dental assistant, 1 lab tech. assistant - 5 rooms, 5 beds, dental,
13 ROOM, 5 BEDS, LABORATORI, DENTAL
laboratory, NCH services & immunization.
MSH
HEALTH: Basic Post
Ghoryan
Ongoing
AID
5 89 -- --
2 BHWs
MSH
HEALTH: Vaccination
Ghoryan
Ongoing
AID/UN
9 90 -- --
COVERED FROM HERAT VSF. SEE HERAT LISTING FOR DETAILS.
NAC
CONST:
Pub.Building
Qaisan /Center
Completed
NAC
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
UNO
EDUCAT: Primary
Ongoing
AID -
6 66 -- --
7 schools in Sar Asyab, Fegda101, Sboor. Barmabad & Rouj.
VITA
CONST:
Road
Ghoryan
Ongoing
AID
10 91 -- --
Rehabilitation of 28 km road from Ghoryan to Zindajan, benefit 11,429 families.
VITA
CONST:
Bridge
Ghoryan
Completed
AID
-- -- 11 92
Construction of 4 m bridge(concrete & masonry), benefit 11428 families.
VITA
CONST:
Bridge
Ghoryan
Completed
AID
-- -- 12 92
Construction of 5 m bridge (concrete & .masonry), benefits 11428 families.
VITA
CONST:
Bridge
Ghoryan
Completed
AID
-- -- 11 92
Construction of 6 m bridge(concrete & masonry), Benefit 11228 families.
VITA
WATER:
Canal
Astanou
Ongoing
AID
9 91 -----
Cleaning of 8 km canal, benefit 86 families.
VITA
WATER:
Canal
Saboul
Completed
AID
4 92
Cleaning of 8.5 canal, benefit 214 families.
VITA
WATER:
Canal
Barna Abad
Ongoing
AID
12 91 -- --
Cleaning of 9 km canal, benefit 2,857 families.
VITA
WATER:
Canal
Gaza
Ongoing
AID
4 92 -- --
Cleaning of 9.5 km canal, benefit 129 families.
VITA
WATER:
Canal
Shahrabad
Ongoing
AID
9 91 -- --
Cleaning of 18 km canal, benefit 285 families.
Approved
FAO
-- 93 -- --
--
2 building each with 8 rooms - local materials.
9 92
Gozarah
Herat
ARAA
11 91
AGRIC:
Crop Product
70 villages
Distribution of 10 MT various kinds of seed 110 MT DAP & 2 MT salfar to 350 farmers for multiplication in Gozarah /
Enjeel / Pasbtun Zar & Earokh.
.Crop Product
ARAA
AGRIC:
MCPA
MINES:
MSH
HEALTH: Compr.Clinic
ACBAR
Survey
50 villages
Completed
1 minefield
'Completed
Peri Surkb
Ongoing
FAO
UNOCHA
AID
Multiplication of 5 MT wheat seed & 5 MT DAP benefit 259 farmers.
10 92 11 92
19,059 Sqm residential.
1 92 12 92
1 MD, 1 NURSE; 1 MEDICAL TECH, 1 LAB.TECB.ASST.
10 87 -- --
DATABASE OF NGO ACTIVITIES
Page:
65
A6actrep Date: 27 /08/93
5 ROOM, 5 BEDS,
LABORATORI
---
6TB EDITION
SECTOR
AGENCY
Herat
- - -- VILLAGES) - - --
ACTIVITY
FUNDED
-- STATUS-
-BT --
DURATION
< ACTIVITY
Begin- -End
DESCRIPTION>
Gozarah
MSE
HEALTH: Basic Post
OMAR
MINES:
SCA
AGRIC:
SCA
HEALTH: Compr.Clinic
UNO
EDUCAT: Primary
'Clearance
Qaymast
Ongoing
AID
Gozarah
Ongoing
EC
-- 93 -- --
kilning program
Completed
SCA
-- 92 -- 92
Provision of 0.085 MT agrochemicals
Asia Chah
Ongoing
SCA
3 89 --
1 MD / 2 mid -level Efts / 2 Mental Tech,
--
Ongoing
AID
4 88 -- --
3 schools in Sayed Khan, Sewshan & Sweshan char labutar villages.
Plant Protec
7 88 -- --
4 BHNs
Gulran
Herat
BRCO
AGRIC:
Crap Product
Haft Muna/D.Zulfiq
Ongoing
ARGON
11 92 -- --
BRCS`
AGRIC:
Machinery
Haft Munar/D.Zulfi
Ongoing
ARCON
11 92 -- --
MSH
HEALTH: Basic Clinic
tares Elyas
Ongoing
AID
Distribution of 7 MT wheat and equal amount fertilizer
1 tractor contracted to farmers...
10 90 -- --
3 MED. TECH.
..._....
MSH
HEALTH: Basic Poet
larez E1yas
Ongoing
AID
3 88 -- --
3 BBfis
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT
SCA
AGRIC:
Other
--
Ongoing
SCA
4 93. -- 93
Agriculture survey on 30
Herat
agroCheiicals
villages,
Herat
ARAA
RELIEF:Food Items
Center
ARCON
CONST:
Pub. Building
BRCO
AGRIC:
BRCO
BRCO
people.
- Ongoing
RONCO
-- 93 -- -
--
Ongoing
ARCON
-- -- -- --
.Construction of Herat Ospitai
Crop Product
Flabat Farm
Ongoing
ARCON
11 92 -- --
Cultivation of 30 hectares land with wheat ! fertilizer
AGRIC:
Crop Product
Urde than
Ongoing
ARCON
6 92 -- --
Cultivation of 30 hectares land with wheat
AGRIC:
Fruit Trees
Flahat Farm
Ongoing
ARCON
6 92 -- --
Nursery of 20 jeribs (1,000,000 saplings)
Levelling and filling of 1 km road
.
178 MT wheat distribution for the needy
BRCO
CONS!:
Road
Jade Eidgah
Completed
ARCON
6 92
7
BRCO
CONST:
Road
Eabarzan
Completed
ARCON
6 92
7 92
CONST:
Bridge
tabaraan
Completed
ARCON
6 92
7
92
Construction of 8 concrete bridges
CONST:
Pub.Bnìldimg
Sultan Herat
Completed
ARCON
11 92
4
93
Construction of concrete Mosque for government offices
BRCO
BRCO
-
ACBAR
92
Levelling and filling
of 4 km road
DATABASE OF IGO ACTIVITIES
Page:
66
A6actrep Date: 27/0B/93
- ---
- ---- OS EDITION
ACTIVITY
.
SECTOR-
AGENCY
---- VILLAGE(S) - ---
-- STATUS --
DURATION
FUNDED
- --BY --
Begin- -End
'<ACTIVITY
DBSCRIPTION>
Herat
Herat
aid Eidgah
Completed
ARMA
6 92 10 92
Pooran
Completed
ARCON
10 92 11 92
Canal
Iabarzan
Completed
ARGON
WATER:
FloodControl
labarzan /Sbaghalia
Completed
ARCON
10 92 11 92
BRCO
WATER:
Other
Flahat Farm
Ongoing
ARCON
6 92 -- --
Installation enter pump for irrigation of fars.
DAC
HEALTH: Other
City
Approved
DAC
9 93 -- --
Providing assistance and training in surgical section of Herat hospital
IAM
HEALTH: Other
Hera
Ongoing
IA.M
-- -- -- --
Support to MOPH ophthalmic center
ICRC
HEALTH: Disabled Reh
City
Ongoing
ICRC
-- 92 -- --
Orthopaedic wcrkehop (producen 80 liaba per month)
IOM
RELIEF:Help Returnee
--
Ongoing
IOM
-- 92 -- --
Transportation assistance for returning families going long distances inside Afghanistan
MCPA
MINES:
1 minefield
Completed
UNOCHA
MDM
HEALTH :Othdr
Center
Ongoing
MDM
-- 82 -- --
Rehabilitation of surgical unit in Herat hospital
MDM
HEALTH: Other
City
Ongoing
MDM
-- 92 -- --
Taking care of hospital's incenarator
MSH
HEALTH: Basin Post
Unspecified
Ongoing
AID
it 89 -- --
2 BHWs
MSB
HEALTH: Vaccination
Herat
Ongoing
AID/UN
BRCO
CONS!:
Pub.Buildìng
BRCO
WATER:
Canal
BRCO
WATER:
BRCO
Survey
.
6 92
Repairing of a Midrasa
Cleaning 4 km canal + construction of a rater divider
9 92
Cleaning 8 km canal.
Changing direction of the river which
1 92 12 92
9 90 -- --
vas
threatening the villages
3,559 residential
24 VACCINATORS OPERATE UNDER AN IMMUNIZATION
SUPERVISOR WTI ?MUD IMMUNIZATION TECHICIANS OUT OF THE VSF IN
HERAT CITY COVERING 66 VILLAGES IN 5 DISTRICTS IN IIINT 11W 4
CHILIAD 0 -2 YEARS, WOMEN 5 -45
NPO
SOCIAL:Other
Herat
Ongoing
NRC/NCA
OMAR
MINIS:
Awareness
City
Completed
UNOCHA
ÌMAR
MINES:
Clearance
City
Ongoing
EC
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrocheaicals
SCA
AGRIC:
Other
--
Ongoing
5.4
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
City
Ongoing
SCA
A C B A R
----------------------------- -- - ---
--
---
--
--
6 82 12 82
-- 93 -- --
=- -- -- -
R PROVINCES EXCLUDING HERAT CITY.
TARGET GROUPS-
TEARS.
Survey is going on
Safety lessons - 17184 people participated
Demining program
4 mid -level BWs. i X -ray tech
- DATABASE OF AGO ACTIVITIES
i dental tech
6TH EDIiION I
!
Page:
67
A6actrep Date: 27/08/93
ACTIVITY
---- VILLAGE(S) - - --
SECTOR
AGENCY
Herat
FUNDED
DURATION
-- -BY --
Begin- -End
<ACTIVITI
AGRIC:
MSH
HEALTH: Basic Post
UNO
EDUCAT: Primary
For detials see ARAA CrCp Production in Gozarah.
--
Approved
FAO
-- 93 -- --
Pashtan
Ongoing
AID
5 89 -- --
i BHW
Ongoing
AID
3 89 -- --
1 school in Chashma Nuqra village.
Ongoing
AID
7 90 -- --
i BHW
Provision of 0.15 MT agrochemicals.
Kushk
Iushk
MSH
HEALTH: Basic Post
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 --
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
--
Completed
SCA
0 92 -- 92
Agriculture survey on 40 villages:
Bagul
Ongáing
AID
12 88 -- --
2 BHWs
--
Approved
FAO
-- 93 -- --
For detials see ARAA Crop Production in
Hann Abad
Ongoing
AID
12 88 -- --
4 BHWs
Pashtoon Zarghun
Ongoing
EC.
-- 93 -- --
Damning programa
12 92
93.
Obey
Herat
NSH
DESCRIPTION>
Karokh
Crop Product
ARAA
Herat
.
-- STATUS --
HEALTH: Basic Post
Pashtun Zar
Herat
Crop Product
ARAA
AGRIC:
MSH
HEALTH: Basic Post
OMAR
MINES:
Clearance
Gozarah.'
Zendajan
Herat
Multiplication of 5.2 MT wheat seed & 5 MT DAP benefit 259 farmers.
93
ARAA
AGRIC:
Crop Product
50 villages
Completed
FAO
CPA
MINES:
Survey
4 minefields
Completed
UNOCHA
1 92 12 92
21.993 Sqm residential & road.
MSH
HEALTH: Basic Post
Qala New-
Ongoing
AID
7 90 -- --
2 BHWs
HEALTH: Med.Training
Zendajan
Completed
AID
12 89 11 92
1
15 BRWs received initial 3 months duration community health worker training & were assigned basic health posts in
Afghanistan.
1SH
HEALTH: Vaccination
NPO
CONST:
Sanitation
Zendajan
Ongoing
AID /UN
9 90 -- --
COVERED FROM HERAT VSF. SEE HERAT LISTING FOR DETAILS.
Zendajan
Ongoing
NRC /NCA
4 93 -- --
Sanitation program e.g. pit latrines.
DATABASE OF NGO ACTIVITIES
Page:
68
A6actrep Date: 27 /08/93
6TH EDITION I
AGENCY
----VILLAGEES! -
SECTOR
Herat
- --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Zenda3an
Demining program.
-- 93 -- --
Ongoing
EC
Completed
SCA
0 92 -- 92
Provision of 0.11 MT agrocheaicals.
Ongoing
AID
3 89 -- --
4 schools in Qala Nay, Qala Reg, Mahal Ibwaja & Mahal Langar villages.
Shada
Completed
AID
-- -- 12 92
Canal
Zendajan
Ongoing
AID
4 92 -- --
WATER:
Canal
Agha
Completed
AID
-- -- 12 92
Cleaning of 5 km canal, benefit 600 families.
VITA
WATER:
Canal
3 villages
Completed
AID
-- -- 10 92
Cleaning of 6 km canal, benefit 900 families.
VITA
WATER:
Canal
Qala Mamoren
Completed
AID
-- -- 11 92
Cleaning of 8 km canal, benefit 170 families.
OMAR
MINES:
Clearance
SCA
AGRIC:
Plant Protec
UNO
!DUCAT: Primary
VITA
WATER:
Canal
VITA
WATER:
VITA
Jawzjan
Zendajan
Cleaning of 10 km canal, benefit 380 families.
Cleaning of 14 km canal, benefit 2.143 families.
A9cha
ARCAR
WATER:
Structure
Yangi Qala
Completed
UNDP
2 93
5 93
Construction of reservoir.
ARCAR
WATER:
Structure
ghanaga
Completed
UNDP
2 93
5 93
Construction of reservoir.
CRFA
INCOME: Handicrafts
Jangal Ariq
Ongoing
CIDA
8 92 -- --
Carpet production: 40 women are paid Rs.700 /sq m carpet - raw material is provided -
carpet is marketed locally /
overseas.
Silk weaving program.
-- 93 -- --
CRFA
INCOME: Handicrafts
Qor Chango
Approved
UNESCO
MSH
HEALTH: Basic Post
Unspecified
Ongoing
AID
4 88 -- --
1 BHW
SCA
AGRIC:
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
12 91 -- --
UNO
EDUCAT: Primary
Ongoing
AID
9 87 -- --
Ongoing
EC/UNICF
Ongoing
UNDP
Jawzjan
Jawzjan
WATER:
ACBAR
Lhanaga
3 mid -level HWs
8 schools in Surkh, Qamariq, Saqazkul, Shah War, Jangal Righ, Baishkafa, Bastt & Dugum villages.
Balkhab
ALTH: Vaccination
AVICEN
&ACRP
Other
41 villages
1 team - 2 vaccinators
-- -- -- --
Faizabacl
Structure
Buz Tepa
2 canal divider - concrete (1 Em).
7 93 -- --
DATABASE OF NGO ACTIVITIES
Page:
69
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCT
SECTOR
PRB
CONST:
Pub.Building
SCA
AGRIC:
Other
Jawzjan
MSH
Center
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
Completed
ARGON
8 92
Ongoing
SCA
O 83 -- 93
Agriculture survey on 30 villages
Ongoing
AID
4 88 -- --
3 BHAs
1 93
DESCRIPTION>
Bova primary school with 6 classrooms / 2 administration rooms - brick i steel bar & concrete
Khanagah
HEALTH: Basic Post
Jawzjan
- - -- VILLAGE(S) - - --
Ihanagab
Kohistanat
MSH
HEALTH: Basic Poet
Agsoo We Agbulag
Ongoing
AID
11 87 -- --
4 Billie
MSH
HEALTH: Vaccination'
Iohietanat
Ongoing
AID/UN
11 90 -- --
COVERED FROM BALIH VSF.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.13 MT agrochemicals
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 3íi villages
UNO
EDUCAT: Primary
Ongoing
AID
1 91 -- --
6 schools in Jarhgan, Ilarwa, Qambari, Bazni, Ganjiha &.Ihawal
Ongoing
GAA
-- 93 -- --
Baroon Awal
Ongoing
AID
4 90 -- --
Mengajek
Ongoing
AID/UN
Ongoing
AID
1 91 -- --
3 schools in Tughan, Char Chango & Abasi villages
4 88 -- --
1 BHW
x+.wz j an
GAA
Mardyan
RELIEF :Food Items
Jawzjan
.I:ALTH: Basic Post
NSH
HEALTH: Vaccination
Úl10
EDUCAT: Primary
Jawzjan
IISIL
ONO
INC
Shor Tepa
Ongoing
AID
HEALTH: Vaccination
Qargin
Ongoing
AID/UN
Ongoing
AID
EDUCAT: Primary
CONST:
ACBAR..
i BBA
11 90 -- --
COVERED FROM BALIH VSF. SEE BAZAR- I- SHARIF LISTING FOR DETAILS
Qargin
HEALTH: Basic Post
Jawzjan
See GAA -R2 project in Mazar for details
Mengajek
MSH
SR
--
SEE MAZAR-I- SHARIF LISTING FOR DETAILS
11 90 -- --
COVERED FROM BALIH VSF.
SEE MAZAR-I-SBARIF LISTING FOR DETAILS
1 88 -- --
6 schools in Joi Sarai, Dinar, Man Tape, Shor Tapa, look & Iamiab villages
5 90 -- --
Clinic building
Sang .Charak
Pub.Bnilding
TabarlJuybar
Ongoing
DATABASE OF AGO ACTIVITIES
Page:
70
A6actrep Date: 27/08/93
- 6TH EDITION
ACTIVITY
AGENCY
SECTOR
Jawzjan
.
VILLAGB(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
---------------- <ACTIVITY
DESCRIPTION>
Sang Charak
IMC
HEALTH: Coipr.Clinic
MAI
DUCAT: Primary
Joy Bar
0ngoing
AID
5 87 -- --
Ongoing
MAI
--
2 aid -level HWs ! 1 lab tech. - OPD ! lab / vaccination
9 schools in Arabai, Arabai Sufla, Ghat Dolaq, Nana Feriahtagan(2), Guzar Ferisbtagan, Pashsak, jEalan Ferahtagan &
Langar
MSH
HEALTH: Basic Post
Sang Charak
Ongoing
AID
8 87 -- --
19 BMWs
MSH
HEALTH: MCH
Alalghan
Ongoing
AID
5 90 -- --
1 MT, 2 Rooms; women / children under 5 care; health education and Dai training programs
MSH
HEALTH: Vaccination
Sang Charak
Ongoing
AID/UN
li 90 -- --
COVERED FROM BALEE VSF.
SEE MAZAR -I- SHARI! FOR DETAILS. A SECOND TEAM WITH 5 VACCINATORS UNDER PHD SUPERVISION IS
ALSO IMPL%MENTING IMMUNIZATION PROGRAMS WITH VACCINES SUPPLIED BY TBE BALER VSF
.SCA
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
Completed
SCA
0 92 -- 92 - -- Provision of 0.195 MT agrochemicals
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.3 MT agrochemicais
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages
SCA
AGRIC:
Other
vompleted
SCA
.O 92 -- 92
Agriculture survey on 88 .villages
SCA
HEALTH: Basic Clinic
lutan Mast
Ongoing
SCA
7 88 -- --
2 aid -level HWs / 1 Nurse
SCA
HEALTH: Basic Clinic
Tokzar
Ongoing
SCA
3 89 -- --
2 mid -level HWs / 2 PHOa / 1 Pharmacist
SCA
HEALTH: Basic Clinic
Farashghan
Ongoing
SCA
1 85 -- --
1 mid -level MI / 2 Nurses
11S0
EDUCAT: Primary
Ongoing
AID
9 88 -- --
16 schools in different villages
Jawzjan
Sari
--
-
Pul
MAN.
HDUCAT: Primary
-
Ongoing
MAI
-- -- -- --
4 schools in Qad Qachi, Hajar, Qadas Jan & Wasidan villages
MSH
HEALTH: Basic; Poet
Sare Pul
Ongoing
AID
11 87 -- --
10 BMWs
SCA
AGRIC:
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrocheaicals
SCA
3.ALTH: Basic Clinic
Ongoing
SCA
4 90 -- --
7 mid -level HWs.
Ongoing
AID
3 89 -- --
3 schools in Haq lochs, Pista Mazar & Faizabad villages
Ongoing
WFP
3 93 -- --
186 MT wheat per month for 3 months
UNO
Plant Protec
Shahri Maw
DUCAT; Priaary
Bagrami
Kabul
APIO
RRLIEF :Food Item
ACHAR
18 villages
- --
DATABASE OF NGO ACTIVITIES
Page:
71
A6actrep Date: 27/08/93
GTI EDITION
ACTIVITY
- - -- VILLAGE'S) - --
SECTOR
AGENCY
Kabul
FUNDED
DURATION
< ACTIVITY
- - -BY-
Begin- -End
Ongoing
FAO
12 92 -- --
Multiplication tf 5 MT wheat seed
Approved.
UNDP
-- 93 -- --
Animal vaccination & treatment
-- STATUS --
DESCRIPTION>
Bagrami
sine Hesar
ARO
AGRIC:
Crop Product
CRAA
AGRIC:
Vet
ICRC
HEALTH: Mobiie!F -Aid
Bagrami
Ongoing
ICRC
-- 92 -- --
First Aid / Dispensary
MSH
HEALTH: Basic Poet
Shina
Ongoing
AID
11 67. -- --
3 BHWs
SCA
HEALTH
Basic Clinic
Cbakari
Ongoing
SCA
5 90 -- --
11 mid - level HWs / 1 Dental Tech
SJAWI
AGRIC:
Crop Product
Ongoing
FAO
5 93 -- --
Distribution of seed & fertilizer to the farmers of the area
65 villages
Ongoing
WFP
2 93 -- --
282 MT wheat per month for 3 months.
i DVM / 1 paravet & i guard
Charasyab
Kabul
APWC
RELIEF :Food items
APWC
WATER:
Canal
5 villages
Approved
WFP
-- 93 -- -
Cleaning of M. Hashim canal (food for work)
APWO
WATER
Canal
20 villages
Approved
WFP
-- 93 -- --
Cleaning of Euz Musahi canal (food for work)
APW1
WATER:
Canal
5 villages
Approved
WFP
-- 93 -- --
Cleaning of Khwaja ghel canal (food for work)
APWC
WATER:
Canal
20 villages
Approved
WFP
-- 93 -- --
Cleaning of Bar Musuhi canal (food for work)
APWO
WATER:
Canal
Mia Ebel
Ongoing
WFP
4 93 -- --
ARCON
WATER:
Drinking
Completed
ARCON
-- -- -- -
Repairing of Logar well
ARCON
WATER
Drinking
--
Ongoing
ARGON
-- -- -- --
Rehabilitation of Logar well
GAF
AGRIC:
Vet
Musaie
Ongoing
UNDP
3 93
7 93
1 assist DVM / 2 paravets / i guard curative & preventive service
GAF
AGRIC:
Vet
Charasyab
Ongoing
UNDP
6 92
6 93
1 DVM / 2 paravet / 1 guard curative & preventive service
ICRC
HEALTH: Mobile/F-Aid
'haraeyrab
Ongoing
ICRC
MSH
HEALTH: Basic Post
Shad Khan
Ongoing
AID
8 87 -- --
5 BHWs
SCA
HEALTH: Basic ,'linic
Center
Ongoing
SCA
1 89 -- --
9 mid -level HWs / 1 dental
SCA
HEALTH: Basic C ini"
Mit Del
Ongoing
SCA
8 88
5 mid -leveì HWs
A C B A R
Cleaning of Mia Ehei canal (food for work)
First Aid / Dispensary.
-- 92 -- --
--
tech.
DATABASE OF NGO ACTIVITIES
Page:
72
A6actrep Date: 27/08/93
.
6TH EDITION 1
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
- -BY --
Begin --End
<ACTIVITY
DfiSCRIPTION>
Chardehi
Kabul
6
93
1 assist DVN / 2 paravet / 1 guard curative & preventive service
ICRC
-- 92 --
-,
First Aid / Dispensary
Ongoing
ICRC
-- 92 -- --
First Aid / Dispensary
Dashti Barchi
Ongoing
EC /NSF
1
93 -- --
HEALTH: Distrct Hosp
Qala Wazir
Ongoing
AID
1
89 -
MAC
RELIEF:Food Items
Qala Luqman
Completed
NAC
8 91
SCA
HEALTH: Basic Clinic
Niez Beg
Ongoing
SCA
2
90 -- --
SCA
HEALTH: Basic Clinic
gala Luqman
Ongoing
SCA
2
87
-- --
Ongoing
UNDP
8 90
6 93
Completed
FAO
Chardehi
Ongoing
UNDP
HEALTH: Mobile /F -Aid-
Dashti Barchi
Ongoing
ICU
HEALTH: Mobile /F -Aid
Fazel Beg
MSF -F /B
HEALTH: Compr.Clinic
MSH
GAF
AGRIC:
ICRC
Vet
.
1
93
5 MD / 60 consults / day EPI (UNICEF)
2 MD / 2 MED TECH / 2 LAB TECH ASST i 1 F- AIDER / 5 ROOMS / 5 BEDS / LAB / DENTAL / GENERAL SURGERY / X-RAY
--
Distribution of 200 MT wheat - there vas food shortage in the area
8 91
1 MD / 3 mid -level HWs / 1 Nurse / 1 Pharmacist
1 nurse, 8 mid -level Hiis, 1 pharmacist,
Deh Sabz
Kabul
Deh Sabz
OAF
AGRIC:
Vet
HRP
AGRIC:
Crop Product
MSF:
HEALTH: Compr.Clinic
Deh Yahya
Ongoing
AID
MSH
HEALTH: Basic Post
Puli Charkhi
Ongoing
AID
12 89 -- --
ORA
HEALTH: Compr,Clinic
Pull Charkhi
Ongoing
ORA
9 92 -- --
1 assist DPI / 2 paravet / I guard curative & preventive service.
Distribution of 10 NT wheat seed and 5 MT DAP,
-- 92 -- 92
4-90 -
'2 MED. TECH., 1 NURSE, 1 LAB, TECH. ASST.
-
LABORATORY
1 BHW
2 MDs / 2 nurses / 3 caretakers / OPD / vaccination & eye camp - in cooperation with SERVE
2 schools
MAI
EDUCE: Primary
Shoraba /Isterghich
Ongoing
MAI
MSH
HEALTH: Basic Clinic
Khwaja Hassan
Ongoing
AID
5 90 -- --
i NURSE, 1 MED. TECH
MSH
HEALTH: MCH
Payan Deh Farzah
Ongoing
AID
5 92 -- --
1 MD / 1 Nurse,
MSH
HEALTH: MCH
Gudarah
.Ongoing
AID
-- -- -- --
VITA
CONST:
Several villages
Ongoing
AID
6 91.-- --
City
Ongoing
Germans
AHED
10 ROOr.:3 BEDS.
Ietalef
Kabul
Kabul
1 lab tech.. 1 dental tech., 2 PH
Road
i MCHO,
2 ROOMS
1 Ned Tech / 5 Rooms: women
children under 5 care; health education and Dai training programs
Women /children under 5 cari: health education.
Rehabilitation of 23 km road, benefit 9,285 families
Kabul
RELIEF :Food Items
Food distribution in colaboration with GAA.
-- 93 -- --
_____
DATABASE OF IGO ACTIVITIES
Page:
72
A6actrep Date: 27/08/93
6711
EDITION
ACTIVITY
SECTOR
AGENCY
Kabul
-VILLAGES! - - --
-- STATUS --
FUNDED
- --BY --
DURATION
tACTIVITY
Begin- -End
DESCRIPTION>
Kabul
ARCOS
CONST:
ARCON
Pub.Building
--
Ongoing
ARCON
--
Health unit
HEALTH: Other
City
Ongoing
ARCON
--
Equipment & supplies
ARCS
HEALTH: Mobile /F -Aid
--
Ongoing
ICRC
-- 92 -- --
10 dispensaries in different parts of the city
ARCS
RELIEF:Food Items
Ongoing
*Donors
-- 92 -- --
Distribution of emergency food & other commodities to displaced families in public buildings in collaboration with
ICRC
ARF
HEALTH: Region.Hosr
gala Fathullah
Ongoing
'Donors,
-- 92 -- --
Gynaecological hospital.
AVICEN
HEALTH: Other
City
Approved
EC
-- 93 -- --
1 office for EPI
Ongoing
GAA
-- 93 -- --
Distribution of 2,900 MT food (wheat i chick pea /oil; in Kabul / Charikar ! Baghlan
Shahre New
Ongoing
ODA
--
'GAP.
HT
RELIEF:Food Items
HEALTH: Compr.Clnic
.IAAAE
CONST:
Other
City
Completed
Self
IAN
CONST:
Energy Cons.
Barte 3
Ongoing
IAM
IAN
HEALTH: Region.Hsp
Shahre Naw
Ongoing
NCA /IAN
IAN
HEALTH: Nobile /L' -Aid
Base in Shahre Naw
Ongoing
HEALTH: MCH
Larte 3
IAN
HEALTH: Med.Training
IAM-
General OPD for local people
Survey of destructions of buildings electricity & water supply
10 92 11 92
--
Production of 96, 10 -Lit. & 294, 50 -Lit. solar water heaters i year
--
Tertiary eye hospital(Noor), reconstructed.- 93
IAd
--
Mobile eye care, 1 -day clinics & 2 -week camps.
Ongoing
IAd
--
100 vistors / day, in cooperation with NOPH
Wazir Akbar Khan
Ongoing
IAN
HEALTH: Disabled Reh
Karte 3
Ongoing
IAN
--
Education & rehabilitation
IAN
HEALTH: Disabled Reh
Wazir Akbar Khan
Ongoing
IAN
--
Orthopaedic clinic 3295 consultations in 1992
IAN
INCOME: Help Vulner.
Karte 4
Ongoing
IAN
-- -- -
--
Cooperation workshop with 30 trainees (mainly blind)
ICRC
HEALTH: Region.Bosp
Karte 3
Ongoing
ICRC
-- 92 -- --
Complete support to Karte Seh Surgical Hospital (for war wounded).
ICRC
HEALTH: Disabled Reh
Wazir+Akbar Khan
Ongoing
IGRC
-- 92 -- --
Orthopaedic component of IAN center.
ICRC
HEALTH: Other
Ongoing
ICRC
-- 92 --
Support to all hospitals during clashes
ICRC
HEALTH: Other
Ongoing
ICRC
-- 92 -- --
Suppport to surgical unit of Wazir Akbar Khan Hospital (food / medicines i supply)
4jAM
Wazir Akbar Ikea
--
Physiotheraphy school 3-years /16 studenta!year & planned recruitment
IACBAR
DATABASE OF NGO ACTIVITIES
Page:
74
A6actrep Date: 27/08/93
for visually handicaped
6TH EDITION
AGENCY
SECTOR
Kabul
1.
ISRA
- - -- VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
- --BI --
Begin- -End
<ACTIVITY
DESCRIPTION>
Kabul
INCOME: Help Vulner.
City
Ongoing
'ISRA
HEALTH: Other
City
Ongoing
ODA
IDA
CONST:
Pub.Building
Karte 3
Completed
ICRC
5 91
MSF -F!B
HEALTH: Compr.Clinic
Taimany
Ongoing
BC/MSF
9 92 -- --
10 beds
MSF -F /B
HEALTH: Other
City
Ongoing
BC/MSF
8 92 -- --
Academical / surgical / abdominal - general / 180 beds in Jasuriat Hospital
MSH
BHALTH: Other
Kabul
Ongoing
AID
4 93 -- --
Regional Health Administration (RHA) administrative center and depot for issue of supplies and salaries and for
JWMM
.
9 92 -- --
-- 88 -- --
6 92
Assistance to 493 orphans(monthly allowance / health i education ! clothing i foot -wear etc)
Provision of medicine & medical instruments to different hospital & clinics through ARCS
Construction of hospital building with steel & cement
5 MD i 120 consults / day no BPI yet
monitoring and supervision of the BHWs and health facilities under its supervision
PRS
RELIEF:Food items
Completed
GP (UK)
-- -- -- 92
Distribution of 235.5 MT flour i ghee i rice & tea for the most needy people
RDA
RELIEF:Food Items
Completed
WFP
-- 92 -- 93
Distribution of 400 MT wheat
SCO
HEALTH: Basic Post
Ongoing
INDOORS
-- 93 -- --
35 patients i day
Ongoing
AID
11 87 -- --
2 BHWs
Kabul
Kalakan
HEALTH: Basic Post
MSH
Kabul
Kalakan
Khake Jabar
Kabul
APWO
RELIEF:Food Items
8 villages
Ongoing
WFP
2 93 -- --
27 MT wheat per month for 3 months
MSH
HEALTH: Basic Post
Jalghozi
Ongoing
AID
1 90 -- --
l' BHW
RDA
WATER:
Khord Kabul
Ongoing
WFP
6 93
Construction of 13 M head dam
Structure
Kabul
Mir
8
93
Bachakot
GAF
AGRIC:
Vet
Mir Bachakot
Ongoing
UNDP
10 91
ICRC
HEALTH: Mobile /F -Aid
Mir Bachakot
Ongoing
ICRC
-- 92 -- --
First Aid i Dispensary
NSH
HEALTH: Basic Post
Sarai Kbwaja
Ongoing
AID
12 90 -- --
i BHW
UNO
EDUCAT:. Primary
Ongoing
AID
8 87 -- --
6 93
1 DV)! / 2 paravet f 1 guard curative & preventive service
9 schools in Payandeh, Mashwani, Mashwani Ulya, Q.Mir Afghan, Kalafgan, Ihwaja Mir, Daku Sufla, Doghabad & Mashwani
Sufla
VITA
CONST:
ACBAR
Bridge
Payan Deh
Discontin
AID
9 91 -- --
Construction of '12 n bridge(concrete & sesonry), benefit 3,571 faillies
DATABASE OF NGO ACTIVITIES ---
Page:
75
,
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
-VILLAGE(S) - ---
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Mir Bachakot
Kabul
Qala Amirbaz
Completed
AID
-- -- 12 92
Cleaning of 6.5 km canal, benefit 100 families
WATER:: Canal
Darak
Completed
AID
-- -- 12 92
Cleaning of 9 km canal, benefit 190 families
VITA
WATER:
Canai
Tangi Bagh
Completed
AID
-- -- 12 92
Cleaning of 8 km canal, 120 families
.VITA
WATER:
Canal
Kouch Gala
Completed
AID
-- -- 12 92
Cleaning of 7 km canal, benefit 150 families
VITA
WATER:
Canai
Qala Khwajamir
Completed
AID
-- -- 12 92
Cleaning of 6 km canal, benefit 93 families
VITA
WATER:
Canal
Qala Merza
Completed
AID
-- -- I1 92
Cleaning of 14.5 km canal, benefit 800 families
.ria Ea Pl
Ongoing
W FP
4 9i -- --
VITA
WATER:
VITA
Canal
Kabul
PaBhman
AN
RBLIEr":Food ïteme
ARCON
CONST:
Shelter
Paghman
Ongoing
ARCON
ATC
MÌNES:
Clearance,
Parachi
Completed
UNOCHA
DCA
AGRIC.
Vet
Khaldari
Ongoing
UNDP
10 90 -- --
1 paravet
DCA
AGRIC:
Vet
Qala Hakim
Ongoing
UNDP
10 90 -- --
1 paravet
DCA
AGRIC:
Vet
Bazi Khel
Ongoing
UNDP
10 90 -- --
1 paravet
DCA
AGRIC:
Vet
Morghgiran
Ongoing
UNDP
10 90 -- --
1 paravet
KAAI
EDUCAT: Primary
Katar Khel
Ongoing
MAI
-- -- -= --
1 school.
MCPA
MINES:
2 minefields
Completed
UNOCHA
7 92
MSH
HEALTH: Basic Post
Arghandi Bala
Ongoing
AID
8 87 -- --
SAC
HEALTH: Other
Chandaibahi
Ongoing
RAC
-- 91 -- --
NAC
RELIEF:Food Items
Paghman
Completed
MAC
SCA
HEALTH: Basic Clinic
Arghandi Bala
Ongoing
SCA
-- -- -- --
UNO
EDUCAT: Primars
-
Ongoing
AID
3 89 -- --
Survey
-:Ptniiuf.:f . f 500 MT wheat *9 el: :%:FR
Paghman shelter program
7 92
8 91
8 92
8 92
8 91
ACBAR
Destroyed 204 devices, cleared 126610 Sqm agri.land.
154,501 Sqm agri.land.
13 BHWs
Dental clinic
Distribution of 500 MT wheat - there was food shortage in the area
7 mid-level BWe / 1 nurse.
5 schools in Kabaki, Arghanda Bala(2), Gumbad, Arghanda Sufis villages up to 4 grades
DATABASE OF NGO ACTIVITIES
Page:
76
A6actrep Date: 27/08/93
6TH EDITION
-VILLAGE(S)-
SECTOR
AGENCY
but
ACTIVITY
FUNDED
DURATION
- STATUS-
--BY --
Begin --End
tACTIVITY
DESCRIPTION>
Gara Iftagh
1 assist DVN / 2 paravet / 1 guard curative & preventive service
6 93
GAF
AGRIC:
Vet
Qara Bagh
Ongoing
UNDP
12 90
INC
CONST:
Pub.Building
Qara Bagh
Ongoing
Pvt
10 92 -- --
Cline building
IMC
HEALTH: Distrct Rasp
Qara Bagh
Ongoing
Pvt
11 92 -- --
7 MDa / 2 mid -level RWs / in- patient services ! surgery / dental ! obgyn / pediatrics
MAI
EDUCAT: Primary
Ongoing
MAI
5 schools in Karez, Baghir Ban, Yagharaq Ulia & Aka Ebel villages.
SCA'
HEALTH: Basic Clinic
Ror Ba Khan
Ongoing
SCA
4 mid -level Haie / 3 Nurses
UNO
EDUCAT: Primary
Sabzsang
Ongving
AID
8 90 -- --
,
1 school up to 4 grades.
Sarobi
Kabul
A;H
HEALTH: Compr.Ciinic
Center
Ongoing
Cermany
Ccmpreheneive health center,
APWo
RELIEF:Food Items
Refugees
Ongoing
WFP
38 MT wheat per month for 3 monche
AEON
CONST:
Pub.Building
Sarobi
Ongoing
AR'CON
Construction Of Sarobi school
ATC
MINES:
Clearance
Tehzin/Ghundi
Diseontin
UNOCHA
CRAA
AGRIC:
Vet
Bandi par9
Ongoing
ISRA
HEALTH: Compr.Clinic
Sarobi
MCPA
MINES:
MMC
it 92 12 92
Destroyed 106 devices, cleared 75640 Su agri.iand / village
UNDP
9 92 -- --
Animai vaccination & treatment; 1 DVM / 2 paravete & 1 guard
Completed
ISRA
8 92 11 92
Established for displaced people - 1 MD I l'medical assistant 1 I lab tech.. i helper,
8 minefields
Completed
UNOCHA
HEALTH: Mobile /F -Aid
Pull Charkhi
Ongoing
NAC
3 89 -
MSH
HEALTH: Basic Post
Jegdalak
Ongoing
AID
4 88 -- --
4 BHWs
MSR
HEALTH: Vaccination
Sarobi
Ongoing
AID/UN
3 93 -- --
4 VACCINATORS IMPLIMENT UNDER PMD SUPERVISION.
OMAR
MINES:
Awareness
Sarobi
Completed
UNOCHA
6 92 12 92
Safety lessons
RDA
WATER:
Karez
Ongoing
WFP
6 93
8 93
Rehabilitation of 10,600 linear M karez - benefit 890 farmers
RDA
WATER:
Karez
Ongoing
WFP
6 93
8 93
Rehabilitation of 9,322 linear M karez - benefit 864 farming families
SC -US
AGRIC:
Other
Ongoing
FAO/UNDP
11 92
7 93
Monitoring of activities of participating agencies on multiplication of improved wheat seed
SCA
AGRIC:
Crop Product
Completed
SCA
i
CBP.R
Survey
--
.
240,148 S4m road /agri. lands / residential & grazing lands.
10 92 12 92
Mobile clinic (2 MD+4 paramedics +3 ambulances - working for war -wounded all over the province)
--
TARGET GROUPS: CHILDREN 0 -2 YEARS ANI WOMEN 5 -45
YEARS
6934 people participated
Distribution 'of 1.5 MT wheat seed & 1.5 MT DAP
0 92 -- 92
6TH EDITION
DATABASE OF RGO ACTIVITIES
Page:
A6actrep Date
27/08/93
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S)- - --
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
VITA
CONST:
Road
VITA
CONST:
Road
Kabul
--STATUS --
FUNDED
- - -BY --
DURATION
SCA
--
Ongoing
AID
7 87 -- --
Jegdalak
Ongoing
AID
--
8 villages
Ongoing
AID
8 90 -- --
Rehabilitation of 27 km road. benefit 1715 families,
4 villages
Completed
UNOCHA
8 92 10 92
Destroyed 268 devices. cleared 126610 Sqa grazing land and road i agri.land
4 nid -level HWs
3 schools,
1
in each Gaz, Qalabalan & road villages (3 grades)
Rehabilitation of 13 km road
Shakar ' Dara
MINES:
AVICEN
HEALTH: Vaccination
15 villages
Ongoing
EC /UNICF
GAF
AGRIC:
Shakar Dan
Ongoing
UNDP
KAI
EDUCAT: Primary
Ongoing
KAI
MCPA
MINES:
5 minefields
Completed
UNOCHA
8 92
MSH
HEALTH: Basic Post
Karez Mir
Ongoing
AID
4 88 -- --
HEALTH: NCH
Sahrai Behzadi
Ongoing
AID
3 91 -- --
'
DESCRIPTION>
Ongoing
Islam Kotgai
ATC
MSH
-<ACTIVITY
Begin --End
Clearance
Vet
Survey
1 team - 1 vaccinator
--
6 92
canal
6 93
1 DWI
-- -- -- --
2 paravet
1 guard curative & preventive service
3 schools in Mobil, Tali Eheaa & Payan Qala
9 92
170.478 Sgm road i agri.land & irrigation.
3 BNB
1 MD, 1 Nurse Midwife,
1 anaesthesia tech - 4 rooms, women i children under 5 care; surgery: health education and Dai
training program
MER
HEALTH: NCH
Aga Ali Shaikho
Ongoing
AID
7 92 -- --
SCA
HEALTH: Basic Clinic
Sofi Khel
Ongoing
SCA
12 91 -- --
Haji Palk
Ongoing
SCA
4 89 -- --
7 mid -level HWs i 2 Nurses / 1 Dental 'Tech. i 1 X -ray Tech
Ongoing
AID
7 87 -- --
5 ochools in Ghaza, Karez Mir (2), Akhum Khel, Haji Bakhshi, Behzadi & Hayatabad villages - different grader
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
VITA
CONST:
Road
GUI Dara
Ongoing
AID
10 92 -- --
VITA
CONST:
Road
Bagh Mumtaz
Ongoing
AID
--
Shaaali
Ongoing
ILO
-- 93 -- --
Completed
Pvt.Comp
1 MCHO, 1 Dai
Women i children under 5 care;
health education and Dai training program
2 nurses, 5 mid -level HWs, 1 PH officer
'
Rehabilitation of 7 km road, benefit 40,000 families
Rehabilitation of 10 km road, benefit 15,000 families
Kabul
GP-UK
INCOME: Skill Train.
MAMAR
CONST:
Training disabled people in 30 different skills (18 trainers)
r
ACBAR
Road
5 92
8 92
Prelimenary road survey (Kabul -Kandahar & Kandahar- Herat'
DATABASE OF NO ACTIVITIES
Page:
78
A6actrep Date: 27/08/03
6TH EDITIOp
SECTOR
AGENCY
-, -- VILLAGEES) - - --
RACA
HEALTH: Other
RDA
WATER:
RONCO
RELIEF:Other
Kandahar
Countrywise
Earez
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
ACTIVITY
Ongoing
WHO
1 92 -- --
Approved
WFP
-- 93 -- --
Ongoing
AID
--
Collection of vital statistics in Afghanistan.
DESCRIPTION>
The firts phase has finished and the second phase is going on
Earez rehabilitation
Provision of esargency assistance as
needed.
Arghandab
ANE
EDUCAT: Primary
Senzarc
Ongoing
Germany
-- 91 -- --
25 students / 1 teacher
ANH
HEALTH: Basic Clinic
Charguiba /Baba Wal
Ongoing
Germany
-- 91 -- -
2 clinics in Chagulba (60-150 pts. OPD ' day'. & Baba Wali (40 -100 pts. OPD r day)
ARR
AGRIC:
Crop Product
Ongoing
FAO
-- -- -- --
Distribution of 10 MT improved wheat seed / 10 MT DAP ! 10 MT Urea
ARR
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed. IC MT DAP and 4 MT maize seed
AVICEN
HEALTH: Vaccination
Ongoing
EC/UNICF
MCI
HEALTH: Basic Clinic
Discontin
AID
3 88
MCI
HEALTH: Basic Poet
Ongoing
AID
6 89 -- --
MCI
WATER:
Ongoing
AID/WFP
MSH
HEALTH: Basic Post
Ongoing
AID
7 88 -- -
3 BRWs
MSH
HEALTH
Ongoing
AID/UN
1 92 -- --
.5 VACCÍNATORS COVER 22 VILLAGES IN MARUF
69 villages
.
Structure
Vaccination
Ehwaja Mulk
Maruf
-
--
5 93
11 92 -- --
1 team - 3 vaccinators
1 mid -level HW i 1 lab tech / 1 F.aid & 1 dental. - OPD / dental / lab & F.aid,
1 dental tech / 2 mid -level HWs & 1 lab tech. - Dental & OPD
Baba Wali intake irrigation structure,
AND WOMEN 5 -45
CONST:
Other
4 villages
Completed
CIDA
RIFRA
AGRIC:
Crop Product
--
Completed
FAO
SC -US
WATER:
Structure
Minar
Completed
UNDP
9 91
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.11 MT agrochemical!
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.065 MT agrochemical!.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 117
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
1 A C B A R
4 93
-- 92 -- 92.
2 92
TARGET GROUPS: CHILDREN 0 -2 TEARS
Construction & reconstruction of 30 Eishmiab khans.
RDM
9 92
DISTRICT (2416), EANDAHAR PROVINCE.
YEARS.
Distribution of 10 MT wheat seed, 10 MT DAP, 6 MT urea and 4 MT maize seed.
Construction of 100 meter weir of stone masonry work for diversion of river water into canal.
villages.
DATABASE OF NGO ACTIVITIES
6TH EDITION
9
Page:
79
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGES) - ---
--STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
Arghandab
Kandahar
SCA
HEALTH: Basic Clinic
Joi Labor
Ongoing
SCA
1 91 -- --
4 mid -level Hiss.
SCA
HEALTH: Basic Clinic
Sarkari Bagh
Ongoing
SCA
9 87 -- --
7 mid -level BWs.
START
CONST:
Bridge
Baghi Pul
Completed
NRC
-- -- 12 92
START
CONST:
Other
20 villages
Completed
UNDP
3 91
SWAAD
MINES:
Clearance
14 villages
Completed
UNOCRA
1 92 12 92
33925 Sqm agri.land /8070 Sqm road,
UNO
EDUCAT: Primary
Ongoing
AID
9 89 -- --
i school in Deb Iushki.
Jngcing
NOVIE
-- -- -- --
6 beds i 15 MLHWs
Approved
AID
-- 93 -- --
Pedestrian Cable bridge construction.
Completed
AID
7 87 -- --
Kandahar
Repair of Baghi Pul bridge.
Survey of flood damage in 20 villages of district.
6 91
Arghistan
50 villages
small surgery
TB lab
IAHC
HEALTH: Distrct Hosp
MCI
CONST:
MCI
HEALTH: Basic Post
MCI
WATER:
Canal
Ongoing
AID!WFP
RAFA
WATER:
Tarez
Completed
UNDP /WFP
RAFA
WATER:
garez
Completed
UNDP
RAFA
WATER:
garez
Completed
UNDP/WFP
9 90 -- 91
RAFA
WATER:
Canal
Completed
ARCON
1 92
RIFRA
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 116 villages.
UNO
EDUCAT: Primary
Ongoing
AID
3 89 -- --
2 schools in Sandozai & Bakalzai villages.
VITA
WATER:
Canal
Shnakhti
Ongoing
AID
--
VITA
WATER:
Canal
Sar Cally
Completed
AID
Aug Isla
Ongoing
SV
Kandahar
ADA
AGRIC:
ILCBAR --
DESCRIPTION>
Bridge
--
Rahman canal cleaning and repair.
Rehabilitation of 3 karezee - total length 8375 m - irrigate 1000 hectares of land - benefit 190 families.
9 90 10 91
Rehabilitation of 2 karezes - total length 4100 m - irrigate 200 hectares of land - benefit 310 familis.
10 90 12 90
--
OP.
Dental ! OPD & F.AID.
11 92 -- --
8 92
.
.Rehabilitation of 4 canals - total length 43 km - irrigate 250 hectares of land benefit 793 families.
Distribution of 10 MT wheat seed and 10 MT DAP.
Cleaning of 17.4 km canal, benefit 250 families.
Cleaning of 14 km canal, benefit 200 families.
1 93
Daman
Crop Product
---4-'
Distribution of 52.5 NT wheat seed & 82.5 HT fertilizer to 600 families.
1 92 -- --
---'
DATABASE OF H60 ACTIVITIES
Page:
80
A6actrep Date: 27/08/93
6TH EDITION
(
ACTIVITY
SECTOR
AGEN :Y
Kandahar
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
-¿ACTIVITY
Begin- -End
DESCRIPTION?
Daman
5 villages
Ongoing
NRC /NCA
5 93
4 94
Construction of 125 pit latrines & installation of o shallow sells for
INCOME: Skill Train.
Azam Kale
Ongoing
EC
5 93
4 94
Training of 14 students in masonry / pit latrine & pump maintenance.
ADA
WATER:
Azam Kala
Ongoing
NRC /NCA
7 92 -- --
ANH
EDUCAT: Primary
Karez
Ongoing
Germany
-- 91 -- --
25 students i I teacher.
ANH
HEALTH: BasicCiinic
Kranz
Ongoing
Germany
-- 91 -- --
50 -150 pts. OPD / day.
MCI
WATER:
FloodControl
Shorab
Completed
UNDP
11 92
4 93
Construction of dike flood protection.
MCI
WATER:
FloodControl
Shorab
Completed
UNDP
11 92
4 93
Construction of canal flood protection.
MCPP.
MINES:
Survey
1 minefield
Completed
UNOCHA
192 12 92
42,500 Sqm irrigation
MSH
HEALTH: Basic Clinic
Mohmand
Ongoing
AID
3 90 -- --
3 MED. TECH.
MSH
HEALTH: Basic Post
Shor Andes
Ongoing
AID
7 88 -- --
1 BHW
SC -US
AGRIC:
Crop Product
Sultan Mohd Khan
Completed
UNDP
10 90
8 92
Distribution of 75 MT seed to 750 farmers.
SC -US
AGRIC:
Research
Sultan Mohd Iban
Completed
UNDP
10 90
8 92
Extension services provided to 750 farmers.
VITA
CONST:
Road
Many villages
Discontin
AID
Dand
Ongoing
Germany
-- 91 -- --
--
Completed
FAO
-- 92 -- 92
Distribution of 10 äT wheat seed, 22 MT DAP and 6 äT urea.
--
1 team - 3 vaccinators
ADA
CONST:
ADA
Kandahar
Sanitation
Canal
7 92 -- --
families.
Cleaning of canal ! irrigates 12,500 jeribs & benefit 600 farmers.
1 ROOM
Rehabilitation of road, benefit 14,258 families.
Darid
Ail
HEALTH: Basic Clinic
ARR
AGRiC:
AVICEN
HEALTH: Vaccination
37 villages
Ongoing
EC/UNICF
&VICEN
HEALTH: Other
Dand.
Ongoing
EC
EAU
AGRIC:
Crop Product
1O. villages
Completed
AID
EAFA
WATER:
Canal
Zaker
Completed
RAP
193
IMA
WATER:
Iarez
10 villages
Ongoing
UNDP/VFP
2 93 -- --
Cleaning of 22 km karez - irrigate 4000 jeribs & benefit 400 families.
6äA
WATER:
Tarez
4 villages
Approved
UNDP/91P
-- 93 -- --
Cleaning of 13 km karez - irrigate 1200 jeribs & benefit 160 faillies.
I C B A R
12:
Crop Product
--
-- -- 11 91
3 93
' 2 clinics in Dead - 40 -80 pta. OPD / day.
1 VSF / 1 CC technician & 1 supervisor
Distribution of 50 MT DAP.
Rehabilitation of 12 km canal
DATABASE OF #6O ACTIVITIES
Page:
81
A6actrep Date: 27/08/93
/ irrigates 6.000 jeribs & benefits 390 farming families.
6TH EDITION 8
ACTIVITY
-VILLAGES) - - --
SECTOR
AGENCY
Kandahar
-- STATUS --
FUNDED
-BY --
DURATION
iACTIVITY
Begin- -End
DESCRIPTION>
Dand
AMA
WATER:
tarez
MCI
AGRIC:
Crop Product
MCI
HEALTH: Distrct Hosp
9 villages
--
Completed
UNDP/WFP
Completed
IRC /AID
Discontin
AID
Rehabilitation of 25 km karez
8.92 11 92
10 88
- irrigates 3000 Jeribs - benefits 180 families
Fertilizer distribution & canal cleaning.
7 89
3 mid -level HWs / 1 ward / 1 X- ray -tech / 2 dental -tech i 1 lab -tech / 1,MD,& 1 mid -level -0T. - OPD / dental / ward /
2 88 10 92
X -ray / lab & OT facilities
7 87
3 first aiders.
1 92
- BHW & F.AID.
MCI
HEALTH: Compr.Clinie
Discontin
AID
MCI
HEALTH: Basic Clinic
Completed
AID
MCI
HEALTH: Mobile /F -Aid
Discontin
AID
3 88
4 92
3 first eiders.
- BHW.& F.AID
MCI
HEALTH: Mobile /F -Aid
Discontin
AID
10 87
1 92
3 *first aidere.
- BHE & F.AID.
MCI
WATER:
Canal
Completed
AID /WFP
2 93
4 93
Cleaning of 2 canals
MCPA
MINES:
Survey
1. tinefieid
Completed
UNOCHA
1 92 12 92
33,050 Sqm agri.land
MSH
HEALTH: Basic Post
Soof
Ongoing
AID
11 89 -- --
4 BHWs
RIFRA
AGRIC:
Crop-:Ptodict,
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed and 22 MT DAP,
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 !!T agrochemicals,
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
SCA
HEALTH: Basic Clinic
Gach Ahana
Ongoing
SCA
START
CONST:
Other
25 villages
Completed
UNDP
3 91
SWAAD
MINES:
Clearance
13 villages
Completed
UNOCHA
1 92 12 92
SWAAD
MINES:
Clearance
Dand
Completed
UNOCHA
1 93
3 93
28199 Sqm houses.
SWFAO
WATER:
Structure
Hood Ghor
Completed
UNDP
1 93
3 93
Construction of dam.
UNO
DUCAT: Primary
Ongoing
AID
9 89 -- --
IACBAR
1 First aider / 2 mid -level HWs & 1 lab -tech. - Lab / OPD & first aid,
li 80 -- --
Agriculture survey on 40 villages
Agriculture survey on 110 villages
5 mid -level HWs.
Survey on flood damage in 25 villages
6 91
38677 Sqm agri.land / 1985 Sqm houses / 4307 Sqm canal,
1 school in Ser Pooza.
DATABASE OF AGO ACTIVITIES
Page:
82
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Ghorak
Kandahar
Completed
AID
Tangai
Completed
Crop Product
--
AGRIC:
Vet
AGRIC:
Research
MCI
HEALTH: Basic Post
SC -US
AGRIC:
Crop Product
SC -US
AGRIC:
5 -US
S.-US
Lab / dental & OPD.
3 90
-- --
UNDP
10 90
8 92
Completed
FAO
--
Tangai
Completed
UNDP
10 90
3
92
3 paravete. 3 vit.technicians + basic wound treatment
47 villages
Completed
UNDP
10 90
8
92
Extension services provided to 750 farmers.
--
50 students / 5 teachers (grades 7th & 8th).
92 -- 92
Distribution of 75 MT seed to 750 farmers
Distribution of 15.2 MT wheat seed. 30 MT DAP and 0.3 MT barley seed.
Kandahar
Kandahar
ANH
EDUCAT: Secondary
Kokaran
Ongoing
Germany
-- 91 -
ANH
HEALTH: Provinc.Hosp
Kokaran
Ongoing
Germany
-- 91 -- --
25 bed hospital (10 beds for female ! children) - X-ray í lab / dental/ vaccination i 150 -250 pts. OPD /day
AVICEN
HEALTH: Vaccination
Kandahar
Ongoing
EC/DNICF
-- -- -- --
l vaccinator
ESAR
CONST:
Completed
UNDP
IAHC
HEALTH: Provinc.Hosp
Ongoing
NOVIB
..
Road
City
4
Survey of road of Spin Boldak- Arghastan & Attegar (186 km).
90 --
--
150 bed hospital / 8 MD / 25 nurses / lab / X-ray I operation which need local anaesthesia / dental clinic / 150 -160
patients 0PD /day
City
Ongoing
NOVIB
Kandahar/Helmand
Completed
UNDP
1
90
3
92
Animal health prograi - mass vaccination (free) & basic treatments (subsidized sale) for 400,000,animals.
Livestock
Completed
UNDP
5
93
6
93
Animal mass vaccination.
Other
Ongoing
AID
7
90
4
94
PVC Support: ag rehab. (wheat production I orchard rehab. I irrigation repair I cash crop pilot projects I ag
IAHC
HEALTH: Compr.Clinic
MCI
AGRIC:
Vet
MCI
AGRIC:
MCI
AGRIC:
-- -
-- --
8 MD / 15 nurses / malaria I TB lab / small surgery I dental / 100 patients OPD / day,
assessment / animal health
MCI
WATER:
MSH
HEALTH: Med.Training
Other
Rahman Kcul
Approved
AID
Ongoing
AID
-- 93 -- --
2
Rahman bout drainage cleaning
Because of political & security problems the training center is inactive at present. Exepet to begin BHW refresher
93 -- --
training & PAC seminars when security situation.
OMAR
MINES:
Awareness
SC -US
AGRIC:
Training
ACBAR
City
Completed
UNOCHA
Completed
UNDP
Safety lessons - 7650 people participated
6 92 12 92
10 90
Training given to 21 SCF employees in agriculture project management.
8 92
DATABASE OF NGO ACTIVITIES
Page:
83
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(S)- - --
--STATUS --
FUNDED
- - -BY --
DURATION
Begin- -End
< ACTIVITY
SHAD
MINES:
Clearance
Center
Completed
UNOCHA
1 93
3 93
30213 Sqi houses & 6312 Sqm roads.
SVAAD
MINES:
Clearance
34 villages
Completed
UNOCHA
1 93
3 93
108274 Sqm houses /12964 Sqm road.
All villages
Ongoing
NRC
1 93 -- 93
56 villages
Ongoing
EC/UNICF
Kandahar
DESCRIPTION>
Khakraiz
ADA
AGRIC:
AVICEN
HEALTH: Vaccination
MCI
HEALTH: Basic Clinic
Discontin
AID
6 90
MCI
HEALTH:, Basic Clinic
Completed
AID
3 88 -- --
Crop Product
--
Distribution of 50.75 MT wheat seed and 79.5 MT fertilizer to 968 farmers for multiplication.
--
i team - 2 vaccinators
5 93
1 lab-tech S 1 BHW & 1 dental tech - Lab / F.aid & dental.
i MD / 2 EPI vaccinators / MCH assist / i mid -level HW / 1 dental tech & i lab tech. - EPI / MCH / OPD / dental &
lab.
MSH
HEALTH: Basic Clinic
RDA
AGRIC:
RDA
Aroq
Ongoing
AID
Crop Product
--
Ongoing
FAO
10 29
7 93
Distribution of 15 MT wheat & 15 MT DAP.
AGRIC:
Crop Product
--
Completed
FAO
5 91
7 92
Multiplication of seed at the cost of Rs. 150.000.
RDA
AGRIC:
Crop Product
--
Completed
FAO
10 91 -- --
SC -US
AGRIC:
Vet
Shahagha
Completed
UNDP
10 90
3 92
3 paravets / 3 veterinary technicians providing vaccinations basic wound treatment.
SC -US
AGRIC:
Other
Shahagha
Completed
UNDP
10 90
8 92
Distribution of 75 IT seeds to 750 farmers.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.06 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Kandahar
3 90 -- --
1 NURSE, 2 MED. TECH
1 ROOM
Distribution of 10 MT seed.
Maruf
ANH
HEALTH: Basic Clinic
Center
Ongoing
Germany
ARPD
AGRIC: drop Product
100 villages
Ongoing
FAO
9 92 -- --
Multiplication of 5 MT wheat & 5 MT DAP benefit 3495 farmers.
DCA
AGRIC:
Vet
Ehogiani
Ongoing
Dutch G.
9 91 -- --
1 paravet.
DCA
AGRIC:
Vet
Mohd Zai
Ongoing
Dutch G.
11 92 -- --
DCA
AGRIC:
Vet
Salison
Ongoing
Dutch G.
9 91. -- --
-- 91 -- --
Page:
70 -150 pts. OPD I day.
1 vaccinator.
1 paravet & i vaccinator.
84
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
Kandahar
---- VILLAGE(S) - - --
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin - -End
DESCRIPTION>
Maruf
DCA
AGRIC:
Vet
Ubato
Ongoing
Dutch G.
9 91 -- --
MCI
AGRIC:
CropProduct
Northeast Kandahar
Completed
HCR
9 88
7 89
1 vaccinator.
Seed / fertilizer
pesticide distribution - cultivation i harvest assistance & irrigation repair in Maruf and
Arghistan.
MCI
AGRIC:
Vet
Northeast Kandahar
Completed
IRC /AID
10 88
7 89
Animal vaccination.
MCI
CONST:
Road
Northeast Kandahar
Completed
IRC /AID
10 88
7 89
Road repair.
MCI
HEALTH: Basic Clinic
Ongoing
AID
MCI
WATER:
Drinking
Northeast Kandahar
Completed
IRC!AID
10 88
MRORA
AGRIC:
Crop Product
13 villages
Ongoing
FAO
12 92 -- --
AGRIC:
Crop Product
50 villages
Completed
FAO /UNDP
6.92 12 92
MRORA
AGRIC:
Crop Product
47 villages
Completed
FAO /UNDP
12 91 10 92
Multiplication of 7 MT wheat seed
MRORA
AGRIC:
Fruit Trees
80 villages
Completed
FAO /UNDP
12 92 12 92
Distribution of 14,000 fruit trees I apple / apricot.
MRORA
WATER:
Karez
3 villages
Completed
UNDP/WFP
-- --
MRORP.
WATER:
larez
10 villages
Approved
RONCO
-- 93 -- --
Cleaning of 10 karezes / length 12.8 km / irrigate 4685 jeribs & benefit 279 families.
MSH
HEALTH: Basic Post
Peerzai
Ongoing
AID
12 88 -- --
6 BMWs
SCA
HEALTH: Compr.Clinic
Peerzai
Ongoing
SCA
3 88 -- --
1 MD / 2 mid -level MI5 / 1 Lab Tech.
UNO
DUCAT: Primary
Ongoing
AID
4 88 -- - -.
6 schools in larez Isha9zai, Khogiani, Peerzai, BAri, Jalalgi k Lali.
VITA
WATER:
Completed
AID
MRORA
-
Kandahar
Canal
Baz Mohd Khel
4 87 -- --
7 89
9 92
1 lab tech
1 nurse i 1 dental tech & 1 mid -level HI - Lab 1 dental & OPD.
Hand Pump installation in Maruf & Arghastac.
Multiplication of 5 MT wheat seed to 51 farmers.
Multiplication of 2 MT maize seed / 6 MT DAP & 3 MTlUrea to 126 farmers.
7 MT DAP & 7 MT Urea to 117 farmers.
Cleaning of 3 karzea / length 6.3 km & benefit 98 farmers.
Cleaning of 6 h canal, benefit 60 families.
--
Maywand
AWE
EDUCAT: Primary
Panjwai
Ongoing
Germany
-- 91 -- --
25 stedenta / i teacher.
AKE
HEALTH: Basic Clinic
Sangesar
Ongoing
Germany
-- 91 -- --
OPD.
MCI
CONS!:
Completed
CBC/WFP
MCI
HEALTH: Mobile /F -Aid
Discontin
AID
Other
--
3 90
Repairing of 1,200 Kishmish Kbana.
5 91
10 87 10 92
Lab -F.AID.
DATABASE OF IGO ACTIVITIES
Page:
85
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Kandahar
- - -- VILLAGES) - - --
HEALTH: Basic Post
RIFRA
AGRIC:
Crop Product
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Plant Proteo
SCA
AGRIC:
Other
--
START
CONST:
Other
7 villages
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Sangesar
--
-
Ongoing
AID
7 88 -- --
Completed
FAO
-- 92 -- 92
bngoing
SCA
0.93 -- 93
Provision of 0.08 MT agrochemicals
Completed
SCA
0 92 -- 92
Provision of 0.095 MT agrochemicals
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Completed
UNDP
3 91
Survey of flood damage in 7 villages.
Completed
FAO
Ongoing
WRC
-- -- -
-
5 BHWs
Distribution of 10 HT wheat seed and 10 MT DAP.
6 91
Nesh
Crop Product
WRC
AGRIC:
WRC
HEALTH: Basic Clinic
Kandahar
FUNDED
- - -BY --
Maywand
MSH
Kandahar
-- STATUS --
--
Distribution of ri ... seed It 60 MT DA..
.
4 clinics
--
Panjwai
ANH
EDUCAT: Primary
Zalakhan /Panjwai
Ongoing
Germany
-- 91 -- --
2 schools in Zalakhan (25 stedents í i teacher) & Panjwai (25 stedents / i teacher).
ANH
HEALTH: Basic Clinic
Zalakhan/Nalgham
Ongoing
Germany
-- 91 -
2 clinics in Zalakhan (60 -150 pts, OPD i day) & Nalgham (40 -100 pts. OPD / day)
ARR
AGRIC:
Grop Product
Ongoing
FAO
-
ARR
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
Distribution of 10 MT wheat seed and 10 MT DAP
AVICEN
HEALTH: Vaccination
92 villages
Ongoing
EC,UNICF
-- -- -
1 team - 1 vaccinator
BURC
WATER:
Canal
Zalakhan
Completed
UNDP
12 92
HI
HEALTH: Disabled Reh
i(akhunai
Ongoing
AID
IAHC
HEALTH: Distrct Hosp
'35 villages
Ongoing
NOVIB
IAHC
HEALTH: Basic Clinic
15 villages
Ongoing
NOVIB
IAHC
HEALTH: Basic Clinic
50 villages
Ongoing
NOVIB
MCI
HEALTH: Basic Post
Completed
AID
5 91 --
2 mid -level HWS / 1 dental tech / 1 MCH nurse f 1 lab tech & 1' student. - OPD I Lab & MCH
MCI
HEALTH: Mobile /F -Aid
Discontin
AID
8 89
3 first aiders. - BHW & F.AID
ACBAR
--
-
--
Distribution of 10 MT improved wheat seed /10 MT DAP / 10 MT Urea
-- -
-
2 93
2 92 -- --
Cleaning of 6 km canal i irrigates 6,000 jeribs land & benefit 300 families
3 orthopaedic technicians manufacture crutches & prostheses.
6 beds i 8 MLBWs / small surgery / malaria & TB lab / 30 -40 patients OPD / day
-- -- --
6 MLHWa / small surgery i lab / 40 -45 patients OPD / day.
4 MLHWs / small surgery / lab / 20-25 patients OPD / day
1 92
DATABASE OF NGO ACTIVITIES
Page:
86
A6actrep Date: 27/0813
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Kandahar
-- STATUS --
- - -- VILLAGES) - - --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
Panjwai
Ongoing
AID/WFP
11 92 -- --
Shalt Mohd canal cleaning and repair
Ongoing
AID/WFP
11 92 -- --
Panjwai Drain cleaning & repair
2 minefields
Completed
UNOCHA
1 92 12 92
94,030 residential.
i NURSE. 2 MED. TECH
MCI
WATER:
Canal
MCI
WATER:
Structure
MCPA
MINES:
Survey
MSH
HEALTH: Basic Clinic
Nakhunai
Ongoing
AID
2 90 -- --
MSH
HEALTH: Basiç Post
Nalgham
Ongoing
AID
11 87 -- --
OMAR
MINES:
Awareness
Completed
UNOCHA
RIFRA
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
SCA
AGRIC:
Crop Product
Completed
SCA
0 92 -- 92
Distribution of 2 MT wheat seed & :.6 MT DAP
AGRIC:
Research
Completed
SCA
0 92 -- 92
1 crop variety testing trials
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.13 MT agrochemicals
SCA
AGRIC:
Plant. Protec
Completed
SCA
0 92 -- 92
Provision of 0.135 MT agrochemicaie
SCA
AGRIC:
Other
Completed
SCA
0 92 =- 92
Agriculture survey on 116 vilia,
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 50 villages
SCA
HEALTH: Compr,Clinic
Ongoing
SCA
1 89 -
1 MD / 7 mid -level HWe
START
CONST:
Other
22 villages
Completed
UNDP
3 91
SWAAD
MINES:
Clearance
16 villages
Completed
UNOCHA
1 92 12 92
99973 Sqm houses /136457 Sqm road
VITA
CONST:
Road
Pashmol
Ongoing
AID
7 92 -- --
Rehabilitation of 7 T km road, benefit 4,286 families.
VITA
CONST:
Road
Qand Herat
Ongoing
AID
--
VITA
CONST:
Road
Panjwai
Ongoing
AID
11 91 -- --
VITA
CONST:
Road
Qasam Rabat
Ongoing
AID
VITA
CONST:
Bridge
Rashuga
Ongoing
AID
--
VITA
CONST:
Bridge
Qatar talay
Ongoing
AID
7 92 -- --
SCA
.
1 A C B A R
DESCRIPTION>
--
Pashmol A (Ungava
'
1 92
I ROOM
5 BHWs
Safety lessons - 4869 people participated
6 92
Distribution of 10 MT wheat seed and 10 MT DAP
-
6 91
Survey of flood damage in 22 villages
Rehabilitation of 6 km road; benefit 11,500 families
Rehabilitation of 23 km road, benefit 71,400 families
Rehabilitation of 16 km road, benefit 4,286 families.
Construction of 10 m bridge, benefit 1,700 families
Construction.of 2 m bridge, benefit 1,429 families,
DATABASE OF RGO ACTIVITIES
Page:
87
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
Kandahar
- - -- VILLAGE(S) -- --
FUNDED
-- STATUS --
- --BY --
DURATION
Begin- -End
{ACTIVITY
DESCRIPTIÓN>
Panjwai
VITA
WATER:
Canal
Panjdeh
Completed
AID
--
1
93
Cleaning of 14 km canal, benefit 70 families
VITA
WATER:
Canal
Salawet
Completed
AID
--
6
92
Cleaning of 14 km canal, benefit 114 families
VITA
WATER:
Canal
Eolak
Completed
AID
--
-- -- --
Cleaning of 40 km canal, benefit 1571 .families.
VITA
WATER:
Structure
Panjwai
Ongoing
AID
3
92 -- --
Construction of 10 m siphon (concrete & stone), benefit 1,428 families.
VITA
WATER:
Structure
Safed Raivan
Completed
AID
Kandahar
-- -- 10 92
Construction of intake(gabion work), benefit 857 families.
Shahwali Kot
ADA
AGRIC:
Crop Product
6 villages
Completed
NRC /FAO
1
92 12 92
Distribution of 202.5 MT DAP & 4 HT maize seed tc 3,000 farmer.
ADA
AGRIC:
Fruit Tries
All villages
Ongoing
NRC /NCA
1
93
Construction of Nursurey & distribution of 10,000 fruit trees to the fa.lers
ADA
AGRIC:
Machinery
Ail villages
Completed
NRC /FAO
1
92 12 92
15 tractors / 6 threshers
ADA
CONST:
Sanitation
9 villages
Ongoing
NRC /NCA
5
93
4
94
Construction of 225 pit latrines & installation of 9 shallow wells for 225 families,
ADA
INCOME: Skill Train.
4 villages
Completed
NRC /ACA
1
92 12
92
ADA
INCOME: Skill Train.
5 villages
Ongoing
EC
5 93
,
4
4
94
&
other suplements - benefit 3,797 farmers
.Training of 17 trainees in tractor repair & driving for 6 months.
94
Training of 31 students in masonry / pit latrine / pump maintenance / tractor repairing & veterinary
ADA
WATER:
Karez
18 villages
Completed
NRC /NCA
1
92 12 92
Cleaning of karezes / irrigate 3863 jeribs & benefit 1010 farmers
ADA
WATER:
Canal
Shah Agha
Ongoing
EC
5
93
Cleaning & development of canal / irrigates 300 jeribs & benefit 70 farmers.
Drinking
5 villages
Ongoing
EC
5 93
9 93
_
ADA
WATER:
ANH
DUCAT: Primary
Shah Wali Kot
Ongoing
Germany
-- 91 -- --
ANH
HEALTH: Basic Clinic
Shah Well Kot
Ongoing
Germany
-- 91 -- --
1
94
Installation of 5 tube -wells / irrigate 4250 jeribs land
25 students / i teacher
.
50 -100 pts. OPD / day
AVICEN
HEALTH: Vaccination
96 villages
Ongoing
EC/UNICF
-- -- -- --
1 team - 3 vaccinators
DCA
AGRIC:
Vet
Dahia
Ongoing
Dutch G.
10 89 -- --
1 paravet & i vaccinator
DCA
AGRIC:
Vet
Karez
Ongoing
Dutch G.
10 89 -- --
i paravet.
HAFO
AGRIC:
Crop Product
8 villages
Completed
SV /FAO
11 92 '6
HAFO
AGRIC:
Machinery
8 villages
Ongoing
FAO
ACBAR
-
93
Multiplication of wheat & maize. seed with fertilizer
--
I tractor A 1 thresher
DATABASE OF NO ACTIVITIES
Page:
68
A6actrep Date: 27/08/93
-------- VS OIlI4N
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGES) - - --
Kandahar
DURATION
FUNDED
-- STATUS --
<ACTIVITY
Begin- -End
- --BY --
DESCRIPTI)N>
Shahwali Kot
HAFO
WATER:
Kara
HAFO
WATER:
Structure
HAFO
WATER:
FloodControl
MCI
Completed
RAP
1 93
5 93
Cleaning & repairing of 3 karezes,
Completed
VFP
12 91
2 92
Construction of 1. intake
3 villages
Completed
RAP
2 92
2 93
Construction of 5 embankments.
HEALTH: Basic Clinic
--
Diacontin
AID
3 88
9 92
1 lab tech/ 1 dental tech & First aider. - Lab / F.AID & dental.
MSH
HEALTH: Basic Post
Zar Iain
Ongoing
AID
SC -US
AGRIC:
Crop Product
Vayan
Completed
UNDP
SC -US
AGRIC:
Research
Vayan
Completed
UNDP
CA
AGRIC:
Plant Protec
Ongoing
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Other
SCA
HEALTH: Basic Clinic
Kandahar
3 villages
.
.
12 88 -- --
2 BHWs
10 90
2 92
Distribution of 75 MT seed to 750 farmers.
10 90
8 92
Extension services provided to 750 farmers
SCA
0 93 -- 93
Provision of 0.1 NT agrochemicals.
Completed
SCA
0 92 -- 92
Provision of 0.065 MT agrochenicais,
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages
Dare Moor Camp
Ongoing
SCA
1 89 -- --
4 mid -level Hits.
1 minefield
Completed
UNOCHA
1 92 12 92
52,452 Sqm road
Takhta Pul
Ongoing
AID
7. 88 -- -=
1 BHW
-
-
Shega
Survey
MCPA
MINES:
MSH
HEALTH: Basic Post
RDA
AGRIC:
Crop Product
--
Completed
FAO
-- -- -- --
Distribution of 10 MT wheat seed & 10 MT DAP.
RIFRA
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
Distribution of 10 NT wheat seed and 10 MT DAP
SCA
AGRIC:
Other
Completed
SCA
0 92 --.92
Agriculture survey on 52 villages
SWAAD
MINES:
Clearance
Completed
UNOCHA
1 92 12 92
11287 Sqm agri.land /28661 road
Kandahar
6 'villages
Shorabak
ARCON
WATER:
larez
Selland Khan
Ongoing
ARCON
MCI
AGRIC:
Crop Product"
--
Completed
IRC /AID
OMAR
MINES:
Awareness
Completed
UNOCHA
ACBAR
'
Repairing of karez
--
10 88
7 89
Seed / fertilizer distribution, cultivation assistance & irrigation repair
1 92
6 92
Safety lessons - 5514 people participated.
DATABASE OF UGO ACTIVITIES
Page:
89
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
-- -- VILLAGE(S) - - --
Kandahar
FUNDED
DURATION
<ACTIVITY
DESCRIPTION>
- - -BY --
Begin- -End
Ongoing
FAO
11 92 -- --
Multiplication of 5 MT wheat seed & 5 MT DAP to 250 farmers
-- STATUS --
Shorabak
50 villages
SRO
AGRIC:
'Crop Product
SRO
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 5 MT wheat seed and 5 MT DAP.
SRO
AGRIC:
Crop Product
Ongoing
FAO
12 91 -- --
Distribution of 27 MT improved wheat seed ( 4 different var.) 7 25 MT Urea / 30 MT DAP to 2,544 farmers in 44
villages.
SRO
AGRIC:
Crop Product
52 villages
Completed
FAO
Ongoing
ARCON
11 91
Multiplication of 27 MT wheat seed / 25 MT TAP & 25 MT Urea to 544 farmers.
6 92
Spin Boldak
Kandahar
Boldak
Construction of mosque
ARCON
CONST:
Pub.Building
ARR
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 5 MT wheat seed and 5 MT DAP
DACAAR
CONST:
Road
Completed
DACAAR
-- 91 -- 92
Partly repair of 35 km on Highway to Kandahar
DACAAR
CONST:
Road
Spin Boldak
Completed
DACAAR
DACAAR
WATER:
Drinking
Several villages
Ongoing
DACAAR
-- 92 -- --
152 shallow wells improved & '42 hand -pumps.
DACAAR
WATER:
Drinking
Spin Boldak Bazaar
Completed
DACAAR
-- 91 -- 91
Tube -well & pipe-scheme in bazaar
DACAAR
WATER:
Drinking
Spin Boldak
Completed
DACAAR
-- 91 -- 91
1 canai of 19 km for drinking water,
ESAR
CONST:
Road
Completed
UNDP
5 91 -- --
Repair of 20 km of Spin Boldak - Arghistan road with machinery - 18 culverts /20 washes
BAR
CONST:
Road
Ongoing
UNDP
5 92 -- --
Repair of 51.5 km of Sipn Boldak- Arghistan road - machinery
ESAR
WATER:
Karez
Completed
RAP
5 92 -- --
Rehabilitation of 14 karezes (8 km) - irrigate 1,500 jeribs & benefit 480 families.
MCI
AGRIC:
Crop Product
Completed
NCR
3 89
Seed / fertilizer distribution, traction assistance & irrigation repair for Spin Boldak, Maiwand, Panjwai, Daman
South Kandahar
3 91
Repair of Kandahar road(35 km) - 20 culverts (pipe culverts), 700 m concrete - 2.5 km ret.wall - 35 km shoulder
3 92
3 90
Arghandab and Pend.
Crop Production assistance, irrigation repair, animal health & road repair in Spin Boldak & Arghastan.
Completed
CHC
Boldak- Kandahar
Ongoing
AID/WFP
Survey
8 minefields
Completed
UNOCHA
1 92 12 92
203,462 Sqm agri.land & road.
MINES:
Survey
13 minefields
Completed
UNOCHA
192 12 92
316,881 residential /agri.land & road
MINES:
Clearance
10 villages
Completed
UNOCHA
1 92 12 92
213820 Sqm agri.land /19851 Sqm road.
MCI
AGRIC:
Other
MCI
CONST:
Road
MCPA
MINES:
MCPA
SWAAD
2 89 12 89
Repair of Boldak- Kandahar road
11 92 -- --
,
DATABASE OF NGO ACTIVITIES
IA C B A R
Page:
90
A6actrep Date: 27/08/93
6TH EDITION
I
-VILLAGE(S)-
SECTOR
AGENCY
ACTIVITY
FUNDED
- STATUS-
BY
DURATION
-
<ACTIVITY
Begin- -End
DESCRIPTION>
Spin Boldak
Kandahar
SWFAC
WATER:
Canal
Mala Wall
Completed
UNDP
9 92
1 93
Construction of canal.
SWFAO
WATER:
Structure
Raleath
Completed
HCR
4 92
6 92
Construction of dam.
VITA
WATER:
Structure
Gorgan
Ongoing
AID
--
Construction of 100 m flume(concrete & stone), benefit 200 families.
VITA
WATER:
F1oodControl
Shero
Ongoing
AID
--
Construction of 1.5 km retaining wall (stone work), benefit 500 families.
64 villages
Ongoing
ECIUNICF
-- -- -- --
1.1 90
Kapisa
Kapisa
AVICEN
HEALTH: Vaccination
GAF
AGRIC:
Vet
Mahmood Raqi
Ongoing
UNDP
IAAAE
CONST:
Pub.Buiiding
Deh Baba.Ali
Discontin
ARCON
IMt
HEALTH: Compr.Ciinic
Shokhi
Ongoing
AID
MSH
HEALTH: Basic Post
Haroki Ulya
Ongoing
MSH
HEALTH: Vaccination
Mahmood Ragi
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Other
SCA
UNO
1 team - 2 vaccinators
1 assist DVM ! 2 paravets / 1 guard curative & preventive service
7 93
qtr
Construction of school with 24 rooms - stone
5 86 -- --
3 mid -level HWs I 1 lab tech. - OPD / lab
AID
4 90 -- --
1 BHW
Ongoing
AID/UN
9 91 -- --
COVERED FROM PANJJSHER VSF.
Ongoing
SCA
0 93 -- 93
Provision of 0.09 MT agrochemicals
--
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages
EDUCAT: Primary
Danger Ihel
Ongoing
SCA
7 87 -- --
8 schools / 55 teachers / 1420 students
EDUCAT: Primary
Sabzsang
Ongoing
AID
7 87 -- --
ß schools one in each Qazi Ihel, Berokai, Shufai, Lahkashan Ulya, Reg Rawan,
.
.
fired-bricks / steel & cement
SEE ROKHA/ PANCSHARE LISTING FOR DETAILS
lakari, Deh Nawabad & Ashur Ihel
villages.
VITA
CONST:
Road
Deh Babi
Ongoing
AID
9 91 -- --
VITA
CONST:
Bridge
Deb Babi
Ongoing
AID
-- -- -- --
VITA
WATER:
FloodControl
Ali Lhel
Discontin
AID
--
Kapisa
Rehabilitation of ? km road, benefit 5,000 families
Construction of 75 m bridge(concrete & masonry), benefit 10.000 families
Construction of 360 m retaining wall(gabion work,
Kohband
MßH
HEALTH: -Basic Clinic
Lobband
Ongoing
AID
6 90 -- -
1 MED. TECH., 1 DENTAL TECH. ASST.
MSH
HEALTH: Basic Post
Haji Lei
Ongoing
AID
7 87 -- --
6 BHWs
IACBAR
DATABASE OF NGO ACTIVITIES
Page:
91
Â6actrep Date: 27'08/95
2 BHW. 1 MEDICAL STUDENT 4TH IR.
3 ROOMS, 3 BEDS, DENTAL, IMMUNIZATION
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGES) - - --
HEALTH: Vaccination.
MSH
Kapisa
Kohband
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
Ongoing
AID /UN
82 villages
Ongoing
EUUNICF
Kohistan
Ongoing
UNDP
10 90
:or:i4Fte'
CIDA
6 91
9 91 -- --
COVERED FROM PANJSHER VSF.
DESCRIPTION>
SEE ROKHA /PANJSHARE LISTING FOR DETAILS.
Kohistan
AVICEN
HEALTH: Vaccination
GAF
AGRIC:
Vet
iAAA:i
CONST:
iL:R::.
:AAAE
Cï'NST:
PuL ,B;iildini
'.i.^ii.7ar
Ctamp.a toÚ
äR40N
3 92
iAAAE
CONST:
Pub.Buildin.g
Eisìiktan
I'iscont:n
ARCON
3 92 -- --
Earaiai
J.Tgoing
AID
7 87 -- --
Kohistan
Ongoing
AID /UN
9 91 -- --
COVERED FROM RUSHER VSF.
Center
Completed
ARCON
4 92 11 92
Mardrasa building (36 rooms) + a mosque - cement / brick & steel bar
Completed
SCA
0 92 -- 92
Provision of 0.055 MT agrochemicals
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals,
MSH
-
HEALTH: Basic Post
1 team - 2 vaccinators
6 93
.
2 paravet
1 assist DVM
92
1 guard curative & preventive service.
Reconstruction o: 1 ama.agna-t1s :ktcn road length 10 Km with. 17 culverts & bridges.
Construction
6 92
f Mosque-with 2 rooms & 4 baths.- e tone
Construction of school with 16 rooms - stone
HEALTH: Vaccination
PRB
CONST:
Pub.Building
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Other
Completed
SCA
0 92 ---92
Agriculture survey on 89 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages
SCA
EDUCAT: Primary
Bulaghain
Ongoing
SCA
7 88 -- --
5 schools / 33 teachers 1 750 students
SCA
HEALTH: Compr.Clinic
Dado Khel
Ongoing
SCA
SCA
HEALTH: Basic Clinic
,Khamcargar
Ongoing
SCA
3 89 -- --
18 mid -level Hilo / 2 Nurses
SCA
:1: ALTH:
Rahman Khel
Ongoing
SCA
7 89 -- --
1 nurse. 10 mid -level HWs
4 mid -level Hits / 1 Nurse
Basic Clinic
'Ongoing
firebrick & cement.
10 89 -- -
SEE ROKHA /PANJSHARE LISTING FOR DETAILS
i MD 13 aid -level Hiss 1 1 Lab Tech
SCA
HEALTH: Basic Clinic
Sher Khan Khel
Ongoing
SCA
-- -- -- --
SCA
HEALTH: Basic Clinic
Shuturgran
Ongoing
SCA
6 89 -- --
14 mid-level HWs
UNO
EDUCAT: Primary
Ongoing
AID
7 87 -- --
31 schools in different villages
VITA
COMM Road
Ongoing
AID
7 92 -- --
Rehabilitation of 70 km road, benefit 50,000 families
ACM
Many villages
-r
wood & cement.
7 BHWs
.
MSH
--
mud
2 Nurses I 1 PHO
DATABASE OF AGO ACTIVITIES
Page:
92
A6actrep Date: 27/08/93
67E EDITION
ACTIVITY
AGENCY
- - --
SECTOR
-- STATUS --
- - -- VILLAGE(S) - --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Kahistan
Kapisa
Rehabilitation of 4.5 km road, benefit 5,000 families
VITA
CONST:
Road
Hula Ebel
Ongoing
AID
-- -- -- --
VITA
CONST:
Road
Auahtur Karam
Ongoing
AID
--
Rehabilitation of 4.5 km road, benefit 4.500 families.
VITA
CONST:
Bridge
Mula Del
Ongoing
AID
--
Construction of 100 m cable bridge
VITA
WATER:
Canal
Regi Rawan
Ongoing
AID
7 92 -- --
VITA
WATER:
Canal
5 villages
Ongoing
AID
--
VITA
WATER:
Structure
15 villages
Ongoing
AID
-- -- -- --
Construction of 100 m intake(gabion work), benefit 20.000 families
Nejrab
Ongoing
BMZ
10 88 12 93
1 DVM / 4 paravets i 2 guards curative & preventive service
Ongoing
UNICEF'S
-- 90 -- --
Mobile vaccination team with 3 vaccinators
Ongoing
MWL
-- -- -- --
3 school buildings
Cleaning of 30 km canal, benefit 6,000 families.
-
Cleaning of 15 km canal, benefit 1.000 families
Nejrab
Kapisa
GAF
AGRIC:
Vet
GAF
HEALTH: Vaccination
IAAAE
CONST:
Pub.Building
Nejrab
IAAAE
CONST:
Pub.Building
Nejarb
Ongoing
MEL
IAAAE
CONST:
Pub.Building
Kharej Dara
Discontin
ARGON
3 92 -- --
Construction of Mosque with 1 room - stone ! firebrick & cement
IAAAB
CONST:
Pub.Building
Badakhshi
Ongoing
Self
4 92 -- --
Construction of high school
IAAAE
CONST:
Pub.Building
Data Dalan
` Ongoing
Self
4 92 -- --
Construction of .high school
MAI
DUCAT: Primary
-
3 school buildings
Kharej Dare
Ongoing
MAI
Qaryee Khwaja
Ongoing
AID
8 90 -- --
i MD, i NED. TECH., i NURSE
1 MED. TECH, 1 NURSE, 1 DENTAL TECH. ASST.
1 school
3 100MS
MSH
.HEALTH: Compr.Clinic
MSH
HEALTH: Basic Clinic
Pachaghan
Ongoing
AID
1 90 -- --
MSH
HEALTH: Basic Post
Haider Khel Afghan
Ongoing
AID
11 89 -- --
MSH
HEALTH: Vaccination
Nejrab
Ongoing
AID /UN
9 91 -- --
COVERED FROM PANJSHER VSF.
SCA
AGRIC:
Crop Product
Completed
SCA
0 92 -- 92
Distribution of 6 MT wheat seed .& 6 MT DAP
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.4 MT agrochemicala
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.135 MT agrochemicals.
'ACM
3 ROOMS, 3 BEDS, DENTAL
3 BBVe
DATABASE OF NGO ACTIVITIES
Page:
93
A6actrep Date: 27/08/93
SEE ROLHA/PANJSHARE LISTING FOR DETAILS
6TH EDITION i
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
Nejrab
Kapisa
SCA
AGRIC:
Other
Completed
'SCA
0 92 -- 92
Agriculture survey on 70 villages
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages
SCA
HEALTH: Compr.Clinic
Rozah Ebel
Ongoing
SCA
9 90 -- --
1 MD / 7 mid -level HWs
SCA
HEALTH: .Basic Clinic.
Pachaghan
Ongoing
SCA
UNO
EDUCAT: Primary
Ongoing
AID
Ongoing
AID
VITA
.
WATER:
DESCRIPTION>
Other
Naguman
2 mid -level HWs r 2 first -ciders
6 87 -- --
-
31 schools in 12 different villages
Rehabilitation of ,150 m spring, benefit 357 families
Panjshare
Kapisa
A -AID
AGRIC:
Fruit Trees
Bazarak
i:nving
ODA
-- 92 -- --
Fruit nursery (apple i peach i apricot etc).
A-AID
AGRIC:
Forestry
Dashtak
Completed
ODA
-- 91 -- 93
Timber tree cutting
A-AID
CONST:
Shelter
Rokha
Completed
ODA
-- 92 -- 92
Distribution of (beams I windows / doors / gates) for 173 houses
A -AID
CONST:
Shelter
Bazarak
Completed
ODA
-- 92 -- 92
Distribution of (beams / windoons i doors I gates) for 69 houses
CBR
CONST:
Pub.Building
Bazarak
Discontin
ARCON
-- 92 -- --
1 concrete middle school for 600 students
CBR
CONST:
Pub.Buiiding
Rokha
Approved
ARCON
-- 93 -- --
High school for 1200 students
DCA
AGRIC:
Vet
Bazarak
Ongoing
UNDP
10 89 -- --
1 paravet & vaccinator
GAF
AGRIC:
Vet
Panjehare
Ongoing
UNDP
11 90'
LBI
INCOME: Help Vulner.
Pat,jshare
Ongoing
LBI
-- 89 -- --
KAI
EDUCAT: Primary
yßaba Ali
Ongoing
MAI
MSH
HEALTH: Basic Clinic
Peshghoor
Ongoing
AID
9 90 -- --
4 PIED. TECH., 1 DENTAL TECH. ASST.
MSH
HEALTH: Basic Post
Borja Bel
Ongoing
AID
6 88 -- --
5 BBWs
MSH
HEALTH: MCH
daiacna- i -Farai
Ongoing
AID
8 90 -- --
1 Assist.Doctor, 1 Nurse 1 Dal Assist.: 3 rooms;
1 DVM / 2 paravets I 1 guard curative & preventive service
7 93
Orphanage
1 school
3 ROOMS. DENTAL
women I children under 5 care: health education and Dai training
programs.
ALBAR
DATABASE OF NGO ACTIVITIES
Page:
94
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
- - -- VILLAGE(S) - - --
SECTOR
i,;;ê,NCY
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
Panjshare
Kapisa
HEALTH: Vaccination
MS.:
-- STATUS --
Roán,
Ongoing
AID /UN
DESCRIPTION)
2 SOLD CHAIN TECHNICIANS
4 ADDITIONAL VACCINATORS PLANNED TO BE HIRED),l COLD CHAIN SUPERVISOR
IN IAPISA AND PARWAN PROVINCES TARGETS
COVERING
ABOUT
268
VILLAGES
IN
13
DISTRICTS
OPERATE UNDER AN MD DOCTOR
17 VACCINATORS,
9 91 -- --
(
GROUPS: CHILDREN O -2 YEARS
WOMEN 5 -45 YEARS.
and depot for issue of supplies and salaries and
Regional Health Administration (RBA) administrative center
monitoring and supervision of BHWs and health facilities under its jurisdiction
Rokha
Ongoing
AID
9 90 -- --
Crop Product
Panjshare
Completed
RAP
5 92
1 93
AGRIC:
Machinery
Dashtak
Ongoing
ARCON
4 92
.9 95
PRB
CORSTI:
Pub.Building
Center
Completed
ARCON
4 92
4 93
WATER:
Canal
Dashtak
Completed
SEN
9 90 10 90
Cleaning of 5 km canal.
PRB
Crop Product
--
0 92 -- 92
Distribution of i MT wheat seed, 1 MT DAP & 1 MT Urea
AGRIC:
Completed
rrA
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 F.T agrochemical!.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.12 MT agrochemicaia
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages
SCA
EDUCAT: Primary
Panjshare
Ongoing
SCA
7 89 -- --
18 schools / 127 teachers / 2900 students
SCA
HEALTH: Compr.Clinic
Bazarak
Ongoing
SCA
1 84 -- --
3 MD / 10 mid -level HWa I 1 Nurse 13 Dentál Tech. 12 X-ray Tech. / 1 Pharmacist
SCA
SCA
HEALTH: Compr.Clinic
Rothe
Ongoing
SCA
1 84 -- --
HEALTH: Basic Clinic
Ashpi
Ongoing
SCA
--
SCA
HEALTH: Basic Clinic
Safidcher
Ongoing
SCA
-- -- -- -
4 mid -level HWs.
SCA
MSH
HEALTH: Other
PRB
AGRIC:
PRB
Kapisa
Dv.4
Establishment of corn seed multiplication farm in 1O .jeribs
land,
market
5 tractors working on hire basis between the farmers of Panjshir at half the price of the local
High school building with 20 rooms - cement / brick & steel bar.
..I MD f 1 mid -level HE
3 mid -level HWs i 1 Dental Tech. I 1 First Aider
Panjsharel
Crop Product
Paryan
Completed
ODA
Distribution of 10 MT wheat seed _& 10 MT DAP.
AGRIC:
-- 92 -- 92
A -AID
Crop Product
Shaba
Completed
ODA
Distribution of 10 MT DAP & 15 MT Urea.
AGRIC:
-- 92 -- 92
A -AID
AGRIC:
Plant Protec
Paryan
Ongoing
ODA
-- 93 -- 93
Chemical crop protection / Ration weed (400 Lit
A-AID
Plant Protec
Shaba
Ongoing
ODA
Chemical crop protection / graminon for 1,000 jeribe
AGRIC:
-- 93 -- 93
A -AID
6TH EDITION 1
ACBAR
DATABASE OF NGO ACTIVITIES
Page:
95
A6actrep Date: 27/08/93
AGENCY
SECTOR
VILLAGE(S)-
ACTIVITI
FUNDED
- STATUS-
- --BY --
Begin- -End
DURATION
<ACTIVITY
DESCRIPTION>
Panjshare±
Kapisa
A -AID
AGRIO:
Other
Paryan
Completed
ODA
-- 92 -- 92
Crop cutting survey
A -AID
AGRIC:
Other
Mingavor
Completed
ODA
-- 92 -- 92
Crop cutting survey
A -AID
AGRIC:
Other
Parandi
Completed
ODA
-- 92 -- 92
Crop cutting survey
CONST:
Shelter
Astana
Completed
ODA
-- 92 -- 92
Distribution of (beams / doors / windows i gates) for 64 houses
A -AID
WATER:
Karez
Astana
Ongoing
ODA
-- 92 -- 93
Repairing of karez - irrigated 350 jeribs
CONST:
Pub.Building
Sangona
Discontin
ARGON
-- 92 -- --
Mosque for 300 prayers a time
AGRIC:
Vet
Astana
Ongoing
UNDP
AGRIC:
Vet
Paryan
Ongoing
Jangram
Ongoing
HRA
5 93 -- --
Ongoing
AID
9 90 -- --
A -AID
CBR
DCP.
DCA
HRA
MSH
.HEALTH: Distrct Hosp
HEALTH: Distrct Hoep
Onaba
-
7 91 -- --
1 paravet
UNDP
i paravet
18 beds / general surg
1 MD,
/ med
orthop
/ lab / X-ray / OPD / ECG / 4 spec f 3 MD / 9 tech. & 8 nurses
1 doctor assistant, 5 medical tech,
I malaria tech assistant, 1 X-ray tech, 1 X-ray tech assistant, 1 admin
1 anaesthesia tech assistant, 1 lab tech assistant -4 rooms, 10 Beds, X -ray, surgery lab, OPD
dental. immunization & TB control
assistant, 2 nurses,
MSH
MSH
MSH
.SCA
VITA
HEALTH: Basic Post
Kor Paitabi- Pariaa
Ongoing
AID
9 91 -- --
2 BHWs
HEALTH: MCH
Omars
Ongoing
AID
1 93 -- --
1 MD,
Panjshare Awal
Ongoing
AID /UN
9 91 -- --
COVERED FROM RUSHER VSF.
HEALTH: Vaccination
MSH
MSH
SCA
Women i children under 5 care, health education and Dai training program.
HEALTH: Compr.Clinic
Paryan
Ongoing
SCA
-- -- -- --
WATER:
Khum Zargar
Discontin
AID
--
Dara Hazara
Completed
ODA
-- 92 -- 92
Crop cutting survey
HEALTH: Basic Post
Tun Kbo
Ongoing
AID
11 88 -- --
i BHW
HEALTH: Vaccination
Panjshare Down
Ongoing
AID UN
Ongoing
SCA
Kapisa
A-AID
1 Nurse
AGRIC:
FloodControl
1 MD / 3 mid -level HWs / 3 first alders
Construction of 125 m retaining wall(gabion work)
Panjehare2
Other
HEALTH: Basic Clinic
ACBAR
SEE ROKHA /PANJSHARE LISTING FOR DETAILS.
Dara
9 91 -- --
COVERED FROM PANJSHER VSF.
SEE ROKHA!PANJSHARE LISTING FOR DETAILS
4 mid -level HWs / 2 first alders
DATABASE OF NGO ACTIVITIES
Page:
96
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Kapisa
-VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
<ACTIVITY
- --BY --
Begin --End
11 92
7 93
Multiplication of 10 MT wheat seed & 10 MT
3 93
2 94
Distribútion of 5.000 fruit trees saplings.
Tagab
fertilizer.
ADAg
AGRIC:
Crop Product
5 villages
Ongoing
UNDP
ADAg
AGRIC:
Fruit Trees
5 villages
Ongoing
DCP
ARCON
CONST:
Pub.Building
Hassan Abad
Ongoing
ARCON
--
Construction of Al- Sbaheed Habibullab school
ARCON
CONST:
Pub.Buìlding
Askim
Ongoing
ARCON
--
Construction of Al- Hanafia Darul Uloot
CRAA
AGRIC:
Vet
Tameer
Ongoing
UNDP
HRP
AGRIO:
Crop Product
--
Completed
FAO
iAAAE
CONST:
Pub.Building
Tameer
Ongoing
Self
4 92 -- --
Construction of high school
MSH
HEALTH: Basic Clinic
Shankai
Ongoing
AID
9 91 -- --
3 MED. TECH.i
MSH
HEALTH: Basic Post
Nawroz Khel
Ongoing
AID
4 89 -- --
4 BHWs
MSH
HEALTH: Vaccination
Tagab
Ongoing
AID /UN
9 91 -- --
COVERED FROM PANJSHER VSF.
OMAR
MINES:
Awareness
Tagab
Completed
UNOCHA
6 92 12 92
Safety lessons - 15038 people participated
PDA
WATER:
Garez
Se Padar
Ongoing
WFP
7 93 -- --
Rehabilitation of 3 karezes - FFW
PDA
WATER:
Karez
Landa Ihel
Ongoing
WFP
7 93 -- --
Rehabilitation of 3 karezes - FFW
PDL.
WATER:
Karez
Jalo Khel
Ongoing
WFP
6 93 -- --
Rehabilitation of 3 karezes - FFW
PDA.
WATER:
Karez
Adizaye /Joibar
Ongoing
WFP
7 83 -- --
Rehabilitation of 4 karezes - FFW.
SC -US
AGRIC:
Other
Ongoing
FAO /UNDP
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicaie
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages,
SCA
EDUCAT: Primary
Tagab
Ongoing
SCA
7 86 -- --
13 schools / 87 teachers / 2050 students
SCP.
HEALTH: Basic Clinic
Qurghal
Ongoing
SCA
11 92 -- --
SCA
HEALTH: Basic Clinic
Aakim Tagab
Ongoing
SCA
--
UNO
EDUCAT: Primary
Sabzsang
Ongoing
AID
9 87 -- --
ACBAR
DESCRIPTION>
--
9 92 -- --
Animal vaccination & treatment. 1 DVM i 2 paravete & 1 guard
Distribution of 10 MT DAP
-- 92 -- 92
11 92
7 93
SEE ROEHA /PANJSHARE LISTING FOR DETAILS
Monitoring of activities of participating agencies on multiplication improved wheat seed
4 mid -level HWs.
6 mid -level HWs / 1 first -aider
10 schools in different villages.
DATABASE OF NGO ACTIVITIES
Page:
97
A6actrep Date: 27/08/93
6TH EDITION
I
ACTIVITY
VILLAGES) - -
SECTOR
AGENCY
--
FUNDED
-- STATUS --
DURATION
- --BY --
Begin- -End
< ACTIVITY
DESCRIPTION>
Bar Kunar
Kunar
Shinkorak
Completed
AID
11 88 12 91
Reconstruction of Shinkorak Bridge (43.2 m) for heavy traffic - RCC beams / slab /cement
HEALTH: Basic Clinic
Amer
Ongoing
Germany
10 89 -- --
50 -90 pts. OPD I day.
ARCAR
CONST:
Pub.Building
Shigal
Discontin
ARCON
ATC
MINES:
Clearance
4 villages
Completed
UNOCHA
CARE
RELIEF :Help Returnee
Asmar
Completed
CARE
SOCIAL:Fore Committ.
Asmar
CAE
WATER:
Earez
DACAAR
CONST:
JCE
ACLU
CONST:
ANH
Bridge
Construction of secondry school with 9 rooms - stone & cement
7 92 -- --
il 90
2 92
Destroyed, 640 devices. cleared 673350 Sqe agri.land /-grazing land & road
AID
2 90
0 92
Distribution of 74 Mt wheat,/ 569 sets hand tools to 369 returning families
Completed
AID
3 90
0 92
Formed local shuras & held periodic meetings discussing projects related affairs.
vhingurgui
Completed
AID
5 90
0 92
Rehabilitation of 2.60 km Irrigation canal benefits Village Population
Pub.Building
Shigal
Ongoing
DACAAR
CONST:
Road
Helaqal
Discontin
ARGON
1 92 12 92
Repairing of 30 km road / 2 bridges.
JGE
CONST:
Pub.Building
Saw
Discontin
ARCON
1 92 12 92
Construction of primary sçhooi (stone / wooden beam)
S;rú
CONST:
Pub.Building
Center
Diseontin.
ARCON
1 92 12 92
Construction of primary school (gone I wooden bean).
JCE
CONST:
Other
Center
Discontin
ARCON
6 92 12 92
Construction of rope carrier
JCE
CONST:
Other
Saw
Completed
ARGON
1 92
MADERA
AGRIC:
Crop Product
Asmar
Completed
FAO
-- 91 -- --
Multiplication of rice / maize & wheat seeds
MADERA
AGRIC:
Fruit Trees
Asmar
Completed
Self
-- 90 -- --
Selling of 1.488 fruit & forest trees
MADERA
AGRIC:
Forestry
Asmar
Ongoing
Self
3 90 -- --
'
'
Primary school (50% of work done by ARR)
-- 93 -- --
Construction of rope carrier (60 m)
6 92
3 forest agents, control the forestry, select the trees for cutting - this forestry provides seedlings 606 of
forestry plants & 882 seedlings of fruit trees
Veterinary treatment, selling of medicines & vaccination
5 90 -- --
MADERA
AGRIC:
Vet
Nishagam
Ongoing
EC/F.Gvt
MADERA
AGRIC:
Vet
Asmar
Ongoing
EC
-- 90 -- --
Veterinary treatment, selling of medicines & vaccination.
MADERA
AGRIC:
Vet
Ongoing
EC
-- 90 -- --
Veterinary treatment, selling of medicines & vaccination.
MADERA
AGRIC:
Vet
EC
-- 90 -- --
Veterinary treatment, selling of medicines & vaccination
ragam /Asmar
Shigai,íhsmar
Ongoing
,
DATABASE OF NGO ACTIVITIES
"
Page:
98
A6actrep Date: 27/08/93
6TH EDITION
- - -- VILLAGES) - - --
SECTOR
AGENCY
ACTIVITY
FUNDED
DURATION
-- STATUS --
- - -BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Bar Kunar
Kunar
is working 100 hours per month at e
subsidised
price,
MADERA
AGRIC:
Machinery
Asmar
Ongoing
EC
-- 91 -- --
1 tractor
MADERA
AGRIC:
Research
Asurar
Ongoing
EC /FAO
-- 90 -- --
Trials of .different wheat / maize & rice varieties.
MADERA
AGRIC:
Plant Protec
Asmar
Ongoing
EC
-- 91 -- --
Selling of some agriculture tools & agrochemicale (BBC, zinc phosphide DDVP melathen) 21 1g & 450 farmers aré advised
about the use of agrochemicals
Training
MADERA
AGRIC:
MSH
HEALTH: Compr.Clinic
Asear
Ongoing
EC
Jaj
Ongoing
AID
Agricultural training of i person,
-- 90 -- --
2 MED TECH, 1 LAB
2 MD,
6 88 -- --
TECH. ASST.1 DENTAL TECH ASST.
6 ROOMS,-4 BEDS. LABRATORY, DENTAL. ORTHOPAEDIC SURGERY
VOLUNTEER HEALTH SISTER (VHS) AND DAI TRAINING
KSH
HEALTH: Basic Post
Asurar
Ongoing
AID
7 57 -- --
4 BHWs
!SE
HEALTH: Vaccination
Asmar
Ongoing
AID/UN
? 8F -- --
5 vaccinators cover 34 villages in lunar province.
NPO
CONST:
Bridge
Aster
Completed
NRC INCA
5 91
NPO
CONST:
Shelter'
Shinkorak
Completed
NRC /NCA
9 91 12 91
NPO
CONST:
Pub.Building
Shigal
Completed
NRC /NCA
8 02
SCA
¡DUCAT: Primary
Pashingar
Ongoing
SCA
7 92 -- --
1 school / 7 teachers / 270 students
SCA
EDUCAT: Primary
Shinkorak
Ongoing
SCA
7 89 -- --
1 school / 5 teachers / 120 students
SCA
HEALTH: Basic Clinic
Shigal
Ongoing
SCA
1 89
8 mid -level HWs / 1 Dental Tech.; i Lab Tech.
UNO
EDUCAT: Primary
Ongoing
AID
3 87 -- --
5 schools in Qaseem Kali, Zor Bard., La Husain
VITA
CONST:
had
Waghz Bagh
Discontin
AID
2 91 -- --
Rehabilitation of 12.5 km road, benefit 2,286 families
VITA
WATER:
Canal
Qaria Dab
Discontin
AID
6 92 -- --
Cleaning of 1.5 kt canal, benefit 86 families
VITA
WATER:
FloodControi
Haji Abad
Ongoing
AID
12 92 -- --
VITA
WATER:
FloodControl
boal Barawal
Ongoing
AID
4 92 -- --
WRC
HEALTH: Basic Clinic
Ongoing
WRC
2 clinics
WRC
HEALTH: Basic Clinic
Ongoing
WRC
2 clinics
ACBAR
-
.
Target groups: Children 0 -2 years and women 5 -45
years_
Small bridges crossing canals.
5 92
Slab & beams provided to 5 houses
Clinic of small size running
8 92
--
costs SCA
Sowkhowr & Taghgan villages
Construction of 12 km retaining wall(masonry work), benefit 750 families
Construction of 117 m retaining wallimasonry work). benefit 950 families.
DATABASE OF NGO ACTIVITIES
Page:
99
A6actrep Date: 27/08/93
6TH EDITION
i
ACTIVITY
AGENCY
SECTOR
Kunar
-VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
- - -BY --
Begin --End
<ACTIVITY
Barg Matal
NAC
HEALTH: Cour.Clinic
Eaygal
Ongoing
NAC
--
NAC
HEALTH: Basic Clinic
Shilarn
Ongoing
NAC
-- 90 --
--
Basic health center
NAC
HEALTH: Other
Arans
Ongoing
NAC
-- 91
--
--
Dental clinic.
Ongoing
Germany
10 89 --
--
25 bed female & children hospital - X-ray
Kunar
ANH
DESCRIPTION?
x -ray / lab ! MD doctor & 10 beds
89 -- --
Chag;hasarai
HEALTH: Provinc.Hosp
Dam Kali
lab i dental i vaccination program & medical & surgical wards & 150 -200
pts. OPD /day.
ARCON
CONST:
ATA/L7
HEALTH: Other
ATC
HINES:
AVICEN
Pub.Buiiding
Ongoing
ARCON
Ongoing
*Donors
Bachi
Completed
UNOCHA
HEALTH: Vaccination
Asadabad
Ongoing
EC/UNICF
CARE
COAST:
Bachi Shoitan
Completed
AID
9
CARE
RELIEF:Help Returnee
Asadabad
Completed
AID
2 90
0 92
200 mt.wheat ! 820 sets hand tools given to 1000 returning families in different Villages
CARE
SOCIAL :Farm Committ.
Asadabad
Completed
AID
8 90
0 92
Formed local shuras & held periodic meetings discussing projects related affairs
CARE
WATER:
Canal
Marawara/Brawlo
Completed
AID
2
90
0 92
3 Irrigation canals with total length of 8 km irrigates 85 hectares lands, benefits village population
CRAA
AGRIC:
Vet
Wata Poor
Ongoing
UNDP
1
92 -- --
CRAA
AGRIC:
Vet
Dam Kali
Ongoing
UNDP
7 91
DACAAR
CONST:
Road
Ongoing
DACAAR
DACAAP.
CONST:
Pub.Building
Marawara
Discontin
DACAAR
DACAAR
COAST:
Sanitation
Several villages
Ongoing
DACAAR
-- 92 -- --
Sanitation: elements for baths(400 installed)
DACAAR
WATER:
Canal
Several villages
Completed
DACAAR
-- 89 -- 91
Salar canal: 26 km cleaned & 29 structures made.
DACAAR
WATER:
Drinking
Several villages
Ongoing
EC /Self
-- 91 -- --
82 shallow wells & 49 hand -pumps
DACAAR
WATER:
Drinking
Asadabad
Ongoing
DACAAR
-- 93 -- --
Tube -well & pipe - scheme
JACBAR
Clearance
Road
d.sadabad
Construction of Asad Abad mosque
-- 91
3
92
-- --
5
92
Tuberculosis control program
Destroyed 2483 devices, leared 1746213 Sqm agri.land I grazing land / hill side I canal & road
1 team - 2 vaccinators
90
7
92
-- --
-- 91 -- 93
8 91 --
--
1.8 km road with 3.6 km side ditch, 2 causeways has been done for this project
Animal vaccination & treatment, 1 DVM / 2 paravets & 1 guard
Animal vaccination & treatment, 2 paravets & 1 guard
Repair of 31 km road in-Pech Valley(16 km completed)
School building (9 rooms) -
DATABASE OF NGO ACTIVITIES
Page: 100
A6actrep Date: 27/08/93
cement i sand ! gravel / stone & wood
6TH EDITION !
ACTIVITY
AGENCY
SECTOR- --- - --
Kunar
---- VILLAGE(S)' - --
Chaghasarai
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
< ACTIVITY DESCRIPTION>
,
aCI
HEALTH: Compr.Clinic
Wata Poor
Completed
HCI
5 90 11 91
1 ND / 1 nurse 1 1 lab tech
ISRA
AGRIC:
Crop Product
Asadabad
Ongoiñg
FAO /ISRA
5 93 11 93
Distributioñ of 0.35 MT rice seed & 1 MT DAP
ISRA
AGRIC:
Crop Product
Asadabad
Ongoing
FAO
5 93 11 93
Distribution of 0.35 MT rice seed & 1.87 MT DAP.
INCOME: Help Vulner.
Asadabad
Ongoing
ISRA
8 92 -- --
Assistance to 647 orphans(monthly allowance / health / education .etc)
LEI
AGRIC:
Crop Product
8 villages
Completed
FAO /UNDP
-- 92 -- 93
Multiplication of 3.6 MT seeds & 3.6 MT DAP
LEI
AGRIC:
Crop Product
4 villages
Ongoing
LEI /FAO
-- 93 -- --
3.8 MT maize, rice, lung beans & DAP
LBI
AGRIC:
Machinery
Asadabad
Ongoing
LEI /FAO
-- 91 -- --
2 tractors / 2 threshers / 1 trailer & 20 sprayers
MADERA
AGRIC:
Fruit Trees
Salar Bagh
Ongoing
-- 91 -- --
Nursery provides 15,265 forest & fruit trees
MADERA
AGRIC:
Vet
Asadabad
Ongoing
EC /F.Gvt
-- 88 -- --
Veterinary treatment, selling of medicines & vaccination
MAI
EDUCAT: Primary
Ongoing
MAI
MCPA
MINES:
2 minefields
Completed
UNOCHA
KS
REAM Basic Post
Sheengam
Ongoing
AID
FPO
AGRIC:
Asadabad
Ongoing
NRC/NCA
1.91 -- --
PO
INCOME: Skill Train.
Asadabad
Completed
NRC/NCA
1 91
RAFA
WATER:
barhala
Completed
ISRA
8 89 12 89
1 culvert of 59 a lenght was built with stone masonry I concrete - irrigates 200 hectares of land - benefits 50
families
SOS -PG
EDUCAT: Teacher T.
Ongoing
EC/B.Gvt
-- 84 -- --
Through resource centers in schools / two & half month courses 1 15 day seminars & practical work in classrooms
SOS -PG
INCOME: BelpCraftmen
Ongoing
EC
'ISRA
Survey
Training
Structure
4 villages
--
4 schools in Maonogai, Dam %alai, Asadabad A Nawabad
1 92 12 92
84,618 Sqm agri.land
11 88 -- --
2 93
3 BBWs
Poultry farm training of students to this work
7 92
6 94
Vocational training in 8 different handicraft skills
Provision of toolkits & credit facilities to small enterprises.
25% of the beneficiaries are selected from
vulnerable groups
SOS -PG
INCOME: Skill Train.
UNO
4 villages
Ongoing
EC
2 93
EDUCAT: Primary
Ongoing
AID
7 8? -- --
WE
AGRIC:
Machinery
Ongoing
FAO
--
WIC
CONST:
Road
Ongoing
WRC
-- 91 -- --
IA C B A R
Marawara
6 94
Training of 26 trades by placement in apprenticeship.
i school in Dewar, village.
2 tractors
Construction of road
DATABASE OF NGO ACTIVITIES
Page: 101
A6actrep Date: 27/08/93
6TH EDITION
1
FUNDED
ACTIVITY
SECTOR
AGENCY
DURATION
iACTIVITY
- --BT --
Begin --End
Completed
WIC
-- 91 -- 92
Ongoing
WRC
--
Asadabad
Ongoing
WRC
-- -- -- --
2 clinics
Digging of 3 wells.
---- VILLAGE(S) - - --
-- STATUS --
DESCRIPTION>
Chaghasarai
Kunar
Other
Asadabad
WRC
CONST:
WRC
HEALTH: Provine.Hosp
WRC
HEALTH: Basic Clinic
WRC
WATER:
Drinking
Asadabad
Completed
WRC
-- -- -- 93
WRC
WATER:
Drinking
Asadabad
Completed
UNDP
-- -- -- 92
Germany
10 89 -- --
Re- energizing of Kunar Power House.
Dawat surgical hospital (53 beds).
.
Digging of i well.
Chapa Dara
Kunar
30 -50 pts. OPD 1 day,
ANH
HEALTH: Basic Clinic
Marchai
Ongoing
AVICEN
HEALTH: Vaccination
100 villages
Ongoing
EC UNICF
CRAA
ÉDUCAT: Other
Total Area
Ongoing
DCP
11 22 -- --
Narcotic awareness, i extension agent
MADERA
AGRIC:
Crop Product
Kandy
Ongoing
EC /FAO
-- 91 --
Distribution of 280 Kg maize ! 300 1g DAP & 188.17 Kg vegetable seed to 700 farmers
MADERA
AGRIC:
Crop Product
Different villages
Ongoing
EC /FAO
-- 91 -- --
-
2 teams - 4 vaccinators
--
Distribution of 2950 Kg (85) wheat seed to 305 farmers
24.47 Kg forage crop seed to 11 farmers
1770 Kg of DAP i 166 Kg vegetable seed to 442 farmers &
during 1992,
MADERA
AGRIC:
Forestry
Chaps Dara
Ongoing
Self
-- 91 -- --
3 forest agents contorl the forest & select the trees for cutting run village nurseries & talk to people & shuras.
MADERA
AGRIC:
Vet
Gulsalak
Ongoing
EC
-- 91 -- --
Veterinary treatment, selling of medicines & vaccination
MADERA
AGRIC:
Vet
Kandy
Ongoing
EC
-- 91 -- --
Veterinary treatment, selling of medicines & vaccination
MADERA
AGRIC:
Machinery
Kandy
Ongoing
EC
-- 91 -- --
1 tractor is working 100 hours per month at a subsidised price
MADERA
AGRIC
Research
Kandy
Ongoing
EC /FAO
-- 91 -- --
Trials of different varieties of wheat i maize & rice seed
MADERA
AGRIC:
Research
Gulsalak
Ongoing
EC /FAO
-- 91 -- --
Trials of different varieties of wheat
MADERA
AGRIC:
Research
Kandy
Ongoing
EC /FAO
-- 91 -- --
Trials of wheat & maize varieties,
MADERA
AGRIC:
Plant Protec
Kandy
Ongoing
EC
-- 91 -- --
Selling of some agricultural tools & agrochemicals (BHC) zine phosphide & (DDVP) 25.036 at a subsidised price &
maize & rice seed.
advised 342 farmers about the use of agrochemicals during 1992.
MADERA
AGRIC:
Plant Protec
Gulsalak
Ongoing
EC
-- 91 -- --
Selling of some agricultural tools & agrochemicals (BBC) zine phosphide & (DDVP) 14.99 Kg at a subsidised price &
advised 119 farmers on how to use them during 1992
IA C B A R
DATABASE OF NGO ACTIVITIES
Page: 102
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
---- VILLAGEESI - - --
FUNDED
-- STATUS --
DURATION
- --BY --
Begin --End
< ACTIVITY
DESCRIPTION>
Chapa Dara
Kunar
MADERA
AGRIC:
Training
Kandy
Ongoing
EC
-- 91
MADERA
AGRIC:
Training
Kandy
Ongoing
EC
-- 91
MADERA
AGRIC:
Training
Gulsalak
Ongoing
EC
-- 91 -- --
Agricultural training of 1 staff.
MADERA
AGRIC:
Training
Kandy
Ongoing
EC
-- 92 -- --
Agricultural training of 2 staff.
MADERA.
INCOME: Skiiì Train.
Pamn
Ongoing
NEC
--
MADERA
WATER:
FloodControl
Kandy
Completed
EC
-- 92
1
HEALTH: i:
Basic Post
Marchai
Ongoing
AID
3 88
--
Training of people from different project areas in forestry.
-- --
' --
91 --
Training of 2 staff members from different projects in different agencies as ='arsvets & cold chain supervisors.
--
--
Training of 10 carpet weavers.
93
Gabion working for the protection of agricultural land.
++
.SH
RBS
SOCIAL:Other
Ongoing.
FRc
SCA
AGRIC:
Other
Ongoing
SCA
0 93 --
VITA
CONST:
Road
Chase Dara
Ongoing
AID
9
VITA
WATER:
FloodControl
Saidoor
Completed
AID
Kunar
.
1!'
92
2 BMWs
93
Training of volunteers (community workers.
93
Agriculture survey on 30 villages.
Rehabilitation of 14 km road, benefit 10,000 families.
90 -- --
-- --
2
Construction of 75 m retai, thg wail + gabion work, benefit 143 families.
93
Chawki
AHSAO.
HEALTH: Vaccination
Chawki
Ongoing
ANB
HEALTH: Basic Clinic
Chawki Center
Ongoing
ITC
MINES:
Haber
Completed
Clearance
'UNICEF
Germany
'
UNOCHA
11
92 -- --
10 89 -- --
5
92
7
92
Polio /measles /D.P.T & T.T.
50 -90 pts. OPD / day.
Destroyed 400 devices, cleared 454174 So agri.land / grazing land & village.
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness. i extension agent.
IIRO
HEALTH: Compr.Clinic
Chawki
Ongoing
TIRO
11 88 --
--
1 MD i 3 nurse - 30 pts. OPD I daily.
ISRA
AGRIC:
Crop Product
Chawki
Ongoing
FAO
5
93 11
93
Distribution of 0.35 NT rice seed & 1.87 MT DAP.
ISBA
AGRIC:
Crop Product
Chawki
Ongoing
FAO
5 93 10 93
ISRA
AGRIC:
Crop Product
Chawki
Ongoing
FAO
3
93
ISRA
AGRIC:
Crop Product
Chawki
Ongoing
FAO
5
93 11 93
ISRA
EDUCAT: Primary
Chawki
Ongoing
ISRA
3 94
-- 89 -- --
Distribution of 0.03 MT peanut to progressive farmers.
Distribution of 24 MT sugar cane seed & 0.85 MT DAP.
Distribution of 0.35 MT rice seed & 2 MT DAP.
816 students / 15 teachers:
DATABASE OF NGO ACTIVITIES
6TH EDITION
I
Page: 103
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
Kunar
- -- VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
- - -BY --
Begin - -End
<ACTIVITY
DESCRIPTION>
Chawki
ISRA
EDUCAT: Otter
Chawki
Ongoing
IBA
-- 89 -- --
I3RA
HEALTH: Other
Chawki
Ongoing
ISBA
2 90 -- --
LOO
INCOME: Help Vulner.
Chawki
Ongoing
LQO
MADERA
AGRIC:
Forestry
Chawki
Ongoing
MADERA
AGRIC:
Vet
Chawki
Ongoing
EC/F.Gvt
MADERA
AGRIC:
Machinery
Chawki
Ongoing
EC
-- 91 -- --
1 tractor is working 100 hours per month at a subsidised price.
MADERA
AGRIC:
Research
Chawki
Ongoing
EC
-- 91 -- --
Triais of wheat & maize varieties.
MADERA
AGRIC:
Plant Protec
Chawki
Ongoing
EC
-- 91 -- --
Selling of 17 g agrochemicals during 1992.
MADERA
AGRIC:
Training
Chawki
Ongoing
EC
-- 91 -- -
Extension work for veterinary treatment & agro- chemicals - training of 2 agricultural technicians in seed
Quranïc center - 60 students & 3 teachers.
Dispensary for school.
-- 92 -- --
Orphanage: providing monthly cash to 150 orphans.
-- 90 -- --
Distribution of 4,000 trees of forestry.
5 90 -- --
Veterinary treatment, selling of medicines & vaccination.
multiplication.
6 schools in Dewagal, gulmani, Shioqi, Chawki, Kotki & Narrang.
Ongoing
MAI
--
Nour Gul Ulya
Ongoing
AID
2 89 -- --
HEALTH: Basic Post
Chawki
Ongoing
AID
11 87 -- --
2 BHNs
RES
SOCIAL:Commu.Particp
--
Ongoing
RBS
10 92 12 93
Center for disabled children.
RBS
SOCIAL :Form Committ.
Ongoing
RBS
10 92 12 93
Formation of social welfare committees.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93. -- 93
Provision of 0.08 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.165 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on .88 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
--
UNO
EDUCAT: Primary
Ongoing
AID
11 87 -- --
6 schools in Aarchando Mazar, Chambail, Badal Lewat, galmani, ëhaki Qala(2).
iIRC
AGRIC:
Completed
FAO
-- 92 -- 93
Distribution of 6 MT DAP, 1.5 MT urea and 2 MT maize seed.
MAI
EDUCAT: Primary
MSH
HEALTH: Basic Clinic
MSH
ACBAR
Crop Product
Chawki Center
1 MED. STUDENT 2ND, 1 BHW,
1 NURSE
3 ROOMS, 3 BEDS
7 mid -level His.
DATABASE OF NGO ACTIVITIES
Page: 104
A6aetrep Date: 27/08/93
6TH EDITION
ACTIVITY
- - -- VILLAGE(S) - - --
SECTOR
AGENCY
Kunar
-- STATUS --
FUNDED
-
DURATION
- --BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Chawki
WRC
CONST:
Pub.Building
--
Ongoing
WRC
-- 92 - -. --
Construction of Chowki mosque.
WRC
CONST:
Pub.Building
Dewagal
Ongoing
WRC
-- 92 -- --
Construction of Dewagal mosque.
WRC
WATER:
Canal
Completed
FAO
WRC
WATER:
Canal
Completed
FAO
-- -- 12 92
Cleaning of Chawki canal.
WRC
WATER:
Canal
gechi Sufla
Completed
FAO
-- -- -- 91
Cleaning of canal.
WRC
WATER:
Canal
Bachi Ulya
Completed
FAO
-- -- -- 91
Cleaning of canal.
WRC
WATER:
Canal
Beber (Wier)
Completed
FAO
-- -- -- 93
Construction of canal.
WRC
WATER:
Structure
Baber
Completed
FAO
-- -- -- 92
Construction of Baber wash.
WRC
WATER:
Structure
Baber
Completed
FAO
-- -- -- 93
Bank protection near Baber canal Weir(No. 2).
WRC
WATER:
Structure
Dewagal
Ongoing
FAO
-- 92 -- --
Construction of Dewagal wash.
WRC
WATER:
Structure
Chawki Ealan
Completed
FAO
-- -- -- 93
Construction of canal bank protection.
WRC
WATER:
Structure
Chawki Kalan
Completed
FAO
-- -- -- 93
Construction of intake.
WRC
WATER:
Structure
Dewagal
Completed
FAO
-- -- -- 93
Ban protection near Dewagal wash.
WRC
WATER:
Structure
Baber
Completed
FAO
-- -- -- 93
Bank protection near Baber canal(No. 1).
WRC
WATER:
Drinking
Completed
WRC
-- -- -- 93
Digging of 3 wells.
WRC
WATER:
Drinking
Completed
UNDP
-- -- -- 92
Digging of 1 well.
Ongoing
Germany
Completed
UNDP
-- 92 -- 92
8 89 -- --
:
'
--
Repairing of 3 canals.
7 93
Dòngóm
Kunar
Char Gala
ANB
HEALTH: Basic Clinic
CRR
CONST:
Road
VITA
CONST:
Road
3 provinces
Ongoing
AID
VITA
WATER:
Canal
Dongam
Completed
AID
AR
-t
1 89 -- --
--
4 93
60 -80 pts. OPD ! day.
Road survey.
Rehabilitation-of 34 km road, benefit 14,285 families.
Cleaning of 2 km canal, benefit 286 families.
DATABASE OF AGO ACTIVITIES
6TH EDITION
!
Page: 105
A6actrep Date: 27!08!93
AGENCY
SECTOR
Kunar
- - -- VILLAGES' - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin --End
< ACTIVITY
Kamdesh
ANF
HEALTH: Basic Clinic
Mirdeh
Ongoing
Germany
ARCON
CONST:
lamdesh
Ongoing
ARCON
--
Repairing of Nooristan road.
AVICEN
HEALTH: Vaccination
33 villages
Ongoing
EC /UNICF
--
1 team - 2 vaccinators
MADERA
AGRIC:
Fruit Trees
Kamdesh
Ongoing
MADERA
AGRIC:
Fruit Tree!
Kamdesh
Ongoing
EC
MADERA
AGRIC:
Vet
Kamdesh
Ongoing
EC
MAI
EDUCAT: Primary
Baz Gui
ng_i ng
N3^
HEALTH: Basic Post
Gawhar Dash
Ongoing
AID
EDUCAT: Primary
Keshtuz
Ongoing
SCA
7 86 -- --
7 schools
Ongoing
AID
7 87 -- --
1 school in Pati Gui villages.
Ongoing
AID
1 91 -- --
Rehabilitation of 33 km road, benefit 8,571 families.
Ongoing
WRC
-- 91 -- --
Ongoing
OXFAM
SCA
Road
UNO
EDUCAT: Primary
:'ITA
CONST:
Road
WRC
CONST:
Road
any villages
10 89 -- --
40 -50 pts. OPD / day.
-- 91 -- --
Distribution -of 2,000 fruit trees.
Selling of fruit & forest trees.
Veterinary treatment, selling of medicines & vaccination.
--
.chord.
ì
Dff'(4
,
45 teachers / 1050 students
Construction of Mirdish- Kamdish road.
Khas Kunar
Kunar
AMA
DESCRIPTION>
HEALTH: Compr.Clinic
Center
1 87 -- --
1 MD ! 2 disp. / i lab tech / 1 TBA / 1 vaccinator -.100 -150 pts.OPD / day - general medicine / !TN i vaccine / lab /
maìaria +TB control / 1 LHV & 1 Dai.
ANH
HEALTH: Basic Clinic
Tamar
Ongoing
Germany
ATC
MINES:
Clearance
Khas lunar
Completed
UNOCHA
9 90
CRAA
AGRIC:
Vet
lowli Gram
Ongoing
UNDP
1 92 -- --
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, i extension agent.
DACAAR
WATER:
Drinking
Several villages
Ongoing
EC /Self
-- 93 -- --
100 shallow wells & hand -pumps.
MADERA
AGRIC:
Crop Product
Khas Kunar
Completed
FAO
-- 91 -- --
Distribution of DAP 1 rice & maize seed.
Ongoing
MAI
-- -- -
5 schools in Arazi Ulia, Khas lunar, Hakim Abad, Arazi Sufla, Tanal Blilages.
MAI
-
EDUCAT: Primary
!CHAR
'
410 89 -- --
5 92
-
40 -80 pts. OPD / day.
Destroyed 111 devices, cleared 131058 Sqm agri.land & village.
Animal vaccination & treatment, 1 DYM / 2 paravets & 1 guard.
DATABASE OF NGO ACTIVITIES
Page: 106
AGactrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
-VILLAGE(S) - - --
-- STATUS --
DURATION
FUNDED
- --BY --
<ACTIVITY
Begin --End
DESCRIPTION>
Khas Kunar
Kunar
18 schools in different villages.
MAI
EDUCAT: Primary
--
Ongoing
MAI
MAWA
WATER:
Ehas Kunar
Ongoing
CIDA
-- 92 -- 93
Reconstruction of 100 m Bella canal.
MSi
HEALTH: Basic Post
Arazi Ulya
Ongoing
AID
it 87 -- --
4 BHWs
MSF
HEALTH: Vaccination
Khas Kunar
Ongoing
AID/UN
12 89 -- --
5 VACCINATORS COVER 24 VILLAGES IN ERAS SONAR
RAFA
AGRIC:
Crop Product
Diff. villages
Completed
FAO
RAFA
WATER:
Canal
Valley
Completed
FAO
RATA
WATER:
Canal
Khayber
Completed
FAO
AN:.
WATER:
Structure
Shinkoray
Ongoing
FAQ
RAFA
WATER:
Structure
Khayber
Completed
FAO
10 91
5 92
Construction of 30 m wall by store masonry - benefits 100 families (5 hect. of Iand).
RAF. =.
WATER:
Structure
Barabad
Completed
FAO
3 91
2 93
Construction o f weir & bank protection v! Elms Kunar canal.
RAFA
WATER:
Structure
Shinkoray
Completed
FAO
F 02
8 92
Rehabilitation of Shinkoray wash on Hakim abad canal.
.RAFA
WATER:
Structure
Khayber
Completed
FAO
1 92
5 92
30 m gabion work - benefits 100 familioc(5OO hect. of of land))).
RAFA
WATER:
Structure
Tanar
Completed
FAO
12 92
2 93
Rehabilitation of Tanar wash on Hakim abad canal.
RBS
SOCIAL:Other
Ongoing
RBS
10 92 12 93
RDA
WATER:
Canal
Ongoing
WFP
7 93 12 93
Rehabilitation of 20,000 linear M canal - benefit 6,000 farming families.
SCA
AGRIC:
Crop Product
Ongoing
SCA
0 93 -- 93
Distribution of 0.67 MT rice seed.
SCA
AGRIC:
Crop Product
Completed
SCA
0 92 -- 92
Distribution of 0.3 MT wheat seed. 0.3 MT DAP & 0.3 MT Urea.
SCP.
AGRIC:
Research
Completed
SCA
0 92 -- 92
1 crop variety testing trial.
TTP /GT2
INCOME: Skill Train.
Ongoing
TTPIGTZ
4 92 -- --
Training 80 people per year in carpentry and. masonry t4 months sessions).
WRC
CONST:
Completed
WRC
Ongoing
WRC
Completed
FAO
Canal
--
Distribution of 3 MT seed & 3 MT fer*
.
DISTRICT.
TARGET GROUPS: CHILDREN 0 -2 YEARS AND WOMEN 5 -45
ve{
8 90 10 90
Rehabilitation of 24 km canal - irrigates benefits ..00O people.
` 90 12 90
Rehabilitation of 12 km Cana. - irrigates 2390 hectares of land - benefits 1800 p ople.
..
93 -- --
Construction oi diversion wall
YEARS.
,
.
Formation of boy scouts group
(
Islami Khadmatgar).
r
WRC
Pub.Building
-HEALTH: Basic Clinic
WRC
WATER:
:
C H A R
Canal
--
43
Construction o
mosque.
2 clinics
--
7 93
Repairing of 3 canals.
DATABASE OF NGO ACTIVITIES
f
Page: 107
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
--- - -- SECTOR
WRC
WATER:
Drinking
FUNDED
DURATION
< ACTIVITY
DESCRIPTION>
- --BY --
Begin- -End
Completed
WRC
-- -- -- 93
Digging of 3 wells.
Completed
AID
11 88 12 91
Reconstruction of Nawapass- Barikot road (B0 km) -128 culverts (787m) with machinery,
Completed
AID
11 88 12 92
Repair of Arandu Bailey Bridge (55 m) for heavy traffic - metallic -construction stone masonry 1:6 for abutment &
-- STATUS --
-VILLAGES) - - --
Kunar
Kunar
ACLU
CONST:
Road
ACLU
CONST:
Bridge
Arandu
pier.
Crop Product
Distribution of 3 MT wheat seed and 3 MT DAP.
Completed
FAO
Completed
AMI
--
Completed
UNICEF
All parts
Ongoing
TAW
Pub.Building
--
Ongoing
ISRA
-- 92
Drinking
Different villages
Ongoing
ISRA
-- 92 -- 93
5 shallow wells.
All parts
Ongoing
NSF
-- 93 -- --
Monitoring & technical evaluation of microscopists.
--
Completed
FAO
-- 92 -- 92
Other
Completed
FAO
2 90
Other
Completed
FAO
8 91 11 91
Topographic survey, long / cross -section of canals / hydrolic str. in %has-lunar / Nour Gal / Chawki & Sirkanay.
Ongoing
EC
2 93
Provision of toolkits & credit facilities to small enterprises.
AIMA
AGRIC:
AKI -A
HEALTH:Other
DS
HEALTH: Disabled Reh
FWSAD
SOCIAL:Other
ISRA
CONST:
ISRA
WATER:
MSF-H
HEALTH: Other
RAFA
AGRIC:
Crop Product
RAFA
WATER:
RAFA
WATER:
SOS -PG
INCOME: HelpCraftmen
--
-- 92 -- 92
5 93
Health survey of existing facilities.
6 93
A team conducted survey on disabled people in 35 selected villages.
-- 91 -- 91
Advocacy / awareness / registry & feasability studies on disabilities.
5 92 -- 93
Construction of 10 mosques in diferent districts.
9 93
4 90
6 94
,
Distribution of 6 MT wheat seed and 3 MT DAP.
Topographic survey, long / cross- section of canals / hydrolic str. in Khas / Sirkanay / Chwaki & Nour Gul.
25% of the beneficiaries are selected from
vulnerable groups.
SOS -PG
INCOME: Skill Train.
Kunar
--
Ongoing
EC
2 93
Ongoing
Germany
8 90 -- --
6 94
Training of 26 trades by placement in apprenticeship.
NarariB
ANH
HEALTH: Basic Clinic
ARCON
CONST:
Road
Narang
Ongoing
ARCON
ARCON
CONST:
Pub.Building
Narang
Ongoing
ARGON
ATC
MINES:
Clearance
Narang
Completed
UNOCBA
IA C B A R
Char Qala,
'
--
40 -60 pts. OPD / day.
Repairing of Karang road.
Construction of Narang mosque.
2 90
2 90
Destroyed 5 devices, cleared 1450 Sqm road.
DATABASE OF NGO ACTIVITIES
Page: 108
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
-- STATUS --
- - -- VILLAGE(S) - - --
FUNDED
- --BY --
DURATION
Begin- -End
-
< ACTIVITY
DESCRIPTION>
Narang
Kunar
CRAA
AGRIC:
Vet
Ghundo
Ongoing
UNDP
7 91 -- --
Animal vaccination & treatment. 1 DYM / 2 paravets & 1 guard.
DACAAR
AGRIC:
Crop Product
13 villages
Ongoing
DACAAR
9 92 -- --
6.5 vegetable seed i 278000 vegetable seedlings & 89 kg onion seedlings distributed to 909 farmers in 13 villages.
DACAAR
AGRIC:
Crop Product
13 villages
Completed
DAI
6 92 10 92
0.5 MT rice seed & 450 kg CAP distributed to 55 selected farmers in 5 villages for seed multiplication.
DACAAR
AGRIC:
Crop Product
13 villages
Ongoing
FAO
11 92 -- --
.
0.22 MT barley seed / 2 MT wheat seed & 2.22 MT DAP distributed to 87 selected farmers in 13 villages for seed
multiplication.
DACAAR
AGRIC:
Crop Product
13 villages
Ongoing
DACAAR
2 93 -- --
Vegetable nursery established in an area of 428 Sqm.
DACAAR
AGRIC:
Crop Product
13 villages
Completed
FAO
5 92 10 92
13.5 MT DAP i 3 MT urea & 4.5 MT maize seed distributed to 90 farmers.
DACAAR
AGRIC:
Crop Product
--
Completed
FAO /Self
5 91 12 91
Distribution of 30 kg vegetable seed to 240 farmers in ii villages.
DACAAR
AGRIC:
Crop Product
--
Completed
FAO /Self
5 91 12 91
Distribution of 200 kg rice seed / 4.67 MT maize seed / 9.25 Mî DAP to 156 farmers in 9 villages.
DACAAR
AGRIC:
Crop Product
13 villages
Ongoing
FAO /Self
11 92 -- --
Spinach & onion planted in an area of 220 Sqm for seed producted.
DACAAR
AGRIC:
Forestry
Completed
FAO /Self
'1 91 -- --
5,000 encalyptus & 300 guava saplings
DACAAR
AGRIC:
,Machinery
Completed
FAO /Self
.5 91
8 91
1 thresher - threshed 43.33 MT harvested wheat of 28 farmers in 3 villages.
DACAAR
AGRIC:
Machinery
13 villages
Completed
FAO /Self
6 92
6 92
80 MT wheat harvest of 34 farmers in 5 villages threshed.
DACAAR
AGRIC:
Machinery
13 villages
Completed
FAO /Self
11 92 11 92
DACAAR
AGRIC:
Research
13 villages
Completed
FAO /Self
7 92 10 92
2 maïze(19 var.) experiments conducted.
DACAAR
AGRIC:
Research
13 villages
Completed
DACAAR
7 92 10 92.
1 rice field trial conducted.
DACAAR
AGRIC:
Research
13 villages
Ongoing
FAO /Self
11 92 -- --
DACAAR
AGRIC:
Research
13 villages
Completed
FAO /Self
11 91
6 92
1 wheat yield trial, 4 wheat, 1 barley & 3 oat test plots conducted.
DACAAR
AGRIC:
Plant Protec
13 villages
Completed
DACAAR
2 93
3 93
150 kg 2 -4 -D was used on 375 jeribs .of 217 farmers wheat fields.._
DACAAR
AGRIC:
Plant Protec
13 villages
Completed
DACAAR
2 92
3 92
200 kg 2 -4 -D was used on 500 jeribs of farmers wheat fields.
DACAAR
AGRIC:
Training
13 villages
Ongoing
DACAAR
1 93 -- --
305 farmers technically trained.
DACAAR
AGRIC:
Training
13 villages
Completed
DACRRA
1 92 12 92
580 farmers technically trained.
A C B A R
are ready for distribution.
30.5 MT maize harvest of 25 farmers in 4 villages threshed.
i wheat yield trial 14 var.. 18 wheat, 12 oat 1 barley observation lines & 4 wheat test plot.
DATABASE OF NGO ACTIVITIES
Page: 109
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
Kunar
DACAAR
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin- -End
<ACTIVITY
DESCRIPTION>
Narang
CONST:
Shelter
Nawabad
Completed
DACAAR
1 91 -- --
Production of RCC elements such as beams (3.5 m), lintels (2.5m & 1.5e)
- for community housing - capacity 2,700 /
month.
DA "AAR
CONST:
Pub.Buiiding
Narang
Completed
DACAAR
-- 90 -- 90
Secondary school building
DACAAR
CONST:
Pub.Building
Narang
Completed
DACAAE
-- 90 -- 91
2 primary school buildings.
D..0 A:
WATER:
Canal
Several villages
Completed
DACAAR
-- 89 -- 91
Narang canal: 13.5 km cleaned & 4 structures made.
WATER:
.anal
Narang
Completed
DACAAR
WATER:
Drinking
Several villages
Ongoing
INCOME: Help Vuiner.
Narang
Ongoing
LEI
-- 89 -- --
Orphanage
HEALTH: Basic :n °r
Narang 3ufl:
Ongoing
ADD
11 88 -- --
.. BNB
Bar Narang
Narang
t.
Ongoing
.i
i..
CA
Ongoing
EC /B.Gvt
D._
-
^A^ik:
LET
u3F..
Biro
-.n«
t11/1.í+
HEALTH:
Basic Clinic
. e.a
1/
SOS
EDUCAT: Teacher T.
Kunar
. .
3 92
6 91
Rehabilitation of 13.5 km canal - construction of 4 etructures.
Gr.
" ß3e .f
-
--
82 shallow wells & y9 hand-pumps.
ÿ mid -level HWe
-- 84 -- --
Through resource centers in schools
I
two & half month courses
15 day seminars & practical work in ciassrome.
Naray
AT"
MINES:
Clearance
Naray Dokalam
ComT.°T°^
MADERA
AGRIC:
Fruit Trees
Barikot
Ongoing
MADERA
AGRIC:
Vet
Hatay,
Ongoing
EC
--
Veterinary treatment, selling of medicines & vaccination.
MADERA
AGRIC:
Vet
Barikot
Ongoing
EC
11 89 -- --
Veterinary treatment, selling of medicines & vaccination.
MADERA
AGRIC:
Vet
Naray
Ongoing
EC
1 91 -- --
Veterinary treatment, selling of medicenee & vaccination.
MADERA
AGRIC:
Machinery
Barikot
Ongoing
EC
-- 91 -- --
MADERA
AGRIC:
Rese rch
Barikot
Ongoing
EC /FAO
MADERA
AGRIC:
Plant Protec
Barikot
Ongoing
EC
-- 91 -- --
Selling of 16 £g agrochemicale during 1992.
MADERA
AGRIC:
Training
Barikot
Ongoing
EC
-- 91 -- --
Extension work for veterinary treatment & agrochemicais - training of i agriculture technician in seed
multiplication.
MADERA
WATER:
Drinking
Barikot
Completed
EC
-- 92 -- 92
Drinking water project (tank & 700 m pipe) - benefit 200 families.
IACBAR
UNOCHA
1 91
4 91
Destroyed 3 2C devices, cleared 596974 S9m agr .. land & grazing land.
-- 90 -- --
Selling of 1,000 fruit trees.
1 tractor working 100 hours per month at a subsidised price.
Trials of wheat
maize & rice varieties.
DATABASE OF EGO ACTIVITIES
Page: 110
A6actrep Date: 27/08/93
1
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
---- VILLAGE(S) - - --
MSH
HEALTH: Basic Poet
NAC
CONST:
Pub.Buiiding
Kunar
-- STATUS - -
FUNDED- --BY --
DURATION
:ACTIVITY
Begin- -End
Shahi Kot
Ongoing
AID
7 87 -- --
1 BHW
Barikot
Completed
NAC
7 91
1 building with 8 rooms - stone ! brick
5 92
timber
:
DESCRIPTION>
iron sheet.
Nour Gui
ANH
HEALTH: Basic Clinic
Center
Ongoing
Germany
CRAA
AGRIC:
Dara Mazar
Ongoing
UNDP
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, i extension agent.
HCI
CONST:
cub. Building
Kara Mazar
Completed
HCI
12 90
6 91
Mosque building - cement
.3R ".
WATER:
Structure
Nour Gul
Completed
FA"
Gy
5 93
Construction of intake.
LDI
HEALTH: Basic Clinic
Nour Gui
Ongoing
LDI
KAI
EDUCAT: Primary
Ongoing
MAI
--
MSH
HEALTH: Basic Post
Ongoing
AID
7 88 -- --
2 BHWs
RASA
CONST:
Road
Ongoing
ARCON
4 92 -- --
Repair of Nour Gul -Mazar Dare road 8,200 m by hand tools.
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.04 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0.93 -- 93
Agriculture survey on 30 villages.
START
AGRIC:
Crop Product.
4 villages
Completed
UNDP
5 92 10 92
Improved maize seed multiplication.
START
AGRIC:
Crop Product
3 villages
Completed
UNDP
5 92 10 92
Improved rice seed multiplication.
START -
WATER:
Canal
Nour Gul
Ongoing
FAO
WRC
HEALTH: Basic Clinic
Ongoing
WRC
Bulak
Ongoing
Germany
Kunar
Vet
Pech
Adeet
'
60 -90 pts. OPD / day.
7 92 -- --
Animal vaccination & treatment,
-- -- -- -
:'
1
DVM ! L paravets & 1 guard.
stone.
2-mid-level HWs - OPD.
-- --
3 schools in Nour Gal, Mia Qala & Qala Masood villages.
Rehabilitation of Noue Gul canal (9.1 KC.
2 clinics
.
WI
HEALTH: Basic Clinic
ARCON
CONST:
Pub.Building
Shangal
Ongoing
ARCON
ATC
MINES:
Clearance
Bar landy/Terani
Completed
UNOCHA
IA C B A R
10 89 -- --
10 89 -- --
--
8 91
8 92
40 -100 pts. OPD / day.
'
Construction of school.
Destroyed 5 devices, cleared 32382 Sgm agri.land & grazing land.
DATABASE OF AGO ACTIVITIES
Page: 111
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
-VILLAGE(S)- - --
SECTOR
AGENCY
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Pech
Kunar
2 teams - 4 vaccinators
AVICEN
HEALTH: Vaccination
44 villages
Ongoing
EC/UNICF
:ARE
RELIEF:Heip Returnee
Manoogai /Waradish
Completed
AID
9 90
0 92
CARE
SOCIAL:Form Committ.
Pech Valley
Completed
AID
4 90
0 92
Formed local shuras & held periodic meetings discussing projects related affairs.
DACAAR
CONST:
mara Pech
Completed
DACAAR
1 91
1 93
Repair of Chighan -Nangalam road(13km) - construction of 150 culverts - 10 km ret. wall - standard road - with
Road
.Distribution of 127 sets hand tools to
returning families.
machinery.
DACAAR
HC7
CONST:
Road
liEAd TH: .Fui. Post
'BI
AGRIC:
Fruit Trees
MADERA
AGRIC:
Crop Product
c ,_,_
vil.eges
Ongoing
DACAAR
Ongoing
H'.:
Completed
LBI /FAO
Ongoing
EC/ FAO
,
-- 91 -- 93
5 8: -- --
,
. nurse - 2 beds.
-- 91 -- 92
Distribution of 3500 trees (apple. apr,'At. almond & persimon )
-- 90 -- --
Distribution o.
n/
War,
Repair of 31 km road.
of n 5i.
!
.:
seed
Kg wheat .,eeo
to 520 farmers.
.Ar tc
to-305
t4:: farmers
1770 Ag DAP
!+^
,
.....
rip.
Kg vegetable .,eed
seed to 146 farmers & 122
g
forage crop seeds to 87 farmers.
MADERA
AGRIC:
Crop Product
Mangelaa
Ongoing
EC /FAO
-- -- -- --
Distribution of. 440 Kg maize & 250 Kg DAP to 88 farmers buring 1992.
MADERA
AGRIC:
Crop Product
9 vi:lagee
Onvin g
EC
-- 91 -- --
Distribution of 39 Ag different vegetable seeds.
MADERA
AGRIC:
Crop Product
Nangalam
Ongoing
EC
-- 91 -- --
Distribution of 197.04 Kg vegetable seed to 88 farmers.
MADERA
AGRIC:
Fruit Trees
Nangalaa
Ongoing
-- 90 -- --
Selling of 2,500 fruit & forest trees.
MADERA
AGRIC:
Fruit Trees
Weyga: Valley
Ongoing
-- 90 -- --
Nursery & selling of 2,500 fruit & forest trees.
MADERA
AGRIC:
Fruit Trees
Wéygal
Ongoing
-- 91 -- --
Selling of fruit & forestry trees (2,500 seedlings).
MADERA
AGRIC:
Vet
mama
Ongeing.
EC
-- 91 -- --
Veterinary treatment, selling of medicines & vaccination.
MADERA
AGRIC:
Ve:
Nangalaa
Ongoing
EC
-- 90 -- --
Veterinary treatment, selling of medicines & vaccination.
MADERA
AGRIC:
Ve:
Wèygal Valley
Ongoing
EC
-- 90 -- --
Veterinary treatment, selling medicines & vaccination.
MADERA
AGRIC:
Machinery
Nangalam
Ongoing
EC
-- 91 -- --
2 tractors are working 100 hours per month at a subsidised price.
MADERA
AGRIC:
Researon
NangEiam
Ongoing
EC /FAO
-- 90 -- --
Trials of different varieties of wheat
MADERA
AGRIC:
Plant Protec
Wama
Ongoing
EC
-- 91 -- --
Agrochemicals (zine phosphide BBC & nogas) 2623 gas & advised 316 farmers about the use of agrochemical.
MADERA
AGRIC:
Plant Protec
Nangalam
Ongoing
EC
-- 91 -- --
Agrochemicals
EC
(
zinc phosphide BBC & nogas) 14.098 Kg are against insects ' pests & rodents.
DATABASE OF EGO ACTIVITIES
Page: 112
maize & rice seed.
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED -
DURATION
- --BI --
Begin --End
<ACTIVITY
DESCRIPTION>
Pech
Kunar
MADERA
AGRIC:
Plant Protec
Weygal Valley
Ongoing
EC
-- 91 -- --
Selling of some agricultural equipment & agrocheiicals 7 ¡g of (BBC & DDVP) to control pest 6 rodents.
MADERA
AGRIC:
Training
Weygal Valley
Ongoing
EC
-- 91 -- --
Agricultural training of 1 staff.
MADERA
CONST:
Road
Weygal Valley
Ongoing
EC /DACAA
-- 92 -- ;-
Construction of 45 Em
MADERA
CONST:
Road
Wane
Ongoing
WFP
8 92 -- --
45 ta Wane pack animal road.
MADERA
CONST:
Road
Want
Ongoing
WFP
6 92 -- --
Construction of 40 ka pack animal road.
MADERA
CONST:
Pub.Building
Weygal Valley
Completed
EC
6 92 12 92
Construction of agriculture center with 4 rooms during 1992.
MADERA
INCOME: Skill Train.
Weygal
Ongoing
NRC
MADERA
WATER:
Canal
Weygal Valley
Completed
EC
6 92 12 92
Repairing cf 620 m canal.
MADERA
WATER:
Canal
Pumbazaar
Ongoing
EC
3 93 -- --
Repairing of 4 ëm'Pumbazaar canal.
MADERA
WATER:
FloodControl
Want
Ongoing
ECIF.Gvt
MADERA
WATER:
FloodControl
Wodygram
Ongoing
EC
2 93 -- --
Gabion working 330 a / protects 1350 jeribs agricultural land & benefit 1273 farmers.
MADERA
WATER:
Drinking
Mouldesh
Ongoing
EC
7 92 -- --
4 water supplying projects with 8 water storage tanks in different places.
MADERA
WATER:
Drinking
Shahilaa
Completed
EC
9 92
Shahilam water supply project with 2 water storage tank E 1900 a pipe.
MADERA
WATER:
Drinking
Manual
Ongoing
EC
7 92 -- --
MAI
EDUCAT: Primary
Ongoing
MAI
MAI
EDUCAT: Primary
Wandian
Ongoing
MAI
--
MSH
HEALTH: Basic Clinic
Gandii
Ongoing
AID
10 88 -- --
MSH
HEALTH: Basic Post
Garwa
Ongoing
AID
7 87 -- --
NPO
COMM
Bridge
Senzayee
Ongoing
NRC /NCA
3 --
NPO
CONST:
Bridge
Pech
Completed
NRC /NCA
NPO
CONST:
Pub.Building
Bar bandy
Completed
NRC /NCA
RBS
SOCIAL:Coaau.Particp
Ongoing
RBS
!ACM ---
.
road between Ningalaa & Want.
Carpentry training with 4 carpenters & 20 students.
-- 91 -- -
12 92 -- --
2 93
Gabion working 170 m / protects 200 jeribs agricultural rand & benefit 84 farmers.
Ningalaa water. supply project with 2 water tanks.
'7 schools in Arnese, Hateen, Bar Mandy, ¡atar, ilPgraa, Saidor, Sandali & Gui Salale.
3 MED. TECH.
9 92
10 92 12 93
3 ROOMS 4 BEDS
4 BMWs
8 93
10 91 12 91
5 92
1 school.
Construction of bridge:length 30 a..
Small bridges crossing canals.
Clinic of small size running costs SCA.
Center for disabled children.
DATABASE OF HGO ACTIVITIES
Page: 113
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
-VILLAGES) - - --
SECTOR
AGENCY
-- STATUS --
FUNDED
- --BY --
9r,
92 -- 92
Provision .. ..165 MT a B rochemica';s.
SCAA
93 -- 93
V ;'cals.
Provision of 0.095Y MTII.agrr 4'
^hem)
Completed
vA
0 92 -- 92
Agriculture survey on 60 villages.
Ongoing
SCA
' 93 -- 93
Agriculture survey on 40 villages.
Sulaimanzi
Ongoing
SCA
7 89 -- --
5 schools
15 teachers
EDUCAT: Primary
sand Kale
Ongoing
;re
7 90 -- --
4 schools
9 teachers 1 350 students
EDUCAT: Primary
Kandy
Ongoing
Sre
Etr Kandy
Ongoing
.CA
11 89
Pech
Completed
WFP
3 91
Completed
SCA
Plant Protec
Ongoing
AGRIC:
Other
SCA
AGRIC:
Other
Sre
EDUCAT: Primary
SCA
3CA
AGRIC:
Plant Protec
SCA
AGRIC:
3CA
Ji
cAnm11TY
i:; ;:
..w ...,
Pech
Kunar
-,n,
DURATION
Begin- -End
.HEALTH:
.
Basic
1. Clinic
.
.
--
0
.
85 -- --
:Y schools
ví teachers
240 students
::50
students
3 mid-level ñWe .
5'91
Distribution of 50 MT wheat to 800 families.
START
RELIEF:Food Items
TPRPA
AGRIC:
Fruit Trees
Shahllam
Completed
FAO
TPRPA
CONST:
Other
Paroon
Ongoing
CIDA
7 9: -- --
Construction of Paroon Minor
TPRPA
CONST:
Other
Nangalam
Ongoing
ARCON
2 92 -- --
Construction of hydroelectric power station f power house.
UNO
EDUCAT: Primary
Ongoing
AID
3 87 -- --
-- 93 -- --
Fruit trees distribution to farmers
peach / apricot i apples,
Power station + power house50 kv initial capacity) & rehabilitation of 900 mt canal.
11 schools in Gulsalak, Watla, Wama(2), Kantowa, Warsak, Saved Khel, Qandhari, Bulak Degal, Chambrak & Batkundi
villages.
Rehabilitation of 2.2 km foot path, benefit 357 families.
VITA
CONST:
Road
Senzayee
Discontin
AID
10 90 -- --
VITA
CONST:
Road
Wama/Kantiwa
Ongoing
AID
7 92 -- --
VITA
CONST:
Bridge
Dag Carmol
Completed
AID
--
VITA,
WATER:
Canal
Manoogai
Completed
AID
-- --
VITA
WATER:
FïoodControl
Dak
Ongoing
AID
WRC
AGRIC:
Crop Product
Completed
FAO
-- -- --
WRC
CONST:
Bridge
Eandagal
Completed
WRC
--
7 93
Construction of suspension bridge.
WRC
CONST:
Bridge
Man?og5i/Nangaiam
Completed
FAO
--
7-93
Construction of bridge.
-- 12 92
1 93
4 92 -- --
93
Rehabilitation of 2 km foot path road, benefit 3,500 families.
Construction of 31 m bridge (concrete & masonry), benefit 2,000 families.
Cleaning of 1.1 km canal, benefit 57 families.
Construction of 115 m retaining walistone masonry), benefit 357 families.
Distribution of 250 Kg rice seed & 200 Kg Urea.
DATABASE OF NGO ACTIVITIES
Page: 114
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(S) - - --
Kunar
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Pech
WRC
CONST:
Pub.Building
--
Completed
WRC
-- -- -- 92
Construction of Nanogal mosque.
WRC
CONST:
Pub.Building
Chakdara
Completed
WRC
-- -- -- 93
Construction of Chakdara madrasa.
WRC
HEALTH: Basic Clinic
Ongoing
WRC
WRC
WATER:
Structure
Naguman
Completed
WRC
-- -- -- 92
Construction of retaining wall at Naguman river.
WRC
WATER:
Structure
Adizai
Completed
WFP
-- -- -- 92
Bank protection Adizai canal.
WRC
WATER:
Drinking
Completed
WRC
-- -- -- 93
Digging of 3 wells.
WRC
WATER:
Drinking
Completed
UNDP
-- -- -- 92
Digging cf 1 well.
2clinics
Sirkanay
Kunar
AMA
EDUCAT: Primary
Shirogai
Ongoing
OXFAM
3 89 -- --
5 teachers - 200 students.
AMA
EDUCAT: Primary
Ganjgal
Ongoing
OXFAM
1 89 -- --
10 teachers - 500 students - 5 grades ( 2 classes in each grade).
AMA
HEALTH: Compr.Clinic
Ganjgal
Ongoing
OXFAM
1 87 -- --
1 MD
2 disp.
I
1 LHV / 1 vaccinator
1 TBA í 2 CHWe / 1 malaria sup.- 50pts.OPD i day - general medicine ! MCH /
van. ! malaria control.
Destroyed 161 devices, cleared 671652 Sqs agri.land / grazing land i canal & road.
ATC
MINES:
Clearance
Sirkanay
Completed
UNOCHA
8 90
CRAA
AGRIC:
Vet
Center
Ongoing
UNDP
1 92 -- --
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
DACAAR
CONST:
Pub.Building
Pashad
Completed
DACAAR
-- 91 -- --
DACAAR
CONST:
Pub.Building
Pashad
Completed
DACAAR
1 91
7 91
School building (I1 rooms) - cement / sand / gravel i steel / wood.
DACAAR
WATER:
Canal
Sirkanay
Discontin
DACAAR
7 91
8 91
Rehabilitation of Sirkanay canal(6.5 km) - the project discontinued because of fighting.
LBI
AGRIC:
Fruit Trees
7 villages
Completed
LBI!FAO
-- 91 -- 92
Distribution of 3,500 trees (apple, apricot, almond & pears) to 600 farmers.
MADERA
AGRIC:
Crop Product
Pashad
Ongoing
FAO
-- 91 -- --
Multiplication of rice ! maize /wheat seed & distribution of DAP.
MADERA
AGRIC:
Vet
Pashad
Ongoing
EC
4 90 -- --
MADERA
AGRIC:
Machinery
Pashad
Ongoing
EC
-- 91 -- --
A C B A B
6 91
Animal vaccination & treatment, 1 DVM / 2 paravets &.1 guard.
- Narcotic awareness, 1 extension agent.
Primary school building.
Veterinary treatment, selling of medicines & vaccination.
i tracter is working 100 hours per month at a subsidised price.
DATABASE OF EGO ACTIVITIES
6TH EDITION
1
Page: 115
A6actrep Date: 27!08!93
AGENCT
SECTOR
Kunar
VILLAGES) - -
ACTIVITY
FUNDED
DURATION
-- STATUS-
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Sirkanay
MANIA
AGRIC:
Research
Peaked
Ongoing
NADERA
AGRIC:
Plant Protec
Pastead
Ongoing
.
EC
-- 91 -- --
Trials of different wheat / maize & rice varieties.
EC
-- 91 -- --
Selling of some agriculture tools & agrochemicals (BBC) zinc phosphide (DDVP aelathen) 20 Kg at a subsidised price &
370 farmers are advised about the use of agrochemicals.
ëADERA
AGRIC:
Training
Pashad
Ongoing
IC
-- 91 -- --
Agricultural training of 1 staff:
MADERA
VATER:
FloodControl
Pashad
Ongoing
IC
-- 91 -- --
1 project for the protection of agricultural land with gabion.
KAI
DUCAT: Primary
--
Ongoing
NAI
KSH
HEALTH: Basic Post
Shakal
Ongoing
AID
3 88,-- --
4 BHWs
kPO
CONST:
Pnb.Building
Donahi
Completed
NRC /NCA
6 91 11 91
Primary school for boys & girls running cost SCA.
:! A
WATER:
Canal
Donahi
Completed
FAO/UNDP
10 89
3 90
5 km canal was repaired which irrigates 800 hectares of land - benefits 120 families.
RAFA
WATER:
Canal
-
Completed
UNDP/WFP
8 89
2 90
Rehabilitation of.8 km canal - irrigates 100 hectares of land - benefits 250 families.
.
1 school.
SCA
EDUCAT: Primary
Donahi
Ongoing
SCA
7 91 -
S;A
HEALTH: Basic Clinic
Center
Ongoing
SCA
2 89 -- --
6 mid -level HWs.
VITA
WATER:
Canal
Sirkanay
Ongoing
AID
1 91 -- --
Cleaning of 6.7 ka canal, benefit 1,000 families.
VITA
WATER:
Canal
Pashad
Discontin
AID
9 90 -- --
Cleaning of 5.2 ka canal, benefit 500 families.
VITA
WATER:
Structure
Sirkanay
Ongoing
AID
8 92 -- --
Construction of intake(gabion work).
COOS!:
Road
Pashad
Completed
WIC
-- 92 -- --
Construction of Pashad -Ihas lunar road (16 IC.
Canal
Barabad
Completed
WFP
-- -- -- 92
Repairing of canals.
Center
Approved
WHO
-- 93 -- --
Sued Ahmad
Ongoing
AID
8 89 -- --
3 NED. TECH., 1 FIRST AIDER,
Lagai
Ongoing
AID
4 89 -- --
3 BBB
Aliabad
Ongoing
AID/UN
WRC
WIC
WATER:
Kunduz
--
1 school / 5 teachers i 195 students
Aliabad
CBI
CORST:
NS
HEALTH: Basic Clinic
Pub.Building
KS
HEALTH: Basic Post
BSI
HEALTH: Vaccination
.
10 89 -- _-
Basic health center (4 rooms).
COVERED BY ? ALOCAN VSF.
DATABASE OF NGO ACTIVITIES
Page: 116
4 ROOMS 4 BEDS
SEE TALOQAN LISTING FOR DETAILS.
.
A6actrep Date: 27/08/93
6ih EDITION
ACTIVITY
---- VILLAGE(S)- ---
SECTOR
AGENCI
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
Aliabad
Kunduz
irrigation channel rehabilitation.
3 92
OXFAM
WATER:
Canal
Aliabad
Completed
OXFAM
12 91
PRE
AGRIC:
Vet
Transport
Completed
UNDP
11
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0
93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0
93 -- 93
Agriculture survey on 30 villages.
UNO
!DUCAT: Primary
Ongoing
AID
7 87
VITA
WATER:
Poul &heshti
Discontin
AID
Canal
92
6
93
-- --
11 90 --
--
VFU with 1 DVM, i paravet & 1 guard providing veterinary services to the whole district.
12 schools in different villages.
Cleaning of 5 km canal, benefit 200 families.
Archi
Kunduz
AVICEN
HEALTH: Vaccination
52 villages
Ongoing
ECÌUNICF
2 teams - 4 vaccinators
AVICEN
HEALTH: Vaccination
18 villages
Ongoing
EC/UNICF
2 teams.
MSH
HEALTH: Basic Clinic
Qariuq
Ongoing
AID
8 90 -- --
MSH
HEALTH: Basic Post
Qar1ug
Ongoing
AID
12 90 -- --
MSH
HEALTH: MCH
Daftani
Ongoing
AID
PRB
AGRIC:
Bandar Khwaja -Ghar
Completed
UNDP
SCA
HEALTH: Basic Clinic
Nahri Kohna
Ongoing
SCA
UNO
EDUCAT: Primary
--
Ongoing
AID
Kunduz
Vet
3
92 -- --
11 92
6 93
5 vaccinators
1 ROOM
3 MED. TECH.,
3 BHWs
1 Nurse, 1 Med. Tech. 3 Rooms;women ! children under 5 care; health education and Dai training programs.
VFU with 1 DVM, 1 paravet h i guard providing veterinary services to the whole district.
2 aid -level HWs
7
87 -- --
.7 schools in Dawran iati, Mohmand, Shahrawan(2), Nahr Kohna, Sanjani & Sharotian villages.
Char LDara
ARA
AGRIC:
Fruit Trees
Bans
Ongoing
ARCON
12 92 -- --
Almond nursery 2,000,000 (l0 jeribs).
CBR
CONST:
Pub.Building
Center
Approved
WHO
-- 93 -- --
Basic health center (4 rooms).
MSH
HEALTH: Basic Clinic
Qara Ehani
Ongoing
AID
8
89 --
--
2 MED. TECH.
4 ROOMS 3 BEDS
MSH
HEALTH: Basic Clinic
Mang Tepe
Ongoing
AID
8
90 -- --
3 MED. TECH.
3 ROOMS, 5 BEDS
MSH
HEALTH: Basic Post
Mir Shaikh
Ongoing
AID
7 88 -- --
3 BHWs
OXFAM
WATER:
Nawabad
Completed
OXFAM
2 92
Irrigation channel rehabilitation.
1ACBAR
DESCRIPTION>
Canal
4
92
DATABASE OF NGO ACTIVITIES
Page: 117
A6actrep Date: 27/08/93
6!I IDITION
I
ACTIVITY
AGENCY
SECTOR
Kunduz
AGRIC:
Vet
SCA
AGRIC:
SCA
ARCON
ARCON
MSH
MSH
MSH
MSH
SCA
SCA
SCA
SCA
UNO
VITA
VITA
VITA
DURATION
Begin- -End
<ACTIVITY
DESCRIPTION>
Center
UNDP
9 92
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.14 MT agrochemicals.
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 88 villages.
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
Ongoing
AID
1 87 -- --
9 schools in Yateem, Ajenzai Sabzzli, Gulabi, Nawabad, Subhani, Basus, Mama Ebel, Char Shaheed & Qasab villages.
Completed
ODA/EC
R 0-
--
EDUCAT: Primary
Kunduz
A -AID
FUNDED
- --BY --
Completed
SCA
NO
-- STATUS --
Char Dara
PRB
SCA
- - -- VILLAGE(S) - - --
AGRIC:
6 93
VFU with 1 DVM, 1 paravet & 1 guard providing veterinary services to the whole district.
Hazrat Imam
Crop Product
--
^ 92
CONST:
Pub.Buiïding
Imam Sahib
Ongoing
ARCON
WATER:
Structure
Imam Sahib
Ongoing
ARCON
HEALTH: Compr.Clinic
Imam Sahib
Ongoing
AID
8 89 -- --
HEALTH: Basic Post
Daiwana Qeshlaq
Ongoing
AID
11 87 -- --
HEALTH: NCH
Imam Sahib
Ongoing
AID
6 92 -- --
HEALTH: Vaccination
Hazrat Iman
Ongoing
AID/UN
Seed distribution
multiplication
:T:al
ag extension in selected villages.
.
Construction of Bases school.
--
Rehabilitation of Shahrawan Dan.
1 MED. TECH., 2 NURSE
4 ROOMS
7 BHtis
1 ECHO,
10 89 -- --
Women / children under 5 care: health education and Dai training program.
COVERED BY TALOQAN VSF.
SEE TALOQAN LISTING FOR DETAILS.
AGRIC:
Plant Proteo
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicals.
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.142 MT agrochemicals.
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
Ongoing
SCA
-- -- -- --
Ongoing
AID
1 87 -- --
11 schools in Eohdaman(2), Gumbad(2), Shahrawan, Islamabad, Banbaka, Hag Masjid, Farghan Tapa, Rawza Mubarak & Gharo.
Rehabilitation of 14 km road, benefit 4,286 families..
HEALTH: Basic Clinic
Qatar Bain
EDUCAT: Primary
CONST:
5 mid -level HWs.
Road
Qatar Belag
Ongoing
AID
6 92 -- --
WATER:
Canal
Gul Mohd
Discontin
AID
11 90 -- --
Cleaning of 7 km canal, benefit 80 families.
WATER:
Canal
Qara Eotorma
Discontin
AID
11 90 -- --
Cleaning of 4 km canal, benefit 571 families.
ACBAR
DATABASE OF NGO ACTIVITIES
{
Page: 118
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
-VILLAGE(S) - ---
SECTOR
AGENCY
-- STATUS --
DURATION
FUNDED
<ACTIVITY
- --BY
Begin- -End
Discontin
Cleaning of 6 km canal, benefit 1,428 families.
Canal
Gul Tapa
11 90 -- --
WATER:
AID
VITA
Don Qeshlak
Discontin
Cleaning cf 4 km canal, benefit 571 families.
Canal
11.90 -- --
WATER:
AID
VITA
Canal
Mohaman
Discontin
AID
Cleaning of 8 km canal, benefit 100 families.
WATER:
11 90 -- --.
VITA
Runduz
DESCRIPTION>
Khanabad
Completed
ODAIEC
8 92
7 93
villages.
Seed distribution /multiplication i trial & ag. extension in selected
--
A -AID
AGRIC:
Crop Product
Rassus /Aktaeh
Completed
8 93
Seed distribution
Crop Product
7 94
AGRIC:
ODA /EC.
A -AID
ODA /EC
8 92
7 93
AGRIC:
--
Completed
& Musazi.
Seed distribution i multiplication i tría: & ag extension in Mullah Ghuiam
Crop Product
ODA /EC
8 93
7 94
AGRIC:
'Completed
Seed distribution-/ multiplication
Crop Product
A -AID
A -AID
multiplication
.
tai
& :,g extension.
trial & ag extension in Moo i Shekhali I Khwaja Bolak / Aminul1ah /Panshiri I
Kerghez.
A -AID
AGRIC:
Crop Product
A -AID
AGRIC:
Crop Product
A -AID
AGRIC:
Crop Product
A -AID
AGRIC:
Crop Product
A-AID
AGRIC:
Crop Product
8 93
7 94
Lower Chogha i Zelbur.
Seed distribution I multiplication / trial & ag. extension in Upper Chogha /
Completed
ODA /EC
Completed
AID
Completed
ODA /EC
.8 93
7 94
Qala / Janat Bagh / Kabuli Qeshlaq.
Seed distribution / multiplication / trial & ag extension in Sahaq / Kohna
--
ODA /EC
8 92
7 93
Seed distribution /multiplication /
--
Completed
-
7 90 12 90
Distribution
of 30 MT improved seed / 7 MT Abi seed
14 MT lalgi seed 17 MT Urea 146 MT DAP to 1,701 families.
trial & ag extension in Charsari / Michen
Ihel / Dukon Adam Khan / Hasan Ihel /
Laghmani.
7 93
Zard lama / Ezantop.
Seed distribution ; multiplication / trial & ag extension in Chartut /
--
Completed
ODA/EC
8 92
ODA
7 91 -- --
5:7 MT improved seed 15.7 MT DAP / 8
--
Ongoing
'farìs.:
MT planted in 4 trial plots - 161 jeribs seed multiplication
A -AID
AGRIC:
Crop Product
Ongoing
the community)..
2 tractors (60 % of cost was paid by Afghanaid & the remaining by
Machinery
7 91 -- --
AGRIC:
AID
A -AID
ODA/IC
8 92 11 92
Construction of 3 bridges over Gawcush
Bridge
Completed
Completed
AID
A -AID
CONST:
Janat Bagh
10 90 11.91
canal: Esantoq(10e), Mahfaïy (5e) & Tarakhel(6).
in 8 villages.
Rehabilitation of 6 km canal - irrigate 3,000 jeribs - benefit 800 families
WATER:
Canal
8 93
1,400 ha.
Cleaning of 5 km of the Ihwaja Bolak canal to provide irrigation over
WATER:
ODA /EC
A -AID
Completed
7 94
Canal
8 92
Cleaning of 6 km of the Charsari canal to
Canal
Completed
7 93
WATER:
ODA/EC
A -AID
Structure
Completed
ODA
8 91 10 91
A -AID
A -AID
WATER:
provide irrigation over 600 ha.
1 spillway in Husain Khel / 1 spill way + 1 ret.wall (70m) in
Kohna Qala / 1 aquedut (7.71) in Kilachi I i aquduct
(3.5m) in Jan Qatghan.
$TB EDITION
ACBAR
DATABASE OF IGO ACTIVITIES
Page: 119
A6actrep Date: 27/08/93
AGENCY
SECTOR
Kunduz
---- VILLAGE(5) - - --
ACTIVITY
FUNDED
DURATION
--STATUS-
--BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Khanabad
A -Ai''
WATER:
Structure
A -AID
WATER:
A -AID
--
Completed
AID
Structure
Completed
ODA/EC
8 92
7 93
Construction of retaining wall on Narai canal to prevent water losa to Gawcush canal. Canal irrigates 1,800 ha
WATER:
Structure
Completed
ODA /EC
8 93
7 94
Construction of retaining wall on the Bande Barq canal, irrigating 600 ha
A -AID
WATER:
Structure
Completed
ODA/EC
8 93
7 94
Construction of offtake & retaining wall on Chogha canal to irrigate 600 ha
A -AID
WATER:
Structure
Completed
ODA /EC
8 92
7 93
10 90 12 90
Cone.of 2 ret.walls, Janat Bagh (105m), Arbab Safar (95e) - both irr. 11,000 J. / benefit 2,300 families
Cons.of spillway on Gawcush canal to increase water for 200 ha in Mullah Ghulam / Charsari / Dukon Adam Khan
Musazi.
A -AID
WATER:
FloodContrcl
Arbat Safar
Ongoing
ODA/EC
A -AIT
WATER:
FloodContrci
Basa!
Completed
AID
A-AID
WATER:
FioodControl
Rassus /Aktach
Completed
ODA /EC
8 93 11 93
Construction of flood protection groynes on the Khanabad River to protect Ihanabad- Kunduz road from erosion.
10 90 11 90
8 93
46 km flood control for protection of 500 jeribe land - benefit 150 families
7 94
Construction of flood protection groynes on the Khanabad River to protect the Basus canal from Breach. canal
irrigates 232 hect
AVICEN
HEALTH: Vaccination
CBR
CONST:
Pub.Building
CBR
CONST:
Pub.Building
IAAAE
WATER:
Canai
KWA
INCOME: Skill Train.
KWA
Ongoing
EC/UNICF
-- -- -- --
1 team - 3 vaccinators
City
Discontin
WHO
-- 92 -- --
Comprehensive health center (17 rooms)
Khanabad
Discontin
ARCON
-- 92
1 concrete middle school for 600 students
Discontin
ARGON
Ehanabad
Completed
CIDA
-- 91 -- 92
Carpet weaving training
INCOME: Skill Train.
Ihanabad
Completed
CIDA
-- 90 -- 91
Lady tailor training
NH
HEALTH: Basic Post
Qarya Laghman
Ongoing
AID
MSH
HEALTH: Vaccination
Ihanabad
Ongoing
AID /UN
.
-
--
-6 92 --
Construction of canal - stone / cement & steel
4 88 -- --
10 90 -- --
10 BBWa.
.COVERED FROM TALOQAN VSF.
SEE TALOQAN LISTING FOR DETAILS. A SECOND TEAN WITH 4 VACCINATORS UNDER PMD SUPERVISION
IMPLEMENTS IMMUNIZATION PROGRAMS WITH VACCINES SUPPLIED BY THE TALOQAN VSF
OXFAM
WATER:
Canal
Khanabad
Completed
OXFAM
2 92
7 92
Irrigation channel rehabilitation
PRB
AGRIC:
Vet
City
Completed
UNDP
2 92
6 92
1 DVM / 2 paravets.
RBS
SOCIAL:Animation
Ongoing
::S
1 93 -- -
Training of social animators.
SCA
AGRIC:
Completed
0 92 -- 92
Distribution of 2.4. MT wheat seed & 2.4 MT DAP
1ACBAR
Crop Product
SCA
DATABASE OF IGO ACTIVITIES
Page: 120
A6actrep Date: 27/08/93
-
6TH EDITION I
ACTIVITY
VILLAGE(S) - - --
SECTOR
AGENCY
Kunduz
-- STATUS --
FUNDED
- --BY --
Khanabad
DURATION
tACTIVITY
Begin- -End
Completed
SCA
0 92 -- 92
Provision of 0.24 MT agrochemicals
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 107 villages
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 90 village:
SCA
HEALTH: Compr.Clinic.
Hayat Abad
Ongoing
SCA
SCA
HEALTH: Basic Clinic
Ihanabad
Ongoing
SCA
1 85 -- --
UFO
EDJCAT: Primary
Ongoing
ga._ .
AID
7 St
\:T
C.1 .i.
CONTI:
Road
7 ltarjai
:..,._....!
VITA
CONST:
Road
Lalaki
Discontin
AID
VITA
CONST:
Road
Char Toot
Discontin
AID
9 92. -- --
VITA
CONST:
Road
Now Deh
Discontin
AID
11 90 -- --
VITA
CONST:
Bridge
Khanabad
Ongoing
AID
VITA
WATER:
Canal
Chuqur Qashlaq
Discontin
AID
11 90 -- --
Cleaning of 6 km canal, benefit 400 families.
VITA
WATER:
Canal
Angel Bashi
Discontin
AID
11 90 -- --
Cleaning of 5 km canal, benefit 80 familiea
WATER:
Canal
Banas
Discontin
AID
11 90 =- -
Cleaning of 8 km canal, benefit 3,000
.VITA
VITA
WATER:
Canal
Boien
Ongoing
AID
11 90 -- --
Cleaning Of 6 km canal, benefit 100 families
WATER:
Canal
Bosazai/Shorab
Discontin
AID
11 90 -- -
Cleaning of 6 km canal, benefit 200 families.
VITA
WATER:
Canal
Boien Agtash
Discontin
AID
11 90 -- --
Cleaning of 6 km canal, benefit 100 families
VITA
VITA
WATER:
Canal
Agtash
Discontin
AID
11 90 -- --
Cleaning of 8 km canal, benefit 200 families
VITA
WATER:
Canal
Dara Shorab
Discontin
AID
11 90 -- --
WATER:
Canal
Iorochi
Discontin
AID
11 90 -- --
.Cleaning of 6 km canal, benefit 100 families
VITA
WATER:
Canal
Jangal Bashi
Discontin
AID
11 90 -- --
Cleaning of 6 k canal, benefit 86 families
VITA.
SCA
AGRIC:
Plant Protec
.SCA
AGRIC:
SCA
--
t,{ s:R,w!`P
1
A C B A R
1 MD, 1 nurse, 5 mid -level HWs, 1 i-ray tech.,
11 89 -- -
6
DESCRIPTION>
i dental tech
3 mid -level HWs
schools in different `.'ill9g°s
Rehabilitation of 22 km road, benefit 20C families,
--
Rehabilitation of 2 km road, benefit 100 families
11 90 -- -
Rehabilitation of 5.7 km road, benefit 1,429 families,
Rehabilitation of 6 km road, benefit 200 families
Construction of 19 m bridgeístone & concrete), benefit 14,285 families
,
families.
Cleaning of 6 km cañal, benefit 200 families
DATABASE OF NGO ACTIVITIES
Page: 121
A6actrep Date: 27/08/93
6TH EDITION
-_J
1
ACTIVITY
AGENCY
SECTOR
---- VILLAGE(S) - - --
FUNDED
-- STATUS --
DURATION
- --BY --
Begin- -End
<ACTIVITY
VITA
WATER:
Canal
Niakpi
Discontin
AID
11 90 -- --
Cleaning of 4.5 km canal, benefit 100 families.
VITA
WATER:
Canal
Eshanha
Discontin
AID
11 90 -- --
Cleaning of 4 km canal, benefit 200 families.
;:TA
WATER:
Canal
Agtash
Discontin
AID
11 90 -- --
Cleaning of 7 km canal, benefit 500 families.
32 villages
Ongoing
EC /UNICF
Kunduz
DESCRIPTION>
Kunduz
AVICEN
HEALTH:.Vaccination
^ ;;
CONST:
Pub.Building
Gul Tepa
Approved
WHO
2CA
AGRIC:
Vet
Kilachi banani
Discontin
Dutch G.
HEALTH: Basic Clinic
Ghourdaz
Ongoing
TIRf
:SRA
INCOME: Help Vulner.
Kunduz
Ongoing
ISRA
9 92 -- --
EWA
INCOME: Help Vuiner,
Center
Ongoing
CIDA
-- 92 -- 93
Orphans training.
MSH
HEALTH: Compr.Ciinic
Gor Tapa
Ongoing
AID
10 88 -- --
i NURSE, i MED. TECH.
MSH
HEALTH: Ccmpr,CC::..ic
Malarghi
Ongoing
AID
1 88 -- --
MSH
HEALTH: Basic Post
Kunam
Ongoing
AID
11 87 -- --
MSH
HEALTH: MCH
Qochi
Ongoing
AID
9 91 -- --
3 Nurses; 1 Room; women / children 5 care; health education. and Dai training programs.
MSH
HEALTH
Mahajer Seh Darak
Ongoing
AID
1 93 -- --
2 MV / 1 Nurse,
MS::
HEALTH: Vaccination
Center
Ongoing
OXFAM
INCOME: Skill Train.
Center
OXFAM
RELIEF:Help Returnee
OXFAM
WATER:
FRB
MCH
1 team - 3 vaccinators
--
-- 93 -- --
9 89
Basic health center (4 rooms).
1 paravet.
1 93
--
1 BHU.
Assistance-to 875 orphans(monthlp allowance I health / education / clothing ! foot -wear etc).-
3 ROOMS, 3 BEDS
1 MD, 2 MED.TECH,1 LAB TECH ASST., 1 BHW
4 ROOMS 6 BEDS, LABORATORY
12 BHWs
1 Dai -Woman I children under 5 care, health education and Dai training program.
AID /UN
10 89 -- --
COVERED BY TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.
Completed
OXFAM
12 91 12 92
Women's vocational training in carpet weaving.
Center
Completed
OXFAM
10 91 12 92
Assistance with transport costs + protection for unregistered refugees returning from Baluchistan.
Canal
Asgalan
Completed
OXFAM
12 91 12 92
Irrigation channel rehabilitation.
AGRIC:
Vet
Bander Cbardara
Completed
UNDP
12 91
SCA
AGRIC:
Crop. Product
Ongoing
SCA
SCA
AGRIC:
Plant Protec
Ongoing
SCA
IACBAR
.
.
6 93
VFU with 1 DVM, 2 paravets & i guard providing veterinary services to the whole district.
0 93 -- 93
Distribution of 1.32 MT rice seed.
0 93 -- 93
Provision of 0.165 MT agrochemicals.
DATABASE OF NGO ACTIVITIES
Page: 122
A6actrep Date: 27/08/93
--- - -- 6TH EDITION
ACTIVITY
AGENCY
SECTOR
Kunduz
- - -- VILLAGE(S) - - --
- - -BY --
DURATION
Begin --End
<ACTIVITY
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
AGRIC:
SCA
EDUCAT: Primary
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
VITA
CONST:
Road
VITA
WATER:
VITA
VITA
--
Completed
SCA
0 92 -- 92
Provision of 0.165 MT agrochemicals.
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 79 villages.
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 79 villages.
Funduz
Ongoing
SCA
-- 93 -- --
Taloka /Aeheen
Ongoing
SCA
9 88 -- --
4 mid -level HWs.
Ongoing
AID
7 87 -- --
6 schools in lanum(2), Temiur Archan, Gui Tapa, Tapa Buride & Hazrat Sultan.
30 villages
Ongoing
AID
1 93 -- --
Rehabilitation of 25 km road, benefit 5,000 families.
Canal
Galach Got Tapa
Discontin
AID
6 92 -- --
Cleaning of 12 km canal, benefit 1,142 families,
WATER:
Canal
Bagh Meri
Discontin
AID
11 90 -- --
WATER:
Canal
Asgalan
Discontin
AID
7 92 -- --
Cleaning of 18 is canal, benefit 1,714 families.
Ongoing
SCA
0 93 -- 93
Provision of 0.266 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
Ongoing
AID
7 87 =- --
2 schools in Eulukh Tapa & Tarmuz Guzar villages.
Completed
FAO
12 91
FAO/UNDP
11 92 -- 92
Multiplication of 5 MT wheat seed & 5 MT DAP.
FAO
12 91 12 92
Distribution of 10 MT wheat seed / 9 MT DAP to 400 families in 6 villages.
Kunduz
Qala
SCA
AGRIC:
Plant Protes
SCA
AGRIC:
Other
ONO
EDUCAT: Primary
Lag/man
11 schools
Cleaning of 8 km canal, benefit 352 families.
Zal
--
Ali rig ear
AGRIC:
Fruit Trees
APWO
AGRIC:
Crop Product
8 villages
Completed
APWO
AGRIC:
Crop Product
--
Completed
ARCON
AGRIC:
Crop Product
Broy
Ongòing
ARGON
--
Main crops
ARCO,'
AGRIC:
Crop Product
Badi Abad
Ongoing
ARCON
--
Main crops
ARCON
CONS!:
Bridge
Bozi
Ongoing
ARGON
--
Construction of Abo,Zay bridge.
ARCON
CONST:
Bridge
binda
Completed
ARCON
--
Repair of linda bridge.
"
DESCRIPTION>
Kunduz
SCA
AFS
FUNDED
-- STATUS --
ACBAR
.
2 92
Fruit tree distribution: 3,000 apricot, 1,500 peaches, 500 almond, 500 plums, 500 pears.
DATABASE OF NGO ACTIVITIES
Page: 123
A6actrep Date: 27/06/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- - -BY --
DURATION
tACTIVITY
Begin- -End
DESCRIPTION>
Alingar
Laghman
ARCON
CONST:
Pub.Building
Alingar
Completed
ARCON
--
Construction of Alingar governor office
ARGON
CONST:
Pub.Building
Badi Abad
Ongoing
ARCON
--
Construction of Badi Abad secondary school
ARCON
CONST:
Pub.Building
Alingar
Completed
ARCON
--
Construction of Alingar municipality
ARCON
WATER:
Karez
Shekb Sahez
Completed
ARCON
--
Rehabilitation of Singer Karez
DCA
AGRIC:
Vet
Besram
Ongoing
Dutch G.
4 91 -- --
1 paravet
DCA
AGRIC:
Vet
Adar
Ongoing
Dutch G.
4 91 -- --
1 paravet
GAF
HEALTH: Vaccination
Ongoing
UNICEF /S
-- 92 -- --
Mobile vaccination teat with 3 vaccinators,
IHSAN
WATER:
Karez
Lower Sangar
Ongoing
WFP
-- 93 -- --
Rehcñiiitation of 5 karezes + repairing of tunnel & well (FFW -48 MT wheat)
ION
WATER:
Karez
Sangar
Ongoing
WFP
-- 93 -- --
Rehabilitation of 8 karezes + repairing of tunnel & well (FFW -5O MT wheat).
TIRO
HEALTH: Basic Clinic
Noorlam /Alingar
Ongoing
IIRO
-- -- -- --
A BRU in Alingar village & a First Aid Post in Alingar village.
LRO
AGRIC:
Crop Product
Sav /Salab /Iuïman
Completed
CIDA /FAO
12 92
LRO
AGRIC:
Crop Product
Sangar- Sufla /landa
Ongoing
FAO
6 93 12.93
Distribution of 0.1 maize seed / 0.5 MT fertilizer & rice seed for multiplication
LRO
AGRIC:
Crop Product
Sav /Salab /äulman
Completed
CIDA /FAO
6 92 11 92
Distribution of 10 MT maize seed & fertilizer for 500 women farmers in the mountainous aree:
LRO
AGRIC:
Livestock
Mango-Sangar /Niazi
Completed
TAF
2 92
7 92
Poultry project for 57 widows & disabled families.
LEO
AGRIC:
Livestock
Band -Sufia
Ongoing
TAF
10 92
9'93
Bee keeping project for 30 widows & disabled families
LRO
CONST:
Bridge
3 villages
Ongóing
UNCHS
7 93 -- 94
LRO
WATER:
Structure
Niazi
Completed
CIRA
1 91
7 91
Construction of .4 siphons on Ihowaja Ehel -e -sufla canal, benefit 1,500 farmers
LRO
WATER:
Structure
Adar/Warnata
Completed
CIDA
12 91
5 92
Construction of 1 flume / i siphon & 70 m long of retaining wall, benefit 800 farmers
MADERA
AGRIC:
Crop Product
Alingar
Ongoing
EC /FAO
-- 91 -- --
-
"
Distribution of 21 -25 MT wheat seed & fertilizer for 500 women farmers in the mountainous area
6 93
Repairing of 3 bridges / benefit 500,000 people
Distribution of 1050 Kg improved varieties of wheat seed with 1220 Eg of DAP to 101 farmers / 2240 Kg improved
varieties of maize seed with fertilizer to 389 farmers & 165 Kg summer.& spring vegetable seed.
MADERA
AGRIC:
Fruit Trees
Alingar
Completed
Self
MADERA
AGRIC:
Vet
Alingar
Ongoing
EC /F.Gvt
LCBAR
3 92 -- --
-- 88 -- --
Selling of 1,666 fruit & forest trees
Veterinary treatment selling of medicines & vaccination
DATABASE OF NGO ACTIVITIES
Page: 124
A6actrep Date: 27/08/93
6TH EDITION
AGENCY
SECTOR
Laghman
----VÍLLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin --End
-< ACTIVITY
DESCRIPTION>
"Alingar
varieties.
MADERA
AGRIC:
Research
Alingar
Completed
EC
12 92 -- --
Trials of wheat & maize
MADERA
AGRIC:
Plant Protec
Alingar
Ongoing
EC /F.Gvt
=- 91 -- --
Selling of some agricultural tools & agrochemicals 26 Kg at a subsidised price & 1250 farmers are advised'about the
use of agrochemicals.
MAPERL
AGRIC:
Training
Alingar
Ongoing
EC
-- 92 -- --
Agriculture training of 4 staff.
MADERA
WATER:
Canal
Alingar
Completed
EC
-- 92 -- --
Repairing of 7 canals.
!LAPERA
WATER:
F1oodControl
Alingar
Ongoing
EC /F.Gvt
-
92 -- --
8 different projects for the protection of agricultural land with the help of gabion.
MAI
EDUCAT: Primary
Ongoing
MAI
-- -- -- --
7 schools in Pariana, Badey Abad, Ebwal Sufla, Eolat. Salsb Sufla, Qalatak & Sorwat -
MSH
HEALTH: Basic Post
Ongoing
AID
4 89 -- --
6 BHWs
OMA
MINES:
Awareness
Completed
UNOCHA
6 92 12 92
Safety lessons - 1010
RDA
AGRIC:
Crop Product
Completed
FAO
RDA
WATER:
Structure
Completed
AID
6 92
2 93
ll.wash crossings built
RDM
AGRIC:
Crop Product
7 villages
Ongoing
FAO
10 92
7 93
Multiplication of 5 MT wheat seed & 5 MT DAP
RDM
AGRIC:
Fruit Trees
7 villages
Completed
FAO
10 93 -- --
SC -US
AGRIC:
Other
Ongoing
FAO/UNDP
11 92
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages
SCA
HEALTH: Compr.Clinic
Ongoing
SCA
UNO
EDUCAT: Primary
Ongoing
AID
Laghman
Ehwaja Ehel Ulya
Tingour
people participated
Distribution of 35.5. MT wheat
10 92 -
Distribution of fruit trees apricot 2000 / peaches 500 / plum 1500 & persimon 500:
Monitoring of activities of participating agencies on multiplication improved wheat seed
7 93
I MD / 2 mid -level HW
--
7 schools in 0th Jabar Ehel, Chatla, Raja!, Mondil, Gulmand, Manzgui Badi Abad & Taä villages
1 86 -- --
Alishing
ACDO
AGRIC:
Crop Product
Baku Alishang
Approved
FAO /UNDP
--
--
Rice seed multiplication & distribution program
ACDO
AGRIC:
Crop Product
Basra Alishang
Approved
FAO/UNDP
--
--
Maize seed multiplication & distribution
AMRAN
AGRIC:
Crop Product
Alishang
Ongoing
FAO/UNDP
11 92
IACBAR
7 93
"
program.
Multiplication & distribution of 5 MT improved wheat seed & 5 MT fertilizer
DATABASE OF NGO ACTIVITIES
Page: 125
A6actrep Date: 27/08/93
6TH EDITION I
- - -- VILLAGE(S) - - --
SECTOR
AGKNCY
Laghman
ACTIVITY
FUNDED
DURATION
-- STATUS --
- --BI --
Begin - -End
<ACTIVITY
DESCRIPTION>
Alishing
--
Repairing of Alishing hospital.
ARCON
CONST:
Pub.Building
Aiishang
Ongoing
ARCON
DCA
AGRIC:
Vet
Deb Ziarat
Ongoing
Dutch G.
4 91 -- --
i veterinarian.
DCA
AGRIC:
Vet
Kalatak
Ongoing
Dutch G.
4 91 -- --
2 vaccinators.
GAF
HEALTH: Vaccination
Ongoing
UNICEF /S
-- 92 -- --
TIRO
HEALTH: Basic Clinic
Alishang
Ongoing
TIRO
LRO
WATER:
Structure
3 villages
Completed
CIDA
MADERA
AGRIC:
Crop Product
Alishang
Ongoing
EC /FAO
Mobile vaccination teas with 3 vaccinators.
1 BHU.
8 92
2 93
-- 91 -- --
Construction of 1 retaining wall(30 m) / 2 siphon & 1 flume, benefit 3,000 farmers.
Distribution of 262 If improved wheat seed í 289 Kg DAP ! 560 Kg maize seed ! 27 Kg different of vegetable seed & 126
Kg Urea.
3 92 -- --
Selling cf 1,650 fruit & forest trees.
MADERA
AGRIC:
Fruit Trees
Alishang
Completed
FAO
MADERA
AGRIC:
Vet
Alishang
Ongoing
EC
-- 88 -- --
Veterinary treatment. selling of medicines & vaccination.
MADERA
AGRIC:
Research
Alishang
Ongoing
EC
-- 91 -- --
Trials of wheat & maize varieties.
MADERA
AGRIC:
Plant Protec
Alishang
Ongoing
EC
-- 91 -- --
Selling of 30 bB agrochemicals at a subsidised price.
AGRIC:
Training
Alishang
Ongoing
EC!F.Gvt
-- 91 -- --
Training of 2 agriculture technicians in seed multiplication.
MADERA.
MADERA
AGRIC:
Other
Alishang
Ongoing
EC /F.Gvt
-- 91 -- --
Extension work for veterinary treatment & agrocbericals.
MADERA
WATER:
Canal
Alishang
Completed
EC
MAI
&DUCAT: Primary
Ongoing
MAI
MSH
HEALTH: Cospr.Clinie
Sabrabad
Ongoing
AID
1 89 -- --
1 MD, 1 LAB TECH ASST.
MSB
HEALTH: Basic Post
Deb Gazi
Ongoing
AID
4 89 -- --
3 BHW
MSH
HEALTH: MCH
Kalatak
Ongoing
AID
1 92 -- --
2 Med.Tech. 1 Dai, 2 Rooms, women / children under 5 care:
RDA
WATER:
Canal
Ongoing
WFP
3 93 -- 93
Rehabilitation of 19,300 linear M canal - benefit 1,597 families.
SC -US
AGRIC:
Other
Ongoing
FAO/UNDP
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
ACBAR
--
7 92
1 93
-- -- -- -
11 92
7 93
0 93 -- 93
Repairing of 2 canals.
'9 schools in Islamabad, Chamdal, bared, Patiq, noia, Keel, Neel,
Zar basar & Dawlat Shah.
5 ROOMS, LABORATORY
health education and Dai training programs.
Monitoring of activities of participating agencies on multiplication improved wheat seed.
Provision of 0.08 MT agrocheaicals.
DATABASE OF NGO ACTIVITIES
Page: 126
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Laghman
---- VILLAGEUS) -- --
-- STATUS --
FIRMED
- --BY --
DURATION
<ACTIVITY
Begin - -End
DESCRIPTIOit>
Alishing.
--
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochemicale.
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 75 villages.
Ongoing
SCA
2 90 -- --
3 MD / 6 mid -level His / 1 Dental Tech. / 2 Lab Tech. 1 X-ray Tech.
Ongoing
AID
6 87 -- --
14 schools in different villages.
9 91 -- --
1 DM. 1 NURSE. 1.LAB. TECH. ASST.
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
AGRIC:
SCA
HEALTH: Compr.Clinic
UNO
EDUCAT: Primary
Islamabad
Dawlateha
Laghman
MSH
HEALTH: Compr.Clinic
Dawlat Shah
Ongoing
AID
MSH
HEALTH: Basic Post
Noorah Dawlat Shah
Ongoing
AID
MSH
HEALTH: MCH
Kashwak Najeei
Ongoing
AID
4 92 -- --
1 MD, Ilurse
SCA
AGRIC:
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Completed
AMI
5 93
6 93
Health survey of existing facilities.
5 92
6 93
Advocacy / awareness / registry & feasibility studies on disabilities.
Other
2 BHWs
2 Rooms: women / children under 5 care: health education and Dai training program.
Laghman
Laghman
AMI -A
HEALTH: Other
FWSAD
SOCIAL :Other
All parta
Completed
TAF
MSF -H
HEALTH: Other
All parts
Ongoing
NSF
RDA
RELIEF:Food Items
Completed
WFP
SOS -PG
INCOME: HelpCraftmen
Ongoing
EC
Monitoring A technical evaluation of microscopista.
-- 93 -- -
Distribution of 200 MT wheat and other goods.
1 93
6 94
Provision of toolkits & credit facilities to small enterprises.
251 of the beneficiaries are selected from
vulnerable groups.
SOS -PG
INCOME: Skill Train.
Laghman
Ongoing
EC
1 93
6 94
Training of 26 trades by placement in apprenticeship.
--
7 91
Free distribution of 124 NT vbeat to 1240 families.
Mehterlam
AB
RELIEF:Food Items
Mehtarlam
Completed
WFP
APWO
WATER:
Canal
9 villages
Approved
WFP
APWO
WATER:
Canal
12 villages
Ongoing
WFP
-- 93 -- --
4 93 --
_
IACBAR
DATABASE OF RGO ACTIVITIES
Page: 127
f
A6actrep Date: 27/08/93
6TH EDITIOR 1
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin- -End
Mehterlam
Laghman
6 93
Training of 20 students in carpentry & 20 studente in masonry (4 soothe).
Bazaar
Completed
CIDA
--
Ongoing
ARCON
Ongoing
ARCON
--
Animal food
Mehterlam
Ongoing
ARCON
--
Sheep fare
Pub.Building
lehterlam
Ongoing
ARCON
--
Construction of-education center
CONST:
Pub.Building
Mehterlam
Ongoing
ARCON
--
Construction of Islamic center
ARCON
CONST:
Pub.Buiiding
Mehteriam
Ongoing
ARCON
--
Repairing of agricultural admin. building
AR^(+N
CONS":
P',b.Buiiding
M?Gt°rî.4m
Ongoing
ARCON
ACON
CONST:
Other
Mehterlam
Ongoing
ARCON
-- -- -
ARCON
INCOME: Skill Train.
Mehterlam
Ongoing
ARCON
-- -- -- -
ARCON
WATER:
Canal
Mehterlam
Ongoing
ARCON
ARCON
WATER:
Other
Mehterlam
Ongoing
ARCON
ARR
RELIEF:Food Items
Mehterlam
Completed
WFP
ATA /AP
HEALTH: Other
Approved
*Donors
ATC
HEALTH: Mobile /F -Aid
Sarandoi
Ongoing
UNOCHA
-11 92 -- --
ATC
MINES:
Clearance
Dalii Alingar,' eya
Completed
UNOCHA
12 92 12 92
CAS
AGRIC:
Crop Product
Center.
Ongoing
FAO
5 93 -- --
Multiplication of 3.5 MT rice, maize & DAP
DCA
AGRIC:
Vet
Mohd Ehel
Ongoing
Dutch G.
4 91 -- -
1 paravet
DCA
AGRIC:
Vet
Mehterlam
Ongoing
Dutch G.
4 91 --
1 paravet
GAF
HEALTH: Vaccination
Ongoing
UNICEF /S
IIRO
HEALTH: Basic Clinic
Maiden'
Ongoing
IIRO
ISRA
HEALTH: Compr.Clinic
Mehterlam
Ongoing
ISRA
ARCAR
INCOME: Skill Train.
ARCON
AGRIC:
Crop Product
ARCON
AGRIC:
Livestock
ARCON
AGRIC:
Livestock
ARCON
CONST:
ARCON
'.ACBAR
DESCRIPTION>
2 93
Main crops
Repairing of Menterlam mosque
--
Repairing of electricity station.
Al -Moor center
Repairing of Laghian canal
--
Rehabilitation of water station
4 92
Distribution of 500 MT wheat
-- 93 -- --
Tuberculosis control program.
4 92
-- 91 -- --
6 nurses I 1 MD / treat definers & local people
Destroyed 66 devices, cleared 24456 S4: agri.land & grazing land
Mobile vaccination tea: with 4 vaccinators
1 BHU
9 92 -- --
1 MD I 1 medical assistant / 1 lab tech. / helper
DATABASE OF NGO ACTIVITIES
Page: 128
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Laghman
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin - -End
DESCRIPTION>-
tiehterlam
ISRA
INCOME: Help Vulner.
Mehterlaa
Ongoing
ISRA
8 92 -- --
Assistance to 348 orphans(ionthly allowance / health / edacatio: / clothing I foot -wear etc).
LR^
CONST:
Center
Ongoing
DACHS
6 93 10 93
Provision of 800 doors & 800 windows for 800 manilla
MAI
EDUCAT: Primary
Ongoing
MAI
-- -- -- --
4 schools in Haider Beni, Maidani, Qadaba & Hakim Abad.
MCPA
MINES:
it ainefields
Completed
UNOCRA
11 92 12 92
236,059 age residential / agr.land / canals / roads & grazing lands
MSH
HEALTH: Basic;Post
Kalakoat
Ongoing
AID
3 88 -- --
MSH
HEALTH: Vaccination
Mehterlaa
Ongoing
AID/UN
3 93 -- --
Shelter
Survey
10 BHWs
4 VACCINATORS UNDER PMD SUPERVISION COVER 14 VILLAGES IN M ITIRLAM (901) AND ALISHING (905) DISTRICTS IN LAGHMAN
PROVINCE.
TARGET GROUPS: CHILDREN 0 -2 TEARS AND WOMEN 5 -45
SCA
AGRIO:
Crop Product
Ongoing
SCA
0 93 -- 93
Distribution of 0.66 MT rice seed
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemical!
SCA
AGRIC:
Plant Protes
Completed
SCA
0 92 -- 92
Provision of 0.34 MT agrochemicals
SCA
AGRIC:
Other
Completed
SCA-
0 92 -- 92
Agriculture survey on 90 villagee
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages
SCA
HEALTH: Coapr.Clinic
Manjuaa
Ongoing
SCA
4 90 -- --
2 MD / 4 aid -level Hs / i Nurse
SCA
WATER:
30 villages
Ongoing
SCA/UNIC
1 93 12 93
100 wells - benefit 2,000 faailies
SOS -PG
EDUCAT: Teacher T.
-
Ongoing
EC/B.Ovt
-- 84 -- --
SOS -PG
INCOME: RelpCraftaen
Bazaar
Ongoing
IC
Drinking
TEARS
Through resource centers in schools / two A half :oath courses ; 15 day seminars & practical work in classrooms
,
1 93
6 94
Provision of 'toolkits & credit facilities to small enterprises.
252 of the beneficiaries are selected from
vulnerable groups
SOS -PG
INCOME: Skill Train.
UNO
EDUCAT: Primary
Bazaar
Ongoing
IC
193
Ongoing
AID
6 88 -- --
Training of 26 trades by placement in apprenticeship
6 94
11 schools in Nalawai, betel, Baraal, Sayed Qala, Noora, Mnnjaaan, Basraa, Maiden Rodet, Khan Qala, Fatehulla &
Hakiaabad.
Laghman
tit) oriettali
DCA
AGRIC:
MAI
EDUCAT: Primary
IACBAR.
Vet
Teteen
Ongoing
Dutch G.
il 92 -- --
1 vaccinator
Nadho
Ongoing
MAI
-- -- -
1 school
--
DATABASE OF NGO ACTIVITIES
Page: 129
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Laghman
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
< ACTIVITY
- --BY --
Begin --End
12 90 -- --
DESCRIPTION)
Nooristan
ASH
HEALTH: Basic Post
boltan
Ongoing
AID
KPO
INCOME: HelpCraftmen
Nooristan
Completed
NRC /NCA
1 91 12 91
Help to skilled craftsmen.
RAFA
COAST:
Road
Dìff. villages
Ongoing
WFP
3 93 -- --
Pedisterial road construction 2nd stage.
RAFA
COAST:
Road
Completed
WFP
SCA
HEALTH: Compr.Clinic
Ongoing
SCA
6 89 -- --
1 MD / 5 mid -level HWs / 1 Nurse
UNO
EDUCAT: Primary
Ongoing
AID
6 88 -- --
2 schools in Pajkal & shaman villages.
liangarach
--
10 91
1 92
3 BMWs
Rehabilitation of 17 km road - Menjan- Pashal by hand tools - 3 local culverts.
Qarghaie
Laghman
AMRAN
AGRIC:
Fruit Trees
Bolan
Completed
FAO /UNDP
3 93
3 93
Distribution of 5,000 fruit tree saplings.
APWO
AGRIC:
Crop Product
10 villages
Completed
FAO
1 91
1 91
Multiplication of 8 MT sugar care & 3 MT DAP.
APWO
AGRIC:
Crop Product
10 villages
Completed
FAO
1 91
1 92
Distribution of 10 MT DAP, 10 MT urea to 188 farmers.
APWO
AGRIC:
Fruit Trees
7 villages
Completed
FAO
2 92
2 92
Distribution of 6,000 fruit trees to 260 farmers.
APWO
WATER:
Drinking
10 villages
Ongoing
ASC
2 92 -- --
ARO
COAST:
Road
Char Bagh
Completed
WFP
2 93
4 93
9 km road, Charbagh to Surkhakan.
ARO
WATER:
Canal
Char Bagh
Completed
WFP
2 93
4 93
Rehabilitation of 8 km canal.
ARR
AGRIC:
Crop Product
53 villages
Completed
SV
9 92
6 93
ARR
WATER:
Canal
Nahri Karim
Completed
RAP
7 92 10 92
Cleaning of canal & gabion work.
CRAA
AGRIC:
Vet
Surkhakan
Ongoing
UNDP
9 92 -- --
Animal vaccination & treatment, 1 DV?! ! 2 paravete & 1 guard.
ESAR
COAST:
Shelter
Ongoing
UNCHS
GAF
HEALTH: Vaccination
Ongoing
UNICEF /S
HAFO
WATER:
Ongoing
HCR
TIRO
HEALTH: Basic Post
Ongoing
TIRO
-- -- -- --
First Aid Post.
ISRA
COAST:
Ongoing
ISRA
-- 92 -- 93
Construction of 1 mosque.
A C B A R
Structure
Pub.Building
Surkhakan
Char Bagh
.
--
-- 91 -- --
--
'Distribution of 18 MT wheat seed / 21 AT Urea & 15 AT DAP.
Manufacture and distribution of 4,000 concrete beams for housing / FFW 12 MT
Mobile vaccintion team with 4 vaccinators.
Construction of protection wall, stone masonry (760 m length
DATABASE OF AGO ACTIVITIES
Page: 130
A6actrep Date: 27/08/93
2 m width / 3 m height.
-- -- 6TH EDITION I
ACTIVITY
---- VILLAGE(S) - - --
SECTOR
AGENCY
Laghman
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin - -End
DESCRIPTION>
©arghaie
75 students & 2 teachers.
ISRA
EDUCAT:, Primary
Qalatak
Ongoing
ISRA
7 93 -- --
ISRA
EDUCAS: Other
Qalatak
Ongoing
ISBA
11 92 -- --
ISRA
WATER:
Drinking
Ongoing
ISRA
MADERA
AGRIC:
Crop Product
Qarghaie
Ongoing
EC
-- 92 -- --
Distribution of 2.6 1g improved vegetable seed / 180 1g DAP & 126 Kg urea.
MADERA
AGRIC:
Crop Product
Qarghaie
Ongoing
FAO
-- 88 -- --
Multiplication of maize / wheat & vegetable seeds.
MADERA
AGRIC:
Fruit Trees
Qarghaie
Ongoing
EC
4 91 -- --
MADERA
AGRIC:
Vet
Qarghaie
Ongoing
EC
-- 88 -- --
MADERA
AGRIC:
Machinery
Qarghaie
Ongoing
EC
6 92 -- --
MADERA
AGRIC:
Research
Qarghaie
Ongoing
EC
-- 91 -- --
Trials of wheat & maize varieties & some agriculture equipment by a subsidised price.
MADERA
AGRIC:
Plant Protec
Qarghaie
Ongoing
ECIF.Gvt
-- 91 -- --
Selling of 24 Kg agrochemicals to control insects & peste.
MADERA
AGRIC:
Training
Qarghaie
Ongoing
EC
-- 92 -- --
Training of farmers on agrochemicals & veterinary - 1,800 farmers are advised.
MADERA
WATER:
Canal
Qarghaie
Completed
WFP
Ni A
EDUCAT: Primary
Kasai Poor
Ongoing
MAI
-- -
MSH
HEALTH: Basic Poet
Zangora Abdurahimz
Ongoing
AID
11 87 -- --
OMAR
MINES:
Awareness
Completed
UNOCBA
6 92 12 92
Safety lessons - 11464 people participated.
SCA
AGRIC:
Crop Product
Completed
SCA
0 92 -- 92
Distribution of 6.65 MT wheat seed, 6.65 MT DAP & 9.4MT Urea.
SCA
AGRIC:
Research
Completed
SCA
0 92 -- 92
1 crop variety testing trial of wheat.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.19 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.25 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
SCA
HEALTH: Compr.Clinic
Ongoing
SCA
ACHAR
--
Dare Lam
Quranic center - 75 orphans i 1 teacher & 1 volunteer.
8 93
5 92
-
1 jerib nursery - selling of 1.650 fruit & forest trees.
Veterinary treatment. selling of medicines& vaccination.
4 tractors working 100 hours per month at a subsidised price.
9 92
7 92
4 shallow wells.
--
Repairing of 4 canals.
1 school.
1 BBW
1 MD ! 6 mid -level HWs
DATABASE OF IGO ACTIVITIIS
Page: 131
A6actrep Date: 27/08/S3
6TH EDITION
ACTIVITY
SECTOR
a4_ " ^v
Logar
ANDS
- - -- VILLAGES) - - --
- STATUS --
FUNDED
DURATION
tACTIVITY
Begin --End
- --BI --
DESCRIPTION>
Azra
CONST:
Pub.Building
Akbar Ebel
Completed
WHO
8 90 11 91
Construction of comprehensive clinic & running cost for 1 year (2 MD / 2 nurses / 1 dispenser / 1 lab tech.
- OPD &
treatment of war injuries).
AR`.
AGRIC:
Crop Product
EMAR
CONST:
Road
EMAP.
CONST:
Pub.Building
AGRIC:
Vet
:Rc'RPA
:RC/RPA
HEALTH: Vaccination
:R"'RPA
WATER:
Canai
Akbar Ehel
Completed
UNDP
5 91 10 91
Completed
CIDA
8 91
7 92
Repair of Tanga- Wuluswali road (10 km), 2 km ret.wall, 6 culverts, 4 washes with hand tools & tractor
Albar Ehel
Completed
ARCON
4 92
9 92
Construction of Madrasa building.
Maroof Ehel
Ongoing
UNDP
6 92 -- --
Ongoing
UNICEF
Completed
S!
Zaman Ehel
Distribution of 20 kg vegetable seed 1 2 MT corn seed / 2 MT fertilizer to 20 farmers
1 Farm Animal Vaccination and Treatment clinic, 2 paravets
on"v,üiting
11 1
9 92 1
. . á'
:ehPC'
:....;t
;nn
x year.
at least .
" Canai.
L'wi
..
tar getting l-2 years children & :ema l e aged 5-45
irrigate 10'
ani-n..s,
HALM C:mrr r.. '.in..
d.zna
Mv:
HEALTH: Basis Post
.B 77
CARL
WATER:
Canal
Mangal
Completed
CIDA
4 91 12 91
OR
WATER:
Structure
Bengal
Ongoing
CIDA
-- 92 -- --
RAFA
CCORST:
Pub.Buiidin
Tatar
Ongoing
ARCON
1 92 -- --
Scbocl building(12 rooms)
RAFA
CONST:
Pub.Building
Osman Ebel
Ongoing
ARCON
1 92 -- --
Mosque building - stone masonry & PCC
RAFA
WATER:
Canal
Completed
WFP
5 91
Rehabilitation of 24 canals - total length 2,200 m
SCA
HEALTH: Basic Clinic
Kasol
Ongoing
SCA
-- -- -- --
5 mid -level HWs.
WRC
AGRIC:
Crop Product
--
Ongoing
FAO
-- -- -- 93
Distribution of 1 MT maize seed / 1.5 MT Urea & 2 MT DAP
WRC
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 93
?.71Prrcir,
Ebel
Rehabilitation of 2.8 km canal & repair of diversion dam
Repair of an aqueduct & a tunnel
9 91
AGRIC:
Crop .roduct
--
Completed
FAO
-- 92 -- 93
WRC
AGRIC:
Crop Product
--
Completed
FAO
-
WRC
AGRIC:
Fruit Trees
--
Ongoing
FAr
-- 9
WRC
AGRIC:
Livestock
--
Discontin
.AG
-- -- -- --
-- -- 92
-- P3
6 ROOMS 4 BEDS. LABORATORY
4BHWs
1187 - - --
WRC
ACHAR
7E7._ . LAB. TECH. A337.
I
benefit :nC families
.
irrigate 3,000 families
Distribution of 32 MT seed & 32 MT DAP
Distribution of 40 MT fertilizer
Distributic: of 80 MT DAP
retribution of 20,000 fruit trees
Fe'ablishment of poultry farm (looted in 91)
DATABASE OF AGO ACTIVITIES
Page: 132
A6actrep Date: 27/08/93
STE EDITION
ACTIVITY
- - -- VILLAGES) - - --
SECTOR
AGENCY
DURATION
FUNDED
< ACTIVIT7
DESCRIPTION:
- - -B7 --
Begin - -End
Ongoing
FAO
-- -- -- --
1 tractor
Completed
FAO
-- -- -- 92
Distribution of 105 MT wheat as emergency food assistance.
11 92
-- STATUS --
Azra
Logar
Machinery
WRC
AGRIC:
WRC
RELIEF:Food Items
Baraki
Logar
Multiplication of 5 MT k 5 MT fertilizer.
7 93
ADAg
AGRIC:
Crop Product
1 village
Ongoing
UNDP
AFRANE
AGRIC:
Machinery
Barati Barak
Ongoing
*Donors
AFRANE
AGRIC:
Research
Baraki Barak
Ongoing
RAP
10 93 -- --
AFRANE
WATER:
Canal
Baraki Barak
Ongoing
UNDP
-- 93 -- 93
Irrigation repair.
AGRIC:
Crop Product
Mohmand/Mashak Ehe
Completed
FAO/UNDP
10 91 '8 92
Distribution of 2MT Pak -81 ! 5 MT Blue Silver / 5MT Urea
AHSAO
ARSAO
AGRIC:
Fruit Trees
Baraki Barak
Completed
FAO/UNDP
AMI -A
CONST:
Pub.Building
Baraki Rajan
Ongoing
AMI -A
HEALTH: Med.Training
--
Ongoing
7 tractors & 5 threshers
-- -- --
-
Variety á agronomical trials to know good variety k proper use of
fertilizer k demonstration plots.
.
2MT DAP in Momand
12 91
6 92
Distribution of 10.000 fruit trees (apple ; apricot ! peach),
AMI/WHO
8 90
8 93
Construction of a 40 bed hospital building (concrete)
AMI
7 92 12 93
Mashak í Nowberja
PE coureú for mid -level. BWs it Logar each session 6 weeks ! 12 students per session ò ;30 students have been trained
so far.
1 92
2 92
Distribution of 100 MT wheat to 252 families
Completed
WFP
Barak( Barak
Ongoing
ARGON
Pub.Building
Baraki Barak
Ongoing
ARGON
--
ARCON
INCOME: Skill Train.
Baraki Barak
Ongoing
ARCON
-- -- -- --
Al -Argaa Bin Al -Argaa
WATER:
Earez
Barak(
Ongoing
ARCON
-- -- -- --
Rehabilitation of Barak karez,
ARCON
ARO
CONST:
Bridge
Deh Mughulan
Ongoing
CIDA
10 92 -- --
40 a foot bridges - 1 beam
CONST:
Pub.Building
--
Approved
CIDA
-- 93 -- 93
Repairing of Shuhada high school (10 rooms)
BDA
CoAR
AGRIC:
Crop Product
Baraki
Ongoing
RAP
-- 92 -- 93
Multiplication of seed & fertilizer
CoAR
AGRIC:
Fruit Trees
Baraki
Ongoing
FAO
-- 92 -- 93
106 so nursery
CONS':
Pub.Building
Baraki
Ongoing
WHO
-- 90 -- 93
Rehabilitation of baratri hospital
CoAR
APWO
RELIEF :Food Items
AEON
GMT:
Pub.Building
ARCOS
CONST:
ACBAR
Construction of Padekhwab Shana intermediate school
Construction of Holy Quran Bouse
'DATABASE OF IG0 ACTIVITIBS
Page: 133
A6actrep Date: 27 /08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR-
Logar
---- VIbLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
Completed
DACAAR
-- 89 -- 90
< ACTIVITY
DESCRIPTION>
Baraki
DACAAR
CONST:
Road
EMAE
CONST:
Pub.Building
Baraki Barak
Completed
ARCON
GAF
AGRIC:
Vet
Baraki Barak
Ongoing
BNZ
11 88 12 93
1 assist DVM / 4 paravets / 2 guards curative & preventive service.
IRC /RPA
HEALTH: Vaccination
Approved
UNICEF
-- 93 -- --
3 mobile vacca visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
ISR!
AGRIC:
Crop Product
Baraki Barak
Ongoing
FAO
5 93 10 93
Distribution of 50 Kg sung bean seed.
ISRA
AGRIC:
Crop Product
Baraki Barak
Ongoing
FAO
5 93 10 93
Distribution of 0.5 MT rice seed & 0.75 MT DAP for multiplication.
ISEA
AGRIC:
Crop Product
Baraki Barak
Ongoing
FAO /UNDP
ISRP.
EDUCAT: Primary
Baraki Barak
Ongoing
ISRA
3 93 -- --
i .school for orphans - 120 students & 3 teachers.
ISRA
HEALTH: Compr.Clinic
Baraki
Ongoing
ISRA
9 92 -- --
1 MD / 1 medical assistant / 1 lab tech.
MSH
HEALTH: Basic Clinic
Baraki Rajan
Ongoing
AID
5 88 -- --
2 NURSES, 2 BHWS
MSH
HEALTH: Basic Post
Chalozai
Ongoing
AID
3 88 -- --
21 BMWs
MSH
HEALTH: MCH
Baraki Barak
Ongoing
AID
1 90 -- --
.1 Diploma Nurse 1 Dai / 10 Rooms; Women ! children under 5 care; health education, Voluntary Health Sister (VHS) and
4 92
11 92
Repair of 15 ks road from Cbarkh to Baraki.
9 92
Construction of 1 secondary school building (18 rooms) - concrete.
7 93
Distribution of 5 MT DAP & 5 MT wheat seed to 200 farmers - 200 jeribs.
helper.
3 ROOMS 2 BEDS
Dal training programs.
MSH
HEALTH: MCH
Chalozai
Ongoing
AID
MSH
HEALTH: Vaccination
Beraki
Ongoing
AID/UN
10 92 -- --
9 88 -- --
1 MCHO,
Women I children under 5 care; health. education.
5 VACCINATORS COVER 121 VILLAGES IN BARAKI DISTRICT (501) OF LOGAR PROVINCE.
TARGET GROUPS: CHILDREN -0-2 YEARS AND
MORN 5 -45 IIARS.
KPO
INCOME: HelpCraftien
OMAR
MINES:
Awareness
RAR
WATER:
Karez
Baraki
Completed
NRC /NCA
1 91
Baraki
Completed
UNOCHA
6 92 12 92
D villages
Ongoing
UNDP
6 91
-- 93 -- 93
Help to skilled craftsmen.
Safety lessons - 151 28 people participated.
Rehabilitation of 9 karezes (Abzokh Payn / Abzokh Bal I Zarsang 1
/ Zarsang 2 / Kata Sanag / Sajawand Kalan / Baladah
/ Ebwaja Shekhan I Alif Khan).
RAH
WATER:
Karez
18 villages
Ongoing
UNDP
--
RAH
WATER:
Karez
18 villages
Ongoing
UNDP
-- 93 -- 93
Karez rehabilitation.
Rehabilitation of 18 karezes (Sadyed Inaytuliah Sohìb Zada ! M.Ghani I Bangash I Mola Inaan ford i Mola Inaam ! Kam
I Balan'/ Pera Khel Kalan / Pera Ihel Khord / Quorban Kalan I Quorban ford / larval / Basher / Kabos KhordBabos Kalan
/ ford Iharr ! Kalan Kharr / Narredaly).
DATABASE OF IGO ACTIVITIEF
Page: 134
- - --
A6actrep Date: 27/08/93
6TH EDITION
SECTOR
AGENCY
Logar
VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
- -BY --
Begin- -End
tACTIVITY
DESCRIPTION>
Baraki
Rehabilitation of 15,000 linear
canal - benefit 3.000 farming
famili
RDA
WATER:
Canal
Baraki
Approved
WFP
7 93
RDA
WATER:
FloodControl
--
Ongoing
WFP
6 93 10 93
RDW
AGRIC:
Crop Product
--
Ongging
FAO
-- -- -- --
Distribution of 10.2 MT improved wheat seed / 10 MT DAP / 10 Urea
RDW
AGRIC:
Crop Product
--
Ongoing
FAO
--
Distribution of 2.7 MT improved wheat seed / 3 MT DAP i 5 MT Urea
SC -US
AGRIC:
Other
Ongoing
FAO/UNDP
SCA
AGRIC:
Crop Product
Ongoing
SCA
0 93 -- 93
Distribution of 66.5 MT wheat seed
SCA
AGRIC:
Research
Completed
JCA
0 92 -- 92
11 crops variety testing trials of wheat, barley & triticale.
SCA
AGRIC:
Research
Ongoing
SCA
(i
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision cf . agrochemicals
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.13 MT agrochemicals
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 80 villages
SCA
EDUCAT: Primary
Qalai Gul
Ongoing
SCA
7 86 -- --
8 schools / 55 teachers / 1380 students
SCA
EDUCAT: Primary
Chalozai
Ongoing
SCA
7 90 -- --
5 schools / 35 teachers / 850 students
SCA
EDUCAT: Primary
Baraki Barak
Ongoing
SCA
5 87 -- --
9 schools / 60 teachers / 1450 students
SCA
EDUCAT: Primary
Qalai Mai
Ongoing
SCA
4 86 -- --
6 schools 139 teachers / 1080.students
Sbekhi
Ongoing
SCA
-- -- -- --
SCE
;
ALTH: Compr.Clinic
--
11 92
9 93
7 93
93 -- 93
M
Construction of 750 M retaining wall
Monitoring of activities of participating agencies on multiplication of improved wheat seed.
4 crops variety testing trial of dry beans, 11 of wheat.
1 MD, 2 mid -level HWs, 1 lab tech., 2 vaccinators, 1 first -aider
SCA
! IEALTH: Basic Clinic
Qalai Nahib
Ongoing
SCA
8.89 -- --
3 mid -level HWs
SCA
HEALTH: Basic Clinic
Babors
Ongoing
SCA
5 86 -- --
3 nurses. 6 mid -level HWs. 1 dental tech
SCA
HEALTH: Basic Clinic
Shah Mazar
Ongoing
SCA
3 88 -- --
3 mid -level HWs / 2 Dental Tech./ 1 Lab Tech,
SCA
HEALTH: Basic Clinic
Baraki Rajan
Ongoing
SCA
SCA.
HEALTH: Basic Clinic
Cbehltan
Ongoing
SCA
ACBAR
-- -- -- -
3 89 -- --
1 nurse, 4 mid -level HWs
8 mid -level HWs / 1 Nurse i 1 Dental Tech./ 1 Lab Tech
-- DATABASE OF NGO ACTIVITIES
6TH EDITION
1
Page: 135
ASactrep Date: 27/08/93
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGES) - - --
FUNDED
DURATION
- -BY --
-- STATUS --
:ACTIVITY DESCRIPTION>
Begin- -End
Baraki
Logar
SCA
HEALTH: Basic Clinic
Charahi Deh Shekh
Ongoing
SCA
8 89 -- --
1 nuree..4 mid -level HWe
SCA
HEALTH: Basic Clinic
Deb Doshanba
Ongoing
SCA
5 89 -- --
5 mid -level HWs,
SCA
HEALTH: Basic Clinic
Pandeh
Ongoing
SCA
SCA
HEALTH: Basic Clinic
Akhund Ehel
Ongoing
SCA
HEALTH: Basic Clinic
Dasht Charkh
UNO
EDUCAT: Primary
1 dental tech
-- -- -- --
3 mid -level HWs
SCA
11 87 -- --
8 mid -level Hs
Ongoing
SCA
9 88 -- --
6 mid -level HWs / 2 Nurses
Ongoing
AID
3 87 -- --
39 schools in different villages
Rehabilitation of 31 km road from Baraki Rajan to Padkhab, benefit 14.285 families
.
`
1 Lab Tech
CONST:
Road
Baraki Rajan
Discontin
AID
8 91 -- --
TA
MET:
Road
Qaiai Amir
Discontin
A :D
-- -- --
VITA
CONST:
Bridge
Qalai Bala
Completed
AID
VITA
CONST:
Bridge
Tagab
Ongoing
AID
VITA
CONST:
Bridge
Chehitan.
Completed
A:D.
VITA
CONST:
Bridge
Qalal Amir
Discontin
AID
VITA
CONST:
Bridge
Sayed Jan
Ongoing
AID
VITA
WATER:
Canal
Qalai Shadi Ehel
Ongoing
AID
10 92 -- --
Cleaning of 27 ka canal, benefit 14,286 families
VITA
WATER: - FldodControl
AID
11 92 -- --
Construction of 84.1 retaining wall(gabion work), benefit 38 families
Free distribution of 60 MT wheat to 600 families
VITA
.
Logar
'
-- --
--
--
9 92
--
-- -- -
Zaqum,Ehel
Ongoing
Eharwar
Completed
WFP
-- --
V
9 92
.
Rehabiliteion cf_11 km road. benefit 1,:00 fam.ilies.
Construction of 15 m bridgeiconcrete & aasonryi, benefit 1428 families
-
Construction of 24 m bridge(concrete & masonry), benefit 200 families
Construction of 8 m bridge (concrete & masonry), benefit 1,500 famiiiea
Construction of 20 m bridgeconcrete & masonry!. benefit 600 families
Construction of 17 m bridge(concrete & masonry), benefit 40 familie6
V
Charkh
AB
RELIEF:Food Items
AFRANE
AGRIC:
Research
Charkh
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety k proper use of fertilizer & demonstration plots
CoAR
AGRIC:
Crop Product
Charkh
Ongoing
RAP /FAO
-- 92 -- 93
Multiplication of seed & fertilizer
CoAR
AGRIC:
Fruit Trees
Charkh
Ongoing
FAO
-- 93 -- 93
106 so nursery
CoAR
AGRIC:
Other
Charkh
Ongoing
RAP /FAO
-- 91 -- 93
Repairing of agriculture machinery
GAF
AGRIC:
Vet
Charkh
Ongoing
1ACBAR
`
BMZ
8 91
7 87 12 93
1 DVN / 4 paravets / 2 guards curative & preventive service.
DATABASE OF NGO ACTIVITIES
Page: 136
A6actrep Date: 27/08/93
6TH EDITION I
AGENCY
SECTOR
.
----VILLAGE(S)--- -
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BI --
Begin- -End
<ACTIVITY
DESCRIPTION>
Charkh
Logar
46 primary school teachers participated in pedagogical seminar
.IRC
EDUCAT: Teacher T.
Charkh
Completed
-SV
1
93
1
93
IRC
EDUCAT: Teacher T.
Charkh
Completed
SV
2
93
3
93
IRC/ PA
AGRIC:
Crop Product
Completed
FAO
10 92
2
93
IRC /RPA
AGRIC:
Crop Product
Ongoing
UNDP
10 92 -- --
iRC'?PA
AGRIC:
.Fruit Treea
Completed
AID
3
93 .4 93
Distribution of 556 saplings to 10 farmers
IRC; RPA
AGRIC:
Fruit Trees
Ongoing
AID_
4
92 -- --
Nursery with 1194 sqm planted with stone fruit r nut / apple seed and cuttings
TRC'R14
AGRIC:
Machinery
Ongoing
AID
6
92 -- --
1 tractor
IRC!RP- -
AGRIC:
Research
Completed
AID /FAO
4
92 12 92
Improved wheat seed trials
IRÇIRPA
AGRIC:
Training
"Ongoing
AID
1
92 -- --
1 -2 day trng in seed must, nurseries, bees, poultry, food preservation, etc, 191 farmers trained
IRC /EPA
AGRIC:
Other
Ongoing
AID
4
92 -- --
Model farm: seed mult, nurseries, vegetables, poultry, bees., farm power
IRCIRPA
HEALTH: Vaccination
Ongoing
UNICEF
4
91 --
IRC/RPA
WATER:
éarez
Ongoing
.SV
IRC/RPA
WATER:
Earez
IRC /RPA
WATER:
Drinking
ISRA
AGRIC:
ISRA
AGRIC:
MAI
EDUCAT: Primary
$SH.
HEALTH; Basic Clinic
MSH
HEALTH: Basic Post
NT
ÁGRIC:
NPO
INCOME: HelpCraftmen
SC -US
AGRIC:
IACBAR
-
--
Mango
.
Mango
Mango
.
éarezgai
Ihojegoor /Ihawro
Completed
SV
Crop Product
Charkh
Ongoing
FAO/UNDP
Crop Product
Charkh
Ongoing
FAO
5 93 10 93
Ongoing
MAI
-- -- -- --
human Bhel
Ongoing
AID
Dazaar Ihwaja Ha
Ongoing
AID
Other
.
Seed multiplication: 0.43 mt wheat, 0.1 st DAP to 9 farmers
3 mobile vans visiting at least 3 x year, targetting 0 -2 years children &
10 91
9
7
6 88
'
Self
Charban
Completed
NRC/NCA
- -
Ongoing
FAO/UNDP
Rehabilitation of 18 karezes, total 16.29 km, irrigate 7625 jeribs, benefit 1888 families
12 92
*Gravity -flow water supply, two systems, benefit 140 families
92 10 92
11 92
93
-
females. aged 5 -45
'Rehabilitation of 2, karezes, total 2.55 km, irrigate 280 jeribs. benefit 48 families
10 91 -- --
SV
Ongoing
Seed distribution: 14.57 mt wheat, 15 mt DAP to 291 families
-:
Completed
Livestock
53 primary school teachers participated in Maths seminar
-
Distribution of 5 MT DAP & 5 MT wheat seed to 240 farmers -. 200 jeribs
Distribution of 0.5 MT rice seed & 0.75 MT DAP for multiplication
10 schools in Ceder, Charkh, Daht, Pingrai Balokhel Shaishir Mel; Shams gala, New Shahr, Blandgul Qala & Eajdara
1 NURSE, 2 MED TECH
11 87 -- --
8 BMWs
-- -- -- --
Honey bee project
i ROOM
91
6
91.
Help to skilled craftsmen
11 92
7
93
Monitoring of activities of participating agencies on multiplication of improved wheat seed
1
DATABASE OF NGO ACTIVITIES
Page: 137
A6actrep Date: 27/08/93
6TH EDITION
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
Logar
ACTIVITY
FUNDED
DURATION
-- STATUS --
- -BY --
Begin- -End
tACTIVITY
DESCRIPTION>
Charkh
Distribution of 50.25 MT wheat seed
Ongoing
SCA
Plant Protes
Ongoing
.SCA
0 93
-- 93
Provision of 0.14 HT agrochemicals
AGRIC:
Other
Completed
SCA
0 92
-- 92
Agriculture survey on 75 villages
SCA
AGRIC:
Other
Ongoing
SCA
0
93 -- 93
Agriculture survey on 70 villages
SCA
HEALTH: Compr.Clinic
Qalai Naw ( Charkh)
Ongoing
SCA
9
88 -- --
2 HD i 5 mid -level HWs ! 1 Nurse I 1 Dental Tech.
SCA
HEALTH: Basic Clinic
Bazaar Charkh
Ongoing
SCA
9
88 -- --
5 mid -level HWs / 1 Nurse
SCA
HEALTH: Basic Clinic
Qalai Nirak
Ongoing
SCA
2
89 --
i nurse, -5 mid -level HWs
SCA
HEALTH: Basic Clinic
Bazaar Charkh
Ongoing
SCA
7
89 -- --
UNO
EDUCAT: Primary
Ongoing
AID
6
87 --
VITA
CONST
Qalai New
Ongoing
Alr
8
91 -- --
SCA
AGRIC:
Crop Product
SCA
AGRIC:
SCA
Bridge
--
0
93 -- 93
-
'
--
.
i PHO
nurse. 3 mid -level HWs
25 schools in different villages
Construction of 62 m bridge(concrete & masonry), benefit 400 families
Khoehi
Logar
Cleaning of eine karezes
AFRANE
WATER:
Karez
Ihoshi
Ongoing
RAP
ARC
AGRIC:
Crop. Product
--
Ongoing
*Donors
4
93 -- 93
Distribution of vegetable seedlings
ARC
AGRIC:
Fruit Treed
--
Ongoing
*Donors
3
93
Distribution of fruit saplings
ARC
AGRIC
Fruit Trees
--
Completed
*Donors
2
93
ARC
AGRIC:
Fruit Trees
Approved
*Donors
8 93
ARC
AGRIC:
Research
Ongoing
*Donors
3
93
8
93
Recording & data from wheat seed triais
ARC
AGRIC:
Research
Approved
*Donors
8
93
8
93
Preparing of seed & fertilizer for next wheat seed trials
ARC
AGRIC:
Plant Protec
Completed
*Donors
2
93
3
93
Testing 2 -3 new method of local material for pest & diseese control
ARC
AGRIC:
Other
Approved
*Donors
9
93 10 93
Preparing of land & sowing
ARC
AGRIC:
Other
Cómpleted
*Donors
2
93
Obtian amount of vegetable seed
ARÇ
AGRIC:
Other
Completed
*Donors
2 93
1 A C B A R
--
-- 93 -- 93
9 93
3
93
10 93
2
93
3 93
Designing extension education for horticulture
Nursery establishment
Designing extension education for vegetables
DATABASE OF NGO ACTIVITIES
Page: 138
.
A6actrep Date: 27/08/93
6TH EDITION i
FUNDED
ACTIVITY
SECTOR
AGENCY
Logar
'
- - -- VILLAGES) - - --
-- STATUS --
- - -BY-
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Khoshi
Construction of 4 mini bridges each length 5 m / tonnage 30 T /material use atone / cement & steel bar.
8'93
3 villages
Ongoing
*Donors
4 93
HEALTH: Basic Clinic
Deh Bala
Ongoing
NOVIB
1 92 -- --
ARC
HEALTH: MCH
Deb Bala
Ongoing
NOVIB
1 92 -- --
ARC
HEALTH: Education
Deh Bala
Ongoing
NOVIB
1'92 -- --
ARC
WATER:
Structure
3 villages
Ongoing
*Donors
4 93
9 93
Construction of 7 outlets each length 10 m / material use stone /cement & gravel
ARC '
WATER:
Structure
3 villages
Ongoing
- *Donors
4 93
9 93
Gabion construction length 100 m ! material use stone & gabion box.
ARC
WATER:
Structure
Deh Bala
Ongoing
*Donors
4 93
7 93..
Construction of 40 m aqueduct / material use stone ! cement
AEC
WATER:
Structure
Deh Palen
Ongoing
*Donors
6 93
9 93
Construction of 13 m intake/material
1RC /RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.75 mt wheat, 0.75 mt DAP to 15 farmers
IRC /RPA
AGRIC:
Crop Product
--
Completed
FAO
10 92
2 93
Seed distribution: 9.25 mt wheat, 9.25 mt DAP to 206 families
IRC /RPR
AGRIC:
Fruit Trees
Karen
Ongoing
AID
4 92 -- --
IRC /RPA
AGRIC:
Fruit Trees
Completed
AID
3 93
IR'C!RPA
AGRIC:
Forestry
Ongoing
AID
4 92 -- --
Nursery with 9,000 cedar and pine seedlings
IRC/RPA
AGRIC:
Machinery
Ongoing
AID
6 92 -- --
1 tractor
IRCÍRPA
AGRIC:
Research
Completed
AID /FAO
4 92 12 92
IRC!RPA
AGRIC:
Training
Ongoing
AID
1 92 -- --
1 -2 day trng in seed mutt, nurseries, bees, poultry, food preservation etc, 203 farmers trained
IRC /RPA
AGRIC:
Other
larezo
Ongoing
AID
4 92 -- --
Model farm: seed eult, nurseries, vegetables, poultry, bees, farm power
IRC /RPA
HEALTH: Vaccination
Center
Ongoing
UNICEF
11 91 -- --
1 static vaccinator in ARC clinic, targetting 0 -2 years children & females 5 -45 years
IRC!RPA
WATER:
Darya Ihan /Suliman
Completed'
SV
10 91
Rehabilitation of 2 karezes, total 2.24 km, irrigate 2100 jeribs, benefit 28), families
MSH
HEALTH: Basic Clinic
Deh Bala
Ongoing
AID
9 90.-- --
MSH
HEALTH: Basic Post
Dubandi
Ongoing
AID
11 87 -- --
NPO
INCOME: HeìpCraftmen
Dubandi
Completed
NRC/NCA
ARC
CONST:
ARC
A C H A R
Bridge'
garez
t
Karezo
Karezo
.
------
8 92
6 91
steel bar & sand
cement & gravel
use stone
Nursery with 1898 som planted with stone fruit
,1
nut / apple seed and cuttings
Distribution of 747 saplings to 11 farmers
4 93
---11 91
i doctore! OPD i dental / lab facility / malaria control ! EPI by IRC
.
Improved wheat seed trill's
1 NURSE, 2 MED. TECH., i BBW
4 ROOMS,DENTAL
2 BHWs
Help to skilled craftsmen.
----- DATABASE OF AGO ACTIVITIES
Page: 139
A6actrep Date :
27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
AGRIC:
SCA
'
-- STATUS --
DURATION
FUNDED
cACTIVITY
Begin- -End
-- -BY --
DESCRIPTION>
Khoshi
Logar
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochemicals
Plant Protec
Completed
SCA
0 92
Provision of 0.155 MT agrochemicalr
Other
Ongoing
SCA
0 93 -- 93
Ongoing
FAO
-- 93 --.93
Ongfing
ARCON
Ongoing
TAF
Logar
--
92
Agriculture survey on 30 villages
Logar
AFRANE
AGRIC:
Crop Product
ARCON
CONST:
Pub.Buiiding
FWSAD"
SOCIAL :Other
ISR!
CONST:
Pnb.Buiiding
Ongoing
ISRA
-- 92
MAMAR
CONST:
Road
Completed
CCSC
-- 92 -- 92
Survey of 150 km road for FRCS
NSF -H
HEALTH: Other
Ongoing
NSF
-- 93 -- --
Monitoring & technical evaluation of microscopists,
Mohd Agha
Ongoing
Pvt
-- 88 -- --
1 tractor & 1 thresher
Mohd Agha
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots
Logar
.
---- VILLAGE(S) - - --
Logar'
-Logar
All Parts
All Parts
liolici
Multiplication of maize r sung bean & rice seed
--
5 92 -- 93
'
Islamic' center
.Advocacy
9 93
awareness /registry & feasibility studies on disabilities
Construction .of 13 mosques in (Baraki Barak
Agha
AFRANE
AGRIC:
Machinery
AFRANE
AGRIC:
Research
ARCAR
INCOME: Skill Train.
Center
Ongoing
UNDP
4 9310 93
ARCON
AGRIC:
Crop Product
Lewa Rocket
Ongoing
ARCON
-- -- -- --
ARCON
WATER:
Karez.
Dara
Ongoing
ARCON
--
Rehabilitation of Dara karez
ARCON
WATER:
Karez
Dado
Ongoing
ARCON
--
Rehabilitation of Dado karez
ARCON
WATER:
Canal
Nar Kaman
Ongoing
ARCON
--
Rehabilitation of Nar Eamran canal
ARCON
WATER:
Canal
Surkhab
Ongoing
ARCON
-- -- -- --
ARCON
WATER:
Canal
Dehnaw
Ongoing
ARCON
ARCON
WATER:
Canal
Zarghon Shahr
Ongoing
ARCON
ARO
AGRIC:
Crop Product
Mohd Agha
Ongoing
FAO/UNDP
lACBAR
.
Charkh / Puli Alas)
Training of 50 students in carpentry & 50 students' in masonry (6 months)
Main crops
Rehabilitation of Sorkh tab cans'
Rrhabilitation of Dehnaw canal
Rehabilitation of Zarghon Shahr canal
--
12 92 -- --
Multiplication of 5 MT wheat.
DATABASE OF NGO ACTIVITIES
Palle,
140
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
Logar
- - -- VILLAGES) - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Mohd Agha
6 93
Cleaning of 13 canals - benefit 950 farmers
ARC
WATER:
Canal
Dehnaw
Completed
RAP
9 92
ATC
MINES:
Clearance
4 villages
Completed
UNOCHA
9 92 11 92
CARE
CONST:
Other
Mohd Agha
Completed
AID&WFP
0
0
0 92
Renovation of Office / Warehouse with rooms /capacity of 17 ! 120 Rooms
CARE
WATER:
Larez
Mohd Agha
Completed
AID&WFP
4
0
0 92
Rehabilitation of 73 larezes with total length 185km including other activities.
CARE
WATER:
Canal'
Mohd Agha
Completed
AID &WFP
0
0
0 92
Rehabilitation of 13 Irrigation canals with total length 155km including other activities
-CARE
WATER:
Drinking
Mohd Agha
Completed
AID &WFP
0
0
0 92
Rehabilitation of 3 Springs with total length 3km including other activities
GAF
AGRIC:
Vet
Mohd Agha
Ongoing
UNDP
4 90
6 93
1 DVM ; 2 paravet
IAAAE
CONST:
u
r. Building
Pub
iarghon Shahr
Ongoing
Self
5 92 -- --
IRC!:PA
AGRIC:
.Crop Product
Completed
FAO
10 92
IRCYRPA
AGRIC:
Crop Product
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.81 mt -wheat, 0.15' mt DAP to 17 farmers
IRC'RP.A
AGRIC:
Fruit Trees
Ongoing
AID
11 92 -- --
Nursery. with.1152 sqm Planted with stone fruit 1 nut / apple seed and cuttings
IRC /RPA
AGRIC:
Machinery
Ongoing
AID
6.92 -- --
1 tractor
IRC!RPA
AGRIC:
Training
Ongoing
AID
1 92 -- --
I -2 day trng in seed must, nurseries, bees, poultry, foód preservation etc, 94 farmers trained
IRC /RPA
AGRIC:
Other
Mohd Agha
Ongoing
AID
11 92 -- --
Model farm: seed mult, nurseries, vegetables, poultry, bees, farm power
IRC /RPA
HEALTH: Vaccination
=-
Approved
UNICEF
-- 93 -- --
3 mobile vacca visiting at least 3 z year, targetting 0 -2 years, children & females aged,
ISBA
AGRIC:
Crop Product
Mohd Agha
Ongoing
FAO,NNDP
11 92
IRA
AGRIC:
Crop Product
Mohd Agha
Ongoing
FAO
MAI
DUCAT: Primar;
Ongoing
MAI
-- -
MAWA
AGRIC:
Crop Product
Mohd Agha
Ongoing
FAO.
11 92
MAWA
AGRIC:
Crop Product
Mohd Agha
Completed
FAO/UNDP
-- 92 -- 92
1 MT maize seed
MAWA
AGRIC:
Machinery
MOO Agha
Completed
FAO
-- 91 -
Farm machinery
MAWA
RELIEF:Food Items
Mohd Agha
Completed
WFP
-- 91 -- 92.
Destroyed 770 devices. cleared 112727 Sqm agri.land
grazeland / canal & road comp.
mt
'
1 guard curative & preventive service.
Construction cf high school.
.
IACBAR
'
Mohd Agha
2 93
7 93
5 93 10.93
-- --
8 93
91
Seed distribution: 9.29 mt wheat. 9.29 mt DAP to 185 families
5 -4e
Distribution of 5 MT DAP & 5. MT wheat seed to 200 farmers - 200 jeribs
Distribution of 0.5 MT rice seed & 0.75 MT DAP for
5 schools in Deb Naw, Zarghun Shahr(3) & Fazel
multiplication.
Ehel
Multiplication of 10 MT wheat seed
10 MT wheat for flour
DATABASE OF-NGO ACTIVITIES
Page: 141
A6actrep Date: 27/08/93
6TB EDITION
AGENCY
SECTOR
Logar
-VILLAGE(S) - ---
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Mohd Agha
MCPA
MINES:
EH
Survey
15 minefields
Completed
UNOCHA
HEALTH: Basic Post
Dewalak
Ongoing
AID
RAFA
WATER:
Canal
Diff. villages
Completed
RAP
9 92
1 93
Cleaning of 10,000 m Noh. Agha canal
RAFA
WATER:
Canal
Diff. villages
Completed
RAP
9 92
1 93
Cleaning of 12,000 m of Zerghoon Shar canal
RAF&
WATER:
Structure
;Diff. villages
Completed
RAP
--
RAFA
WATER:
Structure
Diff. villages
Completed
RAP
-- -- -- --
RDA
WATER:
Karez
Ongoing
WFP
SC -Us
AGRIC:
Other
Ongoing
FAO /UNDP
SCA
AGRIC:
Crop Product
Nohd Agha
Completed
SCA
0 92 -- 92
Distribution of 22.92 MT wheat seed & 4.033 MT DAP
SCE
AGRIC:
Crop Product
Nohd Agha
Ongoing
SCA
0 93 -- 93
Distribution of 100 MT wheat seed.
SCA
AGRIC:
Plant Proteo
Zarghon Shahr
Ongoing
SCA
0 93 -- 93
Provision of 0.1 NT agrochemicals.
SCA
AGRIC:
Plant Pmotec
Mohd Agha
Ongoing
SCA
0 93 .-- 93
1 92 12 92
219,254 So agri.land / grazing / agri.canal / irrigation & canal
11 87 -- --
8 BMWs
Construction of canal structures
Construction of canal structures
6 93
8 93
Rehabilitation of 9.300 linear N karez - benefit 230 farming families
11 92
7 93
Monitoring of activities of participating agencies on multiplication Of impioved wheat seed
Provision 0.19 MT agrochemicals
.
SCA
AGRIC:
Plant Protec
Nohd Agha
Completed
SCA
0 92 -- 92
Provision of 0.155 MT agrochemicals.
SCA
AGRIC:
Other
Zarghon Shahr
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages
SCA
AGRIC:
Other
Nohd Agha
Completed
SCA
-- 92 -- 92
Agriculture survey on 88 villages
SCA
AGRIC:
Other
Mohd Agha
Ongoing
SCA
0 93 -- 93
Agriculture survey on 77 villages
SCA
CONS!:
Pub.Building
1 village
Ongoing
SCA
i 93 12 93
Construction of primary school
SCA
HEALTH: Basic Clinic
Surkhab
Ongoing
SCA
8 88 -- --
1 mid-level HW
SCA
HEALTH: Basic Clinic
Surkhab
Ongoing
SCA
5 89 -- --
6 mid -level HMIs / 1 Dental Tech./ 1 Lab Tech
SCA
HEALTH: Basic Clinic
Surkhab
Ongoing.
SCA
-- -- -- --
4 mid -level HWs / 2 Nurses
SCA
HEALTH: Basic Clinic
Zarghon Shahr
Ongoing
SCA
12 88 -- --
7 aid -level HWs / 1 Nurse / 1 Lab Tech./ 1.Pbarmacist
SJAWO
AGRIC :, ,Crop Product
Surkhab
Ongoing
FAO
10 92 -- --
Distribution .of 5 MT wheat seed & 5 NT DAP to 100 farmers
Page: 142
A6actrep Date: 27/08/93
SECTOR
AGENCY
UNC
VITA
-VILLAGE(S) - - --
EDUCAT: Primary
CONST_:
Zarghon Shahr
Road
Puli
Logar
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
<ACTIVITY
Ongoing
AID
6
87 -- --
7 schools in Nulls Ebel, Zarghubn Shahr (6) villages.
Ongoing
AID
1
90 -- --
Rehabilitation of 40 km road, benefit 2.857 families.
DESCRIPTION>
Alani
ARRAN':
AGRIC:
Machinery
Puli Alas
Ongoing
RAP
-- 92. -- --
2 tractors.
AFF'AN_
AGRIC:
Research
Puli Alam
Ongoing
RAP
10 93 -- --
Variety L agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
AFRANF
WATER:
Canal
Puli Alam
Ongoing
UNDP
-- 93 -- 93
irrigation repair.
APWC
RELIEF:Food Items
20 villages
Completed
WFP
ARA
AGRIC:
Masera
Ongoing
AR CON
ARC
INCOME: Skill Train.
Doghabad
Disco tin
NOV1B
ARCAR
AGRIC:
Crop Product
Padkhaw /Hori Sayed
Ongoing
INCA
AGRIC:
Vet
Padkhaw
DCA
AGRIC:
Vet
DCAR
Fruit Tree!
1
93
j
á.
.
t
100 MT wheat was distributed to 1000 families.
93
?nwePn. a_ cf 500 ,000 fruit tree! (apple
apricot / almond
.
grape) - 20 j er. s
.
91
6
92
Training of 50 people in auto wiring / blacksmithry / carpentry / tìnsmithry & masonry.
FAO/UNDP
10 92
7
93
Multiplication of improved wheat seed (5 MT).
Ongoing
UNDP
11 92 -- --
Kulangar
Ongoing
UNDP
HEALTH: Mobile /F -Aid
5 villages
Ongoing
*Donors
IRC
EDUCAT: Teacher T.
Pull Alas
Completed
SV
IRC /RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.8 mt wheat, 0.1 mt DAP to 16 farmers
IRC!RPA
AGRIC:
Crop Product
Completed
FAO
10 92
Seed distribution: 4.10 mt wheat, 4.10 mt DAP to 82 families
tRC!RPA
AGRIC:
Fruit Trees
SV
., -- -10 92
IRCIRPA
AGRIC:
Fruit Trees
Completed
SV
3
93
4
93
Distribution of 550 saplings to 12 farmers
IRC /RPA
AGRIC:
Training
Ongoing
SV
1
92 --
--
1 -2 day trng in seed mult, nurseries, bees, poultry, food preservation etc, 100 farmers trained
ïRC /RPA
AGRIC:
Other
Ongoing
SV
10 92 --
--
Model farm: seed mult, nurseries, vegetables, poultry, bees, farm power
IRC /RPA
WATER:
garez
Completed
AustCare
11 92 12 92
ISRA
AGRIC:
Crop Product
Ongoing
FAO/UNDP
11 92
Pull Alas
Puli Alam
Puli Alam
Ongoing
-
7
_
4 89 --
1 vaccinator.
Central clinic with 1 vet. assistant / 4 paravet & 1 vaccinator,
--
Dental sevices 95 -100 patients daily.
-- 84 -- --
6
93
7
32 primary school teachers participated in pedagogical seminar.
93
3 93..
a.
7
93
Nursery with 912 sqm planted with stone fruit f nut / apple seed and cuttings
&habilitation of 3 karezes, total 4.52 km, irrigate 2100 jeribs, benefit 1530 families
Distribution of 5 MT DAP & 5 MT wheat seed to 200 farmers - 200 jeribs.
DATABASE OF NGO ACTIVITIES
Page: 143
A6actrep Date: 27/08/93
-- 6TH EDITION
J
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
Puli
Logar
ISRA
AGRIC:
KAI
EDUCAT: Primary
MSE
HEALTH: Basic Post
MSH
HEALTH: Vaccination
Crop Product
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITI
Begin --End
Alain
Pull Alas
Ongoing
FAO
5 93 10 93
Ongoing
MAI
--
Bahrain ghel
Ongoing
AID
12 87 -- --
14 BHils
Pull Alas
Ongoing
AID /UN
11 89 -- --
5 VACCINATORS COVER 96 VILLAGES IN KOLANGAR \PULE ALAN (506) LOGAR PROVINCE.
Distribution of 0.5 MT rice seed & 0.75 MT DAP for multiplication.
15 schools in different villages.
WOMB 5 -45
'
DESCRIPTION>
TARGET GROUPS: CHILDREN 0 -2 YEARS AND
YEARS.
OMAR
MINES:
Awareness
Kulangar
Completed
UNOCRA
PRB
AGRIC:
Crop Product
Kulangar
Completed
FAO
11 92
6 93
Distribution of 5 MT wheat seed & 5 MT DAP to 100 farmers.
RDM
AGRIC:
Crop Product
12 villages
Completed
FAO
11 92
6 93
Multiplication of 5 MT wheat seed & 5 MT DAP.
"^-vú
AGRIC:
Other
Ongoing
FAO UNDP
11 92
7 93
Monitoring of activi'jDQ of participating agencies on multiplication improved wheat seed.
SCA
AGRIC:
Plant Proteo
Center
Completed
SCA
0 92 -- 92
Provision of 0.38 MT agrochemicaie.
SCA
AGRIC.:
Plant Proteo
Pull Alas
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochesicals.
SCA
AGRIC:
Plant Protec
Eulangar
Ongoing_
SCA
0 93 -- 93
Próvision of 0.285 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Center
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrechemicais.
SCA
AGRIC:
Other
Pull Alas
Ongoing
SCA
0 92 -- 93
Agriculture survey on 79 villages.
SCA
AGRIC:
Other
Eulangar
Ongoing
SCA
O 93 -- 93
Agriculture survey on 100 villages.
SCA
AGRIC:
Other
Pull Alas
Ongoing
SCA
0 93 -- 93
- Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Center
Completed
SCA
-- -- -- 92
Agriculture survey on 30 villages.
SCA
CONST:
Pub.Building
3 villages
Ongoing
SCA
1 93 12 93
Construction of prisary schools.
SCA
EDUCAT: Primary
Khwala Afghan
Ongoing
SCA
7 86 -- --
12 schools ! 62 teachers 1 1950 students
SCA
DUCAT: Literacy
Kulangar
Approved
SCA
-- 93 -- --
9 months / 125 women
SCA
DUCAT:. Teacher
Kulangar
Approved
SCA
-- 93 -- --
2 months ! 5 female teachers
SCA
HEALTH: Compr.Clinic
Khasi Hindu
Ongoing
SCA
2 87 -- -
T.
.
6 92 12 92
Safety lessons - 15250 people participated.
1 MD i 12 mid -level Hßa 12 Dental Tech. I 1 Lab Tech.
Page: 144
A6actrep Date: 27/08/93
FUNDED
ACTIVITY
SECTOR
AGENCY
-- STATUS --
---- VILLAGEtS) - ---
DURATION
- --BY --
Begin - -End
10 89 -- -
<ACTIVITY
DESCRIPTION>
Puli Alam
Logar
SCA
HEALTH: Compr.Clinic
Qalai Jelga
Ongoing
SCA
SCA
HEALTH: Basic Clinic
Dahana Reg
Ongoing
SCA
SCA
HEALTH: Basic Clinic
Purak
Ongoing
SCA
-- -- -- --
UNO
EDUCAT: Primary
AID
6 87 -- --
VITA
CONST:
Ongoing
Road
.
Pull Alam
Completed
AID
1 MD / 2 mid -level HWa / 4 Nurses / i Lab Tech.
2 mid -level HWs / 1 Nurse
--
2 mid -level BWs / Pharmacist
12 schools in different villages.
Rehabilitation of 200 m road, benefit 4428 families.
9 92
Achin
Nangarhar
Construction of Achin clinic.
ARCON
CONST:
Pub.Building
--
Ongoing
ARCON
CRAA
AGRIC:
Fruit Trees
Total Area
Completed
*Donors
3 92
CRAP:
AGRIC:. Vet
Kahl
Ongoing
UNDP
7 91 -- --
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
KNF
EDUCAT: Primary
Iahi /Shadle / Pekha
Ongoing
DCP
5 93 12 93
LEI
EDUCAT: Madrasa
Abdul Del Sufla
Ongoing
LBI
-- 89 -- --
Quran memorization center
LEI
EDUCAT: Madrasa
Pekha
Ongoing
LBI
-- 89 -- --
Quran memorization center
LBI
EDUCATI Madrasa
Abdul Del Ulya
Ongoing
LBI
-- 88 -- --
bran memorization center
MAI
EDUCAT: Primer?
Abdul Khel/Mamand
Ongoing
MAI
-- -- -- --
2 schools.
MCPA
MINES:
Kahi/Maidanak/Band
Completed
UNOCHA
.
Survèy
'
--
1 91
Distribution of fruit tree (apricot ¡ plum /apple j peach & pears).
8 92
Animal vaccination & treatment, 1 DVM / 2 paravets & 1 guard.
Narcotic awareness, 1 extension agent.
3 schools / 25 teachers / 1,515 students.
8 m-fields, 2 in Maydanak(196,197sgm-grazing),2 in Iahi
.2 91
(156,556sgm-ag.land,6,940 sg m-grazing),4 in Bandar (137,545
sqm-road ) .
1 MD, 1 NURSE, I LAB. TECH. ASST.
KSH
HEALTH: Compr.Clinic
Iahi
Ongoing
AID
9 91 -
MSH
HEALTH: Basic Post
Foetal
Ongoing
AÍD
5 91 -- --
RDA
WATER:
garez
Ongoing
WFP
6 93
8 93
Rehabilitation of 9,950 linear M karez - benefit 755 farming families.
RDA
WATER:
Tarez
Achin
Ongoing
WFP
7 93
9 93
Rehabilitation of 13,600 linear M karez - benefit 860 families.
SCA
HEALTH: Basic Clinic
Pa Del
Ongoing
SCA
7 89 -- --
A C B A R
--
i BHW
6 mid -4eval HWs.
DATABASE OF NGO ACTIVITIES
Page: 145
A6actrep Date: 27/06/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
UNO
-VILLAGE(S) - - --
EDUCAT: Primary
Nangarhar
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
Ongoing
AID
11 87 -- --
:ACTIVITY
2 schools in Iahe & Mohammad Tangi villages.
Bati Kot
ARCON
AGRIC:
Crop Product
Farm 3
Ongoing
ARCON
--
Increasing improved seeds.
ARCH
AGRIC:
Crop Product
Farm 2
Ongoing
ARCON
--
Main crops - 500 jeribs.
ARCH
AGRIC:
Crop Product
Farm 3
Ongoing
ARCON
--
Main crops
ARCH
AGRIC:
Fruit Trees
Farm 3 &4
Ongoing
ARCH
Olive rehabilitation.
ARCON
AGRIC:
Fruit Trees
Farm 2
Ongoing
ARCON
Gardens rehabilitation.
ARGON
AGRIC:
Fruit Trees
Xs *m 2
Ongoing
ARCON
ARCON
AGRIC:
Livestock
Fare 2
Ongoing
ARCON
ARCH
AGRIC:
Livestock
Farm 3
Ongoing
ARGON
ARCON
AGRIC:
Livestock
Farm 2
Ongoing
ARCON
ARCON
AGRIC:
Livestock
Farm 3
Completed
ARGON
ARGON
AGRIC:
Livestock
Farm 3
Ongoing
ARCON
ARCOS
AGRIC:
Livestock
Farm 2
Ongoing
ARCON
--
Cows farm..
ARCH
AGRIC:
Livestock
Farm 2
Ongoing
ARCON
--
Sheep farm
ARGON
AGRIC:
Machinery
Farm 3
Ongoing
ARCON
- -
Machinery for agriculture.
ARCON
AGRIC:
Plant Protec
Farm 3
Ongoing
ARCON
--
Insecticide spray equipment
ARCON
AGRIC:
Other
Farm 3
Ongoing
ARCH
ARCON
AGRIC:'
Other
Farm 2
Ongoing
ARCON
ARCON
AGRIC:
Other
Farm 3
Completed
ARCON
Ren a in ing of animals production well.
Ongoing
ARCON
Construction cf horses building.
Ongoing
ARCON
ARCON
CONST:
ouh.lyiding
Farm
ARCOK
CONST:
Pub.Buiïding
Fart 3
lACBAR
DESCRIPTION>
2.;,,
,>
,
.
. ;
,
Nursery establishment.
- -
Animal food
Fish farm
--
Chicken farm
--
Establishment of fish well.
Fish pool
Farm 3 lighting project
--
Farm 2 electricty network & generators.
.
- -
Repairing of Agriculture dept. building.
DATABASE OF NGO ACTIVITIES
Page: 146
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Nangarhar
- - -- VILLAGES) - - --
-- STATUS --
DURATION
FUNDED
- --BY --
<ACTIVITY
Begin --End
DESCRIPTION>
Bati Kot
--
Construction of chichen building.
--
Construction of cows farm building.
--
Construction of veterinary clinic building.
ARCON
CONST:
Pub.Building
Farm 2
Completed
ARCON
ARCON
CONST:
Pub.Building
Farm 2
Completed
ARCON
AR :ON
CONST:
Pub.Building
Farm 3
Completed
ARCON
ARCON
WATER:
Canal
Farm 2
Ongoing
ARCON
ARCON
WATER:
Drinking
Farm 3
Completed
ARCON
--
ARCON
WATER:
Drinking
Charasyab
Completed
ARCON
--
ARCON
WATER:
Other
Farm 3
Ongoing,
ARCON
--
ARCON
WATER:
Other
Farm 2
Completed
ARCON
CRAA
AGRIC:
Vet
Bati Kot
Ongoing
UNDP
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, 1 extension agent.
¡AU
HEALTH: Basic Post
Barikab
Ongoing
Pvt
-- -- -- --
Health post for providing first aid to injured people and evacuating them to hospitals.
ISRA
AGRIC:
Crop Product
Bati Kot
Ongoing
FAO
5 93 10 93
Distribution of 0.025 MT cotton seed to progressive farmers.
ISRA
AGRIC:
Crop Product
Bati Kot
Ongoing
FAO
5 93 11 93
Distribution of 0.2 MT rice seed & 1.5 MT DIP.
ISRA
AGRIC:
Crop Product
Bat! Kot
Ongoing
FAO
5 93 10 93
Distribution of 0.39 MT-maize seed & 1.5 MT DAP.
ISRA
AGRIC:
Crop Product
Bati got
Ongoing
FAO
5 93 10 93
Distribution of 0.06 MT peanut to progressive farmers.
ISRA
AGRIC:
Crop Product
Bati Kot
Ongoing
FAO
3 93
3 94
Distribution of 16 MT sugar cane seed & 0.55 MT DAP.
ISRA
AGRIC:
Crop Product
--
Ongoing
CRC
193
7 93
Distribution of 45 MT Urea in 3 districts (Bati-Kot / Rodat / Deb Bala).
INF
AGRIC:
Crop Product
Chandi/Lachapur
Ongoing
RAP
12 92
7 93
5 MT wheat seed & 5 MT DAP for 40 hectares of land.
Bati got
Ongoing
LBI
-- 89 -- --
--
¡DUCAT: Medrase
LBI
'
.
Cleaning of canal.
Repairing of nursery well.
"Repairing of Logar well digger.
Rehabilitation of fare 3 well pumps.
Repairing pumps -cf farm 2.
1 92 -- --
Animal vaccination & treatment, I DWI / 2 paravets & I guard.
Quran memorization center
M
LDI
HÉALTH: Compr.Clinic
Barikab
Ongoing
LDI
LDI
HEALTH: Basic Clinic
Farm 3
Ongoing
LDI
-
MAWA
AGRIC:
Bati Kot
Ongoing
FAO
li 92
ACBAR
Crop Product
z
-- -- --
8 93
General OPD & dressing.
2 rid -level HWs - OPD.
Multiplication of 10 MT wheat seed.
DATABASE OF AGO ACTIVITIES
Page: 147
ABactrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
Nangarhar
---- VILLAGEtS) - - --
-- STATUS --
FUNDED
DURATION
<ACTIVITY
- --BI --
Begin- -End
-- 92 -- 92
DESCRIPTION>
' Bati Kot
Multiplication of 3 MT improved barley seed.
MAWA
AGRIC:
Crop Product
Bati lot
Completed
FAO
"CPA
MINES:
Survey
1 minefields
Completed
UNOCHA
1 92 12 92
237,955 Sqm residential.
MMC
HEALTH: Coipr.Clinic
Barikab
Ongoing
NAC
3 89 -- --
2 MD /4 paramedics - surgical services for war -wounded / OPD / dental.
MSH
HEALTH: Basic Post
Chardehi
Ongoing
AID
5 91 -- --
1 BHW
SC -US
AGRIC:
Ghaziabad Farm
Completed
tUN
11 90 ii 9i
Fruit Trees
Nursery establishment / prooning /grafting / plant prot. / spray insecticide ± pesticide / weeding / irrigation /
vegetable protection.
SC -US
AGRIC:
Machinery
Ghaziabad Fare
Completed
r.4
#UN
12 9C
9C 11
91
. 91
2 tracto:v
tractors
SC -US
AGRIC:
Plant Protec
Ghaziabad Farm
Completed
tUN
12 90 11 91.
Distribution of 169 liters metasystaz
2 threshers.
threshers
138 liters Gusataian / 60 kg inter- coal / 20 picks / 50 secateurs / 60 saws /
200 shovels to farmers.
SC -US
AGRIC:
Training
Ghaziabad Farm
Completed
*UN
12 90 11 91
10 courses per month for 850 farmers.
SC -US
WATER:
Canal
Ghaziabad Farm
Completed
SUN
12 90 11 91
Rehabilitation of 41.38 Em canal.
AGRIC:
Crop Product
--
Completed
SCA
0 92 -- 92
Distribution of 0.1 MT wheat seed.
SCA
AGRIC:
Plant Protec
'Ongoing
SCA
0 93 -- 93
Provision of 0.09 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
-- 92 -- 92
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
--
.Ongoing
SCA'
0 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
--
Completed
SCA
-- 92 -- 92
Agriculture survey on 70 villages.
Approved
FAO.'UNDP
-- -- -- --
Rice seed multiplication & distribution program.
Behsud
Completed
NOVIB
10 92
10 92 -- --
Rehabilitation of 4.5 Em canal.
Repairing of Barak Goreeq road.
SCA
'
Behsud
Nangarhar
Crop Product
ACDO
AGRIC:
ARC
HEALTH: Basic Clinic
ARCAR
WATER:
Canal
Zangoiee
Ongoing
BCR
ARCON
CONST:
Road
Goreek
Ongoing
ARCON
--
ARCON
CONST:
Pub.Building
Wilaiaty
Ongoing
ARCON
-- -- -- --
ARCON
WATER:
Canal
Belandghar
Ongoing
ARCON
--
IACBAR
.
' Belandghar
OPD /lab /dental / MCH & malaria control.
4 93
Repairing of Behsood mosque.
Cleaning of Behsood canal.
DATABASE OF NGO ACTIVITIES
Page: 148
A6actrep Date: 27/08/93
6TH EDITION
-
ACTIVITY
AGENCY
SECTOR
Nangarhar
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Behsud
ARCON
WATER:
Structure
Behsud
Ongoing
ARCON
-- -- -- --
Rehabilitation of Behsood Dam.
ATC
MINES:
Clearance
Karez Kabir
Completed
UNOCHA
10 92 10 92
Destroyed 36 devices, cleared 20612 591 canal & village.
BCURA
AGRIC:
Crop Product
Mugam Khan /Jni Da
Ongoing
FAO
4 93 10 93
Multiplication of 200 1g rice through 25 farmers.
BCURA
AGRIC:
Crop Product
3 villages
Ongoing
FAO
4 9310 93
Multiplication of 400 Kg maize seed through 50 farmers.
BCURA
AGRIC:
Fruit ;Trees
Saracha/Karez Rabi
Ongoing
FAO /DCP
1 93
1 94
Distribution of 5,000 fruit trees to 50 farmers.
CBR
CONST:
Pub.Building
Tameerat
Completed
IIRO
1 93
5 93
Mosque with brick masonry and wooden I steel beams.
CRAA
AGRIC:
Vet
Tameerat
Ongoing
UNDP
7 92 -- --
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, 1 extension agent.
DACAAR
AGRIC:
Crop Product
10 villages
Completed
FAO
11 92 11`92
6.55 MT wheat seed & 6.55 MT DAP distributed to 614 farmers.
DACAAR
.AGRIC:
Crop Product
10 villages
Ongoing
DACAAR
3 93 -- --
17600 vegetable seedlings distributed to 87 farmers.
AGRIC:
Fruit 'Trees
10 villages
Completed
FAO
3 93
4,750 fruit saplings distributed to 142 growers.
DACAAR
AGRIC:
Research
10 villages
DACAAR
1 93 -- --
15 wheat demonstration plots in 5 villages.
DACAAR
AGRIC:
Plant Protec
10 villages
Completed
DACAAR
3 83
40 kg 2 -4 -D was used on 100 jeribe of wheat fields of 72 farmers for weed control purpose.
DACAAR
AGRIC:
Training
iD villages
Ongoing,
DACAAR
11.92 -- --
DACAAR
HATER:
Canal
Mush Gumbad
Ongoing
DACAAR
92 -- 93
DESP
AGRIC:
Fruit Trees
Romani
Ongoing
FRG
2 93 -- --
Tree nursery - 25,000 saplings in local varieties.
MEP
WATER:
Canal
Behsud
Ongoing
WFP
2 93
Cleaning of 612 Behsud canal
IDA
CONST:
Pub.Building
Perawal
Approved
ISRA
IHSAN
WATER:
Canal
Miran
Completed
WFP
1HSAN
WATER:
Canal
Qali All
Ongoing
VIP
-- 93 -- --
Rehabilitation of 7 is canal (FFW -25 MT wheat).
IHSAK
WATER:
Canal
Mula Khel
Ongoing
WFP
-- 93 -- --
Rehabilitation of 6 km canal (FFW -30 MT wheat)
IHSAN
WATER:
Canal
Charmisa
Completed
WFP
DACAAR
.
b--
ACBAR
. Ongoing
3.93
3 93
5 93
253 farmers technically advised.
Appx. 13 km canal cleaned
3 93
=- 93 -- 93
5 93
Animal vaccination & treatment, i DVM 12 paravets & 1 guard.
6 93
6 93
6 culverts constructed.
FFW.
Construction of mosque.
Rehabilitation of 8 is canal.
Rehabilitation of 3 Km canal - 3 structures.
DATABASE OF NGO ACTIVITIES
Page: 149
A6actrep Date: 27/08/93
STE RDITIQN
ACTIVITY
SECTOR
AGENCY
Nangarhar
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
<ACTIVITY
Begin --End
- --BY --
DESCRIPTION>
Behsud
Survey
MCP,
MINES:
MSH
HEALTH: Basic Post
7 minefields
Completed
UNOCHA
1 92 12 92
156,565 Sqf residential & agri.land.
Jamali
Ongoing
AID
4 90 -- --
3 BBWs
Distribution of 10 MT wheat seed.
AGRIC:
Crop Product
Ongoing
FAO /UNDP
SCA
AGRIC:
Crop Product
Completed
SCA
0 92 -- 92
Distribution of 8.15 MT wheat seed 8.15 MT DAP & 10.1 MT Urea.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.13 MT agrochemicals.
SCf.
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
54E
91 T C:
Other
Completed
SCA
{ 92 -- 92
Agriculture survey on 52 villages.
SC«
WATER;
Drinking
.O villages
Cwwi:°:°d
J^4.I.,.
o ß'
r 93
_cr shallow wells - .erL'i
START
AGRIC:
Crop Product
7 villages
^c:. + e d
UNDP
., o2
6 93
Improved wheat seed .?t-r ?;rann
Approved
SCA
-- 93 -- --
Completed .
UNDP
Chaparhar
Ongoing
4 villages
SA
Nangarhar
-- 92 -- 93
.
°0i ;6z...La
2,000
.
Chaparhar
AEA
CONST:
Pub.Buìlding
ARA
AGRIC:
Livestock
ATC
HEALTH: Mobile /F-á'id
ATC
MINES:
AVICEN
HEALTH: Vaccination
CRAA
AGRIC:
CRAA
--
Reconstruction 'of school ±12 rooms) roofing with vaults & girders with stabilized bricks.
9 91 -- 92
Distribution of 12.000 chicks to 1,000 families.
UNOCHA
12 92 -- --
5 nurses / 1 MD ; treat definers & local people.
Completed
UNOCHA
7 92 12 92
29 villages
Ongoing
EC/UNICF
5 villages
Completed
*Donors
10 92 10 92
Distribution of 8 kg of turnip ! onion i spinach i radish & carrot seeds.
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, 1 extention agent.
CRAA!
WATER:
Kare,
11 villages
Completed
UNDP
6 92 11 92
Cleaning of 12 karezes, irrigated 2.000 jeribs.
DACAAR
AGRIC:
Crop Product
12 villages
Ongoing
DACAAR
3 93 -- --
33400 vegetable seedlings distributed to 167 farmers.
DACAAR
AGRIC:
Crop Product
12 villages
Ongoing
DACAAR
3 93 -- --
Vegetable nursery established in an area of 105 Sum.
DACHAR
AGRIC:
Crop Product
12 villages
Completed
FAO
DACAAR
AGRIC:
Fruit Trees
12 villages
Completed
FAO
A C B A R
Clearance
Crop Product
.
--
11 92 11 92
.
3 93
3 93
Destroyed 107 devices, cleared 105615 Sun road
village & agri.land.
.1 teal - 1 vaccinator
10 MT wheat seed & 10 MT DAP distributed to 555 farmers.
1.058 fruit saplings distributed to 73 faders.
DATABASE OF NGO ACTIVITIES
Page: 150
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
VILLAGES) - - --
SECTOR
AGENCY
-- STATUS --
DURATION
FUNDED
<ACTIVITY
Begin- -End
- - -BY-
Chaparhar
Nangarhar
12 villages
Ongoing
DACAAR
1 93 -- --
3 93
i wheat demonstration plot in 1 village.
DACAAR
AGRIC:
Research
DACAAR
AGRIC:
Plant Protec
12 villages
Completed
DACAAR
DACAAR
AGRIC:
Training
12 villages
Ongoing
DACAAR
DACAAR
CONST:
Pub.Building
--
Ongoing
DACAAR
DACAAR,
CONST:
Pub.,Building
Alagadari
Ongoing
DACAAR
-- 93 -= --
Secondary school building
DACAAR
WATER:
Drinking
Several villages
Ongoing
DACAAR
-- 92 -- --
120 shallow wells.
GAF
AGRIC:
Vet
Chaparhar
Ongoing
UNDP
10 91
6 93
1 assist DV!
ISRA
HEALTH: Mobile /F -Aid
Chaparhar
Completed
ISRA
11 92
4 93
Mobile clinic - 1 MD & medical assistant.
!!CPA
MINES:
10 minefields
Completed
UNOCHA
MSH
HEALTH: Basic Post
Mano
Ongoing
SAA
AGRIC:
Fruit Trees
Chaparhar
SCA
,AGRIC:
Crop Product
--
SCA
AGRIC:
Plant Protec
Ongoing
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
AGRIC:
SCA
HEALTH: Basic Clinic
SOS -PG
EDUCAT: Teacher T.
Nangarhar
3 93
11 92 -- --
50 kg 2 -4 -D applied on 125 Jeribs wheat fields of 72 farmers.
241 farmers technically trained.
Primary school building
2 paravet / 1 guard curative & preventive service.
1 92 12 92
139,743 Sqm road /residential /agri.land & grazing.
AID
5 91 -- --
2 BHWs
Completed
SAA
1 92
Completed
SCA
0 92 -- 92
Distribution of 1.75 MT wheat seed, 1.75 MT DAP & 1.6 MT Urea.
.SCA
0 93 -- 93
Provision of 0.15 MT agrochemicals.
Completed
SCA
0 92 -- 92
Provision of 0.3 MT agrochemicals:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 50 villages.
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 97 villages.
Ongoing
SCA
-- -- -- --
8 mid -level HWs ! 1 Lab Tech.
Ongoing
EC/B.Gvt
-- 84 -- --
Through resource centers in schools 1 two & half month courses / 15 day seminars & practical work in classrooms.
Survey
.
Mesti Khel
.
2 92
Distribution of 6,000 trees (different types) to 1,200 families.
Darae Noor
AC
WATER:
Structure
Amla
Ongoing
UNDP
APWO
CONST:
Other
Bonta
Discontin
ARCON
A C B A R
DESCRIPTION>
.
6 93 -- --
Retaining wall construction.
192 -- --
Lack of fund from ARCON Side.
DATABASE.OF NGO ACTIVITIES --L
Page: 151
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
-VILLAGE(S)-
- STATUS -
FUNDED
DURATION
-BY-
Begin- -End
.
<ACTIVITY
DESCRIPTIONS
Darae Noor
Nangarhar
ARGON
CONST:
Pub.Building
Bonta
Ongoing
ARGON
--
Repairing of Benta mosque.
ARCON
CONST:
Pub.Building
Shokialy
Ongoing
ARCON
--
Construction of Shokiàly mosque.
ARCON
WATER:
Structure
Data Noor
Ongoing
ARCON
--
Rehabilitation of Pipe culverts.
AVICEN
HEALTH: Vaccination
60 villages
Ongoing
EC/UNICF
--
CIUP
AGRIC:
Crop Product
Completed
FAO/UNDP
-- 92 -- 92
GAF
AGRIC:
Vet
Dara Noor
Ongoing
UNDP
4 90
6 93
1 assist DVM / 2 paravet ! 1 guard curative & preventive service.
IHSAN
AGRIC:
Fruit Trees
Center
Ongoing
FAO
3 93
3 94
Distribution of 5.000 fruit trees (Agricot
:SEA
EDUCAT: Other
Dare Moor
Ongoing
'SEA
4 93 -- -_
Quranic center - 91 students & % teachers.
JAMS
HEALTH: Compr.Cìinic
Ongoing
Self
-- 91 -- --
MADERA
AGRIC:
-- -- -
_1 team - 2 vaccinators
Distribution of 5 MT DAP.
plum
amrud & peach).
15 health workers - 80 -120 patients OPD I day - lat facility. _t is planned to have 4 beds + x-ray.
Crop Product
Dara Noor
Ongoing
Fruit Trees
Dara Noor
Ongoing
EC
-- 92 -- --
Selling of 844 fruit & 1,718 forest trees.
Dara Noor
Ongoing
EC
-- 92 -- --
1 tractor is working 100 hours per month at a subsidised price.
.
Distribution of 70 Kg wheat seed i 70 Kg DAP & 21 Kg vegetable seed to 65 farmers.
EC /FAO
MADERA
AGRIC:
MADERA
AGRIC: 'Machinery
MADERA
AGRIC:
Research
Dare Noor
Completed
EC
-- 91 -- --
Trials of wheat
MADERA
AGRIC
Plant Proteo
Dara Noor
Ongoing
BC
-- 91 -- --
Selling of some agricultural tools & agrochemicals (BHC zinc phosphide DDVP melathen) 19 Kg at a subsidised price á
! maize & rice varieties.
200 farmers are advised about the use of agrochemical.
MADERA
AGRIC:
Training
Dara Noor
Completed
EC
-- 91 -- --
Agricultural training of 2 staff during 1992.
MADERA
WATER:
tares
Dara Noor
Ongoing
EC /F.Gvt
-- 92 -- --
Repairing of 11 karezes.
MADERA
WATER:
Canal
Dara Noor
Ongoing
EC /F.Gvt
-- R
Repairing of 11 Cana: intakes.
MSH
HEALTH: Basic Post
Amle
Ongoing
AID
5 91 -- --
1 BHW
PO
INCOME: HelpCraftmen
Dara Noor
Completed
NRC /NCA
2 93
3 93
Help to skilled craftsmen.
-
Completed
UNOCHA
1 92
6 92
Safety lessons - 5176 people participated.
Dara Noor
Ongoing
ORA
OMAR
MINES:
ORA
EDUCAT: Secondary
1ACBAR
Awareness
--
-- 92 -- --
High school - 741 students ! 35 teachers & cc- sponsored with SERVE.
ßaABASE OF NGO ACTIVITIES
DATABASE
Page: 152
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(S)-- --
-- STATUS --
FUNDED
DURATION
< ACTIVITY
Begin --End
- --BY --
DESCRIPTION>
Darae Noor
Nangarhar
Distribution of rice seed to farmers.
RAE
AGRIC:
Crop Product
All villages
Completed
FAO
7 92 11 92
RAH
AGRIC:
Crop Product
All villages
Completed
FAO
6 92 10 92
., Distribution of maize seed to farmers.
RAE
AGRIC:
Crop Product
Data Noor
Ongoing
FAO/UNDP
10 92 -- --
Seed multiplication for 2.000 farmers.
RAH.
WATER:
Canal
Janjapoor
Completed
FAO
6 92
SERVE
RELIEF:Other
Various villages
Ongoing
T.Fund
1 93 12 93
Ongoing
EC/UNICF
--
Ongoing
FA^f UNDn
-- 92 -- 93
Distribution of 5 M? wheat seed & 5 M^ fertilizer
11 92 -- --
Narcotic awareness. 1 extension agent.
Nangarhar
8 92
Cleaning of canal - irrigates 1500 jeribe land.
Food for work involving schools and a road construction project.
Deh Ba1a
1 team - 1 vaccinator
AVICEN
HEALTH: Vaccination
CIUP
AGRIC:
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
DCA
AGRIC:
Vet
Shpola
Ongoing
UNDP
4 92 -- --
DCA
AGRIC:
Vet
And Ehel
Ongoing
UNDP
10 89 -- --
1 advanced paravet (sub clinic) I 1 paravet & 1 vaccinator.
ESAR
CONST:
Road
Dara
Completed
DCP
-- 92 -- --
Repair of 10 km road + 33 culverts.
ESAR
CONST:
Road
Dara
Completed
DCP
1 92 -- --
ESA,
WATER:
Karez
Ghalani
Completed
WFP
ESE
WATER:
Canal
Sandalay
Completed
ESAE
WATER:
Canal
Dare
K
::AI
ri
T Priman
EIJCA..
MAWA
MAW
AGRIC:
Crop Product
MAWA
WATER:
MAWA
69 villages
Crop Product
Central clinic with 1 vet. assistant
1 paravet & 2 vaccinators.
Rehabilitation of 10 km road in Data - 5 culverts.
-- 93 -- --
Rehabilitation of karez.
WFP
-- 93 -- --
Rehabilitation of canal.
Completed
DCP
5 92 -- --
Ongoing
!!Ai
--
4
Deh Bala
Ongoing
FAO
il Ti;
93
Multiplication of 10 MT wheat seed.
Structure
gham Deb Bala
Completed
CIDA
-- 92 -- 92
Reconstruction of 100 m Sham diversion dam.
WATER:
Structure
Deb Bala
Completed
CIDA
-- 90 -- 90
Construction of 80 m diversion dam.
KAWA
WATER:
Structure
Deb Baia
Ongoing
FAO
-- 92 -- 93
Reconstruction of 100 m protection wall.
IBA
WATER:
Structure
Ghukb Dara
Completed
CIRA
-- 91 -- 91
Construction of 80 m diversion dam.
r
1ACBAR
.
Rehabilitation of 6 km canal + 70 m siphon - irrigate 10,000 jeribs.
.:en,
k:.-,
schools
.,,,h
c' in Mar
.:
ka:, 1Kam Palen,
DATABASE OF NGO ACTIVITIES
Page: 153
A6actrep Date: 27/08/93
Lfi1 Palen
Pa.wn &
At villages.
tirguru.
v:ï.age.
6TH EDITION 1
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
FUNDED
-- STATUS --
- --BY --
DURATION
<ACTIVITY
Begin- -End
Deh Bala
Nangarhar
MSH
HEALTH: Basic Clinic
Gorgori
Ongoing
AID
9 91 -- --
MSH
HEALTH: Basic Post
Shekh Maiden
Ongoing
AID
12 90 -- --
SAA
WATER:
Drinking
Ughuz
Ongoing
SAA
--
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 3 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
7 89 -- --
3 mid -level HIE
UNO
EDUCAT: Primary
Ongoing
AID
11 87 -- --
2 schools in Morgai & Surkhi villages.
YARA
AGRIC:
Crop Product
Ongoing
FAO /UNDP
--
Distribution of 5 MT wheat seed & 5 MT DAP.
.A RA
AGPIC
Crop Product
laghi Band /Mar e"
Completed
FAO/?NDP
Completed
.
Shpoia
!ARA
AGRIC:
Crop Product
6 villages
TARA
AGRIC:
Crop Product
--
AGRIC:
Fruit Trees
TARA
Nan gar har
MCPA'
MINES:
Nangarhar
AHSAO
AGRIC:
DESCRIPTION?
.
1 MED. TECH., 1 MED. STUDENT 1ST.,
1 NURSEi
2 BHWs
Provision of pipe system drinking water for 35 families:
1 Nurse / 1 Lab Tech.! 1 FA 1.1 Pharmacist
6 92 12 92
250 kg rice
C e seed planted for redistributed to 30 farmers for 30 jeribs.
FAO/UNDP
6 92 12 92
Distribution cf1 MT maize seed
FAO
5 93 -- --
Multiplication .of maize seed
Completed
FAO /DCP
3 92 12 92
Distribution of 6,000 fruit trees to 600 farmers.
Completed
UNOCHA
2 91
2 91
4 mine fields, 3 in Tawda China (5,510 sq m- grazing land, 6,051 sq m-road) & 1 in Shoigar (120,000 sq a- road).
Completed
FAO/UNDP
11 91
7 92
Distribution of 4 MT Pak -81 wheat seed / 4 MT Urea / 4 MT DAP to 431 farmers in Ihawazi, Sayed Ihel, Worsak, Chore
Ongoing
.
.
(
,
3 MT DAP I 1 MT Urea to 66 farmers.
8 Ig for each farmer).
Dorbaba
Survey
Tawda China /Sholga
Goshta
Crop Product
Ihel villages.
AHSAO
AGRIC:
Crop Product
--
Ongoing
FAO /UNDP
-- 92 -- 93
-Distribution of 5 wheat seed (PS -85) & 5 DAP.
AHSAO
AGRIC:
Crop Product
9 villages
Ongoing
FAO
10 92 -- --
Multiplication of 5 MT wheat seed & 5 MT DAP for 200 farmers.
AHSAO
AGRIC:
Crop Product
--
Completed
FAO/UNDP
11 91
7 92
Distribution of 4 MT Pak -81 wheat seed / 4 MT Urea / 4 MT DAP to 431 farmers in Ihawazai, Sayed Ihel, Vorsak, Chora
Ihel villages.
AHSAO
AGRIC:
AHSAO
HEALTH: Vaccination
ERSA
AGRIC:
A C B A R
Crop Product
Crop Product
8 villages
Completed
FAO/UNDP
-- 92 -- 92
Multiplication of 1 MT improved maize seed / 3 MT urea.
Ongoing
UNICEF
-- 93 -- --
Polio /measles /D.P.T & T.T.
Completed
FAO
4 93
5 93
Multiplication of seize & other seed.
DATABASE OF IGO ACTIVITIES
Page: 154
A6actrep Date: 27/08/93
oak-
6TH EDITION !
ACTIVITY
SECTOR
AGENCY
Nangarhar
- -
-- VILLAGES) - - --
-- STATUS
FUNDED
DURATION
BY
Begin --End
--
<ACTIVITY
DESCRIPTION>
Goahta
Completed
NRC/NCA
1 93
1 .93
Farm mechanization (2 tractors).
Canal
Completed
BCR
1 93
3 93
Rehabilitation of Goahta main canal intake(16 km) ! irrigates 15,000 jeribs & benefit 2.100 families.
Structure
Completed
NRC/NCA
8 92
1 93
Siphon Charkhowar(45 m), Super Passages, Dry 'hover (21.5 m), Worse Ihowar (44.5 m) & intake of the main canal -
ERSA
AGRIC:
Machinery
ERSA
WATER:
ERSA
WATER:
--
benefit 4,000 families.
5 93
River bank retaining.
6 91---
i assist DYE ! 2 paravet ; 1 gurad curative & preventive service.
.11 92
8 93
Multiplication of 10 MT wheat seed.
2 93
2 93
Multiplication of 16 MT sugar cane.
4 93
ERSA
WATER:
FloodControl
--
Completed
NRC/NCA
GAF
AGRIC:
Vet
Goahta
Ongoing
UNDP
MINA
AGRIC:
Crop Product
Goahta
Ongoing
FAO
- MAWA
AGRIC:
Crop Product
Gosbta
Completed
FAO /UNDP
Ongoing
ABS
10 92 12 93
Training of volunteers (communuty workers).
Completed
SCA
-- 92 -- 82
Distribution of 0.8 MT wheat seed, 0.8 MT DAP.& 1.05 MT Urea.
11 91
RES
SOCIAL:Other
SCA
AGRIC:
Crop Product
SCA
AMC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AMC:
Other
Ongoing
SCA
0 93 -- .93
Agriculture survey on 20 villages.
SCA
HEALTH: Compr.Clinic
Gandagbar
Ongoing
SCA
8 88 -- --
1 MD / 2 mid-level HWs i 1. Nurse
DUCAT: Primary
--
Ongoing
AID
8 87 -- --
7 schools in Atte Ihozi, Ihoizi, Ihaga lbel(2), Wali, Alkali Iohi & Deena villages.
UNO
'
Nangarhar
--
Hesarak
10 91
Multiplication of 10 MT wheat seed & 20 MT fertilizer.
7 92
ADAg
AGRIC:
Crop Product
6 villages
Completed
UNDP
ADAg
AGRIC:
Crop Product
2 villages
Completed
UNDP
ADAg
AGRIC:
Crop Product
4 villages
Ongoing
UNDP
ADAg
AGRIC:
Crop Product
6 villages
Completed
CIDA
7 91 10 91
Multiplication of 8 MT wheat seed & 1050 bags fertilizer.
ADAg
AGRIC:
Fruit Trees
13 villages
Completed
DCP
3 92 12 92
Distribution of 6,500 fruit saplings to 400 farmer families.
ADAg
AGRIC:
Fruit Trees
6 villages
Ongoing
DCP
3 93
2 94
Distribution of 10,000 fruit tree saplings.
ADAg
WATER:
Jerez
3 villages
Completed
UNDP
1:92
4 92
Rehab. of 3.55 km karez - irrigate 5590 jeribs land & benefit 730 farmers.
`ACBAR
Multiplication of 1 MT maize seed & 2.5 MT
1 92 11 92
11 92
7 93
fertilizer..
Multiplication of 10 MT wheat seed & 10 NT fertilizer.
DATABASE OF IGO ACTIVITIES
6TH EDITION
I
Page: 155
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
Nangarhar
---- VILLAGE(S) - - --
FUNDED
DURATION
< ACTIVITY
- - -BY --
Begin --End
Completed
Pvt
-- 92 -- 92
Completed
DCP
--
-- STATUS --
DESCRIPTION>
Hesarak
Structure
ADP
WATER:
ARCO
EDUCAT: Other
Construction & repair of irrigation structures.
Drug Awareness Event attented 400 people(mullahs / colanders I intellectuals I influential ! tribal elders &
students).
ANCO
WATER:
Canal
ANCO
WATER:
Canal
ANCO
WATER:
Canal
Completed
DCP
Chartoot
Ongoing
DCP
--
Completed
DCP
10 92
1 93
--
2 92
6 92
Rehabilitation of canal.
Rehabilitation of Chartoot canal - benefit 4,460 people.
Rehab.of 2 canals (Nawar -3.8 Lm & Langar Lhel -2.9 Lm) & Const.of 1 aqueduct- irrigate 1,140 jeribs & benefit 380
farmers.
AGRIC:
Crop Product
--
Completed
FAOÌUNDP
ARCON
AGRIC:
Other
ueearak
Ongoing
ARCON
Rehabilitation of agricultural load.
ARCON
CONST:
Pub.Building
Hesarak
Ongoing
ARCON
Repairing of main hospital.
ARGON
CONST:
Pub.Building
Hesarak
Completed
ARCON
--
Repairing of Hesarak hospital.
CONST:
Pub.Building
Hesarak
Completed
ARCON
--
Construction of Hesarak mosque.
DCA
AGRIC:
Vet
Naar
Ongoing
Dutch G.
IRC
EDUCAT: Primary
Bak Lhel/Malizai
Ongoing
IRC
-- 90 -- --
KAWA
AGRIC:
Hesarak
Ongoing
FAO
11 92
MSH
HEALTH: Basic Post
Jaw Ian
Ongoing
AID
11 89 -- --
OMAR
MINES:
Awareness
Completed
UNOCHA
RDA
AGRIC:
Crop Product
Ongoing
FAO
10 92
7 93
Distribution of 15 MT wheat & 15 MT DAP,
SAA
AGRIC:
Fruit Trees
Hesarak
Completed
SAA
1 92
2 92
Distribution of 6,000 trees (different types) to 1,200 families.
SCA
AGRIC:
Crop Product
--
Completed
SCA
0 92 -- 92
Distribution of 0.15 MT wheat seed & 0.15 MT DAP.
SCA
HEALTH: Compr.Clinic
Paghi Band
Ongoing
SCA
4 89 -- --
1 MD , 6 mid -level HWs ! 1 Lab Tech.
SCA
HEALTH: Basic Clinic
Laji Gar
Ongoing
SCA
6 87 -- --
5 mid -level HWs.
START
CONST:
Hesarak
Ongoing
ACLU
1 93 -- --
Construction of structures of 52 Lm Jalalabad- Hesarak road.
ARCO;
.
C H A R
Crop Product
Road
-- 92 -- 92
Distribution of 5 MT DAP.
ARADA
7 91 -- --
8 93
6 92 12 92
Centarl clinic with 1 vet. assistant
3 paravets & 2 vaccinators.
2 schools i 500 students.
Multiplication of 10 MT wheat seed.
2 BHWs
Safety lessons - 6009 people participated.
DATABASE OF NGO ACTIVITIES
Page: 156
A6actrep Date: 27!08/93
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
UNO
-- -- VILLAGES) - ---
EDUCAT: Primary
Nangarhet]
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Ongoing
AID
6 87 -- --
7 schools in Nawar(2), Patloo, Alas Iashes, Ghokiza. Shekhan & Lajagar villages.
Jalalabad
AABRAR
EDUCAT: Literacy
City
Ongoing
*Donors
8 92 -- --
Literacy course to 20 students for one month.
AABRAR
HEALTH: Med.Training
City
Ongoing
*Donors
8 92 -- --
One qualified nurse provides one, month first aid training to 25 students..
AABRAR
HEALTH: Disabled Reh
City
Ongoing
*Donors
S 92 -- --
2 trainers give bicycle training to 20 people a month.
One bicycle mechanic deale with the repairs of bicycles & job
training to the interested amputees.
female / children) every day.
AABRAR
HEALTH: Disabled Reh
City
Ongoing
*Donors
R 92 -- --
2 physical therapists provides physiotherapy to 2,5 patience (male
AABRAR
INCOME: Skill Train.
City
Ongoing
*Donors
392'----
interested trainees are receiving juice making
ACDG
EDUCAT: Literacy
City
Ongoing
TAF
-- 93 -- --
Literacy course.
Ann
EDUCAT: Management
City
Ongoing
TAF
-- 93 -- --
Management / accounting & typing courses.
ACM
EDUCAT: Language
City
Ongoing
TAF
-- 93 -- --
English language course.
ACDO
EDUCAT: Language,
City
Completed
TAF
11 92
4 93
English language development.
ACRU
AGRIC:
3 villages
Completed
UNCHS
12 92
4 93
3 incubators & poultry production.
AICC
EDUCAT: Madrasa
City
Ongoing
Pvt
9 92 -- --
AMWS
INCOME: Skill Train.
City
Ongoing
MIL
-- 93 -- 93
Tailoring course for 50 women(6 months) + literacy.
ANH
HEALTH: Provinc.Hasp
PH Hospital
Ongoing
Germany-
-- 92 -- --
40 beds hospital with x -ray, Lab, dental, internal & surgical services.
AOGH
HEALTH: Provinc.Hoep
Asir Shaheed Rd
Ongoing
*Donors
2 93 -- --
APWO
WATER:
Canal
Completed
IF?
1 93
4 93
Rehabilitation of 12 canals (FFW).
APia
WATER:
Canal
Completed
WFP
i 93
4 93
Cleaning of 12 canais inform of(food for work).
ARCON
AGRIC:
Training
Ongoing
ARCON
ARCON
CONST:
Shelter
Jalalabad
Ongoing
ARCON
--
Repairing of Mohajereen camps.
ARGON
CONST:
Shelter
Jalalabad
Ongoing
ARCON
--
Pre -caste concrete factory.
Livestock
4 villages
.
knife srarpning & cotton candy making for 1 month.
Madrasa and training center for Islamic cultural purposes.
21 bed delivery complex - lab /.ultrasound - OPD: 60 -70 women / children / daily.
Agriculture training center.
'DATABASE OF NGO ACTIViTIES
Page: _157
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
Nangarhar
- - -- VILLAGES) - - --
--STATUS --
DURATION
FUNDED
- --BY --
Begin- -End
<ACTIVITY
Jalalabad
Repairing of Gary Moen mosque.
ARCON
COAST:
Pub.Building
Jalalabad
Ongoing
ARCON
-- -- -- --
ARCON
CONST:
' Pub.Building
Jalalabad
Ongoing
ARCON
--
ARCON
CONST:
Pub.Building
Jalalabad
Ongoing
ARCON
-- -- -- --
ARCON
CONST:
Pub.Building
Jalalabad
Ongoing
ARCON
--
Repairing of Jalalabad market mosque.
AEON
CONST:
Pub.Building
Jalalabad
Ongoing
ARCON
--
Health unit
ARCON
CONS?:
Other
Farm Hada
Ongoing
ARCON
-- -- -- --
ARCON
CONST:
Other
Farm Hada
Ongoing
ARCON
ARCON
HEALTH: Disabled Reh
Jalalabad
Ongoing
ARCON
-- -- -- --
ARCON
INCOME: Skill Train.
Jalalabad
Ongoing
ARCON
-- -- -- --
ARCON
INCOME: Skill Train.
Jalalabad
Ongoing
ARCON
--
ARCON
RELIEF:Non-Food Item
Jalalabad
Ongoing
ARCON
-- -- -- --
ARCOlO
SOCIAL:Other
Farm Hada
Ongoing
ARCON
-
-- -- --
Jalalabad press
ARCON
WATER:
larez
Najm Algora
Ongoing
ARGON
-
-- -- --
Rehabilitation of Raja Algora karez.
ARCON
WATER:
Canal
Naja Algora
Ongoing
ARCON
-- -- -
ARCON
WATER:
Drinking
Jalalabad
Completed
ARCON
Nangarhar well digger preparation.
ARCON
WATER:
Drinking
Naja Algora
Ongoing
ARCON
Rehabilitation of Raja Algora well.
ARGON
WATER:
Drinking
Jalalabad
Ongoing
ARCON
Rehabilitation of province well & tank.
ARCON
WATER:
Drinking
Jalalabad
Completed
ARCON
-- -- -- --
Repairing of province well.
ARCON
WATER:
Drinking
Jalalabad
Completed
ARCON
-- -- -- --
Repairing of well.
ARGON
WATER:
Drinking
Jalalabad
Ongoing
ARCON
-- -- -- --
Rehabilitation of Jalalabad well pumps.
ARCON
WATER:
Drinking
Jalalabad
Ongoing
ARGON
-- -- -- --
Rehabilitation of Jalalabad well.
ARCON
WATER:
Other
Jalalabad
Completed
ARCON
-- -- -= --
Establishment of air compressor.
I
ACHAR
DESCRIPTION>
Construction of Al Mujahid health center.
Repairing of Obai Bin Iaab school.
Plastic factory.
industrial complex.
--
Artificial limb center
_
Jalalabad textile project
Al -Fateh center
Mohajereen instant sheltering.
Repairing of Naja Algora canal.
DATABASE OF NGO ACTIVITIES
Page: 158
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Nangarhar
VILLAGE(S)1- --
-- STATUS --
FUNDED
- --BY--
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jalalabad
ARCS
DUCAT: Other
City
Ongoing
ARDE
AGRIC:
Fruit Trees
Center
Ongoing
ARDP
AGRIC:
Crop Product
Center
Completed
FAO/URDP
ARR
RELIEF:Food Items
City
Completed
WFP
5 92 -- --
ARR
RELIEF:Food Items
Jalalabad
Completed
WFP
4 92
ATA /!.P
HEALTH: Other
Approved
*Donors
ATC
HEALTH: Mobile /F -Aid
Sharwali
Ongoing
UNOCHA
.:.[
AV10EN
V.
HEALTH:
Other
City
Ongoing
EC
CAS
HEALTH: Compr.Clinic
Nahia 1
Ongoing
CIDA
12 92 -- --
I MD ! 2 nurses
CIUP
INCOME: Skill Train.
Center
Ongoing
CIDA
-- 92 -- 93
Jalalabad shoe making training project.
CRAA
AGRIC:
Sheshee Bag
Completed
*Donors
DACAAR
AGRIC: ,Crop Product
8 villages
Completed
FAO
DACAAR
AGRIC:
Crop Product
8 villages
Ongoing
DACAAR
3 93 -- --
DACHAR
AGRIC:
Fruit Trees
8 villages
Completed
FAO
3 93
DACAAR
AGR.IC:
Research
8 villages
Ongoing
FAO /Self
1 93 -- --
Training
.
.
BC
7 95
7 93
Training teachers in how to teach basic health education - funds channeled through IFRCS.
Established nursery farms for different kinds of tree saplings.
--
-- 91 -- 92
Production of improved wheat seed.
Distribution of 210 MT wheat to 2,100 families (food security)
4 92
Distribution of 210 MT of wheat.
-- 93 -- --
Tuberculosis control program.
5 nurses I 1 MD ;¡t rest deminers A local people.
5 92 -- --
1 VSF (shared
1 93 -- --
11 92 11 92
3 93
with NAC),
1
4
CC technician A 1 supervisor.
supervisor.
1 dispenser / 100 pte. i day.
36 DVM / assist DWI trained on clinical diagnosis of pregnancy in cows for 12 days.
3.8 MT wheat seed & 3.8 NT DAP distributed to 319 farmers.
Vegetable nursery established in an area of 135 Sgt.
2,545 fruit saplings distributed to 129 growers.
Ezperiments: wheat yield trial 15 var. test plots of 9-var. of wheats 3 var. of oat & 3 var. of barley & 12
demonstration plots of wheat in 7 villages.
DACAAH
AGRIC:
Plant Protec
8 villages
Completed
DACAAR
3 93 -- --
DACAAR
AGRIC:
Training
8 villages
Ongoing
DACAAR
11 92 -- --
232 farmers technically trained.
DACAAR
GOUT:
Shelter
City
Ongoing
DACAAR
11 92 -
Concrete beams 300.
DACAAR
WATER:
tarez
Farm Hada
Completed
DACAAR
-- 92 -- 92
2 karezes cleaned.
DACAAR
RATER:
Drinking
City
Ongoing
UNICEF
-- 92 -- 93
74 tube -wells with hand -pumps, output 22.
DCA
AGRIC:
Vet
Farm Hada
Ongoing
Dutch G.
--
8 92 -- --
.
60 kg 2 -4 -D applied on 150 jeribs wheat fields of 100 farmers.
1 veterinarian with medicine equipments & training facilities.
Page: 159
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENGI
Nangarhar
- --- VILLAGE(S) - - --
-- STATUS --
DURATION
FUNDED
- --BY --
Begin- -End
-- 93 -- --
<ACTIVITY
DESCRIPTION>
salalabad
Maxillofacial & ENT / dental health center i dental training course for female trainees 150 -200 patients daily.
DCAR
HEALTH:. Compr.Ciinic
--
Ongoing
*Donors
DESP
INCOME: HelpCraftmen
Center
Ongoing
FRG
6 91 -- --
Establishment of commercial bakeries & training in basic equipment.
FNSAD
SOCIAL:Other
City
Ongoing
TAF
2 92 -- 93
Provision of money to disabled on monthly basis.
GAA
RELIEF:Food Items
Farm Hada/Mumtaz B
Completed
GAA
-- 93 -- --
Distribution of 300 MT food (wheat / chick pea i oil) to Kabul displaced families.
GAC
AGRIC:
Fruit Trees
Angur Bagh
Ongoing
FAO
-- 92 -- --
Nursery
GAC
AGRIC:
Livestock
Angur Bagh
Ongoing
UNDP
-- 92 -- --
Poultry production and distribution (30.000 chicks up to May 1993).
RC
HEALTH: Mobile /F -Aid
Ongoing
HCI
10 91 -- --
Mobile clinic, treatment for Kabul refugees i 18 schools & colleges students.
Completed
HCI
IC 91
Ongoing
HCI
Completed
HCI
10 91
Ongoing
HCI
-- -- -- --
Distribution of 150 tents for labul refugees.
Distribution of 300 blankets.
HEALTH: Disabled Reh
--
RELIEF:Food Items
¡ICI
RELIEF:Food Items
HCI
RELIEF:Non -Food Item
gCI
RELIEF:Non -Food Item
Farm Bada/Mumtaz B
Ongoing
HCI
-- -- -- --
HCI
SOCIAL:Other
Farm Hada/Mumtaz B
Ongoing
RCI
--
HCI'
HATER:
Farm Hada
Ongoing
HCI
-
iCRC
HEALTH: Other
Ongoing
ICRC
-- 92 -
Shekh Sahib
Approved
IIRO
-- 93 -- 93
IDA
.
CONST:
Drinking
Pub.Building
Distribution of 1,000 bags fiour(50 kg each) & 1,000 tin oil(5 kg each).
2 92 -- --
HCI
Farm Hada/Mumtaz B
Medical treatment for disabled people.
2 93
150 Sacrificed meat(Qurbani)for displaced people.
2 93
Hired 2 persons for the services of disabled people.
Drinking water supply for labul refugees.
-- -- --
--
'
Providing medical support to different hospitals.
Construction of mosque.
Distribution of food & fruit during the month of Ramazan in camps.
IDA
RELIFF:Food Items
Mumtaz Bagh
Completed
Pvt.
--
IDA
FELIEF:Food Items
Mumtaz Bagh
Completed
Pvt.
7 92 -- --
Distribution of 5 MT wheat.
IDA
RELIEF :Non -Food Item
Mumtaz Bub
Ongoing
Pvt.
7 92 -- --
Distribution of food, medicines & Blankets for refugees in camps - benefit 100 families.
IHSAN
RELIEF:Food Items
Camps
Completed
NFP
9 92
IHSAN
NAM:
Firqa
Ongoing
NFP
7 93 -- --
IACBAR ---
Canal
9 92
Distribution of 300 MT wheat for the 3,000 displaced families who came from Kabul.
Rehabilitation of 11 km canal (FFN -42 MT wheat).
DATABASE OF NGO ACTIVITIES
Page: 160
A6actrep Date: 27/06/93
6TH EDITION 1
ACTIVITY
AGENCY
SECTOR
Nangarhar
IIRO
-- -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jalalabad
HEALTH: Region.Hosp
City
Ongoing
IIRO
'12 92 -- --
150 bed Children & female hoop: (Fatesa El- Zabra) - Gen.surgery / orthopaedic / ob -gyn /ENT / Opthalmology /
int.iedicine / paediatric / emergency ! ICU / plastic surgery ! dental services.
TIRO
HEALTH: Vaccination
Jalalabad
Ongoing
IIRO
--
Vaccination program (open cases).
TIRO
HEALTH: Vaccination
Jalalabad
Ongoing
IIRO
--
Vaccination program covered different parts of Nanagarhar i lunar
IIRO
HEALTH: Other
.Various
Ongoing
IIRO
-- 93 -- --
TIRO
INCOME: Help Vulner.
City
Ongoing
TIRO
IMC
HEALTH: Compr.Clinic
City
Ongoing
AID
HEAL T H: Med. T raining
City
Ongoi ng
AID
IOC
INCOME: Help Vulner.
Center
Ongoing
IOC
IRC /RPA
CONST:
Sanitation
Farm Hada /Mumtaz B
Completed
AustCare
9 92
1 93
Construction of 20 bathing facilities in 2 camps
IRC /RPA
CONST:
Sanitation
Farm Hada/Mumtaz B
Completed
AustCare
9 92
1 93
Construction cf 209 pit latrines in 2 camps
IRC /RPA
HEALTH: Education
Farm Hada/Mumtaz B
Completed
Aust "ere
9 92
1 93
Basic health education messages on sanitation, vaste disposal, clean water etc
ISRA
CONST:
Center
Ongoing
ISRA
-- 92
9 93
Construction of 4 mosques.
ISRA
EDUCAT: Primary
Jalalabad
Ongoing
ISRA
11 92 -- --
ISRA
HEALTH: Coepr.Clinic
Center
Ongoing
ISRA
9 92 -- --
2 MD / 1 medical assistant / 1 lab tech. / I nurse / male & female helpers.
ISRA
HEALTH: Other
Center
Ongoing
ONICEF
3 93 -- --
Establishment of emergency drop -in center for vulnerable childerm
ISRA
INCOME: Help Vulner.
Center
Ongoing
ISRA`
9 92 -- --
Assistance to 1, ?36 orphans (monthly allowance / Health / education / clothing / foot -wear.
ISRA
INCOME: Skill Train.
Center
Ongoing
ISRA
11 92 -- --
Vocational training center for 40 woven students(tailoring / sewing / literacy etc).
ISRA
INCOMES Skill Train.
Center
Ongoing
ISRA
11 92 -- --
Vocational training center for 50 boy students(Auto Mech. / carpentry / tailoring ; welding / electricity /
7M(
Pub,Building
Laghman.
Malaria control program in collaboration with WHO I UNHCR / MSF.
Orphanage: provision of monthly cash to orphans.
93 -- --
Comprehensive clinic._
_
3 93
M e di ca. training.
.
-- 93 -- --
Provision assistance to orphans.
1 School for orphans - 120 students 1 3 teachers & 2 teachers with Quranic center.
capacity for 500 childern.
agriculture).
IRCS
HEALTH: Disabled Reh
City
Ongoing
BRCS
LQO
INCOME: Help Vulner.
City
Ongoing
LQO
-- 92 -- --
Orphanage: providing monthly cash to 750 orphans.
MAMA
INCOME: Handicrafts
Center
Ongoing
Dutch
-- 92 -- 93
Handicraft - use wool for carpet.
'ACBAR
9 92 -- --
10 bed rehabilitation center - physiotherapy + orthopaedic workshop - plans to add paraplegic center.
DATABASE OF NGO ACTIVITIES
Page: 161
!6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
Nangarhar
-VILLAGES) - ---
--STATUS --
FUNDED
DURATION
- - -BY --
Begin --End
tACTIVITY
DESCRIPTION>
Jalalabad
MF
RELIEF:Food Items
Farm Hada,Mumtaz B
Ongoing
MF
-- 92 -- --
Providing food to Kabul displaced families.
MF
RELIEF:Non -Food Item
Farm Hada/Jumtaz B
Ongoing
MF
-- 92 -- --
Providing of tents
MMC
HEALTH: Compr.Clinic
City
Ongoing
NAC
4 90 -- --
3 MD+6 paramedics +l vaccinatorl lab tech.+1 female nurse - surgical / OPD / Lab / EPI / MCH / Dental.
MMC
HEALTH: Other
City
Ongoing
RAP
5 92 -- --
Family Training Program: home visiting & instructing on hygiene, nutrition, ante -natal & post -natal care, first -aid &
blanekets & other commodities to Kabul displaced families.
ORS making.
MSH
HEALTH: Med.Training
Jalalabad
Ongoing
AID
10.92 -- --
Institute of public health (IPH) training center transferred from Peshawar in 10/92 offering BHW, RHO, MCHO training,
management & PHC seminars & workshops.
MSH
HEALTH: Other
Jalalabad
Ongoing
AID
Regional Health Administration (P.HA I
--
administrative center and depot for issue of supplies and salaries and
monitoring and supervision of the BHfis and health facilities under its jurisdiction
n
NAC
AMC':
NAC
HEALTH: Vaccination
NPO
CONST:
PDA
Animal vaccination program.
Center
Ongoing
MAC
PH Hospital
Ongoing
UNICEF /S
Pub.Building
City
Ongoing
NRC /NCA
4 93 -- --
Construction of gynocological hospital for women.
CONST:
Pub.Building
Medical Institute
Ongoing
IIRO
7 93 -- --
Construction of a mosque inside the Institute.
RAH
AGRIC:
Forestry
City
Completed
OV
6 92
6 92
Distribution of 19,000 non -fruft trees.
RAH
RELIEF:Non -Food Item
City
Completed
0V
5 92
5 92
Distribution of quilt to 1,250 refugees from Kabul.
RBS
SOCIAL:Form Committ.
Ongoing
RBS
ROAOW
INCOME: Help Vulner.
SCA
AGRIC:
Crop Product
SCA
AGRIC:
SCA
AGRIC:
SCA
EDUCAT: Management
SCA
SGAA
Vet
-- 90 -- --
A vaccine storage facility (300,000 vaccines capacity) - joint project with AVICEN - would cover eastern zone.
10 92 12 93
Formation of social welfare committees.
-- 93 -- --
Orphanage & KG for orphans.
Center
Ongoing
--
Ongoing
SCA
0 93 -- 93
Distribution of 1.076 MT rice seed.
Crop Product
Completed
SCA
0 92 -- 92
Distribution of 15.3 MT wheat seed, 15.7 MT DAP & 41.95 MT Urea.
Research
Ongoing
SCA
0 93 --'93
20 crops variety testing trials of wheat & 2 of rice.
Jalalabad
Completed
SCA
6 93 -- --
7 days / 60 headmasters
EDUCAT: Teacher T.
Jalalabad
Ongoing
SCA
6 92 -- --
3 months / 60 teachers
HEALTH: Disabled Reh
City
Ongoing
SGAA
IAC B A R
10 92 -- --
Orthopaedic workshop and physiotherapy center.
DATABASE OF NGO ACTIVITIES
Page: 162
A6actrep Date: 27/06/93
6TH EDITION I
SECTOR
AGENCY
- - -- VILLAGES) - - --
ACTIVITY'
FUNDED
DURATION
-- STATUS --
--BI --
Begin- -End
<ACTIVITY
Jalalabad
Nangarhar
Ongoing
UNDP
10 92 -- --
Establishment of poultry farm.
INCOME: Skill Train.
Approved
EC
-- 93 --
Carpentry, masonry & welding training.
SOS -PG
EDUCAT: Teacher T.
Ongoing
EC/B.Gvt
-- 84 -- --
SOS -PG
INCOME: HelpCraftmen
Ongoing
EC
SJAWO
AGRIC:
SJAWO
DESCRIPTIOI>
Liveatock
Center
3 villages
7 92
6
--
Through resource centers in schools ! two & half month courses / 15 day seminars & practical work in classrooms.
94
Provision of toolkits & credit facilities to small enterprises.
25% of the beneficiaries are selected from
vulnerable groups.
7 92
Training of 26 trades by placement in apprenticeship.
6 94
SOS -PG
INCOME: Skill Train.
3 villages
Ongoing
EC
UMCA
HEALTH: Med.Training
Sarband
Ongoing
NAC
-- 92 -- --
Training of 10 dais for 3 months. 3 batches (30 pecpis
--
Approved
SCA
-- 93 --
Reconstuction of school(12 roots) roofing with vaults & girders with stabilized bricks.
6 villages
Ongoing
UNICEF
--
3 villages
Completed
UNOCHA
Total Area
Ongoing
DCP
Orígoiùg
NRC /NCA
2 93
12 93
2 tractors.
5 93
10 93
Construction of wells.
Kama
Nangarhar
Pub.Building
--
AEA
CONST:
AHSAO
HEALTH: Vaccination
AT"
MINES:
CRAA
DUCAT: Other
ERSA
AGRIC:
Machinery
ERSA
WATER:
Drinking
--
Ongoing
NRCINCA
GAF
AGRIC:
Vet
lama
Ongoing
UNDP
MCPA
MINES:
Survey
4 minefields
Completed
UNOCHA
1
MSH
HEALTH: Basic Post
Sangar Sarai
Ongoing
AID
3 88 -- --
SCA
AGRIC:
Crop Product
--
Completed
SCA
0
SCA
AGRIC:
Plant Protec
Completed
SCA
0 -- -- 92
Provision of o.4 MT agrochemicals.
SCA.
AGRIC:
Other
Ongoing
SCA
0
93 -- 93
Agriculture survey on 50 villages.
SCA
CONST:
Pub.Building
Sangar Sarai
Completed
SCA
9
92
6
93
Construction of 1 boys school.
SCA
CONST:
Pub.Building
Sanger Sarai
Completed
SCA
9 92
6
93
Construction of 1 girls school.
A C H A R
have completed the course so far.
Clearance
--------------__
Polio /messies /D.P.T & T.T.
93 -- --
5 92
11 92 --
11 91
Destroyed 13 devices, cleared 13213 Sim road & canal.
9 92
6
Narcotic awareness, 1 extension agent.
_ --
93
92 12 92
92 -- 92
1 DVM / 2 paravet / 1 guard curative & preventive service.
35,888 S9m irrigation I unknown & road.
3 BHWs
Distribution of 78 MT wheat seed, 78 MT DAP & 110.1 MT Urea.
DATABASE OF NGO ACTIVITIES
her: 163
A6actrep Date: 27/08/93
6TH EDITION
AGENCY
SECTOR
-VILLAGE(S)-
ACTIVITY
FUNDED
DURATION
STATUS-
---BY--
Begin--End
(ACTIVITY
DESCRIPTION>
Kama
Nangarhar
SCA
CONST:
Pub.Building
Sangar Serai
Completed
SCA
9 92
SCA
HEALTH: Basic Clinic
Sangar Sarai
Ongoing
SCA
4 88 -- --
SCA
WATER:
Completed
UNDP
8 92
UNO
EDUCAT: Primary
Ongoing
AID
8 87 -- -- -
Drinking
Nangarhar
.28 villages
6 93
Construction of 1 clinic.
4 mid -level HWs.
2 93
Construction'of wells - benefit 1,000 families.
1 school in Atam lalai.
KhoBiani
AAA
AGRIC:
Crop Product
Waziri
Ongoing
FAO/UNDP
AAA
AGRIC:
Crop Product
Waziri
Completed
FAO /UNDP
5 92 .9 92
AAA
AGRIC:
Crop Product
Waziri
Completed
FAO /UNDP
5 92
9 92
Rice seed multiplication.
AAA
AGRIC:
Crop Product
Zawa
Completed
FAO/UNDP
11 91
7 92
Multiplication of 15 MT wheat seed & fertilizer.
AAA
AGRIC:
Fruit Trees
Waziri
Completed
FAO/UNDP
3 92.12 92
Distribution of 6,000 fruit saplings.
AAA
AGRIC:
Fruit Trees
Waziri
Ongoing
FAO
3 93 12 93
Distribution of 6,000 fruit saplings.
AA1
WATER:
Canal
Zawa
Completed
UNDP
3 92
6 92
Rehabilitation of 3 km canal - irrigates 4500 jeribs & benefits 1200 farmer families.
AAA
WATER:
Canal
Zawa
Discontin
UNDP
11 92
5 93
Rehabilitation of 4 km canal - irrigates 15000 jeribs & benefits 2300 farmer families.
AB
AGRIC:
Fruit Trees
Male
Completed
FAO
3 91
3 91
Fruit trees distribution (10,000 saplings).
AB
WATER:
Canal
Ehader Ebel
Completed
DCP
9 92
1 93
Canal reconstruction for 500 jeribs land.
AB
WATER:
Canal
All Ihel
Completed
DCP
9 92
1 93
Canal reconstruction for 150 jeribs land.
ACDO
AGRIC:
Crop Product
' Ihoza Ihel
Approved
FAO /UNDP
-- -- -- --
Rice seed multiplication & distribution program.
ACDO
AGRIC:
Crop Product
Pera Ebel
Approved
FAO/UNDP
--
Maize seed multiplication & distribution program.
AGRIC:
Crop Product
Bebar
Ongoing
FAO
ACDO
AGRIC:
Crop Práduct
Ihoza Del
Approved
FAO/UNDP
-- -- -- -
Maize seed multiplication & distribution program.
ACDO
AGRIC:
Crop Product
Bebar
Approved
FAO/UNDP
-- -
Maize seed multiplication & distribution program.
ACDO
AGRIC:
Crop Product
Pera Ihel
Approved
FAO/UNDP
ACDO
,
11 92
7 93
--
2 93 -- --
--
Multiplication of 10 MT wheat seed & fertilizer.
Multiplication cf 10.5 MT maize seed.
Distribution of 8 MT sugar cane & 0.25 MT DAP.
Rice seed multiplication & distribution program.
'DATABASE OF 11G0 ACTIVITIES
Page: 164
A6actrep Date: 27/08/93
ACTIVITY
-VILLAGE(S) - --
SECTOR
AGENCY
--STATUS --
FUNDED
DURATION
- --BY --
Begin --End
II 92
<ACTIVITY
DESCRIPTIOR>
Khogiani
Nangarhar
Multiplication of 5 MT wheat seed & fertilizer.
7 93
ACDO
AGRIC:
Crop Product
-Wazir Khan Del
Ongoing
FAO/URDP
ACDO
AGRIC:
Fruit Trees
Wazir Khan Del
Ongoing
FAO /UNDP
4 93 -- --
Distribution of fruit trees apples
ADAg
AGRIC:
Crop Product
3 villages
Completed
UNDP
1.992 11 92
Multiplication of 0.25 MT rice seed & 1.25 MT fertilizer.
ADAg
AGRIC:
Crop Product
2 villages
Completed
UNDP
1 92 11 92
Multiplication of 1 MT 'aine seed & 2.5 MT fertilizer.
ADAg
AGRIC:
Fruit Trees
4 villages
Ongoing
DCP
3 93
ARSAO
AGRIC:
Fruit Trees
Ibermana
Ongoing
FAO
6 92 -- --
AMf2AN
AGRIC:
Crop Product
Ihermana
Ongoing
.FAO /UNDP
AMRAN
SOCIAL:Other
Many villages
Completed
Germany
AMRAN
WATER:
Tala fiel
Completed
CIDA
OH
HEALTH: Basic Clinic
Waziri.
Ongoing
Germany
1 87 -- --
80 -120 pts. OPD / day.
APWO
AGRIC:
Crop Product
Waziri -6 villages
Completed
FAO /UNDP
5 92 11 92
Rice geed multiplication project (250 kg).
APWO
AGRIC:
Crop Product
--
Ongoing
FAO
II 92 11 93
Multiplication of 5 MT wheat seed & 5 MT DAP.
ARADA
AGRIC:
Crop Product
--
Completed
FAOÍUNDP
-- 92 -- 92
Distribution of 5 MT DAP.
ARCON
AGRIC:
Livestock
Hashim fiel
Ongoing
ARGON
LRCON
AGRIC:
Livestock
Bashi' Del
Ongoing
ARCON
ARCON
AGRIC:
Livestock
Ongoing
ARCON
--
Honey Bees
ARCON
WATER:
ferez
Completed
ARCON
--
Cleaning of 1 fm karez.
ARDA
AGRIC:
Fruit Trees
ARDA
EDUCAT: Primary.
laja
Ongoing
ARDA
EDUCAT: Madrasa
laja
Ongoing
AkDA
WATER:
Bazo- Khel
Ongoing
Canal
Structure
Ador
-- 92
pears / peaches & plum.
Distribution of 5,000 fruit trees saplings.
2 94
Fruit & forest trees nursery in 2 jeribs of land.
Multiplication & distribution of 5 MT improved wheat seed & 5 MT fertilizer.
7 93
Assessment survey project relating to opium addicts.
8 90 10 9C
Cleaning of 2.5 km canal.
10 90 12 90
Honey Bees
--
Poultry farm
Established nursery farms for different kinds of tree saplings.
Ongoing
-- -- -GAC
6 92
--
Established primary school in laja.
--
Established Madrasa in laja.
8 92
Construction of 20 m (40 cu.m) Gabion water intake & cleaning 2 L canal - irrigate 8O4_ jeribs / benefit 300
families.
IACBAR
DATABASE OF RGO ACTIVITIES
Page: 165
A6actrep Date: 27/08/93
6TH IDITION
ACTIVITY
AGENCY
SECTOR
Nangarhar
ARDA
WATER:
- - -- VILLAGE(S) -- --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Khogiani
Structure
Hawi Shar
Ongoing
GAC
6 92
Construction of 30 m (60 cu.m) Gabion water intake & cleaning 3 Km canal - irrigate 1,200 jeribe / benefit 400
8 92
families.
ARDA
WATER:
Structure
Wazir
Ongoing
GAC
6 92
8 92
Construction of 40m(80 cu.m) Gabion water intake & cleaning of 4 Km canal - irrigate 1,500 jeribs t benefit 600
families.
ARDP
AGRIC:
Crop Product
ARDP
AGRIC:
Crop Product
ARDP
AGRIC:
Crop Product
AGRIC:
AGRIC:
OAi?p
A DP
Qelaghou
Completed
FAO /UNDP
10 91
Completed
FAO
-- 91 -- 92
Production of improved wheat seed.
Ongoing
FAO/UNDP
-- -- -- --
Production of improved wheat seed.
Fruit Trees
Ongoing
FAO!DCP
12 91 -- -
Distribution of 11,000 fruit saplings.
Fruit Trees
Completed
D^ IFA(
4
Ongoing
UNDP
- -- -- --
Mule
Completed
UNOCHA
Qelaghou
6 92
Distribution of4 MT Pak -81 / 2 MT Prisabak -85 ! 6 MT Urea / 6 MT DAP.
Distribution of 6.50: fruit-trees - vánaf.: 400 families.
.9' 12 92
.
ARDP
AGRIC:
Livestock
ATC
MINES:
Clearance
AVICEN
HEALTH: Vaccination
195 villages
Ongoing
ECÍUNICF
CIUP
CONST:
Pub.Building
Tirakhel Waziri
Ongoing
ARCON
-- 92 -- --
A mosque building - cement & steel bar.
CONST:
Pub.Building
Tirakhel Waziri
Ongoing
ARCON
-- 92 -- --
A mosque building - cement & steel bar.
CRR
CONST:
Road.
Completed
UNDP
-- 92 -- 92
Technical survey of secondary roads.
DCA
AGRIC:
Vet
Samochi
Ongoing
UNDP
4 89 -- --
DCA
AGRIC:
Vet
Behar
Ongoing
UNDP
4 92 -- --
DCA
AGRIC:
Vet
Memia
Ongoing
UNDP
11 92 -- --
1 paravet.
DCA
AGRIC:
Vet
Samochi
Ongoing
NAC
4 89 -- --
2 paravet.
DESP
AGRIC:
Fruit Trees
Khogiani
Completed
FAO
2 93
DESP
INCOME: Skill Train.
Completed
GTZ
-- 92 -- --
GAC
AGRIC:
Fruit Trees
Band Surinai
Ongoing
FAO
-- 92 -- --
Nursery
GAC
AGRIC:
Livestock
--
Ongoing
UNDP
-- 92 -- --
Poultry production and distribution.
Poultry distribution project.
12 92 12 92
Cleared 4000 Sqm agri.land.
2 teams - 5 vaccinators
3 93
Central clinic with 1 advanced paravet.
'
1 paravet.
Distribution of 6,000 local varieties saplings , providing training in grafting & curing in 5 villages.
_Training of metal workers to produce & sell fuel -efficient cooking ; heating stoves. ;minimum 2 metal workshops;.
DATABASE OF NGO ACTIVITIES
Page: 166
A6actrep Date: 27/08/93
6TH EDITION
S$CTOR
AGENCY
Nangarhar
IC
GAC
GAC
GAC
GAG
IAAAE
IHSAN
Baja Bazaar
Ongoing
-- -- --
Malikyar Hotak high school - 600 students.
EDUCAT: Madrasa
laja Bazaar
Ongoing
-- -- -- --
Faizul Islam Medrase - Hifzul Quran - 125 students.
HEALTH: Distrct Beep
baja
Ongoing
-- 92 -- --
20 beds general hospital - lab/ OPD A vaccin.
HEALTH: Basic Clinic
/awe
Ongoing
HEALTH: Basic Clinic
Wazir
Ongoing
CONST:
Pub.Building
laja
Completed
IWL
5 91
5 92
Construction of Mosque with 2 rooms- stone ,1 firebrick i wood A cement.
Canal
Nukur lhel
Completed
ARGON
2 92
4 92
Rehabilitation of 5 Im canal A construction of its intake.
Structure
Reshakai
Completed
ARCON
6 92.12 92
Construction of 70 m retaining gall.
Structure
Mule
Completed
ARCON
5 92 10 92
Construction of 300 m retaining wall A 20 a intake.
Henla
Completed
ARCON
6 92 10 92
Construction of 8/18 a vier and 2 retaining walla each 20 m.
lhader lhel /Zawa
Completed
SV
6 92
7 92
Gravity -flow water supply, two systems, benefit 1980 families
laja
Completed
UNDP
12 92
4 93
Construction of intake retaining wail of 216 a long & benefit 3,500 farmers.
Wazir /Ahmed Ebel
Completed
MAI'
6 91
8 91
In- service teacher training: 82 teachers were trained in 45 days seminar in Iuz Saber, $nrguri A Wazir Ahmed Ihel.
Ihogiani
Completed
CIDA
Structure
Drinking
Structure
EDUCAT: Teacher T.
NAVA
CONST:
Bridge
,
--
.
--
Sub clinic of GAC hospital.
-- -- -- --
Sub clinic of GAC hospital.
-- 91 -- 91
' Reconstruction of 6 bridges.
......,...___
.
CPA
NINES: ,Survey
2 minefields
Completed
UlIÖCEà
1 92 12 92
19,595 Sul road.
NSB
HEALTH: Basic Post
lhader IIel/Zawa
Ongoing
AID
8 87 -- --
i BBIì
AGRIC:
Research
--
Completed
SCA
0 92 -- 92
1 crop variety testing trial of when A 1 of rice.
AGRIC:
Plant Protec
--
Ongoing
SCA
0 93 -- 93
Provision of 0.05 MT sgrochemicals.
AGRIC:
Plant Protes
-
Completed
SCA
0 92 -- 92
Provision of 0.355 MT agrochemicals.
SCA
0 93 -- 93
Agriculture survey on 30 villages.
SCA
0 92 -- 92
Agriculture survey on 98 villages.
SCA
SCA
SCA
SCA
AGRIC:
SCA
ACBA
DESCRIPTION>
EDUCAT: Secondary
WATER:
MAI
Khogiand
<ACTIVITI
i school / 150 boys & 30 girls.
WATER:
LRO
Begin- -End
a---
-- -- -- --
WATER:
IRC /RPA
DURATION
Ongoing
WATER:
IHSAN
FUNDED
--BY --
laja Bazaar
WATER:
IHSAN
ACTIVITY
-- STATUS --
EDUCAT: Primary
WATER:
IHSAN
---- TILLAGEES) - ---
AGRIC:
Other
Other
R-------------
Ongoing
Completed
-
DATABASE OF 1G0 ACTIVITIES
Page: 167
A6actrep Date: 27/08/93
-------- - - - - --
STB EDITION
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(S) - - --
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION?
Khogiani
Nangarhar
Kaja/Tutu /Behar
Ongoing
SCA
6 93 12 93
Construction of primary schools.
HEALTH: Compr.Clinic
Lokhai
Ongoing
SCA
2 87 -- --
1 MD ; 8 mid -level HWe ! 1 Lab Tech.
SCA
HEALTH: Basic Clinic
Pera Khel/Wazir
Ongoing
SCA
12 88 -- --
UNO-
EDUCAT: Primary
Ongoing
AID
6 87 -- --
20 schools in different villages.
WOA
AGRIC:
Livestock
--
Ongoing
UNDP
3 91 -- --
Karakul breeding in Nangarhar.
WROR
WATER:
Other
Torghar
Completed
UNDP
3 92 -- 92
Technical survey of irrigation system (7 karezes & 30 canals):
.
SCA
CONST:
SCA
'Pub.Building
4 mid -level HWs.
Kouz Konar
Nangarhar
: iPven & d:`.gn of nhewa & Shagi canals & structure.
AF
WATER:
`:a!:;.î
.hewLLi3hgLú i
Completed
FAO
ARC A :
WATER:
Canal
Shewa
Ongoing
F AO
10 92
Rehabilitation of 6.4 Km main 'canal,
ATC
HEALTH: Mobile /F -Aid
Shewa
Ongoing
UNOCHA
11 92 -- --
4 nurses I 1 MD / treat deminers & local people.
ATC
FINES:
Shagai /Koari
Completed
UNOCHA
11 92 12 92
Destroyed 2236 devices cleared 408741 Sqm road & canal.
AVICEN
HEALTH: Vaccination
36 villages
Ongoing
EC /UNICF
-- -- -- --
1 team - 2 vaccinators
GAF
AGRIC:
Vet
Shewa
Ongoing
UNDP
11 91
6 93
1 assist DVM f 2 paravet 1 1 guard curative & preventive service.
waM4R
CONST:
Shelter
Ongoing
UNCHS
2 93
8 93
Production of 5,000 41 beam.
MAMAR
WATER:
Structure
Completed
FAO
1 93
5 93
Construction of 1 vier & culvart.
MCPA
MINES:
Survey
6 minefields
Completed
UNOCHA
1 92 12 92
424,955 Sqm road & agri.land.
MSH
HEALTH: Basic Post
Suruch
Ongoing
AID
3 88 -- --
2 BHWs
RAH
AGRIC:
Crop Product
Kouz lunar
Ongoing
FAO/UNDP
AGRIC:
Crop Product
Ongoing
FAO
2 93 -- --
Distribution of sugar cane.
RAH
AGRIC:
Fruit Trees
Ongoing
FAO
2 93 -- --
Distribution of 5,000 trees.
RAH
WATER:
Canal
Shagai
Completed
FAO
8 92 IO 92
Cleaning of Shegay main canal irrigate more than 60.000 jeribs land.
RAH
VATER:
Structure
Shagai
Completed
FAO
8 92 10 92
Construction of temporary intake for Shagai main canal(60,000) jeribs.
RAH
.
ACBAR
Clearance
4 93
10 92 -- --
Seed multiplication through 2600 farmers.
DATABASE OF NGO ACTIVITIES
Page: 168
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
Nangarhar
----VILLAGE(S)--- -
--STATUS--
FUNDED
---BY--
DURATION
Begin--End
tACTIVITY
DESCRIPTION>
Kouz Konar
RAH
WATER:
Drinking
Kouz lunar
Completed
TIRO
RAH
WATER:
Drinking
Shagai
Ongoing
IIRO
10 92 12 93
10 shallow wells for 10 villages of Shagai - 500 families.
RSSA
AGRIC:
Crop Product
Shewa
Ongoing
FAO/UNDP
-- 92 -- 93
Distribution of 10 MT wheat & 10 MT DAP.
RSSA
AGRIC:
Crop Product
Shewa
Ongoing
FAO/UNDP
-- 92 -- 93
Maize seed multiplication (2 MT maize, 2.5 MT Urea, 3.5 MT DAP).
RSSA
AGRIC:
Crop Product
Shewa
Ongoing
FAO/UNDP
-- 92 -- 93
Rice seed multiplication (.5 MT rice, 2 M: urea & 2.5 CT DAP).
SCA
AGRIC:
Crop Product
Completed
SCA
EGA
HEALTH: Compr.Clinic
Ongoing
SCA
Ongoing
i-
FAO
V
3
Ongoing
AID
3 88 -- --
Completed
FAO
Completed
WFP
START
AGRIC:
UNo
EDUCAT: Primary
Center
Fruit Trees
Nangarhar
5 villages
3 93
1 93
20 shallow veils in 20 villages for 3.000 families.
0 92 -- 92-
Distribution of 13.15 MT wheat seed, 9 MT DAP & 19.6 MT Urea.
-- -- -- --
4
P
93
i
93
MP 'S
,
i mid-level try ' 2 Nurses
Fruit trees distribution
(MOO eaplinga`.¡.
14ìi4iUü 44....
4 schools in Badal. Shalwat, Shagandol & Keshmand villages.
Lalpur
AINA
AGRIC:
Crop Product
APWO
COAST:
Shelter
ARCON
COAST:
Pub.Building
Tor Khan
Ongoing
ARCON
ARCON
CONS!:
Pub.Building
Rinow- Parchaw
Ongoing
ARCON
-- -- -- --
ARGON
COAST:
Pub.Bnilding
Chaknawor
Ongoing
ARCON
--
ARGON
WATER:
Drinking
or Thai
Ongoing
--
.
ARCON
-- 92 -
92
Distribution of 5 MT DAP.
8 91 11 91
Repair of 157 damaged bouses in 9 villages - food- for -work project (184 MT wheat).
Construction of Torkham mosque.
-- -- --
-
Health unit
Construction of Chaknwar school.
Rehabilitation of Trokhan well
ATC
MINES:
Clearance
Lalpur /Daka Ulya
Diecontin
UNOCHA
2 91
4 91
Cleared 17,921 grazing land.
ATC
MINES:
Clearance
Lalpur /Daka Ulya
Diecontin
UNOCHA
2 91
4 91
Destroyed 2 devices, cleared 17921 Sul garzland.
ATC
MINES:
Clearance
Shamshad Laipnr
Completed
UNOCHA
12 91
3 92
Destroyed 41 devices, cleared 209677 Sqm road & bill.
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
GAF
AGRIC:
Vet
Lalpur
Ongoing
UNDP
11 91
6 93
1 assist DVM / 2 paravet / i gurad curative -& preventive service.
JCE
AGRIC:
Crop Product
lama Daka
Completed
FAO/UNDP
10 91
5 92
Distribution of 4 MT improved wheat seed ! 4 MT DAP ! 4 MT Urea.
A C B A R
----------_.
Narcotic awareness, 1 extension agent.
DATABASE OF IGO ACTIVITIES
Page: 169
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Nangarhar
- - -- VILLAGES) - - --
-- STATUS --
FUNDID
- --BY --
DURATION
<ACTIVITY
Begin --Ind
DESCRIPTION>
Lalpur
1 93
Multiplication of improved sugar cane seed.
JCE
AGRIC:
Crop Product
gama Daka
Completed
UNDP
4 92
JCE
AGRIC:
Crop Product
Kama Daka
Completed
FAO /UNDP
4 92 10 92
JCE
CONST:
Pub.Building
Renow -Parchaw
Completed
ARCON
11 91
7 92
Construction of clinic building - 5 rooms I stone / cement I RCC / steel beam.
JCE
CONST:
Pub.Building
Renow -Parchaw
Completed
ARCON
11.91
8 92
Construction of primary school - 8 rooms / stone /cement / RCC / steel beam.
JCE
COKST:
Pub.Building
gama Daka
Completed
ASRA
1 91
4 91
Consturction of mosque (stone f PCC slab / steel beam).
JCR
WATER:
FloodControl
Lalpur
Completed
CIDA
1 92
6 92
Construction of 13 dikes i 1200 cubic N gabion work / 1,000 hectares land.
NxWA
CONST:
Road
Tor Eham
Ongoing
CIDA
MSH
HEALTH: Basic Post
Lalpur
Ongoing
AID
5 91 -- --
1 BMW
NSfi
HEALTH: Basic Post
Dada Sufla
Ongoing
AID
7 87 -- --
2 BMWs
OMAR
MINES:
Awareness
Tor Ihnm
Completed
UNOCHA
6 92 12 92
Safety lessons - 53078 people participated.
OMAR
NINES:
Awareness
Completed
UKOCHA
1 92
6 92
Safety lessons - 5049 people participated.
SC -US
AGRIC:
Crop Product
Chaknawor
Completed
FAO/UNDP
3 92
3 93
Multiplication of improved sugar cane & extension courses.
SC -US
AGRIC:
Crop Product
Chaknawor
Ongoing
FAO
6 92 11 93
Multiplication of 3 MT improved maize seed (Shaheen / EV / Kessan), 3.1 MT Urea, 9MT DAP (through 487 farmers).
SC -US
AGRIC:
Crop Product
Chaknawor
Completed
FAO/UNDP
3 92
3 93
Multiplication of 50 KT improved sugarcane (CP/357), 2.5 MT Urea, 1.5 MT DAP, 05 kg fungicide (through 42 farmers).
SC-US
AGRIC:
Crop Product
Chaknawor
Ongoing
FAO/UNDP
11.92
7 93
Multiplication of improved wheat seed & extension courses.
SJAWO
WATER:
Canal
Mir Sanga
Completed
HCR
1 93
4 93
Rehabilitation of Mir Sanga main canal - irrigates 800 4eribs.
12 92
4 93
960 m protection wall.
Nangarhar
-- 93 -- 93
Distribution of maize seed / DAP / Urea.
Repairing of Torkham -Jal alabad paved road in 3 phases. f44 km) .
Mohmand Para
ADAg
WATER:
FloodControl
6 villages
Completed
UNDP
ARCM
CONST:
Pub.Building
Basavol Sufla
Ongoing
ARCON
--
Construction of Sayed Alas primary school.
ARCM
CONST:
Pub.Building,
Ghazgai
Ongoing
ARCON
--
Construction of Hazrat Anas school.
ARCON
CONST:
Pub.Building
Bila
Ongoing
ARCON
--
Construction of Bazrat Abbas primary school.
#O ST:
Pub.Building
Basawol Ulya
Ongoing
ARCON
--
Construction of Aiman Khan school.
ARCH
.
ACBAR ----
DATABASE OF NGO ACTIVITIES
Page: 170
A6actrep Date: 27/08/93
6TH EDITION
SECTOR.
AGENCY
Nangarhar
---- VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
--STATUS --
--BY --
Begin- -End
<ACTIYITY
DESCRIPTION>
Mohaand Dara
Ongoing
FAO
4 93 -- --
5;000 trees (Apricot, peach, plum & persimon).
Completed
WFP
--
Digging 5 wells &-installation of water pupa.
Completed
WFP
5 92
6 92
15 shallow well for about 30 villages.
Completed
'MOCHA
1 90- 2 90
Cleared 3,096 soil road / grazing land.
Total Area
Ongoing
DCP
11 92 --
Narcotic awareness, 1 extension agent.
Shelter
Basawol
Ongoing
DACAAR
11 91 -- --
RCC production beans - for community housing.
CONST:
Shelter
Bazar New
Completed
DACAAR
-- 92
DACAAR
CONS?:
Pub.Building
Ghazgal
Completed
DACAAR
-- 92
DACAAR
CONST:
Pub.Building
Basawol/Ghazgai
Completed
DACAAR
3 91 1091
DACAAR
CONST:
Sanitation
Several villages
Ongoing
DACAAR
-- 92 -- --
Sanitation: elements for baths(335 installed).
DACAAR
WATER:
Drinking
Several villages
Ongoing
UNDP /Slf
-- 91 -- 93
153 wells improved & 59 hand -pumps.
BSA
AGRIC:
Crop Product
--
Completed
FAO
10 92 12 92
Distribution of improved seed & fertilizer.
ERSA
AGRIC:
Machinery
Ongoing
NRC/NCA.
2 93 12 93
ERSA
CONST:
Road
Completed
NRC/NCA
8 92 10 92
BSA
CONST:
Pub.Building
Ongoing
NRC/NCA
2 93
ERSA
WATER:
Canal
Completed
NRC/NCA
8 92 10 92
Construction of Girdi Ghat canal (75 a).
ERSA
WATER:
FloodCot(trol
--
Completed
NRC/NCA
7 92 10 92
Construction of 300 m retaining wall.
GAF
AGRIC:
Vet
Mohmand Dare
Ongoing
UNDP
4 90
6 93
1 DVM / 2 paravet / -1 guard curative A preventive service.
JCR
AGRIC:
Crop Product
Amber Ihana
Completed
10 91
6 92
Distribution of wheat seed / DAP / Urea.
JCE
WATER:
garez
Amber Ebene
Completed:
ARCON
9 91
4 92
Cleaing of.5 harms (4 km).
MAWA
AGRIC:
Crop Product
Maitland Darn
Completed
FAO
2 93
2 93
Multiplication of 16 MT sugar cane.
ARDC
AGRIC:
Fruit Trees
3 villages
ARE
WATER:
Drinking
Gerdi Ghaws
ARE
WATER:
Drinking
Gerdi Ghays
ATC
MINES:
Clearance
CRAA
EDUCAI: Other
DACAAR.
CONST:
DACAAP.
--
.
.
FAO/UNDP
3 93
Production of 6116 concrete beams.
1 primary school building
8 93
.2 schools,
1 in Baswul (9 rooms) & 1 in Ghazgai (13 rooms)
cement /steel / brick [gravel /wood /,stone.
.Farm mechanization / nursery & traction (3 tractors & 2 threshers).
Repairing of 1.3 km road & ,4 culverts.
,Rehabilitation of Daká primary school.
DATABASE OF NGO ACTIVITIES
Page: 171
ARactrep Date: 27/08/93
6TH EDITION
AGENCY
SECTOR
Nangarhar.
MSH
---- VILLAGE(S) -- --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Mahmand Dora
HEALTH: Compr.Clinic
Basawol
Ongoing
AID
6 88 -- --
1 MD, 2 ME:. TECH, 1 DENTIST -M.D.
1 LAB TICE ASST.
2 ROOMS 3 BEDS. LABORATORY, DENTAL, ORTHOPAEDIC SURGERY,
VOLUNTEER HEALTH SISTER
ala.i ,'VHS)
AND DAI TRAINING
Y 1
WATER:
Structure
RBS
SOCIAL: Form Committ.
Se -Us
AGRIC:
Crop
Product,
Gerdi Ghaws
,
--
Ongoing
FAO
11 92
Ongoing
RBS
1092 12 93
Completed
*UN
12 90 11 91
9 93
Construction cf intake
retaining wall & cleaning. cf canal (2,000 jeribs).
Formation of social welfare committees.
Distribution of 475 MT impr. wheat / 3.65MT maize in Basawul ! Chaknawor / Guldag & parts of Batikot. Also dist. of
50 cans impr. veg. to 100 families.
SC -US
AGRIC:
Livestock
Mehrrand Dare
Ongoing
TAF
2 91
7 93
Training cf 165 women in poultry production.
SC-US
AGRIC.
Llvestoci
Basawcl/Hazar New
Calpieted
TAv
3 91
2 92
Poultry project
!Jyvv. (150 woman
SC -US
CONST:
Shelter
Completed
aN9 NFP
3 91 Lu 91
wi^w,i SM ~4'vks tnn 39 faüT?160
Repair & reconstruction of the 675 earthquake damaged hnLvy : in 4 villages - food-for-work project.
.
SC -US
INCOME: Handicrafts
SC -US
Basawol/Hazar Now
Completed
RAP
4 92
INCOME: Handicrafts
Completed
RAP
3 91 12 91
800 women are involved in_handicraft / embroidery. Products are sold at SCF Craft Shop in .Peshawar.
SC -US
WATER:
garez
Completed
RAP
6 91 12 91
Rehabilitation of 12 karezes.
S2 -US
WATER:
Structure
Completed
RAP /WFP
6 91 12 91
Construction of 750.1 retaining wall - food- for -work project.
SC -US
WATER:
FloodControl
--
Completed
RAP
6 91 11 91
Construction of 86 m flood control.
SCA
AGRIC:
Plant. Protec
--
Completed
SCA
0 92 -- 92
Provision of 0.27 MT agrochemicals.
SCA
HEALTH: Compr.Clinio
Gerd! Ghawe
Ongoing
SCA
11 88 -- -
1 MD /.2 mid -level HWs / 1 Lab Tech.
SJAWO
AGRIC:
Ongoing
UNDP
-- -- -- --
Distribution of 22,000 chickens amongst farmers for breeding purpsoses
SJAWO
EDUCAT: Literacy
Gerdi Ghaws
Completed
TAF.
7 90
3 93
Trainees of vocational center are offered literacy + numeracy.
SJAWO
INCOME: Skill Train.
Gerdi Ghaws
Completed
UNDP
5 91
1 92
Training in blacksmith & carpentry for repairing / manufacturing agricultural tools for farmers in their area.
YARA
AGRiC:
Ongoing
PAO
Many villages
Completed
USA
Gora lob
Completed
UNOCHA
Livestock
Crop Product
Nangárhar
ARAN
ATC
Crafts for women (income gen.prog) 4,800 kits have been given to 400 women (kit producers) on payment basis.
Distribution of sugar cane for 64 farmers.
Naziyan
SOCIAL:Other
MINIS:
3 93
Clearance
8 91 10 91
12 90 12 90
Assessment survey project relating to opium addicts.
Destroyed 1 device, cleared 390E 10 m roads.
DATABASE OF EGO ACTIVITIES
Page: 172
A6actrep Date: 27/08/93
ACTIVITI
---- VILLA6W) - - --
SECTOR
AGENCY
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Naziyan
Nangarhar
Ghundi
Ongoing
UNDP
7 91 -- --
Total Area
Ongoing
DCP
11 92 -- --
lazebiar
Completed
MIL
6 91 12 91
INCOME: Help Vulner.
Naziyan
Ongoing
LBI
MAI
_DUCAT: Primary
--
Ongoing
MAI
MCPA
MINES:
Completed
UNOCHA
Vet
CRAA
AGRIC:
CRAA
EDUCAT: Other
IAAAF
CONST:
LBI
Pub.Building
Survey
-- 89 -
2 91
Animal vaccination & treatment, i DVM 12 paravets & 1 guard.
Narcotic awareness, 1 extension agent.
School building - local materials.
--
Orphanage
--
4 schools in Sarobi, Lal Mandi, Lelmi & Spinazi villages.
34E-grazing) & 1 in
5 m- fields, 2 in Tarkha(9,970 so-gr. ,1 1.170 eqm- canal) / 2 in Marcha: (7,676 sçm -res. / 1,315
2 91
Sharmokhi(405e4a- ree.).
MSS?.
HEALTH: Compr.Clinic
Ongoing
AID
Agam
Ongoing
ARCON
Morchal
1 MD,
9 91 -- --
1 NURSE, 1 MED. TECH.
3 ROOMSi
Pachier /Agam
Nangarhar
Pub.Building
Construction of Abo Hanifa school.
--
ARCON
CONST:
AVICEN
HEALTH: Vaccination
27 villages
Approved
EC/UNICF
-- 93 -- --
1 team - 2 vaccinators
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, 1 extension agent.
DESP
AGRIC:
Fruit Trees
Aga:
Completed
FAO /GTZ
DESP
CONST:
Shelter
Agam
Completed
DESP
CONST:
Energy Cons.
Agam
GAF
AGRIC:
Crop Product
GAF
AGRIC:
GAF
.
2 90
4 90
Distribution & planting of 6,000 fruit saplings in 5 villages.
GTZ
12 91
6 93
Reconstruction of 600 residential rooms / roofs - air dried stabalized bricks are used.
Completed
GTZ
-- 92 -- --
Saber
Completed
FAO
12 92
Fruit Trees
Saber
Ongoing
BMZ
AGRIC:
Vet
Pachir Agam
Ongoing
UNDP
4 90
6 93'
1 DVM / 2paravet i 1-guard curative & preventive service.
ïRC /RPA
CONST:
Sanitation
Completed
AustCare
9 92
1 93
Construction of 100 double -vault surface latrines
IRC /RPA
HEALTH: Education
Completed
AustCare
7 92 12 92
INF
AGRIC:
Belo Ehel/Morgi /Sa
Ongoing
ISBA
INN
HEALTH: Compr.Clinic
Pachir Agam /Saber
Ongoing
Crop Product
DCP
Integration of at least 1 fuel - efficient cooking
6 93
heating device into each constructed room.-
Distribution of 5 MT wheat seed & 5 MT DAP to 200 farmers.
Distribution of 5,000 fruit trees (apricot 1 peach /plums / persïmon / pears).
11 92
Basic health education messages on sanitation, waste disposal, clean water etc
7 93
5 93 12 93
Distribution of 5 MT wheat seed & 5 MT DAP for 40 hectares of land.
1 Doctor / 2 nurses & 67 Pte. OPD /day.
DATABASE OF AGO ACTIVITIES
Page: 173
A6actrep Date: 27/08/93
6TH EDITION
AGBNCI
SECTOR
Nangarhar
MAI
Sc A
SCA
ADAg
ADAg
APWO
ARCON
ARGON
ARCO$
ARGON
ARCON
ARDCD
ITC
AVICBN
CRAA
DURATION
Begin --Ind
cACTIVITY
MAI
Agas
Ongoing
MAI
--
HIALTB: Basic Post
'midi Ihel
Ongoing
AID
5 91 -- --
1 BM
AGRIC:
--
Completed
SCA
0 92 -- 92
Distribution of 0.25 MT wheat seed & 0.25 MT DAP.
Ongoing
SCA
0 93 -- $3
Provision of 0.08 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Approved
FAO/UNDP
--
--
Rice seed-multiplication & distribution program.
Eot Baïdar Ehani
Approved
FAO /UNDP
--
--
Maize seed multiplication & distribution program.
5 villages
Ongoing
UNDP
11 93
7 93
Multiplication of 5 MT wheat seed & 5 MT fertilizer.
Completed
UNDP
1 91
9 92
Distribution of .20,000 Fayo'e .chickens to 1800 families.
Crop Product
Plant Protec
AGRIC:
Other
Nangarhar
ADAg
FUNDID
--BY --
Ongoing
AGRIC:
SCA.
ACDO
Aga'
IDUCAT: Primary
ESE
ACTIVITY
-- STATUS --
AGRIC:
AGRIC:
--AGRIC:
AGRIC:
WATIR:
WATER:-
CONST:
COlST:
CONST:
WHIR:
MINIS:
Crop Product
lot Salim Ihel
Crop Product
Crop Product
Livestock
6 schools in Shahi, Levai Mina, Marsha, Pachir Ulia, Pachir Sufla & Saber villages.
20 villages
Earez
5 vi11ages
Completed
UNDP
8 92
1 93
Rehab. of 7.5 ka tarez - irrigate 1720 hectares land - benefit 6250 farmers.
Structure
Mahan
Completed
'UNDP
4 92
8 92
Construction of dike & ,retaining wall.
Baser Shahi
Ongoing
ARGON
Completed
ARCH
Besar Shahi
Ongoing
ARCON.
--
Construction of Sershahi mosque.
Sadar Beearak
Ongoing
ARCO!
--
Construction of Dar Alhoffaz school.
Roghani
Ongoing
ARCO!
--
Construction of Holy Quran Dar. Tahfeez.
14 villages
Ongoing
UNDP
7 93 12 93
14 karezes.
Bait-Surkh Devil
Completed
UNOCHA
5 92
Destroyed 102 devices, cleared 36045 Sol agri.land / road & canal.
115 villages
Ongoing
IC/UNIC!
Ongoing
OUP
Pub.Building
Zerbacha
Pub.Building
Pub.Building
Pnb.Building
Aare:
Clearance
HIALTB: Vaccination
AGRIC:
7 schools in Ihogi ianbo, Pira Ibel, Wazir -Ahmed Ihel, Sangani, Mirza Ihel, Qilfo & Nish villages.
Rodat
COAST:' Pub.Building
CONS!:
DESCRIPTION>
Pachier /Agam
DUCAT: Pri'ary
MAI
ACDO
-VILLAGES) - - --
Vet
.
- -- --
Construction of Abdullah Bin Mesood secondary school.
Construction of Zarbachah mosque.
6 92
-- -- -- --
1 92 -- --
1 teas - 1 vaccinator
Aniaal vaccination & treatment, 1DVM / 2 paravets & 1 guard.
ACBAR
DATABASE OF 100 ACTIVITIES
Page: 174
- - ---
ABactrep Date: 27/08/93
6TB
IDITIO!
AGENCY
-VILLAGE(S)-
SECTOR-- --- - --
ACTIVITY
FUNDED
STATUS-
- - -BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Rodat
Nangarhar
7 91 -- --
Animal vaccination & treatment, i DVM / 2 paravets & 1 guard.
Barro
Ongoing
UNDP
Total Area
Ongoing.
DCP
1192 -- --
Narcotic awareness, 1 extension agent.
Road
Besar Shahi
Completed
UNDP
-- 92 -- 92
Technical survey of secondary roads.
Drinking
Several villages
Ongoing
BCR /Self
-- 92 -- 93
-78 wells improved & 33 hand -pumps.
HEALTH: Basic Clinic
Hesar Sbahi
Ongoing
IIRO
-- -- -- --
2 BHUs.
HEALTH: Basic Clinic
lot
Ongoing
IIF.O
-- -- -- -
BHt
Vet
CRAP
AGRIC:
CRAA
EDUCAT: Other
CRP:
CONST:
DACAAR
WATER:
IIRO
IIRO
AGRIC:
Crop Product
Rodat
Ongoing
FAO /ISRA
5 93 11 93
Distribution of 0.45 MT rice seed & 3 MT DAP.
ISRz
AGRIC:
Crop Product
Rodat
Ongoing
FAO
5 93 10 93
YG
Y
Distribution
4ív1' : of
of r'r 025
VY' MTl cotton
cottonYL seed
to progressive farmers.
L'av
ISRA
AGRIC:
Crop Product
--
Ongoing
FAO
5 93 10 93
Distribution Of 0.5 MT maize seed & 1.5 MT DAP.
ISRA
AGRIC:
Crop Product
--
Ongoing
FAO
5 93 11 93
Distribution of 0.2 MT rice seed & 1.5 MT DAP.
ISRA
AGRIC:
Fruit Trees
Rodat
Ongoing
FAO
3 93 11 93
Distribution of 10,000 fruit saplings.
ISRA
HEALTH: Compr.Clinic
Mirju
Ongoing
ISRA
9 91 -- --
1 doctor / 1 assistant / I lab tech. / female & sale helpers.
LDI
HEALTH: Basic Clinic
Hesar Shahi
Ongoing'
LDI
-- -- -- -
MAI
EDUCAT; Primary
tot
Ongoing
MAI
-
MAWA
AGRIC:
Crop Product
Rodat
Completed
FAO
MAWA
AGRIC:
Crop Product
Rodat
Completed
AGRIC:
Crop Product
Rohl
MAP
AGRIC:
Crop Product
--
AGRIC:
MAWA
'
-- -- --
Y'
4 mid -level BÏs
OPD.
1 school.
-- 94 -- 90
Multiplication of improved rice seed.
FAO
-- 90 -- 90
Multiplication' of 10 MT wheat seed.
Ongoing
FAO .
11 92
8 93
Multiplication cf 10 MT wheat seed.
Rodat
Completed
CIDA
-- 90 -- 90
Multiplication of 15
Crop Product
Rodat
Completed
FAO
-- 91 -- 92
Multiplication of 10 MT wheat seed.
AGRIC:
Fruit Trees
Rodat
Completed
FAO
-- 92 -- 92
Seedlings of 5,000 fruit trees.
NAVA
AGRIC:
Fruit Trees
Rodat
Ongoing
FAO
-- 92 -- 93
Distribution of 5,000 fruit trees (almond / apple / peach) to farmers.
MAWA
AGRIC:
Fruit Trees
Rodat
Completed
DCP
-- 92 -- 92
5,000 fruit tree saplings project.
MAWA
_
MAWA
'
ACBAR
'
ki
improved onion seed.
DATABASE-OF NGO ACTIVITIES
Page: 175
A6actrep Date: 27/08/93
_---=
6TH EDITION
ACTIVITY
AGENCY,
SECTOR
Nangarhar
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- - -BT --
Begin- -End
ACTIVITY
DESCRIPTION> - - --
Rodat
..NAWA
WATER:
Karez
Rodat
Completed
CIDA
-- 90 -- 90
Cleaning of 4 karezes.
KAWA
WATER:
Structure
Rodat
Ongoing
CIDA
-- 92 -- 93
Reconstruction of 10 culverts.
MAWA
WATER:
Structure
Rodat
Completed
CIDA
-- 91 -- 92
Reconstruction of 80 m diversion dam.
MCPA
MINES:
Survey
4 minefield
Completed
UNOCHA
192 12 92
41,273 Su agri.ïand & road.
MSH
HEALTH: Basic Post
Metrani
Ongoing
AID
' 85 -- --
2 BMWs
PDA
WATER:
Karez
Barro
Ongoing
WFP
5 93
3 karezes - FFW
RDA
WATER:
Karez
Completed
WFP
-- -- -- -
Rehabilitation of 8,500 linear M karez.- benefit 550 farming fam,,44.
-SAA
AGRIC:
Crop Product
Completed
SAA
-- 91 -- --
Distribution of 50 bags fertilizer & improved wheat seed (at the cost of Rä.45,000) to SAA teachers plus some poor
.
8 93
farmers.
SAA
AGRIC:
Fruit Trees
Shahikot/Mazina
Completed
Self
SAA
AGRIC:
Livestock
Aza Ebel
Ongoing
SAA
-- -- -- --
SAA
EDUCAT: Primary
Ongoing
SAA
10 90 -- t-
SAA
EDUCAT: Secondary
Ongoing
SAA
-- -- -- --
SCA
AGRIC:
Crop Product
SCA
AGRIC:
Other
SCA
CONST:
Pub.Building
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
Nangarhar
DESP
CONST:
Narigarhar
AAA
AGRIC:
--
1 92
Distribution of 18,000 trees ( differen types) to 3,600 families in sot, Mazina & Shahi lot.
2 92
Bee Keeping farm (123 hives).
'
6 schools (1,200 students, 24 teachers) up to 3 grades.
800 students.
%Completed
SCA
0 92
Completed
SCA
0 92 -- 92
Besar Shahi
Ongoing
SCA
6
Meeran
Ongoing
SCA
2 89 --
--
5 did -level BWs / 1 dental Tech. / 1 Lab Tech.
Ongoing
AID
3 89 --
--
4 schools in Said Ahmed Ehel, Chaparhar, Jabha lot, Laghanjoi & Morgai villages.
Completed
GTZ
-- 02 -- 92
Establishment of at least 30 bakeries in different parts of Nangarhar with improved bakery ovens.
Completed
MCI
11 90
Multiplication of 175 MT wheat seed & 420 NT fertilizer.
-- 92
93 12 93
Distribution of 2.05 HT wheat seed, 2.05 NT DAP & 1.55 NT Urea.
Agriculture survey on 108 villages,
Construction of primary school with stone masonry (8 roofs).
Several Diet.
Other
Sherzad
Crop Product
Hama Ehel
7
91-
DATABASE OF NGO ACTIVITIES
Page: 176
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SBCTOR
Nangarhar
----VILLAGEiSI----
--STATUS--
FUNDED
DURATION
---BY--
Begin--End
tACTIVITY
Sherzad
AAA
AGRIC:
Livestock
Tutu
Completed
UNDP
7 92
9 92
Poultry: distribution of 18,000 chickens.
AAA
WATER:
Canal
Hama Ebel
Completed
HCR
5 90
2 91
Rehabilitation of canal - irrigates 700 jeribs land.
AAA
WATER:
Canal
Tutu
Completed
HCR
8 89 12 89
lodi lhel
Approved
FAO /UNDP
Tutu /Marki Ebel
Completed
HCR
Crop Product
Ongoing
FAO /UNDP
AGRIC:
Fruit Trees
Ongoing
FAO
12 92 -- --
Fruit trees & forest nurseries.
AGRIC:
Fruit Trees
Completed
FAO
12 91 -- 92
Fruit trees & forest nurseries.
WATER:
Canal
Completed
HCR
WATER:
Canal
Completed
ACDO
ARDP
ARDP
ARD:
ARDP
ARDP
ARD?
ARE
ARR
ARR
ARR
ARR
ARR
DCA
DCA
DCA
DCA
DESP
GAC
AGRIC:
AGRIC:
AGRIC:
AGRIC:
AGRIC:
AGRIC:
AGRIC
AGRIC:
AGRIC:
Crop Product
Crop Product
Rehabilitation ,af 2 km canal - irrigates 4000 jeribs & benefit 800 farmer families.
-- -- -- --
5 90
Maize seed multiplication & distribution program.
5 91
Distribution of 155.46 MT Pak -81 / 105 MT DAP / 21e MT Urea.
Production of improved wheat seed.
3 90
2 91
Irrigation repair.
HCR
10 89 12 89
Irrigation repair.
Distribution of 6 MT Pak -81 / i MT Prisabak-85 16 MT Urea 16 MT DAP tc 117 farmers in 3 villages.
Crop Product
Gandumak
Completed
FAO/UNDP
10 91 -- --
Crop Product
Gandusak /Tutu/Rod
Completed
FAO /UNDP
6 92 10 92
--
Ongoing
FAO/UNDP
-- 92 -- 93
Crop Product
Gandumak
Ongoing
FAO
6 93 10 93
Distribution of 0.15 MT maize seed 12.1 MT DAP.
Fruit Trees
Gandmak
Ongoing
FAO/DCP
1 93 12 93
Distribution of 5,000 budded tree saplings (2,000 apricot / 500 peach ! 1,000 plum / 250 fipple), to 96 families.
Fruit Trees
Gandumak/Tutu/Rod
Completed
DCP /FAO
3 92 1292
Distribution of 6000 fruit trees (apple i apricot / plum / peach
Crop Product
Distribution of 1 MT Shaheen maize seed ;' 3 MT DAP / 1 MT Urea
Vet
Qadir Ebel
Ongoing
OUP
4 92 -- --
1 paravet.
AGRIC:
Vet
Gandumak
Ongoing
UNDP
B 91 -
Central clinic with 1 veterinarian & 1 vet. assistant.
AGRIC:
Vet.
Marki Ebel
Ongoing
UNDP
Il 92 -- --
1 vaccinator.
AGRIC:
Vet
Tutu
Ongoing
UNDP
11 92 -- --
1 vaccinator.
CONST:
Pub.Building
lodiAhel
Completed
FRG
10 92
School construction (8 rooms) - local material.
lodi Ehel
Ongoing
HEALTH: Basic Clinic
------------------
.
--
6 93
to 57 farmers.
Distribution of 10 MT improved wheat seed & 10 MT DAP & Urea.
AGRIC:
A C B A R
DESCRIPTION>
pear) through 350 farmers.
Sub clinic of GAC hospital.
DATABASE OF NGO ACTIVITIES
Page: 177
A6actrep Date: 27 /08/93
- -- 6TH EDITION
i
- - -- VILLAGE(S) - -°
SECTOR
AGENCY
ACTIVITI
FUNDED
DURATION
-- STATUS --
-BY
Begin- -End
<ACTIVITY
DESCRIPTION>
Sherzad
Nangarhar
GAC
HEALTH: Basic Clinic
Marki Ehel
TIRO
HEALTH: . Basic Clinic
Center/Tutu
LBI
AGRIC:
Crop Product
LBI
AGRIC:
LBI
WATER:
MAI
EDUCAT: Primary
MSH
HEALTH: Compr.Clinic
MS"
Ongoing
-- -- -- --
Sub clinic of GAC hospital.
Ongoing
IIRO
-- -- -- --
2 BHUe.
10 villages
Completed
FAO/UNDP
-- 92 -- 93
Multiplication of 5 MT wheat seed & 5 MT DAP.
Machinery
Tutu
Ongoing
LBI
-- 92 -- --
2 tractors /1 trailer á 10 sprayers.
Earez
5 villages
Completed
UNDPILBI
-- 92 -- 93
Cleaning of 5 karezea (1310 11).
Ongoing
MAI
-
Gandumak
Ongoing
AID
9 91 -- --
HEALTH: Basic Clinic
Fedi Ebel
Ongoing
Al.
10 88 -- --
MSI?
HEALTH: Basic Post
Khair Marki Ihel -H
Ongoing
AID
3
PRE
AGRIC:
Livestock
Gandumak
Completed
UNDP
2 93
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0
93 -- 93
Provision of 0.085 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0
93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Completed
SCA
0
92 -- 92
Agriculture survey on 17 villages.
SCA
HEALTH: Basic Clinic
lodi Mel
Ongoing
SCA
3 88 -- --
VITA
CONST:
Road
Gandumak
Ongoing
AID
7
1 villages
Ongoing
UNICEF
4 91 --
5 92
Nangarhar
,
-- -- --
88 -- --
6
93
92 -- --
12 schools in Wazir Tatang, Nakar bhel, Hashim Ihel, Ganduaak, Shamal, Bandai, Narai Jabba, Tutu (5) villages.
1 MED. TECH., 1 LAB. TECH. ASST.
4 MED. TECH.
3 ROOMS
3 BHWs
Distribution of 14,000 bread of chicken to 700 families of Gandumak.
3 mid -level Ho I 1 Nurse / 1 Lab Tech.
Rehabilitation of road from Gandumak to Mana ibel, benefit 3,200 families.
Shinwar
--
Polio /measles /D.P.T A T.T.
AESAO
HEALTH: Vaccination
APWO
AGRIC:
Crop Product
Ghani the'
Completed
FAO/UNDP
ARCON
AGRIC:
Livestock
Ghani Ehel
Ongoing
ARGON
ARCON
CONST:
Pub.Building
Deb Barak
Ongoing
ARCON
Construction of Abdullah Bin Abbas intermediate school.
ARCON
CONK:
Pub.Building
Golayee
Ongoing
ARCON
Construction of Golayee mosque.
ARCON
CONST:
Pub.Building
Ghani Mel
Ongoing
ARCON
ACBAR
8 92
-- -- -- --
--
Maize seed multiplication project (1 MT maize, 1 MT urea, 3 MT DAP).
Hdney Bees
Repairing of Ghani ihel clinic.
DATABASE OF AGO ACTIVITIES
Page: 178
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
Nangarhar
FUNDED
DURATION
BY-
Begin -End
STATUS-
<ACTIVITY
CONST:
Pub.Building
Deli Sarak.
Completed
ARCON
--
Construction of Abdullah Bin Abbas school.
/IKON
CONST:
Pub.Building
Golayee
Ongoing
ARCON
--
Construction of Aishaheed Tar Mohammad school.
ARGON
CONST:
Other
Ghani Ehel
Ongoing
ARGON
',WATER:
larez
Golayee
Ongoing
ARCON
--
Rehabilitation of Golayee karez.
ARCON
WATER:
Karel
Ongoing
.ARCON
--
Rehabilitation of Ghani Ehel karez.
ARDCD
AGRIC.:
Crop Product
3 villages
Ongoing
FAO/UNDP
ABC!)
Crop Product
3 villages
.Ongoing
FAO
4
93
ATC
Clearance
Ghani Ebel
Ditcontin
UNOCHA
2
91
Clearance
Ghani Ebel
Completed
'MOCHA
Vet
Ghani Ebel
Ongoing
UNDP
A'C
744
,
MIRES:
'AGRIC:
.
12 92
7 93
Repairing of workshop.
Distribution of 5 MT wheat seed & 5 MT DAP te 100 farmers.
C.
4
91
MT maize seed & 1 MT'DAP.
Destreyed 1 device, cleared 7,107 zgt grazing land.
Destroyed 1 devices, cleared 7107 Sqa grazing land.
7 91
Animal vaccination & treatment, 1 DVM / 2 paravets & 1 guard.
--
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 --
Narcotic awareness, I extension agent.
IDA
WATER:
Canal
Ghani Khel
Ongoing
Pvt.
-- 92 --
RehaMitation of 1 Km canal.
IIRO
HEALTH: Basic Clinic
Muni Khel
Ongoing
IIRO
LBI
EDUCAT: Madrasa
Ghani Ebel
Ongoing
LBI
MCP A
MINES:
Center
Completed
UNOCill
2 91
MS!!
HEALTH: Compr.Clinie
Golayee
Ongoing
AID
7
MSH
HEALTH: Basic Post
Golayee
Ongoing
AID
11 89
i Bill
RBS
SOCIAL:Commu.Particp
Ongoing
RBS
10 92 12 93
Center for disabled children.
SCL
AGRIC:
Crop Product
Completed
SCA
0
92 -- 92
Distribution of 0.1 MT wheat seed & 0.1 MT DAP.
SCA
AGRIC:
Plant Proteo
Completed
SCA
0
92 -- 92
Provision of 0.2 MT agrochemicals.
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.1 HT agrochemicals.
SCA
AGRIC:
Other
Ongoing
'3CA
ACBAR
DESCRIPTION>
Shinwar.
ARCON
ARCON
.
-VILLAGE(S)-
SECTOR
AGENCY
Survey
.
--
BHU
bran memorization center
-- 89
0
2
2 mine fields (11,935 sq s-ag.land).
92
1 MD, 1 doctor assistant, 2 medical tech., 1 lab tech assistant - 4 rooms & laboratory.
89
93 -- 93,
Agriculture survey on 40 villages.
DATABASE OF BOO ACTIVITIES
Page: 179
Bactrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Nangarhar
UNO
AGRIC:
TARA
Crop Product
AGRIC:
TARA
Crop Product
AGRIC:
TARA
Crop Product
AGRIC:
YARA
Fruit Tree!
AGRIC:
Fruit Trees
Nangarhar
WI
AGRIC:
ACY
AGRIC:
ACDO
AGRIC:
ADAg
AGRIC:
ADAg
AGRIC:
ADAg
AGRIC:
ADAg
CONST:
AHDS 2
CONST:
ANDS
ARDS
AHSAO
ARRAN
Crop Product
Crop Product
Crop Product
Crop Product
Crop Product
Crop Product
CORM Pub.Building
ARDS.
Pub.Building
Pub.Building
HEALTH: Basic- Post
-
HEALTH: Basic Post
HEALTH: Basic Post
HEALTH: Vaccination.
AGRIC:
FUNDED
- - -BY --
DURATION
Begin --End
< ACTIVITY
DESCRIPTION>
--
Ongoing
AID
--
Ongoing
FAO/UNDP
Ongoing
FAO
5 93 -- --
Multiplication of 300 Kg maize seed (8 Ig for each farmer).
Ongoing
FAO
5 93 -- --
Multiplication of 50 Kg sung beano (2.5 1g for each farmer).
Ghani Ihel
Ongoing
FAO
3 93 -- 94
Distribution of 5,00 fruit trees.
Ghani Ebel
Ongoing
FAO
3 93 -- 94
Distribution of 5,000 fruit trees.
Ongoing
FAO
Ghani Ihel
Ghani Ihel
9 90 -- --
1 school in Ihwaja Ahmad Ihel village.
-- 92 -- 93
Distribution of 10 NT wheat & 5 MT DAP.
Surkh Rod
WATER:. Canal
ANDS
-- STATUS --
Shinwar
EDUCAT: Primary
TARA
ARDS
- - -- VILLAGE(S) - - --
Crop Product
Surkh Rod
Iakr.,
Iatrak
'
4 villages
6 villages
5 villages
18 villages
11 92
7 93
Multiplication of wheat seed & fertilizer.
Approved
FAO /UNDP
-- -- -- --
Maize seed multiplication & distribution program.
Approved
FAO /UNDP
-- -- -- --
Rice seed multiplication & distribution program.
Completed
UNDP
3 92
3 93
Multiplication of 50 MT sugar cane & 4 MT fertilizer.
Ongoing
UNDP
3 93
2 94
Multiplication of 24 MT sugar cane & 0.8 MT fertilizer.
Ongoing
.UNDP
1I 92
7'93
Multiplication of 5 MT wheat seed & 5 MT fertilizer.
Completed
UNDP
11 $2
4 93
Rehabilitation of 44.75 km canal
Baghbani
Completed
WHO
-- -- -- --
Construction of BHU building.
Asir Ihel
Completed
WHO
--
Construction of BHU building.
SJfamshapoor
Completed
WHO
--
Construction of BHU building.
5hamshapoor
Ongoing
WHO
--
Running cost for 1 year.
Baghbani
Ongoing
WHO
-- -- -- --
Running cost for 1 year.
Ongoing
WHO
--
Running cost for i year.
Ongoing
UNICEF
Ongoing
FAO/UNDP
Amir Ihel
-10 villages
Dehbala
'
-
--13 -- -2 93 12 93
irrigates 2576 ha.. land - benefit 1190 farmers.
Polio /seasles/D.P.T & T.T
Multiplication & distribution of 24 MT improved sugar cane seed & 850 kg fertilizer.
ACBAR
DATABASE OF 1G0 ACTIVITIBS
6TH EDITION
Page: 180
A6acirep Date: 27/06/93
.
ACTIVITY
AGENCY
SECTOR
-- -- VILLAGE(S) - ---
Nangarhar
BRAN
AGRIC:
AFWO
FUNDED
--STATUS --
DURATION
- - -BY --
Begin- -Ind
<ACTIVITY
Surkh Rod
Crop Product
Sultanpur Sufla
Ongoing
FAO/UNDP
11 92
AGRIC:. Crop Product
--
Completed
FAO
11 91 11 91
ARDP
AGRIC:
Crop Product
Fatehabad
Ongoing
FAO/UNDP
--
Production of improved wheat seed.
ARDP
AGRIC:
Crop Product
--
Completed
FAO/UNDP
--
Multiplication of improved rice seed.
ARDP
AGRIC:
Crop Product
--
Completed
FAO/UNDP
-- --
- --
Multiplication of improved maize seed.
ARDP
AGRIC:
Crop Product
--
Completed
FAO/UNDP
3 92
3 93
Multiplication of improved sugar cane.
ARDP
AGRIC:
Crop Product
ARDP
AGRIC:
Crop Product
--
Ongoing
FAO
--
ARDP
AGRIC:
Fruit Trees
--
Ongoing
FAO
2 92 -- --
Distribution of fruit trees.
ARE
WATER:
Canal
Saydan Gharbi
Completed
UNDP
8 91 10 92
Cleaning of 6 canals.
ARR
WATER:
Canal
Sultanpur Sufla
Completed
IRC /RPA
ARR
WATER:
Canal
Sultanpur
Completed
IRC/RPA
ARR
WATER:
Canal
Completed
IRC /RPA
ATC
MINES:
Clearance
3 villages
Completed
UNOCHA
AVICEN
HEALTH: Vaccination
33 _villages
Ongoing
EC/UNICF
-- -- -- --
i team - 2 vaccinators
CIUP
AGRIC:
Crop Product
Ongoing
FAO/UNDP
-- 92 -- 93
Distribution of 5 MT wheat seed, 6.75 MT DAP.
CRAA
AGRIC:
Vet
Sultanpur
Ongoing
UNDP
CRAA
EDUCAT: Other
Total Area
Ongoing
DCP
11 92 -- --
Narcotic awareness, 1 extension agent.
CRR
CONST:
Road
Completed
UNDP
-- 92 -- 92
Technical survey of secondary roads.
DACAAR
WATER:
Canal
Ongoing
DACAAR
-- 92 -- 93
Cleaning of Bazi Ihel canal.
RRSE.
AGRIC:
Machinery
Ongoing
NRC/ICA
2 93
ERSA
CONSTI
Pub.Building
Ongoing
IRC/NCA
S 93 12 93
ACBAR
DESCP.IPTIOA>
:
Completed
Bazid bhel
--
.
FAO/UNDP
7 93
Multiplication & distribution of 5 MTïmproved wheat seed & 5 M7 fertilizer.
Distribution of 20 IT wheat seed f 20 MT DAP to 800 farmers in 10 vi:lages.
-- 02 -- 92
11 92
Multiplication of improved sugar cane seed.
Multiplication of improved sugar cane.
Rehabilitation of 12 km canal.
1 93
8 92 10 92
-- 92 -
--
6 92.12.92
6 92 -- --
1 94
Canal & spring cleaning.
Rehabilitation of 8 km canal (Nahr Shahl).
Destroyed 5009 devices 680662 So agri.land / grazing land / canal & road.
Animal vaccination & treatment, 1 DVM / 2 paravets & i guard.
Farm mechanization, ploughing & threshing(1 thresher. & 3 tractors).
Construction- of 2 primary .school.
DATABASS OF IGO ACTTIYITIBS
Page: .181
A6actrep Date: 27/08/93
67H EDITION
ACTIVITY
AGENCY
SECTOR
Nangarhar
VILLAGE(S) - - --
FUNDED
DURATION
< ACTIVITY
- --BY --
Completed
NRC /NCA
2 93
3 93
Rehabilitation of Sayedan- e- Foladi intake (25 m), irrigates 3,000 jeribs & benefit 525 families.
Completed
NRC,'NCA
2 93
3 93
Rehabilitation of Dewaliad intake (100 a), irrigates 1.600 jeribs & benefit 280 families.
Begin- -End
Surkh Rod
--
ERSA
.WATER:
Structure
ERSA
WATER:
Structure
ERSA
WATER:
Drinking
--
Approved
NRC /NCA
-- 93 -- --
GAF
AGRIC:
Crop Product
Balabagh
Ongoing
IRC
12 92
GAF
AGRIC:
Crop Product
Balabagh
Ongoing
FAO
IHSAN
WATER:
Garez
Sia Sang
Completed
WFP
12 92
1 93
Rehabilitation of 3 karezes.
IS:SAB
WATER:
Canal
v.a Sang
ang
L4Completed
a.,
.
WFP
12-92
1 93
.,
:H AN
WA
Canal
Char Bagh
Completed
WFP
9J
4 .94
Rehabilitation of Bahia canal t!
WATER:
Structure
Sia Sang.
Completed
WFP
12 92
1 93
Construction of 9 reservoirs.
KNF
AGRIC:
Crop Product
Saydan Arabi /Eushk
Ongoing
RAP
12 92
'7 93
MCPA
MINES:
Survey
28 minefields
Completed
UNOCHA
MSH
HEALTH: Compr.Clinic
Fatehabad
Ongoing
AID
12 87 -- --
MSH
HEALTH: Basic Poet
Baghtan
Ongoing
AID
12 90 -- --
MqH
HEALTH: MCA
Bagrami
Ongoing
AID
8 92 -- --
TUMAC
DESCRIPTION>
-- STATUS --
'
Construction of wells.
7 93
Distribution of 5 MT wheat seed & 5 MT DAP to 200 farmers.
3 93 11 93
Distribution cf 16 MT sugar cane 550 MT DAP to 48 farmers.
5 water, courses & rehabilitation. ;'f : fords..
.
...
.. k`¡ .
5 MT wheat seed & 5 MT DAP for 40 hectares of
1 92 12 92
land.
767,391 Sig agri.land / irrigation / C.V.agr. / road & ag.viliage.
1 MD 2 MED :TECH, 1 LAB TECH. ASST.
2 ROOMS, 5 BEDS
3 BHWs
1 MD,
1 MCHO, 2 Dai
3 Rooms, women / children under 5 care; health education Volunteer Health Sisters (VHS) and Dai
training programs.
NPO
INCOME: Help Vulner.
Surkh Rod
Ongoing
NRC /NCA`
4 93 -- 93
NPO
WATER:
Drinking
Surkh Rod
Completed
NRC /NCA
3 93
OMAR
MINES:
Awareness
Completed
UNOCHA
6 92 12 92'
Safety lessons - 15075 people participated.
PDA
CONST:
Pub.Building
Zulmabad
Completed
IIRO
2 93
Construction of a mosque
PDA
WATER:
Canal
Chaknowri
Ongoing
WFP
6 93 -- --
PRE
AGRIC:
Crop Product
Sultanpur Ulya
Completed
FAO
12 92
RSSA
AGRIC:
Crop Product
--
Ongoing
FAOÌUNDP
-- 92 -- 93
ACHAR
5 93
5-93
7 93
Assistance to vulnerable groups in community.
Well with community participation.
concrete).
Rehabilitation of 7 km canal.
Distribution of 5 MT wheat seed & 5 MT DAP to 100 farmers.
Distribution of 5 MT wheat seed & 10 MT DAP.
DATABASE OF NGO ACTIVITIES
Page: 182
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
- - -- VILLAGES) - - --
SECTOR
AGENCY
-- STATUS --
FUNDED
- - -BY --
,
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Surkh Rod
Nangarhar
Completed
SCA
0 92 -- 92
Distribution of 6.075 MT wheat seed, 6.075 MT DAP & 8.95 MT Urea.
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.27 MT agrochemicaïs.
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.125 MT agrochemicals.
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 112 villages.
SCA
HEALTH: Compr.Clinic
Ongoing
SCA
-- -- -- --
1 MD 1 9 mid -level Bits / i Lab Tech.
SCA
EDUCAT: Teacher T.
Ongoing
EC,1B.Gvt
-- 84 -- --
schools
Through resource centers in schools
SOS -PG
UNO
EDJGA
Ongoing
AID
SCE
AGRIC:
Crop Product
SCA
AGRIC:
SCE
--
Char Bagh
Primary
schooi in
3 NQ
LL a£* a k
t
,
month courses
course
two F half month
.5 ay seminarsY & practical
practical work in classrooms.
village.
Unspecified
Nangarhar
ACLU
CONST:
Road
Torkham -Kabul
Ongoing
AID
-- -- -- --
Repair of Torkham-Kabul highway.
CONST:
Bridge
Torkham -Kabul
Ongoing
AID
-- -- -- --
Construction ! reconstruction of aeveral bridges along Torkham - Kabul highway.
ACLU
READ
SOCIAL :Other
All parte
Ongoing
TAF
5 92 -- 93
ISRA
WATER:
Different villages
Ongoing
ISRA
MSF -H
HEALTH: Other
Various
Ongoing
NSF-H
HEALTH: Other
All parta
RDA
Advocacy f awarenessíregistry & feasibility studies on disabilities.
-- 92 -- 93
1? shallow wells.
WHO
-- 93 -- --
Malaria control including bed net distribution.
Ongoing
NSF
-- 93 -- -
Completed
WFP
-- -- -- --
Distribution of 200 MT wheat and other goods.
RELIEF:Food Items
RELIEF:Help Returnee
Ongoing
*Donors
-- 92 -- --
Goods distribution on limited basis to assist in repatriation.
SERVE
SOS -PG
INCOME: HelpCraftmen
Ongoing
EC
Drinking
'
7 92
6 94
.
Monitoring & technical evaluation of microscopists.
Provision of toolkite & credit facilities to small enterprises.
25% of the beneficiaries are selected from
vulnerable troupe.
SOS -PG
INCOME: Skill Train.
Nimroz
VARA
AGRIC:
liCBAR
Ongoing
EC
Completed
FAO
7 92
6 94
Training of 26 trades by placement in apprenticeship.
12 92
1 93
Distribution of 9 MT wheat seed k 9 MT DAP.
Chakhansur
Crop Product
30 villages
DATABASE OF NGO ACTIVITIES
Page: 183
A6actrep Date: 27/08/93
6TH EDITION 1
ACTIVITY
AGENT
SECTOR
Nimroz
-- -- VILLAGES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
- ---------------tACTIYITI
Begin - -Ind
Char Borjak
HEALTH: Compr.Clinic
--
Completed
AID
VARA
EDUCAT: Primary
Bandar
Completed
Comunity
7 91
VARA
WATER:
Bandar
Completed
Coaunity
9 91 11 91
7 minefieide
Completed
UNOCHA
Mohd Seddiq
Ongoing
AID
Completed
UNOCHA
1
92 12 92
71337 Sqn canal.
Completed
UNOCHA
1
93
42050 Sqm road/35743
Ongoing
AID
3
89 -- --
MCI
DáSCYIPTIOA>
Canal
Nimroz
11 90 --
8
-
i MD I 1 lab -tech / 1 dental -tech I 1 sid -level MW do 1 first aider - Lab / First aid i dental & OYD.
91
1 school 12 teachers & 45 students.
Cleaning of canal / irrigates 3,000 jeribs & benefit 300 families.
Kang/Ktirki
MCPA
MINES:
MSR
HEALTH: Basic: Post
SWAAD
MINES:
Clearance
SWARD
MINES:
Clearance
Survey
-4 viiiagee
sang
1
42 12 92
145,096 5qm irrigation.
12 88 -- --
1 BHW
3 93
Sqa canal.
UNi!
EDUCAT: Primary
Vim
AGRIC:
Crop Product
20 villages
Ongoing
FAO/UNDP
VARA
AGRIC:
Vet
15 villages
Completed
UNDP
6
92 11 92
Aarez
Completed
RAP
1
91
Canal
Ongoing
RAP
9 90 -- --
Shishaba
Ongoing
AID
12 88 -- --
1 BIN
25 villages
Ongoing
URN
12 92 -- --
2 DVMs / 4 paravets - vaccination / de- worming & treatment training.
25 villages
Ongoing
FAO/UNDP
12 92
Multiplication of 10 MT wheat seed & 10 MT DAP.
3 villages
Ongoing
CIDA
Nimroz
CHA
CHA
MSH
WATER:
VATBR:
HEALTH: Basic Post
AGRIC:
Nimroz
VARA
VAR
AGRIC:
7
93
Multiplication of 10 MT wheat seed & 10 MT DAP.
1 DYE / i paravet / 1 vaccinator.
Khosh Rod
Nimroz
VARA
12 92
1 school in Sarlof village.
6 91
Rehabilitation of 5 karezes - irrigate 18,400 jeribs & benefit 422 families.
Rehabilitation of 2 canals (total length 12 ka) in Shasbaba Pushta Basan.
Nimroz
Vet
Zaranj
Crop Product
INCOME: Skill Train;
2'93
7 93
7
93
Carpet weaving training with 30 trainee' for 6 months.
Page: 184
A6sctrep Date: 27 /08/93
ACTIVITY
- - -- VILLAGES) - - --
SECTOR
AGENCY
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin - -Ind
Ai restan
Oruzgan
!ICI
HEALTH: Basic- C1inic
--
Completed
AID
4 87 -- --
MSE
HEALTH: Basic Post
Qalandar Ihel
Ongoing
AID
10 87 -- --
IISH
HEALTH: Vaccination
Ajrestan
Ongoiñg
AID /UN
9 89 -- --
1 lab tech I 1 dental tech & 1 mid -level Hit - Lab i OPD & dental.
7 ERR!
6 VACCINATORS COVER 22 VILLAGES IN AJRESTAN DISTRICT (2607) IN UROZGAN PROVINCE.
AND WOMEN 5 -45
HEALTH: Basic Clinic
SCA
Oruzgan
DISCRIPTION>
Center
Ongoing
SCA
YEARS.
3 mid -level HWa.
Chorah
193
4 94
Distribution of 5C.75 MT wheat seed & 79 MT fertilizer to 966 farmers for muff
ADA
AGRIC:
Crop Product
All villages
Ongeing
NRC /RCA
ADA
WATER:
garez
9 vi .a gPs
Completed
Rdi
SCA
AGRIC:
Crop Product
Ongoing
SCA
0 92 -- 93
Distribution of 2.94 MT wheat seed, 2.4 MT DAP & 3.4 MT Urea.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 92 -- 93
Provision of 0.28 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.2 MT agrochemical!.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
'Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 98 villages.
UNO
EDUCAT: Primary
Ongoing
AID
6 88 -- --
1 school in Qala Rag.
12 villages
Ongoing
EC /UOICF
-- -- -- --
2 teams - 2 vaccinators
Oruzgan
--
6 g
Q
(r-
744r4ng
.lTP/remórt. rl 9 Ea"?zee
irrigata 985 uP:. es
s'; ^afio^
benefit 281 farmers.
Dai. Aundi
AVICBN
HEALTH: Vaccination
BURC
AGRIC:
Crop Product
10 villages
Completed
FAO
10 92 11 92
Multipli cation of 5 MT wheat seed & 5 MT DAP to 200 farmers.
GRC
AGRIC:
Fruit Trees
19 villages
Completed
FAO
11 91 11 91
9,000 fruit trees / tipple I apricot & peach saplings distributed for 309 farmers.
GRC
CORST:
Road
15 villages
Completed
Public
8 90 12 $0
Repair of 100 km road by cooperation of public -GRC.
GRC
CONST:
Pub.Building
90 villages
Ongoing
Spe.D
3 93 -- -
Hospital with 10 rooms - stone & cement.
GRC
EDUCAT: Primary
lhadir
Ongoing
GRC
6 92 -- --
1 school in lhadir Dah lundi.
MSE
HEALTH: Basic Clinic
Eshter Lee
Ongoing
AID
1 92 -
A C B- A R
TARGET GROUPS: CHILDREN 0 -2 IEARS
--
3 M.T.
2 ROOMS
DATABASE OF NGO ACTIVITIES
Page: 185
A6actrep Date: 27!08/93
6°H BD":ON
ACTIVITY
SECTOR
IGENCY
Oruzgan
- - -- VILLAGE(S) - ---
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin --End
Dai Kundi
MSE
HEALTH: Basic Clinic
Sang Moem
Ongoing
AIr
4 91
3 MED. TECH., i DENTAL TECH. ASST.
M3S
HEALTH: Basic Post
Sang Takht
Ongoing
AID
4 89 -- --
3 BHWs
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0
-- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Oruzgán
LNnD
ERIC:- rn nF Product
Deb Rc ud
Ongoing
FA
AMC
ACMrC:
Crop Product
Det, Raud
Ongoing
FAn/JNPP
12 92 -- --
IMO
µA?^:
Crop Product
_
Ongoing
FAO/UND;
11 32
M^'
HEALTH: Basic Pili..
Completed
AID
F 88
Ongoing
AID
7 88 -- --
3 BHWe
SC
'
HEALTH: Basic Post
villages
Miyandoo
Multiplication r improved }hcUt seed.
12 92
.,..r
...
.,
Multiplication of F
--
a nurse
e . ,#,i,eat
,.r..
i. wheat seed
Plant Protec
Completed
SCA
O 92 -- 92
Provision of 0.105 MT agrochemicals.
SCA
AGRIC:
.
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.2 MT agroche
L+...v icals
iaiv.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
5 89 -- --
2 mid -level HMIs / 1 Lab Tech.
UNO
EDUCAT: Primary
Ongoing
AID
12'87 -- --
Temzan Ulya
Ongoing
AID
12 88 -- --
Gezab
Ongoing
AIDIUN
Oruzgan
Center
HEALTH: Basic Poet
MSH
HEALTH: Vaccination
-'aV.
detta 1 & OPD.
' 6 schools in Tarak Timak(2), Miando(2), Sikzai & Band Toghi..
-
1 92 -- --
1 BHW
4 VACCINATORS COVER 12 VILLAGES IN GEZAB
AND WOMEN 5 -45
DISTRICT (2608), UROZGAN PROVINCE.
TARGET GROUPS: CHILDREN 0 -2 YEARS
YEARS.
Kajran
AVICEN
HEALTH: Vaccination
BURC
AGRIC:
A C B A R
1t0 f5mr.rs.
Gezab
MSH
Oruzgan
5 #^ }E.
a Lc} tech & a meìa e e. -(jL+
AGRIC:
'
4 ROOMS. DENTAL
Deh Raiad
ARO
MSH
DESCRIPTION>
Crop Product
49 villages
Ongoing
ECIUNICF
--
2 teams - 4 vaccinators
5 villages
Completed
FAO
10 92 11 92
Multiplication of 5 MT wheat seed & 5 MT DAP to 200 farmers.
DATABASE OF NO ACTIVITIES
Page: 186
A6actrep Date: 27/0813
6TH EDITION
ACTIVITY
SECTOR
AGENC°.
Oruzgan
GRC
AGRIC:
GRC
VILLAGES)- - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Kai ran
Fruit Trees
29 villages
Completed
FAO
3 91
RELIEF:Food Items
83 villages
Completed
UNDP
9 90 11 90
310 MT wheat for 1692 families.
GRC
RELIEF:Food Items
35 villages
Completed
WFP
5 90
6 90
50 MT wheat for 379 families due to shortage of food in the area.
GRC
WATER:
3 villages.
Discontin
UNDP/WFP
6 91
8 91
Cleaning of canal - benefit 180 farmers - discontinued due to conflict.
MCI
HEALTH: BasicrClinic
Completed
AID
4 87 -- --
1 lab tech / 1 dental tech I 1 mid -level HW & 1 first Aider - Lab I OPD / dental & first aid.
MSH
HEALTH: Basic Clinic
Shah Joy
Ongoing
AID
1 90 -- --
2 MED. TECH..
MSH
HEALTH: Basic Post
Dasht
Ongoing
AID
3 88 -- --
2 BHWs
Oruzgan
Canai
15,000 fruit trees distributed for 445 farmer families.
4 91.
i NURSE
1 ROOM, DENTAL
C?ruzgan
ADA.
AGRIC:
Crop Product
All villages
Ongoing
NRC /NCA
1 93
4 94
Distribution of 80.5 MT wheat seed & 127 MT fertilizer to 1533 farmers for multiplication.
ADA
AGRIC:
Machinery
All villages
Ongoing
NRC /NCA.,
1 93
4 94
7 tractors & 5 threshers to plough 7650 jeribs land.
ADA
AGRIC
Plant Protec
All villages
Ongoing
NRC /NCA
1 93
4 94
Spraying of 5.000 jeribs of orchard for the benefit of 2,500 farmers.
ADA
CONST:
Sanitation
3 villages
Ongoing
NRC /NCA
5 93
4 94
Construction of 75 pit latrines & installation of 3 shallow wells for 75 families.
ADA
INCOME: Skill Train.
8 villages
Ongoing
EC
5 93
4 94
Training of 45 students in masonry / gabion weaving / pit latrine / pump maintenance / tractor repairing &
veterinary.
ADA
WATER:
larez
Shah Agha
Ongoing
NRC /NCA
1 93
ADA
WATER:
Karez
7 villages
Completed
RAP
6 92 11 92
Cleaning & improvement of 7 karezes / irrigate 530 jerba k benefit 145 farmers.
ADA
WATER:
Canal
3 villages
Ongoing
NRC /NCA
1 93 -- 93
Cleaning & deveplopme*t of canal / irrigates 5,000 jeiibe &benefit 1,500 farmers.
GRC
AGRIC:
Crop Product
42 villages
Completed
FAO
9 92 11 92
5 MT wheat seed & 5 MT fertilizer distributed for farmers`.
MCI
HEALTH: Basic Clinic
--
Completed
AID
5 91 -- --
2 first Aiders & 1 mid -level NW - Fire aid & OPD.
MSH
HEALTH: Basic Post
Sayedan
Ongoing
AID
7 88 -- --
4 BHWs
SCA
AGRIC:
Plant Protec
-
Ongoing
SCA
0 93 -- 93
Provision of 0.3 MT agrochemicals.
SCA
AGRIC:
Plant Protec
-
Completed
SCA
O 92 -- 92
Provision of 0.3 MT agrochemicals.
IACBAR
4 93
Cleaning & improvement of 30 karezes / irrigate 7,665 jeribs & benefit 648 farmers.
DATABASE OF NGO ACTIVITIES
6TH EDITION
J
Page: 187
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
<ACTIVITY
Begin- -End
- --BY --
Oruzgan
Oruzgan
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 87 villages
SCA
AGRIC:
Other
Ongoing
SCA
0 g -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
11 92 -- --
UNC
EDUCAT: Psimary
Ongoing
AID
3 87 -- --
Oruzgan
Center Elias Oruzga"
2 mid -level HWs.
8 schools in Balock(2), 'Mamba:- Deb Javz(2), Ehurma, Eakrak & Qali Kale villages.
Shahrietan
AVICEN
HEALTH: Vaccination
34 villages
Approved.
SC,'UNICF
-- 93 -- --
)c
AGRIC:
Vet
Woi Jan
Ongoing
Dutch G.
12 92 -- --
1 paravet.
Da
AGRIC:
Vet
Moher
Ongcing
Dutch G.
12 92 -- --
1 paravet.
MBE
HEALTH: Basic Clinic
Chaprasak
Ongoing
AD
9 91 -- --
MSH
HEALTH: Basic Clinic
Bargar Hasan Reza
Ongoing
AID
9.91 -- --
KB
HEALTH: Basic Post
Char Sad Plana
Ongoing
AID
7 88 -- --
SCA
HEALTH: Compr.Clinic
Olgan
Ongoing
SCA
11 89 -- --
Ongoing
NRC/NCA
Oruzgan
DESCRIPTION>
1
team - 3 vaccinators
3 MED. TECH.
DENTAL
2 MED. TECH. 1 BHW.i
'
3 BEVe
2 MD 1 4 mid -level HWs / 1 Lab Tech.
Tirin
ADA
AGRIC:
Crop Product
All villages
ADA
CONST:
Sanitation
' villages
Ongoing
NRC/NCA
ADA
INCOME: Skill Train.
I villages
Ongoing
ADA
WATER:
Xeres
30 villages
ADA
WATER:
Canal
EAFA
AGRIC:
Crop Product
IAHC
1 93
4 94
5 93
4 94
EC
5 93
4 94
Completed
NRC/WFP
6 92 12 92
Cleaning & improvement of 30 karezes / irrigate 6396 jeribs & benefit 717 farmers.
11 villages
Ongoing
EC
5 93
Cleaning & development of 6 canals / irrigate 24,300 jeribs & benefit 4800 farmers.
15 villages
Completed
AID
HEALTH: Distrct Hosp
Tirin Kot
Ongoing
NOVIB
1AHC
HEALTH: Distrct Hosp
Mehrabad
Ongoing
NOVIB
Ott
HEALTH: Compr.Clinic
Completed
AID
'
.
4 94
-- -- 11 91
Distribution of 80.5 MT wheat seed & 127 MT fertilizer to 1539 farmers for multiplication.
' Construction of 75 pit latrines & installations of 3 shallow wells for 75 families.
Training of 25 students in masonry / gabion weaving / pit latrine & pump maintenance.
Distribution of 50 MT DAP.
6 MLHWs / 10 beds / lab / small surgery / 40 patients OBI day.
--
1 88 -- --
6 MLHWs / 10 beds / lab / small surgery 140 patients OPD / day.
1 mid -level HW / 1 X- ray -tech ! 2 dental -tech / 1 lab -tech & 1 fist aider. - X -ray I dental / lab / first aid & OPD.
4
DATABASE OF NGO ACTIVITIES
Page: 188
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Oruzgan
VILLAGE(S)-
DURATION -_
FUNDED
-STATUS
BY-
Begin- -End
< ACTIVITY
DESCRIPTION>
Tirin
MCI
HEALTH: Basic Clinic
--
Completed
AID
2 89 12 92
1 mid -level BW / 1 lab tech & i dental tech
MSH
HEALTH: Basic ?oat
Surkh Murghab
Ongoing
AID
7 88 -- --
3 BRWs
RDA
AGRIC:
Crop Product
--
Completed
FAO
10 91
7
RDA
WATER:
Karez
Completed
WFP
it 92
1 93
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.15 NT agrochemicals.
SCA
AGRIO:
Plant Protec
-Ongoing
SCA
0 93 -- 93
Provision of 0.25 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 88 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
SWFAO
AGRIC:
Crop Product
Center
SWFAO
AGRIC:
Crop Product
Tirin Kot
SWFAO
AGRIC:
Fruit Trees
:Thin Kot
-r
'Ongoing
FAO/UNDP
92
Multiplication of seed at the cost of Rs. 333.920.
Rehabilitation of 16.3 is karez
10 92 -- 93
Ongoing
FAO
Completed
FAO/HCR
10 92
Ongoing
BC/UNICF
--
5 93
benefit 565 farming f *flies.
Distribution of 10.MT improved wheat seed (pat 81) & 10 MT fertilizer.
9 93
3
- OPD t Lab & dental.
Multiplication of sung bean & maize seed with fertilizer.
93
Distribution of 30,000 fruit trees to 2,000 families.
--
Students
Btirmal
Pakteka
AVICEN
HEALTR: Vaccination
15 villages
CARE
SOCIAL:Fors Committ.
Barial
Completed
AID
0
0
0 92
Formed 2 local sburas in different areas & held perìàdic meetings discussing
CARE
WATER:
Canal
Banal
Completed
AID
--
0
0 92 '
Repair of 2 canals in Nkali / Margha.
CARE
WATER:
Structure
Barmal
Completed
AID
--
0
0 92
Repair of Protection Walla in Nkali iaski & Margha with total length 630s.
DCA
AGRIC:
Vet
Sharif Khel
Ongoing
UNDP
11 92 -- --
DCA
AGRIC:
Vet
Margha
Ongoing
UDR
5 91 -- --
Central clinic with l veterinarian & 2 vaccinators.
MSH
HEALTH: Basic Post
Barmal
Ongoing
AID
3 88 -- --
5 BHWs
START
WATER:
Barmal
Completed
UNDP
3 92
Rehabilitation of 7 Karates in different villages.
Zarghun Shahr
Ongoing
UNDP
4 91 -- --
Karez
AGRIC:
ilACBAR
5 92
related affairs.
1 vaccinator.
Dila
Pakteka
DCA
'
-
Vet
1 paravet.
.
DATABASE OF NGO ACTIVITIES
Page: 19
A6actrep Date: 27/08/9S
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
VITA
WATER:
- - -- VILLAGES) - ---
Structure
-- STATUS --
FUNDED
DURATION
<ACTIVITY
- --BY --
Begin --End
11 92 -- --
Dila
Ongoing
AID
Salowatta
Ongoing
AID
6 90 -
Completed
WFP
4 90
G omal!i @ña-
Completed
AID
--
--
DESCRIPTION>
Construction of 30 m intake(gabion work', benefit 700 families.
Gayan
Pakteka
"5H
HEALTH: Basic Post
RAFA
RELIEF:Food Items
--
2 BHWs
5 90
Distribution of 100 Nt wheat to 150 families to decrease the rate of wheat & help needy people.
0
0 92
Fred 3 local snsr. . it rïffarpi' area! & held periodic meetings discussing related Project! affairs.
.'
(} 92
Rehabilitation of canals in Eecakhel,
8 92
0 92
832m lone with be
0 92
Rehabilitation of canal ir, Eseakhel Jag' Wyala with total length 2.2km.
Gomal
Pakteka
PM
SOCr A? :FC r m ^ Ommitt
CARE
WATER:
Canal
Gomal/Rabat
Completed
AID
CART,
WATER:
Canal
Gomal'Raba.
Completed
AID
CARE
WATER:
Canal
Gomal/Rabat
Completed
AID
CAR,
WATER:
Canal
Gomal/Rabat
Completed
AID
7 92 -- 92
1.05k1 long with bed cleaning. .one protection wall and one intake.
CARE
WATER:
Canal
Gomal /Rabat
Completed
AID
9 92 -- 92
1.5km long with bed cleaning, one protection wall, one aqueduct and one culvert.
CARE
WATER:
Canal
Gomal /Rabat
Completed
AID
7 92
0 92
i.872km long with bed cleaning, 1 protection wall, 1 intake, 2.aqueducts, 2 E / barriers.
CARE
WATER:
Canal
Gomal /Rabat
Completed
AID
" 91
0 92
1, 02km long with 3 erosion barriers.
CARE
WATER:
Structure
Gomal /Rabat
Completed
AID
--
0
0 92
Reconstruction of Protection Walls in Essakhel, Lanji Bel & Abas Ihel with atone masonry.
CARE
WATER:
FloodControl
Gomal/Rabat
Completed
AID
-- -- -- 92
52 m long one erosion barrier.
CARE
WATER:
FloodControl
Gomal/Rabat
Completed
AID
0 92
50 m long one erosion barrier.
'CARE
WATER:
Other
Gomal /Rabat
Completed
AID
0 92
3150 cu m capacity dam Reconstructed
DCA
AGRIC:
Vet
Sarobi'Zama
Ongoing
UNDP
4 92 -- --
1 raravet.
DCA
AGRIC:
Vet
Bair Menzi
Ongoing
UiiDP
10 90 -- --
1 paravet.
DCA
AGRIC:
Vet
Mingatoy
Ongoing
UNDP
5 91 -- --
ESAR
WATER:
Earez
--
Completed
RAP
5 91
2 92
Rehabilitation of 14 karezes (8 km) - irrigate 1.350 jeribs benefit 270 families.
ESAR
WATER:
Canal
Completed
RAP
5 91
2 92
Rehabilitation of 3 km canal - irrigate 200 jeribs & benefit 50 farmers.
AT, B A R
--
0
8 92
--
0
:O.r.
i khel & Alas K el including intake & siphon.
cleaning, one protection wall. one intake and one erosion barrier.
Central clinic with 1 advanced paravet.
DATABASE OF NGQ ACTIVITIES
Page: 190
A6actrep Date: 27/08/33
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
---- VILLAGEf S) - - --
DURATION
FUNDED
< ACTIVITY
Begin --End
- -=BY --
DESCRIPTION>
Gomal
Pakteka
Ongoing
EDUCAT: Primary
HCI
-- STATUS --
5 89 -- --
HCI
8 girls school. in Sayed Ihel ! Gomal / Sperab ! !lillizai ! thani Qala ! Alizai tl ! tlangaroti ! Tera thei - 595
students ! 23 teachers.
TPr
-- 90 -- --
2 schools
300 students.
IRC
EDUCAT: Primary
Rabat!Shkin
Ongoing
MSH
HEALTH: Basic Post
Nawab Kali
Ongoing
AID
7 88 -
RAFA
RELIEF:Food Items
Completed
WFP
4 90
5 90
Distribution of 100 MT wheat to 150 families to decrease the rate of wheat & help thé needy people.
RAFA
WATER:
Karez
Completed
W FP
12 84
2.91
Rehabilitation of 3 ka raz o in different villages - total length 5,434
AGRI"':.
Plant Prot".ec.
Completed
SCA
s 92 --
Provision
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 02
Provision cf 0.1 MT - n o chem i"a. s
AGRI":
Other
Completed.
CrA
rr1
93 -- 92
0,213 #T . rocnemina. Q
.
schools
u
Ongoing
AID
6 87 -- --
3 schools in Ashkeen. Ehamgala & Barmali villages.
Zoorz
Ongoing
AID
11 92 -- --
FloodControi
Bakhti
Completed
AID
-- --
FloodControl
11ohd Hasan
Ongoing
AID
11 92 -- --
Construction of 3O m retaining wall(stone work), benefit 30 families.
--
Student teams - variable in number.
EDUCAT.: Primary
VITA
WATER:
FloodControi
VITA
WATER:
VITA,
WATER:
Z 93
_
69 teachers ! 1754 students
'i
ii
Amber Khel
15.000 people.
Agriculture survey on 40 villages.
7 89 -- --
UNO
Construction of 30 m retaining wallfstone work.),. benefit 24 families..
Construction of 40 m retaining wall(gabion work). benefit 65 families..
Jani Khel
ALICEN
HEALTH: Vaccination "
118 villages
Ongoing
ECÌUNICF
nSH.
HEALTH: Basic Post
Jani Ihel
Ongoing
AID
,
--
4 89 =- --
2 BHWs.
Katawaz
Repairing of Barkhan well.
ARCON
WATER:
Drinking
Barkhan
Completed
ARCON
ARCON
WATER:
Itrinking
Zormat Khel
Completed
ARCON
--
ARCON
NATE?:
Drinking
Jehad Abad
Ongoing
ARCON
-- -- -- --
Rehabilitation of well.
ARCON
WATER: "
Drinking
Sehar Bagh
Ongoing
ARCON
-- -- -- -
Rehabilitation of well.
fBAP
.
benefit
--
.
SCA
EDUCAT: Primary
Pakteka
ii
i BHW
Ongoing
r
Pakteka
r1A
--
.
-- -
Repairing cf well.
DATABASE OF NGO ACTIVITIES
Page: 191
A6actrep Date: 77!08!93
6TH EDITION I
ACTIVITY
SECTOR
ati6NCs
---- VILLAGE(6 - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
Katawaz
Pakteka
Rehabilitation of Iatawaz well pumps.
ARCOR
WATER:
Drinking
Iatawaz
Ongoing
ARCON
ARDP
AGRIC:
Crop Product
--
Ongoing
FAO/UNDP
ARDP
AGRIC:
Fruit Trees
Completed
FAO
--
ARDP
HEALTH: Other
Ongoing
NAC
-- -- -- --
ATC
MINES:
Mohd Hassan/Mast
Completed
UNOCHA
AVICER
HEALTH: Vaccination
20 villages
Ongoing
EC /UNICF
HEALTH: C ompr C7 in c
Iha ir ko;
Ongo i ng
TD:
NEH
HEALTH: Basic Post
Pak Khel
Ongoing
AIi:
7 88 -- --
RAFA
RELIEF:Food Items
Completed
WFP
4 90
SCA
EDUCAT: Primary
Ongc ing
SCA
7 92 -- --
4 schools i
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
16 schools in 15 different villages.
*ri
DESCRIPTION>
Clearance
.
Bak Ihel
--
Production of improved wheat seed.
-- -- --
Distribution of 11.000 fruit saplings.
CDD program.
Destroyed 82 devices. cleared 248500 Sqm road.
9 90 12 90
1 team - 2 vaccinators
--
1 sed-level
1 MD
5 90
r
1
lab tech.
,
1 F-a.der - OPD
:a
.
1 BHW
Distribution of 200 MT wheat to 300 families to decrease the rate of wheat & help the needy people.
2',
teachers 1 498 students
Mata Khel
Pakteka
ARO
WATER:
Tarez
Mata Ihel
Completed
UNDP
3 92
7 92
Cleaning of 16 karezes - benefit 200 farmers.
GAF
AGRIC:
Vet
Mata Ihel
Ongoing
UNDP
10 90
6 93
1 assist DYE / 2 paravet / 1 guard curative &preventive service.
IMC
CONST:
Pub.Buiiding
Center
Completed
WHO
5 B7 -- --
MSH
HEALTH: Compr.Cïinic
Mete Ine:
Ongoing
AID
4 *3 -- --
1 MD
MSH
HEALTH: Basic Post
Lagr,.r
Ongoing
AID
2 92 -- --
1 BHW
NAC
AGRIC:
Crop Product
Ongoing
FAO
3 93
8 93
Multiplication of improved wheat seed.
NAC
AGRIC:
Research
Completed
NAC
9 91
8 92
Fertilizer response demonstration plots.
NAC
WATER:
larez
Completed
NAC
12 91 -- --
.Hospital building.
17 karezes in different villages - Total length = 12.74kí including digging new tunnels ' wells k atone work
- irrigate 8.330 J.
NAC
WATER:
Iarez
Completed
NAC
6 91 -- --
/ benefit 328 families.
20 karezes in different villages - Total length = 12.44 km including new tunnels / wells & stone work -irr.3.978 J.
ben. 366 families.
ACBAR
DATABASE OF NGO ACTIVITIES
Page: 192
A6actrep Date: 27/08/93
6TH EDITION
/
FUNDS
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
-- STATUS --
Begin --End
-- 91 -- 92
PARC
CONST:
Bridge
Mata Ihel
Completed'
CIDA
START
CONST:
Road
Mata Ihel
Completed
Pvt
loti
Ongoing
RAP
Ongoing
MAI
Pakteka
AFRANE
RAI
"SE
AGRIC:
Research
CARE
Detail survey of Sharan -Mata Than road(17.8 Em)
-- 91 -- --
Variety &agronomical trials to-know the best variety in consideration of good yield & proper use of fertilizer &
demonstration plots
Sarak- Bazak!Tarakh
HEALTH: Basic Poet
Sade,
Ongoing
AID
Spian
Ongoing
AID
Completed
CCSC
-- 92 -- 92
Survey of 150 km road for ARCS.
--
HEALTH: Basic Post
CONST:
CONS ?:
WATER:
'
2 schools.
8 89 -- --
3 BHWe
Omna
:BHW
Pakteka
Road
Pakteka
CARE
7 91
DESCRIPTION>
Reconstruction of foot bridge.
EDUCAT: Primary
Pakteka
MAMAR
6 91
,-- <ACTIVITI
Neka
Ph.kteka
M'SH
DURATION
- --BY --
SarhawzaRoad
Sarhawza
Completed
AID
Canal
Sarhawza
Completed
0
0 92
Reconstruction of Sra kot Road with total' length 7 ka.
AID
8 92
0 92
3.336km long with bed cleaning, 161 protection salt and one intake.
CARE
WATER:
Canal
Sarhawza
Ongoing
AID
8 92
0 --
Bed cleaning 2070 cu m.
CARE
WATER:
Other
Sarhawza
Completed
AID
8 92
0 92
33600 cu a capacity Reservoir with
Other
Sarhawza
Ongoing
AID
8 92
0 --
28000 cu a capacity Reservoir with 30 s protectio wall and one culvert.
Storage
Center
Completed
HCR
-- 89 -- --
CARE
WATER:
ISAR
CONS?:
LDI
HEALTH: Basic Clinic
Sarhawza
Ongoing
LDI
--
EDUCAT: Primary
Barham
Ongoing
SCA
7 87 -- --
Sarobi
Completed
AID
SCA
Pakteka
CARE
CONST:
A C B A R
75 a protection well and one intake.
Warehouse
1 aid -level HW / 1 lab tech I 1 OT tech - prostheses I dental service & OPD.
4 schools / 28 teachere / 768 students
Sarobi
Road
--
0
0 92
Reconstruction of Penskbwa Road(eec- 1Tlith total length 8 km.
DATABASE OF AGO ACTIVITIES
Page: 193
A6actrep Date: 27/98/93
6TH EDITION
ACTIVITY
- - -- VILLAGES) - - --
SECTOR
AGENCY
-- STATUS --
.
FUNDED
- --BY --
DURATION
<ACTiViTY
Sarobi
Pakteka
DESCRIPTION>
Begin- -End
Completed
AID
0
0
0 92
affairs..
Formed 3 -local shuras in different areas & held periodic meetings discussing'reïated Projects
Sarobi
CARE
SOCIAL:Fort Committ.
Sarobi
Completed
AID
0 92
Rehabilitation of canals in Dare with total length
Canal
0
WATER:
--
CARE
Canal
Sarobi
Completed
AID
0
0 92
Rehabilitation of Ihargosh Canal including structures with total length 2.2km.
WATER:
--
CARE
Canal
Sarobi
Completed
AID
0
0 92
Rehabilitation of canals in Bandi Sapedar & banji Ihel Jaded including intake & siphon.
WATER
--
CARE
Sarobi
Completed
AID
0 92
Rehabilitation of Lewani Canal including structures with total length 3.2km..
Canal
0
WATER:
- -.
CARE
Completed
AIL+
Rehabilitation of Dagari IC including 600m Soil
Sarobi
0 92
WATER:
Canal
0
CARE
Structure
Sarobi
Completed
AID
0
0 92
Reconstruction of Protection Walls in Abass Ihel, Bandi Sapedar & Lanji Ihel Jaded.
WATER:
--
CARE
WATER:
FloodControl
Sarobi
Completed
AID
-- -- -- 92
CARE
WATER:
FloodControl
Sarobi
Completed
AID
-- --
CARE
Storage
Center
Completed
HCR
Warehouse
CONS':
-- 89 -- --
ESAS
Sarobi
Ongoing
ISRA,
1 doctor / 1 assistant I 1 lab tech. I female & male helpers.
HEALTH: Compr.Clinic
10 91 -- --
ISRA
HEALTH: Basic Clinic
Sarobi
Ongoing
LDI
-- -
LDI
MSH
HEALTH: Basic Post
Mastoy
Ongoing
AID
Sarobi
Completed
CIDA
,0 92
-- --
5 89 -- --
-- 89 -- 90
2.3km,
erosion barrier, 1 reservoir & other structures.
60 m long one erosion barrier.
252 along one erosion barrier.
2 mid -level HWs - OPD.
2 BHWs
Cleaning of karez.
^RC
WATER:
Iarez
RAFA
WATER:
Karez
Completed
WFP/UNDP
RAFA
WATER:
Iareí
Completed
WFP
Plant Proteo
Ongoing
SCA
Provision of 0.065 MT agrochemicals.
AGRIC:
0 93 -- 93
SCA
Other
Ongoing
SCA
Agriculture survey on 30 villages.
AGRIC:
0 93 -- 93
SCA
EDUCAT: Primary
Ongoing
AID
6 87 -- --
5 schools in Marian, Manzai(Dinar Ihel), gala Mahd Than, Gadli, Pata Ihel villages.
UNO
Ongoing
AID
2 schools in Sayed Ihel & Suri Ihel villages.
&DUCAT: Primarf
6 8? -- --
UNO
Ongoing
FAO
12 92 -- --
Pakte:ka
ARO?
AGRIC:
8.90 10 90
12 89
2 91
Rehabilitation of 8 karezes in different villages
Rehabilitation of 3 karezes in different villages -
total length 11,500 m.
total length 5,434 m - benefit 15,000 people.
Sharan
Crop Product
Sharan
Multiplication of 5 MT wheat.
- 6TH EDITION 1
DATABASE OF $GO ACTIVITIES
Page. 194
A6actrep Date: 2 ?/08/93
FUNDED
ACTIVITY
A^EN^Y
-VILLAGE(S) - - --
SECTOR
-- STATUS --
DURATION
- - -BY --
Begin- -End
10:91
{ACTIVITY
Sharan
Pakteka
6 93
1 assist DVM
DBSCRIPTION>
2 paravet / 1 guard curative & preventive service.
Sharan
Ongoing
UNDP
HEALTH: Distrct Hosp
Sharan
Ongoing
LDI
wc"
HEALTH: Basic Post
ghwaja Ehei Mirza
Ongoing
AID
2 92 -- --
AGRIC:
Crop Product
--
Completed
FAO
9 91
7 92
Distribution of 12 MT improved wheat seed ! 1.3 MT Urea & 13 MT DAP t
NAC
AGRIC:
Fruit Trees
Completed
FAO
-- --
3 91
Distribution of 4,150 fruit trees (apple % apricot' to 391
NAC
AGRIC:
Other
Completed
NAC
9 ól
á 92
NA:
N -split demonstration.
WATER:
arez.
Completed
NAC
01
NA"
-- --
CAF
AGRIC:
L:.
Vet
24 bed hospital
1r'
¡n}-: aiJr iWßTy
pPS
(' E
Completed
t
hik:
AF^+K
-- 91 -- 91
3 MD!
'
6 technicians
1 nurse - OPD !emergency care ! .ab & X-ray.
1 BHW
50 farmer! in 6 big villages.
farmers :n 41
23 karezes in different villages - Total length _ 12.5 km including digging new tunnels I wells & stone work
irrigate
nk^
-
.386 y!
4'
iam;
höne: i` 473
,ae.,
- schools.
.
B 92
6 93
40 karezes.
WATER:
Parez
Completed
:omr..v.,.
WATER:
Earez
Ongoing
Drinking
Completed
ARGON
á 92
6 93
WATER:
10 wells.
Completed
WFP
4 90
5 40
Distribution of 200 MT wheat to decrease the rate of wheat & help the needy people.
Mha Ehel
Ongoing
SCA
7 86 -- --
5 schools f 39 teachers / 1149 students
-- 9?
21 karezes in MOhammad Ahel & Towta .China.
RAFA
RELIEF: Food Iteme
SCA
!DUCAT: Primary
CONS?:
Road
Sharan
Compl.eted
UNDP/WFP
5 91 10 91
Repair of Sharan-Satrwaza road (10 Im).
START
CONST:
Pnb.Building
Sharan
Completed
NAC
8 91 11 91
Administration building construction for NAC field office.
START
Ongoing
EC.nJNiCF
Ongoing
ARCON
-
Ongoing
ARCON
-- -- -- 43
Pakteka
-
Sultan Khan
AVICBN
HEALTH: Vaccination
PRS
WATER:
tarez
PRS
WATER:
Drinking
19 villages
-
Student teams - variable in number.
-- -- 93
20 kartzes.
30 wells.
6TH EDITION
ACHAR
DATABASE OF NGO ACTIVITIES
Page: 195
A6actrep Date: 27/08/93
AGENCY
SECTOR
Pakteka
AB
AGRIC:
ACTIVITY
FUNDED
- STATUS-
- --BY --
DURATION
Begin- -End
<ACTIVITY
DESCRIPTIO$>-
tirgUun
RELIEF:Food Items
AFRANE
-VILLAGE(S)-
Research
City
Urgoun
Completed
WFP
--
Ongoing
RAP
-- 91 --
7 91
--
Free distribution of 232 MT wheat to 2320 families.
Variety & agronomical trials to know the best variety in
consideration of good yield & proper use of fertilizer &
demonstration plots.
ATC
AVICEN
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
MINES:
Clearance
HEALTH: Vaccination
AGRIC:
AGRIC:
AGRIC:
CONST:
CONST:
CORP:
CONST:
CONST:
CONS!:
CONST:
Fruit Trees
Forestry
Other
Road
Road
Road
Shelter
Shelter
Storage
Storage
RELIEF:Help Returnee
SOCIAL:Fors Committ.
SOCIAL:Form Committ.
Musa Ihel /Paraw
viscontin
UNOCHA
130 villages
Ongoing
EC/UNICF
Urgoun
Proposed
AID&WFP
0
93
0 93
Establishment of 4 Nurseries including all related activities.
Proposed
AID &WFP
0
93
0 93
Plantation of 43,000 trees along the 22km irrigation canals.
Proposed
AID &WFP
0
93
0 93
Rehabilitation of one Farm which cover 2 ha area including all related activities.
Proposed
AID&WFP
0 93
0 93
Reconstruction. of 2 Roads with the total length 12km including other structures.
Dora
Ongoing
AID
7 92
0
Pirkoti
Completed
AID
5 91
0 92
Urgoun
Completed
AID
8 92
0 92
40 Houses which was 80 rooms have been completed.
Proposed
AID &WFP
0 93
0 93
Construction of 27 Shelter / house with 54 rooms.
Completed
AID
8
92
0 92
3 warehouses in Urgoun, Pirkoti and Amber one village have been completed.
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 1 village level storehouse with capacity of 50 mt.
Urgoun
Completed
AID
--
0
0 92
Distribution of 40.5 Mt wheat / 411 sets hand tools to 411 returning families.
Urgoun
Completed
AID
--
0
0 92
Formed 47 local shuras in different areas & held periodic meetings discussing project related affairs.
Urgoun
Completed
AID
--
0
0
92
Formed 16 local shuras in different areas & held periodic meetings discussing project related affairs.
Urgoun
Urgoun
Urgoun
Urgoun
Urgoun
5 90
12 91
--
--
--
Destroyed 584 devices, cleared 1148259 Sip agri.land / grazing land i airport i village & road.
1 team - 2 vaccinators
1.9 km long with 2 culverts, 6 causeways, 5 retaining walls, cutting & filling.
1 km long with 4 culverts, 6 retaining wails,cutting i filling i grading & levelling.
`ACHAR
DATABASE OF X6O ACTIVITI&S
.
6TH IDITION
Page:
196
A6ectrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
DURATION
FUNDED
-- STATUS --
- --BY --
CARE
WATER:
larez
Urgoun
Proposed
AID&WFP
CARE
WATER:
larez
Urgoun
Completed
AID
CARE
WATER:
Canal
Shahnawaz
Completed
AID
CARE
WATER:
Canal
Urgoun
Completed
AID
CARE
WATER:
Canal
Urgoun
Ongoing
AID
CARE
WATER:
Canal
Urgoun
Completed
AID
--
WATER:
Canal
Urgoun
Completed
AID
--
CARE
WATER:
Canal
Urgoun
Proposed
CARE
WATER:
Canal
Amburwan
CARE
WATER:
Canal
'
DESCRIPTION>
Urgoun
Pakteka
CARE
<ACTIVITY
Begin- -End
0 93
0 93
Rehabilitation of 5 tarezes with total length ilkm including other structures.
0
0 92
Rehabilitation of 5 Karam in Mia Sahib, Maidan -i- Hawaee & thanadar with total length 3km.
5 91
0 92
2ám long with 2 protection wails, 9851 canal desalting, and one Erosion Barrier.
0
0 92
Rehabilitation of 5 canals in Mutriban. Mundak, Masondi, Masood, & Showgir with total length 8km.
7 92
0 --
3.3km with bed cleaning, construction of 2841 2 protection walls, 10 erosion barriers
0
0 92
Rehabilitation of canals in Mati, Hagar. Mat, Fazilgai & Manz witc
0
0 92
Rehabilitation of 10 canals in Haji M Gui. Satin. Pirkoti. Urgoun. Derag, Shagai. Pushtai&Shanawaz.
AID &WFP
0 93
0 13
Rehabilitation of 10 irrigation canals with total length 22ám including other structures.
Completed
AID
7 91
0 92
5km long with desilting, one protection wall. one reservoir, and 2 Erosion barriers.
Urgoun
Completed
AID
--
0
0 92
--
--
'
total
length 5.85km.
Rehabilitation of canals in Jabar kali, Omar khan, Eagi, thoram & Rab nvaz with total length 10km.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of canals in Gaum, Bondi, Gulki, Baji Zarif .& Shir Jan with total length 6kî.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of canale in Mundt Sadat, Karkali, Treen, Akram Gulshab & Chanokhwa with total length 4km.
CARE
WATER:
Canai
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of canals in Perkoti, Mundah, Nawab, Turgul, & Gundeer with total length 9ka.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of lamran canal total length 1.9km.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Shah nawaz canal. with total length 2km.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Masood canal total length 3.5km.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Presht canal with total length 1.5km.
--
0
0 92
Rehabilitation of 5 canal with the total length of 3 km.
.
CARE
WATER:
Canal
Urgoun
Completed
AID
CARE
WATER:
Canal
Dahana
Completed
AID
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of canals in Siasang, Jamal, Nazar, & than Aeek with total length 7ka.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Landi larez IC canal with total length 2.71m.
8 92 11 92
92
Page:
2.5ka long with bed cleaning one 115 a protection wall, and one intake.
Rehabilitation of canals in Majid Jelani, Mia Shokor, Gailani, Abengaran & Ali Jan with total length 3k.
197
A6ectrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY',
Pakteka
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Urgoun
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Amber One canal frith total length 5km.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Haji n. Gul canal with total length 1.5km.
CARE
WATER:
Canal
Balish
Ongoing
AID
7 92
0 --
3.5km long with bed cleaning, one intake and 6 Erosion barriers.
CARE
WATER:
Canal
Urgoun
Proposed
AID
--
0
-O 92
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Zawaw canal with total length 1.3km.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
O,
0 92
Rehabilitation of canals in blab meirza, Jusakhan, Marghasi, Iatakhel & Zawaw with total length 4.5km.
CARE
WATER:
Canai
Urgoun
Completed
AID
--
0
0.92
Rehabilitation of Gulaki canal with total length 2k*.
CARE
WATER:
Canal
Urgh Spring
Completed
AID
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Showger canai.total length 1.3km.
CARE
WATER:
Canal
Urgoun
Proposed
AID
--
0
0,92
Rehabilitation of Saidoni canal total length.
CARE
WATER:
Canal
Urgoun
Completed
AID
--
0
0 92
Rehabilitation of Mir koti canal total length 1km.
CARE
WATER: " Canai.
Urgoun'
Completed
AID
--
0
0 92
Rehabilitation of 5 canals in karez Hindu, 2:10ks, Loy karez tkm, handy karez 44* Tah karez tkm & Barok.
CARE
WATER
Canal
Urgoun
Completed
AID
--
4
O 92
Rehabilitation of canals in Shamatgai, Nazar gul, Matan, Bardamandi & Warghar with total Iength'204.
CARE
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Reconstruction of Protection Walls in Mutriban, Mundak, Masondi, Masood & Shawgir with total length 272
CARE
WATER:
Structure
Urgoun
Completed
AID
--
O
O 92
Repair of 5 protection\ walls in. tarez Hindu(BOi), Loy Rare; (34m), Landy (40m), Tab Tarez (2401).
CARE
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Repair of 5 protection walls in Cati (60m), nagar (120m), mat. (20m), and mans (40*) stone masonry.
CARE
WATER:
Structure
Urgoun
Completed
AID.
--
0
0 92
Repair of 5 protection walls in_sula mirza (42m), juma khan (3241), marghasi(85m), katakhel(1051).
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Repair of Protection Walls in 4au*, Bondi, Gulak, Haji Zarif & Shir Jan with.total length 1010*.
CARE
WATER:
Structure
Urgoun
Completed'
AID
-
0
0 92
Reconstruction of Protection Walls in Majid & Jelani, Mia Shokor, Gailani, Ahengaran & Ali Jan.
CARE
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Repair of 6 protection walls in pirkoti (120*), tunda (120m), nawab (5O1), turgu (187*) and gundeer.
CARE
WATER:
Structure
Urgoun
Completed
AID
--
O
0 92
Repair of 10 protection walls with total length 1200* in H.M.Gul / Batiu 1 Derag i Paniargha /Shagi / Shanawaz &a
CARE
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Repair of 5 protection walls in Jabar thel (90m), Omar Iban (100*), tagay (70s), Thoras (20m) and Rab Nawaz.
CARE
'
ACBAR
'
5 91 11 92
Rehabilitation of Manzki canal
1.349ka long with bed cleaning of entire bed, and construction of one siphon.
DATABASE OF NGO ACTIVITIES
Page:
198
A6aetrep Date: 27/08/93
6TH EDITION
ACTIVITY
.
SECTOR
AGENCY
VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Urgoun
Paktskat
CARE
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Reconstruction of Protection Walls in Shamatgi, Nazar Gul, Matan, Bardamendi & Warghar
CARE
WATER:
Structure
Urgoun
Completed
AID
--
0
0 92
Repair of Protection Walls in Siasnng, Jamal, Nazar M. & than Aaak with total length 2301.
CARE
WATER:
FloodControl
Urgoun
Completed
AID
--
4
0.92
106 m long one erosion barrier
CARE
WATER:
FloodControl
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 29 Erosion barriers with stone masonry, compacted soil l Gabion work
CARE
WATER:
FloodControl
Masta,
Ongoing
AID
5 91
0 --
751 long 2 erosion barriers.
CARE
WATER:
FloodControl
Urgoun
Completed
AID
0
0 92
173 m long
CARE
WATER:
Other
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 2 Dam (reservoir) with capacity of 1800 cum.
DACAAR
CONST:
Road
Urgoun
Completed
DACAAR
5 90 12 90
--
erosion barrier constructed
Repair of Urgoun - Sarobi romd(21 km ) - construction of 53 culverts / bridges - with machinery - maintenance
completed for 92
Repair of 21 km road from Urgoun to Sarobi
Completed
DACAAR
-- 90 --11
Center
Completed
UHILOG
12 90
Center
Completed
HCR
-- 89 -- --
Completed
UNDP
12 90
5 91
Survey of the whole irrigation system with complete data on karezes / springs f diversions & canals
Urgoun
Ongoing
UNDP
10 90
6 93
1 assist DVM
Pub.Building
Center
Discontin
WHO
5 87 -- --
Hospital building,
AGRIC:
Fruit Trees
gala Norullah
Ongoing
SV
3 91 -- --
Nursery with 4100 sqm planted with stone fruit / nut / apple seed and cuttings
IRC/RPA
AGRIC:
Fruit Trees
Completed
SV
3 93
RC /RPA
AGRIC:
Machinery
Ongoing
FAO
IRC/RPA
AGRIC:
Research
Completed
SV /FAO
3 91 12 92
Improved wheat, barley and oat seed trials
IRC /RPA
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed suit, nurseries, bees, poultry, food preservation etc, 47 farmers trained
IRC/RPA
AGRIC:
Other
Ongoing
SV
3 91 -- --
Model farm: seed mult, nurseries, vegetables, pòultry, bees, farm power
IRC /RPA
WATER:
garez
Ongoing
SV
11 91 -- --
DACAAR
CONST:
Road
ESAR
CONST:
Stdrage
ESAR
CONST:
Storage
ESAR
WATER:
Other
GAF
AGRIC:
Vet
IMC
CONST:
IRC /RPA
A coat galvanized corrigated sheet -hoúse (401t2O1b5a dimension & 250 MT capacity). WFP wheat is stored in it now
8 91
Warehouse
4 93
2 paravet
1 guard curative & preventive service.
Distribution of 350 saplings to 7 farmers
1 tractor, 1 thresher
10 91 -- --
rt-
CBAR
Wale Norullah
Qala Norullah
Rehabilitation of 10 karezes, total 6.44 km, irrigate 1736 jeribs, benefit 750 families
DATABASE OF HGO ACTIVITIES
C
Page:
199
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
-VILLAGE(S)-
SECTOR
AGENCY
Pakteka
DURATION
FUNDED
- STATUS
- - -BY --
Completed
HCR /SV
Ongoing
MAI
<ACTIVITY
Begin- -End
DESCRIPTION>
Urgoun
6 90
Rehabilitation of 41 karezes, total 39.13 km, irrigate 15734 jeribs, benefit 5159 families
2 93
iRC/RPA
WATER:
44Ái
&DUCAT: Primary
EH
HEALTH: Compr.Ciinic
Urgoun
Ongoing
AID
4 93 -- --
1 MD,
NSF.
HEALTH: Basic Poet
Pirkoti
Ongoing
AID
4 89 -- --
5 BHWs
MSc
HEALTH: Other
Urgoun
Ongoing
AID
3 92 -- --
Regional Health Administration ÍRha! administrative center and depot for issue of salaries and supplies and
ëarez
6 schools in ielook, Debi, Seri Maiden Darkai Ehwai, Sarobi A Alimzai villages.
1 LAi;.TECH. ASST., 1 M.T.
LABORATORY SERVICES
monitoring and supervision of the BHWs and health facilities under its jurisdiction
Ntr
AGRIC:
Fruit Trees
Urgoun
Ongoing
NRC /NCA
5 92 -- --
WPi,'
CONST:
Shelter
Urgoun
Ongoing
NRC/NCA
4
t,NST:
Pub.Building
Urgoun
Completed
NRC¡NCA
Í1PO
MST:
sanitation
Urgoun
Ongoing
KPO
INCOME: HelpCraftmen
Urgoun
NPO
WATER:
Canal
NPO
WATER:
.FloodControl
RATA
G:.
Cleaning of governmental garden in lava.
-- --
Production of beau 1.5 m for roofing houses.
5 92 10 92
Middle school.
NRC /NCA
5 92 -- --
Surface(pit latrines) for villages coop. with CARE.
Completed
NRC /NCA
1 91 12 91
Help to skilled craftsmen.
Urgoun
Completed
NRC /NCA
7 92
Repair of canal - length 132 m.
Urgoup
Completed
NRC /NCA
8 92 10 92
Completed
WFP
4 90
5 90
Distribution of 200 MT wheat
12 89
2 91
Rehabilitation of 6 karezes in different villages - total length 1446? - benefit 30,000 people.
" RELIEF.Food items
-
9 92
Hinderance wall in old Urguon river.
to 300 families to decrease the rate of wheat A help the needy people.
&FA
WATER:
garez
Completed
WFP
RATA
WATER:
tarez
Completed
WFP /UNDP
8 90 10 90
SCA
AGRIC: '
Crop Product
Completed
SCA
O 92 -- 92
Distribution of 2.5 MT wheat seed & 2 MT DAP.
SCA
AGRIC:
Plant Protec
Completed
SCA
O 92 -- 92
Provision of 0.23 MT agrocheaicais.
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SL£
AGRiC:
Otnei
'Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
Ongoing
AID
EDUCAY: Pridary
AfkAR
--
Center
_
Rehabilitation of 15 karezes in different villages - total length 21,561 m.
8 mid -level HWs
3 Nurses
12 schools in different villages.
6 87 -- --
DATABASE OF NGO ACTIVITIES
Page'
200
A6actrep Date: 27/68/93
6TH EDITION
- - -- VILLAGE(S) - - --
SECTOR
AGENCY
ACTIVITY
FUNDED
DURATION
-- STATUS --
- --BY --
Begìn- -End
<ACTIVITY
DESCRIPTION>
VITA
WESTER:
FloodControl
Zama
Completed
AID
--
1 93
Construction of 80 m retaining walligabion work), benefit 114) families.
VITA
WATER:
F1oodControi
Fazel than
Completed
AID
-- --
2 93
Construction of 88 m retaining wall(gabion work), benefit' 106
Pakteka
families.
Wazakhwa
1 team - 2 vaccinators
AVICEN
HEALTH: Vaccination
150 villages
Ongoing
EC /UNICF
MSH
HEALTH: Basic Post
Gala Nohd Khan
Ongoing
AID
5 Bt -- --
RAFA
RELiEF:Food 'test
Completed
WFP
4 90
RAFA
WATER:
Ongoing
RAP
3 92 -- --
La
EDUCA:: Primary
START
CONST:
STAR?
Dire:
2 BHWs
Distribution of ZOO MT wheat to 300 families to decrease the rate of wheat & help needy people.
5 90
-
Rehabilitation of 17 karezes - total length 34.5 km.- benefit 918-families.
...
41 teachers
976 students
Chun:
Or gvy ng
Pub.Buiiding
Wazakhwa
Completed
NRC
9 91 12 91
Construction of Wazakhwa high school building.
WATER:
Structure
Wazakhwa
Completed
CIDA
3 92 -- --
Construction of water surface reservoir daa (1601 L. 4.5m H.).
VITA
CORSI':
Road
4amaruddin.
Diacontin
AID
C d: -- --
Unionization gi 76 km road, dopRiit 20,000 iamilìas.
VITA
WATER:
Structure
Borj
Ongoing
AID
-- -- -- --
Construction of 120
VITA
WATER:
Structure
Borg
Completed
AID
-- -- 11 92
Construction of 401 intaketgabion work:), benefit 250 families.
VITA
WATER:
FioodControl
Grob
Completed
AID
-- -- 11 92
Construction of 200 m retaining wall(gabion work(, benefit 230 families.
VITA
WATER:
FloodControl
Khairabad
Discontin
AID
8 91 -- --
VITA
WATER:
FloodControl
Loy Wat
Ongoing
AID
Construction of 72 m retaining wall(stone work), benefit 20 families.
Ongoing
ECr:F CF
Student teams
Compietec:
SCA
Ongoing
ARCON
-- -- -- --
Fruit nursery
Ongoing
ECIUNICF
--
Student tears - variable in number..
Pakteka
AVICEN
Pakteka
.
,'
m
intaketgabion work), benefit 10 families.
Construction of 150 m retaining wall(gabion work), benefit 90 families.
Wo1-Man7av
HEALTH: Vaccination
A(,IR:C:
6 schools
57 .-- --
23 villages
Other
Agriculture survey on 3 villages.
0 92 -- 92
Yusuf Khel
Fruit Trees
ARCON
AGRIC:
AVICEN
HEALTH: Vaccination
7 villages
DATABASE OF HGO ACTIVITIES
Fage:
201
A6actrep Pate: 27/05'9:
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
Pakteka
- - -- VILLAGE(S) - - --
-- STATUS --
DURATION
FUNDED
- - -BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Yusuf Khel
--
1 paravet
Gui Abad
Ongoing
UNDP
12 92 -- --
Ninzi
Ongoing
UNDP
2 89 -- --
EDUCAT: Primary
Mush Del
Ongoing
IRC
-- 91 -- --
200 students
WATER:
3 villages
Completed
WFP
-- 92 -- --
Survey of 13 karezes in Mist / Ihabin ! Yusif yhel villages.
Zelok
Completed
UNOCHA
DCA
AGRIC:
Vet
DCA
AGRIC:
Vet
IRC
START
.
Other
Pakteka
Central clinic with 1 advanced paravet
Zelok
Clearance
9 91 11 91
Destroyed 35 devices, cleared 78950 Sum road
ATC
MINES:
AVICEN
HEALTH: Vaccination
39 villages
Ongoing
EC /UNICF
--
CARE
WATER:
tarez
Zelok
Completed
AID
--
0
0 92
Rehabilitation of Kaska' Karez with total length 2.5km
CARE
WATER:
Karen
Zelok
Completed
AID
--
0
0 92
Rehabilitation of
CARE
WATER :.
Earn
Zelok
Completed
AID
--
O
0 92
Rehabilitation of Kam' Karez with total length 3.5km
CARE
WATER:
Karez
Zelok
'Completed
AID
--
0
0 92
Rehabilitation of
Ihorgi larez with total length 1.85kí
CARE
WATER: larez
Zelok
Completed
AID
--
0
0 92
Rehabilitation of
Narghasi larez with total length 3.2km,
CARE
WATER:
larez
Zelok
Completed
AID
--
0
0 92
Rehabilitation of
Latal Karez with total length 4.64ka
CARE
WATER:
Karez
Zelok
Completed
AID
--
0
0 92
Rehabilitation of
Bula! larez with total length 3.51ta
CARE
WATER:
Canal
Zelok
Completed
AID
--
0
0 92
Rehabilitation of Ali Khan Ihel canal with total length Oka
CARE
WATER:
Canal
Zelok
Completed
AID
--
0
0 92
Rehabilitation of Gulradin canal with total length 4.2ka
CARE
WATER:
Other
Zelok
Completed
AID
--
0
0 92
19360 cu
MSH
HEALTH: Basic Post
Sharsai
Ongoing
AID
4 89 -- --
3 BHWs
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
0 93 -- 93
Provision of 0.085 MT agrochesicals
SCA
AGRIC:
Other.
Ongoing
SCA
O 93 -- 93
Agriculture survey on 30 villages
SCA
HEALTH: Basic Clinic
Ongoing
SCA
9 88 -- --
6 aid -level HWs ; 1 Nurse I 1 Lab Tech
A C $'A R
-----r
Zelok
.
--
1 team - 2 vaccinators
Sarwati Karez with total length 4.7km.
capacity Water dai (ReservoiriReconstructed.
DATABASE OF NGO ACTIVITIES -
Page:
202
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
FUNDED
DURATION
- --BI --
Begin --End
Approved
UNDP
-- 93 -- --
Completed
ONDP
4
92 11 92
93
-- STATUS --
<ACTIVITY
DESCRIPTION>
Bak
Paktia
APR
AGRIC:
Livestock
APR
WATER:
Canal
AIR
AGRIC:
Crop Product
8 villages
Ongoing
FAO
1
ARR
AGRIO:
Crop Product
8 villages*,
Completed
FAO/UNDP
6 92 10 93
ARR
AGRIC:
Crop Product
6 villages
Completed
FAO/UNDP
ARR
WATER:
Tarez
Mano Ihel
Completed
UNDP
2
ARR
WATER:
Canal
Mano Ihel
Completed
ARR
WATER:
Canal
Bak
ARR
WATER:
Structure
ARR
WATER:
Structure
ARR
WATER:
BRR
All villages
7
7,000 head poultry.
Rehabilitation of 3 canals & construction of retaining yells
Distribution of vegetable seed (tomato / pepper / egg plant)
93
Distribution of 2 MT maize(Shaheen) 16 MT DAP & 2 MT Urea to 180 farmers
10 92
6 93
Distribution of improved wheat seed (Pe -85) & 15 MT DAP
92
6 92
Rehabilitation of Nano lali karez -1.9 km & Plen Kehl tarez -2.5 ka
UNDP
2 92
6 92
Rehabilitation of 600 m Katkai canal & 600 m Iamkai canal
Completed
UNDP
7 92
12 92
Nano Kbel
Completed
UNDP
2
Tarati
Proposed
WFP
Structure
Completed
UNDP
2 92
WATER:
Structure
Proposed
UNDP
5 93 -- --
IRC /RPA
AGRIC:
Vet
Ongoing
UNDP
1
IRC /RPA
AGRIC:
Training
Completed
UNDP
7 92
5 91 -- --
Center
92
6
1 Farm Animal Vaccination and Treatment clinic, 1 vet, 2 paravets
2 z one-month courses for village -based basic veterinary workers, 6 trained
5 93
IRC/RPA
HEALTH: Other
Approved
HCR
-- 93 -- --
Completed
WFP
9 90 11 90
atone masonry & cement.:
Rehabilitation of retaining wall in Bak village of Pattie
93 -- --
UNICEF
ACBAR
Rehabilitation of 400 a diversion dam
6 92
Ongoing
WATER:
Construction of 3 diversion walle
-- 93 -- --
a.ALTH: Vaccination
AB
Rehabilitation of 100 a dam with stone masonry & cement
92
IRC /RPA
Paktia
Cleaning of canal & construction of diversion vail
3 mobile vacca visiting at least 3 a year, targetting 0 -2 years children & females aged 5 -45
Sale of insecticide- impregnated bed neta for salaria prevention
Chamkani
Tarez
Sarangor
Construction of three karma (11W - 50 MT).
DATABASE OF EGO ACTIVITIES ------- - - ----
Page:
203
A6actrep Date: 27 /08/93
6TB EDITION
ACTIVITY
AGENCY
SECTOR
Paktia
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Chamkani
Construction of mosques.
ARCON
CONST:
Pub.Building
Babo Ehel
Completed
ARCON
ARCON
CONST:
Pub.Building
Chamkani
Completed
ARCON
--
Construction of Chamkani school.
ARCON
CONST:
Pub.Building
Made Ehel
Completed
ARCON
--
Construction of Nada Ehel mosque.
ARCON
CONST:
Pub.Building
Shnargi
Completed
ARCON
--
Construction of Shnargi mosque.
ARCON
CONST:
Pub.Building
Miri Ehel
Completed
ARGON
--
Construction of Miri Khel mosque.
ARCON
CONST:
Pub.Building
Nergesi
Completed
ARCON
-- =- -- --
ARCON
CONST:
Pub.Building
Chamkani
Completed
ARCON
--
Construction of Chamkani hospital.
ARCON
CONST:
Pub.Building
Darman Khel
Completed
ARCON
--
Construction of Darman Khel mosque.
ARCON
EDUCAT: Madrasa
Chamkani
Ongoing
ARGON
-- -- -- --
ARCON
WATER:
Karez
Shnargi
Ongoing
ARCON
--
ATC
MINES:
Clearance
4 villages
Completed
UNOCHA
GAF
AGRIC :. Vet
Chamkani
Ongoing
BIG
9 90 12 93
IRC
EDUCAT: Primary
Chaskani
Ongoing
IRC
-- 91 -- --
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
1 89 -- --
3 mobile vaccs visiting at least 3 x year, targetting 0 -2 years children &
IRC /RPA
WATER:
Drinking
Completed
SV
5 93 -- --
Gravity -flów water supply, one system, benefit 85 families
IRC /RPA
WATER:
Drinking
Completed
SV
4 93
LBI
AGRIC:
Crop Product
20 villages
Completed
FAO/UNDP
-- 92 -- 93
Multiplication of 5 MT wheat seed & 5 NT DAP.
LBI
AGRIC:
Crop Product
4 villages
Ongoing
LBI /FAO
-- 93 -- --
Multiplication of 250 Kg rice & maize seeds & 750 Kg DAP.
LBI
AGRIC:
Crop Product
22 villages
Completed
LBI
-- 92 -- 92
70 MT DAP to 3,000 farmers
LBI
AGRIC:
Fruit Trees
14 villages
Completed
FAO
-- 92 -- 92
Distribution of 5,000 trees (apple, apricot, peach & pear).
AGRIC:
Machinery
Shari Naw
Ongoing
FAO /LBI
-- 91 -= --
3 tractors / 1 thresher / 2 trailers & 25 sprayers.
Chamkani
Ongoing
LBI
-- 89 -- --
60 bed hospital - fully equipped
LBI
LBI
'
HEALTH: Provinc.Hosp
IACBAR
-
Pirkoti
12 90
5 92
5 93
Construction of Nergesi mosque.
Haqqania intermediate Dar Aloìom
Repairing of Shnargi karez.
Destroyed 913 devices,'
1 DVM / 4 paravets / 1-guard curative & preventive service.
2 schools / 400 students.
females aged 5 -45
Gravity -flow water supply, three systems, benefit 470 families
DATABASE OF BGO ACTIVITIES
Page:
683118 Sqm agri.land / grazing land I canal & road.
204
A6actrep Date: 27/08/93
6TH EDITION
I
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
DURATION
FUNDED
- --BY --
Begin --End
Ongoing
AID
11 87 -- --
-- STATUS --
< ACTIVITY
DESCRIPTION>
Chamkani
Paktia
Ghundi
2 BHWE
BSA
HEALTH: Basic Post
SCA
AGRIC:
Plant Protec
Complete,.
SCA
0 92 -- 92
Provision of 0.26 MT agrochemicale.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.085 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villagee.
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
2 echools in Patka & Tashnak villagee.
WRC
CONST:
Ongoing
WRC
-- 91 -- --
Other
Paktia
Establiehrent of communication workshop.
Dand Patarí
ARCON
CONST:
Pub.Building
Dand Paten
Completed
ARCON
--
Construction of Salah Uddin mosque.
ARCON
CONST:
Pub,Building
Dand Paten'
Ongoing
ARCON
--
Construction of Danda Paten clinic.
IBC
EDUCAT: Teacher T.
Dand Paten
Completed
SV
iRC /RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
IRC /RPA
AGRIC
Fruit Trees
Completed
5V
3 93
IRC /RPA
AGRIC:. Fruit Trees
Paten
Ongoing
SV
3 90 -- --
Nursery with 2121 sqi planted with stone fruit / nut / apple seed and cuttings
IRC /RPA
AGRIC:
Forestry
Paten
Ongoing
SV
3 90 -- --
Nursery with 4,000 pine seedlings
IRC /RPA
AGRIC:
Forestry
Completed
SV
3 93
IRC /RPA
AGRIC:
Vet
Sepan
Ongoing
UNDP
IRC /RPA
AGRIC:
Research
Paten
Completed
SV /FAO
3 90 12 92
Improved wheat seed trials
IRC /RPA
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed Ault, nurseries, bees, poultry, food preservation etc, 202 farmers trained
IRC /RPA
AGRIC
Training
Completed
UNDP
IRC /RPA
AGRIC:, Other
Paten
Ongoing
SV
3 90 -- --
Model farm: seed molt, nurseries, vegetables, poultry, bees, farm power
IRC/RPA
CONS?:
Storage
Sokhtah
Completed
UNDP
6 90
3 93
1 warehouse, 750 at capacity, built from cement, bricks, steel bars, iron sheets
IRC/RPA
CONST:
Sanitation
Completed
SV
1 92
5 93
Construction of 42 double -vault surface latrines in 5 villages
ACBAR
1 93
2 93
10 92 -- --
'
4 93
4,93
10 91 -- --
12 91
8 92
29 primary school teachers participated in Maths seminar.
Seed multiplication: 1.15 mt wheat, 1.15 mt DAP to 19 farmers
Distribution of 1,966 saplings to 34 farmers
Distribution of 4,000 forestry tree seedlings in 8 villages
1 Farm Animal Vaccination and Treatment clinic, 2 paravets
2 x one -month courses for village -based basic veterinary workers, 6 trained
DATABASE OF NGO ACTIVITIES
Page: 205
A6actrep Date: 2T/08/93
611
AGENC
SBCTOR
Paktia
---- VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Dand Patan
IRC /RPA
HEALTH: Education
Ongoing
SV
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
10 89 -- --
3 mobile vacca visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
IRC /RPA
WATER:
Karen
Completed
HCR /SV
11 89 12 92
Rehabilitation of 7 karezes, total 1.63 km, irrigate 2920 jeriba, benefit 880 families
IRC /RPA
WATER:
bare:
Lodi /Nawi Hasaa th
Ongoing
SV
6 92 -- --
Rehabilitation of 2 karezea, total 0.48 ka, irrigate 360 jeribs, benefit 620 families
IRC /RPA
WATER:
Canal
Sultak /Ghundi
Ongoing
SV
6 92 -- --
Rehabilitation of 2 canals, total 7.04 km, irrigate 2900 jeriba, benefit 810 families
I'RC /RPA
WATER:
Canal
Patan (Liwanay)
Completed
SV
6 92
Rehabilitation of 1 canal, 4 km, irrigate 3000 jeriba, benefit 250 families
?FIFA
WATER:
Drinking
Completed
AustCare
8 91 11 92
Gravity -flow water supply, four systems, benefit 238 families
MSH
HEALTH: Basic Post
Ongoing
AID
8 87 -- --
2 BMWs
UNO
EDUCAT: 'Primary
Ongoing
AID
3 87 -- --
5 schools in Zigar, Saltak, lot Kali, Patan & Zawargi villages
Ongoing
UNICEF
10 89 -- --
3 mobile vacca visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
Ongoing
RAP
-- 91 -- --
Variety & Agronomical trials to know the best variety in consideration of good yield if proper use of fertilizer &
Pa-lttia
IRG %RPA
AGRIC:
9 92
Dara Darang
HEALTH: Vaccination
Pattìa
AFRANI
Patan
Basic health education aeaaagea on sanitation, nutrition, waste disposal, clean water etc
4 90 -- --
Gardaiz
Research
Gardaiz
demonstration plots.
ARCON
AGRIC:
Fruit Trees
Gardaiz
Ongoing
ARCON
ARCH
AGRIC:
Livestock
Haji Ali Khel
Ongoing
ARCON
- -
Chichen farm.
ARCON
AGRIC:
Livestock
Center
Ongoing
ARCON
--
Cows farm
ARCON
AGRIC:
Livestock
Gardaiz
Ongoing
ARCOK
- -
Honey Bees
ARCOK
AGRIC:
Livestock
Ongoing
ARCH
--
Honey Bees
ARCON
,COAST:
ARCON
ARCON
.Center
Apple & gardens and poultry.
Pub.Building
Gardaiz
Ongoing
ARCO§
--
Repairing of Gardaiz hospital
COAST:
Other
Center
Ongoing
ARCON
--
!host electric St. maintenance
COAST:
Other
Gardaiz
Ongoing
ARCON
IACBAR
Maintenance & training gen. workshop
DATABASE OF NGO ACTIVITIES
Page: 206
A6actrep Date: 27/08/93
6TH EDITION I
-VILLAGE(S)-
SECTOR
AGENCY
ACTIVITY
FUNDED
DURATION
-STATUS-
BY-
Begin- -End
<ACTIVITY
DESCRIPTION>
Gardaiz
Paktia
12 92 -- --
Multiplication of 5 MT wheat.
ARO
AGRIC:
Crop Product
Gardaiz
Ongoing
FAO
ATC
MINIS:
Clearance
3 villages
Completed
UNOCRA
IRC /RPA
AGRIC:
Crop Product
--
Completed
FAO
10 92
IRC!RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
10 92 -- --
IRC /RPA
AGRIC:
Fruit ;Trees
Completed
SV
3 93
IRC /RPA
AGRIC:
Fruit Trees
Sari Sang
Ongoing
SV
8 92 -- --
Nursery with 2290 sqm planted with stone fruit / nut / apple seed and cuttings
IRC /RPA
AGRIC:
Research
Sari Sang
Completed
SV /FAO
8 92 12 92
Improved wheat, barley and oat seed trials
IRC /RPA
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed molt, nurseries, bees, poultry, food preservation etc, 141 farmers trained
IRC /RPA
AGRIC:
Other
Ongoing
SV
8 92 -- --
Model fars: seed molt, nurseries, vegetables, poultry, bees, farm power
IRC /RPA
HEALTH: Vaccination
Approved
UNICEF
ISRA
AGRIC:
Crop Product
Gardaiz
Ongoing
FAO
ISRA
AGRIC:
Crop Product
Gardaiz
Ongoing
FAO /UNDP
ISRA
HEALTH: Cospr,Clinic
Gardaiz
Ongoing
ISRA
9 92 -- --
1 MD / 1 medical assistant / 1 lab tech. / helper.
MSS
HEALTH: Vaccination
Gardaiz
Ongoing
AID/UN
4 93 -- --
4 VACCINATORSIMPLENBNT UNDER PHD SUPERVISION. TARGET GROUPS: CHILDREN 0 -2 YEARS AND WOMEN 5 -45 YEARS.
NPO
INCOME: Skill Train,
Gardaiz
Ongoing
NRC /NCA
3 93 -- --
Vocational training in the handicraft skills.
NPO
SOCIAL:Other
Gandaiz
Ongoing
NRC/NCA
-- -- -- --
PRB
AGRIC:
Vet
City
Completed
UNDP
4 93
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 98 villages.
VITA
CONST:
Road
Gardaiz
Ongoing
AID
9 91 -- --
Rehabilitation of 44 km road from Gardez to Ghazni, benefit 30,000 families.
Paktia
Sari Sang
5 92 11 92
3 93
4 93
-- 93 -- --
5 93 10 93
11 92
7 93
6 93
Deetroyed 367 devices, cleared 2686 Sin agri.land / village A road.
Seed distribution: 3 st wheat, 3 at DAP to 51 families
Seed multiplication: 1 at wheat, 1 at DAP to 10 farinera
Distribution of 1,267 saplings to 17 farmers.
3 mobile vacca visiting at least 3 a year, targetting 0 -2 years children & females aged 5 -45
Distribution of 145 6g seize seed & 600 Eg DAP.
Distribution of 5 MT DAP & 5 MT wheat seed to 196 farmers - 196 jeriba.
In the process of surveying.
VFU with 2 paravets & 1 guard providing veterinary services to the whole district.
Gurbuz
AB
AGRIC:
Crop Product
Alida
Completed
FAO
5 92
9 92
Maize seed multiplication.
AB
WATER:
Canal
Saggi Earlkay
Completed
FAO
9 92
9 92
Canal cleaning & reconstruction for 400 jeribs land.
A C B A R
DATABASE OF NGO ACTIVITIES
1
Page: 207
A6áctrep Date: 27/08/93
6T1 EDITION]
ACTIVITY
AGENCY
SECTOR
Paktia
- - -- VILLAGES) - - --
FINDED
-- STATUS --
- --BY --
DURATION
Begin- -End
<ACTIVITY
DESCRIPTION>
Gurbuz
AB
WATER:
Canal
Sagai Qala
Completed
FAO
7 92
9 92
Canal cleaning & reconstruction for 500 jeribs land.
AB
WATER:
Canal
Shahida
Completed
FAO
8 92
9 92
Canal cleaning & reconstruction for 600 jeribs land,
AB
WATER:
Structure
Shahida
Ongoing
FAO
3 93 -- --
APWO
WATER:
Canal
Bazaar Kali
Completed
FAO
3 93
4 93
ATC
MINES:
Clearance
Gurbuz
Completed
UNOCHA
2 92
6 92
DACAAR
AGRIC:
Crop Product
9 villages
Ongoing
DACAAR
2 93 -- --
DACAAR
AGRIC:
Crop Product
9 villages
Completed
FAO
DACAAR
AGRIC:
Fruit Trees
9 villages
Completed
FAO
DACAAR
AGRIC:
Research
9 villages
Ongoing
FAO /Self
Flume structure for Shadida canal.
Destroyed 36 devices, cleared 216044 Sqm road.
Vegetable nursery established in 95 Sqm.
10 92 10 92
3 93
-10 MT wheat seed & 10 MT DAP distributed to 400 farmers.
3 93
2,500 fruit saplings distribution to 60 growers.
11 92 -- --
Experiments: test plots of 7 var. of wheat, observation lines of 18 var. of wheat, 14 var. of oat & 10 var. of
barley.
DACAAR
AGRIC:
Training
9 villages
Ongoing
DACAAR
3 93 -- --
60 farmers in 9 villages technically trained.
IRC /RPA
AGRIC:
Vet
Kotkai
Ongoing
UNDP
1 93 -- --
1 Farm Animal Vaccination and Treatment clinic, 1 vet, 2 paravets.
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
2 92 -- --
3 mobile vacce visiting at least 3 x year, targetting 0-2 years children &
IRC /RPA
HEALTH: Other
Approved
RCR
IRC /RPA
WATER:
Karez
Ongoing
SV
3 93 -- --
Rehabilitation of 4 karezes, total 1.92 km, irrigate 1600 jeribe, benefit 360 families
IRC/RPA
WATER:
Canal
SV
4 93 -- --
Rehabilitation of 1 canal, 1.95 km, irrigate 800 jeriba, benefit 100 families
Completed
SV
4 93
5 93
Rehabilitation of 3 canals, total 5.81 km, irrigate 2500 jeribs, benefit 390 families
9 92
Gravity -flow water supply, one system, benefit 400 families
Shikhan
( Kaikai)
Ongoing
'
-- 93 -- --
IRC /RPA
WATER:
Canal
IRC/RPA
WATER:
Drinking
Bori Ebel
Completed
SV
8 92
MCPA
MIKES:
Survey
32 minefield
Completed
UNOCHA
1 92 12 92
MSH
HEALTH: Basic Post
Balai
Ongoing,
AID
OMAR
MINES:
Awareness
Completed
UNOCHA
1 92
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
IA C B A R
11 88 -- --
6 92
females aged 5 -45
Sale of insecticide - impregnated bed nets for malaria prevention
844,719 So agri.land / road / foot path & residential.
4 BNB
Safety lessons - 6234 people participated.
Provision of 0.08 MT agrochemicals.
DATABASE OF NGO ACTIVITIES
Page: 208
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SCP.
SECTOR
AGRIC:
- - -- VILLAGES) - - --
Other
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY ' DESCRIPTION>
Begin- -End
Ongoing
SCA
0 93 -- 93
Hasan Ihel
Ongoing
IRC
-- 91 -- --
200 students.
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.4 at wheat, 0.4 mt DAP to 12 farmers
Completed
SV
3 93
3 91 -- --
Agriculture survey on 40 villages.
Hasan Khel
Paktia
IRC
EDUCAT: Primary
IRC/RPA
AGRIC:
Crop Product
IRC /RPA
AGRIC:
Fruit Trees
IRC /RPA
AGRIC:
Fruit Trees
Sikander Ihel
Ongoing
SV
IRC /RPA
AGRIC:
Vet
Moshaka
Ongoing
UNDP
10 91 -- --
1 Farm Animal Vaccination and Treatment clinic, 3 paravets.
IRC /RPA
AGRIC:
Machinery
Ongoing
FAO
10 91 -- --
1 tractor
IRC /RPA
AGRIC:
Research
Completed
SV /FAO
3 91 12 92
Improved wheat seed trials
IRC /RPA
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed suit, nurseries, bees, poultry, food preservation etc, 169 farmers trained
IRC/RPA
AGRIC:
Training
Completed
UNDP
IRC /RPA
AGRIC:
Other
Sikander Ihel
Ongoing
SV
3 91 -- --
Model farm: seed Ault, nurseries, vegetables, poultry, bees, farm power
IRC /RPA
CONST:
Storage
Wachaalogada
Completed
HCR
6 90 11 91
1 warehouse, 750 mt capacity, built from cement, bricks, steel bara, iron sheets
IRC /RPA
CONST:
Sanitation
Completed
SV
1 91 12 82
Construction of 6 double -vault surface latrines in 3 villages
IRC /RPA
HEALTH: Education
Ongoing
SV
4 90 -- --
Basic health education messages on sanitation, nutrition, waste disposal, clean water etc
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
IRC /RPA
WATER:
Iarez
Completed
SV/HCR
1 90
IRC/RPA
WATER:
Drinking
Hasan Ihel /Ghoondi
Completed
SV
8 91 11 91
MAI
EDUCAT: Primary
Oshki/Mangara Toi
Ongoing
MAI
MSH
HEALTH: Basic Post
Hasan Ihel
Ongoing
AID
4 89 -
Jul Ihel
Completed
WFP
9 91 11 91
Paktia
AB
WATER:
IA C B A R
Sikander Khel
4 93
Distribution of 2,160 saplings to 52 farmers
Nursery with 2510 agm planted with stone fruit / nut f apple seed and cuttings
5 93
12 91
2 x one -month courses for village -based basic veterinary workers, 10 trained
10 89 -- --
2 93
.
3 mobile vaces visiting at least 3 a year, targetting 0 -2 years children & females aged 5 -45
Rehabilitation of 14 kareaes, total 1.94 km, irrigate 1190 jeribs, benefit 840 families
Gravity -flow water supply, two systems, benefit 880 families
--
2 schools.
--
l BHW
Jadran
Canal
Reconstruction of 3 canals k 5
DATABASE OF NGO ACTIVITIES
Page: 209
A6actrep Date: 27/08/93
intakes.
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jadran
Paktia
5 91
6 91
Reconstruction of i canal & 1 karez - FFW (50 MT wheat) .
AB
WATER:
Canal
Jani Ihel
Completed
WFP
ARCON
AGRIC:
Livestock
Wadi Shvak
Ongoing
ARGON
-- -- -- --
Honey Bees
ARCON
CONST:
Pub.Building
Danda
Ongoing
ARCOS
-- -- --
Health unit
ARCON
CONST:
Pub.Building
--
Ongoing
ARCON
--
ARCON
CONST:
Pub.Building
Nozi
Ongoing
ARCON
--
Construction of Alshaheed Abdullah school.
ARCON
WATER:
Structure
Jadran
Completed
ARCON
--
Construction of Jadran wall.
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
IRC /RPA
WATER:
Drinking
Completed
SV
IRC /RPA
WATER:
Drinking
Ongoing
SV
MAI
!DUCAT: Primary
Ongoing
MAI
MSH
HEALTH: Compr.Clinic
Piangi
Ongoing
AID
5
MSH
HEALTH: Basic Post
Soran
Ongoing
AID
8 89
PRB
AGRIC:
Vet
Sperkai
Completed
UHF
SCA
AGRIC:
Other
Completed
SCA
HEALTH: Compr.CÌinic
Said Ihe1 /Domanda
Said Bel
4
92 -- --
93
5
--
5
93
93 -- --
lenstruction of Gill Zarak mosque.
3 mobile vans visiting at least 3 x year, targetting 0-2 years children & females aged
5 -45
Gravity -flow water supply, three systems, benefit 350 families
Gravity -flow water supply, two systems, benefit 215 families
3 schools in Miti, Sterkam & Easel Ihel.
93 -- --
1 MD,
-- --
1 BEN
1 M.T.
92
6
93
VFU with 1 DVM, 2 paravets & 1 guard providing veterinary services to the whole district.
SCA
0 92
--
92
Agriculture survey on 3 villages.
Ongoing
SCA
7 87
-- --
Completed
AID
1
Completed
AID
11
1 MD / 5 mid -level HWs.
Jail
Paktia
ACLU
CONST:
Road
ACLU
CONST:
Bridge
Jaji
90 -- --
11 89 12 91
Reconstruction of Jaji -Deb Now road (30 km) with machinery.
Reconstruction of Bailey Bridge (10 m) for heavy traffic - metallic construction with stone masonry 1:6 of abutment &
pier.
91 10 91
ATC
MINES:
Clearance
Belawat /Ihazi Ehel
Completed
UNOCHA
7
GAF
AGRIC:
Vet
Jaji
Ongoing
UNDP
5 90
IAAAB
CONST:
Pub.Building
Taji Ali /Ali Ihel
Ongoing
MWL
IACBAR
6
Destroyed 248 devices, cleared 70155 Sqm grazing land & road.
93
1 assist DVM / 2 paravet / i guard curative & preventive service.
--
i mosque in Taj Ali - cement / steel bar I local materials (copleted), 1 school in Ali Ihel - 6 rooms.
DATABASE OF NGO ACTIVITIES
Page: 210
A6actrep Lo... 27/08 c?
6TH EDITION I
ACTIVITY
- - -- VILLAGE(S) -- --
SECTOR
AGENCY
-- STATUS --
FUNDED
- - -BY --
DURATION
< ACTIVITY
Begin- -End
DESCRIPTION>
Jaji
Paktia
4 91
9 91
Construction of Mosque with 2 rooms & 6 baths - stone / firebrick & cement.
Chawni
Completed
IWL
Ali Mel
Ongoing
IRC
-- 91 -- --
400 students.
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.6 st wheat, 0.6 mt DAP to 13 farmers
Crop Product
AGRIC:
Fruit Trees
Laski /Ghonzi Ahmed
Ongoing
SV
IRC /RPA
AGRIC:
Machinery
Ongoing
FAO
Research
Completed
SV /FAO
Improved wheat, barley and oat seed trials
AGRIC:
3 91 12 92
IRC /RPA
Training
Ongoing
SV
1 -2 day trng in seed cult, nurseries, bees, poultry, food preservation etc, 196 farmers trained
AGRIC:
1 92 -- --
IRC /RPA
Other
Laski /Ghonzi Ahead
Ongoing
SV
2 Model farms: seed mult, nurseries, vegetables, poultry,
AGRIC:
3 91 -- --
IRC /RPA
Storage
Ali Ebel
Completed
HCR
1 warehouse, 750 mt capacity, built from cement, bricks, steel bars, iron sheets
COKST:
6 90 12 91
IRC /RPA
Sanitation
Completed
SV
Construction of 3 double -vault surface latrines in 3 villages
CONS!:
1 91 12 92
IRC /RPA
Ongoing
SV
Basic health education messages on sanitation, nutrition, waste disposal, clean water etc
HEALTH: Education
4 90 -- --
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
10 89 -- --
IRC /RPA
WATER:
Iarez
Completed
HCR /SV
1 90 12 92
IRC /RPA
Canal
Completed
SV
Rehabilitation of 3 canals, total 7.47 km, irrigate 245Ojeribs,
WATER:
10 91 -- 92
IRC /RPA
Drinking
Completed
SV
Gravity -flow water supply, three systems, benefit 470 families
WATER:
8 91 12 92
IRC /RPA
CONS ?:
Pub.Building
Belawat Payan
Completed
ARCON
6 92 12 92
Construction of mosque with stone masonry.
JCE
COKST:
Pub.Building
Belawat Bala
Completed
ARCON
6 92 12 92
Construction of mosque with stone masonry.
JCE
LBI
HEALTH: Distrct Hosp
Jaji
Ongoing
LBI
-- 89 -- --
MSR
HEALTH: Basic Post
Saperai
Ongoing
AID
8 87 -- --
RDA
WATER:
Ali Ihel
Approved
WFP
-- 93 --.93
HEALTH: Basic Clinic
Chawni
Ongoing
SCA
5 89 -- --
5 mid -level HWs / 1 Nurse / i Dental Tech. /1 Lab Tech. / 1 Pharmacist
SCA
EDUCAT: Primary
Ongoing
AID
3 90 -- --
2 schools in Baldad Kali & Hassan Dara villages.
UNO
Pub.Building
IAAAE
COKST:
IRC
&DUCAT: Primary
IBC /RPA
AGRIC:
IRC /RPA
Tarez
Laski /Ghonzi Ahmad
3 91 -- --
10 91- -- --
Nursery with 8603 sqm planted with stone fruit
nut / apple seed and cuttings
1. tractor
bees, farm power
3 mobile vacs visiting at least 3 x year, targetting 0-2 years children & females aged 5 -45
Rehabilitation of 22 karezes, total 3.68 km, irrigate 7210 jeribs, benefit 5025 families
benefit 663 families
20 bed hospital - fully equipped
2 BHWs
Rehabilitation of 5,700 Linear M karez - benefit 570 families.
DATABASE OF NGO ACTIVITIES
1 A C B A R
Page: 211
A6actrep Date: 27/08/93
6TH EDITION
I
ACTIVITY
AGENCY
SECTOR
Paktia
-VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
.DURATION
Begin --End
<ACTIVITY
DESCRIPTION>
Jaji Maiden
APWO
CONST:
Pub.Building
Center
Completed
APWO
3 92
APWO
WATER:
Canal
7 villages
Completed
UNDP
4 92 11 92
ARCAR
AGRIC:
Livestock
All villages
Ongoing
UNDP
4 93
ARCON
CONST:
Pub.Building
JSji Baldan
Completed
ARCON
CARI
WATER:
Canal
Musa Ihel /Jaji Mai
Completed
AID
--
0
0 92
Rehabilitation of 6 Irrigation canals with total length 42.1ka including other structures.
WATER:
Canal
Musa Ihel /Jaji Mai
Completed
AID
--
0
0 92
Rehabilitation of Showdeda Irrigation canal with total length 7.5km including other structures.
HEALTH: Vaccination
Approved
UNICEF
-- 93 -- --
3 mobile yaces visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
HEALTH: Other
Approved
HCR
-- 93 -- --
Sale of insecticide -impregnated bed nets for malaria prevention
1 minefield
Completed
UNOCHA
CARE
IRC /RPA
IRC /RPA
9 92
MSH
HEALTH: Basic Post
Shaweya
Ongoing
AID
PRB
AGRIC:
Center
Completed
UNDP
4 93
UNO
EDUCAT: Primary
Ongoing
AID
3 89 -- --
Paktia
Poultry distribution: 7500 chinckens.
--
MINES:
Vet
Rehabilitation of 7 canals - benefit 900 faiilies.
7 93
MCPA
Survey
Bosque construction.
Construction of Jaji Hayden mosque.
1 92 12 92
57,548 Spa road.
11 88 -- --
2 BHWs
6 93
VFU with 1 DVH, 2 paravets & 1 guard providing veterinary services to the whole district.
2 schools in Rokyan & Sheikhan villages.
Jani Khel
ARGON
CONST:
Pub.Building
Iotkai
Ongoing
ARGON
ARCON
CONST:
Pub.Building
Balkhel
Ongoing
ARCON
--
Construction of Balkhel school.
ARCON
CONST:
Pub.Buìldìng
Jani Ihel
Completed
ARCON
--
Construction of Jani Ihel mosque.
IRC /RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
IRC /RPA
AGRIC:
Fruit Trees
Completed
SV
3 93
IRC /RPA
AGRIC:
Fruit Trees
Ongoing
SV
3 90 -- --
Nursery with 2222 aqm planted with stone fruit / nut / apple seed and cuttings
IRC /RPA
AGRIC:
Forestry
Completed
SV
3 93
4 93
Distribution of 852 forestry tree seedlings to 56 farmers in 11 villages
IRC /RPA
AGRIC:
Vet
Discontin
UNDP
10 91
1 92
1 Fare Anisal Vaccination and Treatment clinic closed following thefts from stores.
1ACBAR
Maidan Ihola
Construction of Salsas Alfarsi school.
10 92 -- --
4 93
Seed multiplication: 1 at wheat. 1 mt DAP to 21 farmers
Distribution of 988 saplings to 35 farmers
DATABASE OF NGO ACTIVITIES
Page: 212
Aóactrep Date: 27/48/93
6TH BDITION
I
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
Paktia
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- Bad
<ACTIVITT
DESCRIPTION>
Jani Khei
10 91 -- --
Ongoing
FAO
Completed
SV /FAO
Training
Completed
UNDP
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed mult, nurseries, bees, poultry, food preservation etc, 184 farmers trained
IRC /RPA
AGRIC:
Other
Maidan [hola
Ongoing
SV
3 90 -- --
Model farm: seed mutt, nurseries, vegetables, poultry, bees, fare power
IRC /RPA
CONST:
Storage
Maidan [hola
Completed
HCR
6 90 12 91
1 warehouse, 750 mt capacity, built from cement, bricks, steel bars, iron sheets
IRC /RPA
CONST:
Other
Maiden [hole
Completed
SV
IRC /RPA
HEALTH: Education
Ongoing
SV
IRC /RPA
HEALTH: Vaccination
Ongoing
IRC /RPA
WATER:
garez
--
IRC /RPA
WATER:
Canal
Palo [hei (Nishpa
IRC /RPA
WATER:
Drinking
MAI
BDUCAT: Primary
MSH
IRC/RPA
AGRIC:
Machinery
4RC /RPA
AGRIC:
Research
IRC /RPA
AGRIC:
IRC /RPA
Maiden [hola
3.90 12 92
12 91
1 92
10 91 11 91
1 tractor
Improved wheat seed triele
1 x one -month course for village -based basic veterinary workers, 5 trained
22 culverts
0 --
Basic health education messages on sanitation, nutrition, waste disposal, clean water etc
UNICEF
10 89 -- --
3 mobile vaccs visiting at least 3 x year, targetting 0 -2 years children females aged 5 -45
Completed
HCR /SV
11 89 10 92
Rehabilitation of 8 karezes, total 1.88 km, irrigate 1570 jeribs, benefit 570 families
Completed
SV
10 91
Completed
SV
Kotkai
Ongoing
MAI
--
HEALTH: Basic Post
Haaanzai Senzai
Ongoing
AID
11 89 -- --
SCA
HEALTH: Basic Clinic
Bazi [hei
Ongoing
SCA
8 89 -- --
UNO
EDUCAT: Primary
Ongoing
AID
10 87 -- --
3 schools in Worgora, Mea Del & Rubat Hassan Zai villages.
5 km Musa khel road reconstruction.
Paktia
4 90
3 92
8 91 11 92
Gravity -flow water supply, three systems, benefit 260 families
i school.
2 BHWe
.12 mid -level HWs, 1 lab tech.
Khoet
AB
CONST:
Road
ghost
Approved
UNDP
-- -- -- --
AB
WATER:
Structure
[asay
Completed
FAO
10 92
ACLU
CONST:
Road
[host
Completed
AID
ACRU
CONST:
Pub.Building
Domanda
Ongoing
UNDP
IACBAR
Rehabilitation of 1 canal, 2.47 km, irrigate 2000 jeribs, benefit 180 families
1 93
6 91 12 91
--
.
Construction of 151 Gabion wall intake.
Reconstruction of Miranaha -ghost road (4.55 km) with machinery.
Repairing of a secondary school.
DATABASE OF NGO ACTIVITIES
Page: 213
A6actrep Date: 27/08/93
6TH BDITIOK I
ACTIVITI
SECTOR
AGENCY
AGRIC:
-- STATUS --
FUNDED
DURATION
- --BI --
Begin --End
RAP
-- 91 -- --
<ACTIVITY
DESCRIPTION>
Khost
Paktia
AFRANE
- - -- VILLAGE(S) - - --
(host
Research
Ongoing
Variety & agronomical trials to know the best variety in consideration of good yield & proper use of fertilizer &
demonstration of plots.
Vaccination of B.C.G.
AHSAO
HEALTH: Vaccination
Matoon
Ongoing
UNICEF
P.PWO
WATER:
Canal
(host
Completed
FAO
ARCON
AGRIC:
Crop Product
--
Ongoing
ARCON
--
Main crops
ARCON
AGRIC:
Livestock
Ongoing
ARCON
--
Sheep farm.
ARCON
AGRIC:
Livestock
Ongoing
ARGON
--
Poultry farm
ARCON
CONST:
Shelter
Khost
Ongoing
ARCON
--
Concrete factory
ARCON
CONST:
Pub.Building
Mogbil /Zikar
Ongoing
ARCON
--
Construction of Zikar school,
ARCON
CONST:
Pub.Building
Badam Bagh
Ongoing
ARCON
--
Construction of Badam Bagh farm building.
ARCON
CONST:
Pub.Building
Khost
Ongoing
ARCON
--
Construction of Ihost hospital for IIRO.
ARCON
CONST:. Pub.Buildìng
Ihost
Ongoing
ARCON
--
Construction of Manda Aljihad school.
ARCON
CONST:
Pub.Building
Mir Mandi
Ongoing
ARGON
--
Construction of Gurbuz school.
ARCON
CONST:
Pub.Buìlding
Niazi
Ongoing
ARGON
--
Construction of Niazi Sholian school.
ARCON
CONST:
Pub.Building
Ihost
Completed
ARCON
-- -- -- --
Construction of Hagani school.
ARCON
CONST:
Pub.Building
Mogbil /Saltak
Ongoing
ARGON
-- -- -- --
Construction of Saltak mosque.
ARCON
CONST:
Pub.Building
Ihost
Ongoing
ARCON
ARCON
CONST:
Pub.Building
Ihost
Completed
ARCON
--
Repair of Shura building.
ARCON
CONST:
Pub.Building
(host
Ongoing
ARCON
--
Repairing of female hospital.
ARCON
CONST:
Pub.Building
[host
Completed
ARGON
--
Construction of main mosque.
ARCON
EDUCAT: Madrasa
Ihost
Ongoing
ARCON
ARCON
INCOME: Skill Train.
Khasi
Ongoing
ARCON
IA C B A R
'
11 89 -- --
5 92
.
-- -
9 92
-- --
--
Construction of Ihost municipality.
Islamic university
--
Al- Shohadaa center
DATABASE OF NGO ACTIVITIES
Page: 214
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Paktia
VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION?
Khost
ARCON
INCOME: Skill Train.
Ihost
Ongoing
ARCON
-- -- -- --
ARCON
INCOME: Skill Train.
Ehost
Ongoing
ARGON
--
ARCON
WATER:
Canal
Haroon Ebel
Completed
ARCON
-- -- -- --
ARCON
WATER:
Canal
[host
Completed
ARCON
-- -
ARCON
WATER:
Drinking
Ihoet
Completed
ARCON
--
Repairing of Hindo weil.
ACON
WATER:
Drinking
Ehost
Completed
ARCON
--
Repairing of Ihost market well.
ARGON
WATER:
Drinking
Badam Bagh
Completed
ARCON
--
Repairing of well.
ARGON
WATER:
Drinking
Mandi Ihel
Ongoing
ARGON
--
Repairing of Matoon well.
ARO
AGRIC:
Crop Product
Matoon
Ongoing
FAO
12 92
--
Multiplication of 10 MT wheat.
ARO
WATER:
Earez
Diri
Ongoing
UNDP
12 92 -- --
Rehabilitation of 03 karezes.
ARO
WATER:
Canal
Diri
Ongoing
UNDP
12 92 -- --
Rehabilitation of 4 canal - benefits 300 people.
ARR
WATER:
Karez
Tor Oba
Completed
UNDP
ARS
AGRIC
Fruit. Trees
15 viilag ;e
Completed
ARS
WATER ::Iarez
5 villages
ARS
WATER:
Iarz
ARS
WATER:
ARS
.
Machanic achool
AI Shaheed vocational center.
Rehabilitation of Haroon Ihel canal.
-- --
Repairing of Ali Shir canai.
2 92
6 92
Rehabilitation of Jaila Ihel Iarez -2 km.
FAO
10 91
2 92
Distribution of 6,000 trees.
Completed
NAC
12 91
6 92
Cleaning of 7 karezes(15.55 ka), irrigate 1155 jeribs & benefit 628 families.
4 villages
Completed
NAC
9 91 11 91
Cleaning of 4 karezes(3.44 km), irrigate 1230 jeribs & benefit 150 farmers.
Karma
4 villages
Completed
UNDP
5 92 11 92
Rehabilitation of 8 karezes (7.59 km), irrigate 4,730 jeribs & benefit 940 families.
WATER:
Canal`.
5 villages
Completed
UNDP
5 92 11 92
Cleainig of 7 canals(17.2 km), irrigate 5,000 jeribs & benefit 1005 families.
ARS
WATER:
Structure
4 villages
Ongoing
NAC
ATC
MINES
Clearance
bazgar
Completed
--
BRR
CONST:
had
Ihost/3
Completed
UNDP
CARE
AGRIC:
Other
Ihost
Completed
AID
0
CARE
CONST:
Road
[host /Alisher /Saba
Completed
AID
--
A C B A R
11 92 -- --
Construction Of 4 intakes (atone & cement) & irrigate 17800 jeribs:
5 92
6 92
Destroyed 56 devices, cleared 107620 Su road.
10 92
3 93
From 2 +400 to 6 +300 of Angur Ada_ Banyan road (17 culverts & wash)
0
0 92
Rehabilitation of 2 Farms (Milma kot & Project Farm) which cover 78 ha area including all related activities.
t
0 92
Reconstruction of Lacan, Batai & Trizai Roads with total length 31.1km including other structures.
DATABASE OF NGO ACTIVITIES
Page: 215
A6actrep Date: 27/08/93
.
6TH EDITION
ACTIVITY
AGENCY
SICTOR
- - -- VILLAGI(S) - - --
-- STATUS --
FUNDID
- --BY --
DURATION
<ACTIVIYY
Begin- -End
DESCRIPTION>
Khost
Paktia
CARE
CONST:
Storage
Ihost /Alisher /Saba
Completed
AID
-- 92
CARE
CONST:
Other
Boat
Completed
AID
-- -- -- 92
Renovation of Warehouse with capacity of 1.800 mt. )
CARE
WATER:
Earez
£host /Alisher /Saba
Completed
AID
-- -- -- 92
Rehabilitation of Ghobdi A Mangas larez with total length 7 km including other structures.
CARE
WATER:
Canal
ghost
Completed
AID
--
0 92
Rehabilitation of 5 Irrigation canals with total length 15.4Ìm including other structures.
CARE
WATER:
FloodControl
Ehost /Alisher /Saba
Completed
AID
-- -- -- 92
Construction of one Erosion barrier with stone masonry with_the total length 57m
CER
WATER:
Canal
Chenjani
Ongoing
FAO
-- 93 -- 93
Cleaning of canal.
CDU
CONST:
Road
Completed
UNDP
-- 92 -- 93
Repairing of road structure.
CRR
CONST:
Road
Domanda
Completed
UNDP
7 92
DACAAR
AGRIC:
Crop Product
5 villages
Ongoing
DACAAR
2 93 -- --
DACAAR
AGRIC:
Crop Product
5 villages
Completed
FAO
DACAAR
AGRIC:
Fruit Trees
5 villages
Completed
FAO
DACAAR
AGRIC:
Research
5 villages
Ongoing
FAO /Self
DACAAR
AGRIC:
Plant Protec
5 villages
Completed
DACAAR
3 93
DACAAR
AGRIC:
Training
5 villages
Ongoing
DACAAR
2 93 -- --
DACAAR
WATER:
Drinking
Several villages.
Ongoing
DACAAR
-- 92 -- - -
160 shallow wells A 87 hand- puipe.
GAF
AGRIC:
Vet
ghost
Ongoing
UNDP
11 91
1 assist DVM / 2 paravet / 1 gaurd curative & preventive service.
IIRO
HEALTH: Provinc.Hosp
;
Ongoing
.
0
3 93
10 92 10 92
3 93
3 93
11 92 -- --
IIRO
Construction of 2 village level storehouses with capacity of 100 mt.
3 93
6 93
--
Conetruction of structures in 5 km road.
Vegetable nursery established in an area of 7.2 SAm.
15 MT wheat seed & 27.1 MT DAP distributed_ to 842 farmers.
2540 fruit saplings distributed to 69 Revere.
Test plots of wheat 7 varieties.
47.5 kg 2 -4 -D applied on 119 jeriba wheat fields of 157 farmers.
76 farmers'technically advised.
75 bed hoop (E1 -Fath) - General surgery i orthopaedic / ob -gyn / internal medicine / dental clinic.
IRC /RPA
AGRIC:
Crop Product
--
Completed
FAO
10 92
3 93
Seed distribution: 14.1 st wheat; 14.1 at DAP. to 178 families
IRC /RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.95 at wheat, 0.95 st DAP to 16 farmers
IRC /RPA
AGRIC:
Fruit Trees
Completed
SV
IRC /RPA
AGRIC:
Fruit Trees
Completed
AID
IRC /RPA
AGRIC:
Fruit Trees
Ongoing.
SV
Natoon (Pir halal
:
3 93
4 93
Distribution .of 1,303 aaplinga to 30 farmers
3 93
4 93
Distribution of 952 aaplinga to 18 farmers
11.92 -- --
Page:
Nursery with 1600 sal planted with stone fruit / nut / apple seed and cuttings
216
A6actrep Date: 27/08/93
AGENCY
SECTOR
---- VILLAGE(SI - - --
ACTIVITY
FUNDED
-- STATÚS-
-BY --
DURATION
<ACTIVITY
Begin -=End
DESCRIPTION>
Khost
Paktia
IRC /RPA
AGRIC:
Forestry
Completed
SV
3 93
4 93
Distribution of 2,500 forestry tree seedlings to 25 farmers in 2 villages
IRC /RPA
AGRIC:
Forestry
Completed
AID
3 93
4 93
Distribution of 3,795 forestry tree seedlings to 50 farmers in 15 villages
IRC /RPA
AGRIC:
Forestry
Matoon (Pir ¡alai
Ongoing
SV
11 92 -- --
Nursery with 2,240 mixed seedlings
IRC /RPA
AGRIC:
Vet
Center
Ongoing
UNDP
11 92 -- --
1 Farm Animal Vaccination monitoring office
IRC /RPA
AGRIC:
Machinery
Ongoing
AID
6 92 -- --
IRC /RPA
AGRIC:
Research
Completed
SV /FAO
IRC/RPA
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed molt, nurseries, bees, poultry, food preservation etc. 127 farmers trained
ER /RPA
AGRIC:
Training
Ongoing
AID
1 92 -- --
1 -2 day trng in seed suit, nurseries, bees, poultry. food preservation etc. 159 farmers trained
IRC /RPA
AGRIC:
Other ;
Matoon (Pir ¡alai
Ongoing
SV
IRC /RPA
HEALTH: Vaccination
--
Ongoing
UNICEF
IRC/RPA
HEALTH: Other
Approved
HCR
IRC /RPA
WATER:
Canal
Completed
SV /FAO
2 92 12 92
Rehabilitation of 16 canals, total 47.85 km, irrigate 17,200 jeribs, benefit 3512 families
IRC /RPA
WATER:
Drinking
Modi Khel (Sukbari
Completed
SV
193
1 93
Gravity -flow water supply, one system, benefit 20 families
ISRA
CONST:
Pub.Building
--
Ongoing
ISRA
-- 92.
9 93
Construction of 2' mosques.
ISRA
EDUCAT: Primary
¡boat
ongoing
ISRA
11 92 -- --
1 School for orphans - 153 students & 4 teachers.
ISRA
HEALTH: Compr.Clinic
Matta -China
Ongoing
ISRA
12 91 -- --
1 doctor / i assistant / 1 lab tech. I female & sale helpers.
ISRA
INCOME: Help Vulner.
¡host
Ongoing
ISRA
1 85 -- --
Assistance to 637 orphans(sonthly allowance / health i education / clothing I foot -wear.
ISRA
WATER:
Completed
FAO
3 93
Cleaning of canal - irrigates 100 hectares.
MAI
DUCAT: Primary
Dosanda/Jani Del
Ongoing.
MAI
-- -- -- --
2 schools.
MAMAR
CONST:
Road
Ghulam Khan Gurbuz
Ongoing
CCSC
10 92 -- 93
Rehabilitation of 18 km road & construction of 50 structures.
MCPA
MINIS:
Survey
13 minefields
Completed
UNOCHA
MSH
HEALTH: Basic Clinic
Ayoob ¡bel
Ongoing
AID
A C B A R
Matoon (Pir ¡alai
Canal
1 tractor
11 92 12 92
Improved wheat seed trials
Model farm: seed mult, nurseries, vegetables, poultry, bees. farm power
11 92 -- --
5 92 -- --
3 mobile vans visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
-- 93 -- --
5 93
1 92 12 92
10 88 -- --
Sale of insecticide -impregnated bed nets for malaria prevention
565,569 Spi agri.lands / residential & road.
1 NURSE, 2 MED. TECH., 1 LAB. TECH. ASST.
DATABASE OF NGO ACTIVITIES
Page: 217
A6actrep Date: 27/08/93
2 ROOMS
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Paktia
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
--BY-
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Khost
KSH
HEALTH: Basic Post
Ihost
MSH
HEALTH: MCH
Ihost
'
Ongoing
AID
3 88 --
Ongoing
AID
6 92 -- --
4 BHWs
I MD /
1
Women /children under 5 care;
Lab. Tech.
health education Voluntary Health Sister (VHS) and Dai training
programs.
HEALTH: Med.Training
MSH
Ihost
Ongoing
AID
10 92 -- --
Previously in Mires Shah the training center was shifted to thost in 11/92. Trained 102 BHWs (3 months initial
training), 147 BHWs refresher training, 30 health workers attended management, PHC & CDD workshops & seminars.
MSH
'
'
HEALTH: Other
Ihbst
Ongoing
'AID
i 92 -- --
Regional Health - Administration (RHA) administrative center and depot for issue of supplies and salaries and
monitoring and supervision of the BHWe and health facilities under its jurisdiction.
MSH
HEALTH: Other
Ihost
Ongoing
AID
10 92 -- --
Regional Health Administration (RBA) administrative center and depot for issue of supplies and salaries and for
monitoring and supervision of the BHWe and health facilities under its jurisdiction
NPO
AGRIC:
Fruit Trees
Lhoet
Completed
NRC /NCA
3 92 10 92
Cleaning of government garden with fruit trees.
NPO
CONST:
Bridge
Ihost
Completed
NRC /NCA
5 92
Viaduct crossing river watering substantial area.
NPO
CONST:
Shelter
Khost
Completed
NRC /NCA
3 92 -- --
NPO
INCOME: Skill Train.
Ihoet
Completed
NRC /NCA
3 92
9 92
OMAR
MINES:
Awareness
--
Completed
UNOCHA '
i 92
6 92
Safety lessons - 12236 people participated.
RAFA
WATER:
Canal
Zagara
Completed
FAO
692
8 92
Rehabilitation of 1100 m canal.
RAFA
WATER:
Canal
Jeribi Luz Sewaki
Ongoing
FAO
2 93 -- --
RAFA
WATER:
Canal
Pass Abu Khan
Completed
FAO
2 92
5 92
Rehabilitation of 3900 m canal
RAFA
WATER:
Canal
Zen Ghondai
Completed
FAO
6 92
8 92
Rehabilitation of 2700 m canal.
RAFA
WATER:
Structure
luz Abu than
Completed
FAO
8 92 12 92
Construction of retaining wall.
RAFA
WATER:
Structure
luz Abu Khan
Ongoing
FAO
3 93 -- --
Construction of structure & changing of river direction.
RAFA
WATER:
Other
Diff. villages
Completed
FAO
4 92
RBS:
SOCIAL:Commu.Particp
Ongoing
RBS
10 92 12 93
Established center for disabled children.
RBS
SOCIAL:Form Committ.
Ongoing
RBS
10 92 12 93
Formation of social welfare
RBS
SOCIAL:Other
Ongoing
RBS
10 92 12 93
Training of volunteers (coaunity_workere).
IA C B A R'
1 93
842
Production of concrete beans length 4.5 m for rote.
'Vocational training
of etudente in handicraft;
Rehabilitation of 4175 m canals,
irrigates 200 hectares of land - benefits 529 families.
Topographic survey for structures.
DATABASE OF AGO ACTIVITIES
Page: 218
A6actrep Date: 27/08/93
committees.
6TH EDITION
I
ACTIVITY
SECTOR
AGENCY
Partie
'WATER:
RDM
---- VILLAGE(S)-- --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin - -End
DESCRIPTION>
Khost
Rehabilitation of canal - length 4.1 kt - benefit 200 families.
Canal
5 villages
Completed
FAO
2 93 12 93
Completed
FAO
2 93
4 93
Rehabilitation of Lawany canal - length 4.1 km - benefit 200 families.
FAO
3 93
5 93
Slab / wall / beams / column of Dando canal benefit 200 families.
Completed
UNDP
9 92
2 93
Length 2.4 km, 19 culvert & Domanda -ghost road repair.
RUM
WATER :.
Canal
5 villages
RDM
WATER:
Structure
5 villages
RDP
CONST:
Road
Domanda/Ehost
SCA
AGRIC:
Fruit Treee
Completed
SCA
0 92 -- 92
Distribution of 3,986 fruit tree saplinge.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 1.02 MT agrochemicale.
J'vG
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 7- 92
Agriculture survey on 122 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
12 88 -- --
SJAWO
EDUCAI: Literacy
Completed
UNDP /Slf
9 92
3 93
Providing education to trainees in literacy & numeracy.
SJAWO
EDUCAT: Literacy
Ongoing
UNDP
3 93 -- --
Providing education to trainees in literacy & numeracy.
INCOME: Skill Train.
Ongoing
UNDP
3 93 -
Training of 100 students in the trades of carpentry & masonry for repairing I Manufacturing agricultural tools for
SJAWO
:
Laken
- Ongoing
-
1 mid -level Ps I i Dental Tech./ 1 Lab Tech.
failure of their area.
START
AGRIC:
Crop Product
3 villages
Ongoing
FAO /UNDP
3 93 12 93
Sugar cane aultiplication (24 MT).
START
AGRIC:
Crop Product
10 villages
Completed
UNDP
5 92-10 92
Improved rice seed multiplication.
START
AGRIC:
Crop Product
10 villages
Completed
UNDP
5 92 10 92
Improved maize seed multiplication.
START
AGRIC:
Crop Product
3 villages
Completed
UNDP
10 92
6 93
Improved wheat seed multiplication.
START
AGRIC:
Fruit Trees
6 villagee
Ongoing
FAO
3 93
9 93
Fruit trees distribution (10,000 saplings).
START
WATER:
Canal
Matuon
Ongoing
FAO
12 91 -- --
Rehabilitation of 15 canale.
TPRPA
CONST:
Other
Panzia
Approved
ARCON
-- 93 -- --
To lake Panzia Mini hydel power station.
TPRPA
WATER:
Canal
Panzia
Completed
FAO
ALBAR
7 92
.8 92
.
Panzia casal cleaning.
DATABASE' OF NCO ACTIVITIES
Page: 219
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Paktia
- - -- VILLAGES) - - --
FUNDED
-- STATUS --
DURATION
-- -BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Khost
TPRPA
WATER:
Canal
Mony
Completed
FAO
-- 93 -- --
Cleaning of Mony canal.
TPRPA
WATER:
Canal
Zifty
Completed
FAO
-- 93 -- --
Cleaning of Zifty canal.
TTP!GTZ
INCOME: Skill Train.
City
Ongoing
TTP /GTZ
Dargai
Ongoing
AID
--
Rehabilitation of 10 km road from Dargai to Ismaiel Khel, benefit 2,857 families.
Dargai
Ongoing
AID
--
Construction of 100 m retaining wall(gabion work), benefit 60 families.
Ongoing
FAO
--
Cleaning of Kosh canal.
VITA
CONST:
VITA
WATER:
WiC
WATER:
WROR
CONST
WATER:
WROP,
WOE
WATER:
Road
FloodControl
Canal
Road
Domanda
Completed
UNDP/WFP
Other
Abad Khans
Completed
Abad Khans
Other
Paktia
IRC /RPA
AGRIC:
IRC/RPA
AGRIC:
IRC /RPA
AGRIC:
IRC /RPA,
IRC /RPA
IRC/RPA
IRC /RPA
IRC /RPA
IRC /RPA
IRC /RPA
IRC /RPA
IRC /RPA
.
Fruit. Trees
Forestry
AGRIC:
Research
AGRIC:
CONST:
CONST:
5 93
Rehabilitation of a 1.6 k® road structures.
UNDP
11 91
3 92
Technical survey of 1,600 m canal
Completed
UNDP
11 91
2
Completed
SV
3 93
4
Laja /hole
Ongoing
SV
3 91
Laja Khola
Ongoing
SV
3 91 -- --
Ongoing
FAO
Completed
SV /FAO
3 91 12 92 .
Improved wheat, barley and oat seed trials
Completed
UNDP
7 92
1 x one -month course for village -based basic veterinary workers, 2 trained
Ongoing
SV
1
Laja /bola
Ongoing
SV
3 91
Laja ßhola
Completed
HCR
6 90 12 91
Davda
Completed
SV
1
Ongoing
SV
4 90
Ongoing
UNICEF
1
Laja Bola
Training
Training
Other
Storage
Sanitation
HEALTH: Education
HEALTH: Vaccination
ACBAR
-- 93 --
Training 80 people per year in masonry & carpentry (4 months sessions j.
-- 92
Fruit -frees
Machinery
AGRIC:
92 -- --
92
1 reservoir I i aqueduct.
Survey of -a karez ISuitani karez -446 m) + 4 springs.
Laimaneal
AGRIC:
AGRIC:
4
93
Distribution of 807 saplings to 14 farmers
-- --
Nursery with 4040 sqm planted with stone fruit / nut / apple seed and cuttings
Nursery with 11,409 cedar and pine seedlings
10 91 -- -
1 tractor
8 92
92 -- --
-- --
91 12 92
-- --
89 -- --
1 -2 day trng in seed mult, nurseries, bees, poultry, food preservation etc, 169 farmers trained
Model farm: seed mult, nurseries, vegetables, poultry, bees, fars power
1 warehouse, ?50 it capacity, built from cement, bricks, steel bars, iron sheets
Construction of 2 double -vault surface latrines in 1 village
Basic health education messages on sanitation, nutrition, waste disposal, clean water etc
3 mobile vacca visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
DATABASE OF $GO ACTIVITIES
Page: 220
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
---- VILLAGE(S)-- --
SECTOR
AGENCY
--STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Iso=====
IRC /RPA
WATER:
(area
IRC /RPA
WATER:
Drinking
Paktia
Toudi Tak /Satu Toe
Rehabilitation of 10 karezes, total 2.39 la, irrigate 910 jeribs, benefit 1220 families
4 92
Completed
SV/BCR
1 90
Completed
SV
8 91 11 91
i 93
3 93
Construction of 150 a breached section & intake.
1 93
3 93
Construction of 330 a breached section & intake.
1 93
3 93
Construction of 200m breached sectiont & intake.
Gravity -flow water supply, two systems, benefit 63 families
Mandozi
AB
WATER:
Structure
Salami
Completed
UNDP
AB
WATER:
Structure
Dilpurai
Completed
UNDP
AB
WATER:
Structure
Landwara
Completed
UNDP
Sarband Leca
Ongoing
UNOCHA
12 92 -- --
5 nurses i 1 MD / treat deminers & local people.
-HEALTH: Mobile /F -Aid
,0,ATC
'
ATC
MINES:
Clearance
3 villages
Completed
UNOCHA
11 91 12 92
Destroyed 2023 devices, cleared 503800 So agri.land /,grazing land / road & canal.
DACAAR
AGRIC:
Crop Product
12 villages
Ongoing
FAO
10 92 -- --
2 MT wheat seed A 2 MT DAP distributed to 42 selected farmers for seed multiplication.
DACAAR
AGRIC:
Crop Product
12 villages
Completed
FAO
5 92
5 92
DACAAR
AGRIC:
Crop'Product
12 villages
Completed
FAO
6 92
6 92
DACAAR
AGRIC:
Crop Product
--
Completed
90/Self
8 91 -- --
0.7 MT rice seed / 0.5 MT DAP & 0.1 Mt urea distributed to 79 selected farmers for seed multiplication.
4.5 NT maize seed / 4.5 MT DAP & 3 MT-urea distributed to 260 farmers.
Distribution of 16 kg vegetable seed to 117 'farmers A 80.000 seedlings of cauli - flower & cabbage to 264 farmere in 13
villages.
Distribution of 80.75 MT improved wheat seed / 83.15 MT Urea / 75.06 MT DAP to 1,663 farmers in 12 villages.
11 91 -- --
Completed
FAO /Self
12 villages
Completed.
DACAAR
Fruit Trees
12 villages
Ongoing
DACAAR
AGRIC:
fruit Trees
12 villages
Completed
FAO
2 92
2 92
DACAAR
AGRIC:
Fruit Trees.
12 villages
Completed
FAO
3 93
3 93
DACAAR
AGRIC:
Fruit Trees
42 villages
Ongoing
DACAAR
3 92 -- --
Citrus nursery established in an area of 500 Sqa.
DACAAR
AGRIC:
Fruit Trees
12 villages
Ongoing
DACAAR
2 93 -- --
1026 orange saplings distributed to 230 growers.
DACAAR
AGRIC:
Forestry
12 villages
Completed
DACAAR
1 93
DACAAR
AGRIC:
Forestry
12 villages
Ongoing
DACAAR
1 92 --
DACAAR
AGRIC:
Crop Product
DACAAR
AGRIC:
Crop Product
DACAAR
AGRIC:
DACAAR
ACBAR
3 92
33.7 kg vegetable seed and-221,000 vegetable seedlings distributed to 1513 farmers.
3 92
Apricot nursery established in an area of 720 Sqm.
12 92 -- --
.
14,000 fruit saplings distributed to 1,475 growers.
5,000 fruit saplings distributed to 121 growers.
39,597 forest trees distributed to 2,810 farmers.
2 93
Forest nursery(150,000 plastic tube)established.
DATABASE OF NGO ACTIVITIES
Page:
221
Aóactrep Date: 27/08/93
6TH EDITION
AMfIVITY
AGENCY
SECTOR
Paktia
DACAAF
DrA&E
DACAAR
DACAAR
DACAAR
Maki:
DA.ìLj,
,.......r.
,,EAA
DACAAR
DACAAR
DACAAR*
DACAAE
DACAAR
DACAAR
DACAAR
DACAAR
DACAAR
DACAAR
DACAAR
DACAAR
DACAAR
----VILLAGE(S)----
FUNDED
--STATUS--
---BY--
DURATION
Begin--End
<ACTIVITY
DESCRIPTION>
Mandozi
AGRIC:
Research
12 villagee
Completed
FAO /Self
3
92
9
AGRIC:
Research
12 villages
Completed
FAO /Self
7
92
9 92
Research
12 villages
Ongoing
FAO /Self
11 92 -- --
Experiments: 1 wheat yield triai 13 var. / 16 wheat / 24 barley & 19 oat varieties as observation lines.
12 villages
Completed
FAO /Self
11 91
Wheat yield trial 13 var., test plots of 9 var of wheat, 7 var. of alfalfa,68 observation lines of barley & 2
varieties of wheat as demonstration plots in 3 locations.
12 villages
Completed
DACAAR
3 93
3
12 villages
Completed
DACAAR
3 92
3 92
12 villages
Ongoing
DACAAR
1
93 -- --
Field rat control measure conducted on 43 jeribs of farmers field.
12 villages
v .:a A
Completed
DACAAR
1
92 12 92
2,000 farmers technically adivsed.
12 villages
Ongoing
DACAAR
1
93 -
485 farmers technically advised.
12 villages
Completed
DACAAR
7
92
Completed
DACAAR,
--
Completed
DACAAR
12 91
Ongoing
DACAAR
-- 92 -- 93
Mandozai
Ongoing
DACAAR
--
Completed
DACAAR
11 91 -- --
PCC production - beams(4 a), linteis(2 & 1.5 m) - for community housing.
Shelter
Matakhan
Completed
DACAAR
-- 91 -- 92
Concrete beams 5,023 & lintels 3,788.
Shelter
Haider Bel'
Ongoing
DACAAR
-- 91 -- --
Concrete beams 8,0335 & lintels 5,6619.
AGRIC:
AGRIC:
AGRIC:
AGRIC:
AGRIC:
AGRIC:
Ahi.,.
AGRIC:
AGRIC:
CONST:
CONST:
CONST:
' CONST:
CONST:
CONST:
CONST:
Research
Plant Protec
Plant Protec
Plant Protec
Trainin
Training
Training
Other
Road
Road
Mandozei
Road
Shelter
Shelter
8
92
Two rice experiments. (18 var.) conducted.
1 maize experiment (10 var. )conducted.
5 92
93
79.1 kg 2 -4 -D applied on 198 jeribs wheat fields of 148 farmers.
2.05 kg 2 -4 -D applied on -.443 teribs of 463 farmers.
-
8 92
92 --
613 shovel
92
1423 farmers in 11 villages.
Repair of 15 km road in Manduzai.
10 92
91 --
i 837 sickle distributed to
Rehabilitation of baduwai- Diipurai road (15 km) - construction of 67 culverts - with machinery.
Repair of 15 km road in Ismailkhei(6.5 km completed).
--
RCC production - beams(4p), lintels (2 & 4.5m) for community-housing.
CONST:
Pub.Building
Haider Ehel
Ongoing
DACAAR
-- 92 -- 93
1 primary school building
CONST:
Pub.Buiidìng
Matakhan
Ongoing
DACAAR
-- 92 -- 93
1 primary school building
WATER:
Canal
Several villages
Ongoing
DACAAR
-- 91 -- 93
Appx. 130 is canals cleaned & several structures made.
Several villages
Ongoing
DACAAR
-- 92 -- --
160 shallow wells & 87 hand- pumps.
WATER:
Drinking
Page: 222
A6rtr p Date: 1/48/93
ACTIVITY
- - -- VILLAGES) - - --
SECTOR
AGENCY
Paktia
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Pi andozi
1 Farm Animal Vaccination and Treatment clinic, 3 paravets
Ongoing
UNDP
1
93 -- --
Training
Completed
UNDP
5
93
5
93
1 x one -month course for village- based.basic veterinary workers,
Sanitation
Ongoing
SV
3 93 --
--
Construction of double -vault surface latrines
HEALTH: Vaccination
Ongoing
UNICEF
5 92 --
--
3 mobile vaccs visiting at least 3 i year, targetting 0 -2 itere children & females aged 5 -45
IRC/RPA
HEALTH: Other
Approved
HCR
NINES:
19 minefields
Completed
UNOCHA
1
92 12 92
938,921 Sgm agari. lands / rd.res.agr. / irrigation i .residential / grazing lands & road.
MCPA
EH
HEALTH: Basic Post
Matakhan
Ongoing
AID
4
82 -- --
4 BHWs
AGRIC:
Plant Protec
Ongoing
SCA
0
93 -- 93
Provision of 0.08 MT agrochemicale.
SCA
AGRIC:
Other
Ongoing
SCA
0
93 -- 93
Agriculture survey on 40 villages.
SCA
Completed
UNDP
Ongoing
ARCON
IRC /RPA
AGRIC:
Vet
IRC /RPA
AGRIC:
IRC /RPA
CONST:
IRC /RPA
Matakhan
Survey
Paktia
"
-- 93
-- --
:
trained
Sale of insecticide - impregnated bed nets for malaria prevention
Musa Khel
Musa Ihel
11 92
1
93
Construction of road / culverts / washes & fords.
--
Repairing & maintenance of workshop.
AB
CONST:
Road
ARCON
CONST:
Other
CONST:
Road
Musa Del
Completed
UNDP
8
92 11 92
Rehabilitation of 1.7 km road / 15 washes & retaining walls.
ARR
NINES:
Clearance
Musa Ihei
Discontin
UNOCHA
1
92 -- --
Destroyed 1 device, cleared 7740 Sgm road.
ATC
CARE
WATER:
Iarez
Zoor Kot
Coapleted
AID
--
CARE
WATER:
FloodControl
Zoor Kot
Completed
AID
-- -- -- 92
CONST:
Road
Completed
UNDP
-- 92 --
92
Road survey.
CRE
AGRIC:
Crop Product
Ongoing
UNDP
10 92 --
--
Seed multiplication:
IRC /RPA
AGRIC:
Fruit Trees
Completed
SV
3 93
93
Distribution of 1,404 saplings to 27 farmers
IRC /RPA
AGRIC:
Fruit Trees
Zoor Tot /Garda Kho
Ongoing
SV
3 90 -- --
Nursery with 4544 ma planted with stone fruit i nut
IRC /RPA
AGRIC:
Forestry
Zoor Kot /Gardi Kho
Ongoing
SV
3 90 --
Nursery with 20,455 mixed seedlings
tRC /RPA
IRC /RPA
AGRIC:
Vet
Discontin
UNDP
0
11 91
0 92
4
--
2 92
Rehabilitatioq of Zorkot Iarez with total length 3.73km including other structures.
Construction of one Erosion barrier with stone masonry with the total length
162m
1 at wheat, 1 st DAP to 22 farmers
apple aeed and cutting',
1 Farm Animal Vaccination and treatment clinic closed as no suitable site found.
Page: 223
A6actrep Date: 27/08/93
ACTIVITY
AGENCY
SECTOR
Patia
---- VILLAGE(Si - - --
FUNDED
DURATION
<ACTIVITY
- STATUS --
- - -BY --
Begin- -End
Ongoing
FAO
10 91 -- --
DESCRIPTION>
Musa Khel
IRC/RPA
AGRIC.
Machinery
IRC /RPA
AGRIC:
Research
:oor Kot/Gardi Eho
Ongoing
SV /FAO
IRC /RPA
AGRIC:
Training
--
Completes
UNDP
IRC/RPA
AGRIC:
Training
Ongoing
SV
1 92 -- --
1 -2 day trng in seed Ault, nurseries, bees, poultry, food preservation etc, 369 farmers trained
IRC /RPA
AGRIC:
Other
Zoor Kot/Gardi Eho
Ongoing
SV
3 90 -- --
2 Model farms: seed Ault, nurseries, vegetables, poultry, bees, farm power
IRC /RPA
CONST:
Storage
Lador Khula/Zoor K
Completed
HCR
6 90
2 warehouses, 750 mt capacity, built from cement, bricks, steel bars, iron sheets
IRC /RPA
CONST:
Sanitation
Ehar Lotai /Mawa Ka
Completed
SV
1 91 12 92
Construction of 20 double -vault surface latrines in 2 villages
IRC /RPA
CONST:
Other
Lador Ehula
Completed
SV
8 91 11 91
22 culverts
IRC /RPA
HEALTH: Education
Ongoing
SV
4 90 -- --
Basic health education messages on sanitation. nutrition. waste disposal, clean water etc
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
10 89 -- --
3 mobile vaccs visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
IRC /RPA
WATER:
Earez
Completed
HCR
11 89
1
Rehabilitation of 10 karezes, total 1.52 km, irrigate 1477 jeribs, benefit 1445 families
IRC /RPA
WATER:
Canal
Completed
SV
10 91
3 92
IRC /RPA
WATER:
Drinking
Completed
SV
8 91 10 92
Gravity -flow water supply, four systems, benefit 240 families
MSH
HEALTH: Basic Post
Ongoing
AID
3 88 -- --
3 BHWs
Gedawara
Completed
FAO
3 93
3
93
Distribution of 5,000 fruit trees.
Paktia
M?rgha /Ghalang Can
Zoor Kot
1 tractor
Improved wheat, barley and oat seed trials
3 90 -- --
12 91
2 x one -month courses for village -based basic veterinary workers, 6 trained
8 92
9 91
92
Rehabilitation of i canal, 2.03 km, irrigate 2000 jeribs, benefit 250 families
Nader Shah
'Fruit Trees
AB
AGRIC:
AB
WATER:
Canal
Gedawara
Completed
IRC /RPA
11 92
1
93
Canal cleaning & Intake construction.
CARE
CONST:
Road
Tani /Gurbuz /Nad.Eo
Coipleted
AID
--
0
0
92
Reconstruction of Zanikhel & Darogai Roads with total length 1O.5km including other structures.
CARE
CONST:
Storage
Tani /Gurbuz /Nad.Ko
Completed
AID
--
0
0 92
Construction of 1 village level storehous with capacity of 50 mt.
CARE
WATER:
Earez
Tani /Gurbuz /Nad.Eo
Completed
AID
--
0
0 92
Rehabilitation of 4 Earezes with total length 8.2km including other structures.
HCI
WATER:
Other
Kapary Bala
Completed
UNDP/HCI
6 91
2 93
Sediment cleaning i construction of intake & retaining walls (gabion work) i siphons i irrigating 17,500 jeribs of
land.
IACBAR
DATABASE OF NGO ACTIVITIES
6TH EDITION
J
Page: 2Y4
A6actrep Date: 27/08/93
AGENCY
SECTOR
Paktia
---- VILLAGE(S)- - --
ACTIVITY
FUNDED
-- STATUS -
- -BY --
DURATION
Begin --End.
(ACTIVITY
DISCRIPTION>-
Nader Shah
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
ii(C/RPA
HEALTH: Other
Approved
HCR
-- 93 -- --
IRC /RPA
WATER:
Canal
Ongoing
SV
4 93 -- --
Rehabilitation of 6 canals, total 10.06 km. irrigate 5050 jeribs, benefit 890 families
IRC!RPA
WATER:
Drinking
Palusy
Completed
SV
2 93
Gravity -flow water supply,.one system, benefit 100 families
MSH
HEALTH: Basic Post
Palusy
Ongoing
AID
ii 89 -- --
SCA
AGRIC:
Plant Protec
--
Completed
SCA
0 -- -- 92
Provision of 0.085 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
O -- -- 92
Agriculture survey on 40 villages.
ñolalgo
Ongoing
RAP
-- 91 -- --
Paktia
7 91 -- --
2 93
3 mobile vacca visiting at least 3 x year, targetting O -2 years children & females .eyed 5 -45
Sale of insecticide - impregnated bed nets for malaria prevention
3 BHWs
Paktia
AFRANE
AGRIC:
DS
HEALTH: Disabled Reh
--
Completed
UNICEF
-
MAI
EDUCAT: Primary
Darkaí
Ongoing
MAI
-- -- -- --
3 schools in Darakai Tarakhel, Darkai Kochian & Wazhla.
HEALTH: Other
All province
Ongoing
MSF
-- 93 -- --
Monitoring & technical evaluation of microscopists.
Completed
UNOCHA
-- -- -- --
Destroyed 2 devices, clerared 3323 Sqm grazing land.
Ongoing
UNICEF
10 89 -- --
3 mobile vaces visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
Qalandar
Ongoing
AID
4 89 -- --
4 93
!ISF -h
Paktia
Research
Two teams conducted survey on disabled people in 50 selected villages,
Qalandar
ATC
MINIS:
IRC /RPA
HEALTH: Vaccination
MSH
HEALTH: Basic Post
Paktia
`
91/-- 91
Variety & agronomical trials to know the best variety in consideration of good yield & proger use of fertilizer &
demonstration plots.
Clearance
Qalandar
i BHW
Sabari
ARCAR
AGRIC:
Livestock
All villages
Ongoing
UNDP
ARCON
CONST:
Pub.Building
Sabari
Completed
ARCON
-- -- -- --
Construction of Sabari mosque.
ARGON
CONST:
Pub.Building
Sabari
Ongoing
ARCON
-- -- -- --
Construction of Sabari mosque.
DACAAR
CONST:
Shelter
Yaqubi
Ongoing
DACAAR
A C B A R
7 93
2 92 -- --
Poultry distribution: 7500 chickens.
PCC production (4 i beams) for community housing.
DATABASE OF pGO ACTIVITIES
f
Page: 225
A6actrep Date: 27/08/93
6TH EDITION]
ACTIVITY
- ---VILLAGE(S)-
SECTOR
AGENCY
Paktia
STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Sabari
DACAAR
CONST:
Shelter
Earesuna
Completed
DACAAR
-- 91 -- 92
Concrete beams 7,076.
DACAAR
CONST:
Pub.Building
Yaqubi
Ongoing
DACAAR
-- 92 -- 93
Construction of primary school.
DACAAR
CONST:
Pub.Building
Machei
Ongoing
DACAAR
-- 92 -- 93
1 primary school building
DACAAR
WATER:
Karen
Sabari
Completed
DACAAR
10 91
Rehabilitation of 4 karezes - total length 4.35 km.
DACAAR
WATER:
Canal
Ongoing
DACAAR
-- 91 -- 93
Appx. 65 km canal cleaned.
DACAAR
WATER:
Canal
Yaqubi
Completed
DACAAR
10 91
Rehabilitation of 6 canals - total length 12.9 km.
DAAAI!
WATER:
Drinking
Several villages
Ongoing
DACAAR
-- 91 -- --
122 shallow well improved & 92 hand- pumps.
IRC /RPA
AGRIC:
Crop Product
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.65 at wheat. 065 mt DAP to 13 farmers
IRC RPA
AGRIC:
Crop Product
Completed
FAO
10 92
Seed distribution: 10.4 mt wheat. 10.4 st DAP to 208 families
IRC /RPA
AGRIC:
Fruit Trees
Ongoing
AID
11 91 -- --
IRC /RPA.
AGRIC:
Fruit Trees
Completed
AID
3 93
4
93
Distribution of 1,140 saplings to 17 farmers
IRC /RPA
AGRIC:
Forestry
Completed
AID
3 93
4
93
Distribution of 7,248 forestry tree seedlings to 277 farmers in 12 villages
IRC /RPA
AGRIC:
Vet
Ongoing
UNDP
12 91 -- --
IRC /RPA
AGRIC.:
Machinery
Ongoing
AID
6 92 -- --
IRC /RPA
AGRIC:
Research
Ongoing
AID /FAO
IRC /RPA
AGRIC:
Training
Completed
UNDP
7 92
IRC /RPA
AGRIC:
Training
Ongoing
AID
1 92 -- --
IRC /RPA
AGRIC:
Other
Center
Ongoing
AID
11 91 -- --
IRC /RPA
CONST:
Sanitation
Center
Ongoing
SV
3 93 -- --
Construction of double -vault surface latrines
IRC/RPA
HEALTH: Vaccination
Ongoing
UNICEF
4 92 -- --
3 mobile vaccs visiting at least 3 x year, wetting 0-2 years children & females aged 5 -45
IRC /RPA
HEALTH: Other
Approved
HCR
IRC /RPA
WATER:
Ongoing
SV
IA C B A R
Karez
ßhel
'Several villages
Center
Center
Center
6 92
6 92
3
93
Nursery with 3084 sqs planted with stone fruit / nut I apple seed And cuttings
1 Farm Animal Vaccination and Treatment clinic, 1 vet, 2 paravets
1 tractor
Improved wheat, barley and oat seed trials
11 91 -- --
5
2 x one -month course for village -based basic veterinary workers, 9 trained
93
-- 93 -- --
3 93 -- --
.
1 -2 day trng in seed mult, nurseries, bees, poultry, food preservation etc, 179 farmers trained
Model farm: seed mult, nurseries, vegetables, poultry, bees, farm power
Sale of insecticide - impregnated bed nets for malaria prevention
Rehabilitation of 3 karezes, total 3.78 km, irrigate 2600 jeribs, benefit 420 families
DATABASE.OF NO ACTIVITIES
6TH EDITION
J
Page: 226
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
---- VILLAGEES) - - --
Paktia
SV
4
93 -- --
Leon Khel /Yaqubi
Completed
SV
1
93
2 minefields
Completed
UNOCHA
1
92 12 92
China Kalai
Ongoing
AID
Awareness
Completed
UNOCHA
1
92
AGRIC:
Plant Protec
Ongoing
SCA
0
93 -- 93
AGRIC:
Other
Ongoing
SCA
0 93
Canal
IRC/RPA
WATER:
Drinking
MCPA
MINES:
Survey
MSH
HEALTH: Basic Post
OMAR
MINES:
SCA
Paktia
<ACTIVITI
Begin --End
Ongoing
WATER:
.
DURATION
FUNDED
- --BY --
DESCRIPTION>
Sabari
IRC /RPA
SCA
--STATUS --
4
11 87 --
93
--
6 92
Rehabilitation of 3 canals, total 2.67 km, irrigate 1800 jeribs, benefit 400 families
Gravity -flow water supply, two systems, benefit 800 families
60,923 Sum agri. land & irrigation.
1 BHW
Safety lessons - 6008 people participated.
Provision of 0.08 MT agrochemicals.
-- 93
Agriculture survey on 40 villages.
Sayed Karam
ARGON
CONST:
Pub.Building
bayed Karam
Ongoing
ARGON
-- -- --
--
Repairing of Sayed Karam hospital.
ARD2
AGRIC:
Fruit Trees
--
Completed
FAO
12 90 --
--
Distribution of 11.000 fruit saplings.
ETC
MINES:
Clearance
Sayed Karam
Completed
UNOCHA
9
IMC
CONST:
Pub.Buiiding
Duo Ghundi
Ongoing
WHO
5 90 --
IRC /RPA
AGRIC:
Crop Product
--
Completed
FAO
10 92
3 93
Seed distribution: 9.25 mt wheat, 9.25 it DAP to 191 families
IRC /RPA
AGRIC:
Crop Product
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 0.75 it wheat, 0.75 mt DAP to 15 farmers
ÍRC /RPA
AGRIC:
Fruit Trees
Khoshal Ihel laser
Ongoing
AID
10 91 -- --
Nursery with 1050 sqm planted with stone fruit / nut / apple seed and cuttings
IRC /RPA
AGRIC:
Fruit Trees
Completed
AID
3
IRC /RPA
AGRIC:
Machinery
Ongoing
AID
6 92 -- --
IRC /RPA
AGRIC:
Research
Completed
AID /FAO
IRC /RPA
AGRIC:
Training
Ongoing
AID
IRC /RPA
AGRIC:
Other
Ongoing
AID
IRC /RPA
HEALTH: Vaccination
Ongoing
UNICEF
1
IRC /RPA
WATER:
Ongoing
SV /AustC
7 92 -- --
IACBAk
Karez
Khoshal Khel Eamar
Khoshal Ihel Kamer
'
92 10 92
93
10 91
1
4
--
93
12 92
92 -- --
10 91 -- --
89 -- --
Destroyed 291 devices, cleared 38236 Sqm road.
Clinic building.
Distribution of 668 saplings to 10 farmers
i tractor
Improved wheat seed trials
1 -2 day trng in seed mult, nurseries, bees, poultry, food preservation etc, 59 farmers trained
Model farm: seed mult, nurseries, vegetables, poultry, bees, farm power
3 mobile vacca visiting at least 3 x year, targetting 0 -2 years children & females aged a -45
Rehabilitation of 29 karezes, total 20.27 km, irrigate 17200 jeribs, benefit 11030 families
DATABASE OF NGO ACTIVITIES
Page: '227
A6actrep Date: 27/08/93
6TH EDITION
I
AGENCI
SECTOR
Paktia
- ---VILLAGE(S)- - -
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY--
Begin --End
iACTIVITY
DäSCRIPTION?-
Sayed Karam
1RC /RPA
WATER:
tarez
Good Gala /Mu1ah Kb
Completed
SV
iSRA
AGRIC:
Crop Product
bayed Karam
Ongoing
FAO /UNDP
CPA
MINKS:
Survey
6 minefields
Completed
UNOCHA
1
!!SE
HEALTH: Compr.,Cïinic
Ghundi Kali
,Ongoing
AID
3 90 --
M5:
HEALTH: Baeiic Post
Rod Ahmadzai
Ongoing
AID
3
NAC
AGRIC:
Crop Product
--
Completed
FAO
9 90 -- 91
Distribution of 13 MT improved wheat seed i 13 MT Urea & 13 MT DAP to 370 farmers in 26 villages.
AGRIC:
CroP Product
--
Completed
NAC
5 91
Distribution of 5 MT rainfed improved wheat seed ;Blue Silver) to 350 farmers in 26 villages.
NAC
AGRIC:
Fruit Trees
Competed
FAO
--
SCA
AGRIC:
Other
Completed
SCA
0
UNO
EDUCAT: Primary
Ongoing
AID
3 89
WRC
AGRIC:
Completed
FAO
--
RAC
Paktia
--
Crop Product
-
'
7
92 12 92
11 92
7
93
2 MED. TECH., 1 LAB. TECH. ASST.
7
91
Distribution of 3.900 fruit trees !apple ! apricot i to 190 farmers in l: villages.
92 --
92
Agriculture survey on 119 villages.
-- --
2 schools in Machaigho & Karlakan villages.
-- -- 92
Distribution of 20 MT seed & 20 MT DAP.
Shamal
UNOCHA
12 92 --
IRC /RPA
AGRIC:
Fruit Trees
Shamal (Norozáii
Ongoing
AID
12 91
AGRIC:
Forestry
Shamal (Norozai)
Ongoing
AID
12 91 --
--
Shamal (Norozaï)
Ongoing
AID
12 91 --
--
Ongoing
UNICEF
IRC /RPA
AGRIC:
IRC /RPA
HEALTH: Vacci ation
Othe.
4 92
6 nurses i 1 MD / treat deminers It local people.
--
-- --
Nursery with 4574 sqm planted with stone fruit / nut / apple seed and cuttings
Nursery with 13,649 mixed seedlings
'
Model farm: seed mult, nurseries, vegetables, poultry, bees, farm power
-- --
3 mobile vacs visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
HEALTH: Other,
--
Approved
HCR
WATER:
Shinki
Ongoing
SV
4
Said Khel
Ongoing
AID
8 87
--
Ongoing
SCA
0
93 -- 93
Provision of 0.08 MT agrochemicals.
Ongoing
SCA
0
93 -- 93
Agriculture survey on 40 villages.
Cana-ii
MSH
HEALTH: Basic Poet
SCA
AGRIC:
Plant Protec
SCA
AGRI-;
Other !,
ACHAR
3 ROOMS, LABORATORY
7 BHWs
9 91
Ongoing
IRC /RPA
1 MD,
88 -- --
Charkhesht
A
231,946 Sqt road; gr,c,ag & graz land.
--
HEALTH: Mobile /F -Aid
IRC,
Distribution of 5 MT DAP & 5 MT wheat seed to 147 farmers - 2O4 3eribe.
92 12 92
ATC
IRC /RPA
Rehabilitation of 2 karezes, total 1.73 km, irrigate 950 jeribs, benefit 480 families
-- 93 --
--
Sale of insecticide- impregnated bed nets for malaria prevention
93 --
--
Rehabilitation of 1 canal, 2.2 km, irrigate 4000 jeribs, benefit 180 families
-- --
1 BHW
DATABASE OF IGO ACTIVITIES
Page: 228
ACa: tree Date: 27/08/93
6TH EDITION
ACTIVITI
AGENCY
SECTOR
- - -- VILLAGE(S) --
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Shawak
Paktia
Ongoing
UNICEF
4 92 -- --
3 mobile vans visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
Sawakey R/B
Ongoing
FAO
5 93 10 93
Distribution of 50 Ig mung be
Crop Product
Sawakey L/B
Ongoing
FAO
5 93 10 93
Distribution of 50 Ig sung bean seed for trial.
AGRIC:
Crop Product
Sawakey R/B
Ongoing
FAO
5 93 10 93
Distribution of 0.03 MT peanut among progressive farmers.
ISRA
AGRIC:
Crop Product
Sawakey
Ongoing
FAO
.5 93 10 93
MSH
HEALTH: Basic Post
Beraim
Ongoing
AID
8 89 -- -
Ongoing
EC /Self
-- 92 -- 94
Repair of 60 km road in Tangi Zadranïl3 it completed).
Ongoing
DACAAR
-- 92 11 93
Repair of Tangi ladran read (160 km) / 170 culverta ! 6 km retaining wall / 50 cause rays with machinery.
Ongoing
UNICEF
6 91 -- --
IRC /RPA
HEALTH
Vaccination
ISRA
AGRIC:
Crop Product
ISRA
AGRIC:
ISRA
seed for trial.
Distribution of 1.08 MT maize seed & 2.5 MT DAP.
1 BHW
Sperah
Paktia
DACAAR
CONST:
Road
DACAAR
CONST:
Road
IRC /RPA
HEALTH: Vaccination
JCE
AGRIC:
Crop Product
Diff. villages
Completed
FAO /UNDP
li 91
6 9"
Distribution of improved wheat seed / DAP / Urea.
JCE
AGRIC:
Crop Product
Diff. villages
Completed
FAO /UNDP
11 91
6 92
Distribution of improved rice seed i DAP i Urea.
JCE'
CONST:
Road.
Diff. veliages
Discontin
ARCON
1 92 12 92
JCE
WATER:
Canal
Ser Kai
Completed
FAO
2 93
4 93
Rehabilitation of 4 km canal 150 hectares land / benefit 30 families.
JCE
WATER:
Canal
Lakan
Completed
FAO
12 92
3 93
Cleaning of 8 km canal / 300 hectares land í benefit 80 families.
JCE
WATER:
Structure
Karasi
Discontin
ARCON
4 92 12 92
JCE
WATER
Structure
Laken
Completed
FAO
1 93
JCE
WATER:
Structure
Lakan
Ongoing
FAO
6 93 -- --
MAI
EDUCAT: Primary
Ongoing
MAI
MSH
HEALTH: Basic Post
Tangi Sultan Ihel
Ongoing
AID
PRE
AGRIC:
Center'
Completed
UNDP
A C B A R
Vet
Sperab
3 mobile vaccs visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
Repairing of 37 ks road (Ihost - Shabak) with 6 structures.
20 m diversion structures í 300 hectares land / benefit 200 families.
5 93
Construction of 11 structures on canal.
Constrrction of 3 structures / 360 hectares land / benefit 250 families,
8 schools in Jarr Ihel, Ihatak, Kotki, Balkh Khan (2), Markaz & Mata villages.
8 89 -- --
12 92
6 93
2 BHWs
¡NU with 1 DVM, 2 paravete & 1 guard providing veterinary services to the whole dietr:ct
DATABASE.OF NGO ACTIVITIES
Page: 229
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Paktia
---- VILLAGEES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Sperah
RAFA
WATER:
Jerez
RAFA
WATER:
Other
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Other
SCA
AGRIC:
Other
SJAWO
AGRIC:
Crop Product
SJAWO
AGRIC:
SJAWO
AGRIC:
SJAWO
UNO
Completed
WFP
4 90
5 90
Rehabilitation of 7 karezes in different villages - total length 1,000 m.
Completed
FAO
1 92
3 92
Topographic survey, long cross -section / hidro. str in Khost area.
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochemicals.
Ongoing
SCA
0 92 -- 93
Provision of 0.02 MT agrochemicals.
Completed
SCA
0 92 -- 92
Agriculture survey on 82 villages.
Ongoing
SCA
0 93 -- 93
Agricultùre survey on 30 villages.
Ongoing
FAO
5 93 -- --
Distribution of 8.49 MT maize / 8.05 MT rice / 0.1 MT lung bean & 2.5 MT DAP among the farmers for multiplication.
Fruit Trees
Completed
FAO
i 92
2 92
Fruit trees plantation - benefit 1,000 farmers families.
Fruit Trees
Completed
FAO
3 93
4 93
Distribution of 5,000 fruit trees to the needy farmers.
INCOME: Skill Train.
Ongoing
CIDA
EDUCAT: Primary
Ongoing
AID
Paktia
Diff. villages
--
-
--
Carpentry training.
--
6 87 -- --
2 schools in Sur Khak & Shadal villages.
Tani
AB
AGRIC:. Crop Product
Alida
Completed
FAO
4 93
4 93
Distribution of 5 MT wheat seed to 48 families.
AB
RELIEF: Food Items
Ismail Del
Completed
WFP
2 90
7 90
Free distribution of 700 MT wheat to 2500 families.
AB
WATER:
Canal
Ismail 6hel
Completed
UNDP
1 92
3 92
Reconstruction of Dilpurai, landawara & Salonai canals.
ABSAO
AGRIC:
Crop Product
12 villages
Ongoing
FAO
10 92
7 93
8 MT wheat seed 8 MT of DAP for 235 farmers under seed multiplication program.
AHSAO
AGRIC:
Crop Product
Completed
FAO/UNDP
11 91
7 92
Distribution of 5 MT Pak -81 wheat seed i 5 MT Urea
-
5 MT DAP to 239 farmers in Dargai, Senegal, Narasai, Ter Ihel &
Worzele.
ATC
MINES:
Clearance
3 villages
Completed
UNOCHA
12 91
CARE
WATER:
Canal
Tani /Gorboz /Nad.Io
Completed
AID
-- -- -- 92
Rehabilitation of 11 Irrigation canals with total length 38.4km including other structures.
AGRIC:
Vet
Tani
Ongoing
UNDP
12 90
6 93
1 assist DVM / 2 paravet / 1 guard curative & preventive service.
AGRIC:
Training
Completed
UNDP
5 93
5 93
l x one -month course for village -based basic veterinary workers, 3 trained
-GAF
IRC /RPA
A C BAfl
7 92
Destroyed 1745 devices, cleared 337993 SQm agri.land Ì grazing land I village / road & canal.
DATABASE OF NGO ACTIVITIES
Page: 230
A6actrep Date: 27/08/93
6TB EDITION
VILLAGES) - - --
SECTOR
AGENCY
Paktia
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
4ACTIVITY
Tani
DESCRIPTION>
3 mobile vaccs visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
5 91 -- --
IRC /RPA
HEALTH: Vaccination
--
Ongoing
UNICEF
IRC /RPA
HEALTH: Other
-
Approved
HCR
IRC /RPA
WATER:
Warghar
Ongoing
SV
MAI
EDUCAT: Primary
Ongoing
MAI
--
KAI
EDUCAT: Primary
Sor lot
Ongoing
MAI
-- -- -- --
MCPA
MIKES:
8 minefields
Completed
UNOCHA
1 92 12 92
417,240 Sqm agri. lands a road.
MSE
HEALTH: Basic Post
Barur
Ongoing
AID
3 88 -- --
8 BHWs
:AMA:;
MINES:
Awareness
Completed
UNOCHA.
i 92
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.325 MT agrochemicaïs.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.085 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
HEALTH: Compr.Clinic
Ongoing
SCA
3 88 -- --
1 MD 12 mid -level HWs / 2 Nurses I 1 Lab. Tech.
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
5 schools in Fakhri Shankai, Toot Ebel, Banda Ihel & Sperkai villages,
VITA
WATER:
Ongoing
AID
6 92 -- --
Rehabilitation of 5 km spring, benefit 2,193 families.
Paktia
Canal
Survey
Other
Sperkai
Dargai Tani
-
Sale of insecticide- impregnated bed nets for malaria prevention
-- 93 -- --
Rehabilitation of 1 canal, 1.51 km. irrigate 850 jeribs, benefit 250 families
4 93 --
4 schocis in Shti, Manira Kahola, Sultan Kahola & Ihiali.
1 schools.
Safety lessons - ,6145 pe;pie participated.
6 92
Trayzai
AFS
AGRIC:
Crop Product
6 villages
Ongoing
FAO
5 93 10 93
Multiplication of 0.4 MT Maize seed & 1.5 MT DAP.
AFS
AGRIC:
Crop Product
Zechok Ebel
Ongoing
FAO
5 93 10 93
Multiplication of 0.1 MT sung bean & 1.0 MT DAP.
AFS
WATER:
Canal
Lakan
Completed
FAO
5 93
APWO
AGRIC:
Crop Product
5 villages
Ongoing
FAO
1 93 -- --
APWO
AGRIC:
Livestock
All villages
Approved
UNDP
-- 93 -- --
&PWO
WATER:
Canal
Janpir I.
Ongoing
WFP
4 93 -- --
ARCON
CONST:
Pub.Building
Alisher /Trayzai
Ongoing
ARGON
ACBAR
Cleaning of canal (4.2 Km) - benefits 200 farming
6 93
families.
Multiplication of 5 MT wheat seed & 5 MT DAP.
7,000 head poultry.
--
Construction of Ali Shir / Tirazi mosque.
-- -- -- --
DATABASE OF NGO ACTIVITIES
Page:
231
A6actrep Date: 27/08/93
6TH EDITION
SECTOR
AGENCY
---- VILLAGE(S) -- --
Pak tia
WATER:
Canal
ARCON-
WATER:
Canal
ARF
CONST:
ARF
WATER:
AGRIC:
FUNDED
DURATION
--BY --
Begin- -End
< ACTIVITY
DESCRIPTION>
Tr- ayzai
ARCON
ARR
ACTIVITY
-- STATUS --
Qadam
Ongoing
ARCON
Sidqi
Ongoing
ARCON
Other
Tarakai
Ongoing
SKI
-- 92 -- --
Construction of ready -made beams i slab factory.
Other
--
Completed
Self
1541 11 91
Detail survey of irrigation (karezes i canals ï dams) & buildings.
Crop Product
5 villages
Ongoing
FAO
'
--
Cleaning of Qadam canal.
Cleaning of Sedqi canal.
6 93 10 93
3.17 MT agricultural inputs (Baize I rice ! peanut ; sung bean) distributed for multiplication.
ARR
AGRIC:
Crop Product
5 villages
Ongoing
FAO
2 93 12 93
Distribution of 16 MT sugar -cane (CP -375) & ll bags DAP to 16 farmers.
ARE
WATER:
Canal
Trayzai
Completed
RAP
7 92
Canai cleaning.
GAC
WATER:
Canal
Landar
Completed
SAC
6 91 12 91
IRC /RPA
AGRIC:
Vet
Center
Ongoing
UNDP
IRC /RPA
AGRIC:
Training
Completed
UNDP
7 92
2 92 -- -
9 92
1291 -- 5 93
Rehabilitation of i canal (5.5 km) with several syihons - irrigate 1,500 jeribs & benefit 200 families.
1 Farm Animal Vaccination and Treatment clinic, l vet, 2 paravets.
2 x one -month course for village -based basic veterinary workers, ,5 trained
IRC /RPA
HEALTH: Vaccination
--
Ongoing.
UNICEF
IRC /RPA
HEALTH: Other
--
Approved
HCR
IRC /RPA
WATER:
Karez
Laken (Dolan)
Ongoing
SV
3 93 -- -
IRC /RPA
WATER:
Canal
--
Completed
SV
4 93
IRC /RPA
WATER:
Canal
Lakan (Ayub Ihel)
Ongoing
SV
4 93 --
IRC!RPA
WATER:
Drinking
Zera Ghondi
Completed
SV
2 minefields
Completed
MOCHA
1 92 12 92
23,795 Spi road,
Ongoing
AIDi
4 89 -- --
1 BHW
-- 93 -- --
.
i 93
5 93
2 93
3 mobile vices visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
Sale of insecticide- impregnated bed nets for malaria prevention
Rehabilitation of 1 karez, 0.96 km, irrigate 7000 jeribs, benefit 100 families
Rehabilitation of 5 canals, total 9.49 kmt irrigate 4650 jeribs, benefit 540 families
Rehabilitation of 1 canal, 2.3 km, irrigate 6000 jeribs, benefit 450 families
Gravity-flow water supply, one system, benefit 80 families
CPA
MINES:
MSH
HEALTH: Basic Post
5CA
AGRIC:
Plant Proteo
Ongoing
SCA
U 93 -- 93
Provision of 0.08 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93.
Agriculture survey on 40 villages.
SNI
COKST:
Shelter
Ongoing
SNI
2 91 -- --
Per -cast factory - joint project with ARF - 9,000 produced 'sot of which have been distributed to the people at a
Survey
'Belawat
subsidized price - 6,000 'ore to be produced,
,
ACTIVITY
AGENCY
SECTOR
.
-VILLAGE(S) - - --
-- STATUS --
DURATION
FUNDED
- - -BY --
tACTIVITY
Begin- -End
DESCRIPTION>
Trayzai
Paktia
SOLAF
WATER:
Canal
12 villages
Completed
UNDP
2 92 11 92
29 km, irrigates 800 3eriba, benefits 1000 persone.
SOLAF
WATER:
Structure
8 villages
Ongoing
WFP
3 93 -- --
Intakes up to 201 each with stone sand & gravel, cement, wood steel - benefit 1000 persone.
START
AGRIC:
Crop Product
Trayzai
Completed
FAO /UNDP
3 92 11 92
Improved maize seed and vegetables multiplication.
START
CONST:
Road
Trayzai
Completed
NRC
START
CONST:
Road
Alisher
Ongoing
NEC
3 92 -- --
Repair of Alisher -bhost road 3.5 is length.
START
CONST:
Road
Alisher
Completed
NRC
6 92 11 92
Repairing of Alisher -khost road (10 KC
Ongoing
UNICEF
10 90 -- --
-
5 92
Repair of Alisher -Ihost road (7 Em).
Wolma
Paktia
IRC /RPA
12 91
HEALTH: Vaccination
3 mobile vaccs visiting at least 3 x year, wetting 0 -2 year° children & females aged 5 -45
Zormat
Paktia
-- -- --
Fuirt Nursery
ARCON
AGRIC:
Fruit Trees
Petan
Ongoing
ARGON
CARE
WATER:
barez
Zormat
Completed
AID
ESAR
CONST:
Shelter
Ongoing
UNCHS
èSAR
COST:
Shelter
buïalgo
Completed
HCR
8 89 -- --
Pre -cast factory, provides roofing beams / slab for community a
GAF
AGRIC:
Vet.
Zormat
Ongoing
UNDP
4 90
6 93
1 assist DVM / 2 paravet / i guard curative & 'preventive servic
TIRO
HEALTH: Compr.Clinic
Zormat
Ongoing
TIRO
9 89 -
IRC /RPA
AGRIC
Crop Product
--
Completed
FAO
10 92
IRC /RPA
AGRIC:
Crag Product
--
Ongoing
UNDP
10 92 -- --
Seed multiplication: 1.2 st wheat, 1.2 at DAP to 18 farmers
IRC /RPA
AGRIC:
Fruit Trees
Guided Ihel /Stogen
Ongoing
AID
11 91 -- --
Nursery with 3902 age planted with stone fruit / nut / apple seed and cuttings
IRC /RPA
AGRIC:
Fruit Trees
--
Completed
AID
3 93
IRC /RPA
AGRIC:
Machinery
Ongoing
AID
6 92 -
IRC /RPA
AGRIC:
Research
Completed"
AID /FAO
IRC /RPA
AGRIC:
Training
Ongoing
AID
Guided Ihel /Stogen
0
0 92
Rehabilïtation of Charkhawi & Dinmanan larezes with total length 4.7km including other structures.
- --
Manufacture and distribution of 1,900 concrete beans for hòusinp.
-
3 93
4 93
-
11 91 12 92
1 9Z -
--
- 30,000 sg.ft. roofing materials distributed,
1 MD / 1 mid -level HW / 1 nurse / 1 lab tech - OPD I lab.
Seed distribution: 8.6 at wheat, 8 -.6 st DAP to 234 families
Distribution of 1,399 saplings to 18 farmers
1 tractor
Improved wheat, barley and oat seed trials
1 -2 day trng in seed mult, nurseries, bees, poultry, food preservation etc, 190 farmers trained
DATABASE OF NGO ACTIVITIES
AGENCY
SECTOR
AGRIC:
IRC /RPA
ACTIVITY
FORDED
DURATION
-- STATUS --
--BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Zormat
Paktia
IRC /RPA
- - -- VILLAGES) - - --
Other
Guldad Khel /Stogen
2 Model fares: seed mult, nurseries, vegetables, poultry, bees, fars power
Ongoing
AID
HEALTH: Vaccination
Ongoing
UNICEF
8 90 -- --
3 mobile veccs visiting at least 3 x year, targetting 0 -2 years children & females aged 5 -45
tRC /RPA
WATER:
Iarez
Ongoing
SV
6 92
Rehabilitation of 16 karezes, total 13.51 ka, irrigate 9495 jeribs, benefit 2198 families
IRC /RPA
WATER:
larez
Completed
SV
6 92 12 92
Rehabilitation of 17 karezes, total 20.72 km, irrigate 10960 jeribs, benefit 2064 families
MSH
HEALTH: Basic Post
Shekh Noor
Ongoing
AID
8 89 -- --
3 BHWs
RAC
AGRIC:
Crop Product
1? villages
Ongoing
FAO
11 92
NAC
AGRIC:
Forestry
Dawlat Khan
Ongoing
NAC
10 92 10 94
NAC
AGRIC:
Other
Completed
NAC
9 91
NAC
CORST:
Pub.Building
Sehak
Ongoing
NAC
10 92
9
93
Construction of secondary school (11 rooms).
NAC
CONST:
Pub.Building
Dawlat Khan
Ongoing
NAC
10 92
9
93
Construction of primary school (8 rooms).
NAC
HEALTH: Compr.Clinic
Tameer
Ongoing
NAC
5 93 -- --
Comprehensive health center with MD doctors.
NAC
RELIEF:Food Items
Completed
NAC
5 91
Distribution of 20 MT flour /400 tins ghee (5 kg / tin) 1 400 kg tea / 600 salt to 440 families (the area was attached
11 91 -- --
--
-
8 93
8 92
6
91
Improved wheat seed multiplication.
Forestry tree nursery project.
Seed demonstration plots..
by Kabul).
RAC
RELIEF:Food Items
Completed
NAC
--
NAC
WATER:
Completed
RAC
1 92 -- --
Larez
Distribution of 49 MT flour / 2,050 blankets to 574 families (internal displaced families from around Gardaiz).
9 karezes in different villages - Total length
5 :7km including digging new tunnels / wells A stone work - irrigate
2,363 J. / benefit 188 families.
PARC
INCOME: Skill Train.
lormat
Completed
CIDA
-- 91 -- 92
Carpentry training.
PARC
WATER:
Karez
Zormat
Completed
CIDA
-- 90 -= 91
Cleaning of karez.
PARC
WATER:
Structure
Makawa
Completed
CIDA
-- 89 -- 90
Reconstruction of water catchment.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 119 villages.
UNO
EDUCAT: Primary
Ongoing
AID
7 87 -- --
11 schools in Bazak, Turki Sahak, loti Ihel, Niazi Taghar, Painda Khel, Dawlat Iban, Nawi Koh, Sani ihel, Sahak,
Azar Khel
VITA
CORST:
A C B A R
Road
Naik. Nam
Ongoing
AID
7 90 -- --
Rehabilitation of 26 km road from Naik Name to Lolalgo, benefit 30,000 families.
---- DATABASE OF NGO AtTIVITIBS
Page: 234
A6actrep Date: 27/08/93
--- 6TH EDITION
ACTIVITY
SECTOR
AGENCY
VILLAGI(S) - - --
Paktia
-- STATUS --
FUNDED
DURATION
cACTIVITY
- --BY --
Begin- -End
10 91 -= --
DESCRIPTION>
Zormat
VITA
WATER:
Canal
Kulalgo
Discontin
AID
VITA
WATER:
Canal
Guldad Ihel
Ongoing
AID
VITA
WATER:
Canal
Murad Ebel
Ongoing
AID
VITA
WATER:
Structure
Guided Ihel
Ongoing
AID
VITA
WATER:
Structure
Akhond Ihel
Ongoing
VITA
WATER:
Structure
Baqi
VITA
WATER:
Structure
VITA
WATER:
VITA
WATER:
Cleaning of 3.6 km canal, benefit 57 fesilies.
Cleaning of 1.5 km canal, benefit 286 families.
Cleaning of 1.9 ks canal, benefit 86 families.
--
92 -- --
Construction of 25 a intake(gabion work), benefit 100 faoilies.
AID
--
Construction of 22 it intake(gabion work), benefit 214 faoilies.
Ongoing
AID
-- -- -- --
Construction of 30 m intake(gabion work), benefit 571 families.
Landi Shah
Ongoing
.AID
Structure
Bazid Khan Kaz
Ongoing
AID
Structure
Kohi Noor
Ongoing
AID
Ehel
8
6 91
6
Construction of 150 m siphon(gabion work).
-- --
92 --
- -"
12 92 -- --
Construction of 18 n intake(gabion work), benefit 71 families.
Construction of 20 m intake(gabion work), benefit 286 families.
Bagram
Parwan
.Cleaning of Bagram canal.
ARCON
WATER:
Canal
Bagres
Ongoing
ARCON
ARCOK
WATER:
Canal
Mahigeer
Ongoing
ARGON
HEALTH: Cospr.Clinic
--
Ongoing
GAF
-- 91 -- --
OPD / 1 doctor / 2 nurses & 1 guard,
GAF
HEALTH: Vaccination
--
Ongoing
ïINICEF/S
-- 90 -- --
Mobile vaccination tail with 3 vaccinators.
MSH
HEALTH: Basic Post
brache
Ongoing
AID
5 89 -- --
3 BHWs
MSH
HEALTH: Vaccination
Bagras
Ongoing
AID /UN
9 91 -- --
COVERED FROM RUSHER VSF.
FRB
AGRIC:
Vet
Center
Completed
UNDP
5 92
SCA
AGRIC:
Plant Proteo
--
Ongoing
SCA
0 93 -- 93
Provision of 0.08 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0'93 -- 93
Agriculture survey on 30 villages.
UNO
EDOCAT: Prisery
Ongoing
AID
6 87 -- --
8 schools in Chaikal, Rubat, Malo Malek, Markaz, New Deh, Gala Ihwaja, Ghuiam Ali & blander Ebel villages.
Ongoing
ARCON
GAF
,
Parwan
ARCON
WATER:
ACBAfl
--
Cleaning of Mahaigeer canal.
6 93
SEE ROIHA/PANJSHARE LISTING FOR DETAILS.
VFU with 1 DVM, 2» paravets & 1 guard providing veterinary services to the whole district.
Charikar
Canal
--
Cleaning of Ihawaja canal.
DATABASE OF NGO ACTIVITIES
6TH EDITION
I
Page: 235
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(S) - ---
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
<ACTIVITY
DESCRIPTION>
Charikar
Parwan
AViCEN
HEALTH: Other
Charikar
Approved
UNICEF
-- 93 -- --
1 VSF rehabilitation in the hospital.
GAA
RELIEF :Food Items
--
Ongoing
GAA
-- 93 -- --
See GAA -R2 project in Kabul for details.
GAF
HEALTH: Vaccination
Ongoing
UNICEF /S
-- 90 -- --
Outreach EPI program from Bagram.
IAAAE
CONST:
Gualaner Khel
Ongoing
Self
4 92 -- --
Construction of Mosque.
ISRA
INCOME: Help Vulner.
Charikar
Ongoing
ISRA
l 85 -- --
Assistance to 356 orphans each month (health services
KAI
EDUCAT: Primary
Khalazai
Ongoing
MAI
MSF -F/B
HEALTH: Provinc.Hosp
Charikar
Ongoing
EC /MSF
MSH
HEALTH: Basic Clinic
Sayadan
Ongoing
AID
9 90 -- --
4 MED. TECH.
MSH
HEALTH: Basic Post
Totua Dara Uiya
Ongoing
4 90 -- --
6 BMWs
MSH
HEALTH: Vaccination
Charikar
Ongoing
AID /UN
9 91 -- --
COVERED FROM PANJSHER VSF.
PRB
AGRIC:
Vet
Center
T
AID
Completed
UNIT
9 92
6 93
VFU with 1 DVM,
PRB
CONST:
Road
Completed
CIDP.
11 91
2 92
Repair of Guibahar - Said` Khel road (12 km) + construction of 3 culverts - cement i stone & steel oar.
PRB
CONST:
Pub.Building
Center
Approved .
ARCON
-- -
9 93
BHC (14 rooms) material - brick / steel bar & concrete.
SCA
HEALTH: Compr.Clinic
Azizbig Ehel
Ongoing
SCA
9 88 -- --
1 MD / 4 mid -level Hs / 2 Nurses
SCA
HEALTH: Basic Clinic
Tout Dara
Ongoing
SCA
2 89 -- --
4 mid -level HWs / 1 Nurse / 2 Dental Tech./ 1 Lab Tech. / 1 PHO
SCA
HEALTH: Basic Clinic
Dashti Ofyan
Ongoing
SCA
1 90 -- --
14 mid -level Hs / 2 Nurses / Dental Tech. / 1 Lab Tech.
SGAA _
HEALTH: Disabled Reh
Center
Ongoing
WHO
7 90 -- --
Orthopaedic workshop manufacturing approx. 20 artificial limbs per month.
UNO
EDUCAT: Primary
--
Ongoing
AID
6 88 -- --
8 schools in Senjit Dara(2), Abdi Bai, Sadullah(2), Telanchi & DehQazi.villages.
VITA
CONST:
Taghberdy
Ongoing
All
5 92 -- --
Rehabilitation of 24 ka road, benefit 5,000 families.
5 93
Piping 100 m canals & repairing 24 a - benefit 2,000 farmers.
Parwan
Pub.Building
Road
10 92 -- --
1 school.
30 beds Í supply of medicines i sanitation & nursing care.
6 ROOMS, 3 BEDS, ORTHOPAEDIC SURGERY, VOLUNTEER HEALTH SISTER (VHS) AND DAI TRAINING
SEE ROKBA /PANJSHARE LISTING FOR DETAILS.
1 paravet & 1 guard providing veterinary services to the whole district.
Ghorband
A -AID
WATER:
Structure
Qiachaq
Completed
ODA
A -AID
WATER:
FloodControl
Ferenjal
Completed
ODA
lACBAR
--
education / clothing / foot- wear).
6 93
10 92 il 92
45 a flood protection (stone /gabion).
DATABASE OF NGO ACTIVITIES
Page: 236
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
---- VILLAGR(S) - --
FUNDED
-- STATUS --
DURATION
- --BY --
Begin --End
<ACTIVITY
DESCRIPTION?
Ghorband
Parwan
Ferenjal
Completed
ODA
10 92 11 92
94 a flood proteetion(stone/gabion',.
HEALTH: Vaccination
259 villages
Ongoing
EC/UNICF
-- -- -- --
4 teams - 8 vaccinators
GAF
AGRIC:
Vet
Ghorband
Ongoing
BMZ
7 87
IAAAE
CONST:
Pub.Building
Chardeh
Ongoing
Self
4 92 -- --
Construction of high school.
IAAAE
CONST:
Pub.Building
Siagird
Ongoing
Self
4 92 -- --
Construction of high school.
MSH
HEALTH: Basic Post
Ghorband
Ongoing
AID
7 88 -- --
7 BHWs
PRC
WATER:
Canal
Completed
CIDA
SCA
AGRIC:
Crop Product
Completed
SCA
0 92 -- 92
SCA
AGRïC:
Plant Protec
--
Ongoing
SCA
0 93 -- 93
SCA
AGRIC:
Plant Protec
--
Completed
SCA
0 92 -- 92
SCA
AGRIC:
Other
Ongoing
SCA
'0 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 83 villages.
SCA
EDUCAT: Primary
Ferenjal
Ongoing
SCA
7 86 -- --
5 schools 1 35' teachers 1 880 students
SCA
HEALTH: Basic Clinic
Chardeh
Ongoing
SCA
5 90 -- --
11 mid-level HWs / 1 Nurse / 1 PHO
UNO
EDUCAT: Primary
--
Ongoing
AID
6 87 -- --
15 schools in different villages:
VITA
CONST:
Road
Ghorband
Discontin
AID
12 90 -- --
VITA
CONST:
Bridge ;
Mazana
Ongoing
AID
9 92 -- --
Construction of 13 n bridge(concrete i masonry). benefit 2,000 faille!.
VITA
WATER:
Canal
Gudan
Ongoing
AID
9 92 -- --
Cleaning of 2 km canal, benefit 50 families.
VITA
WATER:
FloodControl
Faragard
Discontin
AID
12 90 -- --
Construction of 150 m retaining Nall(gabion work), benefit 8,000 families:
10 91 -- --
Nurseries of 200,000 fruit trees (mulberry) - 10 jeribs - 1,000,000 (grapes) - 20 jeribs.
A-AID
WATER:
AVICEN
Parwan
FloodControl
-
-- 91 -- 92
'`
1 DVM i 4 paravets / 2 guards curative & preventive service.
Reconstruction of canal.
Distribution of 2.55 MT wheat seed. 2.55 MT DAP & 2.55 MT Urea.
'Provision of 0.11 MT agrochemicals.
Provision of 0.247 MT agrochemicals.
Rehabilitation of 50 km road from Ghorband to Senjed Dare, benefit 20,000 families.
Jabul Sarai
ARA
AGRIC:
Fruit Trees
Gulbahar- Munara
Ongoing
ARCON
ARCON
CONST:
Pub.Building
Deh Qazi
Ongoing
ARCON
¡ C H A R
12 93
Construction of Da Qazi school.
DATABASE OF IiGO ACTIVITIES
Page: 237
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jabul Saraj
Parwan
Gulbahar
Cleaning of Hasht Mail canal.
Ongoing
ARGON
Ongoing
ARCON
65 villages
Ongoing
EC/UNICF
Structure
Jabul Saraj
Completed
RAP
-- 92 -- 92
Construction of 22 aqueducts along Parwan canal.
AGRIC:
Vet
Matak
Ongoing
UNDP
10 90 -- --
Centarl clinic with I vet. assistant ! 1 paravet & 3 vaccinator.
GAF
AGRIC:
Vet
Gulbahar
Ongoing
UNDP
10 91
MSH
HEALTH: Distrct Hosp
Jabul Saraj
Ongoing
AID
ARCON
WATER:
Canal
ARCON
WATER:
Canal
AVICEN
HEALTH: Vaccination
CBR
WATER:
DCA
-- --
--
Cleaning of Waziri canal.
1 team - 1 vaccinator
6 93
9 90 -- --
1 assist DVM /2 paravet / 1 guard curative & preventive service.
1 MD i 1 anaesthisia tech assistant ¡ 5 medical tech i 1 nurse / i dental tech natant / 1 lab tech assistant 1
admin i
1
MSH
HEALTH: Basic Clinic
Shutul
Ongoing
AID
9 90 -- --
1 NURSE, 3 MED. TECH.,
MSH
HEALTH: Basic Poet
Said Khel
Ongoing
AID
4 88 -- --
5 BHWs
MSH
HEALTH: MCH
Ashaba Sharif
Ongoing
AID
1 93 -- --
2 MD,
MSH
HEALTH: Vaccination
Jabul Saraj
Ongoing
AID /UN
9 91 -- --
COVERED FROM PANJSHER VSF.
PRE
AGRIC
Crop Product
Said Del
Completed
RAP
5 92
1 93
Establishment of corn seed multiplication farm in 10 jeribs.
PRE
AGRIC:
Fruit Trees
Center
Ongoing
SEN
10 91
3 94
Establishment of fruit trees nursery in 2 jeribs the seedlings of which will be distributed to farmers.
PRE
CONST:
Pub.Building
gala Agha
Completed
ARCON
5 92
1 93
Madrasa with 36 classrooms &.l Mosque capacity 500 persons.
PRE
CONST:
Pub.Building
Gulbahar
Ongoing
ARCON
9 92
9 93
BHC (14 rooms) - brick /steel bar & concrete.
PRE
WATER:
Canal
Jabul Saraj
Completed
SOLAF
8 89 10-91
Cleaing of 10 ka canal & construction of 75 m washes.
SCA
AGRIC:
Plant Protec
--
Completed
SCA
O 92 -- 92
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 88 villages.
SCA
EDUCAT: Primary
Ongoing
SCA
7 89 -- --
4 schools / 26 teachers / 590 students
ACHAR
Gozar Pay
i DENTAL TECH. ASST.
Women / children under 5 care,
DATABASE OF NGO ACTIVITIES
Page:
238
1
X -ray tech assistant - 14 rooms i 15 beds I surgery / dental i lab / X -ray & OPD.
A6actrep Date: 27/08/93
8 ROOMS, 5 BEDS, DENTAL.
health education and Dai training program.
SEE ROEHA /PANJSARE LISTING FOR DETAILS,
Material - cement / brick & roof wood.
6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
Parwan
-- STATUS --
FUNDED
- --BY --
DURATION
< ACTIVITY
Begin- -End
DESCRIPTION>
Jabul Sara
SCA
HEALTH: Coapr.Clinic
Rasool Dad Ihel
Ongoing
SCA
1 89 -- --
1 MD, 3 mid-level H.
UNO
EDUCAT: Primary
--
Ongoing
AID
7 87 -- --
13 schools in Niaz Ihel, Iaaangar, Sayed Ihel(Munara), Hama
Ehel, Gulbahar(2), Wash, Encho, Hayat Ihel. Fatah
Khan Bel.
Rehabilitation of IO ka road, benefit 3.500 families.
VITA
CONST:
goad
Inchou
Ongoing
AID
6 91 -- --
VITA
CONST:
Road
Said Ehel
Ongoing
AID
11 91 -- --
Rehabilitation of 6 km road from Said Ihel 'to Naunara, benefit 8,000 families.
VITA
CONST:
Road
Gulbahar
Ongoing
AID
11 91 -- --
Rehabilitation of 12 ka road from Sadullah to Gulbahar, benefit 10,000 families.
Kohe Safi
Parwan
AB
RELIEF:Food Items
Kohi Safi
Ongoing
WFP
4 93 -- --
KB
HEALTH: Basic Post
Kohi Safi
Ongoing
AID
11 87 -- --
MSH
HEALTH: Vaccination
Kohi Safi
Ongoing
AID/UN
PRE
AGRIC:
Center
Completed
UNDP
11 92
Entire province
Ongoing
EC /ODA
-- 92 -- 94
Parwan
Vet
9 91 -
--
6 93
Distribution of 500 MT wheat to eligibles.
1 BHW
COVERED FROM PANJSHER VSF.
SEE ROEHA /PANJSHARE LISTING FOR DETAILS.
VFU with 1 DVM, 2 'paravets & 1 guard providing veterinary services to the whole district.
Parwan
Demining(including aine field survey and aine awarrness) in all districts.
HT
MINES:
Clearance
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrocheaicais.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92.
Provision of 0.255 MT agrocheaicais.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Parwan
Salang
--
-
NSH
HEALTH: Basic Clinic
Deb Yak
Ongoing
AID
9 90 - -. --
4 medical tech., 1 doctor assistant - 4 rooms 3 beds.
MSH
HEALTH: Basic Poet
Aghel Ihel Agba
Ongoing
AID
7 90 -- --
5 BIIWe
MSH
HEALTH: Vaccination
Salang
Ongoing
AID/UN
9 91 -- --
COVERED FRON PANJSHER VSF.
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
14 schools in different villages.
Page: 239
A6actrep Date: 27/08/93
SEE ROIRA /PANJSHARE LISTING FOR DETAILS.
ACTIVITY
AGENCY
SECTOR
Parwan
A -AiD
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin- -End
<ACTIVITY
DESCRIPTIONS
3hekh Ali
CONST:
Bridge
Dalian Shengerian
Completed
ODA
9 92 11 92
Construction of 4m & 25 tonnage bridgetstonesteel
.
cement).
A -AID
CONST:
Bridge
Dahan Botian
Completed
ODA
9 92 11 92
Construction of 4m & 25 tonnage bridge (stone r steel i cement).
A -AID
CONST:
Bridge
Dahan Kotak
Completed
ODA
9 92 11 92
Construction of 3m & 25 tonnage bridge (stone / steel i cement).
A -AID
CONST:
Bridge
Chochah Shibar
Completed
ODA
9 92 11 91
Construction of 41 & 25 tonnage bridge(stone 1 steel i cement).
A -AID
CONST:
Bridge
Sail Benak
Completed
ODA
9 92 11 92
Construction of 41 & 25 tonnage bridge( stone /steel i cement).
A -AID
WATER:
FloodControl
Tangai Lali
Completed
ODA
9 92 11 92
107 m flood protection (stone/cement).
AViCEN
HEALTH: Vaccination
105 villages
Ongoing
EC%UNICF
INC
HEALTH: Compr.Clinic
Shekh Ali
Ongoing
AID
Bulool
Ongoing
Germany
LEPCO
HEALTH: Other
-- -- -- --
1 team - 3 vaccinators
5 90 -- --
-- -- --
4 mid-level HWe
1 lab tech. -GPI
Leprosy control center
-
lau.
proviees health care for general patients
i
offer a full lab. testing service ! 1 leprosy
technician ST 1 field asziatarit.
MSH
HEALTH: Basic Clinic
MSH
EAL;
:
Basic Post
Färwan
Shekh Ali
Ongoing
AID
190 -- --
1 MED. TECH., i NURSE
Derwas..
Ongoing
.AID
4 89 -- --
2 BHWe
8 ROOMS, 2 BEDS
Shinwari
DCA
AGRIO:
Vet
Bagh Afghan
Ongoing
Dutch G.
4 89 -- --
1 paravet.
DCA
AGRIC:
Vet
Shinvari Bazar
Ongoing
Dutch G.
3 89 -- --
Central clinic with 1 veterinarian.
DCA
AGRIC:
Vet
Data Ushtur
Ongoing
Dutch G.
11 92 -- --
1 vaccinator.
DCA
AGRIC:
Vet
Ushtorshahr
Ongoing
Dutch G.
11 92 -- --
1 vaccinator.
DCA
AGRIC:
Vet
Fandigistan
Ongoing
Dutch G.
6 89 -- --
l vaccinator & 1 paravet.
MSH
HEALTH: Basic Clinic
Shewa
Ongoing
AID
6 88 -- -
1 NURSE, 3 MED TECH, 1 DENTAL TECH ASST.
MSH
HEALTH: Basic Clinic
Safi ßhei
Ongoing
AID
2 90 -- --
3 MED. TECH.
MSH
HEALTH: Basic Post.
Qagehal
Ongoing
AID
11 89 -- --
SCA
AGRIC:
Ongoing
SCA
0 93 -- 93
ACBAR
Plant Protec
2 ROOMS, DENTAL
2 ROOMS i BED
1 BHW
Provision of 0.1 MT agrochemicaiE.
DATABASE OF NGO ACTIVITIES
Page: 240
A6actrep Date: 27/08/93
6TH EDITION
SECTOR
AGENCY
AGRIC:
SCA
VILLAGE(S1 - - --
Other
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
Ongoing
SCA
<ACTIVITY
DESCRIPTION>
Agriculture survey on 30 villages.
0 93 -- 93
Surkh Parses
Parwan
teams - 4 vaccinators
--
AVICEN
HEALTH: Vaccination
124 villages
Ongoing
EC /UNICF
MSH
HEALTH: Distrct Hoap
Lolenj
Ongoing
AID
9 91 -- --
1 MD ! 2 MED TECH / 1 ADMIN / i DENTAL TECH ! 10 BEDS / LAB / X -RAY / DENTAL / SURGERY.
MSh
HEALTH: Basic Clinic
Gulak We Kafzar
Ongoing
AID
9 91 -- --
3 MED. TECH., 1 DENTAL TECH. ASST.
MSE
HEALTH: basic Clinic
Dawlat ghani
Ongoing
AID
6 90 -- --
1 doctor assistant, i nurse, 1 BHW - 3 roots
MSE
HEALTH: Basic Post
Xhwaia Parsa
Ongoing
AID
4 88 -- --
3 BHWs
MSH
HEALTH: Vaccination
Surkh Parse',
Ongoing
AID /UN
OXFAM
WATER:
Canal
Loienj
Completed
OXFAM
AGRIC:
Plant Protec
Completed
SCA
-- 92 -- 92
SCA
-
COVERED FROM KAJAB VSF.
11 89 -- --
2 9:
DENTALI
immunization.
SEE KAJAB'GARDANDEWAL LISTING FOR DETAILS.
irrigation channel extension.
3 92
.
Provision of 0.13 MT agrochemicais.
SCA
EDUCAT: Primary
Lolenj
Ongoing
SCA
7 89 -- --
3 schools f. 13 teachers i 620 students
SCA
EDUCAT: Primary
Turkman
Ongoing
SCA
7 89 -- --
8 schools ! 53 teachers i 850
SCA
HEALTH: Compr.Ciinic
Turkman
Ongoing
SCA
9 92 -- --
2 MD / 1 mid -level HW.
UN°
EDUCAT: Primary
Ongoing
AID
6 87 -- --
14 schools in Shangarian, Lolenj(2), Miana Jai, Puli Sangi(2), Gumbad,
students
Parsa, Wand, Dalian Rebat, Turkman, Rubat &
Baqi villages.
6 91 -- --
VITA
CONST:
Road
Parsa
Ongoing
AID
VITA
WATER:
Canal
Loienj
Completed
AID
-- -
Samangan
9 92
Cleaning of 7 kt canal. Benefit 600 fatiliee.
Dares Souf
MAI
EDUCAT: Primary
Folad
Ongoing
MAI
-- -- -- --
MSH
HEALTH: Basic Post
Dehi
Ongoing
AID
7 88 -- --
MSH
HEALTH: Vaccination
Data Souf
Ongoing
AID /UN
NAC
CONST:
Shekha
Completed
NAC
IA C B A R
Rehabilitation of 8 km road, benefit 5.000 families.
Pub.Building
11 90 -- --
7 91 -- 92
i school.
5 BMWs
COVERED FROM BALKH VSF. SEE MAZAR- I- SHARIF LISTING FOR DETAILS.
A building of boys primary school (8'rooms) - local materials.
DATABASE OF NGO ACTIVITIES
Page: '241
A6actrep Date: 27/08/93
6TH EDITION
1
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
FUNDED
-- STATUS --
- - -BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Dara Souf
Samangan
NAC
WATER:
Drinking
SCA
AGRIC:
Plant Protec
SCA
EDUCAT: Primary
UNO
UNO
Dara Soul
Completed
NAC
7
Completed
SCA
0 92 --
Ongoing
SCA
7
EDUCAT: Primary
Ongoing
AID
EDUCAT: Primary
Ongoing
AID
Dara Souf
Hazrat
Samangan
91
8 92
--
Provision of 0.1 MT agrochemicals.
92
8 schools / 32 teachers f 920 studente
91 -- --
11 87 -- --
2 87
3 schools in Debi, Ali Ihel & Chartaq villages.
12 schools in different villages.
-- --
Sultan
AVICEN
HEALTH: Vaccination
13 villages
Ongoing
EC /UNICF
IMC
HEALTH: Compr.Ciinic
Nawaqul
Ongoing
AID
MSH
HEALTH: Vaccination
Hazrat Sultan
Ongoing
AID /UN
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
0
93 -- 93
Provision of 0.1 MT agrochemicaïs.
SCA
AGRIC:
Other
Ongoing
SCA
0
93 -- 93
Agriculture survey on 10 villages.
UNO
EDUCAT: Primary
Ongoing
AID
6
87 -- --
5 schools in Nomas, Haq Qambar, Iukcha, Aghahu A Ihwaja Gulab villages.
Samangan
--
--
5
89 -- --
11 90 --
1 team - 2 vaccinators.
3 mid -level HWs / 1 lab tech. - OPD I lab.
--
COVERED FROM BALIH VSF. SEE MAZAR-i- SHARIF LISTING FOR DETAILS.
Khulm
AVICEN
HEALTH: Vaccination
15 villages
Ongoing
EC/UNICF
--
1 teat
MAI
EDUCAT: Primary
Qarghan
Ongoing
MAI
-- -- -- --
1 school.
MSF -F/ B
HEALTH: Distrct Hosp
Ihulm
Ongoing
MSH
HEALTH: Basic Post
Guzer Deh Wardagi
MSH
HEALTH: MCH
MSH
HEALTH: Vaccination
2 vaccinators
EC/MSF
i 93 -- --
5 beds / 100 consults / day i 2 MD / 3 nurses & EPI.
Ongoing
AID
4 66
7 BEWs
Ali Murad Haig
Ongoing
AID
1
Dull
Ongoing
AID/UN
'
-- --
93 -- --
11 90 -- --
2 MD, i Dai -Women / children under 5 care,
health education and Dai training program.
COVERED FROM BALER VSF. SEE MAZAR-I-SBARIF LISTING FOR DETAILS. A SECOND TEAM WITH 5 VACCINATORS UNDER PMD
SUPERVISION IS ALSO IMPLEMENTING IMMUNIZATION PROGRAMS WITH VACCINES SUPPLIED BI THE BALM VSF.
NAC
CONST:
Pub.Building
Ianjaboi
Completed
NAC
9 91 -- 92
NAC
WATER:
Structure
Feroz Nakbahi
Completed
NAC
7
ACBAR
91
Girls school building - cement A local materials.
6 92
DATABASE OF NGO ACTIVITIES
Page: 242
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITI
SECTOR
AGENCY
-- -- VILLAGES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Khulm
Samangan
Completed
NAC
7 91
4 92
Drinking water for 80 families in Tapa Shekhi & 120 families in loh Takezar.
Completed
ARGON
8 92
1 93
Boye primary school with 6 rooms ! 2 administration rooms - brick / steel bar & concrete.
Completed
SCA
0 92 -- 92
Provision of 0.175 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Provision of 0.27 MT agrochemicals.
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 70 villages.
Other
Completed
SCA
0 92 - -- 92
Agriculture survey on 78 villages.
Dehi Werde
Ongoing
SCA
7 91 -- --
6 schools / 19 teachers / 590 students
Center
Ongoing
SCA
6 87 -- --
3 mid -level HWs / 1 Nurse
NAC
WATER:
Drinking
PRB
CONST:
Pub.Buildìng
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
Plant Protec
SCA
AGRIC:
SCA
AGRIC:
SCA
EDUCAT: Primary
SCA
HEALTH: Basic Clinic
Samangan
lhoja Burhan
--
Ray I) ()fit)
AVICEN
HEALTH: Vaccination
44 villages
Ongoing
RC/UNICF
-- -- -- --
1 team - 2 vaccinators
MAI
EDUCAT: Primary
--
Ongoing
MAI
-- -- -- --
3 schools in Arafa Qul, Arafa Sufia & Arafa Surkh Qala villages.
MSH
HEALTH: Basic Post
Ombulaq
Ongoing
AID
'12 92 -- --
2 BRiis
NAC
CONST:
Road
Eshpushta
Completed
NAC
8 91
SAC
CONST:
Pub.Building
Sarbagh
Completed
NAC
7 91 -- 92
2 school
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.275 MT agrochemicals.
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
0 93 -- 93
Provision of 0.27 MT agrochemicals.
AGRIC:
Other.'
--
Completed
SCA
0 92 -- 92
Agriculture survey on 69 villages.
SCA
AGRIC:
Other
--
Ongoing
SCA
0 93 -- 93
Agriculture survey on 50 villages.
UNO
DUCAT: Primary
--
Ongoing
AID
3 88 -- --
7 schools in Ghazì Murad Ihuran, Tabaqsari, Surkh Qala, Arbitol, Charmaghz Sarai, Do Ab & Hoye Do Ab 'has.
Discontin
ARCON
SCA
.
Samangan
CBR
COKST:
ACBAR
Repair of 8 kn road between Banyan & Samangan.
9 91
buildings, 1 for girls (6 rooms), 1 for boys (B rooms) - cement & local materials.
Samangan
Pub.Building
Sarbagh
Complex (mosque / clinic & workshop).
-- 92 -- --
DATABASE OF NGO ACTIVITIES
Page:
243
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITI
SECTOR
AGENCY
-VILLAGE(S) - - --
AGRIC:
DURATION
- --BY --
Begin --End
DACAAR
12 90
<ACTIVITY
DESCRIPTION>
Samangan
Samangan
DACAAR
-- STATUS --
FUNDID
Completed
Pl/ant Protec
5 91
Application of 50.06 MT BHC / Somicombialfa & diet. of 50 duster / 12 sprayers through 12 locust / sunpest control
stations.
See GAA -R2 project in Mazar for details.
Ongoing
GAA
-- 93 -- --
Sarbagh
Ongoing
AID
5 90 -- --
HEALTH: Compr.Clinic
Daree Zawandun
Ongoing
AID
11 87 -- --
ME
HEALTH: Basic Clinic
Rabatak
Ongoing
AID
9 91 -- --
MSH
HEALTH: Basic Clinic
Aq Cheshma
Ongoing
AID
9 91 -- --
2 MED. TECH.
LABORATORY
MSH
HEALTH: Basic Clinic
Ihwaja Boor
Ongoing
AID
6 90 -- --
3 MED. TECH.
i ROOM
Mj;
HEALTH: Basic Post
Shahn Qadeem
Ongoing
AID
7 88 -- --
5 BHiis
MSH
HEALTH: Vaccination
Markei Samangan
Ongoing
AID /UN
NAC
WATER:
Canal
Langer Ehel
Completed
NAC
891592
PRB
CONST:
Pub.Building
Center
Completed
ARCON
8 92
SCA
AGRIC:
Plant Protec
--
Completed
SCA
0 92 -- 92
Provision of 0.37 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.37 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 81 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 60 villages.
SCA
EDUCAT: Primary
Ongoing
SCA
7 89 -- --
12 schools / 61 teachers / 1450 students
UNO
EDUCAT: Primary
Ongoing
AID
7 87 -- --
20 schools in different villages.
10 91 101
GAA
RELIEF :Food Items
IMC
HEALTH: Compr.Clinic
MS&-.
Takhar
Sarbagh
11 90 -- --
1 93
AGRIC:
Crop Product
--
Completed
AID
A -AID
AGRIC:
Crop Product
Dahn Bangi
Completed
AID
7 90 12
AGRIC:
Crap Product
--
Completed
ODA /RAP
8 92
°
i NURSE, i MED.TECH.
4 ROOMS, 2 BEDS
-1 NURSE. 2 MED. TECH. i
COVERED FROM BALEH VSF. SEE MAZAR -I- SHARIF LISTING FOR DETAILS.
Boys primary school with 6 rooms
2 administration rooms -
brick- masonry
steel bar & concrete.
Bang i
A -AID
A-AID
2 mid -level Hic / i dentist / 1 lab tech / OPD i lab / dental.
9j
7 93
Multiplication of 2 MT improved seed / 1.43 MT DAP / 2.65 MT Urea in two farms.
Distribution of 1.749 MT improved seed / 1.749 MT DAP / 2.65 MT Urea to 53 families.
Seed distribution / multiplication / trial & ag extension in Jell ayor Ehord / Badakhshi + eshlaq / Qul Boraq / Sagaw
Bangi / Chinzai.
JACHAE
DATABASE OF NGO ACTIVITIES
Page: 244
A6actrep Date: 27/08/93
6TH IDITION
1
SECTOR
AGENCY
Takhar
A -AID
WATER:
- - -- VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
- -BY --
Begin- -End
<ACTIVITY
DESCRIPTION)
Bangi
Structure
Saqaw Bangi/Afaqi
Completed
ODA
10 91 12 91
2 ret.walls, Saqaw Bangi (74- irr.5,000 J.
i benefit 600 fas. ), Afaqi (9Om- irr.5,000 J.
benefit 450 farm. )- gabion
t
stone.
A -AID
WATER:
Structure
Completed
ODA /RAF
8 92
7, 93
Cons.of Offtake- on Qul Baraq canal to irr.8O0 ha in Jalayor ëhard / Badakhshi Qeshlaq
Choghul Qeshlaq / Qui Baraq /
Saqaw Bangi / Cha Ab.
A -AID
WATER:
Structure
Karez Kalan
Completed
ODA
10 91 12 91
Repair of an aqueduct - irrigate 3,000 jeribs & benefit 400 families. Stone masonry.
CBE
CONST:
PubBuilding
Center
Discontin
ARCON
-- 92 -- --
Concrete middle school for 600 students.
CEE
CONST:
Pub.Building
Center
Discontin
WHO
-- 91 -- --
Basic health center (4 rooms).
NSF
HEALTH: Basic Post
Jamal Qiya
Ongoing
AID
8 90 -- --
NSF
HEALTH: Vaccination
Bangi
Ongoing
AID /UN
10 89 -- - ;
?EE
AGRIC:
Vet
Center
Completed
UNDP
12 92
VITA
WATER:
FioodControl
Bangi
Ongoing
AID
Takhar
ô 93
8 92 -- --
i BHW
COVERED FROM TALOQAN VSF. SEE TALOQAN LISTING FOE DETAILS.
VFU with 1
DVi!,
2 paravets & 1 guard providing veterinary services to the whole distric :.
Construction of 70 m retaining wailistone work`?, benefit 30,000 families.
Chah Al)
2 teams - 4 vaccinators
AVICEN.
HEALTH: Vaccination
18 villages
Ongoing
EC/UNICF
MSH
HEALTH: Compr.Clinic
Chah Ab
Ongoing
AID
4 92 -- --
1 MD,
KSH
HEALTH: Basic Post
Anjeer
Ongoing
AID
9 88 -- --
3 BHWs
MSH
HEALTH: MCH
Chah Ab
Ongoing
AID
1 93 -
i MD,
MSH
HEALTH :' Vaccination
Chah Ab
Ongoing
AID /UN
PRE
AGRIC
Vet
Center
Completed
UNDP
9 91
6 93
VFU with i DVK, 2 paravets & 1 guard providing veterinary services to the whole district.
PRE
AGRIC:
Vet
City
Completed
UNOP
9 91
4 92
1 DVK / 2 paravets.
SCA
AGRIC:
Plant Protec
-
Completed
SCA
0 92 -- 92
Takhar
`
-- -- -- --
--
1 MAILARIA TECH. ASST., i K.T.
1 Nurse -Women / children under 5 care,
COVERED BY TALOQAN VSF.
10 69 -- -
6 ROOMS, IN- PATIENT BEDS, IMMUNIZATION
health education and Dai training program.
SEE TALOQAN LISTING FOR DETAILS.
Provsion of 0.1 MT agrochemicals.
Chal
CBR
CONST:
Pub.Building
Chal
Approved
WHO
-- 93, -- --
MSH
HEALTH: Basic Clinic
Chal
Ongoing
AID
8 90 -- --
A C B A R
1 4TH YR NED.STUDENT,
Basic health center concrete (4 rooms).
1 MED. STUDENT 3RD YR.. 2 MED. TECH., i DENTAL TECH. ASST.
DATABASE OF NGO ACTIVITIES
Page: 245
A6actrep Date: 27/08/93
1
i NURSE
HELPER
3 ROOKS. DENTAL
6TH EDITION
I
ACTIVITY
AGENCI
SECTOR
VILLAGES) - - --
FUNDED
-- STATUS --
DURATION
- --BY --
Begin --End
<ACTIVITI
DESCRIPTION>
MSH
HEALTH: Basic Post
Bazar Saye
Ongoing
AID
11 88 -- --
2 BHÜE
MSH
HEALTH: Vaccination
Chal
Ongoing
AID /UN
10 89 -- --
COVERED FROM TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.
Takhar
Darqad
MSH
HEALTH: Basic Clinic
Qarah Taipa Afhgan
Ongoing
AID
9 91 -- --
i NURSE, i MED. TECH.
MSH
HEALTH: Basic Poet
Darqad
Ongoing
AID
9 91 -- --
1 BHW
MSH
HEALTH: Vaccination
Darqad
Ongoing
Takhar
.
AID /UN
10 89 -- --
COVERED BY TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.
2 teams - 4 vaccinators
Eshkamesh
AVICEN
HEALTH: Vaccination
CBR
CONST:
CBR
CONST:
MSH
19 villages
Ongoing
EC /UNICF
--
Pub.Building
Center
Discontin
WHO
-- 92 --
Pub.Building
Eshkamesh
Discontin
ARCON
-- 92 -- --
HEALTH: Distrct Hosp
Eshkamesh
Ongoing
AID
8 90
-
,--
--
Comprehensive health center (17 roes).
Concrete middle school for 600 students.
1 MD / i BHW / i admin / 1 X -ray tech / 1 dental tech assistant / 1 anaestheeia tech assistant / 2 nurses / 1 lab
tech assistant - 9 rooms 15 beds ! X -ray / dental i surgery i lab / OPD & immunization.
MSH
HEALTH: Basic Post
Teer Sak Chaim
Ongoing
AID
MSH
HEALTH :, Vaccination
Eshkamesh
Ongoing
AID /UN
RBS
SOCIAL:Animation
Ongoing
RBS
1 93 -- --
Training of social animators.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
1 85 -- --
3 mid -level HWs.
UNO
EDUCAT: Primary
Ongoing
AID
8 87
VITA
WATER:
Ongoing
AID
10 91 -- --
Cleaning of 7 ka canai, benefit 250 families.
Destroyed 32 devices, cleared 17594 Sqa hill side.
Takhar
Canal
Bangi
Dara-e-lalan
4 89 -- --
10 89 -- --
-- --
6 BHWs
COVERED FROM TALOQAN VSF.
SEE TALOQAN LISTING FOR DETAILS.i
7 schools in Saiab Bangi, Fakhrak, Alockak, Eokabelaq(2), Lhanaga Chal & Sar Bazar villages.
Farkhar
ATC
MINES:
Clearance
Chashama Shir Fark
Completed
UNOCHA
12 91
CBR
CONST:
Pub.Building
Center
Discontin
ARCON
-- 92 -- --
One 15 bed hospital annexed with mosque.
MSH
HEALTH: Basic Post
Wardak
Ongoing
AID
11 88 -- --
10 BHW
'ACBAR
3 92
DATABASE OF AGO ACTIVITIES
6TH EDITION
4
Page: 246
A6actrep Date: 27/08/93
ACTIVITY
AGENCY
SECTOR
VILLAGE(S) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
< ACTIVITY
DESCRIPTION
Farkhar
Takhar
Eh
HEALTH: Vaccination
PEE
AGRIC:
PRE
COVERED FROM TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.i
Farkhar
Ongoing
AID /UN
10 89 -- --
Fruit Trees
City
Completed
SEN
10 91
3 94
Nursery of fruit trees - distribution to farmers.
AGRIC:
Vet
City
Completed
UNDP
9 91
4 92
Sub- clinic - i paravet.
PEE
AGRIC:
Research
Public Gardan
Completed
SEN
5 91 10 92
.PRE
AGRIC:
Plant Protec
Shoor / Tagab
Completed
SEN
6 91
PRE
CONST:
Bridge
Tangi Farkhar
Completed
UNDP
8 91 12 91
Rehabilitation of a bridge near Tangi Farkhar - cement & steel oar.
PRE
WATER:
Canal
Sang Atish
Completed
SOLAF
8 90 11 90
Cleaning of 8 k' canal & reconstruction of 51 t intake & retaining wall.
Ongoing
RBS
10 91 -- --
Training of physiotherapy technicians.
7 91
Research on potatoes (local variety) & 3 varieties of local bean (2 kg fro' each).
Provision of 50 kg agrochemical to 50 farmers in 2 villages.
.ES
HEALTH: Other
RES,
HEALTH: Other
--
Ongoing
RES
10 91 -- --
Physiotherapy services.
RBS
SOCIAL:Animation
--
Ongoing
RBS
10 91 -- --
Training of social animators.
SCA
AGRIC:
Crop Product
--
Completed
SCA
O 92 -- 92
Distribution of 4 MT wheat seed & 4 MT DAP.
3CA
AGRIC:
Research
--
Ongoing
SCA
0 92 -- 93
3 crops variety testing trial of wheat, barley & triticaie.
SCA
AGRIC:
Plant Proteo
--
Completed
SCA
0 92 -- 92
Provision of 0.14 MT agrochemicals.
SCA
AGRIC:
Plant Proteo
--
Ongoing
SCA
0 93 -
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92'
Agriculture survey on 76 villages.
SCA
AGRIC:
Other
--
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
SCA
EDUCAT: Primary
Farkhar
Ongoing
SCA
10 85 -- --
SCA
HEALTH: Coepr.Clinic
Center
Ongoing
SCA
1 85 -- --
SCA
HEALTH: Basic Clinic
Tagab Chap
Ongoing
SCA
-- -- -
TRC
CONST:
Farkhar
Completed
CIDA
-- 91 -- 92
Reconstruction of road.
TRC
INCOME: Other
Farkhar
Ongoing
CIDA
-- 92 -- 93
Income generation project.
TRC
WATER:
Abdara
Ongoing
CIDA
-- 92 -- 93
Irrigation rehabilitation project.
IACBAR
Road
Canal
93
16 schools / 87 teachers / 2010 students
2 MD / 7'id -level Hils.
2 mid -level HWs.
-
DATABASE OF NGO ACTIVITIES
Page:
247
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin - -End
< ACTIVITY
DESCRIPTION>
UNO
DUCAT: Primary
--
Ongoing
AID
7
VITA
WATER:
tondal
Ongoing
AID
8 92
--
--
Construction of 200 m retaining vall(stone work). benefit 250 families.
Completed
ODA /RAP
8 92
7
93
Seed distribution / multiplication / trials & ag extension in Zardalu Dara / Aq Bolaq / Choghul / Sar Asyab /
Takhar
A -AID
AGRIC:
FloodControl
87 -- --
7 schools in Lan Shahr, Mastan, Ardishpan, Shahr Farghar, /akin & Hanaoy villages.
Kalafgan
Crop Product
--
Sarkragh.
A -AID
A -AID
AGRIC:
Crop Product
WATER:
Structure
ATC
MINES:
Clearance
AVICEN
HEALTH: Vaccination
CBE
CONST:
Pub.Building
MCPA
MINES:
Survey
MSH
HEALTH: Basic Clinic
--
Completed
AID
CompietedODA /RA.P
3 villages
7
90 12 90
Distribution of 0.033 MT improved seed / 6.55 MT laimi seed i 0.033 MT DAP i 0.05 MT Urea to 132 families.
8
92
Construction of aqueduct to irrigate 600 ha. land in Zardaul Dara / Aq Bolaq / Choghul / Sar Asyab & Sarkragh.
7 93
Completed
UNOCHA
12 91
Approved
EC/UNICF
-- 93 -- --
1 team - 2 vaccinators
Ealafgan
Diecontin
ARCON
-- 92 -- --
Concrete middle school for 600 students.
2 minefields
Completed
UNOCHA
1
92
Ealafgan
Ongoing
AID
1
88 -- --
6
1
92
Destroyed 145 devices, cleared 41192 Sqm agri.land & village.
22,849 sqm agri.land.
92
3 MED.TBCH., 1 MED.STUDENT 3RD TR, 1 DENTAL TICE ASST., 1 BHW
CROONS, 3 BIDS, DENTAL
MSH
HEALTH: Basic Post
Sar Asiyab
Ongoing
AID
11 88 -- --
MSH
HEALTH: Vaccination
talafgan
Ongoing
AID /UN
10 89 -- --
Ongoing
AID
3 88 -- --
4 schools in Zardalo Dara Sufis. Gaziztan, Sarak Bala & Zardalo Ulia villages.
Distribution of 0.99 MT improved seed / 3 MT laimi seed / 0.99 MT DAP / 1.5 MT Urea to 90 families.
UNO
EDUCAS: Primary
Takhar
i BHW
COVERED BY TALOQAN VSF.
SEE TALOQAN LISTING FOR DETAILS.
Khwajaghar
AGRIC:
Crop Product
Completed
AID
7 90 12 9v
AGRIC:
Crop Product
Completed
ODA /RAP
8 92
WATER:
FloodGontrol
--
Completed
ODA /RAP
8
92
7
93
Const.of flood protection ret.wall on Sharowan canal to protect canal from flash floods. Canals irrigates 500 ha.
MCPA
MINIS:
Survey
2 minefielda
Completed
UNOCHA
1
92
1
92
3,119,63 5qm agri. land.
MSH
HEALTH: Basic Clinic
Ihwajaghar
Ongoing
AID
8 89 -- --
HEALTH: Basic Post
Hazer Bagh Qezel S
Ongoing
AID
A -AID
A -AID
A -AID
MSH
I
A C B A R
7 93
11 87 --
--
Seed distribution / multiplication / trial & ag extension in &czar Bagh / lazal Qua / Qechlaq / Qeshiaq Abdul Haq.
3 MED. TECH., i MED. STUDENT 3RD YR, i DENTAL TECH. ASST.
3 ROOMS, DENTAL
4 BHWa
DATABASE OF NGO ACTIVITIES
Page: 248
A6actrep Date: 27/08/93
6TH EDITION l
ACTIVITY
AGENCY
SECTOR
VILLAGES) - - --
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Khwajaghar
Takhar
MSH
HEALTH: MCH
Khwajaghar
Ongoing
AID
MSH
HEALTH: Vaccination
Khwajaghar
Ongoing
AID/UN
PRE
AGRIC:
Vet
City
Completed
UNDP
9 91
4 92
1 DVM / 2 paravets.
PRB
AGRIC:
Vet
Spinzer Club
Completed
UNDP
10 91
6 93
VFU with 1 DVM, 2 paravets & i guard providing veterinary services to the whole
PRB
CONST:
Road
Several villages
Completed
ARCON
5 92 12 92
Reconstruction of 50 kg road between Talogan - Ehoja Char & construction_ of 7 culverts &400 m retaining wall.
PRB
CONST:
Pub.Building
Bazar Bagh
Completed
ARCON
8 92
Boys primary school with 6 rooms / 2 administration rooms
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.19 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.165 MT agrochenicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Sar Rustaq
Completed
UNOCHA
12 91
8 villages
Ongoing
EC/UNICF
-- -- -- --
Rustaq
Approved
WHO
-- 93 -- --
Shari Nay
Ongoing
AID
9 91 -- --
1 93 -- --
10 89 -- --
1 93
2 MD,
Women / children under 5 care; health education and Dal training programs.
COVERED BY TALOQAN VSF. SEE TALOQAN LISTING FOR DETAILS.
-
district,
brick -masonry i steel bar 4 concrete.
Rustaq
Takhar
Clearance
ATC
MINES:
AVICEN
HEALTH: Vaccination
CBR
CONST:
MSH
HEALTH: Distrct Hoop
Pub.Building
4 92
Destroyed 13 devices, cleared 70590 Sqm road.
Comprehensive health center wooden roof (17 rooms ).
1 SPECIASLIST / 1 MD / 7 MED TECH / 1 BHW / 1 ADMIN / 1 LAB TECH ASST / 4 ROOMS / 6
BEDS / LAB / X -RAY / DENTAL /
SURGERY / IMMUNIZATION.
MSH
'HEALTH: Basic Post
Bar Rustaq
Ongoing
AID
12 88 -- --
MSH
HEALTH: Vaccination
Rustaq
Ongoing
AID/UN
10 89 -
PRB
AGRIC:
Shari Nay
Completed
UNDP
9 92
RBS
SOCIAL:Animation
Ongoing
RBS
i 93 -- --
Training of social animators.
SCA
AGRIC:
Completed
SCA
0 92 -- 92
Agriculture survey on 83 villages.
SCA
HEALTH: Basic Clinic
Ongoing
SCA
1 85 -- --
2 nid -level HWs.
1 A C B A R
Vet
Other
Cha lab
--
6 93
8 BHWs
COVERED FROM TALOQAN VSF. SEE TALOQAN FOR DETAILS. i
VFU with 1 DVM, 2 paravets & I guard providing veterinary services to the whole district.
DATABASE OF NGO ACTIVITIES
Page: 249
A6actrep Date: 27/08/93
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
FUNDED
-- STATUS --
- --BY --
DURATION
(ACTIVITY
Begin- -End
DESCRIPTION>
Takhar
Takhar
Ongoing
SCA
0 93 -- 93
Distribution of 0.24 MT rice seed.
Research
Completed
SCA
0 92 -- 92
3 crops variety testing trials of wheat, barley & triticale.
AGRIC:
Research
Ongoing
SCA
0 93 -- 93
1 crop variety testing trial of dry bean, 2 of rice & 7 of wheat.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.15 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.165 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
SCA
WATER:
Drinking
Ongoing
SCA
1 93 12 93
Wells - benefit 4.000 families.
Completed
AID
10 91 11 91
SCA
AGRIC:
Crop Product
SCA
AGRIC:
SCA
Takhar
A -AID
AGRIO:
--
Center
Talogan
Crop Product
--
Multiplication of 1.05MT improved seed / 2.25MT fert. - Qulours, 1.93 MT Apr. seed / 3.13 MT fert. - Chaehma Shit &
0.91 MT impr. seed / 1.95 MT fert.
A -AID
AGRIC:
Crop Product
A -AID
AGRIC:
Crop Product
--
Completed
AID
7 90 12 90
Completed
ODA /RAP
8 92
7 93
Distribution of 39.93 MT improved seed / 20.4 MT lalti seed / 60.5 MT Urea / 39.93 MT DAP to 1,610 families.
Seed distribution I multiplication / trial & ag extension in Okhund Zada / Mangali / Wakil Tora / Baji Nur /Jalali /
Hai i Mohd Husain.
A -AID
AGRIC:
Crop Product
A -AID
AGRIC:
A -AID
Khetayan
7 93
Completed
ODA
8 92
Machinery
Ongoing
AID
7 90 -- --
1 tractor.
AGRIC:
Research
Completed
AID
9 91 10 91
4 seed trial blocks - 12.48 kg improved seed / 17.86 kg Urea / 12.48 kg DAP.
A -AID
WATER:
Canal
Ongoing
ODA /RAP
8 92 -- --
Const.of Sharowan canal ret.wall to increase water flow to areas in north ?slogan & Ihwaja Ghar suff.for 2,000 ha.
A -AID
WATER:
Structure
Completed
ODA
10 91 11 91
Cons.of spillways in Shekhali / Qarando / Bagh Mir - irrigate 7,500 & benefit 750 families.
A -AID
WATER:
Structure
Completed
AID
10 90 12 90
2 ret.walle, Ratak Frosh(104m- irr.13,000 J.
Ratak Froshi /Majir
.
Seed distribution / multiplication i triais & agriculture extension.
/ benefit 3500 fat.), Majir Qeshlag (991- irr.30,000 J. / benefit 8,000
fat.)- gabion.
A -AID
WATER:
Structure
Ihoeti Sheratu
Ongoing
ODA
8 92 11 92
A -AID
WATER:
FloodControl
Ihetayan
Completed
ODA
8 92
7 93
Construction of flood protection groynes to protect main road & 100 hectares of land.
A -AID
WATER:
FloodControl
--
Completed
ODA/RAP
8 92
7 93
Construction of flood protection groynes on Taïogan River to protect Naahre Said canal which irrigates 2,000 ha.
HEAR
Construction Of a retaining wall on Dorahi River to protect village of 100 households.
DATABASE OF NGO ACTIVITIES
6TH EDITION
I
Page: 250
A6actrep Date: 27/08/93
VILLAGES) - - --
SECTOR
AGENCY
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin--End
<ACTIVITY
DESCRIPTION>
Talogan
Takhar
Construction of flood protection groynes on Taiogan River to protect village of 50 households.
8 92 -- --
E-AID
WATER:
FloodControl
Qarandu
Ongoing
ODA
ARA
AGRIC
Fruit Trees
City
Ongoing
ARCON
10 91 -- --
ARCON
CONST:
Shelter
Ongoing
ARCON
--
ATC
MIKES:
Clearance
Chashma Sher Bagaz
Completed
UNOCHA
AV'ICEN
HEALTH: Vaccination
113 villages
Ongoing
EC/UNICF
-- --
CBR
WATER:
Canal
Talogan City
Completed
RAP
-- 92 -- 93
JCE
CONST:
Pub.Building
Center
Discontin
ARGON
1 92 12 92
Construction of madrasa (brich i wood).
MCP,.
MINES:
Survey
3 minefields
Completed
UNOCHA
1 91
18,667 Su agri. land.
MSS
HEALTH: Provinc.Hosp
Taiogan
Ongoing
AID
8 89 -- --
f
apple
plue % grape) - 25 jeribs.
Destroyed 1533 devices, cleared 208521 So agri.ïand / village & hill side.
--
91
walnut
Bricks factory
3 92 10 92
1
Nurseries of 600,000 fruit trees (peach i apricot
2 teams - 4 vaccinators
Cleaning of 6 canals benefit 3430 families.
8 MD INCL.2 SPECIALISTS
i PHARMACIST ! 8 NURSE & NURSE HELPERS / 4 LAB i ANAESTHESIA / BLOOD BANK /
2 ADMIN.
X-RAY/MALARIA TECH ; 2 DENTAL TECH ASST. 18 MED TECH / 44 ROOMS, 40 BEDS,. SURGICAL(INC. ORTHOPAEDIC) I DENTAL 1 OPD /
LAB
X -RAY / BLOOD BANK I PHARMACY
1"
TB CONTROL PROGRAM.
MSH
HEALTH: Basic Poet
Takhta Eabruk
Ongoing
AID
11 87 -- --
20 BHWs
MSH
HEALTH: MCH
Talogan
Ongoing
AID
10 91 -- --
2 MDs, 3 Nurses; 3 Rooms; women/children under 5 care; health education,
Voluntary Health Sister (VHS) and Dai
training programs.
MSH
HEALTH: Med.Training
Taiogan
Ongoing
AID
6 88 -- --
Trained 175 BHWs (3 months initial course), 80 BHWs refresher training, 120 health workers participated in hanagement
&
MSH
HEALTH: Vaccination
Talogan
Ongoing
AID /UN
10 89 -- --
PHC seminars & workshops.
41 VACCINATORS (7 ADDITIONAL VACCINATORS PLANNED TO BE HIRED), 1 COLD CHAIN SUPERVISOR, 3 COLD CHAIN TECHNICIANS
OPERATE UNDER THE SUPERVISION OF AN MD DOCTOR OUT OF THE VACCINE STORAGE FACILITY (VSF) IN TALOQAN COVERING 451
VILLAGES IN 20 DISTRICTS OF TAlHAR, BAGHLAN AND EUNDUZ PROVINCES.
MSH
HEALTH: Other.
Talogan
Ongoing
AID
8 90 -- --
TARGET GROUPS: CHILDREN 0 -2 YRS, WOMEN 5 -45 IRS.
Regional Health Administration (RHA) administrative center and depot for issue of supplies and salaries and
supervision and monitoring of the BHWs and health facilities under its jurisdiction.
1 93
PRB
AGRIC;
Crop Product
Bagh Zakhira
Completed
RAP
5 92
PRE
AGRIC:
Crop Product
Agricultural Farm
Completed
UNDP
5 91 12 92
PRB
AGRIC:
Crop Product
Ehetayan
Completed
SEN
PRE
AGRIC:
Vet
City
Ongoing
UNDP
CHAR
10 91 11 91
8 91 -- --
Establishment of rice -seed multiplication &
demonstration fare & then distributed to 89 farmers.
Multiplication of 100 kg rice seed(Basmati 385) to be distr.to farmers; Research on 3 varieties of local cotton.
Distribution of 300 kg DAP & Urea to 100 farmer.
1 DVM
:'
3 paravets.
DATABASE OF NGO ACTIVITIES
Page: 251
A6actrep Date: 27/08/93
6TH EDITION I
ACTIVITY
AGENCY
SECTOR
Takha4r
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
Begin --End
tACTIVITY
DESCRIPTION>
Talogan
PRE
AGRIC:
Vet
Center
Completed
UNDP
9 91
PRE
AGRIC:
Livestock
Spinzar Farm
Ongoing
SEN
5 91 -- --
AGRIC:
Training
City
Approved
UNDP
-- 93 -- --
Completed
UNDP
8 91 12 92
Rehabilitation of Talogan- Farkhar road (45 km) + construction of 3 culverts.
Completed
ARCON
5 92 11 92
Reconstruction of 33 km road resurfaced out 59 km road between Talogan - lushes. Construction of 21 culverts & 400 m
retaining wall & 5 washes.
Completed
ARCON
5 92 ii 92
Repair of Talogan- Eeshim road (35 km) + construction of 7 culverts & 5 washes with stone & steel bar.
PRE
PRE
PRE
PRE
PRE
CONST:
Road
COST:
Road
CONST:
Road
CONST:
Several villages
6 93
VFU with 1 DVM, 2 paravets & 1 guard providing veterinary services to the whole district.
Dairy farm (20 local cows) - income generation project.
Training 20 people in extension work for 60 months.
Pub.Building
City
Completed
UNDP
8 91 10 91
Vet. clinic building - cement & other local materials.
Structure
Namak Froshi
Completed
SEN
8 91 10 91
Reconstruction of 20 m intake along the Shahrawan canal.
HEALTH: Other
Ongoing
RES
6 91 -- --
Training of physiotherapy technicians.
HEALTH: Other
Ongoing
RES
6 91 -- --
Physiotherapy services.
RBS
SOCIAL:Anìmation
Ongoing
RBS
6 91 --
Training of social animators.
SCA
EDUCAT: Primary
Talogan
Ongoing
SCA
10 89 -- --
SCA
EDUCAT: Management
Talogan
Approved
SCA
9 93 -- --
SCA
EDUCAT: Teacher T.
Talogan
Ongoing
SCA
12 92 -- --
SCA
HEALTH: Basic Clinic
Jangawar (Dorahi)
Ongoing
SCA
1 89 -- --
6 mid -level HWs / 2 Nurse i 1 Dental Tech.
HEALTH: Basic Clinic
Nahri Chaman
Ongoing
SCA
1 85 -- --
4 mid -level HWs.
HEALTH: Basic Clinic
Namakab
Ongoing
SCA
1 85
4 mid -level HWs.
HEALTH: Other
City
Ongoing
*Donors
CONST:
Road
Chashma Sher
Ongoing
AID
7 92 -- --
WATER:
Canal
Mucha Ebene
Discontin
AID
10 91 -- --
WATER:
FloodControl
Zargari
Ongoing
AID
6 92 -- --
PRE
RES
RES
SCA
SCA
SERVE
VITA
VITA
VITA
WATER:
A C H A R
7 schools
7 days / 60 headmasters
3 months i 60 teachers
--
10 91 -- --
44 teachers ! 1485 students
Consultancy with SCA I DAP for blind rehabilitation - Field teams.
Rehabilitation of 8.5 km road, benefit 427 families.
Cleaning of 6 km canal, benefit 250 families.
Construction of 300 m retaining walitetone work), benefit 2,857 families.
DATABASE OF NGO ACTIVITIES
Page: 252
A6actrep Date: 97/06/93
6TH EDITIOIi
I
ACTIVITY
SECTOR
AGENCY
-VILLAGE(S)- ---
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
Warsai
Takhar
6 88
-- --
5 BBWs
M3ú
HEALTH: Basic Post
Batadan
Ongoing
AID
MSH
HEALTH: Vaccination
Warsaj
Ongoing
AID /UN
PRB
WATER:
Trish
Completed
SEN
8 89 10 89
RBS
HEALTH: Other
Ongoing
RBS
10 91 -- --
CBS
HEALTH: Other
Ongoing
RBS
10 91
--
Physiotherapy services.
EBS
SOCIAL:Animation
Ongoing
RBS
10 91 --
--
Training of social animators.
SCA
EDUCAT: Primary
Khanaqa
Ongoing
SCA
10 88 -- --
VITA
CONST:
Warsaj
Ongoing
AID
7
Completed
ODA /RAP
8 92
Canal
Bridge
AGRIC:
.
10 89 --
--
92 -- --
COVERED FROM TALOQAN VSF.
SEE TALOQAN LISTING FOR DETAILS. i
Cleaning 10 ka canal & construction 2 a intake & 3 a water passer.
Training of physiotherapy technicians.
4 schools í 26 teachers
750 students
Construction of 20 a bridge(concrete & masonry), benefit 10,000 families.
Yangi gala
Takhar
A -AID
DESCRIPTION>
Crop Product
--
7 93
Seed distribution / multiplication i trial & ag extension in Afghanya / Kaftar Ali / Alawdin Í Omer Ihel / Hazara /
Tap Dana.
A -AID
AGRIC:
Crop Product
Safi
Completed
ODA
8 92
7
93
Seed distribution / multiplication / trial & agriculture extension.
A -AID
WATER:
Structure
--
Completed
ODA /RAP
8
92
7
93
Offtake on Oser Ihel / Kaftar Ali canal to irr.1,400 ha in Afghaya / Kaftar Ali / Alawdin / Omer Ihel / Hazara / Top
Ihana.
8 92
93
Constrution of flood protection retaining wall to protect village of 50 households, & 120 ha of ag. land.
Safi
Completed
ODA
HEALTH: Vaccination
21 villages
Ongoing
EC/UN1CF
MSH
HEALTH: Coapr.Clinic
Khwaja Bahawoodin
Ongoing
AID
M3R
HEALTH: basic Post
Baish Kapa
Ongoing
AID
11 87 --
MSH
HEALTH: Vaccination
Yangi Pala
Ongoing
AID/UN
10 89 -- --
PRE
AGRIC:
Vet
City
Completed
UNDP
9 91
4
92
1 DVM i 2 paravets.
PTE
AGRIC:
Vet
Center
Completed
UNDP
9 92
6
93
VFU with 1 DVM, 2 paravets & 1 guard providing veterinary services to the whole district.
PRE.
AGRIC:
Vet
Center
Completed
UNDP
9 92
6
93
VFU functioning with 3 paravets to provide veterinary services to the whole district.
A -AID
WATER:
AVICEN
1ACBAR
FloodControl
.
7
-- -- -- --
9 91
-- --
--
1 team - 2 vaccinators
1 MD, 1 MED. TECH.i
'5 BBWs
COVERED BY TALOQAN VSF.
SEE TALOQAN LISTING FOR DETAILS.
DATABASE OF NGO ACTIVITIES
Page: 253
A6actrep Date: 27!08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Wardak
AB
CONST:
AB
ACRD
- - -- VILLAGES ? - ---
-- STATUS --
FUNDED
DURATION
- - -BY --
Begin - -End
<ACTIVITY
DESCRIPTION>
Chak
Road
Goda
Completed
UNDP
10 91
8 92
Reconstruction of 5 km secondary road.
RELIEF:Food Items
Chak
Completed
WFP
-- --
7 91
Free distribution of 200 MT wheat to 200 families.
HEALTH: Basic Clinic
Berana
Ongoing
ASDAA
-- 85 -- --
BHU with consultation & dressing facilities.
Ongoing
UNDP
-- 92 -- --
For details see in ACRD karez rehabilitation project in Jaghatu.
ACED
WATER:
Earez
AFEANE
AGRIC:
Research
Chak
Ongoing
RAP
10 93 -- --
Variety & agronomical triais to know good variety & proper use of fertilizer & degonstration plots.
CONST:
Pub.Building
Sewak
Completed
WHO
10 90 11 92
Construction of BHU building & running cost for 1 year (1 mid -level HW i 1 BHW - OPD & first aid covering 10,000
AHD3
people.
CONST:
Pub.Building
ARGON
AGRIC:
Livestock
ARCCN
AGRIC:
Machinery
ARCON
CONST:
Pub.Building
ARCON
CONST:
ARCON
CONST:
ARGON
ARE
AP-WO
ARE
--
Completed
WFP
Ongoing
ARCON
Ongoing
ARGON
Langar
Ongoing
ARCON
Pub.Building
Bomba.
Ongoing
ARGON
Pub.Building
Bombai
tng_ :ng
ARCON
-- -- -- --
Construction of Chak mosqúe.
DUCAT: Madrasa
Bombai
Ongoing
ARGON
-- -- -- --
Abdulïah Bin Abbas Dar Hoffaz.
CONST:
Road
Eawtara -Sewak
Completed
UNDP
7 92 10 92
CONST:
Road
Sawak
Completed
UNDP
10 91 -- --
Repair of 5 km of Angur Ada - Bamyan road (Faffar - Baal - 3 culverts / 13 washes.
-- -- -- --
2 teams - 4 vaccinators
-
6 91 10 91
Cows farm
--
-
301 vi rages
Ongoing
EC /UNICE
AVICEN
HEALTH: Other
Chak
Ongoing
EC
DCA
AGRIC:
Vet
Nowker Ehe1
Ongoing
UNLF
89 --
DCA
AGRIC:
Vet
Shahbaz Khan
Ongoing
UNDP
4 91 --
Vet
Shaly
Ongoing
UNDP
4 89 -- --
CBAR
Construction of Langar school.
Construction of Bombai school.
HEALTH: Vaccination
AGRIC:
Machinery for agriculture.
-- -- --
AVICEN
DCA
Construction of mosque & madrasa building (FFW!.
Rehabilitation of 5 km road i 13 washes & 3 culverts.
1 'V3F & 1 CC technician
1 vaccinator.
1 paravet.
-
1 paravet.
DATABASE OF NGO ACTIVITIES
Page:
254
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Wardak
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Chak
DCA
AGRIC:
Vet
Churak Ihel
Ongoing
UNDP
4 89 -- --
1 paravet.
DCA
AGRIC:
Vet
Berane
Ongoing
UNDP
9 90 -- --
Central clinic with 1 veterinarian & i paravet.
ESA&
CONST:
Road
Ongoing
UNDP
10 91 -- --
GAC
HEALTH: Distrct Hop
Bombai
Ongoing
EC /IRC
:üü
HEALTH: Mobile/ F -Aid
Shaikhabad
Ongoing
ICRC
-- 92 -- --
LDI
HEALTH: Compr.Ciinic
Goda Bahadur
Ongoing
LDI
--
LDI
HEALTH: Basic Clinic
China
Ongoing
LDI
1 mid-level HW -OPD.
MAI
EDUCAT: Primary
Ongoing
MAI
6 school: in Lwaï, Tangi Maiden, Marc. 2hûl, Barbai & Abguzar vi iages.
MSH
HEALTH: Basic Post
Alah Sang
Ongoing
_AID
MSH
HEALTH: MCH
Sia Ab
Ongoing
Al
MSH
HEALTH: Med.Training
Bedarf
Completed
AID
9 84 -- --
-- --
Repairing of 5 km of Angur Ada - Bamyan road / Levelling & work on structures completed.
12 bed hospital - 4 MD 18 mid -level Hiss / 2 tech - OT 13 -ray / lab r dental service
First Aid / Dispensary.
i MD /1 mid -level HWs l 1
8 87
9 BMWs
C 93 -- --
2 MD,
10 90
3 93
80 pts. OPD I day.
lab tech. - OPD I lab i dental service.
1 5th Yr Med, Student
Women / children under 5 care,
health education and Dai training programs.
12 BHWs trained in initiai 3 months course, 15 health workers received refresher (in- service) training, 20 RHOs
received field related training.
RES
HEALTH: Other
Ongoing
RBS
9 91 -- --
Training of physiotherapy technicians.
RBS
HEALTH: Other
Ongoing
RBS
9 91 -- --
Physiotherapy services.
RES
SOCIAL:Animation
Ongoing
RBS
9 91 -- --
Training of social animators.
RDA
AGRIC:
Livestock
Completed
UNDP
RDA
WATER:
garez
Ongoing
WFP
6 93
8 93
Rehabilitation of 94,600 linear M karez - benefit 288 farming families.
RDA
WATER:
garez
Ongoing
WFP
6 93
8 93
Rehabilitation of 6,267 linear M karez - benefit 196 farming families.
SCP,
AGRIC:
Crop Product
Ongoing
SCA
0 53 -- 93
Distribution of 57.75 MT wheat seed.
SCA
AGRIC:
Research
Completed
SCA
0 92 -- 92
11 crops variety testing trials of wheat, barley & triticale.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.175 MT agrochericals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.455 MT agrochemicals.
sACBAk
10 91 12 92
DATABASE OF NGO ACTIVITIES
Page: 255
A6actrep Date: 27/08/93
6TH EDITION
AGENCY
SECTOR
Wardak
-VILLAGES) - - --
ACTIVITY
FUNDED
-- STATUS-
-BI --
DURATION
< ACTIVITY
Begin -- End
DESCRIPTION>
Chak
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 60 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 88 villages.
SCA
CONST:
Pub.Building
5 villages
Ongoing
SCA
1 93 12 93
Construction of primary schools.
SCA
EDUCAT: Primary
Bedarf
Ongoing
SCA
10 84 -- --
SCA
HEALTH: Compr.Clinic
Shah blander
Ongoing
SCA
--
SCA
HEALTH: Compr.Clinic
Naikpaykool
Ongoing
SCA
5 88 -- --
SCP.
HEALTH: Compr.Clinic
Araban
Ongoing
SCA
--
i MD
11 mid-level HWs
SCA
HEALTH: Compr.Clinic
Ahmad Ehei
Ongoing
SCA
12 88 -- --
1 MD
5 mid -level HWs.
SCP.
HEALTH: Basic Clinic
Sewak
Ongoing
SCA
10 89 -- --
11 mid -level HWs / 2 Nurses
SCA
HEALTH: Basic Clinic
Lowar
Ongoing
SCA
11 88 -- --
7 mid -level HWs / 1 Dental Tech.
SCA
HEALTH: Basic Clinic
Shaikh Yasin
Ongoing
SCA
4 89 -- --
SCA
HEALTH:. Basic Clinic
Salar
Ongoing
SCA
-- -- -- --
SOLAF
AGRIC:
Machinery
13 villages
Ongoing
RAP
2 90 -- --
5 tractors provide services for 2,000 persons.
START
AGRIC:
Crop Product
4 villages
Ongoing
FAO/UNDP
3 93
Improved wheat seed multiplication.
START
AGRIC:
Crop Product
24 villages
Completed
RAP
5 92 11 92
Vegetables rehabilitation in 24 villages.
UNO
EDUCAT: Primary
Ongoing
AID
6 87 -- --
14 schools in different villages.
VITA
CONST:
Road
Eeboufar
Completed
AID
-- -- 10 92
VITA
CONST:
Road
Boon
Ongoing
AID
6 92 -- --
Rehabilitation of 145 km road from Boon to Tezak, benefit 25,500 families.
VITA
CONST:
Road
Ganikar
Ongoing
AID
5 92.-- --
Rehabilitation of 15 km road, benefit 12,800 families.
VITA
CONST:
Bridge
Goda Ulia
Ongoing
AID
2 92 -- --
Construction of 19 km bridge (concrete & masonry), benefit 195 families.
VITA
CONST:
Bridge
Zama Ebel
Ongoing
AID
2 92 -- --
Construction of 21 m bridge(concrete & masonry), benefit 320 families.
VITA
WATER:
Canal
Chak
Completed
AID
-- -- 10 92
'ACBAR
9
93
23 schools /160 teachers / 3710 students
1 MD / 9 mid -level HWs / 1 Nurse / i Lab Tech: / 2 Vaccinators
2 MD / 3 mid -level HWs / i Lab Tech.
3 Nurses ; 1 Dental Tech.
/
i Lab Tech. / 1 PHO
10 mid -level HWs / 1 Lab Tech.
10 mid -level HWs / 2 Nurses
Rehabilitation of 10 km road, benefit 13,000 families.
Cleaning of 4.8 km canal, 1800 families.
DATABASE OF NGO ACTIVITIES
Page: 256
A6actrep Date: 27/08/93
6TH EDITION
SECTOR
AGENCY
VILLAGE(S) ----
ACTIVITY
FUNDED
DURATION
-- STATUS -
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Chak
Wardak
VITA
WATER:
Canal
4 villages
Completed
AID
--
-- 10 92
VITA
WATER:
Canal
3 villages
Completed
AID
--
-
VITA
WATER:
Canal
Ginikar Ulia
Completed
AID
-- --
WROR
CONST:
Road
Goda /Omarzai
Completed
UNDP
10 91 10 92
WROR
WATER:
Structure
Ongoing
UNDP
196 villages
Ongoing
EC /UNICF
Wardak
4
Cleaning of 45 ks canal, benefit 85 families.
10 92
Cleaning of 4.3 km canal, benefit 126 families.
11 92
Cleaning of 4.3 km canal, benefit 130 families.
Repair of 5ìm road of Angur Ada- Bamyan road. Levelling has been completed.
Protection against water erosion 1968 su gabion & 363 eu.m stone work).
93 -- --
Day Mirdad
2 teams - 4 vaccinators
AVICEN
HEALTH: Vaccination
DCA
AGRIC:
Vet
Durani
Ongoing
Dutch G.
4
DCA
AGRIC:
Vet
Babak Dorani
Ongoing
Dutch G.
9 91
LDI
HEALTH: Distrct Hosp
Tangi Sayedan
Ongoing
LDI
-- -- -- --
Surgical hospital - 5 MDs / 9 mid -level HWs / B other HWs - OT / X -ray& lab.
MAI
DUCAT: Primary
Rashidia
Ongoing
MAI
-- -- -- --
1 school.
MSH
HEALTH: Basic Post
Dalan
Ongoing
AID
11 88 -
7 BHWs
MSH
HEALTH: Vaccination
Day Mirdad
Ongoing
AID/UN
11 89
-- --
COVERED FROM LAJAB VSF.
RBS
HEALTH: Other
--
Ongoing
RBS
9 91
-- --
Physiotherapy services.
RES
HEALTH: Other
Ongoing
RBS
9
RBS
SOCIAL:Animation
Ongoing
RBS
9 91
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0
93 -- 93
Provision of 0.113 MT agrochemicals.
SCA
AGRIC:
Other
Completed
SCA
0
92 -- 92
Agriculture survey on 3 villages.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
UNO
EDUCAT: Primary
Ongoing
AID
6 87
-- --
Discontin
UNDP/WFP
10 91
7 92
Wardak
ARU
CONST:
A C B A R
-- --
-- --
89 -- --
-- --
91 -
--
--
-- --
.
i paravet.
Central clinic with 1 veterinarian & i vaccinator.
SEE LAJAB /GARDANDEAL LISTING FOR DETAILS.
Training of physiotherapy technicians.
Training of social animators.
Agriculture survey on 50 villages.
7 schools in Dawlat Shah, Miran(2), Lalandar Muka, Babak, Noolfasha & anka villages.
Gardandewal
Road
Behsud
Road repairing.- discontinued because of security.
DATABASE OF NGO ACTIVITIES
Page: 257
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
---- VILLAGE(S' - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin --End
-- -- -- --
<ACTIVITY
DESCRIPTION>
Gardandewal
Wardak
AVICEN
HEALTH: Vaccination
219 villages
Ongoing
ECIUNICF
AV ICEN
HEALTH: Other
Tezak
Ongoing
EC
CCA
CONST:
Road
Dahan -i- Abdula
Completed
UNDP/WFP
10 91 12 92
DCA
AGRIC:
Vet
Dahan- i- Garamabad
Ongoing
Dutch G.
2 92 -- --
Central clinic with 1 advanced paravet & 1 paravet.
DCA
AGRIC:
Vet
Dahan- i- Abdara
Ongoing
Dutch G.
4 92 -- --
3 paravets.
LEPCO
HEALTH: Other
Chakhakoor
Ongoing
Germany
MSH
HEALTH: Distrct Hosp
Eule Ehish
Ongoing
AID
'
4 teams - 8 vaccinatora
l VSF i 1 CC technician & 1 supervisor
--
12 90 -- --
5 km of Banyan - Pakteka road i 15 culverts & 392 cub.m retaining wail.
Leprosy control centers / provides care for general patients / i lab technician & 1 field assistant.
1 MD i 1 NURSE i 1 ADMIN.
i
1 MED.TECH.
i
í X -RAY TECH.ASST r" 1 LAB TECH ASS! / 15 ROOMS i IN- PATIENT BEDS / X -RAY /
LAB i IMMUNIZATION.
MSH
HEALTH: Basic Clinic
Abdul thaleq
Ongoing
AID
MSH
HEALTH: Basic Clinic
Abdul thaieq
Ongoing
AID
.
7 91 -- -
2 MED. TECH.
4 89 -- --
1 doctor assistant, 2 nurses, i dentist -Mir., 1 lab tech. assistant - 2 Rrroms, dental services, immunization &
IMMUNIZATION
laboratory.
IISH
HEALTH: Basic Clinic
Vardan Dewar
Ongoing
AID
9 91 -- --
MSH
HEALTH: Basic Post
Tezak
Ongoing
AID
10 91 -- --
UNO
EDUCAT: Primary
Ongoing
AID
4 87 -- --
3 MED. TECH. i
2 BHWs
9 schools in Sabz Darakht, Daban Garab, Sia Buta, Zajoi; iawl Ehesh2), Ab Nugra, Dahan Sia Sang & Daban Hesar
villages.
VIT
Vtr,
CONST:
Wardak
Road
Abi Nuqra
Discontin
AID
11 91 -- --
Rehabilitation of 65 km road, benefit 10,000 families.
Approved
IRCiRPA
--
--
Cleaning of 24 karezes for 300 jeribs land.
-- --
Multiplication of 0.5 MT barley &-5 MT DAP.
JaBhatu
AB
WATER:
tarez
ACRD
AGRIC:
Crop Product
Ongoing
FAO
--. 92
ACRD
AGRIC:
Crop Product
Ongoing
FAO
-- 92 -- 93
Multiplication of 3 MT PS -85 & 1.5 MT Faisalabad -85 wheat seed.
ACRD
AGRIC:
Crop Product
Completed
FAO
11 91 -.- 92
Distribution of 5 MT Pak -81 i 2 MT Blue Silver i 100 kg Faisalabad -85 i 8 MT DAP i 8 MT Urea to be done in the next
Jaghatu
Spina Lila
spring.
ACRD
AGRIC:
ACBAR
Fruit Trees
Ongoing
UNDP
Orchard rehabilitation & setting up .fruit tree nurseries in 5 jeribs.
DATABASE OF NGO ACTIVITIES
6TH EDITION
ACTIVITY
SECTOR
AGENCY
AGRIC:
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jaghatu
Wardak
ACRD
VILLAGEIS) - - --
Fruit Trees
Spina Tala
Completed
FAO
8 90 11 90
Distrib.of 15,000 fruit trees (apple i almond / peacn
plus i apricot) to 75 villages in Jaghatu & 5 in Chak /
Sayedabad / Daymirdad.
ACRD
AGRIC:
Fruit Trees
Spina Bala
Completed
ACED
2
91 --
92
non -fruit nursery(15 jeribs) -over 100.000 seedlings capacity - diff.seeds of peaches r almond 1 apricot í
Fruit
apple.
ACRD
AGRIC:
Fruit Trees
Spina Kala
Completed
FAO
8 91
ACRD
AGRIC:
Forestry
Gol Mohammad
Completed
ACRD
4 91
5 91
ACED
AGRIC:
Livestock
Shekh Ali
Ongoing
ACRD
8 91
-- --
--
92
12,000 fruit trees (apple) - planted to be distributed next spring.
Plantation of 50,000 paplar cuttings for propagation of species in the centrai regione..
Dairy farm:5 cows / bull- breeding services for vicinity villages. 300 sheep for income gen. i propagation of sheep
population.
ACRD
AGRIC:
Livestock
ACE)
AGRIC:
Livestock
ACRD
AGRIC:
Livestock
Spina Kale
Beber
Ongoing
ACRD
Ongoing
UNDP /Sif
Ongoing
ACED
8.
88 --
--
Bee- keeping project as income generation with a capacity of 120 nives.
Poultry production & distribution with the capacity of 29,000 chickens
6 91 -- --
i
year.
Poultry farm with the capacity of 372 layer ; 100 turkey - an average of Afe. 127,000 is generated from this project
Monthly.
ACRD
AGRIC:
Machinery
Spina Kale
Ongoing
ACED
ACRD
AGRIC:
Plant Protec
Spina tala
Completed
ACRD
-- 84 -- --
5 91
-- --
9 tractors 4 8 threshers / 3 harvesters work at 30% discount from the market rate for the farmers.
289.5 lit.pesticides sprayed in 127 villages. Grafting & budding services are also provided in framework of plant
protection.
ACRD
AGRIC:
Other
ACRD
AGRIC:
Other
ACRD
CONST:
Pub. Building
-
Agriculture rehabilitation..
2
91
Workshop for ag.machinery - 6 tech, (wiring / denting 1 lathing / engine) - also repairs vehicles.
7
87
1 hoop. (12 rooms )-MDM Funds / 1 vet center (6 roofs) -VSF Funds - local materials - 1 workshop (7 rooms) -ACRD Funds -
-- --
Ongoing
RAP
Spina Kale
Completed
ACRD
1
91
Spina Kale
Completed
MDM /VSF
4 84
cement + local mat.
ACRD
HEALTH: Distrct Hosp
Ghar Morgh
Ongoing
ASDAA
-- 84 -- --
20 bed hoop: 25 HWs - X-ray / anaesthesia i dressing / surgery -OT (4 oper. i month
dental / MCH i TB control /
vaccinations.
ACRD
HEALTH: Coapr.Clinic
Kalandeh
Ongoing
ASDAA
-- 83 -- --
ACRD
HEALTH: Mobile /F -Aid
Ialandeh
Ongoing
ASDAA
-- 62 --
--
OPD with tab i dental i NCH services.
TB control: 638TB lab tests conducted in 91. visits Ihwaja Uteri / Baralcat - Ghazni & Jaghatu / Chak / Daymirdad /
Sayedabad -Wardak.
ACRD
RELIEF: Food Items
Ongoing
ACRD
-- 92 -- 93
ACRD
RELIEF :Food Iteae
Ongoing
WFP
--
1 A C B A R
-- --
--
Distribution of 600 MT wheat under cereal bank program.
Distribution of 25 MT wheat.
DATABASE OF NGO ACTIVITIES
Page: 259
A6actrep Date: 27/08/93
6TH EDITION
I
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
DURATION
FUNDED
<ACTIVITY
DESCRIPTION>
- --BY --
Begin- -End
Completed
ACRD
-- 91 -- --
Distribution of 22.8 MT wheat to 100 displaced families of Maidan.
-- STATUS --
Jaghatu
Wardak
Spina Tala
ACRD
RELIEF :Food Items
ACRD
RELIEF:Food Items
Completed
AID
-- 92 -- 93
Distribution of 283.2 MT different food commodities.
ACRD
RELIEF:Non -Food Item
Completed
AID
-- 92 -- 93
Distribution of 17,145 pieces of different clothing.
ACRD
WATER:
tarez
Ongoing
UNDP
-- 92 -- --
Rehabilitation of 80 karezes in Jaghatu / Sayedabad & Chal district.
ACRD
WATER:
larez
Spina Kale
Completed
RAP
6 90
AHDS
CONST:
Pub.Building
Babar Khel
Completed
WHO
8 90 11 92
6 91
Rehabilitation of 81 karezes in 79 villages - irrigate 1,605 hectares land & benefit 2.459 families.
Construction of BHU building & running cost for 1 year (1 mid -level HW / 1 BHW - OPD & first aid covering 5 -6
thousand people).
Ongoing
ARCON
--
Milk cows farm
116 villages
Ongoing
ECt`UNICF
--
1 team -- 3 vaccinators
Vet
Shabihtak
Ongoing
UNDP
12 92 -- --
AGRIC:
Vet
Sadat Khel
Ongoing
UNDP
9 91 -- --
Central clinic with l vet. assistant & 1 paravet,
DCA
AGRIC:
Vet
Sadat Sar Band
Ongoing
UNDP
9 91 -- --
i vaccinator.
EAFO
AGRIC:
Crop Product
43 villages
Ongoing
FAO /UNDP
3 93 -- --
Improved wheat, maize, mungbeans & fertilizer - multiplication.
HAFO
AGRIC:
Fruit Trees
Ongoing
HAFO
-
BAFO
AGRIC:
Livestock
Ongoing
UNDP
-- 91 -- --
Poultry program.
HAFO
NEC: Livestock
Ongoing
HAFO /FAO
-- 90 -- 93
Animal husbandry (15 cows / 15 calves / 5 bulls) & distribution calves each year.
HAFO
AGRIC:
Machinery
Ongoing
FAO /NAC
LDI
HEALTH: Basic Clinic
lalandah
Ongoing
LDI
--
5 mid -level HWs - OPD.
MAI
EDUCAT: Primary
Qlaljina
Ongoing
MAI
--
i school.
MAI
EDUCAT: Primary
Ongoing
MAI
--
12 schools in different villages.
L
$DUCAT: Primary
Ialandeh/Mulah /Dnh
Ongoing
MAI
BEALTH: Basic Post
Sadat Sar Band
Ongoing
AID
Livestock
ARCON
AGRIC:
AVICEN
HEALTH: Vaccination
DCA
AGRIC:
DCA
A Ç B A R
----=----d-
.
-- -- --
1 paravet.
Fruit & vegetable nursery in 2 jeriba (20,000 fruit trees).
2 tractors / 1 thresher & 90 oxen are serving the farmers.
3 schools.
11 87 -- --
13 BHWs
DATABASE OF NGO ACTIVITIES
Page: 260
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
---- VILLAGE(5) - - --
SECTOR
AGENCY
-- STATUS --
DURATION
FUNDED
<ACTIVITY
Begin- -End
- --BY --
DESCRIPTION?
Jaghatu
Wardak
RBS
HEALTH: Other
Ongoing
RBS
9 91 -- --
Training of physiotherapy technicians.
RBS
HEALTH: Other
Ongoing
RBS
9 91 -- --
Physiotherapy services.
RBS
SOCIAL:Animation
Ongoing
RBS
9 91 -- --
Training of social animators.
RDA
AGRIC:
Crop Product
Completed
FAO
5 92
7 92
Multiplication of seed at the cost of Ra. 150,000.
RDA
AGRIC:
Fruit Trees
Completed
FAO
10 91
7 92
10,000 saplings
RDA
RELIEF:Food Items
Completed
WFP
10 91 12 92
Distribution of 168 MT wheat.
WATER:
Karen
Approved
WFP
-- 93 -- --
Rehabilitation of 4,400 linear M karez - benefit 950 farming families.
RDA
RDA
WATER:
Earez
Ongoing
WFP
RDA
WATER:
garez
Completed
UNDP
RDA
WATER:
tarez
Ongoing
WFP
RUM
AGRIC:
Livestock
15 villages
Ongoing
UNDP
RDW
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
Distribution of 0.25 MT wheat seed.
AGRIC:
Crop Product
--
Ongoing
FAO
-- -- -- --
Distribution of 10.7 MT improved wheat seed / 11 MT DAP / 10 MT Urea.
RDW
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.13 MT agrochemical!.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 60 villages.
SCA
EDUCAT: Primary
Aryabi la
Ongoing
SCA
7 87 -- -
10 schools / 60
SCA
HEALTH: Compr.Clinic
Meari ghel
Ongoing
SCA
2 90 -- --
1 MD / 11 mid -level HWe / i Nurse i 1 Lab Tech.
SCA
HEALTH: Compr.Clinic
Gandah Qol
Ongoing
SCA
9 89 -- --
1 MD / 7 mid -level líWs / 1 Nurse / 1 Lab Tech.
SCA
HEALTH: Basic Clinic
Dewalak
Ongoing
SCA
UNO
EDUCAT: Primary
Ongoing
AID
VITA
CONSY:
Ongoing
AID
Road
Jaghatu
Rashidan
7 93
9 93
-- -- -- --
.
Rehabilitation of 20,000 linear M karez - benefit 15.000 families.
Rehabilitation of 1107 linear N karez.
7 93
8 93
Rehabilitation of 20,000 linear M karez - benefit 15,000 families.
4 93
8 93
Distribution of 1,200 chickens, beneficiaries 1000,
teachers / 1409 students
3 mid -level HWs.
3 87 -- --
17 schools in different villages.
Rehabilitation of 35 km road, benefit 9,252 families.
Page: 261
A6actrep Date: 27/08/93
ACTIVITY
AGENCY
SECTOR
Wardak
ADA
AGRIC:
AVICEN
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin - -End
10 81
(ACTIVITY
DBSCRIPTIOK>
Jalrez
21 villages
Completed
FAO!UNDP
HEALTH: Vaccination
54 villages
Ongoing
EC!UNICF
CARE
CONST:
Road
Jairez
Completed
AID &WFP
0
0
0 92
Reconstruction of one Road with the total length 20km including other structures.
CARE
WATER:
Karez
Jairez
Completed
AID &WFP
0
0
0 92
Rehabilitation of 2 Earezes with total length 3km including other activities.
CARE
WATER:
Canal
Jalrez
Completed
AID &WFP
0
0
0 92
Rehabilitation of 14 irrigation canals with total length 35km including other activities.
OCA
AGRIC:
Vet
Siah Petaw
Ongoing
UNDP
5 89 -- --
Central clinic with 1 veterinary assistant & 3 paravets.
DCA
AGRIC:
Vet
Taman Ehei
Ongoing
UNI:
5 89 -- --
1 paravet.
LDI
HEALTH: Basic Clinic
Jairez
Ongoing
iDI
MAI
EDUCAT: Primary
Shah Rokh
Ongoing
MA:
-- -- -- --
MSH
HEALTH: Basic Clinic
Sanglakh
Ongoing
AID
1 90 -- --
MSH
HEALTH: Basic Post
Sarcheshma
Ongoing
AID
10 91 -- --
3 BHWs
MSH
HEALTH: Vaccination
Jairez
Ongoing
AID /UN
11 89 -- --
Covered from lajab VSF.
MWRA
WATER:
Structure
Takana
Completed
CIDA
-- 91 -- 92
Construction of erosion barrier.
NAC
CONST:
Road
Jairez
Completed
NAC
2 91 11 91
Repair of Jalrez -Nerkh road (15 km)
Crop Product
7 92
Distribution of 11.32 MT improved wheat seed / 10.87 MT DAP & 17.66 MT Urea to 275 farmers for multiplication.
1 team - 2 vaccinators
--
1 mid -level HW
1 med. student - OP[.
i school.
2 medical tech - 4 rooms, immunization, Volunteer health Sister (VHS) and dai training.
See Kajab/Gardandewal Listing For Details.
.
SCA
AGRIC:
Plant Proteo
Ongoing
SCA
0 93 -- 93
Provision of 0.18 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
Q 93 -- 93
Agriculture survey on 50 villages.
SCA
EDUCAT: Primary
Sanglakh
Ongoing
SCA
7 88 -- --
9 schools / 55 teachers / 1358 students
SCA
EDUCAT: Primary
Sarcheshma
Ongoing
SCA
7 91 -- --
4 schools / 30 teachers i 868
HEALTH: Basic Clinic
àala Hazratmir
Ongoing
SCA
8 88 -- --
2 nurses, 2 mid -level HWs, 1 lab tech.,
SCA
HEALTH: Basic Clinic
4ewaiat
Ongoing
SCA
5 89 -- --
4 mid-level HWs / 1 Nurse
SCA
HEALTH: Basic Clinic
Sieh Petaw
Ongoing
SCA
11 89 -- --
SOLAF
AGRIC:
8 villages
Ongoing
FAO
3 92 -- --
SCA
-
IACBAE
Crop Product
students
1 PHO
1 Dental Tech. /3 Vaccinators
11 mid -level HWs i 2 Pharmacist
Multiplication of 5 MT seeds & fertilizer.
DATABASE OF NGO ACTIVITIES
Page: 262
A6actrep Date: 27/0B/93
6TH EDITION
M
AGENCY
SECTOR
ACTIVITI
FUNDED
DURATION
-- STATUS --
--BI --
Begin- -End
<ACTIVITI
DESCRIPTION>
Jalrez
Wardak
SOLAF
AGRIC:
Fruit Trees
5 villages
Completed
FAO
12 91
3 92
10,000 fruit trees of two years distributed 80 cm high.
SOLAF
CONST:
Road,
12 villages
Completed
RAP
5 91
8 92
11 km Jalrez to Darsarsi, 35 culverts 1m & 21 - 40 MT cement, sand & gravel, stone steel, wood.
SOLAF
WATER:
Tarez
6 villages
Completed
WFP
7 92 12 92
40 km 600 Jeribs, 5000 persons.
SOLE
WATER:
Canal
8 villages
Completed
WFP
7 92 12 92
20 km - irrigates 1000 Jeribs, benefits 5000 persons.
SOLAF
WATER:
Structure
8 villages
Completed
*Donors
8 92 12 92
3 intakes (20 m each), stone, cement, sand & gravel steel pipe.
SOLAF
WATER:
FioodControl
8 villages
Completed
*Donors
8 92 12 92
Retaining wall, stone, cement sand, gravel & wood 89.17 a length of road, 5000 persons.
0Hù
EDUCAT: Primary
Ongoing
AID
7 87
8 schools in Takana Bala, Iharoti Sufla, Iharoti, Qalacha(2), Takana(Puli Mehrab), Qaïa Naw & Sar Chashma villages.
VITA
CONST:
Discontin
AID
11 90 -- --
Babak /Surchab
Completed
FAO/UNDP
10 91
--
Road
-
Jalrez
--
Rehabilitation of 61 km road from Jalrez to Parsa, benefit 71,428 families.
Markaz Bee.
Warciak
-
VILLAGE(S) - - --
Crop Product
7 92
Distribution of 2.5 MT improved wheat seed / 2.6 MT DAP & 3.9 MT Urea to 50 farmers for multiplication.
ADA
AGRIC:
AVICEN
HEALTH: Vaccination
296 villages
Ongoing
EC/UNICF
CCA
EDUCAT: Primary
Gero -e -Rozi
Ongoing
UNI /Novb
3 85 -- --
CCA
HEALTH: Med.Training
Iajab
Completed
OXFAM
6 91
CCA
INCOME: Skill Train.
Bad Asyab
Ongoing
NOVIB
11 91 -- --
Training / auto repairing / building J machinery, 30 trainees / year.
CCA
INCOME: Skill Train.
Kajab
Ongoing
CIDA
11 91 -- --
Training of 64 women in carpet& Gelis weaving Naiad making & knitting also 40 women are trained in literacy.
DCA
AGRIC:
Vet
Abi Shiraz
Ongoing
Dutch G.
4 92 -- --
3 paravets.
MADERA
AGRIC:
Crop Product
Behsud
Ongoing
OXFAM /Fr
5 92 -- --
Distribution of 4,900 Kg of improved wheat seed i 4,900 1g Urea i 2450 Kg DAP to 700 farmers.
MADERA
AGRIC:
Crop Product
Behsud
Ongoing
OXFAM /Fr
5 92 -- --
Distribution of 4,900 1g wheat seed i 5250 Ig DAP & 4.900 Kg Urea to 1,400 farmers.
MADERA
AGRIC:
Training
Behsud
Ongoing
OXFAM /Fr
5 92 -- --
Agricultural training. of 1 staff / extension work for agriculture improvement & 800 farmers are advised to use the
--
5 92
3 teams - 6 vaccinators
7 teachers r 250 -300 students.
20 women were trained in 3 months as FHW & TBA.
improved seed varieties.
MADERA
AGRIC:
Training
Behsud
Ongoing
OXFAM /Fr
5 92 -- --
Agriculture training of 1 staff / extension work to improve agriculture in the area & 780 farmers are advi$gd about
new agriculture farming system.
MADERA
AGRIC:
Other
Behsud
Ongoing
OXFAM /Fr
5 92 -- --
Hiring of 5 jeribs land for nurseries i research & seed multiplication.
Page: 263
A6actrep Date: 27/08/93
AGENCY
- - ---- SECTOR-- - -----
Wardak
MADERA
AGRIC:
MSH
---- VILLAGE(S) - - --
Markaz
Other
ACTIVITY'
FUNDED
-- STATUS --
- --BY--
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Bes.
Behsud
Ongoing
HEALTH: Compr.Clinic
Ragol
Ongoing
-AID
MSH
HEALTH: Basic Clinic
Safed Dever Ihana.
Ongoing
AID
MSH
HEALTH: Basic Post
Rawl Mir Chehil -S
Ongoing
AID
MSH
HEALTH: Med.Training
`Center
Completed
AID
MSH
HEALTH: Vaccination"
Iajab
Ongoing
AID/UN
5
OIFAM /Fr
92 -
Hiring of 5 jeribs land for nurseries k research purposes.
--
i MD, 2 MED. TECH., 1 LAB. TECH. ASST.
11 90 -- -
5 ROOMS, LABORATORY, IMMUNIZATION
'
9 91 --
1 MED. TECH., 2 BHW, 1 NURSE, LABORATORY
--
2 BHWs
10 91 -- --
1
89
1
49 BHSs trained in initial 3 months community health worker course k assigned to basic health posts.
92
15 VACCINATORS,
11 89 -- --
1 COLD CHAIN TECHNICIAN OPERATE UNDER AN IMMUNIZATION SUPERVISOR WITH TRAINED IMMMUNIZATION
TECHNICIANS TRAINED BY Al IMMUNIZATION TRAINER OUT OF THE VSF IN IAJAB (BERM AVAL) COVERING 221 VILLAGES IN 5
DISTRICTS OF WARDAI, PARWAN AND BANYAN PROVINCES.
MSH
HEALTH: Vaccination
Markaz Beheud
Ongoing'
AID/UK
MSH
HEALTH: Other
Iajab
Ongoing
AID
11 89 -
7
--
COVERED FROM
IAJAB VSF.
TARGET GROUPS: CHILDREN 0 -2 TEARS AND WOMEN 5 -45 YEARS.
SEE IAJAB /GARDANDEWAL LISTING FOR DETAILS.
Regional Health Adsinistration (RHA) administrative center and depot for issue of supplies and salaries and
90 --
monitoring and superviision of the BHWs and health facilities under its jurisdiction.
RAC
;CONST:
Pub.Building
Gero-e-Rozi
Completed
RAC
11 91
6 92
School building (8 roomei - cement / stone / wood / brick.
SCA
HEALTH: Basic Clinic
Abdara
Ongoing
SCA
2 89 --
SCA
HEALTH: Basic Clinic
Shash Burja
Ongoing
SCA
8 89 -- --
4 mid-level HWs.
UNO
¡DUCAT: Primary
Ongoing
AID
6 87 --
6 schools in lajab, Mumrak, Iamjab, Mula Ihel, Surkh Dawaz k Markaz villages.
--
--
6 aid-level Hie / 1 Nurse
Maydan Shar
:Wardak
BRR
CONST:
Road
Wardak
Completed
UNDP
7 92
10 92
CARE
CONST:
Road
Maydan Shar
Completed
AID&WFP
0
0
0 92
Reconstruction of 2 Roads with the total length 15ka including other structures.
CARE
CONST:
Other
Maydan Shar
Completed
.AID&WFP
0
0
0 92
Renovation of Office / Warehouse with rooms / capacity of 15/500 Rooms / at.
CARE
WATER:
Inez
Hayden Shar
Completed
AID&WFP
0
0
0 92
Rehabilitation of one Tarez with total length 3001 including other activities.
CARE
WATER:
Canal
Maiden Shar
Completed
AID&WFP
0
0
0
CARE
WATER
Drinking
Hayden Shar
Completed
AID&WFP
0
0
0 92
MAI
DUCAT: Primary
Ongoing
MAI
ACBAR
'
92
Survey of 176 ka road.
Rehabilitation of 4 Irrigation canals with total length 40ka including other activities.
Rehabilitation of 2 Springà with total length 651 including other activities.
2 schools in Tangi Shapla Ihel k Ibrahim Ihel.
DATABASE OF NGO ACTIVITIES Y
6TH EDITION
I
Page: 264
A6actrep Date: 27/08/93
ACTIVITY
SECTOR
AGENCY
Wardak
- - -- VILLAG &(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
Maydan Shar
MSH
HEALTH: Basic Clinic
Kohna Banat
Ongoing
AID
4 89 -- --
NSR
HEALTH: Basic Post
Rusts' Khel Ws Cha
Ongoing
AID
11 87 -- --
MSH
HEALTH: Vaccination
Hayden Shar
Ongoing
AID/UN
1 doctor aasstant, 2 medical tech. - 4 roofs 3 beds, surgery.
5 HMIs
5 VACCINATORS COVER 19 VILLAGES IN HAYDAN SEAR
5 92 -- --
(401) DISTRICT OF WARDAE PROVINCE.
TARGET GROUPS: CHILDREN 0 -2
IEARS AND WOMEN 5-45 YEARS.
SCA
AGRIC:
Crop; Product
Center
Ongoing
SCA
0 93 -- 93
Distribution of 87.9 NT wheat seed.
SCA
AGRIC:
Crop Product
Kota Ashro
Completed
SCA
0 92 -- 92
Distribution of 10 NT wheat seed.
SCA
AGRIC:
Plant Protec
Center
Coapleted
SCA
0 92 -- 92
Provision of 0.65 HT agrochesicals.
SCA
AGRIC:
Plant Protec
Center
Ongoing
SCA
0 93 -- 93
Provision of 0.18 HT agrochemicals.
SCA
AGRIC:
Plant Protec
Iota Ashro
Ongoing
SCA
0 93 -- 93
Provision of 0.175 MT agrochemicais.
SCA
AGRIC:
Other
Center
Ongoing
SCA
0 93 -- 93
Agriculture survey on 60' villages.
SCA
AGRIC:
Other
Hiss Awal
Completed
SCA
8 92 -- 92
Agriculture survey on 3 villages.
SCA
AGRIC:
Other
Iota Ashro
Ongoing
SCA
0 93 -- 93
Agriculture survey on 50 villages.
SCI
AGRIC:
Other
Center
Completed.
SCA
0 92 -- 92
SCA
&DUCAT: Priaary
Kohn Buser
Ongoing
SCA
7 91 -- --
11 schools / 80 teachers / 1727 students
SCA
HEALTH: Compr.Clinic
Farm Ihel
Ongoing
SCA
3 90 -- --
1 MD / 7 lid-level Hs / 3 Nurses / 1 Lab Tech.
ONO
¡DUCAT: Primary
Ongoing
AID
8 87 --. --
5 schools in Zewalat, Hala Ihel, Eagan Ihel, Barag T&natal Ebel villages
Wardak
'
Agriculture survey on 87 pillages.
Nerkh
CARE
COKST:
Road
Nerkh
Completed
AID&WFP
0
0
0 92
Reconstruction of 1 Roads with the total length lOkm including other structures.
CARE
WATER:
Karez
Nerkh
Completed
AID&WFP
0
0
0 92
Rehabilitation of 2 Aarezes with total length 14,7ìa including other activities.
CARE
WATER:
Canal
Nerkh
Completed
AIDAWFP
0
O
0 92
Rehabilitation of i Irrigation canals with total length 5km including other activities.
CARE
WATER:
Drinking
Nerkh
Completed
AIDAWFP
0
0
0 92
Rehabilitation of 3 Springs with total length 13.7ks including other activities.
GAF
AGRIC:
Vet
Nerkh
Ongoing
ONDP
10 91
7 93
1 DVH ! 2 pelmets / i guard. curative. a preventive service.
IACBAR
BA3ABASI OF NGO ACTIVITIES
638 BDITIOA
1
Page: 265
A6actrep Date: 27/08/93
AGENCY
SECTOR
- - -- VILLAGE(S) -- --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin --End
---<ACTIVITY
DESCRIPTION>
Nerkh
Wardak
ëarimdad
Ongoing
FAO /UNDP
--
--
Multiplication of improved wheat seed & fertilizer.
Durani Bini Badam
Ongoing
AID
11 87 --
--
3 BHWs
Plant Protec
Ongoing
SCA
Other
Ongoing
SCA
Iarimdad
Ongoing
Bini Badam
Crop Product
HAFO
AGRIC:
MSH
HEALTH: Basic Post
SCA
AGRIC:
SCA
AGRIC:
SCA
HEALTH: Basic Clinic
SCA
HEALTH: Basic Clinic
UNO
EDUCAT: Primary
0 93
Provision of 0.19 MT agrochemicals.
-- 93
93 --
93
Agriculture survey on 60 villages.
SCA
5 90 --
--
4 mid -level Hill / 3 Nurses l 2 Vaccinators
Ongoing
SCA
-- -- --
--
8 mid -level HWs.
Ongoing
AID
-0
7
1 0 schools in Tukarak, Badam, DadiliHusain shell, Omar Ihel, Titaar,Badaa, DehHayat, larimdad, Chaghdar & Chinzai
87 -- --
villages.
Wardak
Syed Abad
ACR&
WATER:
Ere:,
ADA
AGRIC:
Crop Product
7 villages
ADA
WATER:
Karen
14 villages
Completed
NRC /NCA
AFRAhE
AGRIC:
Research
Tangi
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
AERANE
AGRIC:
Research
Shash Qala
Ongoing
RAP
10 93 -- --
Variety & agronomical trials to know good variety & proper use of fertilizer & demonstration plots.
AERANE
AGRIC:
Research
Sayed Abad
Ongoing
RAP
10 93 -- --
Variety & agronomicaI trials to know good variety & proper use of fertilizer & demonstration plots.
AHI°S
CONST:
Pub.Building
Mangalai
Completed
WHO
Ongoing
'Completed
.
UNDP
FAOiCIDA
--
92 -- --
For details see in ACRD kare: rehabilitation project in Jaghatu.
1
91 10 91
Distribution of 10 MT wheat seed & 10 MT DAP to 81 farmers for multiplication.
'9
8
91.
5 92
90 11 92
Cleaning & improvement of 14 karezes
i
irrigate 20,271 jeribs & benefit 146 farmers.
Construction of BHU building & running cost for i year (1 aid -level HW
i BHW - OPD & first aid covering 18,000
people).
T:
Attiiv
rub.Buiiding
Dandokai
Completed
WHO
-- 93 -- --
Construction of BHU building &running cost for 1 year (1 mid -level HW ! 1 BHW - OPD & first aid covering 5,000
people).
APWU
RELIEF: rood Items
ARCON
AGRIC:
Crop Product
ALA
AGRIC:
Machinery
AVICEN
HEALTH: Vaccination
CBAR
20 villages
Completed
WFP
Hakim ghel
Ongoing
ARCON
Ongoing
ARCON
Ongoing
EC/UNICF
100 villages
1
--
--
93
-
1
93
100 MT wheat distributed to 1000 families.
--
--
Main crops
--
Machinery for agriculture.
--
2 teams - 4 vaccinators
DATABASE OF BGO ACTIVITIES -
Page: 266
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
Wardak
---- VILLAGE(5) - - --
-- STATUS =-
FUNDED
DURATION
- --BI --
Begin --End
<ACTIVITY
DESCRIPTION)
Syed Abad
CoAR
AGRIC:
Crop Product
Sayed Abad
Ongoing
RAP /FAO
-- 92 -- --
Multiplication of small amount of seed & fertilizer.
CoAR
AGRIC:
Fruit Trees
Sayed Abad
Ongoing
RAP /FAO
-- 92 -- --
Distribution of saplings & 2 jeribs of nursery.
CoAR
AGRIC:
Machinery
Sayed Abad
Ongoing
RAP /FAO
-- 92 -- --
7 tractors MF & 6 threshers.
LOAR
CONST:
Road
Saved Abad
Ongoing
WFP
-- 92 -- --
Repairing of 25 km road (Sayed Abad - Zenakhan;
CoAR
CONST:
Bridgi
Sayed Abad
Ongoing
WFP
-- 92 -- --
Small village level bridge.
CoAR
HEALTH: Vaccination
Sayed Abad
Ongoing
SV /AVICN
-- 92 -- --
31 villages in south Sayed Abad.
DCA
AGRIC:
Vet
Salar
Ongoing
UNDP
9 91 -- --
Central clinic with i veterinarian & 1 vaccinator.
DCA
AGRIC:
Vet
Sese
Ongoing
UNDP
9 91 -- --
1 paravet.
DCA
AGRIC:
Vet
Shash Gaw
Ongoing
UNDP
8 89 -- --
1 paravet.
ESAR
CONST:
Road
Saved Abad
Completed
HCR
ESAR
CONST:
Pub.Building
Shash Bata /Guli 1h
Completed
UNISCO
-- 89 -- --
5 92 12 92
Construction of Sayedabad -Baraki road (25 km).
2 school buildings each having 10 rooms with complete water supplies / savage system - stone masonry in cement & RCC
roofs,
Survey of the whole irrigation system with complete data on karezee
Completed
UNDP
Sheniz
Completed
WHO
5 86 -- --
Hospital building.
Sheniz
Ongoing
AID
5 87 -- --
3 red -level / 1 dentist / 1 lab tech. - OPD
Crop Product
Shaikhabad
Ongoing
FAO /UNDP
Crop Product
Tangi Sayed Abad
Ongoing
FAO /ISRA
5 93 10 93
Distribution of 89.5 Kg maize seed & 450 Kg DAP.
EDUCAT: Primary
Sayed Abad
Ongoing
ISRA
3 93 -- --
1 school for orphans - 120 students & 3 teachers.
ISRA
HEALTH: Compr.Clinic
Sayed Abad
Ongoing
ISRA
9 92 -- --
1 MD / i medical assistant
ISRA
INCOME: Help Vulner.
Sayed Abad
Ongoing
ISRA
1 85 -- --
Assistance to 198 orphans(monthly allowance i health / education i clothing / foot -wear.
ISRA
WATER:
Sayed Abad
Ongoing
ISRA
5 92
LBI
EDUCAT: Madrasa
Abdara
Ongoing
LBI
ESAR
WATER:
Other
IMC
CONST:
Pub.Building
IMC
HEALTH: Compr.Clinic
ISRA
AGRIC:
ISRA
AGRIC:
ISRA
IA C B A R
Drinking
12 90
11 92
5 91
7 93
8 93
-- 89 -- --
springe
diversions & canals.
lab / i dental.
..Distribution of 10 MT DAP & 10 MT wheat seed to- 200 farmers - 200 jeribs.
1 lab tech. ; helper
1 shallow well.
Quran memorization center
DATABASE OF NGO ACTIVITIES
Page: 267
A6actrep Date: 27/08/93
6TH EDITION
I
ACTIVITY
AGENCY
SECTOR
VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- - -BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Syed Abad
Wardak
LBï
DUCAT: Madrasa
Onkhi
Ongoing
LBI
-- 89 -- --
Quran memorization center
LEI
DUCAT: Madrasa
Sayed Abad
Ongoing
LBI
-- 89 -- --
Quran memorization center
LBI
DUCAT: Madrasa
Shaikbabad
Ongoing
LBI
-- 89 -- --
Quran aesorization center
LBI
DUCAT: Madrasa
Tangi Nardak
Ongoing
LBI
-- 89 -- --
Quran sesorization center
LBI
INCOMH: Help Vulner.
Sued Abad
Ongoing
LBI
-- 89 -- --
Orphanage
LDI
HEALTH: Basic Clinic
Sheniz
Ongoing
LDI
--
LDI
HEALTH: Basic Clinic
Hassan Ihel
Ongoing
LDI
2 aid -level ifWe / 1 lab tech f 1 sed. student - OPD / lab.
LINO
HEALTH: Other
Haider Ebel
Ongoing
Geraany
Leprosy & tuberculosis control center f provide health care for general patients i a till lab. testing service /
`
1 mid -level HW.
1
leproRy technician & 1 field assistant.
MAI
EDUCAT: Primary
=-
Ongoing
MAI
-- -- -- --
MSR
HEALTH: Basic 'Clinic
Sayed Abad
Ongoing
AID
12 87 -- --
MSB
HEALTH: Basic Post
Shadi Ehel
Ongoing
AID
8 87 -- --
29 BHüs
RBS
HEALTH: Other
--
Ongoing
RBS
9 91 -- --
Training of physiotherapy technicians.
RBS
HEALTH: Other
Ongoing
RBS
9 91 -- --
Physiotherapy services.
RBS
SOCIAL:Animation
Ongoing
RBS
9-91 --
Training of social animators.
RDA
RELIEF: Food Items
Completed
WFP
- -- --
RDK
AGRIC:
Crop Product
--
Ongoing
FAO
-- -- -- --
SCA
AGRIC:
Crop Product
--
Ongoing
SCA
0 93 -- 93
Distribution of 61.75 MT wheat seed.
SCA
AGRIC:
Crop Product
--
Completed
SCA
0 92 -- 92
Distribution of 23.315 MT wheat seed & i MT DAP.
SCA
AGRIC:
Research
--
Ongoing
SCA
O 93 -- 93
10 crops variety testing trials of wheat & 2 MT dry beans.
SCA
AGRIC:
Plant Protec
--
Ongoing
SCA
O 93 -- 93
Provision of 0.23 MT agrochemicals.
SCA
AGRIC:
Plant Protec
Completed
SCA
0 92 -- 92
Provision of 0.535 MT agrochemicals.
CBAR
9 schools in Chopan, Iarokiel, Dare Onkhi, Qala Qazi, Ihankhel, Temor Ihel Payan & Doab Tangi.
1 NURSE, 2 MID. TECH. 1 LAB.TECH.ASST.
5 ROOMS,
1 BBD, LABORATORY
Distribution of 150 MT wheat.
Distribution of 11.8 MT improved wheat seed / 12 MT DAP / 18 MT Urea.
DATABASE OF NGO ACTIVITIES
6TH EDITION
I
Page: 268
A6actrep Date: 27/08/93
ACTIVITY
---- VII,LAGE(5)
SECTOR
AGENCY
Wardak
---
-- STATUS--
Syed Abad
-
FUNDED
DURATION
BY-BY-
Begin --End
<ACTIVITY
DESCRIPTION>
====
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 60 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 169 villages.
SCA
DUCAT: Priaary
Farakhlas
Ongoing
SCA
7 88 -- --
8 schools / 50 teachers / 1576 students
SCA
EDUCAT: Management
Shaikhabad
Approved
SCA
9 93 -- --
7 days / 60 headaastere
SCA
EDUCAT: Teacher T.
Shaikhabad
Ongoing
SCA
12 92 -- --
3 months / 60 teachers
SCA
HEALTH: Coapr:Clinic
Joi Zareen
Ongoing
SCA
8 89 -- --
SCA
HEALTH: Coapr.Clinic
Musa Ihel
Ongoing
SCA
11 88 -- --
3 MD / 17 aid -level HWs /4 Nurses / 1 Dental Tech. í 1 Lab Tech. J 1 PHO 12 Vaccinators
SCA
HEALTH: Coapr.glinic
Tanti Waren Ihel
Ongoing
SCA
10 88 -- --
1 MD / 5 aid -level HWs / 1 'Nurse / i Lab Tech. I i Dental Tech.
SCA
HEALTH: Basic Clinic
Mangalai
Ongoing
SCA
SCA
HEALTH: Basic Clinic
Shaikhabad
Ongoing
SCA
SCA
WATER:
52 villages
Ongoing
SCA/UNIC
I 93 12 93
Wells - benefit 2,100 faailies.
SERVE
HEALTH: Other
Approved
*Donors
3 94 -- --
Consultancy with
Ongoing
WHO
8 91 -- --
orthopaedic workshop - production of approz:24 artificial liaba per month - in eanjution.ith DAP/UN.
Ongoing
AID
5 87 -- --
39 schools in different villages.
6 92 -- -
Rehabilitation of 11 ka road, benefit 700 faailies.
SGAA
: ALTH:
Drinking
Disabled Reh
Sayed Abad
UNO
EDUCAT: Priaary
VITA
CONST:
Road
Mehro
Ongoing
AID
VITA
CONST:
Bridge
Tangs
Ongoing
AID
1 MD / 4 aid -level Bfis / 2 Nurse / i Lab Tech. / 1 Pbarsaciat
11 aid -level HWs / 1 Nurse
3 aid -level HWe / 1 Nurse 1 i PHO
--
I Disabled project far blind rehabilitation - field tease.
Construction of 15 c bridge (concrete A aasonry), benefit 257 families.
Wardak
Wardak
CCA
INCOME: Skill Train.
Various
Ongoing
CIDA
11 92 -- --
Training of 30 woven in spinning.
DCAR
HEALTH: Basic Clinic
7 villages
Ongoing
*Donora
-- 84 -- --
Dental sevicee 80 -95 patients daily.
ESAR
CONST:
Road
Completed
UNDP
5 91
ISRA
AGRIC:
Crop Product
-
Ongoing
FAO /ISRA,
5 93 10 93
ISRA
CONST:
Pub.Building
Different villagee
Ongoing
ISRA
5 92
ACBAR
,
Survey on part of Angur Ada -Banyan road ( 131 b) in_the districts of Zuraat, Sayed Abad A Chak.
7 91
Distribution of 95 le seize seed A 450 ág DAP.
8 93
Construction of 3 cosques.
DATABASE OF NGO ACTIITIES
Page: 269
A6actrep Date: 27/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
MSF -H
- - -- VILLAGE(S) - - --
All province
HEALTH: Other
DURATION
FUNDED
<ACTIVITY
- - -BY --
Begin --End
Ongoing
MSF
-- 93 -- --
Monitoring & technical evaluation of microscopists.
Construction cf BHC building.
-- STATUS --
DESCRIPTION>
Arghandab
Zabul
ARDS
CONST:
Pub.Building
--
Approved
ARCON
-- 93 -- --
ARCON
CONST:
Pub.Building
Arghandab
Ongoing
ARCON
--
ARRA
AGRIC:
Crop Product
--
Completed
FAO
11 92 12 92
ARRA
AGRIC:
Crop Product
Ongoing
CIDA
11 92
8 93
For details see ARRA Crop Production project in Qalat.
ARRA
AGRIC:
Fruit Trees
Completed
FAO
3 93
4 93
For detials see ARRA Fruit Trees project in Shoh Joy.
AÁ,RA
AGRIC:
Machinery
Ongoing'
FAO
ARRA
AGRIC:
Other
216 villages
Ongoing
ARRA,'MCI
INC:
CONST:
Pub.Building
Mohd Agha
Completed
WHO
5 86 -- --
MCI
HEALTH: Basic Clinic
Diecontin
AID
3 88
MSH
HEALTH: Basic Post
Ongoing
AID
11 87 -- --
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.15 MT agrochemicals.
SCA
AGRIC:
Plant Protee
Completed
SCA
0 92 -- 92
Provision of 0.195 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
UNO
DUCAT: Primary
Ongoing
AID
1 91 -- -=
1 school in Chiknak village.
-
Gazah
.,
--
--
-
-- -- --
5 93
Health unit
Multiplication of 35 MT wheat seed to 700 farmers (280 villages) in Arghandab, Shoh Joy & Qalat.
For detials see ARRA At project in Qalat.
For detials see ARRA AO in Qala.
Clinic building.
1 mid -level HW
- OPD.
10 BHWe
Atghar
Zabul
Distribution of 9.05 MT wheat seed, 19 MT DAP, 5 MT urea and'3 MT maize seed.
SC -US
AGRIC:
Crop Product
--
Completed
FAO
-- 92 -- 92
SC -US
AGRIC:
Crop Product
Ghundi
Completed
UNDP
10 90
8 92
Distribution of 750 MT seed to 750 farmers.
SC-US
AGRIC:
Vet
Ghundi
Completed
UNDP
10 91
3 92
3 paravets, 3 vet. technicians providing vaccinations + basic wound treatment.
SC-US
AGRIC:
Research
Ghundi
Completed
UNDP
10 90
8 92
Extension services provided to 750 farmers.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
IA C B A R
Provision of 0.1 MT agrochemicals.
0 93 -- 93
DATABASE OF NGO ACTIVITIES
Page:
270
A6actrep Date: 27/08/93
6TH EDITION 1
ACTIVITY
---- VILLAGE(S)- ---
SECTOR
AGENCY
SCA
C
AGRIC:
Plant Protec
304
AGRIC:
Other
Zabul
Da i
Crop Product
-- STATUS --
FUNDED
- - -BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Completed
SCA
0 92 -- 92
Provision of 0.28 MT agrochemicals.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
39 villages
Completed
RAP
8 92 12 92
Distribution of 44.18 MT wheat seed / 32.9 MT DAP & 47 MT Urea to 940 farmere for multiplication.
109 villages
Ongoing
EC /UNICF
--
--
Chopan
ADA
AGRIC:
AVICEN
HEALTH: Vaccination
HU
AGRIC:
Crop Product
60 villages
Ongoing
FAO
-- 90 -- --
Distribution of wheat / maize i rice & vegetable seeds.
HU
AGRIC:
Fruit Trees
60 villages
Completed
FAO
-- 90 -- --
Fruit trees apple / apricot almond & peach.
HU
AGRIC:
Vet
60 villages
Ongoing
UNDP
-- 91 -- --
3 paravets training 15 basic veterinary workers & treatment of animais.
HU
CONST:
Pub.Buiiding
Gazak
Ongoing
WFP/ODA
-- 89 -- --
i school & 3 clinics.
HU
CONST:
Storage
Eharnai
Completed
WFP
-- 92 -- --
1 store at road head (60 MT wheat).
HU
EDUCAT: Secondary
Ga °ak
Ongoing
ODA
-- 89 -- --
100 students i 7 teachers / 2 staff & grades 1 -7.
HU
EDUCAT: Teacher T.
Gazak
Completed
ODA
-- 90 -- --
Training of 10 teachers for 2 months with EIL. Quetta.
HU
HEALTH: Basic Clinic
Abgoi /Masca
Completed
ODA /WHO
-- 85 -- --
3 clinic / 120 patients per day.
HU
HEALTH: Med,Training
Abol/Gazak
Ongoing
ODA
-- 85 -- --
9 health workers / MLHW i ORW / periodic refresher .courses.
HU
HEALTH: Med.Training
--
Ongoing
WHO
-- 93 -- 94
10 women to be given basic health training.
HU
HEALTH: Education
Abgol
Ongoing
ODA/WHO
HU
HEALTH: Vaccination
60 villages
Ongoing
AVICEN
ER
HEALTH: Basic Post
Showi
Ongoing
AID
7 88 -- --
2 BHWs
MSH
HEALTH: Vaccination
Dai Chopan
Ongoing
AID/UN
3 93 -- --
4 VACCINATORS UNDER PMD SUPERVISION.
SCA
AGRIC:
Plant Protec
--
Completed
SCA
0 92 -- 92
Provision of 0.1 MT agrochesicals.
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochesicals.
SCA
AGRIC:
Other
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
IACBAR
1 team - 3 vaccinators
--
Male & female trainees.
--
Target whole of Daichopan (4 male trainers).
-- 91 -- --
DATABASE OF NGO ACTIVITIES
Page:
271
A6actrep Date: 27/08/93
6TH EDITION 1
T
ACTIVITY
AGENCY
SECTOR
UNC
- - -- VILLAGES) - - --
EDUCAT: Primary
Zabul
MCI
HEALTH: Basic Post
SCA
AGRIC:
SCA
AGRIC:
Sher Safa
Plant Protec
Plant Protec
'
SCA
AGRIC:
UNV.
Other
EDUCAT: Primary
Zabul
MCI
Road
HEALTH: Basic Post
SCA
AGRIC:
SCA
AGRI .:
SCA
AGRIC:
Ziyarat Mokorak
Plant Protec
Plant Protec
Other
bui
AREA
Mizan -Shahr Safe
HEALTH: Basic Clinic
M5t
DURATION
Begin- -End
:ACTIVITY
Ongoing
AID
3 90 -- --
Completed
AID
11 90 -- --
1 EPI vaccinator
Ongoing
AID
11 89 -- --
1 BHW
Completed
SCA
0 92 -- 92
Provision of 0.2 MT agrochemical!.
Ongoing
SCA
0 93 -- 93
Provision of 0.1 MT agrochemical!.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 40 villages.
Ongoing
AID
9 88 -- --
- schools in Tughan & 5enjit villages.
Approved
AID
-- 93 -- --
Completed
AID
3 89 -- --
1 lab -tech & 1 dental -tech.
Ongoing
AID
7 88 -- --
2 BHWs
Ongoing
SCA
0 93 -- 93
Provision of 0.15 MT agrochemicais.
Completed
SCA
O 92 -- 92
Provision' of 0.117 MT agrochemicais.
Ongoing
SCA
0 93 -- 93
Agriculture survey on 30 villages.
Ongoing
CIDA
DESCRIPTION>
1 school in Dahan Gazak.
1 lab tech ; i MD & 1 mid -level HW - EPI I Lab & OPD.'
Mizan
CONST:
MCI'
--BY-
Jaldak
HEALTH: Basic Post
!SSE
FUNDEL
-- STATUS --
Repair of Sharer Safa-Mizan road.
- Lab & dental.
Qalat
AGRIC:
Crop Product
11 92
8 93
Distribution of 95 MT fertilizer to 1700 farmers in Qalat (91 villages), Shah Joy ji0 villages, & Arghandab
f125
villages).
ARRA
ARRA
ARRA
ARRA
AGRIC:
AGRIC:
AGRIC:
AGRIC:
Crop Product
Fruit Trees
Vet
Machinery
30" v.liages
Completed
FAO
Completed
FAO
Completed
Ongoing
li 92 12 92
For details see ARRA Crop Production project in Arghandab.
3-03
4 93
For detiais see ARRA Fruit Trees project in Shoh Joy.
UNDP
11 92
6 93
15 BVW / 3 paravets i 1 DVK
FAO
-- -- -- --
2 tractors
vaccination
treatment & de-worming.
2 treashers i benefit 3,500 people (125 villages)
in Galat
Shoh Joy & Arghandab.
ACBAR
DATABASE OF NGO ACTIVITIES
fiiH ED'al.'3E
Page: 272
A6actrep :.ate: 27Ì0E19:
ACTIVITY
AGENCY
SECTOR
Zabul
---- VILLAGEiS) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
< ACTIVITY
Galat
ARRA
AGRIC:
Plant Proteo
125 villages
Ongoing
CIDA
4Phr
AGRIC:
Other
216 villages
Ongoing
ARRA;'MCI
N.CPA
MINES:
Survey
15 minefields
Completed
UNOCHA
1 92 12 92
SC:.
AGRIC:
Plant Protec
Ongoing
SCA
i!
93 -- 93
Provision of 0.1 M: agrochemicais.
:
92 -- 92
Provision of 0.1 MT agrochemicais.
93 -- 93
Agriculture survey on 40 villages.
Agriculture survey on 86 villages.
Extension & plan: protection - benef :: 350 farmers in
AGRIC:
Plant Protec
Completed
SCA
30A
AGRIC:
Other
Ongoing
SCA
Other
Completed
SCA
0 92 -- 92
Too;, L din
Ongoing
SCA
2 55 -- --
31 villages
Completed
UNOCHA
AGRIC:
HEALTH: Bae1;, Clinic
_.
SWAK
MINES:
Clearance
EDUCAT: Primary
JN0/
Zabul
40
1
754,662 Sqm irrigation
,
92 12 92
residential
mid- level H.
127985 Sqm agri.land / 156898 Sqm houses
17570 Sqm road
Alt
AITroved
ART ON
-- 9: -- --
Construction of BHC building.
For details see ARRA Crop Production project in Qalat.
3 88 -- --
aiat a Arghandab.
agri.iand & road.
Ongoing
,
251217 Sgi cana:.
3 schools in Haji Ebaligdad, Spin Egharga & Gagari.
Shari Joy
AE DS,
CONST:
Pub.Buiiding
ARRA
AGRIC:
Crop Product
Ongoing
CIDA
11 92
ARRA
AGRIC:
Crop Product
Completed
FAO
11 92 12 92
ARRA
AGRIC:
Fruit Trees
Completed
FAO
'Ongoing
FAO
ARRA
50 spray pumps & different kinds of chemicals.
--
STA
SCA
DESCRiPTION'-
AGRIC:
--
Machinery
3 53
8 93
4 93
For details see ARRA Crop Production project in Argbandab.
' Distribution of 18,000 fruit trees ¡apple ¡ plum i peach
-- -- --
-
For detiils see ARRA A6 project in
HEALTH: Basic Post
Mudeer
Cnge ing
SC -US
AGRIC:
Crop Product
Shah Joy
:Completed
'JNDP
10 90
8 92
Distribution of 75 MT seed to 750 farmers.
SC -US
AGRIC:
Research
Shah Joy
Completed
UNDF
10 90
5 92
Extension services provided to 750 farmers.
óCA
AGRIC:
Plant Protec
Ongoing
SCA
;
93 -- 93
Provision of 0.1 MT agrochemicals.
SCA
AGRIC:
Other
Ongoing
SCA
O 93 -- 93
Agriculture survey on 40 villages.
SCA
AGRIC:
Other
Completed
SCA
0 92 -- 92
Agriculture survey on 89 villages.
A C B A R
15 villages) in Shch Joy / Arghandab & Qalat.
lat.
MSH
Y 89 -- --
apricot),
v BHWs
DATABASE OF NGO ACTIVITIES
Page: 273
A6actrep Date: 2748/93
6TE EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
Crop Product
SWFAO
AGRIC:
UNO
EDUCAT: Primary
All villages
-- STATUS --
FUNDED
- - -BY --
DURATION
< ACTIVITY
Begin- -End
7 93
DESCRIPTIONS
Il:.trition cf wheat seed & fertilizer.
Ongoing
FAO /UNDP
5 53
Ongoing
AID
3 BE -- --
5 sci,als in Kashmir Ehel, Manda. Kolar Khel, Chashma Hlial & Gala Ebel villages.
Completed
AID
1 89 -- --
1
Shemalzai
Zabul
lab tech r 1 dental tech &
1 mid -level HW - Lab / dental & OPD.
MCI
HEALTH: Basic Clinic
SC -US
AGRIC:
Crop Product
Completed
FAO
-- 92 -- 92
Distribution of 9.05 MT wheat seed and 10 MT DAP.
SC -US
AGRIC:
Crop Product
Completed
FAC
-- 92 -- 92
Distribution of 9.1+5 MT wheat seed and 10 MT DAP.
SC -US
AGRIC:
Crop Product
Surkai Tanga.
Completed
UNDP
10 90
8 92
Distribution of 75 MT seed tc 7K farmers.
SC -US
AGRIC:
Vet
Surkai Tangai
Completed
UNDP
10 91
3
3 paravets. 3 vit. technicians providing vaccinations * bash wound treatment.
SC -US
AGRIC:
Research
Burka: Tanga.
Completed
UNDP
10 90
8-92
Zabul
--
ÿ';
Extension services provided to 750 farmers.
Shinkai
1 team - 2 vaccinators
AVICEN
HEALTH: Vaccination
28 villages
Ongoing
EC /UNICF
AVICEN
HEALTH: Vaccination
28 villages
Ongoing
EC-UNICF
MCI
AGRIC:
Shinkai /Atghar
Completed
CHC
7 88
MCI
HEALTH: Distrct Hosp
--
Completed
AID
1 88 -- --
Other
-- -- -
-
1 89
1 team - 2 vaccinators
Almond orchard spraying, karez cleaning, road repair in animal vaccination.
i MD / 1 HL OT / 3 mid -level HWs i 2 Mi ward 1 1 lab -tech / 1 dental -tech & i X-ray-tech - OT / OPD / Ward / lab /
dental & X-ray facilities.
MR
HEALTH: Basic Post
SC -US
AGRIC:
Crop Product
SC -US
AGRIC:
Crop Product
SC -US
AGRIC:
Vet
SC -US
AGRIC:
SCA
SCA
heftier,
Ongoing
AID
it 89 -- --
Shinkai
Completed
JNDP
10 90
Completed
FAO
-- 92 -- 92
Shinkai
Completed
UNDP
10 91
3 92
3 paravets, 3 vet. technicians providing vaccinations + basic wound treatment.
Research
Shinkai
Completed
UNDP
10 90
8 92
Extension services provided to 750 farmers.
AGRIC:
Crop Product
--
Completed
SCA
0 92 -- 92
Distribution cf 3 MT wheat seed, 3 MT DAP & 3.23 MT Urea.
AGRIC:
Platt Prctec
Completed
SCA
O 92 -- 92
Provision of 0.137 MT agrochemicais.
8 92
i BIN
Distribution of 75 MT seed to 750 farmers.
Distribution of 9.05 MT wheat seed and 10 MT DAP.
DATABASE OF NGO ACTIVITIES
IACBAR
Page: 274
AEactrep D te: 27/08/93
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
-- -- VILLAGE(S) - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin - -End
Shiny.ai
Zabul
SCA
AGRIC:
Plant Protec
Ongoing
SCA
0 93 -- 933
SCA
AGRIC:
Other
Ongoing
SCA
93 -- 93
Ongoing
AiD
3 89 --
Ongoing
AID
7 90
NO
EDUCAT: Primary
-
Provision of 0.15 MT agrochemicais.
Agriculture survey on 40 villages.
3 schools in Badin, ëamarthel & Ali Jirag villages.
Zabul
Zabul
MCI
DESCRIPTION>
AGRIC:
Other
-
4 94
PVOSupport: ag rehab, (wheat production
orchard rehab.
i
irrigation repairicaeh ..rot pilot projects i ag
assessment i animal health.
IACBAR
DATABASE OF NGO ACTIVITIES - --
Page: 275
A6actrep Date: 27/08/93
6TH EDITION
PROPCloSED AND
ACTIVITY
ENCY
SECTOR
Badakshan
SCA
CONST:
Pub.Building
', -AID
AiD
h-AID
A -AID
SAC
NAC
NAC
NAC
COHST:
Canal
WATER:
Canal
WATER:
Canal
WATER:
Structure
COST:
Pub.Building
CONST:
Pub.Building
CONST:
Pub.Building
WATER:
Canal
Badakshan
NAC
NAC
CONST:
CONST:
CONST:
Badake?hari
NAC
r.AC
AGRIC:
AGRIC:
- --BY --
DURATION
Begin --End
.<ACTIVITY
DESCRIPTIßN>
4 villages
Proposed
SCA
-- 93 12 93
Faizabad
Proposed
ODA
10 93 12 93
Shahmery
Proposed
ODA
9 93 10 93
Rehabilitation of canal.
Chat-ah
Proposed
ODA
-- 9: 10 95
Rehabilitation of canal.
Hafiz Mughul
Proposed
.ODA
-- 93
h 94
Rehabilitation of canal.
Nahia-3/Faizabad
Proposed
ODA
-- 93
8
Proposed
NAC
9 93 10 93
Proposed
NAC
-- 93 -- 93
Repairing of secondary school & construction of latrines.
Proposed
NAC
-- 93 10 93
Construction of primary school (8 rooms).
Yaftal
Proposed
NAC
-- 93
Repairing of channel.
Wardui
Proposed
NAC
-- 33 -- 93
Repairing of secondary school.
Wardui
Proposed
NAC
-- 93
Repairing of primary school.
dura
Proposed
DCP
-- 93 10 93
Repairing of Khostak secondary school.
Proposed
NAC
10 93 12 93
Fruit tree & forest tree nursers.
Proposed
NAC
-- 93 11 93
Seed testing & distribution.
Construction of primary schools.
Faizeibad
Bridge
WATER:
FUNDED
-- STATUS --
Badakshan
Badakshan
'. -AID
---- VILDAGE(S' - - --
1.31Ezt-WEY1Ei3 A'1" I V S'3E°=
Argu
Kor
Yaftal
9
Repair of bridge (vehicle).
93
Replacement foot bridge & small aqueduct.
Repairing of secondary school.
93
Jurm
Pub.Building
Pub.Building
Pub.Buìldìng
9
93
Iti.Pehem
Fruit Trees
Research
Farmangholi
Kuabuk
DATABASE OF NGO ACTIVITIES
f,TH EDITION
Page:
276
A6actrep Date: 01%09/93
ABNCY
SECTOR
VILLAGE(S)----
ACTIVITY
FUNDED
--STATUS-
-BY --
DURATION
Begin --End
< ACTIVITY
Keshem
Badakshan
I,
CONST:
Road
beshem
Proposed
SCA
10 93 11 93
Repairing of local road.
N3C
CONST:
Road
Baluch
Proposed
SCA
10 93 11 93
Repair of Taìogan- Faizabad road.
C
CONST:
Bridge
Artinjelon
Proposed
RAG
NAC
CONST:
Bridge
Shaheed Khan
Proposed
CONST:
Bridge
Ashokan
CONST:
Pub.Building
CONST:
NAC
93 12 93
Reconstruction of vehicle bridge.
NAC
-- 93 11 93
Reconstruction of vehicle bridge.
Proposed
NAC
10 93 11 93
Reconstruction of vehicle bridge.
Dare Jeem
Proposed
DCP
-- 93 10 93
Construction of primary school (8 room).
Pub.Building
Charmaghz Dara
Proposed
SCA
7
93 11 93
Construction of primary school (8 rooms).
CONST:
Pub.Buiiding
Dare Jeem
Proposed
SCA
9
93 11 93
Construction of primary school (8 rooms).
NAC
WATER:
Structure
bangorchi
Proposed
NAC
--
93
Superpassages & Tarnabs.
NAC
WATER:
Structure
Farmangholi
Proposed
NAC
-- 93
NAC
WATER:
Structure
Jarsbababr
Proposed
NAC
-- 93 10 93
Repairing of superpassages & intakes.
NAC
WATER:
Structure
Shaheed Dan
Proposed
NAC
11 93 12 93
Check dam construction.
NAC
WATER:
Structure
Baluch
Proposed
HAG
NAC
WATER:
Drinking
Gandum fool
Proposed
UNICEF
-- 93 11
Ragh
Proposed
DCP
--
NAC
h {.0
Badakshan
SAC
CUNST:
13adakshan
A -AID
A -AID
AACRP
9
9
6
93
9 93
93 11 93
93
Construction of 80 m siphon.
Construction of intake h siphon.
Improving village drinking water supply.
Ragh
Pub.Building
93 11 93
Repairing of primary school (8 rooms).
Sheghnan
CONST:
Bridge
Darmarakht
Proposed
ODA
-- 93
8 93
Replacement of foot bridge.
CONST:
Bridge
Arakht
Proposed
ODA
-- 93
8 93
Replacement of foot bridge.
Proposed
WFP
-- 93 --
Baghlan
WATER:
ACBAR
DESCRIPTION>
Baghlan
Canal
Fabrika-Gridaw
--
Rehabilitation of 35 is main canal (FFW - 200 MT).
DATABASE OF NGO ACTIVITIES
Page:
277
h6actrep Date: 29/08/93
6TH EDITION I
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(Sl - - --
-- STATUS --
FUNDED
Begin- -End
-- 93 -- --
<ACTIVITY
DESCRIPTION>
Puli Khumri
Baghlan
AACRP
WATER:
Canal
Nahr Ajieer
Proposed
WFP
VITA
WATER:
Structure
Baba Nazar
Surveyed
AID
--
3 93
Rehabilitation of 60 Km main canal (FEW - 500 MT).
Construction of 10 m intaketgabion work), benefit 17,142 families.
Bamyan
Bamyan
ARRA
DURATION
- --BY --
benefit 250 farmers.
WATER:
Structure
6 villages
Surveyed
WFP /UNDP
-- -- -- --
Wing wail 850 m i stone masonry
CONST:
Sanitation
Varìuoe
Proposed
WFP /UNiC
-- 93 -- --
Construction of 15 nets public toilet in Hazarajat Bazaars.
-- 93 -- --
1 female doctor / 2 female nurses / 1 female vaccinator / OPD & TBA training for 30 female trainees.
r
GAF
HEALTH: Med.Training
--
Proposed
EC
iAM
SOCIAL:Commu.Particp
--
Surveyed
¡AH
para Ali
Proposed
CIDA
-- 93 -- --
Training of 59 women in carpet & gelim weaving i Knitting & naiad making.
8 villages
Proposed
FAO /UNDP
--
Multiplication of 3.2 MT maize seed i 4.8 MT DAP & 6 HT Urea.
INCOME: Skill Train.
Farah
SWAARR
Possibilities for community based development surveyed projects.
Yakowlang
Bamyan
CCA
- -- -- --
Bakwa
AGRIC:
Farah
Crop Product
--
Bala Balouk
FRF
WATER:
Drinking
9 villages
Proposed
CIDA
-- -- -- --
19 wells with pumps & benefit 3840 families.
SWAARR
AGRIC:
Crop Product
13 villages
Proposed
FAO /UNDP
--
Multiplication of 5.2 MT improved cotton seed / 10.4 MT DAP & 13 MT Urea benefit 260 farmer families.
SWAARR
WATER:
Canal
4 villages
Proposed
FAO /UNDP
-- -- -- --
Machinery
CHA
AGRIC:
VARA
HEALTH: Education
INCOME: Handicrafts
WATER:
A
Canal
Tractor & other agricultural equipment.
33 villages
Proposed
RAP
-- 93 -- 94
Zaranj
Proposed
WHO
-- --
Proposed
UNESCO
Darabad
Proposed
UNDP /WFP
--
--
Cleaning of 36 is canai / irrigates 20.000 jeribs & benefit 350 families.
8 villages
Proposed
FAO /UNDP
--
--
Multiplication of 3.2 MT maize seed l 4.8 MT DAP & 8 MT Urea
villages
40 lady TBAe.
100 people - embroidery.
Farsi
Farah
SWAARR
Cleaning of 8.1 km canal / irrigates 1,000 jeribs land & benefit 500 farmer families.
Farah
Farah
VARA
--
AGRIC:
Crop Product
DATABASE OF NGO ACTIVITIES
CTAR
e
Page:
278
A6actrep Date: 28/08/93
.
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
VARA
---- VILLAGB(S) --
WATER:
Structure
Gilmandin
FUNDED
DURATION
<ACTIVITY
DESCRIPTION>
- - -BY --
Begin- -End
Proposed
WFP/UNDP
--
--
300 a retaining wall - cement k bricks.
--
--
Multiplication of 3.2 MT maize seed ì 4.8 MT DAP & 8 MT Urea.
--
Construction of 55 is road for Sia Gosha -Gulistan Bazaar with 7 bridge.
-- STATUS --
Gulistan
Farah
SWAARR
AGRIC:
Crop Product
8 villages
Proposed
FAO /UNDP
VERA
CONST:
Road
20 villages
Proposed
RAP
VARA
INCOME: Handicrafts
5 villages
Proposed
UNESCO
Canal
Ghanbaran
Proposed
WFP
Cleaning of 15 is canal / irrigates 3100 jeribs & benefit 280
WATER:
--
VARA
Structure
0 villages
Proposed
ARGON
6 Intakes k 2 river groynes (gabion work) & cement benefit 1,000 families.
WATER:
--
VARA
-- -- -- --
50 people - tailoring.
families.
Lash Jaween
Farah
Crop Product
24 villages
Proposed
RAP
Distribution of seed & fertilizer.
AGRIC:
-- 93 -- --
CHA
Fruit Trees
18 villages
Proposed
RAP
Fruit trees distribution.
AGRIC:
-- 93 -- --
CHA
Livestock
26 villages
Proposed
RAP
Bee keeping.
AGRIC:
-- 93 -- --
CHA
Livestock
11 villages
Proposed
RAP
Poultry training.
AGRIC:
-- 93 -- --
CHA
Livestock
12 villages
Proposed
TAF
Poultry training.
AGRIC:
-- 93 -- --
CHA
Research
13 villages
Proposed
RAP
Agriculture research work.
AGRIC:
-- 93 -- --
CHA
Plant Protec
22 villages
Proposed
RAP
Plant protection.
AGRIC:
-- 93 -- --
CHA
Other
23 villages
Proposed
RAP
Saffron project.
AGRIC:
-- 93 -- --
CHA
HEALTH: Vaccination
19 villages
Proposed
RAP
- -. 93 -- --
Vaccination program.
CHA
INCOME: Other
13 villages
Proposed
NAC
-- 93 -- --
Tailoring.
CHA
--
Purchaman
Farah
SWAÀRR
AGRIC:
Crop Product
8 villages
Proposed
FAO /UNDP
VARA
WATER:
tarez
14 villages
Proposed
UNDP
--
Multiplication of 3.2 MT maize seed f 4.8 MT DAP A 8 MT Urea.
Cleaning of 14 karezes length 47.5 is i irrigate 12,500 jeribs & benefit 1386 families.
Page:
279
A6actrep Date: 29/08/93
ACTIVITi
AGENCY
SECTOR
Farah
SRO
AGRIC:
GAF
AFS
CoAR
GAF
ARO
ARR
BRR
BRR
HTCRA
START
é
ICMCIFAO
--
RAP
AGRIC:
Vet
Ab Band
Proposed
UNDP
Proposed
FAO
-- 93 -- --
Iropased
WFP
--
93 -- --
Proposed
RAP
--
93 -- --
-- 93
AGRIC:
WATER:
<ACTIVITY
--
Proposed
DESCRIPTION>
Multiplication of 37 MT wheat seed & 5 MT DAP to 750 families.
-- 93 -- --
Deh Yale
Fruit Trees
10 villages
Canal.
Rabat
Distribution of 10,000 fruit saplings.
Rehabilitation of 11.5 Em canal - benefits 700 families.
Gelan
AGRIC:
Vet
AGRIC:
Plant Protec
Gelan
Proposed
SV
AGRIC:
Vet
Gelan
Proposed
UNDP
5 villages
Proposed
RELIEF:Food Items
5 villages
Proposed
WATER:
Karez
Ghazni
AGRIC:
Crop Product
-- --
Ghazni
Crop Product
--
93 -- --
Multiplication of 5 MT maize seed / 7.5 MT DAP & 10 MT Urea.
WFP
--
93 -- --
50 MT wheat seed for 200 farming faillies who received improved seed.
Proposed
UNDP
-- 93 -- --
5 villages
Proposed
RAP
INCOME: Skill Train.
Ghazni
Proposed
UNDP
-- 93 -- --
WATER:
Structure
Ghazni
Proposed
UNDP
--
WATER:
Structure
Proposed
UNDP
CONST:
Bridge
Proposed
RAP
Ghazni
AFRANE
Proposed
Ab Band
AGRIC:
AFS
60 villages
Vet
Ghazni
AFS
DURATION
Begin --End
AGRIC:
Ghazni
CoAR
FUNDED
- --BY --
Ab Band
Ghazni
AYS
-- STATUS --
Shindand
Crop Product
Ghazni
CoAR
- - -- VILLAGE(S) - - --
SOCIAL:Other
Center
'FAO /UNDP
9
93
6
Rehabilitation of 22 karezes.
94
Distribution of wheat seed & fertilizer.
Engraving training center.
93 -- --
Flood protection wall.
Construction of retaining wall.
-- 93 -- --
Repair of bridge in Ghazni center.
Jaghatu
Jaghatu
Proposed
RAP
-- 93 12 93
Rural development center.
A C B A R
DATABASE OF NGO ACTIVITIES
Page:
280
A6actrep Date: 29/09/93
6TH EDITION
ACTIVITY
AGENCY
SECTOR
-VILLAGE(S)----
FUNDED
DURATION
-STATUS-
---BY--
Begin--End
-<ATTi 1T
DEC7RIPTICK>
Jaghatu
Ghazni
-
-
AERANE
WATER:
Canai
Kakrak
Proposed
URN
-- 93 -- --
NAC
AGRIC:
Other
Kakrak
Proposed
NA3
-- 93 10 93
NAC
AGRIC:
Other
Khogiani
Proposed
NAC
-- 93 10 93
NAC
CONST:
Pub.Building
Khogiani
Proposed
SAC
6 53 11 93
NAC
,CONST:
Pub.Bilding
District level
Proposed
NAC
-- 93 11 93
Reconstruction of primary Ktoo:
NAC
CONST:
Pub.Building
Kakrak
Proposed
NAC
-- 93 10 93
Construction of primary schnol fE
Eicha
Proposed
UNDP
-- 93 -- --
Rehabilitation of 10 karezes.
Sangi Masha
Proposed
UP
-- 93 --
Rehabilitation of 6 karezet.
Ghazni
irrigation repair.
Vegetable promotion prcE am.
.
Vegetable promotion project.
Construction of clinic buildinr
nCF!)
Ja.ghori
Earn
CSFIA
WATER:
CSFIA
WATER: -Karez
KAG
AGRIC:
Crop Product
Angori/4
Proposed
RAP
-- 93 -- 94
Wheat seed multiplication / demonstration plate
KAG
AGRIC:
Livestock
Angori/2
Proposed
CIDA
-- 93 -- 94
Poultry benefit 650 families.
KAG
CONST:
Sanitation
Angori/5
Proposed
RAP
-- 93 -- 93
Latrines construction.
KAG
CONST:
Other
Zeerak
Proposed
CIDA
-- 93 -- 93
Electricity power plant benofit 8
LAG
INCOME: Skill Train.
Zeerak
Proposed
TAF
-- 93 -- 93
20 trainees / 2 ccursv / knitting / 4 months.
KAG
INCOME: Skill Train.
Zeerak
Proposed
TAF
-- 93 -- 93
10 trainees / weaving / 5 months.
&AG
SOCIAL:Other
Angori
Proposed
TAF
-- 94
SCO
AGRIC:
Sangi Masha
Proposed
UNDP
SCO
DUCAT: Literacy
Bosaid
Proposed
TAF
SCO
EDUCAT: Literacy
Tabqus
Proposed
TAF
-- 93
SCO
EDUCAT: Literacy
Dawood
Proposed
TAF
-- 93
SCO
INCOME: Handicrafts
Sangi Masha
Proposed
TAF
Livestock
-- 53 --
ntrsery.
families.
Newsletter i Dan
Improved breeding sikap,
93 -- --
For women / 2 teacCers & 50 students.
For WOMO / 2 teach:rs 4 50 stuCents.
-
--
or women
2 teacers
6,adeotf,
Tailoring center.
IACBAR
DATABASE OF NGO ACTIVITIES
Page:
281
Abactrep pate: 29/08/93
6TH EDITION
ACTIVITY
-VILLAGE(S) - - --
SECTOR
AGENCY
FUNDED
DURATION
<ACTIVITY
- --BY --
Begin --End
Proposed
UNDP
-- 93 -- --
-- STATUS --
DESCRIPTION>
Khwaja Omri
Ghazni
Rehabilitation of 25 karezes in Ihwaja Oiri i Zena Iban.
ACED
WATER:
Larez
CONST:
Pub.Building
Khwaja Omri
Proposed
GAF
--
Reconstruction of boys high school (15 rooms).
AEA
CONST:
Pub.Building
Ihwaja Otri
Proposed
GAF
--
Reconstruction of girls high school (15 roots).
AEA
AGRIC:
Forestry
Ihwaja Otri
Proposed
FAO/UNDP
-- 93 -- --
`s small reforestation project + Introduction 10,000 seedlings.
AFRANE
HEALTH: Med.Training
--
Proposed
UNICEF
-- 93 -- --
OPD / 1 female doctor / 2 female nurses / i guard & training of MCHO.
GAF
HEALTH: Med.Training
--
Proposed
EC
-- 93 -- --
I female doctor/ 2 nurses / 1 fetale vaccinator i OPD &. TEA Training for 30 fetale trainees.
GAF
CONST:
Pub.Building
Barakat/Deh Hail.
Proposed
NAC
-- 93 10 93
Reconstruction of Barakat secondary school.
SAC
CONST:
Road
Ihwaja Omri
Proposed
NRC
-- 93 -- --
Rehair of road between center of Ghazni & Ihwaja Gmarì.
START
Miradina
Proposed
WFP /CBO
-- 93 10 93
School building :15 rooms / 6 toilets - mud / stone / cement & wood.
Maleetan
Ghazni
Pub.Building
IAG
CONST:
EDUCAT: Secondary
Miradina
Proposed
NOVIB
-- 93 -- 93
1 school / 11 teachers & 440 students.
EAG
INCOME: Skill Train.
Miradina
Proposed
TAF
-- 93 -- 93
10 trainees / weaving i 5 months.
EAG
INCOME: Skill Train.
Shenadeh
Proposed
TAF
-- 93 -- 93
10 trainees / weaving / 5 soothe.
IAG
INCOME: Skill Train.
Miradina
Proposed
TAF
-- 93 -- 93
10 trainees in spinning for 5 months.
LAG
INCOME: Skill Train.
Shenadeh
Proposed
TAF /DPI
-- 93 -- 93.
10 trainees in spinning for 5 months.
IAG
Irrigation repair.
Mogor
Ghazni
AFRANE
WATER:
Canal
Honor
Proposed
UNDP
-- 93 -- --
Coil
AGRIC:
Livestock
Hour
Proposed
RAP
-- 93 -- --
CoAR
EDUCAT: Primary
Proposed
SV
-- 93
-- --
Co .R
EDUCAT: Secondary
Proposed
SV
CoAR
HEALTH: Compr.Clinic
Moor
Proposed
RAP
-- 93
- --
Coil
HEALTH: MCH
Moor
Proposed
SV
-- 93
--
District level clinic.
--
6TH EDITION
A
CB
DATABASE OF NGO ACTIVITIES
R
Page:
282
A6actrep Date: 29/08/93
FUNDED
ACTIVITY
GAF
AGRIC:
Vet
- - --
<ACTIVITY
- --BY --
-- STATUS --
Mogor
Proposed
UNDP
Nava
Proposed
RAP /SV
DESCRIPTION>
Nawa
Ghazni
CoAR
- - --VILLAGES)
SECTOR
AGENCY
DURATION
Begin- -End
AGRIC:
Ghazni
Vet
-- 93 -- --
Qarabagh
Distribution of 10,000 fruit saplings.
10 villages
Proposed
-- 93 -- --
AGRIC:
Fruit Trees
FAO
AFS
Rehabilitation of 15 Em karez - benefits 1380 families.
5 villages
Proposed
-- 93 -- --
WATER:
Kara
UNDP
AFS
Proposed
Primary school building
Zardalo
-- 94 -- --
CONST:
Pub.Building
DACAAR
DACAAR
Proposed
Wheat seed multiplication i demonstration & nursery.
Crop Product
Aliabad /3
-- 93 -- 94
AGRIC:
RAP
KAG
Poultry rising for 13 months benefit 700 families.
Livestock
Nei gala
Proposed
-- 93 -- 94
AGRIC:
TAF
EAG
School building: 15 rooms / 6 toilets - sud / stone / cement & rood.
Pub.Building
Jangalak
Proposed
-- 93 10 93
COAST:
WFP /CBO
KAG
Pub.Building
Talaki
Proposed
-- 93 10 93
CONST:
WFP /CBO
KAG
BAG
COAST:
Proposed
WFP /CBO
School building:l5 rooms / 6 toilets - sud i stone / cement A wood.
Shakinoka
-- 93 10 93
Pub.Building
Proposed
Latrines construction.
Sanitation
Aliabad /6
-- 93 -- 93
CONST:
RAP
EAG
1 school / 7 teachers / 370 students.
Jangalak
Proposed
-- 93 -- 93
DUCAT: Prism,
NOVIB
BAG
Proposed
1 school / 9 teachers / 360 students.
Shakinoka
-- 93 -- 83
EDUCAT: Primary
NOVIB
KAG
Proposed
1 school / 5 teachers / 200 students.
Gar Murda
-- 93 -- 93
EDUCAT: Primary
EAG
EAG
Proposed
1 school 16 teachers / 330 students.
Quliaquï
-- 93 -- 93
EDUCAT: Primary
NOVIB
KAG
Proposed
1 school / 9 teachers 1 455 students.
Talaki
-- 93 -- 93
¡DUCAT: Primary
NOVIB
EAG
Proposed
20 trainees / knitting / 2 courses for 4 months.
INCOME: Skill Train.
Nai Qala
TAF.
-- 93 -- 93
KAG
Proposed
10 trainees i weaving for 5 months.
Nai Qala
-- 93 -- 93
INCOME: Skill Train.
.TAF
EAG
Distribution of 6 solar cooker / 1 month trial for 6 families.
Nai Qala
Proposed
-- 93 -- 93
INCOME: Other
TAF
BAG
Aliabad /6
RAP
-- 93 -- 93
Cleaning of 6 canals / irrigates 3620
Proposed
IAG
WATER:
Canal
.
Page:
School buildìng:25 rooms / 6 toilets - mud / stone / cement & wood.
283
A6actrep Date: 29/06/93
jeribs land á benefit 470 farmer families.
FUME`
ACT :BITY
y1j _ ____..
AGENCY
Zea
Ghazni
ARO
WATER:
ARO
WATER:
ARS
WATE1.:
CoAR
AgiIU :
CoAR
ONO,.:
CAR
O F
<ACTIVITY
Proposed
COP
-- 93 --
Repairing and extension of Lena Khan Dac,
FloodControl
iena than
Proposed
RAP
-- 93 -- --
Flood protection.
FioodControl
4 villages
Proposed
UNDP
-- 9,3 --
Construction of 100 m flood protection wail (stone &
--
Vet
Lena Khan
Other
Proposed
RAP
-- 93 -- -..
Proposed
FP`
-- 93 -- -_
SV
St EAm
Pro;Jsea
St'
Proposed
UNIX
Proposed
US Di
3ecnr.ery
vet.
iena Khan
Lai
Earez
Ghor
DESCRIPTION>
cement), protects 5,000 jeribs & benefits 2,000 families.
-- 93 _._
ur -;: angal
8 villages
-
-
- --
Cleaning of 6 karezes length 4 ke irrigate 800 jeribs & benefit
400 families.
Taywara
BiRC
WATER:
garez
Helmand
FRF
WATER:
Helmand
SRO
AGRIC:
He inland
ANB
CONK:
Helmand
ARPD
Begin --End
7,eros Khan
Proposed
WATER:
CURATION
- --BY --
Khan
Structure
(hor
ARPD
- - STATUS --
EPUCAT: Primary
`.ERIC:
BURG
--- VILLAGE S - _-
AGRIC:
WATER:
12 villages
Proposed
UNDP
Proposed
UNDP
-
--
--
Cleaning of 10 karezes length 8 kc / irrigate 4,000 jeribe & benefit 5,000 families,
--
Cleaning of 12 km canal i irrigates 3,000 jeribs land & benefit 250 families.
Bust
Canal
Dagain
Garmser
Crop Product.
15 villages
Proposed
FAO /UNDP
-- -- -- --
Multiplication of 3 MT maize seed / 7.5 MT DAP & 7.5 MT Urea
Construction of school & hospital buildings.
to 150 farmers.
Helmand
Pub,Building
Center
Proposed
Germany
-- -- -- --
Proposed
FAO
-- 93 --
Multiplication of 16 MT maize seed / 100 MT Urea
iGMC
-- 93 --.93
16 karezes - length 58 km - benefit 5270 fariere.
Musa dala
Crop Product
Earn
25 villages
16 villages
Proposed
pACBAR
/ 50 MT DAP through'4020 farmers.
DATABASE OF NGO ACTIVITIES
6TH EDITION
Page:
284
Aëa treç D ate: 2P
r:
O8iK
ACTIVITY
SECTOR
AGENCY
HRAy
AGRIC:
- - -- VILLAGES) - - --
Crop Product
Helmand
25 villages
FUNDED
DURATION
- --BY --
Begin- -End
Proposed
FAO
-
-- STATUS --
<ACTIVITY
DESCRIPTION>
Multiplication of 16 MT maize seed ï 15 MT DAP & 100 HT Urea benefit 756 families.
Nad -Ali
SWAARR
AGRIC:
Crop Product
10 villages
Proposed
FAO /UNDP
SWARO
WATER:
Structure
Babaji
Proposed
UNDP
-- 93 -- --
Cleaning of. drainage.
VARA
HEALTH: Education
Nara
Proposed
WFP
-- -- --
-
25 lady TBAs for 4 months.
VARA
WATER:
Narja
Proposed
UNDP
-- -- - -
-
Cleaning of 10 km canal / irrigates 4.000 jeribs & benefit 900 families.
Canal
Helmand
- -
Pultiplication of 4 NT cotton seed / 10 MT DAP & 10 MT Urea benefit 200 farmer families.
-
Nahr Saraj
HAFO
WATER:
Canal
1 area
Proposed
UNDP
-
Cleaning cf 16 km canai.
4Fù
AGRIC:
Crop Product
23 villages
Proposed
FAO /UNDP
-
Multiplication of 4 MT wheat seed
SWARD
AGRIC:
Fruit Trees
Spin Najit
Proposed
UNDP
-- 93 -- --
Fruit tree nursery & farmer training.
5WFAO
CONST:
Road
Proposed
HCR
-- 93
--
Road repairing.
Proposed
DCP
-
--
Bee keeping A training
Helmand
ätêO
AGRIC:
Helmand
Nauzad
Livestock
5 villages
-
program.
Nawae Barak.
SRO
AGRIC:
Crop Product
15 villages
Proposed
FAO/UNDP
4WFAO
WATER:
Canal
Soorkhudaz
Proposed
UNDP
VERA
WATER:
Canai
Gawargain
Proposed
UNDP /WFP
Cleaning ci 25 ka cana.
Helmand
li CT DAP A 10 NT Urea to 200 farmera.
,
Multiplication of 3 MT maize seed
-- 93 -- --
7.5 MT DAP & 7.5 MT Urea to 150 farmers.
Cleaning of canal.
,/
.000 jeribs A benefit 1190 families.
irrigates
Sarban Mala
HAFO
WATER:
Structure
Sangin
Proposed
DCP
jen5truc
HRAy
AGRIC:
Crop Product
25 villages
Proposed
FAO
Ruitip
ca;ion of 16 MT maize seer,;
Proposed
FÊ)
tit;
cation of 16 MT maize seed i 100 B' Urea ! 50 MT DAP through 3270 farmers
Helmand
ARPD
AGRIC:
ACBAR
cf uL'; 6 a':Lnon.
,
15 1áT DAP
.c
IUÛ MT Urod benefit 754 1aeiiiee.
Waehare
Crop Product
16 vid ages
-
DATABASE OF NGO ACTIVITIES
2g,`
A6actrep Date: 29/06/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
BRCO
WATER:
Canal
ARAA
CONST:
Pub.Building
ARAA
AGRIC:
Crop Product
ARAA
CONST:
Road
Herat
CONST:
Herat
DESCRIPTION>
Excavation of Sahar Khiz canal - 1.5 m depth, 4 a width, 9 km length.
Proposed
ARCON
Proposed
AID
-- 93 -- --
Reconstruction of primary school (10 rooms) use cement & sand.
Proposed
WFP/UNDP
-- 93 -- --
Cultivation of governmental fars with different kinds of seed donated by FAO.
Proposed
WFP /UNDP
-- 93 -- --
Repairing of 50 km road from Gozarh to Puehtun iarghon.
Ionsan
Surveyed
NRC /NCA
-- 93 -- --
Other construction.
Kushk
Proposed
ARCON
-
-- -- --
Excavation of Kushk canal - 2 a width, 2 m depth, 2 ka length.
Proposed
AID
-- 93 -- --
Reconstruction of primary school (10 roots) use cement & sand.
Hospital equipment for the poly clinic of the area.
Sahar Ihiz
--
4 villages
--
Kohean
Other
Kushk
WATER:
Herat
ARRA
<ACTIVITY
Begin- -End
Gozarah
Herat
BRCO
DURATION
FUNDED
- --BY --
Ghoryan
Herat
NPO
-- STATUS --
Enjeel
Herat
CONST:
Canal
Zendajan
Pub.Building
4 villages
Bagrami
Kabul
.
- - -- VILLAGE(S) - - --
ARO
HEALTH: Other
Shewaki
Proposed
WFP
-- -- -- --
ARO
WATER:
Canal
laaari
Proposed
WFP
--
ARO
WATER:
Structure
Bagrami
Proposed
UNDP
-- 93 -- --
One diversion dam.
Proposed
WFP
-- 93 -- --
Rehabilitation of 7.120 I! karez - irrigates 2,500 J. land - benefits 390 families.
Proposed
WFP
-- 93 -- --
Cleaning of 7 karezes(14.78 km), irrigate 1860 Jeribs &benefit 353 families.
Charaayab
Kabul
AFS
WATER:
Kabul
AIS
Cleaning of 8 km canal.
WATER:
IACEA R
Tarez
4 villages
Deh Sabz
Tarez
6 villages
DATABASE OF NGO ACTIVITIES
Page:
Y86
A6actrep Date: 27/08/93
6TH EDITION
FUNDED
ACTIVITY
---- VILLAGK(SI - - --
SECTOR
AGENCY
-- STATUS --
<ACTIVITY
Begin- -End
Kabul
Kabul
DURATION
- --BY --
DESCRIPTION>
Rehabilitation of chichen farms.
City
Proposed
UNDP
-- 93 -- 94
City
Proposed
CIDA
--
INCOME: Skill Train.
Proposed
Preservation of local Terminologies of different provinces.
Center
-- 93 -- --
SOCIAL:Other
NRC
BRR
Proposed
A provisional orthopaedic workshop.
City
-- 93 -- --
HEALTH: Disabled Reh
ICRC
ICRC
Proposed
UNDP
-- 93 -- --
Rehabilitation of 144 karezes.
Proposed
WFP
-- 93 -- 93
Distribution of 76.5 MT wheat benefit 875 families.
3 villages
ACRU
AGRIC:
ACRU
Livestock
Leather training center.
PaBhman
Kabul
tarez
ACRD
WATER:
ACRU
RELIEF :Food iteae
10 villages
Proposed
FAO
Distribution of 10,000 fruit saplings.
Fruit Trees
-- 93 -- --
AGRIC:
Proposed
Rehab. of 12.6 Is karez - benefits 940 families.
larez
Oria Ihel
-- 93 -- --
WATER:
WFP
AFS
Paghman
Proposed
Rehabilitation of talag Bagee karezes.
Earn
4 93 -- --
WATER:
UNDP
BRR
Paghman
Proposed
Establishment of 16 Nurseries including all related activities.
Fruit Trees
0 93 --
AGRIC:
AID &WFP
CARE
Forestry
Proposed
AID &WFP
Plantation of 72,000 trees along the 36km irrigation canals.
AGRIC:
Paghman
0 93 -- --
CARE
Proposed
Rehabilitation of one Fart which cover 48 ha area including all related activities.
Other
Paghman
0 93 -- --
AGRIC:
AID &WFP
CARE
Proposed
Reconstruction of 5 Roads with the total length 40km including other structures.
Road
Paghman
0 93 -- --
CONSI:
AID&WFP
CARE
Construction of 56 Shelter / house with 112 rooms.
Shelter
Paghman
Proposed
0 93 -- --
CONST:
AID &WFP
CARE
Proposed
Construction of 3 village level storehouses with capacity of 150 mt.
Storage
Paghman
0 93 -- --
CONST:
AID &WFP
CARE
Paghman
0 93 -- --
Earez.
Proposed
Rehabilitation of 30 Karezes with total length 48km including other structures.
WATER:
AID &WFP
CARE
Paghman
Proposed
Rehabilitation of 25 Irrigation canals with
Canal
0 93 -- --
WATER:
AID &WFP
CARE
Proposed
AID&WFP
0 93 -- --
Construction of 69 Erosion barriers with stone masonry,
AF3
-
'
--
total length 54km including other structures.
compacted soil & Gabion work.
CARE
WATER:
F oodeontrol
Paghman
Paghman
Proposed
activities.
Rehabilitation of 4 Springs with total length 4km including other
Drinking
0 93 -- --
WATER:
AID&WFP
CARE
larez
Surveyed
WFP
16 karezes length 20 km irrigate 1000 jeribs benefit 2000 persons.
WATER:
15 villages
1 93 -- --
SOLAF
15 villages
Surveyed
3 canals length 5 km irrigate 1000 jeribs & benefit 2000 persons.
Canal
1 93 -- --
WATER:
WFP
SOLAF
-_ 6TH EDITION]
ACBAx
DATABASE OF NGO ACTIVITIES
Page: 287
A6aetrep Date: 29/08/83
ACTIVITY
AGENCY
SECTOR
SOLAP
WATER:
FloodControl
Kabul
ARDP
SWARD
AGRIC:
WATER:
IBA
KMA
RIFRA
WFP
<ACTIVITY
1 93 -- --
Constructed with 100
DESCRIPTION>
stone / cement / sand & gravel - benefits 1000 persons.
Fruit Trees
--
Proposed
-- 93 -- --
Vineyard project.
Arghistan
Drinking
UNDP
-- -- -- -
Six 40
Bala Jar
Proposed
NCR
-- 93 -- --
Cleaning of 5 karezee.
HEALTH: Basic Post
--
Proposed
EC
WATER:
11 villages
Proposed
UNDP
Canal
Ierz
Proposed
RAP
-- 93.-- 93
Cleaning of 9 ka canal i irrigates 3,150 jeribs & benefits 300 farming families.
Crop Product
40 villages
Proposed
FAO
-- -- -
--
Distribution of 70 MT wheat seed / 70 MT DAP / 120 MT Urea to 100 farmers.
Proposed
DCP
--
Rehabilitation of 3 canals - benefits 36,000 people.
Proposed
UNDP/VFP
-
Installing Bio -Gas system of landahar 150 bed hospital.
WATER:
WATER:
ÁGRIC:
WATER:
Kandahar
VARA
DURATION
Begin- -End
Proposed
Kandahar
EAFA
Surveyed
FUNDED
- --BY --
6 villages
Kandahar
AHDS
15 villages
-- STATUS --
Shakar Dara
Kandahar
INA
VILLAGEms) - - --
CONST:
Kandahar
Larez
Daman
larez
Health post.
--
Cleaning 28 km karez irrigate 4000 jeribs land & benefit 450 families.
David
Canal
Kandahar
Other
Kandahar
-
--
Khakraiz
ANDS
HEALTH: Basic Post
--
Proposed
EC
BURL
WATER:
5 villages
Proposed
UNDP
--
Kandahar
well along with hand pump & benefits 600.
tarez
Health post.
Cleaning of 3 karezes length 5 km / irrigate 2,000 jeribs land & benefit BOO families.
Maruf
ARPD
HEALTH: Distrct Hoop
100 villages
Proposed
ICMC
-- 93 -- 94
Hospital with 10 beds 110 patients dailïr / 5 med. staff & 5 unskilled staff.
ARPD
WATER:
Karen
100 villages
Proposed
UNDP/WFP
-- 93 -- -
10 karezes / length 15 km / irrigate 8500 jeribs / benefit 252 farmers & 80 labour families.
ARPD
WATER:
tarez
40 villages
Proposed
UNDP/WFP
-- 93 -- --
ACHAR
.
40 karezes - length 30 km - irrigate 2764 jeribs & benefit 636 farmers.
DATABASE OF NGO ACTIVITIES
Page: 288
A6actrea Date: 29/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
ARPD
WATER:
Kandahar
---- VILLAGE(S) - - --
garez
20 villages
DURATION
FUNDED
-- STATUS --
Proposed
<ACTIVITY
- --BY --
Begin --Ind
UNDP/WFP
-- 93 -- --
DESCRIPTION>
20 tames / length 2.5 ka / irrigate 1500 jeribs / benefit 700 farmers.
Maywand
FRF
WATER:
Canal
3 villages
Proposed
UNDP
--
Cleaning of 15 km canal / irrigates 5140 jeribs land & benefit 500 families.
FRF
WATER:
Canal
5 villages
Proposed
UNDP
--
Cleaning of 39 km canal / irrigates 1800 jeribs land & benefit 1,000 families.
Proposed
FAO
--
Distribution of 70 NT wheat seed i 70 MT DAP / 120 HT Urea to 100 farmers for multiplication.
--
Cleaning A repairing of 12 karezes.
Kandahar
KMA
AGRIC:
Paniwai
Crop Product
Kandahar
HAFO
WATER:
HAFO
.WATER:
Kandahar
BURC
WATER:
Kandahar
20 villages
Shahwali Kot
larez
14 villages
Proposed
UNDP
Structure
4 villages
Proposed
UNDP
2 villages
Proposed
Construction of 4 dikes A intake.
Shega
Canal
'
UNDP
--
Cleaing of 2 canals / 12 km /irrigate 8,000 jeribs land & benefit 10,000 families.
IC
--
Health post.
--
Multiplication of 15 MT improved potalo seed / 2.5 MT Urea / 2.5 NT DAP & 1.5 NT SOP fertilizer for 50 jeribs.
Shorabak
Proposed
ARDS
HEALTH: Basic Post
SRO
AGRIC:
Crop Product
4 villages
Proposed
ICMC /FAO
--
SRO
CONST:
Shelter
Narkaz
Proposed
HCR/WFP
--
Construction of 628 residential houses for the returnees.
SRO
WATER:
tarez
5 villages
Proposed
ICMC/WFP
--
Cleaning of 7.8 km karez / irrigates 280 jeribs & benefits 294 farmers.
SRO
WATER:
larez
3 villages
Proposed
ICMC/WFP
--
SRO
WATER:
Canal
7 villages
Proposed
ICNC/WFP
SRO
WATER:
Drinking
5 villages
Proposed
HCR
Kandahar
Cleaning of 77 km canal / irrigates 16300 jeribs & benefits 643 families.
Digging of deep well & installation hand pump benefits 626 families.
--
Spin Boldak
FIF
WATER:
FloodControl
12 villages.
Proposed
UNDP
SWARO
WATER:
larez
Babuk Sahib
Proposed
DCP
lACBAR
Cleaning of 5.3 ka karez / irrigates 1050 jeribs & benefits 90 families.
--
700 m gabion & stone / protected 3,000 jeribs 7 benefit 600 families.
-- 93 -- --
Cleaning & rehabilitation of 1 karez & 120 wells.
DATABASE OF IGO ACTIVITIES
Page: 289
A6actrep Date: 29/08/93
6TH EDITION
ACTIVITY
AGENCY
---VILLAGE(S)----
SECTOR
WATER:
SWARD
Structure
Kapisa
CONST:
IAM
-- STATUS --
FUNDED
DURATION
- -BY --
Begin --End
-- 93 -- 83
Shadezi
Proposed
UNDP
Open
Surveyed
IAH
9 94 -- --
<ACTIVITY
DESCRIFTION>
Construction of 300 e diversion dal.
Kapiea
Other
Kapisa
Micro- hydropower plants.
Paniiahare
A-AID
AGRIC:
Fruit Trees
Bazarak
Surveyed
ODA
-- 93 -- 93
Fruit nursery
A -AID
CONST:
Road
Parandti
Surveyed
ODA
-- 93 -- 93
Rehabilitation of 2.5 Ea roat from Seta - Dnagana & construction of 3 culverts i 1 bridge i 700 a retaining wall.
A -AID
CONST:
Shelter
Rokha
Surveyed
ODA
-- 93 -- 93
Distribution of (3,000 beams / 100 windows /100 doors i 100 gates).
A -AID
CONST:
Shelter
Bazarak
Surveyed
ODA
-- 93 -- 93
Distribution of )3,000 beams
A -AID
WATER:
Canal
Gangazak
Surveyed
ODA
-- 93 -- 93
Rehabilitation of canal - benefit 45 farmer families.
A -AID
WATER:
Structure
iohi Shaba
Surveyed
ODA
-- 93 -- 93
Rehabilitation of 2 Ea canal'- benefit 45 farmer families.
Kapisa
I00 windows i 100 doors
Panjsharel
A -AID
AGRIC:
Crop Product
Paryan
Surveyed
ODA
-- 93 -- 93
Distribution seed A fertilizer.
A -AID
AGRIC:
Plant Protec
Paryan
Surveyed
ODA
-- 93 -- 93
Chemical crop protectión.
A -AID
WATER:
Canal
Astana
Surveyed
ODA
-- 93 -- 93
Rehabilitation of canal - benefit 100 farter families.
A -AID
WATER:
Canal
Paryan
Surveyed
ODA
-- 93 -- 93
Rehabilitation of canal - benefit 300 farmer families,
Surveyed
ODA
-- 93 -- 93
Chemical crop grotectioe.
Kapisa
AGRIC:
A -AID
Kunar
Panjehare2
Plant Protec
Dare Hazara
Bar Kunar
AMRAN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
AMRAN
AGRIC:
Crop Product
5 villages
Proposed
UNDP
WATER:
Canai
Chagas
Proposed
UNDP
RDP
'
A C B A R
100 gates).
Multiplication of 3 HT improved rice seed i 3 KT DAP & 3 MT Urea.
--
Multiplication of 4 MT improved maize seed i 4 MT DAP & 4 KT Urea.
Cleaning canal - length 17 kt - irrigate 1600 hectares & benefit 4,000 faillies,
-- 93 -- --
DATABASE OF NGO ACTIVITIES
Pate:
290
A6actrep Date: 29/08/93
6TH EDITION
ACTIVITY
VILLAGE(SI - - --
SECTOR
AGENCY
-- STATUS --
DURATION
FUNDED
<ACTIVITY
- --BY --
Chagtiasarai
Kunar
DESCRIPTION>
Begin- -End
Proposed
UNDP
--
Multiplication of 4 MT improved rice seed / 4 MT DAP & 3 MT Urea.
4 villages
--
Multiplication of 4 MT improved raise seed / 4 MT DAP & 4 MT Urea.
ARRAN
AGRIC:
Crop Product
AGRIC:
Crop Product
4 villages
Proposed
UNDP
ARRAN
Pub.Building
Center
Proposed
-
CONST:
Gersany
ANH
Asadabad
Proposed
Betablishsent of poultry far, in Asadabnd.
Livestock
-- 93 -- --
AGRIC:
UNDP
TPRPA
Proposed
Construction Watapur damaged school.
Pub. :Building
Bata Poor
-- 93 -- --
CONST:
WFP
TPRPA
Asadabad
Proposed
Training line an technicians / operators A electricians.
Other
-- 93 -- --
CONST:
CIDA
TPRPA
Multiplication of 4. MT improved raise seed/ 4 MT DAP A 4 MT Urea.
-- -- -- .
Construction of school & hospital buildings.
Chawki
Kunar
AGRIC:
Crop Product
4 villages
Proposed
UNDP
-- -- -- --
ARRAN
AGRIC:
Crop Product
3 villages
Proposed
UNDP
--
ARRAN
WATER:
Canal
Chawki
Proposed
Gersany
-- -- -- --
ANH
Chawki
Proposed
DCP
.Peab Iuea master trainer drug awareness trainiat couse -..4 courses for 75 hams.
HEALTH: Education
-- 93 -- --
ISRA
Multiplication of 3 MT improved rice seed / 3 MT DAP A 3 MT Urea.
Cleaning of small irrigation; canals.
Kamdesh
Kunar
Pub.Building
ARDP
CONST:
ARDP
EDUCAT: Other
ARDP
HAM Other
Proposed
-- 93 -- --
Construction of health clinic building.
Nooristan
Proposed
-- 93 -- --
Narcotic control program.
Nooristan
Proposed
-- 93 -- --
TB control program.
Narang
Kunar
Cleaning of small irrigation canals.
ANB
WATER:
Canal
Narang
Proposed
Gersany
CONST:
Pub.Building
--
Proposed
DCP
-- 93 -- --
ESAR
WATER:
Structure
Narang
Proposed
FAO
--
RAH
Bar Narang BBU.
Construction of intake k retaining rill.
Nour Gul
Kunar
ARRAN
AGRIC:
Crop Product
lajando
Proposed
UNDP
ARRAN
AGRIC:
Crop Product
tajando
Proposed
UNDP
Multiplication of 3 MT improved rice seed / 3 MT DAP & 3 NT Urea.
Multiplication of 3 NT improved wise need / 3 MT DAP k 3 NT Urea.
--
6TH EDITION
DATABASE OF 1GO ACTIVITIES
ACBAR
Page:
291
A6actrep Date: 29/08/93
ACTIVITY
AGENCY
SECTOR
EAR
CONST:
Pub.Building
Kunar
TPRPA
TPRPA
TPRPA
TPRPA
---- VILLAGE(S)- - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
--
Proposed
DCP
-- 93 -- --
Construction of Noor Gul High School.
-- 93 -- --
Maize crop production.
Pech
AGRIC:
Crop Product
Pech
Proposed
FAO
COAST:
Other
Dangalic
Proposed
EC /NAC
WATER:
Structure
-
Proposed
UNDP
-- 93 -- --
Construction of culvert.
WATER:
FloodControl
--
Proposed
UNDP
-- 93 -- --
Construction of flood protection wall.
Kunar
--
Dangalic mini hydraulic power station.
Sirkanay
ESAR
COAST:
Bridge
RAH
AGRIC:
Crop Product
Kunduz
Proposed
DCP
-- 93 -- --
Coche Baia Footbridge.
All villages
Proposed
FAO /UNDP
-- 93 -- 94
Multiplication of rice & maize seeds.
Kunduz
VITA
CONST:
Road
Gor Tapa
Surveyed
AID
--
1 93
Rehabilitation of road, benefit 15,000 families.
VITA
WATER:
Canal
Gor Tapa
Surveyed
AID
--
1 93
Cleaning of 30 ks canal, benefit 10,000 faiilies.
Laghman
AC
ARAN
ARAN
CIUP
CIUP
IHSAN
IHSAN
LRO
LR0
DESCEIPTION>
A1inBar
WATER:
Structure
Mulayan
Proposed
UNDP
-- 93 -- --
Retaining wall construction.
AGRIC:
Crop Product
4 villages
Proposed
UNDP
-- -- -- -
Multiplication of 3 MT improved laize seed / 3 MT DAP & 3 MT Urea.
Proposed
UNDP
--
Multiplication of 3 MT improved rice seed / 3 MT DAP & 3 MT Urea.
Canal
Proposed
UNDP
--
Rehabilitation of canal.
Canal
Proposed
UNDP
-- -- -- --
Rehabilitation of canal.
Alingar-Mehterlar
Proposed
WFP
-- 93 -- --
Rehabilitation of 25 ks road (Alingar- Mebterlas).
Mian ihel
Proposed
WFP
-- 93 -- --
Rehabilitation of 4 karezes + repairing of tunnel & well.
Abezai- Shasati
Proposed
UNDP
--
UNDP
-- 93 -- 93
AGRIC:
HATER:
WATER:
COAST:
WATER:
WATER:
WATER:
1ACBAR
Crop Product
Road
tarez
Structure
Structure
Tingour /Roghani
lokhi
Surveyed
Construction of 2 siphon & retaining wall(30 s)
Construction of 1 siphon on Kokhi canal.
DATABASE OF NGO ACTIVITIES
Page:
on Iachoor Shasati canal, benefit 3,000 farmers.
292
A6actrep Date: 29/06/93
6TH EDITION I
ACTIVITY'
SECTOR
AGENCY
LRO
WATER:
- - -- VILLAGES) - - --
6hvaja Ehel Sufla
Structure
-- STATUS -
FUNDED
DURATION
--BY --
Begin- -End
Proposed
UNDP
AVRAN
AGRIC:
Crop Product
6 villages
Proposed
UNDP
AMRAN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
LRO
WATER:
3 villages
Surveyed
--
Proposed
UNICEF /S
-Structure
HEALTH: Vaccination
Laghman
AGRIC:
Construction of 500 m retaining rail, benefit 1,500 farmers.
-- 93 -- 94
Multiplication of 4 MT improved rice seed / 3 MT DAP & 3 MT Urea..
Multiplication of 4 MT improved maize seed / 4 MT DAP A 4 MT Urea.
--
Construction of 1 flume & 2 siphon on Ahmadzai A Mandozai canal, benefit 2,500 farmers.
Dawiateha
Laghman
TPRPA
Mobile vaccination team with 3 vaccinators.
-- 93 -- --
Laghman
Crop Product
Laghman
Leghsan
Proposed
FAO
-- 93 -- --
Maize crop production.
-- -- -- --
Cleaning of Baba Saheb canal...
Mehterlam
ACRU
WATER:
Canal
Baba Saheb
Proposed
WFP
AVRAN
AGRIC:
Crop Product
5 villages
Proposed
UNDP
AVRAN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
ANH
CONST:
Pub.Building
Center
Proposed
Germany
CAS
AGRIC:
Crop Product
Proposed
UNDP
CAS
AGRIC:
Livestock
Center
Proposed
UNDP
-- 93 -- -
Poultry farm (50,000 chicks).
RAH
WATER:
Structure
Center
Surveyed
CIDA
-- -- -- --
Construction of intakes, protection walls & siphons.
WROR
WATER:
FloodControl
--
Proposed
UNDP
-- 93 -- --
Bank protection and reconstruction of loose (450 m).
Proposed
UNICEF /S
-- 93 -- --
Mobile vaccination team with 3 vaccinators.
Lághman
GAF
HEALTH: NCH
Multiplication of 3 MT improved rice seed / 3 MT DAP & 3 NT Urea.
Multiplication of 3 MT improved maize seed / 3 MT DAP & 3 NT öres.
--
Construction of school & hospital buildings.
-- -- -- -
--
.
Wheat seed multiplication - autumn plantation.
Nooristan
HEALTH: Vaccination
Laghman
AAA
DESCRIPTION>
Alishing
Laghman
GAF
<ACTIVITY
Qarghaie
Gorghai
Surveyed
NCH.
Page:
293
A6actrep Date: 29/08/93
ACTIVITY
SECTOR
AGENCI
..
---- VILLAGE(S)- --
--STATUS --
FUNDED
- --BY --
DURATION
'< ACTIVITY
Begin --End
DESCRIPTION>
Oarghaie
Laghman
-- -
Qarghaie Haidar Khani canal.
-- --
AAA
WATER:
Canal
Haidar Khani
Surveyed
AAA
WATER:
Canal
óandi
Surveyed
--
Kandì canal.
AAA
WATER:
Canal
Surveyed
--
Surkhakan canal.
AAA
WATER:
Canal
Surveyed
-- -- -- --
AAA
WATER:
Canal
Surveyed
--
Shangery canal.
AB
WATER:
Canal
--
7 ka canal reconstruction.
AEA
CONST:
Road
AKA
CONST:
Bridge
AEA
CONST:
AEA
Abdulrahiazi
Katz Aziz khan
Proposed
RAP
Qarghaie Abdulrahiazi canal.
Reconstruction of Kendrawar -Char Bagh road length 3 km.
Surveyed
-- -- -- --
Qarghaie
Surveyed
--
Repair of Qarghai bridge, heavy transportation capacity - steel / wood & cement.
Pub.Building
Haidar Khani
Surveyed
--
Reconstruction of aiddle school.
CONST:
Pub.Building
Char Bagh
Surveyed
--
Reconstruction of primary school.
ARA
CONST:
Pub.Building
Char Bagh
Surveyed
--
Reconstruction of middle school (8 rooms!.
All
CONST:
Pub.Building
Qarghaie
Surveyed
AEA
CONST:
Pub.Building
Bandrawar
Surveyed
AMRAN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
BRAN
AGRIC:
Crop Product
6 villages
Proposed
UNDP
ARO
CONST:
Road
Qarghaie
Proposed
WFP
--
ARO
WATER:
Structure
Qarghaie
Proposed
UNDP
--
ARO
WATER:
FloodControi
Qarghaie
Proposed
WFP
ARR
WATER:
Canal
Shalatic
Proposed
WFP
-- 93 -- --
Canal cleaning Ì diversion wall / gabion work.
ARR
WATER:
Canal
Qarghaie
Proposed
UNDP
-- 93 -- --
Canal cleaning.
CIUP
WATER:
Canal
--
Proposed
UNDP
ESAR
CONST:
Pub.Building
Mandrawar
Proposed
UNCHS
tA C B A R
--
-- -- -
Reconstruction of high school (10 rooms).
--
Reconstruction of middle school (10 rooms).
--
Multiplication of 3 MT improved rice seed / 3 KT DAP & 3 MT Urea.
Multiplication of 4 MT improved maize seed / 4 MT DAP & 4 KT Urea.
.Repairing of 40 km road (Surkhakan- Meterlam).
Gabion- stone -protection wall & - benefit 900 farmers.
Gabion stone masonry- retaining wall (20 s) - benefit 400 farmers.
Rehabilitation of canal.
Rehabilitation of high school.
-- 93 -- -
DATABASE OF NGO ACTIVITIES
Page:
294
A6actrep Date: 29/08/93
6TH EDITION
1
ACTIVITY
SECTOR
AGENCY
VILLAGES) - - --
FUNDED
DURATION
< ACTIVITY
- --BY --
Begin- -End
Proposed
WFP
-- 93 -- --
Rehabilitation of canals.
-- STATUS --
DESCRIPTION>
ESAR
WATER:
Canal
RAPO
WATER:.
Structure
Qala Iot
Proposed
HCR
-- -- -- --
Construction of 150 a protection wali(gabion work).
START
AGRIC:
Crop Product
3 villages
Proposed
FAO/UNDP
-- 93 -- 93
Improved rice/seize seed multiplication.
Baraki
Proposed
FAO/UNDP
-- 93 -- --
3 smell reforestation project + Introduction 10,000 seedlings.
Baraki
Logar
AFRANE
AGRIC:
AFRANE
INCOME: Other
Baraki Barak
Proposed
UNDP /RAP
-- 90 -- --
AFRANE
SOCIAL:Otheii
Baraki Barak
Proposed
RAP
-- 93 -- 93
Rural de=elopment center.
AFS
AGRIC:
Crop Product
5 villages
Proposed
rAÚ/UNDP
-- 93 -- --
Multiplication of 3 MT maize seed 14.5 MT DAP & 6 MT Urea.
ARO
WATER:
Canal
Deh Iahya
Proposed
UNDP
-- 93 -- --
Rehabilitation of 2 canals - stone masonry of a diversion das.
CARE'
AGRIC:
Fruit Trees
Baraki Barak
Proposed
A,ID&WFP
0 93 -- --
Establishment of 13 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Baraki Barak
Proposed
AIDIVFP
0 93 -- --
Plantation of 337,000 trees alonuthe 168ím irrigation canals.
CARE
AGRIC:
Other
Baraki Barak
Proposed
AID&WFP
4 93 -- --
Rehabilitation of one Fara which cover 5 ha area including all related activities.
CARE
CONST:
Road
Baraki Barak
Proposed
AID&WFP
0 93 -- --
Reconstruction of 2 Roads with the total length 6km including other structures.
CARE
CONS?:
Shelter
Baraki Barak
Proposed
AID&WFP
0 93 -- --
Construction of 33 Shelter / house with 66 rooms.
CARE
CONS?:
Storage
Baraki Barak
Proposed
AID&WFP
'0 93 -- --
CARE
WATER:
tares
Baraki Barak
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 15 &grazes with total length 35ka including other structures.
CARE
WATER:
Canal
Baraki Barak
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 6 Irrigation canals with total length 74ím including other structures.
CARE
WATER:
FloodControl
Baraki Barak
Proposed
AID&WFP
0 93 -- --
Construction of 23 Erosion barriera with stone masonry, compacted soil & Gabion work.
CHI
WATER:
Drinking
Baraki Barak
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 4 Springs with total length llta including other activities.
RAH
WATER:
Structure
Various
Proposed
UN
RAH
WATER:
Structure
Baraki Barak
Proposed
UN
RAH
WATER:
Structure
Various
Proposed
UN
ACBAR
Forestry
__Mechanical work shop for repairing all kinds of machines and instruments.
Construction of 1 village level storehouse with capacity of 50 it.
Construction of intakes in Deh Mughulan, Deb Sheká, Jul Chwla, Jul Shoshma
--
--
Construction of intake & cleaning.
--
Construction of retaining walls in Sheehan, Mohmand, Mohamed Omar, Faizullah Jut, Jul Qazi & Wardak.
DATABASE OF NGO ACTIVITIES
Page: '295
A6actrep Date: 29/08/93
6TH EDITION 1
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
< ACTIVITY
Begin- -End
DESCRIPTION>
===MS
Baraki
Logar
'DURATION
VITA
CONST:
Road
Bardki Rasan
Surveyed.
AID
--
1 93
Rehabilitation of 3.3 km road, benefit 5,714 families.
VITA
CONST:
Bridge
Ghale than
Surveyed
AID
--
4 93
Construction of bridge (concrete & masonry), benefit 480 families.
WROR
WATER:
Inez
Baraki Barak
Proposed
UNDP
-- 93 -- --
Rehabilitation of 5 karezes.
WROR
WATER:
Structure
Baraki Barak
Proposed
UNDP
-- 93 -- --
Repaie of intake and protection wall.
5 villages
Proposed
UNDP
--
5 villages
Surveyed
Charkh
Logar
AMRAN
AGRIC:
Crop Product
Khoshi
Logar
WATER:
ARS
Multiplication of 4 MT improved maize seed / 4 MT DAP & 4 MT Urea.
Iarez
-Cleaning of 15.25 ka karezes, irrigate 1930 jeribs & benefit 420 families.
-- -- -- --
Mahd Agha
Logar
AB
WATER:
Drinking
larghon Shahr
Proposed
UNDP
--
Installation of 100 hand pump wells.
ACRU
WATER:
Canal
Mohd Agha
Proposed
WFP
--
Cleaning of canal.
AMRAN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
-- -
ARO
WATER:
Structure
Dewalak
Proposed
UNDP
-- 93 -- --
CARE
AGRIC:
Fruit Trees
Mohd Agha
Proposed
AID&WFP
0 93 -- --
Establishment of 23 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Mohd Agha
Proposed
AID&WFP
0 93 -- --
flotation of 583,000 trees along the 292ks irrigation -canals.
CARE
AGRIC:
Other
Mohd Agha
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 2 Fards which cover 9 ha area including all related.activities.
CARE
CONST:
Road
Mohd Agha
Proposed
AID&WFP
0 93 -
Reconstruction of 3 Roads with the total length 11km including other structures.
CARE
CONST:
Shelter
Mohd Agha
Proposed
AID&WFP
0 93 -- --
Construction of 57 Shelter f house with 114 rooms.
CARE
CONST:
Storage
Mohd Agha
'Proposed
AID &WFP
0 93 -- --
Construction of 1 village level storehouse with capacity of 50 mt.
CARE
WATER:
Iarez
Mohd Agna
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 25 terms with total length 6lkm including other structures.
CARE
WATER:
Canal
Mohd Agha
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 10 Irrigation canals with total length 130km including other structures.
CARE
WATER:
FloodControl
Mohd Agha
Proposed
LID&WFP
0 93 -- --
Construction of 40 Erosion barriers with stone masonry, compacted soil & Gabion work.
ACBAR
--
-
Multiplication of 4 MT improved maize seed / 4 MT DAP A 4 MT Urea.
2 stone masonry diversion dams.
--
DATABASE OF NGO ACTIVITIES
Page:
296
46actrep Date: 29/08/93
6TH EDITION
SECTOR
AGENCY
Logar
ACTIVITY
FUNDED
DURATION
VILLAGES) - - -- - -- STATUS -
--BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Mohd Agha
Rehabilitation of 7 Springs with total length 19ím including other activities.
0 93 -- --
CARE
WATER:
Drinking
Mohd Agha
Proposed
AID&WFP
DACAAR
AGRIC:
Other
15 villages
Surveyed
FAO /Self
--
RAFA
WATER:
Canal
Proposed
--
-- -° -- --
RRR
CONST:
Pub.Bailding
Proposed
--
--
RRR
WATER:
Structure
Proposed
--
-- -- -- --
Rehabilitation of Surkhab Dam for power and water.
START
AGRIC:
Crop Product
Proposed
FAO /UNDP
-- 93 -- 93
Improved maize seed multiplication.
START
AGRIC:
Crop Product
Mohd Agha
Proposed
ICMC
-- 93 --.93
Vegetables rehabilitation.
START
AGRIC:
Livestock
3 villages
Proposed
FAO /UNDP
-- 93 -- 93
Poultry husbandary.
'° Puli
Logar
--
villages
Data of survey which was conducted by DACAAR submitted to SCA for implementation of agricultural projects.
--
2 canals cleaned.
.
Construction of a guest house, a clinic and a school in Surkhab.
Alam
Rehabilitation of Logar river bank protectien wall.
--
ACRU
WATER:
Structure
lulangar
Proposed
UNDP
APWO
CONST:
Pub.Building
8 villages
Proposed
WFP
CARE
AGRIC:
Fruit Trees,
Puli Alam&Iulangar
Proposed
AID &WFP
0 93 -- --
CARE
AGRIC:
Forestry
Pull Alaa&Iulangar
Proposed
AID&WFP
0 93 -- --
CARE
AGRIC:
Other
Pull Alaa&Kulangar
Proposed
AID&WFP
0 93 -- --
Rehabilitation of one Farm which cover 6 ha area iacleding°nl1 related activities.
CARE
CONST:
Road
Pull Alaa&Iulangar
Proposed
AID&WFP
0 93 -- --
Reconstruction of 2 Roads with the total length 8ka.isclading other structures.
CARE
CONST:
Shelter
Pull Alaa&Iulangar
Proposed
AID&WFP
0 93 -- --
Constructida of 37 Shelter / house with 74 rooms.
CARE
CONS':
Storage
Pull Alaa&Iulangar
Proposed
AID&WFP
0 93 -- --
Construction of 1 village level storehouse with capacity of 50 at.
CARE
WATER:
Iarez
Puli Alaa&Iulangar
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 16 £ aretes with total length 39ka including other structures.
CARE
WATER:
Canal
Puli Alaa&Iulangar
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 7 Irrigation canals with total length 83ks including other structures.
CARE
WATER:
FloodControl
Puli Alaa&tulangar
Proposed
AID&WFP
0 93 -- --
Constriction of 31 Erosion barriers with stoat ,asoary, coapacted soil & Gabion wort.
CARE
WATER:
Drinking
Puli Alaa&luiangar
Proposed
AID&WIP
0 93 -- --
Rehabilitation of 4 Springs with total" "length 13tí including other activities.
RAH
WATER:
Karen
Various
Proposed
UN
Construction of l Mosque & school.
-- 93 -- --
Establishment of 15 Nurseries including all related activities.
.
Plantation of 376,000 trees along the 188ka irrigation canals.
Cleaning of 10 karezes (Objosb Payeen, Objosh Bala, Bangash & Mohd Ghani karezes in Dab Basu, Enaa, Rio Boar,
--
Basheer, Mir Hal, Enayatullah karez in bpi,
'
A C H A R
DATABASE CF NGO ACTIVITIES
Par:
297
A6actrep Date: 29/08/93
6TH EDITION
1
SECTOR
AGENCI
RAE
WATER:
Structure
---- VILLAGI(S)- --
-
ACTIVITY
FUMDID
DURATION
-- STATUS --
--BY --
Begin- -Ind
Babua
Proposed
UN
-- --
--
<ACTIVITY
Construction of Jui Balms intake.
Achin
Nangarhar
Water reservoir.
AAA
WATER:
Drinking
Pekha Boar
Surveyed
BSAR
CONST:
Pub.Building
--
Proposed
DCP
-- 93 -- --
New school Lataband (Pekhool).
BSAR
CONST:
Pub.Building
Proposed
DCP
-- 93 -- --
Construction of 3 new classrooms.
BSAR
CONST:
Pub.Building
Proposed
DCP
-- 93 -- --
Construction of Lataband clinic (Attach to school).
Proposed
P1O /UNDP
-- 93 -- --
Poultry project.
AGRIC:
Lataband
--
Bati Rot
Nangarhar
ERSA
DESCRIPTION>
Livestock
Nangarhar
Behsud
Surveyed
-- -- --
Survey of a village for construction purposes.
All
CONST:
Other
ARRAN
AGRIC:
Crop Product
5 villages
Proposed
U1DP
ARE
WATER:
Canal
Qasimabad /Baharaba
Proposed
UND?
-
BCURA
WATER:
Structure
Iarez babir
Proposed
WFP
-- 93 -- --
5 [m drainage protect 400 jeribe land.
CAS
AGRIC:
Livestock
Center
Proposed
UMDP
-- 93 -- --
Poultry farm - 15,000.
DACAAR
CONST:
Pub.Building
Bush Gunbad
Propoeed
DACAAR
-- 93 -- -
Primary school building
DBSP
CONST:
Shelter
Aga,
Propoeed
FRG
.- 93 -- --
Construction of 100 houses
IHSAN
AGRIC:
Crop Product
Proposed
DCP
-- 93 -- --
Vegetable fars (6 jeribe).
IHSAN
AGRIC:
Livestock
Proposed
OOP
IBSAN
CONST:
Road
Belandghar /iron
Proposed
NIP
-- 93 -- --
Rehabilitation of 7 h road (Bland Ghar- Niran ).
IHSAN
CONST:
Pub.Building
Samba
Proposed
DCP
-- 93 -- --
Construction of a primary school (9 rooms).
IHSAN
WATER:
Canal
Parental
Proposed
WFP
-- -- -- --
Rehabilitation of 4 h canal.
IHSAN
WATER:
Canal
Shandaghar
Proposed
NIP
-- 93 -- --
Rehabilitation of 4 km canal.
`Perawal
-- -- -
Multiplication of 3 HT improved rice seed / 3 NT DAP A 3 NT Urea.
-- -- --
Rehabilitation of major canals & construction of intakes & retaining valle.
i room gar house.
Poultry production.
Pane:
298
A6actrep Date: 29/08/93
-VILLAGE(S)-
SECTOR
AGENCY
ACTIVITY
FUNDED
DURATION
-STATUS-
-BY-
Begin --End
<ACTIVITY -DESCRIPTION>
Road
Behsud
Proposed
BCR
Length 1.33 km, 9 culvert i secondary feeder road.
CONST:
--.93 -- --
RDP
AGRIC:
Crop Product
3 villages
Proposed
FAO/UNDP
-- 93 -- 93
Iiproved rice /Maize seed multiplication.
START
Nangarhar
apart)r
WATER:
Canal
Nondakorak
Proposed
ARGON
--
Nondakorak canal.
AAA
AGRIC:
Crop Product
4 villages
Proposed
UNDP
--
Multiplication of 3 NT improved maize seed / 3 NT DAP i 3 NT Urea.
ARRAN
Structure
Lananga Poor
Proposed
NCR
Construction of i small dam (W.30 M i 11.3.65 b) A flood control.
WATER:
--
HAFO
HTCRA
WATER:
Structure
Shollana
Proposed
UNDP
-- -- -- --
WOA
AGRIC:
Livestock
Proposed
UNDP
--
Nangarhar
Construction of intake.
Poultry iiproveaent.
Darae Noor
AGRIC:
Livestock
Center
Proposed
UNDP
-- 93 -- --
Poultry: providing villager$ with chicken (egg producing breed).
AC
WATER:
Structure
Lundi
Proposed
UNDP
--.93 -- --
Retaining wall construction.
AC
WATER:
Lares
Proposed
UNDP
-- -- -- --
tares cleaning project.
APWO
Shelter
Dara Noor
Proposed
DCP
Construction of shelter.
CONST:
--
MADERA
COAST:
Pub.Building
Darn Noor
Proposed
DCP
--
Repairing of Qalae Shahi Lycee.
MADERA
MADERA
WATER:
Canal
Dare Noor
Proposal
DCP
MADERA
WATER:
Drinking
Dare Noor
Proposed
DCP
--
Water supply.
RAH
AGRIC:
Crop Product
Dare Noor
Proposed
UA
--
Improved seed distribution .
RAH
CONST:
Road
Sheva to Shokiali
Proposed
UN
-- --
CONST:
Pub.Building
Bonta
Proposed
UN
Construction of helth clinic.
RAH
CONST:
Other
Dare loor
Proposed
UN
Reconstruction of flour sill.
RAR
RAB
HEALTH: Basic Clinic
Daru loor
Proposed
UN
Running of c]Aic.
RAH
SOCIAL:Other
Dare loor
Proposed
UN
Creating Soc*1 Welfare Center.
,
-- -- -- -
.
Repairing of Jehanair canal.
Repair of Ihesa to Shokialy road length 16 ka.
------ ---- ---------
Page:
299
A6actrep Date: 29/08/93
-- 0111 IDITION 1
ACTIVITY
AGENCY
SECTOR
---- VILLAGE(S) -- --
Nangarhar
-- STATUS --
.
FUNDED
DURATION
- --BI --
Begin --End
< ACTIVITY
DESCRIPTION>
Darae Noor
RAH
WATER:
Tarez
Dare Noor
Proposed
UN
-- -- --
RAH
WATER:
Structure
Various villages
Proposed
UN
--
Repair of 24 Earers.
Construction of Alai /gala Shahi, Manjena, Gulìna & Faqir Shah / Barkot, Laskanda Qalatak, Safar Qala, Janseer, lodga,
Adil Shah, Jeran /Jonjapoor, êacbaran /gala Shahi & Gaiba/Nanjena.
RAH
WATER:
Structure
Qala Shahi /Amla
Proposed
UN
RAH
WATER:
Drinking
Data Noor
Proposed
UN
Nangarhar
--
Construction of intake & retaining wall.
Spring water supply spates.
Dell Bala
ESAR
CONST:
Pub.Building
ESAR
WATER:
ESAR
--
Propoeed
DCP
-- 93 -- --
Construction of Papin Middle School.
Canal
Proposed
DCP
-- 93 -- --
Reconstruction of Rodkhana canal.
WATER:
Canal
Proposed
DCP
-- 93 -- --
Rehabilitation of Gorgry canal.
ESAR
WATER:
Drinking
Proposed
FP
-- 93 -- --
Drinking water supply Oghez.
YARA
WATER:
Canal
Proposed
UNDP
--
Irrigation repair.
Proposed
UNDP
--
Multiplication of 2 NT improved Baize seed / 3 MT DAP & 2 MT Urea.
Proposed
FAO /UNDP
-- 93 -- --
Poultry & kitchen garden.
-- 93 -- --
Embroidery.
Nangarhar
Goshta
AMRAN
AGRIC:
Crop Product
ERSA
AGRIC:
Livestock
ERSA
INCOME: Handicrafts
Proposed
UNESCO
WORK
AGRIC:
Proposed
UNDP
Arkhai /Sarband
Livestock
Nangarhar
--
Poultry distribution.
-- 93 -- --
Canal rehabilitation.
Hesarak
ADP
WATER:
Canal
Proposed
WFP
ANCO
AGRIC:
Livestock
Proposed
UNDP
ANCO
CONST:
Pub.Building
--
Proposed
DCP
--
Proposed
DCP /UNDP
Proposed
DCP
ANCO
CONST:
ANCO
INCOME: Skill Train.
Pub.Building
.
--
Establishment of poultry fare.
--
Rehabilitation of high school - provides education facilities for 1,200 students grade 1 to 12.
-- 93 -- --
--
Reconstruction of Hesarak district High School building.
Establishment of vocational training center - 100 people in different skills (sesomry / carpestrr / tailoring & stone
work)
ACBAR
.
DATABASE OF NGO ACTIVITIES
Page:
300
A&actrep Date: 29/08/93
6TH EDITION
ACTIVITY
VILLAGES) - ---
SECTOR
AGENCY
-- STATUS --
FUNDED
DURATION
tACTIVITY
- --BY-
Begin- -End
--
Hesarak
Nangarhar
--
Rehabilitation of 2 canals - benefit 1,656 people.
--
Rehabilitation of Sarando canal - benefit 2,555 people.
DESCRIPTION>
Canal
Shaykhan /Kassa
Proposed
DCP
ANCO
WATER
WATER:
Canal
Sarando
Proposed
DCP
ARCO
Nawar /Langer Khel
Proposed
Reconstruction of phase II of Newer 6 Langer Khel canale.
Canal
-- 93 -- --
WATER:
DCP /UNDP
ANCO
Proposed
Rehabilitation of 4 canale (Kasai, Shaykhan, Sarando & Perjina ).
Canal
-- 93 -- --
WATER:
DCP/UNDP
ANCO
Rehabilitation of Perjina canal - benefit 2,685 people.
Canal :
Proposed
--
WATER:
DCP
ANCO
Canal
DCP
Rehabilitation of .3 canals - benefit 14,560 people.
WATER:
Proposed
--
ANCO
Structure
UNDP
Construction of retaining wall.
WATER:
Proposed
--
HTCRA
Surveyed
--
--
Health center for drug abuse control.
City
Jalalabad
Proposed
UNDP
-- 93 --
Nangarhar
Perjina
Jalalabad
-HEALTH: Other
AAA
Canal
Nangarher canai rehabilitation.
AB
WATER:
IDUCAT: Literacy
City
Proposed
NAG
-- 93
ACDO
City
Proposed
NAC
Management & accounting courses.
¡DUCAT: Management
-- 93 -- --
ACDO
City
Proposed
NAC
English language course.
¡DUCAT: Language
-- 93 -- --
ACDO
City-
Proposed
RAP
Health education for adults.
HEALTH: Education
-- -- -- --
ACDO
Proposed
. TAF
Small size business for poor women.
INCOME: Helperaftmen
City
-- -- -- --
ACDO
INCOME: Other
City
Proposed
TAF
--
ACDO
INCOME: Skill' Train.
City
Proposed
CIDA
-- 93 -- --
AFS
Jalaladad
Proposed
WFP /RONC
--
Fruit Trees
-- --
Literacy course,
Self -relaince women program.
Training of 20 trainees for engraving.
Rehabilitation of Sarajui harat garden A
--
producing shadow, fruit 6 ornamental trees saplings.
AHSAO
AGRIC:
City
Proposed
NRC /TAF
Carpet weaving to 15 vomen(6 wontha).
INCONI: Skill Train.
-- 93 -- 94
AMWS
Center
Proposed
--
Health clinic.
HEALTH: Basic Clinic
-- 93 -- --
ARDP
City
Proposed
*Donors
1 BHU in Jalalabad 1 lady doctor / 1 helper & 1 dispenser.
HEALTH: Basic Clinic
-- 93 -- -
CARP
FVSAD
HEALTH: Disabled Reh
Center
Proposed
UNDP
Wheel chair production.
6TH EDITION
ACBAR
DATABASE OF NGO ACTIVITIES
-
-----
--
Page:
.301
A6actrep Date: 29 /08/93
ACTIVITY
AGENCY
SECTOR
Nangarhar
HCI
WATER:
ISRA
HEALTH: Education
PRS
CONST:
RDP
RDP
Livestock
INCOME: Handicrafts
RDP
INCOME: Handicrafts
SERVE
RELIEF:Other
START
AGRIC:
TPRPA
Crop Product
CONST:
Other
Nangarhar
AAA
ACDO
ACDO
ACDO
ACDO
ACDO
ACDO
ACDO
ACDO
ACDO
WATER:
WATER:
AGRIC:
AGRIC:
GOHST:
CONST:
CONST:
CONST:
WATER:
WATER:
WATER:
- --BY --
DURATIO1
Begin --End
<ACTIVITY
DESCRIPTION>
Surveyed
HCI
--
Proposed
DCP
-- 93 -- --
Pesh loan's master trainer drug avareness.training course
Proposed
DCP
-- 93 -- --
Anti -drug abase campaign through anti -drug publicity boards - 200 aignboards in Jalalabad & main roads.
Proposed
WFP
-- -- -- 93
Cleaning of waste material in Jalalabad city.
Proposed
UNOCHA
-- 93 -- --
Distribution of 250 colonies honey bee.
Proposed
UNESCO
-- 93 -- --
Engraving benefit 120 persona.
City
Proposed
NRC /NCA
-- 93 -- --
Carpet craft benefit 22 persons.
Various villages
Proposed
T.Fund
-- 93 11 93
Distributionof food through food for work.
3 villages
Proposed
FAO/UNDP
-- 93 -- 93
lèproved rice & maize seed'multiplication.
Jalalabad
Surveyed
EC
-- 93 -- --
Installation of telecommunication system in Jalalabad, Lagbaan L Lanar.
Center
Center
Sanitation
AGRIC:
FUNDED
-- STATUS --
Jalalabad
Canal
HEALTH: Education
JSRA
AAA
---- VILLAGE(S) - - --
City
City
Survey of 18 canals in Jalalabad / Surkh Rod & Rodat.
4 courses for 100 Isaac.
Khogiani
Canal
Other
Livestock
Livestock
Road
Road
Pub.Building
Pub.Building
larez
Canal
Canal
laja Waziri
Proposed
UNDP
--
Rehabilitation of 4 canals (laja Waziri, Dobandi k Qeaghou).Landi,
Proposed
'UNDP
--
Springs.
Proposed
TAF
Proposed
TAE
Proponed
UNDP
-- -- -- --
Construction of 20 be road.
Proposed
WFP
-- -- -- --
Construction of Behar.road (5 ks).
Proposed
ISBA
-- -- -- --
Construction of Wazir general Mosque.
Proposed
VIP
Ador
Proposed
WFP
Cleaing of karez.
Lhoza Ihel lambo
Proposed
UNDP
Cleaning of 3 ka canal.
Mor
Proposed
WFP
Cleaning of 3 km canal.
Waziri
Wazir
Wazir
Wazir
Behar
Wazir
Wazir
-- -- -- -
--
--
Poultry distribution to 500 poor Afghans.
Bee leaping project for 80-poor women.
Construction of Wazir middle school with 8 rooms.
ACBAR
DATABASE OF ëGO ACTIVITI&5
Page: 302
Aóactrep Date: 29/08/93
---
-- iTB BDITIOA
ACTIVITY
- - -- VILLAGES) ----
SECTOR
AGENCY
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Khogiani
Nangarhar
WATER:
Canal
()sari gala
Proposed
UNDP
--
Cleaning of canal (3 ka) .
ACDO
WATER:
Structure
Omani Tala
Proposed
UNDP
--
Construction of intakes.
ACDO
ACDO
WATER:
Structure
Khoza Khel lambo
Proposed
UNPP
AGRIC:
Crop Product
3 villages
Proposed
UNDP
--
Multiplication of 3 NT improved maize seed / 3 MT DAP k 3 MT Urea.
AMRAN
MAN
AGRIC:
Crop Product
5 villages
Proposed
UNDP
--
Multiplication of 3 MT improved rice seed / 3 MT DAP k 3 MT Urea.
ARDP
EDUCAT: Other
ARDP
WATER:
Tarez
ARDP
WATER:
ARK
Construction of intakes.
Proposed
-- 93 -- --
Narcotic control program.
Qelahgou
Proposed
-- 93 -- --
Rehabilitation of karezes.
Canal
Qelaghou
Proposed
WATER:
Canal
Sakava
Proposed
ARDP
WATER:
Canal
Behar
Proposed
KSAR
CONST:
Pub.Building
--
IHSAN
WATER:
Canal
IHSAN
WATER:
IHSAN
irrigation repair.
UNDP
-- 93 -- --
Irrigation repair.
DCP
-- 93 -- 93
Behar irrigation repair.
Proposed
DCP
-- 93 -- --
Construction of laja High School.
Meals
Proposed
WFP
-- 93 -- --
Rehabilitation bf 7 km canal in National garden, maintenance of garden k extension.
Structure
Maze Khel
Proposed
DCP
-- 93 -- --
Construction of 1 intake k 70 a retaining wall.
WATER:
Structure
Meals
Proposed
DCP
-- -- -- --
Construction of 4 weirs.
IHSAN
WATER:
Structure
Sera Kali
Proposed
DCP
-- 93 -- --
Construction of 1 intake k 120 m retaining wall.
MAMAR
WATER:
Canal
Proposed
UNDP
Nangarhar
*Canal rehabilitation.
--
Kouz Konar
Shewa
Proposed
Repair of comprehensive health center.
Pub.Building
-- -- -- --
CONST:
WHO
ARDS
Several villages
Proposed
DACHAR
--
WATER:
Canal
-- 93 -- 93
DACHAR
Several villages
Proposed
UNICEF
120 shallow wells.
WATER:
Drinking
-- 93 -- --
DACAAR
Crop Product
louz lunar
Proposed
--
AGRIC:
UN
RAH
Livestock
louz Lunar
Proposed
--
AGRIC:
UN
RAH
,
Improved seed distribution.
Poultry Fara.
6TH EDITION
ACBAR
DATABASE OF $60 ACTIVITIES
Page: 303
Aóactrep Date: 25/08/93
ACTIVITY
AGENCY
SECTOR
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Kouz Konar
Nangarhar
RAH
AGRIC:
Other
Abdul Ihel
Proposed
UN
-- --
RAH
AGRIC:
Other
Abdul Ihel Farm
Proposed
UN
--
Rehabilitation of Abdul Del Fars.
RAH
CONST:
Road
Sheila
Proposed
UN
--
Repair of Qalatak road.
RAR
CONST:
Pub.Building
louz lunar
Proposed
UN
--
Reconstruction of Sayed Jamaludin school & 6 primary schools.
RAH
CONST:
Pub.Building,
Gorik /Shagai /L.Iun
Proposed
UN
--
Construction of a health clinic in Gorik, a clinic in Shagai &,three clinics in louz lunar.
RAH
SOCIAL:Other
louz lunar
Proposed
UN
--
Create Social Welfare Center.
RAH
WATER:
Canal
Sheila
Proposed
UN
--
Cleaning of 7 branch canals.
RAH
WATER:
Structure
Sheila
Proposed
UN
--
Repair of Siphon and bank protection.
RAH
WATER:
Structure
Shagai
Proposed
UN
-- -- -- --
RAH
WATER:
Structure
Various villages
Proposed
UN
-- -
RAH
WATER:
FloodControl
Shagai
Proposed
UN
-- -- -- --
Bank protection, siphon repair.
RAH
WATER:
Drinking
All villages
Proposed
UN
-- -- -- --
Digging shallow wells.
SERVE
RELIIF:Otber
Various villages
Proposed
T.Fund
-- 93 12 93
Distribution of food through food for work.
Nangarhar
Reconstruction of 200s long culvert, flumes, control gates.
-- --
Construction of intakes in Bar Lashkot, tachara, Islas Poor, Gorik, loty, Sheila & Shagai.
Lalpur
AFS
AGRIC:
Crop Product
ERSA
AGRIC:
Livestock
Nangarhar
Silk Nora farm in Abdul Ihel
6 villages
Proposed
FAO
-- 93 -- --
Multiplication of 90 MT sugar cane / 3 MT DAP & 3 MT Urea.
Proposed
FAO/UNDP
-- 93 -- --
Poultry project.
Mohmánd Dara
RDP
WATER:
tarez
Than Ihel
Proposed
UNDP
-- 93 -- --
Cleaning of karez length 1.6 ka, irrigate 100 hectares laid & benefit 750 tallies.
RDP
WATER:
Canal
Mohmand Dara
Proposed
UNDP
-- 93 -- --
Length 3 ka, irrigate 250 hectares land & benefit 1500 families.
--
Nangarhar
Pachier/Agam
AMRAN
AGRIQ:
Crop Product
4 villages
Proposed
UNDP
ARAN
AGRIC:
Crop Product
4-villages
Proposed
UNDP
ACBAR
Multiplication of 4 MT improved maize seed / 4 MT DAP & 4 MT Urea.
Multiplication of 3 MT improved rice seed / 3 MT DAP & 3 MT Urea.
DATABASE OF EGO ACTIVITIES
Page:
304
A6actrep Date: 29/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
VOA
AGRIC:
Nangarhar
- - -- VILLAGES) - ---
Livestock
-- STATUS --
FUNDED
- --BY --
DURATION
-tACTIVITI
Begin --End
Proposed
UNDP
--
Poultry improvement.
DESCRIPTION>
Rodat
BRAN
AGRIC:
Crop Product
2 villages
Proposed
UNDP
--
Multiplication of 4 MT improved seize seed / 4 MT DAP & 4 NT Urea.
AWN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
--
Multiplication of 3 MT maize seed / 3 MT DAP 8 3 MT Urea.
APWO
WATER:
Structure
Ihatwanoo
Proposed
UNDP
ARDP
WATER:
Structure
Besar Shahi
Proposed
--
AWA
AGRIC:
Livestock
--
Proposed
UNDP
--
LRO
WATER:
Structure
kodat
Proposed
UNDP
-- 93 -- 93
Construction of an intake retaining wall, benefit 1,800 fermers.
RDP
WATER:
Canal
5 villages
Proposed
UNDP
-- 93 -- --
Length 1625 s, irrigate 150 hectares land b benefit 900 families.
SAA
AGRIC:
Machinery
Aza Ihel
Proposed
SAA
--
SAA
CONST:
Sanitation
Aza Khel
Proposed
TPRPA
AGRIC:
Crop Product
Ioz lot
YARA
AGRIC:
Livestock
Nangarhar
RAH
WATER:
Gabion construction.
-- 93 -- --
Poultry distribution.
--
1 tractor.
SAA
--
Construction of toilets. 1 toilet for women and children of each 10 families A for sen of each 10 feliiies.
Proposed
FAO
-- 93 -- --
Proposed
URN .
Maize crop production.
Poultry distribution.
--
Several Diet.
Drinking
Proposed
UN
-- -- -- --
Digging shallow wells.
Construction of a BO.
Nangarhar; Sher25 ad
All
CONST:
Pub.Building
Mana Ihel
Surveyed
--
-- -- -
AB
WATER:
larez
Tutu
Proposed
DCP
-- -
ACDO
WATER:
Canal
&odi Ihel
Proposed
CIDA
ACDO
WATER:
Structure
lodi Khel
Proposed
CIDA'
Construction of small intakes.
ARRAN
AGRIC:
Crop Product
Gandusak
Proposed
UNDP
Multiplication of 4 MT improved rice seed / 4 NT DAP A 4 MT Urea.
ARCO
CORSI:
Pub.Building
Tutu
Proposed
DCP /UNDP
ACBAR
--
-- --
--
-- 93 -- --
Cleaning of 14 karezes.
Constuction of lodo ihel canal.
Reconstruction of Tutu primary & secondary schools buildings.
DATABASE OF BGO ACTIVITIES
Page: 305
A6actrep Date: 29/08 /93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
---- VILLAGE(S)- ---
FUNDED
DURATION
-- STATUS --
- --BY --
Begin- -End
<ACTIVITY
DESCRIPTION>
Sherzad
Nangarhar
ARCO
WATER:
garez
Tutu/Mama Ihel
Proposed
DCP/UNDP
-- 93 -- --
Rehabilitation of 14 karezes in different villages (list of karezes available at ACBAR).
ANCO
WATER:
Canal
lodi Ihel/Mama he
Proposed
DCP /UNDP
-- 93 -- - -.
Rehabilitation of godi [bel k Mali Ihel canals.
ARDP
HEALTH: Other
lodi Ihel
Proposed
-- 93 -- --
CDD project.
-- 93 -- --
120 shallow wells & hand -pumps.
Nangarhar
Shinwar
DACAAR
WATER:
Drinking
Several villages
Proposed
DACAAR
YARA
WATER:
Canal
Ghani ghel
Proposed
UNDP
-- --
YARA
WATER:
Structure
Ghani Ihel
Proposed
UNDP
--
Nangarhar
Excavating 2,0001 old channel.
Constructing 500a retaining wall.
Surkh Rod
ASA
CONST:
Road
Ghawchak
Surveyed
--
AEA
CONST:
Pub.Building
--
Proposed
RAP
--
Office extension for MNC (4 rooms) with conventional material.
AHD3
COST:
Pub.Building
Sultanpur
Proposed
WHO
--
Repair of comprehensive health center.
ARRAN
AGRIC:
Crop Product
5 villages
Proposed
UNDP
--
Multiplication of 3 MT Improved maize seed / 3äT DAP A 3 MT Urea.
ARRAN
AGRIC:
Crop Product
6 villages
Proposed
UNDP
--
Multiplication of 4 MT improved rice seed / 4 MT DAP k 4 MT Urea.
ARRAN
WATER:
Canal
Zulmabad
Proposed
UNDP
--
Irrigation repair.
ARRAN
WATER:
Canal
Bazid Ihel
Proposed
UKDP
-- -- -- --
Irrigation repair.
ARRAN
WATER:
Canal
Zulmabad
Proposed
UNDP
--
Zulmabad irrigation rehabilitation.
APWO
WATER:
Canal
Deh Walid
Proposed
WFP
--
Canal cleaning(food for work).
APWO
WATER:
Canal
Sabzabad
Proposed
WFP
--
Canal cleaning (food for work).
ARDP
CONST:
Bridge
Fatehabad
Proposed
--
-- 93 -- --
Construction of bridge.
ARDP
CONST:
Pub.Building
Fatehabad
Proposed
--
-- 93 -- --
Construction of Fatehabad school.
ARDP
CONST:
Pub.Buiiding
Fatehabad
Proposed
DCP
-- 93 -- 93
Construction of Fatehabad middle school building.
ARDP
HEALTH: NCH
Proposed
--
-- 93 -- --
MCH project.
ACBAR
-- -- -- --
-- -- -
Reconstruction of road length 2.5 km.
DATABASE OF $GO ACTIVITIES
Page:
306
A6actrep Date: 29/06/93
6TH EDITION
ACTIVITY
---- VILLAGE(S) - - --
SECTOR
AGENCI
-- STATUS --
FUNDED
DURATION
- - -BI --
Begin- -End
<ACTIVITY
DESCRIPTION>
Surkh Rod
Nangarhar
WATER:
Karen
Fatehabad
Proposed
--
-- 93 -- --
Rehabilitation of karezes.
ARDP
WATER:
Canal
Fatehabad
Proposed
DCP
-- 93 -- 93 .
Sawa irrigation repair.
ARDP
ARDP
WATER:
Structure
Hakim Baba
Proposed
ARR
AGRIC:
Fruit Trees
Char Bagh
Proposed
SV
ARR
WATER:
Canal:
Various
Proposed
WFP/HCR
ARR
WATER:
Canal
Proposed
CAS
AGRIC:
Livestock
10 villages
CIUP
AGRIC:
Crop Product
CIUP
AGRIC:
CIUP
93 -- - -'
9 93
9 85
Gabion construction.
Establishment fruit tree nursery in 5 jeribs land.
--
Rehabilitation of 8 canals.
UNDP
--
Rehabilitation of irrigation system.
Proposed
UNDP
-- 93 -- --
--
Proposed
UNDP
--
Improved maize production.
Crop Product
--
Proposed
UNDP
--
Distribution of sugar cane.
Crop Product
--
Proposed
UNDP
--
Distribution of sugar cane.
AGRIC:
AGRIC:
Crop Product
--
Proposed
UNDP
--
Improved rice production.
CIUP
CIUP
AGRIC:
Livestock
Proposed
UNDP
-- -- -- --
CIUP
AGRIC:
Livestock
Proposed
.UNDP
--
DACAAR
WATER:
Drinking
MR
AGRIC:
USA
AGRIC:
ERSA
INCOME: Handicrafts
UFO
WATER:
F1oodControl
IHSAN
WATER:
IBSAN
--
-- --
-- 93 -- --
Poultry fare - 15,000.
Distribution of chickens to the farmers.
Poultry distribution.
100 shallow wells & hand -pumps.
Proposed
6C
Livestock
Proposed
UNDP
Livestock
Proposed
FAO/UNDP
-- 93 -- --
Proposed
UNESCO
-- 93 -- --
Shamshapoor
Proposed
BCE
--
Canal
Sabzabad
Proposed
WFP
-- 93 -- --
Rehabilitation of 5 km canal.
Canal
Iakrak
Proposed
WFP
-- 93 -- --
Rehabilitation of 5 km canal + repairing of 1 intake &siphon.
WATER:
WATER:
Canal
Nall Redd
Proposed
WFP
-- 83 -- --
Rehabilitation of 3 ka canal + construction of intake & 1 portion.
íHSAN
WATER:
Canal
Zulaabad
Proposed
WFP
-- 93 -- --
Rehabilitation of 6 ks canal.
IHSAN
1 A C B A R'
Several villages
--
Poultry farm
'Poultry & kitchen garden.
Embroidery.
Construction of flood control(L.120 m / H.2 a).
DATABASE OF NGO ACTIVITIES
Page:. 307
A6actrep Date: 29/08/93
6TH EDITION
I
ACTIVITY
SECTOR
AGENCY
Nangarhar
VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
<ACTIVITY
Sur0h Rod
IHSAN
WATER:
Canal
than Iali
Proposed
WFP
-- 93 -- --
Rehabilitation of 4 km canal.
PRS
WATER:
Canal
Sultanpur
Proposed
UNDP
-- 93 -- --
.Rehabilitation of irrigation canal.
PRS
WATER:
Canál
Qalai baroof
Proposed
UNDP
-- 93 -- --
Cleaning of canal.
PRS
WATER:
Drinking
--
Proposed
UNDP
-- 93 -- --
RSSA
AGRIC:
Livestock
--
Proposed
UNDP
--
Improved poultry production.
AGRIC:
Livestock
--
Proposed
UNDP
-- -- -- --
Improved poultry production.
RSSA
WATER:
Canal
Iakokhel
Proposed
UNDP
--
START
AGRIC:
Crop Product
3 villages
Proposed
FAO /UNDP
WOA
AGRIC:
Livestock
Proposed
UNDP
--
WOA
AGRIC:
Livestock
Proposed
UNDP
-- -- -- --
Poultry production for distribution.
-- 93 -- 93
Blind rehabilitation program.
RSSA
,
HEALTH: Disabled Reh
Nimroz
VARA
Repair and cleaning of canal.
Improved rice & maize seed multiplication.
-- 93 -- 93
Women's poultry production.
Unspecified
Nangarhar
SERVE
DESCRIPTION>
Saveral Districts
Proposed
KaIng /Kurki
INCOME: Handicrafts
7 villages
Proposed
WFP
--
Carpet weaving 104 women 1 looms per 2 ladies.
--
Cleaning .of 15 km canal I irrigates 15,000 jeribs & benefit 1,000 families.
--
Cleaning of 10 km canal I irrigates 12,000 jeribs & benefit 200 families.
--
Cleaning of 21 km canal / irrigates 2,000 jeribs &`benefit 1260 families.
Khosh Rod
Nimroz
VARA
WATER:
Canal
Shishaba
Proposed
UNDP
VARA
WATER:
Canal
Lokhi
Proposed
UNDP/WFP
VARA.
WATER:
Canal
3 villages
Proposed
WFP
VARA
WATER:
Canal
Iotalak
Proposed
UNDP/WFP
-- -- -- --
Cleaning of 12 km canal / irrigates 800 jeribs & benefit 910 families.
Proposed
HCR
-- 93 -- --
Construction of 50 houses for returnees.
Nimroz
SWARD
CONS ?:
.
Zaranj
Shelter
--
-
Zaramj
ilOITIQg HT'd
Z$ITIVIT9A ODN VO HEATH
Page:
308
A6ectrep Date: 29/08193
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
< ACTIVITY
DESCRIPTION>
Chorah
Oruzgan
ANDS
HEALTH: Basic Post
--
Proposed
EC
-- -- -- --
Health post.
SWFAO
AGRIC:
Choral)
Surveyed
UNDP
-- 93 -- 93
Center for 80,000 annals.
Livestock
Dai Kundi
Oruzgan
Cleaning of 3 ka canal / irrigates 400 jeribs & benefit 500 families.
BURC
WATER:
Canal
4 villages
Proposed
UNDP
--
GRC
AGRIC:
Livestock
10 villages
Proposed
ICMC
-- 93 -- --
1,000 sheep for 100 families.
GRC
HEALTH: MCH
Proposed
CIDA
-- 93 -- --
Training of 10 ALHVs for 9'oaths to work in Dai Lundi.
GRC
HEALTH: Other
Proposed
AID
-- 93 -- --
Medical instruments for Dai lundi hospital
GRC
RELIEF:Non -Food Itea
Proposed
RANCO
-- 93 -- --
Clothing for 500 families.
0ruzgan
90 villages
Deh Raud
ARO
AGRIC:
Vet
Deh Baud
Proposed
UNDP
--
4 DVMs & 12 paravet.
ARO
AGRIC:
Training
Deh Baud
Proposed
FAO
--
Agro- implements to 60 trainees.
ARO
CONST:
Road
Deh Baud
Proposed
UNDP
--
Repairing of 169 km road (Kandahar - Deh- Raud).
WATER:
FloodControl
Deb Baud
Proposed
UNDP
--
Flood protection wall.
ARO
WATER:
Drinking
Deh Raud
Surveyed
--
City deep well water supply system.
ARPD
AGRIC:
Crop Product
20 villages
Proposed
FAO
-- 93 -- --
Multiplication of 20 MT rice seed / 50 MT Urea 25 MT DAP - 3678 farmers.
AGRIC:
Crop Product
25 villages
Proposed
FAO
-- 93 -- --
Multiplication of 16 MT maize seed / 100 MT Urea / 50 MT DAP - 3005 farmers.
BURG
WATER:
Canal
4 villages
Proposed
UNDP
--
Cleaning of 9
HRAy
AGRIC:
Crop Product
16 villages
Proposed
FAO
--
Multiplication of 16 MT seize seed 50 MT DAP A 100 MT Urea benefit 3,000 families.
INORO
AGRIC:
Crop Product
15 villages
Proposed
FAO /UNDP
8 villages
Proposed
UNDP
ARO
'
ARPD
,
Oruzgan
BURL
WATER:
ACBsAR
ka canal / irrigates 3,000 jeribs & benefit 1500. families.
Multiplication of 6 MT wheat seed & 2541T DAP to 100 farmers.
-- -- -- --
Gezab
Garez
Cleaning of 3 karezes length 12
ka / irrigate 3,000 jeribs land A benefit 170 families.
6TH EDITION
DATABASE OF NGO ACTIVITIES
Page:
309
A6actrep Date: 29/08/93
ACTIVITI
---- VILLAGE(5) - - --
SECTOR
AGENCY
Oruzgan
BURC
WATER:
Oruzgan
AHDS
WATER:
Oruzgan
- - -BY --
DURATION
<ACTIVITY
Begin --End
DESCRIPTION>
ran
3 villages
Canal
Proposed
OUP
--
Cleaning of`5 km canal / irrigates 4,000 jeribs & benefit 1500 families.
Proposed
EC
--
Health post.
Oruzgan
HEALTH: Basic Post
Oruzgan
BURC
Kai
-- STATUS --
FUNDED
Shahrlstan
6 villages
Canal
Cleaning of 8 its canal / irrigates 2,000 jeribs & benefit 1600 families.
Proposed
UNDP
Proposed
EC
-- -- -- --
Health post.
proposed
FAO
-- 93 -- --
16 MT Baize seed / 100 MT Urea / 50 MT DAP - 3230 farmers.
Surveyed
UNDP
-- 93 -- 93
Center for 170,000 animals.
Proposed
ARCON
-- 93 -- 93
New building for a hospital (6 beds).
--
Tirin
ANDS
HEALTH: Basic Post
ARPD
AGRIC:
Crop Product
SWFAO
AGRIC:
Livestock
SWFAO
CONST:
Pub.Building
Pakteka
25 villages
Tirin Kot
Gomal
Distribution of 27,000 chickens to 2,700 farming families.
-- 93 -- --
AFS
AGRIC:
Livestock
20 villages
Proposed
UNDP
CARE
AGRIC:
Fruit Trees
Gomal /Rabat
Proposed
AID&WFP
0 93 -- --
CARE
AGRIC:
forestry
Gomal /Rabat
Proposed
AID &WFP
0 93 -- --
CARE
AGRIC:
Other
Gomal/Rabat
Proposed
AID &WFP
0 93 -- --
Rehabilitation of 2 Farms which cover 3 ha area including all related activities.
CARE
CONST:
Road
Gomal /Rabat
Proposed
AID &WFP
0 93 -- --
Reconstruction of 4 Roads with the total length 21km including other structures.
CARE
CONST:
Shelter
Gosai /Rabat
Proposed
AID&WFP
0 93 -- --
Construction of 48 Shelter / house with 96 rooms.
CARE,
CONST:
Storage
Goaal /Rabat
Proposed
AID&WFP
0 93 -- --
Construction of 1 village level storehouse with capacity of 50 mt.
CARE
WATER:
Xarez
Gomal /Rabat
Proposed
AID&WFF
0 93 -- --
Rehabilitation of 8 Iarezes with total length 20ka ,including other structures.
CARE
WATER:
Canal
Gomal /Rabat
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 20 Irrigation canals with total length 39km including other structures.
CARE
WATER:
FloodControl
Goaal /Rabat
Proposed
AID&WFP
0 93
CARE
WATER:
Other
Gatti /Rabat
Proposed
AID&WFP
0 93 -- --
Establishment of 6 Nurseries including all related activities.
.
Construction of 52 Erosion barriers' with atone masonry, compacted soil & Gabion work.
0 93
ACHAR
Plantation of 77,000 trees along the 38km irrigation canals.
Construction of 2 Dam (reservoir) with capacity of 1920 cum.
DATABASE OF NGO ACTIVITIES
Page:
310
A6actrep Date: 29/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
ARDP
CONST:
Pub.Building
ARDP
WATER:
Canal
Pakteka
'
WATER:
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Katawaz
Pakteka
ARO
-- STATUS --
--
Proposed
-- 93 -- --
Construction of animai clinic building.
Proposed
-- 93 -- --
Irrigation repair.
-- 93 -- --
Rehabilitation of 15 karezes.
Matti Khel
larez
alata Ehel
Proposed
UNDP
Sarhawza
Pakteka
CARE
AGRIC:
Fruit Trees
Sarhawza /Zeiok /Nek
Proposed
AID&WFP
0 93 -- --
Establishment of 10 Nurseries including all related activities.
CARE
AGRIO:
Forestry
Sarhawza /Zelok /Nek
Proposed
AID&WFP
0 93 -- --
Plantation of 120,000 trees along the 60kß irrigation canals.
CARE
AGRIC:
Other
Sarhawza/Zelok!Nek
Proposed
AID &WFP
0 93 -- --
Rehabilitation of 2 Farms which cover 8 ha area including all related activities.
CARE
CONST:
Road
Sarhawza /Zelok /Nek
Proposed
AID &WFP
0 93 -- --
Reconstruction of 6 Roads with the total length 33kn including other structures.
CARE
CONST:
Shelter
Sarhawza /Zelok /Nek
Proposed
AID &WFP
0 93 -- --
Construction of 75 Shelter / house with 154' roons.
CARE
CONST:
Storage
Sarhawza /Zeiok /Nek
Proposed
AID&WFP
0 93 -- --
Construction of 1 village level storehouse with capacity of 50 at.
CARE
WATER:
Larez
Sarhawza /Zelok /Nek
Proposed
AID &WFP
0 93 -- --
Rehabilitation of 13 Earezes with total length 31kn including other structures.
CARE
WATER:
Canal
Sarhawza /Zelok /Nek
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 30 Irrigation canals with total length 61kn including other structures.
CARE
WATER:
FloodControl
Sarhawza /Zeiok /Nek
Proposed
AID&WFP
0 93
CARE
WATER:
Other
Sarhawza /Zelok /Nek
Proposed
AID &WFP
0 93 -- --
Pakteka
0
.Construction of 81 Erosion barriers with stone masonry, compacted soil & Gabion work.
93
Construction of 3 Dao (reservoir) with capacity of 3000 cum.
Sharan
ARO
WATER:
larez
Sharan
Proposed
UNDP
-- 93 -- --
Rehabilitation of 30 karezes.
ARO
WATER:
Structure
Sharan
Proposed
UNDP
-- 93 -- --
Construction of water reservoir.
ARO
WATER:
FloodControl
Sharan
Proposed
RAP
-- 93 -- --
90 a flood protection wall.
PRS
WATER:
tarez
Surveyed
WFP
-- 93 -- --
40 karezes.
ACBAR
DATABASE OF $GO ACTIVITIES
Page:
311
A6actrep Date: 29/08/93
6Th EDITION 1
ArTIVITT
AGENCY
SECTOR
- - -- VILLAGES) - - --
-- STATUS - -.
FUNDED
- --BY --
DURATION
Begin- -End
<ACTIVITY
DESCRIPTION>
Urgoun
Pakteka
CARE
AGRIC:
Fruit Trees
Urgoun
Proposed
AID&WFP
0 93
0 93
Establishsent of 4 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Urgoun
Proposed
AID&WFP
0 93
0 93
Plantation of 43,000 trees along the 22ks irrigation canals.
CARE
AGRIC:
Other
Urgoun
Proposed
AID&WFP
0 93
0 93
Rehabilitation of one Fars which cover 2 ha area including all related activities.
CARE
CONST:
Road
Urgoun
Proposed
AID&WFP
0 93
0 93
Reconstruction of 2 Roads with the total length 12ks including other structures.
CARE
CONST:
Shelter
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 27 Shelter / house with 54 rooss.
CARE
CONST:
Storage
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 1 village level storehouse with capacity of 50 at.
CARE
WATER:
laces
Urgoun
Proposed
AID&WFP
0 93
0 93
Rehabilitation of 5 Karezes with total length like including other structures.
CARE
WATER:
Canal
Urgoun
Proposed
AID
--
0
0 92
Rehabilitation of Saidoni canal total length.
CARE
WATER:
Canal
Urgoun
Proposed
AID
--
0
0 82
Rehabilitation of Maniki canal
CARE
WATER:
Canal
Urgoun
Proposed
AID&WFP
0 93
0 93
Rehabilitation of 10 Irrigation canals with total length 22ks including other structures.
CARE
WATER:
FloodControl
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 29 Erosion barriers with stone sasonry, cospacted soil & Gabion work.
CARE
WATER:
Other
Urgoun
Proposed
AID&WFP
0 93
0 93
Construction of 2 Das (reservoir) with capacity of 1800 cus.
Taraki
Proposed
WFP
-- 93 -- --
Construction of 3 diversion. walls.
Proposed
UNDP
-- 93 -- --
Rehabilitation of retaining wall in Bak village of Paktia.
Paktia
.
Bak
ARR
WATER
Structure
BRR
WATER:
Structure
Paktia
Gardaiz
ACDO
EDUCAT: Literacy
Gardaiz City
Proposed
NAC
--
Literacy course.
ACDO
EDUCAT: Managesent
Gardaiz City
Proposed
NAC
--
Managesent & accounting courses.
ACDO
EDUCAT: Language
Gardaiz City
Proposed
NAC
--
English language course.
ARO
WATER:
dares
Gardaiz
Proposed
' WFP
-- 93 -- --
CARE
AGRIC:
Fruit Trees
Gardaiz /Jadran /Zor
Proposed
AID&WFP
0 93 -- 93
Establishsent of 13 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Gardaiz /Jadran /Zor
Proposed
AID&WFP
0 93 -- 93
Plantation of 79,000 trees along the 4Oks irrigation canals.
Page:
Rehabilitation of 25 karezes.
-312
A6actrep Date: 29/08/93
ACTIVITY
SECTOR
AGENCY
FUNDED
-- STATUS --
- --BY --
DURATION
<ACTIVITI
Begin --End
DESCRIPTION>
Gardaiz
Paktia
.
---- VILLAGE(S) - - --
CARE
AGRIC:
Other
Gardaiz /Jadran /Zor
Proposed
AID&WFP
0 93 -- 93
Rehabilitation of 2 Farms which cover 36 ha area including all related activities.
CARR
CONST:
Road
Gardaiz /Jadran /Zor
Proposed-
AID&WFP
0 93 -- 93
Reconstruction of 6 Roads with the total length 37km including other structures.
CARE
CONST:
Shelter
Gardaiz /Jadran /Zor
Proposed
AID&WFP
0 93 -- 93
Construction of 66 Shelter t house with 132 rooms.
CARE
CONST:
Storage
Gardaiz /Jadran /Zor
Proposed
AID &WFP
0 93 -- 93
Construction of 1 village level storehouse with capacity of 50 mt.
CARL
WATER:
Iareá
Gardaiz /Jadran /Zor
Proposed
AID&WFP
0 93 -- 93
Rehabilitation of 12 tarezes with total length 28km including other structures.
CARE
WATER:
Canal
Gardaiz /Jadran /Zor
Proposed
AID&WFP
0 93 -- 93
Rehabilitation of 28 Irrigation canals with total length 57km including other structures.
CARE
WATER:
FloodControl
Gardaiz /Jadran /Zor
Proposed
AID&WFP
O 93 -- 93
Construction of 77 Erosion barriers with stone masonry, compacted soil & Gabion work.
CARE
WATER:
Other
Gardaiz /Jadran /Zor
Proposed
AID &WFP
0 93 -- 93
Construction of 2 Dam (reservoir! with capacity of 2970 cum.
DACAAR
CONST:
Pub.Building
--
Proposed
DACAAR
-- 94 -- --
School building
DACAAR
CONST:
Pub.Building
Salam Ihel
Proposed
DACAAR
-- 93 -- --
Primary school building
DACAAR
WATER:
Iarez
Several villages
Proposed
DACAAR
-- 93 -- 94
Coordination with SCA, NAC & NRC.
DACAAR
WATER:
Canal
Several villages
Proposed
DACAAR
-- 93 -- 94
Plan to coordinate with SCA, NAC & NRC.
DACAAR
WATER:
Drinking
Several villages
Proposed
DACAAR
-- 93 -- --
100 shallow wells & hand -pumps.
-- 94 -- --
Primary school building
"
Gurbuz
Paktia
DACAAR
CONST:
Pub.Building
Gurbuz
Proposed
DACAAR
GAF
AGRIC:
Vet
Gurbuz
Proposed
UNDP
Uaean Khel
Paktiia
ARRAN
AGRIC:
Crop Product
Paktia
GAF
AGRIC:
Paktia
AAA
AGRIC:
3 villages
Proposed
UNDP
Jadran
Proposed
UNDP
Surveyed
--
--
Multiplication of 3 MT improved rice seed / 3 MT DAP & 3 MT Urea.
Jadran
Vet
Jail Maidan
Other
-- 93 -- --
Possibilities of establishment some nurseries / imtroductiom of improved seeds / bee hivesthoney production) /
poultry iaprovment / fruit planta.
Page:
313
A6actrep Date: 29 /08/93
ACTIVITY
AGENCY
SECTOR
Paktia
-VILLAGE(S) - - --
-- STATUS --
FUNDED
- --BY --
DURATION
<ACTIVITY
Begin- -End
DESCRIPTION>
Jaji Maidan
AAA
WATER:
Canal
Hasbim
AAA
WATER:
Canal
ARS
WATER:
CARE
CARE
Ihel
Surveyed
-- 93 -- --
Survey of 6 canal (Esara / Manzay ; Shagy / Mena Ihelo / Mare Ihelo / fathki).
Ali Ihel
Surveyed
-- 93 -- --
Survey of 4 canal (Badak / Dand / fath / Bahlni l
Canal
8 villages
Surveyed
--
AGRIC:
Fruit Trees
Musa Ihel /Jaji Mai
Proposed
AID&WFP
0
AGRIC:
Forestry
Musa Ihel /Jaji Mai
Proposed
AID&WFP
0 93
.
Cleaning of 24.2 ka canals, irrigate 2300 jeribs & benefit 630 faillies.
93 -- 93
Establishaent of 7 Nurseries including all related activities.
-- 93
Plantation of 43,000 trees along the 22ka irrigation canals.
i
CARE
AGRIC:
Other
Musa Ihel /Jaji Mai
Proposed
AID&WFP
0
CARE
CONST:
Road
Musa Ehel /Jaji Mai
Proposed
AID &WFP
0 93 -- 93
CARE
CONST:
Shelter
Musa Ihel /Jaji Mai
Proposed
AID&WFP
0
CARE
CONST:
Storage
Musa Ihel /Jaji Mai
Proposed
AID &WFP
0 93
-- 93
Construction of 1 village level storehouse with capacity of 50 mt.
CARE
WATER:
Tarez
Musa Ehel /Jaji Mai
Proposed
AID &WFP
0 93
-- 93
Rehabilitation of 7 Karezes with total length 15ka including other structures.
CARE
WATER:
Canal
Musa Ehel /Jaji Mai
Proposed
AID &WFP
0
93 -- 93
Rehabilitation of 15 Irrigation canals with total length 41ka including other structures.
CARE
WATER:
FloodControl
Musa Ihel /Jaji Mai
Proposed
AID &WFP
0
93 -- 93
Construction of 42 Erosion barriers with stone masonry, compacted soil & Gabion work.
CARE
WATER:
Other
Musa Ihel /Jaji Mai
Proposed
AID &WFP
0
93 -- 93
Construction of 2 Dam (reservoir) with capacity of 1620 cum.
5 villages
Proposed
UNDP
. Baghi Fara
Proposed
FAO
-- -- --
Paktia
MAN
AGRIC:
Paktia
93 -- 93
Rehabilitation of 2 Fares which cover 19 ha area including all related activities.
Reconstruction of 2 Roads with the total length 16ka including other structures.
93 -- 93
Construction of 36 Shelter / house with 72 rooms.
Jani Khel
Crop Product
--
Multiplication of 4 MT improved maize seed / 4 MT DAP & 4 MT Urea.
--
Fruit trees rehabilitation.
Khost
AB
AGRIC:
Fruit Trees
ACRU
AGRIC:
Livestock
6 villages
Proposed
UNDP
-- 93 -- 93
Distribution 20,000 seven weeks old chickens benefit 2,000 tallies.
ACRU
WATER:
Tarez
Pirana Kalai
Proposed
UNDP
-- 93 -- 93
Cleaning, repairing & improvaent of karezes.
IRAN
AGRIC:
Crop Product
5 villages
Proposed
UNDP
--
Multiplication of 4 HT improved maize seed / 4 MT DAP & 4 MT Urea.
MAN
AGRIC:
Crop Product
3 villages
Proposed
UNDP
--
Multiplication of 4 HT improved rice seed / 4 MT DAP & 4 MT Urea.
ARR
WATER:
Canal
Chulan-Peiran
Proposed
UNDP
-- 93 -- --
'ACBAR
Canal cleaning í spring cleaning and construction of diversion walls.
DATABASE OF NGO ACTIVITIES
Page:
314
A6actrep Date: 29/08/93
6Th EDITION I
ACTIVITY
SECTOR
AGENCY
Paktia
-VILLAGES) - - --
-- STATUS --
FUNDED
DURATION
- --BY --
Begin- -End
-- 93 -- --
11 MT wheat seed.
<ACTIVITY
DESCRIPTION>
Ichost
ARS
AGRIC:
Crop Product
13 villages
Proposed
FAO
ARS
WATER:
Canal
6 villages
Proposed
WFP
-- 93 -- --
Cleaning of 15 canals(70.9 km), irrigate 11990 jeribs & benefit 909 families.
BRE
CONST:
Road
Bost
Proposed
UNDP
-- 93 -- --
Domanda -Ihost road.
BRR
WATER:
Structure
Boat
Proposed
UNDP
9 93 -- --
Rehabilitation of protection wall.
CARE
AGRIC:
Fruit Trees
Ihost /Alisher /Saba
Proposed
AID&WFP
0 93 -- --
Establishment of 7 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Ihost /Alisher /Saba
Proposed
AID &WFP
0 93 -- --
Plantation of 41,000 trees along the 20km irrigation canals.
CARE
AGRIC:
Other
Ihost /Alisher /Saba
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 2 Farms which cover 18 ha area including all related activities.
CARE
CONST:
Road
Ihost/Alisher!Saba
Proposed
AID &WFP
0 93 -- --
Reconstruction of 2 Roads with the total length 16km including other structures.
CARE
CONST:
Shelter
Ihost /Alisher /Saba
Proposed
AID&WFP
0 93 -- --
Construction of 34 Shelter / house with 68 rooms.
CARE
CONST:
Storage
Ihost /Alisher /Saba
Proposed
AID&WFP
0 93 -- --
Construction of i village level storehouse with capacity of 50 at.
CARE
WATER:
Iarez
Ihost /Alisher /Saba
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 6 Karezes with total length 14ka including other structures.
CARE
WATER:
Canal
Khost/Alisher/Saba
Proposed
AID &WFP
0 93 -- --
CARE
WATER:
FloodControl
Ihost /Alisher /Saba
Proposed
AID &WFP
0 93
CARE
WATER:
Other
Ihost /Alisher /Saba
Proposed
AID&WFP
0 93 -- --
DACAAR
CONST:
Pub.Building
!Akan
Proposed
DACAAR
-- 94 -- --
Primary school building
START
AGRIC:
Crop Product
4 villages
Proposed
FAO /UNDP
-- 93 -- 93
Improved rice & maize seeds multiplication.
Proposed
DACAAR
-- 94 -- --
High school building
Paktia
DACAAR
CONST:
Paktia
.
0 93
.Rehabilitation of 14 Irrigation canals with total length 29kÁ including other structures.
Construction of 39 Erosion barriers with stone masonry, compacted soil & Gabion work.
Construction of 2 Dam (reservoir) with capacity of 1530 cum.
Mandozi
Pub.Building
Sarband
Nader Shah
CARE
AGRIC:
Fruit Trees
Tani /Gurbuz /Nad.Io
Proposed
AID&WFP
0 93 -- --
Establishment of 13 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Tani /Gurbuz /Nad.Io
Proposed
AID&WFP
0 93 -- --
Plantation of 77,000 trees along the 38b irrigation canale.
CARE
AGRIC:
Other
Tani /Gurbuz /Nad.ko
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 2 Farms which cover 35 ha area including ali related activities.
AACBAR
DATABASE OF NGO ACTIVITIES
Page:
315
A6actrep Date: 29/08193
6TH EDITION
ACTIVITY
SECTOR
AGENCY
- - -- VILLAGE(S) - - --
FUNDED
-- STATUS --
- --BY --
DURATION
< ACTIVITY
begin- -find
DESCRIPTION>
Nader Shah
Paktia
CARI
COAST:
Road
Tani /Gurbuz/Nad.Io
Proposed
AID&WEP
0 93 -- --
Reconstruction of 6 Roads with the total length 291uí including other structures.
CARE
CONST:
Shelter
Tani /Gurbuz /$ad.Lo
Proposed
AID&WFP
0 93 -- 93
Construction of 64 Shelter / house with 128 rooms.
CARE
CONST:
Storage
Tani /Gurbuz /Nad.Io
Proposed
AID&WFP
0 93 -- --
Construction of 1 village level storehouse with capacity of 50 mt.
CARE
WATER:
Iarez
Tani /Gurbuz /Nad.Io
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 11 Earezes with total length 27km including other structures.
CARE
WATER:
Canal
Tani /Gurbuz /Nad.Lo
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 27 Irrigation canals with total length 55ka including other structures.
CARE
WATER:
FloodControl
Tani /Gurbuz /Nad.Io
Proposed
AID&WFP
0 93 -- --
Construction of 75 Erosion barriers with stone masonry, compacted soil & Gabion work.
CARE
WATER:
Other
Tani /Gurbuz!Nad,Io
Proposed
AID&WFP
0 93 -- --
Construction of 2 Dam (reservoir) with capacity of 2880 cum.
Paktia
"
Sayed Karam
DACAAR
COAST:
Pub.Building
--
Proposed
DACAAR
-- 94 -- --
School building
DACAAR
WATER:
Tarez
Several villages
Proposed
DACAAR
-- 93 -- 94
Coordination with SCA, NAC & NRC.
DACAAR,
WATER:
Canal
Several villages
Proposed
DACAAR
-- 93 -- 94
Plan to coordinate with SCA, NAC & ARC.
Malazai
Proposed
UNDP
-- 93 -- --
2 diversion dais.
Sperah
Proposed
DACAAR
-- 93 -- --
2 primary school buildings.
Tani
Proposed
DACAAR
-- 94 -- --
Primary school building
Paktia
ARO
VATER:
Paktia
DACAAR
CONST:
Paktia
DACAAR
CONST:
Paktia
Shamal
Structure
Sperah
Pub.Building
Tani
Pub.Building
Trayzai
IFS
COAST:
Shelter
Lakan
Proposed
UNCHS
DACAAR
CONST:
Pub.Building
Risher
Proposed
DACAAR
-- 93 -- --
Primary school building
SOLAF
WATER:
Structure
8 villages
Proposed
WFP
-- 93 -- --
7 intakes / 20a each I stone sand & ravel ; cement i wood steel & benefits2,000 persons.
A C B A R
--
200 Doors & 400 windows for distribution of returning refugees.
DATABASE OF NGO ACTIVITIES
A6actrep Date: 29/08/93
6TH áDITION
ACTIVITY
SECTOR
AGINCT
Paktia
- - -- VILLAGE(S) - - --
-- STATUS --
FUNDBD
DURATION
- --BY --
Begin- -End
-- -- -
<ACTIVITY
Zormat
ARRAN
AGRIC:
Crop Product
3 villages
Proposed
ONDP
NAC
AGRIO:
Other
Telmer
Proposed
NAC
8 93 11 93
NAC
COMM Pub.Building
Haaaazai
Proposed
MAC
-- 93 11 93
Construction of primary school (8 rooms).
NAC
CONST:
Pub.Building
Guldad Ihel
Proposed
NAC
-- 93 11 93
Construction of primary school (8 rooms).
NAC
CONST:
Pub.Buflding
loti Ihel
Proposed
NAC
-- 93 11 93
Reconstruction 4 repair of primary school.
NAC
CONST:
Pub.Building
loti Ihel
Proposed
NAC
-- 93 11 93
Construction of primary school (8 rooms).
NAC
HEALTH: Vaccination
District level
Proposed
UNICEF /S
NAC
RELIEF:Help Returnee
District level
Proposed
NAC
-- 93
9 93
Emergency assistance to returnees.
NAC
WATER: Tarez
14 villages
Proposed
MAC
8 53
4 94
Cieaing of karez.
Parwan
DISCRIPTION>
,
--
Multiplication of 3 hT improved maize seed /- 3 MT DAP á 3 MT Urea.
Vegetable proiotion project.
Haan vaccination program.
8 93 -- --
Ghorband
A-AID
AGRIC:
Crop Proddct
Cbardeh, 3
Proposed
ODA
9 93 10 93
Distribution of 10 MT ipak 81) wheat seed.
A -AIg
AGRIC:
Crop Product
Chardeh, 3
Proposed
ODA
8 93 11 93
Multiplication of 0.5 MT (pak 81) wheat seed.
A -AID
NEC: Plant Proteo
Chardeh, 3
Proposed
ODA
3 94
Crop protection / spraying grapes / 1,000 jeribs ï pest disease.
A -AID
CONST:
Hir- Iafshan
Proposed
ODA
9 93 10 93
Construction of 35 a foot bridge (cent / stone / beai).
A -AID
COMM Bridge
Mulleay
Proposed
ODA
9 93 10 93
Construction of 14 m foot bridge (cement / stone / been).
A -AID
WATER:
Structure
Saddat
Proposed
ODA
-- 94
t,;
Construction of diversion weir (gabion / cement / stone).
A -AID
WATER:
Structure
Anger loche
Proposed
ODA
-- 9á
ÿ3
Construction of 7 a aqueduct (steel i cement).
A -AID
WATER:
Structure
lak Shal
Proposed
ODA
10 93 11 93
Construction of 130 a intake wall(gabion / stone) i benefit 500 families / irrigated 80 jeribs.
A -AID
WATER:
Structure
Sheer
Proposed
ODA
-- 93 -- 93
Construction of 14 m aqueduct (steel I cement).
A -AID
WATER:
Structure
Gunbaf
Proposed
ODA
10 93 11 93
Construction of diversion weir (gabion / cement / stones) - b'ser t 250 families.
A -AID
WATER:
FloodControl
Saddat
Proposed
ODA
10 93 11 93
Construction of flood protection / protect 20 jeribs *bias /
Bridge
4 94
Page: 317
A6actrep Date: 29/08/93
atoael.
AGENCY
-VILLAGE(S) -- --
SECTOR
WATER:
FloodContrci
WATER:
Parwan
i
CBR
.
WATER:
Takhar
CQNST:
SCA
-BY --
DURATION
<ACTIVITY
Begin --End
Earez
Shull
Restoration of flooded irrigation eystem.
Proposed
RAP
-- -- -- --
khi Safi
Proposed
UNDP
-
Solang
Proposed
RAP
-- 93 -- 93
Restoration of flood affected irrigation system.
Proposed
SCA
-- 93 12 93
Construction of primary schools.
-- -
Reconstruction of 14
-
karezes.
Salang
FloodControi
Eel-ikameeh
Pub.Buildìng
4 vi:.agee
Talogan
Takhar
CBR
CONST:
Road
Taihar- Badakhsnan
Surveyed
CCSC
-- 93 -- 92
Survey & design of the road from Tahitian to Eeshem.
SCA
CONST!
Pub.Buiiding
4 visages
Proposed
SCA
-- 93 12 93
Construction of primary schools.
Gordan tlasjld
Proposed
WFP
-- -- --
Proposed
ASDAA
-- 93 -- --.
Propogation of honey bee.
Chak
Wardak
CONST:
AB
DESCRIPTION>
Kobe Safi
Parwan
AB
FUNDED
Jabul Saraj
Parwan
CBR
ACTIVITY
-- STATUS -
Wardak
Road
Construction of 30 km secondary road.
.aghatu
Livestock
ACRD
AGRIC:
ACRD
HEALTH: Other
Proposed
ASDAA
-- 33 -- --
Health preventive & sanitary program.
ACRE
INC ME: Handicrafts
Proposed
ASDAA
-- 93 -- --
Promotion & devlopment of rural handicrafts.
ACRD
WATER:
Drinking
Proposed
ASDAA
-- 93 -- --
Improvement of drinking water resources.
UFO
WATER:
Karez
Proposed
UNDP
Wardak
16 villages
Cleaning of 16 karezes.
Jalrez
CARE
AGRIC:
Fruit Trees
Jairez
Proposed
AID &WFP
0 93 -- --
Establishment of 9 Nurseries including all related activities.
CARE
AGRIC:
Forestry
'Aire.:
Proposed
AID&WFP
0 93 -- --
Plantation of 38,000 trees along the 19km irrigation canals.
CARE
AGRIC:
Other
Jairez
Proposed
AID &WFP
0 93 -- --
Rehabilitation of one Farm which cover 26 ha area including all related activities.
A C B A R
DATABASE OF NGO ACTIVITIES
Page:.
318
R6actrep Date: 29/08/93
6TH EDITION
ACTIVITY
SECTOR
AGENCY
VILLAGES) - - --
FUNDED
-- STATUS --
- --BI-
DURATION
cACTIVITY
Begin- -End
DESCRIPTION>
Jalrez
Wardak
CARE
CONST:
Road
Jairez
Proposed
AID&WFP
0 93 -- --
Reconstruction of 3 Roads with the total length 21km including other structures.
CARE
CONST:
Shelter
Jairez
. Proposed
AID&WFP
O 93 -- --
Construction of 30 Shelter / bouse with 60 rooms.
CARE
CONST:
Storage
Jairez
Proposed
AID&WFP
0 93 -- --
Construction of 2 village level storehouses with capacity of 100 it.
CARE
WATER:
Tarez
Jalrez
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 16 Iarezes with total length 25íu including other structures.
CARE
WATER:
Canal
Jalrez
Proposed
AID&WFP
0 33 -- --
Rehabilitation of 13 Irrigation canals with total length 28kí including other structures.
CARE
WATER:
FloodControl
Jairez
Proposed
AID&WFP
0 93 -- --
Construction of 36 Erosion barriers with stone masonry, compacted soil & Gabion work.
CARE
WATER:
Drinking
Jalrez
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 3 Springs with total length 3km including other activities.
OHAID
CONST:
Pub.Building
Sangiakh /gala Shah,
Proposed
ISRA
-- 93 -- --
Construction of a mosque.
SOLA!
CONST:
Road
10 villages
Surveyed
WFP
-- 93 -- --
11 km / Jalrez to Darsaai with 35 small & 3 big culverts.
SOLAF
WATER:
Structure
10 villages
Surveyed
WFP
-- 93 -- --
2 intakes i 201 each / stone / sand & gravel / cement / wood & steel
Proposed
EC
-- 93 -
l female doctor/ 2 female
-- 93 -- --
Markaz Bee.
Wardak
GAF
'benefit 5,000 persons.
HEALTH: Med.Training
--
-
nurses / 1 female vaccinator I OPD & TEA training for 30 female trainees.
Maydan Shar
Wardak
P5
WATER:
Structure
Wardak
Proposed
UNDP
CARE
AGRIC:
Fruit Trees
Hayden Shar /I. Ash
Proposed
AID &WFP
0 93 -- --
Establishment of 16 Nurseries including all related activities.
CARE
AGRIC:
Forestry
Hayden Shar /I. Ash
Proposed
AID&WFP
0 93 -- --
Plantation of 69,000 trees along the 35k1 irrigation canais.
CARE
AGRIC:
Other
Hayden Shar /I. Ash
Proposed
AID&WFP
O 93 -
--
Rehabilitation of one Fara which cover 47 ha area including all related activities.
CARE
CONST:
Road
Hayden Shar /I. Ash
Proposed
AID&WFP
0 93 -
-
Reconstruction of 4 Roads with the total length 39ka including other structures.
CARE
CONST:
Shelter
Hayden Shar /I. Ash
Proposed
AID&WFP
0 93 -- --
Construction of 54 Shelter Í house with 108 rooaa.
CARE
CONST:
Storage
Hayden Shar /á. Ash
Proposed
AID &WFP
0 93 -- --
Construction of 3 village level storehouses with capacity of 150 mt.
CARE
WATER:
Iarez
Haydan Shar /I. Ash
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 30 Karnes with total length 47km including other structures.
CARE
WATER:
Canal
Maydan Shar /I. Ash
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 25 Irrigation canals with total length 52km including other structures.
ACBAR
Tangi Saydan Retaining wall.
DATABASE OF
Page:
319
NGO
ACTIVITIES
A6actrep Date: 29/08/93
6TH EDITION
AGENCY
SECTOR
-VILLAGE(S) - - --
ACTIVITY
FUNDED
DURATION
-- STATUS --
--BY --
Begin- -End
:ACTIVITY
DESCRIPTION>
CARE
WATER:
FloodControl
Maydan Sharll. Ash
Proposed
AID &WFP
0 93 -- --
Construction of 67 Erosion barriers with stone masonry, compacted soil & Gabion work.
CARE
WATER:
Drinking
Maydan Shar /I. Ash
Proposed
AID &WFP
0 93 -- --
Rehabilitation of 4 Springs with total length 4km including other activities.
Nerkh
Wardak
CARR
AGRIC:
Fruit Trees
Nerkh
Proposed
AID&WFP
0 93 -- --
Establishment of 10 Nurseries including all related activities.
ME"'
AGRIC:
Forestry
Nerkh
Proposed
AID &WFP
0 93 -- --
Plantation of 45,000 trees along the 22km irrigation canale.
CARE
AGRIC:
Other
Nerkh
Proposed
AID &WFP
0 93 -- --
Rehabilitation of one Farm which cover 30 ha area including all related activities.
CARE
CONST:
Road
Nerkh
Proposed
AID &WFP
0 93 -- --
Reconstruction of 3 Roads with the total length 25án including other structures.
CARE
CONST:
Shelter
Nerkh
Proposed
AID &WFP
0 93 -- --
Construction of 35 Shelter / house with TO rooms.
CARE
CONST:
Storage
Nerkh
Proposed
AID &WFP
0 93 -
Construction of 2 village level storehouses with capacity of 100 mt.
CARE
WATER:
Iarez
Nerkh
Proposed-
AID &WFP
0 93 -- --
Rehabilitation of 19 Karezes with total length 31km including other structures.
CARE
WATER:
Canal
Nerkh
Proposed
AID &WFP
0 93 -- --
Rehabilitation of 16 .Irrigation canals with total length 34km including other structures.
CARE
WATER:
FloodControl
Nerkh
Proposed
AID &WFP
0 93 -- --
Construction of 42 Erosion barriers with- stone masonry, compacted soil & Gabion work.
CARE
WATER
Drinking
Nerkh
Proposed
AID&WFP
0 93 -- --
Rehabilitation of 3 Springs with total length 3km including other activities.
'
--
s
Sed
Wardak
Abad
AMRAN
AGRIC:
Crop Product
4 villages
Proposed
UNDP
Multiplication of 4 MT improved rice seed / 3 MT DAP & 3 MT Urea.
MAN
AGRIC:
Crop Product
5 villages
Proposed
UNDP
Multiplication of 3 MT improved maize seed / 3 MT DAP & 3 MT Urea.
P.RR
WATER:
Karez
Haft Asia -Salar
Proposed
UNDP
-- 93 -- 93
CoAR
AGRIC:
Livestock
Sayed Abad
Proposed
RAP /FAO
-- 93
--
CoAR
EDUCAT: Primary
Proposed
SV
-- 93
--
CoAR
EDUCAT: Secondary
Proposed
SV
-- 93 -- --
CoAR
HEALTH: Compr.Clinic
Proposed
RAP /FAO
-- 93 -- --
CoAR
HEALTH: MCH
Proposed
SV
-- 93
IACBAR
Sayed Abad
Rehabilitation of 8 ¡areas.
--
,District level clinic.
-- --
DATABASE OF NGO ACTIVITIES
6TH EDITION
q
Page:
320
A6actrep Date: 29/08,93
6190,'67, .a:s;T 1»i:3A9i
.6£
:aaed
y
SSIIIAIIOV 05N d0
NOIZIQS HZ9
;tBSwaág
98uTpTtnq I21Tdaog V IOOQOS IO BOTIVn11911O0
pa9odoad
1a1ua0
euTPITuH''tud
:ZSK00
TngEZ
TngEZ
esp Jo uotlonllsao4
-- -- E6 --
dQKtl
pasodold
MRS oozing
alnlOnalS
Tnr,eZ
du
pasodold
aaesttTA 0I
zalVg
:ROM
--
d/A
pasodoad
aaBViitA 9
IVnsO
:111VA
TRY
--
pOàaAlnS
sa82TITA 16
70121
dQK(1
:UNA
MTV
paitaAlnS
aaBatlTA ZOc
laltaHS
:IS/MO
MTV
aaTITQS; ;EZ lTiaaag V puVi aqTlar 6ItZ aalsFT11T ! zalsl sV ELZ 10 8utusal4
azalel içoz Moog V agTlae ççOLi 0122T11T ! R 09I POINT sazazal z)i ;o uotlslTlTgegaa
imam !VOGT aen - INOW 000'L) Io BoT1ar.1:9ao3
sOH
IngeZ
4eTet9
9azalsl or IO eaTasaT4
-- -- E6
--
aOH
podo
aszTp
pasodold
-- -- E6
TnggZ
P80S
saBsitTA 09
ue3oqO IeQ
alVVZVg S2r212z2H UT lalTo9 M(111(1.2409 çI Jo BoTlanalau04
-- -- B6 --
OIKNddA
pasodoad
aonTl2d
LZIdIZOV`
^u!--uTSag
IZVat10
--Lg--QSQlifld
--Sf1bVWS--
LZIdI10V
----'.S!99V77IA----
:ZSNOO
11H
T
uoTlVltusS
VOO
lIep.zeM
luep,zely
<NOISdIHOSfl4
MAS
mu! :aHIVA
uezTW
paltadal ¡ 9itng psol ox 91
OVdAS
:agZVA
Bop ueuc..3
s1aa1VI OçZ IT;auag V sqTlar 00ç2 salvBTllT / Tauaa ,l 9i ;o uol1VITITQ2gaa
H!.%
sOLOHS
LOK99V
.

Similar documents

41kii_:BAR ,Tif.itBASE OF NGO ACTiVITIIK S

41kii_:BAR ,Tif.itBASE OF NGO ACTiVITIIK S Deh Bala Dorbaba Goshta Hesarak Jalalabad Kama Khogiani Kouz Konar Lalpur Mohmand Dara Naziyan Pachier/Agam Rodat Sherzad Shinwar Surkh Rod Unspecified

More information